TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI.
Amendment to the Tamil Nadu Electricity Supply Code.
..
..
24-25
24-25
Amendments to the Tamil Nadu Electricity Distribution Code.
..
..
25-49
25-49
TAMIL NADU GOVERNMENT GAZETTE
24
[Part VI—Sec. 2
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI.
Amendment to the Tamil Nadu Electricity Supply Code.
(Notifi cation No. TNERC/SC/7–44 dated 24-12-2020).
(Lr. No.TNERC/DD(L)/F, Notifi cation / D.No. 1438/2021,)
No. VI(2)/16/2021.
In exercise of the powers conferred by Section 181 read with Section 50 of the Electricity Act, 2003 (Central Act 36 of 2003)
and all other powers enabling it in this behalf, the Tamil Nadu Electricity Regulatory Commission hereby makes the following
amendments to the Tamil Nadu Electricity Supply Code, the draft of the same having been previously published, as required under
sub-section (3) of the said Section 181.
Aඕඍඖඌඕඍඖග
1. In the said Supply Code, in regulation 6, for the following sentences,
“6. Minimum charges–The consumer shall pay to the Licensee minimum charges in respect of every connection as
detailed below. The minimum monthly charges are payable even when no electricity was consumed or supply disconnected by
orders of Court or when the price of electricity supplied is less than the minimum charges.”,
the following shall be substituted namely:-
“6. Minimum Charges–The consumer shall pay to the Licensee minimum charges / fi xed charges in respect of every
connection as detailed below :
The monthly minimum charges / fi xed charges are payable even when no electricity was consumed or in the event of
disconnection of services for any reasons including the reasons by orders of Court or when the price of electricity supplied is less
than the minimum charges.
Explanation: The term ‘monthly minimum charges / minimum charges’ wherever it occurs in the Tamil Nadu Electricity
Supply code/Distribution code refer to the minimum charges / fi xed charges as prescribed in the Commission’s Tariff orders from
time to time. For the LT services of sanctioned demand above 112KW, the monthly minimum charges / fi xed charges shall be as
applicable to HT services but for full sanctioned demand”.
(By Order of the Tamil Nadu Electricity Regulatory Commission)
Chennai-600 032,
S. CHINNARAJALU,
8th January 2021.
Secretary,
Tamil Nadu Electricity Regulatory Commission.
Eචඔඉඖඉගකඡ Sගඉගඍඕඍඖග
The minimum charges applicable to LT consumers are in eff ect the fi xed charges specifi ed in the Tariff Order by the
Commission from time to time and hence for the purpose of clarity, it is necessary to amend the Regulation 6 of Supply code.
The proposed amendment seeks to give eff ect to the said proposal.
(By order of the Tamil Nadu Electricity Regulatory Commission)
S. CHINNARAJALU,
Secretary,
Tamil Nadu Electricity Regulatory Commission.
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
25
Annexure
Tamil Nadu Electricity Supply Code
Sl.
No.
Existing regulation
(1)
Regulation as amended
(2)
1.
6. Minimum Charges
The consumer shall pay to the Licensee
minimum charges in respect of every connection as
detailed below. The minimum monthly charges are
payable even when no electricity was consumed or
supply disconnected by orders of Court or when the
price of electricity supplied is less than the minimum
charges
xxx
6. Minimum Charges
The consumer shall pay to the Licensee minimum charges /
fi xed charges in respect of every connection as detailed below :
The monthly minimum charges / fi xed charges are payable
even when no electricity was consumed or in the event of
disconnection of services for any reasons including the reasons by
orders of Court or when the price of electricity supplied is less than
the minimum charges
Explanation: The term ‘monthly minimum charges/ minimum
charges’ wherever it occurs in the Tamil Nadu Electricity
Supply code / Distribution code refer to the minimum charges/ fi xed
charges as prescribed in the Commission’s Tariff orders from time
to time. For the LT services of sanctioned demand above 112KW,
the monthly minimum charges / fi xed charges shall be as applicable
to HT services but for full sanctioned demand”.
xxx
(By Order of the Tamil Nadu Elecricity Regulatory Commission)
Chennai-600 032,
S. CHINNARAJALU,
8th January 2021.
Secretary,
Tamil Nadu Electricity Regulatory Commission.
Amendments to the Tamil Nadu Electricity Distribution Code.
Notifi cation No. TNERC/DC/8–28 dated 24-12-2020.
(Lr. No.TNERC/DD(L)/F, Notifi cation / D.No. 1438/2021,)
No. VI(2)/17/2021.
In exercise of the powers conferred by Section 181 read with Section 46 of the Electricity Act, 2003 (Central Act 36 of 2003)
and all other powers enabling it in this behalf, the Tamil Nadu Electricity Regulatory Commission hereby makes the following
amendments to the Tamil Nadu Electricity Distribution Code, the draft of the same having been previously published, as required
under sub-section (3) of the said Section 181.
Aඕඍඖඌඕඍඖගඛ
In the said Distribution Code, -
1.
in regulation 2, after clause (a),
the following
clause shall be inserted, namely:-
“(aa) “Authority” means the Central Electricity Authority referred to in sub section (1) of Section 70 of Electricity Act
2003”;
2.
in regulation 16, after sub-regulation (2), the following sub-regulation shall be inserted, namely:-
“(2A) EARTH LEAKAGE PROTECTIVE DEVICE / RESIDUAL CURRENT DEVICE (ELPD / RCD ):
(i) The supply of electricity to every installation of low voltage (240 V) and medium voltage(415V) including installations
of Temporary supply shall be controlled by a Residual Current (operated) Device (RCD), whose rated residual operating current
shall not exceed 30 milliampere for protection against electric shock, so as to disconnect the supply on the occurrence of earth
fault or leakage of current.
(ii) In the case of installations having large number of motors, equipment, appliances of loads totalling above 10 kW,
one common RCD at the point of commencement of supply with rated residual operating current of 300 milliampere for protection
against electrical fi re shall be provided, in addition to RCD of not exceeding 30 milliampere rating for protection against electric
shock.
TAMIL NADU GOVERNMENT GAZETTE
26
[Part VI—Sec. 2
(iii) An installation, where there are a large number of loads giving rise to a sum of permissible leakage currents exceeding
30 milliampere, shall be subdivided into circuits to avoid nuisance tripping and each sub-divided circuit shall be provided with an
independent RCD with leakage current sensitivity rating not exceeding 30 milliampere at appropriate location(s).
Explanation–RCD is a generic term which embraces the various types of RCCBs, (Residual Current operated Circuit
Breaker), RCBOs (Residual Current operated Circuit Breaker with integral Overcurrent protection), etc., RCCB is also called as
RCB for convenience (RCCB/RCB). The term ELCB (Earth Leakage Circuit Breaker ) is not used in Standards.”;
3.
in regulation 27,-
(a) for sub-regulation (3), excluding the Note, the following sub-regulation shall be substituted, namely :-
“(3) The application for HT service connection shall be in FORM-4. Application for LT service connection (other
than Temporary supply, Agriculture and Hut), Temporary service connection, LT Agriculture service connection and LT Hut service
connection shall be in FORM–1, 1A, 2 and 3 respectively.”;
(b) after sub-regulation 11, the following sub-regulations shall be inserted, namely:-
“(11A) Where the requisition for supply is for a multi-storeyed building, the applicant shall enclose the planning
permission along with building plan approval with the application. The Licensee shall verify the height of the building from the
planning permission / building plan approval enclosed by the applicant. Physical measurement is not necessary. If the height of
the multi-storeyed building is more than 15 metre as given in the planning permission / building plan approval, necessary approval
from the Electrical Inspector in compliance with CEA (Measures relating to Safety and Electric Supply) Regulations 2010 as
amended, shall be furnished by the applicant.
(11B) The supply of electricity to every installation of low voltage (240 V) and medium voltage (415V) including
installations of Temporary supply shall be controlled by a Residual Current (operated) Device (RCD) as specifi ed in sub-regulation
(2A) of Regulation 16 of this Code, to ensure safety against electric shock and fi re hazards.”;
4.
in regulation 29,-
(a) for sub-regulations (11) and (12), the following sub-regulations shall be substituted, namely:-
“(11) In storeyed building and for any building / premises requiring LT service connection(s) having either (a) total fl oor
area of 900 square metre and above (excluding the stilt fl oor / basement fl oor) or (b) the total demand of all the LT services in
the building exceeds 112kW, suffi cient space shall be made available free of cost to the Licensee for installing transformers,
switchgears etc., as stated below:
(a) an electrical room with RCC roof having clear fl oor area 6 metre x 4 metre with a vertical clearance of 2.75 metre
with locking facility, exhaust fans and adequate size of cable duct, shall be provided at the ground fl oor within the consumer
premises of storeyed buildings nearer to the main entrance for installing fl oor mounted distribution transformer and associated
switchgear (or)
(b) a clear space of 10 metre x 4 metre or 5 metre x 5 metre open to the sky for double pole structure or 4 meter x 4
meter open to sky for single pole structure according to site and load conditions, shall be provided within the consumer premises
preferably at the main entrance for installing structure mounted or plinth/concrete pillar mounted distribution transformer and
associated switchgears. In case of concrete/plinth mounted arrangment, such mounting arrangement shall be carried out by the
applicant at his cost.
