राजèथान ͪवÙयतु ͪवǓनयामक आयोग
अͬधसचना
ू
जयपरु, Ǒदसà बर 19, 2025
संÉया रा.ͪव.ͪव. आयोग/सͬचव/ͪवǓनयम/160:- ͪवÙयतु अͬधǓनयम 2003 (2003 का
36वां) कȧ धारा 43 से 48, 50,55 एवं 56 सपǑठत धारा 181 Ùवारा Ĥदƣ ् शिÈतयɉ और उस
Ǔनͧमत उसे समथ[ बनाने वालȣ समèत शािÈतयɉ का Ĥयोग करते हयेु, राजèथान ͪवÙयतु
ͪवǓनयामक आयोग, पव[ू Ĥकाशन के पæचात्, राजèथान ͪवÙयतु ͪवǓनयामक आयोग (ͪवÙयतु
Ĥदाय कोड तथा सàबÙध मामलɅ) ͪवǓनयम, 2021 (इसके पæचात् ‘‘मलू ͪवǓनयम’’ के Ǿप मɅ
संदͧभ[त) मɅ संशोधन करने के ͧलये एतÙÙवारा Ǔनàनͧलͨखत ͪवǓनयम बनाता है, अथा[त् :
1- लघशीष[क
ु
, ĤयोÏयता तथा Ĥारàभण
(क) ये ͪवǓनयम, ‘‘राजèथान ͪवÙयतु ͪवǓनयामक आयोग (ͪवÙयतु Ĥदाय कोड तथा
सàबÙध मामलɅ) (िÙवतीय संशोधन) ͪवǓनयम, 2025’’ कहलायɅगे।
(ख) ये ͪवǓनयम राÏय मɅ माǓनत अन£िÜतधाǐरयɉ
ु
सǑहत ͪवतरण अन£िÜतधाǐरयɉ
ु
एवं
उपभोÈताओं के ͧलये ĤयोÏय हɉगɅ।
(ग) ये ͪवǓनयम, इन ͪवǓनयमɉ के शासकȧय राज-पğ मɅ Ĥकाशन कȧ Ǔतͬथ से Ĥवƣृ्
हɉगɅ।
397 राजè थान राज-पğ, जनवरȣ 28, 2026 भाग 7
2- मलू ͪवǓनयम के ͪवǓनयम 11 मɅ संशोधन
अ. मलू ͪवǓनयम के उप-ͪवǓनयम 11.7(घ)को Ǔनàनानसार
ु
ĤǓतèथाͪपत ͩकया जायेगा:
‘‘ͩकसी èथायी Ǿप से ͪवÍछेǑदत कनेÈशन के ͪवǽÙध कोई भी बकाया देयता,
माͧलक/ अͬधवासी के नामअÛय ͪवÙयमान/नये कनेÈशन से, 30 (तीस) Ǒदवस का
नोǑटस जारȣ कर वसलȣ
ू
योÊय होगी। उपभोÈता को åयिÈतगत सनवाईका
ु
अवसर
और नोǑटस का जवाब Ǒदया जाएगा और उसके पæचात, नोǑटस के जवाब के साथ-
साथ åयिÈतगत सनवाई
ु
के दौरान Ĥèततु तØयɉ पर ͪवचार करने के बाद
अन£िÜतधारȣ
ु
Ùवारा आÉयापक आदेश जारȣ ͩकया जाएगा। आÉयापक आदेश जारȣ
ͩकए ǒबना कोई ͪवÍछेदन / वसलȣ
ू
Ĥभाͪवत नहȣं होगी। यǑद उपभोÈता आÉयापक
आदेश से पीͫड़त है, तो वह उपयÈत
ु
उपभोÈता ͧशकायत Ǔनवारण मंचɉ से संपक[
करने के ͧलए èवतंğ होगा।’’
आ. मलू ͪवǓनयम के उप-ͪवǓनयम 11.8 (ख) को Ǔनàनानसार
ु
ĤǓतèथाͪपत ͩकया
जायेगा :
(ख)’’आपǓत[
ू
को पनु:चालू कराने के ͧलए आवेदन पर ͪवचार ͩकया जाएगा:
(i)
कͪष
ृ
उपभोÈताओं के ͧलये जैसा ͩक राÏय कͪष
ृ
नीǓत मɅ Ǔनधा[ǐरत है
(ii)
एच.टȣ./आई.एच.टȣ.
