[ 907 ]
La Gazette de L' État de Poudouchéry
The Gazette of Puducherry
PART - II
EXTRAORDINAIRE
EXTRAORDINARY
Publiée par
Published by
Autorité
Authority
Registered with the Registrar
of Newspapers for India under
No. 10410
2025 }
|
16 {
No. 58 Poudouchéry
Mercredi
16
Juillet
2025
No.
Puducherry
Wednesday
16th
July
2025
(25 Asadha 1947)
GOVERNMENT OF PUDUCHERRY
CHIEF SECRETARIAT (HOUSING)
(G.O. Ms. No. 12/2025-Hg., Puducherry, dated 15th July 2025)
ORDER
The Union territory of Puducherry has been witnessing rapid
urbanization and population growth which has led to the drastic changes
in the land use pattern and development of new settlements across the
Union territory of Puducherry. Since, the Comprehensive Development
Plan as well as the Building Bye-Laws have not been revised in a regular
interval in accordance with the changing societal needs, technological
advancements and demands of the public, many constructions happened
in deviations to the Building Bye-Law. Therefore, the Government of
908
LA GAZETTE DE L'ETAT
[PART–II
Puducherry, prepared this Scheme to give an amnesty to the public as
an one-time measure hereby notifies the following Scheme to regularise
the unauthorised constructions and buildings constructed in deviation
to the sanctioned plan, as a one-time measure.
NOTIFICATION
In exercise of the powers conferred by section 46A read with
section 2(37) of the Puducherry Town and Country Planning Act, 1969
(No. 13 of 1970), the Lieutenant-Governor, Puducherry, in consultation
with the Town and Country Planning Department Board, hereby notifies
the following Scheme namely:-
1. Short title, applicability and commencement.— (1) This Scheme
may be called "The Puducherry One-Time Regularization Scheme for the
unpermitted constructions and deviations 2025".
(2) They shall be applicable to all the existing buildings and
buildings where structural works are completed and all roof slabs are
laid, in the jurisdiction of all the Planning Authorities in the Union
territory of Puducherry, constructed from 01-05-1987 to the date of
Notification of the Scheme.
(3) They shall come into force from the date of its Notification
in the Official Gazette.
2. Definitions.— In these Scheme, unless the context otherwise
requires,-
(i) "Act" means, the Puducherry Town and Country Planning
Act, 1969;
(ii) "Board" means, the Puducherry Town and Country Planning
Board constituted under the Act;
(iii) "Building Bye-Laws" means, the Puducherry Building
Bye-Laws and Zoning Regulations, 2012;
(iv) "Construction" means, any construction, addition or
reconstruction which was carried out or completed during the period
from 01-05-1987 to the date of Notification of the Scheme, without
obtaining a building permission from the Planning Authority;
909
PART–II]
LA GAZETTE DE L'ETAT
(v) "Guideline Value" means, the prevailing guideline value of
land in terms of rupees per square meter as fixed by the Registration
Department of the Union Territory, as on the date of filing of Application
for regularization;
(vi) "Notification" means, a Notification published in the Official
Gazette of Puducherry and the word "Notified" shall be construed,
accordingly;
(vii) "Planning Authority" means, any Local Planning Authority
constituted under the Act;
(viii) "Registered Technical Personnel" means a Town Planner /
Architect / Engineer / Structural
Engineer / Quality
Auditor /
Construction Engineer / Developer / Licensed Supervisor registered or
deemed to have been registered by the Planning Authority;
(ix) "Rule" means, the Puducherry Town and Country Planning
Rules, 1974;
(x) "Total Built up area" means, the entire built up area covered
in the building including common areas and balconies on all floors;
(xi) "Unauthorized Deviated Construction" means, any
construction, addition or reconstruction which was carried out or
completed during the period from 01-05-1987 to the date of Notification
of the Scheme, in deviation to the sanctioned building plan issued by
the Planning Authority;
(xii) Words and expressions used and not defined in this
Scheme, but defined in the Act, the Rules and the Puducherry Building
Bye-Laws and Zoning Regulations, 2012 made thereunder, shall have the
same meaning assigned to them in the said Act, the Rules and the
Building Bye-Laws.
3. Regularization Notice to the Building owners.— The concerned
Planning Authority may serve a notice to all the owners or occupiers of
unauthorized buildings or deviated buildings within a period of six
months from the date of notification of the Scheme.
