[ 907 ]



La Gazette de L' État de Poudouchéry

The Gazette of Puducherry

PART - II



EXTRAORDINAIRE

EXTRAORDINARY



Publiée par

Published by



Autorité

Authority

Registered with the Registrar

of Newspapers for India under

No. 10410







2025 }

|

16 {

No. 58 Poudouchéry

Mercredi

16

Juillet

2025

No.

Puducherry

Wednesday

16th

July

2025

(25 Asadha 1947)

GOVERNMENT OF PUDUCHERRY

CHIEF SECRETARIAT (HOUSING)

(G.O. Ms. No. 12/2025-Hg., Puducherry, dated 15th July 2025)

ORDER

The Union territory of Puducherry has been witnessing rapid

urbanization and population growth which has led to the drastic changes

in the land use pattern and development of new settlements across the

Union territory of Puducherry. Since, the Comprehensive Development

Plan as well as the Building Bye-Laws have not been revised in a regular

interval in accordance with the changing societal needs, technological

advancements and demands of the public, many constructions happened

in deviations to the Building Bye-Law. Therefore, the Government of

908

LA GAZETTE DE L'ETAT

[PART–II

Puducherry, prepared this Scheme to give an amnesty to the public as

an one-time measure hereby notifies the following Scheme to regularise

the unauthorised constructions and buildings constructed in deviation

to the sanctioned plan, as a one-time measure.

NOTIFICATION

In exercise of the powers conferred by section 46A read with

section 2(37) of the Puducherry Town and Country Planning Act, 1969

(No. 13 of 1970), the Lieutenant-Governor, Puducherry, in consultation

with the Town and Country Planning Department Board, hereby notifies

the following Scheme namely:-

1. Short title, applicability and commencement.— (1) This Scheme

may be called "The Puducherry One-Time Regularization Scheme for the

unpermitted constructions and deviations 2025".

(2) They shall be applicable to all the existing buildings and

buildings where structural works are completed and all roof slabs are

laid, in the jurisdiction of all the Planning Authorities in the Union

territory of Puducherry, constructed from 01-05-1987 to the date of

Notification of the Scheme.

(3) They shall come into force from the date of its Notification

in the Official Gazette.

2. Definitions.— In these Scheme, unless the context otherwise

requires,-

(i) "Act" means, the Puducherry Town and Country Planning

Act, 1969;

(ii) "Board" means, the Puducherry Town and Country Planning

Board constituted under the Act;

(iii) "Building Bye-Laws" means, the Puducherry Building

Bye-Laws and Zoning Regulations, 2012;

(iv) "Construction" means, any construction, addition or

reconstruction which was carried out or completed during the period

from 01-05-1987 to the date of Notification of the Scheme, without

obtaining a building permission from the Planning Authority;

909

PART–II]

LA GAZETTE DE L'ETAT

(v) "Guideline Value" means, the prevailing guideline value of

land in terms of rupees per square meter as fixed by the Registration

Department of the Union Territory, as on the date of filing of Application

for regularization;

(vi) "Notification" means, a Notification published in the Official

Gazette of Puducherry and the word "Notified" shall be construed,

accordingly;

(vii) "Planning Authority" means, any Local Planning Authority

constituted under the Act;

(viii) "Registered Technical Personnel" means a Town Planner /

Architect / Engineer / Structural

Engineer / Quality

Auditor /

Construction Engineer / Developer / Licensed Supervisor registered or

deemed to have been registered by the Planning Authority;

(ix) "Rule" means, the Puducherry Town and Country Planning

Rules, 1974;

(x) "Total Built up area" means, the entire built up area covered

in the building including common areas and balconies on all floors;

(xi) "Unauthorized Deviated Construction" means, any

construction, addition or reconstruction which was carried out or

completed during the period from 01-05-1987 to the date of Notification

of the Scheme, in deviation to the sanctioned building plan issued by

the Planning Authority;

(xii) Words and expressions used and not defined in this

Scheme, but defined in the Act, the Rules and the Puducherry Building

Bye-Laws and Zoning Regulations, 2012 made thereunder, shall have the

same meaning assigned to them in the said Act, the Rules and the

Building Bye-Laws.

3. Regularization Notice to the Building owners.— The concerned

Planning Authority may serve a notice to all the owners or occupiers of

unauthorized buildings or deviated buildings within a period of six

months from the date of notification of the Scheme.