उपभोÈता:
ͪवÍछेदन कȧ Ǔतͬथ से 2वष[ के भीतर
(iii)
अÛय के ͧलये:
ͪवÍछेदन कȧ Ǔतͬथ से 5 वष[ के भीतर
ऊपर बताए गए ͪवÍछेदन कȧ संबंͬधत अवͬध कȧ समािÜत के बाद कनेÈशन को
èथायी Ǿप से ͪवÍछेǑदत माना जाएगा। ऐसे उपभोÈता िजÛहɅ èथायी Ǿप से
भाग 7 राजè थान राज-पğ, जनवरȣ 28, 2026 398
ͪवÍछेǑदत के ͧलये वगȸकत
ृ
ͩकया गया है, को उसी पǐरसर मɅ कनेÈशन वांǓछत होने
पर ͩफर से आवेदन करना होगा।”
इ.मलू ͪवǓनयम के उप-ͪवǓनयम 11.8 (घ) के नीचे Ǔनàनͧलͨखत परÛतकु जोड़ा जाएगा :
“बशतȶ ͩक पनु: कनेÈशन हेतु आवेदन करने वाले आवेदक को, ͪवÍछेदन कȧ Ǔतͬथ
से एचटȣ/रइएचटȣ
्
उपभोÈताओं के मामले मɅ एक वष[ तथा अÛय उपभोÈताओं के
मामले मɅ दो वष[ कȧ अवͬध कȧ समािÜत के पæचात् नया उपभोÈता माना जाएगा,
यǑद अन£िÜतधारȣ
ु
Ùवारा लाइन सामĒी हटा लȣ गरइ् हो, और ऐसी िèथǓत मɅ
आवेदक को लाइन एवं संयंğ कȧ लागत वहन करनी होगी।”
3.
मलू ͪवǓनयम कȧ अनसची
ुू
-I मɅ संशोधन
अ. मलू ͪवǓनयम कȧ अनसची
ुू
-I मɅ ͪवÙयमान अनसची
ुू
2.1 के ऊपर Ǔनàनͧलͨखत नरइ्
अनुसची
ू
-I, 2क जोड़ी जाएगी :
2क: घरेलू एवं अघरेलू उपभोÈताओं के ͧलए 150 ͩकलोवाट तक के भार हेतु
कनेÈशन Ĥभार, िजनका पǐरसर 24 घंटे उपलÞध आपǓत[
ू
वाले तीन-फेज एलटȣ
नेटवक[ से 300 मीटर के भीतर िèथत है, तथा औÙयोͬगक एवं ͧमͬĮत भार
उपभोÈताओं के ͧलए, िजनका पǐरसर 24 घंटे उपलÞध आपǓत[
ू
वाले तीन-फेज
एलटȣ नेटवक[ से 200 मीटर के भीतर िèथत है।
399 राजè थान राज-पğ, जनवरȣ 28, 2026 भाग 7
( i ) ओवरहेड लाइन के ͧलए:
Đ.
सं.
उपभोÈता
कȧ Įेणी
जमा कȧ जाने वालȣ राͧश (ǽ.)
संबंͬधत
ͪवǓनयम
1
घरेलू
जनजातीय उप-योजना: 750/- Ǿपये
Ēामीण:
5 ͩकलोवाट तक:
एकल फेज / तीन फेज: 2000/-Ǿपये
शहरȣ :
5 ͩकलोवाट तक:
एकल फेज / तीन फेज: 3500/-Ǿपये
Ēामीणएवं शहरȣ :
5 ͩकलोवाट से अͬधक 150 ͩकलोवाट तक,
50 kVA तक CD के साथ :
एकल फेज / तीन फेज: 3500 Ǿपये एवं
अǓतǐरÈत राͧश @500 Ǿपये ĤǓतͩकलोवाटया 5
ͩकलोवाटसे अͬधक मɅ उसका अंश।
45 ͩकलोवाट से अͬधक 150 ͩकलोवाट तक,
50 kVAसे अͬधक CD के साथ :
तीन फेज : 90,000 Ǿपये एवं अǓतǐरÈत राͧश
@650 Ǿपये ĤǓतͩकलोवाट या 45 ͩकलोवाट से
अͬधक मɅ उसका अंश ।
2
अघरेलू
5 ͩकलोवाट तक:
एकल फेज / तीन फेज: 5000/-Ǿपये
5 ͩकलोवाट से अͬधक 150 ͩकलोवाट तक,
50 kVA तक CD के साथ :
एकल फेज /तीन फेज : 5000 Ǿपये एवं
अǓतǐरÈत राͧश @650 Ǿपये ĤǓतͩकलोवाट(5
ͩकलोवाट से अͬधक)
45 ͩकलोवाट से अͬधक 150 ͩकलोवाट तक,
50 kVAसे अͬधक CD के साथ :
तीन फेज : 1,00,000 Ǿपये एवं अǓतǐरÈत
राͧश @750 Ǿपये ĤǓतͩकलोवाट(45 ͩकलोवाट
से अͬधक)
6.1
भाग 7 राजè थान राज-पğ, जनवरȣ 28, 2026 400
3
साव[जǓनक
पथ Ĥकाश
åयवèथा
5,000/- Ǿपये ĤǓत कनेÈशन। इसमɅ लाइन /
नेटवक[ लागत शाͧमल नहȣं है।
4
लघु उÙयोग
एवम ͧमͬĮत
भार,
5 ͩकलोवाट तक:
एकल फेज / तीन फेज: 5000/-Ǿपये
5 ͩकलोवाट से अͬधक 18.65 ͩकलोवाट तक:
तीन फेज : 5000 Ǿपये एवं अǓतǐरÈत राͧश
@650 Ǿपये ĤǓतͩकलोवाट(5 ͩकलोवाट से
अͬधक)
5
मÚयम
उÙयोग- एल
टȣएवम
ͧमͬĮत भार
(18.65 से
112 ͩक.वा.
