[1041]

GOVERNMENT OF PUDUCHERRY

CHIEF SECRETARIAT (HOUSING)

(G. O. Ms. No. 15/2017-Hg., Puducherry, dated 20th July 2017)

NOTIFICATION

In exercise of the powers conferred by section 47 of the

Puducherry Town and Country Planning Act, 1969 (No. 13 of 1970), the

Lieutenant-Governor, Puducherry in consultation with the Town and

Country Planning Department, hereby makes the following amendment

to the Puducherry Building Bye-Laws and Zoning Regulations, 2012

issued in the notification vide G. O. Ms. No. 5/2012- Hg., dated



La Gazette de L' État de Poudouchéry

The Gazette of Puducherry

PART - II



EXTRAORDINAIRE

EXTRAORDINARY



Publiée par

Published by



Autorité

Authority

` 11-00

Prix : ` 11-00

Price : ` 11-00

Registered with the Registrar

of Newspapers for India

under No. 10410

Registered No.

SSP/PY/44/2015-17

WPP No. TN/PMG(CCR)/

WPP-88/2015-17

Dated : 1-8-2017

Price : ` 11-00





2017 } | 27 {

No.

49 Poudouchéry Mardi

1

Août

2017

No.

Puducherry

Tuesday

1st

August

2017

( 10 Sravana 1939 )

1042

LA GAZETTE DE L'ETAT

[PART–II

5th March, 2012 of the Chief Secretariat (Housing), Government of

Puducherry and published in the Part-I of Extraordinary Official Gazette

No. 21, dated 8th March, 2012 namely:-

(1) These Bye-laws and Regulations may be called the Puducherry

Building Bye-Laws and Zoning Regulations (Amendment), 2017.

(2) The provisions of these bye-laws and zoning regulations shall

apply to the planning area declared vide:-

(i) G. O. Ms. No. 79/84/F6, dated 17th August 1984, notified

in the Gazette No. 35, dated 28th August 1984;

(ii) G.O. Ms. No. 93/85/F6, dated 8th July 1985, notified in the

Gazette No. 31, dated 30th July 1985; and

(iii) G.O. Ms. No. 68/89/F6, dated 26th July 1989, notified in

the Gazette No. 83, dated 31st July 1989 of Housing Secretariat,

Puducherry and such other areas in the Union territory of Puducherry

notified from time to time.

(3) They shall come into force on and from the date of their

publication in the Official Gazette.

In the Puducherry Building Bye-laws and Zoning Regulations, 2012

after Annexure-XXI, the following Annexure-XXII shall be inserted,

"ANNEXURE- XXII

1. INTEGRATION OF ENVIRONMENTAL CONDITION IN

SANCTION OF BUILDING PLANS

(1.1) The environmental conditions to be integrated with building

permission being granted by the Planning Authority concerned and the

construction of buildings as per the size, shall adhere to the objectives

and monitorable environmental conditions are given in the Table-1, Table-2

and Table-3.

(1.2) For building plans with a total Built-up Area (BUA) between

5,000 Sq.m. and 1,50,000 Sq.m. no separate environment clearance will

be required from the Ministry of Environment, Forest and Climate

Change (MoEF&CC)for individual buildings provided that the

incorporating different set of environmental conditions are being

integrated in the building permission conditions to address environmental

concerns making it legally enforceable.

1043

PART–II]

LA GAZETTE DE L'ETAT

(1.3) As per the final notification vide No. S.O. 3999 (E), dated

9-12-2016 of the Ministry of Environment, Forest and Climate Change

(MoEF&CC), Government of India, the concerned Planning Authority,

which is authorized to sanction building plans, shall ensure at the time

of sanctioning a building plan that the environmental requirements

stipulated in Table-1 (for BUA above 5,000 Sq.m. and upto 20,000

Sq.m.), Table-2 (for BUA above 20,000 Sq.m. and up to 50,000 Sq.m.)

and Table-3 (for BUA above 50,000 Sq.m. and upto 1,50,000 Sq.m.),

as the case may be, are complied with.

(1.4) The Planning

Authority concerned may certify the

compliance of the environmental conditions prior to issuance of

Completion Certificate, as applicable as per the requirements stipulated

for such buildings based on the recommendation of the Environmental

Cell constituted in the Planning Authority.

(1.5) In order to implement the integration of environmental

condition in building Bye-laws, the Planning Authority concerned may

constitute the Environment Cell (herein after called as Cell), for

compliance and monitoring and to ensure environmental planning within

their jurisdiction.

