1

ODISHA ELECTRICITY REGULATORY COMMISSION

BIDYUT NIYAMAK BHAWAN

PLOT NO 4, CHUNOKOLI, SHAILASHREE VIHAR,

BHUBANESWAR - 751021

******

NOTIFICATION

The

27th

December,

2023

No. DIR (T)-419/2023/1907 - In exercise of the powers conferred under section 181, of the Electricity

Act, 2003 (36 of 2003), read with section 42, section 61 and section 86 thereof and all other powers

enabling it in this behalf, and after previous publication, the Odisha State Electricity Regulatory

Commission hereby makes the following Regulations, namely:

CHAPTER 1

PRELIMINARY

1.

Short Title, Extent and Commencement

a)

These regulations shall be called the Odisha Electricity Regulatory Commission

(Promotion of Renewable Energy through Green Energy Open Access) Regulations,

2023.

b)

These Regulations will come into force from the date of their notification in the Official

Gazette.

c)

These Regulations shall extend to the whole of the State of Odisha.

d)

These Regulations shall be applicable exclusively for availing Green Energy through

open access for consumers within the State notwithstanding anything mentioned in

OERC (Terms and Conditions of Intra-State Open Access) Regulations, 2020 as

amended from time to time.

2.

Objective

The objective of these regulations is to Promote Green Energy through Open Access,

allowing Banking of the same and also to promote production of Green Hydrogen or Green

Ammonia or their derivatives.

The Odisha

G a z e t t e

EXTRAORDINARY

PUBLISHED BY AUTHORITY

No. 101 CUTTACK, THURSDAY, JANUARY 11, 2024/PAUSA 21, 1945

2

3.

Definitions

(1)

In these regulations, unless the context otherwise requires,

a)

"Act" means the Electricity Act, 2003 (36 of 2003);

b)

“Banking” means surplus Green Energy of a Green Energy Generator / consumer

injected into the grid and is credited with Distribution Licensee (s) /GRIDCO and shall

be drawn later with banking charge as per this regulation by Green Energy Open Access

consumer.

c)

“Banking Charge” means charges levied upon the Green Energy Generator/Green

Energy Open Access Consumer and paid to DISCOM/GRIDCO for availing banking

facility as determined by the Commission under this Regulations.

d)

“Central Commission” means the Central Electricity Regulatory Commission

referred to in sub-section (1) of Section 76 of the Act;

e)

“Central Nodal Agency” means a Central Agency as notified by the Central

Government to set up and operate a single window Green Energy Open Access system

for renewable energy.

f)

“Commission” means the Odisha Electricity Regulatory Commission constituted

under the Act.

g)

“Day Ahead Market (DAM)” means a market where Day Ahead Contracts are

transacted on the Power Exchange(s);

h)

“Entity” means any consumer who has contracted demand or sanctioned load of one

hundred (100) kW or more either through single connection or through multiple

connections aggregating to Hundred (100) kW or more located in the same operating

area of distribution licensee, except for captive consumer;

Provided that in case of Captive Consumer there shall not be any load limitation;

i)

“Fossil Fuel” means fuels such as coal, lignite, gas, liquid fuel or combination of these

as its primary source of energy, which are used in Thermal Generating Station for

generating electricity;

j)

“Green Energy” means the electrical energy from renewable sources of energy

including hydro and storage (if the storage uses renewable energy) or any other

3

technology as may be notified by the Government of India from time to time and shall

also include any mechanism that utilises green energy to replace fossil fuels including

production of Green Hydrogen (GH) or Green Ammonia (GA) or their derivatives;

k)

“Green Hydrogen (GH) / Green Ammonia (GA)” means Hydrogen / Ammonia

produced by using Renewable Energy (RE), including, but not limited to, production

through electrolysis or conversion of biomass:

Provided that Renewable Energy also includes such electricity generated from

Renewable sources which is stored in an energy storage system or banked with the grid

in accordance with applicable regulations;