एवम /और
CD 50
kVAतक
तीन फेज : 5000 Ǿपये एवं अǓतǐरÈत राͧश
@650 Ǿपये ĤǓतͩकलोवाट(5 ͩकलोवाट से
अͬधक)
6
मÚयम
उÙयोग- एच
टȣएवम
ͧमͬĮत भार
(18.65 से
112 ͩक.वा.
एवम /और
CD50
kVAसे
अͬधक
तीन फेज : 66,000 Ǿपये एवं अǓतǐरÈत राͧश
5,000 Ǿपये एवं अǓतǐरÈत राͧश @650 Ǿपये
ĤǓतͩकलोवाट(5 ͩकलोवाट से अͬधक)
7
वहत
ृ
उÙयोग-एवम
ͧमͬĮत भार
(112 से
150 ͩक.वा.
एवम /और
CD 125
kVAसे
अͬधक
तीन फेज: 66,000 Ǿपये एवं अǓतǐरÈत राͧश
5,000 Ǿपये एवं अǓतǐरÈत राͧश @750 Ǿपये
ĤǓतͩकलोवाट(5 ͩकलोवाट से अͬधक)
401 राजè थान राज-पğ, जनवरȣ 28, 2026 भाग 7
( ii ) भूͧमगत लाइन के ͧलए:
Đ.
सं.
उपभोÈता कȧ
Įेणी
जमा कȧ जाने वालȣ राͧश (ǽ.)
संबंͬधत
ͪवǓनयम
1
घरेलू
जनजातीय उप-योजना: 750/-Ǿपये
Ēामीण:
5 ͩकलोवाट तक:
एकल फेज / तीन फेज: 2000/-Ǿपये
शहरȣ :
5 ͩकलोवाट तक:
एकल फेज / तीन फेज: 3500/-Ǿपये
Ēामीणएवं शहरȣ :
5 ͩकलोवाट से अͬधक 150 ͩकलोवाट तक,
50 kVA तक CD के साथ :
एकल फेज / तीन फेज: 5000 Ǿपये एवं
अǓतǐरÈत राͧश @750 Ǿपये ĤǓतͩकलोवाटया 5
ͩकलोवाटसे अͬधक मɅ उसका अंश।
45 ͩकलोवाट से अͬधक 150 ͩकलोवाट तक,
50 kVAसे अͬधक CD के साथ :
तीन फेज : 90,000 Ǿपये एवं अǓतǐरÈत राͧश
@2000 Ǿपये ĤǓतͩकलोवाटया 45 ͩकलोवाट से
अͬधक मɅ उसका अंश ।
2
अघरेलू
5 ͩकलोवाट तक:
एकल फेज / तीन फेज: 5000/-Ǿपये
5 ͩकलोवाट से अͬधक 150 kW तक, 50
kVA तक CD के साथ :
एकल फेज / तीन फेज: 5000 Ǿपये एवं
अǓतǐरÈत राͧश @850 Ǿपये ĤǓतͩकलोवाट(5
ͩकलोवाट से अͬधक)
45 ͩकलोवाट से अͬधक 150 ͩकलोवाट तक,
50 kVAसे ÏयादाCD के साथ :
तीन फेज : 1,00,000 Ǿपये एवं अǓतǐरÈत
6.1
भाग 7 राजè थान राज-पğ, जनवरȣ 28, 2026 402
राͧश @2200 Ǿपये ĤǓतͩकलोवाट(45
ͩकलोवाटसे अͬधक)
3
साव[जǓनक
पथ Ĥकाश
åयवèथा
5,000/- Ǿपये ĤǓत कनेÈशन। इसमɅ लाइन /
नेटवक[ लागत शाͧमल नहȣं है।
4
लघु उÙयोग
एवम ͧमͬĮत
भार,
5 ͩकलोवाट तक:
एकल फेज / तीन फेज: 5000/-Ǿपये
5 ͩकलोवाट से अͬधक18.65 ͩकलोवाट तक:
तीन फेज : 5000 Ǿपये एवं अǓतǐरÈत राͧश
@850 Ǿपये ĤǓतͩकलोवाट(5 ͩकलोवाट से
अͬधक)
5
मÚयम
उÙयोग- एल
टȣएवम
ͧमͬĮत भार
(18.65 से
112 ͩक.वा.
एवम /और
CD 50
kVAतक
तीन फेज : 5000 Ǿपये एवं अǓतǐरÈत राͧश
@850 Ǿपये ĤǓतͩकलोवाट(5 ͩकलोवाट से
अͬधक)
6
मÚयम
उÙयोग- एच
टȣएवम
ͧमͬĮत भार
(18.65 से
112 ͩक.वा.
एवम /और
CD50
kVAसे
अͬधक
तीन फेज : 66,000 Ǿपये एवं अǓतǐरÈत राͧश
5,000 Ǿपये एवं अǓतǐरÈत राͧश @2200
Ǿपये ĤǓतͩकलोवाट(5 ͩकलोवाट से अͬधक)
7
वहत
ृ
उÙयोग-एवम
ͧमͬĮत भार
(112 से
150 ͩक.वा.
