PART III]
PUNJAB GOVT. GAZ., FEBRUARY 23, 2024 (PHGN 4, 1945 SAKA)
63
Published by Authority
No. 8]
CHANDIGARH, FRIDAY, FEBRUARY 23, 2024 (PHALGUNA 4, 1945 SAKA)
PART III
Notifications by High Court ; Labour Commissioner ; Advertisements ;
Director of Lotteries, Punjab and Notices, etc.
( 63 )
PUNJAB STATE TRANSMISSION CORPORATION LIMITED
(A Punjab Govt. Undertaking)
(Regd. Office: PSEB Head Office, The Mall, Patiala-147001)
Corporate Identity Number: U40109PB2010SGC033814 www.pstcl.org
O/o CE/TS, PSTCL, Patiala Tel. & Fax No. 0175-2207774 E.mail: [email protected]
NOTIFICATION
The16th February, 2024
NO.54/TS/ST-6016/Vol.-IV.-It is hereby notified that Punjab State Transmission Corporation Ltd.
(PSTCL) proposes to undertake the following schemes/transmission works necessary for the dispersal/distribution
of power for the improvement of the transmission and distribution system of the Punjab State Transmission
Corporation Ltd.
TRANSMISSION WORKS FOR THE YEAR 2023-24
Sr.
Name of Work.
Scope of work,
Size of
No.
(Approx. Length
ACSR
of line).
conductor
(Nominal
Aluminium
Area in
mm2)
1.
Regarding shifting of Bays of LILO of 220kV Jamsher-
Sultanpur line at 220kV S/Stn.Badshahpur.
For the Shifting of 220kV Jamsher-Sultanpur line LILO at
220KV S/Stn.Badshahpur line TL No.33/25 proposed at
Length of line
420
increases by 42 mtr.
64
PUNJAB GOVT. GAZ., FEBRUARY 23, 2024 (PHGN 4, 1945 SAKA)
PART III]
new location. The above line crosses through following
village :-
1. Badshahpur (Distt. Jalandhar).
2.
Route plan for the work of Rajpura-Kharar New Greenfield
Highway connecting NH-44 (at Ch. 233.280 on Rajpura
Byepass) with NH-205 (at Ch. 19.700) near Village Ghataur
for greenfield connectivity of Sirhind with Kharar-Banur-
Tepla Stretch (NH-205A).
1) 220kV Mohali-Rajpura DC line.
2) 400kV Rajpura-Nakodar DC line.
i) For the Raising/Shifting of 220KV Mohali-1to Rajpura
DC lineTL.No.47A & 47 Bare proposed at new locations.
The above line crosses through following village :-
1. Patton 2. Pawala (Distt. Fatehgarh Sahib).
ii) For the Raising/Shifting of 400KV Rajpura-Nakodar DC
line tower TL No.32 is dismantled and 2nos. new towers
TL No.31A & 32 are proposed at new locations. The
above line crosses through following village :-
1. Dangherian (Distt. Fatehgarh Sahib).
3.
Regarding route plan for shifting of 66KV D/C Sherpur-
Upper India & Arty Mills line due to connection of 220kV
S/Stn.Sherpur.
For the Shifting of 66kV Sherpur-Arti Mills & Upper India
line 1 no. CN type 66kV tower TL No. A is proposed at
new location. Both 66kV lines are proposed to be charged
from 220kV S/Stn.Sherpur. For this shifting the length of
66kV Sherpur-Arti Mills line is 223 mtr. on Cable and 32
mtr. from proposed tower TL No.A to existing tower TL
No. A1. 66kV Upper India line has length of 230 mtr. on
Cable and from proposed tower TL No. A to existing tower
TL No. B the length is 55 mtr. The new tower will cross
through 220kV S/SSherpur.
4.
Revised route plan of LILO of One ckt. of 220kV Jamalpur-
Dhandari Kalan line for existing 66kV S/S Sherpur (to be
upgrade to 220kV Sub-Station).
In this revised route type of Tower No. 1 is changed from
2-D-60+ 3m to 2-D-60+9m
5.
Regarding route plan of raising/shifting of 220kV Nawapind-
Wadala Granthian & 220kV Nawapind-Udhoke DC line
TL No.46-50 on Chainage 16+980.
