राजस्‍थान राजपत्र

विशेष ांक

RAJASTHAN GAZETTE

Extraordinary

स धिक र प्रक शशत

Published by Authority

आषाढ़ 25, बुधवार, शाके 1947- जुलाई 16, 2025

Asadha 25, Wednesday, Saka 1947- July 16, 2025

भाग-1(ख)

महत्‍वपूर्ण सरकारी आज्ञायें।

Energy Department

NOTIFICATION

Jaipur, December, 2024

No. F.20(62)Energy/2024 :-

Rajasthan Integrated Clean Energy Policy 2024

In order to promote Renewable Energy, Energy Storage Systems, Green

Hydrogen andto ensure their integration with the grid, the State Government

hereby notifies the Rajasthan Integrated Clean Energy Policy, 2024 as under:

1. Preamble

1.1. Growing concerns of global warming and climate change require

emphasis on clean energy. The Renewable Energy Sources are the

bedrock that layingthe foundation for planners in developing the

policy framework to ensure energy security and equity andare

imperative for achieving the goals of reducing carbon emission and

mitigating pollution.

1.2. Utility scale Power Producers, small Power Generators, State Utilities

such as Generation, Transmission and Distribution Companies,

Regulatory and Power Management Agencies, Government and

Consumers are major stakeholders in the Renewable Energy (RE)

sector. This policy is designed to facilitate the promotion of the

Renewable and Clean Energy Sector while safeguarding the interests

of the end consumer.

1.3. Over the past decades, the demand for power has grown and the State

has added conventional power capacity on a large scale. The State has

achieved self-reliance in the availability of power. Furthermore,

Renewable Energy has become commercially viable, therefore, State

Utilities and other stakeholders have an increased interest and a

greater focus on renewable energy.

7495 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

1.4. Renewable Energy,such as Solar Energy, can be deployed in a

decentralised manner,bringing benefits of reduced transmission &

distribution losses and savings in cost of establishing additional

transmission infrastructure on account of generation of power at load

centres. Decentralized generation through solar rooftop systems, off-

grid applications, and small solar power plants at consumers' end are

an efficient way of utilization of Solar Energy.

1.5. The State has a huge and largely untapped potential in terms of intense

solar radiation, one of the highest numbers of sunny days in a year

and

as

availability

of

vast

barren/un-cultivable,

unutilized

government/private land. These attributes have the potential to make

Rajasthan a highly preferred destination for Solar Energy at the Global

level.

1.6. Additionally, National Institute of Wind Energy (NIWE), Government of

India, has assessed wind power potential at Rajasthanis 284GW at

150 meters height and National Institute of Solar Energy assessed the

Solar Potential in Rajasthan is 142 GW.

1.7. To meet the global commitments, Government of India has fixed a

national target of 500 GW Renewable Energy capacity. This will reduce

the dependence on conventional sources of energy by promoting a

non-conventional alternative.

1.8. Notably, Solar and Wind resources are complementary to each other

and hybridization of these two technologies would help in minimizing

the variability in power and would lead to optimum utilization of

infrastructure

including

land

and

transmission

systems.

Superimposition of the wind and solar resources map exhibits high to

moderate Wind and Solar Energy potential in the State.

1.9. In light of these, it is desirable to have suitable policy interventions for

developing new hybrid projects and also for encouraging hybridization

of existing Wind and Solar Power Plants in the State.

1.10 Appropriate capacity storage systems are also required in sync with

generation profile of Wind-Solar Hybrid Power Projects.

1.11 The State will also promote the Energy Storage Program. The Energy

Storage System (ESS) enhances grid stability, reliability and facilitates

better load management, reducing the dependency on fossil fuel-based

peaking power plants. Energy Storage Technologies, such as batteries

and pumped hydro storage are essential for addressing the

intermittency of Renewable Energy sources.

1.12 Utilization of Biomass waste as a fuel for energy generation is yet

another sustainable source of energy. This reduces the environmental

impact caused by open crop residue/ biomass burning.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7496

1.13 State

will

promote

the

Biomass

Programme,

facilitating

the

establishment of Biomass-based Power Projects, briquette/pellet

manufacturing plants, and supporting biomass-based co-firing

projects, as well as Waste-to-Energy based Power Projects for the

utilization of waste such as MSW/RDF/Industrial/Medical waste or

any other wastes as per the guidelines of the State Government and

Government of India.

1.14 Further, Green Hydrogen is a non-fossil fuel which can fulfil the

requirements of Industrial, Power, Transportation and Aviation sectors

while reducing carbon emissions and is useful to produce Green

Ammonia.

1.15 To keep pace with the changing needs of the Renewable Energy

Sector, State Government has decided to review the existing Rajasthan

Renewable Energy Policy, 2023.

2 Vision and objectives:

2.1 To develop RE sector in the State with a ‘Stakeholder-Driven’ policy.

2.2 To ensure that Rajasthan emerges as a major contributing State in order

to achieve the national target of 500 GW capacity of Renewable Energy

as a part of India's global commitment.

2.3 To achieve an “Optimal Energy Mix” of conventional and renewable power,

ensuring energy security in the State and efficient grid management

while protecting the interests of all stakeholders.

2.4 To encourage the use of new technologies andmethods involving combined

generation of Wind &Solar Power and other emerging technologies like

storage systems including pump storage plants, battery storage

systems etc. To facilitate the development of infrastructure in

generation, transmission, distribution and manufacturing sector of

Renewable Energy.

2.5 To boost Human Resource Development with particular reference to

Renewable Energy and to drivegeneration of employment opportunities

in the State.

2.6 To facilitate and support Research & Development activities in the field of

RE. To nurture better products, processes and systems in order to

promote growth of Renewable Energy.

2.7 To deploy ancillary services for making the grid flexible for RE Power

integration by using various modes like Demand Side Management,

Time of Day Tariff, Scheduling & Forecasting, Storage Systems,

Reactive Power Management, Grid Reserve/Balancing Capacity, etc.

2.8 To ensure productive use of the abundant wasteland in the State, thereby

utilizing the un-utilized/under-utilized land for creation of Wind

energy hub. Promoting “Repowering” of Wind Power Projects and

conducting a Wind Resource Assessment Programme.

7497 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

2.9 To attract investors to set-up RE equipment manufacturing facilities by

promoting the development of a manufacturing ecosystem in the

State.

2.10 Hybridization of Wind & Solar technologies to meet the challenges of grid

security and stability while ensuring optimum utilization of land

resources and transmission systems. Also pushing Hybridization of

existing conventional thermal power plants with Renewable Energy in

order to reduce fuel consumption and carbon emission.

2.11 To promote setting up of the RE Power Projects for sale of power to

Distribution Companies of Rajasthan/Rajasthan UrjaVikas & IT

Services Ltd. to meet the State's RPO and beyond RPO as per

requirements and commercial viability and also towards captive use

and 3rd party sale.

2.12 To support the development of Energy Storage Systems (ESS) to enhance

the grid stability and reduce the reliance on fossil fuel. These will also

promote energy independence in remote and isolated areas/

communities.

2.13 To promote setting up of the Waste to Energy plant for generation of

power by utilizing MSW (Municipal Solid Waste), RDF (Refuse Derived

Fuel), Industrial and Medical Waste.

2.14 Utilization of Biomass Waste as a fuel for energy generation as a

sustainable source of energy and also for reducing the problem of

stubble burning in order to address the environmental impact caused

by burning of open crop residue/biomass.

2.15 To develop a Green Hydrogen Manufacturing Ecosystem (Electrolyser,

compressor, storage and transport infrastructure etc. The Policy also

promote the development of Green Hydrogen Parks, Green Hydrogen

based mobility, Green Hydrogen equipment manufacturing industries,

research in cutting-edge technology and the promotion of Green

Hydrogen generation for storage and generation of RTC (round the

clock) power etc.

3 Title and Enforcement:

3.1

This Policy will be known as Rajasthan Integrated Clean Energy

Policy, 2024.

3.2

The Policy will become effective from the date of Notification and

will remain in force until March 29, 2029 or until superseded by

another Policy.

3.3

The State Government may amend/modify/review this Policy as

and when required.

4 Target

4.1. The Policy aims to achieve a target of 1,25,000MW Renewable Power

Projects up to 2029-30 in the Stateas under: -

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7498

S.No.

Particulars

Capacity

1

Solar

90,000 MW

2

Wind & Hybrid

25,000 MW

3

Hydro, Pump Storage Plant (PSP),

Battery Energy Storage System

10,000 MW

4.2. The State DISCOMs will purchase Renewable Energy as per the

Renewable Purchase Obligation (RPO) as determined by RERC.

4.3. The State will endeavour to develop RenewablePower Projects for sale of

power to parties other than DISCOMs of Rajasthan for captive

consumption,within and outside the State.

4.4. This policy also aims to promote RenewableEnergy and other clean energy

sources as follows:

i. Promotion of small Decentralized Grid Connected Solar Power Projects

at load centres.

ii. Promotion of Rooftop Solar Projects through Net Metering and Gross

Metering Mechanism or in any other manner as per the provisions

of the Electricity Act, 2003 and relevant regulations/orders issued

by RERC/CERC.

iii. Promotion of Off-Grid Solar applications like Solar Water Pumps,

home lighting systems, water heater, etc.

iv. Promotion of Renewable Energy Projects for sale of power to Discoms

and for Captive use/3rd Party Sale within and outside the State.

v. Promotion of RenewableEnergy Projects with Storage Systems, Hydro

Projects, Pump Storage Plants and Battery Energy Storage Systems.

vi. Promotion of setting up of Electric Vehicles (EV) Charging Stations

using Renewable Energy.

vii. Development of RE Parks/UMREPPs.

viii. Strengthening of the Transmission and Distribution Network for

Renewable Energy.

ix. Promotion of manufacturing industries of Solar/Wind Energy

Equipment and Storage Systems.

x. Promotion of floating/ canal top/reservoir top solar power projects.

xi. Promotion of Energy Storage Systems for reliable RE Power &grid

stability.

xii. Promotion

of

Bio-energy

(Biomass/Co-firing/Waste

to

Energy/CBG/Bio-CNG/Bio-coal/Bio-Ethanol

etc.)

for

reducing

carbon footprint.

xiii. Promotion of use of Non fossil fuels through production of Green

Hydrogen and its derivatives.

7499 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

5 RREC to act as Nodal Agency

RREC will act as a Nodal Agency for:

i. Registration of projects.

ii. Approval of projects.

iii. Development of RE Parks/UMREPPS;

iv. Selection of projects through a process of competitive bidding on

the request of RUVITL/DISCOMs;

v. Facilitating the allotment of Government land;

vi. Facilitating approval of power evacuation plans& connectivity at

CTU/STU/DISCOMs network and allocation of bays and other

related facilities on behalf of State;

vii. Facilitating the execution of PPA/WBA with DISCOMs of

Rajasthan/RVPN/NVVN/SECI/RUVITL (as may be applicable);

viii. Arranging any other statutory clearances/approvals;

ix. Facilitating water allocation for Hydro, Pump Storage Plants and

Solar Thermal Power Plant and RE plants/Parks for auxiliary

consumption and cleaning of Solar PV Plants;

x. Coordination with MNRE/DISCOMs of Rajasthan/RVPN/Various

agencies under the control of MNRE/Central Agency/Other

Relevant Agency;

xi. Accreditation

and

recommendation

of

Power

Projects

for

registration with Central Agency under REC Mechanism.

Section-A: Renewable Energy

PROJECT BASED PROVISIONS AND INCENTIVES

Solar Energy

6. Rooftop PV Solar Power Systems

6.1. Rooftop PV Solar Power Systems with Net Metering:

The State Government will facilitate the installation of Rooftop PV

Solar Power Systems in the State. It will endeavour to develop all

District Headquarters and other important areas as ‘Green Energy

Cities’ through the installation of Solar Rooftop Systems in the

following manner:

i) The State will promote setting up of grid-connected Rooftop PV Solar

Power Plants under a Net Meteringarrangement. The DISCOMs

will allow Solar Rooftop capacity addition up to 80% of the

capacity of the Distribution Transformerin the area.

ii) Rooftop Solar Power Plants will be promoted by encouraging setup

of the same on Government Building through various modes

including HAM/RESCO Mode.

iii) The DISCOMs will develop suitable and comprehensive consumer-

friendly IT applications for facilitating online and timely approvals

and monitoring of projects for Rooftop Solar Power Plants.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7500

iv) Rooftop consumers will be provided subsidies/incentives as per the

guidelines of MNRE/State Government.

v) Start-ups will be promoted for installation of Rooftop Solar

Systems.

vi) The maximum time period for execution of various activities in

respect of Solar Rooftop Systems under Net Metering by DISCOMs

will be as follows:

S.

No.

Activity

Maximum time period

1.

Issuance of NOC above 10 kW

7days from receipt of

application

2.

Solar & Net Meter Testing

7 days from depositing of

meters

3.

Execution

of

Net

Metering

Agreement

3

days

from

the

submission of the draft

agreement

4.

Commissioning/Connection

of

Rooftop system

3 days from receipt of

application

6.2. Rooftop PV Solar Power Systems with Gross Metering:

Solar Rooftop Systems can also be set up under Gross Metering

Scheme

as

per

the

guidelines

prescribed

by

the

State

Government/Government of India. The entire generated power will be

supplied to DISCOMs at a tariff determined by RERC. Solar Rooftop

Systems up to 1 MW capacity will be allowed under this Scheme.

6.3. Virtual Net Metering (VNM) and Group Net Metering (GNM)

Virtual Net Metering (VNM) arrangement allows multiple consumers

operating within the same licensee area to establish a collective

physical RE plant to meet theirpower demand whereas GroupNet

Metering (GNM) arrangements cater to a single consumer having

multiple service connections across various locations within the same

licensing area by installing a RE Plant at single location.

To enable more access of solar power, Virtual Net Metering and Group

Net Metering schemes will be promoted in the State to allow access to

renewable energy to all consumers not having sufficient space in their

premises.

6.4. Small wind turbines will be allowed with Solar Rooftop under Net

Metering Scheme.

6.5. Government Buildings will be solarised through installation of Solar

Rooftop Plants.

6.6. Appropriate provisions would be made in Urban Building Byelaws to

7501 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

promote and facilitate the use and installation of Solar Rooftop

Systems.

7. Decentralized Grid Connected Solar Power Projects:

Decentralized

Grid

Connected

Solar

Power

Projects

provide

anopportunity to meet the power requirement close around load

centres. Such generation will help the utilities to reduce their T & D

losses and optimize the cost of Transmission and Distribution System.

7.1. The State will promote setting up of decentralized Solar Power Projects

with a minimum capacity of 0.5 MW and a maximum capacity of 5

MW in the premises and in the vicinity of 33 kV Grid Sub-Stations in

order to promote sale of power to DISCOMs. The sub-stations for

which decentralized Solar Power Projects are to be established will be

selected by RUVITL/Discoms. The tariff for these projects will be

determined on basis of tariff based competitive bidding process or as

per the guidelines of State Government/ Government of India.

7.2. The State aims to increase participation of farmers in the Solar Energy

sector to augment their sources of income through generation and

sale of Solar Energy to DISCOMs, in the following manner:

7.2.1 Farmers, on their own or through a developer, can set up

decentralized power projects on their un-cultivable agriculture

land as per clause 7.1.

7.2.2 The State will promote solarization of existing grid-connected

agriculture pumps as per the provisions/guidelines issued by

DISCOMs based on Regulations of RERC/Guidelines of

Central/State Government.

7.3. The State Government will issue schemes/programs for promotion of

decentralized solar generation in the State.

8. Off-Grid Solar Applications:

8.1 The State will promote and incentivize off-grid solar applications, including

Hybrid Systems, as per the guidelines issued by MNRE to meet various

electrical and thermal energy requirements for domestic and

commercial use.

8.2 The State will promote the setting up of Solar Power Plants by persons for

the sale of power to consumers through the State distribution

system/local solar grid.

8.3 The State will also promote the setting up of Stand-Alone Solar Systems to

provide electricity to households in remote Villages /Hamlets(Dhanis).

8.4 The State will promote installation of Solar PV Pumps for pressure

irrigation systems.

9. Utility Grid Power Projects-

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7502

9.1 Solar Power Projects in Rajasthan for sale of power to DISCOMs of

Rajasthan:

The State will promote setting up of Solar Power Projects for sale of

power to DISCOMs of Rajasthan on the tariff discovered through a

competitive bidding process:

i) To fulfil Renewable Purchase Obligation (RPO) target fixed by RERC.

ii) DISCOM/RUVITL may purchase Solar Power beyond RPO limit and

would be able to avail the benefit of REC as per CERC Regulations/

NLDC guidelines.

9.2 Solar Power Projects sanctioned under guidelines/schemes of MNRE:

The State will promote setting up of Solar Power Projects under the

Guidelines/Schemes of MNRE or Solar Power Projects allocated

through competitive bidding by/for other State Utilities/Entities.

9.3 Solar Power Projects for captive use:

The State will promote setting up of Solar Power Projects for captive

use as under:

9.3.1 Solar Power Projects within the premises of a consumer of

Rajasthan;

9.3.2 Solar Power Projects outside the premises of a consumer of

Rajasthan;

9.3.3 Solar Power Projects set up in the State for captive use outside

Rajasthan through open access.

9.3.4 The maximum permissible capacity of individual Solar plant for

captive use within the State will be limited as per RERC

Regulations. The Generating plant capacity for 3rd Party sale can

be any capacity; however, the consumer of the State will be

allowed to take power from such plant up to the limit prescribed

as per RERC Regulations.

9.4

Grid connected Solar Power Projects for Third Party Sale:

The State will promote setting up of solar power projects for third-

party sale within/ outside the State as follows:

9.4.1 Solar Power Projects within premises of a consumer of Rajasthan

(Under RESCO Mode);

9.4.2 Solar Power Projects set up for sale of power within State through

open access;

9.4.3 Solar Power Projects set up for sale of power outside State

through open access/power exchange.

9.5 The Projects set up under clause 9.3 &9.4will also be eligible for RE

(Solar) Certificate as per Orders/Regulations of the appropriate

Commission issued in this regard.

Development of RE Parks

7503 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

10 RE Park

The RE Park is a concentrated zone for development of RE power

projects. It provides a well-demarcated area with proper civil and

power system infrastructure to a power producer, where the risk in

projects is minimized and a fast approval process is facilitated. The RE

Power Park Developer creates supporting infrastructure and facilities

including power evacuation systems, water arrangements, internal

roads and administrative facilities.

10.1 RE Parks by RREC:

Rajasthan Solar Park Development Company Ltd., a Special Purpose

Vehicle (SPV) in the form of a subsidiary company of RREC, has been

established for development of infrastructure and management of

RE/Solar Parks. RREC will develop RE Parks in Rajasthan on its own

or through any other SPV which may be created as required.

10.2 Development of RE Parks by Private Sector:

(i) The State will promote development of RE Parks (Solar Park/Wind

Park/Hybrid Parks) by the Private Sector. The Private Sector RE

Power Park Developer (REPPD) will submit an application in the

prescribed online format to RREC for development of RE Park

along with a non-refundable Registration charge as per clause

15.3.RRECwill

complete

the

processing

of

Registration

applications within a period of 30 days.

(ii) The Private Sector RE Power Park Developer(s) shall be obliged to

create common infrastructure facilities for development of RE

Park(s) These will include creation of power evacuation systems,

development of roads, lights, water supply systems and other

administrative support systems.

(iii) The REPPD will be allowed to acquire agriculture land from title

holder (Khatedar) for developing RE Park(s) in excess of ceiling

limit in accordance with the provisions of Rajasthan Imposition of

Ceiling on Agriculture Holding Act, 1973.

(iv) Land conversion will not be required in accordance with the

provisions of Rajasthan Tenancy Act 1955 and Rajasthan Land

Revenue Act 1956and theRules made thereunder for the

development of RE Park on Private Agriculture Land.

(v) Allotment of Government land to Private Sector RE Power Park

Developer(s) for development of RE Park(s) will be considered on

recommendation of RREC.

(vi) The Private Sector RE Power Park Developer(s) shall be

responsible for registration of RE power projects within their park

with RREC as per the provisions of this policy. Already registered

RE Park/Solar Park prior to commencement of this Policy shall

be continued with the same number and will be implemented

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7504

under the provision of this policy.

(vii) The

necessary

SoP

will

be

developed

by

RREC

for

development of RE Park in the State.

10.3 Development of RE Parks through Joint Venture Companies (JVCs):

10.3.1 The State will promote development of RE Parks through Joint

Venture with private developers investing up to 50% equity or any other

percentage of equity participation as decided by the state government.

The cost of land allotted by state government would be part of its equity

participation in the Joint Venture Company.

10.4 The applicant will submit a proposal to RREC for formation of Joint

Venture Company with the State Government. RREC, after examining

the same, will submit the proposal to Energy department, which after

concurrence of Finance Department will begiven final approval.

10.5 Solar Parks/UMREPPs under MNRE Scheme:

10.5.1 The State Government will promote setting up of Solar Parks/Ultra

Mega Renewable Energy Power Parks (UMREPPs) as per the MNRE

guidelines/schemes through agencies designated by MNRE.

10.5.2 Such developer will submit an application in the prescribed online

format to RREC for registration of Solar Park/UMREPP along with a

non-refundable Registration charge of Rs. 10,000/MW+GST subject to

maximum of Rs. 20 Lac+ GST for each Park.

