106

LA GAZETTE DE L’ETAT

[18 February 2014

GOVERNMENT OF PUDUCHERRY

LAW DEPARTMENT

(G.O. Ms. No. 3/2014-LD, dated 30th January 2014)

NOTIFICATION

O n a t t a i n i n g t h e a g e o f s u p e r a n n u a t i o n ,

Thiru R. Elangovan, Under Secretary to Government (Law),

Law Department, Puducherry shall retire with effect from

the afternoon of 31st January 2014.

(By order of the Lieutenant-Governor)

S.A. SULTAN ABDUL KADIR,

Deputy Secretary to Government.

————

GOVERNMENT OF PUDUCHERRY

CHIEF SECRETARIAT (PUBLIC WORKS)

(G.O. Ms. No. 4, dated 31st January 2014)

NOTIFICATION

The notice of voluntary retirement given under

rule 48 (1) (a) of Central Civil Services (Pension) Rules, 1972

by Thiru R. Narasimmamurthy, Superintending Engineer,

Public Works Department, Puducherry is hereby accepted.

Accordingly, he is admitted into voluntary retirement with

effect from the forenoon of 1-2-2014.

(By order of the Lieutenant-Governor)

N. SUMATHI,

Joint Secretary to Government (Works).

————

GOVERNMENT OF PUDUCHERRY

HOME DEPARTMENT

(G.O. Ms. No. 9, dated 3rd February 2014)

NOTIFICATION

The Lieutenant-Governor, Puducherry is pleased to

declare Public Holiday for all Government Offices/

Institutions and Banking Institutions including

Co-operative Banks of Mahe region in the Union

territory of Puducherry on Tuesday the 15th April 2014

on account of Vishu 2nd day under the Negotiable

Instruments Act, 1881 in lieu of Saturday the 26th July 2014

declared as Public Holiday on account of Karkida

Amavasi vide G.O. Ms. No. 63, dated 29-10-2013 of

Home Department, Puducherry.

2. The Lieutenant-Governor, Puducherry is also

pleased to include Saturday the 26th July 2014 in

Appendix-III (Restricted Holidays 2014) (for Mahe

region only) on account of Karkida Amavasi.

(By order)

YASAM LAKSHMI NARAYANA REDDY,

Joint Secretary to Government.

————

GOVERNMENT OF PUDUCHERRY

LABOUR DEPARTMENT

(G.O. Rt. No. 7/AIL/Lab./J/2014, dated 3rd February 2014)

NOTIFICATION

Whereas, the Government is of the opinion that an

industrial dispute has arisen between the management

of M/s. Pondicherry Agro Service and Industries

Corporation Limited and its union PASIC Uzhiyar

Matrum Thozhilalar Sangam, over charter of demands

and unfair labour practice in respect of the matter

mentioned in the Annexure to this order;

And whereas, in the opinion of the Government, it is

necessary to refer the said dispute for adjudication;

Now, therefore, by virtue of the authority delegated

vide G.O. Ms. No. 20/90/Lab./1, dated 23-5-1991 of the

Labour Department, Puducherry to exercise the powers

conferred by clause (c) of sub-section (1) of section 10

of the Industrial Disputes Act, 1947 (Central Act XIV

of 1947), it is hereby directed by Secretary to

Government (Labour) that the said dispute be referred

to the Labour Court, Puducherry for adjudication.

The Labour Court, Puducherry shall pass the award

within 3 months from the date of issue of reference

as stipulated under sub-section (2-A) of section 10 of

the Industrial Disputes Act, 1947 and in accordance with

rule 10-B of the Industrial Disputes (Central)

Rules, 1957. The party raising the dispute shall file

a statement of claim complete with relevant documents,

list of reliance and witnesses to the Labour Court,

Puducherry within 15 days of the receipt of the order

of reference and also forward a copy of such statement

to each one of the opposite parties involved in the dispute.

