CONTENTS
INDIAN RAILWAYS
RAILWAY ELECTRIFICATION
Energisation of Overhead Equipment with 25kV ac 50 cycle single phase supply system for
Target during 2020-21 in Southern Railway.
..
..
..
..
..
8-9
Pages.
8
TAMIL NADU GOVERNMENT GAZETTE
[Part III—Sec. 2
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
______
INDIAN RAILWAYS
RAILWAY ELECTRIFICATION
Energisation of Overhead Equipment with 25kV ac 50 cycle single phase supply system for
Target during 2020-21 in Southern Railway.
(No. ETR/252/RE/2449/EIG)
(Pro forma 10-01)
PUBLIC NOTIFICATION
No. SRO C-4/2021.
Notice is hereby given to all users of Railway lines and premises situated on the completed Section of the
under noted Sections of the Southern Railway that the 25,000 Volt 50Hz., ac. Overhead Traction wires will be
energized on or after the date specifi ed against the sections. On and from the same date the Overhead Traction line
shall be treated as ‘LIVE’ at all times and no unauthorized person shall approach or work in the proximity of the said
overhead lines.
Section
Date
Pollachi - Podanur Jn.
10-02-2021
Pollachi - Palani
10-06-2021
Palani - Dindigul Jn.
10-09-2021
Pollachi - Palakkad Jn.
10-09-2021
Tirunelveli Jn.- Tiruchendur-Ambasamudram
10-12-2021
Ambasamudram-Sengottai
10-03-2022
Shoranur-Nilambur
10-03-2022
Rajapalaiyam-Tenkasi
10-06-2022
Virudunagar-Rajapalaiyam
10-06-2022
Egmore, Chennai-600 008.
DIGHE SAMEER,
19th February 2021.
Chief Project Director,
Railway Electrifi cation.
ANNEXURE - II
(No. ETR/252/RE/2449/EIG)
INTRODUCTION OF ac 25 Kv TRACTION
(Pro forma 10-02)
"WARNING TO ROAD USERS"
No. SRO C-5/2021.
It is notifi ed for information of the public that in connection with introduction of 25kV ac electric traction on and from the dates
mentioned against the following Sections of Southern Railway, height gauges have been erected at all the level crossings with
clear maximum height of 4.78m, above road level with a view to prevent loads of excessive height from coming into contact or
dangerous proximity to "LIVE" Traction Wires. (Contact Wire), which shall be at a height of minimum 5.5m above the rail level at
level crossings.
Feb. 24, 2021]
TAMIL NADU GOVERNMENT GAZETTE
9
Section
Date
Pollachi - Podanur Jn.
10-02-2021
Pollachi - Palani
10-06-021
Palani - Dindigul Jn
10-09-2021
Pollachi - Palakkad Jn.
10-09-2021
Tirunelveli Jn.- Tiruchendur-Ambasamudram
10-12-2021
Ambasamudram-Sengottai
10-03-2022
Shoranur-Nilambur
10-03-2022
Rajapalaiyam-Tenkasi
10-06-2022
Virudunagar-Rajapalaiyam
10-06-2022
Public are hereby noticed to observe the height specifi ed above for the purpose of loading Vehicles and to see that the loads
carried in road vehicles do not infringe the height gauges under any circumstances.
The Dangers of a load of excessive height are as follows:-
(i) Danger to the height gauge and consequent obstruction to the Road as well as the Railway line.
(ii) Danger to the materials or equipments carried or the vehicle itself.
(iii) Danger of fi re and risk of life due to contact with or dangerous proximity to the conductor.
Egmore, Chennai-600 008,
DIGHE SAMEER,
19th February 2021.
Chief Project Director,
Railway Electrifi cation.
PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI