The Government of India is keen to cut emissions through a greater

share of environment-friendly natural gas for auto and cooking fuel and

towards achieving its ‘One Nation One Gas Grid’ vision.

The Government of India has taken decisive action to enhance the

share of Natural Gas in the primary energy basket from the existing

6.71% to 15% by 2030.

Amflºƒˆ \VWÈ ∂´E>µ

La Gazette de L' État de Poudouchéry

The Gazette of Puducherry

PART - II

E≈©A ÿkπX|

EXTRAORDINAIRE

EXTRAORDINARY

∂]ÔV´D ÿ√u≈

Publiée par

Published by

ÿkπX|

Autorité

Authority

Registered with the Registrar

of Newspapers for India under

No. 10410

Registered No.

PY/44/2021-23

®ı

Amflºƒˆ

A>[˛wÁ\

2023 } ∂¬º¶V√Ï | 11 {

No. 78 Poudouchéry

Mercredi

11

Octobre

2023

No.

Puducherry

Wednesday

11th

October

2023

(19 Asvina 1945)

1576

LA GAZETTE DE L'ETAT

[PART–II

The Petroleum and Natural Gas Regulatory Board Act, 2006

provides the legal framework for the development of natural gas

pipelines and city or local gas distribution networks. The Ministry of

Petroleum and Natural Gas, Government of India, has notified a Policy

namely, “Development of Natural Gas Pipelines and City or Local Natural

Gas Distribution Networks” on 20th December, 2006. The objective of

the said Government of India Policy is to promote investment from the

public as well as the private sector in natural gas pipelines and city or

local natural gas distribution networks and to secure the consumer

interest in terms of gas availability and reasonable tariff for natural gas

pipelines and city or local natural gas distribution networks.

The Petroleum and Natural Gas Regulatory Board (PNGRB)

established under the abovesaid Act, is the Competent Authority for

selecting an entity to lay, build, operate or expand a natural gas pipeline

or a city or local natural gas distribution network in the Country.

The Government of India is rapidly expanding the City Gas

Distribution (CGD) networks across the Country, so as to provide cleaner

fuel through Piped Natural Gas (PNG) to households, industrial and

commercial units, as well as transportation fuel through Compressed

Natural Gas (CNG) to vehicles. The Government of India is also keen on

utilizing domestically produced natural gas in the form of Liquefied

Natural Gas (LNG).

A necessity on the part of the Government of Puducherry has

arosen to notify a City Gas Distribution Policy for standardizing the road

restoration/permission charges along with time-bound issue of

permissions in the Union territory of Puducherry.

The Policy proposes to nominate the Directorate of Industries and

Commerce, Government of Puducherry, as the Nodal Agency for all such

assigned projects in order to expedite the implementation of Petroleum

and Natural Gas Pipeline Projects and City Gas Distribution Network

Projects (CGD) in the Union territory of Puducherry.

The Puducherry City Gas Distribution Policy-2023 proposes the

following objectives:

(1) To promote the adoption of natural gas in the Union territory

of Puducherry as a Green and Clean fuel.

1577

PART–II]

LA GAZETTE DE L'ETAT

(2) To ensure compliance with safe operations by City Gas

Distribution entities and also to entrust the entities to provide a reliable/

uninterrupted supply of natural gas.

(3) To develop applicable rules/regulations to encourage the

use of natural gas for industrial, commercial, transportation and

household purposes in a phased manner.

(4) To encourage Compressed Natural Gas/Liquefied Natural

Gas as a preferred transport fuel, Liquefied Natural Gas bunkering in

fishing vessels/boats and Conversion of Diesel generators in Telecom

service towers with Gas generators.

The Puducherry City Gas Distribution Policy-2023 was approved

by the Council of Ministers on 04-10-2023.

The Hon’ble Lieutenant-Governor, Puducherry, is pleased to accord

approval to the Puducherry City Gas Distribution Policy-2023.

The Department of Industries and Commerce shall formulate

Guidelines wherever required for implementing the Policy.

(By order of the Lieutenant-Governor)

P.T. RUDRA GOUD,

Joint Secretary to Government

(Industries and Commerce).

————

PUDUCHERRY CITY GAS DISTRIBUTION POLICY – 2023

1. Introduction

1.1. Overview : India being the fastest growing economy in the

world with the status of being the most populous Country, the 3rd largest

energy consumer in the world and the 14th in natural gas consumption

is rapidly increasing its energy demand. On the other side, there is an

urgent need to reduce the environmental pollution caused due to the

usage of polluting liquid fuel, thereby, significantly reduce the carbon

footprint, in line with India’s COP 21 commitment in UN Framework

Convention on climate change extended in Paris Agreement. In this

context, the Government of India has taken decisive action to enhance

the share of Natural Gas in primary energy basket from existing 6.71%

to 15% by 2030.

1578

LA GAZETTE DE L'ETAT

[PART–II

The Government of India is rapidly expanding the City Gas

Distribution (CGD) networks across the Country, so as to provide cleaner

fuel through Piped Natural Gas (PNG) to households, industrial and

commercial units, as well as transportation fuel through Compressed

Natural Gas (CNG) to vehicles. The Government of India is also keen in

utilizing the domestically produced natural gas in the form of Liquefied

Natural Gas (LNG) which is cheaper than the imported natural Gas.

The Petroleum and Natural Gas Regulatory Board (PNGRB)

under the Ministry of Petroleum and Natural Gas (MoPNG), Government

of India, has assigned four CGD entities, one each for the four regions

of this Union territory of Puducherry for development of Natural Gas

Infrastructure and CGD network. The estimated project cost of

developing the CGD network in the four regions is around 700 Crores.

The CGD entities are bound to complete the project in the span of eight

years from the date of approval from PNGRB as per the Minimum Work

Program (MWP) set out by PNGRB. In the context of above, there is

necessity on the part of Government of Puducherry to notify a CGD

Policy for standardizing the road restoration/permission charges along

with time bound permissions. As such CGD Policy for this Union

Territory namely, “Puducherry CGD Policy-2023” is notified by the

Directorate of Industries and Commerce, Puducherry.

Definition

1.1.1. “Act” means, the Petroleum and Natural Gas Regulatory

Board (PNGRB) Act, 2006;

1.1.2. “Authorised area” mean, the specified geographical area

for a city or local natural gas distribution (CGD) network authorized

under these regulations for laying, building, operating or

expanding the CGD network which may comprise of the following

categories, either individually or in any combination thereof,

depending upon the criteria of economic viability and contiguity

as stated in Schedule-A, namely:–

(i) geographic area, in its entirety or in part thereof, within

a Municipality, any other urban area notified by the

Central or Puducherry Government, Village Panchayat,

Commune Panchayat, Taluk, Region or District, or any

combination thereof;

1579

PART–II]

LA GAZETTE DE L'ETAT

1.1.3. “Board” means, the Petroleum and Natural Gas Regulatory

Board constituted under sub-section(1) of the section 3 of the Act

and established under the Ministry of Petroleum and Natural Gas,

Government of India;

1.1.4. “City Gas Station (CGS)” means, the point where custody

transfer of natural gas from the main natural gas transmission line

to the CGD network takes place;

1.1.5. “City or local natural gas distribution (CGD) network”

means, an interconnected network of gas pipelines and the

associated equipment used for transporting natural gas from a bulk

supply high-pressure transmission main to the medium-pressure

distribution grid and subsequently to the service pipes supplying

natural gas to domestic, industrial or commercial premises and CNG

Station situated in a specified geographical area;

1.1.6. “CNG Station” mean, a filling station where one or more

dispensing units are provided for sale of compressed natural gas;

1.1.7. “Compressed Natural Gas (CNG)” mean, natural gas used

as fuel for vehicles. Typically compressed to a pressure ranging

from 200 to 250 bars in the gaseous state;

1.1.8. “Development of a CGD network” mean, laying, building,

operating or expanding a city or local natural gas distribution

network;

1.1.9. “DRS/PRS/MRS” mean, District Regulating Station/

Pressure Regulating Station/Metering and Regulating Station for

reducing the pressure of natural gas flowing through pipeline

network from 49 barg to 5 barg approximately;

1.1.10. “Entity” means, a person, association of persons, Firm,

Company, or Co-operative Society, by whatsoever name called or

referred to, other than a dealer or distributor and engaged or

intending to be engaged in refining, processing, storage,

transportation, distribution, marketing, import and export of

petroleum, petroleum products and natural gas, including laying

of pipelines for transportation of petroleum, petroleum products,

and natural gas, or laying, building, operating or expanding city

or local natural gas distribution network or establishing and

operating a Liquefied Natural Gas terminal;

1580

LA GAZETTE DE L'ETAT

[PART–II

1.1.11. “LCNG” means, CNG produced at the fueling station from

LNG by pumping and vapourisation;

1.1.12. “Liquefied Natural Gas” (LNG) mean, a fluid in the liquid

state composed predominantly of methane (CH4) and which may

contain minor quantities of ethane, propane, nitrogen, or other

components normally found in natural gas;