(c) Installation of Distribution Transformer with associated equipment / accessories viz. AB switch, HG fuse, DT structure/
pole shall be carried out by the Licensee at the Licensee’s cost. The cost of installation works from the Distribution Transformer to
the consumer’s meter including portion of any HT line within the consumer’s premises when the Distribution transformer is erected
in the consumer’s premises, shall be borne by the applicant.
(d) While carrying out the work, it should be ensured that the electrical clearance from ground, horizontal/vertical
clearances from building, working clearance etc., as stipulated in the safety regulations are strictly followed.
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
27
(12) (a) Space as per the following norms shall be allotted by the applicant free of cost for establishment of a sub-station/switching
station in places requiring service connections (except industrial service connections other than IT related purposes ) where either
(a) the total demand of all the electrical services in the projects including the loads that will be incident in future exceeds /would
exceed 5 MVA or (b) total fl oor area of 30,000 square metre and above is constructed or proposed to be constructed (excluding
the stilt fl oor / basement fl oor).
(b) The requirement of land for establishment of sub-stations shall be the minimum limit with confi guration given below:
Voltage
level of the sub-
station
Land Requirement in Sq.mts.
Normal sub-station
Compact sub-station
33 KV
sub-station
850 (indoor)
3160 (outdoor)
400 (size of 20x20 or 10x40 with
approaches on any two adjacent sides)
110 KV
sub-station
4000 (outdoor)
1050
230 KV
sub-station
16000(outdoor)
1750
When the developers/owners of the premises apply for additional load / develops additional constructions in phases etc.,
the above requirement of space for establishment of sub-station shall be applicable for the total load or total area of construction
that includes both the existing and additional load / area of construction.
(c) The area earmarked for establishment of sub-station shall be specifi cally shown in the plan including the areas of
constructions, road approaches and other amenities of the premises along with plot development if any for the future and furnished
to the Distribution Licensee by the developers/owners at the time of applying for temporary service connection for construction
purposes.
(d) Where the total demand exceeds /would exceed 5 MVA or the total fl oor area of 30,000 square metre and above is
constructed or proposed to be constructed (excluding the stilt fl oor / basement fl oor), the applicant shall allot the land suitable for
establishing a conventional outdoor Air Insulated Switchgear (AIS) sub-station. In case, the applicant chooses to opt for allotting
land suitable for Compact or Indoor sub-station other than conventional outdoor AIS sub-station, the applicant shall bear the
diff erence in cost between the Compact or Indoor sub-station for which the space is off ered and the conventional outdoor AIS
sub-station. The applicant has to allot the land for establishment of sub-station commensurate with the quantum of demand
applied or the demand assessed by the Licensee, whichever is higher.
Explanation: (i) While calculating the diff erence in cost between the sub-stations of compact and outdoor type or between the
sub-stations of indoor and outdoor type, following methodology shall be adopted:
(ii) The portion pertaining to HV side equipment, only one power transformer that feeds the applicant(s), its allied LV
breaker, CTs, switches , panels, number of its LV feeders feeding the applicant, feeder equipment, panels, cables, accessories,
etc., shall be taken in to account for comparison with the corresponding counterparts of the outdoor sub-station and for computation
of diff erence in cost between them.
(iii) The portion of cost pertaining to remaining Power Transformer(s), their allied HV switches, LV breakers, CTs,
switches, panels, LV feeders feeding other areas, feeder equipment, panels, cables, accessories etc., shall be entirely borne by
the Licensee.
TAMIL NADU GOVERNMENT GAZETTE
28
[Part VI—Sec. 2
(e) The Licensee may consider establishment of sub-stations operating at various voltage levels commensurate with the
demand as below, in the space provided by the applicants:
Total demand
Voltage level of the sub-station
Exceeding 5 MVA but not above 10 MVA
33 KV
Exceeding 10 MVA but not above 50 MVA
110 KV
Exceeding 50 MVA
230 KV
”;
(b) in sub-regulation (14), for clause (b), the following clause shall be substituted, namely :-
“(b) For outdoor metering, a clear space of 10 metre x 4 metre or 5 metre x 5 metre open to sky shall be provided. This
enclosure shall be at the periphery of the building and shall be cut off from other portions of the premises by fi re resistance walls.
These areas shall be specifi cally shown in the plan. Before the plan is sent to the competent authority for approval, it shall be sent
to the Engineer and got approved. The point of supply shall be within 30 metre from the main entry gate easily accessible for lorry
movement from public road and clearly visible from the public road and satisfactory with regards to security aspects. The metering
set, incoming and outgoing HT line of the metering set etc., shall be clearly visible from the public road, even when the gate is in
closed condition.:
Provided that the Chief Executive Offi cer or any other Offi cer, not less than in the rank of a Chief Engineer, authorized by the
Chief Executive Offi cer may approve the point of supply in cases where the applicant is unable to get the metering point erected
within 30 metre from main entry gate as above or able to get the metering point erected within 30 metre, but only in a gate other
than the main entry gate , if he is satisfi ed that such place is-
(i) easily accessible for lorry movement from road located outside the applicant’s premises and clearly visible to the
offi cials of the Licensee from that road even when the gate is in closed condition;
(ii) is safe and secure;
(iii) is not susceptible to malpractice; and
(iv) it is feasible to erect a check metering point outside the applicant’s premises.
(c) There shall be no compromise on technical grounds, while relaxing the distance and the location criteria. The
applicants who are unable to get the metering point erected within 30 metre from main entry gate or able to get the metering point
erected within 30 metre, but only in a gate other than the main entry gate, shall bear the cost of installation of check metering point
outside the premises in a location decided by the Licensee.
Failure to comply with the above requirements will result in denial of supply.
5. in regulation 31, for sub-regulation (3), the following sub-regulation shall be substituted, namely :-
“(3) If the intending consumer fails to avail the supply within the above period, a further three months extension in case
of HT and one month extension in case of LT will be granted by the Licensee, after collecting the monthly minimum for the notice
period including the extended period in advance. If he does not avail himself the supply during this notice period, the application
will be treated as lapsed and cancelled in the case of Low Tension supply and the application shall be treated as cancelled,
terminating the agreement, in the case of High Tension supply. The service connection charges, security deposit, development
charges, monthly minimum charges etc., except meter caution deposit will be forfeited. In case the intending consumer could not
avail the supply under force majeure conditions, the security deposit and meter caution deposit shall be refunded to the intending
consumer.”
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
29
6.
In ANNEXURE III,-
(a) for FORM – 1, the following shall be substituted, namely:-
“FORM I
Application Form for L.T Service Connection( except Temporary supply , Agricultural and Hut )
FORM OF REQUISITION FOR SUPPLY OF LOW TENSION ENERGY ( SINGLE PHASE / THREE PHASE)
[Refer regulation27(3)]
To
The Designated Engineer
(Address of the Licensee)
Sir,
1.I/We,Thiru/Tmty……………………………………………………………….........................................................................
.
S/o/D/o/W/o/………………………………………………………………………………………………………...… hereby request you to
supply electrical energy for the purpose of …..………………………………………………………………………. to the
premises hereinafter described.
2.
I / We agree to pay for said energy, service connection charges, the deposit of such security, meter rent,
development charges and any other charges as may be demanded in accordance with the scale of rates prescribed under
Tamil Nadu Electricity Distribution Code, Supply Code, notifi cations and orders issued in this regard by Tamil Nadu Electricity
Regulatory Commission.
3.
I / We wish to be charged under Tariff ………… under schedule of the TNERC tariff order in force.
4.
I / We agree to avail supply and utilize the energy in the premises described hereunder for my/our bonafi de use.
5.
In case, I/We sell or otherwise dispose of the property / vacate the premises while the supply is continued, I/We
agree to give one Calendar month notice in writing and pay all the arrears to the Licensee. Failing such notice, I/We hold myself/
ourselves liable for payment of arrears of current consumption charges, other dues if any and claims that may arise in the event
of termination of agreement and undertake for loading the dues to other service connection(s) that may stand in my/our name(s).
