TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI
Amendments to the Tamil Nadu Electricity Supply Code .. .. .. .. ..
82-93
82-93
Amendments to the Tamil Nadu Electricity Distribution Code .. .. .. .. ..
93-98
93-98
82
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI
Amendments to the Tamil Nadu Electricity Supply Code
(Notifi cation No. TNERC/SC/7 –41 dated 09-06-2020.)
(Lr.No. TNERC/Legal/1180/D.No. 471/2020.)
No. VI(2)/20/2020.
In exercise of the powers conferred by section 181 read with Section 50 of the Electricity Act, 2003 (Central Act
36 of 2003) and all other powers enabling it in this behalf, the Tamil Nadu Electricity Regulatory Commission hereby
makes the following amendments to the Tamil Nadu Electricity Supply Code, the draft of the same having been previously
published, as required under sub- section(3) of the said Section 181.
Aඕඍඖඌඕඍඖගඛ
In the said Supply Code,
1. in regulation 3, in sub-regulation (1),
(a) for the expression “(1)Supply of electricity available to the consumer is of the following categories”
the following shall be substituted,namely:-
“(1). Supply of electricity shall be availed by the consumer under the following categories:-”;
(b) for clause (b), the following clause shall be substituted, namely:-
“(b) Three-phase 4 wire 415 volts between phases and 240 volts between phase and neutral for supply to a
total connected load exceeding 4000 watts but not exceeding a demand of 150 KW:
Provided that for a consumer requiring a sanctioned demand above 112 KW but below or upto 150 KW, availing
of supply shall be subject to the following conditions:
(i)
Space for erection of a Distribution Transformer by the licensee shall be provided by the consumer free of
cost and such space for erecting the Distribution transformer shall either be provided within the consumer’s premises or
in a private land within a radius of 50 meters from the consumer’s premises.The site provided for erection of Distribution
transformer should have free access for inspection and maintenance.
(ii)
Where possible, the licensee may erect a single pole Distribution Transformer in the consumer’s premises
with separate mounting arrangement that can support and hold the Distribution transformer like providing a stud/plinth
or concrete pillar like arrangement etc. Works for mounting arrangements shall be carried out by the consumer at
consumer’s cost.
(iii) Installation of Distribution Transformer with associated equipments/accessories viz. AB switch, HG fuse, DT
structure/pole shall be carried out by the licensee at Licensee’s cost.
(iv) The cost of installation works from the Distribution Transformer to the consumer’s meter, portion of any
HT line within the consumer’s premises when the Distribution transformer is erected inside the consumer’s premises,
shall be borne by the consumer. Works of erection of overhead lines/laying of cables, equipments/accessories necessary
for supply of electricity to the consumer’s premises may be carried out in compliance of safety norms notifi ed by the
Authority and by the Commission, and other relevant regulations of the Distribution Code.
(v) The fi xed/demand charges of electricity for the sanctioned demand shall be at the rates applicable to the
relevant HT category of service notifi ed in the Commission’s Tariff orders issued from time to time, that is to say, the
rate notifi ed per kVA shall be applied on per KW basis without any conversion of the sanctioned demand in KW to
kVA. To illustrate, for a sanctioned demand of 130 KW, the fi xed/demand charges shall be 130 multiplied by [Rs.350/-
] demand charges applicable per kVA for the HT category. The energy charges shall be the applicable LT tariff rates
notifi ed in the Commission’s tariff orders. The losses in the Distribution Transformer shall be borne by these consumers
of the LT category as per the formula prescribed in sub-regulation (7) of regulation 7 of this Code.
Explanation –(i) Existing Consumers i.e LT consumers prior to the notifi cation of amendment in the Government
Gazette which is the eff ective date of coming into force of this regulation, whose demand exceeds 112 KW but
less than or equal to 150 KW or who require additional demand over and above 112KW may opt to avail supply
Jul. 1, 2020]
TAMIL NADU GOVERNMENT GAZETTE
83
under LT category subject to the above conditions in the proviso to clause (b) of this sub-regulation. Existing LT
Consumers whose demand exceeds 112 KW and who do not opt to avail supply as per the conditions in the proviso
to clause (b) of this sub-regulation shall pay excess demand charges in accordance to clause (ii)(c)I in sub-regulation
(2) of Regulation 5 of this Code.
(ii) New consumers who require demand above 112 KW but less than or equal to 150 KW and who are unable
to comply with the conditions in the proviso to clause (b) of this sub-regulation shall obtain supply under HT category.