4. Compulsory Online Application for Regularization.— (1) As

per clause 1(2) as stated above, an Application for regularization of

buildings constructed without prior plan approval / buildings

constructed in deviation to the approved plan as given in Annexure-I

910

LA GAZETTE DE L'ETAT

[PART–II

shall be made by the Owner / General Power of Attorney / Registered

Association to the Planning Authority in the prescribed pro forma along

with the documents listed below only through online mode. It shall be

filed within a period of one year from the date of Notification of this

Scheme along with the required fees as mentioned in clause 6. If any

Owner / General Power of Attorney / Registered Association does not

apply within the stipulated time, he shall be liable for enforcement action

under the law, as per clause 13 and his building shall not be taken up

for regularization under this Scheme.

(2) The Application shall be accompanied by the following

documents, namely:-

(a) Proof for payment of Application fee, if any, paid to the

Planning Authority under this Scheme.

(b) Floor plans, elevations and sections of the buildings

constructed, the site plan, building plan and wherever applicable

the service plans, parking plans drawn as provided in the

Puducherry Building Bye-Laws and Zoning Regulations and

specification thereunder. The plans so submitted shall be:

(i) Certified by the owner to the effect that "These are the

drawings having reference to the details furnished in

the Application and documents enclosed along with it".

(ii) Certified by the Registered Technical Personnel to the

effect that "These are the drawings having reference to

the details furnished in online Application and

documents enclosed along with it and that the details

and measurements therein conform to the actual

constructions made at the site. Further, certify that the

unauthorized building(s) is/are structurally stable".

(iii) Certified by a Registered Structural Engineer to the

effect that "The unauthorized Special Buildings /

Multi-storied Buildings / Group developments as per

the drawings and Application(s) enclosed herewith is /

are structurally stable".

(c) Self-attested copy of ownership documents of the land / site /

Apartment.

911

PART–II]

LA GAZETTE DE L'ETAT

(d) Time stamped digital photographs of the unauthorised

buildings applied for regularisation under this Scheme (minimum

of 4 numbers from all the four sides showing all external details

of development) which is to be signed by the owner and the

Registered Technical Personnel.

(e) Proof for the period of completion of the construction /

structural works completed / roof laid (copy of property tax /

electricity / water supply bills).

(f) Proof of valid registration of the Registered Technical

Personnel.

(g) Copies of the documents regarding Court cases, if any

(Courts, Tribunal, Ombudsman, etc.) pertaining to or of reference

to the plot or constructions therein.

(h) Any Government orders, circulars, any form of

communication(s) pending to the plot / land or any construction

works therein.

(i) Copy of approved plans and / or permit issued, if any, by

the Planning Authority.

(j) Details of action, if any taken by the Planning Authority

against the unauthorized construction.

(k) Copy of previous orders, if any, regularizing

constructions within the Plot.

(l) Copy of the resolution made by all owners of their

Association (for residential Apartments).

(m) Checklist and acknowledgment.

(n) Any other details pertaining to or of relevance to the plot

and buildings therein, if any.

(3) If, the online Application received is not in order and /or

incomplete for further scrutiny, the Planning Authority shall return the

same, within ninety working days of the receipt of the online Application,

to the Applicant (Annexure-III).

(4) The site of construction of unauthorized buildings

constructed in unapproved / unauthorized layouts falling outside the

Comprehensive Development Plan area in Puducherry and Karaikal

912

LA GAZETTE DE L'ETAT

[PART–II

regions shall be regularized by collecting charges as per the G.O. Ms.

No. 20/2017-Hg., dated 20-10-2017, as subsequently amended, in the first

instance and thereafter the buildings constructed in the said site shall

be considered for regularisation.

5. Clearance from other Authorities / Departments in certain

cases.— In the following cases, clearance (NOC) shall be obtained by

the Applicants from the concerned Authorities before considering the

Application under the Scheme by the Planning Authority:

(a) In respect of cases of residential and non-residential

buildings exceeding 17 mts. in height, and buildings of public

congregation like Schools, Cinema Theatres, Function halls and other

assembly buildings on plot area of 500 sq.m. and above:-

From the Fire Service Department, Puducherry or from the

empanelled Third Party Fire Safety Certifying Agencies notified by the

Government of Puducherry.