ANNEXURE

(a) Whether the dispute raised by PASIC Uzhiyar

Matrum Thozhilalar Sangam against the management

M/s. PASIC, Puducherry, over non-payment of salary

for more than 15 months to the PASIC employees is

justified or not? If not justified, what relief they are

entitled to?

107

18 February 2014]

LA GAZETTE DE L’ETAT

(b) Whether the claim of the union regarding

suspension and transfer of their union employees

was an act of victimisation and motivation? If so,

what remedy they are entitled to?

(c) Whether the management adoptes unfair

labour practice against the union workmen? If so,

what relief they are entitled to?

(d) Whether the claim of the union non-

implementation of the G.O. No. 17/Agri., dated 1-2-2012

for submission of report towards administrative

mismanagement, financial irregularities, etc., is

justified or not? If justified, what relief they are

entitled to?

(e) To compute the relief, if any awarded in terms

of money, if it can be so computed?

(By order)

S. THAMMU GANAPATHY,

Under Secretary to Government (Labour).

————

GOVERNMENT OF PUDUCHERRY

LABOUR DEPARTMENT

(G.O. Rt. No. 8/AIL/Lab./J/2014, dated 3rd February 2014)

NOTIFICATION

Whereas, the Government is of the opinion that an

industrial dispute has arisen between the management

of M/s. PAPSCO, Puducherry and its workman

Thiru M.A. Jothi Murugan, over his non-employment

in respect of the matter mentioned in the Annexure to

this order;

And whereas, in the opinion of the Government, it is

necessary to refer the said dispute for adjudication;

Now, therefore, by virtue of the authority delegated

vide G.O. Ms. No. 20/90/Lab./1, dated 23-5-1991 of the

Labour Department, Puducherry to exercise the powers

conferred by clause (c) of sub-section (1) of section 10

of the Industrial Disputes Act, 1947 (Central Act XIV

of 1947), it is hereby directed by Secretary to

Government (Labour) that the said dispute be referred

to the Labour Court, Puducherry for adjudication.

The Labour Court, Puducherry shall pass the award

within 3 months from the date of issue of reference

as stipulated under sub-section (2-A) of section 10 of

the Industrial Disputes Act, 1947 and in accordance with

rule 10-B of the Industrial Disputes (Central)

Rules, 1957. The party raising the dispute shall file

a statement of claim complete with relevant documents,

list of reliance and witnesses to the Labour Court,

Puducherry within 15 days of the receipt of the order

of reference and also forward a copy of such statement

to each one of the opposite parties involved in the dispute.

ANNEXURE

(a) Whether the dispute raised by Thiru M.A. Jothi

Murugan against the management of M/s. PAPSCO,

Puducherry, over his non-employment is justified or

not? If justified, what relief he is entitled to?

(b) To compute the relief, if any awarded in terms

of money, if it can be so computed?

(By order)

S. THAMMU GANAPATHY,

Under Secretary to Government (Labour).

————

GOVERNMENT OF PUDUCHERRY

LABOUR DEPARTMENT

(G.O. Rt. No. 9/AIL/Lab./J/2014, dated 3rd February 2014)

NOTIFICATION

Whereas, the Government is of the opinion that an

industrial dispute has arisen between the management

of M/s. Raja Talkies, Puducherry and its workman

Thiru Baskal @ Santhachinnaswamy, over non-

employment in respect of the matter mentioned in the

Annexure to this order;

And whereas, in the opinion of the Government, it is

necessary to refer the said dispute for adjudication;

Now, therefore, by virtue of the authority delegated

vide G.O. Ms. No. 20/91/Lab., dated 23-5-1991 of the

Labour Department, Puducherry to exercise the powers

conferred by clause (c) of sub-section (1) of section 10

of the Industrial Disputes Act, 1947 (Central Act XIV

of 1947), it is hereby directed by Secretary to

Government (Labour) that the said dispute be referred

to the Labour Court, Puducherry for adjudication.

