S.R.O. No. 4/2025—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of

1947) the Award, dated the 11th December 2024 passed in the I.D. Case No. 10 of 2023 [under

Section 2-A(2)] passed by the Presiding Officer, Industrial Tribunal, Bhubaneswar on the industrial

dispute between the Management of M/s Khimji K. D. & Sons Pvt. Ltd., At Plot No. 621, Saheed

Nagar, Janpath, Bhubaneswar-751007 and Shri Dusmanta Kumar Jena, S/o SyamSundar Jena,

Plot No. 67/953, Road No. 5, Dibya Bihar, Samantarapur, Bhubaneswar-751002 is hereby published

as in the schedule below :—

SCHEDULE

IN THE INDUSTRIAL TRIBUNAL, BHUBANESWAR

INDUSTRIAL DISPUTE CASE NO. 10 of 2023 [under Section 2-A(2)]

Dated the 11th December 2024

Present :

Shri Benudhar Patra, B.Sc., LL.M.,

Presiding Officer,

Industrial Tribunal,

Bhubaneswar.

Between :

The Management of

. .

First Party—Management

M/s Khimji K. D. & Sons Pvt. Ltd.,

At Plot No. 621, Saheed Nagar,

Janpath, Bhubaneswar-751007.

And

Shri Dusmanta Kumar Jena,

. .

Second Party—Workman

S/o SyamSundar Jena,

Plot No. 67/953, Road No. 5,

Dibya Bihar, Samantarapur,

Bhubaneswar-751002.

2

Appearances :

Shri Trilochan Lenka, Advocate

. . For the First Party—Management

Shri Dusmanta Kumar Jena

. . For the Second Party Workman— himself

AWARD

The legality and justifiability of termination of service of the second party with effect from

the 29th November 2021 is under challenge in the present application under Section 2-A (2) of the

Industrial Disputes Act,1947 (for short ‘the I.D. Act’). It is stated in the application that initially the

second party raised a grievance before the DLO (Khurda), Bhubaneswar on the 16th January

2023 but as the matter could not be resolved by the labour machinery within the stipulated period

of 45 days, he approached this Forum on the 6th March 2023 by filing the present application with

a prayer for grant of compensation in lieu of his reinstatement and back wages owing to the fact

that it would not possible on his part to serve any more under the first party because of its running

the business with the assistance of goons.

2. The case of the second party, in brief, is that he was appointed to work under the first

party as Executive Senior Accountant with effect from the 8th October 2019 and during his

continuance as such he was covered under the ESI/EPF Schemes and was being paid his monthly

wages through bank account. It is stated that while working as such, a misappropriation of money

was noticed under the Scheme -Dhanalaxmi Purchase Plan at Rourkela Branch, but the first party

on the 29th November 2021 without having complete knowledge or proof of his involvement in the

said misappropriation suddenly forced him to tender resignation and instructed him to ask for his

full and final dues and out of fear when he complied with the instructions, the HR Manager of the

first party terminated his employment on the same day. According to the second party, the

termination of his service is in contravention of the provisions of the Act and so also in violation of

the principles of natural justice, inasmuch as, despite his rendering continuous service for more

than 240 days under the first party neither he was given one month’s notice/notice pay in lieu

thereof and compensation as required under the Act, nor such termination was preceded with any

show cause/enquiry for any misconduct committed during his employment. It is asserted that as

the first party is an ‘industry’ and he is a ‘workman’ within the purview of the Act, he raised a dispute

concerning his termination of service before the DLO (Khurda), Bhubaneswar but the labour

machinery having failed to resolve his grievance within the stipulated period, he preferred the

present application under Section 2-A(2) of the Act before this Tribunal redressing his grievance.

Stating to have not been gainfully employed elsewhere after his termination from service, the

second party has prayed for a lump sum compensation in lieu of reinstatement and back wages;

the reason being that now a days the first party has hired goons for running its business and in

such a situation it is not possible for him to serve under it any more.