This is also applicable for existing consumers with sanctioned demand of 112KW and below who require additional
demand over and above 112 KW.”;
2. in regulation 5, in sub-regulation (2),in clause (ii)(c),-
(a) for sub-clauses (I) and (II), the following shall be substituted:
“(I) Where the sanctioned demand is less than and upto 112 KW:
(A) Where the recorded demand does not exceed 112 KW, for every KW or part thereof in excess of the sanctioned
demand, at the rate of 1% of the total energy charges.
Explanation: ‘Total energy charges’ shall have the same meaning as the term ‘charges of electricity supplied’ which
includes both fi xed/demand charges and energy charges.”
(B) Where the recorded demand exceeds 112 KW, for every KW or part thereof in excess of sanctioned demand:-
-
at the rate of 1% of the charges for electricity supplied for every KW or part thereof upto 112 kW;
-
and at the rate of 1.5% for every KW or part thereof over and above 112 KW for the fi rst two
occurrences;
-
and for the third occurrence, at the rate of 3% for every KW or part thereof over and above
112 KW;
-
and thereafter, that is the fourth and subsequent occurrences at the rate of 10% for every KW or
part thereof over and above 112 KW.”;
“(II) Where the sanctioned demand is above 112 KW but less than or equal to 150 KW:
(A) Where the recorded demand does not exceed 150 KW, for every KW or part thereof in excess of the sanctioned
demand, at the rate of 1% of the charges of electricity supplied. The ‘charges of electricity supplied’ is the fi xed/demand
charges and energy charges as per proviso to clause (b) of sub-regulation (1) of regulation 3 of this code.
(B) Where the recorded demand exceeds 150 KW, for every KW or part thereof in excess of sanctioned demand:-
-
at the rate of 1% of the charges for electricity supplied for every KW or part thereof upto 150 kW
-
and at the rate of 1.5% for every KW or part thereof over and above 150 KW for the fi rst two
occurrences;
-
and for the third occurrence, at the rate of 3% for every KW or part thereof over and above
150 KW;
-
and thereafter, that is the fourth and subsequent occurrences at the rate of 10% for every KW or
part thereof over and above 150 KW.”;
(b) for sub-clause (III), the following shall be substituted, namely:-
“(III) Revision of sanctioned demand for consumers with sanctioned demand of 112 KW and below, change over
to LT category of above 112 KW but less than or equal to 150 KW/HT category :
For consumers with a sanctioned demand of 112KW and below, where the recorded demand exceeds the
sanctioned demand for the second and subsequent times,-
(A) In case the recorded demand has not exceeded 112 KW, the existing load sanction shall, after intimation to
the consumer, be revised within one month of the second occurrence to the level of maximum recorded demand and
all the relevant charges applicable to the additional load shall be included in the next bill .
84
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
(B) In case the recorded demand has exceeded 112 KW but less than or equal to 150 KW, the existing load
sanction shall be revised upto the level of maximum recorded demand subject to acceptance of the conditions in the
proviso to clause (b) of sub-regulation (1) of Regulation 3 on payment of all relevant charges applicable. If, however,
the consumer does not opt to switch over to LT category limit of 150 KW under the proviso to clause (b) of sub –
regulation (1) of regulation 3, the existing load sanction shall, after intimation to the consumer, be revised within one
month of the second occurrence, to the level of 112 KW and all relevant charges applicable to the additional load shall
be included in the next bill; For the third and subsequent occurrences of recorded demand exceeding the sanctioned
demand of 112 KW, the licensee shall issue one month’s notice for conversion of LT service to HT service indicating
all relevant charges to be paid for a HT service connection for the level of recorded demand.”;
(c) after sub-clause (III), as so substituted, the following shall be inserted, namely:-
“(IV) Revision of sanctioned demand for consumers with sanctioned demand above 112 KW but less than or equal
to 150 KW, conversion to HT category:
For consumers with a sanctioned demand above 112 KW but less than or equal to 150 KW, where the recorded
demand exceeds the sanctioned demand for the second and subsequent times,-
(A) In case the recorded demand has not exceeded 150 KW, the existing load sanction shall, after intimation to
the consumer, be revised within one month of the second occurrence to the level of maximum recorded demand and
all the relevant charges applicable to the additional load shall be included in the next bill.
