[ 1519 ]

GOVERNMENT OF PUDUCHERRY

INDUSTRIAL DEVELOPMENT (POWER) DEPARTMENT

(G.O. Ms. No. 33, Puducherry, dated 1st September 2023)

ORDER

The Electricity Department has stated vide I.D. Note No. 1165/ED/

SE/HoD/EHV/PLCC & Lines/F.RoW/2017-2018, dated 04-04-2018 of the

Superintending Engineer-cum-Head of Department, Electricity Department,

Puducherry, under the powers conferred in Electricity Act, 2003 and

Indian Telegraph Act, 1885, compensation is being paid only for the crop

damages while erection of towers and stringing of transmission lines

based on the rates assessed by the concerned Revenue Authorities for

Amflºƒˆ \VWÈ ∂´E>µ

La Gazette de L' État de Poudouchéry

The Gazette of Puducherry

PART - II

E≈©A ÿkπX|

EXTRAORDINAIRE

EXTRAORDINARY

∂]ÔV´D ÿ√u≈

Publiée par

Published by

ÿkπX|

Autorité

Authority

Registered with the Registrar

of Newspapers for India under

No. 10410

Registered No.

PY/44/2021-23

®ı

Amflºƒˆ

ÿƒÀkVF¬˛wÁ\ 2023 } ÿƒ©¶D√Ï |5 {

No. 69 Poudouchéry Mardi

5

Septembre

2023

No.

Puducherry

Tuesday

5th

September

2023

(14 Bhadra 1945)

1520

LA GAZETTE DE L'ETAT

[PART–II

the various type of crops damaged and various type of trees removed

which are essentially required to have adequate clearance as per the

Indian Electricity Rules, 1956 as detailed below:

Voltage Class

Ground

Sectional

Clearance

Clearance

(vertical)

(horizontal)

(1)

(2)

(3)

(4)

Not exceeding

66 KV

4.00 m

3.00 m

Not exceeding

132 KV

4.60 m

3.50 m

Not exceeding

220 KV

5.50 m

4.30 m

Not exceeding

400 KV

8.00 m

6.50 m

2. The Electricity Department has also stated that in the recent

past, the Department has been receiving demand for payment of

compensation for affected land due to laying of EHV lines. As there is

no provision for payment of compensation for the affected land, the land

owners are objecting to erect towers and to string transmission lines in

their land, due to which the execution of works relating to the

transmission line is getting delayed.

3. The Electricity Department has further stated that the Ministry

of Power, Government of India, had formulated Guidelines regarding the

payment of compensation for land towards damages in regard to Right

of Way for Transmission lines as stipulated in sections 67 and 68 of the

Electricity Act, 2003, read with sections 10 and 16 of Indian Telegraph

Act, 1885, which will be in addition to the compensation towards normal

crop and tree damages. The said amount will be payable only of

transmission lines supported by a tower base of 66 KV and above and

not for sub-transmission lines and distribution lines below 66 KV as

follows:

(i) Compensation @ 85% of land value as determined by District

Magistrate or any other Authority based on Circle Rate/Guideline Value/

Stamp Act rates for tower base area (between four legs) impacted

severely due to installation of Tower/Pylon structure.

1521

PART–II]

LA GAZETTE DE L'ETAT

(ii) Compensation towards diminution of land value in the width

of Right of Way Corridor due to laying of transmission lines and

imposing certain restriction would be decided by the States as per

categorization/type of land in different places of States, subject to a

maximum of 15% of land value as determined based on Circle rate/

Guideline value/Stamp Act rates.

(iii) In areas where land owner/owners have been offered/

accepted alternate mode of compensation by concerned Corporation/

Municipality under Transfer Development Rights (TDR) Policy of State,

the Licensee/Utility shall deposit compensation amount as per (i) and (ii)

above with the concerned Corporation/Municipality/Local Body or the

State Government.

(iv) For this purpose, the width of Right of Way Corridor shall

not be more than that prescribed in the Table below and shall not be

less than the width directly below the conductors.

Right of Way Width for different voltage line as per the Ministry

of Environment and Forests Guidelines, dated 05-05-2014, is as follows:

Transmission Voltage

Width of Right of Way

(in metres)

66 KV

18

110 KV

22

132 KV

27

220 KV

35

400 KV SC

46

400 KV DC

46

+/- 500 KV HVDC

52

765 KV SC (with delta configuration)

64

765 KV DC

67

+/- 800 KV HVDC

69

1200 KV

89

1522

LA GAZETTE DE L'ETAT

[PART–II

4. The Electricity Department has requested for adoption of the

Government of India Guidelines as this would not only facilitate an early

resolution for right of way issues, but, also for completion of the vital

transmission lines.

5. The Government of Puducherry, after examination of the proposal

has decided to adopt the Guidelines issued by the Ministry of Power,

Government of India for payment of compensation towards damages in

regard to Right of Way for transmission line communicated vide Letter

No. 3/7/2015-Trans., dated 15-10-2015 from the Ministry of Power,

Government of India Guidelines for payment of compensation towards

damages in regard to Right of Way for transmission lines.

6. Accordingly, approval of the Lieutenant-Governor, Puducherry,

is hereby conveyed for adoption of Government of India, Ministry of

Power Guidelines for payment of compensation towards damages in

regard to Right of Way for transmission lines covering 110 KV, 132 KV

and 230 KV lines and above as below, subject to the condition that it

will be applicable to ongoing and new works.

(i) Compensation @ 85% of land value as determined by District

Magistrate or any other Authority based on Circle rate/Guideline value/

Stamp Act rates for tower base area (between four legs).

(ii) Compensation towards diminution of land value in the width

of Right of Way (RoW) Corridor due to laying of transmission lines,

subject to a maximum of 15% of land value as determined based on Circle

rate/Guideline value/Stamp Act rates.

7. This issues with the concurrence of the Finance Department

vide their I.D. Note No. 475/FD/F3/FC/2021-22, dated 24-09-2021.

(By order of the Lieutenant-Governor)

S. MURUGESAN,

Under Secretary to Government (Power).

————

online publication at “https://styandptg.py.gov.in”

Published by The Director, Government Press, Puducherry.