राजè थान राजपğ
ͪवशेषांक
RAJASTHAN GAZETTE
Extraordinary
साͬधकार Ĥकाͧशत
Published by Authority
आिæवन, 01, बधवार
ु
, शाके 1948- ͧसतà बर 23, 2026
Asvina 01 , Wednesday, Saka 1948- September 23, 2026
भाग 4 (ग)
उप-खÖ ड (I)
राÏ य सरकार तथा अÛ य राÏ य-Ĥाͬधकाǐरयɉ Ùवारा जारȣ ͩकये गये (सामाÛ य आदेशɉ, उप-
ͪवͬधयɉ आǑद को सिàमͧलत करते हएु) सामाÛ य काननी Ǔनयम
ू
।
REVENUE (GROUP-6) DEPARTMENT
NOTIFICATION
Jaipur, August 13, 2026
G.S.R.59 .-In exercise of the powers conferred by section 100 of the Rajasthan Land
Revenue Act, 1956 (Act No. 15 of 1956), the State Government hereby makes the following
rules further to amend the Rajasthan Land Revenue (Allotment of Land for setting up of Power
Plant based on Renewable Energy Sources) Rules, 2007, namely:-
1. Short title and commencement.- (1) These rules may be called the Rajasthan Land
Revenue (Allotment of Land for setting up of Power Plant based on Renewable Energy
Sources) (Amendment) Rules, 2026.
(2) They shall come into force at once.
2. Amendment of rule 2.- In rule 2 of the Rajasthan Land Revenue (Allotment of Land
for setting up of Power Plant based on Renewable Energy Sources) Rules, 2007, hereinafter
referred to as the said rules,-
(i) after the existing clause (c) and before the existing clause (d), the following new clause (cc)
shall be inserted, namely:-
“(cc) “Firm Start Date or Start Date of Connectivity” means date of start of connectivity
as mentioned by the Central Transmission Utility of India Ltd. (CTUIL) in its Final
Grant of Connectivity document or the date confirming availability of Transmission
System of State Transmission Utility (STU) for connectivity of Renewable Energy
(RE) Projects/Parks.”; and
(ii) after the existing clause (j-a) and before the existing clause (jj), the following new clause
(j-aa) shall be inserted, namely:-
“(j-aa) “SCOD” means Scheduled Commercial Operation Date of the bay as confirmed by
the Central Transmission Utility of India Ltd. (CTUIL) in its In-principle
Grant/Final Grant/ Subsequent documents issued, from time to time or time line of
utilization of Power Evacuation System mentioned in the approval granted by the
State Transmission Utility (STU)and its subsequent documents, if any;”
3. Amendment of rule 2A.-In rule 2Aof the said rules,-
(i) the existing serial number 1 and 2 and entries thereto shall be substituted by the
following, namely:-
1. Wind Farm/Wind Power Project
2.0 Hectare per MW
2. Solar Power Plant using,-
भाग 4 (ग) राजèथान राज-पğ, ͧसतà बर 23, 2026 227
(ii) the existing serial number 4 and entries thereto shall be substituted by the
following, namely:-
4.
Wind Solar Hybrid Power plant using,-
(i)
Solar
Photo
Voltaic
(SPV)
on
Crystalline Technology.
(ii) Solar
Photo
Voltaic
(SPV)
on
Crystalline Technology with tracker.
(iii) Solar Photo Voltaic (SPV) on Thin
Film/Amorphous Technology with or
without tracker
Land
shall
be
allotted
according
to
individual
capacity of solar and wind
component of the project
subject to condition that
maximum ceiling limit of
overall land for Hybrid
project
shall
be
2.5
Hectare/MW of declared
capacity
of
Hybrid
Project."; and
(iii) after the existing proviso, the following new proviso shall be added, namely:-
“Provided further that 10 percent of the total area of land allotted shall be
reserved by the allottee for the purpose of tree plantation."
