98

PUNJAB GOVT. GAZ., APRIL 2, 2021 (CHTR 12, 1943 SAKA)

PART III]

Published by Authority

Published by Authority

Published by Authority

Published by Authority

Published by Authority

No. 14 ]

CHANDIGARH, FRIDAY, APRIL 2, 2021 (CHAITRA 12, 1943 SAKA)

PART III

Notification by High Court, Labour Commissioner ; Advertisements ;

Director of Lotteries, Punjab and Notices etc.

( 98)

(Regd. Office: PSEB Head Office, The Mall, Patiala)

Office of Chief Engineer /Transmission System,

B-1, Shakti Vihar, Patiala.

Corporate Identity Number (CIN) U40109PB2010SGC033813

NOTIFICATION

The 19th March, 2021

No. 82/TSN-207/Vol-IX.-It is hereby notified that Punjab State Power Corporation Ltd. (here-in-after

called the PSPCL) proposes to undertake the following schemes/transmission works necessary for the dispersal/

distribution of power for the improvement of the transmission and distribution system of the Punjab State

Power Corporation Ltd.

66KV TRANSMISSION WORKS FOR THE YEAR 2020-21

Sr.

Name of Work indicating the villages/localities

Approx. Length

Size of

Approx.

No. over which the line is to pass

of line in Kms.

conductor/

Cost (Rs

(sq. mm)

Cable

in Lacs)

1.

Shifting of 66 kV line from 220 kV G-1 MGG to

0.145 Ckt KM

200 sq mm

10

M/s Aman Alloys due to construction of flyover at

KM 260+800 near Ambey Majra.(Deposit work of

NHAI) (Village- Ambey Majra)

2.

Revised route plan for ckt no. 1 to be LILO at 66 kV

0.027 Ckt KM

420 sq mm

3

Focal Point-1 S/S from T.No.4 to Focal Point 1 for

the erection of Multi Ckt. tower 0.730 ckt.KM/0.4

sq”/66 kV tower line (for 66 kV LILO arrangement of

one ckt at existing Focal Point S/S & LILO of 2nd ckt at

new proposed Focal Point-2 S/S having connectivity with

220 kV S/stn. BBMB Kartarpur and Badshahpur mother

stations, by replacing existing 0.6 KM/0.4 sq”/DC on DC

PART III]

PUNJAB GOVT. GAZ., APRIL 2, 2021 (CHTR 12, 1943 SAKA)

99

tower line.(To avoid already proposed under ground cable

size 630 mm2 S/C)(Locality- Near 66 kV grid S/stn

Focal Point Jalandhar)

3.

Modification of one number span (TL No. 41-42) of

0.312 Ckt KM

200 sq mm

10

66 kV Sirhind – Bassi Pathana line crossing over railway

track at KM 313/19-2 (in between Sadhugarh – Sirhind

Railway station) (Deposit work of DFCCIL) (Locality -

Sirhind, Bassi Pathana)

4.

66 kV line from 220 kV Fatehgarh Churian to 220 kV

6.023 Ckt KM

200 sq mm

130

Majitha line from Rail Pole No. 60 to 100 (replacement of rail

pole line) SC on DC Towers (Village – Hamza, Majitha)

5.

Shifting/rearranging/realignment of 66 kV lines crossing

5.5 Ckt KM

200 sq mm

92

at/around exist TL No. 13 and Exist TL No.35 for energizing

2nd ckt of 66 kV Malerkotla-Guara –Amargarh-Manvi line.

(Village – Dullama Khurd,Mandiaala, Malerkotla city)

6.

66 kV line from 132 kV Taran Taran-66 kV Manochahal

11.542 Ckt KM

200 sq mm

269

SC on DC Towers (replacement of HRP line) (Locality-

Tarn Taran, Palasaur, Walipur, Khara, Kot Jaspat, Manochahal)

It is hereby notified that the PSPCL is undertaking and executing the sanctioned scheme and shall have

the powers for placing of any Towers, Wires, Poles, Stays, Apparatus and Appliances for the Transmission and

Distribution of Electricity or for Transmission of telegraphic or telephonic communications necessary for proper

coordination of the works of PSPCL for the areas indicated above which the telegraph authority possess under

Part-III of the Telegraphs Act. 1885 (XIII of 1885) in respect of telegraphs established or maintained and the

provisions of section 164 of the Indian Electricity Act 2003 shall not apply to the same and therefore no separate

notice of the scheme of PSPCL is required to be given.

