Rajasthan Integrated Clean Energy Policy 2024
In order to promote Renewable Energy, Energy Storage Systems, Green
Hydrogen andto ensure their integration with the grid, the State Government
hereby notifies the Rajasthan Integrated Clean Energy Policy, 2024 as under:
1. Preamble
1.1. Growing concerns of global warming and climate change require
emphasis on clean energy. The Renewable Energy Sources are the
bedrock that layingthe foundation for planners in developing the
policy framework to ensure energy security and equity andare
imperative for achieving the goals of reducing carbon emission and
mitigating pollution.
1.2. Utility scale Power Producers, small Power Generators, State Utilities
such as Generation, Transmission and Distribution Companies,
Regulatory and Power Management Agencies, Government and
Consumers are major stakeholders in the Renewable Energy (RE)
sector. This policy is designed to facilitate the promotion of the
Renewable and Clean Energy Sector while safeguarding the interests
of the end consumer.
1.3. Over the past decades, the demand for power has grown and the State
has added conventional power capacity on a large scale. The State has
achieved self-reliance in the availability of power. Furthermore,
Renewable Energy has become commercially viable, therefore, State
Utilities and other stakeholders have an increased interest and a
greater focus on renewable energy.
7495 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
1.4. Renewable Energy,such as Solar Energy, can be deployed in a
decentralised manner,bringing benefits of reduced transmission &
distribution losses and savings in cost of establishing additional
transmission infrastructure on account of generation of power at load
centres. Decentralized generation through solar rooftop systems, off-
grid applications, and small solar power plants at consumers' end are
an efficient way of utilization of Solar Energy.
1.5. The State has a huge and largely untapped potential in terms of intense
solar radiation, one of the highest numbers of sunny days in a year
and
as
availability
of
vast
barren/un-cultivable,
unutilized
government/private land. These attributes have the potential to make
Rajasthan a highly preferred destination for Solar Energy at the Global
level.
1.6. Additionally, National Institute of Wind Energy (NIWE), Government of
India, has assessed wind power potential at Rajasthanis 284GW at
150 meters height and National Institute of Solar Energy assessed the
Solar Potential in Rajasthan is 142 GW.
1.7. To meet the global commitments, Government of India has fixed a
national target of 500 GW Renewable Energy capacity. This will reduce
the dependence on conventional sources of energy by promoting a
non-conventional alternative.
1.8. Notably, Solar and Wind resources are complementary to each other
and hybridization of these two technologies would help in minimizing
the variability in power and would lead to optimum utilization of
infrastructure
including
land
and
transmission
systems.
Superimposition of the wind and solar resources map exhibits high to
moderate Wind and Solar Energy potential in the State.
1.9. In light of these, it is desirable to have suitable policy interventions for
developing new hybrid projects and also for encouraging hybridization
of existing Wind and Solar Power Plants in the State.
1.10 Appropriate capacity storage systems are also required in sync with
generation profile of Wind-Solar Hybrid Power Projects.
1.11 The State will also promote the Energy Storage Program. The Energy
Storage System (ESS) enhances grid stability, reliability and facilitates
better load management, reducing the dependency on fossil fuel-based
peaking power plants. Energy Storage Technologies, such as batteries
and pumped hydro storage are essential for addressing the
intermittency of Renewable Energy sources.
1.12 Utilization of Biomass waste as a fuel for energy generation is yet
another sustainable source of energy. This reduces the environmental
impact caused by open crop residue/ biomass burning.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7496
1.13 State
will
promote
the
Biomass
Programme,
facilitating
the
establishment of Biomass-based Power Projects, briquette/pellet
manufacturing plants, and supporting biomass-based co-firing
projects, as well as Waste-to-Energy based Power Projects for the
utilization of waste such as MSW/RDF/Industrial/Medical waste or
any other wastes as per the guidelines of the State Government and
Government of India.
1.14 Further, Green Hydrogen is a non-fossil fuel which can fulfil the
requirements of Industrial, Power, Transportation and Aviation sectors
while reducing carbon emissions and is useful to produce Green
Ammonia.
1.15 To keep pace with the changing needs of the Renewable Energy
Sector, State Government has decided to review the existing Rajasthan
Renewable Energy Policy, 2023.
2 Vision and objectives:
2.1 To develop RE sector in the State with a ‘Stakeholder-Driven’ policy.
2.2 To ensure that Rajasthan emerges as a major contributing State in order
to achieve the national target of 500 GW capacity of Renewable Energy
as a part of India's global commitment.
2.3 To achieve an “Optimal Energy Mix” of conventional and renewable power,
ensuring energy security in the State and efficient grid management
while protecting the interests of all stakeholders.
2.4 To encourage the use of new technologies andmethods involving combined
generation of Wind &Solar Power and other emerging technologies like
storage systems including pump storage plants, battery storage
systems etc. To facilitate the development of infrastructure in
generation, transmission, distribution and manufacturing sector of
Renewable Energy.
2.5 To boost Human Resource Development with particular reference to
Renewable Energy and to drivegeneration of employment opportunities
in the State.
2.6 To facilitate and support Research & Development activities in the field of
RE. To nurture better products, processes and systems in order to
promote growth of Renewable Energy.
2.7 To deploy ancillary services for making the grid flexible for RE Power
integration by using various modes like Demand Side Management,
Time of Day Tariff, Scheduling & Forecasting, Storage Systems,
Reactive Power Management, Grid Reserve/Balancing Capacity, etc.
2.8 To ensure productive use of the abundant wasteland in the State, thereby
utilizing the un-utilized/under-utilized land for creation of Wind
energy hub. Promoting “Repowering” of Wind Power Projects and
conducting a Wind Resource Assessment Programme.
7497 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
2.9 To attract investors to set-up RE equipment manufacturing facilities by
promoting the development of a manufacturing ecosystem in the
State.
2.10 Hybridization of Wind & Solar technologies to meet the challenges of grid
security and stability while ensuring optimum utilization of land
resources and transmission systems. Also pushing Hybridization of
existing conventional thermal power plants with Renewable Energy in
order to reduce fuel consumption and carbon emission.
2.11 To promote setting up of the RE Power Projects for sale of power to
Distribution Companies of Rajasthan/Rajasthan UrjaVikas & IT
Services Ltd. to meet the State's RPO and beyond RPO as per
requirements and commercial viability and also towards captive use
and 3rd party sale.
2.12 To support the development of Energy Storage Systems (ESS) to enhance
the grid stability and reduce the reliance on fossil fuel. These will also
promote energy independence in remote and isolated areas/
communities.
2.13 To promote setting up of the Waste to Energy plant for generation of
power by utilizing MSW (Municipal Solid Waste), RDF (Refuse Derived
Fuel), Industrial and Medical Waste.
2.14 Utilization of Biomass Waste as a fuel for energy generation as a
sustainable source of energy and also for reducing the problem of
stubble burning in order to address the environmental impact caused
by burning of open crop residue/biomass.
2.15 To develop a Green Hydrogen Manufacturing Ecosystem (Electrolyser,
compressor, storage and transport infrastructure etc. The Policy also
promote the development of Green Hydrogen Parks, Green Hydrogen
based mobility, Green Hydrogen equipment manufacturing industries,
research in cutting-edge technology and the promotion of Green
Hydrogen generation for storage and generation of RTC (round the
clock) power etc.
3 Title and Enforcement:
3.1
This Policy will be known as Rajasthan Integrated Clean Energy
Policy, 2024.
3.2
The Policy will become effective from the date of Notification and
will remain in force until March 29, 2029 or until superseded by
another Policy.
3.3
The State Government may amend/modify/review this Policy as
and when required.
4 Target
4.1. The Policy aims to achieve a target of 1,25,000MW Renewable Power
Projects up to 2029-30 in the Stateas under: -
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7498
S.No.
Particulars
Capacity
1
Solar
90,000 MW
2
Wind & Hybrid
25,000 MW
3
Hydro, Pump Storage Plant (PSP),
Battery Energy Storage System
10,000 MW
4.2. The State DISCOMs will purchase Renewable Energy as per the
Renewable Purchase Obligation (RPO) as determined by RERC.
4.3. The State will endeavour to develop RenewablePower Projects for sale of
power to parties other than DISCOMs of Rajasthan for captive
consumption,within and outside the State.
4.4. This policy also aims to promote RenewableEnergy and other clean energy
sources as follows:
i. Promotion of small Decentralized Grid Connected Solar Power Projects
at load centres.
ii. Promotion of Rooftop Solar Projects through Net Metering and Gross
Metering Mechanism or in any other manner as per the provisions
of the Electricity Act, 2003 and relevant regulations/orders issued
by RERC/CERC.
iii. Promotion of Off-Grid Solar applications like Solar Water Pumps,
home lighting systems, water heater, etc.
iv. Promotion of Renewable Energy Projects for sale of power to Discoms
and for Captive use/3rd Party Sale within and outside the State.
v. Promotion of RenewableEnergy Projects with Storage Systems, Hydro
Projects, Pump Storage Plants and Battery Energy Storage Systems.
vi. Promotion of setting up of Electric Vehicles (EV) Charging Stations
using Renewable Energy.
vii. Development of RE Parks/UMREPPs.
viii. Strengthening of the Transmission and Distribution Network for
Renewable Energy.
ix. Promotion of manufacturing industries of Solar/Wind Energy
Equipment and Storage Systems.
x. Promotion of floating/ canal top/reservoir top solar power projects.
xi. Promotion of Energy Storage Systems for reliable RE Power &grid
stability.
xii. Promotion
of
Bio-energy
(Biomass/Co-firing/Waste
to
Energy/CBG/Bio-CNG/Bio-coal/Bio-Ethanol
etc.)
for
reducing
carbon footprint.
xiii. Promotion of use of Non fossil fuels through production of Green
Hydrogen and its derivatives.
7499 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
5 RREC to act as Nodal Agency
RREC will act as a Nodal Agency for:
i. Registration of projects.
ii. Approval of projects.
iii. Development of RE Parks/UMREPPS;
iv. Selection of projects through a process of competitive bidding on
the request of RUVITL/DISCOMs;
v. Facilitating the allotment of Government land;
vi. Facilitating approval of power evacuation plans& connectivity at
CTU/STU/DISCOMs network and allocation of bays and other
related facilities on behalf of State;
vii. Facilitating the execution of PPA/WBA with DISCOMs of
Rajasthan/RVPN/NVVN/SECI/RUVITL (as may be applicable);
viii. Arranging any other statutory clearances/approvals;
ix. Facilitating water allocation for Hydro, Pump Storage Plants and
Solar Thermal Power Plant and RE plants/Parks for auxiliary
consumption and cleaning of Solar PV Plants;
x. Coordination with MNRE/DISCOMs of Rajasthan/RVPN/Various
agencies under the control of MNRE/Central Agency/Other
Relevant Agency;
xi. Accreditation
and
recommendation
of
Power
Projects
for
registration with Central Agency under REC Mechanism.
Section-A: Renewable Energy
PROJECT BASED PROVISIONS AND INCENTIVES
Solar Energy
6. Rooftop PV Solar Power Systems
6.1. Rooftop PV Solar Power Systems with Net Metering:
The State Government will facilitate the installation of Rooftop PV
Solar Power Systems in the State. It will endeavour to develop all
District Headquarters and other important areas as ‘Green Energy
Cities’ through the installation of Solar Rooftop Systems in the
following manner:
i) The State will promote setting up of grid-connected Rooftop PV Solar
Power Plants under a Net Meteringarrangement. The DISCOMs
will allow Solar Rooftop capacity addition up to 80% of the
capacity of the Distribution Transformerin the area.
ii) Rooftop Solar Power Plants will be promoted by encouraging setup
of the same on Government Building through various modes
including HAM/RESCO Mode.
iii) The DISCOMs will develop suitable and comprehensive consumer-
friendly IT applications for facilitating online and timely approvals
and monitoring of projects for Rooftop Solar Power Plants.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7500
iv) Rooftop consumers will be provided subsidies/incentives as per the
guidelines of MNRE/State Government.
v) Start-ups will be promoted for installation of Rooftop Solar
Systems.
vi) The maximum time period for execution of various activities in
respect of Solar Rooftop Systems under Net Metering by DISCOMs
will be as follows:
S.
No.
Activity
Maximum time period
1.
Issuance of NOC above 10 kW
7days from receipt of
application
2.
Solar & Net Meter Testing
7 days from depositing of
meters
3.
Execution
of
Net
Metering
Agreement
3
days
from
the
submission of the draft
agreement
4.
Commissioning/Connection
of
Rooftop system
3 days from receipt of
application
6.2. Rooftop PV Solar Power Systems with Gross Metering:
Solar Rooftop Systems can also be set up under Gross Metering
Scheme
as
per
the
guidelines
prescribed
by
the
State
Government/Government of India. The entire generated power will be
supplied to DISCOMs at a tariff determined by RERC. Solar Rooftop
Systems up to 1 MW capacity will be allowed under this Scheme.
6.3. Virtual Net Metering (VNM) and Group Net Metering (GNM)
Virtual Net Metering (VNM) arrangement allows multiple consumers
operating within the same licensee area to establish a collective
physical RE plant to meet theirpower demand whereas GroupNet
Metering (GNM) arrangements cater to a single consumer having
multiple service connections across various locations within the same
licensing area by installing a RE Plant at single location.
To enable more access of solar power, Virtual Net Metering and Group
Net Metering schemes will be promoted in the State to allow access to
renewable energy to all consumers not having sufficient space in their
premises.
6.4. Small wind turbines will be allowed with Solar Rooftop under Net
Metering Scheme.
6.5. Government Buildings will be solarised through installation of Solar
Rooftop Plants.
6.6. Appropriate provisions would be made in Urban Building Byelaws to
7501 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
promote and facilitate the use and installation of Solar Rooftop
Systems.
7. Decentralized Grid Connected Solar Power Projects:
Decentralized
Grid
Connected
Solar
Power
Projects
provide
anopportunity to meet the power requirement close around load
centres. Such generation will help the utilities to reduce their T & D
losses and optimize the cost of Transmission and Distribution System.
7.1. The State will promote setting up of decentralized Solar Power Projects
with a minimum capacity of 0.5 MW and a maximum capacity of 5
MW in the premises and in the vicinity of 33 kV Grid Sub-Stations in
order to promote sale of power to DISCOMs. The sub-stations for
which decentralized Solar Power Projects are to be established will be
selected by RUVITL/Discoms. The tariff for these projects will be
determined on basis of tariff based competitive bidding process or as
per the guidelines of State Government/ Government of India.
7.2. The State aims to increase participation of farmers in the Solar Energy
sector to augment their sources of income through generation and
sale of Solar Energy to DISCOMs, in the following manner:
7.2.1 Farmers, on their own or through a developer, can set up
decentralized power projects on their un-cultivable agriculture
land as per clause 7.1.
7.2.2 The State will promote solarization of existing grid-connected
agriculture pumps as per the provisions/guidelines issued by
DISCOMs based on Regulations of RERC/Guidelines of
Central/State Government.
7.3. The State Government will issue schemes/programs for promotion of
decentralized solar generation in the State.
8. Off-Grid Solar Applications:
8.1 The State will promote and incentivize off-grid solar applications, including
Hybrid Systems, as per the guidelines issued by MNRE to meet various
electrical and thermal energy requirements for domestic and
commercial use.
8.2 The State will promote the setting up of Solar Power Plants by persons for
the sale of power to consumers through the State distribution
system/local solar grid.
8.3 The State will also promote the setting up of Stand-Alone Solar Systems to
provide electricity to households in remote Villages /Hamlets(Dhanis).
8.4 The State will promote installation of Solar PV Pumps for pressure
irrigation systems.
9. Utility Grid Power Projects-
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7502
9.1 Solar Power Projects in Rajasthan for sale of power to DISCOMs of
Rajasthan:
The State will promote setting up of Solar Power Projects for sale of
power to DISCOMs of Rajasthan on the tariff discovered through a
competitive bidding process:
i) To fulfil Renewable Purchase Obligation (RPO) target fixed by RERC.
ii) DISCOM/RUVITL may purchase Solar Power beyond RPO limit and
would be able to avail the benefit of REC as per CERC Regulations/
NLDC guidelines.
9.2 Solar Power Projects sanctioned under guidelines/schemes of MNRE:
The State will promote setting up of Solar Power Projects under the
Guidelines/Schemes of MNRE or Solar Power Projects allocated
through competitive bidding by/for other State Utilities/Entities.
9.3 Solar Power Projects for captive use:
The State will promote setting up of Solar Power Projects for captive
use as under:
9.3.1 Solar Power Projects within the premises of a consumer of
Rajasthan;
9.3.2 Solar Power Projects outside the premises of a consumer of
Rajasthan;
9.3.3 Solar Power Projects set up in the State for captive use outside
Rajasthan through open access.
9.3.4 The maximum permissible capacity of individual Solar plant for
captive use within the State will be limited as per RERC
Regulations. The Generating plant capacity for 3rd Party sale can
be any capacity; however, the consumer of the State will be
allowed to take power from such plant up to the limit prescribed
as per RERC Regulations.
9.4
Grid connected Solar Power Projects for Third Party Sale:
The State will promote setting up of solar power projects for third-
party sale within/ outside the State as follows:
9.4.1 Solar Power Projects within premises of a consumer of Rajasthan
(Under RESCO Mode);
9.4.2 Solar Power Projects set up for sale of power within State through
open access;
9.4.3 Solar Power Projects set up for sale of power outside State
through open access/power exchange.
9.5 The Projects set up under clause 9.3 &9.4will also be eligible for RE
(Solar) Certificate as per Orders/Regulations of the appropriate
Commission issued in this regard.
Development of RE Parks
7503 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
10 RE Park
The RE Park is a concentrated zone for development of RE power
projects. It provides a well-demarcated area with proper civil and
power system infrastructure to a power producer, where the risk in
projects is minimized and a fast approval process is facilitated. The RE
Power Park Developer creates supporting infrastructure and facilities
including power evacuation systems, water arrangements, internal
roads and administrative facilities.
10.1 RE Parks by RREC:
Rajasthan Solar Park Development Company Ltd., a Special Purpose
Vehicle (SPV) in the form of a subsidiary company of RREC, has been
established for development of infrastructure and management of
RE/Solar Parks. RREC will develop RE Parks in Rajasthan on its own
or through any other SPV which may be created as required.
10.2 Development of RE Parks by Private Sector:
(i) The State will promote development of RE Parks (Solar Park/Wind
Park/Hybrid Parks) by the Private Sector. The Private Sector RE
Power Park Developer (REPPD) will submit an application in the
prescribed online format to RREC for development of RE Park
along with a non-refundable Registration charge as per clause
15.3.RRECwill
complete
the
processing
of
Registration
applications within a period of 30 days.
(ii) The Private Sector RE Power Park Developer(s) shall be obliged to
create common infrastructure facilities for development of RE
Park(s) These will include creation of power evacuation systems,
development of roads, lights, water supply systems and other
administrative support systems.
(iii) The REPPD will be allowed to acquire agriculture land from title
holder (Khatedar) for developing RE Park(s) in excess of ceiling
limit in accordance with the provisions of Rajasthan Imposition of
Ceiling on Agriculture Holding Act, 1973.
(iv) Land conversion will not be required in accordance with the
provisions of Rajasthan Tenancy Act 1955 and Rajasthan Land
Revenue Act 1956and theRules made thereunder for the
development of RE Park on Private Agriculture Land.
(v) Allotment of Government land to Private Sector RE Power Park
Developer(s) for development of RE Park(s) will be considered on
recommendation of RREC.
(vi) The Private Sector RE Power Park Developer(s) shall be
responsible for registration of RE power projects within their park
with RREC as per the provisions of this policy. Already registered
RE Park/Solar Park prior to commencement of this Policy shall
be continued with the same number and will be implemented
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7504
under the provision of this policy.
(vii) The
necessary
SoP
will
be
developed
by
RREC
for
development of RE Park in the State.
10.3 Development of RE Parks through Joint Venture Companies (JVCs):
10.3.1 The State will promote development of RE Parks through Joint
Venture with private developers investing up to 50% equity or any other
percentage of equity participation as decided by the state government.
The cost of land allotted by state government would be part of its equity
participation in the Joint Venture Company.
10.4 The applicant will submit a proposal to RREC for formation of Joint
Venture Company with the State Government. RREC, after examining
the same, will submit the proposal to Energy department, which after
concurrence of Finance Department will begiven final approval.
10.5 Solar Parks/UMREPPs under MNRE Scheme:
10.5.1 The State Government will promote setting up of Solar Parks/Ultra
Mega Renewable Energy Power Parks (UMREPPs) as per the MNRE
guidelines/schemes through agencies designated by MNRE.
10.5.2 Such developer will submit an application in the prescribed online
format to RREC for registration of Solar Park/UMREPP along with a
non-refundable Registration charge of Rs. 10,000/MW+GST subject to
maximum of Rs. 20 Lac+ GST for each Park.
11 Promotion of setting up of Renewable Energy based Electric Vehicle
Charging Station:
The shift to clean transport has become necessary due to increase in
carbon emission from fossil fuel, which leads to global warming and
climate change. The rapid increase in fossil fuel consumption due to
rising vehicular movement has led to increase in pollution and has an
adverse impact on Balance of Payment situation because of the rising
import bill.