(1.6) For the purpose of certification regarding incorporation of

environmental conditions in buildings, the Ministry of Environment,

Forest and Climate Change (MoEF&CC) shall accredit the Qualified

Building Environment Auditors (QBEAs) through a qualified agencies to

assess and certify the building projects, as per the requirements of this

notification and the procedure for accreditation of Qualified Building

Auditors and their role as given at Appendix-I.

(1.7) The Cell shall monitor the implementation of the bye-laws

and rules framed for Integration of environmental conditions for

construction of building and the Cell may also allow the third

part auditing process for oversight, if any.

(1.8) The Cell shall function under the administrative control of

the Planning Authorities.

(1.9) The composition and functions of the Cell are given at

Appendix-II.

1044

LA GAZETTE DE L'ETAT

[PART–II

(1.10) The Planning Authorities while integrating the environmental

concerns in the building bye-laws, as per their size of the project, shall

follow the procedure, as given below:

BUILDINGS CATEGORY '1' (5,000 to < 20,000 Square meters)

A Self declaration Form to comply with the environmental

conditions (Table-1) along with Form 1A and certification by the

Qualified Building Environment Auditor to be submitted online by the

project proponent besides application for building permission to the

Planning Authority along with the specified fee in separate accounts.

Thereafter, the Planning Authority may issue the building permission

incorporating the environmental conditions in it and allow the project

to start based on the self declaration and certification along with the

application. After completion of the construction of the building, the

project proponent may update Form 1A online based on audit done by

the Qualified Building Environment Auditor and shall furnish the revised

compliance undertaking to the Planning Authority. Any non-compliance

issues in buildings less than 20,000 square meters shall be dealt at the

level of Planning Authority through existing mechanism.

OTHER BUILDINGS CATEGORIES (> 20,000 Square meters)

The project proponent may submit online application in Form 1A

along with specified fee for environmental appraisal and additional fee

for building permission. The fee for environmental appraisal will be

deposited in a separate account. The Environment Cell will process the

application and present it in the meeting of the Committee headed by

the authority competent to give building permission in that Planning

Authority. The Committee will appraise the project and stipulate the

environmental conditions to be integrated in the building permission.

After recommendations of the Committee, the building permission and

environmental clearance will be issued in an integrated format by the

Planning Authority.

The project proponent shall submit Performance Data and

Certificate of Continued Compliance of the project for the environmental

conditions parameters applicable after completion of construction from

Qualified Building Environment Auditors every five years to the

Environment Cell with special focus on the following parameters:-

1045

PART–II]

LA GAZETTE DE L'ETAT

(a) Energy Use (including all energy sources).

(b) Energy generated on site from onsite Renewable energy

sources.

(c) Water use and waste water generated, treated and reused on site.

(d) Waste Segregated and Treated on site.

(e) Tree plantation and maintenance.

After completion of the project, the Cell shall randomly check the

projects compliance status including the five years audit report.

The State Governments may enact the suitable law for imposing penalties

for non-compliances of the environmental conditions and parameters.

The Cell shall recommend financial penalty, as applicable under relevant

State laws for non-compliance of conditions or parameters to the Planning

Authority. On the basis of the recommendation of the Cell, the Planning

Authority may impose the penalty under relevant State laws. The cases

of false declaration or certification shall be reported to the

accreditation body and to the local body for blacklisting of Qualified

Building Environment Auditors and financial penalty on the owner and

Qualified Building Environment Auditors.

No Consent to Establish and Operate under the Water (Prevention

and Control of Pollution) Act, 1974 and the Air (Prevention and Control

of Pollution) Act, 1981 will be required from the State Pollution

Control Boards for residential buildings up to 1,50,000 square meters.";

CLASSIFICATION/TYPE OF BUILDINGS :

Building/Construction projects/Area Development projects and

Townships

(1)

(2)

(3)

(4)

(5)

1 (a) Building

> 20,000

The term "built up area" for

and

sq.mtrs. and t h e

p u r p o s e

o f

t h i s

Construction

1,50,000

notification is the built up

projects.

sq.mtrs.

or covered area on all floors

of built

put together including its

up area.

basement and other service

areas, which are proposed

1046

LA GAZETTE DE L'ETAT

[PART–II

in

the buildings and

construction projects.

Note 1. The projects or

activities shall not include

industrial shed, universities,

college,

hostel

for

educational

institutions,

but such buildings shall

e n s u r e

s u s t a i n a b l e

environmental management,

solid

and

liquid

and

implement environmental

conditions given at Table-1,

Table-2 and Table-3.

Note 2. General condition

shall not apply.

Note 3. The exemptions

granted at Note 1 will be

available only for industrial

shed after integration of

environmental norms with

building permissions at

the level of local authority.

