Whereas, an Award in I.D. No. 27/2010, dated

28-9-2012 of the Labour Court, Puducherry in respect

of the industrial dispute between the Managing Director,

MRF Limited, Puducherry and one Thiru S. Gnanamani,

over non- employment has been received;

Now, therefore, in exercise of the powers conferred

by sub-section (1) of section 17 of the Industrial

Disputes Act, 1947 (Central Act XIV of 1947) read with

the notification issued in Labour Department’s G.O. Ms.

No. 20/90/Lab./L, dated 23-5-1991, it is hereby directed

by Secretary to Government (Labour) that the said

Award shall be published in the official gazette,

Puducherry.

(By order)

S. THAMMU GANAPATHY,

Under Secretary to Government (Labour).

————

BEFORE THE LABOUR COURT AT PUDUCHERRY

Present : Thiru T. MOHANDASS, M.A., M.L.,

Presiding Officer, Labour Court,

Puducherry.

Friday, the 28th day of September 2012.

I.D. No. 27/2010

S. Gnanamani

. . Petitioner

Versus

The Managing Director,

MRF Limited, Eripakkam,

Puducherry.

. . Respondent

This industrial dispute coming on 24-9-2012 for final

hearing before me in the presence of Thiru H.D. Kumaravelu,

Advocate for the petitioner, Thiruvalargal L. Swaminathan

and I. Ilankumar, Advocates for the respondent, upon

hearing both sides, upon perusing the case records,

after having stood over for consideration till this day,

this court passed the following:

AWARD

This industrial dispute arises out of the reference

made by the Government of Puducherry, vide G.O. Rt.

No. 158/AIL/Lab./J/2010, dated 15-7-2010 of the Labour

Department, Puducherry to resolve the following

dispute between the petitioner and the respondent, viz.,

(1) Whether the dispute raised by Thiru S.

Gnanamani against the management of M/s. MRF

Limited, Eripakkam, Puducherry, over non-

employment is justified or not?

(2) If justified, what relief the petitioner is entitled to?

(3) To compute the relief, if any, awarded in terms

of money, if it can be so computed?

2. The petitioner, in his claim statement, has averred

as follows:

The petitioner had worked in the respondent factory

from 1-8-2001 and he was terminated from service

without any reason. The management according to their

whims and fancies obtained the signature of the

petitioner under threat. The only intention of

management is to keep persons, who are dancing

according to the tunes of management and the persons

like the petitioner, who too worked for the uplift of the

company, is being penalised for no fault and the

petitioner was not guilty of the gross misconduct. The

petitioner was not irregular in his attendance is an

unadulterated pucca falsehood. The order of termination

by the respondent is ultra vires, illegal and without any

reasoning. The disciplinary proceeding alleged by the

management is the concocted documents. No fair

proceedings were conducted against the petitioner by

the management. Hence, this industrial dispute is filed

to reinstate the petitioner into service with back wages.

3. In the counter statement, the respondent has

stated as follows:

The petitioner was offered an appointment as

apprentice through apprenticeship order, dated 1-1-2002

followed by probationary appointment order, dated 1-2-2003.

The petitioner was in the habit of remaining unauthorisedly

absent from duty on various occasions in the calendar

years 2003 and 2004 for which warning letters to the

petitioner were issued by the respondent on 29-6-2003,

9-9-2003, 15-10-2004 and 8-11-2004. As the petitioner had

totally ignored the warning issued by the respondent,

continued to remain absent from duty with effect from

8-5-2005 onwards. The respondent management

issued a show cause notice, dated 21-5-2005 intimating

the petitioner about remaining unauthorisedly absent

for nearly 62 days during October 2004 to April 2005

and again from 8-5-2005 and directed him to submit his

written explanation within 48 hours. The petitioner

submitted his written explanation, dated 23-5-2005

admitting the charges of the show cause notice.

Eventhough the petitioner had admitted the charges,

the respondent in order to be fair and just, had ordered

for an enquiry and on 3-6-2005 during the enquiry

proceedings, the petitioner had admitted the charges

207

12 March 2013]

LA GAZETTE DE L’ETAT

mentioned in the show cause notice, dated 21-5-2005 by

confessing that the charges levelled against the

petitioner as true. The Enquiry Officer had submitted the

enquiry report, dated 23-6-2005 by holding that the

charges against the petitioner are proved.

Before any action could be initiated on the said

enquiry report, the petitioner was again unauthorisedly

absent for seven days in August 2005, for which the

respondent has issued a warning letter, dated 30-8-2005

and in spite of it, the petitioner had again absented from

duty from 7-9-2005 onwards and hence another show

cause notice, dated 28-9-2005 was issued calling upon

him to submit his explanation and he submitted his

explanation, dated 3-10-2005 admitting the charges found

in the said show cause notice and after receipt of the

said explanation, the petitioner was imposed with the

punishment of suspension for a period of four days from

5-10-2005 to 8-10-2005. In spite of punishment of

suspension, the petitioner again remained unauthorisedly

absent. Hence, the petitioner was issued a show cause

notice, dated 16-9-2006 by the respondent and the

petitioner submitted his own hand written explanation,

dated 16-9-2006, admitting the charges contained in the

said show cause notice. Then the enquiry was

conducted and during the enquiry proceedings, the

petitioner admitted the charges and the Enquiry Officer

held that the petitioner was guilty of the misconduct

and the charges stand proved against him. Then the

second show cause notice, dated 12-2-2007 was issued

to the petitioner along with the copy of the enquiry

report and called upon him to submit his written

explanation and then the petitioner was unauthorisedly

absent from 8-5-2007 for which also the enquiry

proceedings was conducted and in the enquiry, the

petitioner admitted the charges found in the show cause

notice. Hence, the respondent had totally lost

confidence against the claim petitioner as in all the three

enquiry proceedings it could be seen that the petitioner

had accepted the charges of unauthorised absence.

Hence, the respondent had issued a order of termination

dated 20-6-2007 to the petitioner. Thus it is an appropriate

case, where the respondent had patiently waited by

taking lenient views on earlier occasions and the

manner of punishment of termination from service is in

consonance with the attitude of the petitioner and no

sympathy can be bestowed even to a slightest extent.

Hence, they pray for dismissal of the industrial dispute.

4. On the side of the petitioner, PW.1 to PW.3 were

examined and Ex.P1 to Ex.P21 were marked. On the side

of the respondent, RW1 was examined and Ex.R1 to

Ex.R31 were marked.

5. The point for determination is:

Whether the industrial dispute can be allowed?

6. On the point:

The contention of the petitioner is that he had

worked in the respondent factory from 1-8-2001 and he

was terminated from service without any reason and the

management according to their whims and fancies

obtained the signature of the petitioner under threat and

the only intention of management is to keep persons,

who are dancing according to the tunes of management

and the persons like the petitioner, who too worked for

the uplift of the company, is being penalised for no fault

and the petitioner was not guilty of the gross

misconduct. In order to prove his claim, the petitioner

examined himself as PW1.

7. Per contra, the contention of the respondent is

that the petitioner was in the habit of remaining

unauthorisedly absent from duty on various occasions

and hence he was terminated from service. The learned

counsel for the respondent relied upon the following

decisions to support the claim of the respondent:

2004(2) LLJ 543 (SC):

“Treating unauthorised absence from duty as

leave without pay, not the same as sanctioned leave.

Absence without obtaining leave in advance, such

being requirement under the relevant Standing

Orders held amounted to misconduct and therefore

termination is justified”.

2008II LLJ 645 (SC):

“Once it is found that all the procedural

requirements have been complied with, Courts would

not ordinarily interfere in the quantum of punishment

imposed upon a delinquent employee. If the decision

of the employer is found to be within the legal

parameters, jurisdiction would ordinarily not be

invoked when the misconduct stands proved.”.