3. Resisting the claim laid on behalf of the second party, the first party filed its written

statement. At the outset while challenging maintainability of the application under Section 2-A(2)

the Act, it is stated that there being no existence or apprehension of an ‘industrial dispute’ within the

meaning of the Act, the Tribunal lacks jurisdiction to entertain the present.application and further by

virtue of appointment of the second party in a supervisory nature of duty with a monthly wages of

Rs.15,000, he cannot be held to be a ‘workman’ within the meaning ‘of Section 2(s) of the Act, so

as to maintain the application in this Forum. As regards the background facts, the first party while

admitting about appointment of the second party under its Corporate Office as Senior Executive

3

(Accounts) on a monthly wages of Rs.15,000 which subsequently raised up to Rs.17,000 per

month, has asserted that he was employed in a supervisory capacity and was entrusted to look

after the Dhanalaxmi Purchase Plan (DPP) of the company which was being implemented by

officials of all the six branches/stores and thus was exercising managerial power. It is stated that

during internal audit it came to the notice of the first party that a huge amount of money, i.e. to the

tune of Rs. 8 lakhs under the head ‘DPP’ was misappropriated in Rourkela store of the company

between the 1st April 2021 and the 21st November 2021 for which the first party lodged an FIR with

the Plant Site Police Station bearing Case No. 509 of 2021 under Section 408/420/468/471 IPC,

but as the second party was entrusted the duty to supervise the said DPP Scheme, an enquiry

was also conducted against him to find out his involvement in the said misappropriation. It is

stated that apprehending disciplinary action in the said enquiry, on the 29th November 2021 the

second party submitted his resignation voluntarily and consequently as a mark of good gesture the

management cleared up all his outstanding dues. Later on, it is stated, when the involvement of

the second party in the above misappropriation came to floor, the first party filed a criminal case

against him bearing I.C.C. Case No. 03 of 2023 under Section 408/420/468/471 of IPC in the Court

of S.D.J.M., Panposh, Rourkela, which is now sub judice. In the premises, the first party has

prayed to reject the claim as bad and invalid.

4. A rejoinder to the written statement is filed by the second party reiterating the stand taken

in the claim statement and further asserting that the nature of duties assigned to the second party

was purely manual/technical in nature and thus he is ‘workman’ within the meaning of the Act and

further, his termination being in contravention of the provisions of the Act. and the principles of

natural justice, he is entitled to the relief(s) claimed in the present proceeding.

5. In view of the pleadings of the parties, the following issues have been framed for

determination :—

ISSUES

(i) Whether the case is maintainable ?

(ii) Whether Shri Dusmanta Kumar Jena is a ‘workman’ as defined under Section

2(s) of the I.D. Act,1947 ?

(iii) Whether the second party has voluntarily resigned from service ?

(iv) Whether the action of the management of M/s Khimji K.D. & Sons Pvt. Ltd.,

Plot No. 621, Saheed Nagar, Bhubaneswar, Dist. Khurda in terminating the

services of Shri Dusmanta Kumar Jena, Ex-Executive Senior Accountant is

legal and/or justified ?

(v) If not, what.relief Shri Jena is entitled to ?

6. In order to substantiate their’ respective stand, while the second party examined himself

as WW 1 and relied on documents which have ‘been marked as Exts.1 to 9, the first party examined

its D.G.M., Admin and Operation Shri Sitakanta Dash as MW 1 and placed reliance on Exts. A’to E.

FINDINGS

7. Issue Nos. (i) and (ii)—As both the issues are framed touching maintainability of the

application, for the sake of convenience they are taken up together for consideration. Although it is

the consistent stand of the first party in its written statement that this Tribunal lacks jurisdiction to

4

entertain the present application under Section 2-A(2) of the Act; the same being not an ‘industrial

dispute’ within the meaning of the Act and further the second party being engaged under first party

as an Executive Senior Assistant was performing supervisory nature of duties and thus he is not a

‘workman’ within the meaning of the Act, yet the learned counsel representing the first party did not

lay much emphasis on such aspects. However, as it reveals from Ext. 9 , the second party raised

his grievance before the District Labour Officer (Khurda), Bhubaneswar by way of a written complaint

which was duly acknowledged by the .office of DLO (Khurda), Bhubaneswar on the 16th January

2023 and despite all efforts when the labour machinery could not resolve his grievance, he

approached this Forum by filing the present application under Section 2-A(2) of the Act on the 6th

March 2023, i.e. much after the stipulated period. It is further ascertained from record that he has

moved the present Forum within the prescribed period of three years of his alleged termination of

service. The application of the second party being in consonance with the provisions of the Act, the

same is held to be maintainable in this Forum.