एवम /और
तीन फेज : 66,000 Ǿपये एवं अǓतǐरÈत राͧश
5,000 Ǿपये एवं अǓतǐरÈत राͧश @2200
Ǿपये ĤǓतͩकलोवाट(5 ͩकलोवाट से अͬधक)
403 राजè थान राज-पğ, जनवरȣ 28, 2026 भाग 7
CD 125
kVAसे
अͬधक
ǑटÜपणी:
क- यǑद Ǔनयमɉ के अनसार
ु
11 केवी ऑयल िèवच / आरएमयू (RMU)èथाͪपत ͩकया जाना
है, तो यह आवेदक Ùवारा उपलÞध कराया जाएगा तथा ऐसी िèथǓत मɅ 50 केवीए से
अͬधक अनबंध
ु
मांग (CD) वाले घरेलू/अघरेलू (DS/NDS) कनेÈशनɉ के ͧलए Ǿपये
90,000/- के èथान पर Ǿपये 24,000/- तथा Ǿपये 1,00,000/- के èथान पर Ǿपये
34,000/- देय माने जाएंगे। हालांͩक, िèवचͬगयर, एचटȣ केबल आǑद के संबंध मɅ Ǿपये
10,000/- का Ǔनधा[ǐरत पय[वे¢ण Ĥभार (Supervision Charges) Ǔनधा[ǐरत है ।
ख- उपय[Èत
ु
के अǓतǐरÈत, ͩकसी भी Ĥकार का अÛय पय[वे¢ण Ĥभार देय नहȣं होगा।
ग- एलटȣ/एचटȣ केबल ǒबछाने तथा डीपी सेट (DP Set) कȧ èथापना हेतु माग[ अͬधकार
(Right of Way – RoW) आवेदक Ùवारा उपलÞध कराया जाएगा।
घ- घरेलू एवं अघरेलू कनेÈशनɉ के ऐसे पǐरसर जो 24घंटे उपलÞध आपǓत[
ू
वाले तीन-फेज
एलटȣ नेटवक[ से 300 मीटर से अͬधक दरȣू पर िèथत हɇ तथा औÙयोͬगक एवं ͧमͬĮत
भार कनेÈशनɉ के ऐसे पǐरसर जो 24 घंटे उपलÞध आपǓत[
ू
वाले तीन-फेज एलटȣ
नेटवक[ से 200 मीटर से अͬधक दरȣू पर िèथत हɇ, उÛहɅ राजèथान ͪवÙयतु
ͪवǓनयामक आयोग (ͪवÙयतु Ĥदाय कोड तथा सàबÙध ͪवषय) ͪवǓनयम, 2021 तथा
समय-समय पर ͩकए गए संशोधनɉ के लागू Ĥावधानɉ के अनसार
ु
Ĥभार वसलू कर
जारȣ ͩकया जाएगा। 150 ͩकलोवाट से अͬधक भार वाले कनेÈशन भी उÈत ͪवǓनयमɉ
एवं समय-समय पर ͩकए गए संशोधनɉ के अनसार
ु
हȣ जारȣ ͩकए जाएंगे।
ङ- अÛय Ĥभार जैसे आवेदन शãक
ु
, मीटर एवं मीटǐरंग उपकरण हेतु ĤǓतभǓत
ू
जमा
(Security), सीटȣ/पीटȣ सेट, एचटȣ आपǓत[
ू
के मामले मɅ संयंğ लागत(Plant Cost)
तथा अͬĒम ऊजा[ Ĥभार के ͪवǽÙध ĤǓतभǓत
ू
(Security) राजèथान ͪवÙयतु
भाग 7 राजè थान राज-पğ, जनवरȣ 28, 2026 404
ͪवǓनयामक आयोग (ͪवÙयतु Ĥदाय कोड तथा सàबÙध ͪवषय) ͪवǓनयम, 2021 तथा
समय-समय पर ͩकए गए संशोधनɉ के लागू Ĥावधानɉ के अनसार
ु
देय हɉगे।
च- यह Ĥावधान उन पǐरसरɉ पर लागू नहȣं होगा जो ͪवकासक/खातेदार Ùवारा ͪवकͧसत
कॉलोǓनयɉ मɅ िèथत हɇ अथवा Üलॉटेड डवलपमɅट मɅ िèथत हɇ, जहाँ राजèथान ͪवÙयतु
ͪवǓनयामक आयोग (ͪवÙयतु Ĥदाय कोड तथा सàबÙध ͪवषय) ͪवǓनयम, 2021 के
ͪवǓनयम 7.6 के अंतग[त यथानपात
ु
(Ĥो-राटा) Ĥभार वसलू ͩकए जा रहे हो।
छ- यह Ĥावधान उन बहमंिजला
ु