11 Promotion of setting up of Renewable Energy based Electric Vehicle

Charging Station:

The shift to clean transport has become necessary due to increase in

carbon emission from fossil fuel, which leads to global warming and

climate change. The rapid increase in fossil fuel consumption due to

rising vehicular movement has led to increase in pollution and has an

adverse impact on Balance of Payment situation because of the rising

import bill.

The above factors are main reasons for adoption of Electric Vehicles

(EV)and supporting technologies. The requirement of suitable grid-

grade electricity is seen as a major challenge for establishing sufficient

charging stations for the EVs. Charging of EVs from electricity

generated from fossil fuel based conventional sources does not reduce

emissions. For further reduction of carbon footprint, it is essential

that the EVs are charged using Renewable Energy Sources. In view of

the above, the State will promote the use of Renewable energy for

charging of EVs in the following manner:

i. The Charging Infrastructure will be developed as per the guidelines

and standards issued by Ministry of Power and Central Electricity

Authority.

7505 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

ii. The EV charging stations may be established by the State/Central

Public Sector Undertakings, Private operators or operators under

the Public Private Partnership models.

iii. The charging station service providers may set up renewable energy

generation plants within their premises for captive use and may

also draw renewable power through open access from generation

plants located within the State to avail the benefits as provided

under clause 17 of this policy.

iv. The aforesaid benefits would also be available to chain of EV

charging stations owned by a single service provider.

v. The State will support Research and Development activities

regarding promotion and use of Renewable Energy by EV charging

stations and also for Research and Development activities to study

the impact of EV charging infrastructure on the grid.

Wind Power Projects

12 Generation of Power from Wind:-

12.1 Wind Power Plants for sale of power to DISCOM(s) of Rajasthan:

The State will promote setting up of Wind Power Projects for sale

of power to DISCOMs of Rajasthan on the tariff discovered through

competitive

bidding

process

to

fulfil

Renewable

Purchase

Obligation (RPO) target fixed by RERC. DISCOMs/RUVITL may

procure wind energy beyond RPO as per their requirement and

commercial viability.

12.2 Utility Grid Power Projects for Captive use /3rdParty sale within and

outside the State of Rajasthan:

12.2.1 The State will promote setting up of Wind Power Projects for captive

use/3rd party sale for consumers within the State.

12.2.2 The State will allow setting up of Wind Power Projects of any capacity

for captive use/third party sale outside the State or sale through the

Power Exchange.

12.2.3 The Maximum permissible capacity of individual Wind plant for captive

use within the State will be limited as per RERC Regulations. The

Generating plant capacity for 3rd Party sale can be any capacity;

however, the consumer of the State will be allowed to take power from

such plant up to the limit prescribed as per RERC Regulations.

12.2.4 Such Power Producers (under clause 12.2.1&12.2.2) will also be eligible

for RE (Non-Solar) Certificate as per Orders/Regulations of the

appropriate Commission.

12.3 Repowering of Wind Power Projects:

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7506

The State will promote Repowering of existing wind turbines

which have completed at least 10 years in operation. Other

provisions will be as per the guidelines/policies issued by

MNRE from time to time.

12.3.1 In case of power being procured by State DISCOMs through existing

PPA, the power generated corresponding to average of last three years

generation prior to Repowering would continue to be procured on the

terms of PPA in-force and remaining additional generation may be

purchased by DISCOMs at a tariff discovered through competitive

bidding in the State at the time of commissioning of the Repowering

Project.

12.3.2 The Wind Power Producer shall also be allowed to use the additional

generated power for captive use/third party sale.

12.3.3 In case of Repowering, the power evacuation facility for new pooling

station or augmentation of existing substation will be provided by

RVPN/DISCOMs based on Load Flow Studies.

12.4 Wind Resource Assessment(WRA) Programme:

For utilization of Wind as an Energy Source, Wind Resource

Assessment (WRA) studies have been carried out by MNRE at various

locations in the State. MNRE has also permitted independent private

participation for WRA. WRA studies have been done at limited

locations. With a view to further assessing wind resources potential,

RREC will also allow/undertake Wind Energy Resource Assessment

studies by private developers for exploring additional locations for such

studies.

12.5 Registration for establishment of Wind Monitoring Station for Wind

Resource Assessment studies-

12.5.1 For carrying out Wind Resource Assessment Studies, thedeveloper

shall select the location for establishing the Wind Monitoring Station

and shall register the application with RREC in prescribed online

format along with the required documents.

12.5.2 Along with application, the Developer shall deposit an amount of Rs.

10,000/- per site with RREC towards registration charge, which shall

be non-refundable. Goods and Services Tax (GST) will also be

payable as applicable. Fee, if any, to NIWE will also be payable as

applicable.

12.5.3 Non requirement of No Objection Certificate (NOC) from Gram

Panchayat for allotment of land for establishment of Wind

Monitoring Station-

N.O.C. from Gram Panchayat will not be required for allotment of

Government land (SiwaiChak land) for establishment of Wind

Monitoring Station.

12.6 General Guidelines for Wind Resource Assessment Studies -

7507 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

12.6.1 The Developer shall follow the guidelines for Wind Resource

Assessment studies issued by Ministry of New & Renewable Energy.

12.6.2 The Developer will bear all costs, including the costs of installation of

Wind Monitoring Station along with necessary accessories, and will

also include its O&M expenses.

12.6.3 The Developer shall submit NIWE report to RREC on completion of

Wind Resource Assessment studies.

12.6.4 The Developer shall not be entitled to claim any cost/charges,

expenses and incidental charges incurred in connection with the

studies for submission of NIWE report to RREC.

12.6.5 Purchase and Acquisition of private land, if any, shall be sole

responsibility of the Developer.

12.6.6 The Developer shall take necessary permissions of Forest Department,

wherever required under Forest Conservation Act, before installation

of wind monitoring station. The Wind Monitoring Station would be

installed by the Developer after completing various formalities

requested by Forest Department. Compliances of various orders

passed by Hon'ble Courts would also be ensured by the Developer.

Hybrid Power Projects

13 Generation of Power from Wind-Solar Hybrid Projects:

13.1 The State will promote setting up of Wind-Solar Hybrid Power Projects

for optimal and efficient utilization of infrastructure and land, and to

achieve better grid stability, under the following categories:

a) Sale of Power to DISCOMs at tariff discovered through transparent

bidding process.

b) Captive Use and Sale to Third Party within and outside State

through open access/Power Exchange.

c) The Maximum permissible capacity of individual Hybrid plant for

captive use within the State will be limited as per RERC

Regulations. The Generating plant capacity for 3rd Party sale can

be any capacity, however the consumer of the State will be allowed

to take power from such plant up to the limit prescribed as per

RERC Regulations.

The Power procured from the Hybrid Project may be used for fulfilment

of solar RPO and non-solar RPO in proportion to the rated capacity of

solar and wind power in the hybrid plant respectively or as per the

Orders/Regulations issued by appropriate Commission.

13.2 The sizing of the Wind/Solar capacity would be assessed by the

Developer on the basis of local resource characteristics. However, a

Wind-Solar Power Plant will be recognized as hybrid plant if the rated

power capacity of one resource (Wind/Solar) is at least 25% of the rated

power capacity of other resource (Solar/Wind).

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7508

13.3 For the purpose of this policy, the plants are classified into two

categories:

Type A Projects: Hybridization of existing Wind/Solar Projects-

This category includes conversion of existing/under construction Wind

or Solar Power Plants into Hybrid Projects.

Type B Projects: New Wind-Solar Hybrid Projects-

This includes new Wind–Solar Hybrid power generation projects which

are not registered with RREC till the date of commencement of this

policy.

All fiscal and financial incentives available to Wind and Solar power

projects will also be made available to Wind-Solar Hybrid projects.

13.4 Hybridization of existing Conventional Thermal Power Plants

13.4.1 The State will promote hybridization of existing Conventional Thermal

Power Plants by allowing setting up of Renewable Power Plants by

the Conventional Power Generators for using its Thermal Pwer or

Renewable Power to meet its scheduled generation from the specific

thermal generating station. This flexibility will provide the thermal

power generators an opportunity to optimally utilize generation from

RE sources and also help in reducing emissions. DISCOMs will also

receive firm power including Renewable Power, which will help them

to meet their Renewable Purchase Obligations.

13.4.2 The Generating Companies will be allowed to utilize such Renewable

capacities for supplying power against existing commitments to

supply the power from its Thermal Power Plants to DISCOMs.

13.4.3 Any net gain realized by the generator by blending Renewable Power

with Thermal Power shall be shared equally between the Generator

and DISCOMs after the approval of the Regulator.

13.4.4 The DISCOMs will be eligible to fulfil their RPO requirement against

such RE procurement. The Generators will also be eligible to fulfil

their Renewable Generation Obligations through such RE Power

Generation, if applicable in future.

14 Newer technologies based RE projects

14.1 Hydro Power Projects.

Energy generated from Hydro Power Projects has been recognized as

Renewable Energy (RE) across the world. Large Hydro Power Projects

(LHPs) including Pumped Storage Project, having capacity more than

25 MW and Energy from all small Hydro Storage (SHPs),

commissioned after 8thMarch, 2019 will be considered as part of RE.

The Sites for these projects will be allocated to the developer through a

transparent mechanism.

RREC will recommend the request of water allocation to the Water

Resources Department for these projects.

7509 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

14.2 Floating Solar

The State will also promote setting up of Floating / Reservoir Top/

Canal Top Solar Power Projects for sale of power to DISCOMs through

Competitive bidding or for captive use/3rd party sale.

The Potential Sites for developing Floating Solar Project will be

allocated to the developer/Power Producer through a transparent

mechanism. Separate Guidelines will be issued by Energy Department

for Floating Solar Projects.

RREC will recommend the requests of water allocation to the Water

Resources Department for such projects.

Registration and Approvals

15 Registration of RE Power Projects:

15.1 All RE projects installed in State on CTU/STU/DISCOMs network shall

be required to be registered with RREC.

15.2 The Developer/Power Producer will submit an online application for

registration to RREC in the prescribed format along with requisite

documents.

15.3 Each Developer/ Power Producer will deposit non-refundable registration

charge with RREC as under:

S.No.

Project/Park Capacity

Rate

1

For RE Project/Park≤10 MW

capacity

Rs5,000/- per project

2

For RE Project/Park>10MW

and up to 100 MW capacity

Rs20,000 Per MW

3

For RE Project/Park >100MW Rs. 20 Lac +

Rs 10,000 Per MW

Note: The Project to be established under any new RE Parks registered

after commencement of this policy will not be required to deposit

registration charges in RREC.

15.4 The GST and other charges, as applicable, shall be payable in addition to

the registration charge. Registration will not confer any right to the

Developer/Power Producer and will not create any obligation on the

part of RREC.

15.5 In case of registration of the Solar/Wind/Hybrid Projects, registered

under the policies prior to this Policy and three years before the

commencement of this policy, for which project developer has not

applied for in-principle clearance, the registration of such projects shall

be allowed to be re-validated by depositing Rs.2,000 per MW subject to

maximum 10 Lac per project with applicable GST,otherwise the

registration of such projects shall be deemed to have been cancelled.

Such re-validated Projects will be required to apply for in-principle

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7510

clearance within1 year from the date of re-validation, failing which the

registration shall be deemed to be cancelled.

15.6 The Power Projects registered under the Rajasthan Renewable Energy

Policy, 2023 or registered under Solar Energy Policy, 2019/Wind &

Hybrid Energy Policy, 2019, three years prior to the date of

commencement of this Policy, shall be deemed to be registered under

this Policy with the same registration number allotted earlier. The

power producers of such projects shall have to apply for in-principle

clearance within 2 year from the date of commencement of this Policy,

failing which the registration shall be deemed to be cancelled.

15.7 The Solar/Wind/Hybrid Projects registered under this Policy shall have

to apply for in-principle clearance within a period of 2 years from date

of registration, failing which the registration shall be deemed to be

cancelled.

15.8 For the projects already commissioned under RE (Solar) certificate

mechanism, the Developer/Solar Power Producer will have to deposit

Accreditation/Registration fee with State Agency / Central Agency as

per the procedure laid down by the regulations/orders of the

appropriate Commission.

The installation of Power Plants not registered with RREC and without

prior approval of competent authority as per policy provisions will be

liable to be disconnected from the Grid. The Developer/Power Producer

will be required to submit certificate of registration of project with

RREC to the Sub-Registrar or any other officer authorized by the

Government for the registration of sale/lease deed of the land.

15.9 No prior registration with RREC will be required by Developer for

participation in bidding. Only successful bidders will be required to

register their projects with RREC.

15.10 No registration will be required for Solar/RE Power projects connected

to grid under Net/Gross Metering Scheme.

15.11 Developer/Power Producer can transfer their registered capacity or part

thereof to their 'holding’, ‘subsidiary', 'fellow subsidiary’ or ‘ultimate

holding’ company with the prior approval of RREC on payment of an

amount equal to 50% of the Registration Charge. However, the

provisions of clause 15.5&15.6shall be applicable to the transferee.

15.12 Developer/Power Producer can transfer the registered capacity or part

thereof from one registration to another registration by them with prior

approval of RREC on payment of an amount equal to25% of the

Registration Charges.

16 Allotment / Procurement of Land:

16.1 Allotment

of

Government

Land

to

Power

Projects/RE

Park/UMREPP:

Government Land will be allotted to RE Park/UMREPPand

Solar/Wind/Hybrid/Hydro Power Projects including PSP/Storage

7511 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

Plants as per the provisions of Rajasthan Land Revenue

(Allotment of land for setting up of Power Plant based on

Renewable Energy Sources) Rules, 2007, as amended from time

to time. Developer shall be allowed to sub-lease the allotted land

as per the aforesaid rules.

16.2 RREC will recommend to the concerned District Collector for allotment of

government land on a case-to-case basis only on submission of

following security deposit in favour of RREC, Jaipur:

i. For Project/Park of capacity < 2000 MW, Rs. 1 Lac/MW by

demand draft/RTGS in favour of RREC.

ii. For Project/Park of capacity≥ 2000 MW, Rs. 1 Lac/MW up

to 2000 MW by DD/RTGS and for exceeding capacity,

Rs. 1 Lac/MW in form of Bank Guarantee.

The security deposit will be refunded to the developer in

proportion to the commissioned capacity of the project on

written request of applicant. The security deposit shall be

forfeited in case the allotted land is not used within the

specified period as per allotment rules. If land is not allotted,

security deposit will be refunded on the written request of the

applicant.

16.2.1 The allotment of Government land identified by Energy Department or

State Power Companies or Joint Venture Companies of State PSUs will

be kept on priority for projects for fulfillment of State Power demand.

16.2.2 The Government Land will be allotted to the Developer/Power

Producers keeping in view of the projects to be set up for Sale of Power

to State Power Utilities/Discoms, Projects granted connectivity at

STU/Discoms Networks, Projects granted connectivity at CTU

Networks, Projects to be set up for Captive use/3rdParty Sale /Green

Hydrogen generation for use within State & outside State, and Projects

not granted connectivity at STU/CTU Networks yet etc.

In case, Developers apply for allotment of same land, the priority in

allotment of the land will be accorded to RE Projects on above basis.

16.2.3 The Developer/Power Producer setting up RE Manufacturing Unit

along with RE Project will be given priority in allotment of Government

Land for developing RE Projects.Minimum eligibility criteria for RE

Manufacturing unit will bespecified by Energy Department as and

when required.

16.2.4In case of extension of the period of utilization of land beyond 2 years

from the allotment, the security amount deposited towards allotment

of land shall be deducted as per Rajasthan Land Revenue (Allotment

of land for setting up of Power Plants based on Renewable Energy

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7512

Sources) Rules, 2007 and deposited in Government account under

head Land Revenue Account.

16.2.5In case of special circumstance, the land recommended or allotted to

the Developer/Power Producer for setting up of a specific RE project

will be allowed for setting up of other RE projects by its SPV,

subsidiary company or group company or subleased on same terms

and conditions. Such transactions will be allowed in the first 2 years

from the date of recommendation/Allotment of land whichever is later.

16.3 For setting up of Power Plants based on different technologies, maximum

land area which can be allotted to the Developer/ Power Producer will

be as under:

S.

No

.

Technology

Maximum land area

for Solar Plant

Maximum

land area for

Hybrid Plant

i SPV on Crystalline Technology.

2.0Hect./MW

2.5 Hect./MW

ii SPV on Crystalline Technology

with tracker.

2.5Hect./MW

2.5Hect./MW

iii SPV on Thin Film/Amorphous

Technology with or without

tracker.

2.25Hect./MW

3.0Hect./MW

iv Solar Thermal (CSP)- Parabolic

Trough / Tower/Other

Technology with and without

storage

a) Up to PLF of 21%:

3.0 Hect./MW

b) For every 1%

increase in PLF, 0.15

Hect./MW additional

land will be allotted.

-

v Maximum land area for Wind

Plant

2.5 Hect/MW

Note: For power projects with storage system, additional land will be allotted

as per the rules prescribed by the Revenue Department, GoR.

16.4 Power Projects on Private Land:

16.4.1 The State will promote setting up of Power Project/Park on private land.

Developer shall be permitted to setup Power Project/Park on private

agriculture land without the requirement of land conversion in

accordance with the provisions of Rajasthan Tenancy Act 1955 and

Rajasthan Land Revenue Act 1956 and the rules made thereunder.

16.4.2 Developer/Power Producers shall also be allowed to acquire/hold

private land from the title holders (Khatedar) for setting up of Power

Plant in excess of ceiling limit in accordance with the provisions of

Ceiling Act, 1973.

16.4.3 Allotment of land for setting up of Wind Monitoring Station-

Government Land up to 100meterx 100 meter required for setting up of

Wind Monitoring Station will be allotted on temporary basis to the

7513 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

Developer/Power Producer for maximum period of 3 years at DLC rates.

The allotment for such land will be done at the level of concerned

District Collector on the recommendation of RREC. After completion of

wind assessment studies, the Wind Monitoring Station shall be

dismantled at the cost of Developer and land shall revert back to the

State Government free from all encumbrances.

16.4.4 Land Tax:

Land tax on the land utilized for setting up of RE Projects/Parks will be

as per the Notification/Order of the State Government.

17 Incentive/facilities available to RE Power Projects

RE Power Plants registered under this policy can avail these incentives

available as per eligibility under the prevailing Rajasthan Investment

Promotion Scheme (RIPS) as amended from time to time.

17.1 Grant of incentive under RIPS

17.1.1 Under clause 4.1.1.2 of RIPS-2024, Renewable Energy Units are eligible

for the following Incentives:

1. Exemptions& Reimbursements: The following exemptions and

reimbursements are applicable to RE Units:

- Exemption from payment of 100% electricity duty for 7 years.

- Exemption from payment of 75% stamp duty and reimbursement

of 25% stamp duty.

- Exemption from payment of 75% conversion charges and

reimbursement of 25% conversion charges.

- Reimbursement of 100% mandi fee/market fee for 7 years.

2. Waiver of PCB Fees to obtain Consent to Establish (CTE) and

Consent to Operate (CTB) certification.

17.1.2 Under Clause 3.1.3.2.3 of RIPS,2024,Enterprises availing Anchor

Booster(Regional Anchors- and Sectoral Anchor)shall be eligible to

avail 100% Banking, Wheeling and Transmission Charges waived

off/reimbursement (for Captive Power Plants set up) provided energy

generated is used for captive consumption only and no third-party

sale will be allowed:

- There shall be a ceiling of 200% on the size of the captive power

plant.

- 100% banking, allowed with no restrictions on withdrawals

during peak hours.

- For ‘behind the meter’ RE Plants, there should be no ceiling on

the maximum capacity of RE generation and ED exemptions

should be applicable on perpetuity, provided no power is

injected into the grid during off-peak hours.

17.2 Availability of Water:

Water Resources Department will allocate required quantity of water

from IGNP canal/the nearest available source for auxiliary

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7514

consumption for Solar PV Power Plants including cleaning of solar

panels and allocation of water for Solar Thermal Power Plants subject

to the availability of water. The Developer/Power Producer will

intimate estimated water requirement to RREC along with details of

the source of water. After assessment/scrutiny, case of water

requirement shall be forwarded to the Water Resources Department.

The modifications(s) required, if any, in the existing canal system will

be done by the Water Resources Department at the cost of the

Developer/Power Producer.

17.3 Banking:

Banking Facility and Charges will be governed as per the prevailing

RERC Regulations as amended from time to time. The State will

provide applicable benefit to the enterprises eligible under prevailing

RIPS.

17.4 Exemption/Relaxation from Electricity Duty-

Power Producers shall be exempted from payment of Electricity Duty

for Captive Use within the State for the enterprises eligible under

prevailing RIPS.

The consumer of Solar Power under clause 6.1(Rooftop Solar Plant)

and Wind Power Projects will be exempted from Electricity Duty as per

the Order/Notifications of the Government of Rajasthan issued from

time to time under the provisions of Rajasthan Electricity (Duty) Act.

17.5 Transmission and Wheeling Charges

Transmission and Wheeling charges will be governed by the prevailing

RERC Regulations, as amended from time to time. The State will

provide applicable benefit towards Transmission and Wheeling

charges, to theenterprises eligible under prevailing RIPS.

