Office of Chief Engineer /Transmission System,

B-1, Shakti Vihar, Patiala.

Corporate Identity Number (CIN) U40109PB2010SGC033813

NOTIFICATION

The 11th May 2020

NO. 75/TSN-207/Vol-VIII.-It is hereby notified that Punjab State Power Corporation Ltd. (here-in-

after called the PSPCL) proposes to undertake the following schemes/transmission works necessary for the

dispersal/distribution of power for the improvement of the transmission and distribution system of the Punjab

State Power Corporation Ltd.

66KV TRANSMISSION WORKS FOR THE YEAR 2020-21

Sr.

Name of Work indicating the villages/localities over

Approx.

Size of

Approx.

No. which the line is to pass

Length of

conductor/

Cost (Rs.

line in Kms.

Cable

in Lacs)

(sq. mm)

1.

66 kV Line from Garhshankar to 66 KV Saroya (Aug)-

8.051Ckt KM

200 sq. mm

182

Aug of Conductor by replacing H rail Pole line SC on DC

Towers (Village-Garhshankar, Dugri, Mehtabpur, Rodan Wali,

Bora, Nanglan, Kunail, Ror Majra & Saroya).

2.

Raising of 66 kV Khassa- Amanat Khan line between

0.495 Ckt KM

200 sq. mm

7

TL No. 4 & 5.(Village – Khassa)

PART III]

PUNJAB GOVT. GAZ., MAY 29, 2020 (JYST 8, 1942 SAKA)

177

3.

66 KV Line from 220 kV Goraya-66 kV Dosanjh Kalan

7.895 Ckt KM

200 sq. mm

178

SC on DC Towers (Replacement of HRP line) (Village-

Roorka Khurd, Bada Pind, Musandpur, Padi Jagir,

Mahil, Kale & Dosanjh Kalan).

4.

Raising of DC Ring main Line BBMB- Tanda Road

0.220 Ckt KM

420 sq. mm

5

Jalandhar in the premises of M/s DSP Pipes fittings

between TL No. A & B .

5.

66 kV Dabwali Road Bathinda - 66 KV MES Bathinda

0.330 Ckt KM

200 sq. mm

5

Line (Re revised) (Locality- Mattidas Nagar).

6

Shift/Raising 66 kV DC Line from 220 kV Ferozepur

O/H

Road to 66 KV DC complex in front of P.A.U. Ludhiana

0.185 Ckt KM

420 sq. mm

(Locality- Sarabha Nagar, Ferozpur Road, P.A.U,

U/G Cable

641

DC Complex )

2.094 Ckt.KM

630 sq. mm

0.914 Ckt.KM

240 sq. mm

(SC)

7

Shifting of 66 kV DC line from 66 kV S/S Dabwali

O/H

Road- 66 KV S/S MES (Barnala Road) line from area

3.362 Ckt KM

200 sq. mm

of proposed ring road-II from NH-7 to ITI Chowk Mansa

Road Bathinda (Locality-Patel Nagar, Model Town

Phase-I, II & III, Focal Point Area).U/G Cable Portion:-

235

1.

Point A to D (SC)

0.503 Ckt KM

240 sq. mm

2.

Point C to D (SC)

0.100 Ckt. KM

240 sq. mm

3.

Lilo 66 kV phase-iii (DC)

0.135 Ckt. KM

240 sq. mm

It is hereby notified that the PSPCL is undertaking and executing the sanctioned scheme and shall have

the powers for placing of any Towers, Wires, Poles, Stays, Apparatus and Appliances for the Transmission and

Distribution of Electricity or for Transmission of telegraphic or telephonic communications necessary for proper

coordination of the works of PSPCL for the areas indicated above which the telegraph authority possess under

Part-III of the Telegraphs Act. 1885 (XIII of 1885) in respect of telegraphs established or maintained and the

provisions of section 164 of the Indian Electricity Act 2003 shall not apply to the same and therefore no separate

notice of the scheme of PSPCL is required to be given.

This notification has been issued in respect of the provisions made under Section 164 of the Indian

Electricity Act 2003 and Govt. of Punjab, Dept. of Power order no. S/O. 46/C.A. 36 /2003/S.164/2013 dt 19-6-2013

where in powers of Telegraph authority under part-III of the Indian Telegraph act, 1885 (Central Act no.13 of 1885)

have been decided to be vested and exercised on PSPCL. Notice is hereby given that any person may raise

objection if any/and or make any representation against the above scheme/transmission works within two month

of issue of this notification. Thereafter no objection and or representation will be entertained and all schemes/

transmission works will be deemed to be sanctioned with or without modifications as approved by the PSPCL.

Necessary plans showing the tentative route of the Transmission Lines may be seen on any working day in the

office of Dy. CE/TL, PSPCL, Jalandhar/Patiala. Objections and/or representations in respect of the above

schemes if any should be sent to the undersigned.

The above works have been planned to augment / add 66 KV transmission network in the state of

178

PUNJAB GOVT. GAZ., MAY 29, 2020 (JYST 8, 1942 SAKA)

[PART III

Punjab so as to ensure quality and uninterrupted power supply to all type of existing/prospective electricity

consumers of the state. These works are urgently required for ensuring quality power supply to the electricity

consumers.