No change
420
Length of line
520
decreases by 7 mtr.
The length of 66kV
Sherpur-Arti Mills line from
proposed tower TL No.A to
220
existing tower TL No.
A1 is 32 mtr.
The length of 66kV Sherpur-
Upper India line from
proposed tower TL No. A to
existing tower TL No. B
is 55 mtr.
No change
420
PART III]
PUNJAB GOVT. GAZ., FEBRUARY 23, 2024 (PHGN 4, 1945 SAKA)
65
1) For the Raising/Shifting of 220KV Nawanpind-Wadala
Granthian and 220kV Nawanpind-Udhoke DC line. TL
No.47 & 48 are proposed to be dismantled and towers
T.No.47, 47A & 48 are proposed at new locations. The
above line crosses through following village :-
1. Nawanpind (Distt. Amritsar).
6.
Route plan for shifting of 66KV S/C Tubular Pole line from
132KV S/S Ropar to GGSSTP Ropar.
For the Shifting of 66kV line towers no. 10,11& 12 are
proposed at new locations. The above line crosses through
the GGSSTPand 400kV S/Stn. Ropar (Distt. Ropar).
7.
Regarding replacement of damaged tower of 132 kV Moga
(Singhawala)-Dhalleke & 132kV Moga (Singhawala) –
Sosan Line.
Existing Tower No. 26 of 132kV Moga-Sosan and Moga-
Dhalleke DC line has been proposed to be dismantled
andproposed to be erected at new location.The above line
crosses through following village :- 1. Ghal Kalan and Daroli
Bhai. (Distt. Moga).
8.
Regarding revised route plan for the work of LILO of one
ckt. of 400kV (Triple Snowbird Conductor) line from
Ludhiana-Koldam at proposed 400kV S/S Ropar (TL No.
19-23).
The above line crosses through following village :- 1. Majri
(Distt. Ropar).
9.
Revised route plan of 132kV Seh-Sihaura SC line on DC
towers from TL No.88 to 90.
The route plan has been revised from TL No.88 to 90. As
per the revision 2 nos. new towers TL No. 89 & 89A have
been proposed to be erected at new locations.The above
line crosses through following village:- 1.Gagra 2) Bardhala
3) Seh 4) Saloudi (Distt. Ludhiana).
10.
Route plan for the work of shifting of 220kV Transmission
Lines due to construction of Sirhind-Sehna 6 lane access
controlled Highway under Bhartmala Priyojna :-
i) 220kV line Malerkotla-Dhuri (Chainage 87+500).
ii) 220kV line Sandhaur-Barnala (Chainage 109+750).
1) For the Raising/Shifting of 220KV Malerkotla-Dhuri DC
line TL No. 45 is dismantled and TL.No.44A,44B &
45are proposed at new locations. The above line crosses
Length of line
220
decreases by 35 mtr.
No change
for 132kV Moga
Moga-Sosan-150
for 132kV Moga-
Dhalleke-220
Length of line
Triple Snowbird
increases from
6.747km to
6.79852 km
Length of line
220
increases from
26.781 km to
26.887km
No change
420
No change
420
66
PUNJAB GOVT. GAZ., FEBRUARY 23, 2024 (PHGN 4, 1945 SAKA)
PART III]
through following village :- 1. Chungan 2. Hathan (Distt.
Sangrur).
2) For the Raising/Shifting of 220KV Sandhour-Barnala
SC line TL No. 149 is dismantled and TL.No.148A&
149 are proposed at new locations. The above line crosses
through following village:-1. Wajhidke Khurd
2. Wajhidke Kalan 3) Amla Singhawala (Distt. Barnala).
11.
Route plan for LILO of 220kV BBMB Jalandhar-Butari
SC line (Prop. 220kV BBMB Jalandhar-Beas SC line) at
400kV S/S PGCIL Jalandhar.
The above line crosses through following village :1. Malhian
2) Kartarpur City (Distt. Jalandhar).
12.
Route plan for LILO of 220kV line Sadiq-Ferozepur at
Jhoke Harihar (To be upgraded from 66kV to 220kV).