Provided that GH or GA or their derivatives can be manufactured by a developer

by using RE from a co-located RE plant or sourced from a remotely located RE plant,

whether set up by the same developer, or a third party or procured RE from Power

Exchange;

Whereas, for Green Hydrogen produced through electrolysis: The non-biogenic

greenhouse gas emission arising from water treatment, electrolysis, gas purification and

drying and compression of hydrogen shall not be greater than 2 kilogram of carbon

dioxide equivalent per kilogram of hydrogen (kg CO2 eq/kg hydrogen) taken as an

average over last 12-month period;

Whereas, for Green Hydrogen produced through conversion of biomass: The non-

biogenic greenhouse gas emission arising from biomass processing, heat/steam

generation, conversion of biomass to hydrogen, gas purification and drying and

compression of hydrogen shall not be greater than 2 kilogram of carbon dioxide

equivalent per kilogram of hydrogen (kg CO2 eq/kg hydrogen) taken as an average over

last 12-month period;

l)

“Green Open Access Consumer” means any person (located in the operating area of

a distribution licensee), who has contracted demand or sanctioned load of one hundred

(100) kW or more either through single connection or through multiple connections

aggregating to Hundred (100) kW or more or such other limit as may be specified by

Commission from time to time by an Order, except for captive consumers and who are

supplied with electricity from green energy sources for their own use by a licensee or

the Government or by any other person engaged in the business of supplying electricity

4

to the public under the Act or any other law for the time being in force and includes

any person whose premises are for the time being connected for the purpose of receiving

green energy with the works of a licensee, the Government or such person, as the case

may be;

m)

“GRIDCO” means the State designated entity responsible for power purchase & bulk

supply of electricity to distribution licensee and acts as demand aggregator & State

Nodal agency responsible for implementation of Odisha Renewable Energy Policy-

2022.

n)

“Long-term access (LTA)” means the right to use the intra-State transmission system

or distribution system for a period exceeding twelve (12) years but not exceeding

twenty-five (25) years as per OERC (Terms and Conditions of Intra-State Open Access)

Regulations, 2020 as amended from time to time;

o)

“Medium-term open access (MTOA)” means the open access for a period exceeding

three (3) months but not exceeding three (3) years as per OERC (Terms and Conditions

of Intra-State Open Access) Regulations, 2020 as amended from time to time;

p)

"Obligated Entity” means entities mandated under Clause (e) of sub-section (1) of

Section 86 of the Act to fulfil Renewable Purchase Obligation, which includes

distribution licensee, GRIDCO, Captive user and open access consumer;

q)

“Rules” means the Electricity (Promoting Renewable Energy Through Green Energy

Open Access) Rules, 2022 and subsequent amendments;

r)

“SERC” means the State Electricity Regulatory Commission;

s)

“Short-term open access (STOA)” means open access for a period up to one (1) month

at a time as per OERC (Terms and Conditions of Intra-State Open Access) Regulations,

2020 as amended from time to time;

t)

“Standby Charges” means the charges applicable to green energy open access

consumers against the standby arrangement provided by the distribution licensee, in

case such green energy open access consumer is unable to procure/schedule power from

the generating sources with whom they have the agreements to procure power due to

outages of Generator, transmission systems and the like;

u)

“State Nodal Agency” means the State Load Despatch Centre (SLDC) of Odisha for

5

grant of green energy Intra-State open access for Short Term Open Access (STOA) and

the State Transmission Utility (STU) for grant of Green Energy Intra-State Open

Access for Medium Term Open Access (MTOA) and Long Term Access (LTA);

v)

“State Transmission Utility (STU)” means the Odisha Power Transmission Corporation

Limited or any such utility declared by State Government;

(2)

Words and expressions used and not defined in these regulations but defined in the Act or

IEGC, OERC (Terms and Conditions of Intra-State Open Access) Regulations, 2020 or any

other regulation of the Appropriate Commission shall have the meaning assigned to them under

the Act or the IEGC or the State Grid Code or any other regulation of the Commission as the

case may be.

