EXTRAORDINARY
PUBLISHED BY AUTHORITY
No. 1363, CUTTACK, FRIDAY, AUGUST 3, 2018 / SRAVANA 12, 1940
LABOUR & ESI DEPARTMENT
NOTIFICATION
The 3rd August, 2018
S.R.O. No. 327/2018 — In exercise of the powers conferred by clause (b) of sub-
section(1) of Section 3 read with Section 4 and sub-section (1b) of Section 5 of the Minimum
Wages Act, 1948 (11 of 1948), the State Government do hereby make proposals for revising
the minimum piece rate of wages as specified in Column (6) of Annexure of the schedule below
in respect of items specified against each in Column (3) of said Annexure of that schedule,
payable to the employees employed in the employments as specified in Column (2) thereof for
the whole State of Odisha, is hereby published as required by clause (b) of sub-section (1) of
Section 5 of the said Act, for information of all persons likely to be affected thereby; and notice
is hereby given that the said proposal shall be taken into consideration on or after the expiry of a
period of two months from the date of publication of this notification in the Odisha Gazette.
Any representation containing objection or suggestion which may be received by the
Principal Secretary to Government, Labour & E.S.I. Department, Odisha, Bhubaneswar-751001
from any person in respect of the said proposal before expiry of the period specified above will
be considered by the State Government.
2
Annexure
SCHEDULE
Proposed Minimum rate of wages for piece rated employments
Sl.
No.
Name of the
scheduled
Employment
Name & Quantum of work concerning
Existing rate
of wages in
Rs.
Percentage
of hike @
25% in Rs.
Proposed rate of
wages in Rs.
(4+5)
1
2
3
4
5
6
1
Saw Mills
1.Truck Loading
(a) Log loading girth (30 cm to 105 cm)
637.5
159.375
796.875 per truck
(b) Log loading girth (117cm to 150
cm)
889.83
222.4575
1112.2875 per
truck
(c) Log loading girth (153 cm)
1112.14
278.035
1390.175 per truck
(d) Bolly/Fair wood load
511.87
127.9675
639.8375 per truck
2.Truck Unloading
(a)Round Timber
192.89
48.2225
241.1125 per truck
(b)Size on Sawn Timber
251.54
62.885
314.425 per truck
3.Stacking
(a)Log stacking
6.48
1.62
8.1 per piece
(b)Bolly stacking
5.2
1.3
6.5 per piece
2
Timber trading
(including falling
& swaing)
1.Truck Loading
(a) Log loading girth (30 cm to 105 cm)
637.51
159.3775
796.8875 per truck
(b) Log loading girth (117cm to 150
cm)
889.83
222.4575
1112.2875 per
truck
(c) Log loading girth (150 cm & above)
1109.48
277.37
1386.85 per truck
(d) Bolly/Fair wood load
511.87
127.9675
639.8375 per truck
2.Truck Unloading
(a)Round Timber
192.89
48.2225
241.1125 per truck
(b)Size on Sawn Timber
251.3
62.825
314.125 per truck
3.Stacking
(a)Log stacking
6.74
1.685
8.425 per piece
(b)Bolly stacking
5.19
1.2975
6.4875 per piece
3
3
Timber trading
(excluding falling
& sawing)
1.Truck Loading
(a) Log loading girth (30 cm to 105 cm)
637.51
159.3775
796.8875 per truck
(b) Log loading girth (117cm to 150
cm)
889.83
222.4575
1112.2875 per
truck
(c) Log loading girth (150 cm & above)
1112.15
278.0375
1390.1875 per
truck
(d) Bolly/Fair wood load
511.87
127.9675
639.8375 per truck
2.Truck Unloading
(a)Round Timber
192.87
48.2175
241.0875 per truck
(b)Size on Sawn Timber
251.3
62.825
314.125 per truck
3.Stacking
(a)Log stacking
6.74
1.685
8.425 per piece
(b)Bolly stacking
5.19
1.2975
6.4875 per piece
4
Tiles & Brick
making
1.Brick making
(a)Mixing of clay, moulding and supply
of 1000 raw bricks of standard size
620.47
155.1175
775.5875
(b)Loading & firing of 1000 bricks into
kin within a distance of 50 metres
163.39
40.8475
204.2375
(c)Unloading of 1000 bricks from the
furnace and stacking within a distance of
50 metres.
