[49 ]

GOVERNMENT OF PUDUCHERRY

DEPARTMENT OF REVENUE AND DISASTER MANAGEMENT

(SURVEY AND LAND RECORDS)

(G.O. Ms. No. 10/2025, Puducherry, dated 24th January 2025)

ORDER

The Department of Land Resources is launching a new programme “National

geospatial Knowledge-based land Survey of urban Habitations (NAKSHA)” under

“Digital India Land Records Modernization Programme (DILRMP)” for creation of

Land Records in Urban Areas as a programme to ensure that urban land records

are accurate and up-to-date empowering urban citizens, improving ease of living

and enabling better urban planning.

2. As per Department of Land Resources, Government of India, a one-year

pilot programme NAKSHA would be implemented in more than 100 cities across

the country with Survey of India as Technical Partner under Digital India Land

Records Modernization Programme (DILRMP). Based on the learning’s and

outcomes of the pilot, a larger programme covering all the cities and towns would

be implemented across the country.

Registered with the Registrar

of Newspapers for India

under No. 10410



La Gazette de L' État de Poudouchéry

The Gazette of Puducherry

PART - I



EXTRAORDINAIRE

EXTRAORDINARY



Publiée par

Published by



Autorité

Authority







2025 }

|

4 {

No.

14

Poudouchéry

Mardi

4

Février

2025 (15 Magha 1946)

No.

Puducherry

Tuesday

4th

February

2025

5 0

LA GAZETTE DE L’ETAT

[ PART-I

50

3. In respect of Union territory of Puducherry, the Department of Land

Resources, Government of India has accorded necessary approval for conduct of

survey at Murungapakkam revenue village with an area of 4.87 sq.km. under the

NAKSHA Programme.

4. In order to achieve the desired result the following would be the Roles

and Responsibilities of various agencies of the Government involved in the

NAKSHA Programme

(I) The Survey of India

(i) The Survey of India will be the technical partner for implementation

of this Scheme at Union territory of Puducherry.

(ii) To conduct Aerial survey by engaging third party agencies/

vendors for the selected urban area/Revenue Village.

(iii) To provide necessary technical inputs at the time of preparation

of the Request for proposal (RFP) in regard to engaging third party

agencies/vendors for conduct of aerial survey.

(iv) To demarcate boundaries of the concerned urban area/Revenue

Village that is to be surveyed and to ensure the accurate establishment

of Ground Control Points (GCP’s). To ensure that vendors had provided

adequate provision of control points at each photogrammetric block.

The size of photogrammetric block may be decided by taking into

consideration on the practical constraints of hardware and software in

smooth processing of manned or unmanned aerial data.

(v) To obtain the necessary permissions from the concerned

authorities for conducting aerial survey using Drone flying in the

selected urban areas/Revenue Village.

(vi) To ensure that the successful vendor willing to perform aerial

survey under NAKSHA Programme in Union territory of Puducherry

before commencing the services/work submits the necessary work plan

and deployment plan showing details viz,. the general methods,

arrangements, orders and scheduling for all activities. Further, after the

commencement of services to monitor whether the services rendered by

the vendor are in accordance with approved plan.

(vii) To ensure that the detailed scope of work for the vending

agencies undertaking aerial survey would include providing images along

with attributes, as interpreted from ORI and/or 3D Reality Model, that

are useful for preparing urban land records, property tax assessment and

urban planning including transportation planning, drainage planning,

flood planning, etc.

(viii) Post processing of aerial surveyed data/images and to generate

of Ortho Rectified Imagery (ORI), Orthomosaic, Digital Elevation Model

(DEM), Digital Surface Model (DSM), Digital Terrain Model (DTM), BIM

(Building Information Model) and to ensure that generated ORI, DEM,

DTM, Orthomosaic images which has the features for property tax

assessment such as volume, height, dimension and floor area buildings.

(ix) Identifying and extracting building features and public utilities

such as roads, parks, utilities, etc., from the imagery to create 2D/3D

models.

PART-I ]

LA GAZETTE DE L’ETAT

51

(x) Developing 3D textured models for extracted features to enhance

realism. Integrating extracted features into GIS platforms for analysis and

visualization

(xi) Creating Property layers with attributes like ownership, area and

other relevant information.

