xxxGIDHxxx
xxxGIDExxx
असाधारण
EXTRAORDINARY
प्राधिकार से प्रकाशित
PUBLISHED BY AUTHORITY
Part II - Section 3
केन्द्र-शासित प्रदेश लद्दाख प्रशािन
ADMINISTRATION OF UNION TERRITORY OF LADAKH
HOUSING & URBAN DEVELOPMENT DEPARTMENT
NOTIFICATION
Ladakh, 7 t h of November, 2025.
S.O. 121 — in exercise of power conferred by Section 218 of The Jammu and Kashmir
Municipal Act, 2000, as made applicable to the Union Territory of Ladakh vide Jammu and Kashmir
Reorganisation Act, 2019 and in super-session of S.O. 123 dated 04.11.2024, the Lieutenant
Governor of Union territory of Ladakh hereby notifies the Ladakh Building Bye-laws, 2025, which
has been previously published in terms of Section 219 of the Jammu and Kashmir Municipal Act,
2000 as under, namely: —
लद्दाख, 20 फरवरी, 2026
LADAKH, FRIDAY, FEBRUARY, 20, 2026
भारत सरकार
GOVERNMENT OF INDIA
एस.जी.-एल.डी.-अ.-20022026-1689
SG-LD-E-20022026-1689
CHAPTER -1: TITLE AND COMMENCEMENT
1.
Short title and Commencement.
1.1
These Bye-Laws shall be called the Ladakh Building Bye Laws, 2025.
1.2
They shall come into force on the date of their final publication in the Official Gazette.
1.3
Except as otherwise provided in these bye laws, they shall apply to all type of buildings
within the notified municipal limits of the Union Territory of Ladakh with effect from the
date of their notification in the Official Gazette.
CHAPTER -2: JURISDICTION AND APPLICABILITY
2.
Jurisdiction/Applicability
2.1
Jurisdiction of Building Bye-Laws:
The Building Bye-Laws shall apply to the building activity in the Municipal Areas, for
which they are framed and the same shall be unambiguously specified in the Building
Bye-Laws.
Applicability of Building Bye-Laws:
The building bye-Laws shall be applicable to all building activities and shall be read in
conjunction with the master plan/development plan/zonal development plan/
development control regulations, and/or any other statutory plan(s) currently in force,
if any, and notifications, as amended from time to time and shall be applicable for a
period of (05) FIVE years after which they shall be reviewed. Until the revised
Building Bye-Laws are officially notified, the existing Bye-Laws shall continue to
remain in force. Until the reviewed building Bye-Laws are notified, these building
Bye-Laws will continue to be in force.
2.2
Development and part-construction:
Except hereinafter or otherwise provided, these Bye-Laws shall apply to all
development, redevelopment, erection and/or re-erection of a building etc. as well as
to the design, construction of, or reconstruction, additions, enhancement, and
alterations to a building.
2.3
In case of part construction:
Where the whole or part of a building is demolished, altered or reconstructed, except
where otherwise specifically stipulated, these Building Bye-Laws shall apply only to
the extent of the work involved.
2.4
Change of use/occupancy:
Where use of a building is changed, except where otherwise specifically stipulated,
these Building Bye-Laws shall apply to all parts of the building affected by the change.
2.5
Reconstruction:
The reconstruction in whole or part of a building which has ceased to operate due to
fire, natural collapse, disaster-based collapse including natural and man-made disasters
or demolition having been declared unsafe, or which is likely to be demolished by or
under an order of the Authority, as the case may be and for which the necessary
certificate has been given by the Authority.
2.6
Existing approved building:
Nothing in these Bye-Laws shall require the removal, alteration, or abandonment, nor prevent
continuance of the lawfully established use or occupancy of an existing approved building unless, in
the opinion of the Authority such a building is unsafe or constitutes a hazard to the safety of
adjacent property or to the occupants of the building itself.
2.7
Power of relaxation:
The Administration may relax any restriction(s) or condition(s) or norm(s) stated in
these Bye-Laws or may issue direction(s) to review and revise the Bye-Laws in public
interest.
SANJIT ROBERT
RODRIGUES
Digitally signed by SANJIT
ROBERT RODRIGUES
Date: 2026.02.20 16:07:08
+05'30'
CHAPTER -3 : DEFINITIONS
3.
Definitions: -
In these Bye-Laws, unless the context requires otherwise, shall define the terms as mentioned below:-
3.1
“abut” in relation to a building means when it is on a street and the outer face of any of its external walls is
on the street boundary;
3.2
“Act” means the Jammu and Kashmir Development Act, 1970 and further amendments, Jammu and Kashmir
Town and Country Planning Act, 1963, please note there is no such act as “ JK Town and Country Planning
Act, 1963), As per the Reorganisation Act, it is Jammu and Kashmir State Town Planning Act, 1963) Jammu
and Kashmir Municipal Act, 2000 as mandated by the administration, as well as any other relevant acts as
may be decided upon by the UT Administration;
3.3
“administration means”, the Administration of Union Territory of Ladakh;
3.4
“advertising sign” means any surface of a structure with characters, letters, illustrations or illuminations
applied thereto and displayed in any manner whatsoever to public view for the purposes of advertising or
giving information regarding, or for attracting the notice of the public to, any place, person, public
performance, article or merchandise whatsoever, and whose surface or structure is attached to form a part of,
or is connected with, any land or building, or is fixed to a wall, hoarding, frame, post, kiosk, tree, structure,
ground or fence, or is displayed in space or on screens;
3.5
“alley” means a public thoroughfare, which affords only a secondary means of access to abutting property
and not intended for general traffic circulation;
3.6
"amenity" includes roads, water supply, street lighting, drainage which includes public health - sewerage,
treatment, and disposal of sewage, sullage and s t o r m w a t e r , p u b l i c w o r k s , t o u r i s t s p o t s ,
open spaces, parks, landscaping and Play fields, and such other conveniences as the UT Administration
may, by notification, specify to be an amenity for the purposes of these Bye-Laws;
3.7
“ancillary building” means the building ancillary to and serving the main building including meter-room,
pump room, security room, sewage treatment plant, stores, guardroom, cycle-shed, dispensary, canteen,
electric substation and quarters for watch and ward staff in the industrial/commercial/institutional plot but
shall not include residential accommodation for the supervisory staff;
3.8
“apartment” means a part of a property, intended for any type of independent use, including building
having one or more rooms with enclosed spaces located on one or more floors or any part or parts thereof,
to be used for residence, office or for practicing any profession or for carrying on any occupation, trade,
business or manufacturing or other uses relating to information technology or for such other types of
independent uses, as may be prescribed, with a direct exit to a public street, road or highway or to a
common area leading to such street, road or highway and includes any garage or room (whether or not
adjacent to the building in which such apartment is located) provided by the owner of such property for use
by the owner of such apartment for parking a vehicle or for the residence of any person employed in such
apartment, as the case may be;
3.9
“applicant” means a person(s) including legal heirs who is owner(s) of the site and who applies to the
competent authority, of his/her intention to erect or re-erect a building under these Bye-Laws;
3.10
“approved” means approved by the competent authority;
3.11
“architect” means a person registered with and has valid membership of the Council of Architecture, India
as prescribed under the Architect Act, 1972;
3.12
“architectural control sheets” means the location specific control sheets showing measures of architectural
control or the drawings containing necessary directions to be adhered and notified by the Competent
Authority which are available in the office of such authority and also on the website of the concerned
authority;
3.13
“area” means area under the jurisdiction of the competent authority;
3.14
“atrium” means a high open area or central court within a multistoried building, covered with transparent
material at the terrace level;
3.15
“authority”, means an authority constituted under Jammu and Kashmir Development Act, 1970, or the Jammu
and Kashmir Municipal Act, Jammu and Kashmir Panchayati Raj Act, 1989, Jammu and Kashmir Panchayati Raj Rules,
1996 and/or any other acts as amended from time to time or under any other law for purpose of these Bye-Laws;
3.16
“authorized officer” means an officer authorized by the competent authority;
3.17
“balcony” means a horizontal cantilevered projection, or otherwise, not more than 1.8 meters from the face
of a wall, including the parapet or railing to serve as a passage or sit out space, open to air at least on one
side;
3.18
"barsati" means a habitable space on the roof of the building with/without toilet facilities;
3.19
“basement or cellar” means the storey of a building, which is below the ground storey of a building and is
in any part more than half of its height below the mean level of the street or adjoining ground, with one or
more than one levels and where the front street is sloping, the average of the front length of the building
shall be taken into account;
3.20
“bazaar” means a place or area reserved or licensed by the authority for the erection of shops or stalls or
both;
3.21
"bio-technology industry" means the industrial unit primarily engaged in micro-organisms research and
development of related software applications only;
3.22
"building" means any structure constructed for whatsoever purpose and of whatsoever material and every
part thereof whether used as human habitation or not and includes foundation, plinth, walls, floors, roofs,
chimneys, plumbing and other services, fixed platforms, verandah, balcony, cornice or projection part of a
building or anything affixed thereto or any wall enclosing or intended to enclose any land or space, signs
and outdoor display structures, tanks constructed or fixed for storage of chemicals or chemicals in liquid
form and for storage of water, effluent, swimming pool, ponds etc., however, the shelters of whatever
material used for tourists’ stay shall be allowed only at the designated sites by the competent authority;
3.23
“Building Envelope” - The horizontal spatial limits up to which a building may be permitted to be
constructed on a plot;
3.24
“building line” means a fixed line, if any, specified for a site beyond which no building shall project within
that site other than a balcony and a canopy and compound wall as permissible under the Bye-Laws;
3.25
“built area” means area covered immediately above the plinth level and the external area up to upper floor;
3.26
"carpet area" means the net usable area of an apartment, excluding the area covered by the external
walls, areas under service shafts, balcony or verandah and open terrace;
3.27
“canopy”- means a cantilevered projection from the face of a wall over an entrance to the building at the
lintel or slab level provided that it:
a) shall not project beyond the plot line (boundary); and,
b) shall not be lower than 2.3 meters at all points when measured from the ground and shall remain
uncovered from above.
3.28
“ceiling height” means the vertical distance between the floor and the ceiling, where a finished ceiling is not
provided, the underside of the joists or top of post plate in case of pitched roof shall determine the upper
point of measurement;
3.29
“chajja” means the sloping or horizontal structural projection usually provided over openings on external
walls to provide protection from sun and rain;
3.30
“Chakra or Dry Toilet” means a traditional two-chamber, waterless toilet system that collects human waste
for decomposition into manure, designed to suit the region’s cold, arid climate;
3.31
“chimney” means the ventilation shaft/absorber provided in a building for intake and disposal of smoke;
3.32
“clear height” means height measured from the surface of ground or from any floor to the soffit of beam or
ceiling, as the case may be;
3.33
“colony” means an area of land divided or proposed to be divided into plots or flats for residential,
commercial, industrial, cyber city/park, purposes or for the construction of flats in the form of group
housing or integrated commercial complexes to be developed/constructed as notified and prescribed in these
Bye-Laws by the competent authority from time to time;
3.34
“Competent authority” means an officer or agency duly authorized to undertake preparation of plans,
approval of building plans and drawings, grant of occupation certificate, and any other powers as deemed
necessary by the administration;
3.35
"Competent professional” means any professional who is capable of making the drawings and submitting to
the competent authority, as mentioned in the Annexures, including but not limited to form BC-V and
subsequent forms in these byelaws;
3.36
“Conservation” means all the processes of looking after a place so as to retain its historical and/or
architectural and/or aesthetic and/or cultural significance and includes maintenance, preservation,
restoration, reconstruction and adoption or a combination of more than one of these;
3.37
“Core area” means thickly built area of the old town, or a village included in the urban local body or area as
shown in the Master Plan or as notified by the competent authority;
3.38
“courtyard” means an area open to the sky within the boundary of a plot, which is enclosed or partially
enclosed by buildings, boundary walls or railing and provides light and ventilation to one or more habitable
rooms. It may be at ground floor level or any other level within or adjacent to a building;
3.39
“Covered area” means the area covered immediately above the plinth of a building but does not include the
space covered by:
a). soak pit, rainwater harvesting tank, sewage/effluent treatment plant, uncovered swimming pool;
b). cantilevered porch without any coverage and areas covered by canopy and portico, open staircases for fire
escape;
c) area under solar panel, service floor, service shaft, and atrium; and
d) basement and stilt floor if used for parking.
3.40
“Cyber city” means self-contained intelligent city with high quality of infrastructure, attractive surrounding and high-
speed communication access to be developed for nucleating the Information Technology concept germination of medium
and large software companies and Information Technology enabled services, wherein no manufacturing units shall be
permitted;
3.41
“Cyber Park” means an area developed exclusively for locating software development activities and Information
Technology Enabled Services, wherein no manufacturing of any kind, including assembling activities, shall be permitted;
3.42
“Damp proof course (DPC)” means a course laid to prevent seepage/penetration of dampness or moisture from plinth to
any part of the structure above it;
3.43
“developer” means individual owner, or a company, or an association, or firm or a limited liability
partnership and includes any other entity designated through a collaboration/development agreement with
the owner for making an application for grant of permission and for completion of formalities required on
behalf of such owner to develop a colony;
3.44
"Development" with its grammatical variations means the carrying out of building, engineering, mining, or
other operations in, on, over or under land or the making of any material change, in any building or land and
includesre-development
1. Development Permission:
No person shall carry out any development or redevelopment including sub-division on any plot or
land (not forming part of any approved layout plan or scheme) or cause to be done without obtaining
approval from the Authority for the layout plan.
2. Building Permit:
No person shall erect, re-erect or make addition/ alterations in any building or cause the same to be
done without, first obtaining a separate building permit for any such building from the Authority.
3. Pre-Code Building Permit:
Where any building permit which has been issued by the Authority before the commencement of the
Building Bye-Laws and where construction is in progress and has not been completed within the
specified period from the date of such permit, the said permission shall be deemed to be sanctioned
under these Bye-Laws and shall only be eligible for revalidation thereunder. Accordingly, where the
validity of sanction has expired and construction has not commenced, construction shall be governed
by the provisions of these Building Bye-Laws.
3.45
“dhoonga” means a floating dwelling on water used for residential/kitchen purposes;
3.46
“drain” means a conduit or channel for the carriage of storm water, sewage, wastewater, or other waterborne
wastes in a building;
3.47
“Drainage system” means a system or a network of pipes, with their fittings and accessories, such as
manholes, inspection chambers, traps, gullies, floor traps used for drainage of building or yards appurtenant to
the building and includes an open channel for conveying surface water or a system for the removal of any
wastewater;
3.48
“Dwelling unit” means a building or a part thereof which is used or is intended to be used by a person(s) or
family for habitation comprising of kitchen, toilet and room;
3.49
“Electronic signature” or “e-signature” means “digital signature” defined in the Information Technology Act,
2008;
3.50
“Empaneled Architect”- A person empaneled by the Authority as per rules under the building Bye-Laws as an
authorized person to sanction building plans of residential buildings up to 15 m. in height and for plot sizes up
to 500 sqm, forming part of any approved lay-out plan;
3.51
“engineer” means a person graduate in civil engineering from a recognized Indian or Foreign University or an
associate member of the Institution of Engineers (India);
3.52
“Erection or re-erection of building” means and includes any material addition, alteration or enlargement of
any building including sub-division of the existing covered area;
3.53
“Executive Officer” means a person, by whatever name called, appointed under section 306 of this Act to
discharge the functions of the Executive Officer under The Jammu and Kashmir Municipal Act, 2000 (Act
No. XX of 2000);
3.54
“exit” means a passage, or means of egress from a building to a street or to the open space;
3.55
“External wall” means an outer wall or vertical enclosure of a building not being a party wall, even though
adjoining to a wall of another building and also includes a wall abutting on an interior open space of any
building but shall not include an outer verandah wall;
3.56
“factory” shall have the same meaning as defined under clause m. of section 2 of the Factories Act, 1948 (Act
LXIII of 1948);
3.57
“filling station” means an area of land including any structure thereon that is or used or designed to be used for
the supply of gasoline or oil or fuel;
3.58
“flat’’ means an apartment intended to be used for residential purposes;
3.59
floor” means the lower surface in a storey on which one normally walks in a building but does not include a
mezzanine floor. The floor at ground level with direct access to a street or open space is the ground floor; the
floors above it shall be termed as floor-1 and the next higher floor being termed as floor-2, and so on upwards;
3.60
“Floor area ratio (FAR)” mean a quotient derived by dividing, the sum total of covered area of all floors and
multiplied by hundred, with the area of plot cited as under.
Equation 1 Calculation of Floor Area Ratio
For calculating FAR, cantilevered/permitted roof projections, lift room, mumty, balcony, basement or any
floor if used for parking, services and storage, stilt area (unenclosed) for parking, fire escape staircase,
without mumty, atrium, water tank, open courtyard of permitted size shall not be counted towards FAR:
i.
Provided that the area under shaft, chutes, lift well and staircase from the stilt to next floor shall be
counted towards FAR only once at ground floor:
Provided further that in case the ventilation shaft area is more than 3 square meters, it shall not be
counted in FAR
3.61
“form” means a form appended to these Bye-Laws;
3.62
“Footwear industry” means the industrial unit primarily engaged in the design, cutting, assembly and
manufacturing of footwear from finished leather, fabric, rubber and their variants and includes other similar
products such as belts, purses, bags, suitcases, brief cases etc. but shall not include the processing and
tanning of leather and its variants;
3.63
“foundation” means a part of a structure which is below the lower most floor supporting the superstructure,
and transmits load of the superstructure to the bearing surface;
3.64
“Framed building” means a building, the external walls of which are constructed of a frame either of timber,
iron, reinforced cement concrete or steel and such framing consisting of posts or columns and beams, filled
in, wholly or partially covered with bricks, stones, iron plates or other materials and the stability of which
depends upon such framing;
3.65
“front” as applied to a building means the portion facing the street from which it has access;
3.66
“garage” means a building or portion thereof used or intended to be used for shelter, storage or parking of
vehicles;
3.67
“Ground coverage” means built area at the ground level, for the purpose of calculating ground coverage, the
area under shaft, chute, lift-well and staircase shall be counted towards ground coverage: however,
ventilation shaft area more than 3 square meters, fire staircase, atrium, and open courtyard of permitted size,
shall not be counted in ground coverage;
3.68
“Group housing” means a building designed and developed in the form of flats for residential purpose or any
building ancillary to group housing;
3.69
“Habitable room” means a room occupied or designed for occupancy by one or more persons for study,
living, sleeping, eating, but not including bathrooms, water-closet compartments, laundries, serving and
store pantries, corridors, cellars, attics, and spaces that are not used frequently or during extended periods;
3.70
“height” as applied to a building means vertical measurement of the building measured from the finished
mean level of the street where such street exists or from the mean level of the ground adjoining the outside
of the external walls to half the height of the roof in the case of sloping roofs and to the highest level of the
building in case of building with flat roof, excluding the projected portions of mumty, flue, ducts building
maintenance unit, machine room, minaret, water tank and parapet not exceeding 1.2 meters in height.
Architectural features serving no purpose other than that of decoration shall be excluded for the purpose of
taking heights. Height as applied to a room shall mean the vertical measurement from the top surface of the
floor to the lowest surface of the ceiling of the same room, joist and beams being allowed to project beneath
the ceiling, and in the case of a sloping ceiling, the height shall be the mean height of any such room;
3.71
“heritage building” means and includes any building of one or more premises or any part thereof and/or
structure and/or artifact which requires conservation and/or preservation for historical and/or architectural
and/or artisanry and/or aesthetic and/or cultural and/or environmental and/or ecological purpose and
includes such portion of land adjoining such building or part thereof as may be required for fencing or
covering or in any manner preserving the historical and/or Architectural and/or aesthetic and/or cultural
value of such building as decided by UT Level Heritage Commission/Committee;
3.72
“Heritage precinct” means and includes any space that requires conservation and/or preservation for
historical and/or architectural and/or aesthetic and/or cultural and/or environmental and/or ecological
purpose. Walls or other boundaries of a particular area or place or building or may enclose such space by an
imaginary line drawn around it;
3.73
“Heritage zone” means the area around such heritage building/ Buildings as defined in the Jammu and
Kashmir Heritage Conservation Authority Act 2010, not inclusive of Archaeological Sites and Remains Act
(AMASR), 1958 and further amendments;
3.74
“House boats” means wooden structure floating on water which includes dhoongas for the residential
purpose or a facility of board and lodge for tourists with inbuilt mechanism for Solid waste disposal and
disposal of liquid waste without polluting water body registered with the concerned government
agency/department;
3.75
“Integrated commercial complex” means building containing apartments sharing common services and
facilities and having their undivided share in the land and meant to be used for office or for practicing any
profession or for carrying on any occupation, trade, business or such other type of independent use as may
be prescribed;
3.76
“Layout plan” means a plan of a colony, both plotted and flatted, showing location of plots/ building blocks,
roads, open spaces, entry/ exit, parking, landscaping etc., and indicating proportionate share of each land use
and approved by the competent authority;
3.77
“Ledge or taakh” means a shelf-like projection, supported in any manner whatsoever, except by vertical
supports within a room itself but not projecting wider than half meter;
3.78
“load” includes:
a)
‘Dead load’ i.e., weight of all permanent stationary construction becoming a part of the structure, and
b)
‘Live load’ i.e., all load except dead load that may be imposed on a structure including wind and snow
loads shall be considered as live upon it,
3.79
"loft" means an intermediary floor between two floors on a residual space in a pitched roof above a residual
normal floor level within a maximum height of 1.5 meters and which is constructed or adopted for storage
purposes;
3.80
“Material changes of use” means a change from one class of building to another;
3.81
“Mean level of street” means the average level of all points on the surface of the street from which the site
derives its access measured at the center line of street;
3.82
“Mezzanine floor” means an intermediate floor, between two floors, with area of mezzanine restricted to 1/3
(one-third) of the area of the lower floor and with a minimum clear height of 2.3 meters and shall not be
lower than 2.3 meters (clear height) above floor level;
3.83
“mumty” means a small structure erected on the roof of a building to protect such a staircase from weather,
with a maximum height of 3 meters, and a minimum height of 2.75 meters (exempted from maximum height
criteria);
3.84
“Multistoried or high-rise buildings” means a building whose height is 15 meters or more measured from the
average level of the central line of the street on which the site abuts or more than four floors excluding
basement or stilt;
3.85
“Natural hazard prone areas” means areas of moderate to high intensity of earthquake or
cyclonic/snowstorm or significant flood flow or inundation or landslides/mud flows or one or more of these
hazards, and declared so by the competent authority;
3.86
“non-conforming use” means the use of a building/structure, or and of land not conforming to the land use
zone of a Master Plan or Zonal Development Plan but existed prior to the notification of these plans;
3.87
“Municipal area” “means the area in respect of which the Municipal Committee having executive and
legislative authority;
3.88
"non-nuisance professional consultancy services" include doctors, lawyers, tax consultants, architects, town
planners, contractor consultants, chartered accountants, company secretaries, property consultants,
ayurvedic and homeopathic practitioner, psychiatrist, clinical psychologist, and tourist guides and as notified
by the competent authority from time to time;
3.89
“occupancy” means the main purpose for which a building or a part of building is used or intended to be
used;
3.90
“Open space” means a space forming an integral part of the plot left open to sky;
3.91
“parapet” means a low wall built along the edge of a roof or a floor not more than 1.2 meters in height for
buildings up to 15 meters and 1.5 meters for buildings above 15 meters in height;
3.92
“parking” means a space enclosed or unenclosed, to park vehicles together with driveways connecting the
parking space with a street permitting ingress and egress of the vehicles;
3.93
“Partition wall” means a wall which bears no load other than its own weight,
3.94
“Party wall” means a common wall partly constructed on the plot of land, and partly on the adjoining plot
and serving both structurally or otherwise;
3.95
“plinth” means the portion or structure between the surface of the surrounding ground and
surface of the floor immediately above the ground;
3.96
“Plinth area” means the built-up covered area measured at ground level;
3.97
“plot” means piece of land or site enclosed by definite boundaries;
3.98
“porch” means a covered surface supported on pillars or otherwise for the purpose of pedestrian or vehicular
approach to a building;
3.99
“Preservation” means and includes maintaining the fabric of a place in its existing state and retarding
deterioration;
3.100
“Prohibited area” means any area specified or declared to be a prohibited area under section 20A of the
AMASR Act, 2010;
3.101
“proof consultant” means a person who is an engineer/civil/structural engineer or a group/firm of
engineers/structural engineers having post- graduate qualification in civil/structural engineering with ten
years’ experience in structural design and evaluation thereof, for multistoried and specialized structure, and/
or an institute of the following type, employed for evaluation/checking of the structural design of the
buildings referred to in the relevant Form BC-V(A2) for all buildings above 15 meters height (including
stilt) (Please see Annexure “A”):-
a)
Institute of Structural Engineers (India),
b)
Central Building Research Institute, Roorkee,
c)
Various engineering institutes,
d)
to name a few, like
i. Indian Institute of Technology,
ii. Engineering College,
iii. National Institute of Technology,
iv.
Or any other institute of repute notified by the
Administration
3.102
“Protected monuments” means an ancient monument which is declared to be of national importance by or
under the AMASR Act, 2010;
3.103
“Public sewer” means a sewer line owned and maintained by competent authority for carriage of the sewage;
3.104
“Public street” means any street levelled, paved, metaled, channeled, sewered, repaired or maintained out of
municipal or other public funds, and includes a private street which are maintained by municipal body or
any other public agency under an agreement with the owner shall be the public street;
3.105
“Rainwater pipe” means a pipe or drain used or constructed to be used solely for carrying off rainwater
directly from roof surfaces;
3.106
“rear” as applied to a building means that portion which is on the opposite side of the ‘front’;
3.107
“Regulated area” means any area specified or declared under section 20B under the AMASR Act, 2010;
3.108
“Reconstruction” means and includes returning a place as nearly as possible to a known earlier state and
distinguished by the introduction of materials (new or old) into the fabric. This shall not include either
recreation or conjectural reconstruction;
3.109
“Restoration” means and includes returning the existing fabric of a place to a known earlier state by
removing accretions or by reassembling existing components without introducing new materials;
3.110
“Retrofitting” means Reinforcement or upgrading of existing structures to become more resistant and
resilient to the damaging effects of hazards;
3.111
“Road/Street”- any highway, street, lane, pathway, alley, stairway, passageway, carriageway, footway,
square, place or bridge whether a thorough-fare or over which the public have a right of way or access or
have passed and have access uninterruptedly for specified period, whether existing or proposed in any
scheme and includes all bends, channels, ditches, storm water drains, culverts sidewalks, traffic islands,
roadside trees and hedges, retaining walls fences, barriers and railing within the street lines;
3.112
“Road/Street Level or Grade”- The officially established elevation or grade of the centerline of street upon
which a plot fronts, and if there is no officially established grade, the existing grade of street at its mid-
point;
3.113
“Road/Street Line” -The line defining the side limits of a road/street;
3.114
“Road Width or Width of Road/Street” - The whole extent of space within the boundaries of a road when
applied to a new road/street as laid down in the city survey or development plan or prescribed road lines by
any act of law and measured at right angles to the course or intended course of direction of such road;
3.115
“Row Housing” -A row of houses with only front, rear and interior open spaces;
3.116
“repairs” means any renovation applied to any structure, which does not in any way change the dimensions of
structure but saves the structure from further deterioration;
3.117
“Retention activity” means any activity or use which is allowed to continue, notwithstanding its non-
conforming nature in relation to the use permitted in the adjoining or surrounding area;
3.118
“retrofitting” means upgrading or and strengthening of an existing building or infrastructure by using suitable
engineering techniques;
3.119
“Sanctioned plan” means a plan, or a set of drawings approved/sanctioned by a competent authority under
these Bye-Laws;
3.120
“self-certification” means seeking approval of building plans duly prepared and certified by the architect as
per Building Bye-Laws, and parameters/policies issued by the competent authority, from time to time;
3.121
“Settlement”- A human settlement, which is urban or rural in character. It includes habited villages, towns,
townships, cities and the areas notified under the control of the Authority;
3.122
“Service floor” means the floor of a building with maximum height of 2.4 meters, where service equipment,
utility lines and various machinery are located;
3.123
“Shingtsak/ tukul-phaktse” means means architectural element in buildings, consisting of elaborate woodwork
above lintels and windows, where several parallel and perpendicular components are integrated into the wall
construction;
3.124
“site” means a “plot” as defined at sub- code 3.93 in these Bye-Laws;
3.125
“Site Corner” A site at the junction of and fronting on two or more intersecting roads or streets;
3.126
“Site Depth”- The mean horizontal distance between the front and rear site boundaries;
3.127
“Site plan” means a detailed plan showing the proposed placement of structures, parking areas, open space,
landscaping, and other development features, on a parcel of land, as required by specific sections of the
Building Bye-Laws;
3.128
“Site, Interior or Tandem” A site, access to which is by a passage from a street whether such passage forms
part of the site or not;
3.129
“Sketshing or Sked-shing means” A traditional Ladakhi construction technique using timber lacings within
stone or brick masonry, where horizontal beams tied with perpendicular wooden elements stabilize walls and
prevent cracks, mainly seen in large houses, monasteries, and forts;
3.130
“Spiral Staircase” A staircase forming continuous winding curve round a central point or axis provided in an
open space having tread without risers;
3.131
“Storage tank” means a tank or a cistern for storage of water which is connected to water main by means of a
supply pipe;
3.132
“storey” means the horizontal levels in a building referred from the ground level to the number of floors above
the ground level but shall not include the mezzanine floor;
3.133
“stilt” means poles, posts or pillars or columns used to allow a structure or building to stand or rest on at a
height above the ground;
3.134
“Street line” means the line defining the outer limits of a street;
3.135
"Structural Engineer" means a person who is a post-graduate in structural engineering from a recognized
Indian or Foreign University or Corporate Member of Civil Engineering Division of the Institution of
Engineers, India or equivalent, and/or BE/B-Tech Civil Engineers as one of the competent professionals as
Engineers/Architect/Structural Engineer/town planner, etc;
3.136
“Structural wall” means a load bearing wall or wall that carries load in addition to its own load;
3.137
“sub-soil drain” means a drain constructed to be used solely for conveying any sewage, either directly or
through another drain, any water that may percolate, through the sub-soil, “sun-shade” means a sloping or
horizontal or vertical structure over hanging, usually provided over openings on external wall to provide
protection from sun and rain and shall not be used for human habitation;
3.138
“superstructure” means the structure erected above the plinth level;
3.139
“supervisor” means a professional whose qualification and competency has been stated at Annexure-A;
3.140
“Temporary building” means a building erected of any material and allowed by the competent authority for
completion of an approved project and to be removed immediately after the completion of the project which
shall not exceed three months from the completion of the project;
3.141
“Third party” means an individual or entity that is involved in a transaction but is not one of the principals
and, thus, has a lesser interest in the transaction/case;
3.142
“Town planner” means a person holding a Post-Graduate Degree in Urban/Regional Planning/ Town and
Country Planning from a recognized Indian or Foreign University;
3.143
“Types of building” means a building which falls in one of the following categories:
i.
