xxxGIDHxxx
xxxGIDExxx
असाधारण
EXTRAORDINARY
प्राधिकार से प्रकाशित
PUBLISHED BY AUTHORITY
Part II - Section 3
केन्द्र-शासित प्रदेश लद्दाख प्रशािन
ADMINISTRATION OF UNION TERRITORY OF LADAKH
HOUSING & URBAN DEVELOPMENT DEPARTMENT
NOTIFICATION
Ladakh , 04 of November 2024
S.O.123- In exercise of powers conferred by Section 218 of The Jammu And Kashmir
Municipal Act , 2000 , the Administration of Union Territory of Ladakh hereby notifies the
Unified Ladakh Building Bye Laws , 2024 applicable within the Municipal limits of Leh and
Kargil, Union territory of Ladakh.
Enclosures : as above.
Sanjeev Khirwar – IAS
Principal Secretary
Housing & Urban Development Department,
UT Ladakh.
लद्दाख, 12 नवंबर, 2024
LADAKH, TUESDAY, NOVEMBER, 12, 2024
भारत सरकार
GOVERNMENT OF INDIA
एस.जी.-एल.डी.-अ.-19112024-1416
SG-LD-E-19112024-1416
Copy to the:
1. Joint Secretary (JKL), Ministry of Home Affairs, New Delhi.
2. All Administrative Secretaries UT Administration Ladakh.
3. Member Secretary, Ladakh Pollution Control Committee for information &
necessary action.
4. Deputy Commissioner/CEO, LAHDC, Leh/Kargil for information & necessary
action.
5. All HoDs of UT Administration Ladakh.
6. Technical Director, NIC, Ladakh with the request to upload the notification on the
official website of the UT Administration Ladakh and District Websites of Leh and
Kargil districts.
7. Executive Officer MC Leh/Kargil for information & necessary action.
8. OSD to the Hon’ble Lieutenant Governor, Ladakh for kind information of the
Hon’ble LG.
9. Private Secretary to the Hon’ble Chairman/CEC, LAHDC, Leh/Kargil for kind
information of the Hon’ble CECs.
10. Private Secretary to Advisor to Hon’ble LG, Ladakh for kind information of the
Advisor.
Sd/-
Sumera Shafi– JKAS
Under Secretary
Housing & Urban Development Department,
UT Ladakh.
Chapter -1: Title and Extent
1.
Short title and extent.
1.1
These Bye-Laws shall be called the Unified Ladakh Building Bye Laws, 2024.
1.2
These shall be applicable within the municipal limits of Leh and Kargil, Union
Territory of Ladakh with effect from the date, it is notified in the official gazette.
Chapter -2: Jurisdiction/Applicability
2.
Jurisdiction/Applicability
2.1
Jurisdiction of Building Bye-Laws:
The Building Bye-Laws shall apply to the building activity in the Municipal Areas, for
which they are framed and the same shall be unambiguously specified in the
Building Bye-Laws.
Applicability of Building Bye-Laws: The building bye-Laws shall be applicable to all
building activities and shall be read in conjunction with the master plan/development
plan/zonal development plan/ development control regulations, and/or any other
statutory plan(s) in force, if any, and notifications, if any, with regard to the same
and as amended from time to time and shall be applicable for a period of FIVE
years after which they shall be reviewed. Till such time the reviewed building Bye-
Laws are notified, these building Bye-Laws will continue to be in force.
2.2
Development and part-construction:
Except hereinafter or otherwise provided, these Bye-Laws shall apply to all
development, redevelopment, erection and/or re-erection of a building etc. as well as
to the design, construction of, or reconstruction, additions, enhancement, and
alterations to a building.
2.3
In case of part construction:
Where the whole or part of a building is demolished or altered or reconstructed,
except where otherwise specifically stipulated, these Building Bye-Laws shall apply
only to the extent of the work involved.
2.4
Change of use/occupancy:
Where use of a building is changed, except where otherwise specifically stipulated,
these Building Bye-Laws shall apply to all parts of the building affected by the
change.
2.5
Reconstruction:
The reconstruction in whole or part of a building which has ceased to operate due
to fire, natural collapse, disaster-based collapse including natural and man-made
disasters or demolition having been declared unsafe, or which is likely to be
demolished by or under an order of the Authority as the case may be and for which
the necessary certificate has been given by the Authority.
2.6
Existing approved building:
Nothing in these Bye-Laws shall require the removal, alteration, or abandonment, nor
prevent continuance of the lawfully established use or occupancy of an existing
approved building unless, in the opinion of the Authority such a building is unsafe or
constitutes a hazard to the safety of adjacent property or to the occupants of the
building itself.
2.7
Power of relaxation:
The Administration may relax any restriction(s) or condition(s) or norm(s) stated in
these Bye-Laws or may issue direction(s) to review and revise the Bye-Laws in
public interest.
Chapter -3: Definitions
3.
Definitions: -
In these Bye-Laws, unless the context requires otherwise, shall define the terms as
mentioned below, or as per the National Building Codes, 2016 and shall have the
meaning as follows:
3.1
“abut” in relation to a building means when it is on a street and the outer face of
any of its external walls is on the street boundary,
3.2
“Act” means the Jammu and Kashmir Development Act, 1970 and further
amendments, Jammu and Kashmir Town and Country Planning Act, 1963, Jammu
and Kashmir Municipal Act, 2000 as mandated by the administration, as well as any
other relevant acts as may be decided upon by the UT Administration,
3.3
“administration means”, the Administration of Union Territory of Ladakh,
3.4
“advertising sign” means any sign, either free, standing or attached to a building or
other structure which advertises a business or commercial establishment,
3.5
“alley” means a public thoroughfare, which affords only a secondary means of
access to abutting property and not intended for general traffic circulation,
3.6
"amenity" includes roads, water supply, street lighting, drainage which includes
public health - sewerage, treatment, and disposal of sewage, sullage and storm
water, public works, tourist spots, open spaces, parks, landscaping and Play fields,
and such other conveniences as the UT Administration may, by notification, specify
to be an amenity for the purposes of these Bye-Laws,
3.7
“ancillary building” means the building ancillary to and serving the main building
including meter-room, pump room, security room, sewage treatment plant, stores,
guardroom, cycle-shed, dispensary, canteen, electric substation and quarters for
watch and ward staff in the industrial/commercial/institutional plot but shall not
include residential accommodation for the supervisory staff,
3.8
“apartment” means a part of a property, intended for any type of independent use,
including building having one or more rooms with enclosed spaces located on one
or more floors or any part or parts thereof, to be used for residence, office or for
practicing any profession or for carrying on any occupation, trade, business or
manufacturing or other uses relating to information technology or for such other
types of independent uses, as may be prescribed, with a direct exit to a public
street, road or highway or to a common area leading to such street, road or
highway and includes any garage or room (whether or not adjacent to the building in
which such apartment is located) provided by the owner of such property for use
by the owner of such apartment for parking a vehicle or for the residence of any
person employed in such apartment, as the case may be,
3.9
“applicant” means a person(s) including legal heirs who is owner(s) of the site and
who applies to the competent authority, of his/her intention to erect or re-erect a
building under these Bye-Laws,
3.10
“approved” means approved by the competent authority,
3.11
“architect” means a person registered with and has valid membership of the Council
of Architecture, India as prescribed under the Architect Act, 1972,
3.12
“architectural control sheets” means the control sheets showing measures of
architectural control or the drawings containing necessary directions to be adhered
and signed by the Competent Authority which are available in the office of such
authority and also on the website of the concerned authority,
3.13
“area” means area under the jurisdiction of the competent authority,
3.14
“atrium” means a high open area or central court within a multistoried building,
covered with transparent material at the terrace level,
3.15
“authority”, means an authority constituted under Jammu and Kashmir Development
Act, 1970, or the Jammu and Kashmir Municipal Act, Jammu and Kashmir
Panchayati Raj Act, 1989, Jammu and Kashmir Panchayati Raj Rules, 1996 and/or
any other acts as amended from time to time or under any other law for purpose
of these Bye-Laws,
3.16
“authorized officer” means an officer authorized by the competent authority,
3.17
“balcony” means a horizontal cantilevered projection, or otherwise, not more than 1.8
meters from the face of a wall, including the parapet or railing to serve as a
passage or sit out space, open to air at least on one side,
3.18
"barsati" means a habitable space on the roof of the building with/without toilet
facilities,
3.19
“basement or cellar” means the storey of a building, which is below the ground
storey of a building and is in any part more than half of its height below the mean
level of the street or adjoining ground, with one or more than one levels and where
the front street is sloping, the average of the front length of the building shall be
taken into account,
3.20
“bazaar” means a place or area reserved or licensed by the authority for the
erection of shops or stalls or both,
3.21
"bio-technology industry" means the industrial unit primarily engaged in micro-
organisms research and development of related software applications only,
3.22
"building" means any structure constructed for whatsoever purpose and of
whatsoever material and every part thereof whether used as human habitation or not
and includes foundation, plinth, walls, floors, roofs, chimneys, plumbing and other
services, fixed platforms, verandah, balcony, cornice or projection part of a building or
anything affixed thereto or any wall enclosing or intended to enclose any land or
space, signs and outdoor display structures, tanks constructed or fixed for storage of
chemicals or chemicals in liquid form and for storage of water, effluent, swimming
pool, ponds etc., however, the shelters of whatever material used for tourists’ stay
shall be allowed only at the designated sites by the competent authority,
3.23
“Building Envelope” - The horizontal spatial limits up to which a building may be
permitted to be constructed on a plot,
3.24
“building line” means a fixed line, if any, specified for a site beyond which no
building shall project within that site other than a balcony and a canopy and
compound wall as permissible under the Bye-Laws,
3.25
“built area” means area covered immediately above the plinth level and the external
area up to upper floor,
3.26
"carpet area" means the net usable area of an apartment, excluding the area
covered by the external walls, areas under service shafts, balcony or verandah and
open terrace,
3.27
“canopy”- means a cantilevered projection from the face of a wall over an entrance
to the building at the lintel or slab level provided that it,
(a) shall not project beyond the plot line (boundary) and,
(b) shall not be lower than 2.3 meters at all points when measured from the ground
and shall remain uncovered from above,
3.28
“ceiling height” means the vertical distance between the floor and the ceiling, where
a finished ceiling is not provided, the underside of the joists or top of post plate in
case of pitched roof shall determine the upper point of measurement,
3.29
“chajja” means the sloping or horizontal structural projection usually provided over
openings on external walls to provide protection from sun and rain.
3.30
“chimney” means the ventilation shaft/absorber provided in a building for intake and
disposal of smoke,
3.31
“clear height” means height measured from the surface of ground or from any floor
to the soffit of beam or ceiling, as the case may be
3.32
“colony” means an area of land divided or proposed to be divided into plots or flats
for residential, commercial, industrial, cyber city/park, purposes or for the construction
of flats in the form of group housing or integrated commercial complexes to be
developed/constructed as notified and prescribed in these Bye-Laws by the
competent authority from time to time.
3.33
“Competent authority” means an officer or agency duly authorized to undertake
preparation of plans, approval of building plans and drawings, grant of occupation
certificate, and any other powers as deemed necessary by the administration,
3.34
"competent professional” means any professional who is capable of making the
drawings and submitting to the competent authority, as mentioned in the Annexures,
including but not limited to form BC-V and subsequent forms in these byelaws,
3.35
“Conservation” means all the processes of looking after a place so as to retain its
historical and/or architectural and/or aesthetic and/or cultural significance and
includes maintenance, preservation, restoration, reconstruction and adoption or a
combination of more than one of these.
3.36
“Core area” means thickly built area of the old town, or a village included in the
urban local body or area as shown in the Master Plan or as notified by the
competent authority,
3.37
“courtyard” means an area open to the sky within the boundary of a plot, which is
enclosed or partially enclosed by buildings, boundary walls or railing and provides
light and ventilation to one or more habitable rooms. It may be at ground floor
level or any other level within or adjacent to a building,
3.38
“Covered area” means the area covered immediately above the plinth of a building
but does not include the space covered by:
(a) soak pit, rainwater harvesting tank, sewage/effluent treatment plant, uncovered
swimming pool,
(b) cantilevered porch without any coverage and areas covered by canopy and
portico, open staircases for fire escape,
(c) area under solar panel, service floor, service shaft, and atrium, and
(d) basement and stilt floor if used for parking,
3.39
“Cyber city” means self-contained intelligent city with high quality of infrastructure,
attractive surrounding and high-speed communication access to be developed for
nucleating the Information Technology concept germination of medium and large
software companies and Information Technology enabled services, wherein no
manufacturing units shall be permitted,
3.40
“Cyber Park” means an area developed exclusively for locating software
development activities and Information Technology Enabled Services, wherein no
manufacturing of any kind, including assembling activities, shall be permitted,
3.41
“Damp proof course (DPC)” means a course laid to prevent seepage/penetration of
dampness or moisture from plinth to any part of the structure above it,
3.42
“developer” means individual owner, or a company, or an association, or firm or a
limited liability partnership and includes any other entity designated through a
collaboration/development agreement with the owner for making an application for
grant of permission and for completion of formalities required on behalf of such
owner to develop a colony,
3.43
"Development" with its grammatical variations means the carrying out of building,
engineering, mining, or other operations in, on, over or under land or the making of
any material change, in any building or land and includes re-development:
1. Development Permission:
No person shall carry out any development or redevelopment including sub-
division on any plot or land (not forming part of any approved layout plan or
scheme) or cause to be done without obtaining approval from the Authority for
the layout plan.
2. Building Permit:
No person shall erect, re-erect or make addition/ alterations in any building or
cause the same to be done without, first obtaining a separate building permit
for any such building from the Authority.
3. Pre-Code Building Permit:
Where any building permit which has been issued by the Authority before the
commencement of the Building Bye-Laws and where construction is in
progress and has not been completed within the specified period from the
date of such permit, the said permission shall be deemed to be sanctioned
under these Bye-Laws and shall only be eligible for revalidation thereunder.
Accordingly, where the validity of sanction has expired and construction has
not commenced, construction shall be governed by the provisions of these
Building Bye-Laws.
3.44
“dhoonga” means a floating dwelling on water used for residential/kitchen purposes,
3.45
“drain” means a conduit or channel for the carriage of storm water, sewage,
wastewater, or other waterborne wastes in a building,
3.46
“Drainage system” means a system or a network of pipes, with their fittings and
accessories, such as manholes, inspection chambers, traps, gullies, floor traps used
for drainage of building or yards appurtenant to the building and includes an open
channel for conveying surface water or a system for the removal of any wastewater.
3.47
“Dwelling unit” means a building or a part thereof which is used or is intended to
be used by a person(s) or family for habitation comprising of kitchen, toilet and
room,
3.48
“Electronic signature” or “e-signature” means “digital signature” defined in the
Information Technology Act, 2008,
3.49
“Empaneled Architect”- A person empaneled by the Authority as per rules under
the building Bye-Laws as an authorized person to sanction building plans of
residential buildings up to 15 m. in height and for plot sizes up to 500 sqm,
forming part of any approved lay-out plan.
3.50
“engineer” means a person graduate in civil engineering from a recognized Indian
or Foreign University or an associate member of the Institution of Engineers (India),
3.51
“Erection or re-erection of building” means and includes any material addition,
alteration or enlargement of any building including sub-division of the existing
covered area,
3.52
“exit” means a passage, or means of egress from a building to a street or to the
open space,
3.53
“External wall” means an outer wall or vertical enclosure of a building not being a
party wall, even though adjoining to a wall of another building and also includes a
wall abutting on an interior open space of any building but shall not include an
outer verandah wall;
3.54
“factory” shall have the same meaning as defined in the Factories Act, 1948 (Act
LXIII of 1948);
3.55
“filling station” means an area of land including any structure thereon that is or
used or designed to be used for the supply of gasoline or oil or fuel,
3.56
“flat’’ means an apartment intended to be used for residential purposes,
3.57
“floor” means the lower surface in a storey on which one normally walks in a
building but does not include a mezzanine floor. The floor at ground level with
direct access to a street or open space is the ground floor; the floors above it shall
be termed as floor-1 and the next higher floor being termed as floor-2, and so on
upwards.
3.58
“Floor area ratio (FAR)” mean a quotient derived by dividing, the sum total of
covered area of all floors and multiplied by hundred, with the area of plot cited as
under.
For calculating FAR, cantilevered/permitted roof projections, lift room, mumty,
balcony, basement or any floor if used for parking, services and storage, stilt area
(unenclosed) for parking, fire escape staircase, without mumty, atrium, water tank,
open courtyard of permitted size shall not be counted towards FAR:
i.
Provided that the area under shaft, chutes, lift well and staircase from stilt to
next floor shall be counted towards FAR only once at ground floor:
Equation 1 Calculation of Floor Area Ratio
ii. Provided further that in case the ventilation shaft area is more than 3 square
meters, it shall not be counted in FAR,
3.59
“form” means a form appended to these Bye-Laws,
3.60
“Footwear industry” means the industrial unit primarily engaged in the design,
cutting, assembly and manufacturing of footwear from finished leather, fabric, rubber
and their variants and includes other similar products such as belts, purses, bags,
suitcases, brief cases etc. but shall not include the processing and tanning of
leather and its variants,
3.61
“foundation” means a part of a structure which is below the lower most floor
supporting the superstructure, and transmits load of the superstructure to the
bearing surface,
3.62
“Framed building” means a building, the external walls of which are constructed of
a frame either of timber, iron, reinforced cement concrete or steel and such framing
consisting of posts or columns and beams, filled in, wholly or partially covered with
bricks, stones, iron plates or other materials and the stability of which depends
upon such framing,
3.63
“front” as applied to a building means the portion facing the street from which it has
access,
3.64
“garage” means a building or portion thereof used or intended to be used for
shelter, storage or parking of vehicles,
3.65
“Ground coverage” means built area at the ground level, for the purpose of
calculating ground coverage, the area under shaft, chute, lift-well and staircase shall
be counted towards ground coverage: however, ventilation shaft area more than 3
square meters, fire staircase, atrium, and open courtyard of permitted size, shall not
be counted in ground coverage,
3.66
“Group housing” means a building designed and developed in the form of flats for
residential purpose or any building ancillary to group housing,
3.67
“Habitable room” means a room occupied or designed for occupancy by one or
more persons for study, living, sleeping, eating, but not including bathrooms, water-
closet compartments, laundries, serving and store pantries, corridors, cellars, attics,
and spaces that are not used frequently or during extended periods.
3.68
“height” as applied to a building means vertical measurement of the building
measured from the finished mean level of the street where such street exists or
from the mean level of the ground adjoining the outside of the external walls to half
the height of the roof in the case of sloping roofs and to the highest level of the
building in case of building with flat roof, excluding the projected portions of mumty,
flue, ducts building maintenance unit, machine room, minaret, water tank and
parapet not exceeding 1.2 meters in height. Architectural features serving no
purpose other than that of decoration shall be excluded for the purpose of taking
heights. Height as applied to a room shall mean the vertical measurement from the
top surface of the floor to the lowest surface of the ceiling of the same room, joist
and beams being allowed to project beneath the ceiling, and in the case of a
sloping ceiling, the height shall be the mean height of any such room,
3.69
“heritage building” means and includes any building of one or more premises or
any part thereof and/or structure and/or artifact which requires conservation and/or
preservation for historical and/or architectural and/or artisanry and/or aesthetic
and/or cultural and/or environmental and/or ecological purpose and includes such
portion of land adjoining such building or part thereof as may be required for
fencing or covering or in any manner preserving the historical and/or Architectural
and/or aesthetic and/or cultural value of such building as decided by UT Level
Heritage Commission/Committee
3.70
“Heritage precinct” means and includes any space that requires conservation and/or
preservation for historical and/or architectural and/or aesthetic and/or cultural and/or
environmental and/or ecological purpose. Walls or other boundaries of a particular
area or place or building or may enclose such space by an imaginary line drawn
around it.
3.71
“Heritage zone” means the area around such heritage building/ Buildings as defined
in the Jammu and Kashmir Heritage Conservation Authority Act 2010, not inclusive
of Archaeological Sites and Remains Act (AMASR), 1958 and further amendments,
3.72
“House boats” means wooden structure floating on water which includes dhoongas
for the residential purpose or a facility of board and lodge for tourists with inbuilt
mechanism for Solid waste disposal and disposal of liquid waste without polluting
water body registered with the concerned government agency/department.
3.73
“Integrated commercial complex” means building containing apartments sharing
common services and facilities and having their undivided share in the land and
meant to be used for office or for practicing any profession or for carrying on any
occupation, trade, business or such other type of independent use as may be
prescribed,
3.74
“Layout plan” means a plan of a colony, both plotted and flatted, showing location of
plots/ building blocks, roads, open spaces, entry/ exit, parking, landscaping etc., and
indicating proportionate share of each land use and approved by the competent
authority,
3.75
“Ledge or taakh” means a shelf-like projection, supported in any manner
whatsoever, except by vertical supports within a room itself but not projecting wider
than half meter,
3.76
“load” includes:
(a)
‘Dead load’ i.e., weight of all permanent stationary construction becoming a part of
the structure, and
(b)
‘Live load’ i.e., all load except dead load that may be imposed on a structure
including wind and snow loads shall be considered as live upon it,
3.77
"loft" means an intermediary floor between two floors on a residual space in a
pitched roof above a residual normal floor level within a maximum height of 1.5
meters and which is constructed or adopted for storage purposes,
3.78
“Material changes of use” means a change from one class of building to another,
3.79
“Mean level of street” means the average level of all points on the surface of the
street from which the site derives its access measured at the center line of street,
3.80
“Mezzanine floor” means an intermediate floor, between two floors, with area of
mezzanine restricted to 1/3 (one-third) of the area of the lower floor and with a
minimum clear height of 2.3 meters and shall not be lower than 2.3 meters (clear
height) above floor level,
3.81
“mumty” means a small structure erected on the roof of a building to protect such
staircase from weather with a maximum height of 3 meters, and a minimum height
of 2.75 meters (exempted from maximum height criteria),
3.82
“Multistoried or high-rise buildings” means a building whose height is 15 meters or
more measured from the average level of the central line of the street on which
the site abuts or more than four floors excluding basement or stilt,
3.83
“Natural hazard prone areas” means areas of moderate to high intensity of
earthquake or cyclonic/snowstorm or significant flood flow or inundation or
landslides/mud flows or one or more of these hazards, and declared so by the
competent authority,
3.84
“non-conforming use” means the use of a building/structure, or and of land not
conforming to the land use zone of a Master Plan or Zonal Development Plan but
existed prior to the notification of these plans
3.85
“Municipal area” “means the area in respect of which the Municipal Committee has
executive and legislative authority.
3.86
"non-nuisance professional consultancy services" include doctors, lawyers, tax
consultants, architects, town planners, contractor consultants, chartered accountants,
company secretaries, property consultants, ayurvedic and homeopathic practitioner,
psychiatrist, clinical psychologist, and tourist guides and as notified by the
competent authority from time to time.
3.87
“occupancy” means the main purpose for which a building or a part of building is
used or intended to be used,
3.88
“Open space” means a space forming an integral part of the plot left open to sky,
3.89
“parapet” means a low wall built along the edge of a roof or a floor not more than
1.2 meters in height for buildings up to 15 meters and 1.5 meters for buildings
above 15 meters in height,
3.90
“parking” means a space enclosed or unenclosed, to park vehicles together with
driveways connecting the parking space with a street permitting ingress and egress
of the vehicles,
3.91
“Partition wall” means a wall which bears no load other than its own weight,
3.92
“Party wall” means a common wall partly constructed on the plot of land, and partly
on the adjoining plot and serving both structurally or otherwise,
3.93
“plinth” means the portion or structure between the surface of the surrounding
ground and surface of the floor immediately above the ground,
3.94
“Plinth area” means the built-up covered area measured at ground level,
3.95
“plot” means piece of land or site enclosed by definite boundaries,
3.96
“porch” means a covered surface supported on pillars or otherwise for the purpose
of pedestrian or vehicular approach to a building,
3.97
“Preservation” means and includes maintaining the fabric of a place in its existing
state and retarding deterioration
3.98
“Prohibited area” means any area specified or declared to be a prohibited area
under section 20A of the AMASR Act, 2010,
3.99
“proof consultant” means a person who is an engineer/civil/structural engineer or a
group/firm of engineers/structural engineers having post-graduate qualification in
civil/structural engineering with ten years’ experience in structural design and
evaluation thereof, for multistoried and specialized structure, and/ or an institute of
the following type, employed for evaluation/checking of the structural design of the
buildings referred to in the relevant Form BC-V(A2) for all buildings above 15
meters height (including stilt) (Please see Annexure “A”):-
(a)
Institute of Structural Engineers (India),
(b)
Central Building Research Institute, Roorkee,
(c)
Various engineering institutes,
(d)
to name a few, like
i. Indian Institute of Technology,
ii. Engineering College,
iii. National Institute of Technology,
iv. Or any other institute of repute notified by the Administration,
3.100
“Protected monuments” means an ancient monument which is declared to be of
national importance by or under the AMASR Act, 2010.
3.101
“Public sewer” means a sewer line owned and maintained by competent authority
for carriage of the sewage,
3.102
“Public street” means any street levelled, paved, metaled, channeled, sewered,
repaired or maintained out of municipal or other public funds, and includes a
private street which are maintained by municipal body or any other public agency
under an agreement with the owner shall be the public street,
3.103
“Rainwater pipe” means a pipe or drain used or constructed to be used solely for
carrying off rainwater directly from roof surfaces,
3.104
“rear” as applied to a building means that portion which is on the opposite side of
the ‘front’,
3.105
“Regulated area” means any area specified or declared under section 20B under the
AMASR Act, 2010
3.106
“Reconstruction” means and includes returning a place as nearly as possible to a
known earlier state and distinguished by the introduction of materials (new or old)
into the fabric. This shall not include either recreation or conjectural reconstruction.
3.107
“Restoration” means and includes returning the existing fabric of a place to a known
earlier state by removing accretions or by reassembling existing components without
introducing new materials.
3.108
“Retrofitting” means Reinforcement or upgrading of existing structures to become
more resistant and resilient to the damaging effects of hazards.
3.109
“Road/Street”- any highway, street, lane, pathway, alley, stairway, passageway,
carriageway, footway, square, place or bridge whether a thorough-fare or over which
the public have a right of way or access or have passed and have access
uninterruptedly for specified period, whether existing or proposed in any scheme and
includes all bends, channels, ditches, storm water drains, culverts sidewalks, traffic
islands, roadside trees and hedges, retaining walls fences, barriers and railing within
the street lines.
3.110
“Road/Street Level or Grade”- The officially established elevation or grade of the
centerline of street upon which a plot fronts, and if there is no officially established
grade, the existing grade of street at its mid-point.
3.111
“Road/Street Line” -The line defining the side limits of a road/street.
3.112
“Road Width or Width of Road/Street” - The whole extent of space within the
boundaries of a road when applied to a new road/street as laid down in the city
survey or development plan or prescribed road lines by any act of law and
measured at right angles to the course or intended course of direction of such road.
3.113
“Row Housing” -A row of houses with only front, rear and interior open spaces.
3.114
“repairs” means any renovation applied to any structure, which does not in any way
change the dimensions of structure but saves the structure from further deterioration,
3.115
“Retention activity” means any activity or use which is allowed to continue,
notwithstanding its non-conforming nature in relation to the use permitted in the
adjoining or surrounding area,
3.116
“retrofitting” means upgrading or and strengthening of an existing building or
infrastructure by using suitable engineering techniques,
3.117
“Sanctioned plan” means a plan, or a set of drawings approved/sanctioned by a
competent authority under these Bye-Laws,
3.118
“self-certification” means seeking approval of building plans duly prepared and
certified by the architect as per Building Bye-Laws, and parameters/policies issued by
the competent authority, from time to time,
3.119
“Settlement”- A human settlement, which is urban or rural in character. It includes
habited villages, towns, townships, cities and the areas notified under the control of
the Authority.
3.120
“Service floor” means the floor of a building with maximum height of 2.4 meters,
where service equipment, utility lines and various machinery are located,
3.121
“site” means a “plot” as defined at sub- code 3.93 in these Bye-Laws,
3.122
“Site Corner”- A site at the junction of and fronting on two or more intersecting roads
or streets.
3.123 “Site Depth”- The mean horizontal distance between the front and rear site
boundaries.