The above factors are main reasons for adoption of Electric Vehicles
(EV)and supporting technologies. The requirement of suitable grid-
grade electricity is seen as a major challenge for establishing sufficient
charging stations for the EVs. Charging of EVs from electricity
generated from fossil fuel based conventional sources does not reduce
emissions. For further reduction of carbon footprint, it is essential
that the EVs are charged using Renewable Energy Sources. In view of
the above, the State will promote the use of Renewable energy for
charging of EVs in the following manner:
i. The Charging Infrastructure will be developed as per the guidelines
and standards issued by Ministry of Power and Central Electricity
Authority.
7505 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
ii. The EV charging stations may be established by the State/Central
Public Sector Undertakings, Private operators or operators under
the Public Private Partnership models.
iii. The charging station service providers may set up renewable energy
generation plants within their premises for captive use and may
also draw renewable power through open access from generation
plants located within the State to avail the benefits as provided
under clause 17 of this policy.
iv. The aforesaid benefits would also be available to chain of EV
charging stations owned by a single service provider.
v. The State will support Research and Development activities
regarding promotion and use of Renewable Energy by EV charging
stations and also for Research and Development activities to study
the impact of EV charging infrastructure on the grid.
Wind Power Projects
12 Generation of Power from Wind:-
12.1 Wind Power Plants for sale of power to DISCOM(s) of Rajasthan:
The State will promote setting up of Wind Power Projects for sale
of power to DISCOMs of Rajasthan on the tariff discovered through
competitive
bidding
process
to
fulfil
Renewable
Purchase
Obligation (RPO) target fixed by RERC. DISCOMs/RUVITL may
procure wind energy beyond RPO as per their requirement and
commercial viability.
12.2 Utility Grid Power Projects for Captive use /3rdParty sale within and
outside the State of Rajasthan:
12.2.1 The State will promote setting up of Wind Power Projects for captive
use/3rd party sale for consumers within the State.
12.2.2 The State will allow setting up of Wind Power Projects of any capacity
for captive use/third party sale outside the State or sale through the
Power Exchange.
12.2.3 The Maximum permissible capacity of individual Wind plant for captive
use within the State will be limited as per RERC Regulations. The
Generating plant capacity for 3rd Party sale can be any capacity;
however, the consumer of the State will be allowed to take power from
such plant up to the limit prescribed as per RERC Regulations.
12.2.4 Such Power Producers (under clause 12.2.1&12.2.2) will also be eligible
for RE (Non-Solar) Certificate as per Orders/Regulations of the
appropriate Commission.
12.3 Repowering of Wind Power Projects:
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7506
The State will promote Repowering of existing wind turbines
which have completed at least 10 years in operation. Other
provisions will be as per the guidelines/policies issued by
MNRE from time to time.
12.3.1 In case of power being procured by State DISCOMs through existing
PPA, the power generated corresponding to average of last three years
generation prior to Repowering would continue to be procured on the
terms of PPA in-force and remaining additional generation may be
purchased by DISCOMs at a tariff discovered through competitive
bidding in the State at the time of commissioning of the Repowering
Project.
12.3.2 The Wind Power Producer shall also be allowed to use the additional
generated power for captive use/third party sale.
12.3.3 In case of Repowering, the power evacuation facility for new pooling
station or augmentation of existing substation will be provided by
RVPN/DISCOMs based on Load Flow Studies.
12.4 Wind Resource Assessment(WRA) Programme:
For utilization of Wind as an Energy Source, Wind Resource
Assessment (WRA) studies have been carried out by MNRE at various
locations in the State. MNRE has also permitted independent private
participation for WRA. WRA studies have been done at limited
locations. With a view to further assessing wind resources potential,
RREC will also allow/undertake Wind Energy Resource Assessment
studies by private developers for exploring additional locations for such
studies.
12.5 Registration for establishment of Wind Monitoring Station for Wind
Resource Assessment studies-
12.5.1 For carrying out Wind Resource Assessment Studies, thedeveloper
shall select the location for establishing the Wind Monitoring Station
and shall register the application with RREC in prescribed online
format along with the required documents.
12.5.2 Along with application, the Developer shall deposit an amount of Rs.
10,000/- per site with RREC towards registration charge, which shall
be non-refundable. Goods and Services Tax (GST) will also be
payable as applicable. Fee, if any, to NIWE will also be payable as
applicable.
12.5.3 Non requirement of No Objection Certificate (NOC) from Gram
Panchayat for allotment of land for establishment of Wind
Monitoring Station-
N.O.C. from Gram Panchayat will not be required for allotment of
Government land (SiwaiChak land) for establishment of Wind
Monitoring Station.
12.6 General Guidelines for Wind Resource Assessment Studies -
7507 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
12.6.1 The Developer shall follow the guidelines for Wind Resource
Assessment studies issued by Ministry of New & Renewable Energy.
12.6.2 The Developer will bear all costs, including the costs of installation of
Wind Monitoring Station along with necessary accessories, and will
also include its O&M expenses.
12.6.3 The Developer shall submit NIWE report to RREC on completion of
Wind Resource Assessment studies.
12.6.4 The Developer shall not be entitled to claim any cost/charges,
expenses and incidental charges incurred in connection with the
studies for submission of NIWE report to RREC.
12.6.5 Purchase and Acquisition of private land, if any, shall be sole
responsibility of the Developer.
12.6.6 The Developer shall take necessary permissions of Forest Department,
wherever required under Forest Conservation Act, before installation
of wind monitoring station. The Wind Monitoring Station would be
installed by the Developer after completing various formalities
requested by Forest Department. Compliances of various orders
passed by Hon'ble Courts would also be ensured by the Developer.
Hybrid Power Projects
13 Generation of Power from Wind-Solar Hybrid Projects:
13.1 The State will promote setting up of Wind-Solar Hybrid Power Projects
for optimal and efficient utilization of infrastructure and land, and to
achieve better grid stability, under the following categories:
a) Sale of Power to DISCOMs at tariff discovered through transparent
bidding process.
b) Captive Use and Sale to Third Party within and outside State
through open access/Power Exchange.
c) The Maximum permissible capacity of individual Hybrid plant for
captive use within the State will be limited as per RERC
Regulations. The Generating plant capacity for 3rd Party sale can
be any capacity, however the consumer of the State will be allowed
to take power from such plant up to the limit prescribed as per
RERC Regulations.
The Power procured from the Hybrid Project may be used for fulfilment
of solar RPO and non-solar RPO in proportion to the rated capacity of
solar and wind power in the hybrid plant respectively or as per the
Orders/Regulations issued by appropriate Commission.
13.2 The sizing of the Wind/Solar capacity would be assessed by the
Developer on the basis of local resource characteristics. However, a
Wind-Solar Power Plant will be recognized as hybrid plant if the rated
power capacity of one resource (Wind/Solar) is at least 25% of the rated
power capacity of other resource (Solar/Wind).
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7508
13.3 For the purpose of this policy, the plants are classified into two
categories:
Type A Projects: Hybridization of existing Wind/Solar Projects-
This category includes conversion of existing/under construction Wind
or Solar Power Plants into Hybrid Projects.
Type B Projects: New Wind-Solar Hybrid Projects-
This includes new Wind–Solar Hybrid power generation projects which
are not registered with RREC till the date of commencement of this
policy.
All fiscal and financial incentives available to Wind and Solar power
projects will also be made available to Wind-Solar Hybrid projects.
13.4 Hybridization of existing Conventional Thermal Power Plants
13.4.1 The State will promote hybridization of existing Conventional Thermal
Power Plants by allowing setting up of Renewable Power Plants by
the Conventional Power Generators for using its Thermal Pwer or
Renewable Power to meet its scheduled generation from the specific
thermal generating station. This flexibility will provide the thermal
power generators an opportunity to optimally utilize generation from
RE sources and also help in reducing emissions. DISCOMs will also
receive firm power including Renewable Power, which will help them
to meet their Renewable Purchase Obligations.
13.4.2 The Generating Companies will be allowed to utilize such Renewable
capacities for supplying power against existing commitments to
supply the power from its Thermal Power Plants to DISCOMs.
13.4.3 Any net gain realized by the generator by blending Renewable Power
with Thermal Power shall be shared equally between the Generator
and DISCOMs after the approval of the Regulator.
13.4.4 The DISCOMs will be eligible to fulfil their RPO requirement against
such RE procurement. The Generators will also be eligible to fulfil
their Renewable Generation Obligations through such RE Power
Generation, if applicable in future.
14 Newer technologies based RE projects
14.1 Hydro Power Projects.
Energy generated from Hydro Power Projects has been recognized as
Renewable Energy (RE) across the world. Large Hydro Power Projects
(LHPs) including Pumped Storage Project, having capacity more than
25 MW and Energy from all small Hydro Storage (SHPs),
commissioned after 8thMarch, 2019 will be considered as part of RE.
The Sites for these projects will be allocated to the developer through a
transparent mechanism.
RREC will recommend the request of water allocation to the Water
Resources Department for these projects.
7509 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
14.2 Floating Solar
The State will also promote setting up of Floating / Reservoir Top/
Canal Top Solar Power Projects for sale of power to DISCOMs through
Competitive bidding or for captive use/3rd party sale.
The Potential Sites for developing Floating Solar Project will be
allocated to the developer/Power Producer through a transparent
mechanism. Separate Guidelines will be issued by Energy Department
for Floating Solar Projects.
RREC will recommend the requests of water allocation to the Water
Resources Department for such projects.
Registration and Approvals
15 Registration of RE Power Projects:
15.1 All RE projects installed in State on CTU/STU/DISCOMs network shall
be required to be registered with RREC.
15.2 The Developer/Power Producer will submit an online application for
registration to RREC in the prescribed format along with requisite
documents.
15.3 Each Developer/ Power Producer will deposit non-refundable registration
charge with RREC as under:
S.No.
Project/Park Capacity
Rate
1
For RE Project/Park≤10 MW
capacity
Rs5,000/- per project
2
For RE Project/Park>10MW
and up to 100 MW capacity
Rs20,000 Per MW
3
For RE Project/Park >100MW Rs. 20 Lac +
Rs 10,000 Per MW
Note: The Project to be established under any new RE Parks registered
after commencement of this policy will not be required to deposit
registration charges in RREC.
15.4 The GST and other charges, as applicable, shall be payable in addition to
the registration charge. Registration will not confer any right to the
Developer/Power Producer and will not create any obligation on the
part of RREC.
15.5 In case of registration of the Solar/Wind/Hybrid Projects, registered
under the policies prior to this Policy and three years before the
commencement of this policy, for which project developer has not
applied for in-principle clearance, the registration of such projects shall
be allowed to be re-validated by depositing Rs.2,000 per MW subject to
maximum 10 Lac per project with applicable GST,otherwise the
registration of such projects shall be deemed to have been cancelled.
Such re-validated Projects will be required to apply for in-principle
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7510
clearance within1 year from the date of re-validation, failing which the
registration shall be deemed to be cancelled.
15.6 The Power Projects registered under the Rajasthan Renewable Energy
Policy, 2023 or registered under Solar Energy Policy, 2019/Wind &
Hybrid Energy Policy, 2019, three years prior to the date of
commencement of this Policy, shall be deemed to be registered under
this Policy with the same registration number allotted earlier. The
power producers of such projects shall have to apply for in-principle
clearance within 2 year from the date of commencement of this Policy,
failing which the registration shall be deemed to be cancelled.
15.7 The Solar/Wind/Hybrid Projects registered under this Policy shall have
to apply for in-principle clearance within a period of 2 years from date
of registration, failing which the registration shall be deemed to be
cancelled.
15.8 For the projects already commissioned under RE (Solar) certificate
mechanism, the Developer/Solar Power Producer will have to deposit
Accreditation/Registration fee with State Agency / Central Agency as
per the procedure laid down by the regulations/orders of the
appropriate Commission.
The installation of Power Plants not registered with RREC and without
prior approval of competent authority as per policy provisions will be
liable to be disconnected from the Grid. The Developer/Power Producer
will be required to submit certificate of registration of project with
RREC to the Sub-Registrar or any other officer authorized by the
Government for the registration of sale/lease deed of the land.
15.9 No prior registration with RREC will be required by Developer for
participation in bidding. Only successful bidders will be required to
register their projects with RREC.
15.10 No registration will be required for Solar/RE Power projects connected
to grid under Net/Gross Metering Scheme.
15.11 Developer/Power Producer can transfer their registered capacity or part
thereof to their 'holding’, ‘subsidiary', 'fellow subsidiary’ or ‘ultimate
holding’ company with the prior approval of RREC on payment of an
amount equal to 50% of the Registration Charge. However, the
provisions of clause 15.5&15.6shall be applicable to the transferee.
15.12 Developer/Power Producer can transfer the registered capacity or part
thereof from one registration to another registration by them with prior
approval of RREC on payment of an amount equal to25% of the
Registration Charges.
16 Allotment / Procurement of Land:
16.1 Allotment
of
Government
Land
to
Power
Projects/RE
Park/UMREPP:
Government Land will be allotted to RE Park/UMREPPand
Solar/Wind/Hybrid/Hydro Power Projects including PSP/Storage
7511 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
Plants as per the provisions of Rajasthan Land Revenue
(Allotment of land for setting up of Power Plant based on
Renewable Energy Sources) Rules, 2007, as amended from time
to time. Developer shall be allowed to sub-lease the allotted land
as per the aforesaid rules.
16.2 RREC will recommend to the concerned District Collector for allotment of
government land on a case-to-case basis only on submission of
following security deposit in favour of RREC, Jaipur:
i. For Project/Park of capacity < 2000 MW, Rs. 1 Lac/MW by
demand draft/RTGS in favour of RREC.
ii. For Project/Park of capacity≥ 2000 MW, Rs. 1 Lac/MW up
to 2000 MW by DD/RTGS and for exceeding capacity,
Rs. 1 Lac/MW in form of Bank Guarantee.
The security deposit will be refunded to the developer in
proportion to the commissioned capacity of the project on
written request of applicant. The security deposit shall be
forfeited in case the allotted land is not used within the
specified period as per allotment rules. If land is not allotted,
security deposit will be refunded on the written request of the
applicant.
16.2.1 The allotment of Government land identified by Energy Department or
State Power Companies or Joint Venture Companies of State PSUs will
be kept on priority for projects for fulfillment of State Power demand.
16.2.2 The Government Land will be allotted to the Developer/Power
Producers keeping in view of the projects to be set up for Sale of Power
to State Power Utilities/Discoms, Projects granted connectivity at
STU/Discoms Networks, Projects granted connectivity at CTU
Networks, Projects to be set up for Captive use/3rdParty Sale /Green
Hydrogen generation for use within State & outside State, and Projects
not granted connectivity at STU/CTU Networks yet etc.
In case, Developers apply for allotment of same land, the priority in
allotment of the land will be accorded to RE Projects on above basis.
16.2.3 The Developer/Power Producer setting up RE Manufacturing Unit
along with RE Project will be given priority in allotment of Government
Land for developing RE Projects.Minimum eligibility criteria for RE
Manufacturing unit will bespecified by Energy Department as and
when required.
16.2.4In case of extension of the period of utilization of land beyond 2 years
from the allotment, the security amount deposited towards allotment
of land shall be deducted as per Rajasthan Land Revenue (Allotment
of land for setting up of Power Plants based on Renewable Energy
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7512
Sources) Rules, 2007 and deposited in Government account under
head Land Revenue Account.
16.2.5In case of special circumstance, the land recommended or allotted to
the Developer/Power Producer for setting up of a specific RE project
will be allowed for setting up of other RE projects by its SPV,
subsidiary company or group company or subleased on same terms
and conditions. Such transactions will be allowed in the first 2 years
from the date of recommendation/Allotment of land whichever is later.
16.3 For setting up of Power Plants based on different technologies, maximum
land area which can be allotted to the Developer/ Power Producer will
be as under:
S.
No
.
Technology
Maximum land area
for Solar Plant
Maximum
land area for
Hybrid Plant
i SPV on Crystalline Technology.
2.0Hect./MW
2.5 Hect./MW
ii SPV on Crystalline Technology
with tracker.
2.5Hect./MW
2.5Hect./MW
iii SPV on Thin Film/Amorphous
Technology with or without
tracker.
2.25Hect./MW
3.0Hect./MW
iv Solar Thermal (CSP)- Parabolic
Trough / Tower/Other
Technology with and without
storage
a) Up to PLF of 21%:
3.0 Hect./MW
b) For every 1%
increase in PLF, 0.15
Hect./MW additional
land will be allotted.
-
v Maximum land area for Wind
Plant
2.5 Hect/MW
Note: For power projects with storage system, additional land will be allotted
as per the rules prescribed by the Revenue Department, GoR.
16.4 Power Projects on Private Land:
16.4.1 The State will promote setting up of Power Project/Park on private land.
Developer shall be permitted to setup Power Project/Park on private
agriculture land without the requirement of land conversion in
accordance with the provisions of Rajasthan Tenancy Act 1955 and
Rajasthan Land Revenue Act 1956 and the rules made thereunder.
16.4.2 Developer/Power Producers shall also be allowed to acquire/hold
private land from the title holders (Khatedar) for setting up of Power
Plant in excess of ceiling limit in accordance with the provisions of
Ceiling Act, 1973.
16.4.3 Allotment of land for setting up of Wind Monitoring Station-
Government Land up to 100meterx 100 meter required for setting up of
Wind Monitoring Station will be allotted on temporary basis to the
7513 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
Developer/Power Producer for maximum period of 3 years at DLC rates.
The allotment for such land will be done at the level of concerned
District Collector on the recommendation of RREC. After completion of
wind assessment studies, the Wind Monitoring Station shall be
dismantled at the cost of Developer and land shall revert back to the
State Government free from all encumbrances.
16.4.4 Land Tax:
Land tax on the land utilized for setting up of RE Projects/Parks will be
as per the Notification/Order of the State Government.
17 Incentive/facilities available to RE Power Projects
RE Power Plants registered under this policy can avail these incentives
available as per eligibility under the prevailing Rajasthan Investment
Promotion Scheme (RIPS) as amended from time to time.
17.1 Grant of incentive under RIPS
17.1.1 Under clause 4.1.1.2 of RIPS-2024, Renewable Energy Units are eligible
for the following Incentives:
1. Exemptions& Reimbursements: The following exemptions and
reimbursements are applicable to RE Units:
- Exemption from payment of 100% electricity duty for 7 years.
- Exemption from payment of 75% stamp duty and reimbursement
of 25% stamp duty.
- Exemption from payment of 75% conversion charges and
reimbursement of 25% conversion charges.
- Reimbursement of 100% mandi fee/market fee for 7 years.
2. Waiver of PCB Fees to obtain Consent to Establish (CTE) and
Consent to Operate (CTB) certification.
17.1.2 Under Clause 3.1.3.2.3 of RIPS,2024,Enterprises availing Anchor
Booster(Regional Anchors- and Sectoral Anchor)shall be eligible to
avail 100% Banking, Wheeling and Transmission Charges waived
off/reimbursement (for Captive Power Plants set up) provided energy
generated is used for captive consumption only and no third-party
sale will be allowed:
- There shall be a ceiling of 200% on the size of the captive power
plant.
- 100% banking, allowed with no restrictions on withdrawals
during peak hours.
- For ‘behind the meter’ RE Plants, there should be no ceiling on
the maximum capacity of RE generation and ED exemptions
should be applicable on perpetuity, provided no power is
injected into the grid during off-peak hours.
17.2 Availability of Water:
Water Resources Department will allocate required quantity of water
from IGNP canal/the nearest available source for auxiliary
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7514
consumption for Solar PV Power Plants including cleaning of solar
panels and allocation of water for Solar Thermal Power Plants subject
to the availability of water. The Developer/Power Producer will
intimate estimated water requirement to RREC along with details of
the source of water. After assessment/scrutiny, case of water
requirement shall be forwarded to the Water Resources Department.
The modifications(s) required, if any, in the existing canal system will
be done by the Water Resources Department at the cost of the
Developer/Power Producer.
17.3 Banking:
Banking Facility and Charges will be governed as per the prevailing
RERC Regulations as amended from time to time. The State will
provide applicable benefit to the enterprises eligible under prevailing
RIPS.
17.4 Exemption/Relaxation from Electricity Duty-
Power Producers shall be exempted from payment of Electricity Duty
for Captive Use within the State for the enterprises eligible under
prevailing RIPS.
The consumer of Solar Power under clause 6.1(Rooftop Solar Plant)
and Wind Power Projects will be exempted from Electricity Duty as per
the Order/Notifications of the Government of Rajasthan issued from
time to time under the provisions of Rajasthan Electricity (Duty) Act.
17.5 Transmission and Wheeling Charges
Transmission and Wheeling charges will be governed by the prevailing
RERC Regulations, as amended from time to time. The State will
provide applicable benefit towards Transmission and Wheeling
charges, to theenterprises eligible under prevailing RIPS.
Approval Mechanism
18 The constitution of the committees for approvals/Clearance of RE
projects will be as under:
18.1 State SanctionCommittee (SSC)
i) ACS/Principal Secretary/Secretary, Energy, GoR(Chairman)
ii) Chairman & Managing Director, RVPN
iii) Managing Director, RREC
iv) Managing Director JVVNL/AVVNL/JdVVNL/ RUVITL
v) Representative of Finance department not below the rank of Joint
Secretary, GoR.
vi) Director (Finance), RREC
vii) Director (Technical), RREC - Convener
18.2 State Level Monitoring&Coordination Committee (SLMCC)
i) Chief Secretary, GoR (Chairman)
ii) ACS/Principal Secretary/Secretary, Energy, GoR.