भवनɉ के आवेदकɉ पर लागू नहȣं होगा, िजनका
ͪवÙयतीकरण
ु
राजèथान ͪवÙयतु ͪवǓनयामक आयोग (ͪवÙयतु Ĥदाय कोड तथा
सàबÙध ͪवषय) ͪवǓनयम, 2021 के ͪवǓनयम 7.5 (i) तथा समय-समय पर ͩकए
गए संशोधनɉ के अनसार
ु
अǓनवाय[ है।
ज- यह Ĥावधान Ǔनजी औÙयोͬगक ¢ेğɉ के आवेदकɉ पर भी लागू नहȣं होगा, जहाँ ͪवǓनयम
7.5 के अनसार
ु
ͪवÙयतीकरण
ु
अǓनवाय[ है अथवा जहाँ ͪवǓनयम 7.6 के अनसार
ु
वाèतͪवक यथानपात
ु
Ĥभार देय हɇ।
झ- यǑद औÙयोͬगक कनेÈशनɉ का सàबÙध भार 112 ͩकलोवाट से अͬधक है अथवा
अनबंध
ु
मांग 50 केवीए से अͬधक है, तो ऐसे कनेÈशन एचटȣ आपǓत[
ू
पर जारȣ ͩकए
जाएंगे। अÛय Įेणी के कनेÈशनɉ के मामले मɅ भी, यǑद अनबंध
ु
मांग 50 केवीए से
अͬधक है, तो कनेÈशन एचटȣ आपǓत[
ू
पर हȣ जारȣ ͩकया जाएगा।
ञ- ͪवÙयतीकत
ु
ृ ¢ेğɉ मɅ िèथत बहमंिजला
ु
भवनɉ मɅ, जहाँ अनमाǓनत
ु
ͫडजाइन मांग 50
केवीए से अͬधक है, कनेÈशन राजèथान ͪवÙयतु ͪवǓनयामक आयोग (ͪवÙयतु Ĥदाय
कोड तथा सàबÙध ͪवषय) ͪवǓनयम, 2021 तथा समय-समय पर ͩकए गए संशोधनɉ
के लागू Ĥावधानɉ के अनसार
ु
जारȣ ͩकए जाएंगे।
ट- ऐसे बहमंिजला
ु
भवनɉ/Ýलैटɉ के मामले मɅ, जो उन भू-खंडɉ पर Ǔनͧम[त हɇ जहाँ Ĥारàभ मɅ
कम भार का आकलन ͩकया गया था Èयɉͩक बहमंिजला
ु
भवनɉ/Ýलैटɉ पर ͪवचार नहȣं
405 राजè थान राज-पğ, जनवरȣ 28, 2026 भाग 7
ͩकया गया था, भले हȣ उनकȧ अनमाǓनत
ु
ͫडजाइन मांग 50 केवीए से कम हो, तथा
जहाँ Ýलैटेड डवलपमɅट ͩकया गया है और åयिÈतगत Ýलैट/मंिजल अनेक संèथाओं को
बेची जा रहȣ हɇ एवं एक से अͬधक कनेÈशन कȧ आवæयकता है, तो ऐसे कनेÈशन
राजèथान ͪवÙयतु ͪवǓनयामक आयोग (ͪवÙयतु Ĥदाय कोड तथा सàबÙध ͪवषय)
ͪवǓनयम, 2021 तथा समय-समय पर ͩकए गए संशोधनɉ के अनसार
ु
जारȣ ͩकए
जाएंगे।
आ. मलू ͪवǓनयम कȧ अनसची
ुू
-I, 2.1 के शीष[क को Ǔनàनानसार
ु
ĤǓतèथाͪपत ͩकया जाएगा :-
2.1 अनसची
ुू
-2क के अंतग[त न आने वाले आवेदकɉ के ͧलए आवेदन के साथ जमा कȧ
जाने वालȣ राͧश(ͪवǓनयम 6 देखɅ)
इ. मलू ͪवǓनयम कȧ अनसची
ुू
-I, 2.2 के शीष[क को Ǔनàनानसार
ु
ĤǓतèथाͪपत ͩकया जाएगा :-
2.2 अनसची
ुू
-2क के अंतग[त न आने वाले आवेदकɉ के ͧलए ͪवतरण मेÛस/आपǓत[
ू
लाइन
के ͪवèतार हेतु मांग पर जमा कȧ जाने वालȣ अǓतǐरÈत राͧश (ͪवǓनयम 7.2 एवं 7.3
देखɅ)
ई. मलू ͪवǓनयम कȧ अनसची
ुू
-I, 2.2 (क) को Ǔनàनानसार
ु
ĤǓतèथाͪपत ͩकया जाएगा :-
(क) एलटȣ आपǓत[
ू
हेतु :
Đ.
सं.
उपभोÈता कȧ
Įेणी
उपरोÈत आइटम 2.1 के अधीन देय राͧश के
अǓतǐरÈत जमा करायी जाने वालȣ राͧश(ǽ.)