Approval Mechanism

18 The constitution of the committees for approvals/Clearance of RE

projects will be as under:

18.1 State SanctionCommittee (SSC)

i) ACS/Principal Secretary/Secretary, Energy, GoR(Chairman)

ii) Chairman & Managing Director, RVPN

iii) Managing Director, RREC

iv) Managing Director JVVNL/AVVNL/JdVVNL/ RUVITL

v) Representative of Finance department not below the rank of Joint

Secretary, GoR.

vi) Director (Finance), RREC

vii) Director (Technical), RREC - Convener

18.2 State Level Monitoring&Coordination Committee (SLMCC)

i) Chief Secretary, GoR (Chairman)

ii) ACS/Principal Secretary/Secretary, Energy, GoR.

7515 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

iii) ACS/Principal Secretary/Secretary, Industries, GoR.

iv) ACS/Principal Secretary/ Secretary, Revenue, GoR.

v) ACS/Principal Secretary/Secretary, Water Resources Department,

GoR.

vi) CMD, Rajasthan RajyaVidyutPrasaran Nigam Ltd.

vii) Chairman Discoms.

viii) Chairman, Rajasthan Renewable Energy Corporation Ltd.

ix) District Collector of concerned District (Special Invitee).

x) MD, Rajasthan Renewable Energy Corporation Ltd., (Member-

Secretary).

19 Approval/ Clearance of RE Power Projects:

19.1 For Bidding Projects under Clause 9.1,9.2,12.1,12.3.1,13.1(a), &14

These projects will be governed by the provisions of the bid document

and will not require approval/clearance from SSC/SLMCC. However,

the Developer/Power Producer will obtain all other necessary

clearance/approvals and shall submit quarterly status report and will

also submit all necessary clearances/approvals before commissioning

of the project in RREC.

19.2 Approval/Clearance

of

Power

Projects

under

Clause

9.3,9.4,11,12.2,12.3.2, 13.1(b) & 14

Approval/Clearance of projects for captive use/3rd party sale under 9.3,

9.4,11,12.2,12.3,13.1(b)&14

will

be

granted

after

evaluating/examining the Project Proposals on the following criteria:

Detailed Project Report

Availability of Land

Availability of Power Evacuation System for Proposed Project

Availability of Water for Solar Thermal plant, if required

Documentary evidence of Power Purchase Agreement or an

undertaking in case of sale to Third Party through Open Access or

undertaking for sale of power in the power exchange

On fulfilment of the above criteria, the project will be considered as In-

principally cleared and after deposition of Security Deposit; the Project

will be conveyed Final approval by RREC.

Note: Developers who have already submitted documents of financial

capability in last one year will not be required to resubmit the same.

19.3 WBA/Open access Agreement Execution

On fulfilment of the criteria under clause 19.2, such projects will be

recommended by RREC to DISCOMs/RVPN/CTUIL for execution of

WBA/Open Access agreement as the case may be.

19.4 Timeline for approval/Clearance:

The Developer/Power Producer to whom Government land is allotted

will have to apply for approval/clearance of the project within three

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7516

months from the date of signing of lease deed of the allotted

Government land. If Developer/Power Producer fails to apply for

approval/clearance within the time prescribed, RREC will recommend

for cancellation of allotment of Government land with the approval of

SSC.

19.5 RREC will develop an online portal for sanction/approval of the

proposals of RE Projects. RVPN & DISCOMs will communicate requisite

permissions/clearances to the RE Projects through the online portal

and decision of the Committees will be communicated to the applicants

through this portal in a time-bound manner.

20 Security Deposits:

20.1 For projects (excluding Bidding Projects) set up under Clause

9.3,9.4,11,12.2,12.3.2,13.1(b),14:

After

approval/clearance

of

the

projects

under

clause

9.3,9.4,11,12.2,12.3.2, 13.1(b) and 14, the Developer/Power Producer

will be required to deposit following security amount-

i. For Project of capacity ≤2000 MW, Rs. 1 Lac/MW by demand

draft/RTGS in favour of RREC.

ii. For Project of capacity> 2000 MW, Rs. 1 Lac/MW up to 2000 MW by

DD/RTGS and for exceeding capacity, Rs. 1 Lac/MW in form of

Bank Guarantee.

The Developer/Power Producer will have to deposit aforesaid Security

Deposit in RREC within one month without interest and within 3

months with interest @ 9% per annum from the date of issue of

approval/clearance. In case Developer/Power Producer fails to deposit

security money within stipulated time as mentioned above, then the

Approval/Clearance shall be deemed to be cancelled without any

notice.

The Developers/Power Producers who have already deposited

Security Deposit for allotment of Government Land will not be

required to deposit aforesaid Security Deposit.

20.2 In case the Developer/Power Producer wants to withdraw his project

within 6 months of depositing the security deposit then 25% security

deposit will be forfeited, and balance 75% amount of the security will be

refunded to the Developer/Power Producer on his written request.

20.3 The security amount deposited by the Developer/ Power Producers shall

be non-convertible and non-transferable.

20.4 The Security Deposit shall be refunded, on the written request of the

Developer/ Power Producer in proportion to the capacity commissioned

after the commissioning of such capacity. The remaining amount shall

be forfeited after the expiry of the scheduled commissioning period

including extension as per Clause 23.2.

20.5 For Bidding projects under clause 9.1,9.2,12.1, 12.3.1,13.1(a) &14

The Security Deposit will be governed by the provisions of bid

document and Power Purchase Agreement.

7517 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

21 Power Purchase Agreement:

The Power Purchase Agreement between the Developer/Power

Producer and Procurer of power will be executed in the following

manner:

21.1 Bidding

Projects

sanctioned

under

clause

9.1,9.2,12.1,

12.3.1,13.1(a)&14

For the projects sanctioned under these clauses, the Power Purchase

Agreement / Power Sale Agreement will be executed as per the

provisions of the bid document.

21.2 Power Projects for Captive use/ 3rdParty Sale:

For

the

projects

sanctioned

under

clause9.3,9.4,11,12.2,12.3.2,13.1(b),14the

Developer/Power

Producer will execute Agreement for Wheeling and Banking etc. with

DISCOM(s). In case, transmission system of RVPN/CTUIL is also used

then power producer will execute separate Transmission Agreement

with RVPN/CTUIL.

21.3 Assignment of PPA:

PPA/WBA will be allowed to be assigned in parts or full to other

parties under following conditions:

i. After completion of the project and its connectivity to the grid;

ii. Consent of RREC & RVPN/DISCOM(s) and related parties;

iii. On payment of Rs. 2.00 lac per application to RREC (GST will be

payable as applicable).

In case the project is financed by any Financial Institution/Lender,

the name of Financial Institute/Lender may be included in PPA on

request of Developer/ Power Producer.

22 Renewable Energy Development and Facilitation Charges (REDFC):

The Developers utilize Solar and Wind resources of the State for RE

Generation. State facilitates Developers for utilization of Land for

setting up of Renewable Energy Project to harness the RE Potential.

Wind and Solar Power are unpredictable and variable in nature and

their large-scale integration to the grid is a challenging task having

both technical and financial implications.

Transmission and Distribution Infrastructure requires continuous up

gradation, for which power utilities require investments in the system

for efficient RE injection into the grid. Further, the RE Project

installation in a particular area also impacts the area and there is

need and responsibility of the State to develop the local area and basic

infrastructure of the area particularly in the health and education

sector.

In view of above, charges will be required to be contributed by RE

Developers. Therefore, Rajasthan Renewable Energy Facilitation

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7518

charges is imposed on RE Developer to be collected in a Fund which is

being utilized as per the plan approved by the State Level Steering

Committee constituted under the chairmanship of Additional Chief

Secretary, Energy, Government of Rajasthan. This Development Fund

will be raised in the following manner:

22.1 In case of Power Project set up in Rajasthan for sale of power to parties

other than DISCOMs of Rajasthan, Rajasthan Renewable Energy

Facilitation charges shall be deposited by the power producer towards

Solar components of the project, from the date of commissioning, as

under:

The Developer/Power Producer will have an option of either paying

REDFC charges or supplying 7% of power generated to Rajasthan

Discoms free of Cost by installing additional capacity to that extent.

22.2 REDFC as above shall be levied on the projects which will be

commissioned on or after the commencement of this policy and for the

entire life cycle of the project, from the date of commissioning of the

project.

22.3 There will be no requirement to pay REDFCfor the Solar Power Projects

commissioned on or after the date of commencement of this Policy, for

sale of power to DISCOMs of Rajasthan either directly or through any

other Agency/Trader.

22.4 There will be no requirement to pay REDFCfor the Solar Power Projects

commissioned on or after the date of commencement of this Policy for

captive consumption within State.

22.5 Developer/Power Producer shall deposit the Renewable Energy

Development and Facilitation Charges by 30th April in every financial

year without interest and up to 30th June with interest @ 9% per

annum. If it is not deposited up to 30th June, then RVPN/DISCOM or

any other Central/State Govt. entity will take suitable action, such as

but not limited to recovery of dues from the power bill of the Power

Producer or disconnection from Grid till the depositing of dues with

interest, on recommendation of RREC.

23

Time frame for completion of Power Projects:

23.1 The time schedule for completion of Power Projects allocated through

Bidding process will be governed by provisions of Bid Document and

Power Purchase Agreement.

S.

N.

Period

Rate of Contribution

1

Project commissioned on or after

commencement of the Policy till

project life

Rs.50,000

/Hectare/Year

7519 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

23.2 The time schedule for completion of the Power Projects, sanctioned

under 9.3,9.4,11,12.2,12.3.2,13.1(b)&14 will beas per table 1& 2

(Annexure-A2).

Provided that extension in time schedule may be granted by RREC on a

case-to-case basis after depositing penalty amount along with

applicable GST as in Table 3 (Annexure-A2):

In case of delays beyond 15 months, Board of RREC,upon its

satisfaction, regarding commissioning of the project, may provide

further extension by imposing a penalty @ Rs. 2,000 per day per MW

for each day beyond the period of 15 months.This penalty for each day

of delay would be over and above the penalty of Rs. 2,00,000 per MW

for the delay up to 15 months.

24

Manufacturing of Solar/Wind Energy Equipment:

The Government aims to promote manufacturing facilities for Solar and

Wind Energy Equipment in Rajasthan, leading to both the development

of solar and wind energy eco-system and facilitating employment

generation in the State. Applicable incentives under Manufacturing

Standard Package or MSME Package will be available for the

enterprises eligible under the prevailing RIPS. Further, within

Manufacturing Standard Package, these enterprises will be offered

ThrustSectorBenefits.

Eligible RE Manufacturing units can avail benefits of Micro, Small and

Medium Enterprises (MSME) Policy/Act.

The State will supportRE Manufacturing units through various

incentives &facilities.To promote RE manufacturing, this will be linked

with RE generations in the State.

25 Power Evacuation, Grid Interfacing, Forecasting & Scheduling and

Dispatch of RE Power:

Power Evacuation, Grid Interfacing, Forecasting & Scheduling and

Dispatch of RE Power for RE Projects will be governed as per the

provisions of this policy (Section-E) and relevant Regulations of RERC.

Other initiatives

26 Project Management Consultancy (PMC):

RREC will work as a Project Management Consultant, on chargeable

basis, for implementation of Renewable Energy based projects taken

up by various Government Departments and Agencies. RREC may also

take up the works related to Renewable Energy sector in the Non-

Government

Domain/Government

agencies/Government

organizations.

27 RRECto undertake following studies in Renewable Energy for

further policy interventions:

i. Estimating the impact of promoting Solar Rooftop Capacity addition on

the grid and the state power utilities

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7520

ii. Assessment of various implementation models for setting up of EV

Charging Stations

iii. Improving the cost competitiveness of Solar Manufacturing Plants

iv. Analysing and identifying suitable technologies and implementation

models for Ancillary Services

v. Identification of actual requirement of storage capacity and suitable

technologies considering the demandcurveandgeneration profile of the

state

vi. Identifying the requirement for training and holding workshops for

capacity building of human resource of RREC regarding regulatory

framework and market reforms

vii. Identifinying optimal generation capacity mix of Renewable and

Conventional Energy Sources, considering possible technology options,

to match the future demand curve and energy requirement with the

generation profile of the State

viii. Analysing the methodology for forecasting and scheduling, efficient

accounting, metering and settlement of transactions of Renewable

Energy for making grid operations RE friendly

ix. Assessing the technical and financial impact of making the conventional

power plants flexible for ensuring large scale RE integration

x. Integrated planning leading to convergence between Transmission

Infrastructure Development and the location of Renewable Energy

projects

xi. Studying the Business life cycle of Solar Power Projects in context of

their impact on Environment.

xii. The matters referred by DISCOMs for promotion of RE in agriculture

sector.

28 Research and Development

The State will promote research in Renewable Energy. RREC will

provide facilitation including Land Allotment and funding for

establishment for R&D/training centre and research work to the

premier Research Institutes, Universities, Associations etc.

29 Virtual RE Power Generation

State Government will promote Solar Projects based on Virtual PPAs or

contract for differentials wherever such contracts are in compliance

with applicable laws. Such projects would be required to deposit 10% of

revenue generated from carbon credits to RREC in lieu of Government

Land Allotment and other facilitation by RREC.

30 Carbon Trading

30.1 The State will promote Carbon Trading for RE Sector through various

National

and

International

mechanisms

in

line

with

guidelines/directions issued by GoI. The Plant to be established for

Carbon Trading, benefit of Carbon Trading will be shared by the

generators with the Discoms.

30.2 State Government will promote RE projects based onThird Party Sale

where the consumer is not using electricity to meet RPO compliance,

7521 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

and such projects will be entitled to avail carbon credits. Such projects

would be required to deposit 10% of revenue generated from carbon

credits to RREC in lieu of Government land allotment and other

facilitation by RREC.

30.3 Promotion of Energy Efficiency

The State will promote Energy Efficiency/Conservation in Residential,

Industries (MSME), and Commercial Building sectors. The Government

will reward exemplary Energy Efficiency Initiatives.

31 Net Zero Buildings

The State will promote Net Zero Buildings, and such Buildings will be

awarded/incentivized by the State.

32 Greening of supply chain

To enable consumers to adopt renewable energy, DISCOM may supply

100% Renewable Energy upon requisition for RE power made by such

consumers at a Green Power Supply Tariff, as determined by RERC from

time to time.

Distribution Companies shall give Green Certificate on a yearly basis to

the consumers for green energy supplied to the consumers on their

request beyond the Renewable Purchase Obligation of the consumers.

33 Green Energy Open access & Energy Accounting

The Consumers would be allowed touse RE Power by installing RE Plants

at any location in the State.Otherwise they can avail RE power from any

developer either directly or indirectly.

The size of the plant for open access of RE Power, energy accounting,

banking facility and open access chargesetc.for all Renewable Energy

Projects, including rooftop projects, shall be as per the regulations framed

by RERC from time to time in accordance with the Green Energy Open

Access Rules 2022 notified by the Ministry of Power, GoI as amended

from time to time.

RVPN

will

endeavour

to

get

concessional

transmission

charges

determined from RERC to evacuate RE power into CTU Network from

RVPN’s GSS directly connected to CTU Network.

34 Power to remove difficulties:

SLMCC is authorized to issue necessary clarification and amendments of

this section & section-E of the policy as and when required. If any doubt,

dispute,

difference

or

issue

arises

with

regard

to

interpretation/implementation of this section of the Policy, or pertaining

to any interdepartmental issues, the State Level Monitoring &

Coordination Committee (SLMCC) may take decision in such matters, not

inconsistent with the provisions of the Policy, as may appear to be

necessary and expedient for removing the difficulties either on its own

motion or on a written representation from the stakeholders.

In order to implement this policy and to remove difficulties of

stakeholders,

Energy

Department

shall

issue

necessary

guidelines/schemes/orders as and when required.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7522

SSC will resolve the disputes related to RE Projects in the State regarding

implementation of the RE project/Parks in the State.

RREC will work towards simplification of various approvals required for

setting up of RE facility in State, as a step towards ensuring ease of doing

business.

ANNEXURE-A1

The Power Producers desirous of setting up Solar/Wind/Hybrid Power

Plant in State of Rajasthan under captive use/sale to 3rd party within

and outside the State must fulfil the following minimum financial

criteria:

Qualification Criteria for Solar PV/Thermal/Wind/Hybrid Projects:

Net Worth

The “Net Worth” of the company should be equal to or greater than the value

calculated at the rate of Rs 1 Crore or equivalent US$ per MW of the project

capacity. The computation of Net Worth shall be based on unconsolidated

audited/unaudited accounts of the company. For the purpose of the

computation of net worth, the best year in the last four years including

current running year shall be considered. The Company would thus be

required, to submit annual audited accounts for the last three financial years

and for part of the current running year (Un-Audited), while indicating the

year, which should be considered for evaluation, along with a certificate from

a Chartered Accountant to demonstrate the fulfilment of the criteria.

For companies, which are newly incorporated, the Net Worth criteria should

be met seven days prior to the date of submission of application by the Project

Developer. To demonstrate fulfilment of the criteria, the Project Developer

shall submit a certificate from a Chartered Accountant certifying the Net

Worth on the date seven days prior to submission of application. Further, the

Project Developer shall submit the un-audited financial statements of the

company for the date on which the Certificate of Chartered Accountant has

been obtained.

{Note:For the Qualification Requirements, if data is provided by the Project

Developer in foreign currency, equivalent rupees of Net Worth will be

calculated using bills selling exchange rates (card rate) USD/INR of State

Bank of India prevailing on the date of closing of the accounts for the

respective financial year as certified by the Project Developer's banker.

For currency other than USD, Project Developers shall convert such currency

into USD as per the exchange rates certified by their banker prevailing on the

relevant date and used for such conversion.}

Net Worth calculation for an individual/partnership firm

Net-Worth = Proprietors/Partner’s Capital reflecting in the Audited Balance

Sheet

Add: Free Reserves (Including the Credit balance of Reserve and

Surplus appearing in the Balance Sheet)

Subtract: Intangible Assets

7523 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

Subtract: Miscellaneous Expenditures to the extent not written off and

carry forward losses.

Net Worth calculation for a Company

Net-Worth =Paid up Share capital which includes

1. Paid up Equity share capital and

2. Fully, compulsorily and mandatorily convertible Preference Shares

and

3. Fully, compulsorily and mandatorily convertible Debentures)

Add: Free Reserves

(Including share premium provided it is realized in Cash or Cash

equivalents.)

Subtract: Revaluation Reserves

Subtract: Intangible Assets

Subtract:

Miscellaneous Expenditures to the extent not written off

and carry forward losses.

For the purposes of meeting financial requirements only unconsolidated

audited annual accounts shall be used. However, audited consolidated

annual accounts of the Project Developer may be used for the purpose of

financial requirements provided the Project Developer has at least twenty six

percent (26%) equity in each company whose accounts are merged in the

audited consolidated account and provided further that the financial

capability of such companies (of which accounts are being merged in the

consolidated accounts) shall not be considered beyond the equity

participation of Project Developer.

In case of a Consortium the financial requirement to be met by each Member

of the Consortium shall be computed in proportion to the equity commitment

made by each of them in the Project Company. Any Consortium, if selected

shall incorporate a Project Company with equity participation by the Members

in line with Consortium Agreement before signing the PPA/WBA/Wheeling

Agreement. The Project Developer may seek qualification on the basis of

financial capability of its Parent Company.

In case of land/any other asset, only the book value will be considered. The

value of land/any other assets will not be re-valued for calculating net worth.

Any reserve created due to this shall not be counted for calculating Net worth.

Annexure-A2

Table-1

Time line of project completions

Type of Projects

Time schedule for completion from

the date of Clearance/Approval

SPV:

Up to 20 MW capacity

Within 15 Months

More than 20 MW and up to 50 MW

capacity

Within 18 Months

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7524

More than 50 MW capacity

Within 24 Months

CSP:

Up to 25

MW capacity

Within 24 months

More than 25 MW and up to 100 MW

capacity

Within 36 months

More than 100 MW and up to 200 MW

capacity

Within 42 months

More than 200 MW capacity

Within 48 months

Table-2

Wind & Hybrid Projects

Project Capacity

Time schedule for completion from the

date of Clearance/Approval

Up to 25 MW

8 Months

Above 25 MW- 50 MW

14 Months

Above 50 MW - 75 MW

18 Months

Above 75 MW - 100 MW

22 Months

Above 100 MW

26 Months

Note: Time lines of the other projects shall be specified by the Energy

department separately.

Table-3

Penalty for delay in commissioning beyond Scheduled period of

commissioning

S.No.

Period of delay

Penalty on un-commissioned capacity

i.

For delay up to 1 month

Rs 25,000 per MW

ii.

For delay up to 3 months

Rs 50,000 per MW

iii.

For delay up to 6 months

Rs 1,00,000 per MW

iv.

For delay up to 9 months

Rs 1,50,000 per MW

v.

For delay up to 15 months

Rs 2,00,000 per MW

Section B:Storage Plant (PSP & BESS)

1. Introduction

1.1 India is undertaking a significant energy transition with a goal to generate

50% of its electricity generation capacity from Non-Fossil Fuel sources by

2030 and to achieve net zero emissions by 2070. To meet these objectives

and ensure energy self-reliance, the country is prioritizing the optimization

of its domestically available renewable energy resources. A crucial

component of this strategy is the development and integration of advanced

7525 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

Energy Storage Systems (ESS). Energy Storage Technologies, such as

Batteries and Pumped Hydro Storage which are essential for addressing

the intermittency of renewable energy sources like Solar and Wind. By

storing excess energy generated during periods of high production and

utilizing it during times of high demand, these systems enhance grid

stability and reliability. Additionally, Energy Storage facilitates better load

management and reduces dependency on fossil fuel-based peaking Power

Plants. As India accelerates its Renewable Energy deployment, robust

Energy Storage Solutions will play a pivotal role in ensuring a sustainable

and resilient energy infrastructure.