3.124 “Site plan” means a detailed plan showing the proposed placement of structures,
parking areas, open space, landscaping, and other development features, on a parcel
of land, as required by specific sections of the Building Bye-Laws
3.125
“Site, Interior or Tandem”- A site, access to which is by a passage from a street
whether such passage forms part of the site or not.
3.126
“Spiral Staircase”- A staircase forming continuous winding curve round a central point
or axis provided in an open space having tread without risers.
3.127
“Storage tank” means a tank or a cistern for storage of water which is connected to
water main by means of a supply pipe;
3.128
“storey” means the horizontal levels in a building referred from the ground level to
the number of floors above the ground level but shall not include the mezzanine
floor,
3.129
“stilt” means poles, posts or pillars or columns used to allow a structure or building to
stand or rest on at a height above the ground,
3.130
“Street line” means the line defining the outer limits of a street,
3.131
"Structural Engineer" means a person who is a post-graduate in structural
engineering from a recognized Indian or Foreign University or Corporate Member of
Civil Engineering Division of the Institution of Engineers, India or equivalent, and/or
BE/B-Tech
Civil
Engineers
as
one
of
the
competent
professionals
as
Engineers/Architect/Structural Engineer/town planner, etc.
3.132
“Structural wall” means a load bearing wall or wall that carries load in addition to its
own load,
3.133
“sub-soil drain” means a drain constructed to be used solely for conveying any
sewage, either directly or through another drain, any water that may percolate,
through the sub-soil, “sun-shade” means a sloping or horizontal or vertical structure
over hanging, usually provided over openings on external wall to provide protection
from sun and rain and shall not be used for human habitation,
3.134
“superstructure” means the structure erected above the plinth level;
3.135
“supervisor” means a professional whose qualification and competency has been
stated at Annexure-A,
3.136
“Temporary building” means a building erected of any material and allowed by the
competent authority for completion of an approved project and to be removed
immediately after the completion of the project which shall not exceed three months
from the completion of the project,
3.137
“Third party” means an individual or entity that is involved in a transaction but is not
one of the principals and, thus, has a lesser interest in the transaction/case
3.138
“Town planner” means a person holding a Post-Graduate Degree in Urban/Regional
Planning/ Town and Country Planning from a recognized Indian or Foreign University.
3.139
“Types of building” means a building which falls in one of the following categories:
i.
Class of buildings:
a. assembly building: a building or part thereof, where 50 (fifty) or more
people gather for amusement, recreation, social, religious, patriotic,
travel and similar purposes,
b. commercial and mercantile building: includes a building or complex or
part thereof used as shops, stores or market for display and sale of
wholesale and/ or retail goods or merchandise, including office,
restaurant, banquet hall, hotel, motel, resort, dhaba, boarding house,
guest house, amusement park, office establishments and service
facilities incidental thereto and located in the same building,
c. educational building: includes a building exclusively used for a school,
college, training/research institute, vocational institute and university
including quarters for essential staff required to reside within the
premises, and building used as a hostel captive to such educational
institution within its campus,
d. industrial building: includes a factory or a part thereof wherein
products or materials are fabricated, assembled, or processed, and
includes, power plant, refinery, gas plant, mill, dairy plants,
e. information technology building: includes building for software
development activities, and IT enabled services and/ or IT related
manufacturing,
f.
inland container depot/custom bounded area: includes a building used
as inland intermodal terminal connected by road or rail to a
seaport/airport and is operating as transshipment centre including
temporary storage,
g. institutional building: includes a building constructed by government
semi-government organization or registered trust/ society and used for
offices, medical or other treatments, care for persons suffering from
physical or mental illness, disease or infirmity, care of orphans,
differently-abled persons, abandoned women, children and infants,
convalescents, destitute or aged persons, hospice and for penal or
correctional detention with restricted liberty of the inmates ordinarily
providing sleeping accommodation, also includes auditorium, complex
for cultural, social, religious, patriotic, and allied activities or assembly
hall, city/town hall, exhibition hall, museum, place of worship,
dharmshala, hospital, sanatorium, custodial and penal institutions such
as jail, prison and the railway, air, and other surface public
transportation stations,
h. mixed land-use building: includes a building put under one or more
conforming uses/activities and duly permitted by the competent
authority,
i.
residential
building:
includes
a
building
with
living,
sleeping
accommodation, cooking, and toilet facilities for one or more dwellings,
residential apartments, flats, and garages used by occupants of such
building,
j.
Storage/warehousing building: includes a building or part thereof used
primarily for storage or shelter of goods, wares, merchandise, freight
depot including a building used as a warehouse, godown, freight
depot, transit shed, store house, public garage, hanger, grain
elevator/silos, barn, stables and parking spaces, attached therewith.
ii.
design and height:
a. “Detached Building”- Includes a building with walls and roofs
independent of any other building and with open spaces on all sides
within the same plot.
b. “Multi-Storied Building or High-Rise Building”- A building above 4
stories, and/or a building exceeding 15 meters or more in height
(without stilt) and 17.5M (including stilt).
c. “Semi-detached Building”- A building detached on three sides with
open space as specified in these regulations
iii.
special features:
a. “Special Building”- Includes all buildings like assembly, industrial,
buildings
used
for
wholesale
establishments,
hotels,
hostels,
hazardous, mixed occupancies with any of the aforesaid occupancies
and centrally air-conditioned buildings having total built-up area
exceeding 500 sq m. NBC Clause 12.2.5 must be followed considering
the seismic safety principles of the region.
b. “Multi-Level Car parking”- A building partly below ground level having
two or more basements or above ground level, primarily to be used
for parking of cars, scooters, or any other type of light motorized
vehicle.
iv.
Safety due to use/maintenance level:
a. “Slum” – Buildings that are in poor condition of maintenance or have
compromised habitability due to poor ventilation, sanitation or
otherwise are termed slums. These are generally declared or notified
as slums under relevant legislation by competent authority
b. “Unsafe Building”- Includes a building which:
i) Is structurally unsafe, or
ii) Is insanitary, or
iii) Is not provided with adequate means of ingress or egress or
iv) Constitutes a fire hazard or
v) Is dangerous to human life or
vi) In relation to its existing use, constitutes a hazard to safety
or health or public welfare by maintenance, dilapidation, or
abandonment.
3.140
"Unsafe building" means a building which is,
(a) structurally unsafe, or
(b) insanitary, or
(c) not provided with adequate means of egress, or
(d) constitutes a fire hazard, or and
(e) in relation to its existing use constitutes a hazard to safety or health or public
welfare by reasons of inadequate maintenance, dilapidation, or abandonment.
3.141
“verandah” means a covered area with at least one side open to the outside with a
parapet of 1.2 meters high on the upper floors to be provided on the open side,
3.142
“Water closet” means a privy with arrangement for flushing the pan with water but it
does not include a bathroom,
3.143
“Warehouse” means a building, the whole or substantial part of which is used or
intended to be used for the storage of goods but does not include a storeroom
attached to and used for the proper functioning of a shop.
3.144
“Zoning plan” means the detailed layout plan of a colony or an area drawn by the
competent authority or approved by the competent authority indicating individual sites
and maintained in the office of the Competent Authority showing the subdivision of
plots, open spaces, streets and other features and in respect of each plot, permitted
land use, building lines and restrictions with regard to use and development of each
plot in addition to those laid down in the Building Bye-Laws.
Chapter-: 4 Building Plan Application Procedure
4.
Plan Application Procedures
4.1
Application for erection or re-erection of building
(a) Any person who intends to erect, re-erect, or make alternation in a
building or demolish any building shall give notice in writing to the
competent authority in the Form BC-I, accompanied by the following
documents:
i.
Ownership documents-lease deed/sale deed, proof of ownership
certified/issued by the revenue authority in the case of self-owned
property and in the case of a plot allotted by the authority copy of
the allotment letter and of the possession letter in the name of
owner issued by the competent authority, and a copy of the letter
in the case where permission to use the land for the intended
purpose issued by the competent authority,
ii. Every person who intends to erect, re-erect, or make alternation
in any place in a building or demolish any building shall give notice
in writing to the Authority of his intention in the prescribed Form
BC-I, as per Annexure – A and such notice shall be accompanied
by plans and statements in sufficient copies. The plans may be
ordinary prints on ferro-paper or any other type, one set of which
shall be laminated. One set of such plans shall be released, and
the rest retained in the office of the Authority for record after the
issue of permit or refusal as the case may be.
iii. Online portal for auto-scrutiny shall always require upload of the
recommended digital format of the drawings to be uploaded on the
portal for use; the provision of submission, of drawings and auto-
scrutiny shall be formulated by UT Administration/Local bodies or
any such bodies as appointed by UT Administration/Local bodies
and shall have the purview of the same. These may include but not
be limited to built features, coverage and features, coverages,
setbacks, provisions for universal design, parking, mezzanine,
building distances, heights, chimneys, parapets, mumties, fire
management, exemptions, green rating applications, access, etc.
iv. a site plan as required under these Building Bye-Laws Section
3.122,
v. details of specifications of the work to be executed in Form BC-
II,
vi. Structural drawings, for record, as per Form BC-V(A1) or BC-
V(A2),
vii. Fire safety design as required under Part IV of the National
Building Code and as updated/revised from time to time in the case
of buildings more than 15 meters in height and all non-residential
buildings.
viii. Heating, ventilation, air-conditioning (H.V.A.C.) service plan
wherever required,
ix. Plumbing drawings, water supply drawings and toilet drawings
x. Certificate of conformity with these Bye-Laws and structural
safety for the relevant buildings (depending upon type and height)
in the relevant Form BC- V(A1) or BC-V(A2),
xi. Public health services plan in un-editable compact disc/DVD or
any other electronic medium, containing drawings in “DWG” Format,
xii. A person applying for permission to carry out any development
shall have to pay tree plantation deposit along with his application
to the Competent Authority at the rates decided by the Competent
Authority from time to time. This deposit shall be refundable after
the period of five years with the condition that trees planted on the
site shall be grown‐up and maintained properly, otherwise the
deposit shall be forfeited and shall be utilized only for tree
plantation and maintenance by the Competent Authority.
xiii. Scrutiny fees (nonrefundable) at the rate of ten (10) rupees per
square meter for the proposed aggregated construction area to be
achieved including basement, stilt floor, service floor and mezzanine,
to be deposited in favour of the competent authority through any
prescribed payment mode.
xiv. No objection certificate from the Authority regarding land use as
per Master/Zonal Plan, if required.
xv. Approval from the Department of Industries, and/or respective
department allotted by the Department of Industries in case of
Industrial Buildings; as well as from the Pollution Control Board,
wherever required
xvi. Approval from Industries Department of Industries, and/or
respective department allotted by the Department of Industries; as
well as from the Pollution Control Board, wherever required
xvii. Indemnity Bond in case of proposal for the construction of a
basement as given in Annexure – ‘B-1’
xviii.
Approval from Chief Fire Officer, or any other authority
as appointed by UT Administration, in case of building defined
under Code 3.22 shall be required
xix. No-objection certificate from Civil Aviation Department wherever
required by competent authority
xx. No-objection certificate from relevant Defense Authority, wherever
required by competent authority
xxi. In case the site falls in the built-up area declared as slum
under any Act NOC from the Competent Authority, from slum
clearance and land use points of view.
xxii. In case the application is for a Farmhouse, Motel, approval/NOC
from the Competent Authority from land acquisition point of view.
xxiii.
In case of the leasehold plots, clearance from the lessor
with regard to the lease conditions shall be obtained wherever
required.
xxiv.
For individual plot, wherever required, approval of the
site from the Competent Authority, if not the part of already
approved layout plan.
xxv.
Site plan for all the authorities, and details as required
by the approval authority
xxvi.
Any other information/document, which the Authority may
require in case of listed buildings or otherwise.
Other documents to be submitted in special cases shall be as follows:
i.
For projects proposed within the Prohibited and Regulated areas as
defined by AMASR Act 2010, permission /NOC from Competent
Authority (NMA) shall have to be obtained as per Rules 2011
framed under the Act by submission of required documents as per
rules.
ii.
Additional documents required for conservation of Heritage sites
including Heritage Buildings, Heritage/Precincts and Natural Features
Areas (wherever required)
Note: The applicant shall submit all kinds of plans in electronic format of online
portal of the competent authority. The competent authority shall convey
objections/observations or sanction/refusal through online portal and or other
prescribed mode.
(b) Every person applying under Code 4.1 may appoint an architect/civil
engineer/structural engineer for drawing up of building plans/structural
drawings and for the supervision of erection or re-erection of the building.
(c) The supervision of erection or re-erection of residential or commercial
buildings up to 9 meters height (G+2 floors including stilt floor) may be
undertaken by the architect or the engineer but is not mandated. In case of
buildings more than 9 meters in height, including stilt floor, the supervision
shall be undertaken both by the architect and the engineer (civil or
structural). In case of buildings in notified heritage zone, ecologically-
conservation zone, special protection zones, or as mentioned in Development
Control Regulations and Master Plan, as well as for plots facing arterial, sub-
arterial and collector roads, licensed architects need to approve designs,
undertake feasibility study, and provide inputs regarding specific design
interventions, and approval.
(d) During construction if appointed architect/engineer notices that violation(s),
except compoundable, are continuing shall intimate the owner and advise him
to stop further construction and rectify the violations and shall also intimate
to the concerned authority.
(e) The applicant, the architect and engineer shall digitally sign the application,
plans, structural drawings, specifications, and the certificates as required in
the relevant forms and documents, before making submission to the
Competent Authority.
(f) In case the building application is returned, it may be re-submitted within
Sixty (60) days from the date of such return without fresh scrutiny fee. Such
re-submission, however, may not be allowed more than two times in Sixty
(60) days from the date of first return.
4.2
Procedure for submitting application through self-certification:
(a) Any person intending to erect or re-erect building shall apply on Form BCS-I
along with documents stated in Code 4.1 to the competent authority for
approval of building plans of buildings falling in low and moderate risk
categories defined in Code 6.2 (i) and 6.2(ii), under self-certification to the
competent authority for intimation. The applicant may initiate construction
immediately after submission of the application and documents.
(b) Certificate of conformity to regulation and structural safety for the relevant
buildings (depending upon type and height) in the relevant Form BCS-II.
(c) Competent Authority or any other authorized person reserves the right to
check the building plans and construction at any stage and violations (except
compoundable ones), if found shall have to be rectified by the
owner/applicant. In case the owner/ applicant fails to rectify violations, the
Competent Authority shall be intimated to take necessary steps to remove
the violations within a stipulated time, as decided by the Approval
Authority(ies). In case of failure to do so by architects, the case shall be
referred to Council of Architecture, who may impose penalties as may
deemed necessary. In case of failure by other competent authorities, the
penalty shall be as imposed by local court. All rectifications shall be at the
risk and cost of the owner and no plea of the owner shall be entertained for
any default committed by the competent authority engaged by the owner. In
all such cases the procedure of self-certification shall stand nullified.
(d) If a building is erected or re-erected or construction work is commenced in
contravention to any of the applicable provisions of the Bye-Laws, the
competent authority or any other person authorized by it shall be competent
to require the building to be altered or demolished, by a written notice
delivered to the owner. Such notice shall also specify the period during which
such alteration or demolition shall be completed and if the notice is not
complied with, the competent authority or any other person authorized by it
may demolish the said building at the expense of the owner.
Note: - The decision of competent authority, in case of any dispute shall be final and
binding on all concerned.
(e) At any stage during construction, if an architect/ structural engineer/ civil
engineer, hired by the owner, notices that violations (except sanctionable
ones) are taking place, he shall intimate the concerned authority of such
violations and stop further supervision. She/he shall also intimate the allottee
about the violations and advise them to stop further construction. Complete
details along with photographs shall be submitted to the competent authority.
The competent authority shall immediately issue a notice to the owner based
on the architect’s certificate to suspend further work and rectify violations. In
such cases the owner shall be held responsible for further additions in
violations. Such a situation shall automatically annul the process of self-
certification and the owner may, after removal of violations, engage an
architect/ structural engineer/ civil engineer for preparing the revised drawings.
In such cases completion shall be given only after scrutiny of revised
drawings and inspection of site.
(f) Sanctionable changes shall be allowed, provided that at the completion stage
all changes are incorporated by the architect/ structural engineer/ civil
engineer in the completion drawings to be submitted by the owner to the
competent authority. While seeking occupation certificate, the architect shall
give a certificate that all changes are made as per Bye-Laws and or
directions issued from time to time.
(g) After submission of the building application and or during the construction of
building, if the owner changes the architect/ structural engineer/ civil engineer,
shall intimate the competent authority by email or online building plan
approval system and also the architect/ structural engineer/ civil engineer shall
intimate the competent authority that he is no longer responsible for the project
from the date of actual dispatch of the letter. The information must be sent
within seven (7) days of occurrence of the change. The construction work
shall have to be suspended until the new owner/architect/structural
engineer/civil engineer, as the case may be, undertakes the full responsibility
of the project as per the forms and documents submitted at the time of
applying for erection/re-erection of the building within seven (7) days of his
taking over. Owner’s intimation regarding change of name of professionals
shall be considered final by the competent authority or any other person
authorized by it.
(h) Self-approval is allowed for building construction, alteration and/or modification
with less than 2 floors. The self-approval can be done with the
aforementioned forms, and/or online building permission system.
4.3
Online receipt and approval.
(a) All functions performed under these building Bye-Laws be performed through
electronic form via Single Window System. However, offline building
permission system shall also be available with Municipal Committees for
additional support.
(b) Without prejudice to the generality of Code 4.2 (a), the functions shall
include all or any of the following:
i.
receipt or acknowledgement of application and payment,
ii.
issue of approvals, orders, or directions,
iii.
scrutiny, enquiry, or correspondence for approval
of building plans or grant of occupation certificates,
etc.,
iv.
filing of documents,
v.
issue of notices for recoveries,
vi.
maintenance of registers and records,
vii.
any other function that the competent authority may deem fit
in public interest.
4.4
Preparation of Government building plans by Government Department (s)
The Government Departments preparing the building plans for the government
buildings conforming to these Building Bye-Laws, shall issue a certificate
specifying that the provisions of these Building Bye-Laws have been adhered to
in all respects. Such plans shall be sent to the competent authority, for
information and records before the commencement of erection or re-erection of
the building(s).
4.5
Constitution of committees comprising officials of Municipal body and of the
Authority
The competent authority shall constitute a committee or committees to perform the
following functions:
(i) preparation of zoning plans,
(ii) approval of building plans,
(iii) composition of violations of building plans,
(iv) grant of occupation certificate,
(v) joint inspection, and
(vi) any other committee with such powers and functions, as may deem proper
Relevant timelines shall be determined for approval, inspection or grant of
occupation certificate as decided by the competent authority. The committee
shall comprise of officials from Municipal Committees, Ladakh Autonomous Hill
Development Council, Tourism Department, Pollution Control Committee, Ladakh
Heritage Commission, Himalayan Institute of Alternatives, Ladakh (indicative).
4.6
Submission of affidavit
The Competent Authority at the stage of approval of building plans, DPC level
and/or grant of occupation certificate, if required, on a case-to-case basis, may
ask for an affidavit from the applicant, as per standard format given at
Annexure-A.
4.7
Building Drawing Norms
a) Size of drawing sheets and colouring of plans:
(i)
The size of drawing sheets shall be any of those specified as below:
Sr. No.
Sheet name
Sheet size (in mm)
1
A0
841 x 1189
2
A1
594 x 841
3
A2
420 x 594
4
A3
297 x 420
5
A4
210 x 297
(ii) All dimensions in plan shall be indicated in metric units.
(iii) Various elements of plans (site and building), elevation, section and
details shall be shown in different colors and thickness/type of line,
etc., and shall be preferably prepared in layers and as per these Bye-
Laws.
(iv) The prints of drawings shall be on one side of the paper only.
b) Key Plan: A key plan drawn to a scale of not less than 1:10,000 shall be
submitted along with notice showing boundary and location of the site with
respect of neighborhood landmarks, in area where there are no approved
layout plans.
c) Site Plan:
(i)
The site plan to be submitted along with the application for seeking
permission shall be drawn to a scale of:
•
1:100 for plots up to 500 square meters in size and
•
on a scale of 1:500 for plots up to 1 acre in size, and
•
for plots above one acre in size the site plan may be
submitted at any readable scale.
(ii)
The plan shall indicate the following details:
•
boundaries of the site and any contiguous feature, including
but not limited to buildings up to 60 feet in surrounding areas,
•
position
of
the
site
in
relation
to
the
neighbouring
street/revenue rasta,
•
name(s) and width of the street(s) on which the site is
situated, if any,
•
all existing buildings standing on, over or under the site,
•
position of the building and of all other buildings, if any, which
the applicant intends to erect upon his contiguous land referred
to in (i),
•
means of access from the street to the building, and to all
other buildings, if any which the applicant intends to erect
upon his contiguous land, referred to in (i),
•
width of the street, in front, and or on the sides or rear of
the site, if any,
•
direction of the north point relative to the plan of the
buildings,
•
any existing physical feature(s) such as well, drains, trees,
overhead/underground
electricity
lines
including
its
voltage/capacity, etc.,
•
service connection details with any critical infrastructure details
including but not limited to drains, overhead/underground
electricity lines including its voltage/capacity, etc.
•
area of the site, proposed covered area on each floor, and
covered area percentile to the total area of the site,
•
plot number or revenue particulars of the property on which
the building is intended to be erected,
•
graphical scale with north direction,
•
parks, landscape plans, parking plans and contour plans
surrounding the land, and
•
such other details as may be prescribed/requested by the
competent authority.
4.8
Clearance zone for buildings near/adjoining High Tension Lines electricity
(Distance from Electric lines NBC Part 3 Code 6.4)
No building or part thereof including Projections from the face of the outer
walls shall be allowed to be erected or re-erected or any addition or alteration
made to a building within the distances quoted below in accordance with the
current Indian Electricity Rules as amended from time to time between the
buildings and any overhead electric supply line:
Type of High voltage Electricity Lines
*Vertical
**Horizontal clearance
(in meters)
a. Low and medium Voltage and service lines
2.5
1.2
b. High Voltage lines up to and including 11
KV
lines,
3.7
1.2
c. High Voltage lines above 11 KV and up to
and including 33 KV.
3.7
2.0
d. Extra High voltage lines beyond 33 KV
3.7 (Plus 0.3 meters
for very additional 33
KV or part thereof)
2.0 (Plus 0.3 meters for
very additional 33KV or
part thereof)
e.
* The horizontal clearance shall be measured when the line is at a maximum deflection from
the vertical due to wind pressure.
** The horizontal clearance between the nearest conductor and any part of such building
shall, on the basis of maximum deflection due to wind pressure, be not less than as given
above
Also See Part VIII, Rules 77 to 80 of The Indian Electricity Rules, 1956
4.9
Building Plan
(a) The plans, elevations and sections of the building accompanying the notice
with dimensions shall be drawn to a scale of:
(i)
1:50 for plots measuring up to 500 square meters,
(ii)
1:100 for plots measuring from 500 square meters to 1000 square meters,
(iii)
1:200 for plots measuring more than 1000 square meters.
(b) The Plans shall indicate:
(i)
all the floors including basements, stilts and all external elevations and cross
sections illustrating distinctly all the different levels and a minimum one
section through staircase, water closet, bath, kitchen, and the garage if to be
constructed,
(ii)
all drawings shall fairly indicate the size of rooms, size of windows and
ventilators, size of door opening, and stair runs, kitchens, bathrooms, and/or
other key design elements (such as size of balconies, lift lobbies, lifts, etc.)
as in the original design,
(iii)
the plinth level of the building with reference to the mean level of street from
where the access to the site is taken,
(iv) the schedule of dimensions of sizes of the doors, windows, other openings,
and methods of ventilation of each room/area,
(v)
the means of access to the building(s) and to various floors as well as the
means of escape in case of fire, if required under the specific law/National
Building Code or these Bye-Laws; along with ramps and steps with respect
to the building(s),
(vi) in case of proposed additions and alterations in the existing building(s), all
new works shall be shown on the drawings in distinct colours with index,
thereof,
(vii) details of method of wastewater disposal, sewage, storm water and water
supply,
(viii) façade wall and Roof Sections as per ECBC 2022 Section 4; Facade Glass,
Facade Wall, and Roof U-Value Calculation as per ECBC 2017 Section 4.
(ix) Provisions as per Eco-Niwas Samhita, 2018 by Bureau of Energy Efficiency,
including but not limited to Thermal Transmittance, Thermal Emittance,
Window-to-floor area ratio, calculation of building envelopes, compliances for
cold climate, surface film thermal resistance, roofs, unventilated air layer
thermal resistance, etc.
(x)
SEF and Daylighting Calculation as per ECBC 2022 Section 4.
(xi) provisions of rainwater harvesting system as per Code 9.1,
(xii) provisions for photo voltaic solar power plant as per Code 9.3,
(xiii) provisions for differently abled person as per Chapter 10.
Note: - Any Govt. of India/UT Acts, Laws, Byelaws, or notifications shall be
applicable for the same. (including Ladakh Energy Conservation Building
Codes/Eco-Niwas Sanhita, once notified)
(c) Disaster Preparedness: Hazard profiling for the construction zones should be
mandatorily carried out as per National Disaster Management Plan, 2019.
Based on topographic profile, specific inclusion of IS Codes should be
implemented for Cloud bursts, Floods/Flashfloods, Avalanches, Earthquake (IS
4326, 13920) Seismic load, (IS 1893, IS 13827), Locust Menace/Agriculture
Droughts, Landslide (IS 14458 , IS 14496), Sandstorms, etc. Adaptation
measures need to be explored as per NDMP 2019 and UT level Disaster
Management Plan. Parametric insurance options for hazard proofing of
structures are recommended for resilient building infrastructure development.
4.10
Construction of buildings as per Architectural Control Sheet(s)
(i)
The applicant shall obtain Architectural Control Sheet(s) approved by the
authorized officer of the competent authority, by applying on plain paper
and as per rate fixed by the competent authority. The applicant is not
required to get the building plan sanctioned from the competent authority
in case the Architectural Control Sheet is adopted for execution wherever,
applicable.
(ii)
Provided the applicant constructs the building strictly in accordance with
the standard architectural controls.
(iii)
The applicant shall, however, have to obtain formal permission from the
competent authority for starting construction of the building and shall also
intimate to the competent authority, the date of commencement of
construction of building.
4.11
Standardization of technology and appropriation of competent authority
The Planned development of the urban habitats drives development most
optimally and also facilitates improvement in the quality of living for all, however,
planning and architecture itself require appropriate standards. Accordingly, Bureau
of Indian Standards (BIS) as the National Standards Body of the Country is
engaged in the formulation of Indian Standards in various areas of development
and technology. The Indian Standards look into standardization of technology,
components, terminology, planning, design, integration, implementation, operation,
maintenance, and assessment towards sustainable habitats, as well as alignment
with international standards, with appropriate necessary modifications to suit the
local requirements. This shall be achieved by establishing a framework for
planned development of the cities, especially built form development, on the
concept of sustainability in all its form, including environmental, technological,
managerial, economical, and social, and would encompass the dimensions of
land use planning, management of infrastructure such as water supply, drainage,
housing, etc. These standards shall be developed by Building Permission Review
Committees (BPRC), along with support from representatives of various
stakeholder interests such as architects, engineers, town planners, consumers,
academicians, policy makers, regulators, etc. Under the phase-wise upgradation
of the Municipal Bodies, the BPRC shall be formed, and competent authorities
shall be established as per the current as well as future norms for approval of
built form.
Chapter-5: Procedure for Approval of Building Plans
5.
Building Plan Approval
5.1
Valid Building Application
All building plan applications submitted under Code 4.1 shall not be
considered valid, unless made on the prescribed Form and attached with
requisite number of plans and documents, along with scrutiny fee and
development permission fee other charges as prescribed by the competent
authority. In case of non-compliance, the application together with plans and
documents shall be returned to the applicant for re submission in accordance
with these Bye-Laws.
5.2
Scrutiny and sanction of building plans
(1)
The competent authority shall constitute such committees for the purpose
specified in Code 4.5, for scrutiny of applications received as specified
under Code 4.1 and for submission of recommendations for sanction/refusal
of such applications.
(2)
The Committee shall consist of officials/officers as constituted by the
competent authority and shall at least once in a week, complete the existing
backlog of the scrutiny in their dues.
(3)
The recommendations of the members of the committee shall be forwarded
to the competent authority for consideration and approval, with or without
change.
(4)
The committee or any officer authorized shall pass an order and convey the
decision of sanction or rejection to the applicant in Form BC-III.
