[ 113 ]
TAMIL NADU
GOVERNMENT GAZETTE
PUBLISHED BY AUTHORITY
©
[Regd. No. TN/CCN/467/2012-14.
GOVERNMENT OF TAMIL NADU
[R. Dis. No. 197/2009.
2020
[Price : Rs. 7.20 Paise.
DTP—VI-2 (32)
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
CONTENTS
No. 32]
CHENNAI, WEDNESDAY, AUGUST 5, 2020
Aadi 21, Saarvari, Thiruvalluvar Aandu–2051
Part VI—Section 2
Notifications of interest to a section of the public
issued by Heads of Departments, etc.
Pages.
Pages.
TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI
TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI
Amendments to the Tamil Nadu Electricity Supply Code .. .. ..
Amendments to the Tamil Nadu Electricity Supply Code .. .. ..
114-116
114-116
Amendments to the Tamil Nadu Electricity Distribution Code .. .. ..
Amendments to the Tamil Nadu Electricity Distribution Code .. .. ..
116-129
116-129
114
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI.
Amendment to the Tamil Nadu Electricity Supply Code.
(Notifi cation No. TNERC/SC/7–43 dated 16-07-2020.)
(Lr.No. TNERC/Legal/1950/2020, dated: 20-7-2020.)
No. VI(2)/33/2020.
In exercise of the powers conferred by section 181 read with section 50 of the Electricity Act, 2003 (Central Act 36 of
2003) and all other powers enabling it in this behalf, the Tamil Nadu Electricity Regulatory Commission hereby makes the following
amendments to the Tamil Nadu Electricity Supply Code, the draft of the same having been previously published, as required under
sub- section (3) of the said section 181.
Aඕඍඖඌඕඍඖග
In the said Supply Code, in regulation 5, in sub-regulation (6), for clause (3), the following clause shall be
substituted, namely:-
“3 (1) Shifting of an existing service connection, other than an agricultural service connection, involving change in door
number or sub door number or survey fi eld number, shall be considered as a new service connection only.
(2) (i) Shifting of an existing agricultural service connection may be permitted within the licensee’s jurisdiction. The charges
of dismantling in the existing location and erection in the newly proposed location towards the shifting shall be borne by the
consumer under Deposit Contribution Works (DCW) basis.
(ii) Shifting of the existing agricultural service connection will be considered only under the following conditions:
(a) Shifting is permissible after one year from the date of eff ecting the service connection in the existing location or from the
date of previous shifting if any.
(b) The applicant should have ownership in the well and the service connection at the existing location and the ownership of
the well in the proposed location
(c) The well at the existing location owned by co-owner(s), should be having separate service connection(s). If the well at
the existing location is owned by co-owner(s), but not having separate service connection(s), the consent of co-owner(s) shall be
obtained and enclosed with the application.
(d) The well and service in the original location should be owned by the applicant(s) on the date of application and they
should continue to be owned by the applicant(s) till the date of shifting the service to the new location.
(iii) Shifting shall be considered irrespective of the reasons, put forth by the consumer.
(iv) Shifting shall be considered, even if the well/ bore well ceased to exist.
(v) Shifting shall be considered even if the land alone is sold for non - agricultural purpose, retaining the well and service.
(vi) The request for shifting shall be accompanied with a fresh application in form 2 of annexure III appended to the
Tamil Nadu Electricity Distribution Code, with relevant documents and registration fee.
(vii) Before taking up the work in the newly proposed location, the applicant shall make payment of shifting charges and report
readiness of motor-pump set with installation to avail supply in the new location and execute an agreement in Form-6 appended
to Tamil Nadu Electricity Distribution Code, with the distribution licensee for the new location. On compliance, the licensee shall
complete the work and give supply and take a test report.
(By the order of the Tamil Nadu Electricity Regulatory Commission)
S. CHINNARAJALU,
Chennai-600 008,
Secretary,
20th July 2020.
Tamil Nadu Electricity Regulatory Commission.
Aug. 5, 2020]
TAMIL NADU GOVERNMENT GAZETTE
115
EXPLANATORY STATEMENT
The shifting of agricultural service connection has been permitted for a very long time in the erstwhile TNEB, presently
TANGEDCO, and is continued to be followed. However, it is necessary to formulate a simplifi ed procedure of the shifting of
Agricultural connection, incorporate in the Code, by issuing suitable amendments with conducive procedures to facilitate uniform
adoption and timely implementation.