संबंͬधत
ͪवǓनयम
1
घरेलू और
अघरेलू
(शहरȣ ¢ेğ
मɅ और
Ēामीण
अबादȣ ¢ेğ
मɅ)
300 मीटर से अͬधक ͪवतरण मेÛस और/या सेवा
लाइन के ͪवèतार के ͧलए :
क) एकल फेज आपǓत[
ू
के ͧलये: 150 Ǿपये ĤǓत
मीटर
ख) तीन फेज आपǓत[
ू
के ͧलये: 225 Ǿपये ĤǓत
मीटर
2
साव[जǓनक
पथ Ĥकाश
वाèतͪवक सामĒी लाग³ + Įम और यथा
ĤयोÏय उपरȣ Ĥभार
7.2 एवं
7.3
भाग 7 राजè थान राज-पğ, जनवरȣ 28, 2026 406
åयवèथा
3
लघु उÙयोग,
मÚयम
उÙयोग एवं
ͧमͬĮत भार
200 मीटर से अͬधक ͪवतरण मेÛस और/या सेवा
लाइन के ͪवèतार के ͧलए :
क) एकल फेज आपǓत[
ू
के ͧलये: 150 Ǿपये ĤǓत
मीटर
ख) तीन फेज आपǓत[
ू
के ͧलये: 225 Ǿपये ĤǓत
मीटर
ǑटÜपणी:
1- यǑद कनेÈशन ͪवÙयमान एलटȣ ͧसèटम और कमीशन ͩकए जाने वाले नए सब-èटेशन से
åयवहाय[ नहȣं है, तो एचटȣ ͪवतरण मैÛस के ͪवèतार कȧ आवæयकता होगी, यह उपभोÈता से
एकल फेज 11 केवी लाइन के मामले मɅ Ǿपये 150 ĤǓत मीटर तथा तीन फेज 11 केवी लाइन
के मामले मɅ 225 Ǿपये ĤǓत मीटर कȧ दर से वसलू ͩकया जाएगा। तथाͪप, सब-èटेशन, यǑद
कोई हो, कȧ लागत कȧ आवæयकता है तो अन£िÜतधारȣ
ु
Ùवारा वहन कȧ जायेगी।
2- अन£िÜतधारȣ
ु
Ùवारा सͪव[स लाइन Ĥदान कȧ जायेगी। जहां अन£िÜतधारȣ
ु
Ùवारा सͪव[स लाइन
Ĥदान नहȣं कȧ जाती है तब अन£िÜतधारȣ
ु
उपभोक्ता Ùवारा अनसची
ुू
2.1 (क) के अनसार
ु
उपभोक्ता Ùवारा जमा करायी गयी राͧश का 25 ĤǓतशत Đेͫडट Ĥदान करेगा।
आयोग के आदेश Ùवारा
सͬचव
407 राजè थान राज-पğ, जनवरȣ 28, 2026 भाग 7
RAJASTHAN ELECTRICITY REGULATORY COMMISSION
NOTIFICATION
Jaipur, December 19, 2025
No. RERC/Secy/ Reg. 160- In exercise of the powers conferred by sections 43 to 48, 50,
55 and 56 read with section 181 of the Electricity Act 2003 (Act 36 of 2003), and all other
powers enabling it in this behalf and after previous publications, the Rajasthan Electricity
Regulatory Commission hereby makes the following regulations to amend the Rajasthan
Electricity Regulatory Commission (Electricity supply code and connected matters)
Regulations, 2021(hereinafter referred to as “the Principal Regulations”), namely:
1.
Short title, applicability and commencement
a)
These Regulations shall be called ‘The Rajasthan Electricity Regulatory
Commission (Electricity Supply Code and Connected Matters) (Second
Amendment), Regulations, 2025.
b)
These Regulations shall apply to distribution licensees including deemed
licensees and consumers in the State.
c)
These Regulations shall come into force from the date of their publication in
the official gazette.
2.
Amendment in Regulation 11 of the Principal Regulations
A. The Sub Regulation 11.7(d) of the Principal Regulations shall be substituted as
under:
"Any outstanding dues against any permanently disconnected connection
shall be recoverable from another existing/ new connection in the name of
the Owner/ Occupier by serving a notice of thirty (30) days. An opportunity
of personal hearing and reply of the notice shall be given to the consumer and
thereafter, a speaking order shall have to be issued by the licensee after due
consideration of the reply of the notice as well as facts furnished during
personal hearing. No recovery shall be affected/ disconnection made, without
the issue of speaking order. If the
consumer is aggrieved with the speaking
order, he shall be at the liberty to approach the appropriate consumer
grievance redressal forums. "
भाग 7 राजè थान राज-पğ, जनवरȣ 28, 2026 408
B. The Sub Regulation 11.8 (b) of the Principal Regulations shall be substituted as
under:
b) An application for restoration of supply shall be considered:
(i)
For Agriculture
Consumers
As prescribed in the State Agriculture Policy
(ii)
HT/EHT consumers
Within 2 years from the date of disconnection
(iii)
For others
Within 5 years from the date of disconnection
A connection shall be treated as permanently disconnected after expiry of
the
respective period of disconnection indicated above. Such consumers
who are
classified permanently disconnect consumers shall have to apply a
fresh if
connections is desired in the same premises.
C. A proviso shall be added below Sub Regulation 11.8 (d) of the Principal
Regulations as under:
“Provided that applicant applying for reconnection will be considered as new
consumer after expiry of period one year in case of HT/EHT consumers and
two years in case of other
consumers (other than HT and EHT) from the date
of disconnection, if line material is removed by the licensee and has to bear
the cost of line and plant.”
3.
