TAMIL NADU

GOVERNMENT GAZETTE

PUBLISHED BY AUTHORITY

©

[Regd. No. TN/CCN/467/2012-14.

GOVERNMENT OF TAMIL NADU

[R. Dis. No. 197/2009.

2021

[Price : Rs. 3.20 Paise.

No. 10]

CHENNAI, WEDNESDAY, MARCH 10, 2021

Maasi 26, Saarvari, Thiruvalluvar Aandu–2052

Part VI—Section 3(b)

Notifications issued by Quasi - Government bodies and

Public Sector undertakings.

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

CONTENTS

TAMIL NADU TRANSMISSION CORPORATION LIMITED

Pages.

GENERAL CONSTRUCTION CIRCLE-I, CHENNAI.—Erection of Transmission Lines ..

18-19

GENERAL CONSTRUCTION CIRCLE, SALEM.—Erection of Transmission Lines ..

19-23

UNIVERSITY AUTHORITIES

îI›Š ð™è¬ô‚ èöè‹, î…ê£×˜

îI›Š ð™è¬ô‚ èöè‹, î…ê£×˜ - ݆C‚ °¿MŸ° «ðó¬õˆ ªî£°FJL¼‰¶ Þ¼

àÁŠHù˜èœ «î˜¾ ªêŒî™ ðŸPò ÜPM‚¬è

..

..

..

23

UNIVERSITY OF MADRAS

Election of [1] six members to the syndicate by the senate from among its members and

[2] four members to the academic council by the senate from among its members

who are not engaged in teaching

..

..

..

..

..

..

23-24

DTP—VI-3(b) (10)—1

[17]

TAMIL NADU GOVERNMENT GAZETTE

18

[Part VI—Sec.3(b)

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

TAMIL NADU TRANSMISSION CORPORATION LIMITED

GENERAL CONSTRUCTION CIRCLE-I, CHENNAI.

Erection of Transmission Lines

[Lr. No. SE/GCC-I/CNI/AEE/GL/CHD/F, T&D/Notifi cation/D. 1393/2020.]

No.VI-3(b)/5/2021.

TAN TRANSCO has sanctioned for erection of the following Transmission lines to Transmit and Distribute Power so

as to meet out additional demands. The work will be taken up shortly.

Sl.

No.

Name of the Transmission Line

Route

Route

Length

in (Km)

Administative Approval

B.P.No.

Scheme Cost in

lakhs

(1)

(2)

(3)

(4)

(5)

(6)

1

Erection of 230 KV DC line on

230 KVMC tower by making

LILO in the existing 230 KV S.P.

Koil - Oragadam SC line for the

establishment of Maramalai Nagar

230 KV AIS SS and stringing

with 110 KV SC line with

panther conductor on 230 KV

MC tower for additional source to

Chengalpattu 110 KV SS.

1. Thirukachoor

2. Singaperumal Koil,

3. Maramalai Nagar,

Ford India Pvt Ltd.,

3.42

FB TANTRANSCO

Proceedings

No. 02,

Dated 19-01-2018

1632.88

Any person interested may make representation on the above scheme within 01 (one) month from the date of issue

of the publication to the undersigned as per the Electricity Act, 2003.

Guindy,

Eක. A. PUSHPANATHAN,

Chennai-600 032,

Superintending Engineer,

2nd March 2021.

General Construction Circle-I.

îI›ï£´ I¡ªî£ìó¬ñй‚ èöè‹ LIªì†

ªð£¶‚ 膴ñ£ù õ†ì‹&1/ªê¡¬ù,

ÜPM‚¬è

[Lr. No. SE/GCC-I/CNI/AEE/GL/CHD/F.T&D/Notifi ction/D. 1393/2020.]

Ã´î™ I¡ «î¬õ¬ò G¬ø¾ ªêŒFì îI›ï£´ I¡ªî£ì¬ñй‚ èöè‹ LIªì† W›è‡ì ÞìƒèO™ Iè àòó¿ˆî

I¡ð£¬î ܬñˆ¶ M¬óM™ ðE ¶õƒè àœ÷¶.

õK¬ê

â‡

I¡ªî£ì˜ «õ¬ôJ¡ Mõó‹

I¡ð£¬î

ªê™½‹

õNˆîì‹

I¡ð£¬îJ¡

c÷‹ (A.e)

G˜õ£è 効î™

õ£Kò ݬí

â‡

F†ì

ñFŠd´

Þô†êˆF™

(1)

(2)

(3)

(4)

(5)

(6)

1

ãŸèù«õ àœ÷

Cƒèªð¼ñ£œ«è£J™& åóèì‹

230 A.«õ£. I¡ ð£¬îJ™

Þ¼‰¶ ¹Fòî£è ܬñ‚è àœ÷

ñ¬øñ¬ôïè˜ 230 A.«õ£. ¶¬í

I¡ G¬ôòˆFŸ° ðô Ü´‚° ²ŸÁ

ðô Ü´‚° «è£¹ó àò˜ Ü¿ˆî

I¡ð£¬î ñŸÁ‹ Þ‰î «è£¹óˆF™

Þ¼‰¶ 埬ø ²ŸÁ I¡ð£¬î

ªêƒè™ð†´ 110 A.«õ£ ¶¬í I¡

G¬ôòˆFŸ° ܬñ‚°‹ ðE.