6.
Description of the premises
a) Door No. and / or name of the house or premises
:
b) Street :
c) Town / village and Taluk
:
d) Owned by (Name in Block Letters)
:
e) Tenanted by (Name in Block Letters) :
f) Applicant(s)’ address for correspondence :
g) Contact No. and e-mail id :
Applicant(s)’
Photo(s)
TAMIL NADU GOVERNMENT GAZETTE
30
[Part VI—Sec. 2
7. The following are my / our requirements
:
(A) Lighting
Number of
Wattage of
Total
Points
Points
wattage
(i) Lights
-
-
-
(ii) Fans
-
-
-
(iii) Convenient wall plugs
-
-
-
(B) Domestic electrical apparatus:
(i) Cookers
-
-
-
(ii) Water heaters
-
-
-
(iii) Refrigerator
-
-
-
(iv) Air Conditioners
(v) Lifts/Elevator/Escalators
-
-
-
(vi) Other purpose
-
-
-
(vii) Convenient wall plugs
-
-
-
(C) Power Loads
-
-
-
(i) Domestic
-
-
-
(ii) Industrial
-
-
-
(iii) Welding
-
-
-
(iv) Other purposes
-
-
-
(v) Convenient Wall Plugs
-
-
-
8.
Demand applied for in KW
:
9. Whether the installation is provided with earth protective device (RCD) as per Tamilnadu Electricity Distribution Code :
10. The wiring has been completed on :
11. Details of existing service connection(s) of the applicant(s) if any :
12. Whether any current consumption charges or any other charges are due to TANGEDCO in the name(s) of the
applicant(s) or premises :
If yes, give details ( with SC No, Name of Section/Circle etc ) :
PRECAUTION TO BE ADOPTED BY CONSUMERS, OWNERS, OCCUPIERS, ELECTRICAL CONTRACTORS,
ELECTRICAL WORKMEN AND SUPPLIERS
No electrical installation work, including additions, alterations, repairs and adjustments to existing installations, except such
replacement of lamps, fans, fuses, switches, domestic appliances of voltage not exceeding 250V and fi ttings as in no way alters
its capacity or character, shall be carried out upon the premises of or on behalf of any consumer, supplier, owner or occupier for
the purpose of supply to such consumer, supplier, owner or occupier except by an electrical contractor licensed in this behalf by
the State Government and under the direct supervision of a person holding a certifi cate of competency and by a person holding
a permit issued or recognized by the State Government.
I / We certify that we are aware of the above precaution and agree to abide by it.
I / We agree to pay to the Licensee at the applicable tariff /minimum rates/fi xed charges/surcharge etc., that may be decided
by the Commission from time to time.
I / We agree to abide under all specifi cations, conditions and provisions laid down in Tamil Nadu Electricity Regulatory Supply
Code, Distribution Code and the applicable Act, Codes, Rules and Regulations and of any modifi cation or re-enactment thereof for
the time being in force and subject to the conditions of revisions, amendments approved from time to time.
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
31
(Note : This undertaking does not preclude execution of a separate written contract to be entered with Licensee)
Signature of the
Applicant(s)
Name(s) in Block
Letters.
Place:
Date:
Note: The application shall be accompanied with the following documents:
(i)
Self attested copy of proof of ownership such as sale deed (or) partition deed (or) gift settlement (or) allotment letter
(or) computer patta (or) ownership certifi cate issued by revenue department offi cials (or) court judgment or recent
property tax receipt.
(ii)
In case of joint property, self attested copies of proof of ownership along with parent documents specifi ed in note
(i) above and consent letters from co-owners. If consent letter is not produced, an indemnity bond with enhanced
security deposits.
(iii)
If the applicant is not the owner, consent letter from owner in FORM No.5 or valid proof of occupancy and indemnity
bond in FORM No.6
FOR LICENSEE’S USE ONLY
ACKOWLEDGEMENT
Applicant(s)’ name :
Address :
Date of receipt :
Reference No. :
Category of Supply :
Signature and seal of Distribution Licensee
Name and designation.”;
TAMIL NADU GOVERNMENT GAZETTE
32
[Part VI—Sec. 2
(b) after FORM I as so substituted, the following Form shall be inserted, namely:-
“FORM IA
Application Form for Temporary Service Connection
FORM OF REQUISITION FOR TEMPORARY SUPPLY (SINGLE PHASE / THREE PHASE)
[Refer regulation 27(3)]
To
The Designated Engineer
(Address of the Licensee)
Sir,
1.
I/We, /Thiru/Tmty……………………………………………………….
S/o/D/o/W/o/………………………………………………………………………..…….…………………………………………
hereby request you to supply electrical energy, temporarily for the purpose of………………………………………………………
…………………………….. …..………………………………………………………………………. …… to the premises (or) location
hereinafter described.
2.
I / We agree to pay for said energy, service connection charges, the deposit of such security, meter rent, development
charges and any other charges as may be demanded in accordance with the scale of rates prescribed under Tamil Nadu Electricity
Distribution Code, Supply Code, notifi cations and orders issued in this regard by Tamil Nadu Electricity Regulatory Commission.
3.
I/ We wish to be charged under Tariff ………… under schedule of the TNERC tariff order in force.
4.
I/ We agree to avail temporary supply and utilize the energy in the premises/ location described hereunder for my/our
bonafi de use.
5.
In case, I/We sell or otherwise dispose of the property / vacate the premises while the supply is continued, I/We agree to
give one month notice in writing and pay all the arrears to the Licensee, failing which , I/We hold myself/ourselves responsible for
the energy consumed in the premises for the entire period of Temporary supply availed. If any due arises in this service connection,
I/We agree to include such dues in my/our existing service connections No(s): ………………………………………………………...(if
available)
6. Ownership of the premises / location where temporary supply is required:
a. SF No./ Door No.
:
b. Street
:
c. Town / village
:
d. Land mark of premises
:
e. Taluk
:
f. District
:
g. Owned by (Name in Block Letters)
:
h. Tenanted by (Name in Block Letters)
:
i. Applicant(s)’ address for correspondence
:
j. Contact No. and e-mail id
:
Applicant(s)’
Photo(s)
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
33
7. Description of the premises
a. Plot area :
b. Total building area/Floor area of all fl oors
:
c. Number of the Floors to be constructed :
(Basement /stilt /ground fl oor/other fl oors to be furnished in detail )
d. Whether the planning permission with building plan approval is obtained from competent authority for above
mentioned fl oors and construction :
e. Whether copy of planning permission with building plan approval is enclosed
:
f. Height of the building as per planning permission/ plan approval :
( If height of the building is more than 15 metre as shown in the planning permission, approval from Electrical
Inspector is required )
g. Whether Gen set /Lift is proposed to be erected :
(If yes , approval from Electrical Inspectorate to be obtained)
h. Any HT/LT line is passing inside or adjacent to the premise :
(If yes, building should be constructed with adequate safe clearance as per the Safety Regulations in force or
otherwise the lines should be got deviated at the cost of Applicant, subject to feasibility)
8. Whether the service connection is required permanently after the period of temporary service connection is over :
If No,(i) Specifi c purpose for which Temporary supply is requested :
(ii) Period of Temporary supply required :
9. Details of Loads to be Connected:
(A) Lighting
Number of
Points
Wattage of
points
Total
wattage
(i) Lights
-
–
-
(ii) Fans
-
-
-
(iii) Convenient wall
plugs–
-
-
(B) Power Loads
-
-
-
(i) Motors
-
-
-
(ii) Welding
-
-
-
(iii) Cutting machine
(iv) Portable appliances
-
-
-
(v) Lifts/elevators
-
-
-
(vi) Other apparatus
-
-
-
(vii) Convenient Wall
Plugs -
-
-
-
10. Demand applied for in KW
:
11. Whether the installation is provided with earth protective device (RCD) as per Tamil Nadu Electricity Distribution Code
:
12. The wiring has been completed on :
13. Details of existing service connection(s) of the applicant(s), if any
:
14. Whether any current consumption charges or any other charges are due to TANGEDCO in the name(s) of the applicant(s)
or premises :
If yes, give details ( with SC No, Name of Section/Circle etc ) :
SPACE TO BE PROVIDED BY APPLICANT(s)
1. In storeyed building and for any building / premises requiring LT service connection(s) having either (a) total fl oor area of
900 square metre and above (excluding the stilt fl oor / basement fl oor) or (b) the total demand of all the LT services
in the building exceeds 112kW, suffi cient space shall be made available free of cost to the Licensee for installing
transformers, switchgears etc., as stated in Regulation 29 (11) of the TNE Distribution Code.
