122

LA GAZETTE DE L’ETAT

[1 March 2016







}| {







































































































































































————

GOVERNMENT OF PUDUCHERRY

DEPARTMENT OF PERSONNEL AND

ADMINISTRATIVE REFORMS (PERSONNELWING)

(G.O. Ms. No. 10, dated 12th February 2016)

NOTIFICATION

In pursuance of the O.M. R.O.C. No. 6566/2015/RG/F-B2,

dated 29-1-2016 of Registrar General, High Court,

Madras and on having reported for duty in this Administration

on the forenoon of 3-2-2016, Shri G. Sendil Kumar,

District Judge of Puducherry Judicial Service is appointed

as Secretary to Government (Law), Puducherry on deputation

basis for a period of 2 (two) years .

2. The terms and conditions of deputation shall be

as per the Annexure to this Government order.

(By order of the Lieutenant-Governor)

MANOJ PARIDA,

Chief Secretary to Government.

ANNEXURE

1. Pay: During the period of deputation, the officer

shall have the option either to get his pay fixed in the

deputation post under the operation of the normal rules

or to draw pay of the post held by him in his

parent department plus a Deputation (Duty) Allowance

in accordance with the instructions contained in

O.M. No.6/8/2009-Estt.(Pay.II), dated 17-6-2010 of

Ministry of Personnel, Public Grievances and Pensions,

Department of Personnel and Training as communicated

vide this Department's I.D. Note/Memorandum

No. A.35011/1/2002/DPAR/CCD(2), dated 6-1-2011.

2. Dearness Allowance: The officer shall be entitled

to Dearness Allowance under the rules of the parent

department or under the rules of the borrowing

123

1 March 2016]

LA GAZETTE DE L’ETAT

department accordingly as he retains the scale of pay

under the parent department or he draws pay in the

scale attached to the post under borrowing department.

3.

Local Allowances and HRA: These allowances

shall be regulated under the rules of the borrowing

department.

4. Children's Educational Allowance: The Officer

shall be entitled either to claim the Children's Education

Allowance from the State Government as laid down in

para.l(a) of Finance Ministry's O.M. No. 8(II)E.II(B)/63,

dated 12-8-1964 subject to the fulfillment of the

condition prescribed in O.M. No. F.16(l). Estt.(Spl.)/60,

dated 30-1-1962 as amended from time to time or to

reimbursement of tuition fees in respect of his children,

subject to the fulfillment of the terms and conditions

laid down in Finance Ministry's O.M. No. l7(l)E.Il(B)/64,

dated 3-6-1964 as amended from time to time and liability

in this regard shall devolve on the borrowing

department.

5.

Joining Time Pay and Transfer Travelling

Allowance: The officer shall be entitled to the Transfer

Travelling Allowance and Joining Time on joining the

post on deputation and on reversion to the parent

department under the Central Civil Services (Joining Time)

Rules, 1979. The expenditure on this account will be

borne by the borrowing department.

6. Travelling Allowance for Journey on duty during

the period of deputation: This shall be regulated under

the rules of the service as applicable to Judicial Officers

in the Grade of District Judge under the Government of

Puducherry.

7.

Leave and Pension: During the period of

deputation on temporary transfer, the officer shall

continue to be governed by the leave and pension rules

of the parent department applicable to him before such

transfer. The allocation of leave salary and pensionary

charges will be regulated as per rules in force.

8.

Provident Fund Benefits: During the period of

deputation, the officer shall continue to subscribe to

the Provident Fund on his parent department to which

he has been subscribing when he was placed on

deputation, in accordance with the rules of such fund.

9.

Leave Travel Concession: The officer shall be

entitled to Leave Travel Concession as admissible to

the employees of Government of Puducherry.

10. Medical

Concession

and

Residential

Accommodation: The officer shall be entitled to these

concessions under the rules of service as applicable to

the Judicial Officers in the grade of District Judge under

the Government of Puducherry.

11. During the period of deputation, the officer shall

be entitled to draw other allowances and benefits

wherever applicable, as specified in G.O. Ms. No. 62/2006-LD,

dated 8-9-2006 of the Law Department, Puducherry.

M. KANNAN,

Under Secretary to Government.

————

GOVERNMENT OF PUDUCHERRY

CHIEF SECRETARIAT (FISHERIES)

(G.O. Ms. No. 3/Fy., dated 15th February 2016)

NOTIFICATION

On the basis of the recommendations of the

Union Public Service Commi ssion, New Delhi,

Tmt. R. Mary Chinna Rani, Deputy Director of Fisheries

is promoted and appointed to the post of Joint Director

of Fisheries on regular basis in the Pay Band-3 of

` 15,600-39,100 with Grade Pay of ` 6,600 in the

Department of Fisheries and Fishermen Welfare,

Puducherry with immediate effect.

