EXTRAORDINARY
PUBLISHED BY AUTHORITY
No. 1475 CUTTACK, TUESDAY, AUGUST 6, 2019 / SRAVAN 15, 1941
HOUSING & URBAN DEVELOPMENT DEPARTMENT
NOTIFICATION
The 6th August, 2019
S.R.O. No. 273/2019― Whereas, in exercise of the powers conferred by Section
124 of the Odisha Development Authorities Act, 1982 (Odisha Act 14 of 1982), the 9
(nine) Development Authorities of the State i.e. Bhubaneswar Development Authority,
Cuttack
Development
Authority,
Berhampur
Development
Authority,
Sambalpur
Development Authority, Rourkela Development Authority, Puri-Konark Development
Authority, Paradeep Development Authority, Kalinga Nagar Development Authority and
Talcher-Angul- Meramandali Development Authority, with the approval of the State
Government, have notified their Planning & Building Standards Regulations for regulating
the development and building construction activities being undertaken within their
respective jurisdictions;
And, whereas, provisions have been made in all the above said Planning &
Building Standards Regulations which empowers State Government to formulate a
scheme for compounding the deviations related to unauthorized constructions;
And, whereas, a scheme for Regularisation of Unauthorised Constructions,
2018 was notified vide notification No.15646/HUD., dated the 20 th June, 2018 published
in the Extraordinary issue of the Odisha Gazette No.987 dated 20th June, 2018 which
was in force initially for a period of six months and has been extended in two spells for a
further period of six months each;
And, whereas, in view of the low response from the general public and after
deliberation and discussion, it is considered necessary to bring some changes in the
Scheme for greater acceptance and benefit of the general public;
And, whereas, it is felt necessary to give further opportunity for regularising the
unauthorized constructions within the framework of standards prescribed for fire safety
and structural stability, so as to bring all such development within regulatory framework of
Development Authorities and thereby reducing the risks arising out of unregulated
development.
2
Now, therefore, in exercise of such provisions and in supersession of the Scheme
for Regularisation of Unauthorised Constructions, 2018 except in respect of things done
or omitted to be done before such supersession, the State Government do hereby
make the following scheme namely:—
1. Short title, extent and commencement :— (1) This scheme may be called
the Scheme for Regularization of Unauthorized Constructions, 2019.
(2) It extends to all development areas of the State declared as such under
the provisions of sub-section (1) of Section 3 of the Odisha Development Authorities
Act, 1982.
(3) It shall come into force from the date of its publication in the Odisha Gazette.
2. Definitions:—
(1) In the scheme, unless the context otherwise requires,—
(i) "Act" means the Odisha Development Authorities Act, 1982; (Odisha
Act 14 of 1982);
(ii) "applicant" means any person who applies under this Scheme to get the
unauthorized constructions regularized;
(iii) "approved plan" means building plan approved by the Competent
Authority;
(iv) "clinical establishment" means clinical establishment as defined
under clause (b) of Section 2 of the Odisha Clinical Establishment
(Control and Regulation) Act, 1991.
(v) "competent authority" means the Development Authority, Regional
Improvement Trust and Special Planning Authority, Urban Local Bodies
or other Government Agency which is or was empowered to approve
building plan under the provisions of the relevant Act, rules and
regulations governing such Authority;
(vi) "Form" means Form appended to this Scheme;
(vii) "Unauthorized constructions" means constructions undertaken in
contravention of the approved plan or without any approval by the
Competent Authority.
3
(2) Words and expressions used in this scheme but not defined shall have the
same meaning as assigned to them in the Act or the rules and regulations made
thereunder.
3. Applicability:— (1) The Scheme intends to give an opportunity to every person
for regularizing unauthorized constructions undertaken within the Development area,
prior to the date of the commencement of the Scheme, by way of compounding on
payment of fee at the rate prescribed in this scheme.
(2) The Scheme is applicable only to such unauthorized constructions
that are structurally safe and do not affect any public interest or safety or interfere
with any public activity.
(3) The relaxation provided in the Notification of the Government of Odisha
in the Housing & Urban Development Department No. 12226, dated the 30th May, 2017
in respect of regularization of the sub-divided plots or layouts over which the unauthorized
construction has been undertaken shall also be made applicable under this Scheme.