TAMIL NADU GOVERNMENT GAZETTE
34
[Part VI—Sec. 2
2. Space as per the norms specifi ed in Regulation 29(12) of the TNE Distribution Code shall be allotted by the applicant
free of cost for establishment of a sub-station/switching station in places requiring service connections (except
industrial service connections other than IT related purposes) where either (a) the total demand of all the electrical
services in the projects including the loads that will be incident in future exceeds /would exceed 5 MVA or (b) total
fl oor area of 30,000 square metre and above is constructed or proposed to be constructed (excluding the stilt fl oor /
basement fl oor).
3. For High Tension Service connections of indoor metering, an electrical room with RCC roof having a clear fl oor area 5m
x 6m with vertical clearance of 3.7 metre between fl oor and ceiling/ beam bottom with locking facility, exhaust fan and
adequate size of cable duct shall be provided at the ground/ basement fl oor for installing the Licensee’s equipment,
etc. This room shall be of fi reproof and weatherproof ; For outdoor metering a clear space of 10 metre x 4 metre or
5 metre x 5 metre open to sky shall be provided. This enclosure shall be at the periphery of the building and shall
be cut off from other portions of the premises by fi re resistance walls. These areas shall be specifi cally shown in
the plan. Before the plan is sent to the competent authority for approval, it shall be sent to the area engineer of the
Licensee and got approved. The point of supply shall be within 30 metre from the main gate easily accessible for lorry
movement from public road and clearly visible from the public road and satisfactory with regards to security aspects.
PRECAUTION TO BE ADOPTED BY CONSUMERS, OWNERS, OCCUPIERS, ELECTRICAL CONTRACTORS,
ELECTRICAL WORKMEN AND SUPPLIERS
No electrical installation work, including additions, alterations, repairs and adjustments to existing installations, except such
replacement of lamps, fans, fuses, switches, domestic appliances of voltage not exceeding 250V and fi ttings as in no way alters
its capacity or character, shall be carried out upon the premises of or on behalf of any consumer, supplier, owner or occupier for
the purpose of supply to such consumer, supplier, owner or occupier except by an electrical contractor licensed in this behalf by
the State Government and under the direct supervision of a person holding a certifi cate of competency and by a person holding
a permit issued or recognized by the State Government.
I / We certify that we are aware of the above precaution and agree to abide by it.
I / We agree to pay to the Licensee at the applicable tariff /minimum rates/fi xed charges/surcharge etc that may be decided
by the Commission from time to time.
I / We agree to abide under all specifi cations, conditions and provisions laid down in Tamil Nadu Electricity Regulatory
Supply Code, Distribution Code and the applicable Act, Codes, Rules and Regulations and of any modifi cation or re-enactment
thereof for the time being in force and subject to the conditions of revisions, amendments approved from time to time.
(Note: This undertaking does not preclude a separate written contract to be entered with Licensee )
Signature of the Applicant(s)
Name(s) in Block Letters.
Place:
Date:
Note:
1. The application shall be accompanied with the following documents:
(i) Self attested copy of proof of ownership such as sale deed (or) partition deed (or) gift settlement (or) allotment letter
(or) computer patta (or) ownership certifi cate issued by revenue department offi cials (or) court judgment or recent
property tax receipt.
(ii) In case of joint property, self attested copies of proof of ownership along with parent documents specifi ed in note (i)
above and consent letters from co-owners. If consent letter is not produced, an indemnity bond with enhanced security
deposits.
(iii) If the applicant is not the owner, consent letter from owner in FORM No.5 or valid proof of occupancy and indemnity
bond in FORM No.6
(iv) Plan approval with area earmarked for installing transformer, in case of fl oor area of 900 square metre and above or
the demand exceeds 112KW, in case of LT service connections as per sub regulation 29 (11) of the TNE Distribution
Code
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
35
OR
Plan approval with area earmarked for establishment of sub-station and road approaches, in case of demand /
area exceeds the limit as specifi ed with conditions in sub regulation 29 (12) of the TNE Distribution Code
OR
Plan approval with area earmarked for indoor / outdoor metering , and location of metering point with road approaches
in case of HT service connection as specifi ed with conditions in sub regulation 29(14) of the TNE Distribution Code.
FOR LICENSEE’S USE ONLY
ACKOWLEDGEMENT
Applicant(s)’ name :
Address :
Date of receipt :
Reference No. :
Category of Supply :
Signature and seal of Distribution Licensee
Name and designation”.
(By order of the Tamil Nadu Electricity Regulatory Commission)
Chennai-600 032.
S. CHINNARAJALU,
8th January 2021.
Secretary,
Tamil Nadu Electricity Regulatory Commission.
Eචඔඉඖඉගකඡ Sගඉගඍඕඍඖග
In order to ensure that the safety norms and regulations mandated in the CEA regulations such as provision of Residual Current
Device inside the premises of consumers and production of necessary approval from Electrical Inspector are to be specifically
provided in the Distribution Code for creating awareness among the consumers and for effective implementation to ensure public
safety against electric shock and fire hazards. Further the expression ‘authority’ needs to be defined with clarity.
The LT application needs to be provisioned for joint application by the co-owners as the present format is suitable only for a
single applicant.
To define the conditions for metering point location in HT service to make it more practicable so as to ensure that the Licensee is
able to reach the location easily during surprise inspection and viable alternate solution where there is no feasibility to erect metering
point within the specified distance from main gate or specified location.
To add provision to erect single pole type Transformer inside consumer’s premises in addition to existing provision for erecting
conventional double pole type.
There being exclusive conditions for Temporary supply, the specific requirements to provide space and other provisions for
erection of Transformer or sub-station need to be made more specific to the applicant at the initial stage itself and for that purpose
it is proposed to prescribe a separate format for the said category.
To add clarity in computing the difference in cost between the types of sub-station when the applicant chooses to provide space
for a type of sub-station other than the type preferred by the Licensee.
The monthly minimum charges to be paid in regard to supply availability notice period has to be made specific to avoid
ambiguity.
The amendment seeks to address the above issues.
(By order of the Tamil Nadu Electricity Regulatory Commission)
Chennai-600 032.
S. CHINNARAJALU,
8th January 2021.
Secretary,
Tamil Nadu Electricity Regulatory Commission.
TAMIL NADU GOVERNMENT GAZETTE
36
[Part VI—Sec. 2
ANNEXURE
Tamil Nadu Electricity Distribution Code
Sl.
No.
Existing regulation
Regulation as amended
1.
2. Defi nitions
(1)
xxx
(a) xxx
(b) xxx
2. Defi nitions
(1) xxx
(a) xxx
(aa) “Authority” means the Central Electricity Authority
referred to in sub section (1) of Section 70 of Electricity Act,
2003
(b) xxx
2.
16. Safety Aspects:
(1) xxx
(2) xxx
(3) xxx
16. Safety Aspects:
(1) xxx
(2) xxx
(2A)
“EARTH
LEAKAGE
PROTECTIVE
DEVICE/
RESIDUAL CURRENT DEVICE (ELPD / RCD ):
(i) The supply of electricity to every installation of
low voltage (240 V) and medium voltage(415V) including
installations of temporary supply shall be controlled by a
Residual Current (operated) Device (RCD), whose rated
residual operating current shall not exceed 30 milliampere
for protection against electric shock, so as to disconnect the
supply on the occurrence of earth fault or leakage of current.
(ii) In the case of installations having large number of
motors, equipment, appliances of loads totaling above 10 kW,
one common RCD at the point of commencement of supply
with rated residual operating current of 300 milliampere for
protection against electrical fi re shall be provided, in addition
to RCD of not exceeding 30 milliampere rating for protection
against electric shock.
(iii) An installation, where there are a large number of
loads giving rise to a sum of permissible leakage currents
exceeding 30 milliampere, shall be subdivided into circuits
to avoid nuisance tripping and each sub-divided circuit shall
be provided with an independent RCD with leakage current
sensitivity rating not exceeding 30 milliampere at appropriate
location(s).
Explanation–RCD is a generic term which embraces the
various types of RCCBs, (Residual Current operated Circuit
Breaker), RCBOs (Residual Current operated Circuit Breaker
with integral Overcurrent protection), etc., RCCB is also called
as RCB for convenience (RCCB/RCB). The term ELCB (Earth
Leakage Circuit Breaker ) is not used in Standards.