8. Next, coming to the question as to whether the second party is a ‘workman’ or not within

the meaning of Section 2(s) of the Act, it is found from the claim statement as well as evidence of

the second party that, althrough the second party has taken a consistent stand that despite being

designated as Executive Senior Accountant he was discharging manual/technical nature of job

while in employment and therefore, he is squarely coming within the definition of ‘workman’. The

first party, on the other hand, has taken a stand that by virtue of his appointment as Executive

Senior Assistant, the second party was entrusted supervisory nature of duties, i.e. to look after the

work relating to DPP Scheme which was being implemented in its six stores located at different

places, besides he was being paid more than the wages as has been prescribed under the Act

and as such by no stretch of imagination he can be held to be a ‘workman’.

9. In view of the rival stand taken by the parties, first I would like to refer to the statutory

meaning of ‘workman’ as given in the Act.

Section 2(s): “workman” means any person (including an apprentice) employed in

any industry to do any manual, unskilled, skilled, technical, sales promotion,

operational, clerical or supervisory or any work for promotion of sales for hire or

reward, whether the terms of employment be express or implied, and for the

purposes of any proceeding under this Act in relation to an industrial dispute, includes

any such person who has been dismissed, discharged - or retrenched in connection

with, or as a consequence of, that dispute, or whose dismissal, discharge or

retrenchment has led to that dispute, but does not include any such person —

(i) who is subject to the Air Force Act, 1950 (45 of 1950); or the Army Act, 1950

(46 of 1950), or the Navy Act, 1957 (62 of 1957); or

(ii) who is employed in the police service or as an officer or other employee of

a prison; or

(iii) who is employed mainly in a managerial or administrative capacity ; or

(iv) who, being employed in a supervisory capacity, draws wages exceeding

ten thousand rupees per mensem or exercise, either by the nature of the

duties attached to the office or by reason of the powers vested in him,

functions mainly of a managerial nature”.

5

The statutory meaning of ‘workman’ as in the Act came up for consideration before the

Hon’ble Apex Court in the case of S.K. Maini Vrs. M/s Carona Sahu Company limited and Others

(1994) 3 SCC 510 and. taking into consideration the legislative intention behind the definition of

‘workman’, it has been held by their Lordships that whether or not an employee is a workman

under Section 2( s) of the Industrial Disputes Act is required to be determined with reference to his

principal nature of duties and functions. Such question is required to be determined with reference

to the facts and circumstances of the case and materials on record and it is not possible to lay

down any strait-jacket formula which can decide the dispute as to the real nature of duties and

functions being performed by an employee in all cases. Further, the Hon’ble Apex Court in the case

of Devinder Singh Vrs. Municipal Council, Sanaur, reported in (2011) 6 SCC 584 have held that the

source of employment, the method of recruitment, the terms and conditions of employment/contract

of service, the quantum of wages/pay and the mode of payment are not at all relevant for deciding

whether. or not a person is a workman within the meaning of Section 2(s) of the Act.

10. Keeping in view the statutory meaning of ‘workman’ and the principle enunciated by the

Hon’ble Supreme Court, now it is to be considered on the basis of avilable materials as to whether

the second party is coming within the purview of ‘workman’ or not.