2002 LLR 220:

“The misconduct of habitual absenting of the

petitioner without obtaining leave on nearly five

occasions has been proved on its own merits and in

spite of imposition of minor punishments, the

petitioner had not mend his ways. The Labour Court

found as a matter of fact that the petitioner is guilty

of unauthorised and unjustified absence. Such a

finding of fact cannot be brushed aside or interfered

with particularly in the facts and circumstances of

the case”.

(2008) 5 MLJ 733:

“When the charge of habitual absence against the

employee was proved and the competent authority/

employer imposed a proper punishment, it is not

open to the Central Administrative Tribunal to interfere

with the quantum of punishment on the premise that

208

LA GAZETTE DE L’ETAT

[12 March 2013

the charge of habitual absence of the employee was

not grave. Such order of the CAT is clearly erroneous

and liable to be set aside”.

2009(5) CTC 160:

“In the light of the above decisions of the

Supreme Court, it is now well settled that desertion

in a disciplined force is a serious lapse, which cannot

be treated lightly. It is the categorical findings of the

Enquiry Officer that the previous punishment imposed

on the petitioner did not give the desired effect of

correction. But he had repeated the act of desertion

for which he has been dismissed from service”.

In order to prove the claim of the respondent, the

Senior Officer of the respondent company was examined

as RW1. RW1 in his evidence has deposed that the

petitioner was in the habit of remaining unauthorisedly

absent from duty on various occasions in the calendar

years 2003 and 2004 for which warning letters to the

petitioner were issued on 29-6-2003, 9-9-2003,

15-10-2004 and 8-11-2004 under Ex.R1, Ex.R3 to Ex.R5

and as the petitioner had totally ignored the said

warning letters, continued to remain absent from duty

with effect from 8-5-2005 onwards and the respondent

issued a show cause notice, dated 21-5-2005 under Ex.R6

intimating the petitioner about remaining unauthorisedly

absent for nearly 62 days during October 2004 to April

2005 and again from 8-5-2005 and directed him to submit

his written explanation and the petitioner submitted his

written explanation admitting the charges of the show

cause notice and then the enquiry was conducted and

in the enquiry proceedings, the petitioner has admitted

the charges mentioned in the show cause notice and

the Enquiry Officer submitted his report under Ex.R10

by holding that the charges against the petitioner were

proved, but the respondent has not taken any action

against the petitioner.

8. RW1 further deposed that again the petitioner was

unauthorisedly absent for seven days from duty in

August 2005 to which the respondent issued warning

letter, dated 30-8-2005 under Ex.R11 and in spite of

issuance of warning letter the petitioner had again

absented from duty from 7-9-2005 onwards and hence a

show cause notice, dated 28-9-2005 under Ex.R12 was

issued calling upon to submit his explanation and

the petitioner submitted his written explanation,

dated 3-10-2005 under Ex.R13 admitting the charges to

the said show cause notice and after receipt of the said

explanation, the respondent issued a memo., dated

4-10-2005 under Ex.R14 and in order to afford another

opportunity, a lenient view was taken by the respondent

and the petitioner was imposed with the punishment of

suspension for four days from 5-10-2005 to 8-10-2005.

RW1 further deposed that again the petitioner was

remained unauthorisedly absent in May 2006 for nine

days, in June 2006 for 8 days and in July 2006 for 3 days

to which warning letter, dated 19-5-2006, 15-7-2006 and

12-8-2006 under Ex.R15 to Ex.R17 respectively were

issued to him and then a show cause notice under

Ex.R18 was issued to the petitioner calling for his

explanation and the petitioner submitted his written

explanation under Ex.R19 admitting the charges and then

they had initiated domestic enquiry proceedings and the

Enquiry Officer after completion of enquiry proceedings

had submitted his enquiry report under Ex.R21 by

holding that the petitioner is guilty of the misconduct

and after receipt of the said report, they had taken a

lenient view by issuing only an order of suspension

under Ex.R22 with effect from 13-10-2006 to 27-10-2006.

9. RW1 further deposed that the petitioner had again

unauthorisedly absent with effect from 2-11-2006

onwards and they issued a phonogram, dated 21-11-2006

under Ex.R23 to report for duty and the petitioner did

not report for duty in spite of receipt of phonogram and

hence they issued a show cause notice under Ex.R24

calling upon him to submit his written explanation and

he submitted his written explanation, dated 18-12-2006

under Ex.R25, admitting the charges to the said show

cause notice and then enquiry was conducted and in

the enquiry, the petitioner had admitted the charges of

unauthorised absence and the Enquiry Officer submitted

his enquiry report under Ex.R27 holding that the charges

levelled against the petitioner are proved and they

issued a show cause notice, dated 12-2-2007 under

Ex.R28 with copy of the enquiry report and the

petitioner was called upon to submit his explanation and

the petitioner submitted his explanation, dated 17-2-2007

admitting the charges of the unauthorisedly absent from

duty and hence they terminated him from service under

Ex.R29.

10. The above oral evidence of RW1 and the

documents as mentioned above are clearly established

that the petitioner had unauthorisedly absent from duty

on four occasions, which has been admitted by the

petitioner himself during the enquiry proceedings.

Hence, the contention of the petitioner that he was

terminated from service without any reason cannot be

accepted.

11. Now this court has to see whether the

punishment imposed by the respondent management is

disproportionate or not.

12. The charge against the petitioner is that he was

in the habit of remaining unathorisedly absent from duty

on various occasions. The petitioner has admitted the

said charge during the enquiry proceedings. On the side

of the petitioner, the copy of the letter, dated 18-12-2009

addressed the respondent company was marked as

209

12 March 2013]

LA GAZETTE DE L’ETAT

Ex.P11. In Ex.P11 the petitioner has admitted about the

absent from duty during the year 2005, 2006 and 2007

and due to his family circumstances and since his

mother was not well, he was unable to attend the duty

and during the year 2007, his mother condition was very

worst, he could not report for duty and then he was

terminated from service. On the side of the petitioner,

the cytology report from FNAC and body fluids of his

mother, dated 6-4-2006 was marked as Ex.P19 and the

certificate dated 18-10-2004, issued by the Medical Officer

was marked as Ex.P20. Ex.P19 and Ex.P20 would prove

that the mother of the petitioner was not well during

the year 2004 and 2006. In the above circumstances,

I feel that the petitioner has not reported for duty

wantonly, but due to the health condition of his mother

was not well, he was absent for various occasions and

hence the charge levelled against the petitioner cannot

be taken as a serious one. Further there is nothing

record to show that any previous adverse remark

against the petitioner had been taken into consideration

by the management for awarding the extreme penalty of

dismissal from service to the petitioner. In fact, RW1 in

his cross examination has admitted that except the

present unauthorised absent, there is no adverse

remarks as against the petitioner. The relevant portion

of his evidence runs as follows:

“\–>V´Ï º√ˆ_ s|©Á√ >s´ ºkÆ ®Õ> zu≈flƒV‚|D

÷_ÁÈ ®[≈V_ ƒˆ>V[”.

When the petitioner has stated about the reason for

absent from duty in Ex.P11 and the same has been

established through Ex.P19 and Ex.P20, the dismissal

order issued by the respondent to the petitioner is

disproportionate. Hence, I am therefore of the opinion

that the punishment awarded to the petitioner is

shockingly disproportionate and consequently, the

dismissal order passed by the respondent management

is liable to be set aside.

13. The learned counsel for the respondent

submitted that they had totally lost confidence as the

petitioner was found guilty of unauthorised and

unjustified absence amounting to grave misconduct and

the present gravity of charges and the past records of

misconduct would clearly spell out that the petitioner

is not a fit person to be allowed to continue in service

and they cannot take the risk of allowing the petitioner

to continue as a workman as it would set a wrong

precedent.