(3) xxx
3(a)
27. Requisitions for Supply of Energy
(3). The application for HT service connection
shall be in Form 4. Application for LT service connection
(other than Agriculture and Hut), LT Agricultural service
connection and LT Hut service connection shall be in
FORM- 1,2 and 3 respectively.
Note:
xxx
27. Requisitions for Supply of Energy
(3) The application for HT service connection shall be
in FORM-4. Application for LT service connection (other
than Temporary supply, Agriculture and Hut), Temporary
service connection, LT Agriculture service connection and
LT Hut service connection shall be in FORM–1, 1A, 2 and 3
respectively.
Note:
xxx
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
37
Sl.
No.
Existing regulation
Regulation as amended
3(b)
27. Requisitions for Supply of Energy
(11) xxx
27. Requisitions for Supply of Energy
(11) xxx
(11A) Where the requisition for supply is for a multi-storeyed
building, the applicant shall enclose the planning permission
along with building plan approval with the application. The
Licensee shall verify the height of the building from the planning
permission / building plan approval enclosed by the applicant.
Physical measurement is not necessary. If the height of the
multi-storeyed building is more than 15 metre as given in
the planning permission / building plan approval, necessary
approval from the Electrical Inspector in compliance with CEA
(Measures relating to Safety and Electric Supply) Regulations
2010 as amended, shall be furnished by the applicant.
(11B) The supply of electricity to every installation of
low voltage (240 V) and medium voltage (415V) including
installations of temporary supply shall be controlled by a
Residual Current (operated) Device (RCD) as specifi ed in sub-
regulation (2A) of Regulation 16 of this Code, to ensure safety
against electric shock and fi re hazards.
4(a)
29. Service Lines:
(11) In storied building suffi cient space at a
suitable place shall be made available free of cost to the
Licensee for installing transformers, switchgears etc., in
addition to the space requirements stated below:
29. Service Lines:
(11) In storeyed building and for any building / premises
requiring LT service connection(s) having either (a) total fl oor
area of 900 square metre and above (excluding the stilt fl oor /
basement fl oor) or (b) the total demand of all the LT services
in the building exceeds 112kW, suffi cient space shall be made
available free of cost to the Licensee for installing transformers,
switchgears etc., as stated below:
(12) For any building / premises requiring LT
service connection(s) having either (a) total fl oor area
of 900 square meter and above (excluding the stilt fl oor
/ basement fl oor) or (b) the total demand of all the LT
services in the building exceeds 150 kW.
(i) (a) an electrical room with RCC roof having clear
fl oor area 6 meters x 4 meters with a vertical clearance
of 2.75 meters with locking facility, exhaust fans and
adequate size of cable duct, shall be provided at the
ground fl oor within the consumer premises of storied
buildings nearer to the main entrance for installing
fl oor mounted distribution transformer and associated
switchgear or
(a) an electrical room with RCC roof having clear fl oor
area 6 metre x 4 metre with a vertical clearance of 2.75 metre
with locking facility, exhaust fans and adequate size of cable
duct, shall be provided at the ground fl oor within the consumer
premises of storeyed buildings nearer to the main entrance for
installing fl oor mounted distribution transformer and associated
switchgear (or)
(b) a clear space of 10 metre x 4 metre or 5 metre
x 5 metre open to the sky shall be provided within the
consumer premises preferably at the main entrance
for installing structure mounted distribution transformer
and associated switchgears, and
(b) a clear space of 10 metre x 4 metre or 5 metre x 5 metre
open to the sky for double pole structure or 4 metre x 4 metre
open to sky for single pole structure according to site and load
conditions, shall be provided within the consumer premises
preferably at the main entrance for installing structure mounted
or plinth/concrete pillar mounted distribution transformer and
associated switchgears. In case of concrete/plinth mounted
arrangement, such mounting arrangement shall be carried out
by the applicant at his cost.
TAMIL NADU GOVERNMENT GAZETTE
38
[Part VI—Sec. 2
Sl.
No.
Existing regulation
Regulation as amended
(c) Installation of Distribution Transformer with associated
equipment / accessories viz. AB switch, HG fuse, DT structure/
pole shall be carried out by the Licensee at the Licensee’s cost.
The cost of installation works from the Distribution Transformer
to the consumer’s meter including portion of any HT line within
the consumer’s premises when the Distribution transformer
is erected in the consumer’s premises, shall be borne by the
applicant.
(d) While carrying out the work, it should be ensured
that the electrical clearance from ground, horizontal/vertical
clearances from building, working clearance etc., as stipulated
in the safety regulations are strictly followed.
29. Service Lines:
12 (ii)(a) Space as per the norms specifi ed in clause (b)
of this sub-regulation shall be allotted for establishment of a
sub-station / switching station in places requiring service
connections (except industrial service connections)
where (i) the total demand of the projects including
expansions, incidence of loads in near future exceeds/
would exceed 5MVA (ii) the total area of construction/
area that would be constructed in the near future is
of 30000 sq.mt and above (excluding the stilt fl oor/
basement fl oor )
(b)The requirement of land for establishment of
sub-stations shall not exceed the limit given below:
29. Service Lines:
(12) (a) Space as per the following norms shall be allotted
by the applicant free of cost for establishment of a sub-station/
switching station in places requiring service connections
(except industrial service connections other than IT related
purposes) where either (a) the total demand of all the electrical
services in the projects including the loads that will be incident
in future exceeds/would exceed 5 MVA or (b) total fl oor area of
30,000 square metre and above is constructed or proposed to
be constructed (excluding the stilt fl oor / basement fl oor).
(b)The requirement of land for establishment of sub-
stations shall be the minimum limit with confi guration given
below:
Voltage level of
the sub-station
Land Requirements
in Sq.mts.
Normal
sub-station
Compact
sub-station
33 kV Sub-
station
850 (indoor)
3160 (outdoor)
400
110 kV sub-
station
4000 (outdoor)
1050
230 kV sub-
station
16000 (outdoor)
1750
Voltage level
of the
sub-station
Land Requirements in Sq.mts.
Normal sub-
station
Compact sub-station
33 KV
Sub-station
850 (indoor)
3160 (outdoor)
400 (size of 20x20
or
10x40
with
approaches on any
two adjacent sides)
110 KV
sub-station
4000 (outdoor)
1050
230 KV sub-
station
16000
(outdoor)
1750
When the developers/owners of the premises apply for
additional load / develops additional constructions in phases
etc., the above requirement of space for establishment of sub-
station shall be applicable for the total load or total area of
construction that includes both the existing and additional load
/ area of construction.
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
39
Sl.
No.
Existing regulation
Regulation as amended
(c) The area earmarked for establishment of
sub-station shall be specifi cally shown in the plan and
furnished to the Distribution Licensee by the developers/
owners at the time of applying for temporary service
connection for construction purposes.
(c) The area earmarked for establishment of sub-station
shall be specifi cally shown in the plan including the areas of
constructions, road approaches and other amenities of the
premises along with plot development if any for the future
and furnished to the Distribution Licensee by the developers/
owners at the time of applying for temporary service connection
for construction purposes.
(d) Where the developer/applicant chooses to allot
land for a compact sub station, the diff erence in cost
between establishment of a conventional sub station
and compact sub station shall be borne by them.
Note: (a) in places situated within 60 Kilo Meters
from the periphery of the Metropolitan/Corporation limit,
the Licensee may establish the compact sub-station;
(b) in places situated within 30 Kilo Meters from
the periphery of the Municipality limit, the Licensee
may establish the compact sub-station; (c) in places
situated within 10 Kilo Meters from the periphery of the
Town Panchayat limit, the Licensee may establish the
compact sub-station;
(d) in other places, the Licensee may establish the
sub-station of his choice
(e) the land area should have the proper approach
road at least on any one side of the land for easy
transporting of power transformer.
(f) the dimension of the land area shall be as per
the suggestions of the Licensee to the consumer.
(d) Where the total demand exceeds /would exceed 5
MVA or the total fl oor area of 30,000 square metre and above
is constructed or proposed to be constructed (excluding the
stilt fl oor / basement fl oor), the applicant shall allot the land
suitable for establishing a conventional outdoor Air Insulated
Switchgear (AIS) sub-station. In case, the applicant chooses to
opt for allotting land suitable for Compact or Indoor sub-station
other than conventional outdoor AIS sub-station, the applicant
shall bear the diff erence in cost between the Compact or Indoor
sub-station for which the space is off ered and the conventional
outdoor AIS sub-station. The applicant has to allot the land for
establishment of sub-station commensurate with the quantum
of demand applied or the demand assessed by the Licensee,
whichever is higher.
