(१)
भाग दोन (संकीर्ण)–१
RNI No. MAHBIL /2009/35827
महाराष्ट्रõ शासन राजपत्र
भाग दोन-संकीर्ण सूचना व जाहिराती
वर्ष ८, अंक १५]
गुरुवार ते बुधवार,欃 एप्रिल १४-२०, २०२२/
चैत्र २४-३०, शके १९४४
[पृष्ठे ५८, किंमत : रुपये १५.००
प्राधिकृत प्रकाशन
संकीर्ण सूचना व जाहिराती
MUMBAI PORT AUTHORITY
NOTIFICATION
No.FA/ACC/231/1013
In exercise of the power conferred on it under Sub-Section (1) of Section 27 of the Major Port
Authorities Act, 2021 and Clause 7 of the Major Port Authorities Rules, (fixation and implementation
of the Scale of Rates, Fees and Condition), the Board of Mumbai Port Authority has approved
to adopt existing Scale of Rates, Fees and Condition that were existing immediately prior to the
Commencement of the Major Port Authorities Act, 2021. Accordingly, Board of Mumbai Port Authority
hereby published Scale of Rates alongwith Performance Standards for information of all concerned
as required under Clause 6(2) of Major Port Authorities Rules (fixation and implementation Scale of
Rates. The said Scale of Rates will be valid upto 2nd October 2022.
2
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
MUMBAI PORT AUTHORITY
SCALE OF RATES
1.1.
Definitions
CHAPTER - I
…In this Scale of Rates, unless the context otherwise requires, the following definitions shall apply:
(i).
“Ballast” - Heavy material placed in the holds of a ship or more often in the ballast tanks,
positioned in the compartments right at the bottom and in rare cases on the sides for
stabilization and make ship seaworthy in all respects. This may consist of liquid material
commonly water.
(ii)
“Barge”- Barge is flat bottomed vessel whether self-propelled or not.
(iii).
‘Coastal Vessel’ shall mean any vessel exclusively employed in trading between any port or
place in India to any other port or place in India having valid coastal licence issued by the
Director General of Shipping/ competent authority.
(iv).
“Cold Move” shall mean the movement of the vessels without the power of the engine of the
vessel.
(v).
“Crew boat” shall mean a boat of any type mainly used for transportation of crew members of
any vessel or ship.
(vi).
“Cruise Vessel” shall mean any vessel carrying passengers for an ocean trip taken for pleasure
calling at ports and other than pleasure yachts.
(vii).
“Day” shall mean the period starting from 07.30 hours of a day and ending at 07.30 hours of
the following day.
(viii)
“Demurrage” shall mean charges payable for storage of cargo within port premises beyond
free period, as specified in the scale of rates.
(ix).
‘Foreign-going Vessel’ shall mean any vessel other than Coastal vessel.
(x).
“Free period” shall mean the period during which cargo/container shall be allowed storage free
of demurrage charges and this period shall exclude Sunday(s), customs holidays and Port’s
non-working days.
(xi).
“Full Container Load” (FCL) shall mean a container containing cargo belonging to one
consignee in the vessel’s manifest.
(xii).
‘GRT’ means Gross Registered Tonnage of vessel as per the Ship’s Registry or the
International Tonnage Certificate issued by the competent authorities or a declaration from
defense Authorities in respect of war ships/ Naval ships.
(xiii).
“Hazardous Container” shall mean a container containing hazardous goods as classified under
IMO.
(xiv).
“Inland Vessels” shall mean Vessels / barges registered under Inland Vessel Act and cannot
ply outside Inland water limit, such vessels do not fall under definition of offshore supply
vessel.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
3
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(xv).
“Less than a Container Load” (LCL) shall mean a container containing cargo belonging to more
than one consignee in the vessel’s manifest.
(xvi).
“Month” shall mean 30 consecutive calendar days including holidays.
(xvii).
“Mafi” shall mean a mobile loading platform for loading a large item, facilitating transport by
Ro-Ro vessels, and treated on par with Containers.
(xviii). “Offshore supply vessel” - Offshore supply vessel is a vessel of any type mainly used for
transportation from docks to offshore installation (outside IV limits) of men, material and stores
required for any offshore installation and does not include barge / vessels registered under IV
Act.
(xix)
“Over dimensional container” shall mean a container carrying over dimensional cargo beyond
the normal size of standard containers and needing special devices like slings, shackles, lifting
beam etc. They also include damaged containers and other types which require special
devices.
(xx)
“Ousting Priority” – When a working vessel at berth is removed (ousted) from the berth and
shifted to stream / other berth for accommodating another cargo / cruise vessel, such
movement shall be treated as “ousting priority” berthing.
(xxi)
‘Pleasure Yacht’ means a ship howsoever propelled which is exclusively used for pleasure
cruises and does not carry any passengers on a commercial basis.
(xxii)
“Reefer Container” shall mean a refrigerated container used for carriage of perishable goods
with provision for electrical supply to maintain the desired temperature.
(xxiii)
“Sailing vessels” shall mean the vessels propelled solely by wind power and includes vessels
fitted with mechanical means of propulsion.
(xxiv)
“Ship stores” shall mean Inventory carried on board of a ship to meet its daily requirements
such as food, water, cleaning supplies, medical supplies, safety supplies, spare parts etc.
(xxv)
“Shut out Container” shall mean a container, which enters into the port as an export intake for
a particular vessel (as indicated by the Vessel Identification Advice Number, i.e. VIA No.) and
is not connected to the particular vessel for reasons whatsoever.
(xxvi)
“Shut out Cargo” shall mean any cargo brought into the port for shipment but not shipped by
the designated vessel and is lying in the port premises.
(xxvii)
‘Telegraph Vessel’ (cable ship) means a vessel equipped with machinery and gears for lifting,
examining and laying sub-marine cables for overseas communications.
(xxviii) “Transhipment cargo” shall mean any cargo not originally manifested for the port of Mumbai,
but landed at Mumbai and subsequently reshipped to other ports / removed to other Ports by
same or any other vessel. Transhipment of cargo is applicable to import oriented cycle only
and not for export oriented cycle.
(xxix)
“Tran-shipment Container” shall mean any container which is discharged from one vessel,
stored in the yard and tran-shipped through same or another vessel.
(xxx)
‘Vessel’ includes any thing made for the conveyance mainly by water of human being or of
goods and a caisson.
(xxxi)
Vessel Completion Date (VCD)
(a).
For vessel in the Docks - the date on which import operations of the vessel are
fully completed.
भाग दोन (संकीर्ण)–१अ
4
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(b).
For vessels in the midstream - the date following two days after the date of
completion of discharging of mother vessel in stream or date of discharge of last
barge at berth, whichever is earlier.
(xxxii). "Wharfage" shall mean the basic due recoverable on all cargo/container imported or
exported or transhipped or passing through the port, whether porteraged by the port or
not.
(xxxiii) “Float
On-Float
Off
(FLO-FLO)
vessels
means
Semi-submersible
heavy
lift ships having a long and low well deck between accommodation area
located
forward
and
an
aft
machinery
space.
In
appearance,
it
looks
similar to a gearless bulk carrier or oil tanker. Its ballast tanks can be
flooded
to
lower
the
main
deck
below
the
water’s
surface,
allowing
oil
platforms, other vessels, or other floating cargo to be moved into position for loading
(float-on/float-off). The ballast tanks are then pumped out and the main deck rises to take
the load of cargo. Float-on / float-off vessels transport vessels, rigs from one site to
another. They also transport other oversized cargo and yachts.
1.2.
General Terms and Conditions
(i).
The status of the vessel, as borne out by its certification by the Customs or the Director
General of Shipping, shall be the deciding factor for its classification as ‘coastal’ or
‘foreign-going’ for the purpose of levying vessel related charges; and, the nature of cargo
or its origin will not be of any relevance for this purpose.
(ii).(I). (A).System of classification of vessel for levy of Vessel Related Charges (VRC):
(i).
A foreign going vessel of Indian flag having a General Trading Licence can convert to
coastal run on the basis of a Customs Conversion Order. Such vessel that converts
into coastal run based on the Customs Conversion Order at her first port of call in
Indian Port, no further custom conversion is required, so long as it moves on the Indian
Coast.
(ii).
A Foreign going vessel of foreign flag can convert to coastal run on the basis of a
License for Specified period or voyage issued by the Director General of Shipping and
a custom conversion order.
(B).
Criteria for levy of Vessel Related Charges (VRC) at Concessional Coastal rate
and foreign rate:
(i).
In cases of such conversion, coastal rates shall be chargeable by the load port from
the time the vessel starts loading coastal goods.
(ii).
In cases of such conversion, coastal rates shall be chargeable till the vessel completes
discharging operations at the last call of Indian Port; immediately thereafter, foreign
going rates shall be chargeable by the discharge ports.
(iii).
For dedicated Indian coastal vessels having a Coastal License from the Director
General of Shipping, no other document will be required to be entitled to coastal rates.
(ii)(II). Criteria for levy of Cargo Related Charges (CRC) at Concessional Coastal rate:
(i).
Foreign going Indian Vessel having General Trading License issued for “worldwide
and coastal” operation should be accorded applicable coastal rates with respect to
Handling Charges (HC) i.e. ship to shore transfer and transfer from/ to quay to/ from
storage yard including wharfage in the following scenario:
a)
Converted to coastal run and carrying coastal cargo from any Indian Port and
destined for any other Indian Port.
b)
Not converted* to coastal run but carrying coastal cargo from any Indian Port
and destined for any other Indian Port.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
5
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
* The Central Board of Excise and Customs Circular no.15/2002- Cus. dated
25 February 2002 allows carriage of coastal cargo from one Indian port to
another port in India, in Indian flag foreign going vessels without any custom
conversion.
(ii).
In case of a Foreign flag vessel converted to coastal run on the basis of a License for
Specified period or voyage issued by the Director General of Shipping, and a Custom
Conversion Order, the coastal cargo/ container loaded from any Indian Port and
destined for any other Indian Port should be levied at the rate applicable for coastal
cargo/ container.
(iii).
(a).
All dollar denominated tariff will be recovered in Indian Rupees after conversion of
charges in dollar terms into its equivalent Indian Rupees at the market buying rate
notified by the Reserve Bank of India, State Bank of India or its associates or any other
Public Sector banks as may be specified from time to time.
(b).
The day of entry of the vessel into port limits shall be reckoned as the day for such
conversion. In respect of charges on containers, the day of entry of the vessel in the
case of import containers and the day of arrival of containers into the port in the case
of export containers shall be reckoned as the day for such conversion.
(c).
A regular review of exchange rate shall be made once in 30 days from the date of
arrival in the cases of vessels staying in the port for longer period. The basis of billing
shall change prospectively with reference to the appropriate exchange rate prevailing
at the time of review.
(iv).
Users will not be required to pay charges for delays beyond a reasonable level attributable to
the port.
(v).
Interest on delayed payments / refunds:
(a).
The user shall pay penal interest on delayed payments and Port shall pay juxtaposed
penal interest on delayed refunds at the rate of 15% per annum.
(b).
The delay in payments by user will be counted beyond 10 days after the date of raising
the bills. This provision will not apply to the case where payment is to be made before
availing of the services / use of port properties as stipulated in the MPT Act, 1963 and /
or prescribed as a condition in the tariff.
(c).
The delay in refunds by the port will be counted beyond 20 days from the date of
completion of services or on production of all the documents required from the user,
whichever is later.
(vi).
(a).
The rates prescribed in the Scale of Rates are ceiling levels; likewise, rebates and
discounts are floor levels. The port may, if it so desires, charge lower rates and/or
allow higher rebates and discounts.
(b).
The port may, if it so desires, rationalise the prescribed conditionalities governing the
application of rates prescribed in the Scale of Rates if such rationalisation gives relief
to the user in rate per unit and the unit rates prescribed in the Scale of Rates do not
exceed the ceiling level.
(c).
The port should notify the public such lower rates and/or rationalisation of the
conditionalities governing the application of such rates and continue to notify the
public any further changes in such lower rates and/or in the conditionalities governing
the application of such rates provided the new rates fixed shall not exceed the rates
notified by the TAMP.
(vii).
(a).
Wherever a specific tariff for a service/cargo is not available in the notified Scale of
Rates, the MBPT can submit a suitable proposal to the TAMP.
(b).
Simultaneously with the submission of proposal, the proposed rate can be levied on
an ad hoc basis till the rate is finally notified.
6
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(c).
The ad hoc rate to be operated in the interim period must be derived based on
existing notified tariffs for comparable services/ cargo; and, it must be mutually agreed
upon by the Port and the concerned user(s).
(d).
The final rate fixed by the TAMP will ordinarily be effective only prospectively. The
interim rate adopted in an ad hoc manner will be recognised as such unless it is found
to be excessive requiring some moderation retrospectively.
(viii).
The minimum charges recovered in any bill shall be Rupees one hundred (₹100/-) only.
(ix).
All charges worked out shall be rounded off to the next higher rupee on the grand total of each
bill.
(x).
In calculating the gross weight or measurement by volume or capacity of any individual item,
fractions upto 0.5 shall be taken as 0.5 unit and fractions of 0.5 and above shall be treated as
one unit, except where otherwise specified.
(xi).
No refund shall be made unless the amount refundable is ₹100/- or more. Similarly, short
collection upto ₹100/- will not be demanded by the port.
(xii).
(a).
The vessel related charges for coastal ships will be 60% of the charges levied for other
vessels.
(b).
The cargo/container related charges for coastal cargo/containers, other than thermal
coal and POL including crude oil iron ore and iron ore pellets will be 60% of the normal
cargo/container related charges.
(c).
In case of cargo related charges, the concessional rates shall be levied on all the
relevant handling charges for ship-shore transfer and transfer from/to quay to/from
storage yard including wharfage.
(d).
In case of container related charges the concession is applicable on composite box
rate. Where itemized charges are levied, the concession shall be on all the relevant
charges for ship-shore transfer and transfer from/to quay to/from storage yard as well
as wharfage on cargo and containers.
(e).
Cargo/ container from foreign port landing at Mumbai Port for subsequent
transhipment to an Indian Port for Coastal Voyage or vice versa would be charged at
50% of the transhipment charges prescribed for foreign going vessels and 50% of that
prescribed for coastal category.
(f).
The charges for coastal cargo/containers/vessels will be denominated and collected in
Indian Rupees (₹).
(xiii).
Vessel related charges for cruise vessels will be 60% of the relevant applicable charges
leviable on other vessels.
(xiv).
(i).
Vessel related charges for coastal vessel shall not exceed 60% of the corresponding
charges for other foreign going vessels. Further, these charges will be collected in
Indian Rupees only
(ii).
As regards the Container related charges which are denominated in US dollars for the
foreign containers, the tariff for coastal container shall not exceed 60% of the
corresponding charges for other foreign containers. Further, these charges will be
collected in Indian Rupees only.
(xv).
All the charges prescribed in the scale of rates are exclusive of taxes.
(xvi).
(a).
The SOR is subject to automatic annual indexation at 100% of the WPI to be annually
announced by the Authority. The next annual indexation will be from 1 April 2020
subject to the MBPT achieving the Performance Standards notified alongwith the SOR.
If Performance Standards prescribed in the SOR are not achieved, there will be no
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
7
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
indexation in SOR for that particular year.
(b).
The port should declare the Performance Standards achieved by it annually for the
period 1 January to 31 December vis-à-vis the Performance Standards notified by the
Authority at the level committed by the port within one month of end of the calendar
year to the concerned users as well as to the Authority. If the Performance Standards
as notified by the Authority are achieved by the port, then the port will automatically
index the SOR at 100% of WPI announced by the Authority. Such adjustment of SOR
will be made every year and the adjusted SOR will come into force from 1st May of the
relevant year to 30th April of the following year. The indexed SOR by the MBPT to be
intimated by the port to the concerned users and to the Authority.
(xvii).
(a).
As per Clause 6 of the Standard Operating Procedure (SOP) for operation of Indo-
Bangladesh Coastal Shipping Agreement (given below), the vessels entering into India
from Bangladesh under the Coastal Shipping Agreement between India and
Bangladesh are not to be treated as foreign going (FG) vessels.
(b).
Port and other charges
(i).
Port dues to be levied by the Major Port Trust on the entry of vessels of the
Republic of Bangladesh into India under the Coastal Shipping Agreement
between the two countries and engaged in inter country trade, will be treated
as domestic vessel engaged in coastal shipping and not as Foreign Going
(FG) vessels.
(ii).
The Major Port Trust shall also on the vessels of the Republic of Bangladesh
levy charges for conservancy, pilotage and other specific services at par with
those charged from the coastal vessels. The charges will be determined with
reference to cargo carrying capacity of the vessels, as applicable to coastal
vessel engaged in coastal shipping.
(xviii).
(a).
Coastal goods transported between an Indian port on east coast and another Indian
port on west coast or vice versa, by a vessel through the territorial waters of Sri Lanka,
whether or not calling any port in Sri Lanka in between and without change of vessel in
terms Notification No.38/2018-Customs (N.T.) dated 11 May 2018 of Central Board of
Indirect Taxes and Customs shall be eligible for concession in vessel related charges
and cargo related charges.
(b).
Coastal goods transported between an Indian port on east coast and a river port in
India or vice versa, by a vessel through a route passing through the Bangladeshi
waters and without change of vessel in terms Notification No.38/2018-Customs (N.T.)
dated 11 May 2018 of Central Board of Indirect Taxes and Customs shall be eligible
for
concession
in
vessel
related
charges
and
cargo
related
charges.
8
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
CHAPTER – II
VESSEL RELATED CHARGES
Docks are classified as (a) Indira Dock including the Ballard Pier, Ballard Pier Extension and
Harbour Wall berths, (b) Prince’s & Victoria Docks, (c) Naval Docks, (d) Mazgaon Dock,
Kassara Basin, (e) Bunders and Darukhana and (f) Jetties at Jawahar Dweep and Pir Pau.
