[ 117 ]
GOVERNMENT OF PUDUCHERRY
CHIEF SECRETARIAT (HOUSING)
(G.O. Ms. No. 5/2015-Hg., dated 26th February 2015)
NOTIFICATION
In exercise of the powers conferred by section 47 of the
Puducherry Town and Country Planning Act, 1969 (No. 13 of 1970),
the Lieutenant-Governor, Puducherry in consultation with the Town and
Country Planning Department, hereby makes the following amendment to
the Puducherry Building Bye-laws and Zoning Regulations, 2012
issued in the notification in G.O. Ms. No. 5/2012-Hg., dated 5-3-2012
of the Chief Secretariat (Housing) and published in the Extraordinary
Official Gazette Part-I, No. 21, dated 8th March 2012, namely :—
Registered with the Registrar
of Newspapers for India under
No. M. 8270
La Gazette de L' État de Poudouchéry
The Gazette of Puducherry
PART - II
EXTRAORDINAIRE
EXTRAORDINARY
Publiée par
Published by
Autorité
Authority
` 6-00
Prix : ` 6-00
Price :
` 6-00
2015 } |
10 {
No. 14 Poudouchéry Mardi
10
Mars
2015
No.
Puducherry
Tuesday
10th
March
2015
( 19 Phalguna 1936 )
Registered No.
SSP/PY/44/2015-17
WPP No. TN/PMG(CCR)/
WPP-88/2012-14
Dated : 10-3-2015
Price : ` 6-00
118
LA GAZETTE DE L'ETAT
[PART–II
1. (1) These bye-laws and regulations may be called the
Puducherry Building Bye-laws and Zoning Regulations (Amendment), 2014.
(2) The provisions of these bye-laws and zoning regulations
shall apply to the planning area declared vide :—
(i) G.O. Ms. No. 79/84/F6, dated 17th August 1984, notified
in the Gazette No. 34, dated 28th August 1984;
(ii) G.O. Ms. No. 93/85/F6, dated 8th July 1985, notified in the
Gazette No. 35, dated 30th July 1985; and
(iii) G.O. Ms. No. 68/89/F6, dated 26th July 1989, notified in
the Gazette No. 83, dated 31st July 1989 of Housing
Secretariat, Puducherry and such other areas in the
Union territory of Puducherry notified from time to time.
(3) They shall come into force on and from the date of their
publication in the official gazette.
2. Amendment of Part-II–Zoning Regulations.— In the Puducherry
Bye-laws and Zoning Regulations, 2012 (hereinafter referred to as the
said bye-laws and regulations) in Part-II - Zoning Regulations, in clause
9 relating to (A) Primary Residential for the existing Note (1) (b) the
following shall be substituted, namely:—
“(b) For the areas situated within the French precinct i.e., on the
eastern side of the Grand Canal in the Boulevard town, the maximum
permissible coverage and F.A.R. of the buildings shall be 50% and
120 respectively and the maximum height of the building on the
front façade shall be 10.50 metres, including the stilt floor if
provided. Provided an additional floor shall be permitted with a
height of 3.0 metres over and above the height of 10.50 metres,
subject to the condition that this additional floor shall be setback
from the front façade by at least 5.0 metres, so that the sightline
extension from the opposite side of the street-side pavement clears
the parapet line of the third floor, and in any case, the above
building parameters shall not exceed the one stipulated in the CRZ
notification, notified by the Government of India from time to time.”.
119
PART–II]
LA GAZETTE DE L'ETAT
3. Amendment of Annexure-II.— In the said bye-laws and zoning
regulations, in Annexure-II Regulation for Lay-out and Sub-divisions
of land, after the sub-clause 6 (a), the following shall be inserted,
namely :—
“6 (b) In cases, where the extent of the residential layout
exceeds 3,000 square metres, ten per cent (10%) of layout area
(excluding roads) shall be developed as economically weaker
section/lower income group plots. The plot area for these groups
shall not be less than 35 square metres and shall not exceed
60 square metres with a minimum plot width of 3.0 metres. The owner
or developer or promoter shall sell these plots only for this
purpose, no conversion or amalgamation is permissible in these
cases of economically weaker section plots.”.
