PUNJAB STATE TRANSMISSION CORPORATION LIMITED

(A Punjab Govt. Undertaking)

(Regd. Office: PSEB Head Office, The Mall, Patiala-147001)

Corporate Identity Number: U40109PB2010SGC033814 www.pstcl.org

O/o EIC/TS, PSTCL, Patiala Tel. & Fax No. 0175-2207774 E.mail: [email protected]

NOTIFICATION

The 30th July, 2020

No. 43/TS/ST-6016/Vol.-IV.-It is hereby notified that Punjab State Transmission Corporation Ltd.

(PSTCL) proposes to undertake the following schemes/transmission works necessary for the dispersal/distribution

of power for the improvement of the transmission and distribution system of the Punjab State Transmission

Corporation Ltd.

TRANSMISSION WORKS FOR THE YEAR 2020-21

Sr.

Name of Work

Scope of work,

Size of ACSR

No.

(Approx. Length

conductor

of line).

(Nominal

Aluminium

Area in mm2)

1.

Regarding Route plan for 220KV D/C line from 400KV S/Stn.

Length of Line of

420

Rajpura to 220 KV S/Stn. Bassi Pathana. The above line crosses

part route plan

through following villages.

24.267 km.

1. ChanduaKhurd 2. DaruGarh 3. Dharamgarh 4. Alluna 5. Miapur

6. Basantpura 7. Jiwanpura 8. Shahpur 9. PatarsiChoota

10. Patarsi Wada 11. ChanduMajra 12. Rajindergarh

13. ChunniMajra 14. Sadhugarh15. RaiMajra

16. Mathi 17. Rampur (Be-Chirag) 18. Bora

PART III]

PUNJAB GOVT. GAZ., AUGUST 7, 2020 (SRAVANA 16, 1942 SAKA)

263

19. Randhawa 20.Ramgarh Saniyan 21. Balhara 22. Rashidpura

23. ChhotiBalhari 24. Manupur 25. Bharonpur and Bharonpur Basti

26. KotlaBajwada 27. Raipur Gajran 28. Mirpur 29. Jodhpur

30. Mahadiyan 31. FatehpurRaiyan 32. Mahimudpur 33. Shahidgarh

34. Ghamandgarh 35. Rasulpur 36. Bassi Pathana

2.

Raising of Height of 132 KV S/C Jalandhar- Khanpur line in the land No change

200

of Sh. Avtar Singh Junior (TL-11 to 12) Deposit Work. TL-11A is

dismantled and new tower 11A is proposed at new location. The

above line crossunder/nearby HP Petro Plaza, Suriya Enclave opp.

Indian Oil corp. Ltd. Pathankot Bye Pass Jalandhar.

3.

Regarding Route Plan of raising of height of 220KV DhandariKalan-

No change

420

LaltonKalan line from TL 10 to TL-13 (P&M Deposit work). TL-11

and 12 are dismantled and proposed at new location. The above line

cross under/nearlyFocal Point Ludhiana.

4.

Revised Route Plan of LILO of 220KV line Sunam-Mansa at 400KV

No change

420

PGCIL Patran from TL-125 to TL-128. Location of TL no.126 and

127 are changed.The above line cross near Lakhmirwala village.

5.

Proposed Route Plan for restoration of supply of 220KV GHTP

Length of Line

420

LehraMohabbat-Himmatpura D/C on DC line due to fallen of tower's

is 5.365 km and

on 21.6.2020.TL no.40,41,43,44,45,50 and 51 are proposed at

resagging of line

new location.

will be carried out.

The above line crosses through following villages:-

1. Salbra 2. BhaiRupa.

6.

Proposed Route plan for LILO of one ckt. of 132 KV Ropar-

Length of part

200

Ghulal line for M/S CN IFFCO village Sehjo Majra/Rattipur

route is 30 mtrs.

(Contributory work). 161-A is proposed between 161-162. The above

line cross through:-SehjoMajra/Rattipura.

7.

Route plan for Restoration of supply of 220 KV RTP-Ghulal and

No change

520

220 KV RTP-Gaunsgarh line due to damage of tower no. 154 due to

wind storm on night between 28.06.2020 and 29.06.2020. 154A is

proposed at new location.The above line cross through-Machhiwara

Village.

