GOVERNMENT OF PUNJAB

DEPARTMENT OF POWER

(ENERGY BRANCH)

NOTIFICATION

The 22nd July, 2025

No. ENRG/10/135/2025-EV1/2048.-In exercise of the powers conferred by section 12 of the Punjab

Electricity (Duty) Act, 2005 (Punjab Act No. 9 of 2005), and all other powers enabling him in this behalf, the

Governor of Punjab is pleased to grant hundred percent (100%) exemption to M/S Kalki Agro Industries,

having its manufacturing unit located at Village Dagham Banga Road, Tehsil Garhshankar, Hoshiarpur,

from the payment of electricity duty (except Social Security Fund and Infrastructure Development Fund) for a

period of ten years, under the Industrial and Business Development Policy, 2022 in public interest, subject

to the following conditions, namely:-

CONDITIONS

(i)

the exemption shall be granted to the said Firm for maunfacturing of Food Product (Flour Mill), as per the

conditions contained in the Eligibility Certificate issued by the Convenor, District Level Committee-cum-

General Manager, District Industries Centre, Hoshiarpur vide No. 639, dated the 11th March, 2025;

(ii)

the exemption shall be granted from the 11th October, 2023 to 10th October, 2033 or till the date of

exhaustion or utilization of quantum of eligible incentive i.e. Rs. 1,50,00,000/- (rupees one crore fifty

lakh only), whichever is earlier, as per the Eligibility Certificate dated the 11th March, 2025. However,

this exemption shall be available on the power consumption corresponding to the Electric Load (KW)

required for the installed capacity as recorded in the approved DPR, (Proposed Electricity Load 450

KW), whichever is lower, However, the date of commercial production of the Unit is certified as 20th

December, 2023;

(iii)

in the event of any revision of rate of electricity duty at any subsequent point of time, the exemption to the

extent of revised levied rate of electricity duty (except contributions out of electricity duty e.g. Social

Security Fund etc.) shall be applicable to the Unit;

(iv)

the usage of the power by the Firm during the aforesaid period shall be regulated through a transparent

metering arrangement installed or approved by the Punjab State Power Corporation Limited and the Chief

PART I]

PUNJAB GOVT. GAZ., DECEMBER 5, 2025 (AGHN 14, 1947 SAKA)

2315

Electrical Inspector to record the consumption of the Unit under exemption;

(v)

the exemption shall not be applicable for the residential area of the said premises and to that effect, an

undertaking shall be submitted by the Unit that no residential area exists in the premises. If there is a

residential area in the premises, in that event, a separate meter has to be installed or a separate electricity

connection shall be obtained in order to record the electricity consumption of that residential area, which

shall be excluded from the total electricity consumption of the Unit;

(vi)

it shall be ensured that the Firm does not connect the load of any other Unit with this Unit for the purpose

of availing exemption from electricity duty;

(vii) the exemption shall be strictly in accordance with the Eligibility Certificate issued by the Convenor ,

District Level Committee-Cum-General Manager, District Industries Centre, Hoshiarpur vide No. 639

dated the 11th March, 2025; and

(viii) in case any exemption claimed in excess is detected at any point of time, it shall be liable for recovery and

penal action under the provisions of the said Act.

To ensure the compliance of the above conditions and proper utilization of incentive, the Auditor of the

office of the Chief Electrical Inspector may inspect the Unit at any time. In case, any violation of any of the

provisions of the Punjab State Electricity (Duty) Act, 2005 and the rules made thereunder and the above

conditions is detected, the owner of the Unit shall be liable for action under section 8 of the said Act and the rules

made thereunder and the exemption shall automatically cease for which the owner of the Unit shall be

responsible.

Sd/-

AJOY KUMAR SINHA,

Principal Secretary to Government of Punjab,

Chandigarh

Department of Power.