1.2 The National Electricity Plan (NEP) 2023 of the Central Electricity

Authority (CEA) projects a significant increase in energy storage capacity

requirements. By the year 2026-27, the requirement is projected to be

16.13 GW (82.37 GWh), with 7.45 GW (47.65 GWh) from Pumped Storage

Plants (PSP) and 8.68 GW (34.72 GWh) from Battery Energy Storage

Systems (BESS). This requirement is expected to further rise to 60.63 GW

(336.4 GWh) by the year 2029-30, comprising 18.98 GW (128.15 GWh)

from PSP and 41.65 GW (208.25 GWh) from BESS.

1.3 Moreover, CEA has projected that by the year 2047, the requirement of

Energy Storage is expected to increase to 320 GW (90 GW PSP & 230 GW

BESS) with Storage Capacity of 2380 GWh (540 GWh PSP & 1840 GWh

BESS) due to the addition of a large amount of Renewable Energy in light

of the Net Zero Emission target set for 2070.

1.4 To meet the evolving needs of the Energy Storage System, the Government

of India has periodically issued various directives. In 2021, the

Department of Heavy Industries introduced the Production Linked

Incentive (PLI) scheme for Advanced Chemistry Cell (ACC) Battery Storage.

In 2022, the Ministry of Power set out the Renewable Purchase Obligation

(RPO) and Energy Storage Obligation (ESO) Trajectory until 2029-30. In

2023, the Ministry of Power released guidelines for Pump Storage Projects

(PSP) and the National Framework for Promoting Energy Storage Systems,

along with operational guidelines for Viability Gap Funding for Battery

Energy Storage Systems. Additionally, the Ministry of Environment, Forest

and Climate Change issued the Battery Waste Management Rules in 2022.

1.5 The State of Rajasthan will promote the Energy Storage Programme by

simplifying regulatory processes and offering financial incentives. This

initiative aims to enhance energy reliability, support the integration of

renewable energy, and reduce dependency on conventional energy

sources. It is expected to attract investments, stimulate technological

advancements, and contribute to the state's sustainable energy goals, in

alignment with the guidelines of both the State Government and the

Government of India.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7526

1.6 Among all Energy Storage Technologies, Battery Energy Storage Systems

(BESS) and Pumped Hydro Storage Projects (PSPs) are well-established

and mature technologies, and these technologies can play a pivotal role in

enhancing energy security and aiding the transition to a more affordable,

low-carbon electricity market. They provide flexible, dispatchable, and

peak power capacity.

2. Vision and Objective

2.1. To become a major contributing state for achieving the national target of

500 GW through non fossil fuels by 2030.

2.2. To ensure 24×7 Dispatchable Renewable Energy, to achieve round-the-

clock Renewable Energy availability.

2.3. To reduce emissions and costs by decreasing the Greenhouse Gas

Emissions and overall energy costs by incentivizing ESS deployment,

reducing reliance on Fossil Fuels.

2.4. The State will promote the enhancement of grid stability by improving

reliability through ESS, this will also provide services such as frequency

regulation and voltage support, ramping and other ancillary support

services.

2.5. The State will promote energy independence in remote and isolated

communities through the deployment of ESS.

2.6. To promote the policy of ESS to attract investment in the Clean Energy

Sector, to increase the local employment opportunities and in turnlead to

development of theState Economy.

2.7. The State will promote the creation of an environment that enables

industry and research institutions to focus on cutting-edge research and

innovation to enhance ESS performance, safety, and cost-effectiveness.

2.8. Support DISCOMs in meeting their Renewable Purchase Obligation (RPO),

Hydro Purchase Obligations (HPO), and Energy Storage Obligation (ESO)

as per regulations.

3. Application and use of ESS in power sector:-

3.1. ESS have a multitude of applications in the energy sector and can be used

independently or as a part of power system infrastructure across various

levels, including generation, transmission, and distribution.

3.2. Integration of Renewable Energy involves managing intermittency by

storing excess energy generated during peak production times, such as

sunny or windy periods, for use when generation is low. Additionally,

Energy Storage Systems help smooth the output of Renewable Energy

sources, reducing variability and making their output more predictable

and manageable.

3.3. ESS contribute to grid stability and reliability by providing frequency

regulation to balance energy supply and demand, ensuring stable grid

frequency. They also offer voltage support by supplying reactive power to

7527 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

maintain required voltage levels, and act as backup power sources during

outages or disruptions, enhancing overall grid reliability.

3.4. Energy independence and security are enhanced by Energy Storage

Systems, which enhance the resilience of Energy Systems against

disruptions such as natural disasters and cyber-attacks. Additionally, they

reduce dependence on imported fuels by maximizing the use of local and

Renewable

Energy

Sources,

contributing

to

greater

resource

independence.

4. Pumped storage hydro projects (PSP):-

Energy generated from hydro power projects has been recognized as

Renewable Energy across the world. Large Hydropower Projects including

Pumped Storage Projects having capacity more than 25 MW and energy

from all Small Hydro Projects commissioned after 08 March 2019 will be

considered as RE projects.

4.1.

The State will envisage the development of PSP projects on their own

through Hybrid Annuity Model (HAM). The guidelines for the same will be

notified separately by the Energy Department.

4.2.

The State can also allocate PSP sites to developers through the

following modes:-

Mode I: Nomination of CPSUs or SPSUs:

i. State may award Pumped Storage Projects directly to the CPSUs or

SPSUs on a nomination basis.

ii. Interested CPSUs/SPSUs may submit their proposals along with

PFR to RREC detailing the execution timelines and methodology

for implementation. Due consideration will be given to the

timeline for execution, track record of projects executed in the

past, financial strength of the entity, and current projects of the

entity in the pipeline.

iii. These proposals shall be presented before the High Level Screening

Committee (HLSC) in order to seek permission to initiate the

project.

iv. The Projects may also be allotted to Joint Ventures (JVs) between

CPSUs and / or SPSUs for development of such PSPs.

v. In such Projects the State Govt. Power Utilities shall be given the

right of first refusal of up to 80% of Project Capacity. The tariff for

this portion will be determined by the State Commission in

accordance with Section 62 of the Electricity Act 2003 or

discovered through bidding of remaining power, whichever is

lower.

vi. The Developer shall submit the Letter of Offer for at least 80% of the

project capacity to the State Govt. after receiving the cost

estimate approval from the CEA. If State Govt. does not provide

acceptance on full or part of offered capacity within 8 weeks of

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7528

Letter of Offer, the Developer would be free to sell the balance

project capacity.

Mode II: Allotment through Competitive Bidding:

i. For PSP sites identified by State, a detailed proposal will be

prepared, which shall be presented before the High Level

Screening Committee (HLSC) in order to seek permission to

initiate the project.

ii. The State Govt may conduct a competitive bidding for these state

identified sites for allocating the projects to the private

developers.

iii. The CPSUs and State PSUs can also participate in the bidding.

The State Govt. may adopt one of the below methodologies of bidding:

1. Two stage competitive bidding:

i. The first stage shall be for pre-qualification based on criteria such as

financial strength, experience in developing Power Projects of a

similar scale, past track record in project development, turnover, and

the capability to meet Performance Guarantees.

ii. In the second stage, bids are to be called based on quantifiable

parameters. such as "Maximum amount per MW per year to be paid

to State" or any other parameter as specified by the Central/State

Government

iii. The State Utility shall have the first right of refusal for up to 80% of

the project capacity. The tariff for this portion will be determined by

the State Commission in accordance with Section 62 of the

Electricity Act 2003 or discovered through bidding of remaining

power, whichever is lower.

iv. This refusal will be mentioned in the bid document.

2. Tariff Based Competitive Bidding (TBCB):

PSPs may also be awarded on a TBCB basis to Developers. For this

purpose, the task of carrying out S&I and preparation of DPR may be

given to an SPV under a CPSU/State PSU. SPV may be responsible

for pre-construction activities such as preparation of project report,

land acquisition, environment and forest clearance etc. The DPR may

be subsequently bid out for construction and SPV will be transferred

to the successful bidder and the bids may be invited based on:

i. Composite Tariff (including the cost of input power) in case input

power is arranged by the Developer, Or

ii. Tariff for storage on a per Megawatt Hour basis if the input power is

to be arranged by the State power utilities.

iii. The Rajasthan Electricity Regulatory Commission (RERC) shall

adopt the above tariff under section 63 of Electricity Act, 2003

Mode III: Allotment of Self-Identified Off-stream closed loop sites:

7529 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

i. The State Govt. shall promote identification and development of off

stream closed loop sites of PSPs by encouraging Developers to self-

identify sites. RREC shall open a window inviting proposals for

self-identified sites from time to time.

ii. Developers shall submit the proposal with complete details of the

identified site, storage potential and techno-commercial viability

along with pre-feasibility report for the State Govt.’s evaluation.

iii. A Developer can submit only one proposal within the duration of a

particular window.

iv. These proposals for particular sites shall be entertained on the "First

Come First Served" basis.

v. These proposals shall be presented before the High Level Screening

Committee (HLSC).HLSC’s decision shall be final regarding these

proposals.

vi. The State Utility shall have the first right of refusal for up to 50% of

the project capacity. The tariff for this portion will be determined

by the State Commission in accordance with Section 62 of the

Electricity Act 2003 or discovered through bidding of remaining

power, whichever is lower.

vii. The Developer shall submit the Letter of Offer for at least 50% of the

project capacity to the State Govt. after receiving the cost estimate

approval from the CEA. If State Govt. does not provide acceptance

on full or part of offered capacity within 8 weeks of Letter of Offer,

the Developer would be free to sell the balance project capacity.

4.3.

Approval of Pumped Storage Projects:

1. To facilitate the seamless allocation of sites, a High-Level Screening

Committee (HLSC)will be constituted under the chairmanship of

ACS/Principal Secretary, Energy, GOR. This committee shall permit the

initiation of the project after a thorough evaluation/examination of the

project proposals.

2. Final Approval/clearance for Pumped Storage Projects will be conferred by

the State Level Monitoring and Coordination Committee (SLMCC) after

evaluating / examining the project proposals on the following criteria:

o Detailed Project Report (DPR)

o Availability of water/ Water Allotment Certificate accorded by WRD

o Environment Clearance

o Forest Clearance

o Availability of land

o Availability of Power Evacuation System

o Documentary evidence of PPA or an undertaking in case of 3rd

party / power exchange sale

The Developer should obtain the final approval of DPR and other clearances

within Two(2) years from the date of Registration of the project. Relaxation of

1 year may be granted to those projects where delay in start of construction is

attributable to pending Environment Clearance (EC) and Forest Clearance

(FC), provided that the applications are submitted to concerned authorities

within timelines agreed at the time of award of the project. Otherwise, the

developer shall be liable to cancellation of project site.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7530

The Storage Projects registered with RE project prior to this policy have to

obtain all clearances including final approval of DPR within two year from

registration date or one year from the date of notification of this policy.

The constitution of the committees for approvals/Clearance of PSP projects

will be as follows:-

A. High Level Screening Committee (HLSC):

1. ACS/Pr.Secy/Secretary, Energy, GoR- Chairman

2. ACS/Pr.Secy/Secretary, WRD or their representative (Not below the rank

of Chief Engineer)– Member

3. ACS/Pr.Secy/Secretary, Forest & Environment or their representative–

Member

4. ACS/Pr.Secy/Secretary, Revenue or their representative – Member

5. ACS/Principal Secretary/Secretary, Industries, GoR

6. CMD/MD, RVPN or their representative – Member

7. Chairman Discoms or their representative – Member

8. CMD/Managing Director, Rajasthan Renewable Energy Corporation

Ltd.– Member

9. District Collector of concerned District (Special Invitee).

10. Director (Technical), Rajasthan Renewable Energy Corporation Ltd -

Convener

B. State Level Monitoring and Coordination Committee (SLMCC):

1. Chief Secretary, Rajasthan (Chairman)

2. ACS/Principal Secretary/Secretary, Energy, GoR.

3. ACS/Principal Secretary/Secretary, Water Resources Department, GoR.

4. ACS/Principal Secretary/Secretary, Forest & Environment, GoR.

5. ACS/Principal Secretary/ Secretary, Revenue, GoR.

6. ACS/Principal Secretary/Secretary, Industries, GoR

7. CMD, Rajasthan RajyaVidyutPrasaran Nigam Ltd

8. Chairman, Discoms.

9. Chairman, Rajasthan Renewable Energy Corporation Ltd.

10. MD, Rajasthan Renewable Energy Corporation Ltd., (Member –

Secretary)

4.4.

Obligations:

4.4.1. Obligation towards the state DISCOM

Developers are mandated to make power available to the state as and

when required from their power share reserved for sale in Day Ahead

Market of Power exchange(s).

This power shall be made available to the state at the tariff discovered

in the PPA(s) of the project or the price discovered in the power

exchange for that particular period, whichever is lower.

4.4.2. Regulatory compliances

Developer shall mandatorily follow the guidelines issued by the

Government of India and State Government from time to time on

7531 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

Local Area Development and Rehabilitation & Resettlement policies

applicable for Pumped Storage or Hydro Projects.

Developer shall mandatorily comply with the Grid Code including

Load Dispatch & System Operation Code, Metering Code, Safety Code

&relevant regulations / orders issued by CERC and RERC as per

applicability.

4.4.3. Progress assessment

The Developer shall submit monthly progress report to the Nodal

Agency. Moreover, a review of the progress of the PSPs shall be

undertaken every 6 months by the HLSC and if it is found that there

is no substantial progress in the development of project for two

continuous review meetings, HLSC may cancel the registration and

project site.

4.4.4. Land charges

Developer shall pay lease charges for the allotted Govt. land as per the

provisions of Rajasthan Land Revenue (Allotment of land for setting

up of Power Plant based on Renewable Energy Sources) Rules, 2007,

as amended from time to time.

For the sustenance of livelihood of people in the local vicinity, the

Developer shall pay minimum Rs. 25,000/acre/year (With an

increase of 5% every third year) rental charges to the owner for the

acquired private land.

4.4.5. Obligations in case state opts for procurement of power

In case the State opts for procurement of power, the Developer shall

be required to deposit bank guarantee of Rs. 1 lac / MW by

DD/RTGS corresponding to the capacity to be procured by the state.

Such Bank Guarantee shall be deposited 6 months prior to the

scheduled date of start of procurement of power.

In case the Developer fails/delays to deliver the committed power to

the state from the Date of Procurement, it shall be liable to pay the

differential amount incurred in procuring such power for the period

of delay.

4.5.

Operational Period

4.5.1. The Pumped Storage Projects shall be offered for a maximum period of

forty-five (45) years from the Date of Allotment at the end of which

they shall revert to the State Govt. or be extended further upto thirty

(30) more years in line with the prevailing rules & regulations and

applicable charges after approval of the state government.

4.5.2. At the end of the Concession Period, the projects without any

encumbrances

shall

be

ordinarily

transferred

to

the

State

Government.

4.6.

Land allotment

4.6.1. Allotment of Land for the project shall be as per the provisions of

Rajasthan Land Revenue (Allotment of land for setting up of Power

Plant based on Renewable Energy Sources) Rules, 2007, as amended

from time to time.

4.6.2. GovernmentLand, if any, will be recommended by RREC on case to

case basis after acceptance of non-forest land for Compensatory

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7532

Afforestation (CA) by Forest Department or after getting Stage-I forest

clearance.

5.

Battery Energy Storage System (BESS)

5.1.1. The State will promote the establishment of BESS, where each

individual project must have a minimum power rating of 1 MW or

higher, an appropriate energy rating based on the specific

application, and be located at a single site with a minimum bid

capacity of 1 MW.

5.1.2. Energy supplied from Standalone BESS will be considered as RE

power. Moreover, if 85% or more of the total energy stored in the

BESS, on an annual basis, is procured from RE Sources, such

energy shall be considered for ESO as specified by appropriate

Regulators/Ministries of GoI.

5.1.3. The State will promote setting up of BESS under the Guidelines/

schemes of MNRE or BESS allocated through competitive bidding

by/for other State Utilities/Entities.

The State will promote the setting up of BESS for sale of power to

DISCOMs of Rajasthan on the tariff discovered through competitive

bidding process in order to fulfil ESO and RPO target fixed by RERC.

DISCOM/ RUVITL may purchase solar power beyond ESO/RPO limit

and can avail the benefit of REC as per CERC Regulations/ NLDC

guidelines.

5.2.

Approval Mechanism:-

Approval/Clearance

of

BESS

projects

will

be

granted

after

evaluating/examining the project proposals on the following criteria:

Detailed Project Report

Availability of land

Availability of Power Evacuation System for Proposed Project

Documentary evidence of Power Purchase Agreement or an

undertaking in case of sale to third Party/ power exchange through

open access.

On fulfilment of the above criteria, the project will be conveyed Final

approval by RREC.

The State Level Monitoring & Coordination Committee (SLMMC) will be

constituted to resolve inter departmental issues:

1. Chief Secretary, Rajasthan (Chairman)

2. ACS/Principal Secretary/Secretary, Energy, GoR-Member.

3. ACS/Principal Secretary/Secretary, Industries, GoR-Member.

4. ACS/Principal Secretary/ Secretary, Revenue, GoR-Member.

5. CMD, Rajasthan RajyaVidyutPrasaran Nigam Ltd-Member.

6. Chairman, Renewable Energy Corporation Ltd. -Member.

7. Chairman, DISCOMs-Member.

8. District Collector of concerned District (Special Invitee)

7533 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

9. MD, Rajasthan Renewable Energy Corporation Ltd., (Member –

Secretary)

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7534

5.3.

Obligations

5.3.1. Regulatory compliances

Developer shall mandatorily follow the guidelines applicable for

Energy Storage Projects issued by the Government of India and

State Government from time to time. It shall comply with the

relevant environmental laws, regulations, and orders.

Developer shall mandatorily comply with the Grid code including

Load Dispatch & System Operation Code, Metering Code, Safety

Code& relevant regulations/orders issued by CERC and RERC as

per applicability.

5.3.2. Obligations in case state opts for procurement of power

In case the State opts for procurement of power, the developer shall

be required to deposit bank guarantee of Rs. 1 lac / MW by

DD/RTGS corresponding to the capacity to be procured by the

State. Such bank guarantee shall be deposited 6 months prior

from the scheduled date of start of procurement of power.

In case developer fails / delays to deliver the committed power to

the state from the date of procurement, it shall be liable to pay the

differential amount incurred in procuring such power for the

period of delay.

5.4. Land Allotment

GovernmentLand, if any, shall be recommended by RREC on case to

case basis. For bidding projects, Govt. land, if any, shall be

recommended by RREC only after submission of LOA.

5.5. BESS projects through Hybrid Annuity Model:

The state will envisage the development of BESS projects on its own

Hybrid Annuity Model (HAM). The guidelines for the same will be

notified separately by the energy department.

6.

Energy Storage Projects integrated with Renewable Energy

projects

State requires reliable power during peak hours of the day which has to be

fulfilled by Distribution Companies through available non-fossil power

sources or from power exchange at market price. High demand of power

during peak hours increases market power whereas Solar Power

Evacuation Systems remain idle during non-solar hours.During non-solar

hours, this idle power evacuation system can be utilized for supply of firm

RE Power into grid by installing BESS with RE power. This initiative will

help to reduce the cost of power during peak hours and ensure grid

stability without expanding power evacuation system.

7535 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

6.1. The State will promote Solar/Wind/Hybrid Power Projects with storage

systems to reduce the variability of output of RE power into the grid and to

ensure availability of firm power for a particular period.

6.2. In the case of Integrated Projects, the Wind and Solar part will be governed

by Section A of this policy and the related ESS will be governed as per the

provisions of this Section B of this policy.

6.3. In order to encourage storage capacity to supply reliable power, new RE

projects integrated with BESS under with minimum capacity of X/2 MWh

(where “X” is the installed capacity of RE project) shall be given 50%

exemption from registration charges for the RE capacity and on

installation of BESS beyond X/2 MWhcapacity, registration charges shall

be exempted up to 100% on pro rata basis corresponding to the storage

capacity added.

6.4. In order to ensure adequate storage capacity to supply reliable power, new

RE projects on STU network (excluding Hydro Projects) with an installed

capacity of over 5 MW or as specified by the central Government will be

mandated to install ESS (of at least 2 Hour storage) for minimum 5% of

the RE capacity.

6.5. RE Generators would be allowed to set up BESS along with their existing

RE Plant to supply peak power/RTC power into the Grid for optimum

utilization of existing evacuation system. The RE Generators can enhance

the RE capacity for storage of RE Power through BESS by itself or owned

by any other entity for injection into grid. Discoms can procure such

power from the generators at a tariff determined by RERC/ through a

transparent mechanism as per their requirement and commercial viability.

6.6. State will encouragesetting up BESS and supplying power during peak

hours

to

Discoms

at

a

ceiling

tariff

decided

by

appropriate

commission/authority.

Such

Projects

can

also

supply

power

to

Captive/Open Access consumers at mutually agreed tariff. Remaining

capacity after meeting Discom Load, shall be allowed to avail GNA for

injection into ISTS Grid.

6.7. CaptiveConsumers and Open Access Consumers will be allowed to store

surplus RE power through BESS and such power can be utilized by the

consumer itself or can be used for sale to Power exchange etc.

6.8. The State will promote ESS in decentralized Rooftop Solar Plants and Grid

Scale RE Project to meet power demand of the consumers.