78.59
19.6475
98.2375
5
Oil Mills
1.Loading of 100 bags of 75 Kgs each
457.31
114.3275
571.6375
2.Unloading of 100 bags of 75 kgs each
457.31
114.3275
571.6375
3.Bagging of 100 bags of 75 kgs each
457.31
114.3275
571.6375
4.Weighting of 100 bags of 75 kgs each
326.77
81.6925
408.4625
5.Stalking of 100 bags of 75 kgs each
326.77
81.6925
408.4625
6.Sewing of 100 bags of 75 kgs each
326.77
81.6925
408.4625
7.Wellding of 100 bags of 75 kgs each
490.2
122.55
612.75
8.Unloading/Loading of 100 full tins of
16 kgs each
261.13
65.2825
326.4125
9.Unloading/Loading of 100 empty tins
32.57
8.1425
40.7125
4
10.Full cake bags loading/unloading
457.31
114.3275
571.6375
11.Gunny bag
loading/unloading
of
bundles each containing 50kgs
163.39
40.8475
204.2375
12.Husk loading/Unloading per truck
261.13
65.2825
326.4125
6
Salt Pans
1.Manufacture of Salt
2645.79
661.4475
3307.2375 per
gadisa comprising
of 60 bag of 70 kg
each
2.Loading and Unloading
457.31
114.3275
571.6375 per 100
of 75 kg each
7
Construction or
maintenance of
roads or building
operations
1.(a) Drilling hole 2.5cm. to 4 cm dia in
granite rock
522.76
130.69
653.45 per running
metre
(b)Drilling hole 2.5cm to 4 cm dia in
rock other than granite
424.52
106.13
530.65 per running
metre
(c)Cutting in soft disintegrated rock
removed by pick axes and crow bars
within 50 metres initial lead and 1.5
metre initial lift.
20382.29
5095.5725
25477.8625 per
100 cum
(d)Earthwork in ordinary soil within 50m
initial lead and 1.5m initial lift including
rough dressing and breaking clods to
minimum 5 cm to 7 cm and laying in
layers not exceeding 0.30 in depth.
5984.24
1496.06
7480.3 per 100
cum
(e)Earthwork in hard soil or gravelly
soils within 50m initial lead and 1.5m
initial lift including rough dressing and
breaking clods to minimum 5 cm to 7 cm
and laying in layers not exceeding 0.30 in
depth.
8042.07
2010.5175
10052.5875 per
100 cum
(f)Earth work in stony earth and gravels
mixed with stone and boulders not
exceeding 0.014cum. In volume with
50m. initial lift including rough dressing
and breaking clods to minimum 5 cm to 7
cm and laying in layers not exceeding
0.30 in depth.
12650.1
3162.525
15812.625 per 100
cum
5
(g)Earth work in slusy soil in water upto
0.6m depth requiring the aid of pan
vessels within 50m initial lead and 1.5m.
initial lift.
8231.31
2057.8275
10289.1375 per
100 cum
2.Loading & Unloading
(a)Loading into and unloading from
trucks and stacking as directed within
50m. lead.
5.69
1.4225
7.1125 per quintal
(b)Loading in trucks, unloading from
trucks except sand, granite, chips, metals
and wood as directed within 50m. lead.
45.48
11.37
56.85 per cum
(c)Loading in trucks, unloading from
trucks sand, granite, chips, metals and
wood within 50m. lead.
45.48
11.37
56.85 per cum
(d)Load and unloading from trucks bulk
materials such as home pipes etc. as
directed within 50. Lead.
55.35
13.8375
69.1875 per cum
(e)Unloading from wagons 1m clear of
rails in platform for cement, coal, AC
sheet, Tarphet paints etc. within 15m.
lead.