Explanation: (i) While calculating the diff erence in cost
between the sub-stations of compact and outdoor type
or between the sub-stations of indoor and outdoor type,
following methodology shall be adopted:
(ii) The portion pertaining to HV side equipment, only one
power transformer that feeds the applicant(s) , its allied
LV breaker, CTs, switches , panels, number of its LV
feeders feeding the applicant, feeder equipment, panels,
cables, accessories , etc., shall be taken in to account for
comparison with the corresponding counterparts of the
outdoor sub-station and for computation of diff erence in
cost between them .
(iii) The portion of cost pertaining to remaining Power
Transformer(s), their allied HV switches, LV breakers,
CTs, switches, panels, LV feeders feeding other areas,
feeder equipment , panels, cables, accessories etc.,
shall be entirely borne by the Licensee.
(e) The Licensee may consider establishment of sub-
stations operating at various voltage levels commensurate with
the demand as below, in the space provided by the applicants:
TAMIL NADU GOVERNMENT GAZETTE
40
[Part VI—Sec. 2
Sl.
No.
Existing regulation
Regulation as amended
Total demand
Voltage level
of the sub-
station
Exceeding 5 MVA but not above 10
MVA
33 KV
Exceeding 10 MVA but not above 50
MVA
110 KV
Exceeding 50 MVA
230 KV
- Deleted – ( Note :a,b,c,d, e and f)
4(b)
29. Service Lines
14(b) For outdoor metering, a clear space of 10
metre x 4 metre or 5 metre x 5 metre open to sky shall
be provided.
29. Service Lines
xxx
This enclosure shall be at the periphery of the
building and shall be cut off from other portions of the
premises by fi re resistance walls. These areas shall
be specifi cally shown in the plan. Before the plan is
sent to the competent authority for approval, it shall be
sent to the Engineer and got approved. The point of
supply shall be within 30 meters from the main gate
easily accessible and visible and satisfactory with
regards to security aspects. Failure to comply with
the above requirements will result in denial of supply.
Provided that the Chief Executive Offi cer or
any other Offi cer, not less than in the rank of a Chief
Engineer, authorized by the Chief Executive Offi cer
may approve the point of supply at a place beyond 30
meters from the main gate, if he is satisfi ed that such
place is -
(a) easily accessible and visible to the offi cials of
the Licensee;
(b) is safe and secure; and
(c) is not susceptible to malpractice. Also there
shall be no compromise on technical grounds, while
relaxing the distance criteria.
This enclosure shall be at the periphery of the building
and shall be cut off from other portions of the premises by fi re
resistance walls. These areas shall be specifi cally shown in
the plan. Before the plan is sent to the competent authority for
approval, it shall be sent to the Engineer and got approved.
The point of supply shall be within 30 metre from the main entry
gate easily accessible for lorry movement from public road and
clearly visible from the public road and satisfactory with regards
to security aspects. The metering set, incoming and outgoing
HT line of the metering set etc., shall be clearly visible from the
public road, even when the gate is in closed condition.:
Provided that the Chief Executive Offi cer or any other
Offi cer, not less than in the rank of a Chief Engineer, authorized
by the Chief Executive Offi cer may approve the point of supply
in cases where the applicant is unable to get the metering point
erected within 30 metre from main entry gate as above or able
to get the metering point erected within 30 metre, but only in a
gate other than the main entry gate , if he is satisfi ed that such
place is -
(i) easily accessible for lorry movement from road located
outside the applicant’s premises and clearly visible to the
offi cials of the Licensee from that road even when the gate is
in closed condition;
(ii) is safe and secure;
(iii) is not susceptible to malpractice; and
(iv) it is feasible to erect a check metering point outside the
applicant’s premises.
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
41
Sl.
No.
Existing regulation
Regulation as amended
(c) There shall be no compromise on technical grounds,
while relaxing the distance and the location criteria. The
applicants who are unable to get the metering point erected
within 30 metre from main entry gate or able to get the metering
point erected within 30 metre, but only in a gate other than the
main entry gate, shall bear the cost of installation of check
metering point outside the premises in a location decided by
the Licensee.
Failure to comply with the above requirements will result
in denial of supply.
5.
31. INSPECTIONS , TESTING AND EFFECTING
SUPPLY:
(3) If the intending consumer fails to avail the
supply within the above period, a further three months
notice in case of HT and one-month notice in case of
LT will be sent to the intending consumer to avail the
supply. If he does not avail himself the supply during
this notice period, the application will be treated as
lapsed and cancelled in the case of Low Tension supply
and the application shall be treated as cancelled,
terminating the agreement, in the case of High Tension
supply. The service connection charges and the
Security Deposit / development charges, etc. except
Meter Caution Deposit will be forfeited. In case the
intending consumer could not avail the supply under
force majuere conditions, the Security Deposit and
meter caution deposit shall be refunded to the intending
consumer.
31 INSPECTIONS, TESTING AND EFFECTING SUPPLY:
“(3) If the intending consumer fails to avail the supply
within the above period, a further three months extension in
case of HT and one month extension in case of LT will be
granted by the Licensee, after collecting the monthly minimum
for the notice period including the extended period in advance.
If he does not avail himself the supply during this notice period,
the application will be treated as lapsed and cancelled in the
case of Low Tension supply and the application shall be treated
as cancelled, terminating the agreement, in the case of High
Tension supply. The service connection charges, security
deposit, development charges, monthly minimum charges
etc., except meter caution deposit will be forfeited . In case,
the intending consumer could not avail the supply under force
majeure conditions, the security deposit and meter caution
deposit shall be refunded to the intending consumer.
6.
ANNEXURE III : FORMATS
Application Form for L.T. Service
FORM 1>
Connection (except agriculture
and hut)
FORM 2>
Application Form for Agriculture
Service Connection
FORM 3>
A pplication Form for Hut Service
Connection
FORM 4>
Application Form for H.T. Service
Connections (including additional
demand) Owner Consent
FORM 5>
Letter for getting New Supply
Indemnity Bond
FORM 6>
from the Occupier when there is
no Consent letter from owner
L.T. Agreement
FORM 7>
for
Industrial
/
Agricultural
Services
FORM 8>
H.T. Agreement Form
ANNEXURE III : FORMATS
FORM 1
Application
Form
for
L.T.
Service
Connection (except Temporary supply,
agriculture and hut)
FORM 1A
Application Form for Temporary Service
Connection.
FORM 2
xxx
FORM 3
xxx
FORM 4
xxx
FORM 5
xxx
FORM 6
xxx
FORM 7
xxx
FORM 8
xxx
TAMIL NADU GOVERNMENT GAZETTE
42
[Part VI—Sec. 2
FORM I
“FORM I
Application Form for L.T Service Connection( except
Agriculture and Hut )
Application Form for L.T Service Connection(except
Temporary Supply, Agriculture and Hut )
FORM OF REQUISITION FOR SUPPLY OF LOW TENSION
ENERGY ( SINGLE PHASE / THREE PHASE)
FORM OF REQUISITION FOR SUPPLY OF LOW TENSION
ENERGY ( SINGLE PHASE / THREE PHASE)
[Refer regulation 27(3)]
[Refer regulation 27(3)]
To
To
The Designated Engineer
(Address of the Licensee)
The Designated Engineer
(Address of the Licensee)
Sir,
1.
I Thiru / Tmty…… ………………….........
……………………………….........……...
.......
S/o/D/o/W/o/...........................................................................
………………………………………........................................
………....................….......…hereby request you to
supply electrical energy for the purposeof
...............................................................
..........................................to the premises hereinafter
described.
Sir,
1.
I / We , Thiru /Tmty……………………………..........
……………………………………...........................................
....................S/o/D/o/W/o/………………………………………
………………………………………………………...............
…………………….................hereby request you to supply
electrical energy for the purpose of …..………………
………………………............................. to the premises
hereinafter described.
(Note : This undertaking does not preclude a separate written
contract being entered into, if so desired by the Licensee
or the consumer.)
2. I agree to pay for said energy, service connection
charges, the deposit of such security,meter rent,
development charges and any other charges as may be
demanded in accordance with the scale of rates prescribed
under Tamil Nadu Electricity Distribution Code, Supply
Code, notifi cations and orders issued in this regard by
Tamil Nadu Electricity Regulatory Commission.
2.
I / We agree to pay for said energy, service
connection charges, the deposit of such security, meter
rent, development charges and any other charges as
may be demanded in accordance with the scale of rates
prescribed under Tamil Nadu Electricity Distribution Code,
Supply Code, notifi cations and orders issued in this regard
by Tamil Nadu Electricity Regulatory Commission.