14. It is pertinent to refer the following decision,

which is relevant to this case:

(2006) 5 Supreme Court Cases 173:

"Ss. 11-A, 25-F and 25-B - Relief under S. 11-A -

Nature of, and preconditions for grant of reinstatement

- Relief under S.11-A, held, discretionary - Hence,

should be granted not automatically but after

considering the peculiar facts of each case including

the nature and purpose of the appointment, the

duration/tenure of the work and the question whether

the post was a sanctioned one - that it is lawful to grant

reinstatement with back wages does not mean that the

same should be granted automatically- In the present

case, the appointment of the respondent workman was

not in a sanctioned post and was made at the instance

of a Minister dehors the rules and in violation of Arts.

14 and 16 while the employer Municipal Council was a

‘State’ within the meaning of Art. 12 - Hence, the said

appointment, held, void- Therefore, for termination of

his service without complying with S.25-F, held, the

appropriate relief was grant of monetary compensation

(` 50,000 in this case) and not reinstatement with back

wages”.

15. This court has already come to the conclusion

that the termination of petitioner from service is

disproportionate and the same is liable to be set aside.

Under these circumstances, if any order passed by this

court to reinstate the petitioner into service, there will

not be any smooth relationship between the petitioner

and the respondent, as the respondent has lost

confidence, since the petitioner was found guilty of

unauthorised and unjustified absence. Hence, being

guided by the Hon'ble Supreme Court in the above

decision, instead of reinstate the petitioner into service,

he can be given monetary compensation.

16. On the side of the petitioner, one Muralidaran,

Subramanian and Arulpragasam were examined as PWs.2

to 4. According to them, they were working in the

respondent company from 2002 to 2009 and since they

were participated in the strike conducted in their

company, they were terminated from service by the

respondent and they raised a dispute before the

Conciliation Officer and on interference by the

Conciliation Officer, it is decided to reinstate them into

service, but the respondent without reinstate them,

settled their accounts by paying a sum of ` 4,50,000

each to them.

17. The services of the petitioner were confirmed

on 1-8-2003 as could be seen from the order of

confirmation under Ex.P1 and he was terminated from

service on 20-6-2007 under Ex.P2. Considering the age

and the services rendered in the respondent company

and considering the evidence of PWs.2 to 4, a sum of

` 2,00,000 is awarded to the petitioner towards

monetary compensation. Accordingly, this point is

answered.

18. In the result, the industrial dispute is partly

allowed and the petitioner is not entitled for

reinstatement. However, he is entitled for monetary

compensation of ` 2,00,000 (Rupees two lakhs only)

from the respondent. No costs.

210

LA GAZETTE DE L’ETAT

[12 March 2013

Typed to my dictation, corrected and pronounced by

me in the open court on this the 28th day of

September, 2012.

T. MOHANDASS,

Presiding Officer, Labour Court,

Puducherry.

————

List of witnesses examined for the petitioner :

PW1 — 16-2-2012 — Gnanamani.

PW2 — 26-7-2012 — Muralidharan.

PW3 — 26-7-2012 — K. Subramanian.

PW4 — 26-7-2012 — Arulpragasam.

List of witness examined for the respondent :

RW1 — 24-8-2012 — C. Rajadurai.

List of exhibits marked for the petitioner :

Ex.P1

— Copy of order of confirmation, dated

1-8-2003.

Ex.P2

— Order, dated 20-6-2007 issued to the

petitioner.

Ex.P3

— Letter, dated 11-7-2008 by petitioner to

Labour Officer.

Ex.P4

— Reply filed by management, dated

17-1-2009.

Ex.P5

— Counter statement, filed by the petitioner

Ex.P6

— Letter, dated 13-11-2008, issued by the

Labour Officer.

Ex.P7

— Notice, dated 2-3-2009 by the Labour

Officer to both parties.

Ex.P8 — Notice, dated 9-6-2009 by the Labour

Officer to the petitioner.

Ex.P9

— Letter, dated 1-10-2009 to the Labour

Officer by the petitioner.

Ex.P10 — Letter, dated 4-11-2009 by the General

Secretary to Labour Officer.

Ex.P11 — Letter, dated 18-12-2009 by the petitioner

to the respondent.

Ex.P12 — Failure report, dated 16-6-2010

Ex.P13 — Government Order, dated 5-7-2010,

issued by Joint Secretary (Labour).

Ex.P14 — Reply filed by respondent, dated

1-6-2009.

Ex.P15 — Reply filed by the petitioner 1-6-2009.

Ex.P16 — Letter,

dated

29-7-2009

by

the

respondent to Labour Officer.

Ex.P17 — Pay slip of the petitioner.

Ex.P18 — D i s c h a r g e s u m m a r y i s s u e d b y

Sri Manakula Vinayagar Medical

College, dated 29-7-2009.

Ex.P19 — Cytology report from FNAC and body

fluids.

Ex.P20 — Medical Certificate, issued by Dr. A.S. Palsami,

dated 18-10-2004.

List of exhibits marked for the respondent :

Ex.R1

— Warning letter, dated 29-6-2003 to the

petitioner.

Ex.R2

— Order of confirmation, dated 1-8-2003 to

the petitioner.

Ex.R3

— Warning letter, dated 9-9-2003 to the

petitioner.

Ex.R4

— Warning letter, dated 15-10-2003 to the

petitioner.

Ex.R5

— Warning letter, dated 8-11-2004 to the

petitioner.

Ex.R6

— Show cause notice, dated 21-5-2005

issued to the petitioner.

Ex.R7

— Explanation of the petitioner, dated

23-5-2005.

Ex.R8

— Enquiry notice, dated 31-5-2005

Ex.R9

— Daily order proceedings, dated 3-6-2005

Ex.R10 — Enquiry report, dated 23-6-2005

Ex.R11 — Warning letter, dated 30-8-2005

Ex.R12 — Show cause notice, dated 28-9-2005

Ex.R13 — Explanation of the petitioner, dated

3-10-2005.

Ex.R14 — Memo., dated 4-10-2005 issued by the

respondent to the petitioner.

Ex.R15 — Warning letter, dated 19-5-2006

Ex.R16 — Warning letter, dated 15-7-2006

Ex.R17 — Warning letter, dated 12-8-2006.

Ex.R18 — Show cause notice, dated 16-9-2006.

Ex.R19 — Explanation submitted by the petitioner,

dated 16-9-2006.

Ex.R20 — Daily order proceedings, dated 12-10-2006.

Ex.R21 — Enquiry report, dated 12-10-2006.

Ex.R22 — Suspension order, dated 13-10-2006.

Ex.R23 — Phonogram, dated 21-11-2006.

Ex.R24 — Show cause notice, dated 14-12-2006.

Ex.R25 — Explanation, dated 18-12-2006 given by

the petitioner.

Ex.R26 — Daily order proceedings, dated 5-1-2007.

Ex.R27 — Enquiry report, dated 22-1-2007.

211

12 March 2013]

LA GAZETTE DE L’ETAT

Ex.R28 — Memo., dated 12-2-2007 issued by the

respondent.

Ex.R29 — Order of termination, dated 20-6-2007.

Ex.R30 — Pay slip of the petitioner.

Ex.R31 — Register of leave with wages of the

petitioner.

T. MOHANDASS,

II Additional District Judge,

Presiding Officer, Labour Court,

Puducherry.

————

GOVERNMENT OF PUDUCHERRY

LABOUR DEPARTMENT

(G.O. Rt. No. 25/AIL/Lab./J/2013, dated 26th February 2013)

NOTIFICATION

Whereas, an Award in I.D. No. 15/2011, dated 25-10-2012 of

the Labour Court, Puducherry in respect of the industrial

dispute between the Pondicherry Co-operative Milk

Producers Union Li m i t e d, Puducherry and one

Thiru J. Anthonisamy, over non-employment has been

received;

Now, therefore, in exercise of the powers conferred by

sub-section (1) of section 17 of the Industrial Disputes

Act, 1947 (Central Act XIV of 1947) read with the notification

issued in Labour Department's G. O. Ms. No. 20/90/Lab./L,

dated 23-5-1991, it is hereby directed by Secretary to

Government (Labour ) that the said award shall be published

in the official gazette, Puducherry.