6.9. The BESS will be also promoted to set up at GSS end or at Distribution

Load Centre, particularly where infirm RE injection is very high in

comparison to load demand.

6.10. Integrated Projects (ESS with RE) already registered prior to notification of

the present policy will not be required to re-register under this policy.

7.

Project Facilitation:

7.1. The Nodal Agency shall assist the Project Developer in obtaining the

consents, clearances and permits by providing letters of recommendation

to the concerned authorities, as may be requested by the Project

Developer. However, the Nodal Agency shall not be accountable for any

delays in obtaining the consents, clearances and permits required for

development of RE projects.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7536

7.2. All Government of India initiatives under MNRE (or any others), such as

Central Finance Assistance, VGF, Budgetary support towards cost of

enabling infrastructure, waiver of interstate & intrastate transmission &

wheeling charges, Benefits under Rajasthan Industrial Policy etc. as

applicable shall be extended to the Project Developer and the Nodal

Agency may facilitate seamless transfer of such benefits.

7.3. The Nodal Agency may assist or facilitate Pumped Storage Project

developersin availing applicable incentives offered to enterprises eligible

under the prevailing RIPS

7.4. (Incentives as specified under clause 4.1.1.2 of RIPS, 2024)

Transmission & Wheeling charges shall be exempted on supply of power

from BESS during peak hours or non-solar hours for a capacity of 2000

MW capacity or capacity installed by 2030 whichever is earlier for the

followings:

i. RE Integrated Storage project with a capacity of 5% of RE capacity will be

eligible for exemption of75% on Transmission and Wheeling charges for

a period of 7 years. For BESS beyond 5% of RE capacity will be eligible

for extra exemption of additional 1% Transmission and Wheeling

charges on enhancement of each 1% capacity of storage system up to

30% capacity. For BESS beyond 30% of RE capacity, will be exempted

from100% Transmission & Wheeling charges.

ii. Standalone Battery Energy Storage System (BESS) will be exempted 100%

transmission and wheeling charge on supply of power from BESS

during peak hours or non-solar hours for a period of 7 years.

iii. BESS connected at 11 kV or 33 kV grid sub stations will be exempted

100% transmission and wheeling charges

7.5. State Government may allocate Government Land at concessional rates to

BESS projects supplying power to the Discoms of the Rajasthan.

a. The Nodal Agency will provide support and assistance to the project in

obtaining grants for special category projects under Central

Government schemes.

b. Under this Policy, registered or upcoming projects shall also be eligible

to avail Viability Gap Funding (VGF) as per the schemes of the

Ministry of Power, Government of India

c. ESS projects may receive applicable incentives offered to enterprises

eligible under the prevailing RIPS.

8.

Registration of ESS Projects

a. All ESS projects installed in the state of Rajasthan shall be required to

be registered with RREC.

b. The Developer will submit an online application to RREC for

registration in the prescribed format along with requisite documents,

net worth criteriaspecified at annexure-A1 and details regarding

capacity of BESS and PSP Projects.

c. The ESS project of Pump Storage Hydro (PSP) will be registered after

getting approval from HLSC.

d. Each Developer of PSPand BESS will deposit non-refundable

registration charges of Rs.10 Lakh/per project with RREC.

7537 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

DRAFT

e. GST and other charges, as applicable, shall be payable in addition to

the Registration Charges. Registration will not confer any right to the

Developer/Power Producer and will not create any obligation on the

part of RREC.

f. The ESS Projects registered (Other than PSPs) under this Policy shall

have to apply for in-principal clearance within a period of 2 years from

Date of Registration, failing which the registration shall be deemed to

be cancelled.

g. No prior registration with RREC will be required by Developer for

participation in bidding. Only successful bidders will be required to

register their projects with RREC.

h. Developer can transfer its registered capacity or part thereof to its

'holding', 'subsidiary', 'fellow subsidiary' or 'ultimate holding' company

with the prior approval of RREC.

i. Developer can transfer the registered capacity or part thereof from one

registration to its other registration with the prior approval of RREC.

9.

Power to Remove Difficulties

State Level Monitoring and Coordination Committee (SLMCC) is

authorized to issue necessary clarifications and amendments under

this section of the Policy as and when required. In the event of any

doubt, dispute, difference, or issue concerning the interpretation or

implementation of this section of the Policy, the SLMCC may make

decisions on such matters. These decisions must align with the

provisions of the Policy and aim to resolve difficulties, whether initiated

by the Committee itself or based on a written request from

stakeholders.

The Energy Department in consultation with other department shall

issue necessary guidelines/ schemes/orders for the implementation of

this Policy.

Annexure-B1

Particulars in Pre-feasibility Report

Upper and Lower Reservoir Details: -

Availability of Upper/Lower Reservoirs with geological coordinates.

Land area required with details such as Revenue/Forest/Private.

Storage capacity of Reservoirs with Live and Dead Storage.

Full Reservoir Level (FRL) and Minimum Draw Down Level (MDDL) of the

available Reservoir(s)

Gross Head available at Site with Length to Height (L/H) Ratio of the

Reservoir.

Deepest Foundation level and Maximum height of Rockfill Embankment.

Location Details: -

District/Tehsil/Village name in which the site is located and Status of the

approach roads.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7538

Geological coordinates of existing transmission &/or distribution network

and GSS with distance from site

Detail of Interference with Wildlife Sanctuary & National Park or any other

restricted Area

Geographical Maps & Pictures of location

Forest and non-forest land required

Survey & Investigation: -

Reconnaissance topographical survey

Hydro Meteorological data with Seismicity

Water availability and water requirement at project location

Designated route for source of one time water requirement.

Evaporation and Sedimentation

Design Flood and Flood absorption

Area of Submergence / Land Acquisition

Other Details: -

Total estimated potential of PSP in MW and MWh

Cycle Efficiency

Capacity of reservoir required to be constructed if any

Power Evacuation Plan

Environmental Aspects

Economic Financial Analysis

Section C: Biomass and Waste to Energy Projects

The State will promote the Biomass Programme, facilitating the

establishment

of

biomass-based

power

projects,

Bio-CNG/CBG

Compressed Bio Gas, briquette/pellet manufacturing units and

supporting biomass-based co-firing projects, as well as Waste-to-

Energy based Power Projects for the utilization of waste such as

MSW/RDF/Industrial/Medical waste or any other wastes as per the

guidelines of the State Government and Government of India.

1.

Projectbasedprovisions.

1.1

Biomass Projects

TheStatewillpromotesettingupofBiomass

ProjectsincludingCogeneration.ThePowerProducersmayusesu

chpowerforcaptiveconsumptionorforsaletothirdparty/licensee

sincludingDiscoms.

DiscommaypurchasethepowerfromBiomassprojectstofulfiltheirR

enewablePurchaseObligation(RPO)andbeyondRPOasper

their

requirement and commercial viability. Discom shall execute

Power PurchaseAgreement(PPA)withDevelopers/PowerProducer.

1.2

Waste to Energy projects:

7539 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

TheStatewillpromotesettingupofthe Waste to Energy Plants

forgeneration of power by utilizing MSW (Municipal Solid

Waste), RDF (RefuseDerivedFuel),Industrialand Medical Waste.

1.3

Biogas Generation

Agriculture Waste, Dairy Waste, Household Waste, Animal

Waste(Poultry farms, Gaushalas) Sewage WasteDisposal is a

major concern. This waste can be utilized to generate Biogas

which can be used for cooking, lighting, power generation,

heating etc.

Farmers, Dairy Farms, Poultry Farms, Farmers Producers

Organizations (FPO), Self help Groups (SHG), Industries etc.

can set up Biogas plants. This will help to earn revenue and

generate employment in rural areas.

Biogas generation will be promoted by the State and such

plants shall be eligible to avail incentives as per schemes/

programs of GoI and State Government. The additional

incentives will be provided by the State.

The State will support the Distribution Mechanism for organic

manure produced in biogas plant.

Programs/Schemes will be run at the level of Gram Panchayat

to promote Biogas for waste utilization.

In Rural Areas, energy transition initiatives will be undertaken

to shift from Fossil Fuel to Non-Fossil Fuel. These initiatives will

include installation of Rooftop Plants, RE plant with Storage

Systems

and

Biogas

Generation

to

meet

100%

energy

requirement.

1.4

Compressed Biogas (CBG/Bio-CNG)

To promote the MNRE Biogas program for power generation and

to meet the mandate by Ministry of Petroleum and Natural Gas

for blending Compressed Biogas (CBG) in Compressed Natural

Gas (CNG) for transport and domestic use, the state will

promote

Compressed

Biogas

(CBG/Bio-CNG)

plant

in

Rajasthan.

The developers who have already been issued LOI under SATAT

and other Bio-energy projects based on compressed Biogas

(CBG) will be registered under this policy.

The Energy Department will issue separate Guidelines for

implementation and promotion of CBG/Bio-CNG projects in the

State.

1.5

Bio-Ethanol

To promote initiatives of GoI for mandate to blend Bio-Ethanol

in petrol, the State will promote the Co-generation power plants

associated with Bio-Ethanol plants in Rajasthan.

The Energy Department will issue separate Guidelines for

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7540

implementation and promotion of Bio-Ethanol projects in the

State.

1.6

Bio-Coal:

To address the issue of Biomass Waste burning atthe local

level, the production of Bio Coal will be promoted for carbon

mitigation from coal burning and to generate revenue and

employment generation in rural area.

1.7

Co-firing in Coal/Lignite based Thermal Power Plants:

The

Statewillfacilitateco-firingof

Biomass

in

Coal/Lignite

basedThermalPower

Plants

for

power

generation

as

per

guidelines

issued

by

Ministry

ofPower,GovernmentofIndiaandasamendedfromtimetotime.

For this purpose Biomass Pellet/Briquettes Manufacturing

units will be promoted.

2.

Incentives

2.1 All Biomass Projects including Briquette/Pellet Manufacturing

units

and

WastetoEnergybasedprojectsmay

avail

incentivesaspertheeligible criteria defined in the prevailingRIPS.

Grant of incentive under RIPS

Under clause 4.1.1.2 of RIPS,2024, Renewable Energy units are eligible

for the following Incentives:

1. Exemption & Reimbursements: The following exemptions and

reimbursement are applicable to RE Units:

- Exemption from payment of 100% electricity duty for 7 years.

- Exemption from payment of 75% stamp duty and reimbursement

of 25% stamp duty.

- Exemption from payment of 75% conversion charges and

reimbursement of 25% conversion charges.

- Reimbursement of 100% Mandi fee/Market fee for 7 years.

3. Waiver of PCB Fees to obtain Consent to Establish (CTE) and

Consent to Operate (CTB) certification.

2.2 ThePowerProducershallbeallowedtousewaterfromsourcesofWater

Resources Departmentsubjecttotheavailabilityof waterforpower

generation.

2.3 All Projects registered under this policy shall also be eligible to

avail CentralFinancial Assistance (CFA) as per the schemes

of the Ministry of New andRenewableEnergy(MNRE).

2.4 Project shall be eligible to avail incentives/benefits under the

schemes/programs of Central Government. The State shall

facilitate the developer to avail such benefits.

3. Land allotments

3.1 Land Allotment for Setting Up Biomass Based Power Plant

7541 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

i. Allotment of Government Land - Government Land for

setting up of Biomass based Power Plant shall be allotted

to Developer/Power Producer as per Rajasthan Land

Revenue (Allotment of Land for setting up of Power Plant

based on Renewable Energy Sources) Rules, 2007 as

amended from time to time.

ii. RREC will recommend the Government Land for allotment

to the concerned District Collector on deposition of land

security @ Rs 1 Lac/MW by DD/NEFT/RTGS in favor of

RREC, Jaipur on case-to-case basis. The Security Deposit

will be refunded to the Developer within 2 months of

commissioning of the project on a written request of

applicant. The Security Deposit shall be forfeited in case

the allotted land is not used within the specified period as

per allotment rules.

iii. Private land will be procured by the Developer/Power

Producer(s)

directly

from

the

private

parties.

The

conversion of this land will be done by the competent

authority.

3.2

Land Allotment for Setting up Waste to Energy Projects: -

Developer will select eligible site in proximity to the landfill

sites or any other suitable land, in consultation with the

Directorate

of

Local

Bodies,

Rajasthan,

Municipal

Corporation, Municipalities etc. as case may be. The Land

may be allotted as per rules of concerned Department.

3.3

Land allotment for setting up of CBG/Biogas/Bio-

coal/Bio-Ethanol:

For establishment of CBG plant, a maximum of 10 Acre

land would be allowed for a plant of 10 MTPD capacityand

25 Acres landfor storage of feedstock.For Bio coal plant on

a maximum of 2 Acre land would be allowed for 100

MTPD.1.5 Acres of land would be allowed for a 100 kilo

Litre Bio Ethanol Plant.Such Projectswould be provided

Revenue Land as per Rajasthan land Revenue (Allotment of

Land for setting up of Power Plant based on Renewable

Energy Sources) Rules, 2007 as amended from time to

time. Developer will have to deposit Security amount of Rs.

1 Lac/MTPD by DD/NEFT/RTGS in favor of RREC for CBG

plant towards land allotment. Such SD amount will be

refunded on successful commissioning of the project and

forfeited if land not utilized within prescribed timeline as

per aforesaid Revenue Rules.

3.4

Sale/ Auction mechanism for weeds (such as Prosopis-

Juliflora, Lantana, Parthenium /Energy Plants) grown on

Govt. Land:-

Unutilized, uncultivated Govt. landare proneto growth

ofweeds.

All

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7542

concerneddepartmentsareadvisedtodeviseatransparentsale

auctionmechanismonperiodicbasis.

4. Registration of Power Project, Biomass Briquettes /Pellet

manufacturing units

4.1 Biomass Power Plant and Waste to Energy based Power

Project

in

theState

shall

be

registered

online

upon

deposition

of

Rs.

30,000/-per

MWplusGSTwithRRECtowardsprocessingfee,whichshallbeno

n-refundable. Biomass Power Plant up to 20 MW capacities

shall be allowedunderthisPolicy.

4.2 No registration charges shall be applicable to the Biomass

Briquettes/Pellet manufacturing units,Biogas & Bio Coal

plants.

4.3 CBG, Bio-Ethanol plant will be required to register their project with

RREC upon deposition of the following charges:

CBG Plant - @ Rs. 30,000/ Metric Ton Per Day (MTPD)

Bio-Ethanol @ 3,000/Kilo Litre Per Day (KLPD)

Under the Sustainable Plan of the Ministry of Petroleum and Natural

Gas,GovernmentofIndia,thedeveloperswhohavealreadybeenissued LOI

and other bio-energy units will be registered under the current policy.

5.

Approval/Clearance of projects

5.1 Approval/Clearance

of

Projects

will

be

granted

after

evaluating/examining the project proposals on the following

criteria:

Detailed project report

Availability of land

Availability of power evacuation system for proposed project

Documentary Evidence of Power Purchase Agreement or an

undertaking in case of sale to Third Party through Open

Access or Undertaking for Sale of Power in the Power

Exchange

NOC

for

allocation

of

water

by

the

concerned

Department/Authority

5.2 Upon fulfilment of the above criteria, the project will be

considered as In-principally cleared and after deposition of

Security Deposit; the project will be conveyed a Final approval

by RREC.

6.

Project Security Deposit:

6.1

After In-principle Clearance, the Developer/Power Producers

are required to submit project Security Deposit @ Rs. 1

lac/MW in cash within 1 month without interest and within 3

7543 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

months with interest @9% per annum from the date of issue of

In-Principle Clearance. Non-deposition of the Security Deposit

within stipulated period shall lead to deemed cancellation of

In-principle Clearance without any notice.

6.2

The Project Security Deposit will be refunded to the

Developer/Power Producer within 2 months of commissioning

of the project after recovery of penalty, if any.

6.3

In case Developer/Power Producer fails to commission the

project within scheduled commissioning period including

extension as per clause 7.2, the Project Security amount shall

be forfeited.

6.4

In case the Developer/Power Producer wants to withdraw his

project within 6 months of depositing of Project Security,

then 25% security deposit will be forfeited, and balance

75% amount of the security will be refunded to the

developer/Power Producer on written request.

6.5

If Power Producer withdraws the project after six months of

depositing the Project Security, then the entire Project

Security shall be forfeited.

7.

Time frame for completion of different activities:

Time frame for completion of different activities, subject to

Force Majeure conditions, would be as follows: -

7.1 Developer/Power

Producer

shall

commission

the

Biomass

based/Waste to Energy Power Project within 36 months from

the date of approval of the Project.

7.2 Provided that extension in time schedule may be granted by the

RREC after depositing penalty amount as under plus GST as

applicable: -

S.

N

DelayPeriod

PenaltyAmount

(a) Fordelayupto3months

Rs.25,000perMW

(b) Fordelayupto6months

Rs.50,000perMW

(c) Fordelayupto9months

Rs.75,000perMW

(d) Fordelayupto15months

Rs.1,00,000perMW

(e) Fordelayupto24months

Rs.1,25,000perMW

SSC may consider extension beyond 24 months where there is

a reasonable certainty of commissioning of the project. In such

cases, extended completion schedule and penalties shall be

decided by SSC on case-to-case basis.

7.3 Power Producer shall furnish online quarterly progress/status

report of Waste to Energy /Biomass based Power Plant from the

date of approval of the Project. Non-compliance may lead to

forfeiting of security money and cancellation of project approval.

7.4 Copy of Work Order along with cost, delivery schedule of supplies,

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7544

civil works execution and erection & commissioning schedule

shall be supplied by the Power Producer as proof of execution of

project within 3 months of the final approval. Financial closure

shall be completed by Power Producer within 4 months from

date of final approval. Incentives allowed by RERC for early

completion shall be applied as per tariff orders issued by RERC.

7.5 After completion of project and before commissioning, the Power

Producer shall furnish the complete updated project report

based on the technology used, order placed, actual cost and

various approvals arranged. The representative of RREC shall

be present during commissioning of Power Project and

commissioning

report

shall

be

issued

by

RREC.

The

incentivetariff, as allowed by RERC order to the Waste to Energy

/Biomass based power plant for early commissioning shall be

applicable after examining the date of financial closure and

commissioning date by RREC.

7.6 Obligations of the Power Producer under this Policy shall be

relaxedduring the period of Force Majeure. Post-registration,

the time frame for completion of different activities is subject to

Force Majeure conditions.

8. Grid Interfacing:

Power Evacuation, Grid Interfacing, Forecasting & Scheduling and

Dispatch of the Power for Bio Power Projects will be governed as per the

provisions of this policy (Section-E) and relevant Regulations of RERC.

9.

Power Purchase Agreement:

9.1 The sale of electricity by Developer/Power Producer to Discoms

will be governed by the Power Purchase Agreement executed

between the concerning Discom and the Power Producer. The

Price for sale of power generated from the Biomass Power

Project/Waste to Energy based project to the Discoms and other

charges/conditions shall be as specified by the RERC from time

to time.

9.2 In case of Third-Party Sale or for Captive Use within the State, the

Developer/Power Producer shall execute a Wheeling Agreement

with Discom. However, the Transmission Agreement with RVPN

will be executed separately if the Developer/Power Producer

intends to use the system of RVPN for Wheeling Power.

9.3 The Price of Power to be sold by the Developer/Power Producer to

consumers/ licensees other than Discoms will be determined by

the mutual understanding/agreement between the seller and

the purchaser.

9.4 Assignment of PPA

PPA/WBAwillbeallowedtobeassignedinpartsorfullto

other

partiesunderfollowingconditions:

i. Aftercompletionoftheprojectanditsconnectivitytothegrid.

7545 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

ii. ConsentofRREC&RVPN/Discom(s)andrelatedparties

10.

Development of Waste Supply Chain:

State will establish the mechanism through which Waste Supply

Chain ensured to the CBG plants

11. Settlement of Accounts:

AccountsofalltransactionsbetweenthePowerProducerandtheD

iscoms/ RVPN regarding Price of Power and Wheeling

Charges shall besettledona monthlybasis.

12. Power to Remove Difficulties

SLMCC is authorized toissue necessary clarification and amendments

withregard

to

this

section

of

the

policy

as

and

when

required.Ifanydoubt,dispute,differenceorissuesarisewithregardtoin

terpretation/implementationofthissection

of

the

Policy,State

LevelSanction

Committeemaytakedecisioninsuchmatters,notinconsistentwithth

eprovisions of the Policy, as may appear to be necessary and

expedient

forremovingthedifficultieseitheronitsownmotionoronawrittenrepre

sentationfromthestakeholders.The Energy Department shall issue

necessary guidelines/ schemes/orders for the implementation of this

Policy.

13. Members of the State Sanction Committee (SSC)

ListofmembersofSSC is as follows:

1. ACS/Pr.Secy./Secretary, Energy-Chairman

2. ACS/Pr.Secy./Secretary,Forest&Environment,ortheirrepresentative-

Member

3. ACS/Pr.Secy./Secretary,WaterResources

Department,Memberortheirrepresentative-Member

4. ACS/Pr.Secy./Secretary,Secretary,Revenue,

ortheirrepresentative–Member

5. ACS/Principal Secretary/Secretary, Industries, GoR

6. ACS/Principal Secretary/Secretary, AgricultureDeptt,

GoR(ApplicableonlyforCBGprojects)

7. ACS/Principal Secretary/Secretary, Animal HusbandryDeptt,

GoR(ApplicableonlyforCBG projects)

8. ACS/Principal Secretary/Secretary, Rural Deptt,

GoR(Applicableonlyfor(ApplicableonlyforCBG projects)

9. ACS/Pr.Secy./Secretary,Secretary, ULB/UDA,

ortheirrepresentative-

Member(ApplicableonlyforwastetoEnergyprojects)

10. ChairmanDiscoms. -Member

11. Chairman, RREC-Member

12. MD,RREC-Member Secretary

Section D: Green Hydrogen

1. Introduction

To meet its global commitment, Government of India has set a national

target of 500 GW Renewable Energy generation by the year 2030. This

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7546

will reduce dependence on conventional sources of energy. Rajasthan

has added a generation capacity of more than 30 GW of Renewables in

the last 2 decades which is the highest in India. Now, the State is

exploring other options for development of Non-Fossil Fuels.

