NOTIFICATION
The 30th September, 2025
No. ENRG/10/172/2025-ENERGY/2618.-In exercise of the powers conferred by section 12 of the
Punjab Electricity (Duty) Act, 2005 (Punjab Act No. 9 of 2005), and all other powers enabling him in this behalf,
the Governor of Punjab is pleased to grant hundred percent (100%) exemption to M/s RS Industries, having
its manufacturing unit located at Village Toor Tehsil Guruharsahai District Firozpur, from the payment of
electricity duty (except Social Security Fund and Infrastructure Development Fund etc.) for a period of ten
years, under the Industrial and Business Development Policy, 2022 in public interest, subject to the following
conditions, namely:-
CONDITIONS
(i)
the exemption shall be granted to the said Firm for maunfacturing of White Rice (Rice Bran, Khudi Phak
and Chilka), as per the conditions contained in the Eligibility Certificate issued by the Convener-cum-
Genral Manager, District Level Committee, District Industries Centre, Firozpur, vide Endorsement No.2078,
dated the 3rd July, 2025;
(ii)
the exemption shall be granted from the 28th August, 2023 to 27th August, 2033 or the date of
exhaustion/utilization of quantum of eligible incentive i.e. Rs. 2,46,59,496/- (rupees two crore forty
six lakhs fifty nine thousand four hundred ninety six only), whichever is earlier, as per the Eligibility
Certificate dated the 3rd july, 2025. However, this exemption shall be available on the power
consumption corresponding to the Electric Load (KW) required for the installed capacity as
recorded in the approved DPR, (Proposed Electricity Load 170 KW), whichever is lower. However,
the date of commercial production of the Unit is certified as 11th January, 2024;
(iii)
in the event of any revision of rate of electricity duty at any subsequent point of time, the exemption to the
extent of revised levied rate of electricity duty (except contributions out of electricity duty e.g. Social
Security Fund etc.) shall be applicable to the Unit;
(iv)
the usage of the power by the Firm during the aforesaid period shall be regulated through a transparent
186
PUNJAB GOVT. GAZ., JANUARY 23, 2026 (MAGHA 3, 1947 SAKA)
PART I]
metering arrangement installed or approved by the Punjab State Power Corporation Limited and the Chief
Electrical Inspector to record the consumption of the Unit under exemption;
(v)
the exemption shall not be applicable for the residential area of the said premises and to that effect, an
undertaking shall be submitted by the Unit that no residential area exists in the premises. If there is a
residential area in the premises, in that event, a separate meter has to be installed or a separate electricity
connection shall be obtained in order to record the electricity consumption of that residential area, which
shall be excluded from the total electricity consumption of the Unit;
(vi)
it shall be ensured that the Firm does not connect the load of any other Unit with this Unit for the purpose
of availing exemption from electricity duty;
(vii) the exemption shall be strictly in accordance with the Eligibility Certificate issued by the Convener-
cum-General Manager, District Level Committee, District Industries Centre, Firozpur, vide Endorsement
No.2078, dated the 3rd July, 2025; and
(viii) in case any exemption claimed in excess is detected at any point of time, it shall be liable for recovery and
penal action under the provisions of the said Act.
To ensure the compliance of the above conditions and proper utilization of incentive, the Auditor of the
office of the Chief Electrical Inspector may inspect the Unit at any time. In case, any violation of any of the
provisions of said Act and the rules made thereunder and the above conditions is detected, the owner of the Unit
shall be liable for action under section 8 of the said Act and the rules made thereunder and the exemption shall
automatically cease for which the owner of the Unit shall be responsible.
Sd/-
AJOY KUMAR SINHA,
Principal Secretary to Government of Punjab,
Chandigarh
Department of Power.
The 30th September, 2025
3616$1-2026/Pb. Govt. Press, S.A.S. Nagar