The above line crosses through following village :-
1. Jhariwala 2) Khilchi 3) Toot 4) Sadhanwala
5) Chughewala 6) Jhoke Harihar (Distt. Faridkot).
It is hereby notified that the PSTCL is undertaking and executing the sanctioned scheme and shall have the
powers for placing of any Wires, Poles, Stays, Apparatus and Appliances for the Transmission and Distribution of
Electricity or for Transmission of telegraphic or telephonic communications necessary for proper coordination of the
works of PSTCL for the areas indicated above for which the Telegraph Authority possess under Part-III of the Telegraphs
Act. 1885 (13 of 1885) in respect of telegraphs established or maintained and the provisions of section 12 to 16, 18 and 19
of the Indian Electricity Act 1910 shall not apply to the same and therefore no separate notice of the scheme of PSTCL
is required to be given.
This notification has been issued with reference to the relevant clauses of Indian Electricity Act 1910
alongwith latest statutory amendments, modifications, upto date over riding enactments if any and the provisions
made under Section 164 of the Indian Electricity Act 2003 and Govt. of Punjab, Deptt.of Power Endst. No. 11/
95/2011-PE 3/2344 dated 28.06.2011 wherein powers of Telegraph Authority under part-III of the Indian Telegraph
Act, 1885 (13 of 1885) have been decided to be conferred and exercised on PSTCL. Notice is hereby given that
any person may raise objections if any/and or make any suggestions against the above scheme/transmission
works within two month of issue of this notification. Thereafter no objections and or suggestions will be entertained
and all schemes/transmission works will be deemed to be sanctioned with or without modifications as approved
by the PSTCL. Necessary plans showing the tentative route of the Transmission Lines may be seen on any
working day in the office of Dy. CE/TLSC Circle, PSTCL, Patiala. Objections and/or suggestions in respect of
the above schemes if any should be sent to the undersigned.
Benefits of the above Scheme:-
The above works have been planned to augment/add 400kV/220kV/132kV transmission network in the State of
Punjab so as to ensure quality and uninterrupted power supply to all types of existing/prospective electricity
consumers of the State and are urgently required.
Sd/-
ER. SANJEEV SOOD,
CE/TS,PSTCL, Patiala.
[37-1]
Length of line is 2.185 Km
420
No change
420
3042/2-2024/Pb. Govt. Press, S.A.S. Nagar
Length of line is 10.693 Km
420
PART III]
PUNJAB GOVT. GAZ., FEBRUARY 23, 2024 (PHGN 4, 1945 SAKA)
67
gzikp oki NoK;fwPB ekog'o/PB fbwfNv
(gzikp ;oeko dk ndkok)
(ofi nkfc; gzLokLfpLp'Lj?v nkfc; fpbfvzr dh wkb, gfNnkbk^147001)
ekog'o/N nkfJv?AfNNh BzpoL U40109PB2010SGC033814, t?p ;kJhN^www.pstcl.org
dcL gqw[Zy fJzih$Nh n?;,ghHn?;HNhH;hHn?b, gfNL, N?bhc'B s/ c?e;H 0175-2207774
Jh w/bL [email protected]
B'Nhfce/PB
fwsh 16 cotoh, 2024
BzL 54$NhHn?;H$n?;HNhH^6016$tkb:{w^4H^fJj dZf;nk iKdk j? fe gzikp oki NoK;fwPB
ekog'o/PB fbwfNv (ghHn?;HNhH;hHn?b) tb'A fBwBfbys ;ehwK$NoK;fwPB d/ ezw P[o{ eoB dk gq;skt j?,
fijVhnK gzikp oki NoK;fwPB ekog'o/PB fbwfNv d/ ;zukbD ns/ tzv ftZu ;[Xko eoB bJh fpibh dh
fv;go;b$tzv bJh Io{oh jB.
;kb 2023^24 d/ NoK;fwPB ezw
bVh ezw dk BK
;e'g nkc toe
;kJhia
(nzdkiB b?AE)
nkc J/H;hH
n?;HnkoH
ezveNo
(B'whBb
n?b{whBhnw
J/ohnk fJB
n?wn?w2)
1H
ohrkofvzr fPcfNzr nkc p/n; nkc bhb' nkc 220 e/th
iwP/o^;[bskBg[o bkJhB n?N 220e/th ;p ;N/PB
pkdPkjg[o.
w"i{dk 220e/th iwP/o^;[bskBg[o bkJhB bhb' n?N 220e/th
;p ;N/PB pkdPkjg[o dh fPcfNzr bJh gqg'Iv Nkto
Nhn?b BzL 33$25 BthA irQk T[go sithI ehsk frnk j?.
fJj bkJhB fgzv pkdPkjg[o fIbQk^ibzXo dofwnkB
bzxdh j?.