5.3
Validity of sanctioned plans
(1)
Sanction for erection or re-erection of a building(s) of less than 15 meters’
height shall remain valid for three (3) years and in the case of buildings
more than fifteen (15) meters’ height the sanction shall remain valid for five
(5) years from the date of sanction,
(2)
The temporary building(s) for construction works, permitted by the
competent authority, shall not be allowed to continue beyond three months
of the lapse of the validity of the sanctioned plans. An additional provision
for extension by up to 3 months may be provided by taking permission
from approval authority, in writing and submission of extension fees for the
same.
5.4
Re-validation of building plans
(1) If a building(s) is not completed within three (3) years or five (5) years, as the
case may be, from the date of sanction, the sanction with respect to the
portion of the building not been completed will be deemed to have lapsed.
(2) A fresh application shall be submitted for the incomplete portion of a building
(s), in accordance with Code 4.1 and accompanied by the prescribed scrutiny
fee.
(3) In case the construction could not be started within three (3) years or five (5)
years, as the case may be after the sanction of a building plan(s) or has been
started but could not be completed within the validity period, the
owner/applicant shall apply for revalidation of building plans before the lapse of
sanction simply by depositing re-validation fee as decided by Approval Authority
for the covered area requested for re-validation. This revalidation of building
plan(s) shall automatically be deemed granted from the date of depositing the
revalidation fee.
5.5
Deemed sanction
The competent authority shall pass the orders, either of sanction or of rejection,
within a period of thirty (30) days of submission of building plan(s) duly
accompanied by all necessary documents as mentioned in Code 4.1. The
building plan(s) shall be deemed sanctioned if it is in conformity with ECBC
Codes, Ladakh ECBC, 2021 (once notified), and any other codes as mentioned
in the Building Bye-Laws, or as deemed necessary by UT Government and/or
Central Government, and in accordance with the permitted land use of the area
and all leviable fee/charges have been deposited by the applicant, but no orders
have been passed by the competent authority within the specified days in this
sub-code. Risk based classification may differ from the given timeline, based on
the nature of the risk on a case-to-case basis, within a period of 2 months.
5.6
Submission of revised building plans during the validity period of sanction
(1)
If during the construction of a building(s), any deviation from the sanctioned plan
(s) is intended to be made, approval of the Competent Authority for the same
may be obtained before the change is made. The revised plan(s) showing
deviations shall be submitted and the procedure laid down for the sanction of
building plan as stated in Code No. 5.1 and 5.2, shall be followed for all revised
plans, along with depositing scrutiny fee for the area proposed to be revised, as
well as previously sanctioned plans and revised drawings in the same format.
(2)
No
notice
and
or
building
approval
is
necessary
for
compoundable
alterations/violations, which do not violate any provision (s) concerning building
requirements, structural stability, and fire safety requirements of these Building
Bye-Laws.
5.7
Revocation of sanction
The sanction granted under Code 5.2 and Code 5.4 can be revoked by the
competent authority, if it is found that such sanction has been obtained by the
owner by means of misrepresentation of material facts or fraudulent document(s)
submitted along with the building plan application or otherwise or the construction
is not being done in accordance with the sanction granted and or in accordance
with these Bye-Laws.
5.8
Maintenance of E-Register for sanction/ Registration of Building Plans
An online E-register integrated with the existing E-Governance module shall be
maintained for all building applications received, whether offline or online, by the
Municipal Committee, permissions granted or deemed to have been granted or
refused and or returned under these Bye-Laws. The said register shall be
available online to the public for inspection on the website of
t h e
c o m p e t e n t authority.
5.9
Damp Proof Course (DPC) Certificate
The owner or the architect shall submit a certificate, in case of self-certification,
that the construction of building up to DPC level is as per the sanctioned
plan(s). The competent authority shall verify the certification and shall issue
consent/comments within three (3) days of receiving the certificate. DPC
certificate shall be deemed to have been accepted if it is in conformity with Bye-
Laws and no orders have been passed by competent authority within specified
days.
5.10
Occupation Certificate
(1)
Every person who intends to occupy a building or part thereof for which the
building plan(s) has been sanctioned shall apply for the occupation
certificate in Form BC-IV(A) or BC- IV(B), accompanied by certificates in
relevant Form BC-V (1) or BC-V (2) duly signed by the architect and/or the
engineer along with following documents:
(i)
details of sanctionable violations from the approved building
plan(s), if any in the building, jointly signed by the owner,
architect, structural engineer and/or civil engineer as the case may
be,
(ii)
completion drawings or as-built drawings along with completion
certificate from architect/ structural engineer and/or civil engineer
as per Form BC-VI,
(iii) photographs of front, side, rear setbacks, front, and rear elevations
of the building shall be submitted along with photographs of
essential areas like cut outs and shafts from the roof top. An un-
editable compact disc/ DVD/ any other electronic media containing
all photographs shall also be submitted,
(iv) Permit checklist needs to be followed and permit certificate from
Bureau of Energy Efficiency (BEE) Certified Energy Auditor for
installation of Rooftop Solar Photo Voltaic Power Plant shall be
required in accordance with orders/policies issued by the
Renewable Energy Department from time to time, if applicable
(v)
Construction permits and Occupancy Certificate from Bureau of
Energy Efficiency (BEE) Certified Energy Auditor for constructing
building in accordance with the provision of ECBC, wherever
applicable
(vi) No Objection Certificate (NOC) of fire safety of building from
concerned
Fire
Officer or
an
officer
authorized
by
UT
Administration for this purpose.
(vii) All provisions of Ladakh Energy Conservation Building Code 2021
(once notified)
Note: Online portal for auto-scrutiny shall always require upload of the
recommended digital format of the drawings to be uploaded on the
portal for use
(2)
No owner/applicant shall occupy or allow any other person to occupy a
new building(s) or part thereof until such building or part thereof has been
certified by the competent authority or by any officer authorized by it in this
behalf as having been completed in accordance with the permission granted
and an ‘Occupation Certificate’ has been issued in Form BC-VII. However,
competent authority shall charge composition charges for compoundable
violations before issuance of Form BC-VII. Further, the water, sewer and
regular electricity connection shall be released only after issuance of
occupation certificate by the competent authority. The ‘Occupation
Certificate’ to be issued shall on the basis of parameters mentioned as
under:
i. minimum 25% of total permissible ground coverage, excluding
ancillary zones, if any, shall be essential for issuance of occupation
certificate, other than residential and industrial buildings,
ii. in the case of residential plot, a minimum 50% of the total
permissible ground coverage to be constructed with minimum one
habitable room, a kitchen and a toilet forming a part of submitted
or the approved building plan shall be completed,
iii. debris and rubbish consequent upon the construction has been
cleared from the site and its surroundings,
iv. after
receipt
of
application,
the
Competent
Authority
shall
communicate in writing within eighteen (18) days, his decision for
grant or refusal of such permission for occupation of the building in
Form BC-VII. The E-register shall be maintained as specified in
Code-5.8 for maintaining record in respect of Occupation Certificate,
if no communication is received from the Competent Authority within
eighteen (18) days of submitting the application for “Occupation
Certificate”, the owner is deemed permitted to occupy building,
considering “Occupation certificate” deemed issued and the
application Form BC-IV (A) or BC-IV(B) shall be the “Occupation
Certificates”. However, the competent authority may check the
violations made by the owner and take suitable action with regard
to the violations, and,
v. if the owner or the architect or structural engineer or civil engineer or
Consultant as mentioned in Code 4.2 and 4.10 as the case may
be, submits a wrong report while making application under these
Bye-Laws or if any additional construction or violation is reported to
exist at site or has concealed any fact or mis-represented regarding
completion of construction of building along with essential conditions
of seeking occupation certificate, s/he shall be jointly and severally
held responsible for such omission/commission and complaint
against the architect/structural engineer/civil engineer for suspension
of his registration/membership, and/or other necessary penal actions
may be taken, and the owner shall be liable to pay for the penalty
as may be decided by the competent authority after giving an
opportunity of being heard. It emerges during the hearing that the
relevant
information
was
concealed
by
architect/structural
engineer/civil engineer/ consultant, necessary penal proceedings of
barring architect/ structural engineer/civil engineer /consultant from
practicing in the Union Territory of Ladakh may be enforced.
5.11
Occupation Certificate through Self-Certification
(1)
The owner who had applied under Code 4.2 and the building falls in the
Low-Risk Category defined in Code 4.9 (b) (vii) and Code 5.2 (1), shall
submit an application to the competent authority for grant of occupation
certificate on Form BCS-III and along with completion drawings, Completion
Certificate on Form BCS- IV and along with the following documents:
(i) details of compoundable violations, if any, in the building, jointly
signed by the owner, architect/civil/structural engineer, along with
demand draft of composition charges for such violations at the
rates determined by the Competent Authority from time to time,
shall be submitted along with Form BCS-III,
(ii) owner and architect/civil/structural engineer both shall give a self-
certification in Form BCS-IV that no provision of these Building
Bye-Laws, has been violated excluding compoundable violations,
(iii) photographs of front, side, rear setbacks, front and rear elevations of
the building shall be submitted along with photographs of essential
areas such as cut outs and shafts from the roof top. An un-
editable compact disc/ DVD containing all photographs shall also
be submitted,
(2)
the competent authority shall issue the occupation certificate in Form BCS-V
within eight (8) working days of the receipt of the Form BCS-III duly
completed in all respects and accompanied by the required completion
drawings, forms, and affidavits. The occupation certificate shall be issued
provided that the documents submitted along with Form BCS-IV are in order.
Provided that if any violation found within time prescribed above during
inspection, which is not listed in compoundable violations stated at Code
4.11(1)(i), then the violation(s) be compounded as per composition charges
prescribed (or demolished if non-compoundable), by the competent authority.
(3)
if no communication is received from the competent authority within eight (8)
working days of submitting the application for “Occupation Certificate”, the
owner is permitted to occupy building, considering deemed issuance of
“Occupation certificate” and the application Form BCS-III shall act as
“Occupation Certificate”. Provided that violations, if found at any subsequent
stage, shall result in cancellation of the occupation certificate issued and the
same shall be restored only after removal of violations. Further, action against
the architect/civil engineer/structural engineer shall also be taken for furnishing
a wrong certificate/affidavit.
(4)
No person shall occupy or allow any other person to occupy any new
building or a part thereof for any purpose whatsoever until such building or a
part thereof has been certified by the competent authority as having been
completed and an occupation certificate has been issued in his/her favour in
Form BCS-V within the above-mentioned period. However, the minimum
percentage of permissible covered area, for industrial plot only as mentioned
below in the table shall have to be constructed to obtain occupation
certificate or as decided by the competent authority, from time to time.
Minimum requirement of construction area for obtaining Occupation Certificate
Sr. No. Area of site
Percentage of permissible covered
area
1
Up to 2 acres
25%
2
Above 2 acres to 5 acres
20%
3
Above 5 acres to 10 acres
15%
4
Above 10 acres
10%
(5)
No occupation certificate shall be issued unless debris and rubbish
consequent upon the construction has been cleared from the site and its
surroundings.
5.12
Occupation Certificate through third party certification
(1)
The owner who had applied under Code 4.1 and having building under
Moderate Risk Category defined in Code 6.1(1), shall submit an application
to the competent authority for grant of occupation certificate in Form BCS-
III and along with completion drawings, Completion Certificate in Form
BCS-IVA and along with the following documents:
(i)
details of compoundable violations from the approved building plan(s), if
any, in the building, jointly signed by the owner, architect, civil engineer
and/or structural engineer, along with demand draft of the due payment
for composition charges of such violations at the rates determined by
the competent authority shall be submitted with Form BCS-III,
(ii)
a certificate from third party (i.e., an architect or a civil engineer or a
structural engineer, other than the architect/ structural engineer/ civil
engineer involved in designing, construction, and supervision of the
building) in Form BCS-IVA that the building has been inspected in all
respect and no provision of the Building Bye-Laws, has been violated
excluding compoundable violations, and
(iii) photographs of front, side, rear setbacks, front, and rear elevation of the
building shall be submitted along with photographs of essential areas
like cut outs and shafts from the roof top. An un-editable compact disc/
DVD containing all photographs shall also be submitted.
(2)
The competent authority shall issue an occupation certificate in Form BCS-
V within eight (8) working days of receipt of the Form BCS-III duly
completed in all respects and accompanied with the required completion
drawings, forms, and affidavits. The occupation certificate shall be issued
provided that the documents submitted along with Form BCS-IVA are in
order. Provided that if any violation (s) found within the time prescribed
above during inspection, which is not listed in compoundable violations
stated at Code 4.12 (1)(i), then the violation(s) be compounded or
demolished by the competent authority if non- compoundable, as per
composition charges prescribed.
(3)
If no communication is received from the competent authority within eight
(8) working days of submitting the application for “Occupation Certificate”,
the owner is permitted to occupy building, considering deemed issuance of
“Occupation certificate” and the application Form BCS-III shall act as
“Occupation Certificate”. Provided that the violations, if found at any
subsequent stage, shall result in cancellation of the occupation certificate
issued and the same shall be restored only after removal of violations.
Further, action against the architect shall also be taken for furnishing a
wrong certificate/affidavit.
(4)
No person shall occupy or allow any other person to occupy any new
building or a part thereof for any purpose whatsoever until such building or
a part thereof has been certified by the competent authority as having been
completed and an occupation certificate has been issued in his favour in
Form BCS-V within the above-mentioned period.
(5)
No occupation certificate shall be issued unless debris and rubbish
consequent upon the construction has been cleared from the site and its
surroundings.
5.13
Revocation of Occupation Certificate
After the issuance of occupation certificate, if at any stage found that the
building is used for some other purpose than as permitted to be used or
made any addition/ alteration in the building then, after affording personal
hearing to the owner, the competent authority may pass orders for revocation
of occupation permission and the same shall be restored only after removal
of violations.
5.14
Green Building Measures and Incentives
1. For reducing consumption of total energy, fresh potable water and
reduction in total waste generation by modern buildings, the green
building measures are to be adopted by all building on various plot sizes.
2. The applicant shall be awarded benefits of additional Floor Area Ratio for
adopting either green norms by getting his/her building/ site/ project
certified from Green Rating for Integrated Habitat Assessment (GRIHA) or
Green and Eco-friendly Movement (GEM), Inand achieving rating as
specified below:
i.
09%: 3 Star / 3 GEM / Silver IGBC/LEED Rating
ii.
12%: 4 Star / 4 GEM / Gold IGBC/LEED Rating
iii.
15%: 5 Star / 5 GEM / Platinum IGBC/LEED Rating
3. The buildings should use minimum 20% of the materials from recycled
construction and demolition waste. Further use shall help in incentives on
Property Tax, as may be decided by Local Bodies.
Note:
A. The additional FAR shall be given over and above the maximum
permissible FAR.
B. Where solar space/ trombe wall areas are designed specifically for solar
passive heating of building proposed, a maximum width of 2 feet can be
exempted from FAR.
C. The incentive of additional FAR for achieving GRIHA/GEM/IGBC/LEED
rating shall be applicable only on new buildings. The incentive of additional
FAR
would
also
be
applicable
on
buildings
which
are
under
construction/design and registered and pre-certified and certified with the
rating agencies (GRIHA/GEM/IGBC/LEED) and incorporating features for
making Green Buildings but have not yet obtained Occupation Certificate.
D. The applicant has to pay only Infrastructure Development Charges on
additional FAR granted as incentive.
E. Procedure for availing incentive:
a. The applicant is required to submit pre-certification rating from
GRIHA/GEM/IGBC/LEED rating agencies at the time of submission
of building plan application to the Competent Authority for claiming
incentive of additional FAR as stated.
b. At the time of applying for Occupation Certificate of building, the
applicant is required to submit provisional/Final rating from
GRIHA/GEM/IGBC/LEED Rating Agency.
c. The
Competent
Authority
only
after
verifying
that
the
GRIHA/GEM/IGBC/LEED rating achieved in final rating is same as
pre-certification rating submitted at the time of building plan
application, shall issue the Occupation Certificate:
i. Provided, in case the final rating achieved is lesser than the
provisional rating, the occupation certificate shall be issued
after compounding the additional FAR (i.e., difference of
additional FAR from precertification rating and final rating)
acquired by the applicant, at ten times the rates of EDC
applicable at the time of submission of occupation certificate
application.
ii. Provided, the applicant may claim additional FAR, if final
rating is higher than the provisional rating.
5.15
Biodiversity and Wildlife Protection and inclusive design
Ladakh is known for its serene and pristine connection with nature. The
biodiversity forms an inclusive part of the ecosystem along with human
interactions. However, the exponential rise in urbanization and tourism in Ladakh
calls for an inclusive ecosystem which works in coherence of protection of
wildlife and biodiversity. Building bye-laws thus play a very important and non-
negotiable role to allow for inclusive design with the environment:
1) All development activities must adhere to the provisions as mentioned in
The Wildlife (Protection) Act, 1972 [and any further amendments], The
Biological Diversity Act, 2002 [and any further amendments] and/or any
acts, laws, notifications or guidelines released by the Central, UT of
Ladakh, or Municipal corporation from time to time.
2) All development activities must be considerate of the People’s Biodiversity
Register (once formulated) and make necessary and conscious decision
to utilize an inclusive design with the biodiversity. Any issues, qualms or
considerations shall be as per The Wildlife (Protection) Act, 1972 [and
any further amendments], The Biological Diversity Act, 2002 [and any
further amendments], and/or any acts, laws, notifications or guidelines
released by the Central, UT, or Municipal Government from time to time.
3) Ladakh had formulated National Biodiversity Strategy and Action Plan for
the sub-state of Ladakh in 2003. The provisions of the same shall be
followed by all developments. Exceptions shall be allowed as per the
decision taken by the respective Biodiversity Management Cell. Further
challenges and appeals shall be subject to rulings by UT-level Biodiversity
Committee and National Biodiversity Authority.
Chapter-6: Classification of Buildings for approval and occupation requirements
6.
Building Approval and Occupation Certificate
6.1
Risk based classification of building applications
There is a need to make provisions for fast-tracking building permission
procedures for all non-automatic approvals. Therefore, in the spirit of ‘Ease of
Doing Business’, the buildings have been classified further on the basis of risk
parameters/ risk-based classification to clear the building permits on fast-track
system. This kind of classification shall be used for fast tracking the sanction of
building plans, which shall facilitate regulated and faster construction permits, and
also aid in improving the rating of the country in World Bank’s assessment in
‘Ease of Doing Business’. Further, the ULB in consultation with all parastatal
bodies involved, shall identify risk-based classification of industrial, commercial,
and institutional buildings, and prepare risk-based matrix, in-line with those
proposed in Model Building Bye Laws, 2016 for residential and storage buildings/
warehouses/ godown and accordingly prescribe the fast-tracking approval system.
This exercise shall be done within a period of 3 months from the date of
publication of the Local Building Bye-laws.
On the basis of above-mentioned risk matrix prepared by each of the agencies
involved in approving building plans, Administration of Union territory of Ladakh
shall design and notify necessary legal instructions to implement risk-based
mechanism with a view to fast track building permissions based on their risk
classification. These instruments may include, but are not limited to, delegation of
powers, out-sourcing, empowering architects/civil engineers/structural engineers,
self-certifications, etc. These notifications shall be done within 3 months from the
date of notification of risk matrix by each competent authority / agency as
mentioned above.
For approval of the residential plotted and group housing buildings, risk-based
classification:
(1) For fast-track building plan approval, the competent authority shall approve
building plans considering the risk-based classification of buildings depending
upon the respective risk matrices as mentioned in Code 6.1 (1) – 6.1 (3)
(2) The application for approval and grant of Occupation Certificate of very-low
to moderate risk buildings shall be allowed as per Code 4.2 and relevant
sections of Chapter-5. The application for approval and grant of Occupation
Certificate of high-risk buildings shall be allowed as per Code 4.1 and
relevant sections of Chapter-5.
(3) For building plan approval, the competent authority shall approve building
plans considering the risk-based classification of buildings depending upon
height and area. The buildings are categorized in the following categories:
i.
Residential Buildings:
Table 1 Risk matrix for different residential buildings
Risks
Very Low
Low
Moderate
High
Criteria
Parameters
Size of the plot Square Meters Below 105 m2 105 – 500 m2
Above 500 m2
All
sizes
Height of the
building
Meters
<15 m
<15 m
<15 m
15 m or
above
Use of the
premises
Various
categories
Residential
plotted
Residentia
l plotted
Residentia
l plotted
Group
Housin
g
Note:
A. Considering no other issue like Monuments, Metro, DUAC, Airports etc. are
involved. In case the property lies within the regulated zone of metro rail, airport
etc. the online clearance from the local body concerned shall be taken
B. Group Housing area is minimum 2000 sq mt (may vary between States)
C. The Competent Authority shall empanel professionals as necessary
D. The Competent Authority shall work out and prescribe fees for submitting the
building plans
E. The fees shall be derived by an automated built-in calculator in the online
system of submission
Suggested Fast Tracking Tools:
For Very Low Risk Buildings:
In case of standard building plans prepared by the Authority for residential plots up to
105 sq.mt. in size and forming part of the approved layout plan, the owner shall be
entitled to sign such standard plans and the required documents for submission for
sanction. In such cases, certificate from professionals would not be necessary and the
owner shall be bound to follow the approved standard plan in detail. The Authority shall
explore options of EWS/LIG/MIG plotted housing schemes to develop pre-approved
Standardized building plans of Housing Units for variable plots sizes/carpet area (in
the range 30sqm-105sqm). The owner shall undertake construction of the so formed
standard housing units.
For Low-Risk Buildings:
A Competent professional (qualification & competence as per Annexure-D) shall be
empowered to issue the building permit, but only after submitting the plan along with
requisite documents and fees to the concerned local body. If the owner/ professional
desires to get the building plan sanctioned by the local body, building plans prepared by
the qualified competent professional will have to be submitted to the concerned local
body along with the fees and other requisite documents and the local body shall grant
the building permit within 10 days.
For Moderate-risk Buildings:
Building plans will have to be prepared by a competent professional and the building
plans will have to be submitted to the concerned local body along with the fees and
other requisite documents. The local body shall grant the building permit within 20 days.
For High-risk Buildings:
Clearances and NOCs from department, or authority as appointed by UT Administration,
and other necessary clearances from AAI, NMA and other agencies as per Section 5.10
and other authorities as deemed necessary by the UT Administration have to be
obtained. Building plans will have to be prepared by a competent professional and the
building plans will have to be submitted to the concerned local body along with the fees
and other requisite documents. The local body shall grant the building permit within 20
days.
ii.
Storage/Warehouse Buildings
For approval of the buildings meant for use as storage buildings/ warehouses/godown, risk-
based classification shall be in the following categories:
Table 2 Risk Matrix for Storage/Warehouses
Risks
Very Low
Low
Moderate
High
Covered area on all
floors / Built-up Area
Up to 250 m2
250 – 2000 m2
Up to 2000 m2
Above 2000
m2
Height of the building
<15 m
<15 m
<15 m
<15 m
Abutting Road width
Min. 12
m
Min. 12 m
Min. 12 m
Min. 12 m
Type of Material
Storage
Category A
Category A
Category B
(Stacking Height
– Medium)
Category B
(Stacking
Height –
Medium)
Note:
A. The level of Risk is classified according to the material stored in the
warehouse/storehouse. Material shall be classified according to the Categories
defined in Annexure “C”.
B. The Urban Local Body/ Urban Development Authority shall empanel
professionals as per “Annexure D”.
C. The building application processing fees shall be derived by an automated
built-in calculator in the online system.
Suggested modes of Fast Tracking:
For Very Low Risk Buildings:
A competent professional (qualification & competence as per Annexure-D) shall be
empowered to issue the building permit, but only after submitting the plan along with
requisite documents and fees to the concerned local body. If the owner/ professional
desires to get the building plan sanctioned by the local body, s/he shall apply online to
the local body and the local body shall grant the building permit within 10 days.
For Low-Risk Buildings:
Building plans will have to be prepared by a competent professional and the building
plans will have to be submitted to the concerned local body along with the fees and
other requisite documents. The local body shall grant the building permit within 20 days.
For Moderate Risk Buildings:
Building plans will have to be prepared by a competent professional and the building
plans will have to be submitted to the concerned local body along with the fees and
other requisite documents. The local body shall grant the building permit within 20 days.
For High-Risk Buildings:
Building plans will have to be prepared by a competent professional and the building
plans will have to be submitted to the concerned local body along with the fees and
other requisite documents. The local body shall grant the building permit within 30 days.
iii.
Industrial Buildings
For approval of the buildings meant for use as storage buildings/ warehouses/godowns, risk-
based classification
Risks
Low
Moderate
High
Criteria
Parameters
Size of the plot
Square Meters
Up to 350 m2
Above 350 m2
All sizes
Height of the building
Meters
Less than 15
m
Less than 15 m
15 m and above
Abutting Road width
Meters
Min. 12
m
Min. 12 m
Min. 12 m
Note:
A. The level of Risk is classified according to the size and height of the industrial
building proposed.
B. The Urban Local Body/ Urban Development Authority shall empanel professionals as
per “Annexure D”.
C. The building application processing fees shall be derived by an automated built-in
calculator in the online system.
Suggested modes of Fast Tracking:
For Low-Risk Buildings:
1. Deemed Approval with Self-Certification
2. Plans to be submitted along with Structural drawings which does not require
sanction
For Moderate-Risk Buildings:
1. Plans to be submitted to the empaneled professional.
2. Clearances and NOCs from department, or authority as per Section 5.10
3. Approval to be granted within 10 working days by the empaneled professional.
4. Approved plan to be submitted to ULB/DA.
For High-Risk Buildings:
1. Online application
2. Immediate acknowledgement by software
3. Clearances and NOCs from department, or authority as per Section 5.10
4. Approval by ULB/DA within 20 working days
Chapter-7: Land Use of Site, Planning and Architectural Control and Coverage
7.1
Use of site, type, and character of building
(i)
Type and character of building, including ancillary buildings, that may be
erected or re- erected on a site and the purpose for which these may be
used shall not be other than that shown in the Master Plan or Zonal
Development Plan, as the case may be, or as shown in the approved
layout plan of a colony or zoning plan, if any.
(ii)
Where the site does not form part of a layout plan or zoning plan, the use
shall be in conformity with the use prescribed in the Master Plan or Zonal
Development Plan and in case no master plan notified, in that case, the
use of the surrounding area will be considered and in such cases the
decision of the competent authority shall be final.
(iii)
Every building that may be erected or re-erected on a site, in addition to
the foregoing restrictions, shall comply with the restrictions shown in the
Architectural Control Sheets, wherever applicable which shall have
precedence over the Building Bye-Laws.
(iv)
Every building that may be erected or re-erected on a site, in addition to
other restrictions under these Bye-Laws, shall comply with the provisions
made in the National Building Code of India (updated from time to time),
wherever these Building Bye-Laws are not applicable.
(v)
Facade design to also incorporate Urban Design guidelines to preserve
heritage conservation and city identity for the districts. Separate Urban
Design guidelines need to be formulated and suitable notification need to be
released for the same by the relevant authorities.
7.2
Sub-division and amalgamation of plots
(i)
Sub-division of a bigger plot into smaller units is permissible in the case of a
family division, in case the plot is not allotted by the development agency.
In case a plot has been allotted by the development agency, the prior
approval of the competent authority is required. Each such sub-division shall
be accessible independently through a street or a public road/street.
(ii)
Except as otherwise expressly provided at the time of sale/allotment of plot
in a colony under specific scheme approved by the competent authority, not
more than one building unit shall be erected on any one plot, however, two
or more plots may be combined together under a single ownership for
purposes of erection of one “building unit”.
Note: -
“Building unit” means a self-contained building with such outbuildings as are
ordinarily ancillary to the main building used in connection therewith and
physically incapable of sub-division into two or more independent building
units. A building unit may, however, be owned by an individual or may be
jointly and severally owned, provided it remains in a single indivisible
ownership.
7.3
Proportion of the site which may be covered with buildings
(1) The proportions of covered area of a building, including ancillary buildings, shall be
in accordance with the categories of plots given in following sub-Codes and the
remaining portion shall be left open in the form of open space around the building
falling in the core area identified in the Master Plan or Zonal Development Plan or
as notified by the competent authority and other than Core Area.
(2)
For General Building Requirements, Chapter-4 of Model Building Bye Laws 2016
needs to be referred.