2.1. Composite Pilotage and Towage Charges
(A) Cargo Vessels
Sr.
No.
Size of the vessel
*Docks
@ Stream
*Jawahar
Dweep / Pir Pau
# Shifting
Charges
(Rate per GRT)
1.
0-30,000 GRT
a. Foreign going
(in US $)
b. Coastal (in ₹)
0.5443
14.8873
0.0985
2.6915
0.9814
26.8484
0.1352
3.7397
2.
30,001 - 60,000 GRT
a. Foreign going
(in US $)
b. Coastal (in ₹)
US $ 16329 for
1st 30,000 GRT
+
US $ 0.4354 for
every additional
GRT
US $ 2955 for
1st 30,000 GRT
+
US $ 0.0788 for
every additional
GRT
US $ 29442 for
1st 30,000 GRT
+
US $ 0.7851 for
every additional
GRT
US $ 4056 for 1st
30,000 GRT
+
US $ 0.1082 for
every additional
GRT
₹446619 for 1st
30,000 GRT
+
₹11.9098 for
every additional
GRT
₹80745 for 1st
30,000 GRT
+
₹2.1532 for
every additional
GRT
₹805452 for 1st
30,000 GRT
+
₹21.4787 for
every additional
GRT
₹112191 for
1st 30,000 GRT
+
₹2.9918 for
every additional
GRT
3.
Above 60,000 GRT
a. Foreign going
(in US $)
b. Coastal (in ₹)
US $ 29391 for
1st 60,000 GRT
+
US $ 0.3810 for
every additional
GRT
US $ 5319 for
1st 60,000 GRT
+
US $ 0.0690 for
every additional
GRT
US $ 52995 for
1st 60,000 GRT
+
US $ 0.6870 for
every additional
GRT
US $ 7302 for
1st 60,000 GRT
+
US $ 0.0946 for
every additional
GRT
₹803913 for
1st 60,000 GRT
+
₹10.4211 for
every additional
GRT
₹145341 for
1st 60,000 GRT
+
₹1.8841 for
every additional
GRT
₹1449813 for
1st 60,000 GRT
+
₹18.7939 for
every additional
GRT
₹201945 for
1st 60,000 GRT
+
₹2.6178 for
every additional
GRT
* Includes vessels docking either directly from sea or from stream, berth to stream,
berth to berth using tugs.
@ Includes vessels coming from sea to stream and back to sea without tugs.
# Shifting charges without tugs. If tugs are used, then dock charges will be applicable.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
9
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(B) Miscellaneous Vessels
Rate per GRT
Foreign
(In US $)
Coastal
(In ₹)
Off Shore Supply Vessels, Survey vessels and specific support
vessels, floating cranes, rig vessels, dredgers, vessels under
construction, telegraph vessels.
0.4536
12.4002
Tugs boats , Passenger boats, Fishing trawlers, Self-propelled
Barges, dumb barges, lash barges, pleasure yacht, country
crafts, crew boats, etc.
0.1911
5.2183
Rates above are without tug assistance. If any tug assistance is required, the rates as per
Section 2.1(A) above will be applicable.
Notes:
(1).
Above rates are for one inward and one outward movement with required number of
tugs/launches of adequate capacity and shifting/s of vessels for port convenience.
(2).
For every Shifting at the request of the vessels the shifting charges as specified in
Section 2.1 (A) above are leviable.
(3).
Charges for movement without the power of the engine of the vessel shall be levied at
twice the rates applicable.
(4).
In the event of a vessel in distress or is not able to move on its own propulsion or cold
move additional tug hire charges will be levied.
(5). Supply vessels/ tugs/ barges going beyond Mumbai Port Trust revised port limits/ MPL
(Nhava Sheva Cross line) shall be treated as leaving Mumbai Port and going to sea
and next arrival of the vessel shall be treated as fresh voyage.
(6).
Any vessel/ tugs/ barges working as supply vessels shall be treated as supply vessels
for levy of charges.
(7).
Vessels traversing from Sea to other Ports situated within port limits through MBPT
waters shall be treated as Sea/ Mumbai Port Trust revised port limits to stream as
arrival and from Stream to inner Port MBPT cross line as departure and fresh arrival
from the same route will be treated as fresh voyage for purpose of levy of MBPT
charges.
(8).
Pilotage cum towage shall be charged 50% of the prescribed rates for inward and leg
of the vessel depending upon the status of the vessel at each leg (i.e.) either going or
Coastal.
(9).
Charges leviable according to GRT will be levied on a minimum of 1000 GRT.
2.2.
Charges on vessels/ Barges/ boats for arranging alongside other vessel for
working of cargo in mid-stream and Port Lighterage Anchorage Area (Double
Banking)
Sr
No.
Nature of Movements
Rate per GRT
Foreign-going Vessel
(in US $)
Coastal vessel
(in ₹)
(a)
Double
Banking
assistance
with
tug
0.3691
10.0891
(b)
Double
Banking
assistance
without
tug
0.2604
7.1232
(c)
Lighterage dues on Mother Vessels discharging / receiving cargo - On foreign-
going vessels and coastal vessels lighterage dues respectively at the rate of
US $ 0.0077 and ₹. 0.2118 per GRT for a period of one hour or part thereof
भाग दोन (संकीर्ण)–२
10
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
2.3.
Lighterage dues at the rate of ₹ per tonne shall be levied on the cargo,
unloaded from or loaded into, the vessels anchored within the Port approaches
and the cargo is transported through Mumbai Port Waters. Provided, however, that
Lighterage dues shall not be levied on the cargo destined to or from the Port of
Mumbai’.
General Notes to Sections 2.1 & 2.2 above
(1)
Shifting of vessels for Port convenience is defined to mean the following:
i)
If a working cargo vessel is required to be shifted to another berth so as to
enable berthing or sailing of another vessel at the same berth or any other
berth in the Dock in view of restriction of LOA, beam, draft, etc., such
shiftings shall be considered as shifting for Port convenience.
ii)
If a working cargo vessel is required to be shifted from one berth to another
berth due to non-availability of storage space of import or export cargo
requiring covered accommodation, such shifting shall be considered as
shifting for Port convenience.
iii)
Whenever a vessel is required to be shifted from the cargo berth to the gantry
berth for the convenience of container loading/ unloading, such shifting will
be treated as shifting for Port convenience provided the agents of the vessel
have made specific request to that effect in their berthing application.
iv)
Whenever a vessel is required to be shifted from one berth to another
berth via stream so as to accommodate another vessel or the same vessel in
view of the restriction of LOA, beam, draft, etc., such shiftings shall be treated
for Port convenience.
v)
Whenever an export loading vessel is required to be shifted from Harbour
Wall berths to BPX/BPS berths due to restriction of LOA, beam and draft via
stream, such shiftings shall be treated for Port convenience.
vi)
Whenever an import discharging vessel is required to be shifted from
BPX/BPS to Harbour Wall berths due to restrictions of LOA, beam and draft
via stream so as to accommodate another vessel at BPX/BPS, such shiftings
shall be treated for Port convenience.
vii)
Whenever irrespective of loading/discharging, if the vessels are required to
reposition either from Harbour Wall berths to BPX/BPS berth and vice versa,
and if such shiftings are required to be done due to restrictions of LOA, beam
and draft, the same shall be treated for port convenience.
viii)
Whenever a vessel is shifted either from Harbour wall berths or BPX/BPS
berths to stream so as to accommodate another ousting priority vessel, such
shifting shall be treated for Port convenience.
shall be levied from the time it is anchored / occupies the place in stream and
Port Lighterage Anchorage Area for working cargo. Anchorage charges shall
be levied during the period vessel is not working cargo. The lighterage dues
shall not be levied on the vessels engaged in mid-stream discharge at Port
Lighterage Anchorage Area Port Limit for (I) vessel which discharges part
cargo for reducing the draft of the vessel for calling at the Docks / Pier of
MBPT and if subsequently calls at Docks or Piers of Mumbai Port, (2) vessels
which discharge entire cargo into barges for subsequent discharge at Docks /
Bunders of Mumbai Port and sail out from stream / Port Lighterage Anchorage
Area and the discharged cargo is subsequently brought at Docks / Bunders
and (3) mother vessels which receive cargo brought by the barges loaded from
the MBPT Docks/ Bunders.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
1 1
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
ix)
Whenever vessels are required to be shifted from deep draft anchorage to
lesser draft anchorage in order to accommodate vessel of higher draft, such
shifting shall be treated for Port convenience.
x)
Whenever vessels shifting occurs due to failure of Port mechanism such as
lock gate not working, tug not working, pilot not available or if berth not
available, such shifting shall be treated for port convenience.
(2).
For piloting a tug in tow of another barge or barges, charges at the above rates shall
be levied on the aggregate Gross Registered Tonnage of the tug and the barge or
barges in tow.
(3).
Vessels which come within the definition of – ‘Coastal Vessels’ and for which
regular berths have been provided at the Dock Harbour Wall shall not be charged all
inclusive rate when such vessels are piloted direct from their berths to the open sea or
vice versa, by their licensed Masters. In all other cases the usual all inclusive rates
shall be charged on such vessels.
(4).
For intercepting a vessel outside the Pilot Station but within the Port’s limit at the
request of the Masters/Owners or Agents of the vessels, a composite charge of
₹.5292.25 in case of coastal vessel and US $ 193.42 in case of foreign-going vessels
will be levied.
2.4.
Charges for attendance, cancellation and detention for a harbour tug
Sl.
No.
Foreign-
going Vessel
(in US $)
Coastal
vessel
(in ₹)
(a).
Attendance by Tug for a vessel on fire for
every hour or part thereof per tug
312.2404
8542.8922
(b).
Detention charges for every half an hour or
part thereof per tug for cancellation of a tug after
it is ordered to tow a vessel and goes alongside
[period to be computed from the time the tug
leaves its station to the time it returns thereto] or
charges for detention of a tug by reasons of a
vessel not being ready or any other cause after it
has gone alongside a vessel, when the tug is not
cancelled
226.8670
6207.0643
(c).
Attendance of a tug on a vessel at Jawahar
Dweep / Pir Pau for every 24 hours or part thereof
per tug
2837.4646
77633.0276
Notes:
(1). Charges for attendance by a tug for a vessel on fire will be payable only if the
vessel on fire requisitions services of an additional tug.
(2). The charges for attendance of a tug on a vessel at Jawahar Dweep / Pir Pau
shall become payable only if the vessel requisitions services of an additional
tug.
2.5.
Attendance and Detention Fees for Master Pilots and Pilots –
(a) When a Master Pilot/Pilot is required to attend a vessel beyond the limits of the
Port, in circumstances of unavoidable necessity, a separate fee of ₹. 7852 or US $
300.707 shall be charged in respect of foreign-going vessels for every six hours or
part thereof from the time the vessel goes beyond the limits of the Port till the time
the Pilot returns to Mumbai. Further, the boarding and loading and traveling
भाग दोन (संकीर्ण)–२अ
12
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
expenses to which the master pilot or pilot is entitled shall be recoverable from the
Masters / Owners or Agents of the vessel at actuals.
(b) Attendance and Detention fees for pilot in case of cancellation of
movement of the
vessel inside the Port limits:
Foreign-going
vessel
Coastal
Vessel
When the movement of the vessel
is cancelled after the boarding of the pilot on the
vessel due to ship's fault and if the vessel does
not move from its anchoring/berthing point.
US $ 300.707
per act
₹7852
per act
2.6.
Charges for Fire Float Vessels, Anchor Hoy Salvage Vessel, Water Boat and
any other suitably equipped craft except a Tug within Port limits:
Sl.
No.
Job Description
Charges per hour or part
thereof
Foreign-going
Vessel ( US $ )
Coastal
Vessel ₹
(a).
For examining, lifting, laying or re-
laying
moorings
or
buoys
or
recovering anchors or cables or
any miscellaneous work
119.4036
3266.85
(b).
For attending a vessel on fire or
otherwise, in Stream or at Jawahar
Dweep and Pir Pau by
(i).
Fire Float Vessel
28.6568
784.04
(ii).
Any other craft
As may be fixed from time to time by
the Chairman
(c).
For Salvage Services
142.0901
3887.58
Note: Charges for attendance by Fire Float vessel or any other craft for a vessel on
fire will be payable only if the vessel on fire requisitions services of additional
Fire Float or any other craft.
2.7.
Charges for hire of Launches and Tank Barges
Sl.
No.
Rate per hour
or part thereof
Rate per hour or
part thereof
Foreign-going
Vessel ( US $ )
Coastal
Vessel ₹
(a).
Launches
17.9105
490.03
(b).
Tank Barges for discharge of
ballast water containing oil in
terms of Clause 53 of Mumbai
Port Rules
2.1394
58.51
CONDITIONS:
(1).
Requisition in writing for Tank Barge must be submitted not less than 12
hours before the time at which the Tank Barge is required.
(2).
All oil contained in the ballast water will become the absolute property of
the Mumbai Port Trust.
(3).
Hire charges for one day will be levied, if the barge is requisitioned and
not utilized.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
1 3
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
2.8.
MBPT Fire Service Stand By Charges
Sl.
No.
For first 8-
hours or part
For first 8-
hours or part
Foreign-going
Vessel ( US $ )
Coastal
Vessel ₹
(a).
For hire of Trailer Pump and/or
Ballast Pump
57.313
1568.076
(b).
For attendance of staff-
Fire Officer or Section Leader-in-
28.658
784.070
Motor Driver/Pump Operator each
22.688
620.706
Sub-Section Leader each
22.688
620.706
Fireman each
17.911
490.029
Notes:
(1).
12.5 per cent of the above charges will be levied for each subsequent hour or
part thereof.
(2).
The chargeable period will be counted from the time of placement of
equipment and personnel till the time the withdrawal of equipment and
personnel in case of container operation.
(3).
In case of more than one operation in a calendar day the charge will be
levied considering all the operations on continual basis taking into account
total number of actual working hours in each operation.
(4).
However if the commencement of the second operation starts in next
calendar day, it will be considered as fresh operation for the purpose of
charging.
(5).
These charges are payable only when the services are requisitioned by the
user.
2.9.
Diver’s Fees:
For work within Port Limits on any day
Particulars
Fees
Foreign- going
Vessel (in US $)
Coastal vessel
(in ₹)
Charges for a shift of four hours or part
thereof of a normal diving team inclusive of
hire charges of diving equipment.
568.360
15550.451
Notes:
(1).
The diving period for the purpose of billing shall be calculated from the time
the team leaves the base in Indira Dock / P&V Docks till it returns to the base.
(2).
Normal diving team consists of:
Category
No. of employees
(i).
Jr. Foreman Diver
1
(ii).
Asstt.Foreman Diver/Diver Gr.I
2
(iii).
Sarang
1
(iv).
Tindal
1
(v).
Linesman
2
(vi).
Lascar
12
14
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(3).
If an extra Diver is employed an additional charge of ₹.620.71 or US $
22.688 per employee for a shift of four hours or part thereof shall be
charged for coastal or foreign-going vessels respectively.
(4).
Equipment used for normal diving operation
(i). Diving boat
1 No.
(ii).
Diving dresses
2 Nos.
(iii).
Diving helmets
2 Nos.
(iv).
Diving Pumps
2 Nos.
(v).
Air Hose
300 R. Ft.
(5).
For deployment of additional employee plant and gear, additional charges will
be recovered. Towing and crane charges shall also be charged separately.
2.10.
Salvage Fees on articles salvaged within the limits of Port:
(a).
Where no risk of life is involved in salvaging, a charge of 15 per cent on the
value of the articles in addition to the actual cost of salvage of articles shall
be payable.
(b).
Where risk of life is involved a charge of 30 per cent on the value of articles
in addition to the actual cost of salvage of the articles shall be payable.
(c).
Customs Duty and Municipal Octroi must be paid by the owners or
purchasers of salvaged articles.
2.11.
Examination and Licence Fees
I.
Examination and Licence Fees for Special Pilots / Licenced Master of
Coastal Vessels, Barges, tugs etc.
Sl.
No.
Particulars
Fees (in ₹)
(1).
Examination Fee
1000
(2).
Licence Fee / Renewal Fee / Issue of Duplicate Licence
500
II.
Licence Fees for water conveyance for harbour crafts
Sl.
No.
Particulars
Rate per GRT per
month (in ₹)
(1).
Catamarans, Hovercraft and Ro-Pax vessels
76.33
(2).
Boats, Craft, Barges, Tugs and launches plying from the
Ballard Pier Jetty and Gateway of India.
42.39
(3).
Barges and Tugs engaged in loading/discharging of cargo in
mid-stream and / or plying beyond the limits of
Port of Mumbai for conveyance of cargo
73.79
(4).
Boats, Barges, Launches, Tugs and Craft (except Fishing
Trawlers/Boats) other than those mentioned above
42.39
(5)
Pleasure Yatchs upto 10 GRT and Speed Boats
101.77
(6)
Pleasure Yatchs of more than 10GRT
231.30
Notes:
(1).
These charges will be recoverable from the vessels/ ships / barges
maneuvering piloted with their licensed Master (Pass pilots) but will not be
recoverable from craft or launches belonging to Customs, Indian Navy,
Coast Guard, Central or any provincial Government and Surveyors.
(2).
Licence fee for water conveyance shall not be levied separately on
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
1 5
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
vessels which are registered under the bunders and paying licence fee
under Section 6.1 at Chapter-VI – Charges leviable at Bunders.
(3)
Charges leviable according to GRT will be levied on a minimum of 10 GRT.
III.
Miscellaneous charges towards licence fees.
Sl. No.
Particulars
Unit
Rate ₹
(1).
Penalty for delayed renewal
(a). Beyond 30 days and upto 60 days
Per license
1000/-
(b). Beyond 60 days to 120 days
Per license
2000/-
(c). Beyond 120 days
Per license
3000/-
(2).