4. Compulsory Online Application for Regularization.— (1) As
per clause 1(2) as stated above, an Application for regularization of
buildings constructed without prior plan approval / buildings
constructed in deviation to the approved plan as given in Annexure-I
910
LA GAZETTE DE L'ETAT
[PART–II
shall be made by the Owner / General Power of Attorney / Registered
Association to the Planning Authority in the prescribed pro forma along
with the documents listed below only through online mode. It shall be
filed within a period of one year from the date of Notification of this
Scheme along with the required fees as mentioned in clause 6. If any
Owner / General Power of Attorney / Registered Association does not
apply within the stipulated time, he shall be liable for enforcement action
under the law, as per clause 13 and his building shall not be taken up
for regularization under this Scheme.
(2) The Application shall be accompanied by the following
documents, namely:-
(a) Proof for payment of Application fee, if any, paid to the
Planning Authority under this Scheme.
(b) Floor plans, elevations and sections of the buildings
constructed, the site plan, building plan and wherever applicable
the service plans, parking plans drawn as provided in the
Puducherry Building Bye-Laws and Zoning Regulations and
specification thereunder. The plans so submitted shall be:
(i) Certified by the owner to the effect that "These are the
drawings having reference to the details furnished in
the Application and documents enclosed along with it".
(ii) Certified by the Registered Technical Personnel to the
effect that "These are the drawings having reference to
the details furnished in online Application and
documents enclosed along with it and that the details
and measurements therein conform to the actual
constructions made at the site. Further, certify that the
unauthorized building(s) is/are structurally stable".
(iii) Certified by a Registered Structural Engineer to the
effect that "The unauthorized Special Buildings /
Multi-storied Buildings / Group developments as per
the drawings and Application(s) enclosed herewith is /
are structurally stable".
(c) Self-attested copy of ownership documents of the land / site /
Apartment.
911
PART–II]
LA GAZETTE DE L'ETAT
(d) Time stamped digital photographs of the unauthorised
buildings applied for regularisation under this Scheme (minimum
of 4 numbers from all the four sides showing all external details
of development) which is to be signed by the owner and the
Registered Technical Personnel.
(e) Proof for the period of completion of the construction /
structural works completed / roof laid (copy of property tax /
electricity / water supply bills).
(f) Proof of valid registration of the Registered Technical
Personnel.
(g) Copies of the documents regarding Court cases, if any
(Courts, Tribunal, Ombudsman, etc.) pertaining to or of reference
to the plot or constructions therein.
(h) Any Government orders, circulars, any form of
communication(s) pending to the plot / land or any construction
works therein.
(i) Copy of approved plans and / or permit issued, if any, by
the Planning Authority.
(j) Details of action, if any taken by the Planning Authority
against the unauthorized construction.
(k) Copy of previous orders, if any, regularizing
constructions within the Plot.
(l) Copy of the resolution made by all owners of their
Association (for residential Apartments).
(m) Checklist and acknowledgment.
(n) Any other details pertaining to or of relevance to the plot
and buildings therein, if any.
(3) If, the online Application received is not in order and /or
incomplete for further scrutiny, the Planning Authority shall return the
same, within ninety working days of the receipt of the online Application,
to the Applicant (Annexure-III).
(4) The site of construction of unauthorized buildings
constructed in unapproved / unauthorized layouts falling outside the
Comprehensive Development Plan area in Puducherry and Karaikal
912
LA GAZETTE DE L'ETAT
[PART–II
regions shall be regularized by collecting charges as per the G.O. Ms.
No. 20/2017-Hg., dated 20-10-2017, as subsequently amended, in the first
instance and thereafter the buildings constructed in the said site shall
be considered for regularisation.
5. Clearance from other Authorities / Departments in certain
cases.— In the following cases, clearance (NOC) shall be obtained by
the Applicants from the concerned Authorities before considering the
Application under the Scheme by the Planning Authority:
(a) In respect of cases of residential and non-residential
buildings exceeding 17 mts. in height, and buildings of public
congregation like Schools, Cinema Theatres, Function halls and other
assembly buildings on plot area of 500 sq.m. and above:-
From the Fire Service Department, Puducherry or from the
empanelled Third Party Fire Safety Certifying Agencies notified by the
Government of Puducherry.