2 a
o{N gbkB cko dk toe nkc okig[ok^yoV fBT{ rohBchbv
jkJht/ e[B?efNzr n?Bn?u^44 (n?N u/B/I 233 a280 nkB
okig[ok pkJhgk;) ftd n?Bn?u^205 (n?N u/B/I 19 a700)
Bhno ftb/I rN"o cko rohBchbv e[B?eNhftNh nkc
;ofjzd ftd yoV^pB{zV^s/gbk ;No?u (n?Bn?u^205HJ/).
1) 220e/th w'jkbh^okig[ok vpb ;oeN bkJhB.
2) 400e/th okig[ok^Be"do vpb ;oeN bkJhB.
1) 220e/th w'jkbh^1 ^ okig[ok vpb ;oeN bkJhB
dh o/fIzr$fPcfNzr bJh Nkto BzL 47J/ ns/ 47ph
bkJhB dh bzpkJh
420
42 whNo tZX ikt/rh.
e'Jh spdhbh BjhA
420
68
PUNJAB GOVT. GAZ., FEBRUARY 23, 2024 (PHGN 4, 1945 SAKA)
PART III]
BthA irQk s/ gq'g'I ehs/ rJ/ jB. fJj bkJhB fgzv
gZs'A ns/ gtkbk fibQk cfsjrVQ ;kfjp dh jZd
B/V/$dofwnkB bzxdh j?.
2) 400e/th okig[ok^Be'do vpb ;oeN bkJhB dh
o/fIzr$fPcfNzr bJh Nkto BzL 32 B{z fvw?ANb eoe/
Nkto BzL31J/ ns/ 32 BthA irQk s/ gq'g'I ehs/ rJ/
jB. fJj bkJhB fgzv vzx/VhnK fibQk cfsjrVQ
;kfjp dh jZd B/V/$ dofwnkB bzxdh j?.
3 a
o{N gbkB cko fPcfNzr nkc 66e/th vpb ;oeN
P/og[o^ngo fJzvhnk n?Av nkosh fwbI bkJhB fvT{ N{
e[B?ePB nkc 220e/th ;p^;N/PB P/og[o.
w"i{dk 66e/th vpb ;oeN bkJhB 66e/th P/og[o^
nkosh fwbI ns/ nZgo fJzvhnk dh fPcfNzr bJh CN
fe;w dk 1 BzL 66e/th Nkto Nhn?b BzL J/ BthA irQk T[go
gq'g'I ehsk frnk j? fJ; fPcfNzr sfjs 66e/th P/og[o
nkosh fwbI bkJhB dh e/pb s/ bzpkJh 223 whNo j? ns/
gq'g'I Nkto J/ s'A w"i{dk Nkto Nhn?b BzL J/1 sZe dh
bzpkJh 32 whNo j?. 66e/th nZgo fJzvhnk bkJhB dh e/
pb s/ bzpkJh 230 whNo j? ns/ gq'g'Iv Nkto Nhn?b^J/
s'A w"i{dk Nkto Nhn?b^ph sZe dh bzpkJh 55 whNo j?.fJj
d'B'A 66e/th bkJhBK gq'g'Iv 220e/th ;$; P/og[o s'A ukoi
j'DhnK sIthi ehshnK rJhnK jB. fPcfNzr sfjs BtK
gq'g'I ehsk Nkto 220e/th ;$; P/og[o dh jZd nzdo
sithI ehsk frnk j?.
4 a
ohtkfJIv o{N gbkB nkc bhb' nkc tB ;oeN nkc
220e/th iwkbg[o^Yzvkoh ebK bkJhB cko n?rih;fNzr
66e/th ;p^;N/PB P/og[o (N{ ph ngro/fvv N{ 220e/th
;p^;N/PB.
gq'g'Iv Nkto Nhn?b BzL1 dh fe;w 2^vh^60O3 wh a s'A
pdb e/ 2^vh^60O9wh a j' rJh j?.