She shall be placed on probation for a period of

two years with effect from the date of joining in the

promoted post.

T. VALARMATHY,

Under Secretary to Government (Fisheries).

————

GOVERNMENT OF PUDUCHERRY

HEALTH SECRETARIAT

(G.O. Ms. No. 8, dated 15th February 2016)

NOTIFICATION

The undermentioned Specialist Doctor and General

Duty Medical Officers, who were placed on probation

for a period of one year and two years respectively are

declared to have been completed their period of

probation satisfactorily in the post on the date noted

against their names at column No. 4.

Sl.

Name and

Date from

Date of

No.

designation

which

completion

placed on

of

probation probation

period

(1)

(2)

(3)

(4)

1. Dr. C.T. Suresh,

7-3-2011

28-9-2013

Specialist Grade-II (SS) in

Neurology.

124

LA GAZETTE DE L’ETAT

[1 March 2016

2. Dr. T. Meena,

30-8-2008

28-9-2013

General Duty Medical Officer.

3. Dr. D. Prabhavathy,

1-9-2008

28-9-2013

General Duty Medical Officer.

4. Dr. D. Dhanasegaran,

3-4-2008

28-9-2013

General Duty Medical Officer.

5. Dr. A. Mukundan,

3-4-2008

28-9-2013

General Duty Medical Officer.

6. Dr. M. Hemanatha Kannan,

18-4-2008

28-9-2013

General Duty Medical Officer.

7. Dr. S. Diana Sharmila Nathan, 9-3-2012

8-3-2014

General Duty Medical Officer.

8. Dr. B. Sudha,

14-3-2012

13-3-2014

General Duty Medical Officer.

9. Dr. S. Sivasankar,

4-7-2013

3-7-2015

General Duty Medical Officer.

10. Dr. A. Alexa,

5-7-2013

4-7-2015

General Duty Medical Officer.

11. Dr. S. Vijaya Shankar,

1-3-2013

28-2-2015

General Duty Medical Officer.

12. Dr. Kandan Nagaraj,

14-3-2012

13-3-2014

General Duty Medical Officer.

13. Dr. T. Ashwini,

6-3-2012

5-3-2014

General Duty Medical Officer.

14. Dr. P. Sivaramakrishnan,

3-4-2008 11-10-2015

General Duty Medical Officer.

15. Dr. C. Ramakrishnan,

3-3-2012 11-10-2015

General Duty Medical Officer.

16. Dr. M.M. Muralikrishna,

5-3-2012 11-10-2015

General Duty Medical Officer.

(By order of the Lieutenant-Governor)

V. JEEVA,

Under Secretary to Government (Health).

————

GOVERNMENT OF PUDUCHERRY

CO-OPERATIVE DEPARTMENT

No. 5/5/1/15/RCS/Hdlms/B3/2014/396.

Puducherry, the 16th February 2016.

PROCEEDINGS OF THE REGISTRAR OF

CO-OPERATIVE SOCIETIES, PUDUCHERRY.

Present :

Dr. A.S. SIVAKUMAR,

Registrar of Co-operative Societies,

Puducherry.

Subject :

The Karaikal Ammayiyar Silk Weavers

Co-operative Society Limited, No. P.536

Appointment

of

Liquidator

under

sub-section (1) of section 127 of the

Puducherry Co-operative Societies Act,

1972–Orders– Issued.

Read

:

Registrar’s Proceedings No. 5/5/1/15/

RCS/Hdlms/B3/2014, dated 16-2-2016.

ORDER

Whereas, an order was made, vide reference cited,

under sub-section (1) of section 126 of the Puducherry

Co-operative Societies Act, 1972, directing the winding

up of the affairs of the Karaikal Ammayiyar Silk Weavers

Co-operative Society Limited, No. P.536;

And whereas, the financing bank viz., the Pondicherry

State Co-operative Bank Limited was consulted in the

matter of appointment of a liquidator, as required under

sub-section (1) of section 127 of the said Act;

And whereas, the Pondicherry State Co-operative

Bank has stated that it has no objection for the

appointment of a liquidator for the said Society;

Now, therefore, in exercise of the powers conferred

on me under sub-section (1) of section 127, of the

Puducherry Co-operative Societies Act, 1972, I hereby

appoint Thiru P. Savarirajalu, Junior Inspector as the

Liquidator for the purpose of winding up of the said

Society;

Thiru P. Savarirajalu, Junior Inspector/Liquidator

shall take into his custody all the properties, effects and

actionable claims to which the said Society is or appears

to be entitled and complete the liquidation proceedings

as per law.