(By order )

S. THAMMU GANAPATHY,

Under Secretary to Government (Labour).

————

BEFORE THE LABOUR COURT AT PUDUCHERRY

Present : Thiru T. MOHANDASS, M.A., M.L.,

Presiding Officer, Labour Court,

Puducherry.

Thursday, the 25th day of October 2012.

I.D. No. 15/2011

J. Anthonisamy

. .

Petitioner

Versus

The Managing Director,

Pondicherry Co-operative Milk

Producers’ Union Limited,

Puducherry.

. .

Respondent

This industrial dispute coming on 19-10-2012 for final

hearing before me in the presence of Thiru P. Sankaran,

M/s. Law Solvers, Advocate for the petitioner,

Thiruvalargal L. Swaminathan and I. Ilankumar,

Advocates for the respondent, upon hearing both sides,

upon perusing the case records, after having stood over

for consideration till this day, this court passed the

following:

AWARD

This industrial dispute arises out of the reference

made by the Government of Puducherry, vide G. O. Rt.

No. 107/AIL/Lab./J/2011, dated 26-5-2011 of the Labour

Department, Puducherry to resolve the following

dispute between the petitioner and the respondent, viz.,

(1) Whether the dispute raised by Thiru J. Anthonisamy

against the management of M/s. Pondicherry

Co-operative Milk Producers’ Union Limited,

Puducherry over his dismissal from service is illegal

is justified?

(2) If justified, to what relief the petitioner is

entitled to?

(3) To compute the relief, if any, awarded in terms

of money, if it can be so computed?

2. The petitioner, in his claim statement, has averred

as follows :

The petitioner was joined as casual workman in the

respondent industry on 1-11-1969 and confirmed as

permanent employee on 1-3-1970. On 28-5-2004 the

respondent management suspended the petitioner from

service all of a sudden without any prima facie with an

ulterior motive to victimise him. Then the respondent

issued a show cause notice to the petitioner, for which

the petitioner has given proper reply. The respondent

management without considering his reply has caused

to issue a false and imaginary charge-sheet to the

petitioner, dated 29-7-2004 without enclosing the

necessary copy of the complaint, list of witnesses, etc.,

for which the petitioner has given a suitable explanation

in time.

Then the enquiry was conducted against him and the

Enquiry Officer without adopting the rules of natural

justice, gave report suiting to the requirements of the

respondent management, dated 26-11-2004 which is

vitiated, void, illegal and unjust. The respondent

postponed the suspension till 7-2-2005 and again

extended for 90 days and proposed punishment of

dismissal disproportionate to the charges levelled

against the petitioner inhumanly ignoring all his past

services and his family on an imaginary and unproved

charge which is against law and natural justice. The

212

LA GAZETTE DE L’ETAT

[12 March 2013

petitioner submitted his reply, dated 11-2-2005 to the

proposed punishment and the respondent ignored the

same and imposed the punishment of dismissal with

effect from 17-2-2005. He was 57 years old completing 35

years of clean service at the time of imposing the grave

punishment of dismissal on purely imaginary and

speculative charges. Hence, this industrial dispute is

filed to declare that the petitioner is deemed to be

continued in service till the date of superannuation and

to declare that he is entitled for back wages till the date

of superannuation.

3. In the counter statement, the respondent has

stated as follows:

The petitioner was employed as Plant Operator in

the respondent administration and he was suspended

from service with effect from 28-5-2004 in contemplation of

the disciplinary proceedings. The respondent has

issued a show cause notice, dated 9-7-2004 calling upon

the petitioner to submit his explanation and he submitted

his explanation on 12-6-2004 denying the contents of

the show cause notice. As the respondent was not

satisfied with the explanation, the petitioner was issued

with a charge-sheet, dated 29-7-2004 and the petitioner

submitted his explanation, dated 4-8-2004 and requested

for reinstatement. As the said reply was not satisfactory,

an enquiry was ordered and the Enquiry Officer after

conducting the enquiry, had submitted his enquiry

report, dated 26-11-2004 by holding that the charges

framed against him were proved. Then the respondent

served a show cause memorandum, dated 7-2-2005 to the

petitioner calling upon him to submit his explanation and

he submitted his written explanation, dated 11-2-2005 by

stating that on account of his family circumstances, he

walked out of the enquiry proceedings on 3-11-2004.

Since the charges are very serious in nature, the

petitioner was dismissed from service through order,

dated 17-2-2005.

The Enquiry Officer conducted the enquiry in strict

observance of principles of natural justice and afforded

all possible opportunities to the petitioner and had held

that the charges under charge-sheet, dated 29-7-2004 as

proved and then the Disciplinary Authority had fully

concurred with the findings of the Enquiry Officer.

Eventhough, the petitioner was dismissed from

service, the petitioner had been effected with full

gratuity amount up to the date of dismissal and has also

received the entire P.F. dues which is normally not paid

to a employee, who is dismissed from service on

account of proven misconduct. Having received the

gratuity amount and provident fund dues, the petitioner

is estopped from challenging the order of dismissal,

dated 17-2-2005 as he had accepted the payments

in lieu of the order of dismissal without any remorse.

Hence, they pray for dismissal of the industrial disput.

4. On the side of the petitioner, PW.1 was examined

and Ex.P1 to Ex.P14 were marked. On the side of the

respondent, no oral evidence was adduced and Ex.R1 to

Ex.R25 were marked.

5. The point for determination is:

Whether the petitioner can be considered for

reinstatement in service with accrued benefits?

6. On the point :

The contention of the petitioner is that he joined as

casual workman on 1-11-1969 and confirmed as

permanent employee on 1-3-1970. Though there is no

document produced on the side of the petitioner, the

said fact has not been denied by the respondent.

7. Further, contention of the petitioner is that

on 28-5-2004 the respondent management suspended

him from service all of a sudden without any prima facie

with an ulterior motive to victimise him. In order to

prove his claim, he examined himself as P.W.1. P.W.1.

further stated that he was serving for the development

of the industry from the very inception of it, but at the

same time, he used to fight for his individual and

collective rights jointly and severally without any

compromise and thereby the respondent management

was always looking for an opportunity to victimise him.

8. Per contra, the contention of the respondent is

that on 19-5-2004 the petitioner has not opened the

chilled water valve during pasteurisation of milk during

his day shift duty, which might have resulted in huge

quantity of milk getting spoiled, if it was not noticed in

time by the superior and hence he was issued with a

show cause notice, dated 9-7-2004 under Ex.R6 and the

explanation submitted by the petitioner was not

satisfied, the petitioner was issued with a charge-sheet

dated 29-7-2004 under Ex.R8 and the petitioner through

his letter, dated 31-7-2004 under Ex.R9 had sought 15

days time for submission of his reply statement and after

getting explanation, dated 4-8-2004 from the petitioner

under Ex.R7, an enquiry was conducted and the Enquiry

Officer conducted the enquiry and submitted his

enquiry report, dated 26-11-2004 and after receipt of the

enquiry report, the respondent served a show cause

memorandum, dated 7-2-2005 under Ex.R3 to the

petitioner calling upon him to submit his explanation and

the petitioner submitted his written explanation, dated

11-2-2005 stating that only on account of his family

circumstances, he walked out of the enquiry

proceedings on 3-11-2004 and based on the enquiry

report and the written explanation of the petitioner,

dated 11-2-2005, he was dismissed from service under

Ex.R14. In order to support his claim, he relied upon the

following decisions:

213

12 March 2013]

LA GAZETTE DE L’ETAT

2011 LLR 634 :

“In the matter of disciplinary proceedings, the

court cannot act as an appellate court to reassess the

evidence produced in the domestic enquiry besides

that it cannot interfere with the ground that any view

is possible on the basis of material on record.

