PUNJAB GOVT. GAZ. (EXTRA), SEPTEMBER 18, 2020 (BHDR 27, 1942 SAKA)

1366

Regd. No. NW/CH-22

Regd. No. CHD/0092/2018-2020

EXTRAORDINARY

Published by Authority

CHANDIGARH, FRIDAY, SEPTEMBER 18, 2020 (BHADRA 27, 1942 SAKA)

( 1366 )

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION

NOTIFICATION

The 18th September, 2020

No. PSERC/Secy/Regu.151.-In exercise of the powers conferred under Section 181 read with Sections

43, 44, 45, 46, 47, 48, 50, 55, 56, 57, 58, 59, 126, 127, 135, 152, 154 & 163 of the Electricity Act, 2003 (Central

Act 36 of 2003) read with Electricity (Amendment) Act, 2007 (No. 26 of 2007) and all other powers enabling

it in this behalf, the Punjab State Electricity Regulatory Commission hereby makes following regulations to

amend the Punjab State Electricity Regulatory Commission (Electricity Supply Code and Related Matters)

Regulations, 2014 including the first to sixth amendments thereof (hereinafter referred to as “the Principal

Regulations”):-

1.

SHORT TITLE, COMMENCEMENT AND INTERPRETATION

1.1

These Regulations may be called the Punjab State Electricity Regulatory Commission (Electricity

Supply Code and Related Matters) (7th Amendment) Regulations, 2020.

1.2

These Regulations shall be applicable to all licensees (including entities exempted under Section 13 of

the Act) in their respective licensed/supply areas and all consumers/persons in the State of Punjab.

1.3

These Regulations shall come into force from the date of their publication in the official gazette of the

State.

2)

Amendments in Regulation 2 of the Principal Regulations:

The following definitions shall be inserted in Regulation 2 of the Principal Regulations:-

(ra) Designated Consumer’ means consumer using or engaged in any of following processes i.e Arc

Furnace, Induction Furnace, Chloro alkaline unit, Billet heaters with total connected rating above 100

kVA, Surface hardening Machine & Electrolytic process industry, Electric Bell furnaces for annealing,

Electro-slag refining/re-melting processes, IT/ITES, Malls, Petro-Chemical units, Railways,

Pharmaceuticals and connected at a supply voltage of 11 kV & above or as may be decided by the

Commission from time to time;

(zna) ‘Maximum demand load current’ means the current value at the point of common coupling

PUNJAB GOVT. GAZ. (EXTRA), SEPTEMBER 18, 2020 (BHDR 27, 1942 SAKA)

1367

calculated as the sum of the currents corresponding to the maximum 15/30 minute demand during each

of the twelve previous months divided by 12;

(zta) ‘Point of Common Coupling (PCC)’ means the point of metering, or any other point on supply

system of distribution licensee, electrically nearest to the particular load at which other loads are, or

could be, connected. For service to industrial users (i.e., manufacturing plants) via a dedicated service

transformer, the PCC is usually at the HV side of the transformer. For commercial users (office parks,

shopping malls, etc.) supplied through a common service transformer, the PCC is commonly at the LV

side of the service transformer;

(zua) ‘Power Quality Meter’ means a device suitable for monitoring and recording of power quality.

It shall be capable of accurate measurement, monitoring and recording of harmonics, sags, swells,

flickers and other power quality parameters;

(zya) ‘Short-circuit ratio at a particular location means the ratio of the available short-circuit current,

in amperes, to the load current, in amperes;

(zzda) ‘Total Demand Distortion (TDD)’ means the ratio of the root mean square of the harmonic

content, considering harmonic components up to the 50th order, expressed as a percent of the maximum

demand current;

(zzdb) ‘Total Harmonic Distortion (THD)’ means the ratio of the root mean square of the harmonic

content, considering harmonic components up to the 50th order, expressed as a percent of the

fundamental;

3)

Amendments in Regulation 24 of the Principal Regulations:

The Regulation 24 of the Principal Regulations shall be substituted as under:-

24.1

The distribution licensee and the designated consumers shall control the harmonics level at the Point of

Common Coupling (PCC). The limits of voltage harmonics by the distribution licensee in its electrical

network, the limit of injection of current harmonics by the designated consumers, Point of measurement

i.e PCC and other related matters shall be as per the IEEE 519-2014 namely ‘IEEE Recommended

Practices and Requirements for Harmonic Control in Electrical Power Systems', as modified from

time to time.

24.2

The measurements undertaken to determine compliance shall be carried out in accordance with the

requirements as specified in IEC 61000-4-7 and IEC 61000-4-30. There shall be continuous measurement

of harmonics with permanent Power Quality meters complying with the IEC 61000-4-30 Class-A

meters.