Amendment in Schedule-I of the Principal Regulations
(i) A new schedule-I, 2A shall be added above existing schedule-I, 2.1 of the
Principal Regulations as under:-
2A. Connection charges up to load of 150 kW to be applicable for domestic and
non-domestic applicants whose premise falls within 300 meter of available 24 hour
supply three phase LT network and for industrial and mix load applicants whose
premise falls within 200 meters of available 24 hour supply three phase LT network.
409 राजè थान राज-पğ, जनवरȣ 28, 2026 भाग 7
i)
For Overhead line:
Sr.
No
Category of
consumer
Amount to be deposited (Rs.)
Related
Regulat
ion
1
Domestic
Tribal sub plan: Rs. 750/-
Rural:
Upto 5 kW:
Single phase/ Three phase: Rs. 2000/-
Urban:
Upto 5 kW:
Single phase/ Three phase: Rs.3500/-
Rural & Urban:
More than 5 kW upto 150 kW with CD upto
50 kVA:
Single Phase / Three phase: Rs. 3500/- plus
additional sum @ Rs. 500 per kW or part
thereof beyond 5 kW.
More than 45 kW upto 150 kW with CD above
50 kVA:
Three phase: Rs. 90,000/- plus additional sum
@ Rs. 650/- per kW or part thereof beyond 45
kW.
2
Non-
domestic
Upto 5 kW:
Single phase/ Three phase: Rs. 5000/-
More than 5 kW upto 150 kW with CD upto
50 kVA:
Single phase/ Three phase: Rs. 5000/- plus
additional sum @ Rs. 650/- per kW (beyond 5
kW)
More than 45 kW upto 150 kW with CD above
50 kVA:
Three phase: Rs. 1,00,000/- plus additional
sum @ Rs. 750/- per kW (beyond 45 kW)
3
Public street
lighting
Rs. 5,000/- per connection. This does not
include line/ network cost.
4
Small
Industry &
Mixed load
Upto 5 kW:
Single phase/ Three phase: Rs. 5000/-
More than 5 kW upto 18.65 kW:
Three phase: Rs. 5000/- plus additional sum @
Rs. 650/- per kW (beyond 5 kW)
6.1
5
Medium
Industry-
LT &
Three phase: Rs. 5000 /- plus additional sum
@ Rs. 650/- per kW (beyond 5 kW)
भाग 7 राजè थान राज-पğ, जनवरȣ 28, 2026 410
Mixed load
(18.65 to
112 kW and
/or CD upto
50 kVA)
6
Medium
Industry-
HT ) &
Mixed load
(18.65 to
112 kW and
/or CD
above 50
kVA
Three phase: Rs. 66,000/- plus Rs. 5000 /- plus
additional sum @ Rs. 650/- per kW (beyond 5
kW)
7
Large
Industry&
Mixed load
(112 kW to
150 kW and
/or CD
above
125kVA)
Three phase: Rs. 66,000/- plus Rs. 5000 /- plus
additional sum @ Rs. 750/- per kW (beyond 5
kW)
ii)
For Underground line:
Sr.
No
.
Category of
consumer
Amount to be deposited (Rs.)
Related
Regulati
on
1
Domestic
Tribal sub plan: Rs. 750/-
Rural:
Upto 5 kW:
Single phase/ Three phase: Rs. 2000/-
Urban:
Upto 5 kW:
Single phase/ Three phase: Rs.3500/-
Rural & Urban:
More than 5 kW upto 150 kW with CD upto
50 kVA:
Single Phase / Three phase: Rs. 5000/- plus
additional sum @ Rs. 750 per kW or part
thereof beyond 5 kW.
More than 45 kW upto 150 kW with CD
above 50 kVA:
Three phase: Rs.90,000/- plus additional
sum @ Rs. 2000/- per kW or part thereof
beyond 45 kW.
6.1
411 राजè थान राज-पğ, जनवरȣ 28, 2026 भाग 7
2
Non-
domestic
Upto 5 kW:
Single phase/ Three phase: Rs. 5000/-
More than 5 kW upto 150 kW with CD upto
50 kVA:
Single phase/ Three phase: Rs. 5000/- plus
additional sum @ Rs. 850/- per kW (beyond
5 kW)
More than 45 kW upto 150 kW with CD
above 50 kVA:
Three phase: Rs. 1,00,000/- plus additional
sum @ Rs. 2200/- per kW (beyond 45 kW)
3
Public street
lighting
Rs. 5,000/- per connection. This does not
include line/ network cost.
4
Small
Industry &
Mixed load
Upto 5 kW:
Single phase/ Three phase: Rs. 5000/-
More than 5 kW upto 18.65 kW:
Three phase: Rs. 5000/- plus additional sum
@ Rs. 850/- per kW (beyond 5 kW)
5
Medium
Industry-
LT &
Mixed load
(18.65 to
112 kW and
/or CD upto
50 kVA)
Three phase: Rs. 5000/- plus additional sum
@ Rs. 850/- per kW (beyond 5 kW)
6
Medium
Industry-
HT &
Mixed load
(18.65 to
112 kW and
/or CD
above 50
kVA)
Three phase: Rs. 66,000/- plus Rs. 5000/-
plus additional sum @ Rs. 2200/- per kW
(beyond 5 kW)
7
Large
Industry&
Mixed load
(112 kW to
150 kW and
/or CD
above 125
kVA)
Three phase: Rs. 66,000/- plus Rs. 5000/-
plus additional sum @ Rs. 2200/- per kW
(beyond 5 kW)
भाग 7 राजè थान राज-पğ, जनवरȣ 28, 2026 412
Note:
1)
In case of 11 kV oil switch / RMU is to be installed as per rule then same shall
be provided by applicant and in such case Rs. 24000/- in place of Rs. 90,000/-
and 34,000/- in place of Rs. 1,00,000/- to be read for DS/ NDS connections
having CD more than 50 kVA, however, Supervision charges fixed @ Rs.
