NOTIFICATION

The 10th September, 2020

No.11/01/2019-2l(P.F.)/1347.-The following draft of rules further to amend the Punjab Factory Rules,

1952, which the Governor of Punjab proposes to make in exercise of the powers conferred by section 112 of the

Factories Act, 1948 (Central Act No. 63 of 1948) and all other powers enabling him in this behalf, is published as

required by sub-section (1) of section 115 of the said Act, for information of the persons likely to be affected

thereby.

Notice is hereby given that the draft will be taken into consideration by the State Government on or

after the expiry of a period of forty-five days from the date of publication of this notification in the Official

Gazette, together with any objection or suggestion, which may be received by the Director of Factories, Punjab,

Labour Bhawan (Model Welfare Centre), Sector-64, Phase-10, Mohali, at email-id [email protected]

from any person before the expiry of the period, so specified, with respect to the said draft, namely:-

DRAFT RULES

1.

(1)

These rules may be called the Punjab Factory (Amendment) Rules, 2020.

(2)

They shall come into force on and with effect from the date of their publication in the Official

Gazette.

2.

In the Punjab Factory Rules, 1952 (hereinafter referred to as the said rules), in rule 2-A, after sub-rule

(5), the following sub-rules shall be added, namely:-

“(6) Following leading technical Institutions in the State of Punjab and Chandigarh having Civil or

Structural Engineering courses shall be the competent person for the purpose of clause (a) of sub-

section (1) of section 6 of the Act namely:-

1)

Punjab Engineering College (deemed to be University), Sector-12, Chandigarh;

2)

Chandigarh College of Engineering and Technology, Sector-26, Chandigarh;

PART I]

PUNJAB GOVT. GAZ., SEPTEMBER 25, 2020 (ASVN 3, 1942 SAKA)

753

3)

Thapar Institute of Engineering and Technology, Patiala

4)

Guru Nanak Dev Engineering College, Ludhiana,

5)

Dr. B.R. Ambedkar National Institute of Technology, Jalandhar

6)

Giani Zail Singh Campus College of Engineering and Technology, Maharaja Ranjit Singh

Punjab Technical University, Bathinda

7)

Indian Institute of Technology, Ropar;

8)

Punjabi University, Patiala

9)

Shaheed Bhagat Singh State Technical Campus, Ferozepur and

10)

any other institute, as may be notified by the State Government

7)

The certification done by the institutions referred in sub-rule (6) shall be accepted only when such

certification is signed by the Head of the Civil or Structural Engineering Department and Head of the

Institution”.

3. In the said rules, in rule 3(A) ;-

(i) for sub-rule (2), the following shall be substituted, namely:-

“(2) No additions, alterations or extensions in the existing factory shall be made, except those specified

in the Schedule given below, unless such additions, alterations or extensions are accepted by the Chief

Inspector.

SCHEDULE

Serial No.

Type of additions, alterations or extensions

1.

Boundary Wall upto height of 6 Feet.

2.

Rooms or cabins be used for clerical/managerial /pantry purposes.

3.

Security pickets or guard rooms

4.

Electricity meter rooms

5.

Sheds for vehicle parking

6.

Canopies for generator sheds

7.

Store where non-combustible or non-inflammable or non-toxic material to be stored.

8.

Balcony or chajjas.

9.

Toilets or urinals.

10.

Demolition of any part of factory building.

11.

Addition of machinery which does not result in any change in process or end product or by product.

12.

Changes in outer gates.

13.

Additional stair cases or ramps.

14.

Rooms to be used for residential purposes”; and

(ii) In the sub-rule (3);-

(a) for the words, figure, signs and letter “Application for submission the plans shall be made by the

competent person In form No, 1-C along-with the following plans and documents in duplicate

(In duplicate duly countersigned by the Occupier or Manager as the case may be), to the Chief

Inspector”, the words, brackets and signs “ Application for submission of the plans shall be uploaded by

the Occupier or Manager along with the following plans and documents on the portal pblabour.gov.in of

the Chief Inspector ,” shall be substituted; and

754

PUNJAB GOVT. GAZ., SEPTEMBER 25, 2020 (ASVN 3, 1942 SAKA)

PART I]

(b) For clause (f), the following clause shall be substituted, namely:-

(i) The occupier or manager of the factory shall appoint a Competent Person for certification of

Building Plans and Stability Certificate.

