Energy Department

NOTIFICATION

Jaipur, August 17, 2026

No.F.20(40) Energy/2025/04269 :-The State Government, vide Notification No.

F.20(62) Energy/2024 dated 04.12.2024, issued the Rajasthan Integrated Clean Energy

Policy, 2024, which was subsequently amended vide Notification dated 25.07.2025. In this

connection, the following clauses of the aforesaid Policy are hereby inserted/replaced as

follows, with immediate effect:

1. New Clause 15.13 (Section-A) inserted below clause 15.12:

The provisions of Clause 15.11 shall mutatis mutandis apply to an RE

Park/Solar Park for transfer of the entire registered capacity of such park.

2. Clause 16.2.6 (Section-A) replaced with following:

The land may be allotted for the establishment of Renewable Energy

Projects/Renewable Energy Parks/Green Hydrogen Projects/Green Hydrogen

Parks with or without storage having capacity of not less than 1000 MW, and in

cases where Developers/Power Producers do not presently have connectivity

from the Central Transmission Utility (CTU)/State Transmission Utility (STU)

for the land identified in accordance with the provisions of prevailing

landrevenue rules.

RREC will make recommendation to Revenue Department forallotment of land

for establishing RE/Green HydrogenProjects/Parks etc. on deposition of Land

Security @ Rs. 1 Lac/MWin form of DD/RTGS or through E-grass/IFMS 3.0 of

RevenueManagement System in designated Budget Head in favour of

StateGovernment. The land so recommended shall not be more than

themaximum limit of land as prescribed under clause 16.3 (section-A)of this

policy.

Revenue Department will issue necessary allotment order for rightto use of the

land as an advance possession, as per applicableprovision of Rajasthan Land

Revenue (Allotment of land for settingup of Power Plant based on Renewable

Energy Sources) Rules,2007 as amended from time to time.

The Security Deposit (SD) deposited with the State Governmentshall be

refunded to the Developer upon commissioning of theproject, in proportion

भाग 7 राजè थान राज-पğ, अगè त 25, 2026 269

tothe capacity commissioned, based on therecommendation of RRECL by

Revenue Department as per the rules.

The Developers/Power Producers who have already applied and/ordeposited the

Security Deposit with RREC as per the EnergyDepartment, GoR Notification

dated 25.07.2025 shall have theoption to migrate their application for allotment

of land under theseprovisions within two months, along with the deposition of

theapplicable Security Deposit, if not deposited from the effective dateof

notification of this policy provision. In case of withdrawal ofapplication towards

set apart of the land by Developer/PowerProducers, the SD will be refunded to

Developer/Power Producerby RREC.

RREC will send the proposal accordingly to Revenue Department.

Any violation of the provisions of this policy & Rajasthan LandRevenue

(Allotment of land for setting up of Power Plant based onRenewable Energy

Sources) Rules, 2007 shall lead to withdrawal ofallotment of the land and also

forfeiture of Land Security amount.

3. Clause 16.3 (Section-A) replaced with following

For setting up of Power Plants based on different technologies, maximum

land area which can be allotted to the Developer/ Power Producer will be as

under:

S.

N

o.

Technology

Maximum land area

for Solar Plant

For Wind-Solar

Hybrid Plant

i SPV on Crystalline Technology. 2.0Hect./MW

ii SPV on Crystalline Technology

with tracker.

2.0Hect./MW

iii SPV on Thin Film/Amorphous

Technology with or without

tracker.

2.0 Hect./MW

iv Solar Thermal (CSP)-

Parabolic Trough /Tower/Other

Technology with and without

storage

a) Up to PLF of 21%:

3.0 Hect./MW

b) For every 1%

increase in PLF,

0.15 Hect./MW

additional land will

be allotted.

Land

shall

be

allotted

according

to

individual

capacity

of

solar

and

wind

component of the

project subject to

condition

that

maximum

ceiling

limit of overall land

for Hybrid project

will be 2.5 Ha/MW

of declared capacity

of Hybrid Project.

v Maximum land area for Wind

Plant

2.0 Hect/MW

Provided that 10% of the total area of land allotted shall be reserved bythe

allottee for the purpose of tree plantation.

270 राजè थान राज-पğ, अगè त 25, 2026 भाग 7

Note: For power projects with storage system, additional land will beallotted as

per the rules prescribed by the Revenue Department,GoR.

New Clause 16.4.5 Stamp Duty (Section-A) inserted below clause 16.4.4.

The applicable stamp duty on execution of lease deed/sub lease deed etc.will be

payable by Developer/Power Producer as per prevalent Act/Rules.

4. Clause 6.3 (Section-B) replaced with following:

In order to encourage storage capacity to supply reliable power, newRE projects

integrated with BESS at STU/Discom Network under with minimum capacity

of X/2 MWh (where "X" is the installed capacity of RE project) shall be

exempted 50% from registration charges for the RE capacity and on installation

of BESS beyond X/2 MWh capacity, registration charges shall be exempted up

to 100% on pro rata basis corresponding to the storage capacity added.

5. Clause 8(d) (Section-B) replaced with following:

Each Developer of PSP will deposit non-refundable registration charge of Rs.

10 Lac per project with RREC.

BESS (Stand alone or integrated with RE) will deposit following registration

charges:

BESS size ≤ 2 MWh

Rs. 5,000/-

BESS size > 2 MWh

& ≤100 MWh

Rs. 10,000 per MWh

BESS size > 100

MWh

Rs. 10 Lac per project

However, the aforesaid registration charges will not be applicable only for

BESS required to be installed with RE Project as per clause 6.4 (section-B).

6. Clause 1.12 (iii) (Section-E) replaced with following:

The Power Evacuation facilities granted by DISCOMs/RVPN as per the grid

connectivity procedure/guidelines of DISCOMs/RVPN, will be utilized by

Developers/ Power Producers within 2 years from the date of approval,

otherwise

power

evacuation

approval

may

be

allocated

to

otherDevelopers/Power Producers on priority basis.

By Order,

Manoj Kumar Mittal,

Dy. Secretary to Government.