(xii) To resolve the issues that arises between the State Authorities

and the vendors for smooth execution/ completion of the work.

(II) Union territory of Puducherry

(i) To undertake the Scanning, Digitization of existing Records and

Maps and to ensure the Integration of Record of Rights (RoRs) including

property tax data and other essential details with the attributes of the

map/vector files generated out of ORI map with assistance of Survey of

India.

(ii) The property tax to be assessed by the concerned Municipalities

in accordance with provisions of the Puducherry Municipalities Act,

1973 for each land parcel comprised in the Revenue Village taking into

consideration of all the essential parameters such as (i) Nature of

occupation (Owner/Tenant/Others), (ii) Type of Usage (Residential/

Commercial/Others), (iii) Type of Classification of Road/Street (located

at Main Road/Internal Road), (iv) Nature of Roof Type (RCC/Madras

Terrace/Asbestos/Country Tiled/Mangalore Tiled/others) and (v) Extent

of building. The assessed property tax to be integrated with the

attributes of the map/vector files generated out of ORI map with

assistance of Survey of India.

(iii) The Departments should undertake field survey activity with the

help of ORI Map (Map 1) by formulating sufficient number of survey

teams. The field Survey team shall be constituted comprising of two

permanent staff (one each from Revenue Department and Local

Administration Department) and two outsourced staff (one surveyor and

one helper) along with one hired vehicle with Driver.

(iv) The survey activity would be undertaken by the team by

demarcating all land parcels on the ground using GNSS Rovers and

controllers. After the field survey activity, final Map (Map 2) would be

published.

(v) Based on the published final Map (Map 2), dispute and grievance

redressal, data correction and processing after hearing appeals would

be carried out as per the Puducherry Settlement Act, 1970 and the

Puducherry Survey and Boundaries Act, 1967. Claim finalization would

involve disposal of objections received relating to the ownership,

classification, share, area, boundary and shape of land parcel.

Culmination of this process would lead to publication of final land

records of urban areas which would be published as FMB/Map

(Map 3).

5. The Government of Puducherry will implement the NAKSHA Programme

with technical and financial supports from the Department of Land resources,

Ministry of Panchayat Raj, Government of India.

5 2

LA GAZETTE DE L’ETAT

[ PART-I

52

6. In order to monitor and review the implementation of NAKSHA

Programme, His Excellency the Lieutenant-Governor, hereby constitutes the State

Level Monitoring and Review Committee for the Union territory of Puducherry as

follows:

(i) The Chief Secretary, Puducherry

. . Chairman

(ii) The Secretary (Revenue, Registration, Survey and

. . Member

Land Records), Puducherry.

(iii) The Secretary (Local Administration Department),

. . Member

Puducherry.

(iv) The Secretary (IT), Puducherry

. . Member

(v) The District Collector-cum-Special Secretary

. . Member-

(Revenue), Puducherry.

Secretary.

(vi) The Deputy/Sub-Collector (Revenue), North,

. . Member

Puducherry.

(vii) The Director of Survey, Puducherry

. . Member

(viii) The Director, Local Administration Department,

. . Member

Puducherry.

(ix) The Municipal Commissioner, Puducherry

. . Member

Municipality, Puducherry.

(x) The District Registrar, Puducherry

. . Member

(xi) The Chief Town Planner – Town and Country

. . Member

Planning Department, Puducherry.

(xii) The Member-Secretary - Puducherry Planning

. . Member

Authorities, Puducherry.

(xiii) The State Informatics, Officer, NIC, Puducherry

. . Member

7. The scope of the State Level Monitoring and Review Committee for the

NAKSHA Programme shall be as follows:

(i) To monitor and review the progress of implementation of the pilot

programme “NAKSHA” in Union territory of Puducherry.

(ii) To facilitate the necessary process reengineering and guide the

implementation authorities.

(iii) To take decision for effective implementation of “NAKSHA”.

(iv) To submit reports, if necessary.

(v) The Committee shall develop a system of spot-check by the officers

of Government of Puducherry through field visits.

(By order of the Lieutenant-Governor)

C. SENDHIL KUMAR,

Under Secretary to Government (Survey).

————

online publication at “https://styandptg.py.gov.in”

Published by the Director, Government Press, Puducherry.