(ii)

The competent person shall make an application of self certification to the effect that the building

plans and stability certificate being certified are as per the Act and rules there under. The occupier

or manager of the factory shall submit such certified application through his user name on the

portal "pblabour.gov.in" of the Chief Inspector, Punjab for acceptance.

4.

In the said rules after rule 10, the following rule shall be added, namely:-

“10 –A Automatic Renewal of License:

(1)

A license shall be renewed for one year digitally through automatic mode if there is no change in

particulars of license from the previous granted or renewed license and other conditions required by

Government.

(2) For the purposes of sub-rule (1) every application for the renewal of license shall be made in Form

2-B together with the fees for a period of one year, and shall be submitted on departmental portal

“pblabour.gov.in” not less than thirty days before the date on which the license is to expire.

(3) The fees for renewal of license for one year shall be as specified in the Schedule given under sub-

rule (2) of rule 8.

Provided that if the application for renewal, complete in all respects, is not submitted on the portal

within the time specified in sub-rule (2), a late fee of twenty-five percent of the fees payable for the

renewal of a license for one year shall be chargeable.

(4) The license generated under this rule shall have the same sanctity as renewed under rule 10

5. In the said rules in rule 70, for sub-rule (5), the following shall be substituted, namely:-

“(5) The Chief Inspector, may by an order in writing exempt any factory from the requirements of this

rule, subject to such conditions as he may specify in that order if there is an empanelment of a hospital or nursing

home of minimum twenty beds at a travel distance of not more than two kilometers from the main gate of the

factory and also there is a provision of ambulance van in the premises of the factory”.

6.

(i) In the said rules after rule 113, the following rule shall be added, namely:-

“114 Maintenance of registers in electronic or digital format

(1)

Occupier or factory manager shall have an option to maintain the registers mentioned in the

Schedule given below in electronic or digital format with time stamp, geo positioning and digital

signatures of the occupier or factory manager in the same format as specified for the said registers

in these rules.

Schedule

Serial. No

Name of Register

Section

Rule

1

Particular of Rooms Register

6

3-A

2

Lime-Washing Register

11

18

3

Humidity Register

15

24

4

Tight-cloth Register

22

58

5

Compensatory Holidays register

53

83

6

Overtime muster roll for exempted workers Register

59

85

7

Adult Workers Register

62

87

PART I]

PUNJAB GOVT. GAZ., SEPTEMBER 25, 2020 (ASVN 3, 1942 SAKA)

755

8

Child Labour Register

73

93

9

Leave With Wages Register

83

94-A

10

Health Register

87

102

11

Muster Roll

112

110

12

Accident Register

112

111

13

Inspection Book

112

112

(2)

The occupier or manager shall provide access to the inspector to inspect such registers as and

when required and shall also make a provision for signing of such registers digitally by the inspector.

(3)

The occupier or manager shall preserve such registers as required under provisions of the Act and

these rules”

FORM 2-B

APPLICATION FOR AUTOMATIC RENEWAL OF LICENCE FOR THE YEAR........

1.

Full name of the factory and address of the factory:

2.

Nature of manufacturing process or processes, bye-products to be carried in factory:

3.

Maximum number of workers proposed to be employed in any one day during the year for which

licencse is sought:

4.

Amount of power in K.W. Installed or proposed to be installed:

5.

Full name, residential address and name of father of the person who shall be the manager of the factory

for the purposes of the Act:

6.

Full name, residential address and name of father of person who is occupier for the purpose of Act:

(a) Proprietor in case of proprietary concern

(b) Partner in case of partnership firm/LLP

(c) The directors in case of a private/public limited Liability Company

(d) Person appointed by Government in case of a Government or local authority factory

(e) Managing Director of society in case of co-operative societies

7.

Full name and address of the owner of the premises or building (including the Precincts thereof) referred

to in section 93:

8. Reference number and date of approval of the plans and stability:

9.

Amount of fee paid: Rs. Date of payment………..

Digital Signature of occupier:

Digital Signature of manager:

VIJAY KUMAR JANJUA, I.A.S.

Additional Chief Secretary to Government of Punjab,

Department of Labour

2110/9-2020/Pb. Govt. Press, S.A.S. Nagar