The amendments seek to give eff ect to the above decision.
(By order of the Tamil Nadu Electricity Regulatory Commission)
S. CHINNARAJALU,
Chennai-600 008,
Secretary,
20th July 2020.
Tamil Nadu Electricity Regulatory Commission.
STATEMENT SHOWING EXISTING PROVISION AND THE PROVISION EMBODYING AMENDMENT
Tamil Nadu Electricity Supply Code
Sl.
No.
Existing regulation
Provision embodying amendment
(1)
(2)
(3)
5. Miscellaneous charges
(1) xxx
(2) xxx
(3) xxx
(4) xxx
(5) xxx
(6) (1) xxx
(2) xxx
(3) Shifting of an existing service connection involving
change in door number or sub-door number or survey
fi eld number, shall be considered as a new service
connection only.
5. Miscellaneous charges
(1)
xxx
(2) xxx
(3) xxx
(4) xxx
(5) xxx
(6) (1) xxx
(2) xxx
(3) (1) Shifting of an existing service connection, other than
an agricultural service connection, involving change in door
number or sub door number or survey fi eld number, shall be
considered as a new service connection only.
(2) (i) Shifting of an existing agricultural service connection may
be permitted within the licensee’s jurisdiction. The charges of
dismantling in the existing location and erection in the newly
proposed location towards the shifting shall be borne by the
consumer under Deposit Contribution Works (DCW) basis.
ii) Shifting of the existing agricultural service connection will
be considered only under the following conditions:
(a) Shifting is permissible after one year from the date of
eff ecting the service connection in the existing location or from
the date of previous shifting if any.
(b) The applicant should have ownership in the well and the
service connection at the existing location and the ownership
of the well in the proposed location
116
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
(c) The well at the existing location owned by co-owner(s),
should be having separate service connection(s). If the well at
the existing location is owned by co-owner(s), but not having
separate service connection(s), the consent of co-owner(s)
shall be obtained and enclosed with the application.
(i(d) The well and service in the original location should be
owned by the applicant(s) on the date of application and they
should continue to be owned by the applicant(s) till the date of
shifting the service to the new location.
(iii) Shifting shall be considered irrespective of the reasons,
put forth by the consumer.
(iv) Shifting shall be considered, even if the well/ bore well
ceased to exist.
(v) Shifting shall be considered even if the land alone is sold
for non - agricultural purpose, retaining the well and service.
(vi) The request for shifting shall be accompanied with a
fresh application in Form-2 of annexure III appended to the
Tamil Nadu Distribution Code, with relevant documents and
registration fee.
(vii) Before taking up the work in the newly proposed location,
the applicant shall make payment of shifting charges and
report readiness of motor-pump set with installation to avail
supply in the new location and execute an agreement with the
distribution licensee for the new location. On compliance, the
licensee shall complete the work and give supply and take a
test report.
(By order of the Tamil Nadu Electricity Regulatory Commission)
S. CHINNARAJALU,
Chennai-600 008,
Secretary,
20th July 2020.
Tamil Nadu Electricity Regulatory Commission.
Amendments to the Tamil Nadu Electricity Distribution Code.
(Notifi cation No. TNERC/DC/8–27 dated 16-07-2020.)
(Lr.No. TNERC/Legal/1960/2020, dated: 20-7-2020.)
No. VI(2)/34/2020.
In exercise of the powers conferred by section 181 read with section 46 of the Electricity Act, 2003 (Central Act
36 of 2003) and all other powers enabling it in this behalf, the Tamil Nadu Electricity Regulatory Commission hereby
makes the following amendments to the Tamil Nadu Electricity Distribution Code, the draft of the same having been
previously published, as required under sub-section (3) of the said section 181.
Aඕඍඖඌඕඍඖගඛ
In the said Distribution Code, -
(I) In regulation 27, the existing sub-regulation (2), shall be re- numbered as clause (a) to sub-regulation (2) and
after clause (a) as shown re-numbered, following sub-regulations shall be added, namely:-
“(b) When the application is in order, it shall be registered with the seniority number by the registering authority and the
applicant shall be informed of the seniority of registration in writing with proper acknowledgement from the applicant.