(B) In case the recorded demand has exceeded 150 KW, the existing load sanction shall, after intimation to the
consumer, be revised within one month of the second occurrence, to the level of 150 KW and all relevant charges
applicable to the additional load shall be included in the next bill. If, however, the recorded demand has exceeded 150
KW for the third or more number of times, the licensee shall issue one month’s notice for conversion of LT service to
HT service indicating all relevant charges to be paid for a HT service connection for the level of recorded demand.”;
3. in regulation 5, in sub-regulation (2),for clause (iii),the following shall be substituted, namely:-
“(iii) In the case of temporary supply, the excess demand charges for HT/LT supply shall be as specifi ed in clause
(i) and (ii) of this regulation, as the case may be.”.
(By order of the Tamil Nadu Electricity Regulatory Commission)
Chennai - 600 008,
S.CHINNARAJALU,
18th June 2020.
Secretary,
Tamil Nadu Electricity Regulatory Commission.
Eචඔඉඖඉගකඡ Sගඉගඍඕඍඖග
The amendments aim to improve the HT/LT line ratio, facilitate consumers to obtain supply under the ‘Ease of
doing business’ programme of the Department of Industrial Policy and Promotion, and provide choice of supply to other
consumers.
(By order of the Tamil Nadu Electricity Regulatory Commission)
Chennai - 600 008,
S.CHINNARAJALU,
18th June 2020.
Secretary,
Tamil Nadu Electricity Regulatory Commission.
Jul. 1, 2020]
TAMIL NADU GOVERNMENT GAZETTE
85
STATEMENT SHOWING EXISTING PROVISION AND THE PROVISION
EMBODYING AMENDMENT
Tamil Nadu Electricity Supply Code
6O
1R
([LVWLQJUHJXODWLRQ
3URYLVLRQHPERG\LQJDPHQGPHQW
1
3. Categories of supply
(1) Supply of electricity available to the
consumer is of the following categories:
(a) Single-phase 2 wire 240 volts
between phase and neutral for supply to a total
connected load not exceeding 4000 watts
(including power loads) ;
(b) Three-phase 4 wire 415 volts
between phases and 240 volts between phase and
neutral for supply to a total connected loads
exceeding 4000 watts but not exceeding a
demand of 112 KW;
(c) The consumer may elect to avail
supply under any one of the above categories
where the connected load does not exceed 4000
watts;
Explanation: If the connected load or demand
of a LT consumer exceeds 50 kW, the consumer
shall be provided with LTCT metering.
(d) Three-phase three wire supply at
11 kV or 22 kV depending on the voltage level
existing in the area of supply shall be provided
for a demand limit upto 3 MVA or 5 MVA as the
case may be. However, the minimum demand
shall be 63 kVA.
(e) The consumer shall be provided
supply at 33 kV for a demand exceeding 3 MVA
and upto 10 MVA if the area of supply is fed
through 11 kV system and if the area of supply is
fed through 22 kV system, supply at 33 kV shall
be provided for a demand exceeding 5 MVA and
upto 10 MVA ;
(f) The consumer shall be provided
supply at 110 kV for a demand above 10 MVA
and upto 50 MVA;
3. Categories of supply
(1) Supply of electricity shall be availed
by the consumer under the following categories:
(a) xxx
(b) Three-phase 4 wire 415 volts between
phases and 240 volts between phase and neutral
for supply to a total connected load exceeding
4000 watts but not exceeding a demand of 150
KW;
Provided that for a
consumer
requiring a sanctioned demand above 112 KW
but below or upto 150 KW, availing of supply
shall be subject to the following conditions :
(i) Space for erection of a Distribution
Transformer by the licensee shall be
provided by the consumer free of cost and
such space for erecting the Distribution
transformer shall
either be provided
within the consumer’s premises or in a
private land within a radius of 50 meters
from the consumer’s premises. The site
provided for erection of Distribution
transformer should have free access for
inspection and maintenance.
(ii) Where possible, the licensee may erect a
single pole Distribution Transformer in
86
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
(g) The consumer shall be provided
supply at 230 kV for a demand above 50 MVA.
(2) In case of existing service connection /
installation not conforming to the provision
mentioned in Sub-Regulation (1), conversion of
such service connection/installation to higher
/lower voltage may be carried out based on the
mutual consent between the Distribution Licensee
and the Consumer duly considering the capacities
of the existing line/cable, transformer etc., and
the cost-benefit analysis of such conversion.
([SODQDWLRQ For this purpose of this
sub regulation, existing service connection
means
the service connection or additional
demand to the existing service connection,
effected on or before 21.3.2012, the date on
which the sub regulation(2) came into force.