4.

Applicability

These regulations shall be applicable for generation, purchase and consumption of Green

Energy as defined under Regulation 3(j) including the energy from non-fossil fuel-based

Waste-to-Energy plant.

5.

Purchase Obligation from Renewable Sources:

There shall be a uniform renewable purchase obligation, on all obligated entities in the area

of supply / operation of a distribution licensee. Any entity, whether obligated or not, may elect

to generate, purchase and consume renewable energy as per their requirements by one or

more of the following methods:-

(1)

Own Generation from renewable energy sources:

There shall not be any capacity limit for installation of any renewable energy source-

based power plant by the entity for his own consumption and such plant may be set

up at any location in India and power shall be transmitted over Inter State Transmission

system (ISTS) or Intra State Transmission System (InSTS) or both using Open Access:

Provided that the generating plant may be set up by the entity itself or by a

developer with which the entity has entered into a Power Purchase Agreement (PPA).

(2)

By procuring Renewable Energy through Open Access from any Developer directly

or through a trading licensee or through power market(s).

Explanation:

6

(a)

Developer means the generating company who generate electrical energy from

Renewable sources of energy.

(b)

Trading Licensee means a person who has been granted a license by the

Commission/Central Commission, for purchase of electricity for resale thereof.

(3)

By requisition from distribution licensee/GRIDCO:

(a)

Any consumer may elect to purchase Green Energy either upto a certain

percentage of its consumption or entire consumption through open access and

place requisition accordingly with respective distribution licensee/GRIDCO,

and GRIDCO shall procure and supply such quantity of Green Energy and the

consumer shall have the flexibility to give separate requisition for solar, wind,

Hydro and other form of Green Energy;

(b)

The consumer may purchase on a voluntary basis, more renewable energy, than

he is obligated to consume and for ease of implementation, this may be in steps

of twenty-five per cent (25%) and going upto hundred per cent (100%);

(c)

The tariff for the Green Energy shall be determined separately by the

Commission;

(d)

Any requisition for procurement of Green Energy from a distribution licensee /

GRIDCO shall be for a minimum period of one year;

(e)

The quantum of Green Energy shall be pre-specified for at least one year.

(f)

The Green Energy purchased from distribution licensee/GRIDCO or from

Renewable Energy sources other than distribution licensee/GRIDCO in excess

of its Renewable Purchase Obligation (RPO) of obligated entity shall be

accounted for RPO compliance of the distribution licensee/GRIDCO as the case

may be;

(g)

The energy Accounting of power purchased from renewable energy source(s)

shall be on a monthly basis;

(4)

By consuming green energy from captive power plant.

(5)

By purchasing of renewable energy certificates in accordance with the regulations in

this regard.

7

(6)

Purchase of Green Hydrogen (GH) or Green Ammonia (GA) or their derivatives: The

obligated entity can also meet their RPO by purchasing GH or GA or their derivatives

and the quantum of such GH or GA or their derivatives would be computed by

considering the equivalence to the GH or GA or their derivatives produced from one

MWh of electricity from the renewable energy sources or its multiple and norms in this

regard as notified by the Central Commission.

(7)

Any other sources, as may be, determined by the Central Government.

6.

Green Energy Open Access:

The application of a Green Energy consumer including GH or GA or their derivative plants

shall be allowed Green Energy open access by the nodal agency within a period of fifteen (15)

days:

Provided that only the consumers (located in operating area of a distribution licensee),

who have contracted demand or sanctioned load of one hundred (100) kW or more, either

through single connection or through multiple connections aggregating to Hundred (100) kW

or more shall be eligible to take power through Green Energy Open Access and there shall be

no limit of supply of power for the captive consumers taking power under Green Energy Open

Access subject to availability of transmission/distribution network capacity;

Provided further that consumer shall not change the quantum of power consumed

through open access within 12-time blocks, so as to avoid high variation in demand to be met

by the distribution licensee / GRIDCO.