Green Hydrogen is a Non-Fossil Fuel which can fulfil the requirements of

Industrial, Power, Transportation and Aviation sectors while reducing

carbon emissions. It is also required to produce Green Ammonia and

could help in reducing the country's import bill. Ministry of Power,

Government of India has also issued a National Green Hydrogen Policy

in Feb 2022.

In the light of these, the State of Rajasthan aims to promote Green

Hydrogen production through a series of incentives and simplified

procedures.

2. Objectives

2.1. To become the pioneer state for Green Hydrogen Production and its

derivatives. To reduce the dependency on import of Ammonia and

Fossil Fuels.

2.2. To develop an ecosystem for production of Green Hydrogen for

Refineries, Fertilizers and other Industries requiring Hydrogen as an

input.

2.3. To create an environment for Industry and Research Institutions to

focus on cutting edge research and to make Rajasthan the preferred

destination for development of Green Hydrogen.

2.4. To

develop

a

Green

Hydrogen

Manufacturing

ecosystem

(Electrolyser, compressor, storage and transport infrastructure.).

This section of the policy will focus mainly on:

i. Promoting Generation of Hydrogen and its derivatives/by products

through RE Power

ii. Development of Green Hydrogen Parks.

iii. Promote Green Tourism in the Stateusing of Green Hydrogen-based

mobility.

iv. Promotion of Green Hydrogen Fuel Cells for transportation. Explore

and support distributed applications of green hydrogen across

Residential, Commercial, Industrial and Mobility sectors

v. Promotion of Green Hydrogen Equipment Manufacturing Industries.

vi. Promotion of research in cutting edge technology for Green

Hydrogen.

vii. Promotion of Green Hydrogen generation for storage and

generation of RTC (round the clock) power.

viii. Support the development of pilots across the Green Hydrogen

Value Chain.

7547 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

3. Targets

i. Producing 2,000 kilo Tonnes per Annum (kTPA) of Green Hydrogen

by 2030.

ii. Commission at least one Green Hydrogen Valley to cater to the

demand from fertiliser plants and refineries within Rajasthan and

in other States.

iii. Develop at least one Gigafactory for electrolyser manufacturing. The

state should also aim to export these domestically manufactured

electrolysers across the globe.

iv. Cater to at least 20 per cent of Green Hydrogen exports from India

either as fuel, chemicals derived from Green Hydrogen or as

technology products like electrolysers.

v. A minimum share of consumption will be met through Green

Hydrogen by designated consumers in the State as per mandate

prescribed in National Green Hydrogen Mission which shall be

extended in phased manner.

vi. Blend up to 10 per cent Green Hydrogen (on a volume basis) in

Natural Gas Pipelines for gas produced within Rajasthan by 2030.

4. Green Hydrogen Projects

4.1. Eligibility ofDevelopers for Green Hydrogen Projects

Developers, as defined below shall be covered under the provisions of this

section of the Policy:

Category 1: Develops

Co-located

Renewable

Energy

and

Green

hydrogen Generation Plant

Category 2: Develops Green Hydrogen Generation Plant and remotely

located RE Plant.

Category 3:DevelopsGreen Hydrogen Park/Hub/Cluster/Valley

4.2. Green Hydrogen Generation Projects: -

4.2.1. The State will promote Generation of Hydrogen and its derivatives/by

products through Renewable Energy by setting up of Green Hydrogen

Generation Plants and RE Plants in the State.

4.2.2. Green Hydrogen and its derivatives/by products can be generated

through a Hydrogen Generation Plant by using Renewable Energy

from a co-located Renewable Energy plant or from a remotely located

Renewable Energy Plant within the State.

4.2.3. The remotely located Renewable Energy Plant can be set up by Green

Hydrogen generators themselves within the State or can procure

Renewable Energy from Third Party within the State.

4.2.4. Green Hydrogen Generators will be allowed toobtain renewable energy

through Open Access from existing/new RE Projects as per relevant

RERC Regulations and State Policies.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7548

4.2.5. The State shall also promote Green Hydrogen Generation for power

generation purposes. The Power Generation Plant can supply assured

power to the grid using green hydrogen as per the requirements of the

grid.

4.2.6. The overall target of 2000 kTPA can be taken with following allowable

capacities in various categories for Green Hydrogen Projects:

1. RE Power Injection and Withdrawal at CTU (PGCIL) Network within

State (No upper Cap)

2. Co-located Green Hydrogen Project with RE Projects (Up to 700

kTPA)

3. Green Hydrogen Projects with Round the Clock RE Power Supply

(Up to 800 kTPA)

4. Green Hydrogen Project with normal RE Project at STU (RVPN)

Network (Up to 500kTPA)

5. Parks/Hubs/Clusters/Valley

The Green Hydrogen Generation Parkis a concentrated zone/hub for

development of Green Hydrogen Generation Plant with/without co-

located Renewable Energy Generation Plant which provides developers,

a well demarcated area with proper civil and power system infra-

structure where the risk of projects is minimized, anda fast approval

process is facilitated. The Green Hydrogen Park Developer creates

supporting infrastructure and facilities including power evacuation,

water arrangements, internal roads and administrative facilities

6. Development of Green Hydrogen Generation Park

1. The State shall promote development of Green Hydrogen Generation

Parks. The Park Developer will submit an application in the

prescribed online format to RREC for development of Green

Hydrogen Generation Park along with a non-refundable process fee

@ Rs. 10,000/ MW + GST subject to a maximum of Rs 10 Lac +GST

for each Park. Registration of park will be carried out by RREC

within a period of 30 days from the submission of application,

complete in all respects.

2. The

Park

Developer(s)

shall

be

obliged

to

create

common

infrastructure

facilities

for

development

of

Green

Hydrogen

Generation Plants(s) viz creation of power evacuation system,

development of roads, road lights, water supply systems etc.

3. The Park Developer will be allowed to acquire agricultural land from

landowners (Khatedars) for developing Green Hydrogen Generation

Park(s) in excess of the ceiling limits in accordance with the

provisions of Rajasthan Imposition of Ceiling on Agriculture Holding

Act, 1973.

4. Allotment of Government land to Park Developer(s) for development of

Green Hydrogen Generation Park will be considered on the

recommendation of RREC.

5. The Park Developer(s) shall be responsible for registration of Green

7549 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

Hydrogen Plants within their park with RREC as per the provisions

of this policy.

6. The State will also develop a Green Hydrogen Valley/Cluster at

suitable location in State for facilitating all infrastructure required

for Generation of Green Hydrogen and its derivatives without any

upper cap on individual developers.

7. Manufacturing of Equipment:

The Government intends to promote manufacturing facilities for Green

Hydrogen Equipments in Rajasthan that can help develop an ecosystem

and support job creation in the State. TheManufacturing Equipment for

Generation of Green Hydrogen like Electrolyser and other equipment as

notified in the prevailing Rajasthan Investment Promotion Schemer

(RIPS) from time to time.

8. Research

The State shall promote and facilitate Research and Development

(R&D) of technologies related to generation of hydrogen, fuel cell

technologies, and storage technologies.

The State shall facilitate industries with a robust ecosystem for Green

Hydrogen Manufacturing and to provide a cost-effective manufacturing

environment. Research and Development (R&D) Centres with testing,

skilling and incubation facilities shall be promoted.

9. Incentives/ facilities available to Green Hydrogen Generation

projects

Green

Hydrogen

Generation

Plants,

Parks

and

Equipment

Manufacturing Plants shall be treated as per the prevailing Rajasthan

Investment Promotion Scheme (RIPS) as amended from time to time.

Benefit provided under RIPS, 2024

Clause 3.3.1.1 (RIPS,2024)

Eligible Sunrise sector (Green Hydrogen) may choose to avail benefits

from either the Sunrise Booster on Asset Creation Incentives or the

Anchor Booster. Furthermore, the total value of all incentives and booster

under the Investment Subsidy (SGST Reimbursement) must not exceed

100% of the State tax due and deposited each year, for a period of 7

years.

Clause 3.3.2.2.1 (RIPS,2024)

A Sunrise Booster of 25% shall be applicable on the Asset Creation

Incentive chosen by the eligible Enterprises (applicable for the first three

units as defined under section 3.3.1)

Clause 3.3.2.2.2- (RIPS,2024) Interest subvention

Eligible Sunrise sector (Green Hydrogen) are eligible for 5% interest

subvention on term loan taken by Enterprises from financial institutional

or State financial institutional or Banks recognised Banks recognized by

Reserve Bank of India. The loan can be taken for an investment in plant

& machinery, for a period of five years subject to maximum of 2.5% of the

EFCI distributed equally over 5 years.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7550

Clause 3.3.2.4 (RIPS,2024) Exemption & Reimbursements

- Exemption from payment of 100% electricity duty for 7 years;

- Reimbursement of 100% mandi fee/market fee for 7 years;

- Exemption from payment of 75% stamp duty and reimbursement

of 25% stamp duty;

- Exemption from payment of 75% conversion charges and

reimbursement of 25% conversion charges.

The following Incentives and facilitations for green hydrogen initiatives

in Rajasthan:

9.1. Green Hydrogen Projects/Parks

Benefits prescribed under the prevailing Rajasthan Investment

Promotion Scheme may be applicable to developers covered by

categories 1,2& 3 as listed in Clause 4.1 of this section of the policy as

amended from time to time.

9.1.1. Availability of Water:

Water Resources Department will allocate required quantity of water

from IGNP canal/the nearest available source for cleaning of solar

panels and auxiliary consumption for Solar PV Power Plants and

water requirement for Green Hydrogen Generation Plants subject to

the availability of water.

In case of use of Brine water/Treated Wastewater for generation of

Green Hydrogen, water will be allocated on priority basis.

Developer will intimate estimated water requirement to RREC along

with the proposed source of water. After assessment/scrutiny, the

case of water requirement shall be forwarded to the Water Resource

Department. The modifications(s) required, if any, in the existing

water resource system will be done by the Water Resources

Department on the cost of the Developer/Power Producer.

9.1.2. Special Incentives

The following facilities will be available on individual Green Hydrogen

Plant capacity of maximum 50 kTPA, as covered by Categories 1 & 2

as listed in Clause 5.1 of this section of the policy forthe first 500

kTPA (Kilo tons per annum with maximum 12,500 MW RE capacity

@25 MW per kTPA) capacity established within the state or plants

established up to March 31, 2029 within the State, whichever is

earlier. In case, after allocation of 500 kTPAcapacity among developers

@ 50kTPA, if capacityis not exhaustedcompletely,the spare capacity

will be allocated by SLEC to the developer beyond 50kTPA

individually.

The Date of Commissioning of the plant shall be treated as the date

established for the above purpose.

These benefits will be applicable for 7 years from the Date of

Commissioning of the projects:

i. 50% waiver of Intra-state Transmission and Wheeling Charges,

Electricity Duty for the power produced from Solar/ Wind plants

7551 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

(with/without storage) to be established for the aforesaid Green

Hydrogen plants. Transmission Losses and Wheeling Losses shall

be applicable as determined by the State Regulatory Commission.

ii. The Additional Surcharge and Cross Subsidy charges shall be

waived on the energy drawn from Wind/ Solar energy Plants (with

and without storage facility) established as Captive Plant or from

plant owned by their subsidiary/ other company for use in Green

Hydrogen production plant within state.

iii. The Facilities/Incentives, if not modified/changed in above, as

available under prevailing state’s Solar/Wind/Hybrid Energy

Policy as amended from time to time shall be available to the

Wind/Solar generation plant (with and without storage facility) to

be established for green hydrogen production plant.

iv. The aforesaid benefits will be limited to the Green Hydrogen

quantum in case of Green Hydrogen is generated with other

byproducts collectively.

9.1.3. Banking:

Banking of Renewable Power generated from Solar/Wind Energy Plant

(with and without storage facility) established for Green Hydrogen

Generation Plant shall be up to1/3rdof the energy injected during 15

minute time block basis at the consumption end. The energy shall be

allowed to be banked for a period of 30 days.

Banking Charges shall be the cost differential between the average

tariff of Renewable Energy (Solar & Wind) discovered through

competitive bidding for procurement by the Distribution Licensee

during the previous year and the average market clearing price of the

energy procured in Day Ahead Market (DAM) for distribution licensees

during the month in which the renewable energy has been banked.

In case, there is no price discovery for procurement of RE (Solar &

Wind) power in the previous year then the latest available average

tariff of renewable energy (Solar & Wind) discovered through

competitive bidding for procurement by the distribution licensee shall

be considered.

The losses of power will also be adjusted during banking of the RE as

per regulatory provisions.

The above provisions will be applicable for a duration of 25 years from

the Date of Commissioning of a Green Hydrogen Generation Plant

setup under the provisions of this policy.

9.1.4. RE Plant Size

The peak power generation capacity of Wind/Solar/Hybrid plant (with

or without storage facility) shall be allowed up to 2.5 times of the

contracted capacity of power connection for the associated Green

Hydrogen Plant.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7552

9.1.5. Incentives for Green Hydrogen generation through Brine

Water/ Treated wastewater

Green Hydrogen Generation Plant through Brine water/Treated

wastewater

with co-located RE sources Government land will be provided on

priority basis.

10. Role of RREC

RREC will act as a Nodal Agency for:

i.

Registration of Green Hydrogen Generation projects;

ii.

Approval of Hydrogen plant along with RE Projects;

iii.

Development of Green Hydrogen Parks;

iv.

Facilitating allotment of Government land;

v.

Facilitating water allocation for Green Hydrogen

Generation Plant/for auxiliary consumption and cleaning of Solar

PV Plants;

vi.

Facilitating approval of power evacuation plan,

connectivity at STU/CTU and allocation of bays etc on behalf of

State;

vii.

Facilitating execution ofPPA/WBA with Discom(s) of

Rajasthan/RVPN/NVVN/SECI/RUVITL(as may be applicable);

viii.

Coordination

with

MNRE/NIWE/Industries

department/Water

Resources

Department/

Discoms

of

Rajasthan/RVPN/Central Agency/Other Relevant Agency.

11. Registration of Green Hydrogen Generation Projects

11.1. All projects as covered by Clause 4.1 of the policy

installed in the State shall be required to be registered

with RREC.

11.2. The Developer will submit an online application for

registration to RREC in the prescribed format with

requisite documents and details regarding capacity of

Hydrogen Plant and RE Plant Capacity.

11.3. Each Developer/ Power Producer will deposit following

non-refundable registration charge for RE Capacity with

RREC (For 1 KTPA Green Hydrogen Plant, maximum 25

MW RE capacity will be considered).

S.No. Project Capacity

Rate

1

For Project ≤100 MW capacity

Rs 30,000/- per MW

2

For Projects

>100MWand≤500MW capacity

30 Lac +Rs 2.5 lac per 100

MW beyond 100 MW or part

thereof

7553 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

3

For Projects

> 500 MW and

≤1000MW capacity

40 Lac +Rs.2 lac per 100 MW

beyond 500 MW or part

thereof

4

For Projects

>1000 MW capacity

50 Lac+Rs.1 lac per 100 MW

beyond 1000 MW or part

thereof subject to maximum

Rs. 80Lakh per project

11.4. GST and other charges, as applicable, shall be payable in

addition to the registration charge. Registration will not

confer any right on the Developer and will not create

any obligation on the part of RREC.

11.5. Installation of Green Hydrogen Generation plant not

registered with RREC and set up without prior approval

of the Competent Authority as per policy provisions will

be

liable

to

be

disconnected

from

the

Grid.

TheDeveloper will be required to submit a certificate of

registration of project with RREC to the Sub-Registrar

or any other officer authorised by the Government for

the registration of sale/lease deed of the land.

However, Registration of Projects done under the aegis of Solar and

Wind&Hybrid Policies, 2019 prior to the commencement of this policy

shall be deemed to be valid and operative.

11.6. In case an existing Solar/Wind/Hybrid Project is being

used exclusively for Hydrogen Generation, the existing

registration number in the category will be assigned to

the Green Hydrogen Project. In such case, Developer

shall deposit difference of registration fees in RREC as

mentioned at clause 11.3 and already paid registration

charges, if any.

11.7. Developers can transfer their registered capacity or part

thereof, to their 'holding’, ‘subsidiary', 'fellow subsidiary’

or ‘ultimate holding’ company with the prior approval of

RREC upon payment of an amount equal to 50% of the

Registration Charges. However, the provisions of clause

11.5&11.6shall be applicable on the transferee.

11.8. Developers can transfer the registered capacity or part

thereof, from one registration to another registration,

with the prior approval of RREC upon payment of an

amount equal of 25% of Registration Charges.

11.9. Developers can transfer their registered capacity or part

thereof, to other Companies with the prior approval of

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7554

RREC on payment of an amount equal to 60% of the

Registration Charges.

12. Approval Mechanism (See flow chart in Annexure-D1)

12.1. State Level Empowered Committee (SLEC):

i) Chief Secretary, GoR (Chairman).

ii) ACS/Principal Secretary/Secretary, Industries, GoR.

iii) ACS/Principal Secretary/Secretary, Energy, GoR.

iv) ACS/Principal Secretary/ Secretary, Revenue, GoR.

v) ACS/Principal Secretary/Secretary, Water Resources Department,

GoR.

vi) CMD, Rajasthan RajyaVidyutPrasaran Nigam Ltd.

vii) Chairman Discoms.

viii) Chairman, Rajasthan Renewable Energy Corporation Ltd.

ix) MD, Rajasthan Renewable Energy Corporation Ltd., (Member-

Secretary).

12.2. In-principle

clearance

of

Green

Hydrogen

Generation

Projects:

In-Principle Clearance of Green Hydrogen Generation Plant along

with Renewable Power Projects

In Principle Clearance of Projects will be granted by the State Level

Empowered

Committee

after

evaluating/examining

the

project

proposals on the following criteria:

Detailed Project Report of Hydrogen Plant and RE Plant.

Financial Capability of the Power Producer (Annexure-D5).

Availability of Land for RE Plants & Hydrogen Plant.

Availability of Water for Green Hydrogen Generation Plant.

Availability of Power Evacuation System for proposed RE project.

Documentary Evidence of Power Purchase Agreement or an

undertaking in case of purchase of RE powerfrom3rd Party.

12.3. The Developer shall obtain requisite clearance/ approvals

from

Industries

Department,

Water

Resources

Department and other Departments/Agencies required

for setting up of Hydrogen Generation Plant as per their

relevant Rules/Regulations/Policies.

12.4. The Developer shall ensure compliance of Safety and

Operational

Norms/Standards

as

prescribed

by

competitive authority of State Government/Central

Government.

12.5. Timeline for In-principle Clearance:

Developers to whom Government Land is allotted will have to apply for

In-Principle Clearance of the project within 3months from the date of

signing of the lease Deed of the allotted Government Land. If

Developers fail to apply for In-Principle Clearance within the time

7555 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

prescribed, RREC will recommend for cancellation of allotment of

Government Land with the approval of SLEC.

13. Security Deposits (see Annexure-D2):

13.1. For projects under Clause 12.2:

After In-principle Clearance of the Projects under clause 12.2by the

State Level Empowered Committee (SLEC), the Developer will be

required to deposit a Security Amount specified at Annexure-D2.

Provided that in case the Green Hydrogen Developer purchases RE

power from 3rd Party, no security will be required to be submitted. In

case developer has deposited Security amount for allotment of

Government Land, no security will be required to be deposited

In case, the Developer fails to deposit the security money within the

stipulated time as above, the In-principle clearance shall be deemed to

be cancelled without any notice.

13.2. The Developer, who has submitted the Project Security

within the prescribed time period, shall be required to

apply for Final Approval within 6 months from the date

of issue of In-Principle Clearance, failing which, in-

principle clearance shall be deemed to be cancelled

without any notice.

13.3. In case the Developer wants to withdraw his project

within 6 months of depositing the security deposit, or

In-Principle Clearance has been cancelled under deemed

provision of Clause 13.2, then 25% Security amount will

be forfeited and balance 75% amount of the Security will

be refunded to the Developer/Power Producer on his

written request. This clause will be applicable only for

new projects registered under this policy.

13.4. The Security Amount deposited by the Developer shall

be non-convertible and non-transferable.

13.5. The Security Deposit shall be refunded to the Developer

in proportion to the capacity commissioned after

commissioning of such capacity. The remaining amount

shall be forfeited after the expiry of the scheduled

commissioning period including extension as per Clause

15.

14. Final Approval:

All In-Principle Cleared Projects will be conveyed final approval by

RREC on submission of Security Deposit under clause 13.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7556

15. Time frame for completion of Green Hydrogen Generation

Project:

15.1. The time schedule for completion of projects under

Clause 13.2will be as per Table-5 subject to Force

Majeure conditions provided that extension in time

schedule maybe granted by the RRECon case to case

basis after depositing penalty amount as mentioned in

Annexure-D3.