Dr. A.S. SIVAKUMAR,

Registrar of Co-operative Societies.

————

GOVERNMENT OF PUDUCHERRY

HOME DEPARTMENT

(G.O. Ms. No. 7, dated 18th February 2016)

NOTIFICATION

Notice of voluntary retirement given on 8-12-2015

by Thiru Tirukoti Bhairavasamy, Superintendent of Police,

Puducherry, Group-‘B’ Officer, under rule 48 (1) of

Central Civil Service (Pension) Rules, 1972 is accepted

and he is admitted into voluntary retirement with effect

from 16-2-2016 afternoon, subject to the conditions that

(1)

(2)

(3)

(4)

125

1 March 2016]

LA GAZETTE DE L’ETAT

the Government servant shall not apply for commutation

of a part of his pension before the expiry of the period

of notice of three months i.e., 8-3-2016.

(By order of the Lieutenant-Governor)

F.P. VERBINA JAYARAJ,

Under Secretary to Government.

————

GOVERNMENT OF PUDUCHERRY

CHIEF SECRETARIAT (AGRICULTURE AND FORESTS)

(G.O. Ms. No. 19/Ag., dated 18th February 2016)

NOTIFICATION

The Lieutenant-Governor, Puducherry is pleased to order

the regular promotion of the following officers in the

grade of Deputy Director of Agriculture in the Agriculture

Department with effect from the dates mentioned against each.

Sl.

Name of the Officer

Date of regular

No.

promotion as Deputy

Director of Agriculture

(1)

(2)

(3)

Thiruvalargal :

1

G. Namasivayam

1-1-2008

2

G. Madavan

1-7-2008

3

B. Giridharan

1-9-2008

4

T. Ilangovan

1-7-2009

5

M. K. Mohamed Usman

1-9-2009

6

J. D. M. Paghan

1-10-2010

7

V. Rajendiran

1-1-2011

8

Nallam Prakash Babu

1-6-2011

9

K. Iyyappa Naidu

1-10-2011

10

Gerald Ashok Kumar

1-2-2012

11

N. Rajendiran

21-3-2012

12

D. R. Murugesan

21-3-2012

13

P. Mohamed Dasir

21-3-2012

14

M. Vedhachalam (SC)*

21-3-2012

15

R. Muthukrishnan (SC)

21-3-2012

16

P. Cartigueane

1-1-2013

17

C. Sivaraman

1-2-2013

18

H. Jakir Hussain

1-4-2013

19

P. Dhanasekaran (SC)

1-9-2013

20

G. Muthukrishnan

1-8-2014

21

A. Poominathan

1-9-2014

22

R. Ragavan

1-12-2014

* Promoted on his own merit

(By order of the Lieutenant-Governor)

N. ANBALAGAN,

Under Secretary to Government

(Agriculture and Forests).







}| {



















































































































126

LA GAZETTE DE L’ETAT

[1 March 2016



































————

GOVERNMENT OF PUDUCHERRY

CHIEF SECRETARIAT (ENVIRONMENT)

(G.O. Ms. No. 2/2016-Envt., dated 19th February 2016)

ORDER

The Government of India has launched the

Jawaharlal Nehru National Solar Mission (JNNSM)

under the National Action Plan for Climate Change

(NAPCC) to promote ecologically sustainable growth while

addressing India's energy security challenges. The objective

of the National Solar Mission is to establish India as a

global leader in solar energy, by creating the policy

conditions for its diffusion across the country as quickly

as possible.

The Union Territory is fast developing with

significant growth in socio-economic development.

There will be a continuous increase in energy demand

from all sectors. To meet the increasing energy demand

in a sustainable

manner,

it

is essential that the

Government of Puducherry formulates and implements

energy policies that are driven by a clear vision and

implemented through the participation of all stakeholders.

This Puducherry Solar Energy Policy intends to

creates a framework that enables the development of

solar energy in the Union territory of Puducherry. The

Solar Energy Policy-2015 framed by the Government of

Puducherry which is appended to this Order is published

for the information of all stakeholders.

(By order of the Lieutenant-Governor)

S. THAMMU GANAPATHY,

Deputy Secretary to Government (Envt.).