Sd/-

Sd/-

Dy.CE /Trans. Lines (D),

Chief Engineer/TS,

PSPCL, Patiala.

Pb. State Power Corp. Ltd.

B-1, Shakti Vihar, Patiala.

PART III]

PUNJAB GOVT. GAZ., MAY 29, 2020 (JYST 8, 1942 SAKA)

179

(ofi;Nov nkfc; gzLokLfpLp'Lj?v nkfc; fpbfvzr dh wkb,gfNnkbk)

dcso L w[Zy fJzihBhno $ NhHn?;H, ph^1, ;aesh ftjko, gfNnkbk

ekog'o/N nkJhv?AfNNh BzL (CIN) U40109PB2010SGC033813

B'Nhfce/PB

fwsh 11 wJh, 2020

BzL 75$NhHn?;Hn?B^207$Vol-VIIIH^fJj dZf;nk iKdk j? fe gzikp oki gkto ekog'o/;aB fbwfNv

(fi; B{z j[D ghHn?;HghH;hHn?b fejk ikt/rk) tb'A fBwBfbys ;ehwK$NoK;whPB d/ ezw P[o{ eoB dk gq;skt

j?, fijVhnK gzikp oki gkto ekog'o/PB fbwfNv d/ ;zukbD ns/ tzv ftZu ;[Xko eoB bJh fpibh dh

fv;go;b $tzv bJh Io{oh jB.

66 e/th bkJhBK d/ ezw pkps ;kb 2020^21

bVh ezw dk Bkw ;w/s fgzv$p;shnK EktK fiZE'A bkJhB

nzdkiaB bkJhB

;kJhI nkc

nzdkiaB

BzL

B/ bzxDk j?.

dh bzpkJh

ezveNo$

ehws

feLwhL ftZu

e/pb

(bZyK

(sq. mm)

ftZu)

1H

66 e/HthH bkJhB cokw rVQ;azeo N{ 66 e/HthH ;V'nk

8.051Ckt KM

200 sq. mm

182

(nkrL) ^nkr nkc ezveNo pkJ/ fogb/f;zr n?u o/b

g'b bkJhB n?;H;hH nkB vhH;hH Nktoia. (fgzv

rVQ;azeo, v[roh, wfjskp g[o, o'vK tkbh, p'ok, BzrbK,

e[B?b, o'V wkiok ns/ ;V'nk).

2H

o/fizr nkc 66 e/Hth yk;k^nwkBs ykB bkJhB

0.495 Ckt KM

200 sq. mm

7

fpNftB NhHn?bH BzL 4 ns/ 5 (fgzvL yk;k) .

3H

66 e/HthH bkJhB cokw 220 e/HthH r'okfJnk^66

7.895 Ckt KM

200 sq. mm

178

e/HthH d[;KM ebK n?;H;hH nkB vhH;hH Nktoia

(fogb/;w?AN nkc n?uHnkoHghH bkJhB) (fgzv ^o{Vek

y[od, pVk fgzv, w[;zdg[o, gVh irho, wkfjb, ekb/

ns/ d[;KM ebK).

4H

o/fizr nkc vhH;hH fozr w/B bkJhB phphn?wph^NKvk

0.220 Ckt KM

420 sq. mm

5

o'v ibzXo fJzB dh gqhwkfJ;ia nkc w?;L vhHn?;HghH

gkJhgia fcfNzria fpNftB NhHn?b BzL A ns/ B .

5H

66 e/HthH vptkbh o'v pfmzvk^66 e/HthH n?wHJhHn?;H

0.330 Ckt KM

200 sq. mm

5

pfmzvk bkJhB. (fo^fotkfJIv) (EktK d/ Bkw^wshdk;

Bro).

6H

f;cfNzr$ o/fizr 66 e/HthH vhH;hH bkJhB cokw 220

O/H

e/HthH fco'ig[o o'v N{ 66 e/Hth vh;h ezgb?e; fJzB

0.185 Ckt KM

420 sq. mm

cozN nkc ghHJ/H:{H b[fXnkDk (EktK d/ Bkw^ ;okGk

U/G Cable

641

Bro, fco'ig[o o'v, ghHJ/H:{H, vh;h ezgb?e;) .

2.094 Ckt.KM

630 sq. mm

0.914 Ckt.KM

240 sq. mm

(SC)

180

PUNJAB GOVT. GAZ., MAY 29, 2020 (JYST 8, 1942 SAKA)

[PART III

7H

f;cfNzr nkc 66 e/HthH vhH;hH bkJhB cokw 66 e/HthH

O/H

200 sq. mm

235

;$; vptkbh o'v^66 e/HthH n?wHJhHn?;H (poBkbk

3.362 Ckt KM

o'v) bkJhB cokw J/ohnk nkc gq'g'iav fozr o'v^II

cokw n?BHn?uH^7 N{ nkJhHNhHnkJhH u'"Ae, wkB;k

o'v pfmzvk.^ (EktK d/ Bkw^gN/b Bro, wkvb NkT{B

c/i^ I, II ns/ III, c'eb g[nkfJzN J/ohnk).