(3) If the consumer opts for higher levels of
voltages for demands less than that specified, the
consumer shall bear the extra expenses to be
incurred by the licensee to provide supply at such
higher voltages “
the consumer’s premises with separate
mounting arrangement that can support
and hold the Distribution transformer like
providing a stud/plinth or concrete pillar
like arrangement etc. Works for mounting
arrangements shall be carried out by the
consumer at consumer’s cost.
(iii) Installation of Distribution Transformer
with associated equipments/accessories
viz. AB switch, HG fuse, DT structure/pole
shall be carried out by the licensee at
Licensee’s cost.
(iv) The cost of installation works from the
Distribution
Transformer
to
the
consumer’s meter including portion of any
HT line within the consumer’s premises
when the Distribution transformer is
erected in the consumer’s premises, shall
be borne by the consumer. Works of
erection of overhead lines/laying of
cables, equipments/accessories necessary
for supply of electricity to the consumer’s
premises
may
be
carried
out
in
compliance of safety norms notified by the
Authority and by the Commission, and
other
relevant
regulations
of
the
Distribution Code.
(v) The fixed/demand charges of electricity
for the sanctioned demand shall be at the
rates applicable to the relevant HT
Jul. 1, 2020]
TAMIL NADU GOVERNMENT GAZETTE
87
category of service notified in the
Commission’s Tariff orders issued from
time to time, that is to say, the rate
notified per kVA shall be applied on per
KW basis without any conversion of the
sanctioned demand in KW to kVA. To
illustrate, for a sanctioned demand of 130
KW, the fixed/demand charges shall be
130 multiplied by [Rs.350/-] demand
charges applicable per kVA for the HT
category. The energy charges shall be the
applicable LT tariff rates notified in the
Commission’s tariff orders. The losses in
the Distribution Transformer shall be
borne by these consumers of the LT
category as per the formula prescribed in
sub-regulation (7) of regulation 7 of this
Code.
Explanation –(i) Existing Consumers i.e LT
consumers prior to the notification of amendment
in the Government Gazette which is the effective
date of coming into force of this regulation,
whose demand exceeds 112 KW but less than or
equal to 150 KW or who require additional
demand over and above 112KW may opt to avail
supply under LT category subject to the above
conditions in the proviso to clause (b) of this sub-
regulation.
Existing
LT
Consumers
whose
demand exceeds 112 KW and who do not opt to
avail supply as per the conditions in the proviso
to clause (b) of this sub-regulation shall pay
88
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
excess demand charges in accordance to clause
(ii)(c)I in sub-regulation (2) of Regulation 5 of
this Code.
(ii) New consumers who require demand above
112 KW but less than or equal to 150 KW and
who are unable to comply with the conditions in
the proviso to clause (b) of this sub-regulation
shall obtain supply under HT category. This is
also applicable for existing consumers with
sanctioned demand of 112KW and below
who require additional demand over and above
112 KW.
(c) to (g) No change
2
5(2) Excess demand charges
(i)…..
(ii) (c) For the remaining LT services other than
those service connections covered in (a) and (b)
above, when the contracted demand is in excess
of 18.6KW (25HP) and for such of those
consumers whose contracted demand is less than
18.6 KW (25HP) but opted for having meters
with demand recording facility, the excess
demand charges shall be-,
(I) Where the recorded demand does not exceed
112 KW, for every KW or part thereof in excess
of the sanctioned demand, at the rate of 1% of the
total energy charges;
(II) Where the recorded demand exceeds
112KW, for every KW or part thereof in excess
of sanctioned demand:-
5(2) Excess demand charges
(i)…..
(ii) (c) xxx
“ (I) Where the sanctioned demand is less than
and upto 112 KW:
(A) Where the recorded demand does not exceed
112 KW, for every KW or part thereof in excess
of the sanctioned demand, at the rate of 1% of the
total energy charges.
Explanation: ‘Total energy charges’ shall have
the same meaning as the term ‘charges of
electricity
supplied’
which
includes
both
fixed/demand charges and energy charges.”