2 (b) Townships

> 3,00,000

> 1,50,000 Note.-General Condition

and area

sq.mtrs.

sq.mtrs.

shall not apply.

development of built up

and <

projects.

area or

3,00,000

sq.mtrs.

built up

area or

covering

covering

an area

an area

> 150 ha.

> 50 ha.

and < 150 ha.

1)

(2)

(3)

(4)

(5)

1047

PART–II]

LA GAZETTE DE L'ETAT

TABLE-1

ENVIRONMENTAL CONDITIONS FOR BUILDINGS AND

CONSTRUCTIONS

(Category '1' : 5,000 to less than 20,000 square meters)

Medium

Sl.

Environmental conditions

No.

(1)

(2)

(3)

Topography

1 (a)

The natural drain system should be

and

maintained for ensuring unrestricted

Natural

flow of water. No construction shall be

Drainage

allowed to obstruct the naturaldrainage

through the site. No construction is

allowed on wetland and water bodies.

Check dams, bio-swales, landscape, and

other sustainable urban drainage systems

(SUDS) are allowed for maintaining the

drainage pattern and to harvest rain water.

Water

2

Use of water efficient appliances shall be

conservation

promoted. The provision for rainwater

Rain water

conservation as in annexure-VII (A) of

Harvesting,

the Puducherry Building Bye-Laws and

and Ground

Zoning Regulations, 2012 should be

water recharge.

followed.

A rain water harvesting plan needs to be

designed where the recharge bores

(minimum one recharge bore per 5,000

square meters of built up area) is

recommended. Storage and reuse of the

rain water harvested should be promoted.

In areas where ground water recharge is

not feasible, the rain water should be

harvested and stored for reuse. The

ground water shall not be withdrawn

without approval from the Competent

Authority.

All recharge should be limited to shallow

aquifer.

1048

LA GAZETTE DE L'ETAT

[PART–II

2(a)

At least 20% of the open spaces as

required by the local building bye-laws

shall be pervious. Use of Grass pavers,

paver blocks with at least 50% opening,

landscape etc. would be considered as

pervious surface.

Waste

3

Solid waste: Separate wet and dry bins

management

must be provided in each unit and at the

ground level for facilitating segregation

of waste.

Sewage: In areas where there is no

municipal sewage network, onsite treatment

systems should be installed. Natural

treatment systems which integrate with

the landscape shall be promoted. As far

as possible treated effluent should be

reused. The excess treated effluent shall

be discharged following the CPCB norms.

Sludge from the onsite sewage treatment,

including septic tanks, shall be collected,

conveyed and disposed as per the

Ministry of Urban Development, Central

Public Health and Environmental

Engineering Organisation (CPHEEO)

Manual

on

Sewerage

and

Sewage

Treatment Systems, 2013.

The provisions of the Solid Waste

(Management) Rules 2016 and the

e-waste (Management) Rules 2016,

and the Plastics Waste (Management)

Rules 2016 shall be followed.

Energy

4

Compliance with the Energy Conservation

Building Code (ECBC) of Bureau of

Energy Efficiency shall be ensured as

(1)

(2)

(3)

1049

PART–II]

LA GAZETTE DE L'ETAT

per the provisions under chapter-IV of

clause 68, Energy Conservation Buildings

of the Puducherry Building Byelaws and

Zoning Regulations, 2012.

Outdoor and common area lighting shall

be Light Emitting Diode (LED).

Energy

4

Solar, wind or other Renewable Energy

shall be installed to meet electricity

generation as per the provisions under

chapter-IV

of

clause

68,

Energy

Conservation Buildings of the Building

Bye-laws and Zoning Regulations, 2012.

Solar water heating system shall be

provided as per the provisions under

Chapter-IV

of

clause

68,

Energy

Conservation Buildings and as in the

Annexure-XVIII of

the Puducherry

Building

Byelaws

and

Zoning

Regulations, 2012 to meet the hot water

demand of the commercial and institutional

building. Residential buildings are also

recommended to meet its hot water

demand from solar water heaters, as far

as possible.

Concept of passive solar design that

minimize

energy consumption

in

buildings by using design elements, such

as building orientation, landscaping,

efficient building envelope, appropriate

fenestration, increased day lighting

design and thermal mass etc. shall be

incorporated in the building design.

Wall, window, and roof u-values shall be

as per ECBC specifications.