GOVERNMENT OF THE UNION TERRITORY OF

PUDUCHERRY

SOLAR ENERGY POLICY–2015

1.0 Preamble:

1.1.

Energy is one of the key driving forces of

socio-economic development and change. Long-

term energy security is therefore, an essential

element of sustainable development. The rapid

depletion of non-renewable energy sources and

the adverse effects caused to the globe by the

process of extracting energy from fossil fuels

call for urgent solutions while demand for

energy will keep increasing. The universally

accepted view is that only energy from renewable

sources offer a solution for a sustainable energy

future.

1.2.

The Government of India has launched the

Jawaharlal Nehru National Solar Mission (JNNSM)

under the National Action Plan for Climate

Change (NAPCC) to promote ecologically

sustainable growth while addressing India's

energy security challenges. The objective of the

National Solar Mission is to establish India as

a global leader in solar energy, by creating the

policy conditions for its diffusion across the

country as quickly as possible.

1.3.

The Union territory of Puducherry comprises of

four

erstwhile

French

settlements

viz.,

Puducherry, Karaikal, Mahe and Yanam,

which are unconnected regions. The Union

Territory is fast developing with significant

growth in socio-economic development. There

will be a continuous increase in energy demand

from all sectors. To meet the increasing energy

demand in a sustainable manner, it is essential

that the Government of Puducherry formulates

and implements energy policies that are driven

by a clear vision and implemented through the

participation of all stakeholders.

1.4.

This Puducherry Solar Energy Policy intends to

create

a

framework

that

enables

the

development of solar energy in the Union territory

of Puducherry.

2.0. Solar Energy Potential in the Union territory of

Puducherry:

2.1.

The four regions of the Union Territory of

Puducherry have an average solar irradiance of

5.6-6.0 kWh / square meter / day and about 300

sunny days in a year, therefore, offering a good

solar energy potential.

127

1 March 2016]

LA GAZETTE DE L’ETAT

2.2.

The urban areas of the Union territory of

Puducherry lend themselves well to the

installation of (rooftop) grid-connected solar

PV systems.

2.3.

The rural areas of the Union territory of

Puducherry have excellent electricity grid

penetration, therefore, also offering good

opportunities for grid-connected solar PV

systems.

3.0. Solar Energy Vision:

3.1.

Solar energy will be a major contributor to a

sustainable energy future for the Union

territory of Puducherry.

3.2.

Solar energy development will be part of an

overall energy strategy that includes demand

side management, energy conservation, energy

efficiency initiatives, distributed renewable

energy generation and smart grid.

3.3.

The Union territory of Puducherry will achieve,

or exceed, the solar energy portfolio obligations

as may be determined by the Joint Electricity

Regulatory Commission (for the state of Goa

and Union Territories) (the "JERC") from time

to time.

3.4.

In the Union territory of Puducherry solar

energy will be a mainstream energy source

by 2025.

4.0. Solar Energy Policy Objectives:

4.1.

Define clear and transparent policy governance.

4.2.

Encourage public-private partnerships and joint

ventures to mobilize investments in solar

energy projects, manufacturing facilities,

research and technology development.

4.3.

Facilitate open access to the public electricity

grid of the Puducherry Union Territory and

thereby create opportunities for grid-connected

distributed generation of solar power and smart

grid solutions, such as the propagation of

electric transport, in order to reduce the

dependence on fossil fuels and urban air

pollution

4.4.

Encourage to set up solar energy plants in

industrial, commercial and residential buildings.

4.5.

Establish a 'Single Window System' for

technical support, funding support and project

clearance.

4.6.

Create an investment-friendly environment that

provides opportunities for private individuals,

companies, local bodies, Government departments

and others to contribute to and participate in

the generation of solar energy, particularly for

the electricity consumer to become a "prosumer"

(a producer-consumer).

4..7.

Initiate information, communication and

education measures for promoting solar energy.

4.8.

Encourage and promote solar energy research

and development through technical institutions

in the Puducherry Union Territory.

4.9.

Establish linkages with National and International

institutions for active collaboration in development,

demonstration and commercialization of solar

technologies and systems.

5.0. Scope of the Solar Energy Policy:

5.1.

The policy will be applicable to projects,

programs and installations relating to both

solar photovoltaic energy (solar PV) and solar

thermal energy.

5.2.

The policy will be in force from the date of

notification and shall be reviewed for its

efficacy every five years with the sole purpose

of considering improvements that may expedite

the realization of the Puducherry Solar Energy

Vision.

5.3.