4.64
1.16
5.8 per quintal
(f)Unloading from Railway wagons,
loading in trucks and unloading and
stacking at the godown within 15m lead.
12.92
3.23
16.15 per quintal
6
3.Conveyance by head loads:
(i)Bajri, Gravel, Stone, Sand etc. upto
50m.
15.53
3.8825
19.4125 per every
cum
(ii)Bajri, Gravel, Stone, Sand etc. upto
100 m.
26.07
6.5175
32.5875 per every
cum
(iii)Bajri, Gravel, Stone, Sand etc. upto
150 m.
46.54
11.635
58.175 per every
cum
4. Conveyance of heavy materials by
sangimullas within 100m.
Add 50% extra over the above rate
8
Stone Breaking &
Stone Crushing
1.Stone Breaking or Stone Crushing
(a)Granite Stone Broken metal 5cm size
crusher.
587.91
146.9775
734.8875 C.B.
522.72
130.68
653.4 H.B. per cum
(b)Granite Stone Broken metal 4cm size
crusher.
653.28
163.32
816.6 C.B.
561.73
140.4325
702.1625 H.B. per
cum
(c)Granite Stone Broken metal to 2.5cm
size.
1045.46
261.365
1306.825 C.B.
947.2
236.8
1184 H.B. per cum
(d)Granite Stone Broken metal to 2cm
size.
1208.32
302.08
1510.4 C.B.
1078.02
269.505
1347.525 H.B. Per
cum
(e)Granite Stone Broken metal to 12mm
size.
1306.58
326.645
1633.225 C.B.
1175.76
293.94
1469.7 H.B. per
cum
(f)Granite Stone Broken metal to 6 mm
size.
1371.71
342.9275
1714.6375 per cum
(g)Stone other than Granite Broken to
5cm size.
261.13
65.2825
326.4125 per cum
(h)Stone other than Granite Broken to
4cm size.
293.93
73.4825
367.4125 per cum
(i)Stone other than Granite Broken to
1.5cm size.
359.34
89.835
449.175 per cum
(j)Stone other than Granite Broken to 2
cm size.
419.64
104.91
524.55 per cum
(k)Stone boulder 15cm and above other
than Granite
150.48
37.62
188.1 per cum
(l)Stone boulder 15cm and above other
than Granite
150.48
37.62
188.1 per cum
2.Loading & Unloading
(a)Loading into and unloading from
trucks and stacking as directed within
50m. lead.
5.69
1.4225
7.1125 per quintal
7
(b)Loading in trucks, unloading from
trucks except sand, granite, chips, metals
and wood as directed within 50m. lead.
45.79
11.4475
57.2375 per cum
(c)Loading in trucks, unloading from
trucks sand, granite, chips, metals and
wood within 50m. lead.
45.79
11.4475
57.2375 per cum
(d)Load and unloading from trucks bulk
materials such as home pipes etc. as
directed within 50. Lead.
55.35
13.8375
69.1875 per cum
(e)Unloading from wagons 1m clear of
rails in platform for cement, coal, AC
sheet, Tarphet paints etc. within 15m.
lead.
4.64
1.16
5.8 per quintal
(f)Unloading from Railway wagons,
loading in trucks and unloading and
stacking at the godown within 15m lead.
12.92
3.23
16.15 per quintal
3.Conveyance by head loads:
(i) Bajri, Gravel, Stone, Sand etc. upto
50m.
15.53
3.8825
19.4125 per cum
(ii) Bajri, Gravel, Stone, Sand etc. upto
100m.
26.14
6.535
32.675 per cum
(iii) Bajri, Gravel, Stone, Sand etc. upto
150m
50.93
12.7325
63.6625 per cum
4. Conveyance of heavy materials by
sangimullas within 100m.
Add 50% extra over the above rate
9
Construction
maintenance of
dams and
embankments
irrigation
projects and
sinking of wells
and tanks.
1.(a) Drilling hole 2.5 cm to 4cm dia in
granite rock
522.76
130.69
653.45 per running
meter
(b) Drilling hole 2.5 cm to 4 cm dia in
rock other than granite
424.52
106.13
530.65 per meter
(c) Cutting in soft disintegrated rock
removed by pick axes and crow bars
within 50 metres initial lead and 1.5
metre initial lift.