As and when the punishment has been imposed

upon the employee after holding of an enquiry, the

courts have restricted powers only when the findings

are perverse or based on no evidence, there has been

violation of principles of natural justice or statutory

regulations.”.

2011 LLR 637:

“Reinstatement with consequential benefits

should not have been granted to a person employed

for a fixed-term of service hence back wages also will

not be allowed because of bad financial status of the

appellant-corporation.”.

2010 LLR 744 :

“Dismissal from service - After enquiry of

petitioner misconduct - Enquiry held found fair and

proper - Findings of Enquiry Officer not perverse or

biased - Dismissal of petitioner after following all due

process of law - Interference with order of dismissal

not required.”.

9. On the side of the respondent, Ex.R1 copy of the

enquiry proceedings was marked. A perusal of Ex.R1

reveals that the enquiry was commenced on 7-10-2004

and on periodical adjournments, the enquiry was posted

to 3-11-2004 and on the said day, the management

witness by name Murugan Babu was examined and he

has stated that the petitioner has not opened the chilled

water valve during pasteurisation of milk and he

directed him to open it and then the petitioner has

opened it and in case if it was not noticed in time, huge

quantity of milk getting spoiled and thereby incurred a

loss of ` 60,000 to the respondent management.

Then the petitioner was asked to cross examine the said

witness, but he walked out of the enquiry proceedings.

A perusal of Ex.R1 further reveals that the Enquiry

Officer completed the enquiry and submitted his

enquiry report to the respondent management by

holding that the charges levelled against the petitioner

were proved.

10. From the documentary evidence of Ex.R1, it can

be seen that the petitioner was given fair opportunity in

the enquiry and he was also required to cross examine

the management witness, but he failed to utilise the said

opportunity. On the side of the petitioner, Ex.P1 to

Ex.P14 were marked. But the said documents are not in

any way helpful to the petitioner to prove that he was

dismissed from service without any reason. In the

above circumstances, I feel that the enquiry was

conducted in a fair manner by giving sufficient

opportunities to the petitioner and consequently, this

court has come to the conclusion that the enquiry

conducted by the respondent management is fair and

proper.

11. Now, this court has to see whether the

punishment of dismissal imposed by the respondent

management is disproportionate or not.

12. There is no dispute that the petitioner has

completed 35 years of service. According to the

respondent, the petitioner has not opened the chilled

water valve during pasteurisation of milk and he

directed him to open it and then the petitioner has

opened it and in case if it was not noticed in time, huge

quantity of milk getting spoiled and thereby incurred a

loss of ` 60,000 to the respondent management. As per

the own version of respondent, the petitioner has

obeyed the order of his superior after noticing the

defect by him. Further there was no loss incurred by the

respondent management due to the said act of the

petitioner. It is not the case of the respondent that the

petitioner was regularly committed the above said

misconduct and he has not performed his duty to their

satisfaction. Hence, the punishment of dismissal from

service imposed by the respondent is disproportionate

one and the same is liable to be set aside and it is

declared that the petitioner is deemed to be continued

in service till the date of superannuation and

consequently the petitioner is entitled for back wages

for the said period. It is admitted by both parties that

the petitioner has received the gratuity amount and the

provident fund dues up to the date of dismissal i.e.,

17-2-2005. Since the misconduct committed by the

petitioner has been proved in the enquiry proceedings,

he is not entitled for full back wages, but he is entitled

only 75% from the date of dismissal i.e., 17-2-2005 till the

date of superannuation. The petitioner is also entitled

for the provident fund, gratuity and other benefits for

the said period for 75% of back wages, as per rules.

Accordingly, this point is answered.

13. In the result, the industrial dispute is partly

allowed and the Dismissal Order, dated 17-2-2005 passed

by the respondent management is set aside and it is

declared that the petitioner is deemed to be continued

in service from the date of dismissal till the date of

superannuation and consequently the petitioner is

entitled to get 75% of back wages for the said period.

However, in the circumstances of the case, there is no

order as to costs.

Typed to my dictation, corrected and pronounced by

me in the open court on this the 19th day of

October, 2012.

T. MOHANDASS,

Presiding Officer,

Labour Court, Puducherry.

214

LA GAZETTE DE L’ETAT

[12 March 2013

List of witness examined for the petitioner:

PW1 —

26-7-2012 — Antonisamy

List of witnesses examined for the respondent: Nil

List of exhibits marked for the petitioner:

Ex.P1 — Suspension order, dated 28-5-2004.

Ex.P2 — Show cause notice, dated 29-6-2004

Ex.P3 — Reply letter by the petitioner, dated 12-7-2004

Ex.P4 — Charge-sheet issued to the petitioner,

dated 29-7-2004.

Ex.P5 — Letter by the petitioner, dated 31-7-2004

Ex.P6 — Explanation given by the petitioner,

dated 4-8-2004.

Ex.P7 — Memorandum issued to the petitioner,

dated 22-9-2004.

Ex.P8 — Enquiry proceedings, dated 7-10-2004

Ex.P9 — Enquiry proceedings, dated 29-10-2004

Ex.P10 — Enquiry report, dated 26-11-2004

Ex.P11—

Show cause notice, dated 7-2-2005

Ex.P12 — Memorandum issued to the petitioner,

dated 7-2-2005.

Ex.P13 — Reply by the petitioner, dated 11-2-2005

Ex.P14 — Dismissal order, dated 17-2-2005

List of exhibits marked for the respondent:

Ex.R1 — Copy of enquiry proceedings, dated 29-7-2004

Ex.R2 — Show cause memorandum, dated 7-2-2005

Ex.R3 — Written explanation, dated 11-2-2005 by

petitioner.

Ex.R4 — Complaint of Technical Superintendent,

dated 20-5-2004.

Ex.R5 — Order of suspension, dated 28-5-2004

Ex.R6 — Show cause notice, dated 9-7-2004

Ex.R7 — Written explanation of petitioner, dated

12-7-2004.

Ex.R8 — Charge-sheet issued to the petitioner,

dated 29-7-2004.

Ex.R9 — Letter of petitioner, dated 31-7-2004

Ex.R10 — Memorandum of the respondent, dated

31-7-2004.

Ex.R11 — Written explanation, dated 4-8-2004 of the

petitioner.

Ex.R12 — Memorandum, dated 22-9-2004 to the

petitioner.

Ex.R13 — Letter of the petitioner to the M.D., dated

2-11-2004.

Ex.R14 — Order of dismissal, dated 17-2-2005

Ex.R15 — Final order, dated 17-6-2005 of Hon’ble

High Court.

Ex.R16 — Appeal preferred by the petitioner,

dated 6-7-2005.

Ex.R17 — Final order dated 26-7-2005 of Hon’ble

High Court.

Ex.R18 — Disposal of appeal, dated 6-7-2005

preferred by the petitioner.

Ex.R19 — Final order, dated 22-10-2009 of Hon’ble

High Court, Madras.

Ex.R20 — Disposal of the appeal, dated 9-12-2009

preferred by petitioner.

Ex.R21 — Industrial dispute raised by the petitioner,

dated 2-8-2010.

Ex.R22 — Counter statement of respondent, dated

29-11-2010.

Ex.R23 — Failure report, dated 11-3-2011

Ex.R24 — Abstract of the gazette notification, dated

26-5-2011.

Ex.R25 — Letter, dated nil by the petitioner

T. MOHANDASS,

Presiding Officer,

Labour Court, Puducherry.