4.Insertion of new rule 2B.- After the existing rule 2A, so amended and before the
existing rule 3 of the said rules, the following new rule 2B shall be inserted, namely:-
“2B. Allotment of Land for Mega Renewable Energy Project/Renewable
Energy Park/ Green Hydrogen Project/Green Hydrogen Park.- (1) For the
establishment of Mega Renewable Energy Projects /Renewable Energy Parks/Green
Hydrogen Projects/Green Hydrogen Parks with or without storage having capacity
of not less than 1000 MW, and in cases where Developer/Power Producer do not
presently have connectivity from the Central Transmission Utility (CTU) or State
Transmission Utility (STU) for the land identified, on application in accordance
with the provisions of these rules, the RREC shall recommend to the Revenue
Department, Government of Rajasthan for allotment of such land on deposition of
applicable Land Security Charges as per prevalent State Renewable Energy Policies.
(2) After receiving of such recommendation from RREC and after taking a report
from the Collector concerned, allotment of land for setting up of Renewable Energy
(i)
Solar Photo Voltaic (SPV) on Crystalline Technology.
2.0Hectare/MW
(ii)
Solar Photo Voltaic (SPV) on Crystalline Technology
with tracker.
2.0Hectare/MW
(iii) Solar Photo Voltaic (SPV) on Thin Film/Amorphous
Technology with or without tracker.
2.0 Hectare/MW
(iv) Solar Thermal (Concentrated solar power-CSP)
Parabolic Trough /Tower/other Technology
with and without storage
(a) upto Plant Load Factor
(PLF) of 21%
3.0 Hectare/MW
(b) for every 1%
increase in Plant Load
Factor
(PLF),
0.15
Hectare per MW
Additional land shall be
allotted.";
228 राजèथान राज-पğ, ͧसतà बर 23, 2026 भाग 4 (ग)
Project/Renewable Energy Park/ Green Hydrogen Project/ Green Hydrogen Park
may be made by the State Government in the following manner, namely:-
(a) the Collector shall inform the Developer/Power Producer of the amount to be
deposited as part payment of the premium, equal to ten percent of the total
premium, as determined in accordance with sub-rule (3) of rule 6. Such part
payment shall be deposited in the Government account under the appropriate
revenue head and shall be adjusted proportionately against the premium payable
for the allotted land, as per clause (c) below.
(b) upon receipt of the application and payment deposited by the Developer/Power
Producer as per clause (a) above, the Collector shall issue an order granting
‘Right to Use’ as advance possession of the land with a condition that land shall
be allowed to use for the purpose to obtain connectivity at CTU/STU in favour of
the Developer/Power Producer in a format as prescribed by the Revenue
Department. Such order, together with the payment of premium, shall entitle the
Developer/Power Producer for allotment of land by the District Collector and to
execute the lease deed for the allotted land in compliance of clause (c) below. The
Tehsildar shall then make specific entries in the records against that khasra
numbers.
(c) in order to facilitate the Developer/Power Producer, the land shall be allotted by
the District Collector in a phased manner subject to payment of the balance
premium in the following manner:-
(i) Minimum One-Third (1/3rd) of Land
The Developer/Power Producer within 3 years from the date of the ‘Right to Use’
order issued by the District Collector, shall get minimum 1/3rd land allotted in its
favour by paying the balance 90% pro-rata premium for the corresponding area
equal to prevailing market price of the land as determined in accordance with sub-
rule (3) of rule 6.
(ii) Minimum Two-Third (2/3rd) of Land
The Developer/Power Producer within 6 years from the date of issuance of the
‘Right to Use’ order issued by the District Collector, shall get minimum 2/3rd land
allotted including land allotted as per clause (i) above in its favour by paying the
balance 90% pro-rata premium for the corresponding area equal to prevailing
market price of the land as determined in accordance with sub-rule (3) of rule 6.