(3)
Chapter 5 & 6 of Model Building Bye Laws, 2016 need to be referred for
provisions of high rise and structural safety, as relevant, unless mentioned
otherwise
(4)
Unless specified in these building bye-Laws, DCRs, or Architecture Control Sheets,
and/or urban design guidelines the minimum setbacks, permissible heights and any
relevant critical sections shall be referred to from Model Building Byelaws, 2016.
(5)
Restrictions based on critical areas need to be included, including Airport Authority
of India, Archaeological Department, Hazard Risk Mitigation, and other critical areas
need to be consulted with the relevant authorities, and NOC shall need to be
obtained as the case may be.
(6)
Relevant group housing requirements need to be referenced with Master Plan/DCR
documents. Special provisions for construction of EWS and slums housing based
on spatial impact assessment depending on the feasibility of the project, location,
and impact shall be taken from Master Plan/DCR Documents. Private developers
need to provide 15% for EWS and hand over to ULB at predetermined price;
similar reservations need to be explored and provided in the Group Housing
wherever relevant.
(7)
Core Area land use-wise permissible coverage, floor area ratio and height shall be
as follows:
(i)
Residential
Sr.
No
.
Plot area slabs
in square
meters
Maximum
permissible
Ground Coverage
Permissible
basement
Maximum
permissible
Floor Area Ratio
(FAR)
Maximum
permissible Height
(G+3 Floor)
(including stilt (S+4
Floor in meters)
1 Up to 100
80%
Single level
200 %
15.0
2 Above 100 to
200
75%
Single level
200 %
15.0
3 Above 200 to
300
70%
Single level
180 %
15.0
4 Above 300 to
400
65%
Single level
160 %
15.0
5 Above 400
55%
Single level
140 %
15.0
(ii)
Commercial
Sr.
No.
Plot area slabs
Square meters
Maximum
permissible
Permissible
basement
Maximum
permissible
Floor Area
Maximum
permissible
Ground Coverage
Ratio (FAR)
Height
1
up to 50
90%
Single level
200 %
18
2
Above 50 to 100
80%
Single level
200 %
18
3
Above 100 to 200
70%
Single level
180 %
18
4
Above 200 to 400
60%
Single level
160 %
18
5
Above 400
40%
Single level
150 %
18
(iii) Plot setbacks for both core and non-core areas.
The buildings shall not project beyond the building lines as shown in the zoning plan
of respective schemes/Zonal Development Plans/Development Control Regulations and
or as indicated below the minimum setbacks shall be adhered.
Sr. No.
Area of plot
(in sq.
meters)
Minimum Front
Setback
(meters)
Minimum Rear
Setback
(meters)
1.
Up to 50
1.0
-
2.
Above 50 to 150
1.5
1.0
3.
Above 150 to 200
2.5
2.0
4.
Above 200 to 400
3.0
3.0
5.
Above 400 square meters
4.5
4.0
(8)
Areas other than core area:
(i)
Residential: In the case of Plots; permissible coverage, floor Area ratio and
height
Sr.
No.
Plot area in
Square
Maximum
permissible
Ground
Permissible
Basement
Maximum
permissible
Maximum
permissible Height
(G+3 Floor)
Meters
Coverage
FAR
(including stilt (S+4
Floor)) (in meters)
1
Up to100
65%
Single level
160 %
15.0
2
Above 100 to 250
65%
Single level
145 %
15.0
3
Above 250 to 350
60%
Single level
130 %
15.0
4
Above 350 to 500
60 %
Single level
120 %
15.0
5
Above 500
55 %
Double level
100 %
15.0
Note:
A. The additional FAR to the extent of 5% within the permissible height can be
purchased at the collector’s rates fixed from time to time for the respective
localities.
B. Provided that the building shall conform to the restrictions contained in the
zoning plans, development control regulations (DCRs) or the architectural control
sheets of respective areas.
C. Provided that the 25% of the built-up area of the building not exceeding up to
50 square meters, whichever is less, can be used for non-nuisance professional
consultancy services, after getting permission from the competent authority in
writing. The applicant shall apply for specific use of consultancy services as
mentioned in Code 3.83 in Form NAC-I along with fee as fixed from time to
time and the permission shall be granted in Form NPC-II”.
D. Stilt floor is permitted for parking purposes in residential and commercial plots of
all sizes, subject to the condition that maximum permissible height of the
building shall not exceed 15 meters.
E. Transfer of Development Rights need to be provided in accordance to Master
Plan, DCRs and Zoning Regulations [that should include disaster management
component, heritage preservation and conservations and other zoning regulations
as required].
(ii)
Group Housing
Sr.
No.
Maximum permissible
ground coverage
Permissible
Basement
Floor Area
Ratio
Maximum Permissible
height (m)
1.
40%
Up to two
levels
175%
15
Note:
A. The parking requirement of group housing shall be governed by Code 7.1 or as
per the national building code updated.
(iii) Commercial
Sr.
No.
Type of building
Area
Norm
Maximum
permissible
Ground
Coverage
Permissible
Basement
Maximum
permissible
Floor Area
Ratio (FAR)
Maximum
permissible
Height
1 Individual Shops
No Limit As per the Architectural Control Sheets relating to
façade and height controls in a street.
2 Approved Commercial
colony: includes
shopping mall,
multiplex,
Departmental store,
integrated commercial
Complex, Service
Apartments, starred
Hotels/ Unstarred
Hotels and Guest
Houses, offices.
No Limit
60 %
Two
levels
175 %
15
3 Dhabas
500
square
meters
50 %
One level
50 % (with
maximum 50
sqm for kiosks
5
to
1/2 acre
for
other items)
4 Banquet Hall
Minimum
2.5
acres
50 %
One level 50% (10%
FAR
allowed for gift
shop/STD
Booths, Toy
Centre and
flower shops
etc.)
15
5 Resort, Motel
(with/without banquet
hall facilities)
No Limit
40%
Two
levels
175 %
15
6 Starred Hotels,
Restaurants
No Limit
40 %
Two
levels
175 % (with
permissible
15%
commercial
component)
18
7 Amusement Park
No Limit
30 %
One Level 50 % (with
permissible
15%
commercial
component)
15
8 Big retail stores
No Limit
50%
Two
Levels
175%
15
9 Petrol Stations
No Limit
As per terms and conditions of Oil companies.
Note: For all use cases subject to petroleum and explosive material handling, PESO
regulations including Fire clearances are recommended
(iv) Institutional and Educational
Plot area
slabs
(Square
meters)
Maximum
permissible
Ground Coverage
Permissible
Basement
Maximum
permissible
Floor Area
Ratio (FAR)
Maximum
permissible
Height
Up to 10000
35%
Up to two
levels
150%
15 m
Above 10000
25% of such portion of
site
Up to two
levels
150%
15 m
Note:
A. In the case of educational institutions (Schools/College/University), the Hostel
component is restricted to 20% of maximum permissible covered area, and
B. The
residential
component
(i.e.,
residential
facility
for
principal,
teachers/professors, staff, etc.) is restricted to 10% of maximum permissible
covered area in addition to hostel component).
C. However, the competent authority may consider the requirement of the project
for permitting residential component up to maximum limit of 50% of FAR by
recording the reasons of Justification.
(v)
Industrial and IT
Sr.
No.
Type of Industry
Maximum
Ground
Coverag
e
Permissible
Basement
Maximum
Permissible
Floor Area
Ratio
Maximum
Permissible
Height
Remarks
1. General
60%
Twin level
150
%
18 Meters
--
2. Apparel and Footwear
40%
Twin level
200 %
18 Meters To be located
(vi)
(vii) Storage / Godown
(viii) Warehouse
Sr.
No.
Type of building
Maximum
permissible
Ground
coverage
Maximum
permissible
Floor Area Ratio
(FAR)
Setbacks all
around the plot
(in meters)
1 Integrated Inland Container
Depot/Custom Bounded Area
60%
75
%
8
2 Warehouse other than
agricultural produce/Grain
Godown/Silos
6
3 Warehouse for Agricultural
Produce/Grain Godown/ Silos
6
4 Gas Godown
6
(ix) Recreational
Sr.
No.
Type of building
Area
norms
Maximum
permissible
Ground
Permissible
basement
Maximum
permissible
Floor Area
Maximum
permissible
Height
3. Biotechnology other
than Pharmaceuticals
on a road
with
Right of Way of
12 meters and
above.
4. Information
Technology/
Information Technology
Enable Services
5. Approved Information
Technology Park,
Cyber Park, Cyber
City, Technology Park
40%
Twin Level
250
%
18 Meters
Subject to
condition that
the plot must be
located on roads
with a Right of
Way of 15
meters and
above.
coverage
Ratio
(FAR)
meters
1 Recreational site in residential
zone such as Club/Community
Centre including swimming pool,
Badminton/Tennis/
Squash
Court, Indoor Games, Canteen/
Restaurant (not exceeding 200
square meters area) and related
uses.
Note:
a. Not more than 10% of the
permitted FAR to be allowed
for rooms.
b. Maximum 10% of the total
FAR can be utilized for
commercial use viz, Canteen/
Restaurants.
0.5
acre to
2 acres
40 %
Single level
100 %
15
2 Open Space Zone such as Mini
Amusement
Park,
Outdoor
games facility, Canteen (not
exceeding 200 square meters
area) and related infrastructure
requiring
minimal
construction
activity
Note:
The overall character of the site
shall be maintained as open
with minimum construction to be
permitted at site. However, Joy
rides/ water parks etc. Installed
in such projects, which are open
to sky
shall not be part of covered
2 acres
to 5
acres
10%
Single level
10%
15
area/ FAR.
Note:
A. Control of signs (hoardings) and outdoor display structures and transmission
tower, telephone tower, mobile/broadband tower, and outdoor display structure
(Apart from provisions laid down in NBC 2005)
7.4
General note
a.
The unrestricted height shall only be allowed subject to submission of No Objection
Certificate from the appropriate authority (i.e., Defense Establishment, Air Force
Establishment, Airport Authority of India, etc.), if any in the area. The same needs to
be sanctioned by Chief Engineer, PWD of UT Ladakh.
b.
It shall be the responsibility of the competent authority to procure the zoning map/
instructions issued by the appropriate authority (i.e., Defense Establishment, Air
Force Establishment, Airport Authority of India, etc.) for final checks and approval.
c.
Architectural/ Frame Control and siting of building
In the case of building sites where architectural control is considered necessary
by the competent authority shall cause to prepare Architectural Control Sheets
showing the extent of architectural control on various units of the buildings or on
the streets for such buildings to have a rhythmic façade and height control, inter-
alia, the following:
(i)
compulsory elevations for a particular building or a row of buildings,
(ii)
compulsory height on the front or on any side exposed to view from a
street upon which building shall have to be erected and completed within a
certain period,
(iii)
compulsory height of floors,
(iv)
compulsory height and design of cornices, sills and top of windows in the
first and higher stories,
(v)
compulsory building line along which the building shall have to be erected
and completed within a certain period,
(vi)
compulsory type designs of balconies,
(vii)
compulsory use of materials texture and colour, and,
(viii) building line in front, rear and side shall be as approved by the competent
authority.
(ix)
Chapter 5 & 6 for National Building Codes, 2016 needs to be referred, as
well as IS-Codes need to be incorporated for various building materials,
and prevalent building codes for common materials found in Ladakh needs
to be referred:
(a) IS-456 (2000) – Concrete/RCC
(b) IS-800 – Steel Structures
(c) IS-857 (Part 4): 1987 – Design loads (other than earthquake) for buildings and
structures - Snow Loads
(d) IS-2212- Brickwork
(e) IS-13077 – Mud Mortar Construction
(f) IS-1904 – Structural Safety
(g) IS-1905 – Structural use of unreinforced masonry
(h) IS – 3629 – Structural Timber
(i) Any other relevant codes as deemed necessary by Competent Authorities, as
mentioned in Chapter-3, and Annexure - D
d.
Special zoning
In case competent authority decides that it is not feasible to keep setbacks/
spaces as prescribed in these Bye-Laws due to peculiar shape and condition of
the site, then the competent authority after recording reasons in writing may
issue special zoning plan, keeping in view the fire safety measures given in Part
IV of NBC, and as updated from time to time.
e.
Green building measures and incentives
(i) For reducing consumption of total energy, fresh potable water and reduction in
total waste generation in modern buildings, the green building measures shall
be adopted by all buildings on plot measuring more than 250 square meters.
(ii) All buildings more than 200 sq. m. shall comply with the green norms and
conform to the requirements mandatory for sanction as per provisions
mentioned in Chapter-10 of Model Building Bye Laws 2016.
(iii) The applicant shall be awarded benefits of additional Floor Area Ratio (on
plot area) for adopting either green norms specified in sub-Code (iii) or by
getting building/ site/ project certified from Green Rating for Integrated Habitat
Assessment (GRIHA) /Indian Green Building Council (IGBC)/ Leadership in
Energy and Environmental Design (LEED)/ Green & Eco-friendly Movement
(GEM) certification and achieving rating as specified in Code 7.4 (e) (iv) Or
Applicants who install and successfully operate a geothermal heating system
in residential, Hotels, resorts and Govt. offices buildings to meet all the space
heating requirements of their building shall be awarded an additional Floor
Area Ratio (FAR) of 6% based on the plot area. However, the geothermal
heating system must comply with all relevant technical and safety standards
and verified by ULB.
(iv) The details of green norms for additional FAR:
(a) For Solar Power
Generating power in respect of total connected
load of building from solar photovoltaic power plant
15 to
25%
26 to
50%
51 to
75%
76 to
100%
Additional FAR for all building Uses (except
approved plotted residential)
3%
6%
9%
12%
(b) For installing Solid Waste Management Unit in industrial sites:
Installing Solid Waste Management Unit for treatment of total generated waste.
Additional FAR for all building uses (except approved plotted residential)
3%
(c) The details of rating achieved from GRIHA/IGBC/LEED and Additional
Floor Area Ratio (FAR) is as under: -
Additional FAR for all building uses (except
plotted residential)
3%
6%
9%
12%
15%
GRIHA rating
1
star
2 star
3 star
4 star
5 star
IGBC/LEED rating
-
-
Silver
Gold
Platinum
GEM Rating
-
GEM 2 GEM 3
GEM
4
GEM 5
Note: -
(i)
The additional FAR shall be given over and above the maximum
permissible FAR as stated in Code 7.3.
(ii)
The incentive of additional FAR for achieving GRIHA/IGBC/LEED/GEM
rating shall be applicable only in the case of erection and re-erection
buildings.
(iii) The incentive of additional FAR would also be applicable for buildings
which are under construction and registered with the rating agencies
(GRIHA/IGBC/LEED/GEM) and incorporating features for making Green
Buildings but have not yet obtained Occupation Certificate.
7.5
Procedure for availing incentive:
(i)
The
applicant
is
required
to
submit
provisional
rating
from
GRIHA/LEED/IGBC/GEM at the time of submission of building plan
application to the competent authority (Code 5.1 and 5.2, Chapter 3, and
Annexure ‘D’) for claiming incentive of additional FAR stated at Code 7.5
(iv),
(ii)
At the time of applying for Occupation Certificate of building, the applicant is
required to submit final rating from GRIHA/LEED/IGBC/GEM,
(iii)
The competent authority only after verifying that the GRIHA/LEED/IGBC/GEM
rating achieved in final rating is same as provisional rating submitted at the
time of building plan application, shall issue the Occupation Certificate.
Provided, in case the final rating achieved is lesser than the provisional
rating, the occupation certificate shall be issued after compounding additional
FAR (i.e., difference of additional FAR from provisional rating and final rating)
acquired by the applicant. However, the applicant may claim additional FAR,
if final rating is higher than the provisional rating.
(iv)
The applicant must submit a rating certificate for the building from
GRIHA/LEED/IGBC/GEM Compliance Certificate with respect to clause 6.5 (iii)
[duly issued by architect or engineer or Bureau of Energy Efficiency Certified
Energy Auditors as the case may be] is to be submitted after every five (5)
years. In case, s/he fails to submit this certificate, the authority, after giving
her/him one month notice may charge the compounding fee or may take
appropriate action on case-to-case basis by recording the reasons in writing,
thereof.
Chapter-8: Parking Spaces and Building Design Norms
8. Parking v/s Building
8.1
Parking Car Space norms for buildings land-use-wise shall be as follows:
(1) Car space Norms for residential plots:
Sr. No. Size of plot (square meters)
No of ECS
1
Above 180
2.00 ECS for each dwelling unit
2
Above 120 to 180
1.50 ECS for each dwelling unit
3
Above 100 to 120
1.00 ECS for each dwelling unit
4
Above 50 to 100
0.50 ECS for each dwelling unit
5
Upto 50
0.25 ECS for each dwelling unit
Note-One ECS=12.5 sq. m. to be indicated in car bay size of 2.5 m X 5 m in residential
plots.
No on street parking where the right of way of road/street is less than 12 meters shall be
permissible
(2) For Residential Plots, Minimum Parking requirement for individual plotted housing
shall be calculated @ 0.25 ECS for every 40 sqm of built-up area.*
*The norms are based on case studies of Building Bye-Laws for other hill cities.
The above clause has been referred to as per the Jammu and Kashmir Unified
Building Byelaws, 2021.
(3) For integrated/multi storied commercial building, big retail stores, restaurant,
multiplex/ cinema/ theatre, and shopping mall 1.0 ECS for every 50 square
meters of covered area,
(4) For offices, cyber park/IT park/cyber cities, 1.0 ECS for every 75 square meters
of covered,
(5) For shopping area and designated shopping markets being developed by
competent authority, 65% of total site area shall be kept for parking purpose,
(6) For hospitals,1.0 ECS for every 2 beds and for visitors 1 ECS for every 4 beds,
(7) For industries, 1.0 ECS for every 300 square meters of covered area,
(8) For assembly buildings (i.e., standalone theatres, cinema houses, concert
halls, auditoria, and assembly halls), 1 ECS for every 40 square meters of
covered area,
(9) For primary and secondary schools, 15% of total site area for parking purpose,
(10) For college, parking at rate of 1 ECS for every 200 square meters of covered
area,
(11) For government or semi-public offices including civil/ High Court, 1 ECS for
every 75 square meters of covered area,
(12) For hotels and motels, 1.0 ECS for every 75 square meters of covered area,
(13) For institutional/ educational/ assembly buildings with parking areas, designated
space in parking lots for on-site snow storage in areas that maximize sunlight
and melting, while being mindful of drainage considerations,
(14) Covered parking in the basement or in the form of multi-level parking above
ground level or stilt shall not be counted towards FAR. However, the footprint
of separate parking building block(s) shall be counted towards ground
coverage. For existing properties, separate parking area shall not be counted
towards FAR,
(15) Parking facilities need to include no-parking zones as per DCRs and Master
Plans of the respective Local bodies,
(16) Necessary changes may be made in the parking as per subsequent
Development Plans and requirement of the time for which the changes are
being provided. Furthermore, Code 3.3 of Model Building Bye Laws 2016
needs to be referred, wherever not mentioned in these Bye-Laws,
(17) In case of provision of mechanical parking in the basement floor/upper stories,
the floor to ceiling clear height of the basement/floor shall be maximum of
4.75 meters,
(18) No storage and commercial activities shall be permissible in the covered
parking areas,
(19) The misuse of the covered parking space shall immediately attract levy of
three times the penalty of the composition fee prescribed (i.e., applicable
collector rates for the locality) for the excess covered area in the respective
category,
(20) Fast charging facilities need to be incorporated at feasible locations for high
volume of vehicles.
8.2
Applicable Car Space norms for sub-code 8.1 (1) to (19) above shall be as under:
i.
1ECS = 23 square meters for open parking,
ii.
28 square meters for parking on stilts, and,
iii.
32 square meters for basement parking.
8.3
Party Wall
(1) In case the plot holder intends to construct a common boundary wall with
minimum width of 230mm, shall be required to submit consent of owners of
adjacent plots with which plot shares a common boundary i.e., the plot on
both sides and at the rear.
(2) Wherever the plot owner opts for independent boundary wall within the plot
boundary:
(i)
shall be allowed independent boundary wall only where adjacent plots are
vacant, and,
(ii)
the owner shall ensure that no part of foundation and boundary wall is
constructed on the adjoining plot.
8.4
Courtyard
Interior courtyard for light and ventilation of habitable rooms shall not be less
than 12.0 square meters in area and the minimum width of every such
courtyard in any direction shall not be less than 3.0 meters.
8.5
Plinth
(1) Plinth area shall be considered from Plot boundary Center line sharing the
approach road. The plinth of the main building shall be sited with respect to
surrounding ground level for proper drainage of the plot. The height of the
plinth shall not be less than 450 mm and more than 1.5 meters in the case of
independent building not sharing party wall. If the party wall is shared the
plinth level shall be the same as already laid for the party wall.
(2) The plinth of courtyard shall be at least 150 mm above the level of the street
from where entry to plot has been taken and shall be satisfactorily drained.
(3) In no case, any part of the ramp/steps connecting building plinth to street/road
shall lie on street/road and obstruct traffic movement.
8.6
Minimum area, size, height, light and ventilation required for different
components of Residential buildings
(1) Minimum area of a habitable room, kitchen and water closet shall be followed
in accordance with tablet given as under:
Sr.
No.
Room type
Minimum
area (in
square
meters
Minimum
width (in
meters)
Minimum clear
Height (in
meters)
Light and Ventilation
(area of openable
windows, ventilators)
1
Habitable
room
9.5
2.4
2.40
Not less than 1/8th of
the total floor area of
the room.
2
Kitchen
5.5
1.8
2.40
Not less than 1/8th of
the
total floor area of the
room.
3
Pantry
3.00
1.40
2.10
Not applicable
4
Bathroom
1.80
1.20
2.10
5
Water
Closet
1.1
0.90
2.10
6
Combined
Bath and
Water
Closet
2.8
1.2
2.10
0.3 square meters on
wall not less than 0.3
meters
wide.
7
Store
No restriction
No restriction
2.10
Not applicable
8
Garage
14.85
2.75 x 5.40
2.40
9
Doorways
Habitable
room
Not applicable
0.90
1.95
10 Doorways
for
kitchen,
bath, W.C
Not applicable
0.75
2.10
(2) Habitable room Size and height
(i)
in case of Group Housing scheme, the dwelling unit having more than one
room may have one of the rooms with a clear floor area not less than 7.5
sq. meters with one side not less than 2.4 meters,
(ii) in case of air-conditioned rooms, the height shall not be less than 2.4
meters measured from the surface of the floor to the lowest point of air
conditioning duct or false ceiling; and,
(iii) all doors and windows shall open directly or through a verandah or to a
permanent open space or an open space abutting the building not less than
1.8 meters in width.
,,
(3) Bathroom and Water Closet (W.C.)
(i)
Every bathroom and water closet shall:
(a) preferably be so situated that at least one of its walls shall have opening
for circulation of external air, with provision of exhaust fan, and,
(b) toilet be provided with impervious floor covering sloping towards the drain
with a suitable gradient.
(ii) where the water-closet in a building is not connected to exterior, it shall be
ventilated by mechanical means or through a vertical shaft open to sky of a
minimum size stated in the Model Building Bye Laws 2016, for ventilation
to toilet, bath, and water closet, and shall be counted in covered area,
(iii) no room containing water-closet shall be used for any other purposes
except as lavatory and no such room shall open directly into any kitchen or
cooking space by a door/ window or another opening, and every room
containing water- closet shall have a door completely closing its entrance.
(iv) soil or ventilating pipes shall not be allowed on the exterior face of any
building, provided these shall either be embedded in the walls or pipe ducts
to be provided to accommodate them.
(v) Security rooms each measuring maximum area of 3.0 square meters is
permitted only at the entry-exit gates of premises.
(vi) All commercial buildings should necessarily design a public toilet with winter
friendly technology and universal design. Buildings with plinth areas more
than 75 sqm shall be accessible from outside of main building block.
8.7
Boundary Wall, Fence, Gate and Porch
(1)
The location of gate shall be one side of front wall.
(2)
Maximum permissible height of front side boundary wall shall be not more than
1.2 meters from the mean level of abutting street in front of the plot from
where entry to the plot is taken.
Note: The owner/applicant if desires, not to construct the front boundary wall, is
permitted so to utilize for parking.
(3)
maximum height of boundary wall at rear and side of plot shall not be more
than 1.8 meters from the mean level of abutting street in front of the plot from
where entry to the plot has been taken.
Note: In case of plots above 2000 square meters, maximum height of boundary
wall at the rear and side of the plot shall not be more than 1.8 meters from
the abutting ground level.
(4)
a railing/grill with or without poly carbonate/fiber glass sheet covering for a
height of 0.75 meter shall be permitted over and above the maximum height of
boundary wall on all sides.
(5)
the temporary porches of polycarbonate sheets/fiber glass roof or any other
temporary material covering on suitable structure, shall be allowed in residential
plots with the condition that these shall be open on sides in the driveway area
within the plot.
(6)
boundary wall up to the height of 2.4 meters may be permitted by the
competent authority in industrial buildings, electric sub-stations, transformer
stations, institutional buildings like hospitals, industrial buildings like workshops,
factories and educational buildings like schools, colleges, including hostels and
other uses of public utility undertakings and strategically sensitive buildings.
(7)
Construction of boundary/compound walls of the site should be at least 10 m
away from the bank of the river, if the location is proposed near any riverbank.
8.8
Staircase
(1) Every building intended to be used as multiple residential building or commercial
or educational and institutional or industrial building shall be provided with
required number of staircases (accessible from a maximum distance of 30
meters (45 meters, if building has automatic sprinklers for firefighting) from any
part of the building, extending from ground floor level to the highest floor, having
following specifications:
(2)
minimum headroom in a passage under the landing of a staircase and the minimum
clear headroom in any staircase shall be 2.1 meters.
Sr.
No.
Type of building
Minimum
permissible clear
width of
staircase (in
meters)
Minimum
permissible width
of tread (in
meters)
Maximum
permissible height
of riser (in
meters)
1
Residential Plots up to 15
meters height
0.9
0.25
(Without nosing)
0.19
Plots above 15
meters height
1.2
2
Commercial Plots up to 50
square meters
area
0.9
0.25
(Without nosing)
0.15
Plots above 50
square meters
area
1.2
0.30
(Without nosing)
3
Assembly building
2.0
0.30
(Without nosing)
0.15
4
Educational building
1.5
0.30
(Without nosing)
0.15
5
Institutional building
2.0
0.30
(Without nosing)
0.15
6
Inland Container Depot
& Custom bounded
area
1.5
0.30
(Without nosing)
0.15
7
Industrial building;
1.5
0.30
(Without nosing)
0.15
8
Any other buildings
1.5
0.30
(Without nosing)
0.15
(3)
maximum numbers of risers in single flight are limited to 14 nos.
(4)
if a service or a spiral staircase is provided, its width shall not be less than 1.0
meter and its average tread width shall not be less than mention in table of sub-
Code (1).
(5)
notwithstanding anything contained in sub-Code (1), the staircases in the private
portion of a public building and industrial building, not open to the general public,
may be of the sizes mentioned for residential building.
8.9
Ramps and Lifts
(1)
Every building having more than 15 meters height shall be provided with a lift or a
ramp with an inclination of 1:10 in addition to the staircases. In all residential
buildings having more than 15 meters height, lift is mandatory to install in numbers
depending on the occupancy of building.
(2)
In case of public buildings with only ground floor, ramp shall be provided for
differently abled persons reaching its plinth level, if public buildings are of more
than one storey, lift or ramp shall be provided, but at ground floor, ramp shall be
provided for reaching plinth level of building.
(3)
Ramps:
(i) The ramp to basement and parking floors shall not be less than 6 meters wide for
two-way traffic and 4 meters wide for one-way vehicular movement, provided with
gradient not less than 1:8.
(ii) The minimum width of the ramps in hospitals shall be 2.4 meters for movement of
stretcher and for public use. In no case, the hospital ramps shall be used for
vehicular movement.
(iii) Ramps may also be provided in the setbacks which can be sloped considering
unhindered movement of fire engine and in no case the gradient shall be less than
1:8. (to be read with basement)
(iv) All structural design/safety aspects as per latest Bureau of Indian Standards Codes
and National Building Code, as amended from time to time, shall be complied along
with consideration of weight of fire engine and its maneuvering.
(v) A ramp for human movement shall have handrail on at least one side, and
preferably two sides with minimum height of 0.90 meters, measured from the
surface of the ramp. The handrails shall be smooth and extend to 0.30 meters
beyond the top and bottom of the ramp. Where predominant movement is of
children, the extra handrail shall be placed at a height of 0.76 meter.