(4) The scheme shall also be applicable to all applications received under the
Scheme for Regularization of Unauthorized Constructions, 2018 including subsequent
extensions of the scheme.
4. Application Procedure:― (1) Any person who intends to get the unauthorized
constructions regularized under this Scheme shall apply to the concerned Development
Authority in Form-A accompanied with the fees as prescribed in the Odisha Development
Authorities (Common Application Form) Rules, 2016, within six months, unless extended
otherwise by the State Government from the date on which this Scheme has come into
force, with the following documents, namely:—
(a)
four copies of building plans as per actual construction at site
showing site plan, layout plan, floor plan, four side elevations,
drainage and sewerage disposal plan, etc. duly signed by the plot
owner or Developer and the Architect or Technical person as per the
provisions of the Planning and Building Standards Regulations of
respective Development Authority;
(b)
copy of ownership document of land;
(c)
copy of approved plan and approval letter, if any;
(d)
affidavit in Form-B regarding peaceful possession of the land and
construction undertaken at site;
4
(e)
photograph of the building from two angles duly signed by the
applicant and attested by the concerned Architect or registered
technical person with date;
(f)
site inspection report duly signed with date by the applicant and the
Architect registered
with
Council
of
Architecture,
India
or
registered Technical Person under the Odisha Development
Authority (Common Application Form) Rules, 2016;
(g)
Certificates or Clearances or No Objection Certificates, as the
case may be, relating to,—
(i)
fire safety in cases where same is required as per the
provisions of the Odisha Fire Prevention and Safety Rules,
2017, if any;
(ii) structural safety as per Planning and Building Standards
Regulations of the respective Development Authority in
Form-C;
(iii)
peripheral infrastructure development in applicable cases from
urban local body;
(h) No Objection Certificate in the form of affidavit from the
concerned neighbour, if the person regularizes unauthorized
constructions with nil setback on any side of the plot in
Form-D:
Provided that No Objection Certificate shall not be
required if the neighbour himself is a violator of setback
norms laid down in the Planning and Building Standards
Regulations:
Provided further that plots having a maximum area of
300 square meters shall be considered for regularization
without
insisting
upon
No
Objection
Certificate
from
neighbours.
(i) Other No Objection Certificates as required for particular
category of buildings as per planning and building standard
regulations of respective Authority, e.g., building require
clearance from Archeological Survey of India, Airport Authority
of India, State Environmental Impact Assessment Authority,
etc.
5
NOTE: The application needs to be mandatorily authenticated by
Architect registered with the Council of Architecture, India or
other
technical
persons
registered
under
the
Odisha
Development Authorities (Common Application Form), Rules,
2016 including the compounding calculation sheet in Form-E.
(2) All other provisions of application procedure as per the Planning and
Building Standards Regulations of respective Development Authority shall apply, mutatis
mutandis.
(3) The applications under this Scheme shall be disposed of within six months
from the receipt of complete application, as per the delegation of powers notified by the
concerned Development Authority for the purpose of approval of Building Plan.
5. Restrictions on regularization.— (1) The unauthorized constructions shall not be
regularized in the following cases, namely:—
(a)
Where construction has been undertaken on the Government land
or land belonging to local body or land not owned by the person
undertaking such development;
(b) Where construction has been undertaken over public or private road
or on the alignment of any of the natural drainage, channel or
any drains proposed in the Development Plan or otherwise;
(c) Where construction has been undertaken in violation of the Ancient
Monuments and Archaeological Sites and Remains (Amendment
and Validation) Act, 2010:
Provided that such constructions can be regularized if
No Objection Certificate from the concerned Authority is produced.
(d) Where construction has been undertaken in violation of the height
restrictions notified by the Airports Authority of India:
Provided that such constructions can be regularized if No
Objection Certificates from the concerned Authority is produced;
(e)
Where construction has been undertaken in violation of the
prescribed norms of Planning and Building Standards Regulations of
respective Development Authorities not specifically relaxed in this
Scheme;
6
(f) Where construction has been undertaken in violation of the zoning
regulations governing Environmentally-sensitive zone, open space
use zone or any other special land use zone as identified in the
respective Development Plan;
(g) Where construction has been undertaken in violation of any norms
of Eco-sensitive zone notified by Forest & Environment Department:
Provided that such constructions can be regularized if No
Objection Certificate from the concerned Authority is produced;
(h) Where construction has been undertaken in violation of coastal
regulation zone or any other special restriction made in the
Planning and Building Standard Regulation of the concerned
Authority.