Class of buildings:
a.
assembly building: a building or part thereof, where 50 (fifty) or more people gather for
amusement, recreation, social, religious, patriotic, travel and similar purposes,
b. commercial and mercantile building: includes a building or complex or part thereof used
as shops, stores or market for display and sale of wholesale and/ or retail goods or
merchandise, including office, restaurant, banquet hall, hotel, motel, resort, dhaba,
boarding house, guest house, amusement park, office establishments and service facilities
incidental thereto and located in the same building,
c.
educational building: includes a building exclusively used for a school, college,
training/research institute, vocational institute and university including quarters for
essential staff required to reside within the premises, and building used as a hostel captive
to such educational institution within its campus,
d. industrial building: includes a factory or a part thereof wherein products or materials are
fabricated, assembled, or processed, and includes, power plant, refinery, gas plant, mill,
dairy plants,
e.
information technology building: includes building for software development activities,
and IT enabled services and/ or IT related manufacturing,
f.
inland container depot/custom bounded area: includes a
building used as inland
intermodal terminal connected by road or rail to a seaport/airport and is operating as
transshipment centre including temporary storage,
g. institutional building: includes a building constructed by government semi-government
organization or registered trust/ society and used for offices, medical or other treatments,
care for persons suffering from physical or mental illness, disease or infirmity, care of
orphans,
differently-abled
persons,
abandoned
women,
children
and
infants,
convalescents, destitute or aged persons, hospice and for penal or correctional detention
with restricted liberty of the inmates ordinarily providing sleeping accommodation, also
includes auditorium, complex for cultural, social, religious, patriotic, and allied activities
or assembly hall, city/town hall, exhibition hall, museum, place of worship, dharmshala,
hospital, sanatorium, custodial and penal institutions such as jail, prison and the railway,
air, and other surface public transportation stations,
h. mixed land-use building: includes a building put under one or more conforming
uses/activities and duly permitted by the competent authority,
i.
residential building: includes a building with living, sleeping accommodation, cooking,
and toilet facilities for one or more dwellings, residential apartments, flats, and garages
used by occupants of such building,
j.
Storage/warehousing building: includes a building or part thereof used primarily for
storage or shelter of goods, wares, merchandise, freight depot including a building used as
a warehouse, godown, freight depot, transit shed, store house, public garage, hanger, grain
elevator/silos, barn, stables and parking spaces, attached therewith.
ii.
design and height:
a.
“Detached Building”- Includes a building with walls and roofs
independent of any other building and with open spaces on all sides within the same plot.
b. “Multi-Storied Building or High-Rise Building”- A building above 4 stories, and/or a
building exceeding 15 meters or more in height (without stilt) and 17.5M (including stilt).
c.
“Semi-detached Building”- A building detached on three sides with open space as
specified in these regulations
iii.
special features:
a.
“Special Building”- Includes all buildings like assembly, industrial, buildings used for
wholesale establishments, hotels, hostels, hazardous, mixed occupancies with any of the
aforesaid occupancies and centrally air-conditioned buildings having total built-up area
exceeding 500 sq m. NBC Clause 12.2.5 must be followed considering the seismic safety
principles of the region.
b. “Multi-Level Car parking”- A building partly below ground level having two or more
basements or above ground level, primarily to be used for parking of cars, scooters, or any
other type of light motorized vehicle.
iv.
Safety due to use/maintenance level:
a.
“Slum” – Buildings that are in poor condition of maintenance or have compromised
habitability due to poor ventilation, sanitation or otherwise are termed slums. These are
generally declared or notified as slums under relevant legislation by competent authority
b. “Unsafe Building”- Includes a building which:
i) Is structurally unsafe, or
ii) Is insanitary, or
iii) Is not provided with adequate means of ingress or egress or
iv) Constitutes a fire hazard or
v) Is dangerous to human life or
vi) In relation to its existing use, constitutes a hazard to safety or health or public
welfare by maintenance, dilapidation, or abandonment.
3.144. "Unsafe building" means a building which is,
a) structurally unsafe, or
b) insanitary, or
c) not provided with adequate means of egress, or
d) constitutes a fire hazard, or and
e) in relation to its existing use constitutes a hazard to safety or health or public welfare by reasons of
inadequate maintenance, dilapidation, or abandonment.
3.145. “verandah” means a covered area with at least one side open to the outside with a parapet of 1.2 meters
high on the upper floors to be provided on the open side;
3.146. “Water closet” means a privy with arrangement for flushing the pan with water but it does not include a
bathroom;
3.147. “Warehouse” means a building, the whole or substantial part of which is used or intended to be used for
the storage of goods but does not include a storeroom attached to and used for the proper functioning of a shop;
3.148. “Yaps or Gyabs” means a flat terraced verandas in residential houses, enclosed with mud-brick walls
and wooden rafters, used for daily activities, storage, and protection from sun, wind, and snow; and
3.149. “Zoning plan” means the detailed layout plan of a colony or an area drawn by the competent authority or
approved by the competent authority indicating individual sites and maintained in the office of the Competent
Authority showing the subdivision of plots, open spaces, streets and other features and in respect of each plot,
permitted land use, building lines and restrictions with regard to use and development of each plot in addition
to those laid down in the Building Bye-Laws.
SANJIT ROBERT
RODRIGUES
Digitally signed by SANJIT
ROBERT RODRIGUES
Date: 2026.02.20 16:07:38
+05'30'
CHAPTER: 4 BUILDING PLAN APPLICATION PROCEDURE
4. Plan Application Procedures
4.1. Application for erection or re-erection of building
(a) Any person who intends to erect, re-erect, or make alternation in a building or
demolish any building shall give notice in writing to the competent authority in the
Form BC-I, accompanied by the following documents:
Other documents to be submitted in special cases shall be as follows:
i.
Property Ownership Document/Proof of Title (Sale deed/Lease deed/Allotment
order/Mutation certificate, etc.).
ii.
Site Plan (location, access roads, surroundings).
iii.
Building plan/dimension/drawings/design with front, and rear elevations as per bye-laws.
iv.
Structural Stability Certificate (wherever applicable).
Further a declaration to be submitted by the Applicant Owner in the format prescribed at Annexure–E
Any additional documents required by the Competent Authority from time to time.
i.
For projects proposed within the Prohibited and Regulated areas as defined by
AMASR Act 2010, permission /NOC from Competent Authority (NMA) shall
have to be obtained as per Rules 2011 framed under the Act by submission of
required documents as per rules.
ii.
Additional documents required for conservation of Heritage sites including
Heritage Buildings, Heritage/Precincts and Natural Features Areas (wherever
required)
Note: The applicant shall submit all kinds of plans in electronic format of online portal of the
competent authority. The competent authority shall convey objections/observations or
sanction/refusal through online portal and or other prescribed mode.
(b) Every person applying under sub para 4.1 may appoint an architect/civil engineer/structural
engineer for drawing up of building plans/structural drawings and for the supervision of
erection or re- erection of the building.
(c) The supervision of erection or re-erection of residential or commercial buildings up to 9 meters height (G+2
floors including stilt floor) may be carried out by the architect or the engineer but is not mandated. In case of
buildings exceeding 9 meters in height, including stilt floor, the supervision shall be undertaken both by the
architect and the engineer (civil or structural). In case of buildings in notified heritage zone, ecologically-
conservation zone, special protection zones, or as mentioned in Development Control Regulations and Master
Plan, as well as for plots facing arterial, sub-arterial and collector roads, registered architects need to approve
designs, undertake feasibility study, and provide inputs regarding specific design interventions, and approval.
.
(d) During construction, if appointed architect/engineer observes any on going violation(s), except
compoundable, are continuing shall intimate the owner and advise him to stop further construction
and rectify the violations and shall also intimate to the concerned authority.
(e) The applicant, the registered architect and engineer shall digitally sign the application, plans,
structural drawings, specifications, and the certificates as required in the relevant forms and
documents, before making submission to the Competent Authority.
(f) In case the building application is returned, it may be re-submitted within Sixty (60) days from the
date of such return without fresh scrutiny fee. Such re-submission, however, may not be allowed
more than two times in Sixty (60) days from the date of first return.
4.2. Procedure for submitting application through self-certification:
(a). Any person intending to erect or re-erect building shall apply on Form BCS-I along with
documents stated in sub para 4.1 to the competent authority for approval of building plans of buildings
falling in low and
moderate risk categories defined in sub para 6.2 (i) and 6.2(ii), under self- certification to the competent
authority for intimation. The applicant may initiate construction immediately after submission of the
application and documents.
(b). Certificate of conformity to regulation and structural safety for the relevant buildings (depending
upon type and height) in the relevant Form BCS-II.
( c). Competent Authority or any other authorized person reserves the right to check the building
plans and construction at any stage and violations (except compoundable ones), if found shall
have to be rectified by the owner/applicant. In case the owner/ applicant fails to rectify violations, the
Competent Authority shall be intimated to take necessary steps to remove the violations within a
stipulated time, as decided by the Approval Authority(ies). In case of failure to do so by architects, the
case shall be referred to Council of Architecture, who may impose penalties as may deemed necessary.
In case of failure by other competent authorities, the penalty shall be as imposed by local court. All
rectifications shall be at the risk and cost of the owner and no plea of the owner shall be entertained for
any default committed by the competent authority engaged by the owner. In all such cases the
procedure of self-certification shall stand nullified.
(d). If a building is erected or re-erected or construction work is commenced in contravention to any of
the applicable provisions of the Bye-Laws, the competent authority or any other person authorized by it
shall be competent to require the building to be altered or demolished, by a written notice delivered to
the owner. Such notice shall also specify the period during which such alteration or demolition shall be
completed and if the notice is not complied with, the competent authority or any other person
authorized by it may demolish the said building at the expense of the owner.
Note: - The decision of competent authority, in case of any dispute shall be final and binding on all
concerned.
( e). At any stage during construction, if an architect/ structural engineer/ civil engineer, hired by the
owner, notices that violations (except sanctionable ones) are taking place, he shall intimate the
concerned authority of such violations and stop further supervision. S/he shall also intimate the allottee
about the violations and advise them to stop further construction. Complete details along with
photographs shall be submitted to the competent authority. The competent authority shall immediately
issue a notice to the owner based on the architect’s certificate to suspend further work and rectify
violations. In such cases the owner shall be held responsible for further additions in violations. Such a
situation shall automatically annul the process of self-certification and the owner may, after removal of
violations, engage an architect/ structural engineer/ civil engineer for preparing the revised drawings. In
such cases completion shall be given only after scrutiny of revised drawings and inspection of site.
(f). Sanctionable changes shall be allowed, provided that at the completion stage all changes are
incorporated by the licensed architect/ structural engineer/ civil engineer in the completion drawings to
be submitted by the owner to the competent authority. While seeking occupation certificate, the
architect shall give a certificate that all changes are made as per Bye-Laws and or directions issued from
time to time.
(g)
After submission of the building application and or during the construction of building, if the
owner changes the registered architect/ structural engineer/ civil engineer, shall intimate the competent
authority by email or online building plan approval system and also the architect/ structural engineer/
civil engineer shall intimate the competent authority that he is no longer responsible for the project from
the date of actual dispatch of the letter. The information must be sent within three (3) days of occurrence
of the change. The construction work shall have to be suspended until the new owner/architect/structural
engineer/civil engineer, as the case may be, undertakes the full responsibility of the project as per the
forms and documents submitted at the time of applying for erection/re- erection of the building within
three (3) days of his taking over. Owner’s intimation regarding change of name of professionals shall be
considered final by the competent authority or any other person authorized by it.
(h)
Self-approval is allowed for building construction, alteration and/or modification with less than 2
floors. The self-approval can be done with the aforementioned forms, and/or online building permission
system.
4.3. Online receipt and approval.
(i) All functions performed under these building Bye-Laws be performed through electronic form via
Single Window System. In case of technical exigencies, offline building permission system shall
also be available with Municipal Committees.
(j) Without prejudice to the generality of sub para 4.2 (a), the functions shall include all or any of the
following:
i.
receipt or acknowledgement of application and payment,
ii.
issue of approvals, orders, or directions,
iii.
scrutiny, enquiry, or correspondence for approval of
building plans or grant of occupation certificates, etc.,
iv.
filing of documents,
v.
issue of notices for recoveries,
vi.
maintenance of registers and records,
vii.
any other function that the competent authority may deem fit in public interest.
The ULB shall issue Standard Operating Procedures (SOPs) for the process of applying for building
permission, which will be updated from time to time.
4.4. Preparation of Government building plans by Government Department (s)
For all type of Very Low Risk Buildings, Government Departments preparing building plans in conformity with
these Building Bye-Laws shall issue a certificate confirming that the provisions have been fully adhered to. Such
plans shall be forwarded to the competent authority for information and record prior to the commencement of
erection or re-erection of the building(s). However, for all other categories of buildings, the Departments needs
to apply building permission through empaneled architects and follow the same procedure as prescribed under
sub para 4.1
4.5. Constitution of committees comprising officials of Municipal body and of the Authority
The competent authority shall constitute a committee or committees to perform the following
functions:
(i) preparation of zoning plans,
(ii) approval of building plans,
(iii) composition of violations of building plans,
(iv) grant of occupation certificate,
(v) joint inspection, and
(vi) any other committee with such powers and functions, as may deem proper
Relevant timelines shall be determined for approval, inspection or grant of occupation certificate as decided by the competent
authority. The committee shall comprise of officials from Municipal Committees, Ladakh Autonomous Hill Development
Council, Urban Planning Department, Tourism Department, Pollution Control Committee, Ladakh Heritage Commission or
invites / members as decided by the Administration of UT Ladakh.
4.6. Submission of affidavit
The Competent Authority at the stage of approval of building plans, DPC level and/or grant of
occupation certificate, if required, on a case- to-case basis, may ask for an affidavit from the
applicant, as per standard format given at Annexure-A.
4.7. Building Drawing Norms
a) Size of drawing sheets and coloring of plans:
(i)
The size of drawing sheets shall be any of those specified as below:
Sr. No.
Sheet name
Sheet size (in mm)
1
A0
841 x 1189
2
A1
594 x 841
3
A2
420 x 594
4
A3
297 x 420
5
A4
210 x 297
(ii) All dimensions in plan shall be indicated in metric units.
(iii) Various elements of plans (site and building), elevation, section and details shall be shown
in different colors and thickness/type of line, etc., and shall be preferably prepared in layers
and as per these Bye-Laws.
(iv) The prints of drawings shall be on one side of the paper only.
b) Key Plan: A key plan drawn to a scale of not less than 1:10,000 shall be submitted along with
notice showing boundary and location of the site with respect of neighborhood landmarks, in area
where there are no approved layout plans.
c) Site Plan:
(i)
The site plan to be submitted along with the application for seeking permission shall be
drawn to a scale of:
•
1:100 for plots up to 500 square meters in size and
•
on a scale of 1:500 for plots up to 1 acre in size, and
•
for plots above one acre in size the site plan may be submitted at any readable
scale.
(ii)
The plan shall indicate the following details:
•
boundaries of the site and any contiguous feature, including but not limited to
buildings up to 60 feet in surrounding areas,
•
position of the site in relation to the neighboring street/revenue rasta,
•
name(s) and width of the street(s) on which the site is situated, if any,
•
all existing buildings standing on, over or under the site,
•
position of the building and of all other buildings, if any, which the applicant
intends to erect upon his contiguous land referred to in (i),
•
means of access from the street to the building, and to all other buildings, if any
which the applicant intends to erect upon his contiguous land, referred to in (i),
•
width of the street, in front, and or on the sides or rear of the site, if any,
•
direction of the north point relative to the plan of the buildings,
•
any
existing
physical
feature(s)
such
as
well,
drains,
trees,
overhead/underground electricity lines including its voltage/capacity, etc.,
•
service connection details with any critical infrastructure details including but
not limited to drains, overhead/underground electricity lines including its
voltage/capacity, etc.
•
area of the site, proposed covered area on each floor, and covered area percentile
to the total area of the site,
•
plot number or revenue particulars of the property on which the building is
intended to be erected,
•
graphical scale with north direction,
•
parks, landscape plans, parking plans and contour plans surrounding the land, and
•
such other details as may be prescribed/requested by the competent authority.
4.8. Clearance zone for buildings near/adjoining High Tension Lines electricity
No building or part thereof including Projections from the face of the outer walls shall be allowed
to be erected or re-erected or any addition or alteration made to a building within the distances
quoted below in accordance with the current Indian Electricity Rules as amended from time to
time between the buildings and any overhead electric supply line:
Type of High voltage Electricity Lines
*Vertical
**Horizontal clearance
(in meters)
a.
Low and medium Voltage and service lines
2.5
1.2
b. High Voltage lines up to and including 11 KV
lines,
3.7
1.2
c. High Voltage lines above 11 KV and up to
and including 33 KV.
3.7
2.0
d. Extra High voltage lines beyond 33 KV
3.7 (Plus 0.3
meters for very additional
33
KV or part thereof)
2.0 (Plus 0.3 meters for very
additional 33KV or
part thereof)
e.
* The horizontal clearance shall be measured when the line is at a maximum deflection from the vertical due to wind
pressure.
** The horizontal clearance between the nearest conductor and any part of such building shall, on the basis of
maximum deflection due to wind pressure, be not less than as given above
4.9. Building Plan
(a). The plans, elevations and sections of the building accompanying the notice with dimensions
shall be drawn to a scale of:
(i)
1:50 for plots measuring up to 500 square meters,
(ii)
1:100 for plots measuring from 500 square meters to 1000 square meters,
(iii)
1:200 for plots measuring more than 1000 square meters.
(b). The Plans shall indicate:
(i)
all the floors including basements, stilts and all external elevations and cross sections
illustrating distinctly all the different levels and a minimum one section through staircase,
water closet, bath, kitchen, and the garage if to be constructed,
(ii)
all drawings shall fairly indicate the size of rooms, size of windows and ventilators, size of
door opening, and stair runs, kitchens, bathrooms, and/or other key design elements (such as
size of balconies, lift lobbies, lifts, etc.) as in the original design,
(iii)
the plinth level of the building with reference to the mean level of street from where the access
to the site is taken,
(iv) the schedule of dimensions of sizes of the doors, windows, other openings, and methods of
ventilation of each room/area,
(v)
in case of proposed additions and alterations in the existing building(s), all new works shall be
shown on the drawings in distinct colours with index, thereof,
(vi) details of method of wastewater disposal, sewage, storm water and water supply,
(vii) façade wall and Roof Sections as per ECBC 2022 Section 4; Facade Glass, Facade Wall, and
Roof U-Value Calculation as per ECBC 2017 Section 4.
(viii) Provisions as per Eco-Niwas Samhita, 2018 by Bureau of Energy
Efficiency, including but not limited to Thermal Transmittance, Thermal Emittance, Window-to-
floor area ratio, calculation of building envelopes, compliances for cold climate, surface film
thermal resistance, roofs, unventilated air layer thermal resistance, etc.
(ix)
SEF and Daylighting Calculation as per ECBC 2022 Section 4.
(x)
provisions of rainwater harvesting system as per Code 9.1,
(xi)
provisions for photo voltaic solar power plant as per Code 9.3,
(xii) provisions for differently abled person as per Chapter 10.
Note: - Administration of UT Ladakh may make any Govt. of India/UT Acts, Laws, Byelaws, or
notifications applicable for the same. (including Ladakh Energy Conservation Building
Codes/Eco-Niwas Sanhita, once notified)
( c ). Disaster Preparedness: Hazard profiling for the construction zones should be mandatorily
carried out as per National Disaster Management Plan, 2019. Based on topographic profile, specific
inclusion of IS Codes should be implemented for Cloud bursts, Floods/Flashfloods, Avalanches,
Earthquake (IS 4326, 13920) Seismic load, (IS 1893, IS 13827), Locust Menace/Agriculture
Droughts, Landslide (IS 14458, IS 14496), Sandstorms, etc. Adaptation measures need to be
explored as per NDMP 2019 and UT level Disaster Management Plan. Parametric insurance options
for hazard proofing of structures are recommended for resilient building infrastructure development.
4.10.
Construction of buildings as per Architectural Control Sheet(s)
(i)
The applicant shall obtain Architectural Control Sheet(s) approved by the competent
authority or the authorized officer, by applying on plain paper and as per rate fixed by the
competent authority. The applicant is not required to get the building plan sanctioned from
the competent authority in case the Architectural Control Sheet is adopted for execution
wherever, applicable.
(ii)
Provided the applicant constructs the building strictly in accordance with the standard
architectural controls.
(iii)
The applicant shall, however, have to obtain formal permission from the competent
authority for starting construction of the building and shall also intimate to the competent
authority, the date of commencement of construction of building.
4.11.
Standardization of technology and appropriation of competent authority
The Planned development of the urban habitats drives development most optimally and also
facilitates improvement in the quality of living for all, however, planning and architecture itself
require appropriate standards. Accordingly, Bureau of Indian Standards (BIS) as the National
Standards Body of the Country is engaged in the formulation of Indian Standards in various areas of
development and technology. The Indian Standards look into standardization of technology,
components, terminology, planning, design, integration, implementation, operation, maintenance,
and assessment towards sustainable habitats, as well as alignment with international standards, with
appropriate necessary modifications to suit the local requirements. This shall be achieved by
establishing a framework for planned development of the cities, especially built form development,
on the concept of sustainability in all its form, including environmental, technological, managerial,
economical, and social, and would encompass the dimensions of land use planning, management of
infrastructure such as water supply, drainage, housing, etc. These standards shall be developed by
Building Permission Review Committees (BPRC), along with support from representatives of
various stakeholder interests such as architects, engineers, town planners, consumers, academicians,
policy makers, regulators, etc. Under the phase-wise upgradation of the Municipal Bodies, the
BPRC shall be formed, and competent authorities shall be established as per the current as well as
future norms for approval of built form.
CHAPTER-5: PROCEDURE FOR APPROVAL FOR BUILDING PLANS
5. Building Plan Approval
5.1 Valid Building Application
All building plan applications submitted under sub para 4.1 shall not be considered valid,
unless made on the prescribed Form and attached with requisite number of plans and
documents, along with scrutiny fee and development permission fee other charges as
prescribed by the
competent authority. In case of non-compliance, the application together with plans and
documents shall be returned to the applicant for re submission in accordance with these Bye-
Laws.
5.2 Scrutiny and sanction of building plans
(1) The competent authority shall constitute such committees for the purpose specified in sub
para 4.5, for scrutiny of applications received as specified under sub -para 4.1 and for
submission of recommendations for sanction/refusal of such applications.
(2) The Committee shall consist of officials/officers as constituted by the competent authority and
shall at least once in a week, complete the existing backlog of the scrutiny in their dues.
(3) The recommendations of the members of the committee shall be forwarded to the competent
authority for consideration and approval, with or without change.
(4) The committee or any officer authorized shall pass an order and convey the decision of
sanction or rejection to the applicant in Form BC-III.
(5)
5.3 Validity of sanctioned plans
(1)
Sanction for erection or re-erection of a building(s) of less than 15 meters’ height shall
remain valid for three (3) years and in the case of buildings more than fifteen (15) meters’
height the sanction shall remain valid for five (5) years from the date of sanction,
5.4 The temporary building(s) for construction works, permitted by the competent authority, shall not be
allowed to continue beyond three months of the lapse of the validity of the sanctioned plans. An
additional provision for extension by up to 3 months may be provided by taking permission from
approval authority, in writing and submission of extension fees for the same.Re-validation of building
plans
(1) If a building(s) is not completed within three (3) years or five (5) years, as the case may be, from
the date of sanction, the sanction with respect to the portion of the building not been completed
will be deemed to have lapsed.
(2) A fresh application shall be submitted for the incomplete portion of a building (s), in accordance
with sub para 4.1 and accompanied by the prescribed scrutiny fee.
(3) In case the construction could not be started within three (3) years or five (5) years, as the case
may be after the sanction of a building plan(s) or has been started but could not be completed
within the validity period, the owner/applicant shall apply for revalidation of building plans
before the lapse of sanction simply by depositing re-validation fee as decided by Approval
Authority for the covered area requested for re- validation. This revalidation of building plan(s)
shall automatically be deemed granted from the date of depositing the revalidation fee.
5.5 Deemed sanction
The competent authority shall pass the orders, either of sanction or of rejection, within a period of
thirty (30) days of submission of building plan(s) duly accompanied by all necessary documents as
mentioned in sub para 4.1. The building plan(s) shall be deemed sanctioned if it is in conformity
with ECBC Codes, Ladakh ECBC, 2021 (once notified), and any other codes as mentioned in the
Building Bye-Laws, or as deemed necessary by UT Administration and/or Central Government, and
in accordance with the permitted land use of the area and all leviable fee/charges have been
deposited by the applicant, but no orders have been passed by the competent authority within the
specified days in this sub- code. Risk based classification may differ from the given timeline, based
on the nature of the risk on a case-to-case basis, within a period of 2 months.
5.6 Submission of revised building plans during the validity period of sanction
(1). If during the construction of a building(s), any deviation from the sanctioned plan (s) is intended
to be made, approval of the Competent Authority for the same may be obtained before the change is
made. The revised plan(s) showing deviations shall be submitted and the procedure laid down for
the sanction of building plan as stated in sub-para No. 5.1 and 5.2, shall be followed for all revised
plans, along with depositing scrutiny fee for the area proposed to be revised, as well as previously
sanctioned plans and revised drawings in the same format.
(2). No notice and or building approval is necessary for compoundable alterations/violations, which
do not violate any provision (s) concerning building requirements, structural stability, and fire safety
requirements of these Building Bye-Laws.
5.7 Revocation of sanction
The sanction granted under sub-para 5.2 and sub-para 5.4 can be revoked by the competent
authority, if it is found that such sanction has been obtained by the owner by means of
misrepresentation of material facts or fraudulent document(s) submitted along with the building
plan application or otherwise or the construction is not being done in accordance with the sanction
granted and or in accordance with these Bye-Laws.
5.8 Maintenance of E-Register for sanction/ Registration of Building Plans
An online E-register integrated with the existing E-Governance module shall be maintained for all
building applications received, whether offline or online, by the Municipal Committee, permissions
granted or deemed to have been granted or refused and or returned under these Bye-Laws. The said
register shall be available online to the public for inspection on the website of the competent authority.
5.9. Damp Proof Course (DPC) Certificate
The owner or the architect shall submit a certificate, in case of self- certification, that the
construction of building up to DPC level is as per the sanctioned plan(s). The competent authority
shall verify the certification and shall issue consent/comments within three (3) days of receiving the
certificate. DPC certificate shall be deemed to have been accepted if it is in conformity with Bye-
Laws and no orders have been passed by competent authority within specified days.