(vi) Standards of Ramps to be referred from Fire safety perspective (Chapter 11, Model
Building Bye Laws, 2016) and Harmonised Guidelines and Standards for
Universal Accessibility 2021
(4)
Lifts
Wherever lift is required as per Code, provision of at least one lift shall be made for
the wheelchair users, with the following cage dimensions, recommended for
passenger lift of 13 persons capacity by the Bureau of Indian Standards:
(i)
Clear internal depth 1.1 meters.
(ii)
Clear internal width 2.0 meters.
(iii) Entrance door width 0.9 meter.
(iv) a handrail not less than 0.6 meter long and 1 meter above floor level shall be
fixed adjacent to the control panel.
(v)
the minimum size of lift lobby shall be 1.8 meters x 2.0 meters or more.
(vi) the interior of the cage shall be provided with Braille symbols and audible that
sounding the floor, when the cage reaches on a floor, indicating that the door
of the cage for entrance/ exit is either open or closed.
Further standards of lifts shall be referred from Code 5.4.4 of Model Building
Bye-laws, 2016, and National Building Codes, 2016, wherever applicable.
8.10
Passages and corridors
(1) The minimum width of corridors and passages in a residential building
shall be 1.25 meters and these shall be of fire-resistant material.
(2) Minimum width of any corridor and passage in case of residential buildings
with multiple dwelling units and for other types of buildings, shall be as
given below:
Sr. No.
Building type
Minimum permissible width of passage and
corridor (in meters)
1
Residential
1.25
2
Commercial
1.25
3
Assembly
2.0
4
Educational
2.0
5
Institutional
2.0
6
Inland Container Depot &
Custom bounded area
1.5
7
Industrial
1.5
8
Hospital, nursing homes, etc.
2.4
9
All other building including
hostels.
1.5
(3) The clear headroom height of passage and corridors shall, in no case, be
less than 2.15 meters.
(4) All surfaces including ceiling shall be of fire-resistant materials.
(5) All the passages and corridors shall be naturally lighted and ventilated and if
not possible, provision for artificial lighting and mechanical ventilation shall be
made.
8.11
Outside Seating
(1)
Seating and gathering places need to be oriented in public spaces to maximize
sunlight and offer some wind protection.
(2)
Climate sensitive materials for seating need to be used, e.g., wood, or heated tiles
need to be chosen for the design.
(3)
Benches and cluster seating near shrubs and coniferous trees to be provided,
where possible, for protection from extreme cold winter. A variety of styles of
benches and tables need to be explored that are moveable, so people may
choose to group with others or sit alone. Public provisions need to be explored by
competent authorities.
8.12
Exit
(1)
The requisite number and sizes of various exits shall be provided, based on the
occupants in each room and floor, on the occupant load, capacity of exits, travel
distance and height of buildings as per provisions of Part 4- Fire and Life Safety,
National Building Code, as updated from time to time.
(2)
At least one primary entrance and exit to each building shall be usable by
individuals in wheelchairs, indicated by a sign and on a level that would make the
elevators accessible.
(3)
Arrangement of Exits
(i) Exits shall be so located that the travel distance on the floor shall not exceed
22.50 meters for residential, educational, institutional, and hazardous occupancies
and 30.0 meters for assembly, business, mercantile, industrial and storage
occupancies. Whenever more than one exit is required for a floor of a building they
shall be placed as remote from each other as possible. All the exits shall be
accessible from the entire floor area at all floor levels.
(ii) The travel distance to an exit from the farthest point shall not exceed half the
distance as stated above.
Note: In the case of fully sprinklered building, the travel distance may be increased
by 50 percent of the values specified.
(4)
Width of Exit (to be read with sub code 8.6)
(i) No exit doorways shall be less than 1 meter in width except assembly and
institutional buildings where it shall not be less than 2 meters,
(ii) Exit doors shall open outwards, that is away from the room but shall not obstruct
the travel along any exit. No door when opened shall reduce the required width of
stairway or landing to less than 0.90 meter. Overhead door shall not be installed.
8.13
Means of Access
(1)
No Building shall be erected which deprives any other building of its means of
access.
(2)
If there are any bends or curves in the approach road, sufficient width shall be
permitted at the curve to enable the fire tenders with a turning circle minimum of
9.0 meters radius.
(3)
Other provisions of means of access for buildings other than plotted residential and
commercial shall be as under:
(i)
The approach to the building and open spaces on its all sides up to 6.0 meters
width, shall have composition of hard surface capable of taking the weight of fire
tender, weighing up to 22 tons for low rise buildings and 45 tons for building with a
height of 15 meters and above. The said open space shall be kept free of an
obstructions/hindrance,
(ii) Main entrance to the premises shall be of adequate width to allow easy access to
the fire tender and in no case, it shall measure less than 6.0 meters. The entrance
gate shall fold/ slide back against the compound wall of the premises, thus leaving
the exterior access way within the plot free for movement of the fire service
vehicles. If archway is provided over the main entrance, the height of the archway
shall not be less than 5.0 meters,
(iii) In case of basement extending beyond the building line, it shall be capable of
taking live load of 45 tons in the case building 15.0 meters and above in height
and 22 tons for building less than 15.0 meters in height,
(4)
Every person who applies for permission for erection or re-erection of a building
shall also submit NOC from the concerned authority for accessing the National
Highway and State Highway.
8.14
Light and Ventilation of building
(1)
Every room that is intended for human habitation shall abut on an interior or
exterior open space or on to a verandah which opens to such interior or exterior
open space.
(2)
The whole or part of one side of one or more rooms intended for human habitation
and not abutting on either the front, rear or side open spaces shall abut on an
interior open space whose minimum width in all directions shall be 3.0 meters in
case of buildings not more than 15 meters in height, and in case of buildings
above 15 meters, the provision of Code 7.2 (1) shall apply.
(3)
Sunken courtyard up to the lowest floor of basement(s) shall be allowed as ‘light
well’ within building envelop for light and ventilation for basement area subject to
drainage provisions.
(4)
Other provisions for light and ventilation in buildings other than plotted residential
and commercial schemes where exterior open-air space is intended to be used for
the benefit of more than one building on same plot/site, then the width of such
open-air space shall be the one specified for the tallest building abutting on such
open-air space, as given below:
Sr.
No.
Height of Building
up to (in meters)
Exterior open spaces to be left on all sides of building
blocks (in meters) (front, rear and sides in each
plot)
1.
10
3
2.
15
5
3.
18
6
(5)
Ventilation shaft
For ventilating the water closets and bathrooms, if not opening on the front,
rear and interior open spaces, can open on the ventilation shaft, the size of
which shall not be less than the values given below:
Sr. No. Height of Building
(in meters)
Minimum size of Ventilation Shaft
(in square meters)
Minimum width of
Shaft (in meters)
1.
Up to 10.0
1.2
0.9
2.
Up to 12.0
2.8
1.2
3.
Up to 18.0
4.0
1.5
Note:
(i)
For fully air-conditioned buildings the ventilation shaft shall not be
required, provided the air- conditioning system works on uninterrupted
source of power supply including power backup system.
(ii)
Horizontal ducting for ventilation may be installed in building with exhaust
fan of appropriate capacity for discharging used air to the external space
of building.
(6)
Integrated Heating and Winter Friendly Heating Systems need to be
incorporated at building levels. Chapter 10.2.3, and 10.2.4, Model Building Bye
Laws, 2016 need to be referred for specifications.
8.15
Cantilevered roof and chajja projections
(1)
No building verandah, chajja or other projections from the face of the building
shall be allowed to be erected or re-erected on or over a road or beyond the
boundaries of the applicants own land/ plot in view of safe distance from an
overhead power line.
(2)
Balcony of a width of maximum 1.80 meters in front and rear sides of a plot
can be permitted within the plot, provided the width of balcony does not
exceed half of the width of setback beyond it shall not be compounded and
has to be rectified, if exceeding.
(3)
On plots of the size of 300 square meters or above, where side setback has
been provided, a balcony of maximum width of 1.0 meter, inside set back can
be permitted.
(4)
Roofs shall be designed to prevent falling ice, snow, etc. onto entrances and
walkways. Snow guards to be included in the roofs to prevent hazards and
avoiding snow accumulation on gutters, etc.
(5)
Roof shapes against pedestrian accesses and/or exterior amenity areas to
reduce ice and snow hazards. These shapes may include elements such as
slippery sloped surfaces, curved roofs, roof steps and the direction of shedding
snow loads.
(6)
Lightwells and roof orientation need to increase solar access to building
interiors and covered outdoor spaces.
(7)
Sunshades over opening can be allowed subject to the following:
(i)
Sunshade of 0.23-meter width may be permitted over any road/over any
park/public place,
(ii)
Sunshade if permitted, shall be not less than a height of 2.3 meters from
the ground level to project up to a maximum of 0.45 meter within the
applicants own land, provided it does not exceed half of the width of
setback/open space.
8.16
Mezzanine floor
(1)
A mezzanine floor or internal balcony shall not be permitted unless the height
of the room is minimum 5.0 meters and such mezzanine floor or balcony does
not cover more than 1/3rd of the room area. The area of such mezzanine floor
shall not be counted in FAR.
(2)
The clear height of such mezzanine floor or internal balcony shall not be less
than 2.3 meters from the floor level to the soffit of ceiling.
8.17
Motor Garage
(1)
The minimum size of a private motor garage shall be 2.75 meters X 5.0
meters. The clear height of the garage shall not be less than 2.40 meters.
The plinth of the motor garage shall not be less than 150 mm above the
average ground level.
(2)
A garage is permissible within the zoned area and shall be counted in the
covered area.
(3)
Garage shall not be used for habitable purposes.
8.18
Minimum provisions for a dwelling unit
Each dwelling unit shall have following minimum provisions, for granting permission
to construct or use/occupy:
For Economic Weaker Section (EWS)
Other than EWS
(i) A Living/bedroom.
(ii) A Pantry,
(iii) One Bathroom and water closet (W.C)
integrated.
(i) A Living/bedroom.
(ii) A kitchen,
(iii) One Bathroom and One latrine or
W.C integrated.
The sizes shall be read comprehensively in conjunction with the General Building
Requirements of Model Building Byelaws by MoHUA, and National Building Code,
2016, and/or reiterations, or Government of India orders as necessary. These acts
shall be read with the Jammu and Kashmir Development Act, 1970, and Ladakh
Autonomous Hill Development Council Act, 1997. Furthermore, the dwelling units are
not to be subdivided into further units less than the mentioned norms in the
aforementioned documents. Also, a single dwelling unit shall not be converted into
apartments if it violates the minimum dwelling unit provisions as per these byelaws
and referred documents. The transfer of rights and subdivisions should not be less
than the minimum dwelling sizes and should be read with the aforementioned
documents.
8.19
Basement
(1)
The construction of the basement shall be allowed by the Competent Authority
in accordance with the provisions of these Bye-Laws.
(2)
The basement shall be constructed exactly below the building which may be
put to following uses:
(i)
Storage of household or other goods of ordinarily non-combustible material,
(ii)
Strong rooms, bank cellars, etc.,
(iii)
Air-conditioning equipment and other machines used for services and utilities
of the building,
(iv)
Modern automated laundry may be allowed only in the basement of Hotel and
Hospital/ Nursing Home sites, group housing, hostels, service apartments, as
an ancillary services for the purpose for which permission is granted by
Competent Authority and meant for in-house services only and subject to the
condition that these meet the public health requirement such as effluent of the
laundry properly pumped up to the ground floor inspection chambers and
discharged to the main sewer, and also for lift/escalator lobbies and parking.
(3)
The use of basement shall be specified in the building plans at the time of
submission, stated in Code 4.1 and 4.2.
(4)
The basement shall have the following provisions:
(i)
Light and ventilation of basement:
a. an open area of a minimum width of 1.8 meters shall be provided across
the full length and/ or width of the basement storey. This area shall be
within the limits of the site and shall be paved with impervious material
above a concrete bed and shall be completely unobstructed,
b. in the case of buildings governed by the zoning approved by the
competent authority, basement stories shall be lighted and ventilated by
means of windows of the minimum area within 1/10th to 1/25th of the total
floor area, at least half of which must open subject to the condition that
the deficit of light and ventilation shall be made up by providing artificial
lighting and mechanical ventilation as per provision of National Building
Code of India,
c. in case of buildings governed by Architectural Control and the basement
are for storage/ services, the provisions of light and ventilation shall be as
shown on the control sheets, and
d. in the second basement i.e., basement lower than below the ground floor
where it is to be used for parking/ services, part IV of National Building
Code to be adhered.
(ii)
Damp proofing of basement:
The walls of the basement story shall be damp-proof for effectively securing
against dampness from the soil.
(iii)
Height of the basement
a. The minimum clear height of the basement shall be 2.4 meters and
maximum clear height of the basement shall be up to 4.75 meters from
floor to the underside of the roof slab or ceiling subject to structural
stability to be certified by the civil/structural engineer.
b. The minimum height of the roof of basement shall be 0.45 meters (with
mechanical ventilation/cutout in stilts) and maximum 1.5 meters above the
average surrounding ground level for plots up to 1000 square meters.
c. For plots above 1000 square meters, can be up to 1.5 meters above the
average surrounding ground level.
(iv)
Drainage of basement
a. Open area adjoining a basement story, if any, shall be effectively drained
to the satisfaction of the Competent Authority.
b. The responsibility of draining the basement storey/stories and for protecting it
from rain shall be of the owner.
c. The access to the basement shall be separate from the main and
alternative staircase providing access and exit from higher floors.
d. Where the staircase is continuous in the case of buildings served by more
than one staircase, the same shall be of enclosed type serving as a fire
separation from the basement floor and higher floors. Open ramps shall be
permitted if they are constructed within the building line subject to the
provision of Code 8.9.
e. The “Exit” requirements in basements shall comply with the provisions of
Part 4 ‘Fire and Life Safety’ of National Building Code of India.
(5)
Basement shall not be constructed beyond the zoned area or in case there is
an adjacent existing building, a setback of 2.4 meters shall be taken from the
existing adjacent building.
8.20
Fire
(1) Fire protection measures provided in Part IV of National Building Code of India,
dealing with the fire protection measures as updated from time to time, shall be
adhered.
(2) The fire provisions made in the building wherever applicable, shall have to be
got verified from the Competent Authority or officer authorized from fire safety
point of view and accordingly a certificate shall be submitted by the owner.
(3) All public buildings, as well as publicly accessible buildings including but not
limited to hotels, guesthouses, restaurants, commercial complexes, hospitals,
government offices, bus stations, airports, schools, institutions, wellness centers,
religious buildings, multilevel car parking, apartments, etc. should have fire
evacuation plans on each floor. The evacuation plans themselves should
incorporate feasible locations for the placement of evacuation plans and should
be vetted by an architect/engineer/appropriate authority as given power by the
UT Administration.
(4) Notwithstanding the provisions mentioned in the previous sections, Chapter 11 of
Model Building Bye Laws, 2016 for Fire Protection and Fire Safety requirements
need to be adhered to. This is to include but shall not be limited to provisions
for building components, means of access, fire escapes, stairs & staircases, lifts,
basement, helipad, service ducts, refuge chute, electrical services, staircase and
corridor lights, air-conditioning, fire dampers, boiler room, electric supply, fire
protection requirements, water storage, sprinklers, extinguisher systems, alarm
systems, material of construction, storage of chemicals & materials, and
occupancy restrictions.
Chapter-9: Climate Change and Sustainable Measures in Cold Desert
9.1.
Rainwater/Snow-Melt Harvesting for Ground Water Recharge
Arrangement for roof top and ground surface rainwater harvesting within the
plot may be made by the plot owner plot measuring more than 200 square
meters, or as may be decided by the UT Administration/Municipal
Committees:
(1) Recharging of ground water shall be preferred not only for residential buildings
but for all types of buildings, including Group Housing Societies having a plot
area more than 250 square meters,
(2) The Ground Water Recharge shall be preferred for open spaces like parks,
parking, plazas, playgrounds, and other common areas. The harvesting and
recharge structures should be constructed by the Authority by associating
community-based organizations including Resident Welfare Associations, or by
any other agencies or client themselves,
(3) Where snow remains on the surface within a plot or in parks, open spaces,
the water of melting snow should flow to the ground water recharge system.
9.2. Rainwater/Snow-Melt Harvesting System Measures
i.
The collection, conveyance, and dispersal of rainwater for harvesting should
only be of clear water to check contamination of ground water. This shall
include ‘filtration and storage’ of surface run-off for limited range, and re-use
of collected and filtered rainwater.
ii.
The entry or pouring points of the rainwater shall be designed to remain
covered.
iii.
The arrangement of quick filtration of rainwater/snow-melt shall also be made
in the rainwater/snow-melt harvesting well/ tube well so that rainwater does
not choke the strata.
iv.
The complete rainwater/snow-melt harvesting system shall be constructed
within the available area of the plot.
v.
The recharge well shall be located at a distance of not less than 10 meters
away from any structure handling sewage or industrial wastewater (such as
septic tank or effluent treatment plant etc.). This minimum distance of 10
meters shall not be applicable to manholes or sewer lines although it shall
be ensured that they are leak proof.
vi.
The detailed proposal of the system comprising collection, conveyance and
dispersion of rainwater harvesting well/ tube well shall have to be shown on
the building plan submitted for approval.
vii.
The Owner/ competent professional duly engaged for supervision and
execution of the construction of the building shall submit the certificate stating
that the rainwater harvesting system is functional at site and same conforms
to the provisions of these Bye-Laws. However, if the said person is found
guilty of misrepresentation of the facts, penal proceedings shall be initiated
along with debarring the concerned professional from practicing in the UT of
Ladakh.
viii.
The construction of the building as laid down in sub-clause (1) shall be the
part of occupation certificate. Unless such construction is completed as per
the approval, occupation certificate shall not be issued.
ix.
The owner of every building shall ensure that the rainwater/snow-melt
harvesting structure, if any, is maintained in good repair for storage of water
of non-potable purposes and recharge of ground water at all times.
x.
Groundwater extraction needs to be regulated; water meters need to be
installed for recording flow/quality of water extraction. District metered areas
and connection to SCADA system needs to be incorporated for all
connections.
xi. Snowmelt run-off drains, if any, need to be away from pathways in order to
prevent hazards due to freeze-thaw cycles.
xii. Chapter-9 of Model Building Byelaws, 2016 need to be referred for
incorporating further techniques and measures of Rainwater Harvesting.
xiii. Any further guidelines and rules released by Govt. of India/UT Acts, Laws,
and Byelaws would be applicable as notified from time to time.
9.3. Compulsory tree plantation to increase tree cover
i.
To reduce cold desert effect in Ladakh, measures to increase the vegetal
cover shall be enforced. Each household shall plant a minimum of one
number of native plant on the proposed construction site.
ii. To enhance fertility in the sand-shedding slopes, the biodegradable waste
shall be deposited in layers under the sand cover to allow decomposition. The
layers of waste shall be watered by the recycled treated water which will
facilitate natural growth of vegetal cover in days to come.
iii. Such sand-shedding slopes where snow is received even in meager quantity,
shall be terraced, or provided with check dams to store the snow and allow
the water to percolate gradually, in the biodegradable waste layers.
iv. The kitchen waste, waste from food industry, fruit and vegetable markets,
horticulture waste shall be carried to the sandy surface and deposited below
the sand layers and sprinkled with the recycled treated water, or surface
water/ground water, as the case may be.
9.4. Provision of Rooftop Solar Photo Voltaic Power Plant
i.
"Minimum 50% of the total energy demand should be met through rooftop
solar panels in all commercial buildings, and minimum 80% of the total
energy demand should be met through rooftop solar panels in all government
buildings."
ii. Installation of Solar Photovoltaic Power Plant as per Code 9.3 (i) above, shall
be part of the occupation certificate.
iii. The Competent Authority shall empanel consultants (experts in solar photo
voltaic power plant installations) for inspecting, verifying, and issuing
certification for installation of Rooftop Solar Photovoltaic Power Plant and
solar evacuated tube collectors for hot water.
9.5. Provision of Energy Conservation Building Code/ Eco-Niwas Sanhita
i. The provision for Energy Conservation Building Code/ Eco-Niwas Sanhita
shall be mandatory applicable on buildings/ areas in accordance with the
direction issued by Administration of UT Ladakh from time to time.
ii. The applicant/ owner along with building plan application shall submit a
certificate from a competent professional confirming that the building plans
confirms to the Energy Conservation directions.
iii. Occupation certificate of building to be issued by the competent authority
only after the applicant/ owner submits a certificate from a competent
professional (who has supervised the construction of building) that the
building has been constructed in accordance with the provision of the Energy
Conservation directions.
iv. The applicant/owner shall submit building plans along with the submission of
Design Stage and Occupancy Stage ECBC/ENS Compliance Forms and/or
Simulation Report duly signed and stamped by Bureau of Energy Efficiency
(BEE) Approved Empaneled Experts/Firms confirming or from Ladakh UT
Level empaneled competent professionals that the building plans and
construction confirms to the Energy Conservation directions as per
ECBC/ENS and Ladakh ECBC/ENS (once notified).
9.6. Recycling of Treated water
i. The sites or buildings in a complex or individual building, discharging water
30,000 liters and above, per day, shall have the treated wastewater recycle
system for horticultural, flushing, cooling tower purposes, etc. to increase the
vegetal cover and minimize the use of potable water.
ii. The dual pipe system shall be adopted in these buildings and indicated in
building plans submitted for approval.
iii. In order to mitigate water pollution, the bulk waste generators including
Hotels, restaurants/cafes, laundry, car wash facilities etc. should provide
Effluent Treatment Plants to treat wastewater generated from their respective
units
iv. Water conservation measures need to be adopted/regulated to maximize the
use of treated STP water for non-potable purpose/gardening, construction
activity, toilet flushing, etc. as per Code 9.6 (1) and 9.6 (2).
v. Any Govt. of India/UT Ladakh Acts, laws, byelaws, notifications, and statutory
provisions shall be binding and applicable as notified from time to time.
9.7. Removal of Construction and Demolition Waste
i. The Construction and Demolition Waste shall be managed in line with the
provisions of the Construction and Demolition Waste Management Policy,
Strategy and Action Plan.
ii. Accordingly, the owner shall be responsible for ensuring that Municipal
Committees shall be contacted for doorstep collection, or through collection
points as may be dedicated by the MCs for suitable collection mechanism.
The necessary fee mechanism shall be in line with the user charges set by
the Municipal Committees, and/or other authorities as designated by UT
Administration.
9.8. Sustainable Habitat
(1) Part-11 Approach to Sustainability of National Building Code need to be
referred for detailed approach to sustainability. This shall include but not be
limited to the built environment, ecological footprint, renewable resource, 3Rs
(reduce,
reuse,
recycle),
sustainable development,
thermal conditioning
(capacity,
conductance,
conductivity,
etc.),
technology
options,
disaster
preparedness, water management, site design and development, external
landscaping, fenestration designs, rainwater harvesting, water elements and
irrigation, access design, parking, lighting, envelope optimization and materials,
along with any other relevant sections.
(2) CPWD Guidelines for sustainable habitat need to be referred to incorporate
sustainable architecture and layout planning, sustainable index and guidance of
materials, selection of equipment for electrical and mechanical services for
sustainable buildings and reuse and recycling of construction & demolition
waste. These shall include energy efficiency design and process, site
development, building orientation and shading, design strategies for day
lighting, building envelope, design strategies in cold climate, reduction in overall
embodied energy of building materials, integrated water management, solid
waste management, sustainability index, building materials, functional life
period, capital cost, building loads (live and dead loads), power saving, lighting,
HVAC and solar power, along with any other relevant sections.
(3) The following supplementary building materials (derived or processed from
waste) may be suitably used while constructing building in combination with
conventional resources in addition to mud bricks:
(i)
Panels, hollow slabs, hollow blocks, or other factory materials which
consume less water.
(ii)
Fly Ash bricks, Portland Pozzolana cement, Fly-ash concrete, phosphor
gypsum-based walling & roofing panels, particle wood, Recycled use of
industrial/agricultural by-products.
(iii) Fly ash/ AAC (Autoclaved Aerated light weight Concrete) panels/ CLC
(Cellular Light weight Concrete) panels- Ensuring thermal comfort.
(iv) Use of timber from rapidly growing plants from environment point of view.
(v)
Compressed Soil Earth Block and Rammed Earth Walls and Vaults.
(vi) Use of Polyurethane Foams (PUF), Extruded Polystyrene (XPS), Expanded
Polystyrene (EPS), Rockwool, Glasswool as per the suitability to keep
building insulated
Further materials and techniques shall be referred as per Code 9.6(1) and Code
9.6(2) of these Bye-Laws.
(4) Solar passive techniques specific to Ladakh need to be incorporated. This is to
include inputs from competent authorities to provide sustainable building
techniques, solar passive heating and comfort retention techniques, thermal
insulation technologies to provide sustainable solutions to extremities of cold
desert climate. The techniques should be in accordance with Code 9.6 (1) and
Code 9.6 (2) of these Bye-Laws for a more inclusive design.
(5) The following passive heating provisions need to be provided in accordance
with Code 9.6(1) and Code 9.6(2):
a. 50 % of bricks within a Govt and commercial buildings at each floor
must be of locally manufactured Compressed cement stabilized mud
bricks or Rammed earth blocks or Sun-dried earth blocks or locally
available stone in all structurally designed RCC framed structure
including steel fabricated structures.
b. All hotels, resorts, guest houses, and government residential buildings
shall have mandatory double-glazed UPVC or wooden-framed double
glazing.
c. The installation of hydro pneumatic pump systems in commercial and
government residential buildings is recommended to supply water on
demand efficiently. Additionally, the use of heat pump systems is
suggested as an energy efficiency measure in all govt residential and
commercial buildings.
d. North-south orientation should be optimized for utilizing maximum
sunlight, wherever possible, along the main path of the sun, exposing
maximum facades to higher solar radiation.
e. Most openings (doors, windows, vents) should face east west to
enhance sun exposure. The window positions should allow optimal
use of daylight, but with a large surface to enhance solar radiation
inside. Horizontal glazing should be preferred.
f.
Major hindrances should be avoided on South orientation of the
buildings for utilizing maximum sunlight.
g. Avoid overglazing- excessive areas of glass can be a large energy
liability product with low conductivity or U value (for example, double
glazing) and high solar heat gain coefficients (SHGC) to be used.
h. Window frames also conduct heat. Timber, uPVC, or thermally
separated metal window frames can be used in cooler climates to
prevent heat transfer.
i.
Permanently shaded glass at the top of the window is a significant
source of heat loss. To avoid this, the distance between the top of
glazing and underside of eaves or other horizontal projection should
be 50% of overhang or 30% of window height, where possible.
j.
Living areas and the kitchen are usually the most important locations
for passive heating because they are used during the day and in the
evening. Bedrooms generally require less heating, because it is easy
to get warm and stay warm in bed. Children’s bedrooms can be
classified as living areas if considerable hours are spent there. Utility
and service areas such as bathrooms, laundries and garages are
used for shorter periods, require smaller windows, and generally
require less heating. The orientation of these rooms may be done
accordingly.
k. Design doors to blow closed if left open in strong winds or consider
using spring closers on external doors. Principles of good insulation
for doors and windows as shown below:
•
Airlock doors
•
Sealing around doors, windows and roofs
•
Double glazed windows and doors
•
Relevant thermal mass and lag of materials
•
Trombe walls
l.
Allow sufficient space between doors so that it is easy to close the
outer door before opening the inner door (or vice versa)
m. Insulation -
Ceilings and roof spaces account for 25–35% of winter heat loss. To
prevent heat loss, place most of the insulation next to the ceiling
because this is where the greatest temperature control is required.
n. Floors account for 10–20% of winter heat loss. In cool climates,
insulate the underside of suspended timber floors and suspended
concrete slabs. Insulate the edges of ground slabs. Insulation is not
required beneath earth-coupled concrete slabs; however, it may be
desirable when groundwater is present. Waffle pod construction helps
to insulate under slabs.
o. Walls account for 15–25% of winter heat loss. Insulation levels in walls
are often limited by cavity or frame width. In cold climates, alternative
wall construction systems that allow higher insulation levels are
recommended.
(6) 3D- printed housing techniques may be provisioned for construction of
buildings. The construction shall need to meet the safety and
habitability conditions laid against National Building Code, 2016, Model
Building Bye Laws, 2016, and Unified Ladakh Building Bye-Laws
2024.