EXAMPLE :
(i)
In open space use zone area the coverage and height of the
Building shall not exceed 40 % and 7 meters, respectively.
(ii)
In environmental sensitive zone, the minimum plot area is to be
4000 square meter, coverage should not exceed 40 % and the
approach road should not be less than 12 metres.
(iii)
The height of the building on Grand Road and up to a distance
of 100 metres on either side of the Grand Road in Puri shall not
exceed 12 meters.
(i)
Where construction has been undertaken in sweet water zone
restricting construction through a notification; and
(j) Where the plot does not have any authenticated access or approach
to the plot.
(k) Where construction or usage of land or Building has been undertaken
in violation of conditions of lease in case of leasehold land leased by
Government in the General Administration & Public Grievances
Department, Revenue & Disaster Management Department or any
other Public Agencies.
(2) The general restrictions on permission as per the Planning and Building
Standards Regulations of Development Authorities shall prevail while considering the
regularization of Special Buildings.
7
6. Relaxation of Planning and Building norms:— (1) In case of Non high-rise and
high-rise buildings, the unauthorized constructions may be regularized as per the
Planning norms specified in the Table-I below:
TABLE-I
Sl.
No.
Buildings Type
Minimum Planning Norms to be met
Ground
Coverage
Setback
Parking
(1)
(2)
(3)
(4)
(5)
(a) Non-High Rise
(i)Residential
Plotted development up to
300 square metres of plot
area
up to 100%
NA
NA
Plotted development
>300
square metres of plot area
up to 75%
NA
NA
Apartments
NA
1.5 m. setback in all sides.
50% of
parking requirement
&
consent
of
Residents'
Welfare
association/ Apartment owners
(ii)Commercial
up to 300 square metres of
plot area
up to 100%
NA
Nil
>300 square metres of plot
area and up to 500 sqm.
up to 75%
NA
25%of parking requirement
>500 square metres of
plot area
up to70%
1.5 m. setback in all sides.
50%of parking requirement
For
Malls,
shopping
complexes and mercantile
buildings of height 9 m. or
more and less than 15 m.
up to 70% Minimum 3.0 meter setback
at least on any two sides
except front side.
50% of parking requirement
For
Business
or
office
buildings/ Hotels, Lodgings
and Guest houses of height
12 m. or more and less
than 15 m.
up to 70%
Minimum 3.0 meter setback
at least on any two sides
except front side.
50% of parking requirement
(b) High Rise building
Building Height of 15 m. or
more and upto 18 m.
(for all category of buildings)
—
1.5 m. setback on all side
and minimum 4.5 meter
setback at least on any two
sides except front side.
For Residential Building 50% of
parking requirement & consent of
Residents' Welfare Association
For Commercial Building 50% of
parking requirement
Building Height above 18 m.
and upto 21 m.
(for all category of buildings)
—
Minimum 4.5 meter setback
on all sides.
For Residential Building 50% of
parking requirement & consent of
Residents' Welfare Association
For Commercial Building 50% of
parking requirement
Building height above 21m.
-
Minimum 6m. setback on all
sides
For Residential Building 50% of
parking requirement & consent of
Residents' Welfare Association
For Commercial Building 50% of
parking requirement
8
NOTE : (a)
For special and institutional buildings except clinical establishment
relaxed planning norms for commercial buildings shall apply, if not
mentioned otherwise in the scheme:
Provided that, the setback provision for non-high rise clinical
establishments shall be applicable as specified for commercial building
and the setback for high-rise clinical establishments shall be applicable
as specified for high-rise building category, in the Table-I above.
(b) For educational buildings and clinical establishments with building height,
of 12 m. or more and less than 15 m., there shall be minimum 3.0 meter
setback at least on any two sides except front side.
(c) Cinema halls and multiplexes- no relaxation shall be given.
(2) In case of non-high rise building and high rise building, the
unauthorised construction may be regularized as per building norms specified in the
Table-II below:
TABLE-II
Sl.
No.