The Labour Court, Puducherry shall submit the award

within 3 months from the date of issue of reference

as stipulated under sub-section (2-A) of section 10 of

the Industrial Disputes Act, 1947 and in accordance with

rule 10-B of the Industrial Disputes (Central)

Rules, 1957. The party raising the dispute shall file

a statement of claim complete with relevant documents,

list of reliance and witnesses to the Labour Court,

Puducherry within 15 days of the receipt of the order

of reference and also forward a copy of such statement

to each one of the opposite parties involved in the

dispute.

108

LA GAZETTE DE L’ETAT

[18 February 2014

ANNEXURE

(a) Whether the dispute raised by Thiru Baskal @

Santhachinnaswamy against the management of

M/s. Raja Talkies, Puducherry, over his non-employment

and regularisation of service is justified or not?

If justified, what relief he is entitled to?

(b) To compute the relief, if any awarded in terms

of money, if it can be so computed?

(By order)

S. THAMMU GANAPATHY,

Under Secretary to Government (Labour).

————

GOVERNMENT OF PUDUCHERRY

CHIEF SECRETARIAT

(AGRICULTURE AND FOREST)

(G.O. Ms. No. 26/Ag., dated 5th February 2014)

NOTIFICATION

The State Ground Water Unit, Department of

Agriculture is implementing the schemes for grant of

assistance to general farmers towards sinking of tubewells

and for installation of submersible pumpsets with

accessories in the Union territory of Puducherry.

The Modus Operandi/Guidelines for the implementation

of the said schemes as approved by Lieutenant-Governor

of Puducherry were notified vide G.O. Ms. No. 16/Ag.,

dated 6th August 2007 of Chief Secretariat (Agriculture),

Puducherry. In keeping with the representation of Service

Association of the Department of Agriculture has

requested to include/modify certain provisions in the

existing Modus Operandi of the said schemes as

detailed hereunder.

Addendum proposed in the Guidelines/Modus

Operandi for grant of assistance to general farmers

towards sinking of tubewells and installation of

submersible pumpsets with accessories in the Union

territory of Puducherry issued vide G.O. Ms. No. 16/Ag.,

dated 6th August 2007 of Chief Secretariat (Agriculture),

Puducherry.

“Sl. No. 2 (iv)— The applicant should hold a

minimum of 1.5 acre under the command area of the

tubewells for availing the subsidy under the said

scheme by the general farmers and also the applicant

should have been in possession of the land for

at least 2 years with a clear ownership title in his/her

name before the date of his/her application”.

2. This issues with the concurrence of the Finance

Department, Puducherry vide U.O. No. 3011/F5/A3,

dated 26-12-2013.

(By order of the Lieutenant-Governor)

V. MANICKASAMY,

Under Secretary to Government

(Agriculture and Forest).

————

GOVERNMENT OF PUDUCHERRY

CHIEF SECRETARIAT (AGRICULTURE AND FOREST)

(G.O. Ms. No. 27/Ag., dated 5th February 2014)

NOTIFICATION

The State Ground Water Unit, Department of Agriculture is implementing the schemes for grant of assistance

to Scheduled Caste farmers towards sinking of tubewells and for installation of submersible pumpsets with accessories

in the Union territory of Puducherry. The Modus Operandi/Guidelines for the implementation of the said schemes

as approved by Lieutenant-Governor of Puducherry were notified vide G.O. Ms. No. 42/Ag., dated 16th March 2007 of

Chief Secretariat (Agriculture), Puducherry. In keeping with the representation of Service Association of the Department

of Agriculture has requested to include/modify certain provisions in the existing Modus Operandi of the said schemes

as detailed hereunder.

Modifications proposed in the Guidelines/Modus Operandi for grant of assistance to Scheduled Caste

farmers towards sinking of tubewells and installation of submersible pumpsets with accessories in the

Union territory of Puducherry issued vide G.O. Ms. No. 42/Ag., dated 16th March 2007 of Chief Secretariat (Agriculture),

Puducherry.