This notification has been issued in respect of the provisions made under Section 164 of the Indian

Electricity Act 2003 and Govt. of Punjab, Dept. of Power order no. S/O. 46/C.A. 36 /2003/S.164/2013

dt 19-6-2013 where in powers of Telegraph authority under part-III of the Indian Telegraph act, 1885 (Central

Act no.13 of 1885) have been decided to be vested and exercised on PSPCL. Notice is hereby given that any

person may raise objection if any/and or make any representation against the above scheme/transmission works

within two month of issue of this notification. Thereafter no objection and or representation will be entertained

and all schemes/transmission works will be deemed to be sanctioned with or without modifications as approved

by the PSPCL. Necessary plans showing the tentative route of the Transmission Lines may be seen on any

working day in the office of Dy. CE/TL, PSPCL, Jalandhar/Patiala. Objections and/or representations in respect

of the above schemes if any should be sent to the undersigned.

The above works have been planned to augment / add 66 KV transmission network in the state of Punjab

so as to ensure quality and uninterrupted power supply to all type of existing/prospective electricity consumers of

the state. These works are urgently required for ensuring quality power supply to the electricity consumers.

Sd/-

Sd/-

Dy.CE /Trans. Lines (D),

Chief Engineer/TS,

PSPCL, B-1, Shakti Vihar,

PSPCL, B-1, Shakti Vihar,

Patiala.

Patiala.

100

PUNJAB GOVT. GAZ., APRIL 2, 2021 (CHTR 12, 1943 SAKA)

PART III]

(ofi;Nov nkfc; gzLokLfpLp'Lj?v nkfc; fpbfvzr dh wkb,gfNnkbk)

dcso L w[Zy fJzihBhno $ NhHn?;H, ph^1, ;aesh ftjko, gfNnkbk

ekog'o/N nkJhv?AfNNh BzL (CIN) U40109PB2010SGC033813

B'Nhfce/;aB

fwsh 19 wkou, 2021

BzL 82$NhHn?;Hn?B^207$Vol-IXH^ fJj dZf;nk iKdk j? fe gzikp oki gkto ekog'o/;aB fbwfNv

(fi; B{z j[D ghHn?;HghH;hHn?b fejk ikt/rk) tb'A fBwBfbys ;ehwK$NoK;wh;aB d/ ezw P[o{ eoB dk gq;skt

j?, fijVhnK gzikp oki gkto ekog'o/;aB fbwfNv d/ ;zukbD ns/ tzv ftZu ;[Xko eoB bJh fpibh dh

fv;go;b $tzv bJh iao{oh jB.

66 e/th bkJhBK d/ ezw pkps ;kb 2020^21

bVh

ezw dk Bkw ;w/s fgzv$p;shnK EktK fiZE'A

nzdkIB bkJhB

;kJhI nkc

nzdkIB

BzL

bkJhB B/ bzxDk j?.

dh bzpkJh

ezveNo$e/pb ehws (bZyK

feLwhL ftZu

(sq. mm)

ftZu)