7.

Nodal Agency:

The State Load Dispatch Centre (SLDC) shall act as the nodal agency for grant of Intra State

Green Energy open access on short term basis and the State Transmission Utility (STU) shall

be the nodal agency for grant of Intra State (InSTS) Green Energy Open Access on Medium

and Long-Term basis. All applications of InSTS Green Energy Open Access consumers shall

be submitted on the portal developed by the State Nodal Agency. For ISTS, a Central Nodal

Agency shall be notified by the Central Government to set up and operate a single window

Green Energy Open Access system for renewable energy. All applications of ISTS Green

Energy Open Access consumers shall be submitted on the portal developed by the Central

Nodal Agency and these applications shall be routed to State Nodal Agency (SLDC or STU)

8

for grant of Green Energy Open Access.

(1)

All relevant information regarding Green Energy Open Access shall be available to the

public on the portal of the Central Nodal Agency / State Nodal Agency (SLDC/STU).

8.

Procedure for grant of Green Energy Open Access:

(1)

All the applications for the Green Energy Open Access complete in all respects as per

format prescribed by Central Nodal Agency / State Nodal Agency (SLDC/STU) shall

be submitted on the portal set up by the Central Nodal Agency / State Nodal Agency

(SLDC/STU) as the case may be.

(2)

The concerned nodal agency shall, by an order in writing, approve the applications for

the Green Energy Open Access within a period of fifteen (15) days from the receipt of

application completed in all respect:

Provided that the order of processing of such applications for Green Energy Open

Access shall be on first in first out basis.

(3)

The Short-Term Open Access (STOA) and Medium-Term Open Access (MTOA) shall

be allowed, if sufficient spare capacity is available in the transmission system without

any augmentation whereas for Long Term Access, the transmission/ distribution

system may be augmented / strengthened based on Load flow study, if required:

Provided that priority shall be given to Long Term Access (LTA) in the existing

system, if spare capacity is available and further open access for generation from non-

fossil fuel sources shall be given priority over the generation from the fossil fuel.

Explanation: For the purposes of this Regulation, the expression - Fossil Fuel includes

the fuels such as coal, lignite, gas, liquid fuel or combination of these as its primary

source of energy, which are used in Thermal Generating Station for generating

electricity.

(4)

No application for open access shall be denied unless the applicant has been given an

opportunity of being heard in the matter and all orders denying open access shall be

speaking orders.

(5)

Appeals against an order of the concerned nodal agency shall lie before the

Commission, within a period of thirty days from the date of receipt of order. The

9

Commission shall dispose the appeal within a period of three months and the order

issued by the Commission, shall be binding on the parties.

9.

The Commission may give rating to the consumer of the Distribution licensee based on the

percentage of Green Energy purchased by such consumer.

10.

The measurement, reporting, monitoring, onsite verification, and certification of Green

Hydrogen and its derivatives shall be as per specification/ guidelines of the Ministry of Power,

Govt. of India.

10

CHAPTER 2

GREEN ENERGY OPEN ACCESS CHARGES

11.

Charges to be levied for Green Energy Open Access

The charges to be levied on Green Energy Open Access consumers shall be as follows:

(a)

Transmission charges;

(b)

Wheeling charges;

(c)

Cross subsidy Surcharge;

(d)

Standby charges wherever applicable;

(e)

Banking Charge and

(f)

Other fees and charges such as SLDC fees and scheduling charges, Deviation

settlement charges as per the relevant regulations of the Commission which are not

specifically mentioned in these Regulations.