109

18 February 2014]

LA GAZETTE DE L’ETAT

Read

(Modified/Amended)

(a) Payment of 90% subsidy assistance to Scheduled

Caste farmers for the construction of tubewells subject

to a maximum of ` 1.50 lakhs per individual/tubewell

under special component plan.

(b) Payment of 90% subsidy assistance to Scheduled

Caste farmers for the installation of submersible

pumpsets with accessories purchased from PASIC/

authorised dealers, subject to a maximum of ` 0.50 lakh

per tubewell/individual under special component plan.

The applicant should hold a minimum of 1 acre under

the command area of the tubewell to be constructed and

the eligible land holding of 1 acre should be in favour

of the applicant farmer or in favour of the husband and

wife of the family or in favour of the members of a joint/

undivided family. This will applicable for installation of

submersible pumpsets also.

The tubewells will be constructed for the applicant

through M/s. PASIC or the applicant may construct the

tubewell with his own financial resources by utilising

departmental machinery or by deploying private

machineries registered with the Puducherry Ground

Water Authority after obtaining necessary NOC from the

State Ground Water Unit and later on claim the subsidy

from State Ground Water Unit.

The installation of submersible pumpsets should be

undertaken by the applicant himself by utilising his own

funds duly observing the formalities and later on claim

the subsidy from State Ground Water Unit and Soil

Conservation by providing proper voucher/bills.

The applicant should execute a legal bond to the

effect that the land will not be sold or transferred to

any other person for a minimum period of 5 years from

the date of construction of the tubewell. In case of any

necessity to sell the land or transfer/convert the land

for some other purposes other than agriculture, the

applicant should remit the entire subsidy availed with

interest to this department. However, the next

construction of the tubewell may be sanctioned only

after 10 years depending upon the failure of the

tubewell.

2. This issues with the concurrence of the Finance Department, Puducherry vide U.O. No. 3011/F5/A3,

dated 26-12-2013.

(By order of the Lieutenant-Governor)

V. MANICKASAMY,

Under Secretary to Government (Agriculture and Forest).

Sl.

For

No.

(existing provision)

1

Provision 3 of the Modus Operandi.

Payment of 90% subsidy assistance to

Scheduled Caste farmers for the construction of

tubewells and installation of suitable submersible

pumpsets subject to a maximum of ` 2 lakhs per

individual/tubewell under special component

plan.

2

Provision 4(iii) regarding eligibility of the

Modus Operandi.

The applicant should hold a minimum of

1.5 acres under the command area of the tubewell

to be constructed.

3

Provision 4(vi) and (viii) of the eligibility of the

Modus Operandi.

The tubewells will be constructed for the

applicant only through M/s. PASIC Limited,

Puducherry, on no account, utilisation of private

machineries will be permitted.

4

Provision 4(v) of the eligibility of the Modus

Operandi.

The applicant should execute a legal bond to

the effect that the land will not be sold or

transferred to any other person for a minimum

period of 10 years from the date of construction

of the tubewell. In case of any necessity to sell

the land or transfer/convert the land for some

other purposes other than agriculture, the

applicant should remit the entire subsidy availed

with interest to this department.

110

LA GAZETTE DE L’ETAT

[18 February 2014

GOVERNMENT OF PUDUCHERRY

LABOUR DEPARTMENT

(G.O. Rt. No. 11/AIL/Lab./J/2014, dated 5th February 2014)

NOTIFICATION

Whereas, the Government is of the opinion that an

industrial dispute has arisen between the management

of M/s. Les Ateliers De Pondicherry Private Limited and

having its office at Vazhudavoor Road, Kurumbapet,

Puducherry and its union United Labour Federation over

removal of machinery strike, stoppage of work and

charter of demands in respect of the matter mentioned

in the Annexure to this order;

And whereas, in the opinion of the Government, it is

necessary to refer the said dispute for adjudication;

Now, therefore, by virtue of the authority delegated

vide G.O. Ms. No. 20/90/Lab./1, dated 23-5-1991of

the Labour Department, Puducherry to exercise the

powers conferred by clause (c) of sub-section (1) of

section 10 of the Industrial Disputes Act, 1947 (Central

Act XIV of 1947), it is hereby directed by Secretary to

Government (Labour) that the said dispute be referred

to the Industrial Tribunal, Puducherry for adjudication.