F¼‚è„Ř,

Cƒèªð¼ñ£œ

«è£J™,

ñ¬øñ¬ôïè˜,

ç«ð£˜´

Þ‰Fò£

H¬ó«õ†

LI†

3.42

FB

TANTRANSCO

Proceedings

No. 02,

Dated 19-01-2018

1632.88

Mar. 10, 2021]

TAMIL NADU GOVERNMENT GAZETTE

19

«ñŸ°PŠH†ì ðEèœ °Pˆ¶ âõ«ó‹ º¬øf´èœ ªîKM‚è M¼‹Hù£™ Þ‰î ÜP‚¬è ªõOJìŠð†ì 01

(å¡Á) ñ£îˆFŸ°œ W«ö °PŠH†´œ÷ ÜFè£K‚° I¡ê£ó ê†ì‹ 2003-¡ ð® º¬øf´ ªêŒòô£‹.

ªê¡¬ù&600 032,

Eක. A. PUSHPANATHAN,

2021 񣘄 2.

«ñŸð£˜¬õ ªð£Pò£÷˜,

ªð£¶ 膴ñ£ù õ†ì‹ -I.

GENERAL CONSTRUCTION CIRCLE, SALEM

Erection of Transmission Lines

[Lr. No. SE/GCC/SLM/AEE(GL)/DM/F.Press/D.1228/2020.]

No.VI-3(b)/6/2021.

Erection of proposed EHT Line to meet out the Additional Demand for the year 2020-21 and Subsequent years

Published as per section 164 and 168 of Electricity Act (2003)

It is hereby notifi ed that the following transmission line is proposed to be constructed during the year 2020-21 and

subsequent year for which sanction has been accorded by the TANTRANSCO for augmenting the power supply.

Sl.

No.

Details of EHT lines

Authority (per.)

FB TANTRANSCO

Proceedings No.

Estimate

cost

in Lakhs

Rs.

Salient features

Benefi ts

(1)

(2)

(3)

(4)

(5)

(6)

1

Erection of 110 KV SC line on DC

towers with Panther Conductor from

existing SIPCOT Phase II 110/22

KV SS to M/s. Ashok Leyland

Ltd., unit II, Hosur Taluk 110 KV

Switch Yard for extension of EHT

Supply to M/s. Ashok Leyland 110

KV Switch Yard.

No. 220,

Dated 12-06-2019.

266.59

For a route length

of 1.5 Kms passing

through Hosur and

nearby Villages

To extend the

EHT Supply

to M/s. Ashok

Leyland., under

DCW basis Ltd.

2

(i)

Erection of 110 KV DC line on DC

towers with Panther Conductor for

making LILO of the existing 110

KV Salem-K.R.Thoppur feeder I

at the proposed Meyyanur 110/22

KV SS.

No. 92,

Dated 30-07-2019.

331.150

For a route length

of 5.00 Kms passing

through Meyyanur,

K.R.Thoppur, Salem

and nearby Villages

To improve the

transmission

network

(ii)

Laying of Dobule run of

110 KV 1x630 Sq.mm UG cable

for making LILO of the existing

110 KV Salem K.R. Thoppur

feeder I at the proposed Meyyanur

110/22 KV SS.

No. 92,

Dated 30-07-2019.

1092.313

For a route length

of 1.5 Kms passing

through Meyyanur,

K.R.Thoppur, Salem

and nearby Villages

To improve the

transmission

network

3.

Erection of 110 KV DC line on

DC towers with Panther Conductor

for making LILO of the existing

110 KV Valayapatty - Erumapatty

- Jamunathapuram feeder at the

proposed Pudukottai (Kettimadu)

110/22 KV SS.

No. 100,

Dated 21-08-2019.

103.395

For a route length

of 1.5 Kms passing

through Valayapatty-

Erumapatty -

Jamunathapuram,

Pudukottai and

nearby Villages

To improve the

transmission

network

4.

Erection of SC line on DC tower

from Thoppur 110 KV SS to

proposed M/s. Thoppur Railway

Traction SS.

No. 396,

Dated 6-11-2019.