(1)

(2)

(3)

1050

LA GAZETTE DE L'ETAT

[PART–II

Air quality

5

Dust, smoke and other air pollution

and noise

prevention measures shall be provided

for the building as well as the site. These

measures shall include screens for the

building under construction, continuous

dust/ wind breaking walls all around the site

(at least 3 meter height). Plastic/tarpaulin

sheet covers shall be provided for vehicles

bringing in sand, cement, murram and other

construction materials prone to causing

dust pollution at the site as well as taking

out debris from the site.

Sand, murram, loose soil, cement, stored on

site shall be covered adequately so as to

prevent dust pollution.

Wet jet shall be provided for grinding and

stone cutting. Unpaved surfaces and loose

soil shall be adequately sprinkled with water

to suppress dust.

All construction and demolition debris shall

be stored at the site (and not dumped on the

roads or open spaces outside) before they

are properly disposed. All demolition and

construction waste shall be managed as per

the provisions of the Construction and

Demolition Waste Rules 2016. All workers

working at the construction site and

involved in loading, unloading, carriage of

construction material and construction

debris or working in any area with dust

pollution shall be provided with dust mask.

For indoor air quality the ventilation

provisions as per National Building Code of

India shall be made.

(1)

(2)

(3)

1051

PART–II]

LA GAZETTE DE L'ETAT

5 (a)

The location of the DG set and exhaust pipe

height shall be as per the provisions of the

CPCB norms.

Green cover

6

A minimum of 1 tree for every 80 square

meters of land should be planted and

maintained. The existing trees will be

counted for this purpose. Preference should

be given to planting native species.

6 (a)

Where

the

trees

need

to

be

cut,

compensatory plantation in the ratio of

1:3 (i.e., planting of 3 trees for every 1 tree

that is cut) shall be done and maintained.

TABLE-2

ENVIRONMENTAL CONDITIONS FOR BUILDINGS AND

CONSTRUCTIONS

(Category '2' : 20,000 to less than 50,000 square meters)

Medium

Sl.

Environmental conditions

No.

(1)

(2)

(3)

Topography

1

The natural drain system should be

and

maintained for ensuring unrestricted

Natural

flow of water. No construction shall be

Drainage

allowed to obstruct the natural drainage

through the site. No construction is

allowed on wetland and water bodies.

Check dams, bio- swales, landscape, and

other sustainable urban drainage systems

(SUDS) are allowed for maintaining the

drainage pattern and to harvest rain water.

Buildings shall be designed to follow the

natural topography as much as possible.

Minimum cutting and filling should be

done.

(1)

(2)

(3)

1052

LA GAZETTE DE L'ETAT

[PART–II

Water

2

A c o m p l e t e p l a n f o r r a i n w a t e r

conservation

harvesting, water efficiency and

Rain water

conservation should be prepared.

Harvesting,

Use of water efficient appliances

and Ground

should be promoted with low flow

water recharge.

fixtures or sensors.

Use of water efficient appliances shall

be promoted. The provision for rainwater

conservation as in annexure- VII (A) of

the Puducherry Building Bye-Laws and

Zoning Regulations, 2012 should be

followed.

A rain water harvesting plan needs to

be designed where the recharge bores

of minimum one recharge bore per

5,000 square meters of built up area and

storage capacity of minimum one day of

total fresh water requirement shall be

provided. In areas where ground water

recharge is not feasible, the rain water

should be harvested and stored for reuse.

The ground water shall not be withdrawn

without approval from the Competent

Authority.

All recharge should be limited to shallow

aquifer.

2 (a)

At least 20% of the open spaces as

required by the Building Bye-laws shall

be pervious. Use of Grass pavers, paver

blocks with at least 50% opening,

landscape etc. would be considered as

pervious surface.

Waste

3

Solid waste: Separate wet and dry bins

management

must be provided in each unit and at the

ground level for facilitating segregation

of waste.

(1)

(2)

(3)

1053

PART–II]

LA GAZETTE DE L'ETAT

Sewage: Onsite sewage treatment of

capacity of treating 100% waste water

to be installed. Treated waste water shall

be

reused

on

site

for landscape,

flushing, cooling tower, and other end-

uses. Excess treated water shall be

discharged as per CPCB norms. Natural

treatment systems shall be promoted.

Sludge

from

the

onsite

sewage

treatment, including septic tanks, shall

be collected, conveyed and disposed as

per the Ministry of Urban Development,

Central Public Health and Environmental

Engineering Organisation (CPHEEO)

Manual

on

Sewerage

and

Sewage

Treatment Systems, 2013.

The provisions of the Solid Waste

(Management) Rules 2016 and the

e-waste (Management) Rules 2016, and

the Plastics Waste (Management) Rules

2016 shall be followed.

3 (a)

All non-biodegradable waste shall be

handed over to authorized recyclers for

which a written tie up must be done with

the authorized recyclers.

3 (b)

Organic waste composter/Vermiculture

pit with a minimum capacity of 0.3 kg./

tenement/day must be installed.

Energy

4

Co mp lia nce

with

the

Energy

Conservation Building Code (ECBC)

of Bureau of Energy Efficiency shall be

ensured as per the provisions under the

clause 68, Chapter-IV, Energy Conservation

Buildings of the Puducherry Building

Bye-laws and Zoning Regulations, 2012.

Outdoor and common area lighting shall

be LED.

(1)

(2)

(3)

1054

LA GAZETTE DE L'ETAT

[PART–II

Concept of passive solar design that

minimize energy consumption in

buildings by using design elements, such

as building orientation, landscaping,

efficient building envelope, appropriate

fenestration, increased day lighting

design and thermal mass etc. shall be

incorporated in the building design.

Wall, window, and roof u-values shall be

as per ECBC specifications.

4 (a)

Solar, wind or other Renewable

Energy shall be installed to meet

electricity generation as per the provisions

under the clause 68, chapter-IV, Energy

Conservation Buildings of the Puducherry

Building

Bye-laws

and

Zoning

Regulations, 2012.

4 (b)

Solar water heating system shall be

provided as per the provisions under the

clause 68, chapter-IV, Energy Conservation

Buildings and as in the Annexure-XVIII of

the Puducherry Building Bye-laws and

Zoning Regulations, 2012 to meet the

hot water demand of the commercial and

institutional building. Residential buildings

are also recommended to meet its hot

water demand from solar water heaters,

as far as possible.

4 (c)

Use of environment friendly materials

in bricks, blocks and other construction

materials, shall be required for at least

20%

of

the

construction

material

quantity. These include fly ash bricks,

hollow bricks, AACs, Fly Ash Lime

Gypsum blocks, Compressed earth

blocks, and other environment friendly

materials.

(1)

(2)

(3)

1055

PART–II]

LA GAZETTE DE L'ETAT

Fly ash should be used as building

material in the construction as per the

provisions of the Fly Ash Notification of

September, 1999 as amended from time

to time.

Air quality

5

Dust, smoke and other air pollution

and noise

prevention measures shall be provided

for the building as well as the site.

These measures shall include screens for

the building under construction, continuous

dust/ wind breaking walls all around the

site (at least 3 meter height). Plastic/

tarpaulin sheet covers shall be provided

for vehicles bringing in sand, cement,

murram and other construction materials

prone to causing dust pollution at the

site as well as taking out debris from the

site.

Sand, murram, loose soil, cement, stored

on site shall be covered adequately so as

to prevent dust pollution.

Wet jet shall be provided for grinding and

stone cutting. Unpaved surfaces and

loose soil shall be adequately sprinkled

with water to suppress dust.

All construction and demolition debris

shall be stored at the site (and not

dumped on the roads or open spaces

outside)

before

they

are

properly

disposed. All demolition and construction

waste shall be managed as per the

provisions of the Construction and

Demolition Waste Rules 2016.

(1)

(2)

(3)

1056

LA GAZETTE DE L'ETAT

[PART–II

All workers working at the construction

site and involved in loading, unloading,

carriage of construction material and

construction debris or working in any

area with dust pollution shall be provided

with dust mask.

For indoor air quality the ventilation

provisions as per National Building Code

of India.

5 (a)

The location of the DG set and exhaust

pipe height shall be as per the provisions

of the CPCB norms.

Green cover

6

A minimum of 1 tree for every 80 sq.mt.

of land should be planted and maintained.

The existing trees will be counted for this

purpose. Preference should be given to

planting native species.

6 (a)

Where the trees need to be cut,

compensatory plantation in the ratio of

1:3 (i.e. planting of 3 trees for every

1 tree that is cut) shall be done and

maintained.

Top soil

7

Top soil should be stripped to a depth of

preservation

20 cm. from the areas proposed for

and reuse

buildings, roads, paved areas, and external

services.

It should be stockpiled appropriately in

designated areas and reapplied during

plantation of the proposed vegetation on

site.

Transport

8

A comprehensive mobility plan, as per

MoUD

best

practices

guidelines

(URDPFI), shall be prepared to include

motorized, non-motorized, public, and

private networks.

(1)

(2)

(3)

1057

PART–II]

LA GAZETTE DE L'ETAT

Road should be designed with due

consideration for environment, and

safety of users. The road system can be

designed with these basic criteria.

1. Hierarchy of roads with proper

segregation

of

vehicular

and

pedestrian traffic.

2. Traffic calming measures.

3. Proper design of entry and exit

points.

4. Parking norms as per local regulation.

TABLE-3

ENVIRONMENTAL CONDITIONS FOR BUILDINGS AND

CONSTRUCTIONS

(Category '3' : 50,000 to less than 1,50,000 square meters)

Medium

Sl.

Environmental conditions

No.

(1)

(2)

(3)

Topography

1

The natural drain system should be

and

maintained for ensuring unrestricted

Natural

flow of water. No construction shall be

Drainage

allowed to obstruct the natural drainage

through the site. No construction is

allowed on wetland and water bodies.

Check dams, bio-swales, landscape, and

other sustainable urban drainage systems

(SUDS) are allowed for maintaining the

drainage pattern and to harvest rain water.

Buildings shall be designed to follow the

natural topography as much as possible.

Minimum cutting and filling should be

done.

(1)

(2)

(3)

1058

LA GAZETTE DE L'ETAT

[PART–II

Water

2

A complete plan for rain water harvesting,

conservation

water efficiency and conservation should

Rain water

be prepared.

Harvesting,

The provision for rainwater conservation

and Ground

as in annexure- VII (A) of the Puducherry

water recharge.

Building Bye-Laws and Zoning Regulations,

2012 should be followed.

A rain water harvesting plan needs to

be designed where the recharge bores

of minimum one recharge bore per 5,000

square meters of built up area and

storage capacity of minimum one day of

total fresh water requirement shall be

provided. In areas where ground water

recharge is not feasible, the rain water

should be harvested and stored for reuse.

The ground water shall not be withdrawn

without approval from the Competent

Authority.

All recharge should be limited to shallow

aquifer.

2 (a)

At least 20% of the open spaces as

required by the local building bye-laws

shall be pervious. Use of Grass pavers,

paver blocks with at least 50% opening,

landscape etc. would be considered as

pervious surface.

2 (b)

Use of water efficient appliances should

be promoted. Low flow fixtures or

sensors be used to promote water

conservation.

2 (c)

Separation of grey and black water should

be done by the use of dual plumbing

system. In case of single stack system

separate recirculation lines for flushing

by giving dual plumbing system be done.

(1)

(2)

(3)

1059

PART–II]

LA GAZETTE DE L'ETAT

Solid

3

Solid waste: Separate wet and dry bins

waste

must be provided in each unit and at the

management

ground level for facilitating segregation

of waste.

The provisions of the Solid Waste

(Management) Rules 2016 and the

e-waste (Management) Rules 2016, and

the Plastics Waste (Management) Rules

2016 shall be followed.

3 (a)

All non-biodegradable waste shall be

handed over to authorized recyclers for

which a written tie up must be done with

the authorized recyclers.

3 (b)

Organic waste composter/Vermiculture

pit with a minimum capacity of 0.3 kg./

person/day must be installed.

Sewage

4

Onsite sewage treatment of capacity of

treatment

treating 100% waste water to be

Plant

installed. Treated waste water shall be

reused on site for landscape, flushing,

cooling tower, and other end-uses.

Excess treated water shall be discharged

as per CPCB norms. Natural treatment

systems shall be promoted.

Sludge

from

the

onsite

sewage

treatment, including septic tanks, shall

be collected, conveyed and disposed as

per the Ministry of Urban Development,

Central Public Health and Environmental

Engineering Organisation (CPHEEO)

Manual on Sewerage and Sewage Treatment

Systems, 2013.

(1)

(2)

(3)

1060

LA GAZETTE DE L'ETAT

[PART–II

Energy

5

Compliance with the Energy Conservation

Building Code (ECBC) of Bureau of

Energy Efficiency shall be ensured as

per the provisions under the clause 68,

Chapter-IV, Energy Conservation Buildings

of the Puducherry Building Byelaws and

Zoning Regulations, 2012.

Outdoor and common area lighting shall

be LED.

Concept of passive solar design that

minimize energy consumption in

buildings by using design elements, such

as building orientation, landscaping,

efficient building envelope, appropriate

fenestration, increased day lighting

design and thermal mass etc. shall be

incorporated in the building design.

Wall, window, and roof u-values shall be

as per ECBC specifications.

5 (a)

Solar, wind or other Renewable Energy

shall be installed to meet electricity

generation as per the provisions under

the clause 68, Chapter-IV, Energy

Conservation Buildings of the Puducherry

Building

Bye-laws

and

Zoning

Regulations, 2012.