7515 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
iii) ACS/Principal Secretary/Secretary, Industries, GoR.
iv) ACS/Principal Secretary/ Secretary, Revenue, GoR.
v) ACS/Principal Secretary/Secretary, Water Resources Department,
GoR.
vi) CMD, Rajasthan RajyaVidyutPrasaran Nigam Ltd.
vii) Chairman Discoms.
viii) Chairman, Rajasthan Renewable Energy Corporation Ltd.
ix) District Collector of concerned District (Special Invitee).
x) MD, Rajasthan Renewable Energy Corporation Ltd., (Member-
Secretary).
19 Approval/ Clearance of RE Power Projects:
19.1 For Bidding Projects under Clause 9.1,9.2,12.1,12.3.1,13.1(a), &14
These projects will be governed by the provisions of the bid document
and will not require approval/clearance from SSC/SLMCC. However,
the Developer/Power Producer will obtain all other necessary
clearance/approvals and shall submit quarterly status report and will
also submit all necessary clearances/approvals before commissioning
of the project in RREC.
19.2 Approval/Clearance
of
Power
Projects
under
Clause
9.3,9.4,11,12.2,12.3.2, 13.1(b) & 14
Approval/Clearance of projects for captive use/3rd party sale under 9.3,
9.4,11,12.2,12.3,13.1(b)&14
will
be
granted
after
evaluating/examining the Project Proposals on the following criteria:
Detailed Project Report
Availability of Land
Availability of Power Evacuation System for Proposed Project
Availability of Water for Solar Thermal plant, if required
Documentary evidence of Power Purchase Agreement or an
undertaking in case of sale to Third Party through Open Access or
undertaking for sale of power in the power exchange
On fulfilment of the above criteria, the project will be considered as In-
principally cleared and after deposition of Security Deposit; the Project
will be conveyed Final approval by RREC.
Note: Developers who have already submitted documents of financial
capability in last one year will not be required to resubmit the same.
19.3 WBA/Open access Agreement Execution
On fulfilment of the criteria under clause 19.2, such projects will be
recommended by RREC to DISCOMs/RVPN/CTUIL for execution of
WBA/Open Access agreement as the case may be.
19.4 Timeline for approval/Clearance:
The Developer/Power Producer to whom Government land is allotted
will have to apply for approval/clearance of the project within three
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7516
months from the date of signing of lease deed of the allotted
Government land. If Developer/Power Producer fails to apply for
approval/clearance within the time prescribed, RREC will recommend
for cancellation of allotment of Government land with the approval of
SSC.
19.5 RREC will develop an online portal for sanction/approval of the
proposals of RE Projects. RVPN & DISCOMs will communicate requisite
permissions/clearances to the RE Projects through the online portal
and decision of the Committees will be communicated to the applicants
through this portal in a time-bound manner.
20 Security Deposits:
20.1 For projects (excluding Bidding Projects) set up under Clause
9.3,9.4,11,12.2,12.3.2,13.1(b),14:
After
approval/clearance
of
the
projects
under
clause
9.3,9.4,11,12.2,12.3.2, 13.1(b) and 14, the Developer/Power Producer
will be required to deposit following security amount-
i. For Project of capacity ≤2000 MW, Rs. 1 Lac/MW by demand
draft/RTGS in favour of RREC.
ii. For Project of capacity> 2000 MW, Rs. 1 Lac/MW up to 2000 MW by
DD/RTGS and for exceeding capacity, Rs. 1 Lac/MW in form of
Bank Guarantee.
The Developer/Power Producer will have to deposit aforesaid Security
Deposit in RREC within one month without interest and within 3
months with interest @ 9% per annum from the date of issue of
approval/clearance. In case Developer/Power Producer fails to deposit
security money within stipulated time as mentioned above, then the
Approval/Clearance shall be deemed to be cancelled without any
notice.
The Developers/Power Producers who have already deposited
Security Deposit for allotment of Government Land will not be
required to deposit aforesaid Security Deposit.
20.2 In case the Developer/Power Producer wants to withdraw his project
within 6 months of depositing the security deposit then 25% security
deposit will be forfeited, and balance 75% amount of the security will be
refunded to the Developer/Power Producer on his written request.
20.3 The security amount deposited by the Developer/ Power Producers shall
be non-convertible and non-transferable.
20.4 The Security Deposit shall be refunded, on the written request of the
Developer/ Power Producer in proportion to the capacity commissioned
after the commissioning of such capacity. The remaining amount shall
be forfeited after the expiry of the scheduled commissioning period
including extension as per Clause 23.2.
20.5 For Bidding projects under clause 9.1,9.2,12.1, 12.3.1,13.1(a) &14
The Security Deposit will be governed by the provisions of bid
document and Power Purchase Agreement.
7517 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
21 Power Purchase Agreement:
The Power Purchase Agreement between the Developer/Power
Producer and Procurer of power will be executed in the following
manner:
21.1 Bidding
Projects
sanctioned
under
clause
9.1,9.2,12.1,
12.3.1,13.1(a)&14
For the projects sanctioned under these clauses, the Power Purchase
Agreement / Power Sale Agreement will be executed as per the
provisions of the bid document.
21.2 Power Projects for Captive use/ 3rdParty Sale:
For
the
projects
sanctioned
under
clause9.3,9.4,11,12.2,12.3.2,13.1(b),14the
Developer/Power
Producer will execute Agreement for Wheeling and Banking etc. with
DISCOM(s). In case, transmission system of RVPN/CTUIL is also used
then power producer will execute separate Transmission Agreement
with RVPN/CTUIL.
21.3 Assignment of PPA:
PPA/WBA will be allowed to be assigned in parts or full to other
parties under following conditions:
i. After completion of the project and its connectivity to the grid;
ii. Consent of RREC & RVPN/DISCOM(s) and related parties;
iii. On payment of Rs. 2.00 lac per application to RREC (GST will be
payable as applicable).
In case the project is financed by any Financial Institution/Lender,
the name of Financial Institute/Lender may be included in PPA on
request of Developer/ Power Producer.
22 Renewable Energy Development and Facilitation Charges (REDFC):
The Developers utilize Solar and Wind resources of the State for RE
Generation. State facilitates Developers for utilization of Land for
setting up of Renewable Energy Project to harness the RE Potential.
Wind and Solar Power are unpredictable and variable in nature and
their large-scale integration to the grid is a challenging task having
both technical and financial implications.
Transmission and Distribution Infrastructure requires continuous up
gradation, for which power utilities require investments in the system
for efficient RE injection into the grid. Further, the RE Project
installation in a particular area also impacts the area and there is
need and responsibility of the State to develop the local area and basic
infrastructure of the area particularly in the health and education
sector.
In view of above, charges will be required to be contributed by RE
Developers. Therefore, Rajasthan Renewable Energy Facilitation
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7518
charges is imposed on RE Developer to be collected in a Fund which is
being utilized as per the plan approved by the State Level Steering
Committee constituted under the chairmanship of Additional Chief
Secretary, Energy, Government of Rajasthan. This Development Fund
will be raised in the following manner:
22.1 In case of Power Project set up in Rajasthan for sale of power to parties
other than DISCOMs of Rajasthan, Rajasthan Renewable Energy
Facilitation charges shall be deposited by the power producer towards
Solar components of the project, from the date of commissioning, as
under:
The Developer/Power Producer will have an option of either paying
REDFC charges or supplying 7% of power generated to Rajasthan
Discoms free of Cost by installing additional capacity to that extent.
22.2 REDFC as above shall be levied on the projects which will be
commissioned on or after the commencement of this policy and for the
entire life cycle of the project, from the date of commissioning of the
project.
22.3 There will be no requirement to pay REDFCfor the Solar Power Projects
commissioned on or after the date of commencement of this Policy, for
sale of power to DISCOMs of Rajasthan either directly or through any
other Agency/Trader.
22.4 There will be no requirement to pay REDFCfor the Solar Power Projects
commissioned on or after the date of commencement of this Policy for
captive consumption within State.
22.5 Developer/Power Producer shall deposit the Renewable Energy
Development and Facilitation Charges by 30th April in every financial
year without interest and up to 30th June with interest @ 9% per
annum. If it is not deposited up to 30th June, then RVPN/DISCOM or
any other Central/State Govt. entity will take suitable action, such as
but not limited to recovery of dues from the power bill of the Power
Producer or disconnection from Grid till the depositing of dues with
interest, on recommendation of RREC.
23
Time frame for completion of Power Projects:
23.1 The time schedule for completion of Power Projects allocated through
Bidding process will be governed by provisions of Bid Document and
Power Purchase Agreement.
S.
N.
Period
Rate of Contribution
1
Project commissioned on or after
commencement of the Policy till
project life
Rs.50,000
/Hectare/Year
7519 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
23.2 The time schedule for completion of the Power Projects, sanctioned
under 9.3,9.4,11,12.2,12.3.2,13.1(b)&14 will beas per table 1& 2
(Annexure-A2).
Provided that extension in time schedule may be granted by RREC on a
case-to-case basis after depositing penalty amount along with
applicable GST as in Table 3 (Annexure-A2):
In case of delays beyond 15 months, Board of RREC,upon its
satisfaction, regarding commissioning of the project, may provide
further extension by imposing a penalty @ Rs. 2,000 per day per MW
for each day beyond the period of 15 months.This penalty for each day
of delay would be over and above the penalty of Rs. 2,00,000 per MW
for the delay up to 15 months.
24
Manufacturing of Solar/Wind Energy Equipment:
The Government aims to promote manufacturing facilities for Solar and
Wind Energy Equipment in Rajasthan, leading to both the development
of solar and wind energy eco-system and facilitating employment
generation in the State. Applicable incentives under Manufacturing
Standard Package or MSME Package will be available for the
enterprises eligible under the prevailing RIPS. Further, within
Manufacturing Standard Package, these enterprises will be offered
ThrustSectorBenefits.
Eligible RE Manufacturing units can avail benefits of Micro, Small and
Medium Enterprises (MSME) Policy/Act.
The State will supportRE Manufacturing units through various
incentives &facilities.To promote RE manufacturing, this will be linked
with RE generations in the State.
25 Power Evacuation, Grid Interfacing, Forecasting & Scheduling and
Dispatch of RE Power:
Power Evacuation, Grid Interfacing, Forecasting & Scheduling and
Dispatch of RE Power for RE Projects will be governed as per the
provisions of this policy (Section-E) and relevant Regulations of RERC.
Other initiatives
26 Project Management Consultancy (PMC):
RREC will work as a Project Management Consultant, on chargeable
basis, for implementation of Renewable Energy based projects taken
up by various Government Departments and Agencies. RREC may also
take up the works related to Renewable Energy sector in the Non-
Government
Domain/Government
agencies/Government
organizations.
27 RRECto undertake following studies in Renewable Energy for
further policy interventions:
i. Estimating the impact of promoting Solar Rooftop Capacity addition on
the grid and the state power utilities
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7520
ii. Assessment of various implementation models for setting up of EV
Charging Stations
iii. Improving the cost competitiveness of Solar Manufacturing Plants
iv. Analysing and identifying suitable technologies and implementation
models for Ancillary Services
v. Identification of actual requirement of storage capacity and suitable
technologies considering the demandcurveandgeneration profile of the
state
vi. Identifying the requirement for training and holding workshops for
capacity building of human resource of RREC regarding regulatory
framework and market reforms
vii. Identifinying optimal generation capacity mix of Renewable and
Conventional Energy Sources, considering possible technology options,
to match the future demand curve and energy requirement with the
generation profile of the State
viii. Analysing the methodology for forecasting and scheduling, efficient
accounting, metering and settlement of transactions of Renewable
Energy for making grid operations RE friendly
ix. Assessing the technical and financial impact of making the conventional
power plants flexible for ensuring large scale RE integration
x. Integrated planning leading to convergence between Transmission
Infrastructure Development and the location of Renewable Energy
projects
xi. Studying the Business life cycle of Solar Power Projects in context of
their impact on Environment.
xii. The matters referred by DISCOMs for promotion of RE in agriculture
sector.
28 Research and Development
The State will promote research in Renewable Energy. RREC will
provide facilitation including Land Allotment and funding for
establishment for R&D/training centre and research work to the
premier Research Institutes, Universities, Associations etc.
29 Virtual RE Power Generation
State Government will promote Solar Projects based on Virtual PPAs or
contract for differentials wherever such contracts are in compliance
with applicable laws. Such projects would be required to deposit 10% of
revenue generated from carbon credits to RREC in lieu of Government
Land Allotment and other facilitation by RREC.
30 Carbon Trading
30.1 The State will promote Carbon Trading for RE Sector through various
National
and
International
mechanisms
in
line
with
guidelines/directions issued by GoI. The Plant to be established for
Carbon Trading, benefit of Carbon Trading will be shared by the
generators with the Discoms.
30.2 State Government will promote RE projects based onThird Party Sale
where the consumer is not using electricity to meet RPO compliance,
7521 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
and such projects will be entitled to avail carbon credits. Such projects
would be required to deposit 10% of revenue generated from carbon
credits to RREC in lieu of Government land allotment and other
facilitation by RREC.
30.3 Promotion of Energy Efficiency
The State will promote Energy Efficiency/Conservation in Residential,
Industries (MSME), and Commercial Building sectors. The Government
will reward exemplary Energy Efficiency Initiatives.
31 Net Zero Buildings
The State will promote Net Zero Buildings, and such Buildings will be
awarded/incentivized by the State.
32 Greening of supply chain
To enable consumers to adopt renewable energy, DISCOM may supply
100% Renewable Energy upon requisition for RE power made by such
consumers at a Green Power Supply Tariff, as determined by RERC from
time to time.
Distribution Companies shall give Green Certificate on a yearly basis to
the consumers for green energy supplied to the consumers on their
request beyond the Renewable Purchase Obligation of the consumers.
33 Green Energy Open access & Energy Accounting
The Consumers would be allowed touse RE Power by installing RE Plants
at any location in the State.Otherwise they can avail RE power from any
developer either directly or indirectly.
The size of the plant for open access of RE Power, energy accounting,
banking facility and open access chargesetc.for all Renewable Energy
Projects, including rooftop projects, shall be as per the regulations framed
by RERC from time to time in accordance with the Green Energy Open
Access Rules 2022 notified by the Ministry of Power, GoI as amended
from time to time.
RVPN
will
endeavour
to
get
concessional
transmission
charges
determined from RERC to evacuate RE power into CTU Network from
RVPN’s GSS directly connected to CTU Network.
34 Power to remove difficulties:
SLMCC is authorized to issue necessary clarification and amendments of
this section & section-E of the policy as and when required. If any doubt,
dispute,
difference
or
issue
arises
with
regard
to
interpretation/implementation of this section of the Policy, or pertaining
to any interdepartmental issues, the State Level Monitoring &
Coordination Committee (SLMCC) may take decision in such matters, not
inconsistent with the provisions of the Policy, as may appear to be
necessary and expedient for removing the difficulties either on its own
motion or on a written representation from the stakeholders.
In order to implement this policy and to remove difficulties of
stakeholders,
Energy
Department
shall
issue
necessary
guidelines/schemes/orders as and when required.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7522
SSC will resolve the disputes related to RE Projects in the State regarding
implementation of the RE project/Parks in the State.
RREC will work towards simplification of various approvals required for
setting up of RE facility in State, as a step towards ensuring ease of doing
business.
ANNEXURE-A1
The Power Producers desirous of setting up Solar/Wind/Hybrid Power
Plant in State of Rajasthan under captive use/sale to 3rd party within
and outside the State must fulfil the following minimum financial
criteria:
Qualification Criteria for Solar PV/Thermal/Wind/Hybrid Projects:
Net Worth
The “Net Worth” of the company should be equal to or greater than the value
calculated at the rate of Rs 1 Crore or equivalent US$ per MW of the project
capacity. The computation of Net Worth shall be based on unconsolidated
audited/unaudited accounts of the company. For the purpose of the
computation of net worth, the best year in the last four years including
current running year shall be considered. The Company would thus be
required, to submit annual audited accounts for the last three financial years
and for part of the current running year (Un-Audited), while indicating the
year, which should be considered for evaluation, along with a certificate from
a Chartered Accountant to demonstrate the fulfilment of the criteria.
For companies, which are newly incorporated, the Net Worth criteria should
be met seven days prior to the date of submission of application by the Project
Developer. To demonstrate fulfilment of the criteria, the Project Developer
shall submit a certificate from a Chartered Accountant certifying the Net
Worth on the date seven days prior to submission of application. Further, the
Project Developer shall submit the un-audited financial statements of the
company for the date on which the Certificate of Chartered Accountant has
been obtained.
{Note:For the Qualification Requirements, if data is provided by the Project
Developer in foreign currency, equivalent rupees of Net Worth will be
calculated using bills selling exchange rates (card rate) USD/INR of State
Bank of India prevailing on the date of closing of the accounts for the
respective financial year as certified by the Project Developer's banker.
For currency other than USD, Project Developers shall convert such currency
into USD as per the exchange rates certified by their banker prevailing on the
relevant date and used for such conversion.}
Net Worth calculation for an individual/partnership firm
Net-Worth = Proprietors/Partner’s Capital reflecting in the Audited Balance
Sheet
Add: Free Reserves (Including the Credit balance of Reserve and
Surplus appearing in the Balance Sheet)
Subtract: Intangible Assets
7523 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
Subtract: Miscellaneous Expenditures to the extent not written off and
carry forward losses.
Net Worth calculation for a Company
Net-Worth =Paid up Share capital which includes
1. Paid up Equity share capital and
2. Fully, compulsorily and mandatorily convertible Preference Shares
and
3. Fully, compulsorily and mandatorily convertible Debentures)
Add: Free Reserves
(Including share premium provided it is realized in Cash or Cash
equivalents.)
Subtract: Revaluation Reserves
Subtract: Intangible Assets
Subtract:
Miscellaneous Expenditures to the extent not written off
and carry forward losses.
For the purposes of meeting financial requirements only unconsolidated
audited annual accounts shall be used. However, audited consolidated
annual accounts of the Project Developer may be used for the purpose of
financial requirements provided the Project Developer has at least twenty six
percent (26%) equity in each company whose accounts are merged in the
audited consolidated account and provided further that the financial
capability of such companies (of which accounts are being merged in the
consolidated accounts) shall not be considered beyond the equity
participation of Project Developer.
In case of a Consortium the financial requirement to be met by each Member
of the Consortium shall be computed in proportion to the equity commitment
made by each of them in the Project Company. Any Consortium, if selected
shall incorporate a Project Company with equity participation by the Members
in line with Consortium Agreement before signing the PPA/WBA/Wheeling
Agreement. The Project Developer may seek qualification on the basis of
financial capability of its Parent Company.
In case of land/any other asset, only the book value will be considered. The
value of land/any other assets will not be re-valued for calculating net worth.
Any reserve created due to this shall not be counted for calculating Net worth.
Annexure-A2
Table-1
Time line of project completions
Type of Projects
Time schedule for completion from
the date of Clearance/Approval
SPV:
Up to 20 MW capacity
Within 15 Months
More than 20 MW and up to 50 MW
capacity
Within 18 Months
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7524
More than 50 MW capacity
Within 24 Months
CSP:
Up to 25
MW capacity
Within 24 months
More than 25 MW and up to 100 MW
capacity
Within 36 months
More than 100 MW and up to 200 MW
capacity
Within 42 months
More than 200 MW capacity
Within 48 months
Table-2
Wind & Hybrid Projects
Project Capacity
Time schedule for completion from the
date of Clearance/Approval
Up to 25 MW
8 Months
Above 25 MW- 50 MW
14 Months
Above 50 MW - 75 MW
18 Months
Above 75 MW - 100 MW
22 Months
Above 100 MW
26 Months
Note: Time lines of the other projects shall be specified by the Energy
department separately.
Table-3
Penalty for delay in commissioning beyond Scheduled period of
commissioning
S.No.
Period of delay
Penalty on un-commissioned capacity
i.
For delay up to 1 month
Rs 25,000 per MW
ii.
For delay up to 3 months
Rs 50,000 per MW
iii.
For delay up to 6 months
Rs 1,00,000 per MW
iv.
For delay up to 9 months
Rs 1,50,000 per MW
v.
For delay up to 15 months
Rs 2,00,000 per MW
Section B:Storage Plant (PSP & BESS)
1. Introduction
1.1 India is undertaking a significant energy transition with a goal to generate
50% of its electricity generation capacity from Non-Fossil Fuel sources by
2030 and to achieve net zero emissions by 2070. To meet these objectives
and ensure energy self-reliance, the country is prioritizing the optimization
of its domestically available renewable energy resources. A crucial
component of this strategy is the development and integration of advanced
7525 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
Energy Storage Systems (ESS). Energy Storage Technologies, such as
Batteries and Pumped Hydro Storage which are essential for addressing
the intermittency of renewable energy sources like Solar and Wind. By
storing excess energy generated during periods of high production and
utilizing it during times of high demand, these systems enhance grid
stability and reliability. Additionally, Energy Storage facilitates better load
management and reduces dependency on fossil fuel-based peaking Power
Plants. As India accelerates its Renewable Energy deployment, robust
Energy Storage Solutions will play a pivotal role in ensuring a sustainable
and resilient energy infrastructure.