5 a
ohrkofvzr o{N gbkB nkc o/fIzr$fPcfNzr nkc 220e/th
BtKfgzv^tvkbk rqzEhnK n?Av 220e/th BtKfgzv^T[X'e/ vpb
;oeN bkJhB Nhn?b BzL 46^50 nkB u/B/I 16O980 a
1) 220e/th BtKfgzv^tvkbk rqzEhnK ns/ 220e/th
BtKfgzv^T[X'e/ vpb ;oeN bkJhB dh o/fIzr$fPcfNzr
bJh w"i{dk Nkto BzL 47 ns/ 48 B{z fv;w?ANb eoe/ Nkto
BzL47, 47J/ ns/ 48 B{z BthA irQk T[go sIthI ehsk frnk
j?. fJj bkJhB fgzv BtKfgzv fIbQk^nzfwqs;o dofwnkB
bzxdh j?.
bkJhB dh bzpkJh 7 whNo
520
xZN ikt/rh.
66 e/th P/og[o^ nkosh
fwbI bkJhB dh Nkto J/ s'A
w"i{dk Nkto Nhn?b BzL J/1
sZe dh bzpkJh 32 whNo j?.
220
66 e/th nZgo fJzvhnk bkJhB
dh Nhn?b^J/ s'A w"i{dk Nkto
Nhn?b^ph sZe dh bzpkJh 55
whNo j?.
e'Jh spdhbh BjhA
420
e'Jh spdhbh BjhA
420
PART III]
PUNJAB GOVT. GAZ., FEBRUARY 23, 2024 (PHGN 4, 1945 SAKA)
69
6 a
o{N gbkB cko fPcfNzr nkc 66e/th f;zrb ;oeN N[p[bo
g'b bkJhB cokw 132e/th ;p ;N/PB o'gV N{
ihihn?;n?;Nhgh o'gV.
66e/th bkJhB dh fPcfNzr bJh Nkto BzL10, 11 ns/
12 BthA irQk T[go gq'g'I ehs/ rJ/ jB. fJj bkJhB
ihihn?;n?;Nhgh o'gV ns/ 400e/th ;p ;N/PB o'gV dh
iwhB ftZu'A bzxdh j?.
7 a
ohrkofvzr ohgb/;w?AN nkc v?w/iv Nkto nkc 132e/th
w'rk (f;zxKtkbk)^YZbe/ ns/ 132e/th w'rk (f;zxKtkbk)^;';B
bkJhB .
w"i{dk 132e/th w'rk^;';B ns/ w'rk^YZb/e/ vpb ;oeN
bkJhB dk 1 BzL Nkto Nhn?b BzL 26 fv;w?ANb eoe/ BthA
irQk T[go sIthI ehsk frnk j?. fJj bkJhB fgzv xZb
ebK ns/ vo"bh GkJh fIbQk^w'rk dofwnkB bzxdh j?.
8 a
ohrkofvzr ohtkfJIv o{N gbkB cko dk toe nkc bhb'
nkc tB ;oeN nkc 400e/th (fNqgb ;B'pov ezveNo)
bkJhB cokw b[fXnkDk^e'bv?w n?N gq'g'Iv 400e/th
;p^;N/PB o'gV (Nhn?b BzL 19^23).
fJj bkJhB fgzv wkioh fibQk^o'gV dofwnkB bzxdh j?.
9 a
ohtkfJIv o{N gbkB nkc 132e/th ;/j^f;j"Vk f;zrb
;oeN bkJhB nkB vpb ;oeN NktoI cokw Nhn?b BzL
88 N{ 90 a
Nkto BzL88 s'A 90 sZe ohtkfJIv ehsk frnk j?.fJ;
spdhbh sfjs 2 BzL Nkto Nhn?b BzL89 ns/ 89J/ BthA
irQk gq'g'I ehsk frnk j?. fJj Nkto j/m fby/ fgzvK dh
iwhB ftZu'A bzxdh j? L^ 1) rZrVk 2) poXbK 3) ;/j
4) ;b"dh (fibk b[fXnkDk).