(B) Where the recorded demand exceeds 112
KW, for every KW or part thereof in excess of
sanctioned demand:-
Jul. 1, 2020]
TAMIL NADU GOVERNMENT GAZETTE
89
-
at the rate of 1% of the charges for
electricity supplied upto 112 kW
-
and at the rate of 1.5% for every KW
or part thereof over and above 112KW for the
first two occurrences;
-
and for the third occurrence, at the rate
of 3% for every KW or part thereof over and
above 112KW;
-
and thereafter, that is the fourth and
subsequent occurrences at the rate of 10% for
every KW or part thereof over and above
112KW;
-
at the rate of 1% of the charges for
electricity supplied for every KW or part thereof
upto 112 kW;
-and at the rate of 1.5% for every
KW
or
part
thereof
over
and
above
112KW for the first two occurrences;
-
and for the third occurrence, at the
rate of 3% for every KW or part thereof
over and above 112 KW;
-
and thereafter, that is the fourth &
subsequent occurrences at the rate of 10%
for every KW or part thereof over and above
112 KW.
“(II) Where the sanctioned demand is above
112 KW but less than or equal to 150 KW:
(A) Where the recorded demand does not exceed
150 KW, for every KW or part thereof in excess
of the sanctioned demand, at the rate of 1% of the
charges of electricity supplied. The ‘charges of
electricity supplied’ is the fixed/demand charges
and energy charges as per proviso to clause (b)
of sub-regulation (1) of regulation 3 of this code.
(B) Where the recorded demand exceeds 150
KW, for every KW or part thereof in excess of
sanctioned demand:-
-
at the rate of 1% of the charges for
electricity supplied for every KW or part thereof
upto 150 kW;
-
and at the rate of 1.5% for every
DTP—VI-2 (27)—1
DTP—VI-2 (27)—1a
DTP—VI-2 (27)—2
90
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
(III) Where the recorded demand exceeds the
sanctioned
demand
for
the
second
and
subsequent times,-
(A) In case the recorded demand has not
exceeded 112 KW, the existing load sanction
shall, after intimation to the consumer, be
revised within one month of the second
occurrence to the level of recorded demand and
all the relevant charges applicable to the
additional load shall be included in the next bill ;
(B) In case the recorded demand has
exceeded 112 KW, the existing load sanction
shall, after intimation to the consumer, be revised
within one month of the second occurrence, to the
level of 112 KW and all relevant charges
applicable to the additional load shall be
included in the next bill; if, however, the
recorded demand has exceeded 112 KW for the
third or more number of times, it is open to the
consumer to opt for HT service.
KW or part thereof
over and above
150 KW for the first two occurrences;
-
and for the third occurrence, at the
rate of 3% for every KW or part thereof
over and above 150 KW;
-
and thereafter, that is the fourth
and subsequent occurrences at the rate of 10%
for every KW or part thereof over and above 150
KW.”;
“(III) Revision of sanctioned demand for
consumers with sanctioned demand of 112 KW
and below, change over to LT category of above
112 KW but less than or equal to 150 KW/HT
category :
For consumers with a sanctioned demand of
112KW and below, where the recorded demand
exceeds the sanctioned demand for the second
and subsequent times,-
(A) In case the recorded demand has not
exceeded 112 KW, the existing load sanction
shall, after intimation to the consumer, be
revised within one month of the second
occurrence to the level of maximum recorded
demand and all the relevant charges applicable
to the additional load shall be included in the
next bill .
(B) In case the recorded demand has exceeded
112 KW but less than or equal to 150 KW, the
existing load sanction shall be revised upto the
DTP—VI-2 (27)—2a
Jul. 1, 2020]
TAMIL NADU GOVERNMENT GAZETTE
91
level of maximum recorded demand subject to
acceptance of the conditions in the proviso to
clause (b) of sub-regulation (1) of Regulation 3
on payment of all relevant charges applicable. If,
however, the consumer does not opt to switch
over to LT category limit of 150 KW under the
proviso to clause (b) of sub –regulation (1) of
regulation 3, the existing load sanction shall,
after intimation to the consumer, be revised
within one month of the second occurrence, to the
level of 112 KW and all relevant charges
applicable to the additional load shall be
included in the next bill;
For the third and
subsequent occurrences of recorded demand
exceeding the sanctioned demand of 112 KW, the
licensee shall issue one month’s notice for
conversion of LT service to HT service
indicating all relevant charges to be paid for a
HT service connection for the level of recorded
demand .”;
“(IV) Revision of sanctioned demand for
consumers with sanctioned demand above 112
KW but less than or equal to 150 KW,
conversion to HT category:
For consumers with a sanctioned demand above
112 KW but less than or equal to 150 KW,
where
the
recorded
demand
exceeds
the
sanctioned
demand
for
the
second
and
subsequent times,-
(A) In case the recorded demand has not
exceeded 150 KW, the existing load sanction
92
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
(iii) In the case of temporary supply, the excess
demand charges shall be as follows:
(a)
For HT supply, the demand in excess of
the sanctioned demand shall be charged at
double the normal rate.