Permission for harbour cruise party
Per cruise.
5000/-
2.12.
Hire charges for harbour tugs and dock tugs leviable for miscellaneous
jobs.
Sl. No
Category of Tugs
Hire rate for per hour or part thereof
(inclusive of operational cost)
Foreign-going
Vessel (in US $)
Coastal vessel
(in ₹)
(a)
Harbour Tugs upto 22 BP
283.5899
7758.928
(b)
Harbour Tugs from 23
BP to 32 BP
567.1483
15517.345
(c)
Harbour Tugs from 33
BP To 45 BP
850.7263
23276.017
(d)
Conventional Dock Tugs
54.0720
1479.404
(e)
AM & VS Dock Tugs
70.5804
1931.065
2.13.
Charges for carrying out Bollard Pull Test:
Foreign-going
vessel (in US $)
Coastal vessel
(in ₹)
Charges for carrying out Bollard
Pull Test
504.58
13805.32
Note:
Applicable charges specified in Section 2.1(A) and Section 2.1 (B) for the movement
of vessels will be levied separately.
2.14.
Charges for Garbage Reception facility
Charges for garbage reception facility during
vessel’s stay at Jawahar Dweep & Pir Pau
₹5500.00 per day or part
thereof
Note: The above charge is not applicable to the vessels registered under Inland Vessel Act
(I.V.Act).The operators of such vessel should dispose their Garbage in the designated
dumping place provided in dock area. If found guilty the above charge will be imposed on them
on each occasion
16
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
2.15
Schedule of Anchorage Fees
(A)
If any vessel or self propelled barge except Lash Barge or Dumb Barge
remains at any anchorage points shown in column No.2 of the table below,
anchorage fees shall be levied as per column 3 ibid.
1
2
3
Sr.
No.
Anchorage Point
Rates per GRT per hour or part thereof
Period of stay
Foreign going
Vessel
(in US $ )
Coastal/Inland
Vessel
( in Rs.)
1
2
3
4
5
(a) A,B,C,D,E,F,G,
TA1,TA2, New explosive
Karanja.
From 1st day
upto 30th day
0.0047
0.0746
Beyond 30th day
0.0118
0.1865
(b) H,I,J,K,V,W ,X,Y,Z,
From 1st day
onwards
0.0047
0.0746
Beyond 30th day
0.0118
0.1865
(c) L, M, (N1, N2, N3 at New
Pir Pau), N1 (Buoy), N2
(Buoy), North N3, O, P,
Q, R
L/F 2
OFF DARUKHANA
OFF COAL BUNDER
OFF HAY BUNDER
OFF KASARA BASIN
OFF FERRY WHARF
OFF MAZGAO AND
P&V CHANNEL
From 1st day
upto 30th day
0.0038
0.0577
Beyond 30th
Day
0.0118
0.1865
(d) Port Lighterage
Anchorage Area
From 1st day
upto 30th day
0.0038
0.0577
Beyond 30th
day
0.0118
0.1865
Note:
Port Lighterage Anchorage area encompasses the following co-ordinates:
Point A – Latitude
18˚57’ N
Longitude
72˚37’E
Point B – Latitude
18˚55’N
Longitude
72˚37’E
Point C – Latitude
18˚55’N
Longitude
72˚43.5’E
Point D – Latitude
18˚57’N
Longitude
72˚43.5’E
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
1 7
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(B).
If any Lash Barge or Dumb Barge remains at any of the anchorage points mentioned
in column No.1 of table below, anchorage fees shall be levied as per column No.2
ibid.
Rates per GRT per hour or part thereof
Anchorage Point Period of stay
Foreign going
vessel
(in US $ )
Coastal/Inland
Vessel
( in Rs.)
1
2
3
4
OFF DARUKHANA
OFF COAL BUNDER
OFF HAY BUNDER
OFF KASARA BASIN
OFF FERRY WHARF
OFF MAZAGAO AND
P&V CHANNEL
From 1st day
upto 60th day
Beyond 60th
day
0.0019
0.0059
0.0289
0.0933
(C).
Every Vessel, Boat, Barge and craft irrespective of the size or the GRT, engaged in
Lighterage operations in midstream and in Port Lighterage Anchorage Area for
conveyance of cargo to the Ports other than Mumbai Port shall during the period of
their not working cargo be charged anchorage fees as per section 2.15 (A) above
depending on the place of anchorage. This differential tariff will not apply to barges
coming into the Mumbai Port.
Notes:-
For the purpose of calculating the period of stay of a vessel at an anchorage:
(1) The anchorage fees shall be levied from the time a vessel drops the anchor till the time
it leaves the anchorage berth;
(2) In the event of a vessel which had stayed at an anchorage taking berth or entering a dry
dock and returning thereafter either to the same anchorage or to another anchorage, the
number of hours the vessel was away from the anchorage will be excluded, but the period
of occupation except for such exclusion will be treated as a continuous period for
computing the Anchorage Fees;
(3) For levy of anchorage fees, a barge is a craft operating within the limits of Mumbai
Port (including extended port limit) for the purpose of lighterage of cargo or supply of fuel,
water and provisions but shall not include lash or any other type of barges/boats
discharged or loaded by mother ships outside the limit of Mumbai Port (including
extended port limit) for all purposes of conveyance of cargoes;
(4) No anchorage fees will be recoverable from the vessel, boat, barge and craft (including
lash barge) which has paid the licence fees for water conveyance as per Section
2.11 above;
(5) No anchorage fees will be charged to the vessel classified as Indian Naval Vessels and
Coast Guard Vessels.
(6) No Anchorage Fees will be charged to the vessel/ship anchored outside the Mumbai
port limits notified by the Central Government.
भाग दोन (संकीर्ण)–३
18
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
2.16.
PORT DUES
Sl.
No.
Vessels chargeable
Rate of per GRT
Due how often
chargeable in respect
of same vessels
Foreign
- going
(in US
Coastal
(in ₹
1.
Vessels
of 3000
tons and
upwards (except fishing boats)
0.3315
9.0725
The due is payable on
each entry into the port.
2
Vessels
of
Ten tons
and
upwards but less than 3000
tons (except fishing boats)
0.2340
6.4044
The due is payable on
each entry into the port.
3.
Tugs, boats, ferry boats and
river boats, whether propelled
by steam or other mechanical
means arriving from ports outside
India
0.2340
6.4044
Once between the 1st
January and 30th June
and once between 1st
July and 31st December
in each year
4.
Inland vessels operating within
port limits
---
6.4044
The due
is
payable
once
in
the
same
month
1.
Port Dues of a vessel will be assessed on her total GRT at the rate shown against the
relevant vessel group according to GRT of that vessel.
2.
For oil tankers with segregated ballast the reduced Gross Tonnage that is indicated in
‘Remarks’ column of its International Tonnage Certificate will be taken as its Gross
Tonnage for the purpose of levying Port dues and not for other tonnage based fees.
3.
No Port Dues shall be chargeable in respect of:
(i). Pleasure Yacht
(ii). Naval vessels and Government vessels
(iii). Any vessel which having left the port is compelled to re-enter by stress of
weather or in consequence of having sustained any damage, either with or
without stress of weather.
(iv). A LASH vessel making a ‘second call’ to pick up empty and / or laden fleeting
LASH barges shall be treated as a vessel entering the port but not discharging or
taking any cargo or passengers therein as described in Section 50 B of the Major
Port Trusts Act
4 A.
Port Dues shall be levied at 50% of the rates specified at Section 2.16 above in the
following case:
A vessel which enters the Port but does not discharge or take in any cargo or
passenger (with the exception of such unshipment and re-shipment of cargoes as
may be necessary for purpose of repairs)
4 B.
Port Dues shall be levied at 18% of the rates specified at Section 2.16 above for the
vessels visiting JNPT in the following case:
A vessel which enters the Port but does not discharge or take in any cargo or
passenger (with the exception of such unshipment and re-shipment of cargoes as
may be necessary for purpose of repairs)
5.
Port Dues shall be levied at 50% of the above rates in the following cases:
(i)
Telegraph vessels
(ii)
A vessel entering the port in ballast and not carrying passengers but
sailing from the Port without taking any passenger or cargo
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
1 9
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(iii)
A vessel entering the port in ballast and not carrying passengers for the
purpose of repairs, dry docking, taking in bunkers, provision of water or
for change of crew or for discharging any sick member of the crew and
sailing from the port without taking in any passenger or cargo
6.
Port Dues shall be levied at 75% of the above rates in the following cases:
(i)
A vessel entering the port in ballast and not carrying passengers but taking
in any cargo or passengers at the port
(ii)
A vessel in distress with no cargo on board brought into harbour in tow
7.
A vessel in distress with cargo on board brought into harbour in tow shall be
charged full Port Dues
8.
The vessels visiting JNPT, if for any reasons the same vessels visit MBPT, 82% of the
Port Dues recoverable as per Section 2.16 above shall be levied. However,
vessels plying exclusively between MBPT and JNPT for carriage of cargo shall be
levied full Port Dues as per Section 2.16 above. Vessels paying full port dues at the
MBPT need not pay 18% of the MBPT port dues at the JNPT.
9.
No port dues shall be levied on the vessels re-entering the port after being forced to
move out of the port limits before completing its discharge/ loading operation and in
the same voyage when,
(a).
If the Naval exercise is undertaken i.e. for safety consideration and vessel is
shifted to outer anchorage.
(b).
If the Vessel is shifted to outer anchorage to accommodate another
passenger vessel.
(c).
No suitable deep draft anchorage is available for the vessel after entering the
port and forced to go to at outer anchorage.
(d).
If the vessel was forced to move out due to dredging work carried out at
respective berth or channel.
(e).
If the Vessel is moved to outer anchorage due to operational difficulties such
as non-availability of MBPT floating crafts required for shipping operation or
change of tide or non-functioning of lock gates etc.
(f).
If the Vessel is shifted to outer anchorage as deep draft anchorage was not
available.
(g).
Any other operational reasons for safety consideration which are not
attributable to the vessel.
2.17.
Composite Berth Hire Charges
Berth hire charges on vessels, boats and barges berthed at Indira Dock and
its Harbour Wall, including Ballard Pier and Ballard Pier Extension, Prince’s
& Victoria Docks and its harbour walls:
Sl.
No.
Vessels berthed at
Rate per GRT for per hour or part thereof
Foreign- going vessel
(in US $)
Coastal Vessel
(in ₹)
1.
Indira Dock & its Harbour
Walls,
Ballard
Pier
and
Ballard Pier Extension
0.0118
0.1865
2.
Prince’s & Victoria Docks and
its harbour walls
0.0094
0.1443
भाग दोन (संकीर्ण)–३अ
20
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
Notes:
1.
For the purpose of levy of the above charges
(i).
The minimum GRT for any vessel except off shore supply vessels
will be taken as 1000 and
(ii)
The term ‘vessel’ will include the boats, barges and craft of GRT
of 1000 and above.
(iii).
Coastal vessels shall include vessels of Coast Guard / Indian
Navy.
2.
(i).
The berth hire shall be leviable from the time a vessel takes the
berth till the time it leaves the berth.
(ii).
There shall be a time limit beyond which berth hire shall not apply,
berth hire shall stop 4 hours after the time of vessel signaling its
readiness to sail.
(iii).
There shall be a ‘penal berth hire’ equal to one day’s berth hire
charges for a false signal.
(iv).
The Master / Agents of the vessel shall signal readiness to sail
only in accordance with favourable tidal and weather conditions.
(v).
The time limit of 4 hours prescribed for cessation of berth hire
shall exclude the ship’s waiting period for want of favourable tidal
conditions or on account of inclement weather or due to absence of
night navigation facilities.
3.
Sundays and Port non-working days will be treated as normal working days for
levy of the above charges and no separate charge will be levied.
4.
Every boat, country craft, dredgers, tugs and passenger boats of less than1000 GRT
and pleasure yacht and a lash barge entering the Docks shall be levied berth hire
charges ₹. 8.5072/ US $ 0.6868 per hour or part thereof for the first 200 GRT or
part thereof and ₹4.2504 / US $ 0.3434 per hour or part thereof for every additional
100 GRT or part thereof in respect of coastal and foreign-going vessels respectively.
This concessional rate will be admissible to local craft, boats and barges except off
shore supply vessels whether self-propelled or not and plying in foreign and coastal
trade. The concessional rates shall also be admissible to lash barges and pleasure
yacht irrespective of their tonnage. Each barge will be separately charged berth hire
charges treating each as a distinct vessel. However, when the barges make use of
wharf crane, the composite berth hire charges as prescribed at Note 1 above shall be
levied.
5.
Off shore supply vessels falling in the category of coastal vessels berthed at any
berth in Docks or Harbour Wall shall be levied with ₹0.4478 per GRT per hour or part
thereof. Off-shore vessel will not be subjected to the conditionality of levy of the
minimum charges of 1000 GRT. All the off shore supply vessels will be subjected to
this rate irrespective of the GRT of the vessels and will not be entitled for
concessional levy as at Note 4 above.
6.
All vessels berthing at berths at Sr. Nos. (1) and (2) above for other than cargo
operations, the berth hire charges shall be recovered as under:
(i)
Upto 10 days of occupation of berth: Normal berth hire charges.
(ii)
From 11th day to 20th day of occupation of berth: 150% of normal berth hire
charges.
(iii). After 21st day of occupation of berth: 200% of normal berth hire charges.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
2 1
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
7.
No berth hire shall be levied for the period when the vessels idle at its berth due
to breakdown of port equipment or power failure or any other reasons attributable
to the port.
8.
Priority / Ousting Priority Charges in addition to Normal Berth Hire Charges
as stated below or as and when changed by the Govt. or appropriate authority will be
applicable:
(a).
For providing the “priority berthing” to any vessel, a fee equivalent to berth
hire charges for a single day or 75 percent of the berth hire charges
calculated for the total period of actual stay at the berth, whichever is
higher shall be levied.
(b).
For providing the “ousting priority” to any vessel, a fee equivalent to berth
hire charges for a single day or 100 per cent of the berth hire charges
calculated for the total period of actual stay at the Berth whichever is
higher shall be levied. In addition, for providing “Ousting priority” to any
vessel, the charges for ‘shifting in’ and ‘shifting out’ of the vessels shall be
collected.
(c).
The fee for according priority / ousting priority as indicated above shall be
charged for all the vessels except the following categories:
(i).
Vessels carrying cargo on account of Ministry of Defence.
(ii).
Defence vessels coming on goodwill visits.
(iii).
Vessels hired for the purpose of Antartica expedition by Department
of Ocean Development.
(iv).
Any other vessel for which special exemption has been granted by
the Ministry of Shipping.
9.
Guidelines on priority berthing of coastal vessels at Major Ports issued by the Ministry
of Shipping vide letter No.PT-11033/51/2014-PT dated 4 September 2014:
(i). “Coastal vessels” is defined as any vessel exclusively employed in trading
between any port or place in India to any other port or place in India having a
valid coastal license issued by the Director General of Shipping / competent
authority.
(ii). Major ports shall accord priority berthing, at least on one berth, to dry bulk/
general cargo coastal vessels to enable shippers to transport goods from one
port in India to another port in India irrespective of origin and final destination
of the cargo. This would be in addition to dedicated berth, for handling of
Coastal Thermal Coal already existing in Major Ports, if any.
(iii). All Major Ports shall accord priority berthing through specific window to coastal
container vessels keeping in view the concession agreements and existing
allotment of window berthing at the private terminals and availability of container
berths operated by the ports.
(iv). In respect of POL / Liquid cargo tankers, existing practices regarding such
priorities as prevalent in various ports may continue.
(v). Coastal vessels which are be accorded priority berthing shall not be liable to pay
priority berthing charges.
(vi). There will be no restrictions on berthing of coastal vessel, in addition to the
coastal vessel berthed on priority as above, if the same is eligible under normal
berthing policy of the port.
(vii). A coastal vessel shall be liable to pay port charges on coastal rates
notwithstanding whether it was berthed on priority or otherwise.
22
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(viii). Ports should explore the possibilities of earmarking exclusive berth, storage
areas and gates for coastal cargo outside the custom bonded area of the Ports
to further facilitate movement of coastal cargoes.
(ix). Major Ports shall clearly work out the time limit within which a coastal vessel
would be berthed in a particular port. This time limit may differ depending on the
cargo and berth. Each Major Port should carry out a detailed exercise and issue
a trade notice clearly indicating the upper time limit within which a coastal vessel
would be given a berth in the port. As regards priority berthing through a specific
window to coastal container vessels, Major Ports should have a detailed
discussion with the PPP operator and publish the specific window for coastal
container vessels. The above mentioned exercise and publication should be
completed within 30 days from the date of issue of these guidelines.
(x). The MIS in the Port should capture data for coastal and foreign vessels cargoes
separately. The data so captured shall be monitored and reported internally in
the port as well as to IPA and Ministry in separate formal for coastal and foreign
vessels.
2.18.
Charges for use of the Dry Docks
I. Charges for Docking and Undocking:
Foreign Going
Vessels (in US $)
Coastal Vessels
(in ₹)
Upto 1000 GRT
6203.24
130543.16
1001 to 2000 GRT
8054.26
160381.43
2001 to 3000 GRT
9552.22
190219.81
3001 to 4000 GRT
11050.23
220058.19
4001 to 5000 GRT
12548.20
249896.46
Above 5000 GRT
US $ 12548.20 + US $
1417.35 for every additional
1000 GRT or part thereof
₹249896.46 + ₹29839
for every additional 1000
GRT or part thereof
II. Rental charges for occupation of the Dry Dock:
(i)
During first 10 days of occupation for vessels –
Vessels
Foreign Going
Vessels
Coastal Vessels
US $
₹
(Rate per day or part thereof)
Upto 1000 GRT
2125.97
44757.46
1001 to 2000 GRT
2306.58
48487.01
2001 to 3000 GRT
2481.30
52217.77
3001 to 4000 GRT
2834.65
59676.76
4001 to 5000 GRT
3189.96
67136.85
5001 to 10000 GRT
3543.30
74595.95
10001 to 20000 GRT
3898.63
82056.15
20001 GRT & above
4430.60
93244.58
(ii)
from 11th day to 20th day of occupation – 150 per cent of rates as at (i)
above per day or part thereof.