5.10 Occupation Certificate
(1)
Every person who intends to occupy a building or part thereof for which the building plan(s) has been
sanctioned shall apply for the occupation certificate in Form BC-IV(A) or BC- IV(B), accompanied by
certificates in relevant Form BC-V (1) or BC-V (2) duly signed by the architect and/or the engineer along with
following documents:
(i)
details of sanctionable violations from the approved building plan(s), if any in the
building, jointly signed by the owner, architect, structural engineer and/or civil
engineer as the case may be,
(ii)
completion drawings or as-built drawings along with completion certificate from
architect/ structural engineer and/or civil engineer as per Form BC-VI,
(iii)
photographs of front, side, rear setbacks, front, and rear elevations of the building
shall be submitted along with photographs of essential areas like cut outs and
shafts from the roof top. An un-editable compact disc/ DVD/ any other electronic
media containing all photographs shall also be submitted,
(iv)
Permit checklist needs to be followed and permit certificate from Bureau of Energy
Efficiency (BEE) Certified Energy Auditor for installation of Rooftop Solar Photo
Voltaic Power Plant shall be required in accordance with orders/policies issued by
the Renewable Energy Department from time to time, if applicable
(v)
Construction permits and Occupancy Certificate from Bureau of Energy Efficiency
(BEE) Certified Energy Auditor for constructing building in accordance with the
provision of ECBC, wherever applicable
(vi)
No Objection Certificate (NOC) of fire safety of building from concerned Fire
Officer or an officer authorized by UT Administration for this purpose wherever
applicable.
(vii) All provisions of Ladakh Energy Conservation Building Code 2021 (once
notified)
Note: Online portal for auto-scrutiny shall always require upload of the recommended
digital format of the drawings to be uploaded on the portal for use
i. No owner/applicant shall occupy or allow any other person to occupy a new
building(s) or part thereof until such building or part thereof has been certified by
the competent authority or by any officer authorized by it in this behalf as having
been completed in accordance with the permission granted and an ‘Occupation
Certificate’ has been issued in Form BC-VII. However, competent authority shall
charge composition charges for compoundable violations before issuance of Form
BC-VII. Further, the water, sewer and regular electricity connection shall be
released only after issuance of occupation certificate by the competent authority.
The ‘Occupation Certificate’ to be issued shall on the basis of parameters
mentioned as under minimum 25% of total permissible ground coverage, excluding
ancillary zones, if any, shall be essential for issuance of occupation certificate, other
than residential and industrial buildings,
ii. in the case of residential plot, a minimum 50% of the total permissible ground
coverage to be constructed with minimum one habitable room, a kitchen and a toilet
forming a part of submitted or the approved building plan shall be completed,
iii. debris and rubbish consequent upon the construction has been cleared from the site
and its surroundings,
iv. after receipt of application, the Competent Authority shall communicate in writing/
online within five (05) days, his decision for grant or refusal of such permission for
occupation of the building in Form BC-VII. The E-register shall be maintained as
specified in sub para -5.8 for maintaining record in respect of Occupation
Certificate, if no communication is received from the Competent Authority within
five (05) days of submitting the application for “Occupation Certificate”, the owner
is deemed permitted to occupy building, considering “Occupation certificate”
deemed issued and the application Form BC-IV (A) or BC-IV(B) shall be the
“Occupation Certificates”. However, the competent authority may check the
violations made by the owner and take suitable action with regard to the violations,
and,
v. if the owner or the architect or structural engineer or civil engineer or Consultant as
mentioned in sub para 4.2 and 4.10 as the case may be, submits a wrong report
while making application under these Bye-Laws or if any additional construction or
violation is reported to exist at site or has concealed any fact or mis-represented
regarding completion of construction of building along with essential conditions of
seeking occupation certificate, s/he shall be jointly and severally held responsible
for such omission/commission and complaint against the architect/structural
engineer/civil engineer for suspension of his registration/membership, and/or other
necessary penal actions may be taken, and the owner shall be liable to pay for the
penalty as may be decided by the competent authority after giving an opportunity of
being heard. I it emerges during the hearing that the relevant information was
concealed by architect/structural engineer/civil engineer/ consultant, necessary
penal proceedings of barring architect/ structural engineer/civil engineer /consultant
from practicing in the Union Territory of Ladakh may be enforced.
5.11 Occupation Certificate through Self-Certification
(1)
The owner who had applied under sub-para 4.2 and the building falls in the Low-Risk
Category defined in sub-area 4.9 (b) (vii) and sub-
(2)
para 5.2 (1), shall submit an application to the competent authority for grant of occupation
certificate on Form BCS-III and along with completion drawings, Completion Certificate on
Form BCS- IV and along with the following documents:
(i) details of compoundable violations, if any, in the building, jointly signed by the
owner, architect/civil/structural engineer, along with demand draft of composition
charges for such violations at the rates determined by the Competent Authority
from time to time, shall be submitted along with Form BCS- III,
(ii) owner and architect/civil/structural engineer both shall give a self-certification in
Form BCS-IV that no provision of these Building Bye-Laws, has been violated
excluding compoundable violations,
(iii) photographs of front, side, rear setbacks, front and rear elevations of the
building shall be submitted along with photographs of essential areas such as
cut outs and shafts from the roof top. An un-editable compact disc/ DVD
containing all photographs shall also be submitted,
(3)
the competent authority shall issue the occupation certificate in Form BCS-V within eight (8)
working days of the receipt of the Form BCS- III duly completed in all respects and
accompanied by the required completion drawings, forms, and affidavits. The occupation
certificate shall be issued provided that the documents submitted along with Form BCS-IV are
in order. Provided that if any violation found within time prescribed above during inspection,
which is not listed in compoundable violations stated at sub para 4.11(1)(i), then the
violation(s) be compounded as per composition charges prescribed (or demolished if non-
compoundable), by the competent authority.
(4)
if no communication is received from the competent authority within eight (8) working days of
submitting the application for “Occupation Certificate”, the owner is permitted to occupy
building, considering deemed issuance of “Occupation certificate” and the application Form
BCS-III shall act as “Occupation Certificate”. Provided that violations, if found at any
subsequent stage, shall result in cancellation of the occupation certificate issued and the same
shall be restored only after removal of violations. Further, action against the architect/civil
engineer/structural engineer shall also be taken for furnishing a wrong certificate/affidavit.
(5)
No person shall occupy or allow any other person to occupy any new building or a part thereof
for any purpose whatsoever until such building or a part thereof has been certified by the
competent authority as having been completed and an occupation certificate has been issued in
his/her favour in Form BCS-V within the above-mentioned period. However, the minimum
percentage of permissible covered area, for industrial plot only as mentioned below in the table
shall have to be constructed to obtain occupation certificate or as decided by the competent
authority, from time to time.
Minimum requirement of construction area for obtaining Occupation Certificate
Sr. No.
Area of site
Percentage of permissible covered area
1
Up to 2 acres
25%
2
Above 2 acres to 5 acres
20%
3
Above 5 acres to 10 acres
15%
4
Above 10 acres
10%
(6)
No occupation certificate shall be issued unless debris and rubbish consequent upon the
construction has been cleared from the site and its surroundings.
5.12. Occupation Certificate through third party certification
(1)
The owner who had applied under sub para 4.1 and having building under Moderate Risk
Category defined in sub para 6.1(1), shall submit an application to the competent authority
for grant of occupation certificate in Form BCS-III and along with completion drawings,
Completion Certificate in Form BCS-IVA and along with the following documents:
(i)
details of compoundable violations from the approved building plan(s), if any, in the
building, jointly signed by the owner, architect, civil engineer and/or structural engineer,
along with demand draft of the due payment for composition charges of such violations at
the rates determined by the competent authority shall be submitted with Form BCS-III,
(7)
No occupation certificate shall be issued unless debris and rubbish consequent upon the
construction has been cleared from the site and its surroundings.
5.12. Occupation Certificate through third party certification
(2)
The owner who had applied under sub para 4.1 and having building under Moderate Risk
Category defined in sub para 6.1(1), shall submit an application to the competent authority
for grant of occupation certificate in Form BCS-III and along with completion drawings,
Completion Certificate in Form BCS-IVA and along with the following documents:
(i)
details of compoundable violations from the approved building plan(s), if any, in the
building, jointly signed by the owner, architect, civil engineer and/or structural engineer,
along with demand draft of the due payment for composition charges of such violations at
the rates determined by the competent authority shall be submitted with Form BCS-III,
(ii)
a certificate from third party (i.e., an architect or a civil engineer or a structural engineer,
other than the architect/ structural engineer/ civil engineer involved in designing,
construction, and supervision of the building) in Form BCS-IVA that the building has
been inspected in all respect and no provision of the Building Bye-Laws, has been
violated excluding compoundable violations, and
(iii)
photographs of front, side, rear setbacks, front, and rear elevation of the building shall be
submitted along with photographs of essential areas like cut outs and shafts from the roof
top. An un- editable compact disc/ DVD containing all photographs shall also be
submitted.
(3)
The competent authority shall issue an occupation certificate in Form BCS-V within eight (8)
working days of receipt of the Form BCS-III duly completed in all respects and accompanied
with the required completion drawings, forms, and affidavits. The occupation
certificate shall be issued provided that the documents submitted along with Form BCS-IVA
are in order. Provided that if any violation (s) found within the time prescribed above during
inspection, which is not listed in compoundable violations stated at Sub Para 4.12 (1)(i),
then the violation(s) be compounded or demolished by the competent authority if non-
compoundable, as per composition charges prescribed.
(4)
If no communication is received from the competent authority within eight (8) working days
of submitting the application for “Occupation Certificate”, the owner is permitted to occupy
building, considering deemed issuance of “Occupation certificate” and the application Form
BCS-III shall act as “Occupation Certificate”. Provided that the violations, if found at any
subsequent stage, shall result in cancellation of the occupation certificate issued and the same
shall be restored only after removal of violations. Further, action against the architect shall
also be taken for furnishing a wrong certificate/affidavit.
(5)
No person shall occupy or allow any other person to occupy any new building or a part
thereof for any purpose whatsoever until such building or a part thereof has been certified by
the competent authority as having been completed and an occupation certificate has been
issued in his favour in Form BCS-V within the above- mentioned period.
5.13 No occupation certificate shall be issued unless debris and rubbish consequent upon the construction
has been cleared from the site and its surroundings.Revocation of Occupation Certificate
If, after the issuance of occupation certificate, it is found at any stage that the building is being
used for a purpose other than for which it was as permitted , or if any addition/ alteration in the
building has been made then, after affording personal hearing to the owner, the competent
authority may issue orders for revocation of occupation permission / certificate and the same
shall be restored only after removal of violations.
5.14 Green Building Measures and Incentives
1. For reducing consumption of total energy, fresh potable water and reduction in total waste
generation by modern buildings, the green building measures are to be adopted by all
building on various plot sizes.
2. The applicant shall be awarded benefits of additional Floor Area Ratio for adopting either
green norms by getting his/her building/ site/ project certified from Green Rating for
Integrated Habitat Assessment (GRIHA) or Green and Eco-friendly Movement (GEM),
Indian Green Building Council (IGBC ) and achieving rating as specified below:
i.
09%: 3 Star / 3 GEM / Silver IGBC/LEED Rating
ii.
12%: 4 Star / 4 GEM / Gold IGBC/LEED Rating
iii.
15%: 5 Star / 5 GEM / Platinum IGBC/LEED Rating
3. The buildings should use minimum 20% of the materials from recycled construction and
demolition waste. Further use shall help in incentives on Property Tax, as may be decided
by Local Bodies.
Note:
A. The additional FAR shall be given over and above the maximum permissible FAR.
B. Where solar space/ trombe wall areas are designed specifically for solar passive heating of
building proposed, a maximum width of 2 feet can be exempted from FAR.
C. The incentive of additional FAR for achieving GRIHA/GEM/IGBC/LEED rating shall be
applicable only on new buildings. The incentive of additional FAR would also be applicable on
buildings which are under construction/design and registered and pre-certified and certified
with the rating agencies (GRIHA/GEM/IGBC/LEED) and incorporating features for making
Green Buildings but have not yet obtained Occupation Certificate.
D. The applicant has to pay only Infrastructure Development Charges on additional FAR granted as
incentive.
E. Procedure for availing incentive:
a. The
applicant
is
required
to
submit
pre-certification
rating
from
GRIHA/GEM/IGBC/LEED rating agencies at the time of submission of building plan
application to the Competent Authority for claiming incentive of additional FAR as
stated.
b. At the time of applying for Occupation Certificate of building, the applicant is
required to submit provisional/Final rating from GRIHA/GEM/IGBC/LEED Rating
Agency.
c. The Competent Authority only after verifying that the GRIHA/GEM/IGBC/LEED
rating achieved in final rating is same as pre-certification rating submitted at the
time of building plan application, shall issue the Occupation Certificate:
i. Provided, in case the final rating achieved is lesser than the provisional
rating, the occupation certificate shall be issued after compounding the
additional FAR (i.e., difference of additional FAR from precertification rating
and final rating) acquired by the applicant, at ten times the rates of EDC
applicable at the time of submission of occupation certificate application.
ii. Provided, the applicant may claim additional FAR, if final rating is higher
than the provisional rating.
Further, an additional 50% FAR shall be awarded for projects registered under PMAY-U
2.0.
5.13 Biodiversity and Wildlife Protection and inclusive design
Ladakh is known for its serene and pristine connection with nature. The biodiversity forms an
inclusive part of the ecosystem along with human interactions. However, the exponential rise in
urbanization and tourism in Ladakh calls for an inclusive ecosystem that works in coherence of
protection of wildlife and biodiversity. Building bye-laws thus play a very important and non-
negotiable role to allow for inclusive design with the environment:
1) All development activities must adhere to the provisions as mentioned in The
Wildlife (Protection) Act, 1972 [as amended], The Biological Diversity Act, 2002
[as amended] and/or any acts, laws, notifications or guidelines released by the
Central, UT, or Office of the Municipal Committee from time to time.
2) All development activities must be considerate of the People’s Biodiversity Register
(once formulated) and make necessary and conscious decision to utilize an inclusive
design with the biodiversity. Any issues, qualms or considerations shall be as per
The Wildlife (Protection) Act, 1972 [as amended], The Biological Diversity Act,
2002 [as amended], and/or any acts, laws, notifications or guidelines released by the
Central, UT, or Office of the Municipal Committee from time to time.
3) In 2003, Ladakh formulated National Biodiversity Strategy and Action Plan for the sub-
state of Ladakh. The provisions of the same shall be followed by all developments.
Exceptions shall be allowed as per the decision taken by the respective Biodiversity
Management Cell. Further challenges and appeals shall be subject to rulings by UT-level
Biodiversity Committee and National Biodiversity Authority.
CHAPTER-6: CLASSIFICATION OF BUILDINGS FOR APPROVAL AND OCCUPATION REQUIREMENTS
6.
Building Approval and Occupation Certificate
6.1 Risk based classification of building applications
There is a need to make provisions for fast-tracking building permission procedures for all non-
automatic approvals. Therefore, in the spirit of ‘Ease of Doing Business’, the buildings have been
classified further on the basis of risk parameters/ risk-based classification to clear the building
permits on fast-track system. This kind of classification shall be used for fast tracking the sanction
of building plans, which shall facilitate regulated and faster construction permits, and also aid in
improving the rating of the country in World Bank’s assessment in ‘Ease of Doing Business’.
Further, the ULB in consultation with all parastatal bodies involved, shall identify risk-based
classification of industrial, commercial, and institutional buildings, and prepare risk-based matrix,
in-line with those proposed in Model Building Bye Laws, 2016 for residential and
storage buildings/ warehouses/ godown and accordingly prescribe the fast-tracking approval
system. This exercise shall be done within a period of 3 months from the date of publication of the
Local Building Bye-laws.
On the basis of above-mentioned risk matrix prepared by each of the agencies involved in approving
building plans, UT Administration shall design and notify necessary legal instructions to implement
risk-based mechanism with a view to fast track building permissions based on their risk
classification. These instruments may include, but are not limited to, delegation of powers, out-
sourcing, empowering architects/civil engineers/structural engineers, self-certifications, etc. These
notifications shall be done within 3 months from the date of notification of risk matrix by each
competent authority / agency as mentioned above.
For approval of the residential plotted and group housing buildings, risk-based classification:
(1) For fast-track building plan approval, the competent authority shall approve building plans
considering the risk-based classification of buildings depending upon the respective risk
matrices as mentioned in Sub Para 6.1 (1) – 6.1 (3)
(2) The application for approval and grant of Occupation Certificate of very-low to moderate risk
buildings shall be allowed as per Sub Para
4.2 and relevant sections of Chapter-5. The application for approval and grant of Occupation
Certificate of high-risk buildings shall be allowed as per Sub Para 4.1 and relevant sections of
Chapter-5.
(3) For building plan approval, the competent authority shall approve building plans considering
the risk-based classification of buildings depending upon height and area. The buildings are
categorized in the following categories:
i.
Residential Buildings:
Table 1 Risk matrix for different residential buildings
Risks
Very
Low
Low
Moderat
e
High
Criteria
Parameters
Size of the plot
Square Meters
Below 105
m2
105 – 500 m2
Above 500
m2
All
Sizes
Height of the
building
Meters
<15 m
<15 m
<15 m
15 m or
Above
Use of the premises Various categories
Residential
plotted
Residential plotted
Residential plotted Group
Housing
Note:
A. Considering no other issue like Monuments, Metro, Airports etc. are involved. In case the property
lies within the regulated zone of metro rail, airport etc. the online clearance from the local body
concerned shall be taken
B. Group Housing area is minimum 2000 sq mt (may vary between States)
C. The Competent Authority shall empanel professionals as necessary
D. The Competent Authority shall work out and prescribe fees for submitting the building plans
E. The fees shall be derived by an automated built-in calculator in the online system of submission
Suggested Fast Tracking Tools:
For Very Low Risk Buildings:
In case of standard building plans prepared by the Authority for residential plots up to 105 sq.mt. in size and
forming part of the approved layout plan, the owner shall be entitled to sign such standard plans and the
required documents for submission for sanction. In such cases, certificate from professionals would not be
necessary and the owner shall be bound to follow the approved standard plan in detail. The Authority shall
explore options of EWS/LIG/MIG plotted housing schemes to develop pre-approved Standardized building
plans of Housing Units for variable plots sizes/carpet area (in the range 30sqm-105sqm). The owner shall
undertake construction of the so formed standard housing units.
For Low-Risk Buildings:
A Competent professional (qualification & competence as per Annexure-D) shall be empowered to issue the
building permit, but only after submitting the plan along with requisite documents and fees to the concerned
local body. If the owner/ professional desires to get the building plan sanctioned by the local body, building
plans prepared by the qualified competent professional will have to be submitted to the concerned local body
along with the fees and other requisite documents and the local body shall grant the building permit within
07 days.
For Moderate-risk Buildings:
Building plans will have to be prepared by a competent professional and the building plans will have to be
submitted to the concerned local body along with the fees and other requisite documents. The local body
shall grant the building permit within 10 days.
For High-risk Buildings:
Clearances and NOCs from department, or authority as appointed by UT Administration, and other
necessary clearances from AAI, NMA and other agencies as per Section 5.10 and other authorities as
deemed necessary by the UT Administration have to be obtained. Building plans will have to be prepared by
a competent professional and the building plans will have to be submitted to the concerned local body along
with the fees and other requisite documents. The local body shall grant the building permit within 20 days.
ii.
Storage/Warehouse Buildings
For approval of the buildings meant for use as storage buildings/ warehouses/godown, risk-based classification
shall be in the following categories:
Table 2 Risk Matrix for Storage/Warehouses
Risks
Very Low
Low
Moderate
High
Covered area on all
floors / Built-
up Area
Up to 250 m2
250 – 2000 m2
Up to 2000 m2
Above 2000 m2
Height of the
building
<15 m
<15 m
<15 m
<15 m
Abutting Road
Width
Min. 12
m
Min. 12
m
Min. 12
m
Min. 12 m
Type of Material Storage
Category A
Category A
Category B
(Stacking
Height –
Medium)
Category B
(Stacking Height –
Medium)
Note:
A. The level of Risk is classified according to the material stored in the warehouse/storehouse.
Material shall be classified according to the Categories defined in Annexure “C”.
B. The Urban Local Body/ Urban Development Authority shall empanel professionals as per
“Annexure D”.
C. The building application processing fees shall be derived by an automated built-in calculator in
the online system.
Suggested modes of Fast Tracking:
For Very Low Risk Buildings:
A competent professional (qualification & competence as per Annexure-D) shall be empowered to issue the
building permit, but only after submitting the plan along with requisite documents and fees to the concerned
local
body. If the owner/ professional desires to get the building plan sanctioned by the local body, s/he shall apply
online to the local body and the local body shall grant the building permit within 07 days.
For Low-Risk Buildings:
Building plans will have to be prepared by a competent professional and the building plans will have to be
submitted to the concerned local body along with the fees and other requisite documents. The local body
shall grant the building permit within 10 days.
For Moderate Risk Buildings:
Building plans will have to be prepared by a competent professional and the building plans will have to be
submitted to the concerned local body along with the fees and other requisite documents. The local body
shall grant the building permit within 20 days.
For High-Risk Buildings:
Building plans will have to be prepared by a competent professional and the building plans will have to be
submitted to the concerned local body along with the fees and other requisite documents. The local body shall
grant the building permit within 30 days.
iii.
Industrial Buildings
For
approval of
the
buildings
meant
for
use
as
storage buildings/ warehouses/godowns,
risk-based classification
Risks
Low
Moderate
High
Criteria
Parameters
Size of the plot
Square Meter
Up to 350 m2
Above 350 m2
All sizes
Height of the
building
Meters
Less than15 m
Less than 15
15 m and above
Abutting Road
Width
Meters
Min. 12m
Min. 12m
Min. 12 m
Note:
A. The level of Risk is classified according to the size and height of the industrial building proposed.
B. The Urban Local Body/ Urban Development Authority shall empanel professionals as per “Annexure
D”.
C. The building application processing fees shall be derived by an automated built-in calculator in the online
system.
Suggested modes of Fast Tracking:
For Low-Risk Buildings:
1. Deemed Approval with Self-Certification
2. Plans to be submitted along with Structural drawings which does not require sanction
For Moderate-Risk Buildings:
1. Plans to be submitted to the empaneled professional.
2. Clearances and NOCs from department, or authority as per Section 5.10
3. Approval
to
be
granted
within
10
working
days
by
the
empaneled
professional.
4. Approved plan to be submitted to ULB/DA.
For High-Risk Buildings:
1. Online application
2. Immediate acknowledgement by software
3. Clearances and NOCs from department, or authority as per Section 5.10
4. Approval by ULB/DA within 20 working days
For High-Risk Buildings:
(1) Online application
(2) Immediate acknowledgement by software
(3) Clearances and NOCs from department, or authority as per Section 5.10
(4) Approval by ULB/DA within 20 working days
iv.
Commercial Buildings
For approval of the buildings meant for use as commercial, risk-based classification.
Risks
Very
Low
Low
Moderate
High
Built-up Area/ Covered
Area of building
Up to 250 m² 250 – 1000 m²
1000– 5000 m²
Above 5000 m²
Height of Building
< 9 m
>9 m and < 15 m
< 15 m
15 m and above
Abutting Road Width
Minimum
3.5 m
Minimum 6 m
Minimum 9 m
Minimum 12 m
Type of Activity
Shops,
small
offices,
clinics
Small retail,
restaurants,
banks
Shopping complexes,
multiplexes, hotels
Malls, IT parks,
convention centers,
large hotels
Notes:
A. Risk classification is based on intensity of use, built-up area, and height.
B. Fees for building applications shall be auto-calculated in the online system.
C. Special clearances may be required if building use involves public assembly, hazardous activities, or falls near regulated
zones
Suggested Modes of Fast-Tracking:
•
Very Low Risk Buildings
Competent professional may issue building permit after submission online. Local body, if approached, shall
grant approval within 7 days.
•
Low Risk Buildings
Plans prepared by competent professional; submission to ULB with documents and fees; approval within
10 days.
•
Moderate Risk Buildings
Plans submitted by competent professional, along with necessary clearances (fire, traffic impact, parking
norms). ULB approval within 15 days.
•
High Risk Buildings
Online application, automatic acknowledgement. Clearances from departments/authorities as per Section
5.10 (AAI, Fire, NMA, etc.) required. ULB to grant approval within 30 days.
v. Mixed Land Use Buildings
For approval of the buildings meant for use as Mixed land use building, risk based classification.
Risks
Very Low
Low
Moderate
High
Built-up
Area
Up to 300 m² (residential +
small commercial at ground
floor)
300 – 1000 m²
1000 – 3000 m²
Above 3000 m²
Height of
Building
< 9 m
>9 m and < 15 m
< 15 m
15 m and above
Road
Width
Minimum 9 m
Minimum 9 m
Minimum 12 m
Minimum 12 m
Type of
Use
Residential with <25%
commercial
(shops/offices)
Mixed-use with ≤ 33%
commercial
Component
Mixed-use with ≤ 50%
commercial
component
Mixed-use with > 50%
commercial or
public assembly use
Notes:
A. Once the masterplan is notified, all Mixed use shall be permitted as per zoning regulations of Master
Plan.
B. Fire safety and structural safety clearances mandatory beyond 1000 m².
Suggested Modes of Fast Tracking:
•
Very Low Risk Buildings
Deemed approval with self-certification by competent professional. ULB to verify compliance within 7 days.
•
Low Risk Buildings
Plans prepared by competent professional; submission to ULB; permit to be issued within 10 days.
•
Moderate Risk Buildings
Building plans with traffic and parking compliance; clearances from Fire/other concerned departments. ULB
approval within 20 days.
•
High Risk Buildings
Online application, immediate acknowledgement. Clearances (fire, traffic impact, environment, AAI/NMA if
applicable) required. ULB approval within 30 days.
CHAPTER-7: LAND USE OF SITE, PLANNING AND ARCHITECTURAL CONTROL AND COVERAGE
7.1 Use of site, type, and character of building
(i)
Type and character of building, including ancillary buildings, that may be erected or re-
erected on a site and the purpose for which these may be used shall not be other than that
shown in the Master Plan or Zonal Development Plan, as the case may be, or as shown in the
approved layout plan of a colony or zoning plan, if any.
(ii)
Where the site does not form part of a layout plan or zoning plan, the use shall be in
conformity with the use prescribed in the Master Plan or Zonal Development Plan and in case
no master plan notified, in that case, the use of the surrounding area will be considered and in
such cases the decision of the competent authority shall be final.
(iii)
Every building that may be erected or re-erected on a site, in addition to the foregoing
restrictions, shall comply with the restrictions shown in the Architectural Control Sheets,
wherever applicable which shall have precedence over the Building Bye-Laws.
(iv)
Facade design to also incorporate Urban Design guidelines to preserve heritage conservation
and city identity for the districts. Separate Urban Design guidelines need to be formulated and
suitable notification need to be released for the same by the relevant authorities.
7.2 Sub-division and amalgamation of plots
(i)
Sub-division of a bigger plot into smaller units is permissible in the case of a family division,
in case the plot is not allotted by the development agency. In case a plot has been allotted by
the development agency, the prior approval of the competent authority is required. Each such
sub-division shall be accessible independently through a street or a public road/street.
(ii)
Except as otherwise expressly provided at the time of sale/allotment of plot in a colony under
specific scheme approved by the competent authority, not more than one building unit shall be
erected on any one plot, however, two or more plots may be combined together under a single
ownership for purposes of erection of one “building unit”.
Note: -
“Building unit” means a self-contained building with such outbuildings as are ordinarily
ancillary to the main building used in connection therewith and physically incapable of sub-
division into two or more independent building units. A building unit may, however, be owned by
an individual or may be jointly and severally owned, provided it remains in a single indivisible
ownership.
7.3 Proportion of the site which may be covered with buildings
(1)
The proportions of covered area of a building, including ancillary buildings, shall be in accordance
with the categories of plots given in following sub- Codes and the remaining portion shall be left open
in the form of open space around the building falling in the core area identified in the Master Plan or
Zonal Development Plan or as notified by the competent authority and other than Core Area.
(2)
For General Building Requirements, Chapter-4 of Model Building Bye Laws 2016 needs to be
referred.
(3)
Chapter 5 & 6 of Model Building Bye Laws, 2016 need to be referred for provisions of high rise and
structural safety, as relevant, unless mentioned otherwise
(4)
Unless specified in these building bye-Laws, DCRs, or Architecture Control Sheets, and/or urban
design guidelines the minimum setbacks, permissible heights and any relevant critical sections shall be
referred to from Model Building Byelaws, 2016.Restrictions based on critical areas need to be
included, including Airport Authority of India, Archaeological Department, Hazard Risk Mitigation,
and other critical areas need to be consulted with the relevant authorities, and NOC shall need to be
obtained as the case may be.