4. Amendment of Annexure-XI.— In the said bye-laws and zoning
regulations in Annexure-XI, Special Buildings and Group Developments
under Category (A) Special Buildings, for the entries in item (2),
the following shall be substituted, namely :—
“(2) The minimum width of road on which the site abuts shall be
9.0 metres, however a building for residential use may be permitted
on a site abutting or gaining access from a 6.0 metres wide
road, except in Mahe region.
In Mahe region, the minimum width of the road on which the site
abuts shall be 4.0 metres for all uses and a minimum front
setback of 3.0 metres, shall be provided.
Note : Kalyana mandapam/Reception hall, cinema theatres and
multiplex complexes shall be permitted only along roads of width of
minimum 12.0 metres.
Explanation : The road width means average road width in
front of the plot in question and for a few metres on either side for
purposes of measurements to be taken in conjunction with the
average width of that road in general.”.
5. Amendment of Annexure-XV.— In the said bye-laws and zoning
regulations, in Annexure-XV Special rules for multi-storeyed buildings,
120
LA GAZETTE DE L'ETAT
[PART–II
(i) after the sub-clause (1)(c), the following shall be
inserted, namely :—
“In Mahe region, the width of access to a multi-storeyed
building and plot as well as the width of the street giving access
to the plot from the main street shall be 5.0 metres.”.
(ii) after the sub-clause (3)(d), the following shall be
inserted, namely :—
“(e) In Mahe region,
(i) A clear motorable open space of minimum 5.0 metres width
shall be provided for the building at the front side as well as at any
one of its sides contiguous to the road abutting it, so as to
facilitate fire fighting, which shall be kept free of vehicle parking
or any other erections or projections thereon other than projections
of roof or sunshade or cornices of not more than 75 cm. width.
(ii) The minimum width of open space between plot boundary
and a high rise building shall be 5.0 metres.
(iii) In case of group of buildings are to be constructed within
any plot belonging to the same owner or by different owners of
adjoining lands jointly, the area of land remaining after accounting
for the mandatory front, rear and side setbacks from the boundary
of the plot shall be considered as buildable area of the plot, where
the buildings may be constructed subject to the conditions
regarding floor area ratio, coverage, access, light and ventilation
etc. for the whole plot, distance between the various blocks within
this area shall be a minimum of 5.0 metres.
(iv) Adequate passageway and clearances required for fire
fighting vehicles to enter the premises shall be provided at the main
entrance; the width of such entrance shall be not less than
5.0 metres. If an arch or covered gate is constructed, it shall have a
clear head room of not less than 5.0 metres.”.
121
PART–II]
LA GAZETTE DE L'ETAT
6. Amendment of Annexure XIX.— In the said bye-laws and
zoning regulations, for the existing Annexure-XIX - Regulations for the
erection of High Mobile Telecommunication Towers, the following shall
be substituted :
“ANNEXURE – XIX
Regulations for installation of Mobile Telecommunication Towers
In case of erection of non-Governmental mobile telecommunication
tower/radio paging and cellular telecommunication towers, the local
Authority/Planning Authority shall grant permission for execution of the
works and the person who intends to execute the above work shall apply
in the prescribed form and such application supported by plans and
specifications in quadruplicate shall be in accordance with the guidelines
prescribed below:
1. Definition.— Telecommunication Infrastructure Tower (TIT) –
shall include ground based tower (GBT)/roof top tower (RTT)/roof top
poles (RTP)/cell phone tower (CPT), antenna fixtures, fabricated antenna,
tower to install the telephone lines and transmission towers. This will not
include the antennas installed for domestic purpose, namely television
antennas or dish antennas.