The second party in his rejoinder has stated that during his tenure of employment under

the first party, his nature of work was to prepare different Scheme Accounts business and the

same was not at all a supervisory nature of duty and the stand taken in that regard by the first party

is nothing but to deprive him of the reliefs claimed in this application. The offer of appointment,

Ext. 1 filed by the second party though reflects that he was assigned with the position of

[Sr. Executive (Accounts) under the first party on a monthly remuneration of Rs. 15,000, yet nothing

mentioned in Ext. 1 as to the nature of duties/responsibilities which the second party was required

to perform while being employed as Sr. Executive (Accounts). Rather, it has come in evidence

during cross-examination of MW 1 that the second party was dealing with accounts matter of nine

branches of the first party through online. This evidence of MW 1 is clearly suggestive of the fact

that by virtue of his appointment the second party was entrusted with technical nature of duties, i.e.

to maintain accounts of the first party in relation to different schemes through online. In view of the

specific stand of the second party that despite being assigned with the designation of Sr. Executive

(Accounts), he was performing clerical/manual nature of duties, the management ought to have

placed sufficient evidence on record showing the second party’s supervision over other subordinate

staffs of branch offices while performing duties in the Corporate Office and by reason of the powers

vested in him, he was discharging managerial nature of duties. In absence of such evidence on

record, it is difficult on the part of this Tribunal to oust the second party from the purview of ‘workman’

solely basing on the stand of the first party that he was designated as Sr. Executive (Accounts) and

was drawing wages more than the one prescribed under the Act.

In view of the discussions held above, both the issues are answered in favour of the second

party.

11. Issue Nos. (iii) and (iv)—Issue No. (iii) and Issue No. (iv) being inter-linked to each

other are taken up simultaneously for consideration. While issue No. (iii) is framed taking into

consideration the stand of the first party, Issue No. (iv) is framed to determine the legality and

justifiability of termination of service, as alleged by the second party .

It is the stand of the first party as well as evidence of MW 1 that on account of a huge

misappropriation found to have been committed in relation to the Dhanalaxmi Purchase Plan

between the 1st April 2021 to the 21st November 2021, which was detected during the internal

6

audit, an FIR (Ext. A) was lodged against one Shri Rasmi Ranjan Patra, who was working as

Junior Executive, Sales in the branch office of the first party at Rourkela and as the second party

was looking after the supervision of the said scheme an enquiry was contemplated to ascertain

his involvement therein. But, being apprehensive of disciplinary/legal action the second party

submitted his resignation voluntarily on the 29th November 2021 and the management as a gesture

of goodwill paid all his outstanding dues pursuant to such resignation. In view of the above, it is

contended on behalf of the first party that the resignation dated the 29th November 2021 tendered

by the second party being voluntary one, it cannot be said to be an act of termination of service of

the second party, consequently the dispute laid in the present application being devoid of any merit

be rejected as bad and invalid. Per contra, it is contended by the second party that although the

second party had tendered resignation to the first party but such an attempt on his part was due to

the rude behaviour of the authority and that too without there being any iota of evidence relating to

the incident of misappropriation of money under the Dhanalaxmi Purchase Plan and as such the

action of the first party is nothing but termination of his service. It is further contended that if at all

the first party was in a mind to cause an enquiry to find out his involvement in the misappropriation,

instead of proceeding against him departmentally it remained silent in the matter and did not even

clear up his outstanding dues, which perforced him to ventilate his grievance before the labour

machinery and ultimately before this Forum.

12. In the context, it is pertinent to refer to Ext. 5, the letter of resignation tendered by the

second party. On perusal it reveals from Ext. 5 that alleging rude \behaviour by the Director of the

first party, the second party had tendered his resignation on the 29th November 2021 with a prayer

to the first party for issuance of NOC; his salary and bonus. When the letter of resignation contains

some allegations against the Director of the first party, in my view, an enquiry into such resignation

should have been conducted by the first party and result thereof should have been communicated

to the second party either accepting his resignation or contemplating a disciplinary action for

attributing such allegation against the Director of the first party. Instead as it reveals, the management

taking a plea of good practice decided’ to settle the dues of the second party. From the circumstances

discussed above, an inference can be drawn that ‘the first party was in a hurry to oust the second

party from its employment without there having any sufficient cause for such removal. In this

connection, it is pertinent to mention here that MW 1, who is the DGM, Admin and Operation while