(b) From the Airport Authority of India / Archaeological Survey

of India / Railways or any State / Central Government Organizations,

wherever applicable.

6. Payment of Fee and Regularization Charges.— (1)Application

Fee.— A non-refundable Application fee of

5000 (Rupees five

thousand only) for residential buildings and 10,000 (Rupees ten

thousand only) for other buildings shall be paid in the name of the

Member-Secretary of the concerned Planning Authority at the time of

filing online Application for regularization by way of e-transfer.

(2) Scrutiny Fee.— A non-refundable scrutiny fee at the rate

of 20 per sq.m. for residential buildings and 50 per sq.m. for

Applications other than residential buildings shall be paid in the name

of the Member-Secretary of the concerned Planning Authority along with

the Application by way of e-transfer.

(3) Regularization Charges.— (a) The Owner / Applicant shall

pay the regularization charges at the rates as given in Annexure-II.

(b) In case of deficit parking area in the ongoing

constructions, online Application for regularization shall be

considered, only, if parking area is provided as per the

requirements specified in the Puducherry Building Bye-Laws

and Zoning Regulations. However, in case of deficit parking area

913

PART–II]

LA GAZETTE DE L'ETAT

in the buildings completed and occupied before this Notification,

regularization charge equivalent to the Weighted Guideline Value

of the land rated in the concerned locality applicable at the time

of submission of online Application shall be paid for the deficit

parking area.

(c) The charges are levied for the total violated built up area

on all floors. The charges does not include the fee / charges such

as permit / development charges etc., to be paid to other

Departments / Local Bodies / Government agencies.

(d) The Planning Authority after verification of the self

computation table of regularization charge filed by the Applicant

shall intimate in Annexure-IV about the regularization charges

to be paid by the Applicant.

(e) The Applicant shall remit the regularization charges by

way of e-transfer to the Member-Secretary of the concerned

Planning Authority within 30 days from the receipt of notice as

in Annexure -IV.

7. Regularization Scheme will not be applicable to the following

cases.— Regularization of unauthorized constructions shall not be

considered in the following cases and in cases where public interest

and public safety are likely to be adversely affected, viz.

(a) Encroachment on Government land or property belonging to

Public undertakings, Puducherry Housing Board, Puducherry Industrial

Promotion and Development Investment Corporation, Puducherry Urban

Development Agency, Local Bodies, Endowments, Hindu Religious

Institutions and Wakf Board, etc.

(b) Land for which the Applicant has no Title Deed.

(c) Surplus land declared under the Puducherry Land Reforms

Act / Agriculture Land / Ceiling / lands resumed under the Land

Acquisition Act, etc.

(d) Buildings affected under alignment of any proposed road

under Master Plan / Comprehensive Development Plan / Road

Development Plan or any other public road / Rail corridors.

(e) Tank bed and lake, canal bunds, river course / drain / canals

and any other water body.

914

LA GAZETTE DE L'ETAT

[PART–II

(f) Prohibited buildings under the Coastal Regulation Zone and

such other environmentally restricted zones as prescribed in the

respective regulations.

(g) Layout / Master Plan Open Spaces / Areas earmarked for

Recreational Use in the Master Plan / Comprehensive Development Plan.

(h) Buildings that are not in conformity with the land use as

notified in the Master Plan / Comprehensive Development Plan.

(i) Site under legal litigation / disputes regarding ownership of

the site / building.

(j) Building constructions that compromises on structural safety

of the building.

(k) Under any circumstances the buildings / floors constructed

after the cut-off date as stipulated in clause 1(2) are not eligible for

regularization. If any Registered Technical Personnel (RTP) / Applicant

submit application for regularization of such buildings suppressing the

facts, he / she will be black listed without any notice. No Application

of blacklisted RTP is acceptable, until unblocked by the Planning

Authority with the consent of the Town and Country Planning Board.

8. Exemption. — (i) Buildings constructed prior to 01-05-1987.

(ii) Huts, semi-permanent and RCC residential buildings up to

two storeys (G+1) in sites up to 60 sq. m. of built up area are exempted

from operation of this Scheme.

(iii) Residential building falling in slums, identified / notified by

the Puducherry Slum Clearance Board / other identified slums / free

house sites given by the Government and residential buildings

constructed by the beneficiaries of various Government Housing

Subsidy Schemes (for Below Poverty Line (BPL) category only).