15.2. SLEC may consider extension beyond 15 months where

there is a reasonable certainty of commissioning of the

project. In such cases, extended completion schedule

and penalties shall be decided by SLEC on a case-to-case

basis.

16. Power Purchase Agreement (PPA)

16.1. Developer as defined in Clause 4.1 of this section of the

Policy, will execute Power Purchase Agreement with RE

Developer/ Power Producer in case of purchase of RE

power at mutually agreed terms and conditions.

16.2. The Green Hydrogen Generator may execute PPA with

Discoms for sale of firm power to Discoms, in case

hydrogen is being used to generate power and to supply

firm power, as per the requirement of Discoms. The

Discoms will select the Green Hydrogen Generator

through a transparent mechanism including competitive

bidding process.

17. Wheeling and Banking Agreement (WBA)

Green Hydrogen Developer/Power Producer shall execute a Wheeling

and Banking Agreement (WBA) with DISCOM(s). In case, the

transmission system of RVPN is also used then power producer will

execute a separate Transmission Agreement with RVPN.

18. Assignment of PPA/WBA:

18.1. PPA/WBA will be allowed to be assigned in parts or in full to

other parties under the following conditions:

i. After completion of the project and its connectivity to the grid;

ii. Consent of RREC & RVPN/Discom(s) and related parties;

iii. On payment of Rs. 2.00 lac per application to RREC (GST will be

payable as applicable).

18.2. In

case

the

project

is

financed

by

any

Financial

Institute/Lender, name of the Financial Institute/Lender

7557 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

may be included in PPA/WBA on request of Developer/

Power Producer.

19. Renewable Energy Development and Facilitation Charges (REDFC):

In case the Developer purchases Solar/Hybrid Power for generation of

Green Hydrogen from parties other than Discoms, then Solar/Hybrid

Power Generator shall contribute Renewable Energy Development

and Facilitation Charges (REDFC) for Solar Components as per the

provision of this policy as amended from time to time or such charges

as per RE Policies prevailing at the relevant time.

20. Land:

20.1. Allotment of Government Land to Green Hydrogen Generation

Plant:

20.1.1. Government Land will be allotted for setting up of Green Hydrogen

Generation Plant in RIICO Industrial area or Revenue land as per

Land

allotment

rules

of

RIICO

and

Revenue

Department

respectively.

20.1.2. Land will be allotted by RIICO or Revenue Department to the

developers on priority within 6 months from the date of

recommendation by SLEC.

20.2. Allotment of Government Land to Renewable Energy Plant:

20.2.1. Government Land will be allotted to Developers for setting up of

Renewable Energy Plant as per the provisions of Rajasthan Land

Revenue (Allotment of land for setting up of Power Plant based on

Renewable Energy Sources) Rules, 2007, as amended from time to

time.

20.2.2. RREC will recommend, on a case to case basis, to the concerned

District Collector for allotment of Government land only on

submission of cash security deposit by demand draft/RTGS in

favour of RREC, Jaipur.

20.2.3. TheSecurity Deposit will be refunded to the developer in proportion to

the commissioned capacity of the project on written request of the

applicant. The Security Deposit shall be forfeited in case the allotted

land is not put to use within the specified period as per allotment

rules. If land is not allotted, security deposit will be refunded, on

the written request of the applicant.

20.2.4. For setting up Renewable Power Plant based on a different technology,

maximum land area which can be allotted to the Power

Developer/Producer shall be as per Annexure-D3

20.2.5. For RE Power Projects with storage systems, additional land will be

allotted as per the rules prescribed by the Revenue Department,

Government of Rajasthan (GoR).

20.3. Project on Private Land:

The State shall promote setting up of Green Hydrogen Plant and/ or

Power Project / RE Farm/Green Hydrogen Valley on private land.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7558

Developers shall be permitted to set up Project/Plant on private

agriculture land without the requirement of land conversion in

accordance with the provisions of Rajasthan Tenancy Act 1955 and

Rajasthan Land Revenue Act 1956 and the rules made thereunder.

Developers shall also be allowed to acquire/hold private land from the

title holders (Khatedar) for setting up of Solar Power Plant in excess of

ceiling limit in accordance with the provisions of Ceiling Act, 1973.

21. Power Evacuation, Grid Interfacing, Forecasting & Scheduling and

dispatch of RE Power:

Power

Evacuation,

Grid

Interfacing,

Forecasting

and

Scheduling

&Dispatch of RE Power for Green Hydrogen Projects will be governed as

per the provisions of this policy (Section-E)and relevant Regulations of

RERC.

22. Power to remove difficulties:

SLEC is authorized to issue necessary clarifications and amendments

under this section of Policy as and when required. If any doubt, dispute,

difference or issue arises with regard to interpretation/implementation of

this Policy, State Level Empowered Committee may take decision in such

matters, not inconsistent with the provisions of the Policy, as may appear

to be necessary and expedient for removing the difficulties either on its

own motion or on the written representation from the stakeholders. In

order to implement this Policy and to remove difficulties being faced by

Stakeholder, the Energy Department in consultation with other

Departments shall issue necessary guideline/schemes from time to time

Section E: General provisions

1

Evacuation and Grid Interfacing:

1.1

Evacuation and Grid Interfacing through Inter State Transmission

System:

Inter State Transmission System is being developed in the State for

evacuation of RE power to other States.

1.2

Evacuation and Grid Interfacing through Intra State Transmission

System:

1.3

Development of Power Evacuation System in RE Potential Areas:

RVPN will prepare an action plan for development of Power Evacuation

Network taking into consideration-

(i) Existing and forthcoming evacuation system of ISTS

(ii) Existing State Transmission Utility Network

(iii) RE potential of the area

(iv) Future energy demand and RE integration with conventional

power.

1.4

Evacuation of RE power generated shall be made through the

transmission and distribution network being maintained by RVPN and

DISCOMs respectively.

7559 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

1.5

Grid Interfacing:

The grid interfacing arrangements for power Renewable Energy

Sources will be made by Developer/RVPN/DISCOM as under:

i. Pooling Sub-station-

Interfacing arrangements such as transformers, panels, kiosks,

protection, metering, HT lines from the points of generation to the

Pooling Sub-station including the Pooling Sub-station shall be

developed and maintained by the Developer/Power Producer as per

the Grid Code applicable from time to time and will also bear its

entire cost.

ii. Receiving Sub-station-

RVPN/Concerned DISCOM shall finalize the location of Receiving

Station on which the electricity generated will be received at

minimum 33 kV level in consultation with RREC.

1.6

Grid Connectivity

For creation of proper facility for receiving power at the receiving sub-

station of RVPN/DISCOM on request of Developer/ Power Producer,

the Developer/Power Producer shall pay grid connectivity charges, as

finalized by RERC from time to time to RVPN/DISCOM for which

minimum capacity to be considered for various voltage level be as

under:

Sr.

No.

Voltage level

Capacity

1

11 kV

3 MW

2

33kV

15MW

3

132kV

50MW

4

220kV

132MW

5

400kV

515MW

These charges will be paid by the Developer/Power Producer to

RVPN/DISCOM. The charges will include cost of complete line bay

(including civil works) and its interconnections with existing electrical

system.

Note: The Power Producer at 11 kV voltage will have the option to

deposit aforesaid charges to Discom or create bay infrastructure by

themselves.

1.7

Transmission and Distribution Network

i. For augmentation of transmission/distribution systems to evacuate

the power from receiving Sub-station, RVPN/DISCOM shall

develop/augment

the

necessary

transmission/

distribution

network within mutually agreed timeframe.

ii. For grid connectivity/construction of line to be arranged by

RVPN/DISCOM on request of Developer/ Power Producer, the

Developer/Power Producer shall submit a time frame for

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7560

construction of their plant along with bank guarantee equivalent

to the cost of bay and dedicated transmission/distribution line

along with an undertaking to use the system within prescribed

time period. RVPN/DISCOM(s) will provide the Power Evacuation

facilities within the scheduled time frame. The bank guarantee

shall be returned to the Developer/Power Producer after

commissioning of the project upon depositing amount of penalty, if

any, on account of delay in the utilization of the system.

iii. In case line bay and grid connectivity has been built by RVPN at a

particular system voltage (say 33kV), and Power Producer at a

later date wants to supply the power on higher voltage (say

132kV), the requisite modification, like addition of line bay on

higher voltage, interconnection with main bus etc. shall be done by

RVPN as a deposit work on behalf of the Power Producer subject to

its feasibility.

iv. In case a Power Producer initially connects its feeder to DISCOM’s

substation and later on desires to connect the feeder to RVPN’s

Sub-station, the additional line shall be constructed by Power

Producer and the addition of line bay in RVPN substation shall be

done by RVPN as deposit work on behalf of Power Producer.

v. RVPN/DISCOM shall provide the inter-connection facility one

month before the scheduled COD as intimated by the Developer

subject to condition that the grid connectivity charges are

deposited by the Developer/Power Producer, and sufficient time is

available with RVPN/DISCOM for creating the interconnection

facility.

vi. The Developer/Power Producer shall install necessary current

limiting devices such as Thyristor in the generating equipment.

Capacitors of sufficient rating shall be provided to ensure the

maintenance of average power factor as per the requirement of

State Load Dispatch Centre, measured at metering point.

vii. In case the Developer/Power Producer injects amount of power

which is more than the approved/contracted power into the Grid,

then excess power will not be adjusted/accounted for by

DISCOM/RVPN. Such power plant will be liable to be disconnected

till such time the excess installed capacity is removed/de-

commissioned.

viii. Transmission line from Pooling Sub-station to Receiving Sub-

station:

The evacuation system beyond Pooling Sub-station till the nearest

Receiving Sub-Station shall be developed as under:

7561 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

a. Grid Connected Power Plants commissioned under Tariff

Based Bidding for sale of power to DISCOMs of Rajasthan

The power evacuation transmission line from generating plant

substation/pooling

sub-station

to

the

receiving

RVPN/

DISCOMs sub-station will be laid as per terms & conditions of

bid document and Power Purchase Agreement.

b. Grid connected Power Plants commissioned underclause

9.3,9.4,11,12.2,12.3.2, 13.1(b)& 14of Section-A or Section

B, C & D.

The power evacuation transmission line from the generating

plant sub-station/pooling sub-station to RVPN/DISCOMs

receiving sub-station will be laid as per regulations of RERC.

ix. The DISCOMs of Rajasthan will develop power systems as per the

requirement

of

Rooftop

Solar

Systems

in

line

with

the

guidelines/orders issued by RERC.

1.8

The Developer/Power Producer shall comply with the Grid Code

including Load Dispatch and System Operation Code, Metering Code,

Safety Code, relevant regulations/orders of the Commission etc. as

applicable from time to time in the State of Rajasthan.

1.9

The Developer/Power Producer who is seeking power evacuation

approval on STU/CTU networks will have to submit land

documents/details as per the procedure prescribed by CTU/STU

for granting connectivity.

1.10 Reactive Power Charges:

The drawl of reactive power shall be charged by RVPN/DISCOMs as

per the RERC Regulations, as amended from time to time.

1.11 Common Pooling Sub-Station:

Power Producers may build Common Pooling Sub-Station to evacuate

the generated solar/wind/hybrid power to RVPN/DISCOM substation

through common transmission line with separate metering system at

the Common Pooling Sub-Station, and main metering system at

RVPN/DISCOM Sub-Station.

1.12 Timeline for utilization of Power Evacuation facilities

i. For

providing

evacuation

facilities

to

the

Developers/Power

Producers, RVPN/DISCOMs will update the availability of

transformation capacity and bay availability on its website and the

approval will be disposed within one month by RVPN/DISCOMs.

ii. In case of non-approval of power evacuation by RVPN/DISCOM(s)

within specified time frame, the case will be put up before SSC for

suitable decision, on the request of the Developer/Power Producer.

iii. The Power Evacuation facilities granted by DISCOMs/RVPN as per

the grid connectivity procedure/guidelines of DISCOMs/RVPN, will

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7562

be utilized by Developers/ Power Producers within 3 years from

the date of approval, otherwise power evacuation approval may be

allocated to other Developer/Power Producers on priority basis.

iv. In that case, the developer/power producers need to apply for

revalidation of the power evacuation approval which shall be

evaluated and approved by RVPN/DISCOMs as per available

evacuation capacity.

2

Measures for Grid Stability:

2.1

RVPN/DISCOMs shall take appropriate technical measures for

ensuring grid stability and safety.

2.2

RVPN will develop a plan for storage system requirement for Rajasthan

State to mitigate unpredictability and variability of renewable energy.

(i) RVPN will study impact of un-predictability and variability of RE

power on the grid and requirement of storage system at grid end to

reduce the same.

(ii) A plan for examining financial and technical viability for development

of storage system at the Grid Sub-Station level will also be prepared

by RVPN.

3

Forecasting& Scheduling:

i. All Power Projects shall forecast and schedule their generation as per

Central Electricity Regulatory Commission (Indian Electricity Grid

Code) Regulations, 2010, RERC (Intra-state ABT) Regulations, 2006,

RERC (Rajasthan Electricity Grid Code) Regulations, 2008 and RERC

(Forecasting, Scheduling, Deviation Settlement and Related Matters of

Solar and Wind Generation Sources) Regulations, 2017 as amended

from time to time.

ii. SLDC will ensure MUST RUN Status of RE Plants in the State and

maintain the data of RE Power Curtailment in transparent manner.

iii. SLDC will develop infrastructure for Forecasting Scheduling with

financial support from Rajasthan Renewable Energy Development

Fund for access of real time generation data.

iv. A Committee consisting of following members under the Chairmanship

of Chairman & Managing Director, RVPN shall be constituted for

monitoring of Solar & Wind generation, forecasting & scheduling and

curtailment issues:

7. Director (Operation), RVPN.

8. Director (Technical), RVPN.

9. Director (Technical), RREC.

10. Chief Engineer, RUVITL

11. Chief Engineer (LD), RVPN – Convener.

7563 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

12. Two members appointed by the State Government from the

persons of eminence in power sector and representatives of

Solar & Wind Power Industry.

The Energy Department will be the Administrative Department of this

Committee.

v. For the stability of Grid, the State will initiate steps to achieve accurate

forecasting & scheduling of RE Power Projects with the technical

support from MNRE/NIWE. RVPN/SLDC will collaborate with NIWE

for such technical support.

4

Commissioning of the Projects

The Projects under bidding mode will be commissioned as per the

procedure prescribed under Bid Documents/PPA, if specified. Otherwise

such projects and Projects covered under non bid category (Captive/3rd

Party sale/any other mode) will be commissioned as per policy

provision.Discoms/RUVITL will ensurecommissioning of the project in a

single

stage

for

all

activities

such

as

connectivity

with

grid,

synchronization and Commissioningetc on receipt of request from RREC

for commissioning.

5

Savings

The Power Plants already approved and/or commissioned before

commencement of this Policy will continue to be governed by the

Policy/Regulations prevailing at the relevant time.

6

Regulation

The provisions under this section of this policy shall be the guiding

principles for Rajasthan Electricity Regulatory Commission.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7564

Annexure-D1

Flow Chart of Green Hydrogen Project establishment

Clearance/Approval from

Industries Department/Other

Agencies

Installation of Hydrogen Plant and RE Plant

Execution of Wheeling Banking Agreement, Transmission

Agreement, if any

Refund of SD

Project Commissioning

Registration of Green Hydrogen Project in RREC

Hydrogen Plant

RE Project

Land Allotment for

Hydrogen Plant by

RIICO/Revenue Deptt.

Land Allotment for RE Plant

by Revenue Deptt.

Power Evacuation Approval

from RVPN/Discoms/CTU

In-principle Clearance by SLEC

Security Deposit

Final Approval

7565 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

Annexure-D2

Various Charges

Table-1

1. Green Hydrogen Registration Charges:

1

Project

Registration

S.No. Project Capacity

Rate

1

For Project ≤100 MW

capacity

Rs 30,000/-

per MW

2

For Projects

>100MWand≤500MW

capacity

30 Lac +Rs

2.5 lac per

100

MW

beyond

100

MW or part

thereof

3

For Projects

> 500 MW and

≤1000MW capacity

40 Lac +Rs.2

lac per 100

MW

beyond

500 MW or

part thereof

4

For Projects

>1000 MW capacity

50 Lac+Rs.1

lac per 100

MW

beyond

1000 MW or

part

thereof

subject

to

maximum

Rs.

80Lakh

per project

2.

Park

Registration

Rs. 10,000 per MW RE capacity plus GST

subject to Maximum Rs. 10 Lac per park

2. Security Deposit –

If Green Hydrogen Developer sets up own RE plant for Green

Hydrogen Generation

Security Deposit:

Table-2

Project

Capacity

< 2000 MW

≥ 2000 MW,

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7566

Solar

Rs. 1 Lac/MW by demand

draft/RTGS in favour of

RREC.

Rs. 1 Lac/MW up to 2000 MW

by

DD/RTGS

and

for

exceeding

capacity,

Rs.

1

Lac/MW in form of Bank

Guarantee.

Hybrid

Rs. 1 Lac/MW by demand

draft/RTGS in favour of

RREC.

Rs. 1 Lac/MW up to 2000 MW

by

DD/RTGS

and

for

exceeding

capacity,

Rs.

1

Lac/MW in form of Bank

Guarantee.

Wind

Rs. 1 Lac/MW by demand

draft/RTGS in favour of

RREC.

Rs. 1 Lac/MW up to 2000 MW

by

DD/RTGS

and

for

exceeding

capacity,

Rs.

1

Lac/MW in form of Bank

Guarantee.

i. In case, Green Hydrogen Developer procures RE Power from 3rd

Party-

Security Deposit-NIL

Table-3

3. Extension fees:

In case of delay in scheduled commissioning period:

a)

For delay upto 1 month

Rs 25,000 per MW RE Capacity

plus GST

b)

For delay upto 3 months

Rs 50,000 per MW RE Capacity

plus GST

c)

For delay upto 6 months

Rs

1,00,000

per

MW

RE

Capacity plus GST

d)

For delay upto 9 months

Rs

1,50,000

per

MW

RE

Capacity plus GST

e)

For delay upto 15 months

Rs 2,00,000 per MW plus GST

Annexure-D3

Land requirement and Extension in Timelines

Table-4

1- Maximum Land area allottable to the RE Projects

S.

No

.

Technology

Maximum land area

for Solar Plant

Maximum

land area for

Hybrid Plant

i SPV on Crystalline Technology.

2.0Hect./MW

2.5 Hect./MW

ii SPV on Crystalline Technology

with tracker.

2.5Hect./MW

2.5Hect./MW

7567 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

iii SPV on Thin Film/Amorphous

Technology with or without

tracker.

2.25Hect./MW

3.0Hect./MW

iv Solar Thermal (CSP)- Parabolic

Trough / Tower/Other

Technology with and without

storage

a) Up to PLF of 21%:

3.0 Hect./MW

b) For every 1%

increase in PLF, 0.15

Hect./MW additional

land will be allotted.

-

v Maximum land area for Wind

Plant

2.5 Hect/MW

Table-5

2- Project Completion Time schedule from approval/Clearance

Type of RE Projects/ Hydrogen Completion Time schedule

Up to 25MW RE capacity

and/or

1 kTPA Hydrogen Plant

Within 15 months from the date of

final approval

More than 25MW and up to 100

MW RE capacity

and/or

>1 kTPAto4 KTPA Hydrogen Plant

Within 18 months from the date of

final approval

More than 100 MW and up to 200

MW RE capacity

and/or

>4 KTPA to 8 kTPA Hydrogen Plant

Within 24 months from the date of

final approval

More than 200 MW RE capacity

and/or

>4 KTPA to 8 kTPA Hydrogen Plant

Within 36 months from the date of

final approval

Annexure-D4

Net Worth Criteria

The Developer/Power Producer desirous of setting up of Green Hydrogen

Project along with RE Power Plant in State of Rajasthan must fulfil the

following minimum financial criteria.

A - Qualification Criteria for RE Projects:

Net Worth

The “Net Worth” of the company should be equal to or greater than the value

calculated at the rate of Rs 1 Crore or equivalent US$ per MW of the project

capacity subject to maximum ceiling of net worth of Rs. 10,000 Cr for the

project. The computation of Net Worth shall be based on unconsolidated

audited/unaudited accounts of the company. For the purpose of the

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7568

computation of net worth, the best year in the last four years including

current running year shall be considered. The Company would thus be

required, to submit annual audited accounts for the last three financial years

and for part of the current running year (Un-Audited), while indicating the

year, which should be considered for evaluation, along with a certificate from

a Chartered Accountant to demonstrate the fulfilment of the criteria.

For companies, which are newly incorporated, the Net Worth criteria should

be met seven days prior to the date of submission of application by the Project

Developer. To demonstrate fulfilment of the criteria, the Project Developer

shall submit a certificate from a Chartered Accountant certifying the Net

Worth on the date seven days prior to submission of application. Further, the

Project Developer shall submit the un-audited financial statements of the

company for the date on which the Certificate of Chartered Accountant has

been obtained.

Note: For the Qualification Requirements, if data is provided by the Project

Developer in foreign currency, equivalent rupees of Net Worth will be

calculated using bills selling exchange rates (card rate) USD/INR of State

Bank of India prevailing on the date of closing of the accounts for the

respective financial year as certified by the Project Developer's banker.