1.1.13. “Local distribution entity” mean, an entity authorized by

the Board under section 20 of the Act to lay, build, operate or

expand a city or local natural gas distribution network;

1.1.14. “MDPE Pipeline” mean, Medium Density Poly Ethylene

pipeline used for flow of medium/low pressure natural gas nearly

5 barg;

1.1.15. “Natural Gas” mean, gas obtained from boreholes and

consisting primarily of hydrocarbons and includes (i) gas in a

liquid state, namely, liquefied natural gas (LNG) and the regasified

liquefied natural gas, (ii) compressed natural gas (CNG), (iii) gas

imported through transnational pipelines, including CNG or

liquefied natural gas, (iv) gas recovered from gas hydrates as

natural gas, (v) methane obtained from coal seams namely, coal bed

methane, but, does not include helium occurring in association with

such hydrocarbons;

1.1.16. “Piped Natural Gas (PNG)” mean, natural gas transported

through pipelines or cascades or any other permitted mode in a

CGD network for consumption by any customer in the domestic,

commercial or industrial segment and includes natural gas supplied

to an online CNG Station before its compressions;

1.1.17. “Regulations” means, regulations made by the Board

under PNGRB Act, 2006;

1.1.18. “SR” means, Service Regulator used for reducing

pressure from 5 barg to 110 milli barg;

1.1.19. “Work Program” until issuance of authorization letter,

means, the number of domestic PNG connections, number of CNG

stations and inch-kilometer of steel pipeline network as quoted by

the bidder in the bid and after such issue on means number of

domestic PNG connections, number of CNG stations and

1581

PART–II]

LA GAZETTE DE L'ETAT

inch-kilometer of steel pipeline network as mentioned in the

authorization letter as per Schedule-D of CGD Authorization

Regulations.

2. Objectives of this CGD Policy

2.1. To promote the adoption of natural gas in the Union

territory of Puducherry as a Green and Clean fuel.

2.2. To ensure faster development and implementation of CGD

infrastructure in the Union Territory.

2.3. To ensure compliance with safe operations by CGD entities

and also to entrust the entities to provide a reliable/uninterrupted

supply of natural gas.

2.4. To facilitate in issue of permissions/clearance/charges in a

time-bound manner and provide necessary support mechanism.

2.5. To Develop applicable rules/regulations to encourage the

use of natural gas for industrial, commercial, transportation, and

household purposes in a phased manner.

2.6. To encourage CNG/LNG as a preferred transport fuel, LNG

bunkering in fishing vessels and boats.Conversion of Diesel generators

in Telecom service towers with Gas generators. In this regard, the

charges and other aspects shall be notified from time to time, upon the

readiness of CGD entities in establishing the CGD networks across the

Union Territory and ensuring uninterrupted supply of natural gas to all

the customers.

2.7. This policy shall come into effect from the date of

notification of this Policy by the Government of Puducherry in the

Official Gazette.

3. Union Territory Level CGD Policy : The Government of

Puducherry shall accord priority to encourage the use of natural gas as

a fuel for Piped Natural Gas (PNG) for the domestic, commercial, and

industrial sectors; and Compressed Natural Gas (CNG) for the

transportation sector. In order to ensure, the coverage of CGD

infrastructure across the Union Territory and to derive benefits from

value-added services and employment opportunities, the Government of

Puducherry hereby notifies guidelines for expeditious and safe

implementation of CGD networks and value added services across the

Union territory of Puducherry.

1582

LA GAZETTE DE L'ETAT

[PART–II

3.1. High-Level Committee on CGD Development

3.1.1. A High Level Committee shall be formed under the

Chairmanship of the Chief Secretary to Government to facilitate

the following:

3.1.1.1. Creation of CGD infrastructure and value-added

services;

3.1.1.2. Formulation of policies and streamlining the processes

for various permissions;

3.1.1.3. Make suitable mechanisms for permission from the

concerned authorities of PESO (Petroleum and Explosive

Safety

Organization)/NHAI

(National

Highway

Authority of India)/Railway/Ministry of Urban

Development (MoUD)/Ministry of Road Transport and

Highways (MoRTH)/Ministry of Environment, Forest

and Climate Changes (MoEF & CC), etc.

3.1.2. The constitution of the High Level Committee is as below.

(i) The Chief Secretary to Government,

. . Chairman

Puducherry.

(ii) The Secretary to Government

. . Vice-

(Industries and Commmerce),

Chairman

Puducherry.

(iii) The Secretary to Government

. . Member

(Local Administration Department),

Puducherry.

(iv) The Secretary to Government

. . Member

(Public Works Department),

Puducherry.

(v) The Secretary to Government (Electricity), . . Member

Puducherry.

(vi) The Secretary to Government

. . Member

(Information Technology),

Puducherry.

(vii) The Secretary to Government

. . Member

(Science and Technology),

Puducherry.

1583

PART–II]

LA GAZETTE DE L'ETAT

(viii) The Secretary to Government

. . Member

(Town and Country Planning),

Puducherry.

(ix) The Secretary to Government (Revenue),

. . Member

Puducherry.

(x) The Secretary to Government

. . Member

(Fire service), Puducherry.

(xi) The Managing Director,

. . Member

PIPDIC, Puducherry.

(xii) The Director

. . Member-

(Industries and Commmerce),

Secretary.

Puducherry.

3.1.3. Periodicity of meetings: High Level Committee shall

convene at least once in six months for expeditious development of the

CGD network and otherwise as per need.

3.1.4. Key Functions: The committee shall decide measures

which may, inter alia include the following:

3.1.4.1. Development of CGD infrastructure in all parts of the

Union territory of Puducherry in alignment with various

Government initiatives.

3.1.4.2. Encouraging the usage of PNG and CNG through the

conversion for city buses to CNG and long-distance

buses to CNG/LNG.

3.1.4.3. Promote usage of PNG and CNG by all segments of

consumers including Industrial and Commercial as a

preferred fuel.

3.1.4.4. Addressing the issues related to safe CGD operations

and all interfaces with the Government of Puducherry

arising out of safe operations and emergency

management.

3.1.4.5. To deal with issues related to land rates, utility and

infrastructure status, ease of rolling out CGD business

in line with that of other Utility programs such as

telecom, electricity, water, etc.,

1584

LA GAZETTE DE L'ETAT

[PART–II

3.1.4.6. To coordinate with all the stakeholders for faster

implementation of the Policy objectives set out here.

3.1.4.7. To implement suitable modification in Building Plan

Rules for providing gas pipe line infrastructure in

residential and commercial buildings at the architectural

design stage itself to facilitate readiness of the

buildings for “Gas-In” at the end of their construction.

3.1.4.8. To develop suitable policy guidelines/framework for

earmarking/allotment of feasible Government lands to

accommodate the District Regulating System (DRS) and

Pressure Regulating System (PRS) for setting up of CNG

stations, etc., by the CGD entities.

3.2. Nodal Agency for GCD implementation:

3.2.1. To expedite the implementation of “Petroleum and Natural

Gas pipeline projects and CGD network projects (CGD)” in the

Union territory of Puducherry, the Directorate of Industries and

Commerce, Puducherry, shall act as the Nodal Agency for all such

assigned projects.

3.2.2. Periodicity of meetings : In order to achieve expeditious

implementation of CGD projects at all Geographical Areas (GA)

covering the four regions of this Union Territory, review meetings

shall be convened under the Chairmanship of the Secretary to

Government (Industries and Commerce), Puducherry, once in three

months or on need basis, along with Nodal Officers of all related

line Departments and District Collectors/Regional Administrators.

The representatives from each CGD entity shall also be invited for

the above said review meetings.

3.2.3. Key functions: The Nodal Agency shall conduct regular

coordination meetings and follow-up with line Departments

concerned and CGD entities for facilitating timely issuance of

permissions/clearances and for allotment of feasible Government

land parcels for establishing DRS/PRS and SRS for faster

1585

PART–II]

LA GAZETTE DE L'ETAT

implementation of CGD network by CGD entities. The Nodal

Agency will suggest suitable measures which may, inter alia

include the following:

3.2.3.1. Coordination with the District/Region Level Monitoring

Committee (DLMC) to ensure the issuance of clearances

to the CGD entities through the single window system.

3.2.3.2. Each of the concerned Departments shall update the

status of issuance of permission/clearance for CGD

projects, including pending clarifications/details from

CGD entities to the Nodal agency in order to ensure

compliance with the timelines for the issuance of

permissions/clearance and also shall submit the details

to State Level Committee.

3.2.3.3. All the matters relating to further suggestions received

for improvement by the line Departments for

incorporation in the Policy.

3.3. District Level Monitoring Committee (DLMC) for CGD

development

3.3.1. The District Level Monitoring Committee (DLMC) shall

be constituted under the Chairmanship of the District Collector/

Regional Administrator with the following as Members:

3.3.1.1. The

Senior

Superintendent

of

Police

(Senior

Superintendent of Police/Superintendent of Police) of

concerned District/Region.

3.3.1.2. The Chief/Superintending/Executive Engineer, Public

Works Department of concerned District/Region.