9. Violation after submission of online Application.— During

verification, if it is found that the Applicant has misrepresented /

undertaken further additions or extensions to the existing building after

submitting the online Application, then such Application shall be

summarily rejected and necessary action shall be taken against such

unauthorized buildings including sealing / demolition of premises as per

law and also legal actions shall be initiated against the Registered

Technical Personnel and the Applicant.

915

PART–II]

LA GAZETTE DE L'ETAT

10. Scrutiny, Rejection and Approval by the Planning Authority.—

After receipt of the online Application for regularization in the

prescribed pro forma (Annexure-I) along with required documents and

plans as per this Scheme, the Planning Authority (or) and the Town and

Country Planning Department shall carryout inspection, confirm the

status of the building and scrutinize the Application. The Applications

for regularization of ordinary residential and ordinary commercial

buildings shall be disposed of by the Member-Secretary of the Planning

Authority. The online Applications for regularization of buildings other

than ordinary residential and ordinary commercial buildings shall be

placed before the Planning Authority Committee, for its approval. The

Planning Authority / Committee will examine whether the minimum safety

and security provisions in the building are provided such as, clearance

from overhead electric lines, availability of minimum width of road,

availability of parking facilities, facilities for persons with disabilities,

fire escape staircases, lift, provisions for waste disposal, rainwater

storage arrangements, solar assisted water heating and lighting systems

and any other provisions in the building Bye-Laws having serious safety

and security concerns. The buildings having outright violations that

exceed the limits of regularization tolerance as above shall not be

considered by the Planning Authority / Committee and its decision shall

be communicated to the Applicant. The Applicant shall comply with the

directions of the Planning Authority Committee within 30 days from the

date of communication of the decision. The Planning Authority shall

communicate its approval or rejection to the Applicant, as early as

possible, but not beyond six months from the date of receipt of online

Applications (Annexures-V and VI). Mere submission of online

Application or any delay in communication of final orders in the matter

by the Planning Authority will not be construed as Approval.

11. Regularization of individual flats.— (1) Individual flats in a

building shall be regularized following two stage process. Wherein, the

registered Association or Society of the building has to submit drawings

for the entire building along with detailed infrastructure drawings.

Individual flat owner shall submit detailed drawings for the unit owned

by him in the building. Scrutiny, subject to clause (10) shall be made as

follows:

(i) An in-principle clearance shall be given for the entire

building in which the said residential / commercial flat is

situated.

916

LA GAZETTE DE L'ETAT

[PART–II

(ii) If, the entire building is found approvable, then

regularization of the individual flat / floor under reference shall

be done.

(2) The Planning Authority Committee shall decide the

regularization charges that is to be paid in common by the registered

Association or Society and that is to be paid by the individual for their

individual flat / floor of the building.

12. Issue of proceedings showing Regularisation of the Buildings

and Occupancy Certificate (Annexure-V).— In case of approval, the

Planning Authority shall issue proceedings to the effect that the building

is regularized under this Scheme and the proceedings issued by the

Planning Authority itself shall be treated as Occupancy Certificate. In

case of incomplete buildings, Occupancy Certificate shall be issued only

after the verification of the completion of buildings, in all aspects.

13. Consequences of non-regularization.— Where no regulations

is ordered under this Scheme for an unauthorised / deviated building;

then-

(a) No electricity, water supply, drainage and sewerage

connections shall be extended to such unauthorised/deviated building;

(b) Such unauthorised / deviated building shall not be

registered by the Registration Department.

(c) Such unauthorized constructions would be treated as

continuing offence and penalty as per the Act / Rules would be levied.

(d) Other enforcement action including sealing/demolition shall

be initiated by the Planning Authority as per the Building Bye-Law

provisions.

(e) Unless the existing buildings in a site are regularised, no

fresh building Applications shall be considered by the Planning

Authority.

14. Infrastructure Development Fund.— (i) All the fees arising

under this Scheme shall be kept in a separate corpus fund by the

respective Planning Authority. Such funds shall be utilized by the

Planning Authority for the purpose of augmentations, improvements or

creation of an infrastructure facility in order to ease the pressure on the

infrastructure occurred due to the deviation.