2. Applicability.— These provisions shall be applicable to all
non-Governmental telecommunication constructions in the Union
Territory and applicable to all such constructions whether completed or
not as in the case of new constructions proposed at the time of
commencement of these regulations.
3. Essentiality of permission.— No person shall erect or re-erect
any non-Governmental telecommunication tower or telecommunication
pole structures or accessory rooms or make alteration or cause the same
to be done without first obtaining a separate permit for each such tower
from the Planning Authority.
4. Site approval.— (1) No site approval shall be necessary for the
construction of telecommunication towers, telecommunication pole
structures or accessory rooms essential for such service.
(2) Telecommunication towers or pole structures or accessory
rooms shall be permitted in any zone or over any approved building roof
tops irrespective of its occupancy or on the ground or open space within
the premises subject to the other regulations.
122
LA GAZETTE DE L'ETAT
[PART–II
5. Application and permit.— Application shall be submitted in the
prescribed form. (Form–I of the Puducherry Building Bye-Laws and
Zoning Regulations, 2012).
Documents to be submitted by the Telecom Service Provider (TSP)
along with the application :
(i) Attested copy of the ownership documents, as the case may be,
of the property or building. In the case of applications other than
owners, legally valid written consent of the owner. Plans, elevations,
site plans, clearly showing the area of plot, details of existing
structures on the site, coverage, height, materials of construction etc.
as per the provisions of Building Bye-laws and Zoning Regulations, 2012.
(ii) Copy of relevant licence/infrastructure provider registration
certificate from Department of Telecommunications.
(iii) Data sheet.
(a) Name of Service/Infrastructure provider;
(b) Location; and
(c) Tower reference :
(i) Height
(ii) Weight
(iii) Ground/Roof-top
(iv) Pole/Wall mounted
(v) Number of antennae.
(iv) Copy of Standing Advisory Committee on Radio
Frequency Allocation (SACFA) clearance/copy of SACFA application for
the said location submitted to WPC wing of DoT with registration number
as WPC acknowledgment along with undertaking that in case of any
objection/rejection, TSPs/IPs will take corrective actions/remove the
tower.
(v) Copy of structural stability certificate for ground based
tower. In case of roof-top BTS towers, structural stability certificate for
the building and tower based on written approvals of any registered
Structural Engineer of the Planning Authority or any other agency
authorised by the Planning Authority. The fresh structural stability
certificate shall be insisted after every 5 years after approval at the time
of renewal of proposal in case of building more than 30 years old.
123
PART–II]
LA GAZETTE DE L'ETAT
(vi) Copy of the type test certificate issued by Automotive
Research Association of India (ARAI) to the manufacturers of the Diesel
Generator (DG) sets.
(vii) Copy of clearance from Fire Safety Department only in case
for high rise buildings where fire clearance is mandatory.
(viii) Acknowledgment receipt issued by TERM (Telecommunication
Enforcement Resources and Monitoring) Cell of DoT of the self- certificate
submitted by telecom service provider/infrastructure provider in respect
of mobile tower/BTS (ground based/roof-top/pole/wall mounted) in the
format as prescribed by DoT, establishing/certifying that all general
public areas around the tower will be within safe EMR exposure limit as
per peak traffic measurement after the antennae starts radiating.
(ix) Copy of the approved plan of the building and occupancy
certificate issued by the Planning Authority.
(x) No objection certificate from the Airport Authority of India,
Puducherry, Coastal Zone Management Authority and Archeological
Survey of India wherever required.
(xi) Indemnity bond (original) to take care of any loss or injury
due to accident caused by the tower (including a declaration to the
effect that the applicant shall take special precaution for fire safety and
lightening and he shall be solely responsible for paying all kinds of
compensation and damages and would be responsible for any civil or
criminal case arising, therefrom).