Chapter-10: Guidelines for Universal Design
The norms, other than the ones mentioned in this chapter shall be in accordance with
Harmonised Guidelines and Standards for Universal Accessibility in India, 2021. These
shall include design elements, and standards to for an include universal design.
10.1. Provision/ facilities for Differently abled Persons and Women
a) In all public buildings/places of public gathering, the level of the roads,
access paths and parking areas shall be described in the plan, along with
specification of the materials.
b) It should be ensured that during winter the ramps, canopies and sheds are
kept dry and non-slippery.
c) Women friendly facilities should be ensured in all public spaces. Furthermore,
all of them must be installed with incinerators for sanitary pads, as well as
other safe-hygiene measures for the same.
d) The specified facilities in public buildings/sites for differently abled persons
shall be as follows:
(i)
Parking: For parking of vehicles of differently-abled people the following
provisions shall be made: -
(a) surface parking for two car spaces shall be provided, near the
entrance, for the differently abled persons, with maximum travel
distance of 30 meters from building entrance,
(b) the parking bay shall be of minimum 3.6 meters in width and marked
as reserved for wheelchair users.
(ii)
Every building shall have at least one entrance accessible to the differently-
abled and shall be approachable through a ramp in addition to the stepped
entry made of non-slippery material with a minimum width of 1.5 meters in a
maximum gradient of 1:12, length of ramp shall not exceed 9.0 meters having
0.8 meters high handrail on both sides of extending 0.3 meters beyond top
and bottom levels of the ramp. The minimum gap between the wall and the
handrail shall be 5 cm.
(iii)
Stepped approach- For stepped approach, size of tread shall not be less
than 0.3 meters and maximum riser shall be 0.15 meters with provision of
0.8 meters high handrail on both sides of the stepped approach similar to
the ramped approach shall be made.
(a) Exit/ entrance door- Minimum clear opening of the entrance door shall
be 0.9 meters and shall not be provided with a step that obstructs the
passage of a wheelchair user.
(b) Entrance landing- Entrance landing shall be provided adjacent to the
ramp, with the minimum dimension of 1.8 meters x 2.0 meters.
(iv) Corridor connecting the entrance/exit for the differently abled; the corridor
connecting the entrance/exit for differently abled leading directly outdoor to a
place where information concerning the overall use of the specified building
can be provided to visually impaired persons by a person:
(a) the minimum width of corridor shall not be less than 1.5 meters,
(b) in case there is a difference of level, slope-ways shall be provided with
a slope of 1:12 with specified above handrails.
(v)
Stair-ways- One of the stairways near the entrance/exit, for the use of
differently abled, shall have the following provisions:
(a) the minimum width shall be 1.35 meters,
(b) height of the riser shall not be more than 0.15 meters and width of the
tread 0.30-meter, maximum number of risers on a flight limited to
maximum 12,
(c) handrails shall be provided on both sides.
(vi) Lifts- Wherever lift is required as per NBC, provision of at least one lift shall
be made for the wheelchair users, with the following cage dimensions,
recommended for passenger lift of 13 persons capacity by the Bureau of
Indian Standards:
(a) Clear internal depth 1.1. meters,
(b) Clear internal width 2.0 meters,
(c)
Entrance door width 0.9 meter,
(d) a handrail not less that then 0.6 meter long and 1.0 meter above floor
level shall be fixed adjacent to the control panel,
(e) the lift lobby shall measure 1.8 meters x 2.0 meters or more,
(f)
the time of an automatically closing door shall be minimum 5 seconds
and the closing speed shall not exceed 0.25 meter/ second,
(g) the interior of the cage shall be provided with a device that audibly
indicates the floor. When the cage reaches on floor, it shall indicate that
the door of the cage for entrance/ exit is either open or closed.
(vii)
Toilets: One special water closet shall be provided with essential provision
of wash basin inside toilet near the entrance having:
(a) minimum dimensions of 1.50 meters x 1.75 meters,
(b) minimum clear opening of the door of 0.90 meter and shall
swing out,
(c) suitable
arrangement
of vertical/horizontal
handrails
with 50mm clearance from the wall.
(viii) Drinking Water: Suitable provision of drinking water shall be made for the
differently abled persons near the special toilet provided for them.
(ix)
Designing for Children: In the building meant for the predominant use of
children, the height of the handrail and other fittings and fixtures, shall suit
the requirements of children.
Chapter-11: Structural Materials
11.1.
Materials
The requirement of building materials to be used in construction shall
conform to the Building Materials specified in Part V of the National
Building Code of India, as updated from time to time.
11.2.
Foundations
(1) The loads and forces shall be calculated in accordance with Structural
Design Section on Loads of specified Part VI of the National Building
Code of India, 2016, as updated from time to time.
(2) The structural design of foundations and elements of substructures and
superstructures of wood, masonry, reinforced, or pre-stressed concrete
shall be in accordance with Part VI- Structural Design, Section 1- Loads,
Section 2- Foundations, Section 3- Wood, Section 4- Masonry, Section
5- Concrete, Section 6- Steel and Section 7- Prefabrication and Systems
Building, of the National Building Code of India, as amended from time
to time.
(3) Occupancy type and occupancy loads per 100 sqm of plinth or covered
area need to be specified as per National Building Code of India, 2016
(as amended from time to time) and Chapter 4: Model Building Bye
Laws.
11.3.
Building Services
The planning, design, and installation of heating systems or air-conditioning as
the case may be in a building shall be in accordance with Building Services,
Section 2- Electrical Installations and Section 3- Air-Conditioning and Heating
specified in Part VIII of the National Building Code of India, as updated from
time to time.
11.4.
Plumbing Services
The planning design and installation of water supply systems, drainage,
sanitary installations, and gas supply installations in a building shall be in
accordance with Plumbing Services, Section 1- Water Supply, Section 2-
Drainage and Sanitation and Section 3- Gas supply specified in the Part IX
of the National Building Code of India, as updated from time to time.
11.5.
Construction Practices and Safety
(1) The
various
activities
including
demolition,
excavation,
blasting,
construction from foundation level up to completion shall be in
accordance with Construction Practices and Safety specified in the Part
VII of the National Building Code of India, as updated from time to
time.
(2) The Safety Measures to be adopted during various construction
operations, including storage of materials on the construction site and
municipal/public land shall be in accordance with Construction Practices
and Safety specified in the Part VII of the National Building Code of
India, as updated from time to time.
11.6. Damp Proof Course
Wall of a building including a pier forming a part of the wall or a
compound wall shall be provided with a damp-proof course, except when
built in cement concrete rated of 1:2:4.
Chapter-12 Public Health Installations
12.1. Two pipe system in drainage
(1)
The drainage system in a building shall be of two pipe system, one for soil
and another for waste. The soil pipe(s) to be connected to the drain directly
and the waste pipes first in a gully trapped and then to the drain. All traps
to be ventilated vertically.
(2)
In Group housing, commercial complexes, commercial (other than plotted),
institutional, industrial, other building specified by the competent authority in
accordance with Code 8.4, the water from waste pipes shall be treated within
the premises and used for flushing, horticulture, cooling tower etc. purposes.
Further, no soil/ waste pipe shall be allowed in common wall/party wall.
12.2. Minimum sanitary facilities required for various type of buildings
(1)
Dwellings with individual convenience shall have at least the following fitments:
(i) one bathroom provided with a tap:
(ii) one water closet; and
(iii) where only one water closet is provided in a dwelling, the bath and water
closet shall be separately provided.
(iv) Kitchen with wash basin.
(v) All wastewater outlets shall be provided with suitable traps for preventing
back flow of water or foul smell or both.
(2)
Dwellings (tenements) without individual conveniences shall have the
following fitments:
(i)
one water taps with draining arrangements in each tenement;
(ii) one water closet and one bath for every two tenements; and
(iii) water tap in common bathroom and common water closet.
(3)
The requirements for fitments for drainage and sanitation, in case of
buildings other than residential such as office buildings, factories, cinemas,
concert halls, theatres, hospitals, hotels, restaurants, schools and hostels
shall be in accordance with NBC applicable to “Basic Requirements for
Water Supply, Drainage and Sanitation” with such updating as may be made
from time to time.
12.3. Method of disposal
(1)
Every water borne drainage installation shall be connected with the public
sewer, but in case no public sewer exists in the vicinity of the said
premises, the drainage system may as a temporary measure and subject to
the previously written approval of the Competent Authority be connected to a
septic tank from which the effluent shall be drained off:
(i)
into absorption pits, or,
(ii) by sub-soil drain
•
Provided that no absorption pit shall be allowed in the case of
any premises or area in which domestic supply is taken from
sub soil water.
•
Provided further that if in future a public sewer is constructed in
the nearby area, the owner shall at his own expense connect
to the sewer.
(2)
Effective arrangements shall be made to treat the effluents up to the
parameters/ guidelines issued from time to time by Central Pollution Control
Board (CPCB) or Administration of UT Ladakh to ensure that the untreated
effluents do not enter into any river, canal or water body or a ground water
zone.
12.4. Septic tank
(1)
No septic tank shall be located :
(i)
at a distance of less than 2.5 meters from a dwelling unit or any other
building used for human habitation or for work or recreation.
(ii)
in a public through fare
(iii)
within 16 (sixteen) meters from any percolation well, watercourse or
stream used or likely to be used for drinking or domestic purposes or for
manufacture or preparation of any article of food or drink for human
consumption and it shall be readily accessible so as to permit cleaning
operation being carried out without interference with the operation of any
water borne sanitary installation as a whole.
(2)
Every septic tank intended to serve a population of 24 (twenty-four) or more
persons shall have two separate compartments so that one compartment for
alternate use for cleaning the filtered one. The capacity of every compartment
of the septic tank shall be 2½ (two and half) times the total water supply
allowances for the total number of residents of the buildings in the premises.
(3)
Every inlet pipe into a septic tank shall be effectively trapped.
(4)
The design of septic tank shall be in accordance with the National Building
Code and guidelines issued by Administration of UT Ladakh.
12.5. Absorption pit
(1)
The location of every absorption pit shall conform to same
restrictions as specified for a septic tank in Code 12.4.
(2)
No absorption pit shall have any outlet into a storm water drain or
surface drain.
(3)
The walls of every absorption pit shall be at least 0.5 meters above
the ground level to ensure that storm water does not enter into the
absorption pit.
(4)
The absorption pits shall be constructed in duplicate as laid in code
12.4 (2). The capacity of the absorption pit shall be as approved by
the Competent Authority.
(5)
All details shall conform to the National Building Code of India as
updated from time to time.
12.6.
Sub-soil irrigation for disposal of effluent
No Sub-soil irrigation work for disposal of effluent from a septic tank shall
allowed.
12.7.
Zero wastewater discharge
(1)
The group housings, industries, commercial, institutions and any other
building specified by the competent authority shall ensure zero
wastewater discharge into main sewer line and shall install suitable
treatment plant for treatment of wastewater. The applicant shall
submit completion certificate of installation of treatment plant from
independent expert agency along with the application of Occupation
Certificate.
(2)
For water conservation in the building, provision shall be made
whereby the wastewater generated from the sources such as
dishwashing or washing machines, is used for sub- surface irrigation,
or if treated, for non-potable purposes as mentioned in these Bye-
Laws.
Note: The above restriction shall not apply in case of plots up to 2000 square meters.
12.8.
Sewerage Connection
All buildings need to be connected to public sewer and shall need prior
permissions by Competent Authority. No connection to any public sewer shall
be made nor any water borne sanitary and drainage installations intended to
be connected until a certificate after completion by the Competent Authority
has been issued.
12.9.
Application for connection with public sewer
(1)
After the grant of a certificate referred to in the building Bye laws or in the
event of the said certificate having been deemed to have been granted,
every person intending to connect a drain to a public sewer shall apply to
the Competent Authority at least seven days before the date on which such
connection is required.
(2)
The application shall be accompanied by a certificate referred to the Code
12.8 and such amount as may be laid down from time to time by the
Competent Authority and calculated on the basis of the current schedule of
rates to meet the cost of the proposed connection.
(3)
On receipt of the application and subject to the requirement of the foregoing
clauses, the Competent Authority shall approve or reject the request.
12.10.
Sewage Discharge
(1)
Every drain discharging into a public sewer shall join the sewer obliquely in
the direction the sewer is flowing.
(2)
If practicable, the connection shall be made at an existing junction in the
sewer and if not possible, then there shall be an intercepting manhole
before the connection.
12.11.
Drainage of roof
The roof of every building shall drain rainwater into gutters, chutes or
trough and shall be carried down through adequate number of down pipes
without causing dampness in any part of the wall or foundation of the
building or any adjacent building.
12.12.
Effect on the transferred areas
Where the planned areas are transferred to the Competent Authority then
the norms/ byelaws/ zoning bye-laws applicable to them at the time of
transfer of these areas shall remain same, as defined, and enforced by the
concerned Authority.
12.13.
Sustainable waste management
Wherever applicable, Chapter 4, Chapter 10.2.5, as well as any other
relevant sections from Model Building Bye Laws, 2016 shall be applicable
for sustainable waste management.
12.14. Provisions of Dry Toilets
The dry toilets should be in the traditional two-storied design to convert
waste into compost, and the facility should be well ventilated and have
smell free technology. The cleaning needs to be free of Manual Cleaning,
carrying and disposal. Ventilation requirements shall be subjected to
Chapter 4.30 and all other relevant sections from Model Building Bye-Laws,
2016. Approval by approval authority needs to be taken before construction.
12.15. Provisions of Sewage Treatment Plant (STP) Requirement for Guest
Houses and Hotels:
(1) For all established guest houses and hotels, as well as those applying for building
permissions with more than 10 rooms, the installation of in-house Sewage
Treatment Plants (STPs) is mandatory to ensure effective wastewater management.
(2) For guest houses and hotels with 1 to 9 rooms, STP installation is
recommended. Owners are encouraged to implement mini-STPs with capacities
starting from 0.75 KLD to help minimize pollution and support sustainable
tourism.
(3) STP installations, operations, and maintenance for all establishments with
more than 10 rooms, regardless of capacity, must comply with the Standard
Operating Procedures (SOPs) and regulations issued by the relevant
authorities or the Ladakh Pollution Control Committee (LPCC), UT Ladakh, as
periodically updated.
Chapter 13 – Environmental Clearance
Note: The Directions/Guidelines issued by the Ministry of Environment, Forest, and
Climate Change from time to time shall be part of this chapter of the Bye-
Laws. Also, relevant sections from Chapter 14, as well as any other relevant
sections from Model Building Bye Laws, 2016 shall be applicable in the same.
The EIA requirements are already mandated by the Environment Protection
Act, 1986. EIA shall be required for all buildings.
13.1.
Environmental clearances for building and construction
(1) The competent authority shall approve and certify the compliance of
environmental clearances requirements for following categories of buildings:
Sr. No.
Building Category
Built up area (in square meters)
1
Category 1
5000- 20000
2
Category 2
Above 20000-50000
3
Category 3
Above 50000-150000
(2) The Competent Authority shall ensure the conditions fulfilled before approving
and certifying the compliance of environmental clearances stated below:
Environmental conditions for Category 1 buildings:
Sr.
No.
Medium
Environmental conditions
Schedule for
submitting
self- certification
1
Natural
Drainage
The inlet and outlet point of natural
drain system should be maintained with
adequate size of channel for ensuring
non- obstructed flow of water
Along with Occupation
Certificate application
2
Water
Conservation-
Rain Water
Harvesting/
Ground Water
Recharge
i.
A
rainwater/snow-melt
runoff
harvesting plan needs to be designed
where the recharge bores (minimum
one per 5000 sqm of built-up area)
shall be provided. The rainwater /
snow-melt harvested should be stored
in a tank for reuse in household
through a provision of separate water
tank and pipeline to avoid mixing with
potable municipal water supply. The
excess rainwater harvested be linked
to the tube well bore in the premise
through a pipeline after filtration in the
installed filters.
Along with Occupation
Certificate application
ii. The unpaved area shall be more
than
or
equal
to
20%
of
the
recreational open spaces
Along with Occupation
Certificate application
3
Solid Waste
Management
Separate wet and dry bins must be
provided at the ground level, as well as
segregation areas on each floor for
facilitating segregation of waste.
Along with Occupation
Certificate application
4
Energy
In common areas, LED/ solar lights
must
be provided.
Along with Occupation
Certificate application
5
Air Quality
and Noise
i. Dust, smoke and debris prevention
measures such as screens, barricading
shall be installed at the site during
construction. Plastic/ tarpaulin sheet
covers
must
be
used
for
trucks
bringing in
Along with notice
of
commencement
of construction
sand and material at the site.
ii. The exhaust pipe of the DG set, if
installed, must be minimum 10 meters
away from the building. In case it is
less than 10 meters away, the exhaust
pipe shall be taken up to 3 meters
above the building.
Along with Occupation
Certificate application
6
Green cover
i. A minimum of 1 tree for every 40
square meters of land shall be planted
and maintained. The existing trees will
be counted for this purpose.
Preference
should be given to planting native
species.
Along with notice of
commencement
of construction
ii. Where the trees need to be cut,
compensatory plantation in the ratio of
1:3 (i.e., planting of 3 trees for 1 tree
cut) shall be done with the obligation
to provide continued maintenance for
such
plantations.
Along with notice
of
commencement
of construction.
Environmental conditions for Category 2 buildings:
Sr. No.
Medium
Environmental conditions
Schedule
for
submitting
self-certification
1
Natural
Drainage
The inlet and outlet point of natural
drain system should be maintained
with adequate size of channel for
Along with Occupation
Certificate application
ensuring obstructed flow of water.
2
Water
Conservation-
Rain
Water
Harvesting
and
Ground Water
Recharge
i.
A
rainwater/snow-melt
runoff
harvesting
plan
needs
to
be
designed
where
the
recharge
bores (minimum one per 5000
sqm of built-up area) shall be
provided. The rainwater/snow-
melt harvested should be stored in
a tank for reuse in household
through a provision of separate
water tank and pipeline to avoid
mixing
with
potable
municipal
water
supply.
The
excess
rainwater/snow-melt harvested be
linked to the tube well bore in the
premise through a pipeline after
filtration in the installed filters.
Along with Occupation
Certificate application
3
Solid Waste
Management
i. The unpaved area shall be more
than or equal to 20% of the
recreational open spaces.
Along with Occupation
Certificate application
ii. Separate wet and dry bins must
be provided at the ground level for
facilitating segregation of waste.
Along with Occupation
Certificate application
4
Energy
i. In common areas, LED/ solar
lights must be provided.
Along with Occupation
Certificate application
ii. At least 1% of connected
applied
load
generated
from
renewable energy source such as
photovoltaic cells.
Along with Occupation
Certificate application
iii. As per the provisions of the
Ministry of New and Renewable
Along with Occupation
energy
solar
water
heater
of
minimum
capacity
10
liters/4
persons (2.5 liters per capita) be
installed.
Certificate application
iv. Sun dried/ rammed earth/ earth
blocks/
solar
passive
building
materials
should
be
used
as
building material
Along with notice of
commencement of
construction
5
Air Quality
and Noise
i.
Dust,
smoke,
and
debris
prevention
measures
such
as
screens,
barricading
shall
be
installed
at
the
site
during
construction.
Plastic/
tarpaulin
sheet covers must be used for
trucks
bringing
in
sand
and
material at the site.
Along with notice of
commencement of
construction
ii. The exhaust pipe of the DG
set, if installed, must be minimum
10 meters away from the building.
In case it is less than 10 meters
away, the exhaust pipe shall be
taken up to 3 meters above the
building.
Along with Occupation
Certificate application
6
Green cover
i. A minimum of 1 tree for every
40 square meters of land shall be
planted
and
maintained.
The
existing trees will be counted for
this purpose. Preference should be
given to planting native species.
Along with notice of
commencement of
construction
ii. Where the trees need to be cut,
compensatory plantation in the
ratio of 1:3 (i.e., planting of 3
trees for 1 tree cut) shall be done
Along with notice of
commencement of
construction
with the obligation to provide
continued maintenance for such
plantations.
Environmental conditions for Category 3 buildings:
Sr.
No.
Medium
Environmental conditions
Schedule for
submitting
self-certification
1
Natural
Drainage
The inlet and outlet point of natural
drain system
should
be
maintained with
adequate size of channel for ensuring
obstructed flow of water.
Along with Occupation
Certificate application
2
Water
Conservation
- Rain Water
Harvesting/
Ground
Water
Recharge
i.
A
rainwater/snow-melt
runoff
harvesting plan needs to be designed
where the recharge bores (minimum
one per 5000 sqm of built- up area)
shall
be
provided.
The
rainwater/snow-melt harvested should
be stored in a tank for reuse in
household through a provision of
separate water tank and pipeline to
avoid mixing with potable municipal
water
supply.
The
excess
rainwater/snow-melt runoff harvested
be linked to the tube well bore in the
premise through a pipeline after
filtration in the installed filters.
Along with Occupation
Certificate application
ii. The unpaved area shall be more
than
or
equal
to
20%
of
the
recreational open spaces.
Along with Occupation
Certificate application
iii. The ground water shall not be
withdrawn without approval from the
competent authority.
Along with notice of
commencement of
construction
iv.
Use
of
potable
water
in
construction should be minimized.
v. Low flow fixtures and sensors must
be
used
to
promote
water
conservation.
vi. Separation of grey and black
water should be adopted by the use
of dual plumbing system.
3
Solid Waste
Management
i. Separate wet and dry bins must be
provided at the ground level for
facilitating segregation of waste.
Along with Occupation
Certificate application
ii. All non-biodegradable waste shall
be
handed
over
to
authorized
recyclers for which a written tie-up
must be done with the authorized
recyclers.
Along with Occupation
Certificate application
iii.
Organic
waste
composter/
vermiculture
pit
with a
minimum
capacity of 0.3 Kg/tenement/ day
must be installed wherein the STP
sludge may be used to be converted
to manure which could be used at
the site or handed over to authorized
recyclers for which a written tie-up
must be done with the authorized
recyclers.
Along with Occupation
Certificate application
4
Energy
i. In common areas, LED/ solar lights
must be provided.
Along with Occupation
Certificate application
ii. At least 1% of connected applied
load
generated
from
renewable
energy source such as photovoltaic
cells.
Along with Occupation
Certificate application
iii. As per the provisions of the
Ministry of New and Renewable
energy solar water heater of minimum
capacity 10 liters/4 persons (2.5 liters
per capita) be installed.
Along with Occupation
Certificate application
iv. Fly ash bricks should be used as
building material in the construction.
Along with notice of
commencement of
construction
v. Adoption of passive solar design of
buildings using architectural design
approaches
that
minimize
energy
consumption
in
buildings
by
integrating
conventional
energy-
efficient devices, such as mechanical
and electric pumps, fans, lighting
fixtures and other equipment with
proper
orientation
of
buildings,
landscaping,
efficient
building
envelope,
appropriate
fenestration
increased day lighting and thermal
mass.
Along with Occupation
Certificate application
vi. Optimizing use of energy systems
in buildings that should maintain a
specific indoor environment conducive
to the functional requirements of the
building
by
following
mandatory
compliance
measures
(for
all
applicable buildings) as recommended
in the Energy Conservation Building
Along with Occupation
Certificate application,
and certifications as
mentioned in Ladakh
ECBC 2021 (once
notified)
Code (ECBC) 2007 of the Bureau of
Energy
Efficiency,
Government
of
India.
5
Air Quality
and Noise
i. Dust, smoke and debris prevention
measures
such
as
screens,
barricading shall be installed at the
site
during
construction.
Plastic/
tarpaulin sheet covers must be used
for trucks bringing in sand and
material at the site.
Along with notice of
commencement of
construction.
ii. The exhaust pipe of the DG set, if
installed, must be minimum 10 meters
away from the building. In case it is
less than 10 meters away, the
exhaust pipe shall be taken up to 3
meters above the building.
Along with Occupation
Certificate application.
6
Green cover
i. A minimum of 1 tree for every 40
square meters of land shall be
planted and maintained. The existing
trees will be counted for this
purpose. Preference should be
given to planting native species.
Along with notice of
commencement of
construction.
ii. Where the trees need to be cut,
compensatory plantation in the ratio
of 1:3 (i.e., planting of 3 trees for
one (1) tree cut) shall be done with
the obligation to provide continued
maintenance for such plantations.
Along with notice of
commencement of
construction
7
Sewage
Treatment
Plant
Sewage treatment plant with capacity
of treating 100% wastewater shall be
installed. Treated water must be
recycled for gardening, flushing etc.
Along with Occupation
Certificate application
8
Environment
Management
Plan
The infrastructure such as Sewage
Treatment
Plant,
Landscaping,
Rainwater Harvesting/ ground water
recharging,
Power
backup,
Infrastructure, Environment Monitoring,
Solid Waste Management and Solar
and Energy conservation, should be
kept operational through Environment
Monitoring Committee with defined
functions and responsibilities.
Along with Occupation
Certificate application
(3) All the provisions mentioned under Municipal Solid Waste (Management
and Handling) Rule, 2016 and their subsequent amendments; Plastic
Waste Management Rules, 2016 and their subsequent amendments and
adoptions by the UT and any other competent authority and their
notifications would be applicable.
(4) The applicant shall self-certify the above stated environmental conditions
with the certification of supervision/ completion from the competent
professional or Bureau of Energy Efficiency Certified Energy Auditors, as
the case may be, responsible for supervising the construction of building
and/ or installing the solar photovoltaic power unit. Sewage Treatment
Plant, Solid waste management system, ECBC Code, Ladakh ECBC 2021
(once notified) & others.
(5) The applicant shall submit the self-certification on environmental
conditions to the Competent Authority as per schedule given in Code
13.1(2).
(6) The Competent Authority shall verify the certification and issue consent/
comments within 10 (Ten) working days of receiving the certification. The
Environmental Clearance certificate shall be deemed accepted, if it is in
conformity with conditions stated herein before, but no consent/
comments have been passed by Competent Authority within specified
time.
(7) If the owner or the competent professional as mentioned in Code
13.1(3) or as the case may be, submits a wrong or false self-certification
or if any additional construction or violation is reported to exist at site or
has concealed any fact or misrepresented regarding environmental
conditions stated in Code 13.1(2), they shall be jointly and severally
responsible for such omission/commission and complaint against the
competent professional for suspension of registration, and/or any
penalties as deemed fit by the UT Administration against the competent
professional and the owner shall be liable to pay for the penalty as may
be decided by the Competent Authority after giving an opportunity of
being heard. Further, if it emerges that the information was concealed by
Competent Professional/Owner, necessary penal proceedings, as decided
by the administration will be initiated along with barring the competent
professional from practicing in the UT of Ladakh.
(8) In case environmental clearance is issued by Competent Authority, no
separate prior environmental clearance shall be required.
(9) In case the building is certified from GRIHA/LEED/IGBC, there is no
requirement for issue environmental clearance.
(10) Any Govt. of India/UT Acts, Laws, Byelaws would be applicable as
notified from time to time
(11) EV Charging rationale, options and infrastructure shall be guided by
Amendments in Model Building Bye Laws, 2016 for Electric Vehicle
Infrastructure
(12) Indoor Air Quality rationale, options and infrastructure shall be guided by
Amendments in Model Building Bye Laws, 2016 for Electric Vehicle
Infrastructure, as and when applicable
(13) In-building
solutions
for
IT
Infrastructure
rationale,
options
and
infrastructure shall be guided by Amendments in Model Building Bye
Laws, 2016 for Electric Vehicle Infrastructure, as and when applicable
(14) Environmental Impact Assessment and Environmental Clearance shall be
in-line with Environmental (Protection) Act 1986, and its subsequent
amendments, specifically 2006 amendment, which define the requirement
of mandates and screening for Category A, B1 and B2 projects.
Chapter-14: Heritage and Protected Monuments
Conservation of heritage sites shall include buildings, artifacts, structures, areas, and
precincts of historic, aesthetic, architectural, cultural or environmentally significant nature
(heritage buildings and heritage precincts), natural feature areas of environmental
significance or sites of scenic beauty.
14.1. Applicability of these Bye-Laws
These regulations shall apply to heritage sites which shall include those buildings, artifacts,
structures, streets, areas and precincts of historic, architectural, aesthetic, cultural or
environmental value (hereinafter referred to as Listed Heritage Buildings/ Listed Heritage
Precincts) and those natural feature areas of environmental significance or of scenic beauty
including, but not restricted to, sacred groves, hills, hillocks, water bodies (and the areas
adjoining the same), open areas, wooded areas, points, walks, rides, bridle paths
(hereinafter referred to as ‘listed natural feature areas’) which shall be listed in
notification(s) to be issued by the UT administration, or as identified in Master Plan.