1.2 The National Electricity Plan (NEP) 2023 of the Central Electricity
Authority (CEA) projects a significant increase in energy storage capacity
requirements. By the year 2026-27, the requirement is projected to be
16.13 GW (82.37 GWh), with 7.45 GW (47.65 GWh) from Pumped Storage
Plants (PSP) and 8.68 GW (34.72 GWh) from Battery Energy Storage
Systems (BESS). This requirement is expected to further rise to 60.63 GW
(336.4 GWh) by the year 2029-30, comprising 18.98 GW (128.15 GWh)
from PSP and 41.65 GW (208.25 GWh) from BESS.
1.3 Moreover, CEA has projected that by the year 2047, the requirement of
Energy Storage is expected to increase to 320 GW (90 GW PSP & 230 GW
BESS) with Storage Capacity of 2380 GWh (540 GWh PSP & 1840 GWh
BESS) due to the addition of a large amount of Renewable Energy in light
of the Net Zero Emission target set for 2070.
1.4 To meet the evolving needs of the Energy Storage System, the Government
of India has periodically issued various directives. In 2021, the
Department of Heavy Industries introduced the Production Linked
Incentive (PLI) scheme for Advanced Chemistry Cell (ACC) Battery Storage.
In 2022, the Ministry of Power set out the Renewable Purchase Obligation
(RPO) and Energy Storage Obligation (ESO) Trajectory until 2029-30. In
2023, the Ministry of Power released guidelines for Pump Storage Projects
(PSP) and the National Framework for Promoting Energy Storage Systems,
along with operational guidelines for Viability Gap Funding for Battery
Energy Storage Systems. Additionally, the Ministry of Environment, Forest
and Climate Change issued the Battery Waste Management Rules in 2022.
1.5 The State of Rajasthan will promote the Energy Storage Programme by
simplifying regulatory processes and offering financial incentives. This
initiative aims to enhance energy reliability, support the integration of
renewable energy, and reduce dependency on conventional energy
sources. It is expected to attract investments, stimulate technological
advancements, and contribute to the state's sustainable energy goals, in
alignment with the guidelines of both the State Government and the
Government of India.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7526
1.6 Among all Energy Storage Technologies, Battery Energy Storage Systems
(BESS) and Pumped Hydro Storage Projects (PSPs) are well-established
and mature technologies, and these technologies can play a pivotal role in
enhancing energy security and aiding the transition to a more affordable,
low-carbon electricity market. They provide flexible, dispatchable, and
peak power capacity.
2. Vision and Objective
2.1. To become a major contributing state for achieving the national target of
500 GW through non fossil fuels by 2030.
2.2. To ensure 24×7 Dispatchable Renewable Energy, to achieve round-the-
clock Renewable Energy availability.
2.3. To reduce emissions and costs by decreasing the Greenhouse Gas
Emissions and overall energy costs by incentivizing ESS deployment,
reducing reliance on Fossil Fuels.
2.4. The State will promote the enhancement of grid stability by improving
reliability through ESS, this will also provide services such as frequency
regulation and voltage support, ramping and other ancillary support
services.
2.5. The State will promote energy independence in remote and isolated
communities through the deployment of ESS.
2.6. To promote the policy of ESS to attract investment in the Clean Energy
Sector, to increase the local employment opportunities and in turnlead to
development of theState Economy.
2.7. The State will promote the creation of an environment that enables
industry and research institutions to focus on cutting-edge research and
innovation to enhance ESS performance, safety, and cost-effectiveness.
2.8. Support DISCOMs in meeting their Renewable Purchase Obligation (RPO),
Hydro Purchase Obligations (HPO), and Energy Storage Obligation (ESO)
as per regulations.
3. Application and use of ESS in power sector:-
3.1. ESS have a multitude of applications in the energy sector and can be used
independently or as a part of power system infrastructure across various
levels, including generation, transmission, and distribution.
3.2. Integration of Renewable Energy involves managing intermittency by
storing excess energy generated during peak production times, such as
sunny or windy periods, for use when generation is low. Additionally,
Energy Storage Systems help smooth the output of Renewable Energy
sources, reducing variability and making their output more predictable
and manageable.
3.3. ESS contribute to grid stability and reliability by providing frequency
regulation to balance energy supply and demand, ensuring stable grid
frequency. They also offer voltage support by supplying reactive power to
7527 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
maintain required voltage levels, and act as backup power sources during
outages or disruptions, enhancing overall grid reliability.
3.4. Energy independence and security are enhanced by Energy Storage
Systems, which enhance the resilience of Energy Systems against
disruptions such as natural disasters and cyber-attacks. Additionally, they
reduce dependence on imported fuels by maximizing the use of local and
Renewable
Energy
Sources,
contributing
to
greater
resource
independence.
4. Pumped storage hydro projects (PSP):-
Energy generated from hydro power projects has been recognized as
Renewable Energy across the world. Large Hydropower Projects including
Pumped Storage Projects having capacity more than 25 MW and energy
from all Small Hydro Projects commissioned after 08 March 2019 will be
considered as RE projects.
4.1.
The State will envisage the development of PSP projects on their own
through Hybrid Annuity Model (HAM). The guidelines for the same will be
notified separately by the Energy Department.
4.2.
The State can also allocate PSP sites to developers through the
following modes:-
Mode I: Nomination of CPSUs or SPSUs:
i. State may award Pumped Storage Projects directly to the CPSUs or
SPSUs on a nomination basis.
ii. Interested CPSUs/SPSUs may submit their proposals along with
PFR to RREC detailing the execution timelines and methodology
for implementation. Due consideration will be given to the
timeline for execution, track record of projects executed in the
past, financial strength of the entity, and current projects of the
entity in the pipeline.
iii. These proposals shall be presented before the High Level Screening
Committee (HLSC) in order to seek permission to initiate the
project.
iv. The Projects may also be allotted to Joint Ventures (JVs) between
CPSUs and / or SPSUs for development of such PSPs.
v. In such Projects the State Govt. Power Utilities shall be given the
right of first refusal of up to 80% of Project Capacity. The tariff for
this portion will be determined by the State Commission in
accordance with Section 62 of the Electricity Act 2003 or
discovered through bidding of remaining power, whichever is
lower.
vi. The Developer shall submit the Letter of Offer for at least 80% of the
project capacity to the State Govt. after receiving the cost
estimate approval from the CEA. If State Govt. does not provide
acceptance on full or part of offered capacity within 8 weeks of
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7528
Letter of Offer, the Developer would be free to sell the balance
project capacity.
Mode II: Allotment through Competitive Bidding:
i. For PSP sites identified by State, a detailed proposal will be
prepared, which shall be presented before the High Level
Screening Committee (HLSC) in order to seek permission to
initiate the project.
ii. The State Govt may conduct a competitive bidding for these state
identified sites for allocating the projects to the private
developers.
iii. The CPSUs and State PSUs can also participate in the bidding.
The State Govt. may adopt one of the below methodologies of bidding:
1. Two stage competitive bidding:
i. The first stage shall be for pre-qualification based on criteria such as
financial strength, experience in developing Power Projects of a
similar scale, past track record in project development, turnover, and
the capability to meet Performance Guarantees.
ii. In the second stage, bids are to be called based on quantifiable
parameters. such as "Maximum amount per MW per year to be paid
to State" or any other parameter as specified by the Central/State
Government
iii. The State Utility shall have the first right of refusal for up to 80% of
the project capacity. The tariff for this portion will be determined by
the State Commission in accordance with Section 62 of the
Electricity Act 2003 or discovered through bidding of remaining
power, whichever is lower.
iv. This refusal will be mentioned in the bid document.
2. Tariff Based Competitive Bidding (TBCB):
PSPs may also be awarded on a TBCB basis to Developers. For this
purpose, the task of carrying out S&I and preparation of DPR may be
given to an SPV under a CPSU/State PSU. SPV may be responsible
for pre-construction activities such as preparation of project report,
land acquisition, environment and forest clearance etc. The DPR may
be subsequently bid out for construction and SPV will be transferred
to the successful bidder and the bids may be invited based on:
i. Composite Tariff (including the cost of input power) in case input
power is arranged by the Developer, Or
ii. Tariff for storage on a per Megawatt Hour basis if the input power is
to be arranged by the State power utilities.
iii. The Rajasthan Electricity Regulatory Commission (RERC) shall
adopt the above tariff under section 63 of Electricity Act, 2003
Mode III: Allotment of Self-Identified Off-stream closed loop sites:
7529 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
i. The State Govt. shall promote identification and development of off
stream closed loop sites of PSPs by encouraging Developers to self-
identify sites. RREC shall open a window inviting proposals for
self-identified sites from time to time.
ii. Developers shall submit the proposal with complete details of the
identified site, storage potential and techno-commercial viability
along with pre-feasibility report for the State Govt.’s evaluation.
iii. A Developer can submit only one proposal within the duration of a
particular window.
iv. These proposals for particular sites shall be entertained on the "First
Come First Served" basis.
v. These proposals shall be presented before the High Level Screening
Committee (HLSC).HLSC’s decision shall be final regarding these
proposals.
vi. The State Utility shall have the first right of refusal for up to 50% of
the project capacity. The tariff for this portion will be determined
by the State Commission in accordance with Section 62 of the
Electricity Act 2003 or discovered through bidding of remaining
power, whichever is lower.
vii. The Developer shall submit the Letter of Offer for at least 50% of the
project capacity to the State Govt. after receiving the cost estimate
approval from the CEA. If State Govt. does not provide acceptance
on full or part of offered capacity within 8 weeks of Letter of Offer,
the Developer would be free to sell the balance project capacity.
4.3.
Approval of Pumped Storage Projects:
1. To facilitate the seamless allocation of sites, a High-Level Screening
Committee (HLSC)will be constituted under the chairmanship of
ACS/Principal Secretary, Energy, GOR. This committee shall permit the
initiation of the project after a thorough evaluation/examination of the
project proposals.
2. Final Approval/clearance for Pumped Storage Projects will be conferred by
the State Level Monitoring and Coordination Committee (SLMCC) after
evaluating / examining the project proposals on the following criteria:
o Detailed Project Report (DPR)
o Availability of water/ Water Allotment Certificate accorded by WRD
o Environment Clearance
o Forest Clearance
o Availability of land
o Availability of Power Evacuation System
o Documentary evidence of PPA or an undertaking in case of 3rd
party / power exchange sale
The Developer should obtain the final approval of DPR and other clearances
within Two(2) years from the date of Registration of the project. Relaxation of
1 year may be granted to those projects where delay in start of construction is
attributable to pending Environment Clearance (EC) and Forest Clearance
(FC), provided that the applications are submitted to concerned authorities
within timelines agreed at the time of award of the project. Otherwise, the
developer shall be liable to cancellation of project site.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7530
The Storage Projects registered with RE project prior to this policy have to
obtain all clearances including final approval of DPR within two year from
registration date or one year from the date of notification of this policy.
The constitution of the committees for approvals/Clearance of PSP projects
will be as follows:-
A. High Level Screening Committee (HLSC):
1. ACS/Pr.Secy/Secretary, Energy, GoR- Chairman
2. ACS/Pr.Secy/Secretary, WRD or their representative (Not below the rank
of Chief Engineer)– Member
3. ACS/Pr.Secy/Secretary, Forest & Environment or their representative–
Member
4. ACS/Pr.Secy/Secretary, Revenue or their representative – Member
5. ACS/Principal Secretary/Secretary, Industries, GoR
6. CMD/MD, RVPN or their representative – Member
7. Chairman Discoms or their representative – Member
8. CMD/Managing Director, Rajasthan Renewable Energy Corporation
Ltd.– Member
9. District Collector of concerned District (Special Invitee).
10. Director (Technical), Rajasthan Renewable Energy Corporation Ltd -
Convener
B. State Level Monitoring and Coordination Committee (SLMCC):
1. Chief Secretary, Rajasthan (Chairman)
2. ACS/Principal Secretary/Secretary, Energy, GoR.
3. ACS/Principal Secretary/Secretary, Water Resources Department, GoR.
4. ACS/Principal Secretary/Secretary, Forest & Environment, GoR.
5. ACS/Principal Secretary/ Secretary, Revenue, GoR.
6. ACS/Principal Secretary/Secretary, Industries, GoR
7. CMD, Rajasthan RajyaVidyutPrasaran Nigam Ltd
8. Chairman, Discoms.
9. Chairman, Rajasthan Renewable Energy Corporation Ltd.
10. MD, Rajasthan Renewable Energy Corporation Ltd., (Member –
Secretary)
4.4.
Obligations:
4.4.1. Obligation towards the state DISCOM
Developers are mandated to make power available to the state as and
when required from their power share reserved for sale in Day Ahead
Market of Power exchange(s).
This power shall be made available to the state at the tariff discovered
in the PPA(s) of the project or the price discovered in the power
exchange for that particular period, whichever is lower.
4.4.2. Regulatory compliances
Developer shall mandatorily follow the guidelines issued by the
Government of India and State Government from time to time on
7531 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
Local Area Development and Rehabilitation & Resettlement policies
applicable for Pumped Storage or Hydro Projects.
Developer shall mandatorily comply with the Grid Code including
Load Dispatch & System Operation Code, Metering Code, Safety Code
&relevant regulations / orders issued by CERC and RERC as per
applicability.
4.4.3. Progress assessment
The Developer shall submit monthly progress report to the Nodal
Agency. Moreover, a review of the progress of the PSPs shall be
undertaken every 6 months by the HLSC and if it is found that there
is no substantial progress in the development of project for two
continuous review meetings, HLSC may cancel the registration and
project site.
4.4.4. Land charges
Developer shall pay lease charges for the allotted Govt. land as per the
provisions of Rajasthan Land Revenue (Allotment of land for setting
up of Power Plant based on Renewable Energy Sources) Rules, 2007,
as amended from time to time.
For the sustenance of livelihood of people in the local vicinity, the
Developer shall pay minimum Rs. 25,000/acre/year (With an
increase of 5% every third year) rental charges to the owner for the
acquired private land.
4.4.5. Obligations in case state opts for procurement of power
In case the State opts for procurement of power, the Developer shall
be required to deposit bank guarantee of Rs. 1 lac / MW by
DD/RTGS corresponding to the capacity to be procured by the state.
Such Bank Guarantee shall be deposited 6 months prior to the
scheduled date of start of procurement of power.
In case the Developer fails/delays to deliver the committed power to
the state from the Date of Procurement, it shall be liable to pay the
differential amount incurred in procuring such power for the period
of delay.
4.5.
Operational Period
4.5.1. The Pumped Storage Projects shall be offered for a maximum period of
forty-five (45) years from the Date of Allotment at the end of which
they shall revert to the State Govt. or be extended further upto thirty
(30) more years in line with the prevailing rules & regulations and
applicable charges after approval of the state government.
4.5.2. At the end of the Concession Period, the projects without any
encumbrances
shall
be
ordinarily
transferred
to
the
State
Government.
4.6.
Land allotment
4.6.1. Allotment of Land for the project shall be as per the provisions of
Rajasthan Land Revenue (Allotment of land for setting up of Power
Plant based on Renewable Energy Sources) Rules, 2007, as amended
from time to time.
4.6.2. GovernmentLand, if any, will be recommended by RREC on case to
case basis after acceptance of non-forest land for Compensatory
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7532
Afforestation (CA) by Forest Department or after getting Stage-I forest
clearance.
5.
Battery Energy Storage System (BESS)
5.1.1. The State will promote the establishment of BESS, where each
individual project must have a minimum power rating of 1 MW or
higher, an appropriate energy rating based on the specific
application, and be located at a single site with a minimum bid
capacity of 1 MW.
5.1.2. Energy supplied from Standalone BESS will be considered as RE
power. Moreover, if 85% or more of the total energy stored in the
BESS, on an annual basis, is procured from RE Sources, such
energy shall be considered for ESO as specified by appropriate
Regulators/Ministries of GoI.
5.1.3. The State will promote setting up of BESS under the Guidelines/
schemes of MNRE or BESS allocated through competitive bidding
by/for other State Utilities/Entities.
The State will promote the setting up of BESS for sale of power to
DISCOMs of Rajasthan on the tariff discovered through competitive
bidding process in order to fulfil ESO and RPO target fixed by RERC.
DISCOM/ RUVITL may purchase solar power beyond ESO/RPO limit
and can avail the benefit of REC as per CERC Regulations/ NLDC
guidelines.
5.2.
Approval Mechanism:-
Approval/Clearance
of
BESS
projects
will
be
granted
after
evaluating/examining the project proposals on the following criteria:
Detailed Project Report
Availability of land
Availability of Power Evacuation System for Proposed Project
Documentary evidence of Power Purchase Agreement or an
undertaking in case of sale to third Party/ power exchange through
open access.
On fulfilment of the above criteria, the project will be conveyed Final
approval by RREC.
The State Level Monitoring & Coordination Committee (SLMMC) will be
constituted to resolve inter departmental issues:
1. Chief Secretary, Rajasthan (Chairman)
2. ACS/Principal Secretary/Secretary, Energy, GoR-Member.
3. ACS/Principal Secretary/Secretary, Industries, GoR-Member.
4. ACS/Principal Secretary/ Secretary, Revenue, GoR-Member.
5. CMD, Rajasthan RajyaVidyutPrasaran Nigam Ltd-Member.
6. Chairman, Renewable Energy Corporation Ltd. -Member.
7. Chairman, DISCOMs-Member.
8. District Collector of concerned District (Special Invitee)
7533 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
9. MD, Rajasthan Renewable Energy Corporation Ltd., (Member –
Secretary)
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7534
5.3.
Obligations
5.3.1. Regulatory compliances
Developer shall mandatorily follow the guidelines applicable for
Energy Storage Projects issued by the Government of India and
State Government from time to time. It shall comply with the
relevant environmental laws, regulations, and orders.
Developer shall mandatorily comply with the Grid code including
Load Dispatch & System Operation Code, Metering Code, Safety
Code& relevant regulations/orders issued by CERC and RERC as
per applicability.
5.3.2. Obligations in case state opts for procurement of power
In case the State opts for procurement of power, the developer shall
be required to deposit bank guarantee of Rs. 1 lac / MW by
DD/RTGS corresponding to the capacity to be procured by the
State. Such bank guarantee shall be deposited 6 months prior
from the scheduled date of start of procurement of power.
In case developer fails / delays to deliver the committed power to
the state from the date of procurement, it shall be liable to pay the
differential amount incurred in procuring such power for the
period of delay.
5.4. Land Allotment
GovernmentLand, if any, shall be recommended by RREC on case to
case basis. For bidding projects, Govt. land, if any, shall be
recommended by RREC only after submission of LOA.
5.5. BESS projects through Hybrid Annuity Model:
The state will envisage the development of BESS projects on its own
Hybrid Annuity Model (HAM). The guidelines for the same will be
notified separately by the energy department.
6.
Energy Storage Projects integrated with Renewable Energy
projects
State requires reliable power during peak hours of the day which has to be
fulfilled by Distribution Companies through available non-fossil power
sources or from power exchange at market price. High demand of power
during peak hours increases market power whereas Solar Power
Evacuation Systems remain idle during non-solar hours.During non-solar
hours, this idle power evacuation system can be utilized for supply of firm
RE Power into grid by installing BESS with RE power. This initiative will
help to reduce the cost of power during peak hours and ensure grid
stability without expanding power evacuation system.
7535 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
6.1. The State will promote Solar/Wind/Hybrid Power Projects with storage
systems to reduce the variability of output of RE power into the grid and to
ensure availability of firm power for a particular period.
6.2. In the case of Integrated Projects, the Wind and Solar part will be governed
by Section A of this policy and the related ESS will be governed as per the
provisions of this Section B of this policy.
6.3. In order to encourage storage capacity to supply reliable power, new RE
projects integrated with BESS under with minimum capacity of X/2 MWh
(where “X” is the installed capacity of RE project) shall be given 50%
exemption from registration charges for the RE capacity and on
installation of BESS beyond X/2 MWhcapacity, registration charges shall
be exempted up to 100% on pro rata basis corresponding to the storage
capacity added.
6.4. In order to ensure adequate storage capacity to supply reliable power, new
RE projects on STU network (excluding Hydro Projects) with an installed
capacity of over 5 MW or as specified by the central Government will be
mandated to install ESS (of at least 2 Hour storage) for minimum 5% of
the RE capacity.
6.5. RE Generators would be allowed to set up BESS along with their existing
RE Plant to supply peak power/RTC power into the Grid for optimum
utilization of existing evacuation system. The RE Generators can enhance
the RE capacity for storage of RE Power through BESS by itself or owned
by any other entity for injection into grid. Discoms can procure such
power from the generators at a tariff determined by RERC/ through a
transparent mechanism as per their requirement and commercial viability.
6.6. State will encouragesetting up BESS and supplying power during peak
hours
to
Discoms
at
a
ceiling
tariff
decided
by
appropriate
commission/authority.
Such
Projects
can
also
supply
power
to
Captive/Open Access consumers at mutually agreed tariff. Remaining
capacity after meeting Discom Load, shall be allowed to avail GNA for
injection into ISTS Grid.
6.7. CaptiveConsumers and Open Access Consumers will be allowed to store
surplus RE power through BESS and such power can be utilized by the
consumer itself or can be used for sale to Power exchange etc.
6.8. The State will promote ESS in decentralized Rooftop Solar Plants and Grid
Scale RE Project to meet power demand of the consumers.
6.9. The BESS will be also promoted to set up at GSS end or at Distribution
Load Centre, particularly where infirm RE injection is very high in
comparison to load demand.