1H

f;cfNzr nkc 66 e/HthH bkJhB cokw 220 e/HthH

0.145 Ckt KM

200 sq mm

10

ih^1 n?wHihHihH N{ w?;L nwB nbkfJI fv:{ N{

ezB;NoePB nkc cbkJh Tto n?N e/Hn?wH

260O800 B/V/ nzp/ wkiok (fvg'fIN toe nkc

n?BHn?uHJ/HnkJhH) (fgzv^ nzp/ wkiok)H

2H

fotkfJIv o{N gbkB cko ;oeN BzL1 N{ ph

0.027 Ckt KM

420 sq mm

3

bhb' n?N 66 e/HthH c'eb g[nkfJzN^ 1 ;$; cokw

NhHBzL4 N{ c'eb g[nkfJzN^1 cko dh fJo?ePB nkc

wbNh ;oeN Nkto 0H730 ;oeN e/Hn?wH$0H4

;e{J/o fJzu$ 66 e/HthH Nkto bkJhB (cko 66 e/HthH

bhb' no/Aiw?AN nkc tB ;oeN n?N n?rfi;fNzr

c'eb g[nkfJzN ;$; n?Av bhb' nkc ;?fezv ;oeN n?N

fB:{ go'g'Iv c'eb g[nkfJzN^ 2 ;$; j?ftzr

e[B/eNhftNh ftd 220 e/HthH ;p^ ;N/PB phphn?wph

eoskog[o ns/ pkdPkjg[o wdo ;N/PB; pkJh

fogb/;f;zr n?rfi;fNzr 0H6 e/Hn?wH$0H4 ;e{J/o

fJzu$ vhH;hH nkB vhH;hH Nkto bkJhB (N{ ntkfJv

nkbo/vh gq'g'Iv nzvorokT{Av e/pb ;kJhI 630

n?wHn?wH2 n?;H$;hH) (EktK^B/V/ 66 e/HthH rfov

;p^ ;N/PB c'eb g[nkfJzN ibzXo)

3.

w'vhfce/;aB nkc tB Bzpo ;g?B ( NhHn?bH BzL41^42) 0.312 Ckt KM

200 sq mm

10

nkc 66 e/HthH ;ofjzd^ pZ;h gmkDk bkJhB eo'f;zr

Uto o/bt/ No?e n?N e/Hn?wH 313$19^2 ( fJzB

fpNthB ;kX{rVQ^ ;ofjzd o/bt/ ;N/;aB) fvg'fiaN

toe nkc vhHn?cH;hH;hHnkJhHn?bH)

(EktK ^ ;ofjzd, pZ;h gmkDk)

PART III]

PUNJAB GOVT. GAZ., APRIL 2, 2021 (CHTR 12, 1943 SAKA)

101

4.

66 e/HthH bkJhB cokw 220 e/HthH cfsjrVQ u{VhnK 6.023 Ckt KM

200 sq mm

130

N{ 220 e/HthH wihmk bkJhB cokw o/b g'b Bzpo

60 N{ 100 (fogb/;w?AN nkc o/b g'b bkJhB)

n?;H;hH nkB vhH;hH Nktoia (fgzv^ jwIk, wihmk)H

5H

fPcfNzr$ oh^no/fizr$ oh^nbkJhBw?AN nkc 66

5.5 Ckt KM

200 sq mm

92

e/HthH bkJhBia eokf;zr n?N$nokT{Av n?rfia;fNzr

NhHn?bHBzL13 n?Av n?rfia;fNzr NhHn?bH BzL35 cko

n?BoikfJzfizr ;?fezv ;oeN nkc 66 e/HthH

wb/oe'Nbk^r'nkok^nworVQ^wkBth bkJhB.

(fgzv^d[bkwk y[od, wzfvnkbk, wb/oe'Nbk f;Nh.)

6H

66 e/HthH bkJhB cokw 132 e/HthH soB skoB^66 11.542 Ckt KM 200 sq mm

269

e/HthH wB'ukjb n?;H;hH nkB vhH;hH NktoI

(fogb/;w?AN nkc n?uHnkoHghH bkJhB) (EktK^soB

skoB, gbk;"o, tkbhg[o, ykok, e'N i;gks, wB'ukjb)

fJj dZf;nk iKdk j? fe ghHn?;HghH;hHn?bHT[es dZ;h wzBia{o ;ehw d/ nXhB b'VhAdh NoK;fw;aB bkJhB

ns/ d{o ;zuko B?N toe; d/ ezw bJh io{oh Nktoia, g'bia, tkfJoia, ;N/nia (fyZuK) ns/ j'o ;kia ;wkB brkT[Dk

ukj[zdk j? fijVk fe T[es dZ;hnK EktK s/ fpibh dh NoK;fw;aB ns/ tzv, N?bhrokfce iK ghHn?;HghH;hHn?bH

d/ nkg;h skbw/b bJh d{o ;zuko B?Ntoe; bJh io{oh jB.fJ; bJh ghHn?;HghH;hHn?bH T[BQK nfXekoK dh

tos'A eo/rk, fijV/ N?bhrokfce nEkoNhi N?bhrokfce n?eN^1885 (XIII^ nkc 1885) d/ gkoN^3 nXhB