20382.29
5095.5725
25477.8625 per
100 cum
8
(d) Earthwork in ordinary soil within
50m initial lead and 1.5m initial lift
including rough dressing and breaking
clods to minimum 5cm to 7cm. and
laying in layers not exceeding 0.30 in
depth
5984.24
1496.06
7480.3 per 100
cum
(e) Earthwork in hard soil or gravelly
soils within 50m initial lead and 1.5m
initial lift including rough dressing and
breaking clods to minimum 5cm and
laying in layers not exceeding 0.30 in
depth
8042.07
2010.5175
10052.5875 per
100 cum
(f) Earth work in stony earth and gravels
mixed with stone and boulders not
exceeding 0.014 cum. in volume with
50m initial lift including rough dressing
and breaking colds to minimum 5cm to
7cm and laying in layers not exceeding
0.30 in depth.
12542.93
3135.7325
15678.6625 per
100 Cum
(g) Earth work in slushy soil in water
upto 0.6m. depth requiring the aid of pan
vessels within 50m initial lead and 1.5m.
initial lift.
8231.31
2057.8275
10289.1375 per
100 cum
2. Loading and Unloading
(a) Loading into and unloading from
trucks and stacking as directed within
50m. Lead
5.69
1.4225
7.1125 per quintal
(b) Loading in trucks, unloading from
trucks except sand, granite, chips, metals
and wood as directed within 50m. lead
45.79
11.4475
57.2375 per cum
9
(c) Loading in trucks, unloading from
trucks, sand, granite, chips, metals and
wood within 50m. lead.
45.79
11.4475
57.2375 per cum
(d) Load & Unloading from trucks bulk
materials such as home pipes etc. as
directed within 50m. lead
55.59
13.8975
69.4875 per cum
(e) Unloading from wagons 1m. clear of
rails in platform for cement, coal, Ac
Sheet, Tarphet paints etc. within 15m.
lead
4.64
1.16
5.8 per quintal
(f) Unloading from Railways wagons,
loading in trucks and unloading and
stacking at the godown within 15m.lead
12.92
3.23
16.15 per quintal
(3) Conveyance by head loads:
(i) Bajri, Gravel, Stone, Sand etc upto
50m.
15.53
3.8825
19.4125 per cum
(ii) Bajri, Gravel, Stone, Sand etc. upto
100m.
26.14
6.535
32.675 per cum
(iii) Bajri, Gravel, Stone, Sand etc. upto
150m.
50.93
12.7325
63.6625 per cum
4. Conveyance of heavy materials by
sangimullas within 100m.
Add 50% extra over the above rate
10
Rice, Mills, Dal
Mills and Floor
Mills
1. Steaming of paddy for 100 bags of 75kgs
each.
457.31
114.3275
571.6375
2. Boiling of paddy for 100 bags of
75kgs each.
457.31
114.3275
571.6375
3. Carrying of paddy for 100 bags of
75kgs each.
326.77
81.6925
408.4625
4. Loading of 100 bags of 75kgs each
457.31
114.3275
571.6375
5. Unloading of 100 bags of 75kgs each
457.31
114.3275
571.6375
6. Bagging of 100bags of 75kgs each
391.94
97.985
489.925
7. Weighing of 100 bags of 75kgs each
326.77
81.6925
408.4625
8. Stacking of 100 bags of 75kgs each
326.77
81.6925
408.4625
9. Sewing of 100 bags of 75 kgs each
326.77
81.6925
408.4625
10
11
Bamboo
Forest
Establishment
1. Bamboo cutting (including piecing
bundling and stacking near the place of
cutting
1699.75
424.9375
2124.6875 per 100
bundles each
having 21 pieces of
2.3 meters
2. Dragging
(i) Within a radius of 100 metres
341.01
85.2525
426.2625 per 100
bundles
(ii) For every additional 50 metres
beyond 100metres
192.87
48.2175
241.0875 per 100
meters
3. Stacking at depot side and at all other
places except near the place of cutting
53.24
13.31
66.55 per 100
meters
4. Re-bundling
96.46
24.115
120.575 per 100
meters
5. Loading
88.92
22.23
111.15 per 100
meters
6. Unloading (including staking near the
place of unloading)
63.57
15.8925
79.4625 per 100
meters
Explanation:-
For the purpose of
computation of minimum wages under
this notification twenty one small
pieces of bamboos ranging from 0.5
metres to 1.5 metres in length each
constitute half of a bundle
12
Printing Press
1.Composing Trade:
For unit of work
done
(a) Distribution and supply of types for
ordinary
composition of manuscript
without correction
68.76
17.19
85.95
(b) Display and complicated finished job
composition, correction, make up and
imposition of composed matter.