(b)
For LT supply, when the recorded
demand does not exceed 112 kW, the excess
demand charges for every kW or part thereof in
excess of the sanctioned demand shall be at the
rate of 1% of the total energy charges, and when
the recorded demand exceeds 112 kW, the
shall, after intimation to the consumer, be
revised within one month of the
second
occurrence to the level of maximum recorded
demand and all the relevant charges applicable
to the additional load shall be included in the
next bill .
(B) In case the recorded demand has exceeded
150 KW, the existing load sanction shall, after
intimation to the consumer, be revised within one
month of the second occurrence, to the level of
150 KW and all relevant charges applicable to
the additional load shall be included in the next
bill. If, however, the recorded demand has
exceeded 150 KW for the third or more number
of times,
the licensee shall issue one month’s
notice for conversion of LT service to HT service
indicating all relevant charges to be paid for a
HT service connection for the level of recorded
demand.”
(iii) In the case of temporary supply, the excess
demand charges for HT/LT supply shall be as
specified in clause (i) and (ii) of this regulation,
as the case maybe.
Jul. 1, 2020]
TAMIL NADU GOVERNMENT GAZETTE
93
excess demand charges shall be as specified in
Para (II) of sub-regulation (2)(ii)(c) of this
regulation.”
(By order of the Tamil Nadu Electricity Regulatory Commission)
Chennai - 600 008,
S.CHINNARAJALU,
18th June 2020.
Secretary,
Tamil Nadu Electricity Regulatory Commission.
Amendments to the Tamil Nadu Electricity Distribution Code
(Notifi cation No. TNERC/DC/8 – 26 dated 09-06-2020.)
(Lr.No. TNERC/Legal/1190/D.No. 472/2020.)
No. VI(2)/21/2020.
In exercise of the powers conferred by Section 181 read with Section 46 of the Electricity Act, 2003 (Central Act
36 of 2003) and all other powers enabling it in this behalf, the Tamil Nadu Electricity Regulatory Commission hereby
makes the following amendments to the Tamil Nadu Electricity Distribution Code, the draft of the same having been
previously published, as required under sub-section (3) of the said Section 181.
Aඕඍඖඌඕඍඖගඛ
In the said Distribution Code, in regulation 26, in sub-regulation (1),
(a) for the expression “Supply of electricity available to the consumer is of the following categories” the following
shall be substituted, namely:-
“(1).Supply of electricity shall be availed by the consumer under the following categories:-”;
(b) for clause (b), the following clause shall be substituted, namely:-
“(b) Three-phase 4 wire 415 volts between phases and 240 volts between phase and neutral for supply to a total
connected load exceeding 4000 watts but not exceeding a demand of 150 KW:
Provided that for a consumer requiring a sanctioned demand above 112 KW but below or upto 150 KW, availing
of supply shall be subject to the following conditions:
(i)
Space for erection of a Distribution Transformer by the licensee shall be provided by the consumer free of
cost and such space for erecting the Distribution transformer shall either be provided within the consumer’s premises or
in a private land within a radius of 50 meters from the consumer’s premises.The site provided for erection of Distribution
transformer should have free access for inspection and maintenance.
(ii)
Where possible, the licensee may erect a single pole Distribution Transformer in the consumer’s premises
with separate mounting arrangement that can support and hold the Distribution transformer like providing a stud/plinth
or concrete pillar like arrangement etc. Works for mounting arrangements shall be carried out by the consumer at
consumer’s cost.
(iii) Installation of Distribution Transformer with associated equipments/accessories viz. AB switch, HG fuse, DT
94
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
structure/pole shall be carried out by the licensee at Licensee’s cost.
(iv) The cost of installation works from the Distribution Transformer to the consumer’s meter including portion of
any HT line within the consumer’s premises when the Distribution transformer is erected in the consumer’s premises,
shall be borne by the consumer. Works of erection of overhead lines/laying of cables, equipments/accessories necessary
for supply of electricity to the consumer’s premises may be carried out in compliance of safety norms notifi ed by the
Authority and by the Commission, and other relevant regulations of the Distribution Code.