3.3.1.3. The Commissioner of Municipality/Commune of

concerned District/Region.

3.3.1.4. The Director/Deputy Director of the Departments at the

District/Region level.

3.3.1.5. The Member-Secretary/Officer Incharge of the Puducherry

Pollution Control Committee.

1586

LA GAZETTE DE L'ETAT

[PART–II

3.3.1.6. The Regional Transport Officer of concerned District/

Region.

3.3.1.7. Other senior officials from concerned line Department

and the representative of CGD entities operating in the

District shall also be invited to the review meetings.

3.3.1.8. The District Collector shall designate Revenue Officer/

Tahsildar/Deputy Tahsildar as the Nodal Officer of the

DLMC who shall function as the Member-Secretary of

DLMC.

3.3.2. Periodicity of meetings: The District Level Monitoring

Committee shall be convened once in 3 months or more frequently

whenever needed, during the implementation of the project. The

status update on the review meeting shall be submitted to the

Nodal Agency, i.e., Directorate of Industries and Commerce,

Puducherry.

3.3.3. Key Functions: The DLMC, headed by the District

Collector/Regional Administrator concerned, will coordinate with

the line Departments and monitor the progress of CGD works

implemented in their District/Region and shall update the status

to the State Nodal Agency periodically. The key functions include:

3.3.3.1. To facilitate allotment of feasible Government land

parcels to the CGD entities for establishing DRS/PRS/

SRS stations and CNG/LNG stations including the

issuance of the enter-upon permissions as per

prevailing Government norms.

3.3.3.2. To facilitate the provision of details of Government

Lands

under

various

categories

available

for

consideration in the pipeline alignment submitted by

the CGD entities.

3.3.3.3. To facilitate the issuance of permissions/clearances and

NOCs related to establishing LCNG/CNG stations and

laying pipelines in a time-bound manner.

3.3.3.4. Standardizing permission issuance mechanisms with

timelines, issuance of “In principle approvals” to

facilitate immediate commencement of field activities,

1587

PART–II]

LA GAZETTE DE L'ETAT

approval of work execution methodology as per site

condition, levying of applicable charges, for issuing

NOC, etc., from CGD entities for laying distribution steel

pipelines, MDPE pipelines, Last Mile Connectivity

(LMC) along/across various categories of roads and

other utilities to facilitate implementation of CGD

infrastructure in a time-bound manner.

3.3.3.5. DLMC shall provide a platform to the CGD entities to

appeal against the decision of the permission issuing

authority for establishing the CGD network.

3.3.3.6. To address the issues related to the seamless execution

of CGD field works by CGD entities at different stretches

in Towns/Cities/Rural area.

3.3.3.7. To facilitate the issuance of requisite additional

operational guidelines as and when felt necessary, to

ensure uninterrupted work execution by the CGD

entities.

3.3.3.8. To facilitate the provision of details covering various

aspects viz. future road expansion, co-existence with

other utilities, period of pipeline laying and public

safety, etc., in consultation with road-owning

authorities concerned and as per synchronisation of

work envisaged under PM_Gati Shakti Framework.

3.3.3.9. To deal with matters related to the adoption of all safety

norms/measures by the CGD entities during the

execution of pipeline laying works at various stretches,

preferably road cutting and restoration work. In case,

any suitable manpower required by the District

Administration for such supervision, the CGD entities

shall assist in providing manpower at their cost.

3.3.3.10. Ensuring submission of ERDMP (Emergency Response

Disaster Management Plan) by the CGD entities.

1588

LA GAZETTE DE L'ETAT

[PART–II

3.4. Authorities who can issue permissions:

Sl.

Details of permission

Permission issuing Authorities/

No.

Nodal officers

(1)

(2)

(3)

1

Laying of pipelines along and

across National Highways -

cutting

and

restoration

of

Roads.

2

Laying of pipelines along and

across State Highways/Major

District

Road-cutting

and

restoration of Roads.

3

Laying of pipelines along and

across Municipality/Commune

Panchayat Roads/ Gram Panchayat

Roads/Village

Roads/other

Road-cutting and restoration of

Roads.

4

Laying of pipelines along and

across water bodies - cutting

and restoration of Roads.

NHAI

Estate Officer/Executive Engineer,

Public

Works

Department,

Puducherry/Karaikal/Mahe/

Yanam Regions after obtaining

in-prinicple approval of Chief

Engineer, Public Works Department,

Puducherry.

Concerned Estate Officers of

Public Works Department will be

the Executive Engineers of

National Highways Division/

Buildings and Roads (Central)

Division/ Buildings and Roads

(North) Division/ Buildings and

Roads (South) Division in

Puducherry,

Buildings

and

Roads Division in Karaikal/

Mahe/Yanam regions.

Commissioner of concerned

M u n i c i p a l i t y / C o m m u n e

Panchayat.

Concerned Estate Officers of

Public Works Department will be

Executive Engineers of Irrigation

1589

PART–II]

LA GAZETTE DE L'ETAT

(1)

(2)

(3)

5

Laying of pipelines along and

across

Government

land

(puramboke land) - cutting and

restoration of Roads.

6

Laying of pipelines along and

across lands owned by PIPDIC

and

other-

cutting

and

restoration of Roads.

7

Laying of pipelines along and

across Railways - cutting and

restoration of lands.

8

Laying of pipelines along and

across various utilities during

cutting

and

restoration

of

Roads.

9

Laying of pipelines along and

across city water and sewage

networks

while

executing

cutting

and

restoration

of

Roads.

10

Prior to laying intimation and

approval for work execution.

11

Allocation of Government land

for setting up DRS/CGS/LCNG/

DCS/SRS and issue of NOC for

setting up CGS and LCNG

facilities.

12

Approval

for

retrofitter

agencies.

Division in Puducherry/Irrigation

and Public Health Division in

Karaikal/Mahe/Yanam regions.

District

Collector / Regional

Administrator (in case of Yanam

and Mahe region).

Managing Director, PIPDIC and

any other agencies responsible

for maintaining public roads/

water courses, etc.

Railways

Consent from concerned Utility

owning agencies.

Consent from concerned Utility

owning agencies.

Urban Local Bodies, Fire Service

and Traffic Police, Electricity,

Telecommunication.

District Collector, Puducherry/

Karaikal District.

Regional Administrator, Mahe/

Yanam region.

T r a n s p o r t

C o m m i s s i o n e r /

Regional Transport Officer.

1590

LA GAZETTE DE L'ETAT

[PART–II

3.4.1. Though the above list of various permissions required

for establishing the CGD network and the permission issuing

authorities concerned are exhaustive, this CGD Policy is applicable

for other road/land/utilities owning Agencies concerned, whose

names are not mentioned above, but, involved in this permission

issuing process.

3.4.2. As the prescribed format for issuing permission vary from

case-to-case, based on the type of utilities along which the

pipelines are laid, the concerned agencies shall issue the

permission as per applicable format utilized by them in other cases,

along with applicable terms and conditions, so as to ensure timely

issuance of permission and also to ensure the quality of work

executed by the CGD entities as per the Guidelines issued to them

in a safe manner, without causing any inconvenience to the general

public.

3.5. Standardisation of Permission issuance mechanisms

3.5.1. CGD Infrastructure-Authorised Implementing Agencies:

The Ministry of Petroleum and Natural Gas (MoPNG), Government

of India has authorized the following entities to lay, build, operate

or expand city or local Natural Gas Distribution Networks in the

following 4 Geographical areas in the Union territory of

Puducherry.

Sl.

Geographical

Authorized Entity

No.

Area (GA)

(1)

(2)

(3)

1

Puducherry

East Coast Natural Gas Distribution Private Limited

2

Karaikal

Torrent Gas Private Limited

3

Mahe

Indian Oil-Adani Gas Private Limited

4

Yanam

HCG Yanam Private Limited

3.5.2. The Government of Puducherry finds it expedient and

essential to formulate uniform Policy/Guidelines elaborating

financial mechanisms, institutional mechanisms for faster

permissions/approvals, technical parameters of trenching and

restoration and liabilities of parties, etc., for timely execution of

1591

PART–II]

LA GAZETTE DE L'ETAT

CGD projects in the public interest. Apart from the above targets

vis-a-vis CGD entities, this Policy applies to all further City Gas

Distribution GD projects/entities also awarded through PNGRB.

3.5.3. The enforceability of permissions granted is restricted to

the extent of provisions and scope of services defined in the licence

agreement with PNGRB executed by CGD entities.

3.5.4. Subject to the Guidelines of PNGRB the CGD entities shall

not claim any exclusive right on the RoW (Right of Way) on which

the CGD network is established and subsequent user agencies shall

be permitted to use the RoW, subject to the technical requirement

being fulfilled.