6. Renewal of permit.— The permit issued by the Planning
Authority for the installation of mobile towers shall be valid for a period
of three years from the date of issue of permit and the same shall be got
renewed for every three years.
7. Persons competent to issue structural stability certificate.—
The structural stability certificate shall be obtained from a registered
Structural Engineer Grade-I registered with the Planning Authority, or
from recognized institute like IITs, NITs and CBRI, Roorkee or from the
Engineering Colleges recognised by AICTE of a Structural Engineer
employed in Central or State Government service or Quasi-Government
organisation.
124
LA GAZETTE DE L'ETAT
[PART–II
8. Fees.— (a) Fee for application shall be ` 1,000.
(b) The permit fee for the installation of mobile towers in the
Union territory of Puducherry shall be ` 1,00,000 per tower and a renewal
fee of ` 35,000 per tower. This is applicable to all the existing towers and
for new towers.
(c) An additional amount for permit fee at the rate of ` 50,000
and a renewal fee of ` 15,000 shall be levied for every additional antenna
which shares the same tower.
(d) An amount of ` 25,000 shall be levied for unauthorised
erection of mobile towers.
9. Scrutiny and disposal of application.— (i) The Planning
Authority shall issue or refuse the permit, not later than 30 days from the
date of receipt of application along with the plans and documents. In
case of refusal, the reasons for the same shall be clearly mentioned. And
if no permission or refusal is accorded within 30 days, the permit is
deemed to have been accorded, provided that, the said installation shall
comply all of these guidelines.
(ii) The permit issued shall be a work permit and the construction
or erection of telecommunication tower or telecommunication pole
structures or accessory rooms essential for the use of such tower or pole
structures shall be completed within one year from the date of issue of
such permit.
(iii) The period of the permit shall be extended for a further
period of one year if an application for the same is submitted to the
Planning Authority, within the valid period of then permit duly paying
25% of the prescribed fee and charges and in the prescribed application
form duly attaching the original permit.
10. Setback.— Minimum setback from the plot boundary abutting
the road to the base of the tower shall be 3.00 metres, irrespective of the
setback of the existing building if any from the plot boundary and other
setbacks from the boundaries of the plots to the base of the
telecommunication tower or pole structure or accessory room
shall be 1.2 metres.
Note : No telecom tower shall project beyond the existing building
line of the building on which it is erected in any direction.
125
PART–II]
LA GAZETTE DE L'ETAT
11. Sharing of sites.— The telecom operators may share the towers
for fixing their respective antennas. The same are however, required to
adhere to the prescribed technical requirements, so as to curtail
multiplicity of towers as well as to optimize the use of the existing ones.
12. F.A.R. and height.— Provisions regarding coverage, F.A.R. and
height contained in the Puducherry Building Bye-Laws and Zoning
Regulations are not applicable in the case of telecommunication towers
and ancillary cabins whether constructed on the ground or on an
existing building or structure. An ancillary cabin constructed over a
building shall not be reckoned as a floor or reckoned for the height of
the building. Ancillary cabin for this purpose shall mean the minimum
protection of whatever material constructed for the equipments
necessary for the telecommunication tower not exceeding 15 sq.m. in area.
13. Protective wall.— (i) Any tower erected on earth or to which
electric power is transmitted shall be provided with a protective wall or
grill at a distance of one metre from any point of the base.
(ii) The wall or grill shall have a minimum of 1.20 metres height
and if provided with door which shall be kept under lock and key, if
provided with door.
14. Protection against lightning.— Any telecommunication tower
shall be provided with sufficient lightning protection and it shall
conform to Indian Standard I.S. 2303-1969 Code of Practice as amended
from time to time for protection of buildings and other structures against
lightning.
15. Other restrictions.— (i) Erection of TIT shall not be allowed
within a radius of 100 metres, from the boundary of the premises of
school and hospital buildings or any other prescribed buildings by the
government from time to time. The existing mobile antenna approved
earlier on school and hospital buildings shall not be renewed further after
expiry of period of approval and the same shall be removed immediately.