The provisions in this chapter are beyond the regulations applicable on the Prohibited and
Regulated areas as defined by Ancient Monuments and Archaeological Sites and Remains
(AMASR) Act 2010, where site specific Heritage Bye-Laws prepared and notified by the
Competent Authority (National Monuments Authority) under the AMASR Act shall be
applicable. NOC shall have to be obtained by submission of required documents as may
be necessary, including “Heritage Impact Assessment” report, if so, necessitated by the
NMA.
14.2. Responsibility of the owners of Heritage Buildings
Post notification, it shall be the duty of the owners of heritage buildings and buildings in
heritage precincts or in heritage streets to carry out regular repairs and maintenance of the
buildings. The UT administration, the Municipal Committee or the Local Bodies and
Authorities concerned shall not be responsible for such repair and maintenance except for
the buildings owned by the Government, the Municipal Committee, or the other local
bodies.
14.3. Restrictions on Development/Redevelopment/repairs, etc.
No development or redevelopment or engineering operation or additions / alterations,
repairs, renovations including painting of the building, replacement of special features or
plastering or demolition of any part thereof of the said listed buildings or listed precincts or
listed natural feature areas shall be allowed except with the prior permission of the
Competent Authority (which may include Executive Officer, Municipal Committee, or
equivalent official of Municipal Committee/ Vice Chairman, Development Authority, or any
other officer as deemed necessary by the UT Administration). Before granting such
permission, the agency concerned shall consult the Heritage Conservation Committee to be
appointed by the UT Administration and shall act in according with the advice of the
Heritage Conservation Committee.
i.
Provided that, before granting any permission for demolition or major
alterations / additions to listed buildings (or buildings within listed streets or
precincts), or construction at any listed natural features, or alteration of
boundaries of any listed natural feature areas, objections and suggestions from
the public shall be invited and shall be considered by the Heritage
Conservation Committee.
ii.
Provided that, only in exceptional cases, for reasons to be recorded in writing,
the Competent Authority may refer the matter back to the Heritage
Conservation Committee for reconsideration.
However, the decision of the Heritage Conservation Committee after such reconsideration
shall be final and binding.
14.4. Penalties
Violation of the regulations shall be punishable under the provisions regarding unauthorized
development. In case of proved deliberate neglect of and/or damage to Heritage Buildings
and Heritage Precincts, or if the building is allowed to be damaged or destroyed due to
neglect or any other reason, in addition to penal action provided under the concerned Act,
no permission to construct any new building shall be granted on the site if a Heritage
Building or Building in a Heritage Precinct is damaged or pulled down without appropriate
permission from the Competent Authority .
It shall be open to the Heritage Conservation Committee to consider a request for
rebuilding/reconstruction/retrofitting of a Heritage Building that was unauthorizedly
demolished or damaged, provided that the total built-up area in all floors put together in
such new construction is not in excess of the total built-up area in all floors put together
in the original Heritage Building in the same form and style in addition to other controls
that may be specified.
14.5. Preparation of list of heritage sites including heritage buildings, heritage precincts
and listed natural features
The list of heritage sites including Heritage Buildings, Heritage Precincts and listed Natural
Features Areas is to be prepared and supplemented by the Competent Authority. Before
being finalized, objections and suggestions of the public are to be invited and considered.
The said list to which the regulation applies shall not form part of this regulation for the
purpose of Building Bye-Laws.
The list may be supplemented from time to time by Government on receipt of proposal
from the agency concerned or by Government suo-moto provided that before the list is
supplemented, objections and suggestions from the public be invited and duly considered
by the Competent Authority / and/or UT Administration and/or the Heritage Conservation
Committee.
When a building, or group(s) of buildings or natural feature areas are listed it would
automatically mean (unless otherwise indicated) that the entire property including its entire
compound / plot boundary along with all the subsidiary structures and artifacts, etc. within
the compound/plot boundary, etc. shall form part of list. The buildings, however, on this list
(original and supplemented, as notified by the Competent Authority /and/or UT
Administration and / or the Heritage Conservation Committee) shall follow these Building
Bye-Laws post its notification.
14.6. Alteration/modification/relaxation in development norms
On the advice of the said Heritage Conservation Committee to be appointed by the
Administration and for reasons to be recorded in writing, the Competent Authority shall
follow the procedure as per Development Authority Act, to alter, modify or relax the
Development Control Norms prescribed in the Master Plan, if required, or Heritage
Conservation and Preservation Act, as may be notified from time to time, for the
conservation or preservation or retention of historic or aesthetic or cultural or architectural
or environmental quality of any heritage site.
14.7. Heritage precincts / Natural feature areas
In cases of streets, precincts, areas and (where deemed necessary by the Heritage
Conservation Committee) natural feature areas notified, development permissions shall be
granted in accordance with the special separate regulation prescribed for respective streets,
precincts / natural feature areas which shall be framed by the Competent Authority on the
advice of the Heritage Conservation Committee. Before finalizing the special separate
regulations for precincts, streets, natural features, areas, the draft of the same shall be
published in the official gazette and in leading newspapers for the purpose of inviting
objections and suggestions from the public. All objections and suggestions received within
a period of 30 days from the date of publication in the official gazette shall be considered
by the Competent Authority. After consideration of the above suggestions and objections,
the agency concerned, acting on the advice of the Heritage Conservation Committee shall
modify (if necessary) the aforesaid draft separate regulations for streets, precincts, areas,
and natural features and forward the same to Government for notification.
14.8. Road Widening
Widening of the existing roads under the Master Plan of the City or Town / Zonal
Development Plan or in the Layout Plan shall be carried out considering the existing
heritage buildings (even if they are not included in a Heritage Precinct) or which may
affect listed natural features areas.
14.9. Incentive uses for heritage buildings
In cases of buildings located in non-commercial use zones included in the Heritage
Conservation List, if the owner / owners agree to maintain the listed heritage building as it
is in the existing state and to preserve its heritage state with due repairs and the owner /
owners / lessees give a written undertaking to that effect, the owner / owners / lessees
may be allowed with the approval of the Heritage Conservation Committee within
permissible use zone to convert part or whole thereof of the non-commercial area within
such a heritage building to commercial/office use/hotel. Provided that if the heritage
building is not maintained suitably or if the heritage value of the building is spoiled in any
manner, the commercial / office / hotel use shall be disallowed.
14.10. Maintaining Skyline and Architecture Harmony
After the guidelines are framed, buildings within heritage precincts or in the vicinity of
heritage sites shall maintain the skyline in the precinct and follow the architectural style
(without any high-rise or multistoried development) as may be existing in the surrounding
area, so as not to diminish or destroy the value and beauty of or the view from the said
heritage sites. The development within the precinct or in the vicinity of heritage sites shall
be in accordance with the guidelines framed by the Executive Officer, Municipal
Committee, or equivalent official of Municipal Committee/ Vice Chairman, Development
Authority on the advice of the Heritage Conservation Committee or separate regulations /
guidelines, if any, prescribed for respective zones by Municipal Committee / Development
Authority. There needs to be a touch of local architecture in all buildings, e.g., Shingstak.
14.11. Restrictive Covenants
Restrictions existing as imposed under covenants, terms and conditions on the leasehold
plots by the Competent Authority shall continue to be imposed in addition to Development
Control Regulations. However, in case of any conflict with the heritage preservation
interest/environmental conservation, this Heritage Regulation shall prevail.
14.12. Grading of the listed buildings / listed precincts
Listed Heritage Buildings / Listed Heritage Precincts shall be graded as per decisions
taken by the Heritage Conservation Committee, or, in absence of it, shall follow Chapter-
12 Conservation of Heritage Sites, Table-12.1 Grading of Listed Heritage. Listing does
not prevent change of ownership or usage. However, change of use of such Listed
Heritage Building / Listed Precincts is not permitted without the prior approval of the
Heritage Conservation Committee. Use should be in harmony with the said listed heritage
site.
14.13. Opinion of the Heritage Conservation Committee
Nothing mentioned above should be deemed to confer a right on the owner / occupier of
the plot to demolish or reconstruct or make alterations to his heritage building / buildings
in a heritage precinct or on a natural heritage site if in the opinion of the Heritage
Conservation Committee, such demolition / reconstruction /alteration is undesirable.
14.14. Approval to preserve the beauty of the area
The Heritage Conservation Committee shall have the power to direct, especially in areas
designated by them, that the exterior design and height of buildings should have their
approval to preserve the beauty of the area.
14.15. Signs and Outdoor display structures/ including street furniture on heritage sites
The Competent Authority on the advice of the Heritage Conservation Committee shall
frame regulations or guidelines to regulate signs, outdoor display structures and street
furniture on heritage sites.
14.16. Implications of listing as heritage buildings
The Regulations do not amount to any blanket prevention of demolition or of changes to
Heritage Buildings. The only requirement is to obtain clearance from the Competent
Authority and Heritage Conservation Committee from heritage point of view.
14.17. Ownership not affected
Sale and purchase of Heritage Buildings does not require any permission from the
Competent Authority or Heritage Conservation Committee. The Regulations do not affect
the ownership or usage. However, such usage should be in harmony with the said listed
precincts / buildings. Care will be taken to ensure that the development permission relating
to these buildings is given within 60 days.
Chapter-15 Roll out of Street Infrastructure and
Small Cells for 5G Networks
With the advent of 5G, there will be a requirement to deploy Low Power Base Transceiver
Stations (LPBTS) with 5G radios often called “small cells'' due to network elements working
on higher frequency spectrum bands that necessitate denser network deployments to
support larger traffic volumes per unit area. A small cell is a cellular base station that
transmits & receives 3GPP-defined Radio Frequency (RF) signals with small power and
small form factor. In most cases, it services a small coverage area ranging from ten
meters to several hundred meters in contrast to a typical mobile macro cell that might
have a range of up to several tens of kilometers.
Various types of street furniture such as poles (streetlights, electricity, traffic lights),
advertisement hoardings, bus shelters and towers have been identified by TRAI as suitable
national assets for deploying small cells.
15.1. Background
Previous generations of cellular infrastructure can no longer keep pace with the growing
demand for communication (data transmission) bandwidth and throughput. The macro
towers that have been serving Fourth-Generation Long-Term Evolution (4G LTE) networks
cannot connect to the rapidly growing number of devices that users are simultaneously
utilizing. The next generation of cellular technology, 5G, represents a paradigm shift for
cellular infrastructure.
As the roll-out of 5G continues, more and more radios need to be deployed and networks
will need to be densified. The Macro radios provide excellent coverage and high capacity.
However, in some cases, for example dense-urban locations dominated by tall buildings,
providing the necessary coverage can be challenging. Similarly, where there are high
numbers of mobile-users, such as busy city-centers and transportation hubs, providing
enough capacity needs from a single radio can also be challenging. In these cases,
outdoor small cells are ideal solutions for improved coverage. These solutions include
micro remote radio heads and high-capacity 5G millimeter wave radios. Around 80% of
mobile broadband traffic originates from mobile users located indoors. However, ensuring
good indoor coverage can also be a challenge, especially as the higher frequencies used
by 5G are more prone to signal propagation limitations than previous generations of mobile
technology. To help overcome this, it is essential to consider indoor small cells as a
deployment option.
Mobile operators will look to small cell deployment technology to add data capacity in
areas of traffic congestion. This dense small cell network increases both the radios per
subscriber and provides subscribers improved signal quality for more efficient data transfer.
The shorter distance between radio sites also helps overcome the short signal reach of
higher frequency 5G radio spectrum. As a result, small cells are becoming the leading
solution in growing the data capacity of the network.
Small cells are therefore required in the 5G network due to the following reasons:
•
Offloading: The Macro site of the area is getting congested and is unable to serve
the entire community of the area.
•
Capacity Enhancement: The macro site serving the building/ area is unable to meet
the capacity requirements of some parts of the building/ spot.
•
Low Coverage of Signal: Higher spectrum band.
•
Indoor Coverage: In building solutions are essential for indoor coverage including
basements, underground metro tunnels etc.
Various small cell product types exist generally depending on, among other attributes, their
targeted coverage range (transmit power) and provided capacity. These small cell variants
include (but are not limited to) femtocells, picocells and microcells/metrocells – broadly
increasing in cell range from femtocells (the smallest) to metrocells (the largest) as
summarized below:
•
Femtocells: A low-power, short range, self-contained small cells. Initially used to
describe consumer small cell units intended for residential homes, the term has
expanded to encompass higher capacity units for enterprise, and metropolitan
areas.
•
Picocells: Typically used to describe low power compact base stations, used in
enterprise or public indoor areas, the term is sometimes used to encompass
outdoor small cells as well.
•
Microcells: Typically used to describe an outdoor short-range base station aimed at
enhancing coverage for both indoor and outdoor users where macro coverage is
insufficient. Occasionally installed indoors to provide coverage and capacity in areas
above the scope of a picocells.
•
Metrocells: A recent term used to describe small cell technologies designed for
high-capacity metropolitan areas. Such devices are typically installed on building
walls or street furniture (e.g., lampposts). This category can include technologies
such as femtocells, picocells and microcells where they meet these deployment
criteria.
15.2. Small Cell Deployment Scenarios and Use cases:
Small cells generally support two lower coverage range base station classes defined by
3GPP [TS38.104] which also determine the RF performance:
i.
Medium-range base stations (derived from microcell scenarios) for outdoor small cell
deployment.
ii.
Local area base stations (derived from Pico cell scenarios) for indoor small cells.
Small cells will play a critical role in a number of use cases in the 5G network. Some of
use cases of Small Cells are given below-
•
Large venues such as sports complexes or concert halls where thousands of users
need to connect within an enclosed area. In order to ensure all users, maintain
network coverage with good throughput, 5G small cells can be deployed in these
facilities and surrounding areas to provide extra capacity so that the influx of users
doesn’t exhaust the network.
•
Another use case is cellular vehicle-to-everything (C-V2X) enabling communications
between vehicles and between the car and infrastructure. Both capabilities are
necessary for autonomous automobiles. 5G small cells can be used to build
infrastructure that can handle massive communications needed for this application
where human lives can be at stake.
•
In smart cities, 5G small cells can be attached to traffic posts or light posts to
enable better coverage in metropolitan areas to ensure the network coverage is
there with the necessary throughput for smart city initiatives, analytics and
intelligence.
•
5G small cells can support residential or business network needs. In a smaller
community of users, that doesn’t justify the capital costs for a macrocell
deployment, a 5G small cell is a great alternative. Placing a 5G small cell near
residential buildings or homes, can ensure throughput is not degraded due to lack
of coverage.
15.3. Communication System:
Data growth is exploding globally and in India as per Nokia MBiT 2021 Report, the
average monthly data usage per user in India has increased almost 17 times over the past
5 years. Covid-19 has further pushed data consumption with people staying indoors.
Government has facilitated Work from Home (WFH) guidelines with a Work from Anywhere
(within India) permitted. Home consumption of data has therefore grown exponentially
through 2020. According to the Tower and Infrastructure Providers Association, almost 85%
data traffic and 70% voice traffic is now generated indoors.
The World Bank has clearly demonstrated that every 10% increase in broadband
penetration leads to nearly 1.40% increase in GDP growth rate. While that is a global
average, even the India specific study by the reputed quasi-Government research agency,
ICRIER, has shown that every 10% increase in internet traffic delivers 3.1% increase in
GDP per capita and a 10% increase in investment in Telecom Infrastructure will increase
GDP by 3.3% The entire consumer pull today is focused on data and broadband now with
the new digital services providing voice services free with the data services. Video and
app-based services are driving the demand for broadband with Apps for ecommerce,
eHealth care etc. in everyday use. It is very clear that Internet Traffic and Apps are
contributing to GDP growth and for this to grow even further, conventional connectivity
needs to be replaced with duct-sharing and fibre especially, which is an essential
requirement In-Building as much as it is for FTTx and Tower Fiberization.
Note: “Service Provider”: any organization that provides any type of telecom or IT
services in the building complex, as per scope defined by DOT i.e., TSP / ISP / IP1
etc.
A broad variety of Information Communication Technology (ICT) systems are expected to
be installed in buildings. In order to facilitate proper cabling and installation / up gradation
of ICT systems and their cost effectiveness and maintenance, adequate physical
infrastructure is required within buildings. This infrastructure will include common ducts,
cable riser systems, conduits, cable trays and utility closets etc. among other things. The
same can also be retrofitted into existing buildings wherever possible and feasible and
must be designed in all new, re-developed and renovated structures. This section
describes the general and specific requirements of such an ICT infrastructure in Building
specially in respect of cabling aspects.
Communication systems are general utility in much the same way as water, power, gas,
cable TV & CCTV/Security. Unlike traditional communication systems which are constantly
evolving, the recommended Digital infrastructure has to be designed to be flexible enough
to accommodate a variety of ICT systems and emerging technologies and be future proof
for the next 25-30 years. Space and power are required for installation of common ducts,
optical fiber, small cells, antennas, smart sensors etc., space, power and earthling is
required for electronic equipment installation for supporting the various digital technologies
of now and the future. Most communication utilities can share the same space since the
physical topology and wiring requirements are similar and no significant power is present in
the cables. However, in some cases state-of-the – art communication cabling or equipment
will involve new or more specific requirements for utility spaces such as:
i.
Cable routing layout and cable length restrictions between Work-Space and utility
closet,
ii.
Bending radius and working clearance requirements for different cable types, e.g.,
Fiber optic cables, Cat-6 Cables and co-axial cables,
iii.
Isolated power circuits for permanent communication equipment,
iv.
Protection, Safety, Grounding and environmental requirements of communication
equipment.
15.4. Emerging Technologies in Telecommunication Services:
The technologies used for telecommunications have changed greatly and over the past few
years and particularly during the pandemic, India has experienced a massive surge in
indoor voice and data consumption. According to the Tower and Infrastructure Providers
Association, almost 85% data traffic and 70% voice traffic is now generated indoors.
Telecommunication network architecture is changing to meet new requirements for a
number of services/applications viz. 5G, massive Internet of things, Artificial Intelligence
etc. Choosing efficient and cost-effective and fast-deployment technologies such as wired
and wireless networks will improve accessibility. Based on type of building and profile of
customers in the buildings, the needs of wired and wireless may vary. Further, the
architecture of the information and communication infrastructure is changing to
accommodate the requirements of a growing number of ICT-enabled services/applications
(broadband, IP, mobile, multimedia, surveillance, IoT, etc.). In order to improve in-building
coverage and to offer better-quality high-speed data services, there is a definite need to
install in - building solutions (IBS) for augmenting the wireless-based voice and data
services. This is equally true for installing 5G and Wi-Fi hotspots along with Fibre to x
(FTTX) distribution network of Fiber and Cat-6 Cables for seamless data connectivity.
Provisioning of telecom services and broadcasting services viz Cable TV, DTH and
Security Services viz. CCTV Cameras and futuristic services viz IoT based sensors would
require suitable wireline connectivity inside the buildings inside buildings are not confined
to wireless medium only. Wireline services through cables such as copper cables, optical
fibre cables (OFC), LAN Cat-6 cables are also equally important for having uninterrupted
connectivity. Also, for services such as Cable TV, DTH and Smart Devices Solutions (IoT),
suitable cabling within building premises is a pre- requisite and for that, shared duct space
across the building riser and floors is critical to achieve the flexibility in the future.
15.5. Incorporation with Smart Cities:
i.
In-Building and Gated building solutions:
It is important to ensure quality telecom services inside a building – in residential, multi-
story building, commercial complex, hotel or airport. It is also essential for
Telecommunication Service Providers/IP-1s to work on sharing of telecom infrastructure
which may be made mandatory as they extend the services in the buildings.
Telecom Service Providers/IP-1s require a non-discriminatory and unhindered access
inside the building / along the premises to install the telecom infrastructure or lay their
cables.
At present, mobile operators and the building owner or building developer or Resident
Welfare Associations (RWA) enter into commercial agreements for in-building deployment.
Building owners or building developers delay the negotiations or request exorbitant rents
— slowing down the speed of deployment. The Competent Authority may intervene in this
regard wherein commercial agreements are insisted upon. TSPs/IP-1s should be given
legal rights to use the Common Telecom Infrastructure (CTI) within the premises of
Building / Gated Society free of charge or for a standardized nominal charge just like
other essential services like water electricity and/or gas. Provision of CTI in a building
should not be deemed as a revenue source in any way, much as the water and
electricity utilities are not.
The issue is not limited to sharing of IBS/ Distributed Antenna System (DAS) systems
only, but TSP should get access to all telecom infrastructures including Fiber Cable and
LAN cables for provision of wired and wireless network, other telecom/ICT and IoT
services.
It is important for telecom service providers to provide mobile coverage / network
presence/high speed connectivity inside big residential / commercial complexes to improve
QoS of their networks. It may not be practical to install individual in-building infrastructure
by TSPs/IP-1s as this will result in not only duplication of network resources but will also
entail huge avoidable cost. It may also be not advisable to lay down cables again and
again on the same land / building by several TSPs/IP-1s.
ii.
Built Provisions:
The buildings are to be constructed in such a way that they are ‘Digital Infrastructure
deployment’/ ‘Digital Connectivity’ ready. There should be provision of telecom ducts/
common pathways/runways (digital access paths) to reach to the accessible parts of the
buildings. The common ducts/digital access paths to access buildings from outside should
invariably be part of the CTI, which could be used by TSPs/IP-1s for laying/deploying
digital infrastructure including cables. While approving the building plans, it has to be
ensured that plan for creation of CTI including the common duct to access the common
space used as telecom room inside the building is also prepared and separate set of
drawings showing the inter/intra connectivity access to the building with distribution
network need to be furnished.
Occupancy-cum-Completion certificate to a building to be granted only after ensuring that
the CTI as per the prescribed standards is in place and an undertaking by the
competent professionals to be insisted to certify that building has ensured common
access to all digital infrastructure to all Service providers in accordance with plan of
creation of CTI.
As part of Building Bye-Laws, the builder/Resident Welfare Association should be
mandated to ensure that:
i.
While preparing the building plans, there is a need to mandate to have properly
demarcated sections within buildings and on rooftops for housing Broadband / digital
connectivity infrastructure / antenna. These areas should have access to power
supply for reliable, always-on services.
ii.
Access to building as well as CTI facilities inside the building should be available on
a fair, transparent and non-discriminatory manner to all Service Providers /IP1’s.
iii.
The Service Providers / IP1’s should have unrestricted access for maintenance work.
iv.
The permission to in-building access and/or CTI facilities inside the building should
not be seen as a source of revenue generation for builder(s)/RWA(s) but as a
means for facilitating penetration of broadband access and thereby helping in socio-
economic growth of all the residents.
v.
Charges (rentals/power rates etc.) levied to the TSPs/IP-1s should be fair,
transparent, and non-discriminatory and should be on residential rates.
Suitable provision for the creation of Common Telecom Infrastructure (CTI) inside the
newly constructed public places like Airports, commercial complexes and residential
complexes:
i.
At Layout Level
While developing Greenfield areas, the layout plans should clearly indicate the telecom
as Utility infrastructure lines. Standards followed for Utility planning shall be published
and work shall be done by the respective department for bringing in the standardization
of the utility coding and sequences. The placement and sequence of above- and below-
ground utilities at the appropriate location in the right-of-way to be ensured for
unconstrained movement as well as easy access for maintenance. Telecommunication
cables should be placed in a duct that can be accessed at frequent service points with
sufficient spare capacity to enable scaling and future expansion, and empty pipes (large
size hume pipes / HDPE pipes) should be laid before planting trees in order to
accommodate additional infrastructure.
Digital Readiness Rating of Buildings / Society in line to the Green ratings (as
mentioned in these Bye-Laws, as well as further laws/notifications/amendments taken up
by shall be created where the existing and new buildings shall be rated on standardized
parameters such as; but not limited to; Digital Infrastructure access, provisions for
Emerging Technologies, Maintenance and Operational ease to TSPs / IPv1, Quality of
Wireless Services, Quality / Interchangeability ease of Wireline Services till each Unit
Security, redundancy and Expandability of the digital infrastructure etc. A detailed rating
parameters and calculation mechanism of Points / Stars shall be devised and
benchmarked for all new / retrofitting of buildings/ societies.
Digital Asset repository which will ensure Proper planning and mapping of utilities
through GIS is necessary especially when the alignments of telecommunication cables
are identified. Design criteria and standards Utilities should meet the following criteria:
•
Telecommunication cables should ideally be placed below the parking area or
service lane, which may be dug up easily without causing major inconvenience.
Where this is not possible, the cables may be placed at the outer edge of the
right-of-way.
•
There is a need to reduce conflicts with pedestrian movements is to place telecom
boxes in easements just off the right-of-way. Where this is not possible, they
should be placed within parking or landscaping areas. If cables have to be located
in the pedestrian path, a space of at least 2m should be maintained for the
through movement of pedestrians. Telecom boxes should never constrain the width
of a cycle track.
•
In order to minimize disruptions, cables should be installed with proper
maintenance infrastructure.
ii.
Other procedures for setting up In-Building Solution (IBS)/ Fiber Networks:
•
There is a need to promote installation of In-Building Solution (IBS) / Smart
Connectivity infrastructure, where there is a poor connectivity in terms of weak
signal strength inside the office, shopping mall, hospitals, multi-story building,
education institutions and the objective has to be to strengthen quality of service of
the voice & data of mobile and Fiber broadband network and access to digital
services being offered by TSP and IP1’s
•
Mode of deployment of In-Building, FTTx/IP Solution: There shall be various mode
of deployment of In Building solutions such as: The possible modes are
deployment by a neutral host infrastructure provider or build and managed by
mobile operator and sharing with other service providers on non-discriminatory
basis. The In-Building Solutions (IBS), FTTx/IP Solutions can also be deployed by
TSPs/ IPs. For deploying indoor solutions these companies should have deemed
permissions from the premise’s owners for installation of Distribution Network within
the utility shafts / common spaces with provisions for common / shared Points of
Interconnect for Connectivity to individual units. Moreover, if the TSP/IP requires to
install optical fiber for connecting In-Building Solution (IBS) / Distributed Antenna
System (DAS) nodes, FTTx/IP Solutions for which RoW / permissions should be
granted by the road owning agency through online mode.
•
Permissibility: The IBS, FTTx/IP component being small equipment can be installed
on any type of land/building/utility pole and shall be exempted from obtaining the
permission for installation of these components from the Competent Authority.
•
Procedure for submitting application for obtaining clearance: The application should
be made to the Administrative Authority of the Building/ Head of the office with
Layout diagram for implementing IBS in the building.
•
Fees: There shall be no fee to be charged for IBS / FTTx Network. However,
charges may be levied for provision of power, fixtures, etc. if taken by the TSP/IP-
1s.
•
Access and Distribution Fiber and IP/LAN networks for connectivity for the shopping
malls, Multi-Storey Residential Buildings, Cooperative Housing Societies, Residential
Welfare Association and Commercial Buildings to be planned and deployed by
TSP/IP-1s as per standard requirement of providing high bandwidth and adequate
indoor coverage to each unit / apartment in these complexes.
Annexure “A”
Standard Affidavit
I ……………………………….. son/daughter/wife of ...................................................................................... , applied
for
building plan approval/ DPC Level/ occupation certificate vide application
dated……………… on Form BC………………….., and resident of ,
hereby solemnly state & affirm as under:
1.
That I shall not use basement as habitable space, as the same has not been
included in the FAR and has not been shown as habitable space in the
approved plans.
2.
That I shall use the building only for the purpose for which approval and
occupation certificate has been obtained.
3.
That I shall comply with all the condition(s) implied by the competent authority
at the
time of approval of building Plan and Occupation certificate.
4.
That ............................. (condition/
indemnity/
affirmity
required by
the
Competent Authority)-I.
5.
That ............................. (condition/
indemnity/
affirmity
required by
the
Competent Authority)-II.
6.
That ............................. (condition/
indemnity/
affirmity
required by
the
Competent Authority)-III.
7.
……………………………………..
Place:
DEPONENT
Date:
VERIFICATION
I ……………………………….. son/daughter/wife
of .......................................... ,
applied for building plan approval/ DPC Level/ occupation certificate vide application
dated……………… on Form BC………………….., and resident of ........................................................... ,
hereby verify and affirm that the contents of this affidavit are true and correct to the best of
my knowledge, belief and information in witness whereof I have signed hereunder on day of
.