3.5.5. The Directorate of Information Technology, Puducherry

has notified an Order vide G.O. Ms. No. 2/DIT/2021/2242, dated

22-02-2021, wherein, the existing Policy has been amended in order

to be in alignment with the provisions contained in the Indian

Telegraph Right of Way Rules, 2016. The Clause No. 3(i) of the

abovesaid Government Order states that “No other fees/charges

shall be levied by the respective authorities other than those

prescribed in the Indian Telegraph Right of Way Rules, 2016 while

giving permission for establishment of telecom infrastructure”. The

CGD Policy adopts the above said clause in terms of charges to

the CGD entities in establishing underground Gas Pipelines.

Accordingly, in adoption of the Indian Telegraph Right of Way

Rules, 2016, the CGD entities shall be charged one thousand rupees

per kilometer for establishing underground Gas Pipelines as

Administrative Expenses to be paid to the respective Authorities

concerned.

3.5.6. Every application submitted by the CGD entities shall be

supported with the following documents to expedite the permission

issuance process by the Departments concerned:

3.5.6.1. Detailed description of route and location details for the

distribution pipeline alignments.

3.5.6.2. Work execution plan/phasing of the plan for

uninterrupted work execution.

3.5.6.3. Details on the proposed methodology section-wise/

area-wise taking local factors into consideration.

1592

LA GAZETTE DE L'ETAT

[PART–II

3.5.6.4. Submission of alternate route plan in case of fouling

with existing above or underground utilities recorded

during the initial survey stage itself.

3.5.6.5. Requisite undertakings for protection of existing

utilities and undertakings as sought by the concerned

authorities for according the “In principle approval”.

3.5.6.6. Alignment maps and trench cross section/bell hole

details, etc.

3.5.6.7. Surface-wise length of road cutting proposed and

number of crossings, etc.

3.5.6.8. Safety precautionary measures envisaged for adoption

during execution of the work at the site.

3.5.7. High and Medium pressure steel pipelines will be laid

predominantly along State Highways/MDR/Main city roads and

other roads under Municipalities/Commune Panchayats, etc. The

medium and low pressure MDPE pipeline will be laid predominantly

in all by-lanes in addition to main roads as a last mile delivery point

by the CGD entities.

3.5.8. After careful consideration, the Government of Puducherry

hereby issues the following guidelines/instructions in regard to

uniform restoration charges based on the methodology proposed

to be adopted by CGD entities as per the permission issued by

the authorities concerned in line with the prevailing site conditions

and safety requirements:

3.5.8.1. Detailed CGD network implementation proposal shall be

submitted by CGD entities in advance to the District

Level Monitoring Committee (DLMC) comprising:

3.5.8.1.1. Route maps for the distribution pipelines alignment.

3.5.8.1.2. Year-wise MWP (Minimum Work Program).

3.5.8.1.3. Methodology (Open cut/HDD) proposed to be

adopted at various stretches.

3.5.8.1.4. Safety measures envisaged at different stages

starting from material construction to connection at

the consumer end.

1593

PART–II]

LA GAZETTE DE L'ETAT

3.5.8.1.5. Information on the number of land parcels with

location and extent details for establishing DRS/

PRS/SV/CNG/LCNG stations shall be initially

surveyed by the CGD entities with the Departments

concerned prior to joint inspection and process of

applications by the Departments concerned.

3.5.8.2. CGD entities shall submit Application Forms in original

along with requisite details to the concerned District

Level Monitoring Committees and Departments/

Agencies concerned of Government of Puducherry for

steel and MDPE pipeline network along with the

methodology of laying of pipelines and drawings for

various stretches as per prevailing site conditions

facilitating speedy scrutiny of applications and issuance

of “In principle” approval for early commencement of

work.

3.5.8.3. Steel and MDPE pipeline laying methodology and

applicable charges levying mechanism:

3.5.8.3.1. The Choice of choosing a methodology for laying

the steel and MDPE pipelines shall be with the CGD

entities concerned except when the roads are

proposed to be laid/relaid by the road owning

authorities during that year as part of their annual

work plan. The CGD entities shall adopt ‘Self Dig

and Restoration method’.

3.5.8.3.2. In case of “Self-Dig and restoration” by the CGD

entity based on prevailing site conditions, the CGD

entities, at their risk and cost shall restore the roads

as per the technical specification specified by the

permission Issuing Authority. In this case, the CGD

entity shall also submit the security deposit for

12 months in the form of a Bank Guarantee @ 100%

of the total restoration charges calculated on the

basis of the cost per square metre rate fixed by the

Government of Puducherry for corresponding

categories of roads before the commencement of the

work. The Bank Guarantee shall be released on

1594

LA GAZETTE DE L'ETAT

[PART–II

issuance of NOC for satisfactory completion of road

restoration works from concern road owning

authority and on submission of a new Bank

Guarantee equal to 10% of the abovesaid Bank

Guarantee as Performance Bank Guarantee towards

the defect liability period of 12 months, which shall

be from the date of completion of work at the site

to the satisfaction of the concerned road owning

authority. During the defect liability period, if, any

damages occur due to faulty restoration, the CGD

entities shall restore the same at their own cost. The

defect liability period shall cease if, any work is

carried out in the same stretch by other

Departments/Local Bodies/Agencies, etc., and the

Performance Bank Guarantee shall be released

immediately.

3.5.8.3.3. For laying the Steel/MDPE pipeline network through

HDD (Horizontal Directional Drilling) trenchless

method, the cost of restoration charges shall be

limited to entry and exit pits on the actuals. The

restoration methodology shall be on “Self-dig and

restoration” basis by the CGD entity. The

restoration charges shall be limited to only entry

and exit pits calculated @ 1.5 times of pit sizes. The

CGD entity need not pay any upfront restoration

charges separately for the undisturbed road stretch,

but, shall have to submit the Security Deposit for

12 months in the form of a Bank Guarantee for 100%

of the total actual restoration charges calculated for

the restoration of entry and exit pits on the basis

of cost per square metre rate incurred for meeting

the technical specifications as per the permission

order before commencement of work. The basic

conditions that necessitate the adoption of the

trenchless method in various segments shall be

issued by the Road owning authorities.

3.5.8.3.4. The road cut restoration charges are as fixed by the

concerned Department as per Puducherry Schedule

of Rates (PSR). As the charges are on a fixed basis,

1595

PART–II]

LA GAZETTE DE L'ETAT

no further additional charges and taxes are leviable

by the line Departments. The road-owning authorities

may revise the restoration charges as per the

revision of rates in latest PSR.

3.5.8.3.5. The unit of measurement for restoration charges

shall be calculated for the area of the road in square

meter basis only.

3.5.8.3.6. During the monsoon period the CGD entities shall

not carry out Open Trench method (more than

600 mm.) road cutting. However Trenchless and

Micro Trenching method (up to 600 mm.) road

cutting may be carried out, provided the CGD

entities shall take adequate measures towards safety

and security and shall restore the damaged position

immediately, if any and in case of extreme weather

also.

3.5.8.3.7. As part of PM-Gati Shakti, the CGD entities shall

also explore the possibilities of laying their CGD

pipeline network along with other works carried out

by line Departments simultaneously when their

works are in progress or utilizing their RoW (Right

of Way) stretches with proper planning and

coordination with the line Departments concerned

in order to eliminate duplication of works and ease

of doing the work execution with the least

inconvenience to the common public.

3.5.8.3.8. The restoration through self-dig and restoration by

the CGD entities on roads under various

Departments including State Highways, Public

Works Department Roads, Municipality/Commune

Panchayat roads, etc., shall be allowed to perform

the self-dig and restoration upon submission of

100% BG.

3.5.8.3.9. The self-dig and restoration modalities of roads

shall be jointly discussed and executed in close

coordination

with

concerned

road

owning

authorities and the CGD entities.

1596

LA GAZETTE DE L'ETAT

[PART–II

3.5.8.3.10. The CGD entities apart from executing the self-dig

and restoration works longitudinally along the

roads, shall also execute the stretches where the

domestic pipelines are also proposed to be laid to

the residences under self-dig and restoration

mechanism or trenchless methodology basis as per

prevailing site conditions.

3.5.8.3.11. The CGD entities apart from executing the trench

works limited to a width of 600 mm. approximately,

shall execute actual restoration of the blacktop

overlapping with the undisturbed stretches of roads

as well and measurement shall be undertaken

accordingly for arriving at actual restoration

charges. Moreover, the Departments concerned

shall extend their assistance for the supervision of

works on the blacktop surface based on the request

from the CGD entities.

3.5.8.3.12. The HDD and the restoration work shall be done

by the CGD entities only under the supervision of

the concerned authority and there shall not be any

damages caused to the utilities provided in the said

roads.

3.6. Protection of existing above and underground utilities

3.6.1. It is the responsibility of all CGD entities to coordinate

and collect the route map and associated details of underground

utilities/essential service water lines, sewerage systems,

telecommunication lines, other pipelines and electricity supply

lines, etc., along with site supervision required by CGD entity prior

to commencement of work. Also, it is the responsibility of the CGD

entity to intimate the concerned supervisory Authority/Department

of such utilities concerned before undertaking the digging work.