For currency other than USD, Project Developers shall convert such currency

into USD as per the exchange rates certified by their banker prevailing on the

relevant date and used for such conversion.}

Net Worth calculation for an individual/partnership firm

Net-Worth = Proprietors/Partner’s Capital reflecting in the Audited Balance

Sheet

Add: Free Reserves (Including the Credit balance of Reserve and

Surplus appearing in the Balance Sheet)

Subtract: Intangible Assets

Subtract: Miscellaneous Expenditures to the extent not written off and

carry forward losses.

Net Worth calculation for a Company

Net-Worth = Paid up Share capital which includes

1. Paid up Equity share capital and

2. Fully, compulsorily and mandatorily convertible Preference Shares

and

3. Fully, compulsorily and mandatorily convertible Debentures)

Add: Free Reserves

(Including share premium provided it is realized in Cash or Cash

equivalents.)

Subtract: Revaluation Reserves

Subtract: Intangible Assets

Subtract:

Miscellaneous Expenditures to the extent not written off

and carry forward losses.

For the purposes of meeting financial requirements only unconsolidated

7569 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

audited annual accounts shall be used. However, audited consolidated

annual accounts of the Project Developer may be used for the purpose of

financial requirements provided the Project Developer has at least twenty six

present (26%) equity in each company whose accounts are merged in the

audited consolidated account and provided further that the financial

capability of such companies (of which accounts are being merged in the

consolidated accounts) shall not be considered beyond the equity

participation of Project Developer.

In case of a Consortium the financial requirement to be met by each Member

of the Consortium shall be computed in proportion to the equity commitment

made by each of them in the Project Company. Any consortium, if selected

shall incorporate a Project Company with equity participation by the Members

in line with consortium agreement before signing the PPA/WBA/Wheeling

Agreement. The Project Developer may seek qualification on the basis of

financial capability of its Parent Company.

In case of land/any other asset, only the book value will be considered. The

value of land/any other assets will not be re-valued for calculating net worth.

Any reserve created due to this shall not be counted for calculating Net worth.

***********

Annexure-D5

Other Benefits under RIPS, 2024

Clause 3.3.2.3.4 Additional benefits for Power Intensive Sectors

Sunrise Enterprises operating in Power Intensive Sectors under Annexure-

9.6 (which includes Solar Cell Manufacturing & New Battery Tech) shall be

eligible for additional benefits.

Additional reimbursement for Power Intensive Sectors

The Enterprises shall be eligible to avail additional 5% reimbursements on

State tax due and deposited for a period of years.

OR

The Enterprises shall be eligible to avail 5%- point VAT reimbursement on

PNG for a period of 7 years.

Inclusion of investment in Captive Power Plants/Group Captive Power

Plants in EFCI

Enterprises investing in captive renewable power plants will be eligible to

include 51% of the said investment in their EFCI. Asset Creation Incentives

basis their respective slabs will be applicable on the EFCI

Enterprises entering into group captive arrangements (12+ years) shall be

eligible to include 100% of their said investment in their EFCI. Asset

Creation Incentive basis their respective slabs shall be applicable on the

EFCI

Annexure-9 (Clause 9.1.2)

Pumped Hydro Storage manufacturing and ElectrolyserManufacturing

included in Manufacturing Sectors eligible to be considered for the Sectoral

Anchor benefit

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7570

Annexure-9.4 :List of manufacturing Thrust Sectors

This

includes

Renewable

Manufacturing,

Pumped

Hydro

Storage

manufacturing &Electrolyser Manufacturing.

Clause 3.1.3.2.2

Eligible Manufacturing Enterprises which operated in Thrust Sector

(annexure 9.4) shall be eligible for a Thrust Booster of 10% over the Asset

Creation Incentives amount.

Ceiling mentioned in Section 3.1.3.1 with respect to specific Asset Creation

Incentivesare inclusive of additional benefits received from thrust booster.

Clause 3.1.3.2.4Interest subvention

5% interest subvention shall be allowed on term loan taken by

Manufacturing Enterprises from financial institutionsor State financial

institutions or Banks recognised Banks recognized by Reserve Bank of

India, for making an investment in plant & machinery or equipment/plant

related apparatus (constituted a part of the EFCI) for a period of 5 years

subject to maximum of 2.5% of the EFCI distributed equally over 5 years.

Annexure-D6

Definitions

1. ABT means Availability Based Tariff;

2. ACC means Advanced Chemistry Cell Battery Storage as are the new

generation advance energy storage technologies that can store electric

energy either as electrochemical or as chemical energy and convert it

back to electric energy as and when required.

3. Act means Electricity Act 2003, including amendments thereto.

4. BESS means Battery Energy Storage Systems shall mean the

system(s)/projects

utilizing

methods

and

technologies

such

as

electrochemical batteries (Lead Acid, Li-ion, solid state batteries, flow

batteries, etc.), providing a facility that can store chemical energy and

deliver the stored energy in the form of electricity, including but not

limited to ancillary facilities (grid support., for example). Such systems

may be co-located with RE Generating Stations, or may be operated on

standalone basis (as defined under the Guidelines for Procurement and

Utilization of Battery Energy Storage Systems as part of Generation,

Transmission and Distribution assets, along with Ancillary Services)

5. Biomass Power Plant means the power plant which generates

electricity from biomass sources.

6. Biomass Co-Firing - stands for adding biomass as a partial substitute fuel

in high- efficiency coal/lignite-based boilers.

7. Biomass means forestry based & agro-based industrial residues, energy

plantations, forestry and agro-residues.

8. Biomass Power Producer/ Co-Firing Power Producers / Waste to Energy

Power Producers means an entity which owns facilities to generate

electric power for sale to Discoms / Licensees and to third party/captive

use by these sources.

7571 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

9. “Bio-Ethanol” means a type of alcohol that is produced by fermenting

biological matter, such as crops or waste products, to create a fuel

alternative to petrol

10. “Bio-coal” a solid fuel that is produced from biomass through a process

called pyrolysis or Torre faction.

11. “Bio-Gas” is a renewable energy source that is produced when organic

matter is broken down by microorganisms in the absence of oxygen.

12. Briquettes - Biomass briquettes are a biofuel substitute made of bio

degradable green waste with lower emissions of greenhouses gases and

carbon dioxide then traditional fuel sources.

13. “Compressed Biogas (CBG)/Bio-CNG” is a renewable fuel made from

purified biogas that has a high methane contentproduced from

biomass/bio-waste including energy plantation or as defined by MNRE,

GoI

14. CAPEX Mode means the mode under which entire investment is to be

incurred by the power consumer for installation of solar power plant.

15. CEA means Central Electricity Authority.

16. Ceiling Act, 1973 means The Rajasthan Imposition of Ceiling on

Agricultural Holdings Ordinance, 1973.

17. “Ceiling Act, 1973” means the Rajasthan Imposition of Ceiling on

Agricultural Holdings Act, 1973;

18. Central Agency means National Load Dispatch Centre (NLDC) as

designated by the Central Electricity Regulatory Commission vide Order

dated 29.01.2010 for the purposes of the REC Regulations;

19. “CERC”

means

the

Central

Electricity

Regulatory

Commission,

constituted under sub-section (1) of Section 76 of the Electricity Act,

2003;

20. CERC

REC

Regulations

means

Central

Electricity

Regulatory

Commission (Terms & Condition for recognition and issuance of

Renewable Energy Certificate for Renewable Energy Generation)

Regulations, 2010 notified by CERC vide Notification dated 14.01.2010

as amended from time to time;

21. COD means Commercial Operation Date i.e., the date when the Power

Plant gets commissioned as per rules/provisions;

22. Collector means Collector of a district as defined in the Rajasthan Land

Revenue Act and includes every officer authorized to discharge the

duties of Collector under the Act/Rules/Executive Orders of the

Government of Rajasthan;

23. Commission / RERC means the Rajasthan Electricity Regulatory

Commission.

24. Contract Demand means regular contract demand plus standby contract

demand, if any, of the Consumer with Discom.

25. CPP or Captive Power Plant means Captive Power Plant as defined in

Electricity Act, 2003 and Electricity Rules, 2005;

26. CPSU means Central Public Sector Undertaking.

27. CSP means Concentrated Solar Power;

28. CTE means Consent to Establish.

29. CTO means Consent to Operate.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7572

30. Discom means a distribution licensee, such as Discom Jaipur, Discom

Jodhpur and Discom Ajmer.

31. Developer means a person who set up RE Plant, developer infrastructure

and generate electricity from Renewable energy as per this policy;

32. DISCOM of Rajasthan means a distribution licensee of the State, such as

Jaipur Discom, Jodhpur Discom and Ajmer Discom.

33. District Level Committee or DLC means the Committee constituted by

the State Government for a District from time to time under Clause (b) of

sub-rule(I) of rule 2 of the Rajasthan Stamps Rules, 2004.

34. DPR means Detailed Project Report.

35. Energy Plantation means the cultivation of specific plant species, often

fast- growing and high-yield, with the primary purpose of harvesting

them for the production of energy excluding invasive species such as

Lantana, Parthenium, Prosopis-Juliflora, etc.

36. Energy Storage Systems or ESS shall mean the system(s) installed in

addition to the solar PV and/or wind power capacity as part of the

project, that can capture energy produced at one time for use at a later

time or any system storage energy as defined by MNRE, GoI;

37. ESO means Energy Storage Obligation

38. "Financial year" means a period commencing on 1stApril of a calendar

year and ending on 31st March of the subsequent calendar year;

39. Force Majeure means any event or circumstance which is beyond the

reasonable direct or indirect control and without the fault or negligence

of the Power Producer or Developer and which results inPower

Producer’s/Developer’s inability, notwithstanding its reasonable best

efforts, to perform its obligations in whole or in part and may include

rebellion, mutiny, civil unrest, riot, strike, fire, explosion, flood, cyclone,

lightning, earthquake, act of foreign enemy, war or other forces, theft,

burglary, ionizing radiation or contamination, Government action,

inaction or restrictions, accidents or an act of God or other similar

causes;

40. Form means a form appended to this Policy.

41. Generating Plant Sub Station means sub-station developed by the Power

Producer for interface with the receiving station.

42. Government or State means Government of Rajasthan or the State of

Rajasthan respectively

43. Government Land means Revenue land which can be allotted/allowed to

usefor

setting

up

of

Renewable

Energy

Projects

(Solar/Wind/Hybrid/Biomass/CBG/Green Hydrogen including land

usable for energy plantation etc.)or for RE Parks as per applicable

revenue rules of the Government.

44. Gram Panchayat means Panchayat established under the Rajasthan

Panchayat Raj Act, 1994 (Rajasthan Act No. 13 of 1994).

45. Green Hydrogen means hydrogen generated using renewable energy

sources as defined by MNRE, GoI.

46. Green Hydrogen Developer/Producer means person who develops

Green Hydrogen Generation Plant through RE Power.

47. Green Hydrogen Generation Plant means the plants generating

Hydrogen through electrolysis of water/brine water/waste treatable

7573 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

water or from biomass through thermo-chemical and biochemical routes

or through any suitable technology as defined by GoI by using renewable

including banking of renewable energy.

48. Green Hydrogen Park developer means an entity which is involved in

the development of Green Hydrogen Parks/Valley/Hub and related

infrastructure.

49. Green Hydrogen Project/Plant means the plants generating Green

Hydrogen as a main product by electrolysis of water using Renewable

Energy Sources or as a by-product through any chemical process using

Renewable Energy or as defined by Ministry of New & Renewable Energy,

GoI;"

50. Grid

Code

means

Rajasthan

Electricity

Regulatory

Commission

(Rajasthan Electricity Grid Code) Regulations, 2008 / Central Electricity

Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010

as amended from time to time;

51. Gross Metering means methodology under which the entire electricity

generated by the Rooftop/ Ground mounted Solar PV System/Any other

RE Plant set up in the premises of the consumer is delivered to the

distribution system of the Licensee;

52. GST means Goods and Services Tax;

53. “HLSC” means High Level Screening Committee.

54. HAM means Hybrid Annuity Model

55. Hydro Power Projects means Large Hydro Power Projects (LHP) having

capacity more than 25 MW and all Small Hydro Projects (SHPs),

commissioned after 8th March, 2019 or as defined by MNRE/MoP, GoI.

56. “Hybrid Project” means a power project which generates power by

combining conventional and non-conventional energy sources or

combining of two or more non-conventional (wind & Solar) energy

sources and feeding the generated power into electricity grid through a

common pooling station. The Project capacity will be the maximum AC

capacity that would be injected into Grid. However, in case of source

wise power injected into grid from different location, the project capacity

will be considered sum of all power source capacity injected from

different location.

57. Interconnection Line means Transmission/Distribution Line connecting

Generating Plant Sub-station/Pooling Sub-station of Developer /Power

Producer to Receiving Sub-station of ISTS/RVPN/Discoms of Rajasthan.

58. Inter-connection Point shall mean a point at Extra High Voltage (EHV)

substation of Transmission Licensee or High Voltage (HV) substation of

distribution licensee, as the case may be, where the electricity produced

from the RE generating station is injected into the Grid;

59. IREDA means Indian Renewable Energy Development Agency;

60. ISTS means Inter State Transmission System;

61. JFM Committee means Joint Forest Management committee.

62. Licensee includes a person deemed to be a licensee under Section 14 of

the Electricity Act,2003;

63. MNRE means Ministry of New and Renewable Energy, Government of

India;

64. MoPMeans Ministry of Power, Government of India.

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7574

65. MSW Municipal Solid Waste

66. National Solar Mission or Solar Mission means Jawaharlal Nehru

National Solar Mission 2009 launched by Government of India;

67. Net Metering means the methodology under which electricity generated

by the Rooftop/ Ground mounted Solar PV System/any other RE Plant

set up in the premises of a consumer under the CAPEX/ RESCO mode is

primarily for self-consumption, and the surplus generated electricity, if

any, is delivered to the distribution licensee which will be off-set against

the electricity supplied by the distribution licensee to the consumer

during the billing cycle;

68. Nodal Agency means Rajasthan Renewable Energy Corporation Limited

(RREC);

69. NVVN means NTPC VidyutVyapar Nigam, a wholly owned subsidiary

company of NTPC;

70. Pellets - Pellet fuels (or pellets) are a type of solid fuel made from

compressed organic material.

71. Personmeans an individual or a firm (Proprietorship Firm /Partnership

Firm/LLP) or company registered under the CompaniesAct1956 or 2013;

72. Policy - 1999 means Policy for Promoting Generation of Power through

Non- Conventional Energy Sources issued on 11th March 1999.

73. Policy – 2004 means Policy for Promoting Generation of Electricity

through Non- Conventional Energy Sources issued on 25.10.2004 as

amended from time to time.

74. Pooled Cost of Power Purchase means the weighted average price at

which the distribution licensee has purchased the electricity including

the cost of self-generation, if any, in the previous year from all the energy

suppliers excluding short-term power purchases and those based on

renewable energy;

75. Pooling station means sub-station developed by the Developer/Power

Producer

for

interface

with

the

Receiving

Sub-station

of

Discoms/RVPN/CTUIL;

76. Power means electricity produced using the energy sources.

77. Power Producer means a person who set up RE Plant and generate

electricity from Renewable energy as per this policy;

78. PPA means Power Purchase Agreement;

79. Project Capacity shall mean the total generation capacity of Green

Hydrogen Project in KTPA and/or equivalent Alternating Current (AC)

capacity of RE Plant capacity in MW required for Hydrogen generation

plant per KTPA at the delivery points subject to maximum 25 MW per

KTPA;

80. Pumped Storage Plant means Pumped Hydro Storage Plant having

capacity more than 25 MW stand alone or with RE sources used for

supply of power at later stage as defined by MNRE/MoP, Government of

India.

81. RDF means Refuse Derived Fuel. This fuel is produced from combustible

components of Municipal Solid Waste (MSW). This waste, usually taken

from industrial or commercial sites, is shred, dried, baled and then

finally burned to produce electricity.

82. RE means Renewable Energy as defined by MNRE, GoI;

7575 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

83. RE Parks means a group of Solar/Wind/Hybrid/Hydro including

PSP/Storage Plants or its combinations in the same location used for the

generation of electric power;

84. RE Plant/RE Power Plant means a power plant or system utilizing

Renewable Energy for generating electricity;

85. RE Power Park Developer means a person who develops and / or

maintains RE parks and the related common infrastructure facilities;

86. Receiving Station means EHV/HV Sub-Station developed by RVPNL/

Discom for evacuation of power generated from Biomass energy sources.

87. Receiving Sub-station means EHV/HV Sub-Station developed by

RVPN/DISCOM of Rajasthan/PGCIL for evacuation of power generated

from Renewable Energy Sources;

88. Renewable

Energy

Certificate

or

REC

means

the

Renewable

EnergyCertificate issued by the Central Agency in accordance with the

procedure prescribed by it and under the provisions specified in this

regard by the Central Electricity Regulatory Commission (Terms &

Conditions for recognition and issuance of Renewable Energy Certificate

for Renewable Energy Generation) Regulations, 2010.

89. Renewable Energy Plants/RE Plants means the power plants other than

the conventional power plants generating grid quality electricity from

Renewable Energy Sources as defined by MNRE, GoI;

90. “RE Parks” means a group of Solar/Wind/Hybrid/Hydro including

PSP/Storage Plants or its combinations in the same location used for the

generation of electric power;

91. RenewableEnergySources”meansandincludesnon-conventional

renewable generating sources such as mini hydel, wind, solar

including its integration withcombined cycle, biomass, biofuel

cogeneration, urban/municipal waste and othersuch sources

asapproved by the Ministry of New and Renewable Energy,

Government of India.

92. "RDF"meansRefuseDerivedFuel.Thisfuelisproducedfromcombust

iblecomponentsofMunicipalSolidWaste(MSW).This

waste,

usually taken from industrial or commercial sites, is shred,

dried, baled and then finally burned to produce electricity.

93. “RERC”/"Commission

means

Rajasthan

Electricity

Regulatory

Commission;

94. RESCO Mode means the methodology in which entire investment is to be

incurred by a company/individual other than the consumer for setting

up of the solar power project in the consumer premises and the

consumer pays for the electricity generated from such solar power

project at mutually agreed tariff to such investor company/ individual;

95. RIICO means Rajasthan State Industrial Development and Investment

Corporation Limited

96. RIPS means Rajasthan Investment Promotion Scheme issued by State

Government.

97. RPO means Renewable Purchase Obligation;

98. RREC/RRECL means Rajasthan Renewable Energy Corporation Ltd;

99. RTC power means Round the Clock power

भाग 1(ख) राजस् थान र राज-पत्र, जुलाई 16, 2025 7576

100. RUVN/RUVNL/RUVITL means the Rajasthan UrjaVikasand ITServices

Limited;

101. RVPN/RVPNL

means the Rajasthan RajyaVidyutPrasaran Nigam

Limited;

102. RVUN/RRVUNL/RVUNL means the Rajasthan RajyaVidyutUtpadan

Nigam Limited;

103. Scheduled Commissioning Period means the scheduled period of the

completion of the project counted from the date of “final approval” issued

by RREC to the date of “COD” as per this policy provision;

104. SECI means the Solar Energy Corporation of India;

105. SLEC means State Level Empowered Committee constituted under the

provisions of this Policy;

106. SLMCC means State Level Monitoring & Coordination Committee

constituted under the provisions of this Policy

107. SSC means State Sanction Committee constituted under the provisions

of this Policy;

108. Solar Farm/Park means a group of solar power plants in the same

location used for the generation of electric power;

109. Solar Plant/Solar Power Plant means a power plant or system utilizing

solar energy through solar photo-voltaic or concentrated solar thermal

devices for generating electricity;

110. Solar Power Park Developer(SPPD) means a person who develops and /

or maintains solar parks and the related common infrastructure

facilities;

111. Solar Power Producer/Solar Developer means a person that makes an

investment for setting up of solar power project and generating electricity

from solar energy;

112. Solar PV Power Plant means the Solar Photo Voltaic (SPV) Power Plant

that uses sunlight for direct conversion into electricity through Photo

Voltaic technology;

113. Solar Thermal Power Plant means the Solar Thermal Power Plant that

uses sunlight through Concentrated Solar Power (CSP) technology based

on either line focus or point focus principle for conversion into

heat/steam which can be used for producing electricity;

114. SoP means Standard Operating Procedure;

115. SPSU means State Public Sector Undertaking.

116. Standalone Battery Energy Storage System means Battery Energy

Storage System installed standalone used for storage of power and

supply power at later stage.

117. State Agency means Rajasthan Renewable Energy Corporation Ltd. or

any other agency designated by the Rajasthan Electricity Regulatory

Commission for accreditation and recommending the Renewable Energy

Project for registration with Central Agency in accordance with the

procedure prescribed by it and under the provisions specified in the

CERC REC Regulations;

118. State and Government means, respectively, the State of Rajasthan and

the Government of Rajasthan.

7577 राजस् थान र राज-पत्र, जुलाई 16, 2025 भाग 1(ख)

119. State Load Dispatch Centre or SLDC means the centre established by

the State Government for purposes of exercising the powers and

discharging the functions under Section 31 of the Act.

120. Tariff means the schedule of charges for generation, transmission,

wheeling and supply of electricity together with terms and conditions for

application thereof;

121. Water means available water in any form pure water/demineralised

water/ brine water/Waste treatable water suitable for Green Hydrogen

generation.

122. WBA means Wheeling and Banking Agreement.

The term not defined above will have their usual meanings.

By Order of the Governor,

Girdhar,

Joint Secretary, Energy.

राज य केन द्रीय मुद्रणालय, जयपुर।