(5)
Relevant group housing requirements need to be referenced with Master Plan/DCR documents. Special
provisions for construction of EWS and slums housing based on spatial impact assessment depending
on the feasibility of the project, location, and impact shall be taken from Master Plan/DCR Documents.
Private developers need to provide 15% for EWS and hand over to ULB at predetermined price;
similar reservations need to be explored and provided in the Group Housing wherever relevant.
(6)
Core Area land use-wise permissible coverage, floor area ratio and height shall be as follows:
(i)
Residential
Sr.
No.
Plot area slabs
in
sq
uare meters
Maximum
permissible Ground
Coverage
Permissible
basement
Maximum
permissible Floor
Area
Ratio
(FAR)
Maximum permissible Height
(G+3 Floor) (Including stilt (S+4
Floor in meters)
1.
Upto 100
85%
Single level
375 %
15.0
2
Above 100 to
500
70%
Single level
300 %
15.0
3
Above 500
60%
Single level
250%
15.0
(ii). Commercial
Sr.
No.
Plot
area slabs in
square meters
Maximum permissible
Ground Coverage
Permissible
basement
Maximum
permissible Floor
Area
Ratio
(FAR)
Maximum
permissible
Height
1
Upto 100
90%
Single level
500%
18
2
Above 100 to
500
80%
Upto
Two
level
400 %
18
3
Above 500
70%
Upto
Two
level
340%
18
iii)
Plot setback for both core and non-core areas
The building shall not project beyond the building lines as shown in the zoning plan of respective schemes/Zonal
Development Plans/ Development Control Regulations and /or indicated below the minimum setbacks shall be adhere
(iv) For industrial or storage or mercantile (wholesale) buildings, the minimum width of setback/side open
spaces shall be as follows.
Sr.
No
.
Area
of
plot (in sq.
meters)
Minimum
Front
Setback (meters)
Minimum
Rear
Setback (meters)
1.
Upto 50
1.0
-
2.
Above 50 to 150
1.5
1.0
3.
Above 150 to 200
2.5
1 .0
4.
Above 200 to 500
3.5
1.0
5.
Above 500 square meters
3.5
3.5
• If the industrial development/building shares a boundary with another industrial development building, no
building setback is required for upto 400 sqm.
• However, no openings (e.g., windows or doors) are allowed along that shared common boundary. (This
exemption is primarily a land-use efficiency measure
—allowing buildings to be constructed right up to the boundary when neighboring uses are similar—while
ensuring safety through the prohibition of openings on that boundary.)
(7) Area other than core area
(i) Residential: In the case of Plots; permissible coverage, floor Area ratio and height
Sr.
No.
Plot area in Square Meters Maximum
permissible Ground
Coverage
Permissible
Basement
Maximum
permissible
FAR
Maximum permissible
Height (G+3 Floor)
(Including stilt (S+4 Floor))
(in meters)
1.
Upto 100
80%
Single level
300 %
15.0
2.
Above 100 to 500
70%
Single level
280 %
15.0
3.
Above 500
60%
Single level
220%
15.0
A. The additional FAR to the extent of 5% within the permissible height can be purchased at the collector’s
rates fixed from time to time for the respective localities.
B. Provided that the building shall conform to the restrictions contained in the zoning plans, development
control regulations (DCRs) or the architectural control sheets of respective areas.
C. Provided that the 25% of the built-up area of the building not exceeding up to 50 square meters, whichever
is less, can be used for non-nuisance professional consultancy services, after getting permission from the
competent authority in writing. The applicant shall apply for specific use of consultancy services as
mentioned in Code 3.83 in Form NAC-I along with fee as fixed from time to time and the permission shall
be granted in Form NPC-II”.
D. Stilt floor is permitted for parking purposes in residential and commercial plots of all sizes, subject to the
condition that maximum permissible height of the building shall not exceed 15 meters.
Abutting Road
Plot size
Setback/
Side
open
space
Side 1
Side 2
Road
abutting
only
minimum 1 side plot
Upto 150
Sqm
0
0
Above
150
to
500 sqm
0
3.5
A clear path/setback of 3.50 m
is required for
firefighting
vehicles.
E. Transfer of Development Rights need to be provided in accordance to Master Plan, DCRs and Zoning
Regulations [that should include disaster management component, heritage preservation and conservations
and other zoning regulations as required].
(ii) Group Housing
Sr.
No.
Maximum permissible
Ground
Coverage
Permissible
Basement
Maximum
permissible
FAR
Maximum
permissible
Height
(G+3
Floor) (Including stilt (S+4 Floor)) (in
meters)
1.
60%
Upto
Two level
300 %
15.0
(iii).
Commercial
Sr.
No.
Type
of
building
Area Norm
Maximum
permissible
Ground
Coverage
Permissible
Basement
Maximum
permissible Floor
Area
Ratio
(FAR)
Maximum permissible
Height
1
Individual Shops
No Limit
As per the Architectural Control Sheets relating to façade and height
controls in a street.
2
Approved
Commercial
colony: includes
shopping mall,
multiplex,
Departmental store,
Integrated
commercial
Complex, Service
Apartments, starred
Hotels/ Unstarred
Hotels
and
Guest Houses,
offices.
No Limit
80 %
Two levels
350 %
15
3
Dhabas
500 square
meters to ½
acre
60 %
One level
100
%
(with
maximum
50 sqm for kiosks
for other items)
5 meters
4
Banquet Hall
Minimum
2.5 acres
50 %
One level
50%(10% FAR
allowed
for
gift
shop/STD Booths,
Toy
Centre
and
flower shops etc.)
15
5
Resort, Motel,
Guest Houses
(with/without
banquet hall
facilities)
No Limit
60%
Two levels
250 %
15
6
Starred Hotels,
Restaurants
No Limit
80 %
Two levels
400 % (with
permissible 15%
commercial
component)
18
Note: For all use cases subject to petroleum and explosive material handling, PESO regulations including Fire
clearances are recommended
(iv).Institutional and Educational
Plot
area
slabs
(Square meters)
Maximum permissible
Ground
Coverage
Permissible
Basement
Maximum permissible
Floor
Area
Ratio(F
AR)
Maximum
permissible
Height
Upto 10000
50 %
Upto two
levels
300%
18
7
Amusement
Park
No Limit
40 %
One Level 100 % (with
permissible 15%
commercial
component)
Unrestricted
8
Big
retail
stores
No Limit
80%
Two
Levels
300%
15
9
Petrol
Stations
No Limit
As per terms and conditions of Oil companies.
Above 10000
35
%
of
such portion of site
Upto two
levels
300 %
18
Note:
A. In the case of educational institutions (Schools/College/University), the Hostel component is restricted to 20%
of maximum permissible covered area, and
B. The residential component (i.e., residential facility for principal, teachers/professors, staff, etc.) is restricted
to 10% of maximum permissible covered area in addition to hostel component).
C. However, the competent authority may consider the requirement of the project for permitting residential
component up to maximum limit of 50% of FAR by recording the reasons of Justification.
D.
(v). Industrial and
IT
Sr.
No.
Type
of
Industry
Maximu m
Ground
Coverage
Permissibl e
Basement
Maximum
Permissible Floor
Area
Ratio
Maximum
Permissible
Height
Remarks
1.
General
80%
Twin
level
500 %
21 Meters
--
2.
Apparel
and
Footwear
70%
Twin
level
350 %
21 Meters
To
be
located on a
road
with
Right of Way of
7 meters and
above.
3.
Biotechnology other
than
Pharmaceutical
s
4.
Information
Technology/
Information
Technology
Enable
Services
5.
Approved Information
Technology Park,
Cyber Park, Cyber
City, Technology Park
50%
Twin
Level
500 %
No Restriction
Subject
to
condition that the
plot must
be
located on roads
with a Right of
Way of 12 meters
and
above.
Provided further that, the base FAR in central Business Districts (CBDs) and Transit-oriented
Development (TOD) corridors shall be 6.
(vi).Warehouse
Sr. No.
Type of building
Maximum permissible
Ground coverage
Maximum permissible Floor
Area Ratio (FAR)
1
Integrated Inland Container
Depot/Custom Bounded Area
60%
200 %
2
Warehouse other than agricultural
produce/Grain Godown/Silos
3
Warehouse for Agricultural
Produce/Grain Godowns/ Silos
4
Gas Go-down
(vii). Recreational
Sr. No.
Type of building
Area norms
Maximum
permissible
Ground
coverage
Permissible
basement
Maximum
permissible
Floor Area
Ratio (FAR)
Maximum
permissible
Height meters
1
Recreational
site
in
residential zone such as
Club/Community Centre
including
swimming
pool, Badminton/Tennis/
Squash Court, Indoor
Games,
Canteen/
Restaurant
(not
Exceeding 300 square
meters area) and related
uses.
Note:
a. Not more than 10%
of
the
permitted
FAR to be allowed
for rooms.
b. Maximum 10% of
the total FAR can be
utilized
for
commercial use viz,
Canteen/ Restaurants.
0.5
acre
to
2
acres
40 %
Single level
200 %
15
Open Space Zone such
as Mini Amusement
Park, Outdoor games
facility, Canteen (not
exceeding
200 square meters area)
and related
infrastructure requiring
minimal construction
activity
2 acres to
5 acres
10%
Single level
20%
15
Note:
The overall character of
the site shall be
maintained as open with
minimum construction
to be permitted at site.
However,
Joy
rides/ water parks etc.
Installed in such
projects, which are
open to sky shall not
be part of covered
area/ FAR.
Note:
A. Control of signs (hoardings) and outdoor display structures and transmission tower, telephone
tower, mobile/broadband tower, and outdoor display structure.
7.4 General note
a.
The unrestricted height shall only be allowed subject to submission of No Objection Certificate from the
appropriate authority (i.e., Defense Establishment, Air Force Establishment, Airport Authority of India,
etc.), if any in the area. The same needs to be sanctioned by Chief Engineer, PWD of UT Ladakh.
b.
It shall be the responsibility of the competent authority to procure the zoning map/ instructions issued by
the appropriate authority (i.e., Defense Establishment, Air Force Establishment, Airport Authority of
India, etc.) for final checks and approval.
c.
Architectural/ Frame Control and siting of building
In the case of building sites where architectural control is considered necessary by the competent
authority shall cause to prepare Architectural Control Sheets showing the extent of architectural
control on various units of the buildings or on the streets for such buildings to have a rhythmic
façade and height control, inter-alia, the following:
(i)
compulsory elevations for a particular building or a row of buildings,
(ii)
compulsory height on the front or on any side exposed to view from a street upon which
building shall have to be erected and completed within a certain period,
(iii)
compulsory height of floors,
(iv)
compulsory height and design of cornices, sills and top of windows in the first and higher
stories,
(v)
compulsory building line along which the building shall have to be erected and completed
within a certain period,
(vi)
compulsory type designs of balconies,
(vii) compulsory use of materials texture and colour, and,
(viii) building line in front, rear and side shall be as approved by the competent authority.
(ix)
IS-Codes need to be incorporated for various building materials, and prevalent building
codes for common materials found in Ladakh needs to be referred:
(a) IS-456 (2000) – Concrete/RCC
(b) IS-800 – Steel Structures
(c) IS-857 (Part 4): 1987 – Design loads (other than earthquake) for buildings and
structures - Snow Loads
(d) IS-2212- Brickwork
(e) IS-13077 – Mud Mortar Construction
(f) IS-1904 – Structural Safety
(g) IS-1905 – Structural use of unreinforced masonry
(h) IS – 3629 – Structural Timber
(i) Any other relevant codes as deemed necessary by Competent Authorities, as mentioned in Chapter-
3, and Annexure - D
d.
Special zoning
In case competent authority decides that it is not feasible to keep setbacks/ spaces as prescribed in
these Bye-Laws due to peculiar shape and condition of the site, then the competent authority after
recording reasons in writing may issue special zoning plan subject to any guidelines/ notification
issued by the Fire and Service Department from time to time.
e.
Green building measures and incentives
(i) For reducing consumption of total energy, fresh potable water and reduction in total waste
generation in modern buildings, the green building measures shall be adopted by all buildings
on plot measuring more than 250 square meters.
(ii) All buildings more than 200 sq. m. shall comply with the green norms and conform to the
requirements mandatory for sanction as per provisions mentioned in Chapter-10 of Model
Building Bye Laws 2016.
(iii) The applicant shall be awarded benefits of additional Floor Area Ratio (on plot area) for
adopting either green norms specified in sub- Code (iii) or by getting building/ site/ project
certified from Green Rating for Integrated Habitat Assessment (GRIHA) /Indian Green Building
Council (IGBC)/ Leadership in Energy and Environmental Design (LEED)/ Green & Eco-
friendly Movement (GEM) certification and achieving rating as specified in sub para 7.4 (e)
(iv) Or Applicants who install and successfully operate a geothermal heating system in
residential, Hotels, resorts and Govt. offices buildings to meet all the space heating requirements
of their building shall be awarded an additional Floor Area Ratio (FAR) of 6% based on the plot
area. However, the geothermal heating system must comply with all relevant technical and
safety standards and verified by ULB.
(iv)
The details of green norms for additional FAR:
(a) For Solar Power
Generating power in respect of total connected load of building
from solar photovoltaic power plant
15 to
25%
26 to
50%
51 to
75%
76 to
100%
Additional FAR for all building Uses (except
approved plotted residential)
3%
6%
9%
12%
(b). For installing Solid Waste Management Unit in industrial sites:
Installing Solid Waste Management Unit for treatment of total generated waste.
Additional FAR for all building uses (except approved plotted residential)
3%
(c). The details of rating achieved from GRIHA/IGBC/LEED and Additional Floor Area Ratio
(FAR) is as under: -
Additional FAR for all building uses (except plotted
residential)
3%
6%
9%
12%
15%
GRIHA rating
1
star
2 star
3 star
4 star
5 star
IGBC/LEED rating
-
-
Silver
Gold
Platinum
GEM Rating
-
GEM 2 GEM 3
GEM 4
GEM 5
Note: -
(i)
The additional FAR shall be given over and above the maximum permissible FAR as
stated in Code 7.3.
(ii)
The incentive of additional FAR for achieving GRIHA/IGBC/LEED/GEM rating shall be
applicable only in the case of erection and re-erection buildings.
(iii)
The incentive of additional FAR would also be applicable for buildings which are under
construction and registered with the rating agencies (GRIHA/IGBC/LEED/GEM) and
incorporating features for making Green Buildings but have not yet obtained Occupation
Certificate.
7.5 Procedure for availing incentive:
(i)
The applicant is required to submit provisional rating from GRIHA/LEED/IGBC/GEM at the
time of submission of building plan application to the competent authority (sub para 5.1 and
5.2, Chapter 3, and Annexure ‘D’) for claiming incentive of additional FAR stated at sub
para 7.5 (iv),
(ii)
At the time of applying for Occupation Certificate of building, the applicant is required to
submit final rating from GRIHA/LEED/IGBC/GEM,
(iii)
The competent authority only after verifying that the GRIHA/LEED/IGBC/GEM rating
achieved in final rating is same as provisional rating submitted at the time of building plan
application, shall issue the Occupation Certificate. Provided, in case the final rating achieved
is lesser than the provisional rating, the occupation certificate shall be issued after
compounding additional FAR (i.e., difference of additional FAR from provisional rating and
final rating) acquired by the applicant. However, the applicant may claim additional FAR, if
final rating is higher than the provisional rating.
(iv)
The applicant must submit a rating certificate for the building from GRIHA/LEED/IGBC/GEM
Compliance Certificate with respect to clause 6.5 (iii) [duly issued by architect or
engineer or Bureau of Energy Efficiency Certified Energy Auditors as the case may be] is to
be submitted after every five (5) years. In case, she/he fails to submit this certificate, the
authority, after giving her/him one month notice may charge the compounding fee or may take
appropriate action on case-to-case basis by recording the reasons in writing, thereof.
CHAPTER-8: PARKING SPACES AND BUILDING DESIGN NORMS
8. Parking v/s Building
8.1 Parking Car Space norms for buildings land-use-wise shall be as follows:
(1) Car space Norms for residential plots:
Sr. No.
Size of plot (square meters)
No of ECS
1
Above 180
2.00 ECS for each dwelling unit
2
Above 120 to 180
1.50 ECS for each dwelling unit
3
Above 100 to 120
1.00 ECS for each dwelling unit
4
Above 50 to 100
0.50 ECS for each dwelling unit
5
Upto 50
0.25 ECS for each dwelling unit
Note-One ECS=12.5 sq. m. to be indicated in car bay size of 2.5 m X 5 m in residential plots.
No on street parking where the right of way of road/street is less than 12 meters shall be permissible
(2) For Residential Plots, Minimum Parking requirement for individual plotted housing shall be calculated
@ 0.25 ECS for every 40 sqm of built-up area.
(3) For integrated/multi storied commercial building, big retail stores,
restaurant, multiplex/ cinema/ theatre, and shopping mall 1.0 ECS for every 50 square meters of
covered area,
(4) For offices, cyber park/IT park/cyber cities, 1.0 ECS for every 75 square meters of covered,
(5) For shopping area and designated shopping markets being developed by competent authority, 65%
of total site area shall be kept for parking purpose,
(6) For hospitals,1.0 ECS for every 2 beds and for visitors 1 ECS for every 4 beds,
(7) For industries, 1.0 ECS for every 300 square meters of covered area,
(8) For assembly buildings (i.e., standalone theatres, cinema houses, concert halls, auditoria, and
assembly halls), 1 ECS for every 40 square meters of covered area,
(9) For primary and secondary schools, 15% of total site area for parking purpose,
(10) For college, parking at rate of 1 ECS for every 200 square meters of covered area,
(11) For government or semi-public offices including civil/ High Court, 1 ECS for every 75 square
meters of covered area,
(12) For hotels and motels, 1.0 ECS for every 75 square meters of covered area,
(13)
For institutional/ educational/ assembly buildings with parking areas, designated space in
parking lots for on-site snow storage in areas that maximize sunlight and melting, while
being mindful of drainage considerations,
(14)
Covered parking in the basement or in the form of multi-level parking above ground level
or stilt shall not be counted towards FAR. However, the footprint of separate parking
building block(s) shall be counted towards ground coverage. For existing properties, separate
parking area shall not be counted towards FAR,
(15)
Parking facilities need to include no-parking zones as per DCRs and Master Plans of the
respective Local bodies,
(16)
Necessary changes may be made in the parking as per subsequent Development Plans
and requirement of the time for which the changes are being provided. Furthermore, sub
para 3.3 of Model Building Bye Laws 2016 needs to be referred, wherever not mentioned
in these Bye- Laws,
(17)
In case of provision of mechanical parking in the basement floor/upper stories, the floor
to ceiling clear height of the basement/floor shall be maximum of 4.75 meters,
(18) No storage and commercial activities shall be permissible in the covered parking areas,
(19) The misuse of the covered parking space shall immediately attract levy of three times the penalty
of the composition fee prescribed (i.e., applicable collector rates for the locality) for the excess
covered area in the respective category,
(20) Fast charging facilities need to be incorporated at feasible locations for high volume of vehicles.
8.2 Applicable Car Space norms for sub-para 8.1 (1) to (19) above shall be as under:
i.
1ECS = 23 square meters for open parking,
ii.
28 square meters for parking on stilts, and,
iii.
32 square meters for basement parking.
8.3 Party Wall
(1) In case the plot holder intends to construct a common boundary wall with minimum width of
230mm, shall be required to submit consent of owners of adjacent plots with which plot shares a
common boundary i.e., the plot on both sides and at the rear.
(2) Wherever the plot owner opts for independent boundary wall within the plot boundary:
(i)
shall be allowed independent boundary wall only where adjacent plots are vacant, and,
(ii)
the owner shall ensure that no part of foundation and boundary wall is constructed on the
adjoining plot.
8.4 Courtyard
Interior courtyard for light and ventilation of habitable rooms shall not be less than 12.0 square
meters in area and the minimum width of every such courtyard in any direction shall not be less
than 3.0 meters.
8.5 Plinth
(1)
Plinth area shall be considered from Plot boundary Center line sharing the approach road. The
plinth of the main building shall be sited with respect to surrounding ground level for proper
drainage of the plot. The height of the plinth shall not be less than 450 mm and more than 1.5
meters in the case of independent building not sharing party wall. If the party wall is shared the
plinth level shall be the same as already laid for the party wall.
(2)
The plinth of courtyard shall be at least 150 mm above the level of the street from where entry to
plot has been taken and shall be satisfactorily drained.
(3)
In no case, any part of the ramp/steps connecting building plinth to street/road shall lie on
street/road and obstruct traffic movement.
8.6
Minimum area, size, height, light and ventilation required for different components of Residential
buildings
(1)
Minimum area of a habitable room, kitchen and water closet shall be followed in accordance with
tablet given as under:
Sr.
No.
Room
type
Minimum area (in
square meters
Minimum width (in
meters)
Minimum
clear Height (in
meters)
Light and Ventilation (area of
openable windows,
ventilators)
1
Habitable
room
9.5
2.4
2.40
Not less than 1/8th of the total
floor area of the room.
2
Kitchen
5.5
1.8
2.40
Not less than 1/8th of the
total floor area of the room.
3
Pantry
3.00
1.40
2.10
Not applicable
4
Bathroom
1.80
1.20
2.10
5
Water
Closet
1.1
0.90
2.10
6
Combined Bath
and
Water
Closet
2.8
1.2
2.10
0.3 square meters on wall not
less than 0.3 meters wide.
7
Store
No restriction
No restriction
2.10
Not applicable
8
Garage
14.85
2.75 x 5.40
2.40
9
Doorways
Habitable room
Not applicable
0.90
1.95
10
Doorways for
kitchen, bath,
W.
Not applicable
0.75
2.10
(2) Habitable room Size and height
(i)
in case of Group Housing scheme, the dwelling unit having more than one room may have one
of the rooms with a clear floor area not less than 7.5 sq. meters with one side not less than 2.4
meters,
(ii) in case of air-conditioned rooms, the height shall not be less than 2.4 meters measured from
the surface of the floor to the lowest point of air conditioning duct or false ceiling; and,
(iii) all doors and windows shall open directly or through a verandah or to a permanent open space
or an open space abutting the building not less than 1.8 meters in width.
(3) Bathroom and Water Closet (W.C.)
(i)
Every bathroom and water closet shall:
(a) preferably be so situated that at least one of its walls shall have opening for circulation of
external air, with provision of exhaust fan, and,
(b) toilet be provided with impervious floor covering sloping towards the drain with a suitable
gradient.
(ii) where the water-closet in a building is not connected to exterior, it shall be ventilated by
mechanical means or through a vertical shaft open to sky of a minimum size stated in the
Model Building Bye Laws 2016, for ventilation to toilet, bath, and water closet, and shall be
counted in covered area,
(iii) no room containing water-closet shall be used for any other purposes except as lavatory and
no such room shall open directly into any kitchen or cooking space by a door/ window or
another opening, and every room containing water- closet shall have a door completely
closing its entrance.
(iv) soil or ventilating pipes shall not be allowed on the exterior face of any building, provided
these shall either be embedded in the walls or pipe ducts to be provided to accommodate
them.
(v)
Security rooms each measuring maximum area of 3.0 square meters is permitted only at the
entry-exit gates of premises.
(vi) All commercial buildings should necessarily design a public toilet with winter friendly
technology and universal design. Buildings with plinth areas more than 75 sqm shall be
accessible from outside of main building block.
8.7 Boundary Wall, Fence, Gate and Porch
(1)
The location of gate shall be one side of front wall.
(2)
Maximum permissible height of front side boundary wall shall be not more than 1.2 meters from
the mean level of abutting street in front of the plot from where entry to the plot is taken.
Note: The owner/applicant if desires, not to construct the front boundary wall, is permitted so to
utilize for parking.
(3)
maximum height of boundary wall at rear and side of plot shall not be more than 1.8 meters from
the mean level of abutting street in front of the plot from where entry to the plot has been taken.
Note: In case of plots above 2000 square meters, maximum height of boundary wall at the rear
and side of the plot shall not be more than 1.8 meters from the abutting ground level.
(4)
a railing/grill with or without poly carbonate/fiber glass sheet covering for a height of 0.75 meter
shall be permitted over and above the maximum height of boundary wall on all sides.
(5)
the temporary porches of polycarbonate sheets/fiber glass roof or any other temporary material
covering on suitable structure, shall be allowed in residential plots with the condition that these
shall be open on sides in the driveway area within the plot.
(6)
boundary wall up to the height of 2.4 meters may be permitted by the competent a u t h o r i t y
i n i n d u s t r i a l b u i l d i n g s , e l e c t r i c s u b -stations,
transformer stations, institutional buildings like hospitals, industrial buildings like workshops,
factories and educational buildings like schools, colleges, including hostels and other uses of
public utility undertakings and strategically sensitive buildings.
(7)
Construction of boundary/compound walls of the site should be at least 10 m away from the bank
of the river, if the location is proposed near any riverbank.
8.8 Staircase
(1) Every building intended to be used as multiple residential building or commercial or educational
and institutional or industrial building shall be provided with required number of staircases
(accessible from a maximum distance of 30 meters (45 meters, if building has automatic sprinklers
for firefighting) from any part of the building, extending from ground floor level to the highest
floor, having following specifications:
Sr.
No.
Type of building
Minimum
permissible clear
width of
staircase (in
meters)
Minimum
permissible
width
of tread (in meters)
Maximum
permissible height
of riser (in meters)
1
Residential
Plots up to 15 meters
height
0.9
0.25
(Without nosing)
0.19
Plots above 15 meters
height
1.2
2
Commercial
Plots up to 50
square meters area
0.9
0.25
(Without nosing)
0.15
Plots above 50
square meters area
1.2
0.30
(Without nosing)
3
Assembly building
2.0
0.30
(Without nosing)
0.15
4
Educational building
1.5
0.30
(Without nosing)
0.15
5
Institutional building
2.0
0.30
(Without nosing)
0.15
6
Inland Container Depot
&
Custom
bounded
area
1.5
0.30
(Without nosing)
0.15
(2)
minimum headroom in a passage under the landing of a staircase and the minimum clear
headroom in any staircase shall be 2.1 meters.
(3)
maximum numbers of risers in single flight are limited to 14 nos.
(4)
if a service or a spiral staircase is provided, its width shall not be less than
1.0 meter and its average tread width shall not be less than mention in table of sub-Code (1).
(5)
notwithstanding anything contained in sub-Code (1), the staircases in the private portion of a public
building and industrial building, not open to the general public, may be of the sizes mentioned for
residential building.
8.9 Ramps and Lifts
(1)
Every building having more than 15 meters height shall be provided with a lift or a ramp with an
inclination of 1:10 in addition to the staircases. In all residential buildings having more than 15 meters
height, lift is mandatory to install in numbers depending on the occupancy of building.
(2)
In case of public buildings with only ground floor, ramp shall be provided for differently abled persons
reaching its plinth level, if public buildings are of more than one storey, lift or ramp shall be provided,
but at ground floor, ramp shall be provided for reaching plinth level of building.
(3)
Ramps:
(i) The ramp to basement and parking floors shall not be less than 6 meters wide for two-way traffic and 4
meters wide for one-way vehicular movement, provided with gradient not less than 1:8.
(ii) The minimum width of the ramps in hospitals shall be 2.4 meters for movement of stretcher and for
public use. In no case, the hospital ramps shall be used for vehicular movement.
(iii) Ramps may also be provided in the setbacks which can be sloped considering unhindered movement of
fire engine and in no case the gradient shall be less than 1:8. (to be read with basement)
(iv) All structural design/safety aspects as per latest Bureau of Indian Standards Codes as amended
from time to time, shall be complied along with consideration of weight of fire engine and its
maneuvering.
(v) A ramp for human movement shall have handrail on at least one side, and preferably two sides with
minimum height of 0.90 meters, measured from the surface of the ramp. The handrails shall be smooth
and extend to 0.30 meters beyond the top and bottom of the ramp. Where predominant movement is of
children, the extra handrail shall be placed at a height of 0.76 meter.
(vi) Standards of Ramps to be referred from Fire safety perspective (Chapter 11, Model Building Bye
Laws, 2016) and Harmonised Guidelines and Standards for Universal Accessibility 2021
(4)
Lifts
Wherever lift is required as per bye laws , provision of at least one lift shall be made for the wheelchair
users, with the following cage dimensions, recommended for passenger lift of 13 persons capacity by
the Bureau of Indian Standards:
(i)
Clear internal depth 1.1 meters.
7
Industrial building;
1.5
0.30
(Without nosing)
0.15
8
Any other buildings
1.5
0.30
(Without nosing)
0.15
(ii)
Clear internal width 2.0 meters.
(iii) Entrance door width 0.9 meter.
(iv) a handrail not less than 0.6 meter long and 1 meter above floor level shall be fixed adjacent
to the control panel.
(v)
the minimum size of lift lobby shall be 1.8 meters x 2.0 meters or more.