10,000/- will be charged towards switchgears, HT cable etc.
2)
Apart from above, no supervision charges shall be levied.
3)
RoW for laying of LT/HT cables and for erection of DP set shall be provided by
the applicant.
4)
The domestic and non-domestic connections premises which exist beyond 300
meter of available three phase 24 hour LT network and industrial and mixed load
connections premises which exist beyond 200 meter of available three phase 24
hour LT network shall be released by recovering charges as per applicable
provisions of RERC (Electricity supply code and connected matters)
Regulations, 2021and amendment from time to time. Connections with load
more than 150 kW shall be released as per applicable provisions of RERC
(Electricity supply code and connected matters) Regulations, 2021 and
amendment from time to time.
5)
Other charges like Application fees, Security for meter and metering equipment,
CT/PT set,plant cost in case of HT supply, Security against advanced energy
charges shall be applicable as per applicable provisions of RERC (Electricity
supply code and connected matters) Regulations, 2021 and amendment from
time to time.
6)
This clause shall not be applicable to premises which exist in colonies developed
by developer /khatedar or in plotted development where pro-rata charges are
being recovered as per Regulation 7.6 of RERC (Electricity supply code and
connected matters) Regulations, 2021 and amendment form time to time.
7)
This clause shall not be applicable to applicants of multistory buildings whose
electrification is mandatory as per Regulation 7.5 (i) of RERC (Electricity
supply code and connected matters) Regulations, 2021 and amendment from
time to time.
413 राजè थान राज-पğ, जनवरȣ 28, 2026 भाग 7
8)
This clause shall not be applicable to applicants of private industrial areas where
electrification as per Regulation 7.5 is must or where actual pro-rata charges as
per Regulation 7.6 are applicable.
9)
If the connected load of industrial connections is more than 112 kW or contract
demand is more than 50 kVA then connections shall be released on HT supply.
For other category connections with Contract Demand more than 50 kVA, the
same shall be released on HT supply.
10)
The connections in multi-story buildings in electrified areas with estimated
designed demand more than 50 kVA shall be released as per applicable
provisions of RERC (Electricity supply code and connected matters)
Regulations, 2021 and amendment form time to time.
11)
Connections in multi-storied buildings/flats which are constructed on plots on
which initially lesser load was considered as no multi-storied building/flats were
considered even though their estimated design demand is less than 50 kVA,
where flatted development is made and individual flats/floor are being sold to
multiple entities and more than one connections is required, then such
connections shall be released as per the RERC (Electricity supply code and
connected matters) Regulations, 2021 and amendment form time to time.
(ii) The heading of the Schedule-I, 2.1 of the Principal Regulations shall be
substituted as under:-
2.1 Amount to be deposited with application for applicant not covered under 2A
(Refer Regulation 6)
(iii) The heading of Schedule-I, 2.2 of the Principal Regulations shall be substituted
as under:-
2.2 Additional amount to be deposited on demand for extension of distribution
mains/ supply line for applicant not covered under 2A (refer Regulations 7.2
&7.3)
भाग 7 राजè थान राज-पğ, जनवरȣ 28, 2026 414
(iv) Schedule-I, 2.2 (a) of the Principal Regulations shall be substituted as under:-
a. For LT supply
Sr
.
No
.
Category of
consumer
Amount to be deposited in addition to sum
payable under item 2.1 above
Related
Clause
1
Domestic and Non-
domestic (in urban
area and in rural
area)
For extension of distribution mains and/or
service line beyond 300 mtrs-
(a) For single phase supply: Rs. 150/mtr
(b) For three phase supply: Rs. 225/mtr
2
Public street lighting
Actual material cost + labour and overhead
charges as applicable
3
Small Industry,
Medium Industry &
Mixed load
For extension of distribution mains and/or
service line beyond 200 mtrs-
(a) For single phase supply: Rs. 150/mtr
(b) For three phase supply: Rs. 225/mtr
7.2
&7.3
Note:1) If the connection is not feasible from existing LT system and new sub-station to be
commissioned then extension of HT distribution mains required, it shall be
recovered from the consumer @ Rs. 150/ meter in case of single phase 11 KV
line and @ Rs. 225 / meter in case of three phase 11 KV line. However, the cost
of sub-station required, if any shall be borne by the Nigam.
2) Service line shall be provided by the Nigam. Where service line is not provided by
the Nigam, then the Nigam shall provide the credit of 25% of amount deposited
by the consumer as per Schedule 2.1 (a) above to the consumer.
By Order of the Commission,
Secretary.