Aug. 5, 2020]
TAMIL NADU GOVERNMENT GAZETTE
117
(c) As and when the applicant’s turn comes in the order of seniority, the Licensee shall issue a 90 days’ notice to the applicant
to ascertain whether the particulars given in the application such as ownership of the well and land, S.F. No(s) are the same as on
date. Proper acknowledgement from the applicant for having received the notice shall be obtained and preserved. Motor-pump set
and capacitor shall not be insisted at this stage. On receipt of particulars from the applicant, the section offi cer shall make a fi eld
inspection for confi rmation of the particulars and enter the particulars in the readiness register maintained in the section offi ce. The
date of entering particulars in the readiness register shall be reckoned as the seniority for preparing estimate.
(d) If there is any change in the name of the ownership and/or S.F. number, extent of land, change of location of well /
bore well, a fresh application shall be made. Necessary approval for the change shall be accorded by the registering authority.
Thereafter, the section offi cer shall inspect the site and enter the particulars in the readiness register.
(e) If the applicant or the present owner is not able to furnish the above particulars within the notice period, he may seek
extension of time with the registering authority. The extension of time may be granted up to a maximum period of fi ve years from
date of receipt of notice. Even if no request is made by the applicant for extension of time, the Distribution Licensee shall keep
the application registered live for a period of fi ve years. On expiry of fi ve years, the application shall be treated as lapsed and
cancelled.
(f) The Licensee shall estimate the work involved in each case and segregate the work under the following three categories
and prepare the priority list in respect of each category and enter in the priority register maintained in the section offi ce:
Category 1 - Mere service connection;
Work not involving extension of line / improvement to the existing line / transformer capacity enhancement / erection of new
distribution transformer
Category 2 - Minor extension;
Work involving extension / improvement of line or both, not involving Distribution Transformer
Category 3 - Major extension;
Work involving capacity enhancement / erection of new distribution transformer with associated line works.
(g) Since no work is involved in Mere service connection category, Licensee shall issue a 30 days’ notice to the prospective
consumer in the order of priority of this category to avail supply by installing motor-pump set with capacitor and to execute an
agreement with the Licensee.
In respect of category of minor and major extensions, a 30 days’ notice to avail supply shall be issued after the work is
completed in the order of priority of each category.
The above notice shall also specify that the motor-pump set and capacitor shall be certifi ed /approved by the Bureau of Indian
Standards / Bureau of Energy Effi ciency, and the Manufacturer’s name plate indicating the ISI mark, rating and capacity etc., shall
be permanently affi xed on them.
(h) If the intending consumer fails to avail the supply within the notice period, a second notice to avail supply within a
maximum period of fi ve months shall be issued. If the supply is not availed within the overall period of six months from date of
receipt of fi rst notice, except due to force majeure condition, the works erected with capital of the Licensee shall be dismantled for
benefi cial use in other works. The application shall be cancelled forthwith.
(i) The prospective consumer should report his readiness to avail supply with his installation erected within the notice period
and furnish the details of motor-pump set and capacitor and execute the agreement in form -7 of Annexure III appended to this
code.
(j) On receipt of readiness from the prospective consumer, the Distribution Licensee shall give supply to the installation within
three days after taking a test report. One copy of the test report shall be given to the consumer at site itself.
118
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
(k) In case of way leave dispute referred to the District Magistrate /Collector, or a case pending in court, or fi eld conditions
like standing crops, water logging, the Licensee may temporarily overlook the priority of the case in any of the category and supply
to others on the priority list shall be given. As soon as the above impediment is cleared, supply shall be given to the overlooked
case, on top priority.
Explanation: The procedure stipulated above is for normal category of Agricultural applications. Licensee shall formulate individual
procedure for other categories, adopting the general procedural steps stipulated in the above regulation.
(II) In regulation 29, sub-regulation (2) shall be renumbered as clause(a) of sub-regulation(2) and after clause (a)
as shown numbered, the following clauses shall be added, namely:-
“(b) Within a survey fi eld number or in a sub-divided fi eld number, a person shall be given one agricultural service connection
to each well/bore well subject to the condition that the wells/bore wells are independent and physically separated from each other
and the minimum extent of land to be irrigated from each well/bore well shall be 0.5 acre.