(iii) Entire Land
The Developer/Power Producer within 9 years from the date of issuance of the
‘Right to Use’ order issued by the District Collector, shall get whole land allotted
in its favour by paying the balance 90% pro-rata premium for the corresponding
area equal to prevailing market price of the land as determined in accordance with
sub-rule (3) of rule 6:
Provided that Developers/Power Producers may also opt to deposit the full
premium in a single installment, as per the demand raised by the District
Collector for the entire land. In such cases, they shall be entitled to allotment and
execution of the lease deed for the entire land.
भाग 4 (ग) राजèथान राज-पğ, ͧसतà बर 23, 2026 229
(3) Failure to comply with timelines as specified in clause (c) of sub-rule (2) may lead to
withdrawal of allotment for the unutilized portion, forfeiture of the Land Security and the
upfront land Premium deposited for allotment of land.
(4) The Developer/Power Producer shall apply for and obtain an in-principal grant of
connectivity from CTU or STU within three years from the date of issuance of the ‘Right
to Use’ order issued by the District Collector or Developer/Power Producer has to obtain
approval of transmission line under section 68 of Electricity Act, 2003 from appropriate
authority for evacuation of renewable power from generating end to drawl end
(consumption point).
(5)The Developer shall utilize the land allotted for establishment of the Renewable
Energy Project/Renewable Energy Park/Green Hydrogen Project/Green Hydrogen Park
upto six months beyond the Scheduled Commercial Operation Date (SCOD) as intimated
by the CTU or STU, or upto the firm start date of connectivity granted by the CTU or
STU, whichever is later. However, the maximum time line of land utilization should not
be more than nine years from the date of issuance of the ‘Right to Use’ order issued by
the District Collector.
(6) The State Government may, upon application by the Developer or Power Producer,
extend the above timeline on a case-to-case basis for valid reasons, including force
majeure or delay in operation of connectivity, without imposing any financial burden on
the Developer or Power Producer.
(7) The Developer/Power Producer shall also deposit annual charges at the rate of ten
percent of lease rent specified in sub-rule (2) of rule 6 of these rules for a period with
effect from the date of issue of ‘Right to Use’ order and till execution of lease deed.
(8) The Lease deed shall be executed only after payment of 100% Premium amount and
other charges as specified in sub-rule (3) of rule 6 of these rules and after issue of
allotment order by the District Collector for the entire land. The Lease term shall
commence from the date of execution of lease deed and the lease rent shall thereafter be
chargeable annually at the rate specified in sub-rule (2) of rule 6 of these rules."
5. Insertion of new rule 4D.- After the existing rule 4C and before the existing rule 5
of the said rules, the following new rule 4D shall be inserted, namely:-
“4D. Allotment of land for Energy Storage System.-In case allotment of land for
setting up of Energy Storage System (Standalone or Integrated with Renewable Energy
Projects) shall be allotted as per the requirement of the project on the recommendation of
the RREC on case to case basis, based on project requirement, duly considering the
project capacity and technology. In case of Pumped Storage Hydro Project (PSP),
Government land shall be recommended by RREC only after acceptance of non-forest
land for Compensatory Afforestation (CA) by the Forest Department or after getting
Stage-I forest clearance."
6. Amendment of rule 9.-In rule 9 of the said rules,-
(i) in sub-rule (1) , for the existing punctuation mark ".", appearing at the end, the
punctuation mark ":" shall be substituted; and
(ii) after sub-rule (1), so amended, the following new proviso shall be added,
namely:-
230 राजèथान राज-पğ, ͧसतà बर 23, 2026 भाग 4 (ग)
“Provided that in case if any power producer desire to transfer his right or
interest in his leased land to its subsidiary company as defined in Indian Company
Act, 2013 or Special Purpose Vehicle (SPV) Company, he may be allowed to do
so by the State Government on the recommendation of RREC."
[No. F.11(14)Rev-6/2025/70]
By order of the Governor,
Hari Singh Meena
Deputy Secretary to the Government.
____________
Government Central Press, Jaipur.