N?bhrokcI B{z ;Ekfgs ns/ w/BN/B oZyD bJh eodhnK jB.fJ; bJh fJzvhnB fJb?eNqhf;Nh n?eN^2003 dk

;?e;aB 164 bkr{ BjhA j[zdk ns/ ghHn?;HghH;hHn?bH dh ;ehw bJh e'Jh tZyok B'fN; d/D dh b'V BjhA.

fJj B'Nhfce/PB fpibh n?eN^2003 dh ;?ePB 164 dhnK BthAnK XkoktK w[skfpe ikoh ehsh

iKdh j? iK Uto okJhfvzr fJB?eNw?AN i/ e'Jh j't/ ns/ gkto fvgkoNw?AN,gzikp ;oeko d/ j[ew BzLS/O. 46/

C.A. 36 /2003/S.164/2013 dt 19-6-2013 nB[;ko fJzvhnB N?bhrokc n?eN^1885 (;?ANob n?eN 13

nkc 1885) d/ gkoN 3 nXhB N?bhrokc nEkoNh dhnK gktoI ghHn?;HghH;hHn?bH Bz{ fdZshnK rJhnK jB.

fJ; ;pzXh B'fN; ikoh ehsk iKdk j? fe i/ fe;/ ftnesh B{z T[go'es ;ehw$NoK;whPB bkJhBK d/ ezwK

;pzXh e'Jh fJsokI j't/ sK T[j nkgDh gqsh t/dBk fJ; B'Nhfce/PB d/ ikoh j'D s'A 2 wjhB/ d/ nzdo^nzdo

d/ ;edk j?. fJ; s'A pknd e'Jh fJsokI iK gqsh t/dBk ;theko BjhA ehsh ikt/rh ns/ ;koh ;ehw$NoK;whPB

bkJhBK d/ ezw fpBQK e'Jh ;'X ehs/ iK ;'X eoe/ ghHn?;HghH;hHn?bH dh wzBi{oh w[skfpe bkr{ wzB/ ikDr/.

fJ; f;bf;b/ ftZu b'VhAd/ nkoIh gbkB fiBQK ftZu NoK;whPB bkJhBK d/ o;s/ ftykJ/ rJ/ jB, fe;/ th

ezweko tkb/ fdB T[g w[Zy fJzihBhno$NhHn?bH, ghHn?;HghH;hHn?bH, ibzXo$gfNnkbk d/ dcso ftu t/y/ ik

;ed/ jB. T[go'es ;ehwK ;pzXh i/ e'Jh fJsoki ns/ gqsh t/dBk j't/ sK fBwB j;skyo B{z G/i/ ikD.

T[go'es ezw gzikp oki d/ 66 e/th NoK;fwPB B?Ntoe ftZu tkXk$ ;woZEk tXkT[D d/ wzst eoe/ gbkB

ehs/ rJ/ jB sK i' oki d/ ;ko/ soK d/ w"i{dk$;zGkth fpibh ygsekoK Bz{ fBoftxB ns/ tXhnk fpibh ;gbkJh

fdZsh ik ;e/. fJj ezw fpibh ygsekoK Bz{ fwnkoh gkto ;gbkJh :ehBh pDkT[D bJh nfsnzs b'VhAd/ jB.

;jh$^

;jh$^

T[g w[Zy fJzihH$NoK;whPB bkJhB(v),

w[Zy fJzihBhno$NhHn?;H,

ghHn?;HghH;hHn?bH

ghHn?;HghH;hHn?bH,

ph^1, Pesh ftjko, gfNnkbk.

ph^1, Pesh ftjko, gfNnkbk.

[38-1]

2262/3-2021/Pb. Govt. Press, S.A.S. Nagar