6.10. Integrated Projects (ESS with RE) already registered prior to notification of
the present policy will not be required to re-register under this policy.
7.
Project Facilitation:
7.1. The Nodal Agency shall assist the Project Developer in obtaining the
consents, clearances and permits by providing letters of recommendation
to the concerned authorities, as may be requested by the Project
Developer. However, the Nodal Agency shall not be accountable for any
delays in obtaining the consents, clearances and permits required for
development of RE projects.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7536
7.2. All Government of India initiatives under MNRE (or any others), such as
Central Finance Assistance, VGF, Budgetary support towards cost of
enabling infrastructure, waiver of interstate & intrastate transmission &
wheeling charges, Benefits under Rajasthan Industrial Policy etc. as
applicable shall be extended to the Project Developer and the Nodal
Agency may facilitate seamless transfer of such benefits.
7.3. The Nodal Agency may assist or facilitate Pumped Storage Project
developersin availing applicable incentives offered to enterprises eligible
under the prevailing RIPS
7.4. (Incentives as specified under clause 4.1.1.2 of RIPS, 2024)
Transmission & Wheeling charges shall be exempted on supply of power
from BESS during peak hours or non-solar hours for a capacity of 2000
MW capacity or capacity installed by 2030 whichever is earlier for the
followings:
i. RE Integrated Storage project with a capacity of 5% of RE capacity will be
eligible for exemption of75% on Transmission and Wheeling charges for
a period of 7 years. For BESS beyond 5% of RE capacity will be eligible
for extra exemption of additional 1% Transmission and Wheeling
charges on enhancement of each 1% capacity of storage system up to
30% capacity. For BESS beyond 30% of RE capacity, will be exempted
from100% Transmission & Wheeling charges.
ii. Standalone Battery Energy Storage System (BESS) will be exempted 100%
transmission and wheeling charge on supply of power from BESS
during peak hours or non-solar hours for a period of 7 years.
iii. BESS connected at 11 kV or 33 kV grid sub stations will be exempted
100% transmission and wheeling charges
7.5. State Government may allocate Government Land at concessional rates to
BESS projects supplying power to the Discoms of the Rajasthan.
a. The Nodal Agency will provide support and assistance to the project in
obtaining grants for special category projects under Central
Government schemes.
b. Under this Policy, registered or upcoming projects shall also be eligible
to avail Viability Gap Funding (VGF) as per the schemes of the
Ministry of Power, Government of India
c. ESS projects may receive applicable incentives offered to enterprises
eligible under the prevailing RIPS.
8.
Registration of ESS Projects
a. All ESS projects installed in the state of Rajasthan shall be required to
be registered with RREC.
b. The Developer will submit an online application to RREC for
registration in the prescribed format along with requisite documents,
net worth criteriaspecified at annexure-A1 and details regarding
capacity of BESS and PSP Projects.
c. The ESS project of Pump Storage Hydro (PSP) will be registered after
getting approval from HLSC.
d. Each Developer of PSPand BESS will deposit non-refundable
registration charges of Rs.10 Lakh/per project with RREC.
7537 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
DRAFT
e. GST and other charges, as applicable, shall be payable in addition to
the Registration Charges. Registration will not confer any right to the
Developer/Power Producer and will not create any obligation on the
part of RREC.
f. The ESS Projects registered (Other than PSPs) under this Policy shall
have to apply for in-principal clearance within a period of 2 years from
Date of Registration, failing which the registration shall be deemed to
be cancelled.
g. No prior registration with RREC will be required by Developer for
participation in bidding. Only successful bidders will be required to
register their projects with RREC.
h. Developer can transfer its registered capacity or part thereof to its
'holding', 'subsidiary', 'fellow subsidiary' or 'ultimate holding' company
with the prior approval of RREC.
i. Developer can transfer the registered capacity or part thereof from one
registration to its other registration with the prior approval of RREC.
9.
Power to Remove Difficulties
State Level Monitoring and Coordination Committee (SLMCC) is
authorized to issue necessary clarifications and amendments under
this section of the Policy as and when required. In the event of any
doubt, dispute, difference, or issue concerning the interpretation or
implementation of this section of the Policy, the SLMCC may make
decisions on such matters. These decisions must align with the
provisions of the Policy and aim to resolve difficulties, whether initiated
by the Committee itself or based on a written request from
stakeholders.
The Energy Department in consultation with other department shall
issue necessary guidelines/ schemes/orders for the implementation of
this Policy.
Annexure-B1
Particulars in Pre-feasibility Report
Upper and Lower Reservoir Details: -
Availability of Upper/Lower Reservoirs with geological coordinates.
Land area required with details such as Revenue/Forest/Private.
Storage capacity of Reservoirs with Live and Dead Storage.
Full Reservoir Level (FRL) and Minimum Draw Down Level (MDDL) of the
available Reservoir(s)
Gross Head available at Site with Length to Height (L/H) Ratio of the
Reservoir.
Deepest Foundation level and Maximum height of Rockfill Embankment.
Location Details: -
District/Tehsil/Village name in which the site is located and Status of the
approach roads.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7538
Geological coordinates of existing transmission &/or distribution network
and GSS with distance from site
Detail of Interference with Wildlife Sanctuary & National Park or any other
restricted Area
Geographical Maps & Pictures of location
Forest and non-forest land required
Survey & Investigation: -
Reconnaissance topographical survey
Hydro Meteorological data with Seismicity
Water availability and water requirement at project location
Designated route for source of one time water requirement.
Evaporation and Sedimentation
Design Flood and Flood absorption
Area of Submergence / Land Acquisition
Other Details: -
Total estimated potential of PSP in MW and MWh
Cycle Efficiency
Capacity of reservoir required to be constructed if any
Power Evacuation Plan
Environmental Aspects
Economic Financial Analysis
Section C: Biomass and Waste to Energy Projects
The State will promote the Biomass Programme, facilitating the
establishment
of
biomass-based
power
projects,
Bio-CNG/CBG
Compressed Bio Gas, briquette/pellet manufacturing units and
supporting biomass-based co-firing projects, as well as Waste-to-
Energy based Power Projects for the utilization of waste such as
MSW/RDF/Industrial/Medical waste or any other wastes as per the
guidelines of the State Government and Government of India.
1.
Projectbasedprovisions.
1.1
Biomass Projects
TheStatewillpromotesettingupofBiomass
ProjectsincludingCogeneration.ThePowerProducersmayusesu
chpowerforcaptiveconsumptionorforsaletothirdparty/licensee
sincludingDiscoms.
DiscommaypurchasethepowerfromBiomassprojectstofulfiltheirR
enewablePurchaseObligation(RPO)andbeyondRPOasper
their
requirement and commercial viability. Discom shall execute
Power PurchaseAgreement(PPA)withDevelopers/PowerProducer.
1.2
Waste to Energy projects:
7539 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
TheStatewillpromotesettingupofthe Waste to Energy Plants
forgeneration of power by utilizing MSW (Municipal Solid
Waste), RDF (RefuseDerivedFuel),Industrialand Medical Waste.
1.3
Biogas Generation
Agriculture Waste, Dairy Waste, Household Waste, Animal
Waste(Poultry farms, Gaushalas) Sewage WasteDisposal is a
major concern. This waste can be utilized to generate Biogas
which can be used for cooking, lighting, power generation,
heating etc.
Farmers, Dairy Farms, Poultry Farms, Farmers Producers
Organizations (FPO), Self help Groups (SHG), Industries etc.
can set up Biogas plants. This will help to earn revenue and
generate employment in rural areas.
Biogas generation will be promoted by the State and such
plants shall be eligible to avail incentives as per schemes/
programs of GoI and State Government. The additional
incentives will be provided by the State.
The State will support the Distribution Mechanism for organic
manure produced in biogas plant.
Programs/Schemes will be run at the level of Gram Panchayat
to promote Biogas for waste utilization.
In Rural Areas, energy transition initiatives will be undertaken
to shift from Fossil Fuel to Non-Fossil Fuel. These initiatives will
include installation of Rooftop Plants, RE plant with Storage
Systems
and
Biogas
Generation
to
meet
100%
energy
requirement.
1.4
Compressed Biogas (CBG/Bio-CNG)
To promote the MNRE Biogas program for power generation and
to meet the mandate by Ministry of Petroleum and Natural Gas
for blending Compressed Biogas (CBG) in Compressed Natural
Gas (CNG) for transport and domestic use, the state will
promote
Compressed
Biogas
(CBG/Bio-CNG)
plant
in
Rajasthan.
The developers who have already been issued LOI under SATAT
and other Bio-energy projects based on compressed Biogas
(CBG) will be registered under this policy.
The Energy Department will issue separate Guidelines for
implementation and promotion of CBG/Bio-CNG projects in the
State.
1.5
Bio-Ethanol
To promote initiatives of GoI for mandate to blend Bio-Ethanol
in petrol, the State will promote the Co-generation power plants
associated with Bio-Ethanol plants in Rajasthan.
The Energy Department will issue separate Guidelines for
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7540
implementation and promotion of Bio-Ethanol projects in the
State.
1.6
Bio-Coal:
To address the issue of Biomass Waste burning atthe local
level, the production of Bio Coal will be promoted for carbon
mitigation from coal burning and to generate revenue and
employment generation in rural area.
1.7
Co-firing in Coal/Lignite based Thermal Power Plants:
The
Statewillfacilitateco-firingof
Biomass
in
Coal/Lignite
basedThermalPower
Plants
for
power
generation
as
per
guidelines
issued
by
Ministry
ofPower,GovernmentofIndiaandasamendedfromtimetotime.
For this purpose Biomass Pellet/Briquettes Manufacturing
units will be promoted.
2.
Incentives
2.1 All Biomass Projects including Briquette/Pellet Manufacturing
units
and
WastetoEnergybasedprojectsmay
avail
incentivesaspertheeligible criteria defined in the prevailingRIPS.
Grant of incentive under RIPS
Under clause 4.1.1.2 of RIPS,2024, Renewable Energy units are eligible
for the following Incentives:
1. Exemption & Reimbursements: The following exemptions and
reimbursement are applicable to RE Units:
- Exemption from payment of 100% electricity duty for 7 years.
- Exemption from payment of 75% stamp duty and reimbursement
of 25% stamp duty.
- Exemption from payment of 75% conversion charges and
reimbursement of 25% conversion charges.
- Reimbursement of 100% Mandi fee/Market fee for 7 years.
3. Waiver of PCB Fees to obtain Consent to Establish (CTE) and
Consent to Operate (CTB) certification.
2.2 ThePowerProducershallbeallowedtousewaterfromsourcesofWater
Resources Departmentsubjecttotheavailabilityof waterforpower
generation.
2.3 All Projects registered under this policy shall also be eligible to
avail CentralFinancial Assistance (CFA) as per the schemes
of the Ministry of New andRenewableEnergy(MNRE).
2.4 Project shall be eligible to avail incentives/benefits under the
schemes/programs of Central Government. The State shall
facilitate the developer to avail such benefits.
3. Land allotments
3.1 Land Allotment for Setting Up Biomass Based Power Plant
7541 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
i. Allotment of Government Land - Government Land for
setting up of Biomass based Power Plant shall be allotted
to Developer/Power Producer as per Rajasthan Land
Revenue (Allotment of Land for setting up of Power Plant
based on Renewable Energy Sources) Rules, 2007 as
amended from time to time.
ii. RREC will recommend the Government Land for allotment
to the concerned District Collector on deposition of land
security @ Rs 1 Lac/MW by DD/NEFT/RTGS in favor of
RREC, Jaipur on case-to-case basis. The Security Deposit
will be refunded to the Developer within 2 months of
commissioning of the project on a written request of
applicant. The Security Deposit shall be forfeited in case
the allotted land is not used within the specified period as
per allotment rules.
iii. Private land will be procured by the Developer/Power
Producer(s)
directly
from
the
private
parties.
The
conversion of this land will be done by the competent
authority.
3.2
Land Allotment for Setting up Waste to Energy Projects: -
Developer will select eligible site in proximity to the landfill
sites or any other suitable land, in consultation with the
Directorate
of
Local
Bodies,
Rajasthan,
Municipal
Corporation, Municipalities etc. as case may be. The Land
may be allotted as per rules of concerned Department.
3.3
Land allotment for setting up of CBG/Biogas/Bio-
coal/Bio-Ethanol:
For establishment of CBG plant, a maximum of 10 Acre
land would be allowed for a plant of 10 MTPD capacityand
25 Acres landfor storage of feedstock.For Bio coal plant on
a maximum of 2 Acre land would be allowed for 100
MTPD.1.5 Acres of land would be allowed for a 100 kilo
Litre Bio Ethanol Plant.Such Projectswould be provided
Revenue Land as per Rajasthan land Revenue (Allotment of
Land for setting up of Power Plant based on Renewable
Energy Sources) Rules, 2007 as amended from time to
time. Developer will have to deposit Security amount of Rs.
1 Lac/MTPD by DD/NEFT/RTGS in favor of RREC for CBG
plant towards land allotment. Such SD amount will be
refunded on successful commissioning of the project and
forfeited if land not utilized within prescribed timeline as
per aforesaid Revenue Rules.
3.4
Sale/ Auction mechanism for weeds (such as Prosopis-
Juliflora, Lantana, Parthenium /Energy Plants) grown on
Govt. Land:-
Unutilized, uncultivated Govt. landare proneto growth
ofweeds.
All
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7542
concerneddepartmentsareadvisedtodeviseatransparentsale
auctionmechanismonperiodicbasis.
4. Registration of Power Project, Biomass Briquettes /Pellet
manufacturing units
4.1 Biomass Power Plant and Waste to Energy based Power
Project
in
theState
shall
be
registered
online
upon
deposition
of
Rs.
30,000/-per
MWplusGSTwithRRECtowardsprocessingfee,whichshallbeno
n-refundable. Biomass Power Plant up to 20 MW capacities
shall be allowedunderthisPolicy.
4.2 No registration charges shall be applicable to the Biomass
Briquettes/Pellet manufacturing units,Biogas & Bio Coal
plants.
4.3 CBG, Bio-Ethanol plant will be required to register their project with
RREC upon deposition of the following charges:
CBG Plant - @ Rs. 30,000/ Metric Ton Per Day (MTPD)
Bio-Ethanol @ 3,000/Kilo Litre Per Day (KLPD)
Under the Sustainable Plan of the Ministry of Petroleum and Natural
Gas,GovernmentofIndia,thedeveloperswhohavealreadybeenissued LOI
and other bio-energy units will be registered under the current policy.
5.
Approval/Clearance of projects
5.1 Approval/Clearance
of
Projects
will
be
granted
after
evaluating/examining the project proposals on the following
criteria:
Detailed project report
Availability of land
Availability of power evacuation system for proposed project
Documentary Evidence of Power Purchase Agreement or an
undertaking in case of sale to Third Party through Open
Access or Undertaking for Sale of Power in the Power
Exchange
NOC
for
allocation
of
water
by
the
concerned
Department/Authority
5.2 Upon fulfilment of the above criteria, the project will be
considered as In-principally cleared and after deposition of
Security Deposit; the project will be conveyed a Final approval
by RREC.
6.
Project Security Deposit:
6.1
After In-principle Clearance, the Developer/Power Producers
are required to submit project Security Deposit @ Rs. 1
lac/MW in cash within 1 month without interest and within 3
7543 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
months with interest @9% per annum from the date of issue of
In-Principle Clearance. Non-deposition of the Security Deposit
within stipulated period shall lead to deemed cancellation of
In-principle Clearance without any notice.
6.2
The Project Security Deposit will be refunded to the
Developer/Power Producer within 2 months of commissioning
of the project after recovery of penalty, if any.
6.3
In case Developer/Power Producer fails to commission the
project within scheduled commissioning period including
extension as per clause 7.2, the Project Security amount shall
be forfeited.
6.4
In case the Developer/Power Producer wants to withdraw his
project within 6 months of depositing of Project Security,
then 25% security deposit will be forfeited, and balance
75% amount of the security will be refunded to the
developer/Power Producer on written request.
6.5
If Power Producer withdraws the project after six months of
depositing the Project Security, then the entire Project
Security shall be forfeited.
7.
Time frame for completion of different activities:
Time frame for completion of different activities, subject to
Force Majeure conditions, would be as follows: -
7.1 Developer/Power
Producer
shall
commission
the
Biomass
based/Waste to Energy Power Project within 36 months from
the date of approval of the Project.
7.2 Provided that extension in time schedule may be granted by the
RREC after depositing penalty amount as under plus GST as
applicable: -
S.
N
DelayPeriod
PenaltyAmount
(a) Fordelayupto3months
Rs.25,000perMW
(b) Fordelayupto6months
Rs.50,000perMW
(c) Fordelayupto9months
Rs.75,000perMW
(d) Fordelayupto15months
Rs.1,00,000perMW
(e) Fordelayupto24months
Rs.1,25,000perMW
SSC may consider extension beyond 24 months where there is
a reasonable certainty of commissioning of the project. In such
cases, extended completion schedule and penalties shall be
decided by SSC on case-to-case basis.
7.3 Power Producer shall furnish online quarterly progress/status
report of Waste to Energy /Biomass based Power Plant from the
date of approval of the Project. Non-compliance may lead to
forfeiting of security money and cancellation of project approval.
7.4 Copy of Work Order along with cost, delivery schedule of supplies,
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7544
civil works execution and erection & commissioning schedule
shall be supplied by the Power Producer as proof of execution of
project within 3 months of the final approval. Financial closure
shall be completed by Power Producer within 4 months from
date of final approval. Incentives allowed by RERC for early
completion shall be applied as per tariff orders issued by RERC.
7.5 After completion of project and before commissioning, the Power
Producer shall furnish the complete updated project report
based on the technology used, order placed, actual cost and
various approvals arranged. The representative of RREC shall
be present during commissioning of Power Project and
commissioning
report
shall
be
issued
by
RREC.
The
incentivetariff, as allowed by RERC order to the Waste to Energy
/Biomass based power plant for early commissioning shall be
applicable after examining the date of financial closure and
commissioning date by RREC.
7.6 Obligations of the Power Producer under this Policy shall be
relaxedduring the period of Force Majeure. Post-registration,
the time frame for completion of different activities is subject to
Force Majeure conditions.
8. Grid Interfacing:
Power Evacuation, Grid Interfacing, Forecasting & Scheduling and
Dispatch of the Power for Bio Power Projects will be governed as per the
provisions of this policy (Section-E) and relevant Regulations of RERC.
9.
Power Purchase Agreement:
9.1 The sale of electricity by Developer/Power Producer to Discoms
will be governed by the Power Purchase Agreement executed
between the concerning Discom and the Power Producer. The
Price for sale of power generated from the Biomass Power
Project/Waste to Energy based project to the Discoms and other
charges/conditions shall be as specified by the RERC from time
to time.
9.2 In case of Third-Party Sale or for Captive Use within the State, the
Developer/Power Producer shall execute a Wheeling Agreement
with Discom. However, the Transmission Agreement with RVPN
will be executed separately if the Developer/Power Producer
intends to use the system of RVPN for Wheeling Power.
9.3 The Price of Power to be sold by the Developer/Power Producer to
consumers/ licensees other than Discoms will be determined by
the mutual understanding/agreement between the seller and
the purchaser.
9.4 Assignment of PPA
PPA/WBAwillbeallowedtobeassignedinpartsorfullto
other
partiesunderfollowingconditions:
i. Aftercompletionoftheprojectanditsconnectivitytothegrid.
7545 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
ii. ConsentofRREC&RVPN/Discom(s)andrelatedparties
10.
Development of Waste Supply Chain:
State will establish the mechanism through which Waste Supply
Chain ensured to the CBG plants
11. Settlement of Accounts:
AccountsofalltransactionsbetweenthePowerProducerandtheD
iscoms/ RVPN regarding Price of Power and Wheeling
Charges shall besettledona monthlybasis.
12. Power to Remove Difficulties
SLMCC is authorized toissue necessary clarification and amendments
withregard
to
this
section
of
the
policy
as
and
when
required.Ifanydoubt,dispute,differenceorissuesarisewithregardtoin
terpretation/implementationofthissection
of
the
Policy,State
LevelSanction
Committeemaytakedecisioninsuchmatters,notinconsistentwithth
eprovisions of the Policy, as may appear to be necessary and
expedient
forremovingthedifficultieseitheronitsownmotionoronawrittenrepre
sentationfromthestakeholders.The Energy Department shall issue
necessary guidelines/ schemes/orders for the implementation of this
Policy.
13. Members of the State Sanction Committee (SSC)
ListofmembersofSSC is as follows:
1. ACS/Pr.Secy./Secretary, Energy-Chairman
2. ACS/Pr.Secy./Secretary,Forest&Environment,ortheirrepresentative-
Member
3. ACS/Pr.Secy./Secretary,WaterResources
Department,Memberortheirrepresentative-Member
4. ACS/Pr.Secy./Secretary,Secretary,Revenue,
ortheirrepresentative–Member
5. ACS/Principal Secretary/Secretary, Industries, GoR
6. ACS/Principal Secretary/Secretary, AgricultureDeptt,
GoR(ApplicableonlyforCBGprojects)
7. ACS/Principal Secretary/Secretary, Animal HusbandryDeptt,
GoR(ApplicableonlyforCBG projects)
8. ACS/Principal Secretary/Secretary, Rural Deptt,
GoR(Applicableonlyfor(ApplicableonlyforCBG projects)
9. ACS/Pr.Secy./Secretary,Secretary, ULB/UDA,
ortheirrepresentative-
Member(ApplicableonlyforwastetoEnergyprojects)
10. ChairmanDiscoms. -Member
11. Chairman, RREC-Member
12. MD,RREC-Member Secretary
Section D: Green Hydrogen
1. Introduction
To meet its global commitment, Government of India has set a national
target of 500 GW Renewable Energy generation by the year 2030. This
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7546
will reduce dependence on conventional sources of energy. Rajasthan
has added a generation capacity of more than 30 GW of Renewables in
the last 2 decades which is the highest in India. Now, the State is
exploring other options for development of Non-Fossil Fuels.