(b) From the Airport Authority of India / Archaeological Survey
of India / Railways or any State / Central Government Organizations,
wherever applicable.
6. Payment of Fee and Regularization Charges.— (1)Application
Fee.— A non-refundable Application fee of
5000 (Rupees five
thousand only) for residential buildings and 10,000 (Rupees ten
thousand only) for other buildings shall be paid in the name of the
Member-Secretary of the concerned Planning Authority at the time of
filing online Application for regularization by way of e-transfer.
(2) Scrutiny Fee.— A non-refundable scrutiny fee at the rate
of 20 per sq.m. for residential buildings and 50 per sq.m. for
Applications other than residential buildings shall be paid in the name
of the Member-Secretary of the concerned Planning Authority along with
the Application by way of e-transfer.
(3) Regularization Charges.— (a) The Owner / Applicant shall
pay the regularization charges at the rates as given in Annexure-II.
(b) In case of deficit parking area in the ongoing
constructions, online Application for regularization shall be
considered, only, if parking area is provided as per the
requirements specified in the Puducherry Building Bye-Laws
and Zoning Regulations. However, in case of deficit parking area
913
PART–II]
LA GAZETTE DE L'ETAT
in the buildings completed and occupied before this Notification,
regularization charge equivalent to the Weighted Guideline Value
of the land rated in the concerned locality applicable at the time
of submission of online Application shall be paid for the deficit
parking area.
(c) The charges are levied for the total violated built up area
on all floors. The charges does not include the fee / charges such
as permit / development charges etc., to be paid to other
Departments / Local Bodies / Government agencies.
(d) The Planning Authority after verification of the self
computation table of regularization charge filed by the Applicant
shall intimate in Annexure-IV about the regularization charges
to be paid by the Applicant.
(e) The Applicant shall remit the regularization charges by
way of e-transfer to the Member-Secretary of the concerned
Planning Authority within 30 days from the receipt of notice as
in Annexure -IV.
7. Regularization Scheme will not be applicable to the following
cases.— Regularization of unauthorized constructions shall not be
considered in the following cases and in cases where public interest
and public safety are likely to be adversely affected, viz.
(a) Encroachment on Government land or property belonging to
Public undertakings, Puducherry Housing Board, Puducherry Industrial
Promotion and Development Investment Corporation, Puducherry Urban
Development Agency, Local Bodies, Endowments, Hindu Religious
Institutions and Wakf Board, etc.
(b) Land for which the Applicant has no Title Deed.
(c) Surplus land declared under the Puducherry Land Reforms
Act / Agriculture Land / Ceiling / lands resumed under the Land
Acquisition Act, etc.
(d) Buildings affected under alignment of any proposed road
under Master Plan / Comprehensive Development Plan / Road
Development Plan or any other public road / Rail corridors.
(e) Tank bed and lake, canal bunds, river course / drain / canals
and any other water body.
914
LA GAZETTE DE L'ETAT
[PART–II
(f) Prohibited buildings under the Coastal Regulation Zone and
such other environmentally restricted zones as prescribed in the
respective regulations.
(g) Layout / Master Plan Open Spaces / Areas earmarked for
Recreational Use in the Master Plan / Comprehensive Development Plan.
(h) Buildings that are not in conformity with the land use as
notified in the Master Plan / Comprehensive Development Plan.
(i) Site under legal litigation / disputes regarding ownership of
the site / building.
(j) Building constructions that compromises on structural safety
of the building.
(k) Under any circumstances the buildings / floors constructed
after the cut-off date as stipulated in clause 1(2) are not eligible for
regularization. If any Registered Technical Personnel (RTP) / Applicant
submit application for regularization of such buildings suppressing the
facts, he / she will be black listed without any notice. No Application
of blacklisted RTP is acceptable, until unblocked by the Planning
Authority with the consent of the Town and Country Planning Board.
8. Exemption. — (i) Buildings constructed prior to 01-05-1987.
(ii) Huts, semi-permanent and RCC residential buildings up to
two storeys (G+1) in sites up to 60 sq. m. of built up area are exempted
from operation of this Scheme.
(iii) Residential building falling in slums, identified / notified by
the Puducherry Slum Clearance Board / other identified slums / free
house sites given by the Government and residential buildings
constructed by the beneficiaries of various Government Housing
Subsidy Schemes (for Below Poverty Line (BPL) category only).
