412
PUNJAB GOVT. GAZ., MARCH 19, 2021 (PHGN 28, 1942 SAKA)
PART I]
Published by Authority
Published by Authority
Published by Authority
Published by Authority
Published by Authority
No. 12]
CHANDIGARH, FRIDAY, MARCH 19, 2021 (PHALGUNA 28, 1942 SAKA)
PART I
Punjab Government Notifications and Orders
( 412 )
GOVERNMENT OF PUNJAB
DEPARTMENT OF POWER
(ENERGY BRANCH)
NOTIFICATION
The 10th February, 2021
No.10/11/2021-EV4/434.-in exercise of the powers conferred by section 12 of the Punjab Electricity
(Duty) Act, 2005 (Punjab Act No. 9 of 2005), and all other powers enabling him in this behalf, the Governor of
Punjab is pleased to grant hundred percent exemption to M/s Jindba Processors Pvt. Ltd., having its
manufacturing New unit at Airport Road, Mangli Uchi, Ludhiana from the payment of electricity duty
(except Social Security Fund) for a period of seven years, in terms of the Detailed Scheme and Operational
Guidelines, 2018 (Industrial and Business Development Policy, 2017) in public interest and subject to the
following conditions, namely:-
CONDITIONS
(i)
the exemption, shall be granted to the said Firm for manufacturing of finishing of Cotton and
Blended Cotton Textiles as per the conditions contained in the Eligibility Certificate issued by the
Convener-cum-Additional Director (Incentive), State Level Committee vide Endorsement No.
Inc/FI/IBDP/37/Jindba/Ldh./174-B dated the 14th January, 2021;
(ii)
the exemption, shall be granted for the period from the 16th February, 2017 to 15th February,
2024. However, the date of commercial production of the unit is certified as 20th November,
2018;
(iii)
in the event of any revision of rate of electricity duty at any subsequent point of time, the exemption
to the extent of revised levied rate of electricity duty (except contributions out of electricity duty
e.g. Social Security Fund etc.) shall be applicable to the Unit;
(iv)
the usage of the power by the Firm during the aforesaid period shall be regulated through a
transparent metering arrangement installed or approved by the Punjab State Power Corporation
Limited and the Chief Electrical Inspector to record the consumption of the unit under exemption;
(v)
the exemption, shall not be applicable for the residential area of the said premises and to that
PART I]
PUNJAB GOVT. GAZ., MARCH 19, 2021 (PHGN 28, 1942 SAKA)
413
effect, an undertaking shall be submitted by the unit that no residential area exists in the premises.
If there is a residential area in the premises, in that event, a separate meter has to be installed or a
separate electricity connection shall be obtained in order to record the electricity consumption of
that residential area, which shall be excluded from the total electricity consumption of the Unit;
(vi)
it shall be ensured that the Firm does not connect the load of any other unit with this unit for the
purpose of availing exemption from electricity duty;
(vii) the exemption shall be strictly in accordance with the Eligibility Certificate issued by the Convener-
cum-Additional Director (incentive), State Level Committee vide Endorsement No. Inc/FI/IBDP/
37/Jindba/Ldh./174-B dated 14th January, 2021; and
(viii) in case any excess claimed exemption is detected at any point of time, it shall be liable for recovery
and penal action.
To ensure the compliance of the above conditions and proper utilization of incentive, the Auditors of the
Office of Chief Electrical Inspector may inspect the unit at any time. In case, any violation of any of the
provisions of the Punjab Electricity (Duty) Act, 2005 or the rules made thereunder and the above conditions is
detected, the owner of the Unit shall be liable for action under section 8 of the said Act and exemption shall
automatically be ceased for which the supplier and owner of the Unit shall be responsible.
Sd/-
ANURAG AGARWAL,
Chandigarh
Additional Chief Secretary to Government of Punjab,
The 5th February, 2021
Department of Power.
2251/03-2021/Pb. Govt. Press, S.A.S. Nagar