10 a o{N gbkB cko d toe nkc fPcfNzr nkc 220e/th
NqK;fwPB bkJhBI fvT{ N{ ez;NoePB nkc ;ofjzd^
;/jBk 6 b/B ne;?; ezNo'bv jkJht/ nzvo Gkoswkbk
goh:'iBk L^
1) 220e/th bkJhB wb/oe'Nbk^X{oh (u/B/I 87O500) a
2)220e/th bkJhB ;zX"V^poBkbk (u/B/I 109O750) a
1H 220 e/HthH wb/oe'Nbk^X{oh vpb ;oeN bkJhB
dh o/fizr$fPcfNzr bJh w"i{dk Nkto BzH 45 Bz{
fv;w?ANb eoe/ Nkto BzH 44J/, 44ph ns/ 45BthA
irQk T[go gq'g'I ehs/ rJ/ jB. fJj bkJhB fgzv
u[zrK ns/ jEB fIbQk^ ;zro{o dofwnkB bzxdh j?.
bkJhB dh bzpkJh 35
220
whNo xZN ikt/rh.
e'Jh spdhbh BjhA
150 (132e/th
w'rk^;';B)
ns/ 220
(132e/th
w'rk^YZb/e/)
bkJhB dh bzpkJh 6 a747
fNqfgb
fewh s'A tZX e/ 6 a79852
;B'pov
fewh j' ikt/rh.
bkJhB dh bzpkJh 26 a781
220
fewh s'A tZX e/ 26 a887
fewh j' ikt/rh.
e'Jh spdhbh BjhA
420
70
PUNJAB GOVT. GAZ., FEBRUARY 23, 2024 (PHGN 4, 1945 SAKA)
PART III]
2H 220 e/HthH ;zX"V^poBkbk f;zrb ;oeN bkJhB dh
o/fizr$fPcfNzr bJh w"i{dk Nkto BzH 149 Bz{
fv;w?ANb eoe/ Nkto BzH 148J/ ns/ 149 BthA irQk
T[go gq'g'I ehs/ rJ/ jB. fJj bkJhB fgzv tihde/
y[od, tIhde/ ebK, nwbk f;zxtkbk fIbQk^ poBkbk
dofwnkB bzxdh j?.
11 a o{N gbkB cko bhb' nkc 220e/th phphn?wph ibzXo^p[Nkoh
f;zrb ;oeN bkJhB (gqg'Iv 220e/th phphn?wph
ibzXo^fpnk; f;zrb ;oeN bkJhB) n?N 400e/th ;p
;N/PB ghih;hnkJhn?b ibzXo.
fJj bkJhB j/m fby/ fgzvK dh iwhB ftZu'A bzxdh j? L^
1) wZbhnK 2) Pfjo eoskog[o (fibk ibzXo).
12 a o{N gbkB cko bhb' nkc 220e/th ;kfde^fco'Ig[o n?N
M'e johjo (N{ ph ngro/fvv cokw 66e/th).
fJj bkJhB j/m fby/ fgzvK dh iwhB ftZu'A bzx/rh L^
1) MkVhtkbk 2) fybuh 3) s{s 4) ;kXKtkbk 5) u[Zr/tkbk
6) M'e johjo (fibk cohde'N).
fJj dZf;nk iKdk j? fe ghHn?;HNhH;hHn?bH T[es dZ;h wzBi{o ;ehw d/ nXhB b'VhAdh NoK;fwPB
bkJhBK ns/ d{o ;zuko B?Ntoe; d/ ezw bJh io{oh NktoI, g'bI, tkfJoI, ;N/nI (fyZuK) ns/ j'o ;kI
;wkB brkT[Dk ukj[zdk j? i' fe T[es dZ;hnK EktK s/ fpibh dh NoK;fwPB ns/ tzv, N?bhrokfce iK
ghHn?;HNhH;hHn?bH d/ nkg;h skbw/b bJh d{o ;zuko B?Ntoe; bJh io{oh jB.fJ; bJh ghHn?;HNhH;hHn?bH
T[BQK nfXekoK dh tos'A eo/rk i' fe N?bhrokfce nEkoNhI N?bhrokfce n?eN 1885 (13 of 1885) d/
gkoN^3 nXhB N?bhrokcI Bz{ ;Ekfgs iK T[;Bz{ ukb{ oZyD bJh eodhnK jB ns/ fJzvhnB fJb?eNohf;Nh
n?eN^1910 d/ ;?ePB 12 s'A 16, 18 ns/ 19 fJ; ;pzX ftu bkr{ BjhA j'Dr/ ns/ fJ; bJh ghHn?;HNhH;hHn?b
dh ;ehw bJh e'Jh tyok B'fN; d/D dh b'V BjhA.