917

PART–II]

LA GAZETTE DE L'ETAT

(ii) The following Committee on Infrastructure shall be

constituted for each region as follows:

I. Puducherry Planning Area

(a) Chief Secretary

. . Chairman

(b) Secretary (Public Works Department)

. . Member

(c) Secretary (Town and Country Planning)

. . Member

(d) Secretary (Local Administration)

. . Member

(e) Chief Engineer, Public Works Department

. . Member

(f) Member-Secretary,

. . Convenor

Puducherry Planning Authority.

II. Karaikal Planning Area

(a) District Collector, Karaikal District

. . Chairman

(b) Municipal Commissioner,

. . Member

Karaikal Municipality.

(c) Deputy Director,

. . Member

Local Administration Department.

(d) Superintending Engineer,

. . Member

Public Works Department, Karaikal.

(e) Member-Secretary,

. . Convenor

Karaikal Planning Authority.

III. Yanam Planning Area

(a) Regional Administrator, Yanam

. . Chairman

(b) Municipal Commissioner, Yanam Municipality . . Member

(c) Executive Engineer,

. . Member

Public Works Department, Yanam region

(d) Member-Secretary, Yanam Planning Authority . . Convenor

918

LA GAZETTE DE L'ETAT

[PART–II

IV. Mahe Planning Area

(a) Regional Administrator, Mahe

. . Chairman

(b) Municipal Commissioner, Mahe Municipality . . Member

(c) Executive Engineer,

Public Works Department, Mahe region

. . Member

(d) Member-Secretary, Mahe Planning Authority

. . Convenor

(iii) This Committee shall examine the requirement of the

infrastructure projects for the respective planning areas and recommend

the executing agency for that works.

(iv) Based on the Committee recommendation, the Planning

Authority shall deposit the work to the executing agency and the works

to be completed following the due procedure by the executing authority.

15. Appeals.— (i) Any person aggrieved by any Order passed

under the Scheme by the Planning Authority may prefer an Appeal to

the Committee viz., Town and Country Planning Board, within 30 days

from the date of receipt of the Order.

(ii) The Town and Country Planning Board shall dispose of the

Appeals, as per the provisions contained in the Act / Rules.

(By order of the Lieutenant-Governor)

S. MURUGESAN,

Under Secretary to Government (Housing).

————

919

PART–II]

LA GAZETTE DE L'ETAT

ANNEXURE-I

920

LA GAZETTE DE L'ETAT

[PART–II

921

PART–II]

LA GAZETTE DE L'ETAT

922

LA GAZETTE DE L'ETAT

[PART–II

923

PART–II]

LA GAZETTE DE L'ETAT

924

LA GAZETTE DE L'ETAT

[PART–II

925

PART–II]

LA GAZETTE DE L'ETAT

16. INDEMNITY BOND AND UNDERTAKING

(Notarized undertaking to be executed on

100 Non-Judicial e-stamp paper)

1. This Undertaking / Indemnity bond is executed on this

................................................................................... day of 20 .................

at .................................................... by the Owner / Applicant, (hereinafter

called the first party) which terms shall include their legal heirs,

successors, agents, assignees etc.

A

Name and Address of the Owner/Applicant (First Party)

(1)

Name

:

(2)

Age

:

(3)

S / D / W / o.

:

(4)

Door / Plot / Flat No.

:

(5)

Road / Street

:

(6)

Locality

:

(7)

Village / Town / City

:

PIN :

(8)

District

:

(9)

e-Mail

:

(10)

Phone / Mobile No.

:

B

Location of the Building

(1)

Plot / Door No.

:

(2)

R.S. No. / T.S. No.

:

(3)

Ward No. / Block No.

:

(4)

Street / Road Name

:

(5)

Layout / Nagar Name

:

(6)

Village Name

:

(7)

Municipality / Commune Name

:

2. Executed in favour of the Member-Secretary, ....................

Planning Authority, (hereinafter called the second party) which term shall

include their officers, successors in office and staff.

926

LA GAZETTE DE L'ETAT

[PART–II

3. Declaration-cum-Undertaking and Indemnity Bond by the Owner /

Applicant:

(a) Whereas, the FIRST PARTY has applied for the

regularisation of the unauthorized constructed / deviated building

constructed to a total built up area ................ sq.m. Whereas, the

SECOND PARTY has agreed to consider regularisation of the

unauthorized construction/deviation in the said site / plot in terms of

the Puducherry one-time regularization Scheme for the unpermitted

constructions and deviations 2025 and made it a condition that there

shall not be any defect / litigations / land acquisition over the said site /

land and the same shall be free from all claims of Government/Banks /

and attachment of Courts, and the FIRST PARTY has to indemnify the

SECOND PARTY to this effect.