3.6.2. It is the responsibility of all CGD entities to submit the

details of the work execution plan along with the route map and

associated details of all the underground utilities/essential services

like water lines, sewage systems, telecommunication lines, other

pipelines and electricity supply lines, etc., to the DLMC in

advance so as to facilitate the line Department concerned to assess

1597

PART–II]

LA GAZETTE DE L'ETAT

their existing underground utilities and advice the level of

protection to be taken by CGD entities during the execution of the

fieldwork.

3.6.3. The CGD entity shall ensure the protection of existing

above-ground and underground utilities. Necessary precautions

are to be taken by the CGD entity for safeguarding and maintaining

all other existing utilities falling in the pipeline alignment including

to make good in case of any damage within 24 hours at their own

risk and cost. It shall be the responsibility of the CGD entity to

coordinate with other related agencies concerned whose utilities

are falling in the pipeline alignment. The CGD entity shall indemnify

the Department concerned by all means against damage to already

existing cables/underground installations/utilities/facilities, etc.,

during the execution of the work at the site.

3.6.4. The CGD entities shall carry out the works without

interrupting the traffic and causing inconvenience to the general

public and prior intimation shall be given to all the authorities

concerned in advance before the commencement of the work at the

site.

3.6.5. The CGD entity shall ensure strict adherence to all safety

guidelines, special terms and conditions apart from general

conditions issued along with permission from the Departments

concerned. All precautionary measures, such as providing sign

boards, warning tapes, fencing, lights, etc., shall be ensured at the

sites by the CGD entity to prevent any accidents or near-miss

incidents to pedestrians and vehicular traffic.

3.6.6. The minimum allowable depth of cover for CGD Steel

Pipeline:

(as per PNRGB Guidelines)

Sl.

Details of Location

Minimum cover

No.

of depth (in meters)

(1)

(2)

(3)

1

Normal/Rocky terrain

1.0

2

Minor/Unlined canal/nala crossings, tidal

1.5

areas and other water courses.

1598

LA GAZETTE DE L'ETAT

[PART–II

(1)

(2)

(3)

3

Major river crossings

2.5

4

Rivers with Rocky bed

1.5

5

Drainage ditches at roadways and rail loads

1.0

6

Rocky areas

1.0

7

Cased/uncased road crossing

1.2

8

Cased railroad crossing

1.7

Notes:

1. Cover shall be measured from the top of the coated pipe to the top

of the undisturbed surface of the soil or the top of the graded

working strip, whichever is lower. The fill material in the working

strip shall not be considered in the depth of cover.

2. For River/Watercourses that are prone to scour and/or erosion, the

specified cover shall be measured from the expected lowest bed

profile after scouring/erosion. Where, scour level cannot be

established, an additional cover of minimum 1 meter shall be

provided from the existing bed of the river/watercourse.

3. The cover shall be measured from the top of road or top of rail, as

the case may be. Whenever the above provisions of cover cannot

be provided due to site constraints, additional protection in form of

casing/concreting, etc., shall be provided.

4. Clearance and casing requirements for buried steel pipelines and

mains and clearance between pipelines or mains and other

underground structures shall be in strict compliance with the

corresponding clauses stipulated in PNGRB Notifications, dated

27-08-2008 and its latest amendments G.S.R. 612(E).

3.7. Standard

Operating

Procedure

(SOP)

for

the

accommodation of City Gaz Distribution network along and across

roads maintained by various Departments

3.7.1. Procedure for processing application for granting

permission for use of Right of Way (RoW):

3.7.1.1. The CGD entity shall make application to the Road

Owning authority for the Right of Way (RoW).

1599

PART–II]

LA GAZETTE DE L'ETAT

3.7.1.2. The following details and documents must be submitted

with the application:

3.7.1.2.1. Name of the road

3.7.1.2.2. Division of the road

3.7.1.2.3. Type: Road/Footpath/CC road/Berms/Earthern Portion.

3.7.1.2.4. Length, Width and Depth of the road cut required.

3.7.1.2.5. Nature of the road cut (open/trenchless technology).

3.7.1.2.6. Sketch and location of the road where, the cut has

to be made.

3.7.1.2.7. Self-restoration/Departmental restoration.

3.7.1.3. After a joint field survey, the concerned line Department

shall issue permission to the respective utility service

provider with the conditions imposed by the

Department to ensure a safe and uninterrupted flow of

traffic. The utility service provider shall be designated

as a ‘Licensee’ for the purpose of this project and will

be authorized to install and operate utility services

within the RoW. However, utility services shall be

made operational by the Licensee only after an NOC

(No Objection Certificate) to the effect is issued by the

Department concerned.

3.7.2. Laying of Utility Services:

3.7.2.1. Laying of Utility Services along the Roads: The Utility

services shall be located, beyond the toe line of the

embarkment and drains, as close to the extreme edge of

the road as possible.

3.7.2.1.1. Towards this, the top of the utility services shall

be as per the PNGRB norms.

3.7.2.1.2. No utility service charges shall be laid over existing

culverts and bridges, except through the utility

ducts where such provision exists. In case of

absence of such provisions, the Licensee shall make

his own arrangements for the crossing of cross

drainage structures, rivers, etc., below the bed.

1600

LA GAZETTE DE L'ETAT

[PART–II

3.7.2.1.3. In exceptional cases, where RoW is restricted the

utility services can be allowed beneath the

carriageway (BT Surface), subject to the conditions

as per IRC and PNGRB norms, which will be

designed to carry traffic on top. In such cases, it

also needs to be ensured that maintenance of the

utility services shall not interfere with the safe and

smooth flow of traffic. The cost of operation and

maintenance will have to be borne by the Licensee.

3.7.2.2. Laying of Utility Services across the Roads:

3.7.2.2.1. The utility services shall be permitted to cross the

Roads preferably using Trenchless technology

(Horizontal drilling method). The casing/conduit

pipe should be minimum extended from drain to

drain in cuts, toe of slope to toe of slope in the fills

and shall be designed in accordance with the

provision of IRC and executed following the

Specifications of the MoRTH.

3.7.2.2.2. Existing drainage structures shall not be allowed to

carry the lines across. The utility services shall

cross the Roads preferably on a line normal to it or

as nearly so as practicable.

3.7.2.2.3. The casing/conduit pipe may be installed under the

road embankment either by boring or digging a

trench installation by the boring method preferably.

3.7.2.2.4. In the case of trenching, the sides of the trench

should be done as nearly vertical as possible. The

trench width should be at least 300 mm. wider (but

not more than 600 mm. wider) than the outer

diameter of the utility pipe. Filling of the trench

shall conform to the specifications contained

here-in-below or as supplied by the road owning

Authority:

3.7.2.2.4.1. The bedding shall be to a depth not less than

300 mm. It shall consist of granular material, free

of lumps, clods and cobbles, and graded to yield

1601

PART–II]

LA GAZETTE DE L'ETAT

a firm surface without a sudden change in the

bearing value. Unsuitable soil and rock edges

should be excavated and replaced by selected

material.

3.7.2.2.4.2. The backfill shall be completed in two stages

(1) Side-fill to the level of the top of the pipe

(2) Overfill to the bottom of the road crust.

3.7.2.2.4.3. The side fill shall consist of granular material laid

in 150 mm. Layers each consolidated by

mechanical tramping and controlled addition of

moisture to 95% of the modified Proctor’s

density. Overfill shall be compacted to the same

density as the material that had been removed.

3.7.2.2.4.4. The road crust shall be built to the same

strength as the existing crust on either side of

the trench or to the thickness and specifications

stipulated by the road owing Authority.

3.7.2.2.4.5. When utilities are allowed aboveground, the

horizontal and vertical clearance in accordance

with the PNGRB Guidelines shall be maintained.

3.7.3. Restoration Methods

3.7.3.1. Self-Restoration Methods : The following methodology

is to be adopted for Self-restoration:

3.7.3.1.1. Self-Dig and restoration mechanism is carried out

at the risk and cost of the utility entities by meeting

the technical specification specified by the

permission Issuing Authority.

3.7.3.1.2. The utility entities should submit the security

deposit for 12 months in the form of a Bank

Guarantee at 100% of the total restoration charges.

3.7.3.1.3. Restoration shall be carried out under the

supervision of the Departmental officials to restore

it to the original condition.

1602

LA GAZETTE DE L'ETAT

[PART–II

3.7.3.1.4. If, the Licensee fails to comply with any condition

to the reasonable satisfaction of the Authority, the

same shall be executed by the Authority at the cost

and risk of the Licensee.

3.7.3.1.5. Grant of Licence is subject to the Licensee

satisfying (a) minimum disruption of traffic and (b)

least damage to the road.

3.7.3.1.6. As far as possible, the Licensee should avoid

cutting of the road for crossing Highway, and other

roads and try to carry out the work by trenchless

technology. In case any damage is caused to the

road pavement in this process, the Licensee shall

restore the road to its original condition at its cost.

3.7.3.1.7. If, due to unavoidable reasons the road needs to

be cut for crossing or laying utility services, the

Licensee has to execute the work in a time-bound

manner at its cost, either by itself or through its

authorized representative in consultation with the

Authority as per predetermined time schedule and

quality standards.