(iii)
from 21st day to 30th day of occupation – 200 per cent of rates as at (i)
above per day or part thereof.
(iv)
Beyond 30 days of occupation – 250 per cent of the rates as at (i) above
per day or part thereof.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
2 3
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(v)
In case the vessel occupies the dry dock beyond the period for which the
dry dock has been allotted, the rental charges for the period of overstayal
shall be charged at double the rate prescribed above.
Notes:
(1)
The above charges will include the charges for services such as one time
draining/flooding of Dry Dock, Divers’ services, cranage, removal and replacement of
damaged keel blocks, other ship repair facilities, etc. No additional charges will be
levied for any services in connection with docking/undocking except shore power
supply and fresh water supply to vessels and for laying/removal of special keel
blocks.
(2)
In the case of vessels requiring laying of special keel blocks due to their
configuration, extra rental charges at the rate prescribed under II (i) above will be
recovered for the period required for laying and removal of such special keel blocks.
The rental charges for occupation of dry docks as above will be recoverable as per
the period groups applicable.
(3)
Vessel will pay for the shore power supplied to it at the rates prescribed from time to
time on actual consumption.
(4)
If the vessel has requisitioned for a dry dock but it is not ready to dock at the time
specified according to the docking programme, no charges shall be leviable provided
an intimation of cancellation/postponement of dry docking is given 2 days (excluding
the day of docking) in advance of the specified time of docking. A cancellation fee of
₹. 3958 and US $ 255 will be recovered in such cases in respect of Coastal vessels
and foreign- going vessels respectively.
(5)
In case, the docking is likely to be delayed and an intimation is given in advance by
less than two days (excluding the schedule day of docking) for reasons other than
those within the control of the vessel, normal charges will be recovered after the
vessel has dry docked. For the days the dry dock or its compartment remains
unoccupied, rental charges will be recovered at the rate applicable during the first 10
days of occupation. In other cases, rental charges will be recovered at 250 per cent of
the rate applicable during the first 10 days of occupation.
(6)
When two or more vessels are docked together in Merewether Dry Dock or the entire
length of Hughes Dry Dock or in either of the compartments of the Hughes Dry Dock
(with or without placing caisson positioned between them) the above charges will be
payable by each vessel separately.
(7)
Wet Dock dues will not be levied in the case of vessels entering and leaving the
Wet Dock for the sole purpose of occupying the Dry Docks, provided :
(i)
Such vessels occupy the Dry Dock;
(ii)
Aggregate period of stay in W et Docks does not exceed 24 hours plus odd
hours occasioned by tidal delays and Dock Master’s programme of
docking/undocking; and
(iii)
No work, i.e. discharge or shipment of cargo, bunkering or repairs, is performed
on board or over the side of such vessel during the stay in the W et Docks.
(8)
Sundays and Customs notified holidays and port non-working days during the
occupation of Dry Dock by a vessel shall be treated as working days and charged
accordingly.
(9)
No separate charge will be levied for docking/undocking on Sundays and Customs
notified holidays and port non-working days. However, docking / undocking
programme should be prepared in advance in such a way to avoid docking /
undocking of vessels from dry docks on Sunday and Customs notified holidays and
Port non working days.
24
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(10)
When two or more vessels are docked together in the Merewether Dry Dock or in
the entire length of Hughes Dry Dock or in either of the compartments of Hughes
Dry Dock without the caisson being placed in position between them and if for any
reason one of the vessels is not ready to undock on expiry of the period for which
she was regulated and thereby causes detention to the other vessel or vessels dry
docked simultaneously, the vessel/s causing detention to other vessel/s (detaining
vessel) shall pay detention charges at double the charges recoverable under clause
II above on her tonnage as well as tonnages of the other vessel/s detained.
(11)
Services/Supplies required for repairs to the vessels in the Dry Dock, requisitioned
by ship repair firm licensed by the Chief Mechl. Engineer shall submit their
requisitions duly endorsed by the Master/Agent of the vessel. The cases in which
endorsement of the Master/Vessel Agent cannot be obtained immediately, the
Superintendent of Dry Dock may at his discretion provide services/supplies
requisitioned, the endorsement of Master/Vessel Agent will have to be obtained
subsequently.
(12)
The Board accept no responsibility whatsoever for any detention to vessels using their
Dry Docks.
(13)
The period of occupation of a vessel shall commence from the time the entrance
caisson is placed in position after the vessel has entered. The period of occupation
ends when the vessel has cleared the Dry Dock entrance. A day means period of 24
hours counted from the time the entrance caisson is placed in position after the vessel
has entered.
(14)
For second time draining/flooding of Dry Dock for the same vessel, 50% of charges as
per Section 2.18 (I) above will be levied.
(III) Fees for License to carry out specialized jobs on board the vessels
(a).
Fees for License to carry out specialized jobs on board the vessels in
Trustee’s Dock Berth No. 1 to 4, 9 to 24 of Indira Dock, BPS, BPX, Stream
and Anchorages.
Annual License Fees
Per on board activity Fees for a year
₹24500/-
₹2450/-
(b).
Cost of Booklet i.e. of ₹1100/- + GST
Note: Above rates as applicable for Licenses issued for carrying out ship
repair activities at locations in port premises other than areas handed over
to Cochin Shipyard Limited.” ”
2.19.
Charges against Government in respect of Vessels of War and Transport
Charges against the Union Government in respect of vessels of War and vessels
engaged solely for the transport of troops, their families, etc. berthed at the Ballard
Pier or Indira Dock Harbour Wall or inside the Docks:
(a)
Vessels of War, that is to
say all vessels plying the
White Ensign of Republic of
India but including in times
of war mine sweepers and
patrol vessels.
All Port and Dock charges whether for general
facilities or for “Special Services” except
(i) Port Dues
(ii) Wharfage on stores and equipment required for
the vessel’s own consumption.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
2 5
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(b)
Vessels employed solely in
the transport of troops and
their
families,
military
animals, military equipment,
ammunition of
war and
naval and military stores,
including
Indian Fleet,
Auxiliaries which are on the
list of Indian Navy and all
Hospital
ships and
Ambulance Transport
(i)
(ii)
All Port and Dock charges except –
(a) Port Dues.
(b) Wharfage charges on horses (other than
remounts), Baggage, carriages and other
effects forming part of the scheduled
equipments of the troops.
Compensation under Section 6 of the Indian
Tolls (Army) Act, II of 1901 at the rate of 22.88
paise per tonne of Gross Registered Tonnage
of the vessel for each day that Dock Dues are
charged under Section III of the Docks Scale
of Rates and the vessels are engaged in
bonafide transport operations.
Note: Wharfage charges shall mean fees levied for the passing of goods or animals, etc.
imported or exported by any vessel, boat or lighter over any wharf, jetty, pier or bunder
within Port Trust areas, but shall not mean charges for services rendered by the Port
Trust in landing and shipping, removing or storing such goods, animals, etc. such as
the provision of cranes, cluster lights and for handling labour.
2.20.
Pier Dues at Jawahar Dweep and Pir Pau
Sl. No.
Vessel Chargeable
Rate per GRT for per hour or part
thereof
Foreign-going
vessel (in US $)
Coastal Vessel
(in ₹.)
(i)
On
every
steam
and
other
mechanically propelled and square
rigged vessels berthed at or using
the bulk oil piers at Jawahar
Dweep and Pir Pau
US $ 0.0212
(Subject to
minimum charge
of US $ 21.29)
₹0.5861 (Subject
to minimum
charge of ₹586.0)
(ii)
On every boat, barge or country
craft (not square rigged)
Rate per hour or part thereof
US $ 0.424
₹11.7285
Notes:
(1)
The Pier Dues shall be levied from the time a vessel takes the Berth/Pier till the time
it leaves the Berth/Pier.
(2)
No Pier Dues shall be levied on vessels after expiry of 4 hours from the time of
signaling its readiness to sail. Penal Pier Dues equal to one day's Pier Dues (i.e.
24 hours) shall be levied for false signal. The Master/Agents of the vessel shall signal
readiness to sail only in accordance with favorable tidal and weather conditions. The
time limit of 4 hours prescribed for cessation of Pier Dues shall exclude the ship's
waiting period for want of favourable tidal conditions or on account of inclement
weather or due to absence of night navigation facilities.
(3)
No Pier Dues shall be levied for the period when the vessels idle at its Berth/Pier due
to breakdown of port equipment or power failure or any other reasons attributable to
the port.
(4)
Sundays and Customs notified holidays and port non-working days will be treated as
normal working days for levy of the above charges and no separate charge will be
levied.
भाग दोन (संकीर्ण)–४
26
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
Section 2.21: Composite Vessel Related Charges for FLO-FLO operations:
Location
Slab (GRT of the
Mother Vessels)
Charges
(US$)
A.
Port Lighterage Anchorage Area
Upto 25000
40000
25001 and above
50000
B.
Inner Anchorage
Upto 25000
50000
25001 and above
60000
Notes:
(i).
The above charges are levied in lieu of Port Dues, Composite towage and
pilotage charges, anchorage charges, tug and mooring launch charges and
are applicable for a period upto 36 hours. Any stay beyond 36 hours will be
on Pro-Rata basis.
(ii).
Since there will be no lighterage of cargo in barges as such, wharfage in
lieu of lighterage will be levied treating this as satellite berth operations as
per schedule of docks wharfgae on goods 3.1 (A) Rate No. 18 based on
CIF value declared for both inner anchorage and PLA operations
separately in addition to above composite charges.
(iii).
As soon as cargo on board (vessels/ crafts) is offloaded at anchorages,
offloaded vessel / craft will be a separate vessel and all applicable port
charges will be recovered.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
2 7
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
CHAPTER – III
CARGO RELATED CHARGES
The charges as herein after prescribed will be leviable on all traffic dealt within the Docks and
Custom notified areas outside the Docks.
3.1. (A) Schedule of docks wharfage on goods
Rate
No.
Description of Goods.
Basis of
Charge
Foreign ₹
Coastal ₹
Dry Bulk Other than
Dry Bulk
Dry Bulk
Other than
Dry Bulk
1. (i) Animals, Birds, reptiles, etc.
Each
-----
58.49
-----
35.10
(ii) Animal products - Bone, Bonemeal,
Hides & Skins
Tonne
42.46
41.03
25.47
24.62
2.
Arms, Ammunitions, Explosives,
Defence Stores and Defence
equipment / machinery.
Tonne
-----
272.21
-----
163.32
3. (i) Asbestos
Tonne
-----
70.24
-----
42.14
(ii) Construction Materials, Sand.
Tonne
72.67
70.24
43.60
42.14
(iii) Fruits, nuts including Raw Cashew,
Tapioca, Coconut, Copra, Tamarind
Seeds.
Tonne
-----
70.24
-----
42.14
(iv) Molasses
Tonne
-----
70.24
-----
42.14
(v) Waste Paper, Newsprint
Tonne
-----
70.24
-----
42.14
(vi) Wood, Timber, Bamboo
Tonne
-----
70.24
-----
42.14
4. (i) Cement, Clinker
Tonne
72.67
70.24
43.60
42.14
(ii) Coal and Fire Wood
Tonne
101.10
97.72
101.10
97.72
(iii) Sulphur ,Fertilisers and Fertiliser raw
materials
Tonne
90.90
87.86
54.53
52.72
(iv) Foodgrains, Oilseeds, Cereals and
Pulses.
Tonne
72.67
70.24
43.60
42.14
(v) Oil-Cakes and Fodder
Tonne
33.94
32.81
20.36
19.69
(vi) Sugar
Tonne
33.94
32.81
20.36
19.69
5. (i) Cotton including cotton waste (also
includes cotton twist and yarn)
Tonne
-----
70.24
-----
42.14
(ii) Jute and jute products, Coir and coir Tonne
-----
41.03
-----
24.62
products.
6. (i) Granites and Marbles
Tonne
-----
70.24
-----
42.14
(ii) Ores, Ore Pellets and Minerals(other
than Iron ore & iron ore pallets)
Tonne
72.67
70.24
43.60
42.14
(iii)
Iron ore and Iron ore pellets
Tonne
72.67
70.24
72.67
70.24
7.
Metals (Ferrous, Non-ferrous) in the
form of ingots billets and un-
manufactured and metal scrap.
Tonne
72.67
70.24
43.60
42.14
8.
Other Liquid bulk including acids and
fatty acids
Tonne
-----
70.24
-----
42.14
9.
(i)
(ii)
(iii)
POL and POL Products :
Crude Oil
Kerosene and Light Diesel Oil.
All other POL Products
Tonne
Tonne
Tonne
-----
-----
-----
81.17
53.40
93.96
-----
-----
-----
81.17
53.40
93.96
10.
Salt
Tonne
9.15
8.85
5.49
5.31
11.
Synthetic Resin (including Moulding
Powder) and Wood Pulp
Tonne
-----
163.91
-----
98.34
भाग दोन (संकीर्ण)–४अ
28
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
12.
Wines, Spirits (Potable) and Alcoholic
beverages
Five litres
-----
41.03
-----
24.62
13.
Iron and Steel Materials (excluding
scrap, dross, ores)
Import
Export
Tonne
Tonne
-----
-----
244.33
162.89
-----
-----
146.60
97.72
14.
Rail cars
Per Wagon
-----
202831
-----
121699
15.
Motor vehicles and Cars Including
bull dozers, forklifts, tractors, cranes
and Military Tanks
Import
Export
Advalorem
-----
-----
0.54%
0.54%
-----
-----
0.32%
0.32%
16.
All items other than those specified
above.
Advalorem
0.52%
0.49%
0.32%
0.31%
17.
Sweepings collected on shore,
Ballast of the vessel, engineering
materials, stores and gears for
repairs to ships in docks, *Seamen’s
baggage consisting of their personal
effects, mails, post parcels and
diplomatic bags irrespective of the
weight per parcel, bag etc.
FREE
18.
Vessels and Crafts
Advalorem
-
1%
-
0.60%
* Although Seamen’s baggage consisting of their personal effects will not attract wharfage,
articles not regarded as bonafide baggage such as arms, ammunition, pearls, precious
stones, pianos, pianolas, carriage, motor cars, motor cycles, etc., will be subject to the levy of
wharfage.
Note: i) 50% of the normal wharfage will be applicable for Bunkers.
ii) 50% of the normal wharfage will be applicable on the cargo handled overside.
GENERAL NOTES TO SECTION 3.1 (A):
1.
Wharfage leviable on ad-valorem basis in the foregoing schedule will be levied on
the CIF value of goods in the case of imports and FOB value of goods in the case
of exports and on value specified in the bill of coastal goods in the case of coastal
cargo. Wharfage leviable on weight basis in the foregoing schedule will be
assessed on gross weight of the goods as shown in the Bill of Lading, Manifest or
Invoices.
2.
For the assessment of wharfage on import or export goods, the importer or the
exporter or their clearing agent, as the case may be, shall produce copy/copies of
the invoices/specification attested by Customs together with the Customs
documents such as Bill of entry/Shipping Bill/ Transhipment Permit as required
under Docks Bye-Law No.96 shall be produced for the purpose of assessment
and verification of charges. For any misdeclaration of weight, quantity, value or
description of goods, the importer/exporter or his clearing agent, as the case may
be, will be liable for action under Section 115 of the Major Port Trusts Act, 1963.
3.
All goods which have been charged full Docks Wharfage in case of import
operation will, if loaded into boats in the Docks by Port Trust labour and
afterwards relanded at a Port Trust Bunder, be charged, instead of wharfage for
export operation, labour charges only as prescribed elsewhere in this Scale of
Rates.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
2 9
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
4.
Wharfage as applicable to transshipment cargo as provided in Note 6 (b) below
shall be recoverable in case of cargo discharged from one hatch of a vessel and
reshipped in another for trimming or re-arranging the vessel’s cargo either by
lighters from overside or over the Docks wharves.
5.
Dangerous, explosive and inflammable goods landed at the Docks contrary to the
Docks Bye-Laws and/or the circulars issued by the MBPT must be immediately
removed by the Masters/Owners/Agents of the vessel to the Board's warehouses
earmarked for such goods, failing which they shall be removed by the MBPT at
their risk and cost and, in addition, a charge of ₹1465/- per package for foreign
cargo and ₹878/- per package for coastal cargo will be levied.
6.
a). Transhipment cargo, if discharged and re-loaded on to the same vessel /
another vessel, single wharfage shall be leviable for both movements and
demurrage on expiration of the free period of three days as admissible to import
cargo will be levied as per the demurrage schedule prescribed at sub-section 3.1.
(B) below.
b). Cargo where advalorem rates are specified and not destined for MBPT, wharfage
@ ₹265/ - per tonne in case of transshipment by sea and ₹114/- per tonne in case of
transshipment by road and demurrage on expiration of the free period of three days as
admissible to import cargo as per the demurrage schedule prescribed at sub-section
3.1. (B) below shall be levied.
7.
Damaged Goods:
Cargo landed from vessels loading in Docks owing to fire or other accidental
cause and re-shipped or from vessels returned to Port by reason of the same
cause or stress of weather will be charged one wharfage prescribed in the above
Schedule.
8.
In respect of Iron and Steel materials, shifting of cargo from the wharf (hook point)
to the storage point will not be undertaken by the Mumbai Port Trust.
9.
The Port shall provide the following minimum additional facilities to the export of
motor vehicles on common user basis:
(i).
Use of MBPT private road without payment of permit charges
(ii).
Unloading ramp for motor vehicles received by rail for export free of cost.