————

GOVERNMENT OF PUDUCHERRY

LABOUR DEPARTMENT

(G.O. Rt. No. 26/AIL/Lab./J/2013, dated 27th February 2013)

NOTIFICATION

Whereas, an Award in I. D. No. 2/2010, dated 10-10-2012 of

the Labour Court, Puducherry in respect of the

industrial dispute between the Managing Director,

M/s. Leo Fasteners Unit-II, Puducherry and one

Thiru R. Joseph Raj, over non-employment has been

received;

Now, therefore, in exercise of the powers conferred by

sub-section (1) of section 17 of the Industrial Disputes

Act, 1947 (Central Act XIV of 1947) read with the

notification

issued

in

Labour

Department’s

G. O. Ms. No. 20/90/Lab./L, dated 23-5-1991, it is hereby

directed by Secretary to Government (Labour ) that the

said award shall be published in the official gazette,

Puducherry.

(By order)

S. THAMMU GANAPATHY,

Under Secretary to Government (Labour).

215

12 March 2013]

LA GAZETTE DE L’ETAT

BEFORE THE LABOUR COURT AT PUDUCHERRY

Present : Thiru T. MOHANDASS, M.A., M.L.,

Presiding Officer, Labour Court,

Puducherry.

Wednesday, the 10th day of October 2012.

I.D. No. 2/2010

R. Joseph Raj

. .

Petitioner

Versus

The Managing Director,

Leo Fasteners Unit-II,

Puducherry.

. .

Respondent

This industrial dispute coming on 3-10-2012 for final

hearing before me in the presence of Tvl. M. Veerappan

and S. Lenindurai, Advocates for the petitioner,

M/s. Vrintha Mohan, Advocate for the respondent,

upon hearing both sides, upon perusing the case

records, after having stood over for consideration till

this day, this court passed the following:

AWARD

This industrial dispute arises out of the reference

made by the Government of Puducherry vide G. O. Rt.

No.19/AIL/Lab./J/2010, dated 3-2-2010 of the Labour

Department, Puducherry to resolve the following

dispute between the petitioner and the respondent, viz.,

(1) Whether the dispute raised by Thiru R. Joseph Raj

against the management of M/s. Leo Fasteners Unit-II,

Puducherry, over refusal to provide work, change of

service conditions and unfair labour practice is

justified or not?

(2) If justified, to what relief the petitioner is

entitled to?

(3) To compute the relief, if any, awarded in terms

of money, if it can be so computed?

2. The petitioner, in his claim statement, has averred

as follows:

He was the regular employee of the respondent

company ever since 15-3-2006 and he was appointed as

Electrician based on his qualification. Though he was a

member of the Employees Trade Union, he had not

participated in any strike including the strike held on

19th to 24th March 2009. On 20-9-2008 when he entered

into the work place, he had seen a snake went into the

working spot and he reported the same to the

management through his superior. No attempt was made

to find out the snake by the respondent management,

but he was issued with a memo on 17-10-2008 by the

respondent as if he made a false complaint.

In an act of vindictive action, the respondent refused

to allow him into the factory premises and carry out his

routine work, instead he was asked to sit before the

factory premises on 16-5-2005 onwards and he was

given the job of scrap coil cutting in waste yard and the

said work was continued for sometime and then no work

was given to him. However, he was made to sit in front

of the factory premises.

The petitioner approached the Conciliation Officer,

who advised the respondent management to take him

back to the factory. But the respondent instead of

following the advise of the Conciliation Officer, all of a

sudden asked him to go to the land situated at

Moratandi to work in the said place. However, no office

order was given to him. He went to the said spot and

found that it is a burial ground and there is no symptom

of working place in the said area.

Since the respondent failed to follow the advise of

the Conciliation Officer, he filed a Writ Petition

No. 20386/2009 before the Hon’ble High Court, Madras

and an order was passed to grant interim injunction

restraining the respondent company and also directed

them not to alter the service condition of the petitioner

as Electrician. On the basis of M.P. No.1 of 2009 in W.P.

No. 20386/2009, an order was passed on 24-2-2010 stating

that an order of interim injunction to remain in force

regarding not to discontinue the service of the

petitioner from the respondent, however the respondent

did not obey the order of Hon’ble High Court. In view of

the difficulty faced by the petitioner, the Hon’ble High

Court directed to respondent to pay the last drawn

wages to the petitioner and the respondent paid the

arrears of pay to him through cheque for

` 43,595 however the respondent did not give the

employment so far to him. Hence, this industrial dispute

is filed for his reinstatement with other benefits.

3. In the counter statement, the respondent has

stated as follows :

The petitioner was assigned his usual job of an

electrical work involved in the helping of setting up of

the electrification of the respondent's new land of

company at Moratandi. The petitioner went to the site

from 27th August 2009 to 1st September 2009 and due

to exigency of service, in the evening of 1-9-2009 the

petitioner was intimated in writing to report to his work

directly to the site and also mark his attendance there

for the purposes of evading the time wastage in

reporting to the petitioner’s place of work and then

travelling to the new site at Moratandi. The petitioner

had not reported to work from 2-9-2009, instead he had

sent a false telegram stating that he has been prevented

from entering the factory. The respondent has sought for

a clarification with the petitioner as to in which site he

has reported to work for which no reply was

216

LA GAZETTE DE L’ETAT

[12 March 2013

forthcoming from the petitioner. The respondent had

issued a letter dated 9-9-2009 urging the petitioner to

report for work without further delay. In spite of receipt

of the said letter, the petitioner chose neither to report

to duty nor to give any reasonable explanations.

Then on 19-9-2009 the respondent issued a show cause

notice asking him to show cause for his unauthorised

absence from 2-9-2009 for which the petitioner

restrained from giving any reply with ulterior motives.

The petitioner having permanently abandoned the

employment with the respondent without any justifiable

or reasonable cause the petitioner had concealed all the

material facts and had preferred with W.P. No. 20386/

2009 before the Hon’ble High Court, Madras. Hence, he

prays for dismissal of the industrial dispute.

4. On the side of the petitioner, PW.1 was examined

and Ex.P1 to Ex.P47 were marked. On the side of the

respondent, RW.1 was examined and Ex.R1 was marked.

5. The point for determination is:

Whether the petitioner can be considered for

reinstatement in service with accrued benefits?

6. On the point:

The main contention of the petitioner is that the

respondent management refused to allow him to carry

out his regular work of electrician and he was asked to

sit before the factory premises from 16-5-2005 onwards

and he was given the job of scrap coil cutting in waste

yard and then he was directed to work at Moratandi

village and he went to the said place and found that the

said place was a burial ground and then he approached

the Hon’ble High Court, Madras and as directed by

them, he was paid the last drawn wages, but till date the

respondent did not given employment to him. In order

to support his claim, the petitioner was examined as PW.1.

7. Per contra, the contention of the respondent is

that the petitioner was directed to work at the new land

of the company at Moratandi and he went to the said

site from 27th August 2009 to 1st September 2009 and

thereafter he did not turn up for work and hence he was

issued with the show cause notice on 19-9-2009 for his

unauthorised absence from 2-9-2009. In order to support

the said claim, the Co-ordination Manager was examined

as RW.1.

8. There is no dispute that the petitioner was an

employee under the respondent company. On the side of

the petitioner, the appointment letter, dated 15-3-2006

was marked as Ex.P1 and confirmation letter,

dated l5-7-2008 as Ex.P2. Ex.P1 and Ex.P2 would prove

that the petitioner was appointed as an Electrician in the

respondent company and he joined duty on 15-3-2006

and then his service was confirmed on 15-7-2008. The

respondent has not challenged these two documents

under Ex.P1 and Ex.P2.