Provided that where CTs/PTs of the existing installation/connection of the designated consumer are of

lower accuracy class than mandated by IEC 61000-4-30 Class-A meters , the meters complying with

the IEC 61000-4-30 Class-B may be installed as an interim measure.

24.3

The data measured and metered as mentioned in regulation 24.2 with regard to the harmonics, shall be

captured by the distribution licensee each month or as may be decided by the Commission from time to

time keeping in view the operational constraints. The data shall also be shared with the consumer

periodically.

24.4

The designated consumers shall install power quality meters by 1st October, 2021 and share the recorded

data thereof with the distribution licensee each month or as may be decided by the Commission.

PUNJAB GOVT. GAZ. (EXTRA), SEPTEMBER 18, 2020 (BHDR 27, 1942 SAKA)

1368

24.5

The distribution licensee shall install power quality meters within three years starting from 1st October,

2021 in a phased manner covering at least 20% of the total identified locations on 11/33/66 kV

feeders as may be approved by the Commission, in the first year and 40% each in subsequent two

years.

24.6

Harmonic limits

Harmonic management in a power system is a joint responsibility involving both the end users and the

distribution licensee, therefore harmonic limits are specified for both voltages and currents. The limits

as mentioned below shall apply only at the Point of Common Coupling (PCC).

24.6.1

VOLTAGE HARMONICS

(a)

The distribution licensee shall control the line-to-neutral voltage harmonics at the Point of Coupling.

The voltage harmonic distortion of the supply voltage shall be assessed in terms of the Total Harmonic

Distortion (THDV) considering harmonic components up to the 50th order. THDV shall be taken as

square root of the sum of squares of all voltage harmonics expressed as a percentage of the magnitude

of the fundamental measured with following formula

where

Vh represents the percent r.m.s value of the hth harmonic voltage component, and N represents the

highest harmonic order considered in the calculation.

(b)

Voltage distortion limits

Table 1

Bus Voltage V at PCC

Individual harmonic (%)

Total harmonic distortion (THD) (%)

V< 1.0 kV

5.0

8.0

1 kV < V < 69 kV

3.0

5.0

69 kV < V < 161 kV

1.5

2.5

161 kV < V

1.0

1.5a

aHigh-voltage systems can have up to 2.0% THD where the cause is an HVDC terminal whose effects will have

attenuated at points in the network where future users may be connected.

For statistical evaluation, voltage harmonics shall be assessed for a period of not less than 7 continuous

days. The short time 10 min values are accumulated over periods of one week and the 95th percentile

values (i.e., those values that are exceeded for 5% of the measurement period) are calculated for each

7-day period for comparison with the recommended limits. The values are measured at PCC in normal

operating condition.

24.6.2

CURRENT HARMONICS

The designated consumer shall limit the value of harmonic currents measured at Point of Common

Coupling (PCC) measured over 10 minutes period to the values as given in table below:

PUNJAB GOVT. GAZ. (EXTRA), SEPTEMBER 18, 2020 (BHDR 27, 1942 SAKA)

1369

(a)

Current distortion limits (TDD) for system nominally rated through 120 V to 69 kV

Table 2

Maximum harmonic current distortion in percent of IL

Individual harmonic order (odd harmonics) a, b

ISC/IL

3 < h <11

11< h < 17

17 < h < 23

23 < h < 35

35 < h < 50

TDD

<20*

4.0

2.0

1.5

0.6

0.3

5.0

20<50

7.0

3.5

2.5

1.0

0.5

8.0

50<100

10.0

4.5

4.0

1.5

0.7

12.0

100<1000

12.0

5.5

5.0

2.0

1.0

15.0

>1000

15.0

7.0

6.0

2.5

1.4

20.0

Note: * All power generation equipment is limited to these values of current distortion, regardless of

actual ISC/IL;

aEven harmonics are limited to 25% of the odd harmonic limits above;

bCurrent distortions that result in a dc offset, e.g., half-wave converters, are not allowed;

where

Isc = maximum short-circuit current at PCC;

IL = maximum demand load current (fundamental frequency component) at the PCC under normal

load operating conditions;

(b)

Values of Current distortion limits (TDD) for system rated above 69 kV through 161 kV

Table 3

Maximum harmonic current distortion in percent of IL

Individual harmonic order (odd harmonics) a, b

ISC/IL

3 < h <11

11< h < 17

17 < h < 23

23 < h < 35

35 < h < 50

TDD

<20*

2.0

1.0

0.75

0.3

0.15

2.5

20<50

3.5

1.75

1.25

0.5

0.25

4.0

50<100

5.0

2.25

2.0

0.75

0.35

6.0

100<1000

6.0

2.75

2.5

1.0

0.5

7.5

>1000

7.5

3.5

3.0

1.25

0.7

10.0

Note: * All power generation equipment is limited to these values of current distortion, regardless of

actual ISC/IL;

aEven harmonics are limited to 25% of the odd harmonic limits above;

bCurrent distortions that result in a dc offset, e.g., half-wave converters, are not allowed;

where

Isc = maximum short-circuit current at PCC;