Green Hydrogen is a Non-Fossil Fuel which can fulfil the requirements of
Industrial, Power, Transportation and Aviation sectors while reducing
carbon emissions. It is also required to produce Green Ammonia and
could help in reducing the country's import bill. Ministry of Power,
Government of India has also issued a National Green Hydrogen Policy
in Feb 2022.
In the light of these, the State of Rajasthan aims to promote Green
Hydrogen production through a series of incentives and simplified
procedures.
2. Objectives
2.1. To become the pioneer state for Green Hydrogen Production and its
derivatives. To reduce the dependency on import of Ammonia and
Fossil Fuels.
2.2. To develop an ecosystem for production of Green Hydrogen for
Refineries, Fertilizers and other Industries requiring Hydrogen as an
input.
2.3. To create an environment for Industry and Research Institutions to
focus on cutting edge research and to make Rajasthan the preferred
destination for development of Green Hydrogen.
2.4. To
develop
a
Green
Hydrogen
Manufacturing
ecosystem
(Electrolyser, compressor, storage and transport infrastructure.).
This section of the policy will focus mainly on:
i. Promoting Generation of Hydrogen and its derivatives/by products
through RE Power
ii. Development of Green Hydrogen Parks.
iii. Promote Green Tourism in the Stateusing of Green Hydrogen-based
mobility.
iv. Promotion of Green Hydrogen Fuel Cells for transportation. Explore
and support distributed applications of green hydrogen across
Residential, Commercial, Industrial and Mobility sectors
v. Promotion of Green Hydrogen Equipment Manufacturing Industries.
vi. Promotion of research in cutting edge technology for Green
Hydrogen.
vii. Promotion of Green Hydrogen generation for storage and
generation of RTC (round the clock) power.
viii. Support the development of pilots across the Green Hydrogen
Value Chain.
7547 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
3. Targets
i. Producing 2,000 kilo Tonnes per Annum (kTPA) of Green Hydrogen
by 2030.
ii. Commission at least one Green Hydrogen Valley to cater to the
demand from fertiliser plants and refineries within Rajasthan and
in other States.
iii. Develop at least one Gigafactory for electrolyser manufacturing. The
state should also aim to export these domestically manufactured
electrolysers across the globe.
iv. Cater to at least 20 per cent of Green Hydrogen exports from India
either as fuel, chemicals derived from Green Hydrogen or as
technology products like electrolysers.
v. A minimum share of consumption will be met through Green
Hydrogen by designated consumers in the State as per mandate
prescribed in National Green Hydrogen Mission which shall be
extended in phased manner.
vi. Blend up to 10 per cent Green Hydrogen (on a volume basis) in
Natural Gas Pipelines for gas produced within Rajasthan by 2030.
4. Green Hydrogen Projects
4.1. Eligibility ofDevelopers for Green Hydrogen Projects
Developers, as defined below shall be covered under the provisions of this
section of the Policy:
Category 1: Develops
Co-located
Renewable
Energy
and
Green
hydrogen Generation Plant
Category 2: Develops Green Hydrogen Generation Plant and remotely
located RE Plant.
Category 3:DevelopsGreen Hydrogen Park/Hub/Cluster/Valley
4.2. Green Hydrogen Generation Projects: -
4.2.1. The State will promote Generation of Hydrogen and its derivatives/by
products through Renewable Energy by setting up of Green Hydrogen
Generation Plants and RE Plants in the State.
4.2.2. Green Hydrogen and its derivatives/by products can be generated
through a Hydrogen Generation Plant by using Renewable Energy
from a co-located Renewable Energy plant or from a remotely located
Renewable Energy Plant within the State.
4.2.3. The remotely located Renewable Energy Plant can be set up by Green
Hydrogen generators themselves within the State or can procure
Renewable Energy from Third Party within the State.
4.2.4. Green Hydrogen Generators will be allowed toobtain renewable energy
through Open Access from existing/new RE Projects as per relevant
RERC Regulations and State Policies.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7548
4.2.5. The State shall also promote Green Hydrogen Generation for power
generation purposes. The Power Generation Plant can supply assured
power to the grid using green hydrogen as per the requirements of the
grid.
4.2.6. The overall target of 2000 kTPA can be taken with following allowable
capacities in various categories for Green Hydrogen Projects:
1. RE Power Injection and Withdrawal at CTU (PGCIL) Network within
State (No upper Cap)
2. Co-located Green Hydrogen Project with RE Projects (Up to 700
kTPA)
3. Green Hydrogen Projects with Round the Clock RE Power Supply
(Up to 800 kTPA)
4. Green Hydrogen Project with normal RE Project at STU (RVPN)
Network (Up to 500kTPA)
5. Parks/Hubs/Clusters/Valley
The Green Hydrogen Generation Parkis a concentrated zone/hub for
development of Green Hydrogen Generation Plant with/without co-
located Renewable Energy Generation Plant which provides developers,
a well demarcated area with proper civil and power system infra-
structure where the risk of projects is minimized, anda fast approval
process is facilitated. The Green Hydrogen Park Developer creates
supporting infrastructure and facilities including power evacuation,
water arrangements, internal roads and administrative facilities
6. Development of Green Hydrogen Generation Park
1. The State shall promote development of Green Hydrogen Generation
Parks. The Park Developer will submit an application in the
prescribed online format to RREC for development of Green
Hydrogen Generation Park along with a non-refundable process fee
@ Rs. 10,000/ MW + GST subject to a maximum of Rs 10 Lac +GST
for each Park. Registration of park will be carried out by RREC
within a period of 30 days from the submission of application,
complete in all respects.
2. The
Park
Developer(s)
shall
be
obliged
to
create
common
infrastructure
facilities
for
development
of
Green
Hydrogen
Generation Plants(s) viz creation of power evacuation system,
development of roads, road lights, water supply systems etc.
3. The Park Developer will be allowed to acquire agricultural land from
landowners (Khatedars) for developing Green Hydrogen Generation
Park(s) in excess of the ceiling limits in accordance with the
provisions of Rajasthan Imposition of Ceiling on Agriculture Holding
Act, 1973.
4. Allotment of Government land to Park Developer(s) for development of
Green Hydrogen Generation Park will be considered on the
recommendation of RREC.
5. The Park Developer(s) shall be responsible for registration of Green
7549 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
Hydrogen Plants within their park with RREC as per the provisions
of this policy.
6. The State will also develop a Green Hydrogen Valley/Cluster at
suitable location in State for facilitating all infrastructure required
for Generation of Green Hydrogen and its derivatives without any
upper cap on individual developers.
7. Manufacturing of Equipment:
The Government intends to promote manufacturing facilities for Green
Hydrogen Equipments in Rajasthan that can help develop an ecosystem
and support job creation in the State. TheManufacturing Equipment for
Generation of Green Hydrogen like Electrolyser and other equipment as
notified in the prevailing Rajasthan Investment Promotion Schemer
(RIPS) from time to time.
8. Research
The State shall promote and facilitate Research and Development
(R&D) of technologies related to generation of hydrogen, fuel cell
technologies, and storage technologies.
The State shall facilitate industries with a robust ecosystem for Green
Hydrogen Manufacturing and to provide a cost-effective manufacturing
environment. Research and Development (R&D) Centres with testing,
skilling and incubation facilities shall be promoted.
9. Incentives/ facilities available to Green Hydrogen Generation
projects
Green
Hydrogen
Generation
Plants,
Parks
and
Equipment
Manufacturing Plants shall be treated as per the prevailing Rajasthan
Investment Promotion Scheme (RIPS) as amended from time to time.
Benefit provided under RIPS, 2024
Clause 3.3.1.1 (RIPS,2024)
Eligible Sunrise sector (Green Hydrogen) may choose to avail benefits
from either the Sunrise Booster on Asset Creation Incentives or the
Anchor Booster. Furthermore, the total value of all incentives and booster
under the Investment Subsidy (SGST Reimbursement) must not exceed
100% of the State tax due and deposited each year, for a period of 7
years.
Clause 3.3.2.2.1 (RIPS,2024)
A Sunrise Booster of 25% shall be applicable on the Asset Creation
Incentive chosen by the eligible Enterprises (applicable for the first three
units as defined under section 3.3.1)
Clause 3.3.2.2.2- (RIPS,2024) Interest subvention
Eligible Sunrise sector (Green Hydrogen) are eligible for 5% interest
subvention on term loan taken by Enterprises from financial institutional
or State financial institutional or Banks recognised Banks recognized by
Reserve Bank of India. The loan can be taken for an investment in plant
& machinery, for a period of five years subject to maximum of 2.5% of the
EFCI distributed equally over 5 years.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7550
Clause 3.3.2.4 (RIPS,2024) Exemption & Reimbursements
- Exemption from payment of 100% electricity duty for 7 years;
- Reimbursement of 100% mandi fee/market fee for 7 years;
- Exemption from payment of 75% stamp duty and reimbursement
of 25% stamp duty;
- Exemption from payment of 75% conversion charges and
reimbursement of 25% conversion charges.
The following Incentives and facilitations for green hydrogen initiatives
in Rajasthan:
9.1. Green Hydrogen Projects/Parks
Benefits prescribed under the prevailing Rajasthan Investment
Promotion Scheme may be applicable to developers covered by
categories 1,2& 3 as listed in Clause 4.1 of this section of the policy as
amended from time to time.
9.1.1. Availability of Water:
Water Resources Department will allocate required quantity of water
from IGNP canal/the nearest available source for cleaning of solar
panels and auxiliary consumption for Solar PV Power Plants and
water requirement for Green Hydrogen Generation Plants subject to
the availability of water.
In case of use of Brine water/Treated Wastewater for generation of
Green Hydrogen, water will be allocated on priority basis.
Developer will intimate estimated water requirement to RREC along
with the proposed source of water. After assessment/scrutiny, the
case of water requirement shall be forwarded to the Water Resource
Department. The modifications(s) required, if any, in the existing
water resource system will be done by the Water Resources
Department on the cost of the Developer/Power Producer.
9.1.2. Special Incentives
The following facilities will be available on individual Green Hydrogen
Plant capacity of maximum 50 kTPA, as covered by Categories 1 & 2
as listed in Clause 5.1 of this section of the policy forthe first 500
kTPA (Kilo tons per annum with maximum 12,500 MW RE capacity
@25 MW per kTPA) capacity established within the state or plants
established up to March 31, 2029 within the State, whichever is
earlier. In case, after allocation of 500 kTPAcapacity among developers
@ 50kTPA, if capacityis not exhaustedcompletely,the spare capacity
will be allocated by SLEC to the developer beyond 50kTPA
individually.
The Date of Commissioning of the plant shall be treated as the date
established for the above purpose.
These benefits will be applicable for 7 years from the Date of
Commissioning of the projects:
i. 50% waiver of Intra-state Transmission and Wheeling Charges,
Electricity Duty for the power produced from Solar/ Wind plants
7551 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
(with/without storage) to be established for the aforesaid Green
Hydrogen plants. Transmission Losses and Wheeling Losses shall
be applicable as determined by the State Regulatory Commission.
ii. The Additional Surcharge and Cross Subsidy charges shall be
waived on the energy drawn from Wind/ Solar energy Plants (with
and without storage facility) established as Captive Plant or from
plant owned by their subsidiary/ other company for use in Green
Hydrogen production plant within state.
iii. The Facilities/Incentives, if not modified/changed in above, as
available under prevailing state’s Solar/Wind/Hybrid Energy
Policy as amended from time to time shall be available to the
Wind/Solar generation plant (with and without storage facility) to
be established for green hydrogen production plant.
iv. The aforesaid benefits will be limited to the Green Hydrogen
quantum in case of Green Hydrogen is generated with other
byproducts collectively.
9.1.3. Banking:
Banking of Renewable Power generated from Solar/Wind Energy Plant
(with and without storage facility) established for Green Hydrogen
Generation Plant shall be up to1/3rdof the energy injected during 15
minute time block basis at the consumption end. The energy shall be
allowed to be banked for a period of 30 days.
Banking Charges shall be the cost differential between the average
tariff of Renewable Energy (Solar & Wind) discovered through
competitive bidding for procurement by the Distribution Licensee
during the previous year and the average market clearing price of the
energy procured in Day Ahead Market (DAM) for distribution licensees
during the month in which the renewable energy has been banked.
In case, there is no price discovery for procurement of RE (Solar &
Wind) power in the previous year then the latest available average
tariff of renewable energy (Solar & Wind) discovered through
competitive bidding for procurement by the distribution licensee shall
be considered.
The losses of power will also be adjusted during banking of the RE as
per regulatory provisions.
The above provisions will be applicable for a duration of 25 years from
the Date of Commissioning of a Green Hydrogen Generation Plant
setup under the provisions of this policy.
9.1.4. RE Plant Size
The peak power generation capacity of Wind/Solar/Hybrid plant (with
or without storage facility) shall be allowed up to 2.5 times of the
contracted capacity of power connection for the associated Green
Hydrogen Plant.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7552
9.1.5. Incentives for Green Hydrogen generation through Brine
Water/ Treated wastewater
Green Hydrogen Generation Plant through Brine water/Treated
wastewater
with co-located RE sources Government land will be provided on
priority basis.
10. Role of RREC
RREC will act as a Nodal Agency for:
i.
Registration of Green Hydrogen Generation projects;
ii.
Approval of Hydrogen plant along with RE Projects;
iii.
Development of Green Hydrogen Parks;
iv.
Facilitating allotment of Government land;
v.
Facilitating water allocation for Green Hydrogen
Generation Plant/for auxiliary consumption and cleaning of Solar
PV Plants;
vi.
Facilitating approval of power evacuation plan,
connectivity at STU/CTU and allocation of bays etc on behalf of
State;
vii.
Facilitating execution ofPPA/WBA with Discom(s) of
Rajasthan/RVPN/NVVN/SECI/RUVITL(as may be applicable);
viii.
Coordination
with
MNRE/NIWE/Industries
department/Water
Resources
Department/
Discoms
of
Rajasthan/RVPN/Central Agency/Other Relevant Agency.
11. Registration of Green Hydrogen Generation Projects
11.1. All projects as covered by Clause 4.1 of the policy
installed in the State shall be required to be registered
with RREC.
11.2. The Developer will submit an online application for
registration to RREC in the prescribed format with
requisite documents and details regarding capacity of
Hydrogen Plant and RE Plant Capacity.
11.3. Each Developer/ Power Producer will deposit following
non-refundable registration charge for RE Capacity with
RREC (For 1 KTPA Green Hydrogen Plant, maximum 25
MW RE capacity will be considered).
S.No. Project Capacity
Rate
1
For Project ≤100 MW capacity
Rs 30,000/- per MW
2
For Projects
>100MWand≤500MW capacity
30 Lac +Rs 2.5 lac per 100
MW beyond 100 MW or part
thereof
7553 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
3
For Projects
> 500 MW and
≤1000MW capacity
40 Lac +Rs.2 lac per 100 MW
beyond 500 MW or part
thereof
4
For Projects
>1000 MW capacity
50 Lac+Rs.1 lac per 100 MW
beyond 1000 MW or part
thereof subject to maximum
Rs. 80Lakh per project
11.4. GST and other charges, as applicable, shall be payable in
addition to the registration charge. Registration will not
confer any right on the Developer and will not create
any obligation on the part of RREC.
11.5. Installation of Green Hydrogen Generation plant not
registered with RREC and set up without prior approval
of the Competent Authority as per policy provisions will
be
liable
to
be
disconnected
from
the
Grid.
TheDeveloper will be required to submit a certificate of
registration of project with RREC to the Sub-Registrar
or any other officer authorised by the Government for
the registration of sale/lease deed of the land.
However, Registration of Projects done under the aegis of Solar and
Wind&Hybrid Policies, 2019 prior to the commencement of this policy
shall be deemed to be valid and operative.
11.6. In case an existing Solar/Wind/Hybrid Project is being
used exclusively for Hydrogen Generation, the existing
registration number in the category will be assigned to
the Green Hydrogen Project. In such case, Developer
shall deposit difference of registration fees in RREC as
mentioned at clause 11.3 and already paid registration
charges, if any.
11.7. Developers can transfer their registered capacity or part
thereof, to their 'holding’, ‘subsidiary', 'fellow subsidiary’
or ‘ultimate holding’ company with the prior approval of
RREC upon payment of an amount equal to 50% of the
Registration Charges. However, the provisions of clause
11.5&11.6shall be applicable on the transferee.
11.8. Developers can transfer the registered capacity or part
thereof, from one registration to another registration,
with the prior approval of RREC upon payment of an
amount equal of 25% of Registration Charges.
11.9. Developers can transfer their registered capacity or part
thereof, to other Companies with the prior approval of
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7554
RREC on payment of an amount equal to 60% of the
Registration Charges.
12. Approval Mechanism (See flow chart in Annexure-D1)
12.1. State Level Empowered Committee (SLEC):
i) Chief Secretary, GoR (Chairman).
ii) ACS/Principal Secretary/Secretary, Industries, GoR.
iii) ACS/Principal Secretary/Secretary, Energy, GoR.
iv) ACS/Principal Secretary/ Secretary, Revenue, GoR.
v) ACS/Principal Secretary/Secretary, Water Resources Department,
GoR.
vi) CMD, Rajasthan RajyaVidyutPrasaran Nigam Ltd.
vii) Chairman Discoms.
viii) Chairman, Rajasthan Renewable Energy Corporation Ltd.
ix) MD, Rajasthan Renewable Energy Corporation Ltd., (Member-
Secretary).
12.2. In-principle
clearance
of
Green
Hydrogen
Generation
Projects:
In-Principle Clearance of Green Hydrogen Generation Plant along
with Renewable Power Projects
In Principle Clearance of Projects will be granted by the State Level
Empowered
Committee
after
evaluating/examining
the
project
proposals on the following criteria:
Detailed Project Report of Hydrogen Plant and RE Plant.
Financial Capability of the Power Producer (Annexure-D5).
Availability of Land for RE Plants & Hydrogen Plant.
Availability of Water for Green Hydrogen Generation Plant.
Availability of Power Evacuation System for proposed RE project.
Documentary Evidence of Power Purchase Agreement or an
undertaking in case of purchase of RE powerfrom3rd Party.
12.3. The Developer shall obtain requisite clearance/ approvals
from
Industries
Department,
Water
Resources
Department and other Departments/Agencies required
for setting up of Hydrogen Generation Plant as per their
relevant Rules/Regulations/Policies.
12.4. The Developer shall ensure compliance of Safety and
Operational
Norms/Standards
as
prescribed
by
competitive authority of State Government/Central
Government.
12.5. Timeline for In-principle Clearance:
Developers to whom Government Land is allotted will have to apply for
In-Principle Clearance of the project within 3months from the date of
signing of the lease Deed of the allotted Government Land. If
Developers fail to apply for In-Principle Clearance within the time
7555 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
prescribed, RREC will recommend for cancellation of allotment of
Government Land with the approval of SLEC.
13. Security Deposits (see Annexure-D2):
13.1. For projects under Clause 12.2:
After In-principle Clearance of the Projects under clause 12.2by the
State Level Empowered Committee (SLEC), the Developer will be
required to deposit a Security Amount specified at Annexure-D2.
Provided that in case the Green Hydrogen Developer purchases RE
power from 3rd Party, no security will be required to be submitted. In
case developer has deposited Security amount for allotment of
Government Land, no security will be required to be deposited
In case, the Developer fails to deposit the security money within the
stipulated time as above, the In-principle clearance shall be deemed to
be cancelled without any notice.
13.2. The Developer, who has submitted the Project Security
within the prescribed time period, shall be required to
apply for Final Approval within 6 months from the date
of issue of In-Principle Clearance, failing which, in-
principle clearance shall be deemed to be cancelled
without any notice.
13.3. In case the Developer wants to withdraw his project
within 6 months of depositing the security deposit, or
In-Principle Clearance has been cancelled under deemed
provision of Clause 13.2, then 25% Security amount will
be forfeited and balance 75% amount of the Security will
be refunded to the Developer/Power Producer on his
written request. This clause will be applicable only for
new projects registered under this policy.
13.4. The Security Amount deposited by the Developer shall
be non-convertible and non-transferable.
13.5. The Security Deposit shall be refunded to the Developer
in proportion to the capacity commissioned after
commissioning of such capacity. The remaining amount
shall be forfeited after the expiry of the scheduled
commissioning period including extension as per Clause
15.
14. Final Approval:
All In-Principle Cleared Projects will be conveyed final approval by
RREC on submission of Security Deposit under clause 13.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7556
15. Time frame for completion of Green Hydrogen Generation
Project:
15.1. The time schedule for completion of projects under
Clause 13.2will be as per Table-5 subject to Force
Majeure conditions provided that extension in time
schedule maybe granted by the RRECon case to case
basis after depositing penalty amount as mentioned in
Annexure-D3.