(c) More than one agricultural service connection shall be given to a well/bore well in a survey fi eld number or in a sub-
divided fi eld number, in the name(s) of the co-owner(s) of the well/bore well, provided the co-owner(s) should own an extent of
irrigated land of minimum 0.5 acre per service.
(d) A separate service connection for water pumping for non-agricultural purpose under appropriate tariff is permitted in the
well/bore well having agricultural service connection.
(e) Installation of changeover switch in an agricultural service connection shall be permitted for using the supply either for a
motor-pump set or for a motor-compressor set to lift water from another well/ borewell in a contiguous land for irrigation purpose
only or for operating a motor for allied agricultural purposes subject to the condition that only the motor -pump set or the motor-
compressor set or the motor for the allied agricultural purposes should be used at a time,within the contracted load. The approval
for changeover switch shall be accorded after inspection and sealing and taking test report by the Distribution Licensee within
fi fteen days of receipt of a requisition letter. No document shall be insisted other than motor / capacitor details. In case, if the
licensee is not giving approval within the said period, the applicant will make use of the change over switch to carry out his urgent
needs pending approval from the licensee.The consumer shall abide by the safety norms for additional wiring for the purpose.
The consumer shall be at liberty to use the supply through change over switch to all the above mentioned purposes at any time
to his changing need.”;
(III) In regulation 31, after sub-regulation (2), the following sub regulation (2A) shall be added, namely:-
“(2A) Notice for supply availability in the case of an intending agricultural consumer shall be as per the provisions in
sub-regulation (2) of regulation 27 of this code.”;
Aug. 5, 2020]
TAMIL NADU GOVERNMENT GAZETTE
119
(IV) In ANNEXURE III, for FORM – 2, the following shall be substituted, namely:-
APPLICATION FORM FOR AGRICULTURE SERVICE CONNECTION
(Refer Regulation 27(2)
For Offi ce Use only
Registration No :
Date of Registration :
Registration Fee :
Fee Receipt No. and Date :
Demand Draft No. and Date :
Signature of Registering Authority
:
1 Name(s) of Applicant(s) with Father’s Name
:
(Passport size photo(s) of applicant (s) to be affi xed)
2. Applicant(s) Full Postal Address(es) with PIN Code
for Communication
:
3. Contact phone Number and e-mail Id ( if available)
:
4. Horse Power of motor-pump set required
:
5. Whether well is owned by single applicant
: Yes / No*
If No, name of co-owners with respective Father’s name
and percentage of share in the well
:
Sl. No. Name
Father’s Name
Percentage of share in the well
______________________________________________________________
_____________________________________________________________
______________________________________________________________
To
The Designated Engineer
(Address of the Designated Offi ce)
120
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
6. Proof for Ownership of well /bore well* and land with SF-Number(s)
with extent of land, village ,Taluk and District
Ownership Certifi cate from Village Administrative
: Enclosed
Offi cer (VAO)
(Note: calling for other documents is not necessary unless
the registering authority justifi es the additional document
for the ownership).
7. a. Whether the Application is made jointly and signed by all the
: Yes / No*
Owners / legal heirs of the well
b. If No, Whether Consent Letter from the Co-Owner(s) / Legal heir (s)
Enclosed
: Yes / No*
c. If No, whether Indemnity Bond enclosed
: Yes.
8 a. S.F.No.of Land/ SF Nos of Land ( In case of more than one S.F. No.)
b. Whether land is contiguous
: Yes/No*.
c. If No, whether NOC/ Route permit enclosed
: Yes.
d. SF No.of well / borewell* for which service required
:
e. Extent of Land in acres to be irrigated ( Minimum of 0.5 acres )
:
f. Name of Village
:
g. Name of Taluk
:
h. Name of District
:
9. Whether No Objection Certifi cate from Government Department required : Yes/No*
If yes, whether NOC enclosed
: Yes
10. a. Whether there is any other well in the land
: Yes / No*
b. If yes, whether there is any service in the well
: Yes / No*
c. If Yes, Details of service connection
Name
:
Service No., SF No. and Distribution
:
Horse Power of motor-pump set
:
Tariff
:
Section Offi ce
:
Aug. 5, 2020]
TAMIL NADU GOVERNMENT GAZETTE
121
11. a. Whether there is any service existing in the well for
which Service Connection is now applied
: Yes / No*
b. If Yes, Details of service connection
Name
:
Service No., SF No. and Distribution
:
Horse Power of motor- pump set
:
Tariff
:
Section Offi ce
:
12. Whether any arrears is pending in any service connection
owned by the applicant in any part of the State
: Yes / No*
If yes , SC. No, Tariff , Distribution and Section
:
NOTE : Yes / No* strike out Yes or No , the term not relevant.