FORM BC-I
[See Code
4.1(1)] Form of
Application
Class of Building
Residential
Institutional
Commercial
Industrial
Educational
Warehousing
Health
Any other
From ……………………
To……………………….
Sir,
I/We apply for permission to erect/re-erect/add/alter a building/wall in accordance with the plans
submitted herewith on Site No.
; Street No.
;
at
/Khasra No.
, Village
(strike
out whichever is not applicable)
1.
I/We attach:
a. Site plan (in triplicate) showing the position of site proposed to be built upon as
required by the Bye-Laws along with an un-editable Compact Disc/DVD or any
other electronic medium permissible by competent authority from time to time
containing the drawings so submitted,
b. Plans, elevations and sections (in triplicate) as required by the Bye-Laws along
with an un-editable compact Disc/DVD or any, other electronic medium
permissible by Director from time to time containing the drawings so submitted,
c. Drainage plans (in triplicate), as required by Bye-Laws along with an un-editable
compact Disc/DVD or any, other electronic medium permissible by the competent
authority from time to time containing the drawings so submitted,
d. Structural drawings (for record) as per Form BC-V(A1)/BC-V(A2), as may be applicable,
e. Specifications of the proposed building (in triplicate) in Form BC-II;
f.
Certificate of conformity to regulation and structural safety for the relevant
buildings (depending upon type and height) in Form BC-V(A1) and
2. Scrutiny fee @ Rs. 10 per square meter deposited as per prescribed mode
3. The construction of the building will be undertaken as per the approved building plans,
structural design given by the architect, civil engineer or structural engineer, and got
supervised through the following architect/engineer:
Architect:
Engineer:
Name of Architect:
Name of Engineer:
Council of Architecture
Registration No.-----------valid
up to---------------------
Qualifications:
Complete Address
Complete Address
Mobile No.
Mobile No.
Enclosures
Signature of applicant
(No digital signatures are required)
i. Complete Address
ii. E-Mail
iii. Mobile
No.
FORM BC-II
See Code 4.1 (a) (iv))
Specifications
The materials to be used in the construction to be clearly specified under the following heads:-
Items
Specifications
(a) Foundations
(b) Walls
(c) Damp-proof course
(d) Floors
(e) Roofs
(f) Windows and Doors and other wood-work
(g) Steel work
(h) Internal finish
(i) External finish.
Signature of applicant
(No digital signatures are required)
Signature of Architect/Engineer
i. Complete Address
ii. E-Mail
iii. Mobile No.
Form BC-V (A1)
(See code 4.1 (a) (vi, viii and ix)
Certificate of conformity to Bye-Laws and structural safety for Residential and
Commercial Buildings up to 15 meters height.
Certificate to be submitted along with the building application in Form BC-1 duly
signed by the Architect, Civil Engineer and the Structural Engineer.
Details of the building for which the certificate is issued
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
.
A. Building Plan :
i. Name of Architect:
ii. Council of Architecture Registration No.
, valid up to
.
iii. Complete Address
iv. E-Mail
v. Mobile no.
B. Structural Design:
i. Name of Civil/Structural Engineer:
ii. Qualifications:
iii. Complete Address
iv. E-Mail
v. Mobile no.
Certificate
It is hereby certified that the plans submitted in Form BC-1 for the building detailed
above, are in accordance with the Administration of UT Unified Ladakh Building Bye-Laws –
2024 (and the approved zoning plan of the plot wherever applicable). The structure has
been designed in accordance with the provisions of the National Building Code and the
relevant Indian Standard Code (with latest amendments) including Bureau of Indian Standard
Codes for structures resistant to earthquakes and other natural hazards. The local soil
conditions, its load bearing capacity and the underground water table etc. have been kept in
view while designing the same.
Dated
Signature of Owner
(No digital signatures are required)
Signature of Architect
Signature of Engineer
Mobile No.
FORM BC-V (A2)
[See code 4.1 (a) (vi and ix)]
Certificate of conformity to rules and structural safety for all buildings except as
stated in Form BC-V (A1).
Certificate to be submitted along with the building application in Form BC-1 duly
signed by the Architect, Civil Engineer and Structural Engineer and the Proof Consultant.
Details of the building for which the certificate is issued
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
A.
Building Plan :
i.
Name of Architect:
ii.
Council of Architecture Registration No.
, valid up to
.
iii.
Complete Address
iv.
v.
Mobile No.
B. Structural Design:
i.
Name of Engineer:
ii.
Qualifications:
iii.
Complete Address
iv.
v.
Mobile No.
Certificate
It is hereby certified that the plans submitted in Form BC-1 for the building detailed
above, are in accordance with the Bye-Laws ((and the approved zoning plan of the plot
wherever applicable). The structure has been designed in accordance with the provisions of
the National Building Code and the relevant Bureau of Indian Standard Codes (with latest
amendments) including Bureau of Indian Standard Codes for structures resistant to
earthquakes and other natural hazards. The local soil conditions, its load bearing capacity
and the underground water table etc. have been kept in view while designing the same.
Dated
Signature of Owner
Signature of Architect
Signature of Civil/Structural
Engineer (No digital signatures are required)
Mobile No. ……….
E-mail -------------------
The structural design has been checked and has been found to be in order. The design is in
accordance with the provisions of the National Building Code and the relevant Bureau of
Indian Standard Codes (with latest amendments) including Bureau of Indian Standard Codes
for structures resistant to earthquakes and other natural hazards. The local soil conditions, its
load bearing capacity and the underground water table etc. have been kept in view while
designing the same.
Dated
Signature of Proof Consultant
along with Mob. No. & E-mail
FORM BC-III
(See Code 5.2 (4))
Form of Sanction
From
To
Memo No.
Dated the ……………..
Reference you application for permission to erect/re-erect-add to/alter a building
on plot No.
/ Khasra no.
, Village
in
accordance with the plans submitted with it.
Permission is hereby-
(i) granted/sanctioned for the aforesaid construction subject to the provisions of the
respective Acts and Administration of UT Ladakh Building Bye-Laws -2024 and
subject to the following amendments, terms and conditions;
(ii) rejected for reasons given below :-
Enclosures
Competent Authority,
FORM BC-IV (A)
(See Code 5.10 (1 & 2))
For Residential and Commercial Buildings up to 15 meters height.
Application for permission to occupy
From
To
Sir,
I/We hereby give you notice that the building/part-of-building described below
and sanctioned vide your order No.
, dated
, has been completed on
in all respects according to the sanctioned plans and the structural design
made for the same and the suggested modifications have been carried out.
Description of Building
Plot No.
, Sector
, Colony
City/Town
.(or)
Khasra no.
, Village
1.
Name
of
the
owner
along with Mob. No. and E- mail
.
Complete address of the owner
.
2.
The modifications made to the building plans and carried out at site during the
course of construction are submitted herewith:
3.
Corresponding to the above modifications made in the building plans, the necessary
amendments were also carried out in the structural design and implemented a site.
4.
Completion certificate from the architect/engineer who supervised the construction of
the building is submitted herewith.
5.
Kindly issue an occupation certificate as required by Administration of UT Ladakh
Building Bye-Laws -2024 Dated
Signature of applicant
Signature of Architect/Engineer
(No digital signatures are required)
supervising the construction at site
i. Complete Address
ii. E-Mail
iii. Mobile no.
FORM BC-IV (B)
(See Code 5.10 (1))
For all Buildings except as stated in Form BR-IV (A) Application for permission to occupy
From
To
Sir
I/We hereby give you notice that the building/part-of-building described below
and sanctioned vide your order No.
, dated
, has been
completed on
in all respects according to the sanctioned plans and the
structural design made for the same and the suggested modifications have been carried out.
Description of Building
Plot No.
, Sector
, Colony
City/Town
.(or)
Khasra no.
, Village
1.
Name
of
the
owner
alongwith
Mob.No.
and
E- mail
Complete address of the owner
.
2.
The modifications made to the building plans and carried out at site during the
course of construction are submitted herewith:
3.
Corresponding to the above modifications made in the building plans, the necessary
amendments were also carried out in the structural design and implemented a site.
4.
Completion certificate (Form BC-VI) from the Architect/Engineer who supervised the
construction of the building is submitted herewith.
5.
Kindly issue an occupation certificate as required under Administration of UT
Unified Ladakh Building Bye-Laws -2024
Dated
Signature of applicant (No digital signatures are required)
Signature of
i) Architect:
a. Complete Address
b. E-Mail
c. Mobile No.
Signature of
ii)
Engineer supervising the construction at site
a. Complete Address
b. E-Mail
c. Mobile No.
FORM BC V (I)
[See Code 4.10(1)]
For Residential and Commercial Buildings up to 15 meters height.
Completion certificate by an Architect/Engineer in respect of building on:
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
.
It is hereby certified that the above work has been supervised by us and has been
completed to my satisfaction in accordance with the sanctioned building plans and its structural
design. The workmanship and all the material used for construction meet the specifications
laid down in the National Building Code. No provision of the Administration of UT Unified
Ladakh Building Bye-Laws -2024 and no rules made, conditions prescribed, or order issued
thereunder has been transgressed in the course of the work.
Dated
Signature of
i. Architect:
a. Complete Address
b. E-Mail
c. Mobile No.
Signature of
ii. Engineer supervising the construction at site
a. Complete Address
b. E-Mail
c. Mobile No.
(See Code 5.10(1))
For all Buildings except as stated in Form BC-V(1)
Completion certificate by the Architect, Civil Engineer and the Structural Engineer in
respect of building on:
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
.
It is hereby certified that the above work has been supervised by us and has been
completed to our satisfaction in accordance with the sanctioned building plans and its
structural design as checked and certified by the proof consultant. The workmanship and all
the material used for construction meet the specifications laid down in the National Building
Code. No provision of the Administration of UT Unified Ladakh Building Bye-Laws -2024 and
no rules made, conditions prescribed or order issued thereunder has been transgressed in
the course of the work.
Dated
Signature of
i)
Architect:
a. Complete Address
b. E-Mail
c. Mobile no.
ii)
Civil/Structural Engineer supervising the construction at site
a. Complete Address
b. E-Mail
c. Mobile No.
Form BC-V (2)
(See Code 5.10(1))
For all Buildings except as stated in Form BC-V(1)
Completion certificate by the Architect, Civil Engineer and the Structural Engineer in
respect of building on:
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
It is hereby certified that the above work has been supervised by us and has been
completed to our satisfaction in accordance with the sanctioned building plans and its
structural design as checked and certified by the proof consultant. The workmanship and all
the material used for construction meet the specifications laid down in the National Building
Code. No provision of the Administration of UT Unified Ladakh Building Bye-Laws -2024 and
no rules made, conditions prescribed or order issued thereunder has been transgressed in
the course of the work.
Dated
Signature of
iii)
Architect:
a. Complete Address
b. E-Mail
c. Mobile no.
iv)
Civil/Structural Engineer supervising the construction at site
a. Complete Address
b. E-Mail
c. Mobile No.
FORM BC VI
See Code 5.10 (a) (ii)
Completion Certificate by an Architect
I do hereby certify-
i)
that the following work has been supervised by me and has been completed to
my satisfaction in accordance with the sanctioned plan.
ii)
that no deviation from sanctioned plan is made while constructing the building/
deviation from sanction plan is made (details as below) and these deviations are
duly shown on completion drawings. Due to these deviations, human safety has
not been compromised (strike off whichever is not applicable).
iii)
that the workmanship and the whole of the materials used are good; that no
provision of the Administration of UT Unified Ladakh Building Bye-Laws, 2024
and no requisition made, conditions prescribed, or order issued there under has
been violated in the course of the work.
Details of construction on (floor-wise along with covered area on each floor)
City
Street
Plot No.
House No. (if any)
(or)
Khasra no.
, Village
Dated
Signature of Architect
i. Complete Address
ii. E-Mail
iii.
Mobile No.
FORM BC-VII
(See Code 5.10 (2)),
Form of Occupation Certificate
From
,
,
To
Memo
No…….
Dated
…………
Whereas Shri/ Smt/ M/s........................... has applied for the issue of an occupation
certificate in respect of the building described below:-
City
Street
Site No.
House No.(if any)
(or) Khasra no.
, Village
Indicating description of the building, covered area, towers, nature of buildings etc.
I hereby:-
(i) grant permission for the occupation of the said building with following conditions; or
(ii) refuse permission for the occupation of the said building for reason given below:-
Competent Authority
Form-BCS-I
(See Code 4.2.(a))
Form of application under self-certification
Class of Building –
Residential
Commercial
Educational
Institutional
Warehousing
Industrial Any other
From ………………………………….
To………………………………….
Sir,
I/we apply for permission to erect/re-erect/add/alter a building/wall in accordance with the plan
submitted herewith on site NO.
Street No.
at
2. I/We attach:
a. a site plan showing the position of site proposed to be built upon as required by the Bye-Laws (in
triplicate) an un-editable Compact Disc/DVD or any other electronic medium permissible by
Competent Authority from time to time containing the drawings as required by Code 4.1;
b. Plans, elevations and sections as required by the Code (in triplicate) an un- editable Compact
Disc/DVD or any other electronic medium permissible by Competent Authority from time to time
containing the drawing as required by Code 4.2;
c. Drainage plans (in triplicate), as required by Bye-Laws along with an un-editable Compact
Disc/DVD or any other electronic medium permissible by Competent Authority from time to time
containing the drawings as required under these Bye-Laws;
d. Structural drawings (for record) along with structure Certificate as per Form BCS-II;
e. Fire Safety design as required in the National Building Code as approved by the UT Fire
Authority, or any other authority as appointed by UT Administration. Alternatively, an undertaking to
the effect that the fire safety plans duly approved by the UT Fire Authority or any other authority
as appointed by UT Administration, will be submitted within sixty days;
f. Heating, Ventilation, Air conditioning (H.V.A.C.) service plans, wherever required;
g. Specifications of the proposed building (in triplicate) in Form BC-II;
h. Certificate of conformity to regulation and structural safety for the relevant buildings;
i. An affidavit from the owner and architect, as required under Code 4.2;
j. Scrutiny fee through an electronic transfer
3 The construction of the building will be undertaken as per the approved building plans,
structural design given by the Civil/Structural Engineer, fire safety design as approved by
the Competent Authority and got supervised through the following Architect/Engineer;
Signature of Architect
i.
Complete Address
ii. E-Mail
iii. Mobile No.
Signature of Civil/Structural Engineer supervising the Construction
i. Complete Address
ii. E-Mail
iii. Mobile No.
Form BCS-II
(See Code 4.2.(b))
Certificate for structure conforming under self-certification
Plot No…………Sector…………..Colony……………..City/Town…………………
Name of the Owner……………….
Complete address of the owner…………………………
It is hereby certified that the plans submitted in Form BCS-I for the building detailed above
are in conformity with the Administration of UT Unified Ladakh Building Bye-Laws -2024 and the
approved zoning plan of the plot. The structure has been designed in accordance with the
provision of National Building Code for structures resistance to earthquakes and other natural
hazards. The local soil conditions, its load bearing capacity and the underground water table
etc have been kept in view while designing the same.
Date…………….
Signature of Architect
Signature of Owner
(No digital signatures are
required) Mobile no.
Signature of Civil/Structural Engineer
FORM BCS-III
[see Code 5.11. (a), (b) and (c)]
For Buildings Residential and Industrial Buildings applied under Code 4.2 Application for
permission to occupy
From:
……………………………………
……………………………………
To:
……………………………………
……………………………………
Sir, I/We hereby give you notice that the building/part of building described below and sanctioned vide your
order no. …………………………., dated ………………….., has been completed in all respect according to the sanctioned
plans and the structural design made for the same and suggested medications have been carried out
Description of Building
Plot No.
, Sector
, Colony
City/Town
.(or) Khasra no. ____, Village ___________
1.
Name
of
the
owner
alongwith
mob.No
and
E- mail
.
Complete address of the owner
.
2.
The modifications made to the building plans and carried out at site during the
course of construction are submitted herewith:
3.
Corresponding to the above modifications made in the building plans, the
necessary amendments were also carried out in the structural design and
implemented a site.
4.
Completion certificate from the architect/engineer who supervised the
construction of the building is submitted herewith.
5.
Kindly issue an occupation certificate as required by Administration of UT
Unified Ladakh Building Bye-Laws -2024 Dated
Signature of applicant
(No digital signatures are required)
Signature of Architect
Mobilen
o.
Signature of Engineer supervising the construction
FORM BCS-IV
(See Code 5.11(1) and (2))
Certificate of conformity to rules and structural safety.
Certificate to be submitted along with the building application in Form BCS-III duly signed by the Architect,
Civil Engineer and the Structural Engineer.
Details of the building for which the certificate is issued
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
.
A.
Building Plan :
i. Name of Architect:
ii. Council of Architecture Registration No.
, valid up to
.
iii. Complete Address
iv. E-Mail
v. Mobile no.
B. Structural Design:
i. Name of Engineer:
ii. Qualifications:
iii. Complete Address
iv. E-Mail
v. Mobile no.
Certificate
It is hereby certified that the plans submitted in Form BCS-I for the building detailed above,
are in accordance with the Administration of UT Unified Ladakh Building Bye-Laws -2024
and the approved zoning plan of the plot. The structure has been designed in accordance
with the provisions of the National Building Code and the relevant Bureau of Indian
Standard Codes (with latest amendments) including Bureau of Indian Standard Codes for
structures resistant to earthquakes and other natural hazards. The local soil conditions, its
load bearing capacity and the underground water table etc. have been kept in view while
designing the same.
Dated
Signature of Architect
Mobile No.
Signature of Engineer supervising the construction
Mobile No.
In case of the building is above 15 meters height, the certificate shall be signed by the
proof consultant, as followed:
The structural design has been checked and has been found to be in order. The design is
in accordance with the provisions of the National Building Code and the relevant Bureau of
Indian Standard Codes (with latest amendments) including Bureau of Indian Standard
Codes for structures resistant to earthquakes and other natural hazards. The local soil
conditions, its load bearing capacity and the underground water table etc. have been kept in
view while designing the same.
Dated
Signature of Proof Consultant
along with Mob. No. & E-mail
Form BCS-IVA
(See Code 5.12(1) and (2))
3rd party certification for conformity to rules and structural safety.
Certificate to be submitted along with the building application in Form BCS-III duly signed by the
3rd party Architect and 3rd party Civil/Structural Engineer.
Details of the building for which the certificate is issued
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
.
A.
Building Plan :
i.
Name of Architect:
ii.
Council of Architecture Registration No.
, valid up to
.
iii.
Complete Address
iv.
v.
Mobile no.
B.
Structural Design:
i.
Name of Engineer:
ii.
Qualifications:
iii.
Complete Address
iv.
v.
Mobile no.
Certificate
It is hereby certified that the site has been inspected and construction has been found in
order as per plans submitted in Form BCS-I, in accordance with the Administration of UT
Unified Ladakh Building Bye-Laws -2017 and the approved zoning plan of the plot, for the
building detailed above. The structure has been designed in accordance with the provisions
of the National Building Code and the relevant Bureau of Indian Standard Codes (with latest
amendments) including Bureau of Indian Standard Codes for structures resistant to
earthquakes and other natural hazards. The local soil conditions, its load bearing capacity
and the underground water table etc. have been kept in view while designing the same.
Dated………………….
Signature of Architect (3rd party): Complete Address………………….E-Mail……………………
Mobile no……………………
Civil Engineer/ Structural Engineer (3rd party): Complete Address…………………………..
E-Mail……………..Mobile no…………………………
In case of the building is above 15 meters height, the certificate shall be signed by the
proof consultant (3rd party), as followed:
The structural design has been checked and has been found to be in order. The design is
in accordance with the provisions of the National Building Code and the relevant Bureau of
Indian Standard Codes (with latest amendments) including Bureau of Indian Standard Codes
for structures resistant to earthquakes and other natural hazards. The local soil conditions,
its load bearing capacity and the underground water table etc. have been kept in view while
designing the same.
Dated
Signature of Proof Consultant (3rd party) along with Mob. No. & E-mail.
Form BCS-V [see Code 5.11(4)]
From
,
,
To
…………………………………………………………………………………………………………..
Memo
No…….
Dated
…………
Whereas Shri/ Smt/ M/s .............................. has applied for the issue of an occupation
certificate in respect of the building described below:-
City
Street
Site No.
House No.(if any)
(or) Khasra no.
, Village
Indicating description of the building, covered area, towers, nature of buildings etc.
I hereby:-
(i) grant permission for the occupation of the said building with following conditions; or
(ii) refuse permission for the occupation of the said building for reason given below:-
Competent Authority
Form-NAC-I
(See Code 3.53, 6.1(3), Annexure-D)
Application form for rendering non-nuisance professional consultancy in residential
premises.
To
…………………………………….
……………………………………
1.
Name of applicant
2.
Premises Number and size
3.
Name of colony/change of land use site
4.
Sector
5.
Detail of floor-wise built up area
(Square meters)
6.
Copy of approved building plan showing duly marked area upon which mixed land
use is applicable.
7.
Whether occupation certificate has been issued, if so, attested copy thereof to be
attached.
8.
Details of profession
9.
Numbers of anticipated visitors
10.
Working hours of consultancy
11.
Detail of fee
through electronic transfer as per Schedule IV A.
12.
Affidavit to the effect that he shall abide by all the terms and conditions, which shall
be imposed by Competent Authority from time to time.
Place:
Date:
Signature of Owner
(No digital signatures are required)
Mobile no.
Form-NPC-II
(See Code 3.85,6.1(3), Annexure-D)
From
……………………
To
…………
…………
Mem
o No.
Dated:
Subject: Permission to provide non-nuisance consultancy services in the
residential premises.
This is with reference to your application dated
.
2.
Permission is hereby granted to provide
services,
within the premises of your land/house bearing number
Sector
town/city
. The above permission shall be subject to the following terms and
conditions:-
(1) You can use the premises of your house up to 25% of the covered area
of the premises or 50 square meters, whichever is less for the purpose.
(2) Total charges paid i.e. Rupees
is for a period of five years.
LADAKH GAZETTE : EXTRAORDINARY 177
(3)
Water, sewerage and electricity charges for such premises to the extent
that is being used for non-residential use would be charged at commercial rates
by the service providing agency.
(4) The permission given by Competent Authority shall be valid for a period of
five years which may be renewed thereafter for a period of five years and
further in block of five years on payment of renewal fee @ 10% of updated
commercial charges.
(5) The owners of a premises where mixed land is used is permitted should
accept any other condition such as restriction with respect of provision of
parking advertisement etc.
(6)
Competent Authority can withdraw the permission give for mixed land
use at any point of time, if the percentage area permitted under mixed land use
is found to exceed the stipulated limit or for any other reason in the public
interest.
(7)
That the permission shall also be governed by the provision of these Bye-Laws.
(8) That the owners of building shall not further sublet/lease out the premises
for which permission is being granted.
Signatures of Permission Issuing Authority along with seal.
LADAKH GAZETTE : EXTRAORDINARY 178
Annexure “B”
INDEMNITY BOND FOR BASEMENT
This Indemnity Bond is executed by Shri/Smt.…………………………………………
S/o, D/O, W/O Shri/Smt…………………………………………………………….………
R/O……………………………………………….in favour of Development Authority. Whereas the executant has
submitted to the concerned Authority the plans for, sanction of basement over Plot No…………………
under the provisions of the Act and lie bye- laws made there under:-
And whereas the concerned Authority has agreed to sanction the aforesaid construction subject
to the conditions that the owner shall indemnify the concerned Authority in the event of any
loss or damage being cause to the adjoining building on account of the construction of the said
basement either at the time of digging of its foundations or in the course of its construction or
even thereafter and also against any claim of any concern thereto. And whereas the executant
has agreed to execute an indemnity bond to the above affect and also to abide by the terms
imposed by the concerned Authority to the grant of sanction for construction of the basement.
Now this deed witnesses:
1. That in consideration of the sanction of the plans by……………………………for construction of the
basement the executant undertakes that he/she shall at all times keep…………………harmless
and free from any liability, loss or damages/flowing from any injury or damage caused
to the adjoining built-up properties or to any person as a consequence of the
construction of at the time of digging of its foundations or during the course of its
construction or at any time thereafter.
2. The owner agreed and undertakes that in the event of any claim being made by any
person or persons against the concerned Authority either in respect of the sanction
LADAKH GAZETTE : EXTRAORDINARY 179
granted by the concerned Authority to the owner for the construction of basement or in
respect of the construction or manner of construction of the basement by the owner or
the consequences flowing from the said sanction the executant shall be responsible and
liable and not the concerned Authority.
3. The executant agrees and undertake to indemnify the concerned Authority fully in
respect of any amount which the concerned Authority may be required to pay to any
person either by way of compensation or damages or on any other account as a result
of any claim or suit or any other proceedings concerning the sanctioning of the
construction of the basement of the making thereof and also in respect of the costs and
expenses which the concerned Authority may incur on defending any action.
4. Without prejudice to the above undertaking the executant hereby binds itself to pay to
the concerned Authority to the full extent any amount which the concerned Authority
may be required to pay to any person in connection with, relating to or concerning the
sanctioning of the basement or the making thereof.
5. The owner further agrees and undertakes that this bond shall remain in full force and
effect till the executant faithfully observes/performs the undertaking herein before
contained.
In witness whereof the executant above named has signed this bond on this ……………..day of
…………………..at…………………………………………
Indemnifier
Witness:
(Signatures)……………………………
1. Name………………………………………
Full Address……………………………….
(Signatures)……………………………….
2. Name………………………………………
Full Address……………………………….
LADAKH GAZETTE : EXTRAORDINARY 180
Annexure “C”
Categories of Materials of storage for Warehouses as per combustion risk
A. Noncombustible materials:
Articles (which are Non- Combustible, Non -Flammable, Non-Corrosive, Non -toxic, Non-
poisonous, Non-Explosive) such as Cement, brick, mortar, hardware items, metals in solid
bar/metal goods (excluding those having melting point below 1000° C)
B. Combustible Materials in following 4 sub-categories:
LADAKH GAZETTE : EXTRAORDINARY 181
Table 3 Source: Page 232, Model Building Bye Laws, 2016
(further explanations may be referred from Page 233 of Model Building Bye-Laws)
LADAKH GAZETTE : EXTRAORDINARY 182
Annexure “D”
Empanelment of Competent professional
1. Definition: In these rules, unless the context otherwise requires:
a) “Act” – the Act of the concerned Authority
b) “Empanelled Architect” – A person empaneled by the Authority as per rules under
these bye-laws as authorized person to sanction building plans of residential
buildings up to 15 mt. in height and for plot size up to 500sqm, forming part of an
approved lay-out plan and for other buildings as authorized in section 3.118 of the
Bye-laws.
c) “Person Authorized” –A qualified person or group of technical personnel such as an
Architect, Structural Engineer, or other specialists who have been enrolled or
licensed by the Authority to carry out various types of building permission-related
works like landscaping, plumbing, electrical layouts, energy modelling etc.
d) “Sanctioned Building Plan” means a building plan of a building/premises to be
constructed on a plot and approved by the Competent Authority in accordance with
the provisions of Master Plan/Zonal development plan and Building Bye-laws.
e) “Fee” means a fee to be charged by the Authority for sanction of building plans.
(Design and consultations fees agreed between the architect and his/her client is
independent of this ‘Fee’)
For the empanelment, the qualified Competent Professional shall submit list of projects handled
with proof and credentials along with recommendations from the highest competent body of the
profession.
2. Authority should obtain security deposit/professional indemnity bond and professional liability
insurance from empaneled Architects as decided in value from time-to-time.
3. The empanelment of an Architect shall be for a period of two years and can be extended
from time to time subject to review by the Authority at the end of every two years.
LADAKH GAZETTE : EXTRAORDINARY 183
4. The Competent Professional shall be empowered to sanction building plans of residential
buildings up to 15 mt. height and for plot size up to 500sqmt, forming part of approved
layout plan. And for other buildings the criteria of empanelment shall be as per section
13.5 of the Bye-laws.
5. In respect of sanction of building plans of Government buildings, the plans shall be
sanctioned by the Chief of the concerned Department of the Administration, provided it
conform to Master Plan/Zonal Development Plan, approved layout plan and Building Bye-
laws.
“No legal responsibility is accepted for the contents of publication of advertisements/publications in this part of The
Ladakh Gazette. Persons notifying the advertisements/public notices will remain solely responsible for the legal
consequences and also for any other misrepresentation etc.”
MICHAEL
MANNY
DSOUZA
Digitally signed by
MICHAEL MANNY
DSOUZA
Date: 2024.11.19
16:16:29 +05'30'