9. RW.1 in his evidence has deposed that the

petitioner has induced the company employees for strike

and he has helped finance the striking employees by

giving them a loan against property documents and

hence, he was issued with a memo calling for his

explanation. The said memo was marked on the side of

the petitioner as Ex.P4. The petitioner has submitted his

written explanation under Ex.P5 denying all the

allegations contained in Ex.P4. When the respondent

has contended that the petitioner has induced the

employees for strike and help the finance for strike

employees, it is their duty to get a complaint from the

concerned supervisor and based on which, the memo

under Ex.P4 should have been issued to the petitioner.

But on the side of the respondent, no such complaint

has been received and marked as exhibit.

10. PW.1 in his evidence has deposed that he was

advised to go to the land situated at Moratandi to work

in the said place and he went to the said place and

found that it is a barren land with a burial ground

adjacent to the area and there is no symptom of working

place or factory premises in the said area and there is no

existence of factory and there is no symptom of working

men, no supervisor.

11. But RW.1 in his evidence has deposed that

on 1-9-2009 the petitioner was intimated in writing to

report to his work directly to the Moratandi site and also

marked his attendance there for the purposes of evading

the time wastage in reporting to the petitioner's place of

work and then travelling to the new site at Moratandi

and the petitioner received this letter under protest, but

the petitioner has not reported to work from 2-9-2009

and instead had chosen to send a false telegram stating

that the petitioner has been prevented from entering the

factory and their company had sought for a clarification

with the petitioner as to in which site he has reported

to work for which, no reply was forthcoming from the

petitioner and then their company had issued a office

letter dated 9-9-2009 urging the petitioner to report for

work without further delay and in spite of receipt of their

letter, the petitioner chose neither to report to duty nor

to give any reasonable explanations for the management

letter and then on 19-9-2009 their management issued a

show cause notice, asking him to show cause for his

unauthorised absence from 2-9-2009.

12. In order to prove his claim, PW.1 has marked the

photos of the said land as Ex.P43. On perusal of Ex.P43,

it is seen that there is a barren land with a burial ground

and there is no building in the said area. Though the

said photos are not proved the identity of the location,

as stated by the respondent, the respondent has not

challenged the said photos under Ex.P43. When the

petitioner has contended that there is no such factory

217

12 March 2013]

LA GAZETTE DE L’ETAT

exists at Moratandi as stated by the respondent, it is the

duty of the respondent to prove that they are having

factory in the said place by producing the documentary

evidence. Admittedly, no documents were produced to

prove their claim. Further in some of the letters sent by

the respondent company, which have been marked on

the side of the petitioner, there is no mention about the

Moratandi Branch. PW.1 has marked the copy of the

transfer order sent to the petitioner as Ex.P11. But Ex.P11

did not contain any name of the designating officer, to

whom the petitioner should contact, travelling to the far

off area from the head office contemplate conveyance

allowance and travelling allowance to be paid to the

employee was also not stated in the said order and to

whom the attendance register was available was also not

specifically indicated in the said order, as rightly

pointed out by the learned counsel for the petitioner.

Hence, I feel that the respondent has failed to establish

that there is a plant and the preliminary work was carried

out at Moratandi Branch, as stated by them and in the

above circumstances, this court has come to the

conclusion that it is a open space and no one of the

employee expected to be put in the adverse atmosphere

of location and the respondent with an ulterior motive

only shifted the petitioner to an isolated place without

mentioning any job in the said order.

13. The learned counsel for the petitioner has

submitted that as per D. No. 38, dated 27-11-2009, the

Conciliation Officer had dealt various points raised by

the petitioner and the respondent company replied and

as per the point dealt by the authority, it is stated that

there is no building and no factory in the said Moratandi

land and no one was there as designating officer in the

said area and therefore the conciliation authority

advised the respondent management to give the job of

Electrician as per the office order and the respondent

has admitted before the authority as found in the

conciliation failure report that the management has

given the alternative work temporarily to the

petitioner and it would rectify the same shortly.

The learned counsel for the petitioner further submitted

that even after the advise given by the conciliation

authority, the respondent continued their motivated

action and refused employment to the petitioner without

any valid reason and justification and hence the

petitioner was forced and compelled to approach the

Hon’ble High Court, Madras through Writ Petition

No. 20386/2009 and the Hon’ble High Court has ordered

the respondent not to terminate the service of the

petitioner and allowed the interim stay in favour of the

petitioner that he should not be removed from service

and again the interim stay order was continued as per

the order, dated 8-10-2009 in the said writ petition and

it was ordered that the respondent has to give arrears

of pay treating the petitioner deemed to be continuing

in the job as per his last drawn pay from

8-10-2009 till this court takes up the matter for

adjudication and accordingly the respondent has

paid the arrears of pay of ` 43,595 vide cheque,

dated 21-10-2011.

14. In order to prove the said claim, PW.1 has marked

the copy of the interim injunction order passed by the

Hon'ble High Court as Ex.P31, copy of the stay

extension as Ex.P36, copy of the order passed in W.P.

No.20386/2009, dated 24-2-2010 as Ex.P40 and copy of

the order in W.P. No.20386/2009 and M.P. No. 1 of 2009

as Ex.P44 to Ex.P47. The above documents would clearly

prove the above claim. The respondent though has

admitted the above facts, submitted that the petitioner

had concealed all the material facts and had preferred

with mala fideness a Writ Petition No. 20386/2009 on

2-10-2009 before the Hon'ble High Court, Madras and

had obtained an interim stay order. Mere oral evidence

of RW.1 will not in any way helpful to the defence taken

by the respondent. In fact except Ex.R1, no documents

were filed on the side of the respondent to disprove the

case of the petitioner.

15. According to RW.1, the prayer by the petitioner

for a direction to offer the same employment to the

petitioner with the continuity of service with increased

salary and a direction to pay the back wages is unjust

and illegal, since the question of reinstatement would

not arise as the petitioner himself had voluntarily

abandoned the service with the respondent and had

also chosen not to avail the opportunities extended by

the respondent requesting the petitioner to come and

join the employment.

16. On the other hand, the petitioner had submitted

that he obeyed the transfer order dated 1-9-2009 Ex.P11

and went to the said land and found that no one was

there and therefore he went back to the head office to

inform the same, but he was stopped by the security in

the gate and he was not allowed to meet the Manager

and he requested the security to inform the said officer,

but he was neither allowed to meet the officer

concerned nor the official called him to get the fact

regarding the visit to the Moratandi vacant land and

hence he immediately sent telegrams from 2-9-2009 to

5-9-2009 under Ex.P15 and Ex.P19 to Ex.P21 to the

respondent informing the said fact. In the said

documents, it has been stated that when he came for

duty, the security has not allowed him inside the

factory. Though RW.1 in his evidence has admitted the

documents under Ex.P15 and Ex.P19 to Ex.P21, stated

that the reason stated therein is false. Even if the reason

stated in the said documents is taken as false and the

petitioner himself has abandoned his service as stated

by the respondent, it is the duty of the respondent to

conduct the enquiry and in the said enquiry, sufficient

218

LA GAZETTE DE L’ETAT

[12 March 2013

opportunities have to be given to the petitioner and

based on the enquiry report of the Enquiry Officer the

action should have taken against him. But in this case,

as admitted by the respondent, no enquiry was

conducted. At this stage, it is pertinent to refer the

following decision, which is relevant to this case :

2002(4) L.L.N. 850 :

State of Uttar Pradesh Vs. Presiding Officer,

Labour Court, Agra and another :

“It is settled that even in the case of alleged

abandonment, it was necessary for the employer to

have conducted an enquiry, issue a charge sheet and

notice to the workman concerned informed him that

he is continuously absenting without any sanctioned

leave though admittedly have not been done.”.

As per the above decision, even in the case of alleged

abandonment, it is necessary for the employer to have

conducted an enquiry. As already stated, there is no

enquiry conducted in this case. Hence, this court has

come to the conclusion that the non-employment of the

petitioner was bad and consequently, he is entitled for

reinstatement with continuity of service, other attendant

benefits and full back wages. Accordingly, this point is

answered.