(iii).
Pre-shipment storage facilities inside the docks free of demurrage for 30
days.
(iv).
Arrangement for supply of water for vehicles for cleaning purposes
including permission of recycling plants inside docks.
10.
Shippers' own container: For recovery of wharfage on empty SOC unit, tare
weight of 20' container will be considered as 2.3 MT; 40' container as 4.0 MT and
45' container as 4.5 MT. Demurrage as applicable will be recovered under Sub
Section 3.1 (B) below.
11.
Before classifying any cargo under unspecified category in the wharfage
schedule, the relevant Customs classification shall be referred to find out whether
the cargo can be classified under any of the specific categories mentioned in the
wharfage schedule. However, in respect of Defence Stores and Defence
equipment/machinery, which can be classified under Rate No.2 of Section 3.1(A),
such reference to Customs classification will not be applicable.
12.
Re-export cargo: For the re-export cargo, import wharfage will be recovered and
demurrage shall be recovered till the date of shipment/stuffing and thereafter
export wharfage will be recovered.
30
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
13.
“Defence stores” would include ‘Bombs, grenades, torpedoes, mines, missiles, and
similar munitions of war and parts thereof: cartridges and other ammunition and
projectiles and parts thereof, including shot and cartridges wads’ coming under
Arms, Ammunition, parts and accessories thereof but the reference to “parts
thereof does not include radio or radar apparatus as per note no. 2 of Chapter no.
93 of Customs Tariff of India.
14.
Vessels calling the Port on her first voyage, which are declared as cargo in the
Import General Manifest or Export General Manifest for the purposes of Customs
Act, 1962, shall not be treated as cargo and no wharfage shall be levied on such
vessels, if the vessels come into the port on their own steam and sail out of the
port limits on their own steam. However, when loading or unloading of vessels
takes place within the Port limits, wharfage as per 3.1(A) above shall be payable
on such vessels.
3.1. (B) Demurrage:
On expiration of free days, save as hereinafter provided, demurrage will be charged for
the period of storage on all goods (except mails, post parcels, diplomatic postal bags
and personal baggage irrespective of weight per parcel, bag etc.) remaining uncleared,
at the following rates:
Class of goods
(1)
How
charged
(2)
How
charged
(2)
RATE (in ₹)
For first
to
20th day
(3)
For 21st
to
40th day
(4)
From 41st
days
onwards
(5)
(a) In respect of all goods
classified in the wharfage
schedule
in
Section-3.1(A)
above
(other
than
goods
specified in (b) below) &
including two wheeler.
Per tonne
per day or
part
thereof
Other
than Dry
Bulk
Cargo
76.35
114.49
152.71
Dry Bulk
Cargo
78.98
118.44
157.98
(b) Motor Vehicles including
bull dozers, forklifts, tractors,
cranes and military tanks
(Import)
Per
vehicle
Per day
----
814
2036
4072
(c) Animals, Birds, reptiles, etc. Each
Per day
----
76.35
114.49
152.71
Note: The personal baggage will be charged at the rate of ₹.30.73/- per tonne per day or part
thereof.
GENERAL NOTES TO SECTION 3.1 (B):
1
All import goods will be allowed storage in the docks free of demurrage for three days
from the date following the day of complete discharge of vessel’s cargo. All export
goods will be allowed storage in the docks free of demurrage for seven days
commencing from the date of admission of cargo into the port.
2
In case of containers handled by ICTPL at its Terminal and subsequently moved to
MBPT CFS for delivery either as loaded container or for destuffing of the container
and delivery of the cargo, as the case may be, the free period will be counted from the
date of entry of containers at the MBPT CFS for the purpose of levy of demurrage
charges on the cargo inside the containers.
3.
For the purpose of calculation of free days Sundays, Customs notified holidays and
port non working days will be excluded.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
3 1
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
4.
Free period of 10 days will be allowed for salvaged goods and the free period will be
counted from the date on which goods are actually salvaged.
5.
In order to promote export aggregation certain specified area will be identified from
time to time for specified cargo. A maximum of 30 free days will be allowed in such
cases.
6.
Demurrage charge on both cargo and container shall not accrue for the period when
the port is not in a position to deliver cargo/container when requested by the users.
7.
DEMURRAGE ON GOODS DETAINED BY THE CUSTOMS
(a)
Periods during which the goods are detained by the Commissioner of
Customs for the purpose of special examination involving analytical or
technical test other than the ordinary process of appraisement and certified
by the Commissioner of Customs to be not attributable to any fault or
negligence on the part of the importers; and
(b)
Where goods are detained by the Commissioner of customs on account of
Import Control formalities and certified by the Commissioner of Customs to
be not attributable to any fault or negligence on the part of the Importer, for
such period of detention under (a) and (b), the demurrage charges shall be
recovered as under:
First 30 days of detention
: 20% of the applicable demurrage
31st day to 60 days of detention : 50% of the applicable demurrage
61st day onwards of detention : 100% of the applicable demurrage
8.
Demurrage charges will be assessed on the gross weight of the goods. Gross
weight if not in exact multiples of 100 kgs will be rounded off to the next higher
multiple of 100 kgs. for levy of charges.
9.
No wharfage will be charged on shut out cargo. Demurrage as per Section 3.1(B)
shall be levied on Shut out cargo from the date of admission of cargo into docks till
and including the date of removal. Shut out cargo must be removed by shippers on
receipt of three days' notice from the MBPT or its authorised person. In case of non-
compliance, the MBPT or its authorised person may remove such goods to a place at
the expenses of shippers.
Any export cargo meant for shipment through Mumbai Port Trust but moved out of
Mumbai Port Trust area either in break bulk form or after stuffing, with Customs
permission for any purpose shall be treated as “Back to Town cargo” only and shall
attract demurrage as per Section 3.1(B) of the SOR.
3.1. (C) Uncleared goods
Uncleared goods when sold by the MBPT under section 61 and 62 of the Major
Port Trust Act, 1963, a free period of 15 working days will be allowed following
the date of receipt of printout of Customs Out of Charge. Where Customs Out of
Charge is not involved, free period of 15 working days will be allowed following
the date of Delivery Order. On the expiry of ‘Free Days’ demurrage will be
charged at the rate of ₹255.08 per tonne per day on goods remaining uncleared
until delivery is effected.
If, however, the goods or a portion thereof remain uncleared on the premises of
the Board beyond 20 days following the date of confirmation of the sale, the sale
proceeds of the goods, or if only a portion of the goods remain to be taken
delivery of by the purchaser, the proportionate sale proceeds, shall be forfeited
and the goods or a portion thereof, as the case may be, resold by the Port Trust.
The aforesaid period of 20 days may be extended, at the discretion of the MBPT
or its authorised person, in suitable cases, for reasons to be recorded in writing,
32
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
having due regard to the circumstances of the case or to the quantity and bulk of
the goods to be removed by the purchaser.
3.1
(D) Charges for providing On Board Stevedoring Services payable by the
Indenters/ Vessel Agents/Vessel Owners/Container Operators
Sr.
No.
Commodity/Activity
Basis of
Charges
Stevedoring
rate (without
gear) (in ₹)
Ceiling
Rate for
supply of
gear by the
port (in ₹)
(1)
(2)
(3)
(4)
(5)
Foreign Coastal
1.
Steel
Coil,
Steel
Plates
(including hot rolled ship
building plates, ship building
/ boiler quality steel plates,
steel bulb flat bars/steel flat
bars / steel shoe sections
prime flat rolled ship builder
plates),
Pipes
(including
seamless tubulars, DIL well
drilling
equipment
pipes,
steel welded tubulars) and
Angles
&
other
steel
products, Billets
Per tonne
136.49
81.90
26.47
2.
Bagged Cargo
Per tonne
224.51
134.70
26.47
3.
Wooden Logs
Per tonne
259.21
155.52
26.47
4.
General Cargo
Per tonne
285.99
171.60
26.47
5.
Oil Cake in Bulk ,Dry Bulk &
others
Per tonne
237.77
142.66
45.37
6.
Machinery/Project Cargo
Per tonne
352.71
211.63
26.47
7.
Vehicle
(a). Vehicles including bull
dozers, forklifts, tractors,
cranes and Military
Tanks less than
10 tonnes by RORO
operation.
Per vehicle
per operation
93.57
56.15
--
(b). Vehicles including bull
dozers, forklifts,
tractors, cranes and
Military Tanks more
than 10 tonnes by
RORO operation.
-- do --
668.13
400.89
--
(c). All other vehicles
including bull dozers,
forklifts, tractors, cranes
and Military Tanks by
LOLO operation.
-- do --
668.13
400.89
--
8.
Wood Pulp
Per tonne
192.41
115.45
--
9.
Metal scrap
Manual Handling – without
gear
Per tonne
512.00
307.20
21.07
Mechanical Handling
Per tonne
302.99
181.79
74.55
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
3 3
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
10.
CONTAINER
a).
Stuffing
(i) Other than Dry Bulk Cargo
Per TEU
6698.25
4018.95
30.56 per
box
(ii) Dry Bulk Cargo
Per TEU
6929.33 4157.60
31.62 per
box
b).
De-stuffing
(i) Other than Dry Bulk
Cargo
Per TEU
4123.41 2474.05
30.56 per
box
(ii) Dry Bulk Cargo
Per TEU
4265.66 2559.41
31.62 per
box
11.
On-board stevedoring using
Ship’s crane
Per Box
1490.32 894.19
111.99
12.
On-board stevedoring using
Port Gantry crane
Per Box
900.95
540.58
---
13.
Containers brought by
barges
Per Box
668.13
400.89
111.99
14.
Cargo handled by coastal
barges.
Per tonne
-
40.10
24.06
15.
Zinc ingots
Per tonne
205.73
123.41
26.47
Notes:
(i)
A vessel agent may bring his own gear for loading/unloading, stuffing and
destuffing operations. In case the port supplies gear for loading/unloading,
stuffing and destuffing operations, then the rate as prescribed in column number
(5) above shall be leviable as a ceiling rate.
(ii)
Lashing and unlashing containers on board the vessel shall be the responsibility of
the vessel agents. If lashing and unlashing service is provided by the port ₹59/-,
₹ /- and ₹/- extra per 20' unit, 40' unit and above 40' unit
respectively shall be leviable.
(iii)
Lashing and unlashing of steel cargo is the responsibility of the shipping agents.
The rates do not include lashing and unlashing charges and no rebate is,
therefore, allowed for lashing and unlashing of steel cargo.
(iv)
The term “Vessel” will include boats, barges and craft of GRT 1000 and above.
(v)
The rate at Sr. No. 14 of Section 3.1(D) of SOR, i.e. Cargo handled by coastal
barges applicable for cargo brought and loaded by barges (having GRT less than
1000) plying between MbPT and other nearby Indian Ports.
(vi)
For cargo brought and loaded by barges (having GRT more than 1000) plying
between MbPT and other nearby Indian Ports, the barge is treated as coastal
vessel and the rates provided in Column “coastal” as per type of cargo /
commodity under Sr.No.1 to 9 and 16 of Section 3.1(D) of SOR are applicable.
(vii)
In cases of cargo unloaded from foreign vessel and brought by coastal barges
and cargo loaded in coastal barges for subsequent loading on to foreign vessels,
Stevedoring charges are recovered treating the vessels as “foreign” vessel and
the rates provided in column “foreign” as per type of cargo/commodity under
Sr.No.1 to 9 and 16 of Section 3.1(D) of SOR are applicable.
(viii)
In cases of cargo unloaded from coastal vessels and brought by coastal barges to
the port and cargo loaded in coastal barges for subsequent loading on to coastal
vessels, Stevedoring charges are recovered treating the vessels as “coastal
vessels” and the rates provided in column “coastal” as per type of
cargo/commodity under Sr.No.1 to 9 and 16 of Section 3.1(D) of SOR are
applicable.
भाग दोन (संकीर्ण)–५
34
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
3.1
(E) Charges for supply of chipping and painting workers
₹1283/- per labour per shift plus overtime wages at actuals
3.2. Wharfage charges leviable at Jawahar Dweep and Pir Pau
Sr.
No.
Description of Goods
Foreign
Going Vessel
(₹per tonne)
Coastal
Vessel
(₹per tonne)
1.
POL and POL Products
(i)
Crude Oil
(ii)
Kerosene and Light Diesel Oil
89.01
58.52
89.01
58.52
(iii)
All other POL products viz.,
Naphtha and Solvent, Fluxing and
Lubricating, Turpentine and Vapourising
Grease,
Bitumen,
Petroleum
Jelly,
Motor Gasoline, Motor Spirit, Liquified
petroleum Gas etc.
(a) Handled at the Jawahar Dweep
(b) Handled at the Pir Pau
103.02
75.18
103.02
75.18
2.
Chemicals viz. Ammonia, EDC, Ethyle,
Benzine, Paraxylene, M.E.G., N.
Paraffin, Orthoxylene and other liquids
in bulk
150.35
90.21
3.
Edible oil handled at Pir Pau
41.00
24.59
3.3.
STORAGE FEES AND WAREHOUSING CHARGES
(A) (I). Fees for storage / cargo operation with or without installation of facilities,
cargo handling equipment by the users for offshore activities
Period
Rates Applicable
From the date of permission
till expiry for
Per sq. mtr. of part thereof per
month or part thereof @
a. Open area
(i) Other than Dry Bulk Cargo
₹97/-
(ii) Dry Bulk Cargo
₹/-
b. Covered area
(i) Other than Dry Bulk Cargo
₹115/-
ii) Dry Bulk Cargo
₹120/-
Note : Installation of facilities/ cargo handling equipment shall be subject to the
clearance by MBPT and shall be dismantled and removed within 15 days
from the date of issue of notice.
Above Charges are applicable only for storage of offshore material / cargo
and shall be valid for 11 months only for a specified place.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
3 5
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(II).
Storage Fees on the goods stored in the areas specified by the MBPT
for storage of cargo upto a maximum of 60 days
Period of Storage
Rate per sq. mtr. or part
thereof per month or
part thereof. (in ₹)
In sheds
i) First 30 days or part
thereof
a) Other than Dry Bulk
Cargo
76
b) Dry Bulk Cargo
78
ii) 31st day to 60th day
a) Other than Dry Bulk
Cargo
154
b) Dry Bulk Cargo
159
Open Yards
i) First 30 days or part
thereof
a) Other than Dry Bulk
Cargo
57
b) Dry Bulk Cargo
59
ii) 31st day to 60th day
a) Other than Dry Bulk
Cargo
115
b) Dry Bulk Cargo
120
Note:
The cargoes lying uncleared beyond 60 days shall be subjected to demurrage
from the 61st day onwards under Section 3.1 (B) of Chapter-III of the Scale of
Rates. For the purpose of levy of demurrage the 61st day of storage of cargo will
be treated as day number one.
(III).
Fee for management of cargo operation (for occupation other than for
cargo storage):
Description
Rate
(i)
Fee for space allotted to Vessel
Agents/Stevedores/CHAs/Transporters/
Port Users including Govt. agencies in
the Port Trust building.
₹395.10 per sq. mtr. or part
thereof per month or part
thereof.
(ii)
Fee for open areas permitted to be
used for carrying out cargo activities by
placing chowkey / porta cabin etc.
₹215.52 per sq. mtr. or part
thereof per month or part
thereof.
Notes to tables II & III:
(i) The MBPT can reject the request or withdraw the permission granted
in such cases, the reasons therefor will be communicated to the
allottee.
(ii) If the area allotted is found to be utilised for any unauthorised purpose
then, the MBPT will withdraw the permission granted.
भाग दोन (संकीर्ण)–५अ
36
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(IV). Fee for commercial establishments like shop, duty free shop, curio shop,
cyber café, communication center, forex center, etc.
Description
Rate
Fee for space allotted in the
Mumbai Port Trust buildings
₹689.42/- per sq. mtr. or part
thereof per month or part
thereof
Notes:-
a. Period of allotment is for 11 months.
b. Whenever MBPT requires this area, the operator will have to vacate the
same at one month’s notice and relocate to other area for the remaining
licence period.
c. All relevant permissions shall be obtained by the operator.
d. All allotments shall be on tender basis, with premium over the above
mentioned rate being the selection criteria.
(V) Fees for storage / warehousing permitted by the MBPT with or without
installation of facilities, cargo handling equipment by the users in non
custom notified areas.
Period
Rate Applicable
From the date of permission till
expiry
Per sq. mtr. or part thereof per
month or part thereof
Open area
(i) Other than Dry Bulk Cargo
₹38/-
(ii) Dry Bulk Cargo
₹40/-
Note: Installation of facilities/ cargo handling equipment shall be subject to the
clearance by MBPT or by persons authorized by it and shall be dismantled and
removed within 15 days.
(B)
Storage fees on goods bonded under Section 60 of the Customs Act, 1962, and
stored in the warehouses and open yards belonging to the Board and licenced
by the Collector of Customs under the Customs Act, 1962:
Period of storage
Rate per sq. mtr. per week
or part thereof
(a) In Sheds:
i) For the first 8 weeks
₹
Other than Dry Bulk Cargo
11.98
Dry Bulk Cargo
12.40
ii) For the next 8 weeks
Other than Dry Bulk Cargo
23.95
Dry Bulk Cargo
24.77
iii) From 17th week onwards
Other than Dry Bulk Cargo
35.93
Dry Bulk Cargo
37.16
(b) In the Open Yards :
i) For the first 8 weeks
Other than Dry Bulk Cargo
9.58
Dry Bulk Cargo
9.90
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
3 7
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
ii) For the next 8 weeks
Other than Dry Bulk Cargo
19.15
Dry Bulk Cargo
19.82
iii) From 17th week onwards
Other than Dry Bulk Cargo
28.74
Dry Bulk Cargo
29.73
Note : The above charges are subject to a minimum calculated as for 5 sq. mtrs.
for each consignment.