The Industrial Tribunal, Puducherry shall pass the

award within 3 months from the date of issue of

reference as stipulated under sub-section (2-A) of

section 10 of the Industrial Disputes Act, 1947 and

in accordance with rule 10-B of the Industrial

Disputes (Central) Rules, 1957. The party raising the

dispute shall file a statement of claim complete with

relevant documents, list of reliance and witnesses to the

Industrial Tribunal, Puducherry within 15 days of the

receipt of the order of reference and also forward a copy

of such statement to each one of the opposite parties

involved in the dispute.

ANNEXURE

(a) Whether the dispute raised by the United

Labour Federation union against the management of

M/s. Les Ateliers De Pondicherry Private Limited,

Puducherry over charter of demands vide letter,

dated 16-3-2012 and removal of machinery is

justified? If justified, what relief they are entitled to?

(b) Whether the strike and stoppage of work with

effect from 29-2-2012 is justified? If so, whether the

claim of the union workmen seeking wages during the

period of strike is justified? If justified what relif they

are entitled to?

(c) Whether the claim of the management against

the union workmen is justified? If so, what relief they

are entitled to?

(d) To compute the relief, if any awarded in terms

of money, if it can be so computed ?

(By order)

S. THAMMU GANAPATHY,

Under Secretary to Government (Labour).

————

GOVERNMENT OF PUDUCHERRY

LABOUR DEPARTMENT

(G.O. Rt. No. 12/AIL/Lab./J/2014, dated 5th February 2014)

NOTIFICATION

Whereas, the Government is of the opinion that an

industrial dispute has arisen between the management

of M/s. Vaigai Industries, No. 32/1, Melakasakudy

village, Karaikal and its workman Thiru U. Ravi, over

reinstatement with back wages in respect of the

matter mentioned in the Annexure to this order;

And whereas, in the opinion of the Government,

it is necessary to refer the said dispute for adjudication;

Now, therefore, by virtue of the authority delegated

vide G.O. Ms. No. 20/90/Lab./1, dated 23-5-1991 of the

Labour Department, Puducherry to exercise the

powers conferred by clause (c) of sub-section (1)

of section 10 of the Industrial Disputes Act, 1947

(Central Act XIV of 1947), it is hereby directed by

Secretary to Government (Labour) that the said dispute

be referred to the Labour Court, Puducherry for

adjudication. The Labour Court, Puducherry shall pass

the award within 3 months from the date of issue

of reference as stipulated under sub-section (2-A)

of section 10 of the Industrial Disputes Act, 1947

a n d i n a c c o r d a n c e w i t h rule 10- B of the

Industrial Disputes (Central) Rules, 1957. The party

raising the dispute shall file a statement of claim

complete with relevant documents, list of reliance and

witnesses to the Labour Court, Puducherry within

15 days of the receipt of the order of reference and

also forward a copy of such statement to each one of

the opposite parties involved in the dispute.

ANNEXURE

(a) Whether the dispute raised by the petitioner

Thiru U. Ravi, over reinstatement with back wages

against the management of M/s. Vaigai Industries,

Karaikal is justified?

(b) If justified, what relief he is entitled to?

(c)

To compute the relief, if any, awarded in

terms of money, if it can be so computed ?

(By order)

S. THAMMU GANAPATHY,

Under Secretary to Government (Labour).

111

18 February 2014]

LA GAZETTE DE L’ETAT

GOVERNMENT OF PUDUCHERRY

OFFICE OF THE DEPUTY COLLECTOR (REVENUE) NORTH

No. 5508/DC(R)N/Rev./Auction/A5/2013.