And whereas, the FIRST PARTY having agreed to the aforesaid

condition hereby indemnifies the SECOND PARTY with the above

assurance and hereby solemnly declare that the abovesaid site / land is

the property of the FIRST PARTY which is possessed by him / her since,

the date of purchase and the same is free from all defects, litigations,

claims and attachments from any Courts, etc., and in case of any

disputes / litigations arises at any time, in future, the FIRST PARTY will

be responsible for the settlement of the same and the SECOND PARTY

will not be a party to any such disputes/litigations.

(b) I / We affirm that I / We shall not encroach any Government

land / canal / road portion adjoining or passing the plot / land, in any

manner. If any such encroachment is found at the later stage, the

regularisation of the building shall be deemed to be revoked and shall

be liable to be dealt as per law and the Planning Authority shall not be

held responsible. (c) I / We affirm that I / We shall pay necessary fees/

charges to the Planning Authority.

4. I/We, the above named deponent, do hereby solemnly affirm and

certify that we have executed this undertaking with free will and signed

this ........................... day of ......................... 20 .......................... .

Name of the Owner / Applicant

:

Address

:

Signature

:

Sworn and signed before me.

Notary

927

PART–II]

LA GAZETTE DE L'ETAT

17. LIST OF DOCUMENTS TO BE ENCLOSED ALONGWITH

THE APPLICATION

Details of documents

1. Sanctioned Plan copy.

2. Copy of Ownership Document/Title Deed for land / site / flat

self-attested.

3. Plans prepared by Registered Technical Personnel and signed by

Applicant and RTP.

4. Self Computation Table for Regularisation charge.

5. e-transfer receipt in favour of the Member-Secretary, Planning

Authority separately towards (i) Application and Scrutiny fee and

(ii) the Regularisation Charge.

6. Encumbrance certificate of land / site / apartment for the past

15 years issued not prior to 30 days from the date of submitting the

online Application.

7. 4 Nos. of time stamped photographs from four sides of the

unauthorised construction showing all external details of

development, which is signed by the owner and the Registered

Technical Personnel.

8. Indemnity Bond and Undertaking.

9. NOC from the Fire Service Department / Airport Authority of India /

Archaeological Survey of India / Railways or any State / Central

Government Organisations (wherever applicable).

10. Proof for the period of completion of the construction/structural

works completed/ roof laid (copy of property tax/electricity/water

supply bills).

11. Weighted Guideline Rate value of the plot as on date of Application.

928

LA GAZETTE DE L'ETAT

[PART–II

929

PART–II]

LA GAZETTE DE L'ETAT

930

LA GAZETTE DE L'ETAT

[PART–II

ANNEXURE – II

(See clause 6)

REGULARISATION CHARGES FOR UNAUTHORISED

CONSTRUCTION / DEVIATION

1. Regularisation charges for unauthorised deviated construction

If, a building or part thereof has been constructed deviating from the

approved plan of the Planning Authority, the same shall be regularised

at the rates provided in the Table below.

Table

Type of building constructed

Rate per sq. m. (in

)

deviated from the approved plan

(a) Residential buildings.

500

(b) Mixed use buildings and

750

Special buildings.

(c) Multi-storeyed buildings.

1,000

(d) Government buildings.

Exempted from the payment of

Regularisation Charges. However,

t he b ui l di ng s ho ul d b e go t

regularised from the Planning

Authority.

(e) Government aided schools

50% of (b) or (c) as applicable

above.

2. Regularisation charges for unauthorised construction

If, a building or part thereof has been constructed unauthorisedly, i.e.,

without obtaining the requisite building permission from the Planning

Authority, as required under the Building Bye-Laws, the same shall be

regularised at the rates as stipulated in the above Table with a multiplication

factor of 1.2.

931

PART–II]

LA GAZETTE DE L'ETAT

ANNEXURE – III

(See clause 4)

......................................... PLANNING AUTHORITY

No. ...........................

Date :

INTIMATION REGARDING ADDITIONAL PARTICULARS

TO BE FURNISHED FOR REGULARISATION

OF UNAUTHORISED CONSTRUCTIONS/DEVIATIONS

To :

Tmt./Thiru ...........................................