I / We certify that the details given above are true to my / our best of knowledge.
Date :
Place :
Applicant(s) Signature
Name(s) in block letters
Enclosure : 1. __________ (As per Serial No.6)
2.__________ (As per Serial No.7, if Applicable)
3.__________ (As per Serial No.8, if Applicable
4.___________ (As per Serial No 9, if Applicable)
-----------------------------------------------------------------------------------------------------------------
122
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
FOR LICENSEE’S USE ONLY
Acknowledgement
Applicant’s Name
:
Address
:
Date of receipt
:
Reference No.
:
Category of supply
:
Signature and seal of Distribution Licensee
Name and Designation
(By order of the Tamil Nadu Electricity Regulatory Commission)
S. CHINNARAJALU,
Chennai-600 008,
Secretary,
20th July 2020.
Tamil Nadu Electricity Regulatory Commission.
EXPLANATORY STATEMENT
Many conditions of current procedure of Agricultural applications are not conducive and practical. Requirement of much
number of documents makes the application process cumbersome. Further, the licensee issues notice to Agricultural applicants to
report readiness with motor-pump set in the initial stage itself, even before estimating and taking up the work . In most of the cases,
the work is taken up and completed after many years of issue of such notice to maintain priority. There is a long gap existing
between reporting readiness with motor-pump set by the applicant and eff ecting supply by the Licensee. Thus, the applicant has
to spend signifi cant amount to purchase Motor-pump set and keep them idle for years till he gets supply.
Further, there are no stipulations in regard to the benefi cial use of the capital investment made on Transformers and lines
erected by the Licensee, if the prospective applicant does not avail supply in time, after the work is completed. This results in idle
investment on the Licensee side, as well.
The above requirements necessitate formulation of a simplifi ed procedures in registering the agricultural applications coupled
with conducive and standardized procedure in processing them to serve the interest of all stakeholders, by issuing suitable
amendments to the Distribution Code.
The amendment seeks to give eff ect to the above decision.
(By order of the Tamil Nadu Electricity Regulatory Commission)
S. CHINNARAJALU,
Chennai-600 008,
Secretary,
20th July 2020.
Tamil Nadu Electricity Regulatory Commission.
Aug. 5, 2020]
TAMIL NADU GOVERNMENT GAZETTE
123
STATEMENT SHOWING EXISTING PROVISION AND THE PROVISION
EMBODYING AMENDMENT
Tamil Nadu Electricity Distribution Code
Sl. No.
Existing regulation
Provision embodying amendment
(1)(1)
(2)
(2)
(3)
(3)
1
27. Requisitions for Supply of Energy
(1) xxx
xxx
(2) Supply to Agricultural category: Application for supply
to agriculture category shall be in Form 2 of Annexure III.
In respect of the agricultural category, this provision shall be
governed by the directives issued by the Commission from
time to time, on the basis of the guidance on this matter by
the National Electricity Policy (as stipulated in sub section 4
under section 86 of the Act) and the policy directions in public
interest given by the State Government under sub section (1)
of section 108 of the Act.
27. Requisitions for Supply of Energy
(1) xxx
xxx
(2)(a) Supply to Agricultural category: Application for supply to
agriculture category shall be in Form 2 of Annexure III. In respect
of the agricultural category, this provision shall be governed by
the directives issued by the Commission from time to time, on the
basis of the guidance on this matter by the National Electricity
Policy (as stipulated in sub section 4 under section 86 of the Act)
and the policy directions in public interest given by the State
Government under sub section (1) of section 108 of the Act.
(b) When the application of normal category is in order, it shall be
registered with the seniority number by the registering authority
and the applicant shall be informed the seniority of registration in
writing with proper acknowledgement from the applicant.