Puducherry, the 5th February 2014)

NOTIFICATION

The following persons are notified as Government authorised auctioneers of Puducherry for conducting

the auction of unredeemed jewels/articles under the Puducherry Pawn Brokers Act and Rules.

Sl.

Name of the auctioneer

Residential address

Business address

No.

(1)

(2)

(3)

(4)

1

D. Nemichand Sowcar

Old No. 71/72, New No. 79/81,

No. 58, High Road, Chengalpattu,

Periyamaniyakara Street,

Kancheepuram District.

Chengalpattu, Kancheepuram District.

2

B. Karthikeyan

No. 32/39A, Srinivasan Street,

Sri Swamy Jewellery and Pawn

Thirupathiripuliyur, Cuddalore-607 002.

Brokers, Vedavinayagar Complex,

23/10A, Lawrence Road,

Cuddalore-607 002.

(By order of the District Magistrate)

A. VINCENT RAYAR,

Deputy Collector (Revenue) North-cum-

Sub-Divisional Magistrate.

————

GOVERNMENT OF PUDUCHERRY

HOME DEPARTMENT

(G.O. Ms. No. 11, dated 7th February 2014)

NOTIFICATION

The Lieutenant-Governor, Puducherry is pleased to

appoint Shri Gavhal Nitin Ramesh, who has been

allotted to the Pondicherry Police Service by DoPT,

Government of India, on the basis of the Civil

Services (Main) Examination, 2012, to the Entry Grade

of Pondicherry Police Service (Group ‘B’) in the Pay

Scale of PB-2: ` 9,300-34,800 with Grade Pay of ` 4,800

with effect from the forenoon of 23-1-2014, subject to

the conditions mentioned in the offer of appointment

letter No. A.12021/01/2013/Home/P1, dated 26-12-2013 of

the Home Department, Puducherry.

2. The Lieutenant-Governor is also pleased to order

that Shri Gavhal Nitin Ramesh will be a probationer in

the Entry Grade of Pondicherry Police Service for a

period of two years from the forenoon of 23-1-2014.

(By order of the Lieutenant-Governor)

YASAM LAKSHMI NARAYANA REDDY,

Joint Secretary to Government.

GOVERNMENT OF PUDUCHERRY

LABOUR DEPARTMENT

(G.O. Rt. No. 15/AIL/Lab./J/2014, dated 7th February 2014)

NOTIFICATION

Whereas, the Government is of the opinion that an

industrial dispute has arisen between the management

of M/s. Hindustan Unilever Limited, Personal Products

Factory, NH 45-A, Vadamangalam, Puducherry and their

workman Thiru S. Sivaprakash, over non-employment in

respect of the matter mentioned in the Annexure to this

order;

And whereas, in the opinion of the Government, it is

necessary to refer the said dispute for adjudication;

Now, therefore, by virtue of the authority delegated

vide G.O. Ms. No. 20/90/Lab./1, dated 23-5-1991 of the

Labour Department, Puducherry to exercise the powers

conferred by clause (c) of sub-section (1) of section 10

of the Industrial Disputes Act, 1947 (Central Act XIV of

1947), it is hereby directed by Secretary to Government

(Labour) that the said dispute be referred to the Labour

Court, Puducherry for adjudication. The Labour Court,

Puducherry shall pass the award within 3 months from

112

LA GAZETTE DE L’ETAT

[18 February 2014

the date of issue of reference as stipulated under

sub-section (2-A) of section 10 of the Industrial

Disputes Act, 1947 and in accordance with rule 10-B

of the Industrial Disputes (Central) Rules, 1957. The

party raising the dispute shall file a statement of claim

complete with relevant documents, list of reliance and

witnesses to the Labour Court, Puducherry within

15 days of the receipt of the order of reference and also

forward a copy of such statement to each one of the

opposite parties involved in the dispute.