(C)
Storage Fees on Over-dimensional packages stored in Docks, Sheds and Yards shall
be payable in lieu of demurrage at the rate of ₹11.98 per sq. mtr. subject to minimum
of 5 sq. mtr. for 30 days following the date from which the consignment is out of
custom charge and is ready for clearance subject to the following conditions :
(i)
Definition of OD packages to be transported by rail would mean packages
having length over 13'6" or having width over 10'. The fee on above
mentioned OD packages would be applicable only on receipt of application
from the importer and on placement of indent for supply of special wagons.
(ii)
For packages to be transported by road, the OD packages would mean a
package having length over 40' or the length protruding over and above
the motor vehicle allowed by the RTO or having width more than 8'6" Plus
protruding width over and above the motor vehicle allowed by the RTO
from time to time.
iii).
After the free period of three days from the day of complete discharge of
vessels cargo as admissible under note 1 below Section 3.1 (B)
Demurrage above till the day on which the cargo is out of Custom charge
and from 31st day from the day on which the cargo is out of Custom charge
the over dimensional packages shall accrue demurrage as per Section 3.1
(B) Demurrage ibid.
3.4.
WHARFAGE
COMPENSATION
PAYABLE
BY
ONGC
IN
TERMS
OF
AGREEMENT dated 28.01.2005 SIGNED BETWEEN MBPT AND ONGC:
ONGC shall pay to the Mumbai Port Trust a compensation at one half (1/2) of
wharfage rate as applicable on the per tonne of crude oil which will be imported
into the Port of Mumbai through all or any of these ONGC pipelines and which will
not be exported through the MBPT Marine Oil Terminal, Jawahar Dweep through
any other existing and future Oil, Gas or Chemical Terminals of the MBPT.
CHAPTER - IV
CRANAGE
4. (A)
Charges for use of Mobile Cranes and Equipment:
Sl.
No.
Type of Crane / Equipment
Charges per Crane /
Equipment
Minimum
charges
₹
Per shift
₹
Per 1/2 shift
₹
1.
Mobile Cranes (10 to 14 tonne
capacity)
5345
3055
3055
2.
Tractor
1273
764
764
3.
Forklift (2/3 tonnes)
1527
1019
1019
38
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
CHAPTER – V
CONTAINER RELATED CHARGES
5. (A) Composite charges on Cargo Containers Handled with Quayside Gantry Cranes
Description
Containers upto 20'
Containers Above 20' but upto
40'
Containers length above 40'
Rates for
Foreign
Containers
(in ₹)
Rates for
Coastal
Containers
(in ₹)
Rates for
Foreign
Containers
(in ₹)
Rates for
Coastal
Containers
(in ₹)
Rates for
Foreign
Containers
(in ₹)
Rates for
Coastal
Containers
(in ₹)
Loaded Empty Loaded Empty Loaded Empty Loaded Empty Loaded Empty Loaded Empty
General
Containers
5030
4012
3018
2407
7544
6017
4527
3610
10060
8022
6036
4813
ICD Containers
7676
6658
4606
3995
11515
9988
6909
5993
15351
13317
9210
7991
Transhipment
Containers and
Same Bottom
Containers
5986
5171
3592
3103
8980
7756
5387
4654
11971 10343
7184
6206
Export
containers
brought by
Barges under
Shipping Bills
from other
ports for
shipment
6047
5232
3629
3140
9071
7850
5443
4710
12094
10464
7257
6278
Containers
moved by
barges
between MBPT
& other ports
6108
5091
3665
3055
9162
7635
5498
4581
12216
10182
7331
6108
5. (B) Composite charges on Cargo containers Handled with cranes other than Quayside
Gantry Cranes.
Description
Containers upto 20'
Containers Above 20' but
upto 40'
Containers length above
40'
Rates for
Foreign
Containers
(in ₹)
Rates for
Coastal
Containers
(in ₹)
Rates for
Foreign
Containers
(in ₹)
Rates for
Coastal
Containers
(in ₹)
Rates for
Foreign
Containers
(in ₹)
Rates for
Coastal
Containers
(in ₹)
Loaded Empty Loaded
Empty
Loaded Empty Loaded Empty Loaded Empty
Loaded Empty
General Containers 3808
3400 2286
2039
5712 5102 3427 3061 7615 6799
4568 4079
ICD Containers
6454
6047
3873
3629
9683
9071
5811
5443
12910
12094
7745
7257
Transhipment
Containers and
Same Bottom
Containers
5680
5071 3410
3043
8521 7607 5113 4564 11360
10140 6816
6084
Export containers
brought by Barges
under Shipping
Bills from other
ports for shipment
5741
5130 3445
3078
8612 7696 5168 4618 11483
10261 6889
6157
Containers moved
by barges between
MBPT & other ports
4888
4481 2932
2689
7328 6720 4398 4033 9773
8959
5864
5376
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
3 9
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
Notes: Sections 5 (A) & 5(B)
(i).
The above composite rates include the following charges towards onboard
stevedoring and inclusion of this element in THC levied by the Shipping Lines/
Agents shall be regulated in accordance with the Order of TAMP passed in case
no: TAMP/47/2000-MBPT, dated 12 June 2001:
Quayside Gantry Cranes:
(a)
All general Containers and all ICD Containers
₹708.55
(b)
All Transhipment containers and all same bottom ₹
1417.10 Containers
(c)
All export containers brought by barges under
₹1243.01
shipping bills from JNPT for shipment through MBPT
Non-Quayside Gantry Cranes:
(a)
All general Containers and all ICD Containers
₹1179.98
(b)
All Transhipment containers and all same bottom ₹ 2359.95
Containers.
(c)
All containers handled by barges to and fro JNPT ₹534.47
(d)
All export containers brought by barges under ₹1714.45
shipping bills from JNPT for shipment to MBPT
(ii). Cargo container means specifically designed container of uniform size for
consolidating goods within compact unit.
(iii). The above charges include on board stevedoring charges, handling at shipside, lift
on of export / lift off import containers at the pre-stack area, removal of container
between shipside and pre-stack / RCD yard in docks, loading / off loading of ICD
containers on Railway wagons within the Docks.
(iv)
Additional services of loading/unloading of containers on to the wagons/Agents’
trailors and hauling to and fro shunting yard at wadala will be provided to the ICD
containers.
(v)
Lashing and unlashing containers on board the vessel shall be the responsibility of
the vessel agents. If lashing and unlashing service is provided by the port ₹60/-,
₹92/- and ₹123/- extra per 20’ unit, 40’ unit and above 40’ unit respectively shall be
leviable.
(vi)
When a transshipment container is unloaded by gantry crane and loaded by Non
Gantry crane or vice versa, 50% of the Box rate for Transhipment containers
prescribed at Section-5(A) and Section-5(B) respectively will be applicable.
(vii)
(a).
Container from a foreign port which reaches an Indian Port ‘A’ for
subsequent transshipment to Indian Port ‘B’ will be levied the
concessional charges relevant for its coastal voyage. In other words,
containers from/to Indian ports carried by vessels permitted
to undertake coastal voyage will qualify for concession.
(b).
A container from foreign port landing at MBPT for subsequent
transhipment to an Indian Port on a coastal voyage or vice versa would be
charged at 50% of the transhipment charge prescribed for foreign-going
vessel and 50% of that prescribed for the coastal
category.
(viii) Empty containers received from/removed to ICD by road shall be treated on par
with local empty containers for levy of charges.
(ix)
Charges for containers handled by Toplift Trucks or Transtainer or Reach Stacker
shall be levied separately.
40
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(x)
Import loaded container manifested as local if subsequently transhipped to ICD
shall be treated as local container till the date on which the container has been
allowed by the Customs to be transhipped to ICD. Similarly ICD import containers
destuffed and cleared from the port shall be treated as FCL for levy of Port
Charges.
(xi). A premium of 25% will be charged for Hazardous containers and will be applicable
in respect of permissible 'A' category containers as also 'B' & 'C' category
containers.
5. (C) With the prior permission of the MBPT authorities, rebates shall be applicable to
the port users for carrying out various container operations with their own
arrangements. The rebates applicable along with the conditions are as follows:
(i). Stevedoring Charges
(a). When Gantry crane is used
Sr.
No.
Particulars
Foreign-Going (in ₹)
Coastal (in ₹)
20'
40'
Over
40'
20'
40'
Over
40'
1.
General
and
ICD
containers
Loaded
708.55
708.55
708.55
425.13
425.13
425.13
Empty
708.55
708.55
708.55
425.13
425.13
425.13
2.
Transshipment
and
same bottom containers
Loaded
1417.10
1417.10
1417.10
850.26
850.26
850.26
Empty
1417.10
1417.10
1417.10
850.26
850.26
850.26
3.
Export
Containers
brought
by
barges
under
shipping
bills
from other ports for
shipment
Loaded
1243.02
1243.02 1243.02
745.82
745.82
745.82
Empty
1243.02
1243.02 1243.02
745.82
745.82
745.82
(b). When crane other than Gantry crane is used
Sr. No.
Particulars
Foreign-Going (in ₹)
Coastal (in ₹)
20'
40'
Over 40'
20'
40'
Over 40'
1.
General
and
ICD
containers
Loaded
1179.98
1179.98
1179.98
707.98
707.98
707.98
Empty
1179.98
1179.98
1179.98
707.98
707.98
707.98
Sr. No.
Particulars
Foreign-Going (in ₹)
Coastal (in ₹)
20'
40'
Over 40'
20'
40'
Over 40'
2.
Transshipment
and
same bottom
containers
Loaded
2359.95
2359.95
2359.95
1415.98
1415.98 1415.98
Empty
2359.95
2359.95
2359.95
1415.98
1415.98 1415.98
3.
Containers handled by
barges to and fro other
ports
Loaded
534.47
534.47
534.47
320.68
320.68
320.68
Empty
534.47
534.47
534.47
320.68
320.68
320.68
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
4 1
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
4.
Export
Containers
brought by barges under
shipping bills from other
ports for shipment
Loaded
1714.45
1714.45
1714.45
1028.68
1028.68 1028.68
Empty
1714.45
1714.45
1714.45
1028.68
1028.68 1028.68
(ii).
Transportation Charges
Sr.
No.
Particulars
Foreign-Going (in ₹)
Coastal (in ₹)
20'
40'
Over 40'
20'
40'
Over 40'
1.
General,
ICD
and
containers handled by
barges to and fro
other ports
Loaded
1150.38
1725.56
2300.74
690.23
1035.33
1380.45
Empty
936.59
1404.87
1873.18
561.94
842.94
1123.91
2.
Transshipment, Same
bottom
Containers
and
Export
Containers brought
by
barges
under
shipping
bills
from
other
ports
for
shipment through
MBPT.
Loaded
2300.74
3451.12
4601.50
1380.45
2070.67
2760.90
Empty
1873.18
2809.77
3746.34
1123.91
1685.86
2247.82
5. Charges on container handling equipment
(1) charges will be leviable on container handling equipment per move as
follows:
Containers upto
20'
Containers Above 20'
but upto 40'
Containers length
above 40'
Foreign
Coastal
Foreign
Coastal
Foreign
Coastal
US $
₹
US $
₹
US $
₹
(a).Quayside
Gantry
Crane
38.68
1010.21
58.02
1514.50
77.37
2020.40
(b).Rubber Tyred Yard
Gantry Crane/ Reach
Stacker/ Top Lift Truck
(TLT)
10.19
266.26
15.28
399.37
20.37
532.50
(c).Trailer
29.53
770.56
44.25
1155.86
59.04
1541.14
(2)
composite box rate for on board shifting operations of containers.
Description
Foreign (in ₹)
Coastal (in ₹)
20’
40’
Above 40’
20’
40’
Above 40’
Loaded Empty Loaded Empty Loaded Empty Loaded Empty Loaded Empty Loaded Empty
Gantry Crane
2489
2489
4268
4268
4268
4268
1493
1493
2561
2561
2561
2561
Ship Crane
1181
1181
1181
1181
1181
1181
709
709
709
709
709
709
भाग दोन (संकीर्ण)–६
42
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(3)
Charges for miscellaneous handling by Quayside Gantry Cranes:
(a)
For opening hatch cover / pontoon and placing it -
Foreign
Coastal
(i) by placing it on the quay (full cycle)
US $ 154.74
₹4040.80
(ii) without placing it on the quay.
US $ 77.37
₹2020.40
(b)
For discharging/loading packages, units vehicles and / or
any other material except containers individually
weighing 20 Tonnes and above per operation/move.
US $ 309.49
₹8081.59
(c)
For discharging/loading packages, units vehicles and / or
any other material except containers individually
weighing less than 20 Tonnes per operation/move.
US $ 154.74
₹4040.80
5. (E) Storage fees on containers:
Rate per day or Part thereof
Sr.
No.
Place of Storage
Container
having
length upto
Container
having length
over 20’ but
Container
having
length
20’
upto 40’
above 40’
(1).
Loaded/Empty
container
landed and stored or brought
for
export
and
stored
anywhere in the declared
Customs areas of the port.
US $ 6.22
US $ 12.46
US $ 18.68
(2).
Empty Container stored in the
areas other than the declared
customs areas of the Port.
US $ 1.25
US $ 2.49
US $ 3.74
(3).
Empty or loaded containers
received from/ despatched to
ICD by Rail/Road.
US $ 6.22
US $ 12.46
US $ 18.68
(a) In case of import containers above charges are leviable from the date following
the date of completion of vessel’s import operations.
(b) In case of export containers above charges are leviable from the date of stuffing
of containers at Port’s CFS or from date of bringing in of fully loaded container
till the date prior to the date of shipment (i.e. excluding the date of shipment)/ the
date of removal in case of Empty Container.
(c) In the case of ICD containers charges are leviable after the expiry of two days
from the date following the date of completion of vessel’s import operation till the
date of their loading on wagons/ removal by road or from two days following the
date of receipt of containers at RCD from the upcountry ICD’s or storage yards
till the date prior the date of shipment (i.e. excluding the date of shipment). In
case a container is not removed/ shipped within 10 days from the date following
the date of completion of import operations in case of import or from the date of
receipt in case of export, the Storage Fees will be levied at double the rate
prescribed at 5 (E) (3) above from 11th day.
(d) Hazardous container will be charged at 25% premium.
(e) Demurrage charge on both cargo and container shall not accrue for the period
when the port is not in a position to deliver cargo/container when requested by
the users.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
4 3
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
Notes:
(1)
Import loaded containers removed out of port area for destuffing shall be
charged storage fees from the date following the date of completion of vessel’s
import operations till the date of removal including the date of removal.
Similarly, export loaded/empty containers received from the areas other than
port premises shall be charged storage fees from the date of receipt till the day
prior to the date of shipment (i.e. excluding the date of shipment).
(2)
If a container has already been charged storage fees on a particular day under
Section 5(E) above, the same unit will not be charged once again on the same
day even if it is moved between the areas referred to above.
(3)
The charges on a container shall be levied irrespective of whether the container
is stored on chassis or on ground or stacked high.
(4)
Storage fees on Containers brought under Shipping Bill for export shall be
charged in terms of provisions of Section 5 (E) above from the date of receipt of
the container in the port premises.
(5)
The combined Transport Operators/Masters, Owners or Agents of vessels shall
remove the containers to the respective site/yard/destuffing point nominated by
the Traffic Manager, within a period of 4 calendar days following the date of the
vessels
completion
of
import
operation.
If
the
combined
Transport
Operators/Masters, Owners or Agents of vessels fail to remove such containers
to the nominated areas within the prescribed period of 4 calendar days, the
Traffic Manager shall have the authority to remove such containers to the
nominated areas at the risk and cost of combined Transport Operators/Masters,
Owners or Agents of vessels. Removal charges as notified from time to time will
be levied on such containers.
(6)
Container stuffed in the Port premises/container received in Docks duly stuffed in
the areas other than Mumbai Port premises and removed for shipment through
Ports other than Mumbai shall be charged fees as per section 5 (E)(a) above
from the day following the date of stuffing/from the date of receipt till the date of
removal of container. In the case of containers stuffed in the Port
premises/containers received duly stuffed in the areas other than Mumbai Port
premises and removed to town shall be charged Fees of US $ 6.22(Coastal
₹.270.96/-) for a container having length upto 20 feet, US $ 12.46 (Coastal – ₹.
541.93/-) for a container having length above 20 feet but upto 40 feet and US $
18.68 (coastal ₹. 812.91/-) for a container having length above 40 feet per day
or part thereof from the day following the date of stuffing/from the date of receipt
till the date of removal of the containers. The cargo inside the container shall be
charged demurrage at the rate of ₹828.74/- per TEU per day or part thereof for
the period of its stay in the Port. [No separate wharfage shall be recovered either
on such container or on cargo inside the container.]
(7)
The Import loaded containers discharged at an Indian port other than Mumbai
and brought to Mumbai by Rail/Road for giving delivery shall be charged Fees
as per Section 5 (E)(a) above. In the case of containers received by Rail,
handling charges of US $ 99.31 (Coastal – ₹. 4322.23/-) per TEU shall be
levied. Demurrage on the cargo inside the containers shall be charged as per
Section 3.1 (B) of Chapter-III from the date of receipt.
(8)
No Storage Fees shall be levied on containers loaded with cargo and
seized/detained by the Customs/DRI/CIU etc. from the day of its removal to the
area allotted by the Board to the Customs for storage of such containers.
Demurrage on the cargo inside the container shall be leviable as under :-
भाग दोन (संकीर्ण)–६अ
44
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
First 30 days of detention
: 20% of the applicable demurrage
31st day to 60 days of detention : 50% of the applicable demurrage
61st day onwards of detention : 100% of the applicable demurrage
(9)
Any consignee desires to clear FCL through private CFSs within or outside
jurisdiction of the Commissioner of Customs, Mumbai shall remove the
containers within 7 working days from the date following the date of completion
of vessel’s import operation. On the cargo inside the container a consolidated
charge of ₹ 3974.00 (Coastal ₹ 2385/-) per TEU shall be recovered. In case
container is not removed within the said period of 7 working days the demurrage
charges at the rate prescribed in Section 3.1 (B) of Chapter-III shall be levied on
the cargo inside the container.