Buildings Type
Minimum Building Norms to be met
(1)
(2)
(3)
(a) Non-high rise
(i)Residential (Plotted)
Staircase
(a)
Corridor
(b)
Plotted
development
up
to
300
square
metres of plot area
Not applicable
Not applicable
Plotted
development
>300 square metres of
plot area
Not applicable
Not applicable
(ii) Apartments and
special buildings
(a) have the provisions of second staircase, the
existing staircase of minimum width of 1.5m
shall
be
converted
to
fire
staircase
(pressurized) fitted with smoke extraction
system and fire resistant doors (two hours
rating).
(b) In case there is a single staircase, an
external staircase (fire escape) of minimum
0.90m width shall be provided from ground
to top of the building connecting all floors for
easy evacuation of the occupants
Where a single staircase of required width as
above in (b) is provided, the owner of the
building shall create refuge area of 10
Square meter fitted with fire resistant doors
of two hours rating in each floor of the
building
along
with
the
provisions
of
opening/exit doors on the external wall
facing to the side open space (setbacks).
(a) The
corridor shall
be of
minimum of
1.5 m wide
Minimum two
exits of 1.5 m
width each
shall be
provided in the
ground floor.
9
(1)
(2)
(3)
(b) High Rise Building
(a) The
width
of
the
stairs
of
both the
staircases shall be at least 1.5m wide each.
(b) Out of minimum of two staircases, one
must be pressurized and fitted with smoke
extraction system and fire resistant doors
of two hours rating in each floor.
(c) If the width of one or both the staircases
is less than the required width as per
NBCI, the owner shall provide a refuge
area of 10 Square meter fitted with
smoke extraction system and fire resistant
doors of two hours rating in each floor
having exit of 1.5 meter wide towards open
spaces / side setbacks / roads in each
floor.
(a)
At
least
two exit doors
of
minimum
1.5m
wide
shall
be
provided
in
the
ground
floor.
The width of
the
corridor
shall not be
less than 1.5m
wide.
EXPLANATION: Irrespective of the relaxation provided in this Para.—
(a) the accessibilities of fire engine and fire-fighting personnel to
different sites and parts of special buildings shall be assessed by
the State Fire Service Organisation while issuing No Objection
Certificate or Fire Safety Certificate;
(b) The owner shall provide all the fire prevention and safety
installations as per the provisions of National Building Code of
India
and
any
additional
fire
protection
measures
as
recommended by State Fire Service Organisation, the reasons
of which shall be recorded in writing;
(c) The owner shall provide underground Water Tank and Terrace
Tank as per the provisions of the National Building Code of India;
and
(d) The setbacks mentioned above shall remain free from all
obstructions and open to sky.
7. Relaxation in planning and building norms for clinical establishments :—
(1) Non-high-rise Building Category having plot size above 200 Square metres
and up to 1000 Square metres shall meet the following requirements; namely:—
(a)
Means of access shall be at least 6 metres wide public road;
(b) the setback provision specified for clinical establishment in Table-I
shall be applicable, if not specified otherwise hereunder;
(c) the front setback need not be insisted upon if the building abuts to
6 metres wide public road;
(d) if the public road of 3 meters wide on the side of the plot or 6 metres
wide on the rear of the plot is available, it will be considered as relaxation
towards open space or setback for the purpose of emergency evacuation
10
and the above requirement of one side setback (excluding rear set-back)
may not be insisted upon:
Provided that, the owner shall provide one exit or exit of refuge
area facing to the said public road.
(2) Non-High rise building category having plot size above 1000 square metres
shall fulfill the following requirements, namely:—
(a)
means of access shall be at least 6 metres wide public road;
(b)
the setback provision specified for clinical establishment in Table-I shall
be applicable, if not specified otherwise hereunder;
(c) if the public road of 4.5 meters wide on one side of the plot or 6 metres
wide on the rear side of the plot is available, the same will be considered
as relaxation towards open space or setback for the purpose of
emergency evacuation and the above requirement of corresponding set
back may not be insisted upon:
Provided that the owner shall provide one exit or exit of refuge area
facing to the said public road.
(3) In case of High rise clinical establishment i.e. height of 15 metres and above
the following requirements shall be met, namely:—
(a) minimum means of access shall be 9 metres for buildings up to
18 metres height and 12 metres for building above 18 metres height.
(b) the setback provision specified for clinical establishment in Table-I shall
be applicable;
(4) (a) The parking requirements shall be relaxed to the extent available,on
compounding in case of non-high-rise clinical establishments on
payment of compounding towards deficit in parking.