(vi) the interior of the cage shall be provided with Braille symbols and audible that sounding the floor,
when the cage reaches on a floor, indicating that the door of the cage for entrance/ exit is either
open or closed.
Further standards of lifts shall be referred from sub para 5.4.4 of Model Building Bye-laws, 2016,
wherever applicable.
8.10 Passages and corridors
(1) The minimum width of corridors and passages in a residential building shall be 1.25 meters and
these shall be of fire-resistant material.
(2) Minimum width of any corridor and passage in case of residential buildings with multiple dwelling
units and for other types of buildings, shall be as given below:
Sr. No.
Building type
Minimum permissible width of passage and corridor (in meters)
1
Residential
1.25
2
Commercial
1.25
3
Assembly
2.0
4
Educational
2.0
5
Institutional
2.0
6
Inland Container Depot & Custom
bounded area
1.5
7
Industrial
1.5
8
Hospital, nursing homes, etc.
2.4
9
All other building including hostels.
1.5
(3) The clear headroom height of passage and corridors shall, in no case, be less than 2.15 meters.
(4) All surfaces including ceiling shall be of fire-resistant materials.
(5) All the passages and corridors shall be naturally lighted and ventilated and if not possible, provision for
artificial lighting and mechanical ventilation shall be made.8.11. Outside Seating
(1)
Seating and gathering places need to be oriented in public spaces to maximize sunlight and offer some
wind protection.
(2)
Climate sensitive materials for seating need to be used, e.g., wood, or heated tiles need to be chosen
for the design.
(3)
Benches and cluster seating near shrubs and coniferous trees to be provided, where possible, for
protection from extreme cold winter. A variety of styles of benches and tables need to be explored that
are moveable, so people may choose to group with others or sit alone. Public provisions need to be
explored by competent authorities.
8.12
Fire Clearance Criteria
a) Category -I. – Exempted from Fire NOC Residential buildings that
meet all of the following:
1`. Less than 15 double-bedded rooms OR less than 4 private dwelling units
2. Height below 12.5 m (from entry/ground level)
3. Covered area below 1000 sqm.
b) Category-II. Self-Certification by empaneled Architect. Residential or mixed-use
buildings that meet any of the following:
1. Between 15 rooms to 30 rooms OR 4 or more dwelling units
2. Height 12.5 m to 15 m (from entry/ground level)
3. Covered area 1000 sqm or more
4. All mixed land-use / commercial buildings up to 15 m height
c) Category-III: - Fire NOC Required.
i. Any building not covered under Category I or II shall require a Fire NOC through Empaneled Third-Party
Auditors as per the directions/guidelines issued from time to time by the Director, Fire & Rescue
Department, UT Ladakh complying with the Ladakh Fire Prevention and Fire Safety Norms ,2025.
ii. Further, after the completion of firefighting installations as approved and duly tested and certified by
Third-party auditors, the Owner/ Builder of the building shall approach the Director Fire and Rescue for
obtaining occupancy certificate.
iii. Validity of Fire Safety Certificate or self-certification:
1. Category II Buildings: Valid for 10 (ten) years from the date of issue, subject to the
submission of a fire safety return every two years.
2. Category III Buildings: Valid for 5 (five) years from the date of issue, subject to the
submission of an annual fire safety return.
Explanation: -
1. For a detailed explanation of building types/categories and the recommended or required fire safety installations and
measures for each, please refer to Schedule 1 of the Ladakh Fire Prevention and Fire Safety Norms, 2025.
2. In this section the word "exit" means a passage, channel or means of access from any building, storey’s or floor area to a
street or other open space of safety and includes a vertical exit
(i)
or a horizontal exit or an outside exit. “vertical exit” means an exit used for ascension or descension between two
or more levels including stairways smoke proof, ramps, lifts, escalators and fire escapes,
(ii)
“horizontal exit” means a protected opening through or around a fire wall or a bridge connecting two
buildings,
(iii)
outside exit” means an exit from the building to a street or to an open area leading to a street or to an
enclosed fire resistive passage leading to a street;
3.
In this section the word “travel distance” means the distance from the exit of any premises on a floor of a
building to a place of safety, be it a vertical exit, a horizontal exit or an outside exit, measured along the line of
travel.
4.
In this section, the word ‘bedded’ shall mean any bed meant for two persons; in the case of dormitories or
bunk beds or single beds, two single beds shall be counted as one bed.”
8.13 Means of Access
(1)
No Building shall be erected which deprives any other building of its means of access.
(2)
If there are any bends or curves in the approach road, sufficient width shall be permitted at the curve to
enable the fire tenders with a turning circle minimum of 9.0 meters radius.
(3)
Other provisions of means of access for buildings other than plotted residential and commercial shall be
as under:
(i)
The approach to the building and open spaces on its all sides up to 6.0 meters width, shall have
composition of hard surface capable of taking the weight of fire tender, weighing up to 22 tons for low
rise buildings and 45 tons for building with a height of 15 meters and above. The said open space shall
be kept free of an obstructions/hindrance,
(ii) Main entrance to the premises shall be of adequate width to allow easy access to the fire tender and in no
case, it shall measure less than 6.0 meters. The entrance gate shall fold/ slide back against the compound wall of the
premises, thus leaving the exterior access way within the plot free for movement of the fire service vehicles. If
archway is provided over the main entrance, the height of the archway shall not be less than 5.0 meters,
(iii) In case of basement extending beyond the building line, it shall be capable of taking live load of 45
tons in the case building 15.0 meters and above in height and 22 tons for building less than 15.0 meters
in height,
(4)
Every person who applies for permission for erection or re-erection of a building shall also submit
NOC from the concerned authority for accessing the National Highway and State Highway.
8.14 Light and Ventilation of building
(1)
Every room that is intended for human habitation shall abut on an interior or exterior open space or on
to a verandah which opens to such interior or exterior open space.
(2)
The whole or part of one side of one or more rooms intended for human habitation and not abutting on
either the front, rear or side open spaces shall abut on an interior open space whose minimum width in
all directions shall be 3.0 meters in case of buildings not more than 15 meters in height, and in case of
buildings above 15 meters, the provision of sub para 7.2 (1) shall apply.
(3)
Sunken courtyard up to the lowest floor of basement(s) shall be allowed as ‘light well’ within building
envelop for light and ventilation for basement area subject to drainage provisions.
(4)
Other provisions for light and ventilation in buildings other than plotted residential and commercial
schemes where exterior open-air space is intended to be used for the benefit of more than one building
on same plot/site, then the width of such open-air space shall be the one specified for the tallest
building abutting on such open-air space, as given below:
(5)
Ventilation shaft
For ventilating the water closets and bathrooms, if not opening on the front, rear and interior open
spaces, can open on the ventilation shaft, the size of which shall not be less than the values given
below:
Sr.
No.
Height of
Building (in
meters)
Minimum size of Ventilation Shaft (in square
meters)
Minimum width of Shaft
(in meters)
1.
Up to 10.0
1.2
0.9
2.
Up to 12.0
2.8
1.2
3.
Up to 18.0
4.0
1.5
Note:
(i)
For fully air-conditioned buildings the ventilation shaft shall not be required, provided the
air- conditioning system works on uninterrupted source of power supply including power
backup system.
(ii)
Horizontal ducting for ventilation may be installed in building with exhaust fan of appropriate
capacity for discharging used air to the external space of building.
(6)
Integrated Heating and Winter Friendly Heating Systems need to be incorporated at building
levels. Chapter 10.2.3, and 10.2.4, Model Building Bye Laws, 2016 need to be referred for
specifications.
8.15 Cantilevered roof and chajja projections
(1)
No building verandah, chajja or other projections from the face of the building shall be allowed
to be erected or re-erected on or over a road or beyond the boundaries of the applicants own land/
plot in view of safe distance from an overhead power line.
(2)
Balcony of a width of maximum 1.80 meters in front and rear sides of a plot can be permitted
within the plot, provided the width of balcony does not exceed half of the width of setback
beyond it shall not be compounded and has to be rectified, if exceeding.
(3)
On plots of the size of 300 square meters or above, where side setback has been provided, a
balcony of maximum width of 1.0 meter, inside set back can be permitted.
Sr.
No.
Height of Building up to
(in meters)
Exterior open spaces to be left on all sides of building blocks (in meters)
(front, rear and sides in each plot)
1.
10
3
2.
15
5
3.
18
6
(4)
Roofs shall be designed to prevent falling ice, snow, etc. onto entrances and walkways. Snow
guards to be included in the roofs to prevent hazards and avoiding snow accumulation on gutters,
etc.
(5)
Roof shapes against pedestrian accesses and/or exterior amenity areas to reduce ice and snow
hazards. These shapes may include elements such as slippery sloped surfaces, curved roofs, roof
steps and the direction of shedding snow loads.
(6)
Lightwells and roof orientation need to increase solar access to building interiors and covered
outdoor spaces.
(7)
Sunshades over opening can be allowed subject to the following:
(i)
Sunshade of 0.23-meter width may be permitted over any road/over any park/public place,
(ii)
Sunshade if permitted, shall be not less than a height of 2.3 meters from the ground level to
project up to a maximum of 0.45 meter within the applicants own land, provided it does not
exceed half of the width of setback/open space.
8.16 Mezzanine floor
(1)
A mezzanine floor or internal balcony shall not be permitted unless the height of the room is
minimum 5.0 meters and such mezzanine floor or balcony does not cover more than 1/3rd of the
room area. The area of such mezzanine floor shall not be counted in FAR.
(2)
The clear height of such mezzanine floor or internal balcony shall not be less than 2.3 meters
from the floor level to the soffit of ceiling.
8.17 Motor Garage
(1)
The minimum size of a private motor garage shall be 2.75 meters X 5.0 meters. The clear height
of the garage shall not be less than 2.40 meters. The plinth of the motor garage shall not be less
than 150 mm above the average ground level.
(2)
A garage is permissible within the zoned area and shall be counted in the covered area.
(3)
Garage shall not be used for habitable purposes.
8.18 Minimum provisions for a dwelling unit
Each dwelling unit shall have following minimum provisions, for granting permission to construct or
use/occupy:
For Economic Weaker Section (EWS)
Other than EWS
(i) A Living/bedroom.
(ii) A Pantry,
(iii) One Bathroom and water closet (W.C) integrated.
(i) A Living/bedroom.
(ii) A kitchen,
(iii) One Bathroom and One latrine or
W.C integrated.
The sizes shall be read comprehensively in conjunction with the General Building Requirements of
Model Building Byelaws by MoHUA or reiterations, or Government of India orders as necessary. These
acts shall be read with the Jammu and Kashmir Development Act, 1970, and Ladakh Autonomous Hill
Development Council Act, 1997. Furthermore, the dwelling units are not to be subdivided into further
units less than the mentioned norms in the aforementioned documents. Also, a single dwelling unit shall
not be converted into apartments if it violates the minimum dwelling unit provisions as per these
byelaws and referred documents. The transfer of rights and subdivisions should not be less than the
minimum dwelling sizes and should be read with the aforementioned documents.
8.19 Basement
(1)
The construction of the basement shall be allowed by the Competent Authority in accordance
with the provisions of these Bye-Laws.
(2)
The basement shall be constructed exactly below the building which may be put to
following uses:
(i)
Storage of household or other goods of ordinarily non-combustible material,
(ii)
Strong rooms, bank cellars, etc.,
(iii)
Air-conditioning equipment and other machines used for services and utilities of the building,
(iv)
Modern automated laundry may be allowed only in the basement of Hotel and Hospital/ Nursing
Home sites, group housing, hostels, service apartments, as an ancillary services for the purpose
for which permission is granted by Competent Authority and meant for in-house services only
and subject to the condition that these meet the public health requirement such as effluent of
the laundry properly pumped up to the ground floor inspection chambers and discharged to the
main sewer, and also for lift/escalator lobbies and parking.
(3)
The use of basement shall be specified in the building plans at the time of submission, stated in
sub para 4.1 and 4.2.
(4)
The basement shall have the following provisions:
(i)
Light and ventilation of basement:
a. an open area of a minimum width of 1.8 meters shall be provided across the full length and/
or width of the basement storey. This area shall be within the limits of the site and shall be
paved with impervious material above a concrete bed and shall be completely unobstructed,
b. in the case of buildings governed by the zoning approved by the competent authority,
basement stories shall be lighted and ventilated by means of windows of the minimum area
within 1/10th to 1/25th of the total floor area, at least half of which must open subject to the
condition that the deficit of light and ventilation shall be made up by providing artificial
lighting and mechanical ventilation,
c. in case of buildings governed by Architectural Control and the basement are for storage/
services, the provisions of light and ventilation shall be as shown on the control sheets, and
d. in the second basement i.e., basement lower than below the ground floor where it is to be
used for parking/ services, any guidelines or order issued by the Competent Authority or any
other Department
(ii)
Damp proofing of basement:
The walls of the basement story shall be damp-proof for effectively securing against dampness
from the soil.
(iii)
Height of the basement
a. The minimum clear height of the basement shall be 2.4 meters and maximum clear height of
the basement shall be up to 4.75 meters from floor to the underside of the roof slab or ceiling
subject to structural stability to be certified by the civil/structural engineer.
b. The minimum height of the roof of basement shall be 0.45 meters (with mechanical
ventilation/cutout in stilts) and maximum 1.5 meters above the average surrounding
ground level for plots up to 1000 square meters.
c. For plots above 1000 square meters, can be up to 1.5 meters above the average surrounding
ground level.
(iv)
Drainage of basement
a. Open area adjoining a basement story, if any, shall be effectively drained to the satisfaction
of the Competent Authority.
b. The responsibility of draining the basement storey/stories and for protecting it from rain shall
be of the owner.
c. The access to the basement shall be separate from the main and alternative staircase
providing access and exit from higher floors.
d. Where the staircase is continuous in the case of buildings served by more than one staircase,
the same shall be of enclosed type serving as a fire separation from the basement floor and
higher floors. Open ramps shall be permitted if they are constructed within the building line
subject to the provision of sub para 8.9.
e. The “Exit” requirements in basements shall comply with the provisions of clause 8.12 as
mentioned in of the Building Bye Laws”
(5)
Basement shall not be constructed beyond the zoned area or in case there is an adjacent existing
building, a setback of 2.4 meters shall be taken from the existing adjacent building.
8.20 Fire
(1) Fire protection measures provided in clause 8.12 of the building byelaws and guidelines issued by
Fire and safety Department of UT Ladakh, dealing with the fire protection measures as updated
from time to time, shall be adhered.
(2) The fire provisions made in the building wherever applicable, shall have to be got verified from the
Competent Authority or officer authorized from fire safety point of view and accordingly a
certificate shall be submitted by the owner.
(3) All public buildings, as well as publicly accessible buildings including but not limited to hotels,
guesthouses, restaurants, commercial complexes, hospitals, government offices, bus stations,
airports, schools, institutions, wellness centers, religious buildings, multilevel car parking,
apartments, etc. should have fire evacuation plans on each floor. The evacuation plans
themselves should incorporate feasible locations for the placement of evacuation plans and should
be vetted by an architect/engineer/appropriate authority as given power by the UT Administration.
(4) Notwithstanding the provisions mentioned in the previous sections, Chapter 11 of Model Building
Bye Laws, 2016 for Fire Protection and Fire Safety requirements need to be adhered to. This is to
include but shall not be limited to provisions for building components, means of access, fire
escapes, stairs & staircases, lifts, basement, helipad, service ducts, refuge chute, electrical services,
staircase and corridor lights, air- conditioning, fire dampers, boiler room, electric supply, fire
protection requirements, water storage, sprinklers, extinguisher systems, alarm systems, material of
construction, storage of chemicals & materials, and occupancy restrictions.
CHAPTER-9: CLIMATE CHANGE AND SUSTAINABLE MEASURES IN COLD DESERT
9.1.
Rainwater/Snow-Melt Harvesting for Ground Water Recharge
Arrangement for roof top and ground surface rainwater harvesting within the plot may be made
by the plot owner plot measuring more than 200 square meters, or as may be decided by the
UT Administration/Municipal Committees:
(i)
Recharging of ground water shall be preferred not only for residential buildings but for all
types of buildings, including Group Housing Societies having a plot area more than 250
square meters,
(ii)
The Ground Water Recharge shall be preferred for open spaces like parks, parking, plazas,
playgrounds, and other common areas. The harvesting and recharge structures should be
constructed by the Authority by associating community-based organizations including
Resident Welfare Associations, or by any other agencies or client themselves,
(iii)
Where snow remains on the surface within a plot or in parks, open spaces, the water of
melting snow should flow to the ground water recharge system.
9.2.
Rainwater/Snow-Melt Harvesting System Measures
i.
The collection, conveyance, and dispersal of rainwater for harvesting should only be of clear
water to check contamination of ground water. This shall include ‘filtration and storage’ of
surface run-off for limited range, and re-use of collected and filtered rainwater.
ii.
The entry or pouring points of the rainwater shall be designed to remain covered.
iii.
The arrangement of quick filtration of rainwater/snow-melt shall also be made in the
rainwater/snow-melt harvesting well/ tube well so that rainwater does not choke the strata.
iv.
The complete rainwater/snow-melt harvesting system shall be constructed within the available
area of the plot.
v.
The recharge well shall be located at a distance of not less than 10 meters away from any
structure handling sewage or industrial wastewater (such as septic tank or effluent treatment
plant etc.). This minimum distance of 10 meters shall not be applicable to manholes or sewer
lines although it shall be ensured that they are leak proof.
vi.
The detailed proposal of the system comprising collection, conveyance and dispersion of
rainwater harvesting well/ tube well shall have to be shown on the building plan submitted for
approval.
vii. The Owner/ competent professional duly engaged for supervision and execution of the
construction of the building shall submit the certificate stating that the rainwater harvesting
system is functional at site and same conforms to the provisions of these Bye-Laws. However,
if the said person is found guilty of misrepresentation of the facts, penal proceedings shall be
initiated along with debarring the concerned professional from practicing in the UT of Ladakh.
viii. The construction of the building as laid down in sub-clause (1) shall be the part of occupation
certificate. Unless such construction is completed as per the approval, occupation certificate
shall not be issued.
ix.
The owner of every building shall ensure that the rainwater/snow-melt harvesting structure, if
any, is maintained in good repair for storage of water of non-potable purposes and recharge of
ground water at all times.
x.
Groundwater extraction needs to be regulated; water meters need to be installed for recording
flow/quality of water extraction. District metered areas and connection to SCADA system
needs to be incorporated for all connections.
xi.
Snowmelt run-off drains, if any, need to be away from pathways in order to prevent hazards
due to freeze-thaw cycles.
xii. Chapter-9 of Model Building Byelaws, 2016 need to be referred for incorporating further
techniques and measures of Rainwater Harvesting.
xiii. Any further guidelines and rules released by Govt. of India/UT Acts, Laws, and Byelaws
would be applicable as notified from time to time.
9.3.
Compulsory tree plantation to increase tree cover
i. To reduce cold desert effect in Ladakh, measures to increase the vegetal cover shall be
enforced. Each household shall plant a minimum of one number of native plant on the proposed
construction site.
ii. To enhance fertility in the sand-shedding slopes, the biodegradable waste shall be deposited in
layers under the sand cover to allow decomposition. The layers of waste shall be watered by the
recycled treated water which will facilitate natural growth of vegetal cover in days to come.
iii. Such sand-shedding slopes where snow is received even in meager quantity, shall be terraced,
or provided with check dams to store the snow and allow the water to percolate gradually, in
the biodegradable waste layers.
iv. The kitchen waste, waste from food industry, fruit and vegetable markets, horticulture waste
shall be carried to the sandy surface and deposited below the sand layers and sprinkled with the
recycled treated water, or surface water/ground water, as the case may be.
9.4.
Provision of Rooftop Solar Photo Voltaic Power Plant
i.
"Minimum 50% of the total energy demand should be met through rooftop solar panels in all
commercial buildings, and minimum 80% of the total energy demand should be met through
rooftop solar panels in all government buildings."
ii. Installation of Solar Photovoltaic Power Plant as per sub para 9.3 (i) above, shall be part of the
occupation certificate.
iii. The Competent Authority shall empanel consultants (experts in solar photo voltaic power plant
installations) for inspecting, verifying, and issuing certification for installation of Rooftop Solar
Photovoltaic Power Plant and solar evacuated tube collectors for hot water.
9.5.
Provision of Energy Conservation Building Code/ Eco-Niwas Sanhita
i. The provision for Energy Conservation Building Code/ Eco-Niwas Sanhita shall be mandatory
applicable on buildings/ areas in accordance with the direction issued by Administration of UT
Ladakh from time to time.
ii. The applicant/ owner along with building plan application shall submit a certificate from a
competent professional confirming that the building plans confirms to the Energy Conservation
directions.
iii. Occupation certificate of building to be issued by the competent authority only after the
applicant/ owner submits a certificate from a competent professional (who has supervised the
construction of building) that the building has been constructed in accordance with the
provision of the Energy Conservation directions.
iv. The applicant/owner shall submit building plans along with the submission of Design Stage
and Occupancy Stage ECBC/ENS Compliance Forms and/or Simulation Report duly signed
and stamped by Bureau of Energy Efficiency (BEE) Approved Empaneled Experts/Firms
confirming or from Ladakh UT Level empaneled competent professionals that the building
plans and construction confirms to the Energy Conservation directions as per ECBC/ENS and
Ladakh ECBC/ENS (once notified).
9.6.
Recycling of Treated water
i. The sites or buildings in a complex or individual building, discharging water 30,000 liters and
above, per day, shall have the treated wastewater recycle system for horticultural, flushing,
cooling tower purposes, etc. to increase the vegetal cover and minimize the use of potable water.
ii. The dual pipe system shall be adopted in these buildings and indicated in building plans
submitted for approval.
iii. In order to mitigate water pollution, the bulk waste generators
including Hotels,
restaurants/cafes, laundry, car wash facilities etc. should provide Effluent Treatment Plants to
treat wastewater generated from their respective units
iv. Water conservation measures need to be adopted/regulated to maximize the use of treated STP
water for non-potable purpose/gardening, construction activity, toilet flushing, etc. as per Code
9.6 (1) and 9.6 (2).
v. Any Govt. of India/UT Ladakh Acts, laws, byelaws, notifications, and statutory provisions shall
be binding and applicable as notified from time to time.
9.7.
Removal of Construction and Demolition Waste
i. The Construction and Demolition Waste shall be managed in line with the provisions of the
Construction and Demolition Waste Management Policy, Strategy and Action Plan.
ii. Accordingly, the owner shall be responsible for ensuring that Municipal Committees shall be
contacted for doorstep collection, or through collection points as may be dedicated by the MCs
for suitable collection mechanism. The necessary fee mechanism shall be in line with the user
charges set by the Municipal Committees, and/or other authorities as designated by UT
Administration.
9.8.
Sustainable Habitat
(1) For Approach to Sustainability, the Municipal committees shall separately notify guidelines
which needs to be referred for detailed approach to sustainability. This shall include but not be
limited to the built environment, ecological footprint, renewable resource, 3Rs (reduce, reuse,
recycle), sustainable development, thermal conditioning (capacity, conductance, conductivity,
etc.), technology options, disaster preparedness, water management, site design and development,
external landscaping, fenestration designs, rainwater harvesting, water elements and irrigation,
access design, parking, lighting, envelope optimization and materials, along with any other
relevant sections.
(2) CPWD Guidelines for sustainable habitat need to be referred to incorporate sustainable
architecture and layout planning, sustainable index and guidance of materials, selection of
equipment for electrical and mechanical services for sustainable buildings and reuse and recycling
of construction & demolition waste. These shall include energy efficiency design and process,
site development, building orientation and shading, design strategies for day lighting, building
envelope, design strategies in cold climate, reduction in overall embodied energy of building
materials, integrated water management, solid waste management, sustainability index, building
materials, functional life period, capital cost, building loads (live and dead loads), power saving,
lighting, HVAC and solar power, along with any other relevant sections.
(3) The following supplementary building materials (derived or processed from waste) may be
suitably used while constructing building in combination with conventional resources in addition
to mud bricks:
(i)
Panels, hollow slabs, hollow blocks, or other factory materials which consume less water.
(ii)
Fly Ash bricks, Portland Pozzolana cement, Fly-ash concrete, phosphor gypsum-based
walling & roofing panels, particle wood, Recycled use of industrial/agricultural by-
products.
(iii)
Fly ash/ AAC (Autoclaved Aerated light weight Concrete) panels/ CLC (Cellular Light
weight Concrete) panels- Ensuring thermal comfort.
(iv)
Use of timber from rapidly growing plants from environment point of view.
(v)
Compressed Soil Earth Block and Rammed Earth Walls and Vaults.
(vi)
Use of Polyurethane Foams (PUF), Extruded Polystyrene (XPS), Expanded Polystyrene
(EPS), Rockwool, Glasswool as per the suitability to keep building insulated
Further materials and techniques shall be referred as per Sub para 9.6(1) and Sub para 9.6(2) of these
Bye-Laws.
(4) Solar passive techniques specific to Ladakh need to be incorporated. This is to include inputs
from competent authorities to provide sustainable building techniques, solar passive heating and
comfort retention techniques, thermal insulation technologies to provide sustainable solutions to
extremities of cold desert climate. The techniques should be in accordance with Sub para 9.6 (1)
and Sub para
9.6 (2) of these Bye-Laws for a more inclusive design.
(5) The following passive heating provisions need to be provided in accordance with Sub para 9.6(1)
and Sub para 9.6(2):
a.
50 % of bricks within a Govt and commercial buildings at each floor must be of
locally manufactured Compressed cement stabilized mud bricks or Rammed earth
blocks or Sun-dried earth blocks or locally available stone in all structurally
designed RCC framed structure including steel fabricated structures.
b. All hotels, resorts, guest houses, and government residential buildings shall have
mandatory double-glazed UPVC or wooden-framed double glazing.
c.
The installation of hydro pneumatic pump systems in commercial and government
residential buildings is recommended to supply water on demand efficiently.
Additionally, the use of heat pump systems is suggested as an energy efficiency
measure in all govt residential and commercial buildings.
d. North-south orientation should be optimized for utilizing maximum sunlight, wherever
possible, along the main path of the sun, exposing maximum facades to higher solar
radiation.
e.
Most openings (doors, windows, vents) should face east west to enhance sun exposure.
The window positions should allow optimal use of daylight, but with a large surface to
enhance solar radiation inside. Horizontal glazing should be preferred.
f.
Major hindrances should be avoided on South orientation of the buildings for utilizing
maximum sunlight.
g. Avoid overglazing- excessive areas of glass can be a large energy liability product
with low conductivity or U value (for example, double glazing) and high solar heat
gain coefficients (SHGC) to be used.
h. Window frames also conduct heat. Timber, UPVC, or thermally separated metal
window frames can be used in cooler climates to prevent heat transfer.
i.
Permanently shaded glass at the top of the window is a significant source of heat loss.
To avoid this, the distance between the top of glazing and underside of eaves or other
horizontal projection should be 50% of overhang or 30% of window height, where
possible.
j.
Living areas and the kitchen are usually the most important locations for passive
heating because they are used during the day and in the evening. Bedrooms generally
require less heating, because it is easy to get warm and stay warm in bed. Children’s
bedrooms can be classified as living areas if considerable hours are spent there. Utility
and service areas such as bathrooms, laundries and garages are used for shorter
periods, require smaller windows, and generally require less heating. The orientation
of these rooms may be done accordingly.
k. Design doors to blow closed if left open in strong winds or consider using spring
closers on external doors. Principles of good insulation for doors and windows as
shown below:
• Airlock doors
• Sealing around doors, windows and roofs
• Double glazed windows and doors
• Relevant thermal mass and lag of materials
• Trombe walls
l.
Allow sufficient space between doors so that it is easy to close the outer door before
opening the inner door (or vice versa)
m. Insulation -
Ceilings and roof spaces account for 25–35% of winter heat loss. To prevent heat loss,
place most of the insulation next to the ceiling because this is where the greatest
temperature control is required.
n. Floors account for 10–20% of winter heat loss. In cool climates, insulate the underside
of suspended timber floors and suspended concrete slabs. Insulate the edges of ground
slabs. Insulation is not required beneath earth-coupled concrete slabs; however, it may
be desirable when groundwater is present. Waffle pod construction helps to insulate
under slabs.
o. Walls account for 15–25% of winter heat loss. Insulation levels in walls are often
limited by cavity or frame width. In cold climates, alternative wall construction systems
that allow higher insulation levels are recommended.
(6) 3D- printed housing techniques may be provisioned for construction of buildings. The
construction shall need to meet the safety and habitability conditions laid against Model
Building
Bye
Laws,
2016,
and
Ladakh
Building
Bye-Laws
2025.
CHAPTER-10: GUIDELINES FOR UNIVERSAL DESIGN
The norms, other than the ones mentioned in this chapter shall be in accordance with Harmonised
Guidelines and Standards for Universal Accessibility in India, 2021. These shall include design elements,
and standards to for an include universal design.