3.7.3.1.8. All required restoration and maintenance work

subsequent to the laying of utility services shall be

required to be undertaken by the Licensee at its

cost either by itself or through its authorized

representative in consultation with the Authority as

per the predetermined time schedule and quality

standards. To process for the granting of permission

a Performance Bank Guarantee for an amount based

on per square metre with a validity of one year

initially, in the prescribed format (extendable if

required, till satisfactory completion of work) shall

have to be furnished by the utility service provider/

Licensee as security against the improper

restoration of ground in terms of filling/unsatisfactory

compaction damages caused to other underground

installations/utility services, interference, interruption,

disruption or failure caused thereof to any services, etc.

1603

PART–II]

LA GAZETTE DE L'ETAT

3.7.3.1.9. In case, the Licensee fails to discharge the

obligation of making good of the excavated trench/

other restoration work, the Authority shall have

a right to make good the damages caused by the

excavation at the cost of the Licensee, and recover

the amount by forfeiture of the Bank Guarantee.

3.7.3.2. Departmental

Restoration : For

Departmental

restoration, the Utility entities should pay the upfront

restoration charges as fixed by the concerned

Departments as per existing PSR and there is no need

for Bank Guarantee.

3.7.4. Methodology for grant of Permission :

The Licensee shall apply in the prescribed format to the

DLMC and the concerned land owning Authorities for usage of

RoW for laying CGD Networks. On receipt of application from the

licensee :

3.7.4.1.1. Joint inspection shall be carried out to assess the

feasibility of the Self-Dig and restoration methodology.

3.7.4.1.2. Road Owning Department will issue the demand and

licensee shall submit the security deposit for 12 months

in the form of a Bank Guarantee @ 100% of the total

restoration charges calculated on the basis of the cost

per square meter rate fixed by the Government of

Puducherry for corresponding categories of roads

before the commencement of the work. The Bank

Guarantee shall be released on issuance of NOC for

satisfactory completion of road restoration works from

concern road owning Authority and on submission of

a new Bank Guarantee equal to 10% of the abovesaid

Bank Guarantee as Performance Bank Guarantee towards

the defect liability period of 12 months, which shall be

from the date of completion of work at the site to the

satisfaction of the concerned road owning Authority.

During the defect liability period, if, any damages occur

due to faulty restoration, the CGD entities shall restore

the same at their own cost. The defect liability period

shall cease if, any work is carried out in the same stretch

1604

LA GAZETTE DE L'ETAT

[PART–II

by other Department/Local Bodies/Agencies, etc., and

the Performance Bank Guarantee shall be released

immediately.

3.7.4.1.3. The Work shall be carried out under the supervision

Road Owning Department Officials and on getting NOC,

the defect liability period of 12 months will commence.

3.7.4.1.4. Self-Dig and restoration methodology shall be carried

and as per the specified standards and specifications.

3.7.4.1.5. Self-Dig and restoration methodology is applicable on

roads under various Departments including State

Highways, Public Works Department Roads, Municipality/

Commune/Panchayat Roads, etc., as per the specified

standards and specifications.

3.7.5. The following Guidelines/norms shall be followed during

and after the execution of the road cuts :

Licensee to lay utility services after obtaining permission

subject to the following conditions, namely :

3.7.5.1. RoW Permissions are only enabling in nature. The

purpose of extending the way leave facility on the RoW

is not for enhancing the score of activity of a utility

service provider, either by content or by intent. Further,

enforceability of the permission so granted shall be

restricted only to the extent of provisions/scope of

activities for the purpose for which it is granted.

3.7.5.2. No Licensee shall claim exclusive right on the RoW and

any subsequent user will be permitted to use the RoW,

either above or below, or by the side of the utilities laid

by the first user, subject to technical requirements being

fulfilled. The decision of the Authority in relation to

fulfillment of technical requirements shall be final and

binding on all concerned parties. In case, any

disruption/damage is caused to any existing user by the

subsequent user, the Authority shall not be held

accountable or liable in any manner.

3.7.5.3. The Licensee shall be responsible for undertaking all

activities including but not limited to site identification,

survey, design, engineering, arranging finance, project

1605

PART–II]

LA GAZETTE DE L'ETAT

management, obtaining regulatory approvals and

necessary clearances, supply of equipment, material,

construction, erection, testing and commissioning,

maintenance and operation and all other activities

essential or required for efficient functioning of their

own utility/industrial infrastructure facilities.

3.7.5.4. The utility services shall be laid at the edge of road.

In case of restricted width of RoW, which may be

adequate only to accommodate the carriageway, central

verge, shoulders, slopes of embankment, drains, other

road side furniture, etc., the utility services shall be laid

beyond the toe line of the embankments and clear of

the drain.

3.7.5.5. The Licensee shall make his/her own arrangement for

the crossing of cross drainage structures, rivers, etc.,

below the bed. In case, this is not feasible, the utility

services may be carried outside the railings/parapets

and the bridge superstructure. The fixing and

supporting arrangement with all details shall be required

to be approved in advance from the concerned

Administration. Additional cost on account of fixing and

supporting arrangement as assessed by the Authority

shall be payable by the Licensee.

3.7.5.6. The road crust shall be built to the same strength as

the existing crust on either side of the trench or to

thickness and specifications stipulated by the

Authority.

3.7.5.7. The Licensee shall ensure making good the excavated

trench for laying utility services by proper filling and

compaction, clearing debris/loose earth produced due

to excavation of trenching at least 50 m. away from the

edge of the right of way.

3.7.5.8. All work subsequent to the laying of the pipe shall be

required to be undertaken by the Licensee at its cost

either by itself or through its authorized representative

in consultation with the Authority as per the

predetermined time schedule and quality standards.

1606

LA GAZETTE DE L'ETAT

[PART–II

3.7.5.9. In case of shifting of the utility services due to

improvement/widening of road or construction of

flyover/bridge the road owning Authority shall submit

the detailed proposal for shifting to the District Level

Monitoring Committee. Based on the recommendation

of the Committee, the Authority shall issue the notice

for shifting. The restoration of the road/land to its

original condition shall be at the own cost and risk of

the CGD entities.

3.7.5.10. The Licensee shall be responsible to ascertain from the

respective agency in coordination with Authority

regarding the location of other utilities/underground

installations/facilities, etc. The Licensee shall ensure the

safety and security of already existing underground

installations/utilities/facilities, etc., before commencement

of the excavation/using the existing utility ducts. The

Licensee shall indemnify against damages to already

existing underground installations/utilities/facilities, etc.

3.7.5.11. The Licensee shall be solely responsible/liable for full

compensation/indemnification of concerned Agency/

Aggrieved Authority for any direct, indirect, or

consequential damage caused to them/claims or

replacements sought for, at the cost and risk of the

Licensee. The concerned Agency in coordination with

Authority shall also have a right to make good such

damages/recover the claims by forfeiture of Bank

Guarantee.

3.7.5.12. The Licensee shall inform/give a notice to the agency

concerned designated by the Authority at least 15 days

in advance with the route details prior to digging

trenches for fresh or maintenance/repair works.

3.7.5.13. The extent of digging the trenches should be strictly

regulated so that utility services are laid and trenches

filled up before the start of the next stretch. Filling

should be completed to the reasonable satisfaction of

the officials concerned designated by the Authority.

1607

PART–II]

LA GAZETTE DE L'ETAT

3.7.5.14. The Licensee shall indemnify the Agency concerned in

coordination with Authority, against all damages and

claims, if any, due to the digging of trenches for laying

pipes/ducts.

3.7.5.15. The Authority also has a right to terminate the

permission or to extend the period.

3.7.5.16. The Licensee shall not undertake any work of shifting,

repairs or alterations to the utility services without prior

written permission of the Authority.

3.7.5.17. The permission granted shall not in any way be deemed

to convey to the Licensees any ownership right or any

interest in route/road/highway, land/property, other

than what is herein expressly granted. No use of RoW

will be permitted for any purpose other than that

specified.

3.7.5.18. The utility services located in RoW/property shall be

deemed to have been constructed and continued only

by the consent and permission of the Authority so that

the right of the Licensee to the use thereof shall not

become absolute and indefeasible by lapse of time.

3.7.5.19. Three copies of ‘as laid drawings’ of utilities (hard and

soft copies) with GIS mapping of Gas pipeline laid (with

respect to the roads) and after restoration shall be

submitted to the Authority for verification and record

within a month of completion of works.

3.7.5.20. The utility services shall not be made operational by

the Licensee unless a NOC to the effect that the utility

services has been laid in accordance with the approved

specifications and drawings and the trenches have been

filled up to the reasonable satisfaction of the concerned

Agency in coordination with the Authority has been

obtained. Notwithstanding anything contained herein,

this permission may be cancelled at any time by

Authority for breach of any condition of the same and

the Licensee shall neither be entitled to any

compensation for any loss caused to it by such

cancellation, nor shall it be absolved from any liability

already incurred.