(v) The fi xed/demand charges of electricity for the sanctioned demand shall be at the rates applicable to the
relevant HT category of service notifi ed in the Commission’s Tariff orders issued from time to time, that is to say, the
rate notifi ed per kVA shall be applied on per KW basis without any conversion of the sanctioned demand in KW to
kVA. To illustrate, for a sanctioned demand of 130 KW, the fi xed/demand charges shall be 130 multiplied by [Rs.350/-
] demand charges applicable per kVA for the HT category. The energy charges shall be the applicable LT tariff rates
notifi ed in the Commission’s tariff orders. The losses in the Distribution Transformer shall be borne by these consumers
of the LT category as per the formula prescribed in sub-regulation (7) of regulation 7 of supply Code.
Explanation –(i) Existing Consumers i.e LT consumers prior to the notifi cation of amendment in the Government
Gazette which is the eff ective date of coming into force of this regulation, whose demand exceeds 112 KW but less
than or equal to 150 KW or who require additional demand over and above 112KW may opt to avail supply under
LT category subject to the above conditions in the proviso to clause (b) of this sub-regulation. Existing LT Consumers
whose demand exceeds 112 KW and who do not opt to avail supply as per the conditions in the proviso to clause
(b) of this sub-regulation shall pay excess demand charges in accordance to clause (ii)(c)I in sub-regulation (2) of
Regulation 5 of supply Code.
(ii) New consumers who require demand above 112 KW but less than or equal to 150 KW and who are unable
to comply with the conditions in the proviso to clause (b) of this sub-regulation shall obtain supply under HT category.
This is also applicable for existing consumers with sanctioned demand of 112 KW and below who require additional
demand over and above 112 KW.”;
(By order of the Tamil Nadu Electricity Regulatory Commission)
Chennai - 600 008,
S.CHINNARAJALU,
18th June 2020.
Secretary,
Tamil Nadu Electricity Regulatory Commission.
Eචඔඉඖඉගකඡ Sගඉගඍඕඍඖග
The amendments aim to improve the HT/LT line ratio, facilitate consumers to obtain supply under the ‘Ease of
doing business’ programme of the Department of Industrial Policy and Promotion, and provide choice of supply to other
consumers.
(By order of the Tamil Nadu Electricity Regulatory Commission)
Chennai - 600 008,
S.CHINNARAJALU,
18th June 2020.
Secretary,
Tamil Nadu Electricity Regulatory Commission.
Jul. 1, 2020]
TAMIL NADU GOVERNMENT GAZETTE
95
6O
1R
([LVWLQJUHJXODWLRQ
3URYLVLRQHPERG\LQJDPHQGPHQW
1
26. Categories of supply
(1) Supply of electricity available to the
consumer is of the following categories:
(a) Single-phase 2 wire 240 volts
between phase and neutral for supply to a total
connected load not exceeding 4000 watts
(including power loads) ;
(b) Three-phase 4 wire 415 volts
between phases and 240 volts between phase and
neutral for supply to a total connected loads
exceeding 4000 watts but not exceeding a
demand of 112 KW;
(c) The consumer may elect to avail
supply under any one of the above categories
where the connected load does not exceed 4000
watts;
([SODQDWLRQ If the connected load or
demand of a LT consumer exceeds 50 kW, the
consumer shall be provided with LTCT metering.
(d) Three-phase three wire supply at
11 kV or 22 kV depending on the voltage level
existing in the area of supply shall be provided
for a demand limit upto 3 MVA or 5 MVA as the
case may be. However, the minimum demand
shall be 63 kVA.
(e) The consumer shall be provided
supply at 33 kV for a demand exceeding 3 MVA
and upto 10 MVA if the area of supply is fed
through 11 kV system and if the area of supply is
fed through 22 kV system, supply at 33 kV shall
be provided for a demand exceeding 5 MVA and
upto 10 MVA ;
(f) The consumer shall be provided
supply at 110 kV for a demand above 10 MVA
and upto 50 MVA;
26. Categories of supply
(1) Supply of electricity shall be availed
by the consumer under the following categories:
(a) xxx
(b) Three-phase 4 wire 415 volts between
phases and 240 volts between phase and neutral
for supply to a total connected load exceeding
4000 watts but not exceeding a demand of 150
KW;
Provided that for a
consumer
requiring a sanctioned demand above 112 KW
but below or upto 150 KW, availing of supply
shall be subject to the following conditions :
(i)
Space for erection of a Distribution
Transformer by the licensee shall be
provided by the consumer free of cost and
such space for erecting the Distribution
transformer shall
either be provided
within the consumer’s premises or in a
private land within a radius of 50 meters
from the consumer’s premises. The site
provided for erection of Distribution
transformer should have free access for
inspection and maintenance.