ANNEXURE

(a) Whether the dispute raised by Thiru S. Sivaprakash,

over his non-employment against the management of

M/s. Hindustan Unilever Limited, Personal Products

Factory, NH 45-A,Vadamangalam, Puducherry is

justified? If not justified, what relief he is entitled to?

(b)

To compute the relief, if any, awarded in

terms of money, if it can be so computed ?

(By order)

S. THAMMU GANAPATHY,

Under Secretary to Government (Labour).

————

GOVERNMENT OF PUDUCHERRY

LABOUR DEPARTMENT

(G.O. Rt. No. 17/Lab./AIL/G/2014, dated 7th February 2014)

NOTIFICATION

Whereas, the Lieutenant-Governor, Puducherry has

by notification vide G.O.Ms. No. 9/95/Lab, dated 7-4- 1995

under sub-section (1) of section 52 of the Puducherry

Shops and Establishments Act, 1964 authorised the

Secretary

to

Government,

Labour

Department,

Puducherry to exercise the powers of the Government

under section 6 of the said Act relating to exemption;

And whereas, M/s. Thillai’s Food Park, 161, Church

Street, Karaikal has applied for grant of exemption from

section 14 (1) of the said Act to run the shop on weekly

holidays since the shop is dealing with highly

perishable items in addition to the other products

catering to the daily needs of the public;

Now, therefore, considering the reasons stated, the

Secretary to Government, Labour Department in exercise

of the powers conferred by section 6 of the said Act,

hereby exempts M/s. Thillai’s Food Park, 161, Church

Street, Karaikal from the provisions of section 14 (1) of

the Puducherry Shops and Establishments Act, 1964 for

a period of one year from the date of issue of this

notification subject to the following conditions:-

(1) Every employee employed in the shop should

be allowed a weekly holiday with wages without fail

on a staggered weekly off basis.

(2) No employee should be allowed to work

continuously for 7 days in a week.

(3) The employer, on any account, should not seek

the service of an employee on his weekly off day.

(4) The employer should display all the notices

and required documents should be shown to the

Inspectors during inspection.

(5) In the event of any complaints regarding the

weekly holiday, the above exemption will be

cancelled.

(By order)

S. THAMMU GANAPATHY,

Under Secretary to Government (Labour).

————

\ıðVΩ©√‚| ÿÔVDR[ √fiƒVB›m

\ıðVΩ©√‚| ÿÔVDR[ √fiƒVB›m

\ıðVΩ©√‚| ÿÔVDR[ √fiƒVB›m

\ıðVΩ©√‚| ÿÔVDR[ √fiƒVB›m

\ıðVΩ©√‚| ÿÔVDR[ √fiƒVB›m

ºÔV. ®ı : 68á53/\.ÿÔV.√./2013á14/√ËÔ^.

∂§s©A

∂§s©A

∂§s©A

∂§s©A

∂§s©A

Amflºƒˆ ∂´∑, c^·V‚E ÿƒBÈÔ›][ 23á8á2004ágD º>]l‚¶ ∂´∑ gÁð ®ı 29/2004á[√Ω

>MBVÚ¬zfl ÿƒVÕ>\V™ ƒVÁÈ© √z]ÔÁ· ÿ√Vm T]Ô·VÔ ∂§s¬zD Amflºƒˆ ÂÔ´V‚EÔ^ ƒ‚¶D (®ı 9/1973)

1973á[ ∏ˆ° 256án, ˛´V\ √fiƒVB›m¬Ô^ �ÆD ÿÔVDR[ √fiƒVB›m¬Ô”¬z sˆ°√|›>©√‚|^·>[

∂Ω©√Á¶l_, \ıðVΩ©√‚| ÿÔVDR[, ƒ[MBVEz©√D kÚkVF ˛´V\›]_ ˇµÔı¶ ∂‚¶kÁðl_ z§©∏¶©√‚|^·

>VÏ ƒVÁÈÔÁ· ÿ√Vm T]Ô·VÔ ∂§s¬Ô \ıðVΩ©√‚| ÿÔVDR[ √fiƒVB›>V_ c›º>E¬Ô©√‚|^·m. º�√Ω ƒVÁÈ©