(c) As and when the applicant’s turn comes in the order of seniority,
the Licensee shall issue a 90 days’ notice to the applicant to
ascertain whether the particulars given in the application such
as ownership of the well and land, S.F. No(s) are the same as
on date. Proper acknowledgement from the applicant for having
received the notice shall be obtained and preserved. Motor-pump
set and capacitor shall not be insisted at this stage.On receipt of
particulars from the applicant, the section offi cer shall make a
fi eld inspection for confi rmation of the particulars and enter
the particulars in the readiness register maintained in the section
offi ce. The date of entering particulars in the readiness register
shall be reckoned as the seniority for preparing estimate.
(d) If there is any change in the name of the ownership and/or
S.F. number, extent of land, change of well / bore well location,
a fresh application shall be made. Necessary approval for the
change shall be accorded by the registering authority. Thereafter,
the section offi cer shall inspect the site and enter the particulars
in the readiness register.
124
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
(e)If the applicant or the present owner is not able to furnish
the above particulars within the notice period, he may seek
extension of time with the registering authority. The extension
of time may be granted up to a maximum period of fi ve years
from date of receipt of notice. Even if no request is made by the
applicant for extension of time, the Distribution Licensee shall
keep the application registered live for a period of fi ve years. On
expiry of fi ve years, the application shall be treated as lapsed
and cancelled.
(f) The Licensee shall estimate the work involved in each case
and segregate the work under the following three categories and
prepare the priority list in respect of each category and enter in
the priority register maintained in the section offi ce:
Category1 - Mere service connection;
Work not involving extension of line / improvement to the existing
line / transformer capacity enhancement / erection of new
distribution transformer
Category 2 - Minor extension;
Work involving extension / improvement of line or both, not
involving Distribution Transformer
Category 3 - Major extension;
Work involving capacity enhancement / erection of new
distribution transformer with associated line works.
(g) Since no work is involved in Mere service connection
category, Licensee shall issue a 30 days’ notice to the prospective
consumer in the order of priority of this category to avail supply
by installing motor-pump set with capacitor and to execute an
agreement with the Licensee.
In respect of category of minor and major extensions, a 30 days’
notice to avail supply shall be issued after the work is completed
in the order of priority of each category.
The above notice shall also specify that the motor-pump set and
capacitor shall be certifi ed /approved by the Bureau of Indian
Standards / Bureau of Energy Effi ciency and the Manufacturer’s
name plate indicating the ISI mark, rating and capacity etc.,
shall be permanently affi xed on them
Aug. 5, 2020]
TAMIL NADU GOVERNMENT GAZETTE
125
(h) If the intending consumer fails to avail the supply within the
notice period, a second notice to avail supply within a maximum
period of fi ve months shall be issued. If the supply is not availed
within the overall period of six months from date of receipt of
fi rst notice, except due to force majeure condition, the works
erected with capital of the Licensee shall be dismantled for
benefi cial use in other works. The application shall be cancelled
forthwith.
(i) The prospective consumer should report his readiness to avail
supply with his installation erected within the notice period and
furnish the details of motor-pump set and capacitor and execute
the agreement in form-7 of Annexure III appended to this code.
(j) On receipt of readiness from the prospective consumer, the
Distribution Licensee shall give supply to the installation within
three days by taking a test report.One copy of the test report shall
be given to the consumer at site itself.
(k) In case of way leave dispute referred to the District
Maistrate /Collector, or a case pending in court, or fi eld condi-
tions like standing crops, water logging, the Licensee may tempo-
rarily overlook the priority of the case in any of the category and
supply to others on the priority list shall be given.
As soon as the above impediment is cleared, supply shall be given
to the overlooked case, on top priority.
Explanation: The procedure stipulated above is for normal cat-
egory of Agricultural applications. Licensee shall formulate in-
dividual procedure for other categories, adopting the general
procedural steps stipulated in the above regulation.
29
Service Lines :
(1)
xxx
(2) In agricultural connections where the consumer requires
a separate service connection for utilizing energy for radios
and other appliances including domestic lighting in the farm
house, more than one service connection in the same Survey
Field Number /sub-divided survey fi eld number will be
permitted.