The Puducherry Solar Energy Policies will be

aligned with Various National policies and

initiatives relating to the promotion of new and

renewable energy

6.0. Solar energy implementation mechanisms:

6.1.

The implementation of solar energy in the

Puducherry Union Territory will include, but,

not be limited to the mechanisms, facilities and

initiatives listed below.

6.1.1. Solar energy gross feed-in and metering: The

solar energy is fed into the grid and sold to

Electricity Department, Puducherry ("EDP") or

other distribution licensee. In addition to the

existing service connection meter that records

the consumption of energy at the premises,

an energy meter will be installed by EDP or

other distribution licensee to record the energy

fed into the grid. The solar energy fed into the

grid will be purchased by EDP or other

distribution licensee at the prevailing solar

energy tariff as determined by the JERC. Under

the solar gross feed-in mechanism, solar

energy may also be sold to another distribution

licensee or to a third party under the open

access mechanism.

128

LA GAZETTE DE L’ETAT

[1 March 2016

6.1.2. Solar energy net-metering: The solar energy is

used for self consumption with the surplus,

if any, being exported to the grid. A bidirectional

service connection energy meter will be

installed by EDP or other distribution licensee

to rec o rd the imp o rted , exp o rt ed and

net-imported energy for the purpose of

net-metered billing. Solar net-metering will be

available for all metered electricity consumers.

6.1.3. Solar energy group net-metering: To encourage

solar plants on rooftops of buildings that

cannot consume all of the energy generated

locally, there shall be group net metering,

whereby, surplus energy exported to the grid

from a solar plant in excess of 100 per cent of

imported energy at the location of the solar

plant can be adjusted in any other (one or more)

electricity service connection(s) of the consumer

within the Puducherry Union Territory. The

purpose of this provision is to help maximize

the utilization of rooftop space for solar energy

generation for consumers with multiple

buildings and service connections.

6.1.4. Solar energy virtual net-metering: To give

access to the solar net-metering facility for

consumers who do not have a suitable roof for

installing a solar system (e.g. residential

consumers who live in apartments, consumers

with shaded rooftops) there will be the facility

of virtual net metering. In virtual net-metering

consumers can be beneficial owners of a part

of a collectively owned solar system. All energy

produced by a collectively owned solar system

will be fed into the grid through an energy

meter and the exported energy as recorded by

that meter will be pro rata credited in the

electricity bill of each participating consumer

on the basis of beneficial ownership. Collective

ownership of solar plants may be established

through

Societies,

Trusts or section 25

Companies or any other legal entity that safeguards

the interests of participating consumers,

including rights which are at par with the rights

enjoyed by consumers who have solar

net-metering with a solar system installed on

their own roof.

6.1.5. Solar energy systems for buildings: Solar PV

systems may be installed on rooftops of all

categories of existing and new buildings

connected to the grid of EDP's or other

distribution licensee. Solar PV systems may

also be installed on elevated structures and on

ground mounted structures within the premises

of a building.

6.1.6. Solar energy systems on rented rooftops:

Developers may rent roofs from building owners

and install solar PV systems on these roofs with

solar energy gross feed-in, net feed-in or

net-metering arrangement. The roof owners may be

paid a fixed or a variable rent linked with solar

generation as may be agreed upon between the

roof owner and the project developer.

6.1.7. Solar Energy Special Economic Zones and Solar

Parks: The Government will promote the

development of Special Economic Zones for

research, development and manufacture of solar

energy products and systems. Suitable land will

be identified for developing Solar Parks.

6.1.8. Stand-alone and solar-wind hybrid systems:

In villages and habitats where grid connectivity

is not feasible or not cost effective, off-grid

solutions based on micro-grid and stand-alone

solar PV, solar - wind hybrid solutions, solar

street lights and lanterns will be taken up.

6.2.

Other solar energy implementation initiatives

will include:

6.2.1. Solar thermal (hot water, steam, drying,

dehumidification) systems at institutions and

industries to lower or eliminate the need for

fossil fuels;

6.2.2. Solar water pumps, water purification systems

and milk pasteurization plants;

6.2.3. Solar energy for cottage industries.

7.0. Sustainable Habitats and Buildings:

7.1. Solar passive building principle and technology

will be encouraged through legislative measures.

7.2. Solar cities will be developed in the Union

territory of Puducherry.

7.3. The Town and Country Planning Department in

collaboration with local bodies shall amend

their bye-laws with due mandatory provisions

for solar water heating facilities in residential

and commercial buildings.