√z]Ôπ[ cˆÁ\BV·ÏÔ^ ∂_Èm kVˆ∑>V´ÏÔ”¬z ÷m ÿ>V¶Ï√VÔ ∞º>–D g‚ºƒ√Áð ÷ÚÕ>V_, ∂kuÁ≈ ÷Õ>

∂§s©A ÿkπl¶©√‚¶ x©√m ÂV‚Ô”¬z^ ÷¬ÿÔVDR[ √fiƒVB›m ∂KkÈÔ›]uz >¬Ô g>V´∫Ô”¶[ ®ø›mJÈD

ÿ>ˆs¬zD√Ω ºÔV´©√|˛≈VÏÔ^.

113

18 February 2014]

LA GAZETTE DE L’ETAT

kˆÁƒ kÚkVF ˛´V\D/

cˆÁ\BV·Ï

\Æ

√‚¶V

¿·D

∂ÔÈD

√´©√·°

z§©A

®ı

c‚˛´V\D

ÿ√BÏ

∂·Ák

®ı

®ı

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

*.

*.

ƒ.*.

]Ú/]Ú\] :

1

ƒ[MBVEz©√D

x›m\VˆBD\[ ºÔVl_

4/15

190

17.80

6.00

106.80

k¶¬záÿ>uz

>uÔVÈ >Ï\ÔÏ›>V.

1

ƒ[MBVEz©√D

1. xÚºÔƒ¬ Ô°ı¶Ï,

4/14

317

21.40

6.00

128.40

k¶¬záÿ>uz

>/ÿ√. mÁ´ƒVt¬ Ô°ı¶Ï;

2. ÷ÚƒD\V^,

Ô/ÿ√. ∂©√V° Ô°ı¶Ï;

3. ∂\VkVÁƒ Ô°ı¶Ï,

>/ÿ√. ÿk∫Ô¶VƒÈ¬ Ô°ı¶Ï.

]ÚAkÁ™, 2014 } ∏©´kˆ | 5 {,

ÿ>.

ÿ>.

ÿ>.

ÿ>.

ÿ>. gÆxÔD,

gÆxÔD,

gÆxÔD,

gÆxÔD,

gÆxÔD,

gÁðBÏ.

GOVERNMENT OF PUDUCHERRY

THIRUNALLAR TEMPLE TOWN DEVELOPMENT PROJECT

Karaikal, the 3rd February 2014.

e-TENDER NOTICE

On behalf of the President of India, e-tenders are invited from the eligible contractors/firms by

the Executive Engineer, Thirunallar Temple Town Development Project, Karaikal for the following works.

Sl.

Tender No.

Name of work

Approximate

Earnest

Eligibility of

No.

estimated cost

money

contractors

deposit

(1)

(2)

(3)

(4)

(5)

(6)

`

`

1

0301/TTTDP/ Construction of queue complex

. .

5,38,63,335

10,77,267

Class I

2013-14.

in Thirunallar, Karaikal

and above

2

0302/TTTDP/ Main work : Construction of bus

. .

1,15,74,671

2,31,500

Class II

2013-14.

terminus in Thirunallar, Karaikal

and above

Sub-work : Filling the site

proposed for construction of bus

terminus in Thirunallar-Phase-I

The detailed procedure is available in the tender notice which can be downloaded along with the NIT

from the website www.etenders-pwdpondy.in only by those contractors who are having valid ikey and Digital

Signature Certificate.

(i)

Availability of NIT

. .

From 10.00 a.m. on 7-2-2014

to 4.00 p.m. on 18-2-2014

(ii)

Closing time for submission of e-tenders

. .

3.30 p.m. on 20-2-2014

(iii)

Date and time of opening of tenders

. .

4.00 p.m. on 20-2-2014