IL = maximum demand load current (fundamental frequency component) at the PCC under normal

load operating conditions;

PUNJAB GOVT. GAZ. (EXTRA), SEPTEMBER 18, 2020 (BHDR 27, 1942 SAKA)

1370

(c)

Values of Current distortion limits (TDD) for system rated above 161 kV

Table 4

Maximum harmonic current distortion in percent of IL

Individual harmonic order (odd harmonics) a, b

ISC/IL

3 < h <11

11< h < 17

17 < h < 23

23 < h < 35

35 < h < 50

TDD

<25*

1.0

0.5

0.38

0.15

0.1

1.5

25<50

2.0

1.0

0.75

0.3

0.15

2.5

>50

3.0

1.5

1.15

0.45

0.22

3.75

Note: * All power generation equipment is limited to these values of current distortion, regardless of

actual ISC/IL;

aEven harmonics are limited to 25% of the odd harmonic limits above;

bCurrent distortions that result in a dc offset, e.g., half-wave converters, are not allowed;

where

Isc = maximum short-circuit current at PCC;

IL = maximum demand load current (fundamental frequency component) at the PCC under normal

load operating conditions;

For statistical evaluation, current harmonics shall be assessed for the period not less than 7 continuous

days. The short time 10 min values are accumulated over periods of one week and the 95th & 99th

percentile values (i.e., those values that are exceeded for 5% and 1% of the measurement period) are

calculated for each 7- day period for comparison with the recommended limits. The values of TDD are

measured at PCC in normal operating condition.

Provided that:

The weekly 95th percentile short time 10 min harmonic current values should be less than the value

given in Table (2), (3) and (4) above, as applicable. However, the weekly 99th percentile short time 10

min harmonic current values should be less than 1.5 times the value given in Table (2), (3) and (4)

above, as applicable .

24.7

In case the designated consumer fails to install power quality meter within the stipulated time, as

specified in regulation 24.4 of these regulations or the injection of current harmonics, after the stipulated

time as may be decided by the Commission, exceeds the limits as specified in regulation 24.6.2 above,

such consumer shall be liable to pay a penalty to the distribution licensee at the rate and in the manner

as may be approved by the Commission from time to time. The penalty shall be without prejudice to the

right of the distribution licensee to take other punitive action as may be approved by the Commission.

24.8

In case the voltage harmonics in the distribution system exceeds the limits specified in regulation 24.6.1

above, the distribution licensee shall be liable to compensate the affected consumers of the feeder(s),

after the stipulated date, at the rate and in the manner as may be approved by the Commission from

time to time.

Sd/-

Secretary to the Commission

PUNJAB GOVT. GAZ. (EXTRA), SEPTEMBER 18, 2020 (BHDR 27, 1942 SAKA)

1371

Note: The Principal Regulations were issued vide Notification No. PSERC/Secy./Regu.97 dated 05.11.2014

published in Punjab Govt. Gaz.(Extra) dated 5th Nov. 2014 and further amended vide:

The 1st amendment to the Principal Regulations issued vide Notification No/. PSERC/Secy./

Regu.114 dated 22.06.2016 published in Punjab Govt. Gaz.(Extra) dated 23.06.2016.

The 2nd amendment to the Principal Regulations issued vide Notification No/. PSERC/Secy./

Regu.116 dated 05.10.2016 published in Punjab Govt. Gaz.(Extra) dated 05.10.2016.

The 3rd amendment to the Principal Regulations issued vide Notification No/. PSERC/Secy./

Regu.119 dated 21.03.2017 published in Punjab Govt. Gaz.(Extra) dated 22.03.2017.

The 4th amendment to the Principal Regulations issued vide Notification No/. PSERC/Secy./

Regu.125 dated 17.05.2018 published in Punjab Govt. Gaz.(Extra) dated 17.05.2018 read with

corrigendum issued vide notification no. PSERC/Secy./Regu.126 dated 06.06.2018 published in Punjab

Govt. Gaz.(Extra) dated 06.06.2018.

The 5th amendment to the Principal Regulations issued vide Notification No/. PSERC/Secy./

Regu.137 dated 28.01.2019 published in Punjab Govt. Gaz.(Extra) dated 28.01.2019

The 6th amendment to the Principal Regulations issued vide Notification No/. PSERC/Secy./

Regu.146 dated 09.01.2020 published in Punjab Govt. Gaz.(Extra) dated 10.01.2020

2108/9-2020/Pb. Govt. Press, S.A.S. Nagar