(b) in case of high rise clinical establishments 50% of the parking
requirement is to be met.
(c) The deficit in off street parking against the provision of Planning and
Building Standard Regulation of the concerned Development Authority
shall be compounded at the rate as specified in item (a) of sub-Para. (1)
of Para. 8 below.
EXPLANATION: (a)
The Building norms specified in Table-II shall apply to the
clinical establishments.
(b) The restriction of numbers of beds as mentioned in Planning
& Building Standard Regulations with respect to Nursing
Homes/ Hospitals/Clinical Establishments shall be done away
with.
(c) The owner shall provide underground Water Tank and Terrace
Tank as per the provisions of National Building Code of India.
(d) The owner shall provide all the fire prevention and safety
installations as per the provisions of National Building Code of
India and any additional fire protection measures as recommended
by State Fire Service Organization, the reasons of which shall be
recorded in wring.
11
(e) All these buildings shall require NOC from the DISCOM/Electrical
Inspector prior to regularization.
(f) The Fire Safety Certificate is required as per the provisions of the
Odisha
Fire
Prevention
and
Safety
Rules,
2017
before
regularization.
(g) The setbacks mentioned above shall remain free from all
obstructions and open to sky.
(h)
Irrespective of the relaxation provided in these recommendations,
the accessibilities of fire engine and fire fighting personnel to
different sites and parts of these buildings shall be assessed by the
State Fire Service Organization while issuing Fire Safety
Certificate.
8. Compounding rate:— (1) The following charges shall be levied for compounding
of;
(a)
parking deficit:
Area
Parking Deficit Charges per Square
meter
(in
Rupees)
(Residential/
Non-Residential)
(1)
(2)
Municipal Corporation
10,000/-
Municipality
8,000/-
NAC
6,000/-
Rural
5,000/-
(b) The Compounding Rate for built-up area deviation shall be applicable
as specified below:
Category Wise Compounding Rates
Sl.
No.
Situations/ Limitations
Compounding Fee for Square meter
(in Rupees) of built-up area
Residential
Other than Residential
(1)
(2)
(3)
(4)
1
Up to Maximum FAR
Rs.250/-
Rs.500/-
2
Beyond Maximum
permissible FAR
Rs.500/-
Rs.500/-
or
25% of Bench Mark Value
of 1 sq.m of land area,
whichever is higher
NOTE: In mixed-use buildings, the rates shall be applicable on
pro-rata basis.
EXPLANATION:
For deciding upon the applicable charges on
pro-rata basis for different uses, in case of
calculation of mixed use of building, the total area
towards each use in the building shall be considered
and ratio of different uses shall be derived
accordingly.
12
(2)
In case of regularization of construction undertaken in respect of plot size up
to 100 Square meters with maximum built up area of 150 square meter, a lump sum
compounding fee of INR 20,000 shall be charged.
(3)
The built-up area constructed on a plot can be regularized under the scheme
without any limitation of Floor Area Ratio (FAR), as per the provisions prescribed in
sub-clause 1 (b) of clause 8 above.
9. Manner of Payment of fee:— (1) The application shall be accompanied by
self- assessed compounding fee as per the rates prescribed and other fee and which shall
be deposited with concerned Development Authority in one installment only in the form of
two separate bank drafts drawn in any nationalized bank payable in their favour.
(2)
The differential amount, if any, shall be paid within 30 days from the date of
receipt of intimation from the Development Authority and extra amount deposited by the
applicant, if any, shall be refunded without interest.
(3)
Conversion Fees, if applicable, as per sub-section (3) of Section 119 of the
Act shall be paid by the applicant.
(4)
The compounding fees and kisam conversion fees so collected under this
Scheme shall be deposited in the Comprehensive Development Plan Infrastructure
Development Fund (CIDF) of the respective Development Authority
10. Penalties:— (1) In the event of incomplete application and non-compliance to the
observations of the Development Authority, the application shall be rejected and 10% of
the compounding charges prescribed under the Scheme shall be forfeited.
(2)
In the event of misrepresentation or suppression of facts, the compounding
fee shall be forfeited and the permission for regularization so issued shall be revoked
and the matter shall be reported to the Council of Architecture, New Delhi for
cancellation of the license of the concerned Architect and Director Town Planning for
cancellation of registration in case of technical persons.
