1508
PUNJAB GOVT. GAZ. (EXTRA), FEBRUARY 24, 2025 (PHGN 5, 1946 SAKA)
EXTRAORDINARY
Published by Authority
CHANDIGARH, MONDAY, FEBRUARY 24, 2025 (PHALGUNA 5, 1946 SAKA)
( 1508 )
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION
NOTIFICATION
The 20th February, 2025
No. PSERC/Secy./Regu. 193.–In exercise of powers conferred under Section 181 read with Section
61, 86(1)(e) of the Electricity Act, 2003 (36 of 2003) and all other powers enabling it in this behalf, the Punjab
State Electricity Regulatory Commission hereby makes the following regulations to further amend the Punjab
State Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations,
2021 including the first amendment thereof (hereinafter referred to as “the Principal Regulations”) namely:
1.
Short title & commencement
1.1
These Regulations may be called the Punjab State Electricity Regulatory Commission (Grid Interactive
Rooftop Solar Photo Voltaic Systems) (Second Amendment) Regulations, 2025.
1.2
These Regulations shall extend to the whole of the State of Punjab.
1.3
These Regulations shall come into force from the date of publication in the official Gazette of the State.
2.
Amendment of Regulation 11.5 of the Principal Regulations
The Regulation 11.5 of the Principal Regulations shall be substituted as under:
“The distribution licensee shall complete technical feasibility study within 15 days of the date of
acknowledgment issued to the applicant.
Provided that the application for rooftop Solar Photovoltaic system upto 10 kW capacity, complete
in all respect shall be deemed to have been accepted without requiring technical feasibility study.
Any commensurate enhancement of the sanctioned load of the consumer, as may be required, shall
be carried out by the distribution licensee for which the consumer shall be liable to pay requisite
charges for extension in load as per the provisions of Supply Code, 2024.”
3.
Amendment of Regulation 11.9 of the Principal Regulations
The Regulation 11.9 of the Principal Regulations shall be substituted as under:
“During the time period from the feasibility study or deemed acceptance of the application as per
1509
PUNJAB GOVT. GAZ. (EXTRA), FEBRUARY 24, 2025 (PHGN 5, 1946 SAKA)
proviso to Regulation 11.5 till the completion of the installation, in case there is any requirement of
upgradation of distribution infrastructure like augmentation of service line, distribution transformer
capacity, etc., for installation of the required capacity of Rooftop SPV system, the same shall be
carried out by the distribution licensee and the cost shall be included in the Annual Revenue
Requirement of the distribution licensee.”
4.
Amendment of Regulation 11.13 of the Principal Regulation:
The Regulation 11.13 of the Principal Regulation shall be substituted as under:
After submission of the installation certificate and site verification, the distribution licensee
shall complete the signing of connection agreeement for a period of upto 25 years, installation
and sealing of the Bi-directional energy meter/unidirectional generation meter and successful
commissioning of the SPV system within 15 days of the submission of installation certificate.
5.
Amendment of Regulation 14 of the Principal Regulation:
The Regulation 14 of the Principal Regulations shall be substituted as under:
“14.
Gross Metering Arrangement- Energy Accounting and Settlement
14.1
The energy consumed by the prosumer during the billing cycle shall be billed at the retail
tariff applicable for the relevant category as determined by the Commission in the tariff
order whereas energy generated during the billing cycle shall be billed at feed-in-tariff
approved by the Commission.A single invoice may be raised by the distribution licensee for
the net bill amount.
14.2 In case, for a billing cycle, any amount is payable by the prosumer to the distribution
licensee as per Regulation 14.1, the same shall be paid by the prosumer to the distribution
licensee within the due date of the bill for that billing cycle.
14.3 In case, for a billing cycle, any amount is payable by the distribution licensee to prosumer
as per Regulation 14.1, the same shall be carried forward to the next billing cycle and may
be accounted for in the subsequent billing cycle(s) without any interest till the end of
settlement period. At the end of the settlement period, if any, net amount is payable to the
prosumer the same shall be paid by the distribution licensee within 30 days of the last date
of the settlement period. In case of any delay, an interest at marginal cost of funds based
lending rate (MCLR) for one year of SBI as applicable on 1st April on the financial year
shall be payable.”
6.
Amendment of Regulation 15 of the Principal Regulation:
The Regulation 15 of the Principal Regulations shall be substituted as under:
“15.
Energy Accounting during meter defect/failure/burnt
15.1
In case of defective/failure/burnt condition of any meter, the prosumer shall report the
failure to the Distribution Licensee.
15.2
Distribution Licensee shall replace the meter as specified in theSupply Code, 2024.
15.3
The electricity generated by the Rooftop SPV system during the period in which the
generation meter is defective shall be determined based on the readings of the Check Meter.
1510
PUNJAB GOVT. GAZ. (EXTRA), FEBRUARY 24, 2025 (PHGN 5, 1946 SAKA)
Provided that if the Check meter is not installed, then the electricity generated shall be
considered equal to the generation of the corresponding period of the last year or average
of the monthly generation in the last one year.
15.4
During the period in which the consumer meter or the bi-directional meter is defective, the
account of the prosumer shall be overhauled as per Supply Code, 2024.”
Sd/-
Secretary to the Commission
Note: 1.
The Principal Regulations were issued vide Notification No. PSERC/Secy./Regu.158 dated
18.08.2021 published in Punjab Govt. Gaz.(Extra) dated 18.08.2021.
2.
The First Amendment to the Principal Regulations was issued vide Notification No. PSERC/
Secy./Regu.186 dated 11.03.2024 published in Punjab Govt. Gaz.(Extra) dated 11.03.2024.
3322/2-2025/Pb. Govt. Press, S.A.S. Nagar