29
Service Lines :
(1) xxx
(2)(a) In agricultural connections where the consumer requires
a separate service connection for utilizing energy for radios and
other appliances including domestic lighting in the farm house,
more than one service connection in the same Survey Field Num-
ber /sub-divided survey fi eld number will be permitted.
(b) Within a survey fi eld number or in a sub-divided fi eld number,
a person shall be given one agricultural service connection to
each well subject to the condition that the wells are independent
and physically separated from each other and the minimum extent
of land to be irrigated from each well shall be 0.5 acre.
126
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
(c) More than one agricultural service connection shall
be given to a well in a survey fi eld number or in a sub-
divided fi eld number, in the name(s) of the co-owner(s)
of the well, provided the co-owner(s) should own an
extent of irrigated land of minimum 0.5 acre per service.
(d) A separate service connection for water pumping
for non-agricultural purpose under appropriate tariff is
permitted in the well having agricultural service connection
(e) Installation of changeover switch in an agricultural service
connection shall be permitted for using the supply either for a
motor-pump set or for a motor-compressor set to lift water
from another well/ bore well in a contiguous land for irrigation
purpose only or for operating a motor for allied agricultural
purposes subject to the condition that only the motor -pump set or
the motor-compressor set or the motor for the allied agricultural
purposes should be used at a time, within the contracted load.
The approval for changeover switch shall be accorded after
inspection and sealing and taking test report by the Distribution
Licensee within fi fteen days of receipt of a requisition letter. No
document shall be insisted other than motor / capacitor details.
In case, if the licensee is not giving approval within the said
period, the applicant will make use of the change over switch to
carry out his urgent needs pending approval from the licensee.
The consumer shall abide by the safety norms for additional
wiring for the purpose. The consumer shall be at liberty to use
the supply through change over switch to all the above mentioned
purposes at any time to his changing need.
31 INSPECTIONS, TESTING AND EFFECTING
SUPPLY:
(1) xxx
(2)
xxx
31 INSPECTIONS, TESTING AND EFFECTING SUPPLY:
(1) xxx
(2) xxx
(2A) Notice for supply availability in the case of an intending
agricultural consumer shall be as per the provisions in
sub regulation (2) of regulation 27 of this code.
Aug. 5, 2020]
TAMIL NADU GOVERNMENT GAZETTE
127
Applicant”s
Applicant”s
Photo
Photo
FORM -2
APPLICATION FORM FOR AGRICULTURE
SERVICE CONNECTION
(Refer Regulation 27(2))
APPLICATION FOR SUPPLY OF POWER TO
AGRICULTURAL PUMP SETS
(Note: The application should be signed by the owner of
the well. If there are partners, all must sign or consent to
be given by co-owners)
To
The Designated Engineer,
(Address of the Licensee’s
Distribution Centre)
1.Name of owner of the well or partners
:
2.Full residential address of the owner or partners :
3.Contact No. and e-mail id
:
4.S.F. No. in which the well is situated :
5.Revenue village name, Taluk and District
:
6.Purpose of supply
:
7. Area and type of land to be irrigated by this well
(Wet / Dry)
:
8. Horse Power of motor pump sets proposed to be
installed
:
9. Type of pump set (Centrifugal/ Submersible/ Air
compressor)
:
10.Consent to abide by R&C of Licensee with regard
to duration of supply
:
11.Details of existing service connections of the
applicant, if any
:
It is certifi ed, I am the sole owner of the well / this
application is signed by all partners
Place :
Signature of Applicant/
Partners
Name(s) in block letters
Date :
Note : The document such as FMB map showing
the location of the well, patta, chitta, adangal etc.,
FORM -2
APPLICATION FORM FOR AGRICULTURE
SERVICE CONNECTION
(Refer Regulation 27(2))
To
The Designated Engineer
(Address of the Designated Offi ce)
1. Name(s) of Applicant(s) with Father’s Name:
(Passport size photo(s) of applicant (s) to be affi xed)
2. Applicant(s) Full Postal Address(es) with PIN Code for Commu-
nication :
3. Contact phone Number and e-mail Id ( if available) :
4. Horse Power of motor-pump set required :
5. Whether well is owned by single applicant
: Yes / No*
If No, name of co-owners with respective Father’s name and per-
centage of share in the well :
Sl. No. Name Father’s Name Percentage of
share in the well
_______________________________________________________
________________
_______________________________________________________
________________
_______________________________________________________
________________
For Offi ce Use only
Registration No :
Date of Registration :
Registration Fee :
Fee Receipt No. and Date :
Demand Draft No. and Date :
Signature of Registering Authority :
Photo
Photo
128
TAMIL NADU GOVERNMENT GAZETTE
[Part VI—Sec. 2
shall be enclosed with the application.