(1)

Transmission Charges

Green Energy Open Access consumer shall pay the charge for use of Intra-State

Transmission System (InSTS) & Inter-State Transmission System (ISTS) as follows:

a)

For use of ISTS: As specified by the Central Electricity Regulatory

Commission (CERC) from time to time.

b)

For use of InSTS: As determined by the Commission in the ARR & Tariff

Order for the relevant year. It shall be Rs./MW-Day for Long Term Access

(LTA) and Medium Term Open Access (MTOA) whereas it shall be Rs./kWh

for Short Term Open Access (STOA):

Provided that for RE generation inside the State, the transmission charges

shall be computed Rs./kWh for long, medium and short term open access. The

applicable normative losses shall be borne by the Green Energy Open Access

consumers in kind through additional injection;

Provided further that for RE generation outside the State, the Intra- State

transmission charges & losses shall be borne by Green Energy Open Access

11

consumers as per applicable Regulations;

Provided further that the concession/exemption of the transmission charges

applicable for Green Energy Open Access transaction shall be as determined &

approved by the Commission in the Tariff Order of relevant year.

(2)

Wheeling Charges

Wheeling charges shall be determined for Green Energy Open Access Consumer by

the Commission and shall be computed in Rs/kWh which shall be charged on the actual

energy wheeled. In addition to Wheeling Charge, Wheeling loss shall be applicable to

consumers seeking Green Energy Open Access. The applicable normative losses shall

be borne by the Green Energy Open Access consumers in kind through additional

injection which shall be determined and approved by the Commission in the Tariff

Order of the relevant year:

Provided that the concession/exemption of the wheeling charges shall be

applicable for Green Energy Open Access transaction as determined and approved by

the Commission in the Tariff Order of relevant year.

(3)

Cross Subsidy Surcharge (CSS) and Additional Surcharge

In addition to transmission and wheeling charges, Green Energy Open Access

consumer shall pay Cross Subsidy Surcharge (CSS) as determined by the Commission

in the Tariff Order of the relevant year. Cross Subsidy Surcharge shall be payable by

the green energy open access consumers on monthly basis for actual energy drawn

during the month through open access. The amount of surcharge shall be paid to the

distribution licensee of the area of power supply from whom the consumer was availing

power supply before seeking open access. The cross-subsidy surcharge shall be

computed in Rs. /kWh:

Provided that the Commission may fix a lower surcharge in the situation of

shortages and load shedding by the distribution licensee;

Provided further that such CSS shall not be levied if the consumer is availing

green power from his own captive generating plant;

12

Provided also that CSS and additional surcharge shall not be applicable in case

power produced from a non-fossil fuel-based Waste-to-Energy plant is supplied to the

Open Access Consumer;

Provided that additional surcharge shall not be applicable in case electricity

produced from offshore wind projects, which are commissioned upto December 2025

and supplied to the open access consumer;

Provided further that CSS & additional surcharge shall not be applicable, if green

energy is utilized for production of Green Hydrogen and Green Ammonia.

Provided that the concession/exemption of the CSS & additional surcharge shall

be applicable for Green Energy Open Access transaction as determined and approved

by the Commission in the Tariff Order of relevant year.

(4)

Standby Facility and Charges

a)

In case the Green Energy Open Access consumer is unable to procure/schedule

power from the generating sources with whom they have the agreements to

procure power due to outages of generator / transmission system or both,

standby charges shall be applicable to Green Energy Open Access consumer as

per standby agreement executed with the respective distribution licensee /

GRIDCO.

b)

The Standby Charges shall not be applicable, if the Green Energy Open Access

Consumers have given notice in advance, at least a day in advance before

closure time of Day Ahead Market (DAM) on ‘D-1’ day, ‘D’ being the day of

delivery of power, for standby arrangement to the distribution licensee:

Provided that the applicable Standby Charges for Green Energy Open

Access shall not be more than 25% (i.e. 125%) of normal tariff of the respective

consumer category.

c)

The Standby Charges for Green Energy Open Access consumer shall be

computed in Rs/kWh and it shall be charged based on the actual energy drawn

by the consumer from distribution licensee during the period of standby availed

13

by Green Energy Open Access consumer in case of outage of RE generator /

transmission/ Distribution system under Green Energy Open Access.