(10)
Demurrage charges on the cargo stuffed inside the container and subsequently
destuffed and removed back to town shall be levied as Note (6) above. No
wharfage shall be levied thereon. Similarly, in the case of cargo stuffed inside
the container and subsequently destuffed and again restuffed in the container
and shipped on board the vessel, demurrage charges shall be levied as per
Note (6) above till the date of restuffing of cargo inside the container and
wharfage in terms of Section 3.1 (A) of Chapter-III shall also be levied on cargo
inside the container.
(11)
Storage charges on abandoned FCL containers/ Shipper owned containers shall
be levied upto the date of receipt of intimation of abandonment in writing or 75
days from the date of landing of container whichever is earlier subject to
following conditions.
(i)
The consignee can issue a letter of abandonment at any time.
(ii)
If the consignee chooses not to issue such letter of abandonment, the
container Agent/ MLO can also issue abandonment letter subject to the
condition that,
(a). the line shall resume custody of container along with cargo and
either take back it or remove it form the port premises; and
(b). the line shall pay all port charges accrued on the cargo and
container before resuming custody of the container.
(iii).
The container Agent/ MLO shall observe the necessary formalities and
bear the cost of transportation and destuffing. In case of their failure to
take such action within the stipulated period, the storage charge o
container shall be continued to be levied till such time all necessary
actions are taken by the shipping lines for destuffing the cargo.
(iv).
Where the container is seized/ confiscated by the Custom Authorities
and the same cannot be destuffed within the prescribed time limit of 75
days, the storage charges will cease to apply from the day the Custom
order release of the cargo subject to lines observing the necessary
formalities and bearing the cost of transportation and destuffing.
Otherwise, seized/confiscated containers should be removed by the
line/consignee from the port premises to the Customs bonded area and
in that case the storage charge shall cease to apply from the day of
such removal.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
4 5
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(12)
The container other than ‘shipper owned container’ shall be removed from the
regular storage area and moved to Sales Warehouse / Overflow Sheds by the
Port Trust at the cost and responsibility of the Main Line Operators (MLOs) and
thereafter, the container can be destuffed before the empty containers are
removed from the Trust’s premises by the MLOs.
5. (F) Charges payable for reefer points :
(1)
For every reefer plug point allotted, a charge of US $ 13.22 (Rate for
coastal container is ₹. 575.96/- per container per Unit of 4 hours or part
thereof will be levied.)
(2)
Reefer points will be allotted on per container/per point basis.
(3)
The combined Transport Operators/Masters, Owners or Agents of vessels
shall provide their own cables from the sources of supply (plug points
provided for the purpose) to the Reefer Container and shall employ their
own qualified staff to connect the reefer container to this supply and
attend on it when in use.
(4)
The Traffic Manager reserves the right to supply power to reefer
containers and shall not be responsible for any loss whatsoever that
the combined Transport Operators/Masters, Owners or Agents of
vessels may incur in the event of
(a)
failure of electric supply due to reasons beyond the control of the
Mumbai Port Trust,
(b)
Mumbai Port Trust's inability to supply power in time, and
(c)
disconnect the supply without assigning any reason, should this
become necessary for smooth operation in the Docks.
(5)
Persons employed to connect/disconnect and monitor reefer containers at
the reefer power supply points shall have a licence issued by the Chief
Mechanical Engineer of the Port.
5. (G) Charges in respect of Port Trust labour supplied for stuffing or destuffing of
cargo containers:
Per Container
(i) Container having length upto 20’
(ii) Container having length over 20’
but upto 40’
(iii) Container having length above 40’
Foreign
US $ 58.04
US $ 116.05
US $ 174.08
Coastal
₹2525.41
₹5050.76
₹7576.18
5. (H) Charges on Containerised Cargo
(1)
Wharfage and demurrage as applicable under Sections 3.1 (A) and
3.1 (B) of Chapter-III shall be payable on import containerised
cargo, excepting those destined to ICD and the FCLs cleared through
Private CFS in terms of note (9) to Section 5 (E) above.
46
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(2)
The term 'LCL' means the container containing cargo belonging to more
than one consignee in the vessel's manifest and the term 'FCL' means
container containing cargo belonging to one consignee in the vessel's
manifest. The consignee means the person/firm/company in whose
name the Bill of Lading is prepared.
(3)
(i)
In the case of containers, other than that destined to or
received from ICD and the FCLs cleared through private CFS
demurrage on cargo in container shall not accrue for seven
working days in respect of FCLs and LCLs from the date
following the date of completion of vessels import operation.
(ii)
If FCL/LCL has not reached the notified area/destuffing point
when the consignee approaches with the Bill of Entry having
Customs order for examination of goods or for delivery, the
consignee
may
make
a
Log
Entry
at
the
nominated
area/destuffing point.
(iii)
If the Log Entry is made on the basis that the container has
not reached the notified area/destuffing point, no demurrage
shall accrue from the date of Log Entry till the receipt of the
container at the notified area/destuffing point plus three
working days. No intimation regarding receipt of container at the
nominated area/destuffing point will be given.
(iv)
The consignee shall have to make a fresh Log Entry every twenty
calendar days till the container reaches the notified area /
destuffing point. If the consignee fails to make the fresh Log
Entry on the twenty first day but makes fresh Log Entry after
lapse of some period, demurrage on cargo inside the container
shall be levied for the period not covered by the Log Entry. If the
twenty first calendar day is a non-working day, being a
Docks Holiday, consignee may make the Log Entry on next
working day.
(v)
If the FCL container, other than that destined to or received
from ICD, transhipment containers and the FCLs cleared through
private CFS, having reached the notified area has not been
destuffed for no fault of the consignee, the consignee will
be entitled to a remission in demurrage charges on obtaining
the endorsement on the Bill of Entry as under :
Conditions to be
fulfilled
Endorsement of the
B/E by the Docks
official
Non-accrual of
demurrage.
(a)
B/E
to
be
presented with order
for
Customs
examination
of
cargo
and
documents of title
Endorsement
“Consignee
presented
document with orders for
Customs
examination,
but goods could not be
forwarded
for
examination” (reasons to
be recorded in writing) to
be made by the Shed
Supdt. and signed by the
Asstt. Manager
3
Calendar
days
including
the
date
of
presentation of
B/E
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
4 7
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(b)
B/E
to
be
presented with “Out
of Customs charge”
endorsement/ ready
for clearance
Endorsement “Cargo not
destuffed”, (reasons for
not
destuffing
the
container
should
be
recorded in writing) to be
made
by
the
Shed
Supdt., and signed by
the Asstt. Manager
3
Calendar
days
including
the
date
of
presentation of
B/E.
(c) On presentation
of B/E on the 2nd
occasion
to
the
Shed Supdt., with
endorsement
of
Customs “ out of
charge
ready
for
clearance” on the 4th
calendar
day
mentioned in Col.(3)
against (b) above.
Endorsement “Cargo not
made
available
for
delivery within the period
of 3 calendar days as
container could not be
destuffed” (reasons to
be recorded in writing) to
be made by Shed Supdt.
and signed by the Asstt.
Manager.
3
Calendar
days
beyond
the period as at
(b) above.
(vi)
If the LCL container is not destuffed and the consignee
approaches on lodgement of document of title to the concerned
CDO and the B/E having the Customs orders for examination or
for delivery, the consignee may make a Log Entry at the notified
area and continue to make fresh Log Entry/Log Entries every
twenty calendar days till the container is destuffed. If the twenty
first calendar day is a non-working day being a Dock Holiday,
consignee may make the Log Entry on the next working day.
No demurrage shall accrue for the period covered by Log Entry
and for 3 working days following the commencement of
destuffing of each container. No intimation regarding destuffing
of the container will be given.
(4)
On export cargo received in the Docks, for shipment in containers,
wharfage charges and demurrage charges under Section 3.1 (A) and
Section 3.1 (B) of Chapter-III shall be levied upto the date of stuffing of
cargo in container and not thereafter.
(5)
Wharfage on cargo inside the export loaded container received from
other than port premises excluding container received from ICD shall be
charged ₹2036/- (Coastal ₹1221/-) for a container having length upto 20
feet, ₹ 3055/- (Coastal ₹1834/-) for a container having length upto 40 feet
and ₹ 4072/- (Coastal ₹2443/-) for a container having length over 40 feet .
(6)
The clauses at Sl. No. (1), (4) and (5) above will not be applicable for the
containers not handled by the MBPT at its berths but brought to its CFS
for cargo management operations and vice-versa and delivery / receipt
purposes.
(7)
A Cargo Management Charge (CMC) of ₹ 2819/- per 20' container
(₹1691/- in the case of coastal containers), ₹4229/- per container above
20' and upto 40' (₹ 2538/- in the case of coastal containers) and ₹ 5638/-
per container above 40' (₹ 3383/- in the case of coastal containers) shall
be recovered in case of import / export containers brought from / taken to
other than MbPT operated berths to / from its CFS / Docks pre-stack / 1
Unclear Warehouse ID for delivery / loading. No wharfage shall be
payable on the cargo inside the container.
The Cargo Management Charges provided on per box basis in respect of
LCL containers be apportioned on pro-rata basis with respect to the
weight of individual/item consignment vis-à-vis the total weight of all
items/consignments of containers as per IGM.
48
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
GENERAL NOTES:
(i).
Mafis and imported chassis shall be treated on par with containers of
equal sizes for levy of all charges under this Section and if the same are
taken back on board the vessel from which they have been discharged,
no charges shall be levied.
(ii).
Transhipment and same bottom containers shall be treated on par with
import containers for levy of licence fees for storage.
6.
An amount of ₹. 155/- per container will be levied on all containers (except transhipment
and coastal) handled at the Major Trusts and BOT terminals operating thereat towards
Mandatory User Charge (MUC) for the Logistics Data Bank (LDB) service rendered by
DMICDC for a period of one year from the date when the Order no. TAMP/12/2019-MUC
dated 24 July 2019 comes into effect. On completion of one year thereafter, ₹. 165/- per
container will be levied as MUC for the next period of one year. The approval accorded
would automatically lapse thereafter unless specifically extended by the Authority.
CHAPTER – VI
CHARGES LEVIABLE AT BUNDERS
Bunder limit means such portion of the wharves and land adjoining the wharves set
aside for goods in transit. A wharf may extend to 15.25 meters measured from the wharf
front.
6.1.
LICENCE FEES
(A)
Licence fees will be levied on vessels registered and vessels using Bunders as
under:
Sl.No.
Description of vessel
Basis of
charging
Monthly Licence
Fees per GRT ₹
1.
Fishing vessels and Trawlers
Rate per GRT
38.13
2.
Vessels using New Ferry
Wharf other than Passenger Boats
-do-
101.80
3.
(a) Passenger Boats
-do-
38.13
(b) Catamarans and Hovercrafts
-do-
63.59
(c) Pleasure Crafts
-do-
76.36
4.
Other vessels including Barges not
covered in the above categories
-do-
89.04
NOTES
(1)
Licence Fees on annual basis shall be 8 times the rates prescribed as
above.
(2)
Vessels using the Port Trust Bunders for the purpose of working cargo,
undergoing survey, repairing or idling, shall pay Licence Fees as
prescribed at 'A' above at the MBPT Cash Collection Centre and obtain
an endorsement on the Licence Book. However, the Vessels occupying
the Wharf/Hard for repairs on its keel or jacked up on the wharf / hard for
changing side plates etc. or being constructed will be charged ₹ 7.61 per
day per GRT from the date of occupation of the hard for the purpose of
construction / repairing.
(3)
Vessels must always carry with them the Licence Book which shall be
presented for inspection whenever so demanded by the MBPT officials
authorized for such inspection.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
4 9
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(4)
Default in adherence to the provisions contained in Notes (1) to (3) above
shall render the vessels being distrained or arrested and sold in
accordance with the provisions contained in the Major Port Trusts Act,
1963 (Act No. 38 of 1963) or the Indian Ports Act, 1908 (Act No. 15 of
1908) and Regulations that may be prescribed thereunder.
(5)
Payment of charges under this Section shall not entitle a vessel to take up
or retain any particular position, in a basin, alongside a wharf or the
approach there to, a Hard, Flat or Wharf or any other portions of the
Bunder premises.
(6)
Annual Licence Fees will not be levied on the following craft provided they
do not ply for hire:
Customs, Water Police, the Central or any Provincial Government and
Surveyors. Also fenders and launches of Shipping Companies employed
in connection with the inspection of crew and landing or embarking
passengers from their own vessels.
(7)
Monthly licence fee shall be charged from the date of registration of the
boat/trawler at the Bunder, valid for one month thereafter.
(8)
Vessels opting to pay Licence Fees on monthly basis shall pay the fees
immediately on their arrival at the Bunders and shall not leave the
bunders without payment of the fees due from them. Default in
adherence to this provision shall render recovery of interest from the
owners at the rate prescribed at Clause 1.2 (v) of the general terms and
conditions at Chapter-I ibid.
(9)
Licence fee for use of Bunders shall not be levied separately on vessels
which pay licence fee for water conveyance under Section 2.11 (II) of
Chapter-II ibid.
(B)
Licence Fees on users and ancillary trade at New Fish Jetty and New
Sassoon Fish Harbour and Old Sassoon Dock.
Sr.
No.
Activity
Rate (₹Per Annum)
1.
Ice Crushing Machine
15270.78/-
2.
Fish Auctioneers
19088.73/-
3.
Hand Carts
764.20/-
4.
Ice Suppliers
10179.50/-
5.
Water Supplier
15270.78/-
6.
Transport / Vehicles
Licensing
(a) ₹1273.34/- per truck per annum
(b) ₹52.25/- per truck per day if permit at (a) above is
not held
7.
Weighing Scale (Katawala)
10179.50 /-
NOTES
1.
Only valid licence holders shall be allowed to carry out above activity
2.
The licences shall be renewed on annual basis.
3.
Registered fishermen's Co-operative societies will be granted rebate of
50% in the above licence fees.
भाग दोन (संकीर्ण)–७
50
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
6.2.
WHARFAGE
On cargo handled at Hay Bunder, Haji Bunder, Malet Bunder and New Ferry
Wharf (except Fish Jetty) and such other Bunders as may be notified separately,
wharfage per tonne will be recovered as under:
Description
Rate (₹)
Basis of
charge
Foreign
Coastal
Dry
Bulk
Other than
Dry Bulk
Dry Bulk
Other than
Dry Bulk
(a ).
Hazardous cargo
Tonne
52.67
50.91
31.61
30.55
(b ).
Non-Hazardous
cargo excluding salt
Tonne
31.61
30.55
18.96
18.34
(c ).
Salt
Tonne
7.86
7.61
4.73
4.56
(d ).
Petroleum products
Tonne
-----
19.59
------
19.59
(e).
Thermal Coal
Tonne
52.67
50.91
52.67
50.91
(f).
Coal other than
thermal coal
Tonne
52.67
50.91
31.61
30.55
(g).
Steel
Tonne
52.67
50.91
31.61
30.55
(h)
Animals, birds,
reptiles etc.
Each
------
29.26
------
17.56
Note:
(i). No wharfage will be recovered at fish jetties of Sassoon Dock and
New Ferry Wharf.
(ii). Hazardous cargo to be classified as per IMO and MBPT categories.
6.3.
DEMURRAGE
(I). On cargo handled at Hay Bunder, Haji Bunder, Malet Bunder and New Ferry
Wharf (except Fish Jetty) or such other Bunders as may be notified
separately, demurrage shall be charged as follows:
Description
Rate per tonne per day or part
thereof (in ₹)
Dry Bulk
Other
than
Dry
Bulk
(a)
Hazardous Cargo
42.13
40.72
(b)
Non-Hazardous Cargo
10.51
10.17
(c)
Coal
42.13
40.72
(d)
Animals, birds, reptiles etc.
------
38.18
(II). No demurrage shall be recovered on cargo landed at other Bunders. Cargo
landed at other Bunders, however, shall be removed from wharf on the day
of landing either by direct delivery or by shifting to importers premises. The
export cargo shall be allowed to be kept on wharf on the day of shipment.
Notes:
(1)
Any consignee or shipper or his agent found shipping or removing cargo
from any of the Trustees' Bunders without first paying the wharfage and
any other charges due shall be liable to pay double the charges laid down
for the same in the Scale of Rates charged at the Bunders.
(2). Wharfage will be assessed on the gross weight of the goods as shown in
the invoices and specifications together with Customs documents and
Import and Export Applications.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
5 1
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
(3)
The charges under the Scale of Rates as above will not be leviable on
goods stored at the Bunders and removed thereto under the provisions of
Docks Bye Law No. 53
(4)
The Board of Trustees does not provide labour at the Bunders for the
landing shipping or removal of goods. All goods lying at the Bunders
remain there at the risk of the consignee or shippers and are in their
charge.
(5)
Charges on containers and containerized cargo shall be assessed in
accordance with the Scale of Rates charged at the Docks.
(6).
The minimum charge recovered in any Application-cum-Bill or Bill should
not be less than ₹157/- (Rupees One Hundred and fifty three only).
(7).
Demurrage charge on both import and export cargo/container shall not
accrue for the period when the port is not in a position to deliver
cargo/container when requested by the users.
CHAPTER – VII
CHARGES FOR BREAKING, CONSTRUCTION AND REPAIR OF
VESSELS AT BUNDERS
7.1.
Charges for Ship-Breaking:
In respect of vessels being broken up on the Port Trust Hards the charges will
be recovered from the date of beaching as under:-
Sr. No.
Description
Rate per day per LDT
(1).
For the period from the date of
beaching to the date preceding the
date of commencement of breaking.