1608

LA GAZETTE DE L'ETAT

[PART–II

3.7.5.21. The Licensee shall ensure adherence to relevant Indian

Standards and follow best industry practices, methods,

and standards for the purpose of ensuring safe, efficient

and economic design, construction, commissioning,

operation, repair and maintenance of any part of the

utility lines/industrial infrastructure facilities and which

practices, methods, and standards shall be adjusted as

necessary to take account of:

3.7.5.21.1. operation, repair, and maintenance guidelines given

by the manufacturers;

3.7.5.21.2. the requirements of Law;

3.7.5.21.3. the physical conditions at the Site, and;

3.7.5.21.4. the safety of operating personnel and human

beings.

3.7.5.22. The Licensee shall have to provide safety measures like

barricading, danger lighting, and other necessary

caution boards while executing the work.

3.7.5.23. While laying utility services, at least one lane of road

shall be kept open to traffic at all times. If, any traffic

diversion works are found necessary during the working

period, it shall be provided at the cost of Licensee.

3.7.5.24. Traffic Police should be informed in advance and

necessary permission has to be obtained from the traffic

point of view, wherever required. After getting Police

permission, the probable date of commencement and

completion date should be informed to the Authority.

3.7.5.25. If, chambers are constructed while laying of utilities in

the road, the chamber should be at the road level to

avoid accidents. It shall not be above or below road

level surface.

3.7.5.26. After the permission, if, the applicant fails to start the

work and complete within the permitted period, the

permission granted will automatically get cancelled. The

work can be commenced only after revalidation of the

permission by the Competent Authority.

1609

PART–II]

LA GAZETTE DE L'ETAT

3.7.5.27. Notwithstanding this, the Licensee shall be liable to pay

full compensation to the aggrieved Authority/its

designated Agency for any damage sustained by them

by reason of the exercise of the RoW facility.

3.7.5.28. Within 24 hours of completion, the service Departments/

service Providers have to inform the Authority.

3.7.5.29. After the completion of road cut work, the photos and

completion certificate have to be submitted to the

Authority by CGD entity.

3.8. Timelines for issuance of permissions/clearances:

3.8.1. Scrutiny of applications submitted by the CGD entities

for seeking clarifications, joint inspection, and additional inputs

if any, shall be done within 10 days of receipt of the application

with requisite details by the Department concerned.

3.8.2. The Department concerned shall ensure issuance of

“In principle approval” for early work commencement within 15

days of receipt of the application with details, and taking requisite

undertakings from CGD entities pending final permission. The final

permission shall be accorded within 30 days from receipt of the

application and payment of the applicable restoration charges or

Bank Guarantee from the CGD entities.

3.8.3. Adequate time-period for work execution shall be given

considering the quantum of works involved, the length of

stretches, and the criticality of the site conditions involved. Needful

extension of the work execution time-period without any penalty

may be given on a case-to-case basis. The decision of the Officer-

in-charge of the Department concerned is final and binding on the

CGD entities.

3.8.4. Upon satisfactory completion of the field works in

compliance with the terms and conditions and specifications of the

permission order, NOC may be issued to entities within 10 days of

receipt of complete details and joint inspection by the Competent

Authority.

3.8.5. It shall be obligatory upon the CGD entities to make the

road motorable - good and safe for movement within 48 hours after

related road works are completed and the full restoration of the

road shall be completed within 30 days of the work completed to

the reasonable satisfaction of the authority concerned.

1610

LA GAZETTE DE L'ETAT

[PART–II

3.9. Alienation/Lease of land parcel for CGD equipment (DRS/

PRS/SV/CNG/LCNG/CGS station) erection.

3.9.1. As a step towards facilitating early work commencement

for DRS/PRS/SV/CNG/LCNG stations in the Government lands

under the process of allotment/alienation, the District Authorities

shall exercise the option of issuance of the “enter upon permission”

for early commencement of work in the station by the CGD entities

within 15 days upon receipt of requisite details and refundable

caution deposit of 10% of the total estimated cost of land in the

form of Bank Guarantee, which shall be refunded or adjusted at

the time of issuance of final allotment/alienation.

3.9.2. In consideration of the requirement of land to CGD entities

for installation of DRS (District Regulating Stations), PRS (Pressure

Regulating Stations), SV (Sectionalizing Valve) Stations, CNG/

LCNG/CGS and other safety-related systems, the concerned State

Department shall have the permissible sanction from Government

to lease feasible Government lands to CGD entities for up to 30

years. The annual lease rent in such cases shall be payable by the

CGD entities as per the new lease policy of the Government.

4. CNG KIT Approval

4.1. Fixing of the CNG Kits into a vehicle is predominantly done

in two ways namely, factory-fitted kits for new vehicles by Vehicle

manufacturers/OEMs and retrofitted kits fitted in the existing vehicles

currently utilizing gasoline fuel.

4.2. For the retrofitted vehicles, all vehicles shall have a CNG

Kit and a cylinder fitted which is type approved in accordance with the

Guidelines of the Ministry of Surface Transport, Government of India,

and installed and tested by a retrofitter Agency authorized by the

Transport Commissioner/Regional Transport Office (RTO) of this Union

Territory and get issued a fitness certificate for its suitability for CNG

use. A vehicle once retrofitted also would require an RTO approval/

endorsement on the Registration document before it is permitted to ply

on the roads. These certificates are essential to be shown to the CNG

Station Operator before each refill of the cylinder. The cylinder with

stainless steel valves and connected facilities fitted in the vehicle shall

be in accordance with Gas Cylinder Rules. These cylinders should be

subjected to a hydro test at least once every three years.

1611

PART–II]

LA GAZETTE DE L'ETAT

4.3. It is essential that qualified people/agencies duly trained

by the CNG kit manufacturers shall have to be deployed sufficiently in

the Union territory of Puducherry. The CNG kit and its accessories viz.,

stainless steel safety valve and pipes shall be tested by the Automotive

Research Association of India (ARAI)/International Centre for

Automotive Technology (ICAT) and other testing agencies for new

vehicles fitted along with these CNG kits. For retrofitting the CNG Kit,

agencies with expertise need to be developed in the Union Territory for

which needful initiatives shall come from the CGD entities. Necessary

amendments in “The Central Motor Vehicles Rules” are being framed

through the Standing Technical Committee formed under the Ministry

of Surface Transport for registering agencies with expertise in monitoring

the installation of CNG kits. Sufficient qualified CNG kit manufacturing

and retrofit agencies shall also be developed by the CGD entities in

converting diesel vehicles/buses.

4.4. Effective inspection system shall be introduced, as already

a large number of CNG Buses are currently operating in this country

and numerous such buses are expected to be converted in the next few

years due to the stringent statutory regulations and also a rapid

proliferation of CNG by CGD entities to meet the minimum work program

as prescribed by PNGRB. The Ministry of Road Transport and Highways

(MoRTH) is already in the process of issuing notifications for

expeditious authorization of conversion workshops.

4.5. The CGD entities shall collaborate and coordinate with CNG

Kit manufacturers, cylinder and fittings manufacturers and explore and

train sufficient retrofitter agencies area wise through the Training

Institutes developed under the guidance of the Government of

Puducherry. The issuance of type approval and RTO endorsement

shall be within 3 months from the date of issuance of permission for

usage of the CNG Kits.

5. Implementation of Safety Measures

5.1. Design of the transmission pipelines and associated

facilities involved in implementing the CGD network shall be in

accordance with PNGRB-T4S, ASME, ANSI, AGA, API, IGE/TD standards

and recommendations, etc., and supported by the relevant international

standards. The material specifications shall follow API, ASTM, ANSI,

AGA ASME IS, MSS-SP, NACE AND DIN standards or as specified

1612

LA GAZETTE DE L'ETAT

[PART–II

by PNGRB and supported by the relevant International Standards.

Anticipated future development shall be taken into account for the

determination of the final location class.

5.2. The location of the pipeline should be indicated at suitable

intervals by using markers installed above ground at field boundaries,

at all the crossings, and wherever the direction of the Pipeline alignment

changes. These markers shall be installed after the mechanical

completion of works and prior to the precommissioning of the CGD

network in accordance with API RP 1109.

5.3. Suitable Cathodic Protection system, Odourisation system,

efficient maintenance practice for sub-transmissions, Primary steel

network pipelines, MDPE Pipeline networks, Pipeline Patrolling, Leakage

survey and establishment of Network control centres, etc., shall be in

place prior to full-fledged commissioning of the CGD network by the

CGD entities.

5.4. All CGD entities shall have an “emergency service group/

emergency response team” positioned at strategic locations. It is very

much an essential and critical requirement for all the CGD entities to

have a dedicated Emergency Response and Disaster Management Plan

(ERDMP) formulated through approved PNGRB Agencies and shall form

a part of the overall Disaster Management Plan under the Chairmanship

of the respective District Collector.

5.5. All the CGD entities shall have following location wise

contingency plan for their proposed CGD network implementation:

5.5.1. Third Party damage prevention plan covering pipeline

markers, dial before dig, creating safety awareness, effective

advertisement and training, etc.

5.5.2. Action Plan-Monsoon focused.

5.5.3. Developing effective leak detection system and carrying

out mobile leak detection surveys.