nzvo rokT[Av e/pb g'o;aBL

1H g[nkfJzN A s'A D (n?;H;hH)

0.503 Ckt KM

240 sq. mm

2H g[nkfJzN C s'A D (n?;H;hH)

0.100 Ckt. KM

240 sq. mm

3H bhb' 66 e/th c/ia^ III (vhH;hH)

0.135 Ckt. KM

240 sq. mm

fJj dZf;nk iKdk j? fe ghHn?;HghH;hHn?bHT[es dZ;h wzBia{o ;ehw d/ nXhB b'VhAdh NoK;fw;aB bkJhB

ns/ d{o ;zuko B?N toe; d/ ezw bJh io{oh Nktoia, g'bia, tkfJoia, ;N/nia (fyZuK) ns/ j'o ;kia ;wkB brkT[Dk

ukj[zdk j? fijVk fe T[es dZ;hnK EktK s/ fpibh dh NoK;fw;aB ns/ tzv, N?bhrokfce iK ghHn?;HghH;hHn?bH

d/ nkg;h skbw/b bJh d{o ;zuko B?Ntoe; bJh io{oh jB.fJ; bJh ghHn?;HghH;hHn?bH T[BQK nfXekoK dh

tos'A eo/rk, fijV/ N?bhrokfce nEkoNhi N?bhrokfce n?eN^1885 (XIII^ nkc 1885) d/ gkoN^3 nXhB

N?bhrokcia B{z ;Ekfgs ns/ w/BN/B oZyD bJh eodhnK jB.fJ; bJh fJzvhnB fJb?eNqhf;Nh n?eN ^2003 dk

;?e;aB 164 bkr{ BjhA j[zdk ns/ ghHn?;HghH;hHn?bH dh ;ehw bJh e'Jh tZyok B'fN; d/D dh b'V BjhA.

fJj B'Nhfce/;aB fpibh n?eN^2003 dh ;?e;aB 164 dhnK BthAnK XkoktK w[skfpe ikoh ehsh

iKdh j? iK Uto okJhfvzr fJB?eNw?AN i/ e'Jh j't/ ns/ gkto fvgkoNw?AN,gzikp ;oeko d/ j[ew BzL S/O. 46/

C.A. 36 /2003/S.164/2013 dt. 19-6-2013 nB[;ko fJzvhnB N?bhrokc n?eN^1885 (;?ANob n?eN 13

nkc 1885) d/ gkoN 3 nXhB N?bhrokc nEkoNh dhnK gktoI ghHn?;HghH;hHn?bH Bz{ fdZshnK rJhnK

jB.fJ; ;pzXh B'fN; ikoh ehsk iKdk j? fe i/ fe;/ ftnesh B{z T[go'es ;ehw$NoK;whPB bkJhBK d/ ezwK

;pzXh e'Jh fJsokia j't/ sK T[j nkgDh gqsh t/dBk fJ; B'Nhfce/;aB d/ ikoh j'D s'A 2 wjhB/ d/ nzdo nzdo

d/ ;edk j?. fJ; s'A pknd e'Jh fJsoki iK gqsh t/dBk ;theko BjhA ehsh ikt/rh ns/ ;koh ;ehw$NoK;wh;aB

bkJhBK d/ ezw fpBQK e'Jh ;'X ehs/ iK ;'X eoe/ ghHn?;HghH;hHn?bH dh wzBi{oh w[skfpe bkr{ wzB/ ikDr/.

fJ; f;bf;b/ ftZu b'VhAd/ nkoiah gbkB fiBQK ftZu NoK;wh;aB bkJhBK d/ o;s/ ftykJ/ rJ/ jB, fe;/ th

ezweko tkb/ fdB T[g w[Zy fJzihBhno$NhHn?bH,ghHn?;HghH;hHn?bH, ibzXo$gfNnkbk d/ dcso ftu t/y/ ik

;ed/ jB.T[go'es ;ehwK ;pzXh i/ e'Jh fJsoki ns/ gqsh t/dBk j't/ sK fBwBj;skyo B{z G/i/ ikD.

T[go'es ezw gzikp oki d/ 66 e/th NoK;whPB B?Ntoe ftZu tkXk$ ;woZEk tXkT[D d/ wzst eoe/

gbkB ehs/ rJ/ jB sK i' oki d/ ;ko/ soK d/ w"i{dk$;zGkth fpibh ygsekoK Bz{ fBoftxB ns/ tXhnk fpibh

;gbkJh fdZsh ik ;e/.fJj ezw fpibh ygsekoK Bz{ fwnkoh gkto ;gbkJh :ehBh pDkT[D bJh nfsnzs

b'VhAd/ jB.

;jh$^

;jh$^

T[g w[Zy fJzihH$NoK;wh;aB bkJhB(v),

w[Zy fJzihBhno$NhHn?;H,

ghHn?;HghH;hHn?bH

ghHn?;HghH;hHn?bH,

ph^1, Pesh ftjko, gfNnkbk.

ph^1, Pesh ftjko, gfNnkbk.

[63-1]