(ii) Where possible, the licensee may erect a
STATEMENT SHOWING EXISTING PROVISION AND THE PROVISION
EMBODYING AMENDMENT
Tamil Nadu Electricity Distribution Code
96
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
(g) The consumer shall be provided
supply at 230 kV for a demand above 50 MVA.
(2) In case of existing service connection /
installation not conforming to the provision
mentioned in Sub-Regulation (1), conversion of
such service connection/installation to higher
/lower voltage may be carried out based on the
mutual consent between the Distribution Licensee
and the Consumer duly considering the capacities
of the existing line/cable, transformer etc., and
the cost-benefit analysis of such conversion.
([SODQDWLRQ For this purpose of this
sub regulation, existing service connection
means
the service connection or additional
demand to the existing service connection,
effected on or before 21.3.2012, the date on
which the sub regulation(2) came into force.
(3) If the consumer opts for higher levels of
voltages for demands less than that specified, the
consumer shall bear the extra expenses to be
incurred by the licensee to provide supply at such
higher voltages “
single pole Distribution Transformer in
the consumer’s premises with separate
mounting arrangement that can support
and hold the Distribution transformer like
providing a stud/plinth or concrete pillar
like arrangement etc. Works for mounting
arrangements shall be carried out by the
consumer at consumer’s cost.
(iii) Installation of Distribution Transformer
with associated equipments/accessories
viz. AB switch, HG fuse, DT structure/pole
shall be carried out by the licensee at
Licensee’s cost.
(iv) The cost of installation works from the
Distribution
Transformer
to
the
consumer’s meter including portion of any
HT line within the consumer’s premises
when the Distribution transformer is
erected in the consumer’s premises, shall
be borne by the consumer. Works of
erection of overhead lines/laying of
cables, equipments/accessories necessary
for supply of electricity to the consumer’s
premises
may
be
carried
out
in
compliance of safety norms notified by the
Authority and by the Commission, and
other
relevant
regulations
of
the
Distribution Code.
Jul. 1, 2020]
TAMIL NADU GOVERNMENT GAZETTE
97
(v) The fixed/demand charges of electricity
for the sanctioned demand shall be at the
rates applicable to the relevant HT
category of service notified in the
Commission’s Tariff orders issued from
time to time, that is to say, the rate
notified per kVA shall be applied on per
KW basis without any conversion of the
sanctioned demand in KW to kVA. To
illustrate, for a sanctioned demand of 130
KW, the fixed/demand charges shall be
130
multiplied by [Rs.350/-] demand
charges applicable per kVA for the HT
category. The energy charges shall be the
applicable LT tariff rates notified in the
Commission’s tariff orders. The losses in
the Distribution Transformer shall be
borne by these consumers of the LT
category as per the formula prescribed
in sub-regulation (7) of regulation 7 of
VXSSO\ Code.
Explanation –(i) Existing Consumers i.e LT
consumers prior to the notification of amendment
in the Government Gazette which is the effective
date of coming into force of this regulation,
whose demand exceeds 112 KW but less than or
equal to 150 KW or who require additional
demand over and above 112KW may opt to avail
supply under LT category subject to the above
conditions in the proviso to clause (b) of this sub-
regulation.
Existing
LT
Consumers
whose
98
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
demand exceeds 112 KW and who do not opt
to avail supply as per the conditions in the
proviso to clause (b) of this sub-regulation
shall
pay
excess
demand
charges
in
accordance to clause (ii)(c)I in sub-regulation
(2)
of Regulation
5 of
VXSSO\ Code.
(ii)
New
consumers
who
require
demand
above 112 KW but less than or equal to 150
KW and who are unable to comply with the
conditions in the proviso to clause (b) of
this
sub-regulation shall obtain supply under HT
category. This is also applicable for
existing
consumers
with
sanctioned demand
of 112KW and below who require additional
demand
over
and
above
112
KW.
(c ) to (g) No change
PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI
ON BEHALF OF THE GOVERNMENT OF TAMIL NADU
(By order of the Tamil Nadu Electricity Regulatory Commission)
Chennai - 600 008,
S.CHINNARAJALU,
18th June 2020.
Secretary,
Tamil Nadu Electricity Regulatory Commission.