10.1. Provision/ facilities for Differently abled Persons and Women
a) In all public buildings/places of public gathering, the level of the roads, access paths and
parking areas shall be described in the plan, along with specification of the materials.
b) It should be ensured that during winter the ramps, canopies and sheds are kept dry and non-
slippery.
c) Women friendly facilities should be ensured in all public spaces. Furthermore, all of them must
be installed with incinerators for sanitary pads, as well as other safe-hygiene measures for the
same.
d) The specified facilities in public buildings/sites for differently abled persons shall be as
follows:
(i)
Parking: For parking of vehicles of differently-abled people the following provisions shall be
made: -
(a)
surface parking for two car spaces shall be provided, near the entrance, for the
differently abled persons, with maximum travel distance of 30 meters from building
entrance,
(b)
the parking bay shall be of minimum 3.6 meters in width and marked as reserved for
wheelchair users.
(ii)
Every building shall have at least one entrance accessible to the differently-abled and shall be
approachable through a ramp in addition to the stepped entry made of non-slippery material
with a minimum width of 1.5 meters in a maximum gradient of 1:12, length of ramp shall not
exceed 9.0 meters having 0.8 meters high handrail on both sides of extending 0.3 meters
beyond top and bottom levels of the ramp. The minimum gap between the wall and the
handrail shall be 5 cm.
(iii)
Stepped approach- For stepped approach, size of tread shall not be less than 0.3 meters and
maximum riser shall be 0.15 meters with provision of 0.8 meters high handrail on both sides of
the stepped approach similar to the ramped approach shall be made.
(a)
Exit/ entrance door- Minimum clear opening of the entrance door shall be 0.9 meters and
shall not be provided with a step that obstructs the passage of a wheelchair user.
(b)
Entrance landing- Entrance landing shall be provided adjacent to the ramp, with the
minimum dimension of 1.8 meters x 2.0 meters.
(iv)
Corridor connecting the entrance/exit for the differently abled; the corridor connecting the
entrance/exit for differently abled leading directly outdoor to a place where information
concerning the overall use of the specified building can be provided to visually impaired
persons by a person:
(a)
the minimum width of corridor shall not be less than 1.5 meters,
(b)
in case there is a difference of level, slope-ways shall be provided with a slope of 1:12
with specified above handrails.
(v)
Stair-ways- One of the stairways near the entrance/exit, for the use of differently abled, shall
have the following provisions:
(a) the minimum width shall be 1.35 meters,
(b) height of the riser shall not be more than 0.15 meters and width of the tread 0.30-meter,
maximum number of risers on a flight limited to maximum 12,
(c) handrails shall be provided on both sides.
(d)
Lifts- Wherever lift is required as per The Ladakh Building Bye Laws, 2025 provision of
at least one lift shall be made for the wheelchair users, with the following cage
dimensions, recommended for passenger lift of 13 persons capacity by the Bureau of
Indian Standards:Clear internal depth 1.1. meters,
(e) Clear internal width 2.0 meters,
(f) Entrance door width 0.9 meter,
(g) a handrail not less that then 0.6 meter long and 1.0 meter above floor level shall be fixed
adjacent to the control panel,
(h) the lift lobby shall measure 1.8 meters x 2.0 meters or more,
(i) the time of an automatically closing door shall be minimum 5 seconds and the closing
speed shall not exceed 0.25 meter/ second,
(j) the interior of the cage shall be provided with a device that audibly indicates the floor.
When the cage reaches on floor, it shall indicate that the door of the cage for entrance/
exit is either open or closed.
(vi)
Toilets: One special water closet shall be provided with essential provision of wash basin
inside toilet near the entrance having:
(a) minimum dimensions of 1.50 meters x 1.75 meters,
(b) minimum clear opening of the door of 0.90 meter and shall swing out,
(c) suitable arrangement of vertical/horizontal handrails with 50mm clearance
from the wall.
(vii)
Drinking Water: Suitable provision of drinking water shall be made for the differently abled
persons near the special toilet provided for them.
(viii)
Designing for Children: In the building meant for the predominant use of children, the height
of the handrail and other fittings and fixtures, shall suit the requirements of children.
CHAPTER-11: STRUCTURAL MATERIALS
Materials
The requirement of building materials to be used in construction shall conform to the Building Materials
specified in the guideline issued by the Competent Authority.
11.1.
Foundations
(1) All foundation designs shall be prepared in accordance with the relevant Indian Standards
and shall be vetted as per the provisions of the said Building Bye-laws
11.2.
Building Services
The planning, design, and installation of heating systems or air- conditioning as the case may be
in a building shall be in accordance with Building Services, Section 2- Electrical Installations
and Section 3- Air-Conditioning and Heating specified in as per the provisions of the said
Building Bye-laws, or as may be notified through Orders, Guidelines, or Standard Operating
Procedures by the Competent Authority as updated from time to time.
11.3.
Plumbing Services
The planning design and installation of water supply systems, drainage, sanitary installations,
and gas supply installations in a building shall be in accordance with Plumbing Services,
Section 1- Water Supply, Section 2- Drainage and Sanitation and Section 3- Gas supply
specified in the as per the provisions of the said Building Bye Laws, or as may be notified
separately through Orders, Guidelines, or Standard Operating Procedures by the Competent
Authority, as updated from time to time.
11.4.
Construction Practices and Safety
(1) The various activities including demolition, excavation, blasting, construction from foundation level up to
completion shall be in accordance with Construction Practices and Safety as per the provisions of the said
Building Bye Laws, or as may be notified separately through Orders, Guidelines, or Standard Operating
Procedures by the Competent Authority, as updated from time to time.
(2) The Safety Measures to be adopted during various construction operations, including
storage of materials on the construction site and municipal/public land shall be in
accordance with Construction Practices and Safety specified in the as per the provisions
of the said Building Bye Laws, or as may be notified separately through Orders,
Guidelines, or Standard Operating Procedures by the Competent Authority, as updated
from time to time.
11.5.
Damp Proof Course
Wall of a building including a pier forming a part of the wall or a compound wall shall be
provided with a damp-proof course, except when built in cement concrete rated of 1:2
CHAPTER 12: -PUBLIC HEALTH INSTALLATIONS
12.1.
Two pipe system in drainage
(1)
The drainage system in a building shall be of two pipe system, one for soil and another for waste.
The soil pipe(s) to be connected to the drain directly and the waste pipes first in a gully trapped
and then to the drain. All traps to be ventilated vertically.
(2)
In Group housing, commercial complexes, commercial (other than plotted), institutional, industrial,
other building specified by the competent authority in accordance with Sub para 8.4, the water
from waste pipes shall be treated within the premises and used for flushing, horticulture, cooling
tower etc. purposes. Further, no soil/ waste pipe shall be allowed in common wall/party wall.
12.2.
Minimum sanitary facilities required for various type of buildings
(1)
Dwellings with individual convenience shall have at least the following fitments:
(i) one bathroom provided with a tap:
(ii) one water closet; and
(iii) where only one water closet is provided in a dwelling, the bath and water closet shall be
separately provided.
(iv) Kitchen with wash basin.
(v) All wastewater outlets shall be provided with suitable traps for preventing back flow of water
or foul smell or both.
(2)
Dwellings (tenements) without individual conveniences shall have the following fitments:
(i)
one water taps with draining arrangements in each tenement;
(ii)
one water closet and one bath for every two tenements; and
(iii) water tap in common bathroom and common water closet.
(3)
The requirements for fitments for drainage and sanitation, in case of buildings other than residential such as office
buildings, factories, cinemas, concert halls, theatres, hospitals, hotels, restaurants, schools and hostels shall be in
accordance with the provisions of the said Building Bye-Laws, or as may be notified separately through Orders,
Guidelines, or Standard Operating Procedures by the Competent Authority for Water Supply, Drainage and
Sanitation” with such updating as may be made from time to time.
12.3.
Method of disposal
(1)
Every water borne drainage installation shall be connected with the public sewer, but in case no
public sewer exists in the vicinity of the said premises, the drainage system may as a temporary
measure and subject to the previously written approval of the Competent Authority be connected to
a septic tank from which the effluent shall be drained off:
(i)
into absorption pits, or,
(ii) by sub-soil drain
• Provided that no absorption pit shall be allowed in the case of any premises or area
in which domestic supply is taken from sub soil water.
• Provided further that if in future a public sewer is constructed in the nearby area,
the owner shall at his own expense connect to the sewer.
(2)
Effective arrangements shall be made to treat the effluents up to the parameters/ guidelines issued
from time to time by Central Pollution Control Board (CPCB) or Administration of UT Ladakh to
ensure that the untreated effluents do not enter into any river, canal or water body or a ground
water zone.
12.4.
Septic tank
(1)
No septic tank shall be located :
(i)
at a distance of less than 2.5 meters from a dwelling unit or any other building used for human
habitation or for work or recreation.
(ii)
in a public through fare
(iii)
within 16 (sixteen) meters from any percolation well, watercourse or stream used or likely to
be used for drinking or domestic purposes or for manufacture or preparation of any article of
food or drink for human consumption and it shall be readily accessible so as to permit
cleaning operation being carried out without interference with the operation of any water
borne sanitary installation as a whole.
(2)
Every septic tank intended to serve a population of 24 (twenty-four) or more persons shall have
two separate compartments so that one compartment for alternate use for cleaning the filtered one.
The capacity of every compartment of the septic tank shall be 2½ (two and half) times the total
water supply allowances for the total number of residents of the buildings in the premises.
(3)
Every inlet pipe into a septic tank shall be effectively trapped.
(4)
The design of septic tank shall be in accordance with the guidelines issued by Administration of
UT Ladakh.
12.5.
Absorption pit
(1)
The location of every absorption pit shall conform to same restrictions as specified for a
septic tank in Sub para 12.4.
(2)
No absorption pit shall have any outlet into a storm water drain or surface drain.
(3)
The walls of every absorption pit shall be at least 0.5 meters above the ground level to
ensure that storm water does not enter into the absorption pit.
(4)
The absorption pits shall be constructed in duplicate as laid in Sub para 12.4 (2). The
capacity of the absorption pit shall be as approved by the Competent Authority.
(5)
All details shall conform to the guidelines issued by the Competent Authority as updated
from time to time.
12.6.
Sub-soil irrigation for disposal of effluent
No Sub-soil irrigation work for disposal of effluent from a septic tank shall allowed.
12.7.
Zero wastewater discharge
(1)
The group housings, industries, commercial, institutions and any other building specified
by the competent authority shall ensure zero wastewater discharge into main sewer line
and shall install suitable treatment plant for treatment of wastewater. The applicant shall
submit completion certificate of installation of treatment plant from independent expert
agency along with the application of Occupation Certificate.
(2)
For water conservation in the building, provision shall be made whereby the wastewater
generated from the sources such as dishwashing or washing machines, is used for sub-
surface irrigation, or if treated, for non-potable purposes as mentioned in these Bye-
Laws.
Note: The above restriction shall not apply in case of plots up to 2000 square meters.
12.8.
Sewerage Connection
All buildings need to be connected to public sewer and shall need prior permissions by Competent
Authority. No connection to any public sewer shall be made nor any water borne sanitary and
drainage installations intended to be connected until a certificate after completion by the
Competent Authority has been issued. Application for connection with public sewer
(1)
After the grant of a certificate referred to in the building Byelaws or in the event of the said
certificate having been deemed to have been granted, every person intending to connect a drain to a
public sewer shall apply to the Competent Authority at least seven days before the date on which
such connection is required.
(2)
The application shall be accompanied by a certificate referred to the Sub para12.8 and such
amount as may be laid down from time to time by the Competent Authority and calculated on the
basis of the current schedule of rates to meet the cost of the proposed connection.
(3)
On receipt of the application and subject to the requirement of the foregoing clauses, the Competent Authority
shall approve or reject the request.
12.9.
Sewage Discharge
(1)
Every drain discharging into a public sewer shall join the sewer obliquely in the direction the
sewer is flowing.
(2)
If practicable, the connection shall be made at an existing junction in the sewer and if not possible,
then there shall be an intercepting manhole before the connection.
12.10.
Drainage of roof
The roof of every building shall drain rainwater into gutters, chutes or trough and shall be
carried down through adequate number of down pipes without causing dampness in any part of
the wall or foundation of the building or any adjacent building.
12.11.
Effect on the transferred areas
Where the planned areas are transferred to the Competent Authority then the norms/ byelaws/
zoning bye-laws applicable to them at the time of transfer of these areas shall remain same, as
defined, and enforced by the concerned Authority.
12.12.
Sustainable waste management
Wherever applicable, Chapter 4, Chapter 10.2.5, as well as any other relevant sections from
Model Building Bye Laws, 2016 shall be applicable for sustainable waste management.
12.13.
Provisions of Dry Toilets
The dry toilets should be in the traditional two-storied design to convert waste into compost, and
the facility should be well ventilated and have smell free technology. The cleaning needs to be
free of Manual Cleaning, carrying and disposal. Ventilation requirements shall be subjected to
Chapter 4.30 and all other relevant sections from Model Building Bye-Laws, 2016. Approval by
approval authority needs to be taken before construction.
CHAPTER 13: – ENVIRONMENTAL CLEARENCE
Note: The Directions/Guidelines issued by the Ministry of Environment, Forest, and Climate Change from
time to time shall be part of this chapter of the Bye-Laws. Also, relevant sections from Chapter 14, as
well as any other relevant sections from Model Building Bye Laws, 2016 shall be applicable in the
same. The EIA requirements are already mandated by the Environment Protection Act, 1986. EIA shall
be required for all buildings.
13.1.
Environmental clearances for building and construction
(1)
The competent authority shall approve and certify the compliance of environmental clearances
requirements for following categories of buildings:
Sr. No.
Building Category
Built up area (in square meters)
1
Category 1
5000- 20000
2
Category 2
Above 20000-50000
3
Category 3
Above 50000-150000
(2)
The Competent Authority shall ensure the conditions fulfilled before approving and certifying the
compliance of environmental clearances stated below:
Environmental conditions for Category 1 buildings:
Sr.
No.
Medium
Environmental conditions
Schedule for
submitting
self- certification
1
Natural
Drainage
The inlet and outlet point of natural drain
system should be maintained with adequate
size of channel for ensuring non- obstructed
flow of water
Along with Occupation
Certificate application
2.
Water
Conservatio
n- Rain
Water
Harvesting/
Ground
Water
Recharge
i. A rainwater/snow-melt runoff harvesting
plan needs to be designed where the recharge
bores (minimum one per 5000 sqm of built-up
area) shall be provided. The rainwater / snow-
melt harvested should be stored in a tank for
reuse in household through a provision of
separate water tank and pipeline to avoid
mixing with potable municipal water supply.
The excess rainwater harvested be linked to the
tube well bore in the premise through a
pipeline after filtration in the installed filters.
Along with Occupation
Certificate application
ii. The unpaved area shall be more than or
equal to 20% of the recreational open spaces
Along with Occupation
Certificate application
3
Solid Waste
Management
Separate wet and dry bins must be provided at the
ground level, as well as segregation areas on each
floor for facilitating segregation of waste.
Along with Occupation
Certificate application
4
Energy
In common areas, LED/ solar lights must be provided. Along with
Occupation
Certificate
application
5. Air Quality and
Noise
i. Dust, smoke and debris prevention measures such
as screens, barricading shall be installed at the site
during construction. Plastic/ tarpaulin sheet covers
must be used for trucks bringing in sand and material
at the site.
Along with notice of
commencement of
construction
ii. The exhaust pipe of the DG set, if installed, must
be minimum 10 meters away from the building. In
case it is less than 10 meters away, the exhaust pipe
shall be taken up to 3 meters above the building.
Along with Occupation
Certificate application
6. Green cover
i. A minimum of 1 tree for every 40 square meters of
land shall be planted and maintained. The existing
trees will be counted for this purpose. Preference
should be given to planting native species.
Along with notice of
commencement of construction
ii. Where the trees need to be cut, compensatory
plantation in the ratio of 1:3 (i.e., planting of 3 trees
for 1 tree cut) shall be done with the obligation to
provide continued maintenance for such plantations.
Along with notice of
commencement of construction.
Environmental conditions for Category 2 buildings:
Sr. No.
Medium
Environmental conditions
Schedule for submitting self-
certification
1
Natural
Drainage
The inlet and outlet point of natural drain system
should be maintained with adequate size of
channel for ensuring obstructed flow of water.
Along with Occupation Certificate
application
2
Water Conservation
Water Harvesting
And Ground Water
Recharge
i. A rainwater/snow-melt runoff harvesting
Plan needs to be designed where the recharge
bores (minimum one per 5000 sqm of built-
up area) shall be provided. The rainwater
/snow- melt harvested should be stored in a
tank for reuse in household through a
provision of separate water tank and pipeline to
avoid mixing with potable municipal water
supply .The excess rainwater/snow-melt
Along with Occupation
Certificate application
Environ
mental
conditio
ns for
Categor
y 3
buildings
:
harvested be linked to the tube well bore in the
premise through a pipeline after filtration in the
installed filters.
3
Solid Waste
Management
i. The unpaved area shall be more than or
equal to 20% of the recreational open spaces.
Along with Occupation Certificate
application
ii. Separate wet and dry bins must be provided
at the ground level for facilitating segregation
of waste.
Along with Occupation Certificate
application
4
Energy
i. In common areas, LED/ solar lights must be
provided.
Along with Occupation Certificate
application
ii. At least 1% of connected applied load
generated from renewable energy source such
as photovoltaic cells.
Along with Occupation Certificate
application
iii. As per the provisions of the Ministry of
New and Renewable energy solar water heater
of minimum capacity 10 liters/4 persons (2.5
liters per capita) be installed.
Along with Occupation Certificate
application
iv. Sun dried/ rammed earth/ earth blocks/
solar passive building materials should be
used as building material
Along with notice of commencement of
construction
5.
Air Quality and
Noise
i. Dust, smoke, and debris prevention
measures such as screens, barricading shall be
installed
at
the
site
during
construction. Plastic/ tarpaulin sheet covers
must be used for trucks bringing in sand and
material at the site.
Along with notice of commencement of
construction
ii. The exhaust pipe of the DG set, if installed,
must be minimum 10 meters away from the
building. In case it is less than 10 meters
away, the exhaust pipe shall be taken up to 3
meters above the building.
Along with Occupation Certificate
application
6
Green cover
i. A minimum of 1 tree for every 40 square
meters
of
land
shall
be
planted
and
maintained. The existing trees will be counted
for this purpose. Preference should be given to
planting native species.
Along with notice of commencement of
construction
ii. Where the trees need to be
cut,
compensatory plantation in the ratio of 1:3
(i.e., planting of 3 trees for 1 tree cut) shall be
done with the obligation to provide continued
maintenance for such plantations.
Along with notice of commencement of
construction
Sr.
No.
Medium
Environmental conditions
Schedule for submitting self-
certification
1
Natural
Drainage
The inlet and outlet point of natural drain system
should be maintained with adequate size of
channel for ensuring obstructed flow of water.
Along with Occupation
Certificate application
2.
.
Water
Conservation-
Rain Water
Harvesting/
Ground Water
Recharge
i. A rainwater/snow-melt runoff harvesting plan
needs to be designed where the recharge bores
(minimum one per 5000 sqm of built- up area)
shall be provided. The rainwater/snow-melt
harvested should be stored in a tank for reuse in
household through a provision of separate water
tank and pipeline to avoid mixing with potable
municipal water supply. The excess
rainwater/snow-melt runoff harvested be linked to
the tube well bore in the premise through a
pipeline after filtration in the installed filters.
Along with Occupation
Certificate application
ii. The unpaved area shall be more than or equal
to 20% of the recreational open spaces.
Along with Occupation
Certificate application
iii. The ground water shall not be withdrawn
without approval from the competent authority.
Along with notice of
commencement of construction
iv. Use of potable water in construction should be
minimized.
v. Low flow fixtures and sensors must be used to
promote water conservation.
vi. Separation of grey and black water should be
adopted by the use of dual plumbing system.
3.
Solid Waste
Management
i. Separate wet and dry bins must be provided at
the ground level for facilitating segregation of
waste.
Along with Occupation
Certificate application
ii. All non-biodegradable waste shall be handed
over to authorized recyclers for which a written
tie-up must be done with the authorized recyclers.
Along with Occupation
Certificate application
iii. Organic waste composter/ vermiculture pit
with a minimum capacity of 0.3 Kg/tenement/
day must be installed wherein the STP sludge
may be used to be converted to manure which
could be used at the site or handed over to
authorized recyclers for which a written tie-up
must be done with the authorized recyclers.
Along with Occupation
Certificate application
4
Energy
i. In common areas, LED/ solar lights must be
provided.
Along with Occupation
Certificate application
ii. At least 1% of connected applied load
generated from renewable energy source such as
photovoltaic cells.
Along with Occupation
Certificate application
iii. As per the provisions of the Ministry of New
and Renewable energy solar water heater of
minimum capacity 10 liters/4 persons (2.5 liters
per capita) be installed.
Along with Occupation
Certificate application
iv. Fly ash bricks should be used as building
material in the construction.
Along with notice of
commencement of construction
v. Adoption of passive solar design of buildings
using
architectural
design
approaches
that
minimize energy consumption in buildings by
integrating conventional energy- efficient devices,
such as mechanical and electric pumps, fans,
l i g h t i n g f i x t u r e s a n d o t h e r equipment
with proper orientation of buildings, landscaping,
efficient
building
envelope,
appropriate
fenestration increased day lighting and thermal
mass.
Along with Occupation
Certificate application
vi. Optimizing use of energy systems in buildings
that
should
maintain
a
specific
indoor
environment
conducive
to
the
functional
requirements of the building by following
mandatory compliance measures (for all applicable
buildings) as recommended in the Energy
Conservation Building Code (ECBC) 2007 of the
Bureau of Energy Efficiency, Government of
India.
Along with Occupation
Certificate application, and
certifications as mentioned in
Ladakh ECBC 2021 (once
notified)
5.
Air Quality and
Noise
i. Dust, smoke and debris prevention measures
such as screens, barricading shall be installed at
the site during construction. Plastic/ tarpaulin sheet
covers must be used for trucks bringing in sand
and material at the site.
Along with notice of
commencement of construction
ii. The exhaust pipe of the DG set, if installed,
must be minimum 10 meters away from the
building. In case it is less than 10 meters away, the
exhaust pipe shall be taken up to 3 meters above
the building.
Along with Occupation
Certificate application.
6
Green cover
i. A minimum of 1 tree for every 40 square meters
of land shall be planted and maintained. The
existing trees will be counted
for this
purpose. Preference should be given to planting
native species.
Along with notice of
commencement of construction.
ii. Where the trees need to be cut, compensatory
plantation in the ratio of 1:3 (i.e., planting of 3
trees for one (1) tree cut) shall be done with the
obligation to provide continued maintenance for
such plantations.
Along with notice of
commencement of construction
7
Sewage Treatment
Plant
Sewage treatment plant with capacity of treating
100% wastewater shall be installed. Treated water
must be recycled for gardening, flushing etc.
Along with Occupation
Certificate application
8
Environment
Management Plan
The infrastructure such as Sewage Treatment
Plant, Landscaping, Rainwater Harvesting/ ground
water recharging, Power backup, Infrastructure,
Environment
Monitoring,
Solid
Waste
Management and Solar and Energy conservation,
should be kept operational through Environment
Monitoring Committee with defined functions and
responsibilities.
Along with Occupation
Certificate application
(3)
All the provisions mentioned under Municipal Solid Waste (Management and Handling) Rule,
2016 and their subsequent amendments; Plastic Waste Management Rules, 2016 and their
subsequent amendments and adoptions by the UT and any other competent authority and their
notifications would be applicable.
(4)
The applicant shall self-certify the above stated environmental conditions with the certification
of supervision/ completion from the competent professional or Bureau of Energy Efficiency
Certified Energy Auditors, as the case may be, responsible for supervising the construction of
building and/ or installing the solar photovoltaic power unit. Sewage Treatment Plant, Solid
waste management system, ECBC Code, Ladakh ECBC 2021 (once notified) & others.
(5)
The applicant shall submit the self-certification on environmental conditions to the Competent
Authority as per schedule given in sub para 13.1(2).
(6) The Competent Authority shall verify the certification and issue consent/ comments within 10
(Ten) working days of receiving the certification. The Environmental Clearance certificate
shall be deemed accepted, if it is in conformity with conditions stated herein before, but no
consent/ comments have been passed by Competent Authority within specified time.
(7) If the owner or the competent professional as mentioned in sub para 13.1(3) or as the case
may be, submits a wrong or false self- certification or if any additional construction or
violation is reported to exist at site or has concealed any fact or misrepresented regarding
environmental conditions stated in sub para 13.1(2), they shall be jointly and severally
responsible for such omission/commission and complaint against the competent professional
for suspension of registration, and/or any penalties as deemed fit by the UT Administration
against the competent professional and the owner shall be liable to pay for the penalty as may
be decided by the Competent Authority after giving an opportunity of being heard. Further, if
it emerges that the information was concealed by Competent Professional/Owner, necessary
penal proceedings, as decided by the administration will be initiated along with barring the
competent professional from practicing in the UT of Ladakh.
(8) In case environmental clearance is issued by Competent Authority, no separate prior
environmental clearance shall be required.
(9) In case the building is certified from GRIHA/LEED/IGBC, there is no requirement to issue
environmental clearance.
(10) Any Govt. of India/UT Acts, Laws, Byelaws would be applicable as notified from time to
time
(11) EV Charging rationale, options and infrastructure shall be guided by Amendments in Model
Building Bye Laws, 2016 for Electric Vehicle Infrastructure
(12) Indoor Air Quality rationale, options and infrastructure shall be guided by Amendments in
Model Building Bye Laws, 2016 for
Electric Vehicle Infrastructure, as and when applicable
(13) In-building solutions for IT Infrastructure rationale, options and infrastructure shall be guided
by Amendments in Model Building Bye Laws, 2016 for Electric Vehicle Infrastructure, as
and when applicable
(14) Environmental Impact Assessment and Environmental Clearance shall be in-line with
Environmental (Protection) Act 1986, and its subsequent amendments, specifically 2006
amendment, which define the requirement of mandates and screening for Category A, B1 and
B2 projects.
CHAPTER -14: HERITAGE AND PROTECTED MONUMENTS
Conservation of heritage sites shall include buildings, artifacts, structures, areas, and precincts of historic, aesthetic,
architectural, cultural or environmentally significant nature (heritage buildings and heritage precincts), natural
feature areas of environmental significance or sites of scenic beauty.
14.1. Applicability of these Bye-Laws
These regulations shall apply to heritage sites which shall include those buildings, artifacts, structures, streets, areas
and precincts of historic, architectural, aesthetic, cultural or environmental value (hereinafter referred to as Listed
Heritage Buildings/ Listed Heritage Precincts) and those natural feature areas of environmental significance or of
scenic beauty including, but not restricted to, sacred groves, hills, hillocks, water bodies (and the areas adjoining the
same), open areas, wooded areas, points, walks, rides, bridle paths (hereinafter referred to as ‘listed natural feature
areas’) which shall be listed in notification(s) to be issued by the UT administration, or as identified in Master Plan.
The provisions in this chapter are beyond the regulations applicable on the Prohibited and Regulated areas as
defined by Ancient Monuments and Archaeological Sites and Remains (AMASR) Act 2010, where site specific
Heritage Bye-Laws prepared and notified by the Competent Authority (National Monuments Authority) under the
AMASR Act shall be applicable. NOC shall have to be obtained by submission of required documents as may be
necessary, including “Heritage Impact Assessment” report, if so, necessitated by the NMA.
14.2. Responsibility of the owners of Heritage Buildings
Post notification, it shall be the duty of the owners of heritage buildings and buildings in heritage precincts or in
heritage streets to carry out regular repairs and maintenance of the buildings. The UT administration, the Municipal
Committee or the Local Bodies and Authorities concerned shall not be responsible for such repair and maintenance
except for the buildings owned by the Government, the Municipal Committee, or the other local bodies.
14.3. Restrictions on Development/Redevelopment/repairs, etc.
No development or redevelopment or engineering operation or additions / alterations, repairs, renovations including
painting of the building, replacement of special features or plastering or demolition of any part thereof of the said
listed buildings or listed precincts or listed natural feature areas shall be allowed except with the prior permission of
the Competent Authority (which may include Executive Officer, Municipal Committee, or equivalent official of
Municipal Committee/ Vice Chairman, Development Authority, or any other officer as deemed necessary by the UT
Administration). Before granting such permission, the agency concerned shall consult the Heritage Conservation
Committee to be appointed by the UT Administration and shall act in according with the advice of the Heritage
Conservation Committee.
i.