5 (b)

Solar water heating system shall be

provided as per the provisions under the

clause 68, Chapter-IV, Energy Conservation

Buildings and as in the Annexure-XVIII of

the Puducherry Building Byelaws and

Zoning Regulations, 2012 to meet the

hot water demand of the commercial and

institutional building. Residential

(1)

(2)

(3)

1061

PART–II]

LA GAZETTE DE L'ETAT

buildings are also recommended to meet

its hot water demand from solar water

heaters, as far as possible.

5 (c)

Use of environment friendly materials

in bricks, blocks and other construction

materials, shall be required for at least

20% of the construction material quantity.

These include flyash bricks, hollow

bricks, AACs, Fly Ash Lime Gypsum

blocks, Compressed earth blocks, and

other environment friendly materials.

Fly ash should be used as building

material in the construction as per the

provisions of the Fly Ash Notification of

September, 1999 as amended from time

to time.

Air quality

6

Dust, smoke

and other air pollution

and noise

prevention measures shall be provided

for the building as well as the site. These

measures shall include screens for the

building under construction, continuous

dust/wind breaking walls all around the site

(at least 3 meter height). Plastic/tarpaulin

sheet covers shall be provided for vehicles

bringing in sand, cement, murram and other

construction materials prone to causing

dust pollution at the site as well as taking

out debris from the site. Wheel washing for

the vehicles used be done.

Sand, murram, loose soil, cement, stored

on site shall be covered adequately so as

to prevent dust pollution.

(1)

(2)

(3)

1062

LA GAZETTE DE L'ETAT

[PART–II

Wet jet shall be provided for grinding and

stone cutting. Unpaved surfaces and loose

soil shall be adequately sprinkled with

water to suppress dust.

All construction and demolition debris

shall be stored at the site (and not dumped

on the roads or open spaces outside)

before they are properly disposed. All

demolition and construction waste shall be

managed as per the provisions of the

Construction and Demolition Waste

Rules 2016.

All workers working at the construction

site and involved in loading, unloading,

carriage of construction material and

construction debris or working in any area

with dust pollution shall be provided with

dust mask.

For indoor air quality the ventilation

provisions as per National Building Code

of India.

6 (a)

The location of the DG set and exhaust

pipe height shall be as per the provisions

of the CPCB norms.

Green cover

7

A minimum of 1 tree for every 80 sq.mt.

of land should be planted and maintained.

The existing trees will be counted for

this purpose. Preference should be

given to planting native species.

7 (a)

Where the trees need to be cut,

compensatory plantation in the ratio

of 1:3 (i.e. planting of 3 trees for every

1 tree that is cut) shall be done and

maintained.

(1)

(2)

(3)

1063

PART–II]

LA GAZETTE DE L'ETAT

Top soil

8

Topsoil should be stripped to a depth of

preservation

20 cm. from the areas proposed for

and reuse

buildings, roads, paved areas, and external

services. It should be stockpiled

appropriately in designated areas and

reapplied during plantation of the

proposed vegetation on site.

Transport

9

A comprehensive mobility plan, as per

MoUD

best

practices

guidelines

(URDPFI), shall be prepared to include

motorized, non-motorized, public, and

private networks.

Road should be designed with due

consideration for environment, and

safety of users. The road system can be

designed with these basic criteria.

1. Hierarchy of roads with proper

segregation

of

vehicular

and

pedestrian traffic.

2. Traffic calming measures.

3. Proper design of entry and exit

points.

4. Parking norms as per local regulation.

Environment

10

An Environmental Management Plan

management

(EMP) shall be prepared and implemented

plan

to ensure compliance with the

environmental conditions specified in

item number 1 to 9 above. A dedicated

Environment

Monitoring

Cell

with

defined functions and responsibility

shall be put in place to implement the

EMP. The environmental cell shall ensure

that the environment infrastructure like

Sewage Treatment Plant, Landscaping,

Rain Water Harvesting, Energy efficiency

(1)

(2)

(3)

1064

LA GAZETTE DE L'ETAT

[PART–II

and conservation, water efficiency and

conservation, solid waste management,

renewable

energy

etc.

are

kept

operational and meet the required

standards. The environmental cell shall

also keep the record of environment

monitoring and those related to the

environment infrastructure.

APPENDIX-I

Accreditation of Environmental Auditors

(Qualified Building Auditors)

The Ministry of Environment, Forest and Climate Change

(MoEF&CC), through qualified agencies shall accredit the Qualified

Building Environment Auditors (QBEAs). The Qualified Building

Environment Auditors could be a firm / organization or an individual

expert, who fulfils the requirements. The Ministry will implement this

process of accreditation through Quality Council of India (QCI),

National Productivity Council or any other organization identified by

the Government. The organizations like Indian Green Building Council,

Bureau of Energy Efficiency etc. can also be associated in the process

of accreditation, training, and renewal. The environmental consultants

accredited by the QCI for building sector will be qualified as QBEAs.