3. I wish to be charged under Tariff ………… under the
schedule of the TNERC tariff order dated…………….
3.
I / We wish to be charged under Tariff …………
under schedule of the TNERC tariff order in force.
4. I agree to take supply for ……………. years and
utilize the energy in the premises described hereunder
or outside the premises for my bonafi de use.
4.
I / We agree to avail supply and utilize the energy
in the premises described hereunder for my/our bonafi de
use.
Applicant’s
photo
Applicant’s
photo
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
43
5. In case I sell or otherwise dispose of the property
/ vacate the premises while the supply is continued, I
agree to give one Calendar month notice in writing and
pay all the arrears to the Licensee. Failing such notice,
I hold myself responsible for energy consumed in the
premises till such notice is given to the Licensee.
5.
In case, I/We sell or otherwise dispose of the
property / vacate the premises while the supply is
continued, I/We agree to give one Calendar month
notice in writing and pay all the arrears to the Licensee.
Failing such notice, I /We hold myself /ourselves liable
for payment of arrears of current consumption charges,
other dues if any and claims that may arise in the event
of termination of agreement and undertake for loading
the dues to other service connection(s) that may stand
in my/our name(s).
6.
Description of the premises
Door No. and/ or name of the house or premises:
Street
:
Town / Village and Taluk
:
Owned by (Name in Block letters)
:
Tenanted by (Name in block letters)
:
Applicant(s)’ address for correspondence
:
Contact No. and e-mail id
:
6.
Description of the premises
a) Door No. and / or name of the house or premises :
b) Street
:
c) Town / Village and Taluk
:
d) Owned by (Name in Block Letters) :
e) Tenanted by (Name in Block Letters) :
f) Applicant(s)’ address for correspondence:
g) Contact No. and e-mail id :
7. The following are my requirements
:
7. The following are my / our requirements
8. Demand applied for in KW :
8. Demand applied for in KW :
9.The wiring has been completed on :
9. Whether the installation is provided withearth protective
device (RCD) as per Tamil Nadu Electricity Distribution Code:
Number of
Points
Wattage of
points
Total
wattage
(A)
Lighting
-
-
(i)
Lights
-
-
(ii) Fans
-
-
(iii) Convenient
wall plugs
-
-
(B) Domestic electrical apparatus:
(i) Cookers
-
-
(ii) Water
heaters
-
-
(iii) Refrigerator
-
-
(iv) Air Conditioners
-
-
(v) Other purpose
-
-
(vi) Convenient
wall plugs
-
-
(C) Power Loads :
(i) Domestic
-
-
(ii) Industrial
-
-
(iii) Welding
-
-
(iv) Other purposes
-
-
(v) Convenient
Wall Plugs
-
-
Number of
Points
Wattage of
points
Total
wattage
(A)
Lighting
-
-
(i)
Lights
-
-
(ii) Fans
-
-
(iii) Convenient
wall plugs
-
-
(B) Domestic electrical apparatus:
(i) Cookers
-
-
(ii) Water
heaters
-
-
(iii) Refrigerator
-
-
(iv) AirConditioners
-
-
(v) Lifts/Elevator/
Escalators
-
-
(vi)
Other purpose
(vii) Convenient wall
plugs
-
-
(C) Power Loads :
(i) Domestic
-
-
(ii) Industrial
-
-
(iii) Welding
-
-
(iv) Other purposes
-
-
(v) Convenient
Wall Plugs
-
-
TAMIL NADU GOVERNMENT GAZETTE
44
[Part VI—Sec. 2
10. Details of existing service connections of the applicant,
if any.
11. Details of pending dues if any to the premises to which
service connection is sought in this application]
Place
Signature of the applicant
Date
Name(in Block letters)
Note:
The application Shall be accompanied with the
following documents.
Certifi ed copy of Proof of ownership such as sale deed
/Partition deed/gift settlement/allotment letter/computer
patta /ownership certifi cate issued by revenue department
offi cials/ court judgment or recent property tax receipt.
In case of joint property, certifi ed copies of proof of
ownership such as legal heir certifi cate along with parent
documents specifi ed in note (i) above and consent letters
from co-owners. If consent letter is not produced, an
indemnity bond with enhanced security deposit.
If the applicant is not the owner, consent letter from
owner in FORM No.5 or valid proof of occupancy and
indemnity bond in FORM No.6
FOR LICENSEE’S USE ONLY
Application registered as No.
dated
Note:1. In case of transfer of the service, fresh
application should be signed by the transferee.
2.Additions or omissions to the connected load to
be notifi ed to the Licensee before eff ecting the electricity
connections.
10. The wiring has been completed on:
11. Details of existing service connection(s) of the
applicant(s), if any :
12. Whether any current consumption charges or any
other charges are due to TANGEDCO in the name(s)
of the applicant(s) or premises :
If yes, give details (with SC No, Name of Section/Circle
etc) :
PRECAUTION TO BE ADOPTED BY CONSUMERS,
OWNERS, ELECTRICAL CONTRACTORS, ELECTRICAL
WORKMEN AND OTHER SUPPLIERS OF ENERGY
PRECAUTION TO BE ADOPTED BY CONSUMERS,
OWNERS, OCCUPIERS, ELECTRICAL CONTRACTORS,
ELECTRICAL WORKMEN AND SUPPLIERS
No electrical installation work, including additions, alterations,
repairs and adjustments to existing installations except
such replacement of lamps, fans, fuses, switches and
other component parts of the installations as in no way
alter its capacity or character shall be carried out upon
the premises or on behalf of any consumer or owner
for the purpose of supply of energy to such consumer
or owner, except by an authorized person specifi ed by
the Authority.
No electrical installation work, including additions, alterations,
repairs and adjustments to existing installations, except
such replacement of lamps, fans, fuses, switches, domestic
appliances of voltage not exceeding 250V and fi ttings
as in no way alters its capacity or character, shall be
carried out upon the premises of or on behalf of any
consumer, supplier, owner or occupier for the purpose
of supply to such consumer, supplier, owner or occupier
except by an electrical contractor licensed in this behalf
by the State Government and under the direct supervision
of a person holding a certifi cate of competency and by
a person holding a permit issued or recognized by the
State Government.
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
45
ACKOWLEDGEMENT
Applicant(s)’ name
:
Address
:
Date of receipt
:
Reference No.
:
Category of Supply :
Signature and seal of Distribution Licensee
Name and designation.
I / We certify that we are aware of the above precaution
and agree to abide by it.
I / We agree to pay to the Licensee at the applicable
tariff /minimum rates/fi xed charges/surcharge etc., that
may be decided by the Commission from time to time.
I / We agree to abide under all specifi cations, conditions
and provisions laid down in Tamil Nadu Electricity Regulatory
Supply Code, Distribution Code and the applicable Act,
Codes, Rules and Regulations and of any modifi cation
or re-enactment thereof for the time being in force
and subject to the conditions of revisions, amendments
approved from time to time.
(Note : This undertaking does not preclude execution
of a separate written contract to be entered with Licensee)
Place:
Signature of the applicant(s)
Date:
Name(s) in Block Letters
Note:
The application shall be accompanied
with the following documents:
(i)
Self attested copy of proof of ownership such
as sale deed (or) partition deed (or) gift settlement
(or) allotment letter (or) computer patta (or) ownership
certifi cate issued by revenue department offi cials (or)
court judgment or recent property tax receipt.
(ii)
In case of joint property, self attested copies of
proof of ownership along with parent documents specifi ed
in note (i) above and consent letters from co-owners. If
consent letter is not produced, an indemnity bond with
enhanced security deposits.
(iii)
If the applicant is not the owner, consent letter
from owner in FORM No.5 or valid proof of occupancy
and indemnity bond in FORM No.6
FOR LICENSEE’S USE ONLY
ACKOWLEDGEMENT
Applicant(s)’ name
:
Address
:
Date of receipt
:
Reference No.
:
Category of Supply :
Signature and seal of Distribution Licensee
Name and designation.”
TAMIL NADU GOVERNMENT GAZETTE
46
[Part VI—Sec. 2
“FORM IA
Application Form for Temporary Service Connection
FORM OF REQUISITION FOR TEMPORARY SUPPLY ( SINGLE PHASE / THREE PHASE)
[Refer regulation 27(3)]
To
The Designated Engineer
(Address of the Licensee)
Sir,
1. I/We, /Thiru/Tmty……………………………………………………….........................................................................................
S/o/D/o/W/o/………………………………………………………………………..…….…………………………………………
hereby request you to supply electrical energy, temporarily for the purpose of………………………………………………………
…………………………….. …..………………………………………………………………………. …… to the premises (or) location
hereinafter described.