8.

Rotue plan for raising of 220KV Sarna-Wadala Garanthian DC line

Length of part

420

(Ckt.-I &II) Railway crossing between Batala-Quadian at Km 8/9-9/0

route is 130 mtrs

(Railway Deposit Work).Tower no. 167 is dismantled and 2 no. tower

166A and 167 is proposed at new location. The above line crosses

through following villages:-

1. Wadala Garanthian 2. Talwandi Chhungla.

9.

Rotue plan for raising of 132KV Verpal- Naraingarh DC line Railway

Length of part line

200

crossing Section between Cheratte- Khasa at no. 519/9-520/0 (Railway

is 344 mtrs

Deposit Work). Tower no. 48 and 49 are dismantled and proposed at

new location. The above line crosses through following villages:-

1 .Ghumanpura 2. Municipal Corporation Amritsar.

264

PUNJAB GOVT. GAZ., AUGUST 7, 2020 (SRAVANA 16, 1942 SAKA)

[PART III

10

Route Plan for 132KV line from 132KV S/StnFaridkot to Kotkapura

Length of Line

200

2 SC on DC towers. The above line crosses through following villages. is 21.976 km.

1. Faridkot 2. Araiyawala 3. PakhiKalan 4. Bholuwala

5. PakkaKalan6. Tehna7. Chahal8. Bhana 9. Chahal Beed

10. Nathewala 11. Sikhanwala12.DhaniTehal Singh 13. Sandhwan

14. Kotkapura.

Further TL no. 62 to 63of the above line crosses through 220kV

No change in

420

MogaMukatsar Line, TL No. 112 is dismantled and four new towers

length of line

are proposed for raising of line. The line crosses through the

following villages. 1. Sikhanwala 2.Dhani Tehal Singh

11

Route plan for Restoration of supply of 220 KV Kot Karor

No change

420

(Talwandi Bhai)-Ferozepur line LILO at 220KV G/S/S Bottian

Wala due to damage of TL No.5 due to wind storm on 21.07.2020.

TL No.5 is proposed at new location. The above linecross

through-Bholuwala Village.

It is hereby notified that the PSTCL is undertaking and executing the sanctioned scheme and shall have

the powers for placing of any Wires, Poles, Stays, Apparatus and Appliances for the Transmission and Distribution

of Electricity or for Transmission of telegraphic or telephonic communications necessary for proper coordination

of the works of PSTCL for the areas indicated above for which the Telegraph Authority possess under Part-III

of the Telegraphs Act. 1885 (13 of 1885) in respect of telegraphs established or maintained and the provisions of

section 12 to 16, 18 and 19 of the Indian Electricity Act 1910 shall not apply to the same and therefore no

separate notice of the scheme of PSTCL is required to be given.

This notification has been issued with reference to the relevant clauses of Indian Electricity Act 1910

alongwith latest statutory amendments, modifications, upto date over riding enactments if any and the provisions

made under Section 164 of the Indian Electricity Act 2003 and Govt. of Punjab, Deptt. of Power Endst.

No. 11/95/2011-PE 3/2344 dated 28.06.2011 wherein powers of Telegraph Authority under part-III of the

Indian Telegraph Act, 1885 (13 of 1885) have been decided to be conferred and exercised on PSTCL. Notice is

hereby given that any person may raise objections if any/and or make any suggestions against the above scheme/

transmission works within two month of issue of this notification. Thereafter no objections and or suggestions

will be entertained and all schemes/transmission works will be deemed to be sanctioned with or without modifications

as approved by the PSTCL. Necessary plans showing the tentative route of the Transmission Lines may be seen

on any working day in the office of Dy. CE/TLSC Circle, PSTCL, Patiala. Objections and/or suggestions in

respect of the above schemes if any should be sent to the undersigned.

Benefits of the above Scheme:-

The above works have been planned to augment/add 400KV/220KV/132KV transmission network in

the State of Punjab so as to ensure quality and uninterrupted power supply to all types of existing/prospective

electricity consumers of the State and are urgently required.

Sd/-

ER. SAJEEV GUPTA,

CE/TS,PSTCL, Patiala.

[97-1]