₹
(2).
For the regulated period of the vessel.
(The regulated period shall be one
month per 900 LDT.)
₹
(3).
If the vessel continues breaking
beyond the regulated period as at (2)
above.
₹ for one month for
vessels upto 3000 LDT and
for two months for the vessels
above 3000 LDT.
(4).
For the period beyond the period of
extension as at (3) above
₹
Notes:
(1).
Charges mentioned above shall be recovered on the total LDT of the
vessel for the entire period of occupation.
(2).
The month for the purpose of regulation shall be reckoned from the date of
commencement of breaking to the preceding date in the following month
eg. 10th April to 9th May.
(3).
The initial regulated period is determined considering 900 LDT or part
thereof per month e.g.
Vessels upto 900 LDT
-
1 month
901 – 1,800 LDT
-
2 months
1,801 – 2,700 LDT
-
3 months
and so on in the multiple of 900.
भाग दोन (संकीर्ण)–८
52
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
7.2.
Charges for Construction & Repair of vessels:-
Vessels including boats, tonies, hodies, rafts pontoons, tank barges, dump
barges and other craft being constructed or fitted out in the Port Trust hards or
anywhere on wharf will be charged ₹ 7.43 per day per GRT from the date of
occupation of the hard for the purpose of construction/repairing.
Notes:
(1). A vessel shall be deemed to be on a hard when she has been beached in
a position approved by the MBPT or its authorised person alongside or as
near as possible to the Bunder pursuant to the application made by the
Owner of the vessel for the purpose.
(2)
Failure to make payment of MBPT charges shall be deemed to be a default
and the Board reserves the right to arrest the vessel or the unbroken part
of it and take over the broken up material of the vessel if any, lying in
MBPT Premises. The vessel/unbroken part of the vessel and all other
material so arrested and taken over shall be disposed off by the Board in
accordance with the provisions of MPT Act, 1963. The sale proceeds will
be first utilized to cover MBPT charges, including expenses of sale and
disposal methods employed. Deficit, if any, will be recoverable from the
ship-breaker. Surplus, if any, will be paid to the shipbreaker as per
rules.
(3).
Charges for construction of vessels will be recovered on the GRT of the
vessel as certified by the Mercantile Marine Department for which purpose
the requisite certificate of registration shall be produced for the inspection of
the MBPT within one month from the completion of construction and the
launching of the vessel. In case of such crafts as are not registered with any
statutory authority, the charges will be levied on the contractual Dead
Weight Tonnage.
(4).
All charges for ship-breaking shall be payable in advance initially for a
period of three months. If the work is not completed within three months, the
further charges shall be payable in advance for every month till completion.
(5).
A vessel launched from the hard and lying in the adjoining Bunder basin for
fitting out or any other purpose will be charged licence fees at ₹per
GRT per day and in the case of unregistered craft on the DWT.
(6).
No vessel shall be constructed or assembled or fitted out (repaired) on a
Port Trust hard without the prior permission of the MBPT or its authorised
person, permission for which shall be granted only after a deposit
equivalent to three months charges calculated on the contractual DWT of
the vessel has been collected from an intending party and which deposit
shall be refunded to the party on completion of the construction of the
vessel and submission of certificate as mentioned at Note (3) above.
(7).
Charges due on construction of a vessel shall be paid at regular monthly
intervals based on contractual DWT of the vessel and all charges due on
the construction shall be paid before the removal of the vessel from the
basin or the hard.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
5 3
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
CHAPTER – VIII
CHARGES LEVIABLE FOR ANY CRAFT, CARRYING PASSENGERS
8.1.
Passenger Fee
(i) ₹.11.77 per passenger, charges to be worked out at 50% of passenger
capacity on all routes.
(ii) ₹.5 per passenger Security fee on all routes.
(iii) Charges to be recovered per month basis in advance taking into account the
slots allotted and capacity of craft (irrespective of whether the services are
operated or not or actual number of passengers)
8.2. Other charges such as licence fee and port dues as per respective scale of rates.
Notes:
(1).
Charges as above will have to be paid by the operators for eight months
only in respect of the catamarans/ hovercrafts plying between Gateway
of India and Mandwa. In respect of other routes the charges will have
to be paid by the operators of catamarans, hovercrafts, speed boats,
etc. making use of the two jetties, for the entire year, including monsoon.
(2).
Three months charges to be recovered as security Deposit.
(3).
Maximum fare has to be approved by the MBPT or the person authorized
by it.
(4).
All the operators shall use the common booth for sale of tickets.
(5).
The route for operation of the hovercraft/catamaran services through
Mumbai Harbour will be as advised by the MBPT or its authorised person.
(6).
In the event of the parties committing any breach of the terms and
conditions or any direction of the MBPT or the person authorized by it, the
arrangement shall be liable to be terminated forthwith.
(7).
The operator shall obtain licence in respect of every vessel under the
provisions of Port of Mumbai Passenger Boats Rules 1962 and shall
comply with all provisions of said Rules.
(8).
As regards the functioning of tidal observatory, the operators shall also
comply with the following:
(i) Any air cushion in water created due to operation of hovercraft may
affect the height of tides that are recorded. If such effects are
observed, the party shall carry out at their own cost such remedial
measures as may be suggested by the Director General, Survey of
India;
(ii)
Utmost precaution should be taken by them to ensure that no
foreign material/wastages are thrown into the sea water which may
result in reduction in the height of water; and
(iii) No oil/gasoline should be thrown in the water that may change the
density/salinity of the water.
(9). Operation of the catamarans/ hovercraft, etc. shall not cause any
pollution. Any failure to ensure this would attract not only recovery of
expenses incurred to clear/neutralise the pollutants, but also penal
action.
भाग दोन (संकीर्ण)–८अ
54
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
8.3 :
Vehicle Fees
(i)
₹.40/- per vehicle will be charged immaterial of peak or non-peak
hours.
(ii)
Charges to be worked out at 60% of the capacity declared as per
certificate of registration in respect of all the routs where vehicles
are transported within inland waters.
CHAPTER – IX
MISCELLANEOUS CHARGES
9.1. A. Labour Charges
Labour charges shall be payable on goods, the cost of
handling of which has not been specified elsewhere in this
Scale of Rates
₹per
tonne
9.1. B. Copy of an Application-Cum-Bill
₹125 per copy
9.1. C. Charges for supply of Fresh Water by the port
Charges for supply of fresh water to the vessels berthed at the Docks and at
Jawahar Dweep and Pir Pau shall be recovered at the rate of ₹298/- for 1000
litres.
9.1. D. Supply of Water by Licensed agencies
Charges for supply of water by licensed agencies will be levied at the rate of
₹17.89 per 1000 liters for use of MBPT facilities.
9.1. E. Charges for use of weighbridges installed by the Port
₹93/- per vehicle
9.2. A. Permits for Motor Lorries, Mobile Crane etc. to ply in the Docks (vide Docks
Bye-Law No. 130)
Charges
1. Motor Lorries and Local Chassis
(i) Fresh permits and renewals for every quarter
(ii) Duplicate
(iii) Fresh permits and renewals valid for the day of issue
₹. 1200/- each
₹. 150/- each
₹.
40/- each
2. Mobile Cranes and Forklifts
(i) Fresh permits and renewals for every quarter
(ii) Duplicate
(iii) Fresh permits and renewals valid for the day of issue
₹. 3000/- each
₹. 150/- each
₹. 100/- each
3. Container handling equipments
(i) Fresh permits and renewals for every quarter
(ii) Duplicate
(iii) Fresh permits and renewals valid for the day of issue
₹. 4500/- each
₹. 200/- each
₹. 150/- each
9.2. B. Consignees, Owners and Importers of iron & steel, other cargoes and container
removed from the Docks under Docks Bye Law No. 60A shall be charged for
such removal at the rates as may be sanctioned by the Board from time to time
and notified in at least two local newspapers. The rates will take effect from the
date of their sanction by the Board.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
5 5
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
9.2 C
Dock and Stream/ JD/ Pir Pau Entry Permit Charges
(a)
Daily Entry Permit Charges (EPC) *
= ₹11/- per person per day
(b)
Temporary EPC (2 to 7 days)
= ₹11/- per person per day
(c)
Monthly Entry Permit Charges
= ₹275/- per person per
month.
(d)
Duplicate Entry Permit Charges
= ₹385/- per person per month.
(including penal charges of ₹110/-)
(e)
Yearly Entry Permit (Smart Card)
= ₹1100/- per person
(f)
Duplicate smart card
= ₹1320/- per person (including
penal charges of ₹.220/-)
(g)
Hawker Permit
= ₹275/- per annum
(h)
LMV
(i) Fresh permits and renewals per annum = ₹1200/- each
(ii) Duplicate
= ₹150/- each
(iii) Fresh permits and renewals valid
=
₹
40/-
each for the day of issue
(i)
Buses, Mini Buses, Passenger Van
(i) Fresh permits and renewals for every quarter = ₹3000/- each
(ii) Duplicate
= ₹150/- each
(iii) Fresh permits and renewals valid
=
₹
100/-
each for the day of issue
(j)
Motor cycles
(i) Fresh permits and renewals for every quarter = ₹600/- each
(ii) Duplicate
= ₹50/- each
(iii) Fresh permits and renewals valid
=
₹
20/-
each for the day of issue
(k)
Taxi
Fresh permits valid only for day of issuance
= ₹10/- each
(l)
Group pass for educational tour
Student
= ₹22/- per day
Faculty / instructor
= ₹165/- per day
(m)
Quarterly Entry Permit charges
=₹250 Per person
(for Crew working on Barges and Launches)
*Applicable to driver & Cleaner also
Note :-
The following categories of port users / officials are exempted from levy of EPC Charges:
(i) Yellow Gate Police Station Officials
(ii) Sea Port Immigration Clearance Officials
(iii) High Court Judges, Judicial magistrates
(iv) Officials / workers of MBPT Contractors
(v) ICTPL Officials
(vi) Staff and suppliers of Cooperative Canteens
(vii) Government Officials, visitors VIPs, Dignitaries and other categories as
may be permitted by the MBPT valid for the day of issue.”
9.2 D
Registration/ Renewal fees from the Port Users availing the services
at 9.2 C above.
(a) Registration Fee – ₹12430/-
(b) Renewal of Registration – ₹6215/-
56
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
9.3. A. Charges payable at Passenger Berths by visitors
For a bonafide visitor to the passenger berth in the
Docks
on
the
day
of
embarkation
and
disembarkation of the passengers.
₹99 per head
9.3. B. Embarkation and disembarkation charges
Embarkation and disembarkation charges at the rate of ₹298/- for embarkation
and ₹ 264/- for disembarkation per passenger at the Docks and other
designated areas from cruise vessels will be levied.
9.4. Charges for use of pipelines from Pir Pau Manifold to Sewree ‘O’ point/Hay
Bunder/Indira Dock/Naval Dock Yard
Description of
pipelines
Charges per 30 minutes or
part thereof (in ₹)
SKO
14879/-
HSD
14879/-
Bunker/Black Oil line
14879/-
Flushing Line
7443/-
Facility Utilisation (Utilisation of
facilities like manifold when main
line is not utilised)
2977/-
NOTES:
(i). Cancellation of requisitions will be treated as an operation once port issues its
readiness for the operation and charges as applicable will be levied for the
period from the time of readiness till the time of stoppage of operation
(ii). Requisitioner for the line/facility will be billed
(iii). Time consumed for flushing operations shall not be treated as an operation.
9.5.
Slipway charges is ₹.1265/- per shift (8 hrs) or part thereof.
Note:
(i).
The above slipway charge is exclusive of operational cost and usual
overheads.
(ii).
The other variable charges (services provided like supply of labour, electricity
etc.) shall be recovered separately at actual, whenever services are provided
at request of the party.
9.6
Charges for Issue of RFID Tags
All types of vehicles like cargo vehicles, cargo handling equipment, contractors’
vehicles (material), passenger vehicles (car, etc.) will be levied RFID tag charges @
₹37/- per vehicle.
In case of loss or damage of RFID tags, the same shall be issued on recovery of
RFID Tags charges @ ₹37/- per vehicle.
The vehicles of MBPT employees will be exempted from levy of RFID charges.
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
5 7
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
Mumbai,
Smt. P. M. DABHOLKAR,
Dated : 5th April 2022.
Financial Adviser and
Chief Accounts Officer (I/c)
58
महाराष्ट्र शासन राजपत्र, भाग दोन-संकीर्ण सूचना व जाहिराती,
गुरुवार ते बुधवार, एप्रिल १४-२०, २०२२/चैत्र २४-३०, शके १९४४
महाराष्ट्र राजय विद्ुत पारेषण कंपनी मर्यादित
प्रस्ावित योजनांची अधिसूचना
क्रमांक एमएसईटीसीएल/सीओ/पीएस/सकीम III/पी.एन./२५७५
विद्युत कायदा, २००३ चया कलम १६४ प्रमाणे व महाराष्ट्र शासनाचया आदेश क्रमांक ०६/प्र.क्र.-३१२/ऊर्जा/४, दिनांक २४
ऑगसट २००६ (शासकीय राजपत्र पान क्रमांक २८०) नुुसार, महाराष्ट्र राजय विद्युत पारेषण कंपनीस प्रदान केलेलया अधिकारानुुसार,
खाली नमूद केलयाप्रमाणे अति उचच दाब पारेषण योजनांचे काम हाती घेणयाचे प्रस्ावित करीत आहे. या सर्व अधिकारांचा वापर प्रस्ावित
योजनेतील विजेचे पारेषण, वितरण अगर म.रा.वि.पारेषण कं.मर्या. चया समन्वय, संचलन व सुुव्यवस्ा या कामाकरिता पारेषण कंपनीद्ारे
करण्यात येईल. जनतेचया माहितीकरिता ही अधिसूचना देण्यात येत आहे.
२. खालील योजना तया भागातील अस्तित्वात असलेलया वीज ग्ाहकांचया वाढतया विजेची गरज पुुरविणयासाठी व नवीन ग्ाहकांना
वीज पुुरवठा करणयासाठी, तसेच विद्युत निष्काष्कासन व्यवस्ा/विद्युत प्रणाली सक्षम करणयासाठी आहे.
(१) पुणे जिल्ह्यात २२०/३३ के.वही. मुुढाळे उपकेंद्र उभारणे. (i) ५० एम.वही.ए., २२०/३३ के.वही. रोहित्र बे सह उभारणे—२
नं. (ii) ३३ के.वही. आऊटलेटस उभारणे—५ नं. (महावितरणचया आवश्यतेनुुसार) (iii) ३३ के.वही., ७.५ एम.वही.ए.आर. संधारित्र
बँक उभारणे—२ नं. (iv) २२० के.वही. लोणंद-बारामती वाहीनीचया एका परिपथावर मुुढाळे उपकेंद्रासाठी लिलो पद्धतीने वाहिनी
उभारणे— २ कि.मी. या योजनेचा अंदाजित खर्च रु. ५२१९.४६ लाख इतका आहे.
(२) नागपूर जिल्ह्यातील अस्तित्वात असलेलया ४०० के.वही. कोराडी - I ते अमरावती (इंडियाबुुल) आणि कोराडी-I ते भुुसावळ
एकपथ वाहिनीवर लिलो पद्धतीने वाहिनी उभारुन ४०० के.वही. कोराडी - I व कोराडी - II उपकेंद्राची आंतरजोडणी करणे. (i) ४००
के.वही. कोराडी - II उपकेंद्रापर्यंत सदरकामाची वयाप्ी ४०० के.वही. कोराडी-I अमरावती (इंडीयाबुुल) आणि ४०० के.वही. कोराडी-I
भुुसावळ एकपथ वाहिनी मधुुन एकपथ, द्विपथ आणि बहुुपथ मनोऱयांचा वापर करून लिलो पद्धतीने वाहिनी उभारणे - ३.०७३ कि.मी.
(ii) ४०० के.वही. कोराडी - II उपकेंद्रामधये वाहिनी बे उभारणे-४ नं. (iii) ४०० के.वही. कोराडी - II उपकेंद्रामधये ४०० के.वही.
बसचा विस्ार करणे. १ नं. या योजनेचा अंदाजित खर्च रु. ९६४०.०३ लाख इतका आहे.
३. परवानेधारक अगर हितसंबंध असलेलया वयक्ीने हवे असलयास, ही सूचना प्रसिद्ध केलेलया तारखेपासून दोन महिनयांचया आत
महाराष्ट्र राजय विद्युत पारेषण कंपनी मर्यादितचया विचाराकरिता पारेषण कंपनीस प्रतिवेदने पाठवावीत, अशी तयांना अधिसूचना देण्यात
येत आहे. याबाबतची अधिक माहिती अधीक्षक अभियंता (प्रकलप योजना-III), महाराष्ट्र राजय विद्युत पारेषण कंपनी मर्यादित, ३ रा
मजला, प्रकाशगंगा, प्लॉट नं. सी-१९, बांद्रा-कुर्ला संकुल, बांद्रा (पूर्व), मुुंबई ४०० ०५१ यांचेशी वेळीच संपर्क साधून मिळू शकते.
मुुंबई,
नसीर कादरी,
दिनांक ७ एप्रिल २०२२.
संचालक (प्रकलप).
ON BEHALF OF GOVERNMENT PRINTING, STATIONERY AND PUBLICATION, PRINTED AND PUBLISHED BY DIRECTOR,
RUPENDRA DINESH MORE, PRINTED AT GOVERNMENT CENTRAL PRESS, 21-A, NETAJI SUBHASH ROAD, CHARNI ROAD,
MUMBAI 400 004 AND PUBLISHED AT DIRECTORATE OF GOVERNMENT PRINTING, STATIONERY AND PUBLICATIONS,
21-A, NETAJI SUBHASH ROAD, CHARNI ROAD, MUMBAI 400 004. EDITOR : DIRECTOR, RUPENDRA DINESH MORE.