7.4. All public buildings will be mandated to meet

their energy requirements increasingly from

solar energy.

8.0. Land for Solar Energy Projects:

8.1. An inventory of surplus and unused land

available with Public Sector Undertakings, the

Union Territory of Puducherry Government,

Urban and Local Bodies and Gram Panchayats

will be undertaken region-wise by the Revenue

129

1 March 2016]

LA GAZETTE DE L’ETAT

Department to identify lands for solar energy

generation projects and the manufacture of

renewable energy equipment.

8.2. The Government will make such identified lands

available to the private sector through appropriate

mechanism, such as long-term lease, etc.

8.3. The Government will either install solar power

plants on all public buildings or rent, the roofs

of these buildings to parties interested in

investing in solar rooftop systems and selling

solar electricity to the EDP or other distribution

licensee.

9.0. Solar Energy Projects Implementation Facilitation

and Incentives:

9.1.

Renewable Enery\Agency, Puducherry will

facilitate the development of Solar Energy

Projects in various modes including public,

private, public-private partnership, build-own-

operate-transfer (BOOT) modes on lands that

have been provided with the requisite

infrastructure for the development of Solar

Energy Projects.

9.2. Statutory clearances that may be required for

the development and commissioning of Solar

Energy Projects will be facilitated by the

Renewable Energy Agency, Puducherry with

the concerned Government departments

and agencies through a single window and

time-bound process.

9.3. Generation of electricity from solar energy

sources with gross solar energy feed-in and

metering will be treated as an industry under

the provisions of the industrial policy and

incentives available to industrial units under

such schemes will also be extended to all Solar

Energy Power Projects.

9.4. Prosumers will be exempted from demand cuts,

power cuts and other restrictions and controls

provided that a minimum percentage of their

annual energy consumption is generated from

their solar energy system. Such minimum solar

energy generation percentages will be determined

by the Government of Puducherry for each year

in relation to the REPO (Renewable Energy

Purchase Obligation) targets fixed by the JERC.

9.5. Renewable Energy Agency, Puducherry will

facilitate and expedite access to various

concessions and incentives provided by the

Ministry of New And Renewable Energy,

Government of India including capital cost

subsidies, where applicable.

9.6. Financing of solar energy projects is expected

to be mainly from the private sector. However,

the Government of the Union territory of

Puducherry may consider providing incentives

for private sector investments in solar energy

which may take the form of sales tax

reductions, soft loans or other modalities.

9.7. Renewable Energy Agency, Puducherry will

provide project development and technical

advice and assistance to Government departments

and agencies for the implementation of Solar

Energy Projects.

9.8. Renewable Energy Agency, Puducherry will

undertake quarterly review of progress of Solar

Energy

Projects under development and

facilitate speedy clearances and approvals if

necessary.

9.9.

Solar energy equipments will be exempted from

VAT (Value Added Tax) for a period of five

years as may be notified by the Government of

Puducherry.

10.0. Grid Connectivity:

10.1. EDP or other distribution licensee and

Renewable Energy Agency, Puducherry will

jointly undertake the survey of LV, HV and EHV

substations and required transmission and

distribution lines necessary for the Solar

Energy Projects.

10.2. EDP or other distribution licensee will

undertake the augmentation of distribution and

transmission lines, cables and other infrastructure

as required. The cost of any augmentation

required after the interconnection point of the

solar power system with the service connection

(in the case of net-metering) or feed-in point

with the grid of EDP or other distribution

licensee shall be borne by EDP or the concerned

distribution licensee.

10.3. The Government will undertake to develop and

maintain sufficient grid capacity for the

evacuation, distribution and consumption of

solar energy and will ensure to be ahead of

solar energy development in this regard.

10.4. All solar energy generated and delivered to the

Puducherry Electricity Grid will be purchased

by EDP or other distribution licensee at feed-

in tariffs fixed by the JERC or credited in the

case of solar net-metering.

130

LA GAZETTE DE L’ETAT

[1 March 2016

10.5. All solar energy prosumers and producers will

be given open access to the Puducherry

Electricity Grid for the sales of energy to EDP

and sales to other distribution licensees and

third parties. Grid access will be provided at all

voltage levels.

10.6. Solar energy will be exempted from grid

connectivity, open access, wheeling and banking,

and cross-subsidy charges.

10.7. Solar energy can be wheeled and banked as per

the JERC regulations.

10.8. All grid-connected solar PV systems shall be

treated as "Must-Run" power plants and shall

not be subjected to merit order despatch

principles.