2. I / We agree to pay for said energy, service connection charges, the deposit of such security, meter rent, development
charges and any other charges as may be demanded in accordance with the scale of rates prescribed under Tamil Nadu Electricity
Distribution Code, Supply Code, notifi cations and orders issued in this regard by Tamil Nadu Electricity Regulatory Commission.
3. I/ We wish to be charged under Tariff ………… under schedule of the TNERC tariff order in force.
4. I/ We agree to avail temporary supply and utilize the energy in the premises/ location described hereunder for my/our
bonafi de use.
5. In case, I/We sell or otherwise dispose of the property / vacate the premises while the supply is continued, I/We agree to
give one month notice in writing and pay all the arrears to the Licensee, failing which, I/We hold myself/ourselves responsible for
the energy consumed in the premises for the entire period of Temporary supply availed. If any due arises in this service connection,
I/We agree to include such dues in my/our existing service connections No(s): ………………………………………………………...
(if available)
6.
Ownership of the premises / location where temporary supply is required:
a. SF No./ Door No.
:
b. Street
:
c. Town / village
:
d. Land mark of premises
:
e. Taluk
:
f. District
:
g. Owned by (Name in Block Letters)
:
h. Tenanted by (Name in Block Letters)
:
i. Applicant(s)’ address for correspondence :
j. Contact No. and e-mail id
:
Applicant(s)’
Photo(s)
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
47
7. Description of the premises
a. Plot area
:
b. Total building area/Floor area of all fl oors :
c. Number of the Floors to be constructed
:
(Basement /stilt /ground fl oor/other Floors to be furnished in detail )
d. Whether the planning permission with building plan approval is obtained from competent authority for above
mentioned fl oors and construction :
e. Whether copy of Planning permission with building plan approval is enclosed :
f. Height of the building as per planning permission/ Plan approval
:
(If height of the building is more than 15 metre as shown in the planning permission, approval from Electrical Inspector
is required)
g. Whether Gen set /Lift is proposed to be erected
:
(If yes , approval from Electrical Inspectorate to be obtained)
h. Any HT/LT line is passing inside or adjacent to the premise :
(If yes, building should be constructed with adequate safe clearance as per the Safety Regulations in force or
otherwise the lines should be got deviated at the cost of applicant, subject to feasibility)
8.
Whether the service connection is required permanently after the period of temporary service connection is over
:
If No,
(i) Specifi c purpose for which Temporary supply is requested :
(ii) Period of Temporary supply required :
9. Details of Loads to be Connected:
(A) Lighting
Number of
Wattage of
Total
Points
points
wattage
(i) Lights
-
-
-
(ii) Fans
-
-
-
(iii) Convenient wall plugs
-
-
(B) Power Loads
(i) Motors
-
-
-
(ii) Welding
-
-
-
(iii) Cutting machine
(iv) Portable appliances
-
-
(v) Lifts/elevators
-
-
-
(vi) Other apparatus
-
-
-
(vii) Convenient Wall Plugs
-
-
10. Demand applied for in KW
:
11. Whether the installation is provided with earth protective device (RCD) as per Tamilnadu Electricity Distribution Code:
12. The wiring has been completed on :
13. Details of existing service connection(s) of the applicant(s), if any :
14. Whether any current consumption charges or any other charges are due to TANGEDCO in the name(s) of the applicant(s)
or premises :
TAMIL NADU GOVERNMENT GAZETTE
48
[Part VI—Sec. 2
If yes, give details ( with SC No, Name of Section/Circle etc ) :
SPACE TO BE PROVIDED BY APPLICANT(s)
1. In storeyed building and for any building / premises requiring LT service connection(s) having either (a) total fl oor
area of 900 square metre and above (excluding the stilt fl oor / basement fl oor) or (b) the total demand of all the LT
services in the building exceeds 112kW, suffi cient space shall be made available free of cost to the Licensee for
installing transformers, switchgears etc., as stated in Regulation 29 (11) of the TNE Distribution Code.
2. Space as per the norms specifi ed in Regulation 29(12) of the TNE Distribution Code shall be allotted by the applicant
free of cost for establishment of a sub-station/switching station in places requiring service connections (except
industrial service connections other than IT related purposes) where either (a) the total demand of all the electrical
services in the projects including the loads that will be incident in future exceeds /would exceed 5 MVA or (b) total
fl oor area of 30,000 square metre and above is constructed or proposed to be constructed (excluding the stilt fl oor /
basement fl oor).
3. For High Tension Service connections of indoor metering, an electrical room with RCC roof having a clear fl oor
area 5 metre x 6 metre with vertical clearance of 3.7 metre between fl oor and ceiling/ beam bottom with locking
facility, exhaust fan and adequate size of cable duct shall be provided at the ground/ basement fl oor for installing the
Licensee’s equipments, etc. This room shall be of fi reproof and weatherproof ; For outdoor metering a clear space
of 10 metre x 4 metre or 5 metre x 5 metre open to sky shall be provided. This enclosure shall be at the periphery
of the building and shall be cut off from other portions of the premises by fi re resistance walls. These areas shall be
specifi cally shown in the plan. Before the plan is sent to the competent authority for approval, it shall be sent to the
area Engineer of the Licensee and got approved. The point of supply shall be within 30 metre from the main gate
easily accessible for lorry movement from public road and clearly visible from the public road and satisfactory with
regards to security aspects.
PRECAUTION TO BE ADOPTED BY CONSUMERS, OWNERS, OCCUPIERS, ELECTRICAL CONTRACTORS,
ELECTRICAL WORKMEN AND SUPPLIERS
No electrical installation work, including additions, alterations, repairs and adjustments to existing installations, except such
replacement of lamps, fans, fuses, switches, domestic appliances of voltage not exceeding 250V and fi ttings as in no way alters
its capacity or character, shall be carried out upon the premises of or on behalf of any consumer, supplier, owner or occupier for
the purpose of supply to such consumer, supplier, owner or occupier except by an electrical contractor licensed in this behalf by
the State Government and under the direct supervision of a person holding a certifi cate of competency and by a person holding a
permit issued or recognized by the State Government.
I / We certify that we are aware of the above precaution and agree to abide by it.
I / We agree to pay to the Licensee at the applicable tariff /minimum rates/fi xed charges/surcharge etc that may be decided
by the Commission from time to time.
I / We agree to abide under all specifi cations, conditions and provisions laid down in Tamil Nadu Electricity Regulatory Supply
Code, Distribution Code and the applicable Act, Codes, Rules and Regulations and of any modifi cation or re-enactment thereof for
the time being in force and subject to the conditions of revisions, amendments approved from time to time.
(Note: This undertaking does not preclude a separate written contract to be entered with Licensee )
Signature of the Applicant(s)
Name(s) in Block Letters.
Place:
Date:
Note:
1. The application shall be accompanied with the following documents:
(i) Self attested copy of proof of ownership such as sale deed (or) partition deed (or) gift settlement (or) allotment
letter (or) computer patta (or) ownership certifi cate issued by revenue department offi cials (or) court judgment or recent
property tax receipt.
Jan. 27, 2021]
TAMIL NADU GOVERNMENT GAZETTE
49
(ii) In case of joint property, self attested copies of proof of ownership along with parent documents specifi ed in note
(i) above and consent letters from co-owners. If consent letter is not produced, an indemnity bond with enhanced security
deposits.
(iii) If the applicant is not the owner, consent letter from owner in FORM No.5 or valid proof of occupancy and
indemnity bond in FORM No.6
(iv) Plan approval with area earmarked for installing transformer, in case of fl oor area of 900 square metre and above
or the demand exceeds 112KW, in case of LT service connections as per sub regulation 29 (11) of the TNE Distribution
Code
OR
Plan approval with area earmarked for establishment of sub-station and road approaches, in case of demand / area
exceeds the limit as specifi ed with conditions in sub regulation 29 (12) of the TNE Distribution Code
OR
Plan approval with area earmarked for Indoor / outdoor metering , and location of metering point with road approaches
in case of HT service connection as specifi ed with conditions in sub regulation 29(14) of the TNE Distribution Code.
FOR LICENSEE’S USE ONLY
ACKNOWLEDGEMENT
Applicant(s)’ name
:
Address
:
Date of receipt :
Reference No. :
Category of Supply :
Signature and seal of Distribution Licensee
Name and designation”
( By order of the Tamil Nadu Electricity Regulatory Commission )
Chennai-600 032,
S.CHINNARAJALU,
8th January 2021.
Secret ary,
Tamil Nadu Electricity Regulatory Commission.