15.2. SLEC may consider extension beyond 15 months where
there is a reasonable certainty of commissioning of the
project. In such cases, extended completion schedule
and penalties shall be decided by SLEC on a case-to-case
basis.
16. Power Purchase Agreement (PPA)
16.1. Developer as defined in Clause 4.1 of this section of the
Policy, will execute Power Purchase Agreement with RE
Developer/ Power Producer in case of purchase of RE
power at mutually agreed terms and conditions.
16.2. The Green Hydrogen Generator may execute PPA with
Discoms for sale of firm power to Discoms, in case
hydrogen is being used to generate power and to supply
firm power, as per the requirement of Discoms. The
Discoms will select the Green Hydrogen Generator
through a transparent mechanism including competitive
bidding process.
17. Wheeling and Banking Agreement (WBA)
Green Hydrogen Developer/Power Producer shall execute a Wheeling
and Banking Agreement (WBA) with DISCOM(s). In case, the
transmission system of RVPN is also used then power producer will
execute a separate Transmission Agreement with RVPN.
18. Assignment of PPA/WBA:
18.1. PPA/WBA will be allowed to be assigned in parts or in full to
other parties under the following conditions:
i. After completion of the project and its connectivity to the grid;
ii. Consent of RREC & RVPN/Discom(s) and related parties;
iii. On payment of Rs. 2.00 lac per application to RREC (GST will be
payable as applicable).
18.2. In
case
the
project
is
financed
by
any
Financial
Institute/Lender, name of the Financial Institute/Lender
7557 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
may be included in PPA/WBA on request of Developer/
Power Producer.
19. Renewable Energy Development and Facilitation Charges (REDFC):
In case the Developer purchases Solar/Hybrid Power for generation of
Green Hydrogen from parties other than Discoms, then Solar/Hybrid
Power Generator shall contribute Renewable Energy Development
and Facilitation Charges (REDFC) for Solar Components as per the
provision of this policy as amended from time to time or such charges
as per RE Policies prevailing at the relevant time.
20. Land:
20.1. Allotment of Government Land to Green Hydrogen Generation
Plant:
20.1.1. Government Land will be allotted for setting up of Green Hydrogen
Generation Plant in RIICO Industrial area or Revenue land as per
Land
allotment
rules
of
RIICO
and
Revenue
Department
respectively.
20.1.2. Land will be allotted by RIICO or Revenue Department to the
developers on priority within 6 months from the date of
recommendation by SLEC.
20.2. Allotment of Government Land to Renewable Energy Plant:
20.2.1. Government Land will be allotted to Developers for setting up of
Renewable Energy Plant as per the provisions of Rajasthan Land
Revenue (Allotment of land for setting up of Power Plant based on
Renewable Energy Sources) Rules, 2007, as amended from time to
time.
20.2.2. RREC will recommend, on a case to case basis, to the concerned
District Collector for allotment of Government land only on
submission of cash security deposit by demand draft/RTGS in
favour of RREC, Jaipur.
20.2.3. TheSecurity Deposit will be refunded to the developer in proportion to
the commissioned capacity of the project on written request of the
applicant. The Security Deposit shall be forfeited in case the allotted
land is not put to use within the specified period as per allotment
rules. If land is not allotted, security deposit will be refunded, on
the written request of the applicant.
20.2.4. For setting up Renewable Power Plant based on a different technology,
maximum land area which can be allotted to the Power
Developer/Producer shall be as per Annexure-D3
20.2.5. For RE Power Projects with storage systems, additional land will be
allotted as per the rules prescribed by the Revenue Department,
Government of Rajasthan (GoR).
20.3. Project on Private Land:
The State shall promote setting up of Green Hydrogen Plant and/ or
Power Project / RE Farm/Green Hydrogen Valley on private land.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7558
Developers shall be permitted to set up Project/Plant on private
agriculture land without the requirement of land conversion in
accordance with the provisions of Rajasthan Tenancy Act 1955 and
Rajasthan Land Revenue Act 1956 and the rules made thereunder.
Developers shall also be allowed to acquire/hold private land from the
title holders (Khatedar) for setting up of Solar Power Plant in excess of
ceiling limit in accordance with the provisions of Ceiling Act, 1973.
21. Power Evacuation, Grid Interfacing, Forecasting & Scheduling and
dispatch of RE Power:
Power
Evacuation,
Grid
Interfacing,
Forecasting
and
Scheduling
&Dispatch of RE Power for Green Hydrogen Projects will be governed as
per the provisions of this policy (Section-E)and relevant Regulations of
RERC.
22. Power to remove difficulties:
SLEC is authorized to issue necessary clarifications and amendments
under this section of Policy as and when required. If any doubt, dispute,
difference or issue arises with regard to interpretation/implementation of
this Policy, State Level Empowered Committee may take decision in such
matters, not inconsistent with the provisions of the Policy, as may appear
to be necessary and expedient for removing the difficulties either on its
own motion or on the written representation from the stakeholders. In
order to implement this Policy and to remove difficulties being faced by
Stakeholder, the Energy Department in consultation with other
Departments shall issue necessary guideline/schemes from time to time
Section E: General provisions
1
Evacuation and Grid Interfacing:
1.1
Evacuation and Grid Interfacing through Inter State Transmission
System:
Inter State Transmission System is being developed in the State for
evacuation of RE power to other States.
1.2
Evacuation and Grid Interfacing through Intra State Transmission
System:
1.3
Development of Power Evacuation System in RE Potential Areas:
RVPN will prepare an action plan for development of Power Evacuation
Network taking into consideration-
(i) Existing and forthcoming evacuation system of ISTS
(ii) Existing State Transmission Utility Network
(iii) RE potential of the area
(iv) Future energy demand and RE integration with conventional
power.
1.4
Evacuation of RE power generated shall be made through the
transmission and distribution network being maintained by RVPN and
DISCOMs respectively.
7559 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
1.5
Grid Interfacing:
The grid interfacing arrangements for power Renewable Energy
Sources will be made by Developer/RVPN/DISCOM as under:
i. Pooling Sub-station-
Interfacing arrangements such as transformers, panels, kiosks,
protection, metering, HT lines from the points of generation to the
Pooling Sub-station including the Pooling Sub-station shall be
developed and maintained by the Developer/Power Producer as per
the Grid Code applicable from time to time and will also bear its
entire cost.
ii. Receiving Sub-station-
RVPN/Concerned DISCOM shall finalize the location of Receiving
Station on which the electricity generated will be received at
minimum 33 kV level in consultation with RREC.
1.6
Grid Connectivity
For creation of proper facility for receiving power at the receiving sub-
station of RVPN/DISCOM on request of Developer/ Power Producer,
the Developer/Power Producer shall pay grid connectivity charges, as
finalized by RERC from time to time to RVPN/DISCOM for which
minimum capacity to be considered for various voltage level be as
under:
Sr.
No.
Voltage level
Capacity
1
11 kV
3 MW
2
33kV
15MW
3
132kV
50MW
4
220kV
132MW
5
400kV
515MW
These charges will be paid by the Developer/Power Producer to
RVPN/DISCOM. The charges will include cost of complete line bay
(including civil works) and its interconnections with existing electrical
system.
Note: The Power Producer at 11 kV voltage will have the option to
deposit aforesaid charges to Discom or create bay infrastructure by
themselves.
1.7
Transmission and Distribution Network
i. For augmentation of transmission/distribution systems to evacuate
the power from receiving Sub-station, RVPN/DISCOM shall
develop/augment
the
necessary
transmission/
distribution
network within mutually agreed timeframe.
ii. For grid connectivity/construction of line to be arranged by
RVPN/DISCOM on request of Developer/ Power Producer, the
Developer/Power Producer shall submit a time frame for
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7560
construction of their plant along with bank guarantee equivalent
to the cost of bay and dedicated transmission/distribution line
along with an undertaking to use the system within prescribed
time period. RVPN/DISCOM(s) will provide the Power Evacuation
facilities within the scheduled time frame. The bank guarantee
shall be returned to the Developer/Power Producer after
commissioning of the project upon depositing amount of penalty, if
any, on account of delay in the utilization of the system.
iii. In case line bay and grid connectivity has been built by RVPN at a
particular system voltage (say 33kV), and Power Producer at a
later date wants to supply the power on higher voltage (say
132kV), the requisite modification, like addition of line bay on
higher voltage, interconnection with main bus etc. shall be done by
RVPN as a deposit work on behalf of the Power Producer subject to
its feasibility.
iv. In case a Power Producer initially connects its feeder to DISCOM’s
substation and later on desires to connect the feeder to RVPN’s
Sub-station, the additional line shall be constructed by Power
Producer and the addition of line bay in RVPN substation shall be
done by RVPN as deposit work on behalf of Power Producer.
v. RVPN/DISCOM shall provide the inter-connection facility one
month before the scheduled COD as intimated by the Developer
subject to condition that the grid connectivity charges are
deposited by the Developer/Power Producer, and sufficient time is
available with RVPN/DISCOM for creating the interconnection
facility.
vi. The Developer/Power Producer shall install necessary current
limiting devices such as Thyristor in the generating equipment.
Capacitors of sufficient rating shall be provided to ensure the
maintenance of average power factor as per the requirement of
State Load Dispatch Centre, measured at metering point.
vii. In case the Developer/Power Producer injects amount of power
which is more than the approved/contracted power into the Grid,
then excess power will not be adjusted/accounted for by
DISCOM/RVPN. Such power plant will be liable to be disconnected
till such time the excess installed capacity is removed/de-
commissioned.
viii. Transmission line from Pooling Sub-station to Receiving Sub-
station:
The evacuation system beyond Pooling Sub-station till the nearest
Receiving Sub-Station shall be developed as under:
7561 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
a. Grid Connected Power Plants commissioned under Tariff
Based Bidding for sale of power to DISCOMs of Rajasthan
The power evacuation transmission line from generating plant
substation/pooling
sub-station
to
the
receiving
RVPN/
DISCOMs sub-station will be laid as per terms & conditions of
bid document and Power Purchase Agreement.
b. Grid connected Power Plants commissioned underclause
9.3,9.4,11,12.2,12.3.2, 13.1(b)& 14of Section-A or Section
B, C & D.
The power evacuation transmission line from the generating
plant sub-station/pooling sub-station to RVPN/DISCOMs
receiving sub-station will be laid as per regulations of RERC.
ix. The DISCOMs of Rajasthan will develop power systems as per the
requirement
of
Rooftop
Solar
Systems
in
line
with
the
guidelines/orders issued by RERC.
1.8
The Developer/Power Producer shall comply with the Grid Code
including Load Dispatch and System Operation Code, Metering Code,
Safety Code, relevant regulations/orders of the Commission etc. as
applicable from time to time in the State of Rajasthan.
1.9
The Developer/Power Producer who is seeking power evacuation
approval on STU/CTU networks will have to submit land
documents/details as per the procedure prescribed by CTU/STU
for granting connectivity.
1.10 Reactive Power Charges:
The drawl of reactive power shall be charged by RVPN/DISCOMs as
per the RERC Regulations, as amended from time to time.
1.11 Common Pooling Sub-Station:
Power Producers may build Common Pooling Sub-Station to evacuate
the generated solar/wind/hybrid power to RVPN/DISCOM substation
through common transmission line with separate metering system at
the Common Pooling Sub-Station, and main metering system at
RVPN/DISCOM Sub-Station.
1.12 Timeline for utilization of Power Evacuation facilities
i. For
providing
evacuation
facilities
to
the
Developers/Power
Producers, RVPN/DISCOMs will update the availability of
transformation capacity and bay availability on its website and the
approval will be disposed within one month by RVPN/DISCOMs.
ii. In case of non-approval of power evacuation by RVPN/DISCOM(s)
within specified time frame, the case will be put up before SSC for
suitable decision, on the request of the Developer/Power Producer.
iii. The Power Evacuation facilities granted by DISCOMs/RVPN as per
the grid connectivity procedure/guidelines of DISCOMs/RVPN, will
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7562
be utilized by Developers/ Power Producers within 3 years from
the date of approval, otherwise power evacuation approval may be
allocated to other Developer/Power Producers on priority basis.
iv. In that case, the developer/power producers need to apply for
revalidation of the power evacuation approval which shall be
evaluated and approved by RVPN/DISCOMs as per available
evacuation capacity.
2
Measures for Grid Stability:
2.1
RVPN/DISCOMs shall take appropriate technical measures for
ensuring grid stability and safety.
2.2
RVPN will develop a plan for storage system requirement for Rajasthan
State to mitigate unpredictability and variability of renewable energy.
(i) RVPN will study impact of un-predictability and variability of RE
power on the grid and requirement of storage system at grid end to
reduce the same.
(ii) A plan for examining financial and technical viability for development
of storage system at the Grid Sub-Station level will also be prepared
by RVPN.
3
Forecasting& Scheduling:
i. All Power Projects shall forecast and schedule their generation as per
Central Electricity Regulatory Commission (Indian Electricity Grid
Code) Regulations, 2010, RERC (Intra-state ABT) Regulations, 2006,
RERC (Rajasthan Electricity Grid Code) Regulations, 2008 and RERC
(Forecasting, Scheduling, Deviation Settlement and Related Matters of
Solar and Wind Generation Sources) Regulations, 2017 as amended
from time to time.
ii. SLDC will ensure MUST RUN Status of RE Plants in the State and
maintain the data of RE Power Curtailment in transparent manner.
iii. SLDC will develop infrastructure for Forecasting Scheduling with
financial support from Rajasthan Renewable Energy Development
Fund for access of real time generation data.
iv. A Committee consisting of following members under the Chairmanship
of Chairman & Managing Director, RVPN shall be constituted for
monitoring of Solar & Wind generation, forecasting & scheduling and
curtailment issues:
7. Director (Operation), RVPN.
8. Director (Technical), RVPN.
9. Director (Technical), RREC.
10. Chief Engineer, RUVITL
11. Chief Engineer (LD), RVPN – Convener.
7563 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
12. Two members appointed by the State Government from the
persons of eminence in power sector and representatives of
Solar & Wind Power Industry.
The Energy Department will be the Administrative Department of this
Committee.
v. For the stability of Grid, the State will initiate steps to achieve accurate
forecasting & scheduling of RE Power Projects with the technical
support from MNRE/NIWE. RVPN/SLDC will collaborate with NIWE
for such technical support.
4
Commissioning of the Projects
The Projects under bidding mode will be commissioned as per the
procedure prescribed under Bid Documents/PPA, if specified. Otherwise
such projects and Projects covered under non bid category (Captive/3rd
Party sale/any other mode) will be commissioned as per policy
provision.Discoms/RUVITL will ensurecommissioning of the project in a
single
stage
for
all
activities
such
as
connectivity
with
grid,
synchronization and Commissioningetc on receipt of request from RREC
for commissioning.
5
Savings
The Power Plants already approved and/or commissioned before
commencement of this Policy will continue to be governed by the
Policy/Regulations prevailing at the relevant time.
6
Regulation
The provisions under this section of this policy shall be the guiding
principles for Rajasthan Electricity Regulatory Commission.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7564
Annexure-D1
Flow Chart of Green Hydrogen Project establishment
Clearance/Approval from
Industries Department/Other
Agencies
Installation of Hydrogen Plant and RE Plant
Execution of Wheeling Banking Agreement, Transmission
Agreement, if any
Refund of SD
Project Commissioning
Registration of Green Hydrogen Project in RREC
Hydrogen Plant
RE Project
Land Allotment for
Hydrogen Plant by
RIICO/Revenue Deptt.
Land Allotment for RE Plant
by Revenue Deptt.
Power Evacuation Approval
from RVPN/Discoms/CTU
In-principle Clearance by SLEC
Security Deposit
Final Approval
7565 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
Annexure-D2
Various Charges
Table-1
1. Green Hydrogen Registration Charges:
1
Project
Registration
S.No. Project Capacity
Rate
1
For Project ≤100 MW
capacity
Rs 30,000/-
per MW
2
For Projects
>100MWand≤500MW
capacity
30 Lac +Rs
2.5 lac per
100
MW
beyond
100
MW or part
thereof
3
For Projects
> 500 MW and
≤1000MW capacity
40 Lac +Rs.2
lac per 100
MW
beyond
500 MW or
part thereof
4
For Projects
>1000 MW capacity
50 Lac+Rs.1
lac per 100
MW
beyond
1000 MW or
part
thereof
subject
to
maximum
Rs.
80Lakh
per project
2.
Park
Registration
Rs. 10,000 per MW RE capacity plus GST
subject to Maximum Rs. 10 Lac per park
2. Security Deposit –
If Green Hydrogen Developer sets up own RE plant for Green
Hydrogen Generation
Security Deposit:
Table-2
Project
Capacity
< 2000 MW
≥ 2000 MW,
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7566
Solar
Rs. 1 Lac/MW by demand
draft/RTGS in favour of
RREC.
Rs. 1 Lac/MW up to 2000 MW
by
DD/RTGS
and
for
exceeding
capacity,
Rs.
1
Lac/MW in form of Bank
Guarantee.
Hybrid
Rs. 1 Lac/MW by demand
draft/RTGS in favour of
RREC.
Rs. 1 Lac/MW up to 2000 MW
by
DD/RTGS
and
for
exceeding
capacity,
Rs.
1
Lac/MW in form of Bank
Guarantee.
Wind
Rs. 1 Lac/MW by demand
draft/RTGS in favour of
RREC.
Rs. 1 Lac/MW up to 2000 MW
by
DD/RTGS
and
for
exceeding
capacity,
Rs.
1
Lac/MW in form of Bank
Guarantee.
i. In case, Green Hydrogen Developer procures RE Power from 3rd
Party-
Security Deposit-NIL
Table-3
3. Extension fees:
In case of delay in scheduled commissioning period:
a)
For delay upto 1 month
Rs 25,000 per MW RE Capacity
plus GST
b)
For delay upto 3 months
Rs 50,000 per MW RE Capacity
plus GST
c)
For delay upto 6 months
Rs
1,00,000
per
MW
RE
Capacity plus GST
d)
For delay upto 9 months
Rs
1,50,000
per
MW
RE
Capacity plus GST
e)
For delay upto 15 months
Rs 2,00,000 per MW plus GST
Annexure-D3
Land requirement and Extension in Timelines
Table-4
1- Maximum Land area allottable to the RE Projects
S.
No
.
Technology
Maximum land area
for Solar Plant
Maximum
land area for
Hybrid Plant
i SPV on Crystalline Technology.
2.0Hect./MW
2.5 Hect./MW
ii SPV on Crystalline Technology
with tracker.
2.5Hect./MW
2.5Hect./MW
7567 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
iii SPV on Thin Film/Amorphous
Technology with or without
tracker.
2.25Hect./MW
3.0Hect./MW
iv Solar Thermal (CSP)- Parabolic
Trough / Tower/Other
Technology with and without
storage
a) Up to PLF of 21%:
3.0 Hect./MW
b) For every 1%
increase in PLF, 0.15
Hect./MW additional
land will be allotted.
-
v Maximum land area for Wind
Plant
2.5 Hect/MW
Table-5
2- Project Completion Time schedule from approval/Clearance
Type of RE Projects/ Hydrogen Completion Time schedule
Up to 25MW RE capacity
and/or
1 kTPA Hydrogen Plant
Within 15 months from the date of
final approval
More than 25MW and up to 100
MW RE capacity
and/or
>1 kTPAto4 KTPA Hydrogen Plant
Within 18 months from the date of
final approval
More than 100 MW and up to 200
MW RE capacity
and/or
>4 KTPA to 8 kTPA Hydrogen Plant
Within 24 months from the date of
final approval
More than 200 MW RE capacity
and/or
>4 KTPA to 8 kTPA Hydrogen Plant
Within 36 months from the date of
final approval
Annexure-D4
Net Worth Criteria
The Developer/Power Producer desirous of setting up of Green Hydrogen
Project along with RE Power Plant in State of Rajasthan must fulfil the
following minimum financial criteria.
A - Qualification Criteria for RE Projects:
Net Worth
The “Net Worth” of the company should be equal to or greater than the value
calculated at the rate of Rs 1 Crore or equivalent US$ per MW of the project
capacity subject to maximum ceiling of net worth of Rs. 10,000 Cr for the
project. The computation of Net Worth shall be based on unconsolidated
audited/unaudited accounts of the company. For the purpose of the
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7568
computation of net worth, the best year in the last four years including
current running year shall be considered. The Company would thus be
required, to submit annual audited accounts for the last three financial years
and for part of the current running year (Un-Audited), while indicating the
year, which should be considered for evaluation, along with a certificate from
a Chartered Accountant to demonstrate the fulfilment of the criteria.
For companies, which are newly incorporated, the Net Worth criteria should
be met seven days prior to the date of submission of application by the Project
Developer. To demonstrate fulfilment of the criteria, the Project Developer
shall submit a certificate from a Chartered Accountant certifying the Net
Worth on the date seven days prior to submission of application. Further, the
Project Developer shall submit the un-audited financial statements of the
company for the date on which the Certificate of Chartered Accountant has
been obtained.
Note: For the Qualification Requirements, if data is provided by the Project
Developer in foreign currency, equivalent rupees of Net Worth will be
calculated using bills selling exchange rates (card rate) USD/INR of State
Bank of India prevailing on the date of closing of the accounts for the
respective financial year as certified by the Project Developer's banker.