69.54
17.385
86.925
2. Printing trade:
(a) Distribution of ordinary jobs in small
and simple type of trade platen/small
handfed cylinder machine
53.24
13.31
66.55
11
(b) Printing of complicated and coloured
jobs in the above type of machine
(Skilled)
62.05
15.5125
77.5625
(c) Printing of straight forward job like
forms and books in large size handfed
flatbed machines, printing of above type
of work in small size auto fed platen and
cylinder machine
62.05
15.5125
77.5625
3. Book Binding Trade:
(a) Manual operations like a folding,
gathering, pasting, stitching, numbering
and hand sewing etc.
68.76
17.19
85.95
(b) Operating common binding machines
like small size paper cutting machines,
Wire stitching machines etc
68.76
17.19
85.95
(c) Complicated and more skilled manual
operation like machine sewing case
making, gold blocking, gift digging,
marbling etc. and operating large size
guilothnes, semi-automatic like folding
machine, book sewing machines, knife,
trimmers, gathering stitcher and flow like
binding machines(Skilled)
68.76
17.19
85.95
Explanation:- For the purpose of this
notification-(a) Each workers for the semi-
skilled work will turnout minimum 3 units of
work per day which the employer is obliged
to provide him and failing that employer will
pay him the minimum wage per day inclusive
of weekly off day wages. The employee will
not refuse to work more if work is provided to
him during normal working hours. in case of
overtime work, he will be paid at double the
rate. (b) Each workers for the unskilled
work will turn out minimum 3.5 units of
work per day for composing trade, book
binding trade and 4 units of work per day
for the printing trade. The employer will
be obliged to provide him such quantity
of work failing which the employer will
pay him minimum wages per day. The
worker will accept and execute more
work if offered during the normal
working hours. If he works over time, he
will be paid at double the rate.
12
13
Collection of Sal
Seeds
1. Undecoraticated Sal Seeds.
11.12
2.78
13.9 per kilogram
of dry weight
2. Decoraticated Sal Seeds.
11.34
2.835
14.175 per
kilogram of dry
weight
3. Bagging, Weighing, and stitching
Debagging and Stacking
9.94
2.485
12.425 per 1 bag of
85 kilograms
4. Loading
6.48
1.62
8.1 per 1 bag of 85
kilograms
5. Unloading
3.91
0.9775
4.8875 per 1 bag of
85 kilograms
14
Kendu leaf
Collection
1. Plucking
0.63
0.1575
0.7875 per 20 leafs
2. Binding
42.91
10.7275
53.6375 per bundle
(5kg bundle) per
bag of 60 kgs)
3. Bagging
42.91
10.7275
53.6375 per bag of
60 kg
4. Mulaya
24.81
6.2025
31.0125 per bag of
60 kg
15
Tobacco
including beedi
(making)
manufacturing
1. Rolling of 1000 beedies
140.62
35.155
175.775 per
thousand
2. Packing & Labeling of 1000 beedies
5.35
1.3375
6.6875 per
thousand
(No.5565—LL-I-III-57/18–LESI.)
By Order of the Governor
ANU GARG
Principal Secretary to Government
______
Printed and published by the Director, Printing, Stationery and Publication, Odisha, Cuttack-10
OGP/SBP Ex. Gaz. -840-173+20