The QBEAs will meet the following criteria. The accrediting agency

can improvise on these criteria.

Qualifications of the Auditor:

(a) Education: Architect (Degree or Diploma), Town Planners

(Degree), Civil Engineer /Mechanical Engineer (Degree or Diploma),

PG in Environmental Science or any other qualification as per the

scheme of the accreditation.

Training:

(b) Mandatory training to be given by the accreditation body or

their approved training providers. This will be as per the scheme of

the accreditation.

(1)

(2)

(3)

1065

PART–II]

LA GAZETTE DE L'ETAT

Experience:

(c)

At least 3 years of work experience in the related field

or building sector Environment Impact Assessment consultants

accredited by QCI or any other experience criteria as per the scheme

of the accreditation.

Infrastructure and equipment:

(d) As per the scheme of the accreditation

Renewal:

(e) The accreditation will be valid for 5 years and will be

renewed as per the process developed under the accreditation scheme.

Accountability/Complaint redressal mechanism: Any complaints

regarding the quality of the work of QBEAs shall be made to the

accreditation body. The accreditation body shall evaluate the complaint

and take appropriate action including black listing or cancellation of

the accreditation with wide public notice. This will be in addition to

the action at the level of planning authority for penalty and blacklisting.

The Ministry can also take such action in case of specific complaint

or feedback.

APPENDIX-II

Environmental Cell at the Level of Planning Authority:

An Environmental Cell shall be setup at the planning authority

level to support compliance and monitoring of environmental

conditions in buildings. The Cell shall also provide assistance in

environmental planning and capacity building within their jurisdiction.

The responsibility of this cell would be monitoring the

implementation of this notification and providing an oversight to

the Third-Party Auditing process. The cell will operate under the

planning authority.

Constitution of the cell:

The cell will comprise of at least 3 dedicated experts in following

fields:

(a) Waste management (solid and liquid)

(b) Water conservation and management

(c) Resource efficiency including Building materials

1066

LA GAZETTE DE L'ETAT

[PART–II

(d) Energy Efficiency and renewable energy

(e) Environmental planning including air quality management.

(f) Transport planning and management.

The Cell shall induct at least two outside experts as per the

requirements and background of dedicated experts. Existing

environmental cells at the level of planning authority can be co-opted

and trained for this Cell.

Financial Support:

An additional fee may be charged along with processing fee for

building permission for integrating environmental conditions and it's

monitoring. The planning authority can fix and revise this additional

fee from time to time. The amount of this fee shall be deposited in a

separate bank account, and used for meeting the requirement of salary /

emoluments of experts and running the system of online application,

verifications and the Environmental Cell.

Functions of the Cell:

(1) The cell shall be responsible for assessing and appraising the

environmental concerns of the area under their jurisdiction where

building activities are proposed. The Cell can evolve and propose

additional environmental conditions as per requirements. These

conditions may be area specific and shall be notified in advance from

time to time. These additional conditions shall be approved following

a due consultation process. These environmental conditions will be

integrated in building permissions by the sanctioning authority (i.e)

planning authority.

(2) Develop and maintain an online system for application and

payment of fees. The Cell shall maintain an online database of all

applications received, projects approved, the compliance audit report,

random inspections made. The Cell shall maintain a portal for public

disclosure of project details including self certification and

compliance audit reports filed by the Qualified Building Environment

Auditors for public scrutiny of compliance of environmental conditions

by the project.

(3) Monitoring the work of Environmental Audit process carried

by the Qualified Building Auditors.

1067

PART–II]

LA GAZETTE DE L'ETAT

(4) The Cell shall review the applications; finalize the additional

environmental conditions if required within 30 days of the submission

of the application to the planning authority.

(5) The Cell shall adopt risk based random selection of projects

for verifying on site for certification of QBA, compliance of

environmental conditions and five yearly audit report.

(6) The Cell shall recommend to the planning authority for

financial penalty for non-compliance of environmental conditions by

the project proponent.

(7) The Cell shall recommend to the accrediting body and

the planning authority against any Qualified Building Environment

Auditor, if any lapse is found in their work.

The selection process of Environmental consultants who are

willing to serve as Qualified Building Environment Auditors (QBEA)

shall be as per the procedures laid down in the notification issued by

the Ministry of Environment, Forest and Climate Change (MoEF&CC),

Government of India.

(By order of the Lieutenant-Governor)

S. THAMMU GANAPATHY,

Deputy Secretary to Government (Housing).

————