Provided that, before granting any permission for demolition or major alterations / additions to listed
buildings (or buildings within listed streets or precincts), or construction at any listed natural
features, or alteration of boundaries of any listed natural feature areas, objections and suggestions
from the public shall be invited and shall be considered by the Heritage Conservation Committee.
ii.
Provided that, only in exceptional cases, for reasons to be recorded in writing, the Competent
Authority may refer the matter back to the Heritage Conservation Committee for reconsideration.
However, the decision of the Heritage Conservation Committee after such reconsideration shall be final and
binding.
14.4. Penalties
Any Violation of the regulations will be subject to penalties under the provisions related to unauthorized
development. In case of proved deliberate neglect of and/or damage to Heritage Buildings and Heritage
Precincts, or if the building is allowed to be damaged or destroyed due to neglect or any other reason, then, in
addition to penal action under the relevant Act, no permission to construct any new building shall be granted
on the site ,if a Heritage Building or Building in a Heritage Precinct is damaged or pulled down without
appropriate permission from the Competent Authority .
It
shall
be
open
to
the
Heritage
Conservation
Committee
to
consider
a
request
for
rebuilding/reconstruction/retrofitting of a Heritage Building that was unauthorizedly demolished or damaged,
provided that the total built-up area in all floors put together in such new construction is not in excess of the
total built-up area in all floors put together in the original Heritage Building in the same form and style in
addition to other controls that may be specified.
14.5. Preparation of list of heritage sites including heritage buildings, heritage precincts and listed
natural features
The list of heritage sites including Heritage Buildings, Heritage Precincts and listed Natural Features Areas is
to be prepared and supplemented by the Competent Authority. Before being finalized, objections and
suggestions of the public are to be invited and considered. The said list to which the regulation applies shall
not form part of this regulation for the purpose of Building Bye- Laws.
The list may be supplemented from time to time by Government on receipt of proposal from the agency
concerned or by Government suo-moto provided that before the list is supplemented, objections and
suggestions from the public be invited and duly considered by the Competent Authority / and/or UT
Administration and/or the Heritage Conservation Committee.
When a building, or group(s) of buildings or natural feature areas are listed it would automatically mean
(unless otherwise indicated) that the entire property including its entire compound / plot boundary along with
all the subsidiary structures and artifacts, etc. within the compound/plot boundary, etc. shall form part of list.
The buildings, however, on this list (original and supplemented, as notified by the Competent Authority
/and/or UT Administration and / or the Heritage Conservation Committee) shall follow these Building Bye-
Laws post its notification.
14.6 Alteration/modification/relaxation in development norms
On the advice of the said Heritage Conservation Committee to be appointed by the Administration and for
reasons to be recorded in writing, the Competent Authority shall follow the procedure as per Development
Authority Act, to alter, modify or relax the Development Control Norms prescribed in the Master Plan, if
required, or Heritage Conservation and Preservation Act, as may be notified from time to time, for the
conservation or preservation or retention of historic or aesthetic or cultural or architectural or environmental
quality of any heritage site.
14.7 Heritage precincts / Natural feature areas
In cases of streets, precincts, areas and (where deemed necessary by the Heritage Conservation Committee) natural
feature areas notified, development permissions shall be granted in accordance with the special separate regulation
prescribed for respective streets, precincts / natural feature areas which shall be framed by the Competent Authority on
the advice of the Heritage Conservation Committee. Before finalizing the special separate regulations for precincts,
streets, natural features, areas, the draft of the same shall be published in the official gazette and in leading newspapers
for the purpose of inviting objections and suggestions from the public. All objections and suggestions received within a
period of 30 days from the date of publication in the official gazette shall be considered by the Competent Authority.
After consideration of the above suggestions and objections, the agency concerned, acting on the advice of the Heritage
Conservation Committee shall modify (if necessary) the aforesaid draft separate regulations for streets, precincts, areas,
and natural features and forward the same to Government for notification
14.8
Road Widening
Widening of the existing roads under the Master Plan of the City or Town / Zonal Development Plan or in the
Layout Plan shall be carried out considering the existing heritage buildings (even if they are not included in a
Heritage Precinct) or which may affect listed natural features areas.
14.9
Incentive uses for heritage buildings
In cases of buildings located in non-commercial use zones included in the Heritage Conservation List, if the
owner / owners agree to maintain the listed heritage building as it is in the existing state and to preserve its
heritage state with due repairs and the owner / owners / lessees give a written undertaking to that effect, the
owner / owners / lessees may be allowed with the approval of the Heritage Conservation Committee within
permissible use zone to convert part or whole thereof of the non-commercial area within such a heritage
building to commercial/office use/hotel. Provided that if the heritage building is not maintained suitably or if
the heritage value of the building is spoiled in any manner, the commercial / office / hotel use shall be
disallowed.
14.10
Maintaining Skyline and Architecture Harmony
After the guidelines are framed, buildings within heritage precincts or in the vicinity of heritage sites shall
maintain the skyline in the precinct and follow the architectural style (without any high-rise or multistoried
development) as may be existing in the surrounding area, so as not to diminish or destroy the value and beauty
of or the view from the said heritage sites. The development within the precinct or in the vicinity of heritage
sites shall be in accordance with the guidelines framed by the Executive Officer, Municipal Committee, or
equivalent official of Municipal Committee/ Vice Chairman, Development Authority on the advice of the
Heritage Conservation Committee or separate regulations / guidelines, if any, prescribed for respective zones
by Municipal Committee / Development Authority. There needs to be a touch of local architecture in all
buildings, e.g., Shingstak.
14.11 Restrictive Covenants
Restrictions existing as imposed under covenants, terms and conditions on the leasehold plots by the
Competent Authority shall continue to be imposed in addition to Development Control Regulations. However,
in case of any conflict with the heritage preservation interest/environmental conservation, this Heritage
Regulation shall prevail.
14.12 Grading of the listed buildings / listed precincts
Listed Heritage Buildings / Listed Heritage Precincts shall be graded as per decisions taken by the Heritage
Conservation Committee, or, in absence of it, shall follow Chapter-12 Conservation of Heritage Sites, Table-
12.1 Grading of Listed Heritage. Listing does not prevent change of ownership or usage. However, change of
use of such Listed Heritage Building / Listed Precincts is not permitted without the prior approval of the
Heritage Conservation Committee. Use should be in harmony with the said listed heritage site.
14.13 Opinion of the Heritage Conservation Committee
Nothing mentioned above should be deemed to confer a right on the owner / occupier of the plot to demolish or
reconstruct or make alterations to his heritage building / buildings in a heritage precinct or on a natural heritage site if in
the opinion of the Heritage Conservation Committee, such demolition /reconstruction /alteration is undesirable.
14.13
Approval to preserve the beauty of the area
The Heritage Conservation Committee shall have the power to direct, especially in areas designated by them,
that the exterior design and height of buildings should have their approval to preserve the beauty of the area.
14.14
Signs and Outdoor display structures/ including street furniture on heritage sites
The Competent Authority on the advice of the Heritage Conservation Committee shall frame regulations or
guidelines to regulate signs, outdoor display structures and street furniture on heritage sites.Signs and Outdoor
display structures/ including street furniture on heritage sites
The Competent Authority on the advice of the Heritage Conservation Committee shall frame regulations or
guidelines to regulate signs, outdoor display structures and street furniture on heritage sites.
14.15
Implications of listing as heritage buildings
The Regulations do not amount to any blanket prevention of demolition or of changes to Heritage Buildings.
The only requirement is to obtain clearance from the Competent Authority and Heritage Conservation
Committee from heritage point of view.
14.16
Ownership not affected
Sale and purchase of Heritage Buildings does not require any permission from the Competent Authority or
Heritage Conservation Committee. The Regulations do not affect the ownership or usage. However, such
usage should be in harmony with the said listed precincts / buildings. Care will be taken to ensure that the
development permission relating to these buildings is given within 60 days.
CHAPTER: -15 ROLL OUT OF STREET INFRUSCTURE AND SMALL CELLS FOR 5G NETWORKS
With the advent of 5G, there will be a requirement to deploy Low Power Base Transceiver Stations (LPBTS)
with 5G radios often called “small cells'' due to network elements working on higher frequency spectrum
bands that necessitate denser network deployments to support larger traffic volumes per unit area. A small cell
is a cellular base station that transmits & receives 3GPP-defined Radio Frequency (RF) signals with small
power and small form factor. In most cases, it services a small coverage area ranging from ten meters to
several hundred meters in contrast to a typical mobile macro cell that might have a range of up to several tens
of kilometers.
Various types of street furniture such as poles (streetlights, electricity, traffic lights), advertisement hoardings,
bus shelters and towers have been identified by TRAI as suitable national assets for deploying small cells.
15.1. Background
Previous generations of cellular infrastructure can no longer keep pace with the growing demand for
communication (data transmission) bandwidth and throughput. The macro towers that have been serving
Fourth-Generation Long- Term Evolution (4G LTE) networks cannot connect to the rapidly growing number
of devices that users are simultaneously utilizing. The next generation of cellular technology, 5G, represents a
paradigm shift for cellular infrastructure.
As the roll-out of 5G continues, more and more radios need to be deployed and networks will need to be
densified. The Macro radios provide excellent coverage and high capacity. However, in some cases, for
example dense-urban locations dominated by tall buildings, providing the necessary coverage can be
challenging. Similarly, where there are high numbers of mobile-users, such as busy city-centers and
transportation hubs, providing enough capacity needs from a single radio can also be challenging. In these
cases, outdoor small cells are ideal solutions for improved coverage. These solutions include micro remote
radio heads and high- capacity 5G millimeter wave radios. Around 80% of mobile broadband traffic originates
from mobile users located indoors. However, ensuring good indoor coverage can also be a challenge,
especially as the higher frequencies used by 5G are more prone to signal propagation limitations than previous
generations of mobile technology. To help overcome this, it is essential to consider indoor small cells as a
deployment option.
Mobile operators will look to small cell deployment technology to add data capacity in areas of traffic
congestion. This dense small cell network increases both the radios per subscriber and provides subscribers
improved signal quality for more efficient data transfer. The shorter distance between radio sites also helps
overcome the short signal reach of higher frequency 5G radio spectrum. As a result, small cells are becoming
the leading solution in growing the data capacity of the network.
Small cells are therefore required in the 5G network due to the following reasons:
• Offloading: The Macro site of the area is getting congested and is unable to serve the entire
community of the area.
• Capacity Enhancement: The macro site serving the building/ area is unable to meet the capacity
requirements of some parts of the building/ spot.
• Low Coverage of Signal: Higher spectrum band.
• Indoor Coverage: In building solutions are essential for indoor coverage including basements,
underground metro tunnels etc.
Various small cell product types exist generally depending on, among other attributes, their targeted coverage
range (transmit power) and provided capacity. These small cell variants include (but are not limited to)
femtocells, picocells and microcells/metrocells – broadly increasing in cell range from femtocells (the
smallest) to metrocells (the largest) as summarized below:Femtocells: A low-power, short range, self-
contained small cells. Initially used to describe consumer small cell units intended for residential homes, the
term has expanded to encompass higher capacity units for enterprise, and metropolitan areas.
• Picocells: Typically used to describe low power compact base stations, used in enterprise or public
indoor areas, the term is sometimes used to encompass outdoor small cells as well.
• Microcells: Typically used to describe an outdoor short-range base station aimed at enhancing
coverage for both indoor and outdoor users where macro coverage is insufficient. Occasionally
installed indoors to provide coverage and capacity in areas above the scope of a picocells.
• Metrocells: A recent term used to describe small cell technologies designed for high-capacity
metropolitan areas. Such devices are typically installed on building walls or street furniture (e.g.,
lampposts). This category can include technologies such as femtocells, picocells and microcells
where they meet these deployment criteria.
15.2. Small Cell Deployment Scenarios and Use cases:
Small cells generally support two lower coverage range base station classes defined by 3GPP [TS38.104]
which also determine the RF performance:
i.
Medium-range base stations (derived from microcell scenarios) for outdoor small cell deployment.
ii.
Local area base stations (derived from Pico cell scenarios) for indoor small cells.
Small cells will play a critical role in a number of use cases in the 5G network. Some of use cases of Small
Cells are given below-
• Large venues such as sports complexes or concert halls where thousands of users need to connect
within an enclosed area. In order to ensure all users, maintain network coverage with good
throughput, 5G small cells can be deployed in these facilities and surrounding areas to provide extra
capacity so that the influx of users doesn’t exhaust the network.
• Another use case is cellular vehicle-to-everything (C-V2X) enabling communications between
vehicles and between the car and infrastructure. Both capabilities are necessary for autonomous
automobiles. 5G small cells can be used to build infrastructure that can handle massive
communications needed for this application where human lives can be at stake.
• In smart cities, 5G small cells can be attached to traffic posts or light posts to enable better coverage
in metropolitan areas to ensure the network coverage is there with the necessary throughput for smart
city initiatives, analytics and intelligence.
• 5G small cells can support residential or business network needs. In a smaller community of users,
that doesn’t justify the capital costs for a macrocell deployment, a 5G small cell is a great alternative.
Placing a 5G small cell near residential buildings or homes, can ensure throughput is not degraded
due to lack of coverage.
15.3. Communication System:
Data growth is exploding globally and in India as per Nokia MBiT 2021 Report, the average monthly data
usage per user in India has increased almost 17 times over the past 5 years. Covid-19 has further pushed
data consumption with people staying indoors. Government has facilitated Work from Home (WFH)
guidelines with a Work from Anywhere (within India) permitted. Home consumption of data has therefore
grown exponentially through 2020. According to the Tower and Infrastructure Providers Association, almost
85% data traffic and 70% voice traffic is now generated indoors.
The World Bank has clearly demonstrated that every 10% increase in broadband penetration leads to nearly
1.40% increase in GDP growth rate. While that is a global average, even the India specific study by the
reputed quasi-Government research agency, ICRIER, has shown that every 10% increase in internet traffic
delivers 3.1% increase in GDP per capita and a 10% increase in investment in Telecom Infrastructure will
increase GDP by 3.3% The entire consumer pull today is focused on data and broadband now with the new
digital services providing voice services free with the data services. Video and app-based services are driving
the demand for broadband with Apps for ecommerce, eHealth care etc. in everyday use. It is very clear that
Internet Traffic and Apps are contributing to GDP growth and for this to grow even further, conventional
connectivity needs to be replaced with duct-sharing and fibre especially, which is an essential requirement In-
Building as much as it is for FTTx and Tower Fiberization.
Note: “Service Provider”: any organization that provides any type of telecom or IT services in the building
complex, as per scope defined by DOT i.e., TSP / ISP / IP1 etc
.
A broad variety of Information Communication Technology (ICT) systems are expected to be installed in
buildings. In order to facilitate proper cabling and installation / up gradation of ICT systems and their cost
effectiveness and maintenance, adequate physical infrastructure is required within buildings. This
infrastructure will include common ducts, cable riser systems, conduits, cable trays and utility closets etc.
among other things. The same can also be retrofitted into existing buildings wherever possible and feasible
and must be designed in all new, re-developed and renovated structures. This section describes the general and
specific requirements of such an ICT infrastructure in Building specially in respect of cabling aspects.
Communication systems are general utility in much the same way as water, power, gas, cable TV &
CCTV/Security. Unlike traditional communication systems which are constantly evolving, the recommended
Digital infrastructure has to be designed to be flexible enough to accommodate a variety of ICT systems and
emerging technologies and be future proof for the next 25-30 years. Space and power are required for
installation of common ducts, optical fiber, small cells, antennas, smart sensors etc., space, power and
earthling is required for electronic equipment installation for supporting the various digital technologies of
now and the future. Most communication utilities can share the same space since the physical topology and
wiring requirements are similar and no significant power is present in the cables. However, in some cases
state-of-the – art communication cabling or equipment will involve new or more specific requirements for
utility spaces such as:
i.
Cable routing layout and cable length restrictions between Work-Space and utility closet,
ii.
Bending radius and working clearance requirements for different cable types, e.g., Fiber optic cables,
Cat-6 Cables and co-axial cables,
iii.
Isolated power circuits for permanent communication equipment,
iv.
Protection, Safety, Grounding and environmental requirements of communication equipment.
15.4. Emerging Technologies in Telecommunication Services:
The technologies used for telecommunications have changed greatly and over the past few years and
particularly during the pandemic, India has experienced a massive surge in indoor voice and data
consumption. According to the Tower and Infrastructure Providers Association, almost 85% data traffic and
70% voice traffic is now generated indoors. Telecommunication network architecture is changing to meet
new requirements for a number of services/applications viz. 5G, massive Internet of things, Artificial
Intelligence etc. Choosing efficient and cost- effective and fast-deployment technologies such as wired and
wireless networks will improve accessibility. Based on type of building and profile of customers in the
buildings, the needs of wired and wireless may vary. Further, the architecture of the information and
communication infrastructure is changing to accommodate the requirements of a growing number of ICT-
enabled services/applications (broadband, IP, mobile, multimedia, surveillance, IoT, etc.). In order to improve
in-building coverage and to offer better-quality high-speed data services, there is a definite need to install in -
building solutions (IBS) for augmenting the wireless- based voice and data services. This is equally true for
installing 5G and Wi-Fi hotspots along with Fibre to x (FTTX) distribution network of Fiber and Cat-6 Cables
for seamless data connectivity.
Provisioning of telecom services and broadcasting services viz Cable TV, DTH and Security Services viz. CCTV
Cameras and futuristic services viz IoT based sensors would require suitable wireline connectivity inside the buildings
inside buildings are not confined to wireless medium only. Wireline services through cables such as copper cables, optical
fibre cables (OFC), LAN Cat-6 cables are also equally important for having uninterrupted connectivity. Also, for services
such as Cable TV, DTH and Smart Devices Solutions (IoT), suitable cabling within building premises is a pre- requisite
and for that, shared duct space across the building riser and floors is critical to achieve the flexibility in the future.
15.5. Incorporation with Smart Cities:
i.
In-Building and Gated building solutions:
It is important to ensure quality telecom services inside a building – in residential, multi-story building,
commercial complex, hotel or airport. It is also essential for Telecommunication Service Providers/IP-1s to
work on sharing of telecom infrastructure which may be made mandatory as they extend the services in the
buildings.
Telecom Service Providers/IP-1s require a non-discriminatory and unhindered access inside the building /
along the premises to install the telecom infrastructure or lay their cables.
At present, mobile operators and the building owner or building developer or Resident Welfare Associations
(RWA) enter into commercial agreements for in- building deployment. Building owners or building
developers delay the negotiations or request exorbitant rents — slowing down the speed of deployment. The
Competent Authority may intervene in this regard wherein commercial agreements are insisted upon.
TSPs/IP-1s should be given legal rights to use the Common Telecom Infrastructure (CTI) within the
premises of Building / Gated Society free of charge or for a standardized nominal charge just like other
essential services like water electricity and/or gas. Provision of CTI in a building should not be deemed as a
revenue source in any way, much as the water and electricity utilities are not.
The issue is not limited to sharing of IBS/ Distributed Antenna System (DAS) systems only, but TSP should
get access to all telecom infrastructures including Fiber Cable and LAN cables for provision of wired and
wireless network, other telecom/ICT and IoT services.
It is important for telecom service providers to provide mobile coverage / network presence/high speed
connectivity inside big residential / commercial complexes to improve QoS of their networks. It may not be
practical to install individual in-building infrastructure by TSPs/IP-1s as this will result in not only
duplication of network resources but will also entail huge avoidable cost. It may also be not advisable to lay
down cables again and again on the same land / building by several TSPs/IP-1s.
It is important for telecom service providers to provide mobile coverage / network presence/high speed
connectivity inside big residential / commercial complexes to improve QoS of their networks. It may not be
practical to install individual in-building infrastructure by TSPs/IP-1s as this will result in not only
duplication of network resources but will also entail huge avoidable cost. It may also be not advisable to lay
down cables again and again on the same land / building by several TSPs/IP-1s.
ii.
Built Provisions:
The buildings are to be constructed in such a way that they are ‘Digital Infrastructure deployment’/ ‘Digital
Connectivity’ ready. There should be provision of telecom ducts/ common pathways/runways (digital
access paths) to reach to the accessible parts of the buildings. The common ducts/digital access paths to
access buildings from outside should invariably be part of the CTI, which could be used by TSPs/IP-1s for
laying/deploying digital infrastructure including cables. While approving the building plans, it has to be
ensured that plan for creation of CTI including the common duct to access the common space used as
telecom room inside the building is also prepared and separate set of drawings showing the inter/intra
connectivity access to the building with distribution network need to be furnished.
Occupancy-cum-Completion certificate to a building to be granted only after ensuring that the CTI as per
the prescribed standards is in place and an undertaking by the competent professionals to be insisted to
certify that building has ensured common access to all digital infrastructure to all Service providers in
accordance with plan of creation of CTI.
As part of Building Bye-Laws, the builder/Resident Welfare Association should be mandated to ensure
that:
i.
While preparing the building plans, there is a need to mandate to have properly demarcated sections
within buildings and on rooftops for housing Broadband / digital connectivity infrastructure / antenna.
These areas should have access to power supply for reliable, always-on services.
ii.
Access to building as well as CTI facilities inside the building should be available on a fair,
transparent and non-discriminatory manner to all Service Providers /IP1’s.
iii.
The Service Providers / IP1’s should have unrestricted access for maintenance work.
iv.
The permission to in-building access and/or CTI facilities inside the building should not be seen as a
source of revenue generation for builder(s)/RWA(s) but as a means for facilitating penetration of
broadband access and thereby helping in socio-economic growth of all the residents.
v.
Charges (rentals/power rates etc.) levied to the TSPs/IP-1s should be fair, transparent, and non-
discriminatory and should be on residential rates.
Suitable provision for the creation of Common Telecom Infrastructure (CTI) inside the newly constructed
public places like Airports, commercial complexes and residential complexes:
i.
At Layout Level
While developing Greenfield areas, the layout plans should clearly indicate the telecom as Utility
infrastructure lines. Standards followed for Utility planning shall be published and work shall be done by
the respective department for bringing in the standardization of the utility coding and sequences. The
placement and sequence of above- and below-ground utilities at the appropriate location in the right-of-way
to be ensured for unconstrained movement as well as easy access for maintenance. Telecommunication
cables should be placed in a duct that can be accessed at frequent service points with sufficient spare
capacity to enable scaling and future expansion, and empty pipes (large size hume pipes / HDPE pipes)
should be laid before planting trees in order to accommodate additional infrastructure.
Digital Readiness Rating of Buildings / Society in line to the Green ratings (as mentioned in these Bye-
Laws, as well as further laws/notifications/amendments taken up by shall be created where the existing and
new buildings shall be rated on standardized parameters such as; but not limited to; Digital Infrastructure
access, provisions for Emerging Technologies, Maintenance and Operational ease to TSPs / IPv1, Quality
of Wireless Services, Quality / Interchangeability ease of Wireline Services till each Unit Security,
redundancy and Expandability of the digital infrastructure etc. A detailed rating parameters and calculation
mechanism of Points / Stars shall be devised and benchmarked for all new / retrofitting of buildings/
societies.
Digital Asset repository which will ensure Proper planning and mapping of utilities through GIS is
necessary especially when the alignments of telecommunication cables are identified. Design criteria and
standards Utilities should meet the following criteria:
• Telecommunication cables should ideally be placed below the parking area or service lane, which
may be dug up easily without causing major inconvenience. Where this is not possible, the cables
may be placed at the outer edge of the right-of-way.
• There is a need to reduce conflicts with pedestrian movements is to place telecom boxes in
easements just off the right-of-way. Where this is not possible, they should be placed within parking
or landscaping areas. If cables have to be located in the pedestrian path, a space of at least 2m should
be maintained for the through movement of pedestrians. Telecom boxes should never constrain the
width of a cycle track.
• In order to minimize disruptions, cables should be installed with proper maintenance infrastructure.
ii.
Other procedures for setting up In-Building Solution (IBS)/ Fiber Networks:
• There is a need to promote installation of In-Building Solution (IBS) / Smart Connectivity
infrastructure, where there is a poor connectivity in terms of weak signal strength inside the office,
shopping mall, hospitals, multi-story building, education institutions and the objective has to be to
strengthen quality of service of the voice & data of mobile and Fiber broadband network and access
to digital services being offered by TSP and IP1’s
• Mode of deployment of In-Building, FTTx/IP Solution: There shall be various mode of deployment
of In Building solutions such as: The possible modes are deployment by a neutral host infrastructure
provider or build and managed by mobile operator and sharing with other service providers on non-
discriminatory basis. The In-Building Solutions (IBS), FTTx/IP Solutions can also be deployed by
TSPs/ IPs. For deploying indoor solutions these companies should have deemed permissions from
the premise’s owners for installation of Distribution Network within the utility shafts / common
spaces with provisions for common / shared Points of Interconnect for Connectivity to individual
units. Moreover, if the TSP/IP requires to install optical fiber for connecting In-Building Solution
(IBS) / Distributed Antenna System (DAS) nodes, FTTx/IP Solutions for which RoW / permissions
should be granted by the road owning agency through online mode.
• Permissibility: The IBS, FTTx/IP component being small equipment can be installed on any type
of land/building/utility pole and shall be exempted from obtaining the permission for installation
of these components from the Competent Authority.
• Procedure for submitting application for obtaining clearance: The application should be made to the
Administrative Authority of the Building/ Head of the office with Layout diagram for implementing
IBS in the building.
• Fees: There shall be no fee to be charged for IBS / FTTx Network. However, charges may be levied
for provision of power, fixtures, etc. if taken by the TSP/IP-1s.
• Access and Distribution Fiber and IP/LAN networks for connectivity for the shopping malls, Multi-
Storey Residential Buildings, Cooperative Housing Societies, Residential Welfare Association and
Commercial Buildings to be planned and deployed by TSP/IP-1s as per standard requirement of
providing high bandwidth and adequate indoor coverage to each unit / apartment in these complexes.
FORM BC-I
[See Code 4.1(1)] Form of Application
Class of Building
Institutional
Residential
Industrial
Commercial
Warehousing
Educational
Any other
Health
From ……………………
To……………………….
Sir,
I/We apply for permission to erect/re-erect/add/alter a building/wall in accordance with the plans
submitted herewith on Site No.
; Street No.
; at
/Khasra
No.
,
Village
(strike out whichever is not applicable)
1.
I/We attach:
a. Site plan (in triplicate) showing the position of site proposed to be built upon as required by the
Bye-Laws along with an un-editable Compact Disc/DVD or any other electronic medium
permissible by competent authority from time to time containing the drawings so submitted,
b. Plans, elevations and sections (in triplicate) as required by the Bye- Laws along with an un-editable
compact Disc/DVD or any, other electronic medium permissible by Director from time to time
containing the drawings so submitted,
c. Drainage plans (in triplicate), as required by Bye-Laws along with an un-editable compact
Disc/DVD or any, other electronic medium permissible by the competent authority from time to
time containing the drawings so submitted,
d. Structural drawings (for record) as per Form BC-V(A1)/BC-V(A2), as may be applicable,
e. Specifications of the proposed building (in triplicate) in Form BC-II;
f. Certificate of conformity to regulation and structural safety for the relevant buildings (depending
upon type and height) in Form BC- V(A1) and
2.
Scrutiny fee @ Rs. 10 per square meter deposited as per prescribed mode
3.
The construction of the building will be undertaken as per the approved building plans, structural design
given by the architect, civil engineer or structural engineer, and got supervised through the following
architect/engineer:
Architect:
Engineer:
Name of Architect:
Name of Engineer:
Council of Architecture Registration
No ----------------- valid up
to
Qualifications:
Complete Address
Complete Address
Mobile No.
Mobile No.
Enclosures
(No digital signatures are required)
Signature of applicant
i.
Complete Address
ii.
iii.
Mobile No.
FORM BC-II
See Code 4.1 (a) (iv))
Specifications
The materials to be used in the construction to be clearly specified under the
following heads:-
Items
Specifications
(a) Foundations
(b) Walls
(c) Damp-proof course
(d) Floors
(e) Roofs
(f) Windows and Doors and other wood-work
(g) Steel work
(h) Internal finish
(i) External finish.
Signature of applicant
(No digital signatures are required)
Signature of Architect/Engineer
i. Complete Address
ii. E-Mail
iii. Mobile No.
Form BC-V (A1)
(See code 4.1 (a) (vi, viii and ix)
Certificate of conformity to Bye-Laws and structural safety for Residential and Commercial Buildings up to 15
meters height.
Certificate to be submitted along with the building application in Form BC- 1 duly signed by the Architect,
Civil Engineer and the Structural Engineer.
Details of the building for which the certificate is issued
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
.
A. Building Plan :
i. Name of Architect:
ii. Council of Architecture Registration No.
, valid up to.
iii. Complete Address
iv.
v.
Mobile no.
B. Structural Design:
i. Name of Civil/Structural Engineer:
ii. Qualifications:
iii. Complete Address
iv.
v.
Mobile no.