deposing for the first party has admitted in his cross-examination that the second party was not

dealing with the Dhanalaxmi Purchase Plan at Rourkela; no explanation in writing was called for

from the second party in connection with the alleged misappropriation at RourkeIa Branch, nor any

enquiry report is submitted before the Tribunal or served upon the second party. He even could not

say the date of initiation or duration of such enquiry. Further, to substantiate its plea the first party

seems to have exhibited’ certain documents out of which Ext. A is the photocopy of FIR No.0509,

dated the 30th December 2021 against .Shri Rasmi Ranjan Patra, Junior Executive, Sales of

Rourkela Branch; Ext. B, the letter of resignation dated the 29th November.2021 regarding which

discussions have already been made in the preceding paragraph ; Ext. C, report made to the IIC,

Saheed Nagar Police Station, Bhubaneswar alleging gross negligence on the part of the second

party; Ext.D, the photocopy of I.C.C. Case No.03 of 2023 filed in the Court of the learned SDJM,

Panposh, Rourkela and Ext. E, the photocopy of letter addressed to the Assistant Labour Officer,

Bhubaneswar pursuant to the complaint raised by the second party dated the 23rd February 2022.

The above documentary evidence filed and proved on behalf of the first party could have lent

support to the assertion of the first party had it initiated a disciplinary action against the second

party in accordance with law. There being clear admission to the effect that not even an explanation

7

was called for from the second party with regard to the alleged misappropriation of money under

the Dhanalaxmi Purchase Plan, this Tribunal finds it difficult to hold that it is a Case of voluntary

resignation by the second party. Rather, the circumstances available in the case in hand suggests

that it is a case of termination of the second party from service solely basing on surmises and

conjecture. The misconduct, if any, alleged against the second party having not been enquired into

by the first party in accordance with the industrial law and adhering to the principles of natural

justice the plea of acceptance of his resignation in the above background cannot be said to be

voluntary one, rather it is held to be a termination of service of the second party. That apart, if the

case is to be viewed from other angle, it is seen that the second party had worked under the first

party for a period of more than two years and thus was also entitled to the protection of Section

25-F of the Act and nothing is placed on record by the first party that at the time of relinquishing the

second party from its employment it had complied with the provisions of Section 25-F of the Act. In

any event, therefore, the action of the first party is not sustainable in the eye of law.

13. To sum up, it is held that it is not a case of voluntary resignation by the second party,

rather for the assigned reasons it is held to be termination of his’ service.

The Issues are answered accordingly.

14. Issue No. (v)—Findings being arrived at on issue Nos. (iii) and (iv), now it is to be

determined as to what relief the second party is entitled. In the context, after going through the mail

correspondences made between the parties, marked Ext. 7 and the fact that relating to the

misappropriation of money under the Dhanalaxmi Purchase Plan the first party has filed a complaint

case (Ext. D) against the second party which is still sub judice before the SDJM, Panposh, Rourkela,

the Tribunal is not inclined to pass an order of reinstatement and allow back wages in his favour,

but owing to the suffering of the second party award of some monetary compensation is found to

be an appropriate relief in the case. Accordingly, weighing all the available materials on record, the

length of employment and the status of the second party and the fact that he is now aged about 42

years, this Tribunal is of the opinion that a monetary compensation of Rs. 1,00,000 (Rupees one

lakh) only would be adequate to compensate the second party for his suffering. The first party is

directed to implement the Award within a period of two months of the date of publication of its

publication in the Official Gazette.

Dictated and corrected by me.

BENUDHAR PATRA

BENUDHAR PATRA

11-12-2024

11-12-2024

Presiding Officer

Presiding Officer

Industrial Tribunal, Bhubaneswar

Industrial Tribunal, Bhubaneswar

[No. 11156—LESI-IR-ID-0111/2024-LESI]

By order of the Governor

NITIRANJAN SEN

Additional Secretary to Government

Printed and Published by the Director, Directorate of Printing, Stationery and Publication, Odisha, Cuttack-10

Ex. Gaz. 1804–173+9