10.9. From April 2016 onwards, all new service

connection meters in the Puducherry Union

Territory shall be configured for bidirectional

energy recording and display, so that all new

service connections and existing service

connections for which the meters are replaced

in the normal course of maintenance are ready

for effecting solar energy net-metering at any

time in the future.

11.0. Solar Energy Agreements:

11.1. Prosumers and solar energy producers who opt

for the solar energy gross metering facility will

enter into a Solar Power Purchase Agreement

(the "SPPA") with EDP, another distribution

licensee or a third party as the case may be.

The payment obligations of EDP or other

distribution licensee under the SPPA shall be

covered by an irrevocable revolving letter of

credit for the duration of the SPPA to ensure

timely payment for the purchase of solar energy

from the prosumer or producer.

11.2. Prosumers who opt for the solar net-metering

facility will enter into a Solar Energy (Group /

Virtual) Net-Metering Agreement with EDP or

other distribution licensee.

11.3. Prosumers and solar energy producers who opt

for the wheeling and banking facility will enter

into a Solar Energy Wheeling and Banking

Agreement with EDP or other distribution

licensee.

11.4. All transactions between the EDP or other

distribution

licensees

and

solar

energy

producers involving sale of power will be as per

the guidelines of JERC.

12.0. Skill Development, Training and Awareness

Programs:

12.1. Renewable Energy Agency, Puducherry will

work with educational institutions and skill

development agencies to develop and implement

solar energy related skill development programs.

12.2. Renewable Energy Agency, Puducherry will

organize periodical solar energy installation and

maintenance training programs for electrical

contractors, electricians and installers.

12.3. Renewable Energy Agency, Puducherry will

undertake publicity and awareness programs,

workshops and exhibitions to promote and

popularise energy efficiency and energy

conservation measures and the use of renewable

energy sources.

13.0. Monitoring and Coordination:

13.1. An

Inter-Departmental

Monitoring and

Coordination Committee for new and renewable

energy sources, including solar energy

(the "Renewable Energy Committee") shall be

constituted by the Government for monitoring

the implementation of this policy and to ensure

that policy objectives and targets are achieved.

14.0. Miscellaneous:

14.1. The Government of Puducherry will have powers

to amend / relax / interpret any of the provisions

under this policy.

14.2. The provisions of this policy are subject to

regulations, tariffs and guidelines of the JERC

as issued from time to time.

————

GOVERNMENT OF PUDUCHERRY

HOME DEPARTMENT

(G.O. Ms. No. 08, dated 20th February 2016)

NOTIFICATION

The Lieutenant-Governor, Puducherry is pleased to declare

Local Holiday on 22nd February 2016 (Monday) for all

Government Offices and Institutions in Karaikal District

on account of Mahamaham festival at Kumbakonam, which

will not be a holiday under the Negotiable Instruments

Act, 1881. Saturday the 27th February 2016 will be a working

day in Karaikal region in lieu thereof

(By order)

YASAM LAKSHMI NARAYANA REDDY,

Additional Secretary to Government.

131

1 March 2016]

LA GAZETTE DE L’ETAT

GOVERNMENT OF PUDUCHERRY

LABOUR DEPARTMENT

(G.O. Rt. No. 11/Lab./AIL/2016, dated 22nd February 2016)

NOTIFICATION

Whereas, the Lieutenant-Governor, Puducherry has by notification vide G.O. Ms. No. 9/95/Lab., dated 7-4-1995

under sub-section (1) of section 52 of the Puducherry Shops and Establishments Act, 1964 authorized the Secretary

to Government, Labour Department, Puducherry to exercise the powers of the Government under section 6 of the said

Act relating to exemption;

And whereas, the Chambre De Commerce, Pondicherry Cloth Merchants Association and Puducherry Book

Sellers, Stationers and Note Books Manufacturers Association, Puducherry have applied for grant of exemption to

Shops and Establishments in Puducherry region to keep them open beyond the working hours and on weekly holidays

from certain provisions of the said Act on account of important festivals viz., Tamil New Year, Atchaya Thridhiyei,

Opening of Educational Institutions, Ramzan, Aadi discount sales, Vinayaga Chathurthi, Bakrid, Ayudha Pooja,

Deepavali, Christmas and Pongal, etc.;

Now, therefore, in exercise of the powers conferred by section 6 of the said Act, the Secretary to Government,

Labour Department, hereby exempt all Shops and Establishments in Puducherry region from the application of the

provisions of the sections 10(1),12(1), 12(2), 13,14(1), 14(2), 16(1), 17(1), 17(2), 18 and 19 of the said Act, to keep them

open beyond the working hours and on weekly holidays during the under mentioned festivals period, subject to the

following conditions:-

Sl.