17. In the result, the industrial dispute is allowed

and the award is passed to the effect that the

non-employment of the petitioner and his dismissal from

service is unjustified and is illegal and therefore it is

hereby set aside. The respondent company/management

shall reinstate the petitioner into service with continuity

of service and back wages and other attendant benefits.

However in the circumstances of the case, there is no

order as to costs.

Typed to my dictation, corrected and pronounced by me

in the open court on this the 10th day of October, 2012.

T. MOHANDASS,

Presiding Officer,

Labour Court, Puducherry.

List of witness examined for the petitioner:

P.W.1 —

23-8-2012 — Joseph Raj

List of witness examined for the respondent:

P.W.1 —

12-9-2012 — Krishnan

List of exhibits marked for the petitioner:

Ex.P1 — Appointment letter of the petitioner, dated

15-3-2006.

Ex.P2 — Copy of the confirmation letter, dated

15-7-2008.

Ex.P3 — Copy of service standing orders

Ex.P4 — Copy of show cause notice issued to

petitioner, dated 1-4-2009.

Ex.P5 — Copy of the reply by the petitioner, dated

2-4-2009.

Ex.P6 — Copy of letter by petitioner, dated 30-6-2009

Ex.P7 — Copy of the objection, dated 14-7-2009

Ex.P8 — Copy

of

the

application

before

Conciliation Officer, dated 16-7-2009.

Ex.P9 — Copy of the reply, dated 21-7-2009

Ex.P10 — Copy of the letter by petitioner, dated 22-7-2009

Ex.P11 — Copy of transfer order, dated 1-9-2009

Ex.P12 — Copy of the reply by petitioner, dated 2-9-2009

Ex.P13 — Copy of the reply by petitioner, dated 2-9-2009

Ex.P14 — Copy of the reply by petitioner, dated 2-9-2009

Ex.P15 — Copy of the telegram by the petitioner,

dated 2-9-2009.

Ex.P16 — Copy of the letter by the petitioner, dated

3-9-2009.

Ex.P17 — Copy of the reply, dated 3-9-2009

Ex.P18 — Copy of the reply, dated 3-9-2009

Ex.P19 — Copy of the telegram by petitioner, dated

3-9-2009.

Ex.P20 — Copy of the telegram by petitioner, dated

4-9.2009.

Ex.P21 — Copy of the telegram by petitioner dated

5-9-2009.

Ex.P22 — Copy of letter by respondent, dated 5-9-2009

Ex.P23 — Copy of the letter by respondent, dated 9-9-2009

Ex.P24 — Copy of reply by respondent, dated 12-9-2009

Ex.P25 — Copy of reply by petitioner, dated 15-9-2009

Ex.P26 — Copy of letter by petitioner, dated 15-9-2009.

Ex.P27 — Copy of show cause notice by respondent,

dated 19-9-2009.

Ex.P28 — Copy of reply by petitioner, dated 23-9-2009

Ex.P29 — Copy of reply by petitioner, dated 23-9-2009

Ex.P30 — Copy of writ petition, dated 2-10-2009

Ex.P31 — Copy of interim injunction order from

Hon’ble High Court, dated 8-10-2009.

Ex.P32 — Copy of reply by petitioner, dated 3-11-2009

Ex.P33 — Copy of letter by petitioner, dated 3-11-2009

Ex.P34 — Copy of letter of petitioner, dated 3-11-2009

Ex.P35 — Copy of letter by respondent, dated 4-11-2009

Ex.P36 — Copy of stay extension by Hon'ble High

Court, dated 12-11-2009.

219

12 March 2013]

LA GAZETTE DE L’ETAT

Ex.P37 — Copy of reply by petitioner, dated 16-11-2009

Ex.P38 — Copy of failure report, dated 27-11-2009

Ex.P39 — Copy of reference letter by Labour

Department, dated 3-2-2010.

Ex.P40 — Copy of order in W.P. No. 20386/2009,

dated 24-2-2010.

Ex.P41 — Copy of contempt petition, dated 13-7-2010

Ex.P42 — Original pay bill of petitioner

Ex.P43 — Photos

Ex.P44 — Copy of order in W.P. No. 20386/2009 in

M.P. No.1/2009, dated 8-10-2009.

Ex.P45 — Copy of order in W.P. No.20386/2009 in

M.P. No. 1/2009, dated 12-11-2009.

Ex.P46 — Copy of order in W.P. No.20386/2009 in

M.P. No. 1/2009, dated 24-2-2010.

Ex.P47 — Copy of order in W.P. No.20386/2009 in

M.P. No. 1/2009, dated 17-8-2011.

List of exhibits marked for the respondent:

Ex.R1 — Board Resolution, dated 10-9-2012.

T. MOHANDASS,

Presiding Officer,

Labour Court, Puducherry.

GOVERNMENT OF PUDUCHERRY

LOCAL ADMINISTRATION SECRETARIAT

(G.O. Ms. No. 36/LAS/2013, dated 21st February 2013)

NOTIFICATION

In pursuance of clause (e) of sub-section (1) of

section 2 of the Information Technology Act, 2000

(Central Act 21 of 2000), the Lieutenant-Governor,

Puducherry has been pleased to direct that the birth

and death certificates required to be issued to an

applicant under rule 8 of the Puducherry Registration

of Birth and Death Rules, 1999 may also be issued in

the following manner, namely:–

(i) The birth and death certificates of the Yanam

Municipality of Union territory of Puducherry will

be issued through online in the form of the

electronic record by the Common Service Centre

located in the Union territory of Puducherry;

(ii) The birth and death certificates issued

through online in the form of electronic record

should be digitally signed by the concerned

Registrar of Birth and Death who holds the

requisite “Digital Signature Certificate” as defined

under clause (q) of sub-section (1) of section 2

of the said Central Act 21 of 2000;

(iii) The birth and death certificates may be

issued to any applicant in respect of the Yanam

Municipality of the Union territory of Puducherry

by Common Service Centre on payment of fee

prescribed under rule 8 of the said rules with such

other incidental charges as prescribed by the

Director of Local Administration Department,

Puducherry;

(iv) Where an applicant obtains the birth and

death certificates issued through online in the form

of electronic record instead of the method

prescribed therein for issue of such certificates,

he can verify such electronic record;

(v) Where the authenticity of the computer

generated birth and death certificates issued by the

Common Service Centre is sought to be verified

by an applicant, he can do verification by logging

on to viz., https://www.puduvaisevai.gov.in by

using the reference number and security code.

2. The birth and death certificates of Yanam

Municipality may be issued by Common Service

Centre through online in respect of any year

commencing from the year indicated below:–

Sl.

Name of the

Year of entry

No.

Municipality

Birth

Death

(1)

(2)

(3)

1

Yanam Municipality

2000

2000

(By order of the Lieutenant-Governor)

N. SUMATHI,

Joint Secretary to Government.

————

GOVERNMENT OF PUDUCHERRY

CHIEF SECRETARIAT (HOUSING)

(G.O. Ms. No. 3/2013-Hg, dated 22nd February 2013)

ORDER

In the G. O. Ms. No. 11/99/Hg., dated 28-6-1999 of the

Chief Secretariat (Housing), Puducherry, certain

reservation criteria has been specified by the

Government in respect of all housing schemes

implemented by the Town and Country Planning

Department, Puducherry and Puducherry Housing

Board, Puducherry. The Puducherry Housing Board,

Puducherry has constructed 24 LIG flats at Valatheru,

Karaikal based on the approval of Government vide

G.O. Ms. No. 8/2001/Hg., dated 16-3-2001 and despite

best efforts taken by the Board, 21 out of 24 LIG flats

remained without takers. In this connection the