(3)
This shall also warrant criminal prosecution against the applicant or
Architect or the Technical person who has signed the application without verifying the
correctness of the facts as mentioned in the application.
11. Miscellaneous:— (1) The permission to regularize the unauthorized construction
will not confer any right, title and interest over the land or plot.
(2)
The unauthorized constructions once regularized under this Scheme shall
not be considered for any regularization in future.
(3)
The representatives of concerned Development Authority, Public Health
Engineering Department and the Urban Local Bodies will form a panel to take up random
inspection of the construction on the site.
13
(4)
The Development Authority reserves the right to initiate proceedings against
unauthorized constructions under the Act where the cases cannot be regularized under
this Scheme.
(5)
A summary of the unauthorized constructions regularized under the Scheme
shall be published through a public notice as per the provisions of the relevant regulation
of the Development Authority.
(6)
In case of any dispute in interpretation of this scheme, the decision of the
State Government is final.
12. Appeal:— Any person aggrieved by the decision of the Development Authority
may prefer appeal under the relevant sections of the Act and the decision of the
Appellate Authority shall be final.
[No.13955-T.P. DEV.-22/2018/HUD.]
By Order of the Governor
G. MATHI VATHANAN
Principal Secretary to Government
14
FORM-A
[See Para. 4(1)]
APPLICATION FOR REGULARISATION OF UNAUTHORISED CONSTRUCTION OF
BUILDING WITHIN DEVELOPMENT PLAN AREA OF
_______________________________________DEVELOPMENT AUTHORITY
(Form to be filled in by the applicant in block letters)
NAME :
PRESENT POSTAL ADDRESS :
(CORRESPONDENCE)
Tel. No .:
FOR OFFICE USE
Registration No:________________________________________
Scrutiny fee (Draft No. & date):__________________________
Compounding fee (Draft___________________________________
To
The Vice-Chairman,
________________________________Development Authority
__________________________________________________
Sir,
I/We hereby apply for regularization of unauthorized/deviated construction as mentioned below:
1. Name of the applicant
______________________________________
2. Applicant’s interest in land
Owner:_______________
Power of attorney:__________
with record-of-rights
3. Plot No.
______________________________________________
4. Area in Sq. Mtrs.
_____________________________________________
5. Mouza
______________________________________________
6. Nature of Ownership
______________________________________________
(Lease hold/Sthitiban)
7. Category of the building
_______________________________________________
8. Land use in C.D.P.
_______________________________________________
9. Kisam of the Land
_______________________________________________
10. Approach road
Private:____________________ Public________________
11. Road width
_______________________________________________
12. Whether connected to
Yes________________________No_________________
existing public road
13. Distance from A.S.I/State protected Monuments:
13(a) Within 100 Mtrs.
_______________________________________
13(b) Up to 300 Mtrs.
_______________________________________
13(c)
Beyond 300 Mtrs.
_________________________________________
14. Whether coming within Airport Restriction Zone? If yes:
14 (a) Height permissible as per colour code zoning map:___________________________
Affix recent
photograph of the
applicant with
signature on the
body of the
photograph
15
15. Height of the existing building__________________________________________________
16. Total deviation in Sq mtr:
16(a) Parking Deficit
_____________________________
16(b) FAR deviation
_____________________________
16(c) Unauthorized construction area ___________________
DOCUMENTS/ PLANS FURNISHED
1. Copy of the ownership document
______________
2. Copy of the Kisam conversion Certificate/ money receipt for conversion, _____________
if necessary
3. Four copies of plan as per actual construction site
______________
4. Photocopy of the approved plan and approval letter, if any
______________
5. Affidavit (in the Form-B)
______________
6. Photographs of the building from two angles existing at the time of
application, signed by the applicant and attested by the Architect with date_____________
7. Site Inspection Report
______________
8. Structural Safety Certificate (in Form-C) from a Structural Engineer in
______________
case of building exceeding two floors/vetting of Structural Design
wherever applicable
9. NOC clearances obtained:
9(i)
Fire Safety Certificate
______________
9(ii) NOC from Urban Local Body in respect of peripheral
______________
Infrastructure evelopment
9(iii) NOC from the Neighbour (Form-D)
______________
9(iv) Any other applicable NOC/Clearance
______________
10. Land use Map of CDP of the Site
______________
11. Deposit details
11 (i) Fees as per ODA(CAF) Rules 2016:
Amount in
Rs.______
Draft Drawee
No._____ Bank/Branch:
11 (ii) Compounding fee
Amount in
Rs.______
Draft Drawee
No.______Bank/Branch:_______
Date:___________________
Place:___________________
_____________________
Signature of the Architect/
Technical Person
_______________________
Signature of the applicant(s)
Name: ____________________________ Name: ____________________________
Registration No.: __ ___________________Tel No.: ___________________________
Tel No.: ____________________________ Postal Address: ____________________
Postal Address:____ __________________
____________________
______________________
____________________
16
FORM-B
[See Para. 4(1) (d)]
AFFIDAVIT
(To be sworn by the applicant)
I/We, Shri/Smt.______________________________________________________________
aged years, son/daughter/wife of Shri/Smt. ____________________________of
village_________________ P.S._______________ Dist.________________do hereby solemnly
affirm as follows :
1. That I/We have obtained a plot/building by way of purchase/ lease/ gift/ family
partition/ court decree from____________________________of village______________
vide deed No.________________________Dt.______________________ schedule below.