(ii) The distance of tower from the electric line of pole or tower
thereof shall not be less than height of tower plus requisite safety
distance from respective high tension or low tension line i.e. a minimum
safety distance (both vertical and horizontal) of 3 metres shall be
maintained between the building/TIT and the high tension electricity
lines and 1.5 metres shall be maintained between the building/TIT and
the low tension electricity lines or as prescribed by the Electricity
Department, Puducherry from time to time.
126
LA GAZETTE DE L'ETAT
[PART–II
(iii) In case of sites located within the distance up to 100 metres
from the protected monuments as notified under the Archeological
Monuments and Ancient Sites and Remain Act, 1955 and as amended no
building/TIT is allowed. For the sites located within distance of above
100 metres and up to 200 metres from the protected monuments, the
construction/TIT is allowed only after obtaining prior permission from
the Archeological Survey of India.
(iv) The base station antennas should be avoided in narrow
lanes than or equal to 5.0 metres.
(v) There will be only one tower allowed on one building/wing
of the building.
(vi) In case of both ground based towers and roof-top covers,
there shall be no building right in front of the antenna(e), of equivalent
height taking into account, the tilt of the lowest antenna on tower as per
details in the Table below. Further, the antennae at the same height only
are to be counted, as the beam width of the mobile antenna in the
vertical direction is very narrow.
TABLE
Number of antenna(e) pointed
Building/Structure safe
in the same direction
distance from the antenna(e)
at the same height (in metres)
1
20
2
35
4
45
6
55
(vii) Wherever the antennae are mounted on the wall of building
or pole on /along the road, their height should be at least 5.0 metres
above ground/road level. However, such installations will have to comply
with the radiation limits.
(viii) As far as safe distance of building from antenna is
concerned, regulations as given above will apply.
127
PART–II]
LA GAZETTE DE L'ETAT
(ix) The operator shall display on board at conspicuous space
of the building at ground floor, the followings :
(a) Operator’s name and address.
(b) Contact person, name, address and telephone number.
(c) Address of complaint redressing authorities with
telephone number.
(d) Other important information, if any.
(e) Details of the insurance policy.
(f) Police control room :
100
(g) Fire control room
:
101
(h) Ambulance
:
102
(x) The "warning sign" should discourage linger stay in the
zone, even for the maintenance personnel. The sign board may contain
the following text:
(i) Danger ! RF radiation, Do not enter.
(ii) Restricted area.
(xi) Access to base station antenna sites should be prohibited
for general public by suitable means such as wire fencing, locking of the
door to the roof etc. access to tower sites, even for the maintenance
personnel, should be for minimum period as far as possible.
16. Redressal of public grievances.— In order to effectively
address the public grievances relating to installation of towers and
issues related to telecom infrastructure, Government may set up,—
(1) State level telecom committee (STC) consisting of officers
from TERM cells, State Administration, representative(s) of concerned
telecom service provider(s) and eminent public persons, etc.
(2) District level telecom committee (DTC) consisting of officers
from district administration, representative(s) of concerned telecom
service provider(s) and eminent public persons etc.
17. Damage and liability.— The applicant and the Structural
Engineer concerned, shall be responsible for the structural stability of
the structure and building and they shall be jointly and severally liable
for any damage caused to life and property on account of structural
failure of the tower and building, shall also be liable for any damage
caused due to inadequate safety measures.
128
LA GAZETTE DE L'ETAT
[PART–II
18. If the land, where the tower is proposed to be constructed on
the ground, is included in any published Town Planning Scheme in which
the existing road is envisaged to be widened, the proposed tower shall
have adequate setback for road widening and further minimum setback
of 3.0 metres.
19. Towers shall be permitted only over authorised structures/
buildings and if the existing building was permitted with certain
conditions, the same stipulated conditions shall also be applicable to the
towers constructed over those buildings.
