No.17/97/2021-3IP3/2099.-

Policy for allowing use of the land belonging to Water Resources Department for laying pipelines of

any type/cables including the crossings.

The application for above said purpose complete with the drawings based on the plans table survey

along with X-sections of canal/drain and the details of the pipelines/cabel and the technology to be used for

laying (i.e. open trench or tunnelling) along with processing charges shall be made to the concerned Executive

Engineer, who after examining the proposal shall forward the case to superintending Engineer, who after

examining the proposal shall forward the case to Superintending Engineer for getting the clearance from

Chief Engineer/Design Water Systems before issuing the approval. If the case is found fit in-principal, the

applicant needs to deposit the following fee/charges to the concerned Executive Engineer as mentioned in table

below:-

1724

PUNJAB GOVT. GAZ., AUGUST 28, 2026 (BHDR 6, 1948 SAKA)

PART I]

Only upon the deposition of fee/charges in advance, permission to start the work will be granted.

Keeping in view the safety of canal/drain and their structures. Chief Engineer Design/Competent Authority

reserves the right to accept or reject the application without assigning any reason. The format of application is

enclosed as Annesure-A.

This policy supersedes all the other policies, if any, for crossing any Pipe Line & cable etc. along/across

canals & drainage system/rivers of Water Resources Department Punjab.

SARVJIT SINGH, IAS

Chandigarh

Principal Secretary to Government of Punjab,

The 7th December, 2021

Department of Water Resources

3810/8-2026/Pb. Govt. Press, S.A.S. Nagar