fJj B'Nhfce/PB fJzvhnB fJb?eNqhf;Nh n?eN^1910 dh ;pzXs XkoktK nXhB ns/ BthAnK iao{oh
spdhbhnK i' fe j[D sZe bkr{ j'JhnK jB, ik Uto^okJhfvzr fJB?eNw?AN i/ e'Jh j't/ ns/ fpibh
n?eN^2003 dh ;?ePB 164 dh Xkok w[skfpe ikoh ehsh iKdh j? ns/ gkto fvgkoNw?AN, gzikp ;oeko d/
fgZm nzeD Bz 11$95$2011^PE 3$2344 fwsh 28H06H2011 nB[;ko fJzvhnB N?bhrokc n?eN^1885 (13 nkc
1885) d/ gkoN 3 nXhB N?bhrokc nEkoNh dhnK gktoI ghHn?;HNhH;hHn?bH Bz{ fdshnk rJhnK jB.fJ;
;pzXh B'fN; ikoh ehsk iKdk j? fe i/ fe;/ ftnesh B{z T[go'es ;ehw$NoK;fwPB bkJhBK d/ ezwK ;pzXh e'Jh
fJsoki j'D sK T[j nkgDh gqsh t/dBk fJ; B'Nhfce/PB ikoh j'D s'A 2 wjhB/ d/ nzdo nzdo d/ ;edk j?. fJ;
s'A pknd e'Jh fJsoki iK gqsh t/dBk ;theko BjhA ehsh ikt/rh ns/ ;koh ;ehw$NoK;fwPB bkJhBK d/ ezw,
fpBQK e'Jh ;'X ehs/ iK ;'X eoe/ ghHn?;HNhH;hHn?bH dh wzBi{oh w[skfpe bkr{ wzB/ ikDr/. fJ; f;bf;b/ ftZu
b'VhAd/ nkoiah gbkB fiBQK ftZu NoK;fwPB bkJhBK d/ o;s/ ftykJ/ rJ/ jB, fe;/ th ezw eko tkb/ fdB T[g
w[Zy fJzihBhno$NhHn?bHn?;H;hH jbek, ghHn?;HNhH;hHn?bH, gfNnkbk d/ dcso ftu t/y/ ik ;ed/ jB.T[go'es
;ehwK ;pzXh i/ e'Jh fJsokia ns/ gqsh t/dBk j't/ sK fBwB j;skyo B{z G/i/ ikD.
e'Jh spdhbh BjhA
420
bkJhB dh bzpkJh 2 a185
420
feHwhH j?.
bkJhB dh bzpkJh 10H693
420
feHwhH j?.
PART III]
PUNJAB GOVT. GAZ., FEBRUARY 23, 2024 (PHGN 4, 1945 SAKA)
71
T[go do;kJhnK ;ehwK d/ bkGL^
T[go'es ezw gzikp oki d/ 400 e/HthH$220e/HthH$132e/HthH NoK;fwPB B?Ntoe ftZu tkXk $;woZEk
tXkT[D d/ wzst eoe/ gbkB ehs/ rJ/ jB sK i' oki d/ ;ko/ soQK d/ w'i{dk$;zGkth ygsekoK Bz{ fBoftxB ns/
tXhnk fpibh ;gbkJh fdZsh ik ;e/ ns/ fJj ezw c'oh s"o s/ nfsnzs b'Vhd/A jB.
;jh$^
fJziL;ziht ;{d,
w[Zy fJzihBhno $NhHn?;H,
ghHn?;HNhH;hHn?bH, gfNnkbk.
[37-1]
3042/2-2024/Pb. Govt. Press, S.A.S. Nagar