20. If the tower is proposed over an existing building permitted in
relaxation of regulations, the proposed construction of tower and
ancillary structures shall not further violate building regulations for the
existing building, such constructions shall also not obstruct or block the
existing entry and exit openings of the existing building.
21. The applicant shall also undertake that the provision of mobile
tower antennas shall be incompatible with the guidelines from the DoT,
if at any stage, it has been brought to the notice of the Government/
Planning Authority, by Telecommunication Enforcement Resources and
Monitoring (TERM) Cell of Department of Telecommunication regarding
any incompatibility in the same, the mobile tower/ antenna will liable to
be removed. It shall be obligatory on part of the service provider that
they shall follow the guidelines from DoT or amendment thereof in future.
22. Penalty.— Operator/Service provider/Infrastructure provider
who violates any provisions of these rules shall be liable to be punished
with fine up to ` 25,000 (Rupees twenty-five thousand) and his
communication tower shall be sealed, seized and operator/providers may
also be asked to remove the tower/antenna within a time frame of one
month.
(a) However, the planning authorities may pass such order of
fine, sealing, seizure or removal shall give notice to the operator/service
provider/infrastructure provider to this intention and provide reasonable
opportunity to the operator to be heard.
(b) After hearing the operator/service provider/infrastructure
provider the Member-Secretary shall pass necessary orders regarding
fine, sealing, seizure and removal.
129
PART–II]
LA GAZETTE DE L'ETAT
(c) In the eventuality of the operators not removing the tower/
antenna the Planning Authority will get the tower/antenna removed and
the cost of such removal will be realised from the operator, by way of
taxes.
The above guidelines shall be applicable for all new installations
after these rules come into effect. For regularisation of existing towers,
same conditions/procedure for the application and documentation shall
be required, as those are required for permission of new mobile towers.
However, approval to such existing towers shall be granted by the
competent authority, only subject to the conditions of fulfillment of all
norms of the policy and applicable fees and all other technical matters
relating the erection of mobile towers will be governed by the guidelines
of DoT published from time to time.”.
7. Amendment of Annexure-XX.— In the said bye-laws and zoning
regulations, in Annexure XX, Penal action for violation of provisions of
Development Code of Master Plan, Building Bye-Laws and Zoning
Regulations for the existing sub-clause (AA) (i) and (iii), the following
shall be substituted, namely :—
“(A.A) Compounding Excess Coverage/FAR :
(i) Deviations in the coverage/FAR to the extent of 10% of the
permissible coverage/FAR in building(s) use premises, other than
building(s) use where 100% ground coverage and fixed height is
allowed as per architectural control forming part of comprehensive
schemes like District Centre, Community Centres, Cluster Court
Housing, etc., may be compounded after levying penalty at the
following rates :
Rates of excess coverage/Floor area :
Up to 10% of excess coverage/FAR a one time compounding fee
equivalent to 12% of the land rated in the concerned locality
applicable at the time of application for compounding.
130
LA GAZETTE DE L'ETAT
[PART–II
(iii) Compounding at setback infringements:-
The infringements of the front setbacks maximum to the extent of
30 cm. (1 feet) may be compounded by way of levying compounding fee
at the following rates :
Infringements
Residential
Non-residential
buildings
buildings
Up to 15 cms. (6 inch)
` 1,000 per sq.m.
` 2,500 per sq.m.
of area infringing
of area infringing
the setback.
the setback.
Above 15 cms. (6 inch)
` 2,000 per sq.m.
` 5,000 per sq.m.
of area infringing
of area infringing
the setback
the setback.
The infringements of the rear and side setbacks may be compounded
by way of levying compounding fee at the above rates.”.
E. RAJESWARI,
Under Secretary to Government (Housing).
————
online publication at “http://styandptg.puducherry.gov.in”
Government Central Press
Directorate of Stationery and Printing
Puducherry-9.