Name of the festival

Period of exemption sought

No of days

No.

(1)

(2)

(3)

(4)

1

Tamil New Year

8-4-2016

to

14-4-2016

7 days

2.

Atchaya Thridhiyei

2-5-2016

to

9-5-2016

7 days

3

Re-opening of Schools (only for tailors, cloth merchants,

footwear, book shops and stationery shops).

19-5-2016 to

15-6-2016

28 days

4

Ramzan

4-7-2016

to

6-7-2016

3 days

5

Aadi discount sales

18-7-2016 to 14-8-2016

28 days

6

Vinayaga Chathurthi and Bakrid

1-9-2016

to 13-9-2016

13 days

7

Ayudha Pooja and Deepavali

3-10-2016 to 29-10-2016

27 days

8

Christmas and Pongal

20-12-2016 to 17-1-2017

29 days

1. Every person shall be paid overtime wages at twice the ordinary rate of wages for the period of work

done by him in excess of 8 hours in a day or 48 hours in a week.

2. The total hours of work of each worker including overtime shall not exceed 10 hours including one hour

of rest in any day or 54 hours in a week.

3. Each shop/establishment should file a return at the end of each of spell exemption specifying the number

of workmen engaged beyond normal working hours and on their weekly holiday and enclosing proof for payment

of extra wages for the hours/days so employed.

(By order)

R. DJEACOUMAR,

Under Secretary to Government (Labour).

132

LA GAZETTE DE L’ETAT

[1 March 2016

GOVERNMENT OF PUDUCHERRY

TRANSPORT SECRETARIAT

(G.O. Ms. No. 28, dated 22nd February 2016)

NOTIFICATION

Whereas, the Equity shares and Board of Directors for the Puducherry Urban Transport Agency (PUTA)

for Operating, Monitoring and Managing Urban Transport Services was notified vide the G. O. Ms. No. 21,

dated 21-2-2014 of the Transport Secretariat, Puducherry and G. O. Ms. No. 14, dated 1-6-2015 of the Transport

Secretariat, Puducherry. The Lieutenant-Governor is pleased to approve the revised proposal of Board of Members/

Directors and Equity shares for the proposed Puducherry Urban Transport Agency Limited with the following

constitution :-

Sl.

Member

Designation

Equity share

No.

(1)

(2)

(3)

(4)

1

The Chief Secretary to Government, Puducherry.

Chairman

1,600

2

The Secretary, Local Administration Department, Puducherry.

Managing

1,400

Director

3

The Director, Local Administration Department, Puducherry.

Director

1,400

4

The Chief Town Planner, Town and Country Planning Department,

Director

1,400

Puducherry.

5

The Commissioner, Puducherry Municipality, Puducherry.

Director

1,400

6

The Commissioner, Oulgaret Municipality, Puducherry.

Director

1,400

7

The Transport Planner, Transport Department, Puducherry.

Director

1,400

2. The Transport Planner, Transport Department, Puducherry will be the full-time Director for the Puducherry

Urban Transport Agency Limited and it will be Head Quartered in the Office of the Transport Department, Puducherry

located at 100 Feet Road, Ozhandhaikeerapalayam, Puducherry–605 004.

3. This issues with the concurrence of the Finance Department vide U.O. No. 2920/F.5/A1/15-16,

dated 18-12-2015.

(By order of the Lieutenant-Governor)

D. SUBRAMANIESWA RAO,

Under Secretary to Government (Transport).

GOVERNMENT OF PUDUCHERRY

USMAN GOVERNMENT HIGH SCHOOL

CHALAKKARA

Mahe, the 10th February 2016.

TENDER NOTICE

Sealed tenders are invited offering the rate for

purchase of unserviceable furniture items mentioned

in the Annexure belongs to Usman Government

High School, Chalakkara, Mahe.

2. The tenders in a sealed cover superscribing as

“Tender for the purchase of unserviceable items” should

be addressed to the Headmaster, Usman Government

High School, Chalakkara, Mahe, so as to reach this

office on or before 14-3-2016 at 10.00 a.m.

3. The tenders will be opened at 11.30 a.m. on the

same day in the presence of tenderers, if any. Tender

will be awarded to the highest tenderer on the spot.

4. Those who are interested to participate in the

tender must deposit an earnest money deposit of

` 100 (Rupees one hundred only). The earnest money