(5)

Banking Facility and Charges:

The generation from Renewable Energy (RE) Sources (Solar, Wind) are variable &

intermittent in nature. The surplus power generated from RE plants can be banked. The

basic premise of the RE banking is to bank energy during surplus generation and utilize

/ draw the banked energy during lean RE period.

Banking facility shall be provided to the consumers availing Green Energy Open

Access. The surplus energy from a ‘Green Energy’ Generating Station after setting off

shall be banked with the Distribution Licensee/ GRIDCO as follows.

a)

The banking facility including injection of surplus energy and drawal of banked

energy shall be subject to scheduling. The SLDC shall formulate a mechanism

for scheduling of injection & drawl of energy linked to banking of RE.

b)

The quantum of green energy Banked by the RE generator or consumer of Green

Energy shall be limited to 30% of the total monthly generation by the generator

(within the State) or monthly consumption of electricity from Distribution

Licensee by the consumer of Green Energy. The energy banked by the RE

generator (s) or consumer (s) within the State shall be limited to energy

equivalent to 200 MW in a month cumulatively for all RE generators or

consumers within the State except the consumer consuming power for

production of Green Hydrogen or Green Ammonia or its derivatives. The

Consumer drawing Green Energy from RE sources within the State or outside

the State for producing Green Hydrogen and or Green Ammonia or its

derivatives, may avail banking facility cumulatively for all the consumers in

this category limited to energy equivalent to 350 MW. However, the total

quantum of banking of Green Energy with GRIDCO at any point of time shall

not be more than 500 MW (i.e demand not exceeding 500 MW in a time block)

for above categories taken together:

Provided that the Commission on the request of GRIDCO may revise the

banking quantum in each category including the capping by a Special Order;

14

Provided further that a Nodal Agency designated by Government of

Odisha shall formulate the methodology / procedure for allocation of quantum

of Green Energy power for Banking to applicant (s) within 3 months of

notification of these regulations and submit the same for information of the

Commission.

c)

The Banking Charge for solar generation shall be @ 8% of the energy banked.

The Banking Charge for wind or solar & wind hybrid generation, shall be

5% of the energy banked:

d)

The Banking of energy shall be permitted only on monthly basis as per Calendar

month (i.e. banking cycle):

Provided that the credit for banked energy shall not be permitted to be

carried forward to subsequent banking cycle / month and shall be adjusted

during the same month / banking cycle;

Provided that the energy whether banked during peak / off-peak TOD

slots shall be permitted to be drawn during off-peak TOD slot only by paying

the banking charges as specified in this Regulation. The TOD slot shall be

determined by the Commission in their Tariff Order from time to time;

Provided that the unutilized banked energy would be treated as deemed

purchase by GRIDCO on the expiry of banking cycle at lowest RE procurement

price of GRIDCO of last financial year or lowest price discovered by SECI

through competitive bidding process in last financial year whichever is less;

Provided that the payment for deemed purchase by GRIDCO shall be

limited to 10 % of the banked energy;

Provided that Green Energy consumed for production of Green Ammonia

or Green Hydrogen or their derivatives or any other activity shall be accounted

for RPO compliance for such open access consumers. The Green Energy

consumption beyond obligation of the open access consumer shall be counted

towards RPO compliance of GRIDCO / DISCOMs;

Provided that unutilized banked energy shall also be accounted for the

RPO compliance of DISCOMs/GRIDCO.