For currency other than USD, Project Developers shall convert such currency
into USD as per the exchange rates certified by their banker prevailing on the
relevant date and used for such conversion.}
Net Worth calculation for an individual/partnership firm
Net-Worth = Proprietors/Partner’s Capital reflecting in the Audited Balance
Sheet
Add: Free Reserves (Including the Credit balance of Reserve and
Surplus appearing in the Balance Sheet)
Subtract: Intangible Assets
Subtract: Miscellaneous Expenditures to the extent not written off and
carry forward losses.
Net Worth calculation for a Company
Net-Worth = Paid up Share capital which includes
1. Paid up Equity share capital and
2. Fully, compulsorily and mandatorily convertible Preference Shares
and
3. Fully, compulsorily and mandatorily convertible Debentures)
Add: Free Reserves
(Including share premium provided it is realized in Cash or Cash
equivalents.)
Subtract: Revaluation Reserves
Subtract: Intangible Assets
Subtract:
Miscellaneous Expenditures to the extent not written off
and carry forward losses.
For the purposes of meeting financial requirements only unconsolidated
7569 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
audited annual accounts shall be used. However, audited consolidated
annual accounts of the Project Developer may be used for the purpose of
financial requirements provided the Project Developer has at least twenty six
present (26%) equity in each company whose accounts are merged in the
audited consolidated account and provided further that the financial
capability of such companies (of which accounts are being merged in the
consolidated accounts) shall not be considered beyond the equity
participation of Project Developer.
In case of a Consortium the financial requirement to be met by each Member
of the Consortium shall be computed in proportion to the equity commitment
made by each of them in the Project Company. Any consortium, if selected
shall incorporate a Project Company with equity participation by the Members
in line with consortium agreement before signing the PPA/WBA/Wheeling
Agreement. The Project Developer may seek qualification on the basis of
financial capability of its Parent Company.
In case of land/any other asset, only the book value will be considered. The
value of land/any other assets will not be re-valued for calculating net worth.
Any reserve created due to this shall not be counted for calculating Net worth.
***********
Annexure-D5
Other Benefits under RIPS, 2024
Clause 3.3.2.3.4 Additional benefits for Power Intensive Sectors
Sunrise Enterprises operating in Power Intensive Sectors under Annexure-
9.6 (which includes Solar Cell Manufacturing & New Battery Tech) shall be
eligible for additional benefits.
Additional reimbursement for Power Intensive Sectors
The Enterprises shall be eligible to avail additional 5% reimbursements on
State tax due and deposited for a period of years.
OR
The Enterprises shall be eligible to avail 5%- point VAT reimbursement on
PNG for a period of 7 years.
Inclusion of investment in Captive Power Plants/Group Captive Power
Plants in EFCI
Enterprises investing in captive renewable power plants will be eligible to
include 51% of the said investment in their EFCI. Asset Creation Incentives
basis their respective slabs will be applicable on the EFCI
Enterprises entering into group captive arrangements (12+ years) shall be
eligible to include 100% of their said investment in their EFCI. Asset
Creation Incentive basis their respective slabs shall be applicable on the
EFCI
Annexure-9 (Clause 9.1.2)
Pumped Hydro Storage manufacturing and ElectrolyserManufacturing
included in Manufacturing Sectors eligible to be considered for the Sectoral
Anchor benefit
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7570
Annexure-9.4 :List of manufacturing Thrust Sectors
This
includes
Renewable
Manufacturing,
Pumped
Hydro
Storage
manufacturing &Electrolyser Manufacturing.
Clause 3.1.3.2.2
Eligible Manufacturing Enterprises which operated in Thrust Sector
(annexure 9.4) shall be eligible for a Thrust Booster of 10% over the Asset
Creation Incentives amount.
Ceiling mentioned in Section 3.1.3.1 with respect to specific Asset Creation
Incentivesare inclusive of additional benefits received from thrust booster.
Clause 3.1.3.2.4Interest subvention
5% interest subvention shall be allowed on term loan taken by
Manufacturing Enterprises from financial institutionsor State financial
institutions or Banks recognised Banks recognized by Reserve Bank of
India, for making an investment in plant & machinery or equipment/plant
related apparatus (constituted a part of the EFCI) for a period of 5 years
subject to maximum of 2.5% of the EFCI distributed equally over 5 years.
Annexure-D6
Definitions
1. ABT means Availability Based Tariff;
2. ACC means Advanced Chemistry Cell Battery Storage as are the new
generation advance energy storage technologies that can store electric
energy either as electrochemical or as chemical energy and convert it
back to electric energy as and when required.
3. Act means Electricity Act 2003, including amendments thereto.
4. BESS means Battery Energy Storage Systems shall mean the
system(s)/projects
utilizing
methods
and
technologies
such
as
electrochemical batteries (Lead Acid, Li-ion, solid state batteries, flow
batteries, etc.), providing a facility that can store chemical energy and
deliver the stored energy in the form of electricity, including but not
limited to ancillary facilities (grid support., for example). Such systems
may be co-located with RE Generating Stations, or may be operated on
standalone basis (as defined under the Guidelines for Procurement and
Utilization of Battery Energy Storage Systems as part of Generation,
Transmission and Distribution assets, along with Ancillary Services)
5. Biomass Power Plant means the power plant which generates
electricity from biomass sources.
6. Biomass Co-Firing - stands for adding biomass as a partial substitute fuel
in high- efficiency coal/lignite-based boilers.
7. Biomass means forestry based & agro-based industrial residues, energy
plantations, forestry and agro-residues.
8. Biomass Power Producer/ Co-Firing Power Producers / Waste to Energy
Power Producers means an entity which owns facilities to generate
electric power for sale to Discoms / Licensees and to third party/captive
use by these sources.
7571 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
9. “Bio-Ethanol” means a type of alcohol that is produced by fermenting
biological matter, such as crops or waste products, to create a fuel
alternative to petrol
10. “Bio-coal” a solid fuel that is produced from biomass through a process
called pyrolysis or Torre faction.
11. “Bio-Gas” is a renewable energy source that is produced when organic
matter is broken down by microorganisms in the absence of oxygen.
12. Briquettes - Biomass briquettes are a biofuel substitute made of bio
degradable green waste with lower emissions of greenhouses gases and
carbon dioxide then traditional fuel sources.
13. “Compressed Biogas (CBG)/Bio-CNG” is a renewable fuel made from
purified biogas that has a high methane contentproduced from
biomass/bio-waste including energy plantation or as defined by MNRE,
GoI
14. CAPEX Mode means the mode under which entire investment is to be
incurred by the power consumer for installation of solar power plant.
15. CEA means Central Electricity Authority.
16. Ceiling Act, 1973 means The Rajasthan Imposition of Ceiling on
Agricultural Holdings Ordinance, 1973.
17. “Ceiling Act, 1973” means the Rajasthan Imposition of Ceiling on
Agricultural Holdings Act, 1973;
18. Central Agency means National Load Dispatch Centre (NLDC) as
designated by the Central Electricity Regulatory Commission vide Order
dated 29.01.2010 for the purposes of the REC Regulations;
19. “CERC”
means
the
Central
Electricity
Regulatory
Commission,
constituted under sub-section (1) of Section 76 of the Electricity Act,
2003;
20. CERC
REC
Regulations
means
Central
Electricity
Regulatory
Commission (Terms & Condition for recognition and issuance of
Renewable Energy Certificate for Renewable Energy Generation)
Regulations, 2010 notified by CERC vide Notification dated 14.01.2010
as amended from time to time;
21. COD means Commercial Operation Date i.e., the date when the Power
Plant gets commissioned as per rules/provisions;
22. Collector means Collector of a district as defined in the Rajasthan Land
Revenue Act and includes every officer authorized to discharge the
duties of Collector under the Act/Rules/Executive Orders of the
Government of Rajasthan;
23. Commission / RERC means the Rajasthan Electricity Regulatory
Commission.
24. Contract Demand means regular contract demand plus standby contract
demand, if any, of the Consumer with Discom.
25. CPP or Captive Power Plant means Captive Power Plant as defined in
Electricity Act, 2003 and Electricity Rules, 2005;
26. CPSU means Central Public Sector Undertaking.
27. CSP means Concentrated Solar Power;
28. CTE means Consent to Establish.
29. CTO means Consent to Operate.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7572
30. Discom means a distribution licensee, such as Discom Jaipur, Discom
Jodhpur and Discom Ajmer.
31. Developer means a person who set up RE Plant, developer infrastructure
and generate electricity from Renewable energy as per this policy;
32. DISCOM of Rajasthan means a distribution licensee of the State, such as
Jaipur Discom, Jodhpur Discom and Ajmer Discom.
33. District Level Committee or DLC means the Committee constituted by
the State Government for a District from time to time under Clause (b) of
sub-rule(I) of rule 2 of the Rajasthan Stamps Rules, 2004.
34. DPR means Detailed Project Report.
35. Energy Plantation means the cultivation of specific plant species, often
fast- growing and high-yield, with the primary purpose of harvesting
them for the production of energy excluding invasive species such as
Lantana, Parthenium, Prosopis-Juliflora, etc.
36. Energy Storage Systems or ESS shall mean the system(s) installed in
addition to the solar PV and/or wind power capacity as part of the
project, that can capture energy produced at one time for use at a later
time or any system storage energy as defined by MNRE, GoI;
37. ESO means Energy Storage Obligation
38. "Financial year" means a period commencing on 1stApril of a calendar
year and ending on 31st March of the subsequent calendar year;
39. Force Majeure means any event or circumstance which is beyond the
reasonable direct or indirect control and without the fault or negligence
of the Power Producer or Developer and which results inPower
Producer’s/Developer’s inability, notwithstanding its reasonable best
efforts, to perform its obligations in whole or in part and may include
rebellion, mutiny, civil unrest, riot, strike, fire, explosion, flood, cyclone,
lightning, earthquake, act of foreign enemy, war or other forces, theft,
burglary, ionizing radiation or contamination, Government action,
inaction or restrictions, accidents or an act of God or other similar
causes;
40. Form means a form appended to this Policy.
41. Generating Plant Sub Station means sub-station developed by the Power
Producer for interface with the receiving station.
42. Government or State means Government of Rajasthan or the State of
Rajasthan respectively
43. Government Land means Revenue land which can be allotted/allowed to
usefor
setting
up
of
Renewable
Energy
Projects
(Solar/Wind/Hybrid/Biomass/CBG/Green Hydrogen including land
usable for energy plantation etc.)or for RE Parks as per applicable
revenue rules of the Government.
44. Gram Panchayat means Panchayat established under the Rajasthan
Panchayat Raj Act, 1994 (Rajasthan Act No. 13 of 1994).
45. Green Hydrogen means hydrogen generated using renewable energy
sources as defined by MNRE, GoI.
46. Green Hydrogen Developer/Producer means person who develops
Green Hydrogen Generation Plant through RE Power.
47. Green Hydrogen Generation Plant means the plants generating
Hydrogen through electrolysis of water/brine water/waste treatable
7573 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
water or from biomass through thermo-chemical and biochemical routes
or through any suitable technology as defined by GoI by using renewable
including banking of renewable energy.
48. Green Hydrogen Park developer means an entity which is involved in
the development of Green Hydrogen Parks/Valley/Hub and related
infrastructure.
49. Green Hydrogen Project/Plant means the plants generating Green
Hydrogen as a main product by electrolysis of water using Renewable
Energy Sources or as a by-product through any chemical process using
Renewable Energy or as defined by Ministry of New & Renewable Energy,
GoI;"
50. Grid
Code
means
Rajasthan
Electricity
Regulatory
Commission
(Rajasthan Electricity Grid Code) Regulations, 2008 / Central Electricity
Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010
as amended from time to time;
51. Gross Metering means methodology under which the entire electricity
generated by the Rooftop/ Ground mounted Solar PV System/Any other
RE Plant set up in the premises of the consumer is delivered to the
distribution system of the Licensee;
52. GST means Goods and Services Tax;
53. “HLSC” means High Level Screening Committee.
54. HAM means Hybrid Annuity Model
55. Hydro Power Projects means Large Hydro Power Projects (LHP) having
capacity more than 25 MW and all Small Hydro Projects (SHPs),
commissioned after 8th March, 2019 or as defined by MNRE/MoP, GoI.
56. “Hybrid Project” means a power project which generates power by
combining conventional and non-conventional energy sources or
combining of two or more non-conventional (wind & Solar) energy
sources and feeding the generated power into electricity grid through a
common pooling station. The Project capacity will be the maximum AC
capacity that would be injected into Grid. However, in case of source
wise power injected into grid from different location, the project capacity
will be considered sum of all power source capacity injected from
different location.
57. Interconnection Line means Transmission/Distribution Line connecting
Generating Plant Sub-station/Pooling Sub-station of Developer /Power
Producer to Receiving Sub-station of ISTS/RVPN/Discoms of Rajasthan.
58. Inter-connection Point shall mean a point at Extra High Voltage (EHV)
substation of Transmission Licensee or High Voltage (HV) substation of
distribution licensee, as the case may be, where the electricity produced
from the RE generating station is injected into the Grid;
59. IREDA means Indian Renewable Energy Development Agency;
60. ISTS means Inter State Transmission System;
61. JFM Committee means Joint Forest Management committee.
62. Licensee includes a person deemed to be a licensee under Section 14 of
the Electricity Act,2003;
63. MNRE means Ministry of New and Renewable Energy, Government of
India;
64. MoPMeans Ministry of Power, Government of India.
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7574
65. MSW Municipal Solid Waste
66. National Solar Mission or Solar Mission means Jawaharlal Nehru
National Solar Mission 2009 launched by Government of India;
67. Net Metering means the methodology under which electricity generated
by the Rooftop/ Ground mounted Solar PV System/any other RE Plant
set up in the premises of a consumer under the CAPEX/ RESCO mode is
primarily for self-consumption, and the surplus generated electricity, if
any, is delivered to the distribution licensee which will be off-set against
the electricity supplied by the distribution licensee to the consumer
during the billing cycle;
68. Nodal Agency means Rajasthan Renewable Energy Corporation Limited
(RREC);
69. NVVN means NTPC VidyutVyapar Nigam, a wholly owned subsidiary
company of NTPC;
70. Pellets - Pellet fuels (or pellets) are a type of solid fuel made from
compressed organic material.
71. Personmeans an individual or a firm (Proprietorship Firm /Partnership
Firm/LLP) or company registered under the CompaniesAct1956 or 2013;
72. Policy - 1999 means Policy for Promoting Generation of Power through
Non- Conventional Energy Sources issued on 11th March 1999.
73. Policy – 2004 means Policy for Promoting Generation of Electricity
through Non- Conventional Energy Sources issued on 25.10.2004 as
amended from time to time.
74. Pooled Cost of Power Purchase means the weighted average price at
which the distribution licensee has purchased the electricity including
the cost of self-generation, if any, in the previous year from all the energy
suppliers excluding short-term power purchases and those based on
renewable energy;
75. Pooling station means sub-station developed by the Developer/Power
Producer
for
interface
with
the
Receiving
Sub-station
of
Discoms/RVPN/CTUIL;
76. Power means electricity produced using the energy sources.
77. Power Producer means a person who set up RE Plant and generate
electricity from Renewable energy as per this policy;
78. PPA means Power Purchase Agreement;
79. Project Capacity shall mean the total generation capacity of Green
Hydrogen Project in KTPA and/or equivalent Alternating Current (AC)
capacity of RE Plant capacity in MW required for Hydrogen generation
plant per KTPA at the delivery points subject to maximum 25 MW per
KTPA;
80. Pumped Storage Plant means Pumped Hydro Storage Plant having
capacity more than 25 MW stand alone or with RE sources used for
supply of power at later stage as defined by MNRE/MoP, Government of
India.
81. RDF means Refuse Derived Fuel. This fuel is produced from combustible
components of Municipal Solid Waste (MSW). This waste, usually taken
from industrial or commercial sites, is shred, dried, baled and then
finally burned to produce electricity.
82. RE means Renewable Energy as defined by MNRE, GoI;
7575 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
83. RE Parks means a group of Solar/Wind/Hybrid/Hydro including
PSP/Storage Plants or its combinations in the same location used for the
generation of electric power;
84. RE Plant/RE Power Plant means a power plant or system utilizing
Renewable Energy for generating electricity;
85. RE Power Park Developer means a person who develops and / or
maintains RE parks and the related common infrastructure facilities;
86. Receiving Station means EHV/HV Sub-Station developed by RVPNL/
Discom for evacuation of power generated from Biomass energy sources.
87. Receiving Sub-station means EHV/HV Sub-Station developed by
RVPN/DISCOM of Rajasthan/PGCIL for evacuation of power generated
from Renewable Energy Sources;
88. Renewable
Energy
Certificate
or
REC
means
the
Renewable
EnergyCertificate issued by the Central Agency in accordance with the
procedure prescribed by it and under the provisions specified in this
regard by the Central Electricity Regulatory Commission (Terms &
Conditions for recognition and issuance of Renewable Energy Certificate
for Renewable Energy Generation) Regulations, 2010.
89. Renewable Energy Plants/RE Plants means the power plants other than
the conventional power plants generating grid quality electricity from
Renewable Energy Sources as defined by MNRE, GoI;
90. “RE Parks” means a group of Solar/Wind/Hybrid/Hydro including
PSP/Storage Plants or its combinations in the same location used for the
generation of electric power;
91. RenewableEnergySources”meansandincludesnon-conventional
renewable generating sources such as mini hydel, wind, solar
including its integration withcombined cycle, biomass, biofuel
cogeneration, urban/municipal waste and othersuch sources
asapproved by the Ministry of New and Renewable Energy,
Government of India.
92. "RDF"meansRefuseDerivedFuel.Thisfuelisproducedfromcombust
iblecomponentsofMunicipalSolidWaste(MSW).This
waste,
usually taken from industrial or commercial sites, is shred,
dried, baled and then finally burned to produce electricity.
93. “RERC”/"Commission
means
Rajasthan
Electricity
Regulatory
Commission;
94. RESCO Mode means the methodology in which entire investment is to be
incurred by a company/individual other than the consumer for setting
up of the solar power project in the consumer premises and the
consumer pays for the electricity generated from such solar power
project at mutually agreed tariff to such investor company/ individual;
95. RIICO means Rajasthan State Industrial Development and Investment
Corporation Limited
96. RIPS means Rajasthan Investment Promotion Scheme issued by State
Government.
97. RPO means Renewable Purchase Obligation;
98. RREC/RRECL means Rajasthan Renewable Energy Corporation Ltd;
99. RTC power means Round the Clock power
भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7576
100. RUVN/RUVNL/RUVITL means the Rajasthan UrjaVikasand ITServices
Limited;
101. RVPN/RVPNL
means the Rajasthan RajyaVidyutPrasaran Nigam
Limited;
102. RVUN/RRVUNL/RVUNL means the Rajasthan RajyaVidyutUtpadan
Nigam Limited;
103. Scheduled Commissioning Period means the scheduled period of the
completion of the project counted from the date of “final approval” issued
by RREC to the date of “COD” as per this policy provision;
104. SECI means the Solar Energy Corporation of India;
105. SLEC means State Level Empowered Committee constituted under the
provisions of this Policy;
106. SLMCC means State Level Monitoring & Coordination Committee
constituted under the provisions of this Policy
107. SSC means State Sanction Committee constituted under the provisions
of this Policy;
108. Solar Farm/Park means a group of solar power plants in the same
location used for the generation of electric power;
109. Solar Plant/Solar Power Plant means a power plant or system utilizing
solar energy through solar photo-voltaic or concentrated solar thermal
devices for generating electricity;
110. Solar Power Park Developer(SPPD) means a person who develops and /
or maintains solar parks and the related common infrastructure
facilities;
111. Solar Power Producer/Solar Developer means a person that makes an
investment for setting up of solar power project and generating electricity
from solar energy;
112. Solar PV Power Plant means the Solar Photo Voltaic (SPV) Power Plant
that uses sunlight for direct conversion into electricity through Photo
Voltaic technology;
113. Solar Thermal Power Plant means the Solar Thermal Power Plant that
uses sunlight through Concentrated Solar Power (CSP) technology based
on either line focus or point focus principle for conversion into
heat/steam which can be used for producing electricity;
114. SoP means Standard Operating Procedure;
115. SPSU means State Public Sector Undertaking.
116. Standalone Battery Energy Storage System means Battery Energy
Storage System installed standalone used for storage of power and
supply power at later stage.
117. State Agency means Rajasthan Renewable Energy Corporation Ltd. or
any other agency designated by the Rajasthan Electricity Regulatory
Commission for accreditation and recommending the Renewable Energy
Project for registration with Central Agency in accordance with the
procedure prescribed by it and under the provisions specified in the
CERC REC Regulations;
118. State and Government means, respectively, the State of Rajasthan and
the Government of Rajasthan.
7577 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)
119. State Load Dispatch Centre or SLDC means the centre established by
the State Government for purposes of exercising the powers and
discharging the functions under Section 31 of the Act.
120. Tariff means the schedule of charges for generation, transmission,
wheeling and supply of electricity together with terms and conditions for
application thereof;
121. Water means available water in any form pure water/demineralised
water/ brine water/Waste treatable water suitable for Green Hydrogen
generation.
122. WBA means Wheeling and Banking Agreement.
The term not defined above will have their usual meanings.
By Order of the Governor,
Girdhar,
Joint Secretary, Energy.