9. Violation after submission of online Application.— During
verification, if it is found that the Applicant has misrepresented /
undertaken further additions or extensions to the existing building after
submitting the online Application, then such Application shall be
summarily rejected and necessary action shall be taken against such
unauthorized buildings including sealing / demolition of premises as per
law and also legal actions shall be initiated against the Registered
Technical Personnel and the Applicant.
915
PART–II]
LA GAZETTE DE L'ETAT
10. Scrutiny, Rejection and Approval by the Planning Authority.—
After receipt of the online Application for regularization in the
prescribed pro forma (Annexure-I) along with required documents and
plans as per this Scheme, the Planning Authority (or) and the Town and
Country Planning Department shall carryout inspection, confirm the
status of the building and scrutinize the Application. The Applications
for regularization of ordinary residential and ordinary commercial
buildings shall be disposed of by the Member-Secretary of the Planning
Authority. The online Applications for regularization of buildings other
than ordinary residential and ordinary commercial buildings shall be
placed before the Planning Authority Committee, for its approval. The
Planning Authority / Committee will examine whether the minimum safety
and security provisions in the building are provided such as, clearance
from overhead electric lines, availability of minimum width of road,
availability of parking facilities, facilities for persons with disabilities,
fire escape staircases, lift, provisions for waste disposal, rainwater
storage arrangements, solar assisted water heating and lighting systems
and any other provisions in the building Bye-Laws having serious safety
and security concerns. The buildings having outright violations that
exceed the limits of regularization tolerance as above shall not be
considered by the Planning Authority / Committee and its decision shall
be communicated to the Applicant. The Applicant shall comply with the
directions of the Planning Authority Committee within 30 days from the
date of communication of the decision. The Planning Authority shall
communicate its approval or rejection to the Applicant, as early as
possible, but not beyond six months from the date of receipt of online
Applications (Annexures-V and VI). Mere submission of online
Application or any delay in communication of final orders in the matter
by the Planning Authority will not be construed as Approval.
11. Regularization of individual flats.— (1) Individual flats in a
building shall be regularized following two stage process. Wherein, the
registered Association or Society of the building has to submit drawings
for the entire building along with detailed infrastructure drawings.
Individual flat owner shall submit detailed drawings for the unit owned
by him in the building. Scrutiny, subject to clause (10) shall be made as
follows:
(i) An in-principle clearance shall be given for the entire
building in which the said residential / commercial flat is
situated.
916
LA GAZETTE DE L'ETAT
[PART–II
(ii) If, the entire building is found approvable, then
regularization of the individual flat / floor under reference shall
be done.
(2) The Planning Authority Committee shall decide the
regularization charges that is to be paid in common by the registered
Association or Society and that is to be paid by the individual for their
individual flat / floor of the building.
12. Issue of proceedings showing Regularisation of the Buildings
and Occupancy Certificate (Annexure-V).— In case of approval, the
Planning Authority shall issue proceedings to the effect that the building
is regularized under this Scheme and the proceedings issued by the
Planning Authority itself shall be treated as Occupancy Certificate. In
case of incomplete buildings, Occupancy Certificate shall be issued only
after the verification of the completion of buildings, in all aspects.
13. Consequences of non-regularization.— Where no regulations
is ordered under this Scheme for an unauthorised / deviated building;
then-
(a) No electricity, water supply, drainage and sewerage
connections shall be extended to such unauthorised/deviated building;
(b) Such unauthorised / deviated building shall not be
registered by the Registration Department.
(c) Such unauthorized constructions would be treated as
continuing offence and penalty as per the Act / Rules would be levied.
(d) Other enforcement action including sealing/demolition shall
be initiated by the Planning Authority as per the Building Bye-Law
provisions.
(e) Unless the existing buildings in a site are regularised, no
fresh building Applications shall be considered by the Planning
Authority.
14. Infrastructure Development Fund.— (i) All the fees arising
under this Scheme shall be kept in a separate corpus fund by the
respective Planning Authority. Such funds shall be utilized by the
Planning Authority for the purpose of augmentations, improvements or
creation of an infrastructure facility in order to ease the pressure on the
infrastructure occurred due to the deviation.