.............................................................

.............................................................

Sir/Madam,

Your online Application No. ........................., date .........................,

for the regularisation of unauthorised construction / deviation

at .......................................................... (precisely state the location of the

building) has been examined by the .............................................. Planning

Authority.

The Planning Authority Committee has approved the above-

mentioned unauthorised construction for regularisation in accordance

with the provisions in “The Puducherry one-time regularization Scheme

for the unpermitted constructions and deviations 2025”, under the

following conditions.

(1)

(2)

(3)

In accordance to the above, you are directed to comply with all

the above conditions and submit a letter of intimation to the

Member-Secretary to the effect that the above conditions are compiled

alongwith the following documents within ................. days.

Member-Secretary

................................ Planning Authority

932

LA GAZETTE DE L'ETAT

[PART–II

ANNEXURE – IV

(See clause 6)

......................................... PLANNING AUTHORITY

No. ...........................

Date :

INTIMATION REGARDING REMITTANCE OF

REGULARISATION CHARGES FOR REGULARISATION

OF UNAUTHORISED CONSTRUCTIONS / DEVIATIONS

To :

Tmt./Thiru ...........................................

.............................................................

.............................................................

Sir/Madam,

It is hereby acknowledged that the receipt of the NOC's and other

documents for the regularisation of the building constructed by you

at .....................................................................................................................

You are directed to remit the regularisation charges of

......................,

by e-transfer in the name of the Member-Secretary, ............................

Planning Authority within 30 days from the receipt of this notice, failing

which your application will be refused and further action will be taken

on the unauthorised construction/deviations as per the Puducherry

Town and Country Planning Act and the Puducherry Building Bye-Laws

and Zoning Regulations.

Member-Secretary

................................ Planning Authority

933

PART–II]

LA GAZETTE DE L'ETAT

ANNEXURE – V

(See clauses 10 and 12)

......................................... PLANNING AUTHORITY

No. ...........................

Date :

FINAL ORDERS REGARDING REGULARISATION OF

UNAUTHORISED CONSTRUCTION / DEVIATION

To :

Tmt./Thiru ...........................................

.............................................................

.............................................................

Sir/Madam,

Your online application No. .........................., date ..........................

for the regularisation of unauthorised construction at ..........................

.............................................. (precisely state the location of the building)

has been considered by the .......................... Planning Authority.

The Planning Authority Committee has approved the above-

mentioned unauthorised construction for regularisation in accordance

with the provisions in “The Puducherry one-time regularization Scheme

for the unpermitted constructions and deviations 2025” vide Order

No. .........................., date ...................... under the following conditions:

(1)

(2)

The conditions stipulated in the order were complied with and the

following NOCs were submitted:

(1)

(2)

934

LA GAZETTE DE L'ETAT

[PART–II

The regularisation charges of

................................... as stipulated

in the order have been remitted vide e-transfer No. ...............................,

date .......................................... Hence, in accordance to the orders of

the Committee, it is certified that the unauthorised construction

of ...................................... building at ................................... (precisely

mention the location of the building) is hereby regularised under the

provisions of “The Puducherry one-time regularization Scheme for the

unpermitted constructions and deviations 2025”.

Member-Secretary

................................ Planning Authority

————

ANNEXURE – VI

(G.O. Ms. No. 12/2025-Hg, dated 15-07-2025)

(See clause 10)

......................................... PLANNING AUTHORITY

No. ...........................

Date :

ORDER REJECTING THE REGULARISATION APPLICATION

To :

Tmt./Thiru ...........................................

.............................................................

.............................................................

Sir/Madam,

Whereas, your online Application for the regularisation of the

unauthorised construction at ................................................... (precisely

mention the location of the site) has been examined as per the provisions

of “The Puducherry one-time regularization Scheme for the unpermitted

constructions and deviations 2025” has been rejected due to the

following reasons:

(1)

(2)

935

PART–II]

LA GAZETTE DE L'ETAT

Now, therefore, in pursuance of the provisions in “The Puducherry

one-time regularization Scheme for the unpermitted constructions and

deviations 2025”, it is hereby informed that your Application for

regularisation is hereby refused and your unauthorized construction

cannot be regularised.

Member-Secretary

................................ Planning Authority

Date :

Place:

————

online publication at “https://styandptg.py.gov.in”

Published by the Director, Government Press, Puducherry.