5.5.4. Action plan for periodical surveys on vegetation, pressure

drop, public building, and green house.

5.6. All the CGD entities to formulate an effective and efficient

“Asset Integrity Plan” with an Asset Integrity Management system and

Integrated Management Plan, etc., for their CGD networks to ensure the

1613

PART–II]

LA GAZETTE DE L'ETAT

safety of the established CGD network to protect the personnel property,

public and environment through requisite provisions/resources for

prevention, detection and mitigation activities.

5.7. All the CGD entities shall ensure stage-wise pre Audit/

Inspection of their CGD network covering all existing and new CGD

networks including Sub-transmission pipelines, CGS, Distribution mains,

piping facilities downstream of inlet isolation valve of CGS (inclusive

of Primary, Secondary and Tertiary networks)including customer meter

for Commercial and Industrial customers up to the final isolation valve

including connecting hose to the Gas appliances for the domestic

customers as per applicable Statutory norms viz., T4S Audit, Oil Industry

Safety Directorate (OISD) audit, auditing/evaluation of Asset Integrity

Management system, and other provisions made as necessary including

statutory approvals from PESO Department.

5.8. The CGD entity shall take third party insurance policy

coverage for any kind of mishap/accidents occurred to General Public

in addition to the employees/workers involved in the CGD project.

6. Adoption of CNG/LNG as the preferred fuel

6.1. To promote the usage of Clean and Green fuel, CNG/LNG

in the transportation sector, the thrust shall be made to make CNG/LNG

a preferred transportation fuel in public transportation. The CGD entities

shall evolve suitable mechanisms in organizing the Public/Industries

awareness campaign in consultation with the District Authorities.

6.2. Needful guidelines shall be issued for the Transport

Department to encourage the possibilities of CNG/LNG buses while

purchasing new buses and retrofitting the present alternative fuel fleet

(which is viable), in order to actively promote the usage of the CNG/

LNG public transport in a phased manner, based on the CGD

infrastructure developed by concerned the CGD entities for the

respective GAs.

6.3. Needful guidelines will be issued to encourage the

possibilities of converting vehicles being utilized/engaged by the

Government Departments (Cars, Buses, Ambulances, Delivery Vans,

Goods Carriers, etc.,) to CNG vehicles in a phased manner, wherever the

CNG infrastructure is made available by the CGD entities.

1614

LA GAZETTE DE L'ETAT

[PART–II

6.4. New industries along with its allied facilities shall be

encouraged to use Natural Gas instead of the liquid/solid fuels through

the Departments concerned based on the establishment of requisite CGD

infrastructure and ensuring uninterrupted gas supply to the industries

by the CGD entities concerned.

6.5. To encourage the adoption of Natural Gas as Green and

clean fuel by the Government Departments/Local Bodies/Concerned

Authorities, requisite guidelines shall be issued for wider usage of the

environment friendly Natural Gas by all the segments of consumers, i.e.,

residential, industrial and commercial establishments, based on the

establishment of the requisite CGD infrastructure, and ensuring the

uninterrupted gas supply to the industries by the CGD entities

concerned.

6.6. Applicable Policy Guidelines in this regard shall be issued

for the effective implementation of this fuel conversion process in

phased manner based on the readiness of the CGD infrastructure by the

CGD entities.

6.7. LNG has the potential to address persistent requirements

of a clean and environment-friendly fuel because of its low level of

harmful emissions. LNG is approximately 15% to 25% cheaper than diesel,

which will lead to savings in the operational cost for shipping companies

and fishing vessels. The State Level Committee shall make efforts to

facilitate the creation of LNG bunkering facility at appropriate places

under the conversion of fishing vessels to LNG by providing the

suitable incentives.

6.8. Conversion of Diesel Generator in Telecom Service Towers

in the Authorised area with Gas generators

Telecom towers are located all over the Union territory of

Puducherry and draw primary and back up energy from a myriad of

Conventional sources. With the implementation of CGD networks,

Government of Puducherry shall be bringing in appropriate rules/

regulations and initiate measures to facilitate the usage of Natural Gas

based generators by all telecom operators, especially in urban areas, for

an environment friendly alternative, at a lower cost. The State Level

Committee shall facilitate conversion of diesel sets to CNG generators

by bringing in appropriate rules/regulations. The CGD entities shall

submit the required details to facilitate the facility by furnishing the

1615

PART–II]

LA GAZETTE DE L'ETAT

detailed mechanisms proposed for supply of natural gas to these

segments spread all over the areas. Upon receipt of the requisite

proposals from CGD entities, applicable Policy Guidelines in this regard,

shall be issued.

7. CBuD app : This Policy shall emphasis the usage of the Call

Before u Dig (CBuD) app developed by BISAG-N as stated below.

7.1. CBuD mobile app provides an interface for excavating

agencies/contractors to alert/inform owners of existing utility assets

about their upcoming excavation route.

7.2. The underground/utility asset owners such as electricity

cables, water pipe, gas pipe, etc., are to map their underline assets with

GIS coordinates on PM Gati Shakti portal.

7.3. All excavation agencies are mandated by the Government

of Puducherry to use this app.

8. Grievance Redressal Mechanism

8.1. The CGD entity should resolve all the complaints/issues

raised by the General Public/Authority/Other Public Utilities within

specified time period.

8.2. The complaint lodged shall be forwarded to the one

concerned CGD entity and the CGD entity shall address the same and

submit the compliance against, each complaint within seven (07) days

to the District Nodal Officer.

8.3. The District Nodal Officer shall review all the complaints/

grievances lodged by the public/authority/CGD entity on quarterly basis.

9. Overall Terms and Conditions

9.1. For clarification/resolution of interpretation of any term

and/or dispute relating to the function of any provisions under this

Policy shall have to be referred to the Department of Industries and

Commerce, Puducherry and the decision of the Department in this regard

shall be the final and binding on all.

9.2. No right or claim of any incentive/privileges under this

Policy shall be deemed to have been conferred merely on the ground of

the provision in the Policy. Implementation of various provisions

1616

LA GAZETTE DE L'ETAT

[PART–II

covering the incentives, concessions, etc., shall be subject to the issue

of detailed Guidelines/Statutory notifications, wherever necessary in

respect of each item by the Department concerned.

9.3. The Department shall reserve right to amend any provision

of the Policy with the approval of the Government, keeping in view of

the Guidelines issued by the Central Government/Government of

Puducherry from time to time.

10. Abbreviations

Sl. Abbreviations

Description

No.

(1)

(2)

(3)

1

AGA

American Gas Association

2

API

American Petroleum Institute

3

ANSI

American National Standard Institute

4

ARAI

Automotive Research Association of India

5

ASME

American Society of Mechanical Engineers

6

ASTM

American Society for Testing and Materials

7

CAGR

Cumulative Average Growth Rate

8

CBG

Compressed Bio Gas

9

CGD

City Gas Distribution

10

CGS

City Gas Station

11

CNG

Compressed Natural Gas

12

CSR

Corporate Social Responsibility

13

DCS

Decompressed Skid

14

DIN

Deutshces Institute for Nornung (German

Institute for Standardization)

15

DLMC

District Level Monitory Committee

16

DRS

District Regulating Station

17

ERDMP

Emergency Response Disaster Management Plan

18

GA

Geographical Area

1617

PART–II]

LA GAZETTE DE L'ETAT

19

GoI

Government of India

20

HDD

Horizontal Directional Drilling

21

ICAT

International Centre for Automotive Technology

22

IGF

International Code of other Low Flashpoint Fuels

23

IS

Indian Standards

24

IIPC

Industries, Investment Promotion and Commerce

25

LCNG

Liquified Compressed Natural Gas

26

LNG

Liquified Natural Gas

27

MDPE

Medium Density Poly Ethylene

28

MDR

Major District Roads

29

MoEF & CC Ministry of Environmental Forest and Climate Change

30

MoPNG

Ministry of Petroleum and Natural Gas

31

MoRTH

Ministry of Road Transport and Highways

32

MoUD

Ministry of Urban Development

33

MRS

Metering Regulating System

34

MSS-SP

Manufacturers Standardization Society of Standard

Practise.

35

MWP

Minimum Work Programme

36

NHAI

National Highways Authority of India

37

NOC

No Objection Certificate

38

OEM

Original Equipment Manufacturer

39

OISD

Oil Industry Safety Directorate

40

PESO

Petroleum and Explosive Safety Organisation

41

PNG

Pipeline Natural Gas

42

PNGRB

Petroleum and Natural Gas Regulatory Board

43

PRS

Pressure Regulating Station

44

PSR

Puducherry Schedule of Rates

45

RTO

Regional Transport Officer

(1)

(2)

(3)

1618

LA GAZETTE DE L'ETAT

[PART–II

46

SLA

Service Level Agreement

47

SV

Sectionalise Value

48

SR

Service Regulator

49

SOP

Standard Operating Procedure

50

WRO

Water Resource Organisation

(1)

(2)

(3)

online publication at “https://styandptg.py.gov.in”

Published by The Director, Government Press, Puducherry.