917
PART–II]
LA GAZETTE DE L'ETAT
(ii) The following Committee on Infrastructure shall be
constituted for each region as follows:
I. Puducherry Planning Area
(a) Chief Secretary
. . Chairman
(b) Secretary (Public Works Department)
. . Member
(c) Secretary (Town and Country Planning)
. . Member
(d) Secretary (Local Administration)
. . Member
(e) Chief Engineer, Public Works Department
. . Member
(f) Member-Secretary,
. . Convenor
Puducherry Planning Authority.
II. Karaikal Planning Area
(a) District Collector, Karaikal District
. . Chairman
(b) Municipal Commissioner,
. . Member
Karaikal Municipality.
(c) Deputy Director,
. . Member
Local Administration Department.
(d) Superintending Engineer,
. . Member
Public Works Department, Karaikal.
(e) Member-Secretary,
. . Convenor
Karaikal Planning Authority.
III. Yanam Planning Area
(a) Regional Administrator, Yanam
. . Chairman
(b) Municipal Commissioner, Yanam Municipality . . Member
(c) Executive Engineer,
. . Member
Public Works Department, Yanam region
(d) Member-Secretary, Yanam Planning Authority . . Convenor
918
LA GAZETTE DE L'ETAT
[PART–II
IV. Mahe Planning Area
(a) Regional Administrator, Mahe
. . Chairman
(b) Municipal Commissioner, Mahe Municipality . . Member
(c) Executive Engineer,
Public Works Department, Mahe region
. . Member
(d) Member-Secretary, Mahe Planning Authority
. . Convenor
(iii) This Committee shall examine the requirement of the
infrastructure projects for the respective planning areas and recommend
the executing agency for that works.
(iv) Based on the Committee recommendation, the Planning
Authority shall deposit the work to the executing agency and the works
to be completed following the due procedure by the executing authority.
15. Appeals.— (i) Any person aggrieved by any Order passed
under the Scheme by the Planning Authority may prefer an Appeal to
the Committee viz., Town and Country Planning Board, within 30 days
from the date of receipt of the Order.
(ii) The Town and Country Planning Board shall dispose of the
Appeals, as per the provisions contained in the Act / Rules.
(By order of the Lieutenant-Governor)
S. MURUGESAN,
Under Secretary to Government (Housing).
————
919
PART–II]
LA GAZETTE DE L'ETAT
ANNEXURE-I
920
LA GAZETTE DE L'ETAT
[PART–II
921
PART–II]
LA GAZETTE DE L'ETAT
922
LA GAZETTE DE L'ETAT
[PART–II
923
PART–II]
LA GAZETTE DE L'ETAT
924
LA GAZETTE DE L'ETAT
[PART–II
925
PART–II]
LA GAZETTE DE L'ETAT
16. INDEMNITY BOND AND UNDERTAKING
(Notarized undertaking to be executed on
100 Non-Judicial e-stamp paper)
1. This Undertaking / Indemnity bond is executed on this
................................................................................... day of 20 .................
at .................................................... by the Owner / Applicant, (hereinafter
called the first party) which terms shall include their legal heirs,
successors, agents, assignees etc.
A
Name and Address of the Owner/Applicant (First Party)
(1)
Name
:
(2)
Age
:
(3)
S / D / W / o.
:
(4)
Door / Plot / Flat No.
:
(5)
Road / Street
:
(6)
Locality
:
(7)
Village / Town / City
:
PIN :
(8)
District
:
(9)
:
(10)
Phone / Mobile No.
:
B
Location of the Building
(1)
Plot / Door No.
:
(2)
R.S. No. / T.S. No.
:
(3)
Ward No. / Block No.
:
(4)
Street / Road Name
:
(5)
Layout / Nagar Name
:
(6)
Village Name
:
(7)
Municipality / Commune Name
:
2. Executed in favour of the Member-Secretary, ....................
Planning Authority, (hereinafter called the second party) which term shall
include their officers, successors in office and staff.
926
LA GAZETTE DE L'ETAT
[PART–II
3. Declaration-cum-Undertaking and Indemnity Bond by the Owner /
Applicant:
(a) Whereas, the FIRST PARTY has applied for the
regularisation of the unauthorized constructed / deviated building
constructed to a total built up area ................ sq.m. Whereas, the
SECOND PARTY has agreed to consider regularisation of the
unauthorized construction/deviation in the said site / plot in terms of
the Puducherry one-time regularization Scheme for the unpermitted
constructions and deviations 2025 and made it a condition that there
shall not be any defect / litigations / land acquisition over the said site /
land and the same shall be free from all claims of Government/Banks /
and attachment of Courts, and the FIRST PARTY has to indemnify the
SECOND PARTY to this effect.