SCHEDULE OF PROPERTY
Name of the Mouza/Village
:
Tahasil
:
Sabak/Hal Plot No.
:
Khata No.
:
Area :
Layout plot (Drawing) No :
Approved by ____________________ Vide letter No.______________ datd____________
BOUNDED BY (Please mention plot numbers/road)
Eastern side: Western side:
Northern side: Southern side:
2. That from the date of acquisition, I/We am/are in lawful and peaceful possession over the
above plot.
3. That I/we have not constructed the building or any part thereof beyond my/our legally
owned land.
4. That I/We have not encroached any Govt. land or any other land abutting or
contiguous to my aforesaid land.
5. That the plan submitted for regularization is exactly as per the actual construction at site.
6. That the information furnished in the application form and documents submitted along
with the application are correct.
7. That the restrictions imposed in Para. 5(Five) of the scheme are not applicable to this
proposal.
8. That I/We undertake the responsibility of structural safety/vetting of structural design of
the building and Development Authority shall in no way be held
accountable for any structural failure of the building.
9. That in the event of any suppression and/or misrepresentation of facts in the
application, the Authority has got every right to refuse the permission/revoke the
permission and forfeit the compounding fee deposited by me/us and I/We shall be liable for
criminal prosecution.
Identified by :
DEPONENT
17
FORM-C
[See Para. 4(1)(g)(ii)]
STRUCTURAL SAFETY CERTIFICATE
This is to certify that I/We have checked the structural stability of the existing storey building
constructed over the Plot No._______________________________mouza___________________
The existing construction of the building is structurally safe as per the provision of the
National Building Code of India taking into account the safety factors especially for cyclone,
earthquake and other natural calamities.
Date:
Place:
Signature with seal of Structural Engineer
Name :
Regn. No.:
Office postal address:
Phone No.:
Signature of the applicant (s)
Name:
Postal address:
Tel No:
18
FORM-D
[See Para. 4(1) (h)]
(No Objection Certificate by the owner of the Neighbour Plot)
AFFIDAVIT
I/We, Shri/Smt._____________________________ aged____________ son/daughter/wife of Shri/
Smt./Kumari________________________village____________P.O.___________P.S.___________
Dist._______________ do hereby solemnly affirm as follows:
That, I/We own a plot of land/building bearing no.________________________of
village / Unit___________________P.O._____________P.S._____________on the North/ South/
East/ West side of Plot / House No._____________Village/Scheme________________owned by
Shri/Smt._______________________________aged__________________son/daughter/wife
of
Shri/Smt.__________________________Village_________________P.O._____________________
P.S._____________Dist.____________.
That, I/We have no objection for the construction undertaken by Shri/Smt.
_________________________________ over above plot with nil/zero set back on
the North/South/East/West side of my /our plot/house.
That, this affidavit is required to be produced before the_____________________________
Development Authority for regularization of construction undertaken over above plot by
Shri/Smt._____________________________ in village/Unit under the provisions of Clause of
Development Authority (P. & B.S.) Regulations.
That the facts stated above are true to the best of my knowledge and belief.
Identified by :
DEPONENT
Printed and published by the Director, Printing, Stationery and Publication, Odisha, Cuttack-10
Ex. Gaz. 806-173+50