Certificate
It is hereby certified that the plans submitted in Form BC-1 for the building detailed above, are in
accordance with the Administration of Ladakh Building Bye-Laws – 2025 (and the approved zoning plan of the
plot wherever applicable). The structure has been designed in accordance with the provisions of the relevant
Indian Standard Code (with latest amendments) including Bureau of Indian Standard Codes for structures
resistant to earthquakes and other natural hazards. The local soil conditions, its load bearing capacity and the
underground water table etc. have been kept in view while designing the same.
Dated
Signature of Owner Signature of Architect Signature of Engineer
(No digital signatures are required)
Mobile No.
FORM BC-V (A2)
[See code 4.1 (a) (vi and ix)]
Certificate of conformity to rules and structural safety for all buildings except as stated in Form BC-V
(A1).
Certificate to be submitted along with the building application in Form BC- 1 duly signed by the Architect,
Civil Engineer and Structural Engineer and the Proof Consultant.
Details of the building for which the certificate is issued
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
A.
Building Plan :
i.
Name of Architect:
ii.
Council of Architecture Registration No.
, valid up to
.
iii.
Complete Address
iv.
v.
Mobile No.
B. Structural Design:
i.
Name of Engineer:
ii.
Qualifications:
iii.
Complete Address
iv.
v.
Mobile No.
Certificate
It is hereby certified that the plans submitted in Form BC-1 for the building detailed above, are in accordance
with the Bye-Laws ((and the approved zoning plan of the plot wherever applicable). The structure has been designed in
accordance with the provisions of the relevant Bureau of Indian Standard Codes (with latest amendments) including
Bureau of Indian Standard Codes for structures resistant to earthquakes and other natural hazards. The local soil
conditions, its load bearing capacity and the underground water table etc. have been kept in view while designing the
same.
Dated
Signature of Owner Signature of Architect Signature of Civil/Structural Engineer
(No digital signatures are required)
Mobile No. ………. E-mail -------------------
The structural design has been checked and has been found to be in order. The design is in accordance with the
provisions of the relevant Bureau of Indian Standard Codes (with latest amendments) including Bureau of Indian
Standard Codes for structures resistant to earthquakes and other natural hazards. The local soil conditions, its load
bearing capacity and the underground water table etc. have been kept in view while designing the same.
Dated
Signature of Proof Consultant
along with Mob. No. & E-mail
FORM BC-III
(See Code 5.2 (4)) Form of
Sanction
From
To
Memo No.
Dated the ……………..
Reference you application for permission to erect/re-erect-add to/alter a building
on plot No.
/ Khasra no.
, Village
in
accordance with the plans submitted with it.
Permission is hereby-
(i)
granted/sanctioned for the aforesaid construction subject to the provisions of the respective Acts
and Administration of UT Ladakh Building Bye-Laws -2024 and subject to the following
amendments, terms and conditions;
(ii) rejected for reasons given below :-
Enclosures
Competent Authority,
FORM BC-IV (A)
(See Code 5.10 (1 & 2))
For Residential and Commercial Buildings up to 15 meters height.
Application for permission to occupy
From
To
Sir,
I/We hereby give you notice that the building/part-of-building described below
and sanctioned vide your order No.
, dated
, has been completed on
in all respects according to the sanctioned plans and the structural design made for the same
and the suggested modifications have been carried out.
Description of Building
Plot No.
, Sector
, Colony
City/Town
.(or)
Khasra no.
, Village
1.
Name
of
the
owner
along with Mob. No. and E- mail
.
Complete address of the owner
.
2.
The modifications made to the building plans and carried out at site during the course of
construction are submitted herewith:
3.
Corresponding to the above modifications made in the building plans, the necessary amendments were
also carried out in the structural design and implemented a site.
4.
Completion certificate from the architect/engineer who supervised the construction of the building is
submitted herewith.
5.
Kindly issue an occupation certificate as required by Administration of UT Ladakh Building Bye-Laws
-2025 Dated
Signature of applicant
(No digital signatures are required)
Signature of Architect/Engineer
supervising the construction at site
i. Complete Address
ii.
iii. Mobile
no:
FORM BC-IV (B)
(See Code 5.10 (1))
For all Buildings except as stated in Form BR-IV (A) Application for permission to occupy
From
To
Sir
I/We hereby give you notice that the building/part-of-building described below
and sanctioned vide your order No. , dated
, has been completed on
in all respects
according to the sanctioned plans and the structural design made for the same and the suggested modifications
have been carried out.
Description of Building
Plot No.
, Sector
, Colony
City/Town
.(or)
Khasra no.
, Village
1.
Name
of
the
owner
along with
Mob.No.
and E- mail
Complete address of the owner
.
The modifications made to the building plans and carried out at site
during the course of construction are submitted herewith:
2.
Corresponding to the above modifications made in the building plans, the necessary amendments were also carried out
in the structural design and implemented a site.
3.
Completion certificate (Form BC-VI) from the Architect/Engineer who supervised the construction of
the building is submitted herewith.
4.
Kindly issue an occupation certificate as required under Administration of Ladakh Building Bye-Laws
-2025
Dated
Signature of applicant (No digital signatures are required)
Signature of
i) Architect:
a.
Complete Address
b. E-Mail
Mobile No.
Signature of
ii)
Engineer supervising the construction at site
a.
Complete Address
b. E-Mail
c. Mobile No.
FORM BC V (I)
[See Code 4.10(1)]
For Residential and Commercial Buildings up to 15 meters height.
Completion certificate by an Architect/Engineer in respect of building on:
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
.
It is hereby certified that the above work has been supervised by us and has been completed to my
satisfaction in accordance with the sanctioned building plans and its structural design. The workmanship and all
the material used for construction meet the specifications laid down in the guidelines issued by the competent
Authority from time to time. No provision of Ladakh Building Bye-Laws -2025 and no rules made, conditions
prescribed, or order issued thereunder has been transgressed in the course of the work.
Dated
Signature of
i. Architect:
a.
Complete Address
b. E-Mail
c.
Mobile No.
Signature of
ii. Engineer supervising the construction at site
a.
Complete Address
b. E-Mail
c.
Mobile No.
(See Code 5.10(1))
For all Buildings except as stated in Form BC-V(1)
Completion certificate by the Architect, Civil Engineer and the Structural Engineer in respect of
building on:
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
.
It is hereby certified that the above work has been supervised by us and has been completed to our
satisfaction in accordance with the sanctioned building plans and its structural design as checked and certified by
the proof consultant. The workmanship and all the material used for construction meet the specifications laid
down in the guidelines issued by the competent Authority from time to time. No provision of Ladakh Building
Bye-Laws -2025 and no rules made, conditions prescribed or order issued thereunder has been transgressed in
the course of the work.
Dated
Signature of
i)
Architect:
a. Complete Address
b. E-Mail
c. Mobile no.
ii)
Civil/Structural Engineer supervising the construction at site
a. Complete Address
b. E-Mail
c. Mobile No.
Form BC-V (2)
(See Code 5.10(1))
For all Buildings except as stated in Form BC-V(1)
Completion certificate by the Architect, Civil Engineer and the Structural Engineer in respect of
building on:
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
It is hereby certified that the above work has been supervised by us and has been completed to our
satisfaction in accordance with the sanctioned building plans and its structural design as checked and certified by
the proof consultant. The workmanship and all the material used for construction meet the specifications laid
down in the guidelines issued by the Competent Authority from time to time. No provision of Ladakh Building
Bye-Laws -2025 and no rules made, conditions prescribed or order issued thereunder has been transgressed in
the course of the work.
Dated
Signature of
iii)
Architect:
a. Complete Address
b. E-Mail
c. Mobile no.
iv)
Civil/Structural Engineer supervising the construction at site
a. Complete Address
b. E-Mail
c. Mobile No.
FORM BC VI
See Code 5.10 (a) (ii)
Completion Certificate by an Architect
I do hereby certify-
i)
that the following work has been supervised by me and has been completed to my satisfaction in
accordance with the sanctioned plan.
ii)
that no deviation from sanctioned plan is made while constructing the building/ deviation from
sanction plan is made (details as below) and these deviations are duly shown on completion
drawings. Due to these deviations, human safety has not been compromised (strike off whichever
is not applicable).
iii)
that the workmanship and the whole of the materials used are good; that no provision of the
Ladakh Building Bye-Laws, 202 5 and no requisition made, conditions prescribed, or order issued
there under has been violated in the course of the work.
Details of construction on (floor-wise along with covered area on each floor)
City
Street
Plot
No.
House No. (if any)
(or) Khasra no.
,
Village
Dated
Signature of Architect
i. Complete Address
ii. E-Mail
iii. Mobile No.
FORM BC-VII (See Code 5.10 (2)),
Form of Occupation Certificate
From
,
,
To
Memo No:
Dated.
Whereas Shri/ Smt/ M/s ............................................ has applied for the issue of an occupation
certificate in respect of the building described below:-
City
Street
Site No.
House No.(if any)
(or) Khasra no.
, Village
Indicating description of the building, covered area, towers, nature of buildings etc. I hereby:-
(i) grant permission for the occupation of the said building with following conditions; or
(ii) refuse permission for the occupation of the said building for reason given below:-
Competent Authority
Form-BCS-I (See Code 4.2.(a))
Form of application under self-certification
Class of Building –
Residential
Commercial
Educational
Institutional
Warehousing
Industrial Any other
From ………………………………….
To………………………………….
Sir,
I/we apply for permission to erect/re-erect/add/alter a building/wall in accordance with the plan submitted
herewith on site NO.
Street No.
at
2. I/We attach:
a. a site plan showing the position of site proposed to be built upon as required by the Bye-Laws (in triplicate) an un-
editable Compact Disc/DVD or any other electronic medium permissible by Competent Authority from time to time
containing the drawings as required by Code 4.1;
b. Plans, elevations and sections as required by the Code (in triplicate) an un- editable Compact Disc/DVD or any other
electronic medium permissible by Competent Authority from time to time containing the drawing as required by Code
4.2;
c. Drainage plans (in triplicate), as required by Bye-Laws along with an un-editable Compact Disc/DVD or any other
electronic medium permissible by Competent Authority from time to time containing the drawings as required under
these Bye- Laws;
d. Structural drawings (for record) along with structure Certificate as per Form BCS-II;
e. Fire Safety design as required in the Ladakh Fire Prevention and Fire safety Norms
, or any other authority as appointed by UT Administration. Alternatively, an undertaking to the effect that the fire
safety plans duly approved by the UT Fire Authority or any other authority as appointed by UT Administration, will be
submitted within sixty days;
f. Heating, Ventilation, Air conditioning (H.V.A.C.) service plans, wherever required;
g. Specifications of the proposed building (in triplicate) in Form BC-II;
h. Certificate of conformity to regulation and structural safety for the relevant buildings;
i. An affidavit from the owner and architect, as required under Code 4.2;
j. Scrutiny fee through an electronic transfer
3 The construction of the building will be undertaken as per the approved building plans, structural design given
by the Civil/Structural Engineer, fire safety design as approved by the Competent Authority and got
supervised through the following Architect/Engineer;
Signature of Architect
i. Complete Address
ii. E-Mail
Mobile No.
Signature of Civil/Structural Engineer supervising the Construction
i.
Complete Address
ii. E-Mail
Mobile No.
Form BCS-II (See Code 4.2.(b))
Certificate for structure conforming under self-certification
Plot No…………Sector…………..Colony……………..City/Town………………… Name of the
Owner……………….
Complete address of the owner…………………………
It is hereby certified that the plans submitted in Form BCS-I for the building detailed above are in conformity with
Ladakh Building Bye-Laws -2025 and the approved zoning plan of the plot. The structure has been designed in
accordance with the provision of various IS codes for structures resistance to earthquakes and other natural hazards.
The local soil conditions, its load bearing capacity and the underground water table etc have been kept in view
while designing the same.
Date…………….
Signature of Architect
Signature of Owner
(No digital signatures are required)
Mobile no.
Signature of Civil/Structural Engineer
FORM BCS-III
[see Code 5.11. (a), (b) and (c)]
For Buildings Residential and Industrial Buildings applied under Code 4.2 Application for permission to
occupy
From:
……………………………………
……………………………………
To:
……………………………………
……………………………………
Sir, I/We hereby give you notice that the building/part of building described below and sanctioned vide your order no.
…………………………., dated ………………….., has been completed in all respect according to the sanctioned plans and the
structural design made for the same and suggested medications have been carried out
Description of Building
Plot No.
, Sector
, Colony
City/Town
.(or) Khasra no.
, Village
1.
Name
of
the
owner
alongwith
mob.No
and
E- mail
.
Complete address of the owner
.
2.
The modifications made to the building plans and carried out at site during the course of construction are
submitted herewith:
3.
Corresponding to the above modifications made in the building plans, the necessary
amendments were also carried out in the structural design and implemented a site.
4.
Completion certificate from the architect/engineer who supervised the construction of the
building is submitted herewith.
5.
Kindly issue an occupation certificate as required by the Ladakh Building Bye-Laws -2025
Dated:__________________________
Signature of applicant (No digital signatures are required)
Signature of Architect:
a.
Complete Address
b. E- mail
c. Mobile no:
Signature of Engineer supervising the construction:
FORM BCS-IV
(See Code 5.11(1) and (2))
Certificate of conformity to rules and structural safety.
Certificate to be submitted along with the building application in Form BCS-III duly signed by the Architect, Civil Engineer and
the Structural Engineer.
Details of the building for which the certificate is issued
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
.
A.
Building Plan:
i. Name of Architect:
ii. Council of Architecture Registration No.
, valid up to
.
iii. Complete Address
iv.
v.
Mobile no.
B.
Structural Design:
i. Name of Engineer:
ii. Qualifications:
iii. Complete Address
iv.
v.
Mobile no.
Certificate
It is hereby certified that the plans submitted in Form BCS-I for the building detailed above, are in accordance
with the Ladakh Building Bye-Laws -2026 and the approved zoning plan of the plot. The structure has been
designed in accordance with the provisions of the relevant Bureau of Indian Standard Codes (with latest
amendments) including Bureau of Indian Standard Codes for structures resistant to earthquakes and other natural
hazards. The local soil conditions, its load bearing capacity and the underground water table etc. have been kept in
view while designing the same.
Dated
Signature of Architect
Mobile No.
Signature of Engineer supervising the construction
Mobile No.
In case of the building is above 15 meters height, the certificate shall be signed by the proof consultant, as
followed:
The structural design has been checked and has been found to be in order. The design is in accordance with the
provisions of the relevant Bureau of Indian Standard Codes (with latest amendments) including Bureau of
Indian Standard Codes for structures resistant to earthquakes and other natural hazards. The local soil conditions,
its load bearing capacity and the underground water table etc. have been kept in view while designing the same.
Dated
Signature of Proof Consultant along with Mob. No. & E-mail
Form BCS-IVA
(See Code 5.12(1) and (2))
3rd party certification for conformity to rules and structural safety.
Certificate to be submitted along with the building application in Form BCS-III duly signed by the 3rd party Architect and
3rd party Civil/Structural Engineer.
Details of the building for which the certificate is issued
Plot No.
, Sector
, Colony
City/Town
.
Name of the owner
.
Complete address of the owner
.
A.
Building Plan :
i.
Name of Architect:
ii.
Council of Architecture Registration No.
, valid up to
.
iii.
Complete Address
iv.
v.
Mobile no.
B.
Structural Design:
i.
Name of Engineer:
ii.
Qualifications:
iii.
Complete Address
iv.
v.
Mobile no.
Certificate
It is hereby certified that the site has been inspected and construction has been
found in order as per plans submitted in Form BCS-I, in accordance with the Ladakh Building Bye-Laws -2017
and the approved zoning plan of the plot, for the building detailed above. The structure has been designed in
accordance with the provisions of the relevant Bureau of Indian Standard Codes (with latest amendments)
including Bureau of Indian Standard Codes for structures resistant to earthquakes and other natural hazards.
The local soil conditions, its load bearing capacity and the underground water table etc. have been kept in view
while designing the same.
Dated………………….
Signature of Architect (3rd party): Complete Address ......................................................................... E-
Mail……………………
Mobile no……………………
Civil Engineer/ Structural Engineer (3rd party): Complete Address…………………………..
E-Mail……………..Mobile no…………………………
In case of the building is above 15 meters height, the certificate shall be signed by the proof consultant (3rd
party), as followed:
Standard Codes for structures resistant to earthquakes and other natural hazards. The local soil conditions, its
load bearing capacity and the underground water table etc. have been kept in view while designing the same.
Dated………………….
Signature of Architect (3rd party): Complete Address ......................................................................... E-
Mail……………………
Mobile no……………………
Civil Engineer/ Structural Engineer (3rd party): Complete Address…………………………..
E-Mail……………..Mobile no…………………………
In case of the building is above 15 meters height, the certificate shall be signed by the proof consultant (3rd
party), as followed:
The structural design has been checked and has been found to be in order. The design is in accordance with the
provisions of the relevant Bureau of Indian Standard Codes (with latest amendments) including Bureau of Indian
Standard Codes for structures resistant to earthquakes and other natural hazards. The local soil conditions, its
load bearing capacity and the underground water table etc. have been kept in view while designing the same.
Dated
Signature of Proof Consultant (3rd party) along with Mob. No. & E-mail.
From
Form BCS-V [see Code 5.11(4)]
,
,
To
………………………………………………………………………………………………
…………..
Memo No…
….
Dated
…………
Whereas Shri/ Smt/ M/s ........................................... has applied for the issue of an occupation
certificate in respect of the building described below:-
City
Street
Site No.
House No.(if any)
(or) Khasra no.
, Village
Indicating description of the building, covered area, towers, nature of buildings etc. I hereby:-
(i) grant permission for the occupation of the said building with following conditions; or
(ii) refuse permission for the occupation of the said building for reason given below:-
Competent Authority
Form-NAC-I
(See Code 3.53, 6.1(3), Annexure-D)
Application form for rendering non-nuisance professional consultancy in residential premises.
To
…………………………………….
……………………………………
1.
Name of applicant
2.
Premises Number and size
3.
Name of colony/change of land use site
4.
Sector
5.
Detail of floor-wise built up area
(Square meters)
6.
Copy of approved building plan showing duly marked area upon which mixed land use is applicable.
7.
Whether occupation certificate has been issued, if so, attested copy thereof to be attached.
8.
Details of profession
9.
Numbers of anticipated visitors
10.
Working hours of consultancy
11.
Detail of fee
through electronic transfer as per Schedule IV A.
12.
Affidavit to the effect that he shall abide by all the terms and conditions, which shall be imposed by
Competent Authority from time to time.
Place:
Date:
Signature of Owner
(No digital signatures are required)
Mobile no.
Form-NPC-II
(See Code 3.85,6.1(3), Annexure-D)
From
……………………
To
…………………………..
Memo No.
Dated:
Subject: Permission to provide non-nuisance consultancy services in the residential premises.
This is with reference to your application dated
.
2.
Permission
is hereby granted to provide
services, within the
premises of your land/house bearing number
Sector
town/city
. The above permission shall be subject to the following terms and conditions:-
(1) You can use the premises of your house up to 25% of the covered area of the premises or 50 square
meters, whichever is less for the purpose.
(2) Total charges paid i.e. Rupees
is for a period of five years.
(3)
Water, sewerage and electricity charges for such premises to the extent that is being used for non-
residential use would be charged at commercial rates by the service providing agency.
The permission given by Competent Authority shall be valid for a period of five years which may be renewed thereafter for a
period of five years and further in block of five years on payment of renewal fee @ 10% of updated commercial charges.
(4) The owners of a premises where mixed land is used is permitted should accept any other condition such as
restriction with respect of provision of parking advertisement etc.
(5)
Competent Authority can withdraw the permission give for mixed land use at any point of time, if the
percentage area permitted under mixed land use is found to exceed the stipulated limit or for any other reason in
the public interest.
(6)
That the permission shall also be governed by the provision of these Bye-Laws.
(7) That the owners of building shall not further sublet/lease out the premises for which permission is being
granted.
Signatures of Permission Issuing Authority along with seal.
Annexure “A”
Standard Affidavit
I ……………………………….. son/daughter/wife of ...................................................................................... , applied
for
building
plan
approval/
DPC
Level/
occupation
certificate vide application dated… ..................................................... on
Form BC………………….., and resident of
,
hereby solemnly state & affirm as under:
e
Place:
DEPONENT
Date:
1.
That I shall not use basement as habitable space, as the same has not been included in the FAR and has not been shown
as habitable space in the approved plans.
2.
That I shall use the building only for the purpose for which approval and occupation certificate has been obtained.
3.
That I shall comply with all the condition(s) implied by the competent authority at t time of approval of building Plan
and Occupation certificate.
4.
That .................................... (condition/
indemnity/
affirmity
required
by
the
Competent Authority)-I.
5.
That .................................... (condition/
indemnity/
affirm it
required
by
the
Competent Authority)-II.
6.
That .................................... (condition/
indemnity/
affirm it
required
by
the
Competent Authority)-III.
7.
……………………………………..
VERIFICATION
I
………………………………..
son/daughter/wife...............................of
,
applied for building plan approval/ DPC Level/ occupation certificate vide
application dated……………… on Form BC………………….., and resident of ............................................... ,
hereby verify and affirm that the contents of this affidavit are true and correct to the best of my knowledge, belief
and information in witness whereof I have signed hereunder on day of
.
Annexure “B”
INDEMNITY BOND FOR BASEMENT
This Indemnity Bond is executed by Shri/Smt.………………………………………… S/o, D/O, W/O
Shri/Smt…………………………………………………………….……… R/O
in favour of Development Authority.
Whereas the executant has submitted to the concerned Authority the plans for, sanction of basement over Plot No…
.......................................................................................... under the provisions of the Act and lie bye- laws
made there under:-
And whereas the concerned Authority has agreed to sanction the aforesaid construction subject to the conditions that the owner
shall indemnify the concerned Authority in the event of any loss or damage being cause to the adjoining building on account of the
construction of the said basement either at the time of digging of its foundations or in the course of its construction or even
thereafter and also against any claim of any concern thereto. And whereas the executant has agreed to execute an indemnity bond to
the above affect and also to abide by the terms imposed by the concerned Authority to the grant of sanction for construction of the
basement.
Now this deed witnesses:
1. That in consideration of the sanction of the plans by… .......................................................................................... for
construction of the basement the executant undertakes that he/she shall at all times keep…
harmless and free
from any liability, loss or damages/flowing
from any injury or damage caused to the adjoining built-up properties or to any person as a consequence of the
construction of at the time of digging of its foundations or during the course of its construction or at any time thereafter.
2. The owner agreed and undertakes that in the event of any claim being made by any person or persons against the
concerned Authority either in respect of the sanction granted by the concerned Authority to the owner for the construction
of basement or in respect of the construction or manner of construction of the basement by the owner or the consequences
flowing from the said sanction the executant shall be responsible and liable and not the concerned Authority.
3. The executant agrees and undertake to indemnify the concerned Authority fully in respect of any amount which the
concerned Authority may be required to pay to any person either by way of compensation or damages or on any other
account as a result of any claim or suit or any other proceedings concerning the sanctioning of the construction of the
basement of the making thereof and also in respect of the costs and expenses which the concerned Authority may incur on
defending any action.
4. Without prejudice to the above undertaking the executant hereby binds itself to pay to the concerned Authority to the
full extent any amount which the concerned Authority may be required to pay to any person in connection with, relating
to or concerning the sanctioning of the basement or the making thereof.
5. The owner further agrees and undertakes that this bond shall remain in full force and effect till the executant faithfully
observes/performs the undertaking herein before contained.
In witness whereof the executant above named has signed this bond on this ................................................................................ day
of …………………..at…………………………………………
Indemnifier
Witness:
(Signatures)……………………………
1. Name………………………………………
Full Address……………………………….
(Signatures)……………………………….
2. Name………………………………………
Full Address……………………………….
Annexure “C”
Categories of Materials of storage for Warehouses as per combustion risk
A. Noncombustible materials:
Articles (which are Non- Combustible, Non -Flammable, Non-Corrosive, Non -toxic, Non- poisonous, Non-Explosive) such as
Cement, brick, mortar, hardware items, metals in solid bar/metal goods (excluding those having melting point below 1000° C)
B. Combustible Materials in following 4 sub-categories:
Table 3 Source: Page 232, Model Building Bye Laws, 2016
(further explanations may be referred from Page 233 of Model Building Bye-Laws)
Annexure “D”
Empanelment of Competent professional
1. Definition: In these rules, unless the context otherwise requires:
a) “Act” – the Act of the concerned Authority
b) “Empaneled Architect” – A person empaneled by the Authority as per rules under these bye-laws as authorized
person to sanction building plans of residential buildings up to 15 mt. in height and for plot size up to 500sqm,
forming part of an approved lay-out plan and for other buildings as authorized in section 13.5 of the Bye-laws.
c) “Person Authorized” – means a qualified and duly registered Architect having a degree in Architecture or equivalent
qualification and registered with the Council of Architects, India with minimum 5 years of experience, and/or BE/B.
Tech. Civil/Structural Engineer is one of the professionals who can prepare the building drawings, design, etc. and/or
Town Planner with a valid degree in Master of Planning (preferably Urban Planning)
d) “Sanctioned Building Plan” means a building plan of a building/premises to be constructed on a plot and approved
by the Competent Authority in accordance with the provisions of Master Plan/Zonal development plan and Building
Bye-laws.
e) “Fee” means a fee to be charged by the Authority for sanction of building plans. (Design and consultations fees
agreed between the architect and his/her client is independent of this ‘Fee’)
For the empanelment, the qualified Competent Professional shall submit list of projects handled with proof and credentials along
with recommendations from the highest competent body of the profession.
2. Authority should obtain security deposit/professional indemnity bond and professional liability insurance from empaneled
Architects as decided in value from time-to-time.
3. The empanelment of an Architect shall be for a period of two years and can be extended from time to time subject to review
by the Authority at the end of every two years.
4. The Competent Professional shall be empowered to sanction building plans of residential buildings up to 15 mt. height and for
plot size up to 500sqmt, forming part of approved layout plan. And for other buildings the criteria of empanelment shall be
as per section
13.5 of the Bye-laws.
5. In respect of sanction of building plans of Government buildings, the plans shall be sanctioned by the Chief of the
concerned Department of the Administration, provided it conform to Master Plan/Zonal Development Plan, approved layout
plan and Building Bye- laws.
Annexure “E”
DECLARATION / AFFIDAVIT
(To be submitted by the Applicant/Owner along with Application for Building Permission) I/We, [Name of Applicant/Owner],
son/daughter/wife of [Father’s/Husband’s Name], resident of [Address], do hereby solemnly affirm and declare as under:
That I/We am/are the lawful owner(s)/occupant(s)/authorized representative(s) of the land comprised in Khasra No.
, Khewat No. , Mutation No. , measuring
situated at
,
for
which building permission is sought. The documents submitted are true and genuine, and I/We alone shall be responsible if
they are found false, fabricated, or invalid.
That I/We understand that grant of permission does not confer ownership rights over the land, and if the land is found
unsuitable or impermissible for the proposed construction under the Ladakh Land Revenue Act, Rules, Ladakh Building
Bye Laws, 2024 or Notifications, the permission shall be withdrawn/cancelled without claim for compensation.
That I/We undertake to comply with all applicable laws, rules, bye-laws, and regulations in force in the UT of Ladakh and
shall not raise any construction contrary to sanctioned use or revenue records.
That the land/property is free from all encumbrances, disputes, claims, or litigation relating to ownership, possession, or
land use at the time of applying for approval and during construction. Any dispute arising shall be resolved solely by
me/us.
That I/We shall indemnify and keep harmless the UT Administration, Competent Authority, its officers, and the
Empaneled Architect involved in project approval or supervision from any claim, loss, or legal proceeding arising out of
ownership, title, land use, or documents submitted by me/us.
Deponent
VERIFICATION
I/We, the deponent(s) above named, do hereby verify that the contents of this declaration/affidavit are true and correct to
the best of my/our knowledge and belief, and nothing material has been concealed therein.
Deponent
By the approval of the Competent Authority
Sanjit Rodrigues(IAS)
Administrative Secretary
Housing and Urban Development Department
UT Ladak
SANJIT
ROBERT
RODRIGUES
Digitally signed by
SANJIT ROBERT
RODRIGUES
Date: 2026.02.20
16:09:00 +05'30'
“No legal responsibility is accepted for the contents of publication of advertisements/publications in this part of The
Ladakh Gazette. Persons notifying the advertisements/public notices will remain solely responsible for the legal
consequences and also for any other misrepresentation etc.”
SANJIT
ROBERT
RODRIGUES
Digitally signed by
SANJIT ROBERT
RODRIGUES
Date: 2026.02.20
16:09:15 +05'30'
MICHAEL
MANNY
DSOUZA
Digitally signed by
MICHAEL MANNY
DSOUZA
Date: 2026.02.20
16:23:27 +05'30'