And whereas, the FIRST PARTY having agreed to the aforesaid
condition hereby indemnifies the SECOND PARTY with the above
assurance and hereby solemnly declare that the abovesaid site / land is
the property of the FIRST PARTY which is possessed by him / her since,
the date of purchase and the same is free from all defects, litigations,
claims and attachments from any Courts, etc., and in case of any
disputes / litigations arises at any time, in future, the FIRST PARTY will
be responsible for the settlement of the same and the SECOND PARTY
will not be a party to any such disputes/litigations.
(b) I / We affirm that I / We shall not encroach any Government
land / canal / road portion adjoining or passing the plot / land, in any
manner. If any such encroachment is found at the later stage, the
regularisation of the building shall be deemed to be revoked and shall
be liable to be dealt as per law and the Planning Authority shall not be
held responsible. (c) I / We affirm that I / We shall pay necessary fees/
charges to the Planning Authority.
4. I/We, the above named deponent, do hereby solemnly affirm and
certify that we have executed this undertaking with free will and signed
this ........................... day of ......................... 20 .......................... .
Name of the Owner / Applicant
:
Address
:
Signature
:
Sworn and signed before me.
Notary
927
PART–II]
LA GAZETTE DE L'ETAT
17. LIST OF DOCUMENTS TO BE ENCLOSED ALONGWITH
THE APPLICATION
Details of documents
1. Sanctioned Plan copy.
2. Copy of Ownership Document/Title Deed for land / site / flat
self-attested.
3. Plans prepared by Registered Technical Personnel and signed by
Applicant and RTP.
4. Self Computation Table for Regularisation charge.
5. e-transfer receipt in favour of the Member-Secretary, Planning
Authority separately towards (i) Application and Scrutiny fee and
(ii) the Regularisation Charge.
6. Encumbrance certificate of land / site / apartment for the past
15 years issued not prior to 30 days from the date of submitting the
online Application.
7. 4 Nos. of time stamped photographs from four sides of the
unauthorised construction showing all external details of
development, which is signed by the owner and the Registered
Technical Personnel.
8. Indemnity Bond and Undertaking.
9. NOC from the Fire Service Department / Airport Authority of India /
Archaeological Survey of India / Railways or any State / Central
Government Organisations (wherever applicable).
10. Proof for the period of completion of the construction/structural
works completed/ roof laid (copy of property tax/electricity/water
supply bills).
11. Weighted Guideline Rate value of the plot as on date of Application.
928
LA GAZETTE DE L'ETAT
[PART–II
929
PART–II]
LA GAZETTE DE L'ETAT
930
LA GAZETTE DE L'ETAT
[PART–II
ANNEXURE – II
(See clause 6)
REGULARISATION CHARGES FOR UNAUTHORISED
CONSTRUCTION / DEVIATION
1. Regularisation charges for unauthorised deviated construction
If, a building or part thereof has been constructed deviating from the
approved plan of the Planning Authority, the same shall be regularised
at the rates provided in the Table below.
Table
Type of building constructed
Rate per sq. m. (in
)
deviated from the approved plan
(a) Residential buildings.
500
(b) Mixed use buildings and
750
Special buildings.
(c) Multi-storeyed buildings.
1,000
(d) Government buildings.
Exempted from the payment of
Regularisation Charges. However,
t he b ui l di ng s ho ul d b e go t
regularised from the Planning
Authority.
(e) Government aided schools
50% of (b) or (c) as applicable
above.
2. Regularisation charges for unauthorised construction
If, a building or part thereof has been constructed unauthorisedly, i.e.,
without obtaining the requisite building permission from the Planning
Authority, as required under the Building Bye-Laws, the same shall be
regularised at the rates as stipulated in the above Table with a multiplication
factor of 1.2.
931
PART–II]
LA GAZETTE DE L'ETAT
ANNEXURE – III
(See clause 4)
......................................... PLANNING AUTHORITY
No. ...........................
Date :
INTIMATION REGARDING ADDITIONAL PARTICULARS
TO BE FURNISHED FOR REGULARISATION
OF UNAUTHORISED CONSTRUCTIONS/DEVIATIONS
To :
Tmt./Thiru ...........................................