15

e)

The RE Generator shall provide Special Energy Meter (SEM) and the monthly

settlement of energy sales shall be done based on Power injected to the system

as per the meter readings. The Green Energy Open Access consumers shall

install Special Energy Meter (SEM) or any other suitable meter approved by the

Commission. The banking as well as withdrawal of banked energy shall be

subject to day ahead scheduling. The energy accounting shall be on a real time

basis in 15 minutes time block.

f)

Distribution licensee / GRIDCO may also procure and supply Green Energy to

the manufacturers of Green Hydrogen / Green Ammonia in the state. In such

cases, the Distribution licensee/ GRIDCO shall only charge the cost of procurement

as well as the transmission charges, the wheeling charges and a small margin as

determined by the Commission.

(6)

If transmission and wheeling charges/losses have been levied on full quantum of energy

injected to the Grid, then no further transmission and wheeling charges/losses shall be

levied on banked energy.

TYPICAL ILLUSTRATION OF CALCULATION OF BANKING CHARGE

Sl.

No.

Banking for solar/ wind/

Hybrid power Installation

Solar

(8% banking

charge)

Wind / Hybrid

(5% banking

charge)

1

Energy injected to Grid after

auxiliary consumption of the RE

Generator corresponding to the

installed capacity

kWh

100.00

100.00

100.00

100.00

2

Quantum of energy banked with

GRIDCO (Max. 30%) [(1) x 0.3]

kWh

30.00

30.00

30.00

30.00

3

Banking Charge (8% /5%/ Nil)

KWh [(2) x 0.08/0.05/0]

kWh

2.40

2.40

1.5

1.5

4

Quantum of banked energy to be

returned by GRIDCO (Considering

Banking Charge of 8%/5%/ Nil)

[(2) – (3)]

kWh

27.60

27.60

28.50

28.50

5

Actual Banked power availed by

generator

kWh

25.00

20.00

25.00

28.00

6

Unutilised banked power [(4) – (5)]

kWh

2.60

7.60

3.50

0.50

7

10% of Banked Power [(2) x 0.1]

kWh

3.00

3.00

3.00

3.00

16

Sl.

No.

Banking for solar/ wind/

Hybrid power Installation

Solar

(8% banking

charge)

Wind / Hybrid

(5% banking

charge)

8

Unutilised banked power treated as

deemed purchase by GRIDCO (10%

of banked power or actual unutilised

banked power whichever is less) [(6)

or (7) whichever is less]

kWh

2.60

3.00

3.00

0.5

9

Energy charge for deemed purchase

by GRIDCO (based on last year

lowest bidding price of RE power

i.e. say Rs.3.00/kWh) [(8) x Rs.3]

Rs

3 x 2.6 =

7.80

3x3 = 9

3x3 = 9

3x0.5 =

1.5

10

Balance free power [(6) – (8)]

kWh

0

4.60

0.5

0

(7)

Other Charges:

In addition to above charges, the consumer availing Green Energy Open Access shall

also pay the following charges determined by the Commission as per the provisions

of the relevant regulations of the Commission:

a)

Applicable SLDC fees and charges

b)

Scheduling charges

c)

RE Deviation Settlement Charges (RE-DSM)

12.

Power to give directions:

CHAPTER 3

MISCELLANEOUS

The Commission may from time to time issue such directions and orders as considered

appropriate for implementation of these Regulations.

13.

Power to relax:

The Commission, by a special-order recording reason in writing and giving opportunity to hear

the parties likely to be affected, may relax any of the provisions of these Regulations Suo

Motu or based on an application made before the Commission by an interested person.

14.

Power to amend:

The Commission may from time to time add, vary, alter, suspend, modify, amend, or repeal

any provisions of these Regulations.

15.

Power to remove difficulties:

If any difficulty arises in giving effect to the provisions of these Regulations, the Commission

may, by an order, make such provisions, not inconsistent to the provisions which are of the

Act and these Regulations, as may appear to be necessary for removing the difficulty.

By Order of the Commission

Antaryami Sahoo

SECRETARY

Printed and published by the Director, Directorate of Printing, Stationery and Publication, Odisha, Cuttack-10

Ex. Gaz. 2311-173+30