Date of receipt in the
Offi ce of the Engineer,
---------------------------------------------------------------------
Certifi ed that the open well / bore well and lands
measuring …………………acres and ………….cents
in
S.F.No……………Village………………………….
of…………………………..Taluk is exclusively owned
by Thiru …………………………………….......................
..………….
s/o………………………………….................
of……………………………….Village.
Jointly owned by
List of owners
(1)……………………………s/o……………………….
(2)…………………………..s/o………………………
(3)……..…………………….s/o……………………….
Certifi ed that
Thiru…………………........s/o……………………………
..............................is small/big farmer(s)
Village Administrative Offi cer
----------------------------------------------------------------------
-------------------------------------------------------------------
FOR LICENSEE’S USE ONLY
Acknowledgement
Applicant’s Name
:
Address
:
Date of receipt
:
Reference No.
:
Category of supply
:
Signature and seal of Distribution Licensee
Name and Designation
6. Proof for Ownership of well /bore well* and land with
SF-Number(s) with extent of land, village, Taluk and District
Ownership Certifi cate from Village Administrative Offi cer (VAO) :
Enclosed
(Note: calling for other documents is not necessary unless the
registering authority justifi es the additional document for the
ownership).
7. a. Whether the Application is made jointly and signed by all the
Owners / legal heirs of the well : Yes / No*
b. If No, Whether Consent Letter from the Co-Owner(s) / Legal
heir (s) Enclosed : Yes / No*
c. If No, whether Indemnity Bond enclosed : Yes / No*
8 a. S.F.No.of Land/ SF Nos of Land ( In case of more than one S.F.
No.) :
b. Whether land is contiguous : Yes/No*.
c. If No, whether NOC/ Route permit enclosed : Yes.
d. SF No.of well / borewell* for which service required :
e. Extent of Land in acres to be irrigated ( Minimum of 0.5 acres :
f. Name of Village :
g. Name of Taluk :
h. Name of District :
9. Whether No Objection Certifi cate from Government |
Department required : Yes/No*
If yes, whether NOC enclosed
: Yes
10. a. Whether there is any other well in the land : Yes / No*
b. If yes, whether there is any service in the well
: Yes / No*
c. If Yes, Details of service connection
Name
:
Service No., SF No. and Distribution
:
Horse Power of motor-pump set
:
Tariff :
Section Offi ce
:
Aug. 5, 2020]
TAMIL NADU GOVERNMENT GAZETTE
129
11. a. Whether there is any service existing in the well for which
Service Connection is now applied : Yes / No*
b. If Yes, Details of service connection
Name :
Service No., SF No. and Distribution :
Horse Power of motor- pump set
:
Tariff :
Section Offi ce
:
12. Whether any arrears is pending in any service connection
owned by the applicant in any part of the State : Yes / No*
If yes , SC. No, Tariff , Distribution and Section :
NOTE : Yes / No* strike out Yes or No , the term not relevant.
I / We certify that the details given above are true to
my / our best of knowledge.
Date :
Place :
Applicant(s) Signature
Name(s) in block letters
Enclosure :
1. ________(As per Serial No.6)
2.________ (As per Serial No.7, if Applicable
3._________(As per Serial No.8, if Applicable
4._________(As per Serial No 9, if Applicable)
FOR LICENSEE’S USE ONLY
Acknowledgement
Applicant’s Name
:
Address
:
Date of receipt
:
Reference No.
:
Category of supply :
Signature and seal of Distribution Licensee
Name and Designation”.
(By order of the Tamil Nadu Electricity Regulatory Commission)
S. CHINNARAJALU,
Chennai-600 008,
Secretary,
20th July 2020.
Tamil Nadu Electricity Regulatory Commission.
PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI
ON BEHALF OF THE GOVERNMENT OF TAMIL NADU