.............................................................
.............................................................
Sir/Madam,
Your online Application No. ........................., date .........................,
for the regularisation of unauthorised construction / deviation
at .......................................................... (precisely state the location of the
building) has been examined by the .............................................. Planning
Authority.
The Planning Authority Committee has approved the above-
mentioned unauthorised construction for regularisation in accordance
with the provisions in “The Puducherry one-time regularization Scheme
for the unpermitted constructions and deviations 2025”, under the
following conditions.
(1)
(2)
(3)
In accordance to the above, you are directed to comply with all
the above conditions and submit a letter of intimation to the
Member-Secretary to the effect that the above conditions are compiled
alongwith the following documents within ................. days.
Member-Secretary
................................ Planning Authority
932
LA GAZETTE DE L'ETAT
[PART–II
ANNEXURE – IV
(See clause 6)
......................................... PLANNING AUTHORITY
No. ...........................
Date :
INTIMATION REGARDING REMITTANCE OF
REGULARISATION CHARGES FOR REGULARISATION
OF UNAUTHORISED CONSTRUCTIONS / DEVIATIONS
To :
Tmt./Thiru ...........................................
.............................................................
.............................................................
Sir/Madam,
It is hereby acknowledged that the receipt of the NOC's and other
documents for the regularisation of the building constructed by you
at .....................................................................................................................
You are directed to remit the regularisation charges of
......................,
by e-transfer in the name of the Member-Secretary, ............................
Planning Authority within 30 days from the receipt of this notice, failing
which your application will be refused and further action will be taken
on the unauthorised construction/deviations as per the Puducherry
Town and Country Planning Act and the Puducherry Building Bye-Laws
and Zoning Regulations.
Member-Secretary
................................ Planning Authority
933
PART–II]
LA GAZETTE DE L'ETAT
ANNEXURE – V
(See clauses 10 and 12)
......................................... PLANNING AUTHORITY
No. ...........................
Date :
FINAL ORDERS REGARDING REGULARISATION OF
UNAUTHORISED CONSTRUCTION / DEVIATION
To :
Tmt./Thiru ...........................................
.............................................................
.............................................................
Sir/Madam,
Your online application No. .........................., date ..........................
for the regularisation of unauthorised construction at ..........................
.............................................. (precisely state the location of the building)
has been considered by the .......................... Planning Authority.
The Planning Authority Committee has approved the above-
mentioned unauthorised construction for regularisation in accordance
with the provisions in “The Puducherry one-time regularization Scheme
for the unpermitted constructions and deviations 2025” vide Order
No. .........................., date ...................... under the following conditions:
(1)
(2)
The conditions stipulated in the order were complied with and the
following NOCs were submitted:
(1)
(2)
934
LA GAZETTE DE L'ETAT
[PART–II
The regularisation charges of
................................... as stipulated
in the order have been remitted vide e-transfer No. ...............................,
date .......................................... Hence, in accordance to the orders of
the Committee, it is certified that the unauthorised construction
of ...................................... building at ................................... (precisely
mention the location of the building) is hereby regularised under the
provisions of “The Puducherry one-time regularization Scheme for the
unpermitted constructions and deviations 2025”.
Member-Secretary
................................ Planning Authority
————
ANNEXURE – VI
(G.O. Ms. No. 12/2025-Hg, dated 15-07-2025)
(See clause 10)
......................................... PLANNING AUTHORITY
No. ...........................
Date :
ORDER REJECTING THE REGULARISATION APPLICATION
To :
Tmt./Thiru ...........................................
.............................................................
.............................................................
Sir/Madam,
Whereas, your online Application for the regularisation of the
unauthorised construction at ................................................... (precisely
mention the location of the site) has been examined as per the provisions
of “The Puducherry one-time regularization Scheme for the unpermitted
constructions and deviations 2025” has been rejected due to the
following reasons:
(1)
(2)
935
PART–II]
LA GAZETTE DE L'ETAT
Now, therefore, in pursuance of the provisions in “The Puducherry
one-time regularization Scheme for the unpermitted constructions and
deviations 2025”, it is hereby informed that your Application for
regularisation is hereby refused and your unauthorized construction
cannot be regularised.
Member-Secretary
................................ Planning Authority
Date :
Place:
————
online publication at “https://styandptg.py.gov.in”
Published by the Director, Government Press, Puducherry.