528.00

For a route length of

08.00 Kms passing

through Thoppur and

nearby Villages

To extend the

EHT Supply to

M/s. Thoppur

Railway Traction

SS. under DCW

basis

TAMIL NADU GOVERNMENT GAZETTE

20

[Part VI—Sec.3(b)

5

(i)

Conversion of existing 230 KV SC

line on SC towers with kundha

conductor of 230 KV Salem-

Sinagapuram feeder (Ex.Loc.No

34 to Loc.No.40) into 230 KV

SC line on MC tower with Zebra

conductor

No. 05,

Dated 07-01-2020.

468.225

For a route length

of 2.5 Kms passing

through Thillainagar

and nearby Village.

To improve the

transmission

network

(ii)

Free arm Stringing of 110KV DC

line on sanctioned MC tower (from

Loc. No.3 to Loc. No. 11)

No. 05,

Dated 07-01-2020

39.850

For a route length

of 2.5 Kms passing

through Thillainagar

and nearby Villages.

To improve the

transmission

network

(iii)

Erection of 110 KV DC line on DC

MC tower with panther conductor

by making LILO of existing 110KV

Salem-Singapuram feeder II at

proposed Thillai Nagar (Vaikkal

Pattarai) 110/22 KV SS(

310.185

For a route length

of 4.5 Kms passing

through Thillainagar

and nearby Village.

To improve the

transmission

network

6

Erection of 110 KV SC line on

DC towers with panther conductor

from Uddanapally 230 KV SS to

Belur 110/33 KV SS.

No. 17,

Dated 24-01-2020

1378.60

For a route length of

20.00 Kms passing

through Uddanapally,

Belur and nearby

Village.

To improve the

transmission

network

7(i)

Erection of No, KCR tower

for making LILO of Hosur -

Gurubarapally Feeder to the

proposed 110/25 KV Hosur Railway

traction sub station of M/s. Railvikas

Nigam Ltd., of Southwestern

Railway, Bangalore Division, Hosur

Taluk, Krishnagiri EDC under

DCW basis.

No. 77,

Dated 11-03-2020

18.00

For a route length of

0.10 Kms passing at

switch yard of Hosur

Railway traction SS

To Extend the

EHT Supply to

M/s. Railvikas

Nigam Ltd., of

Southwestern

Railway,

Bangalore Division

Hosur Taluk DCW

basis

(ii)

Extension of 110 KV Supply tower

form making LILO from Hosur -

Gurubarapally 110 KV yeard to

Railway traction switch yard with

UG cable 630 sq mm (SC) XLPE

UG Cable for M/s. Railvikas, Nigam

limited, South Western Railway

Bangalore under DCW

194.647

For a route length

of 0.5 Kms passing

Hosur Railway

traction SS Metering

point and nearby

Villages.

8

Erection of 110 KV DC line on

MC towers with panther conductor

for making LILO of the existing

110 KV Deviakurichy - Thalaivasal

Villupuram feeder at the proposed

Nathakarai 110 KV SS (AIIRLIVAS)

No. 99,

Dated 15-07-2020

410.306

For a route length

of 1.5 Kms passing

through Nathakarai,

Thalaivasal,

Deviakurichy and

nearby Village.

To extend the

EHT Supply to

AIIRLIVAS under

DCW basis

The Notifi cation is published for General Information of the Public. If any objection regarding the above schemes this

may be appealed to the undersigned within two months from the date of issue of this publication as per Section 164 and 168 of

the Electricity Act 2003.

Eක. A. NOWSHATH,

Salem-14,

Superintending Engineer,

17th February 2021.

General Construction Circle.

Mar. 10, 2021]

TAMIL NADU GOVERNMENT GAZETTE

21

ÜPM‚¬è

îI›ï£´ I¡ªî£ìó¬ñй‚ èöè‹

ªð£¶ 膴ñ£ù õ†ì‹ «êô‹

[Lr. No. SE/GCC/SLM/AEE(GL)/DM/F.Press/D.1228/2020.]

2020-21 ñŸÁ‹ Ü´ˆî ݇´èO™ GÁõ Þ¼‚°‹ I¡ð£¬îèœ ðŸPò ÞšõP‚¬è 2003-‹ ݇´ I¡ê£ó ê†ìŠ HK¾

164 ñŸÁ‹ 168-¡ W› ªð£¶ñ‚èO¡ 𣘬õ‚è£è ªõOJìŠð´Aø¶.

Ã´î™ I¡ ܬñЬð G¬ø¾ ªêŒõîŸè£è¾‹ I¡ Ü¿ˆîˆ¬î Yó£‚辋 I¡ ÞöŠ¬ð °¬øŠðîŸè£è¾‹ W›è‡ì

ÞìƒèO™ I¡ð£¬îè¬÷ 2020-21-Ý‹ ݇´ ñŸÁ‹ Ü´ˆî ݇´èO™ GÁ¾õîŸè£è îI›ï£´ I¡ê£ó õ£Kò‹ /

îI›ï£´ I¡ªî£ìó¬ñй‚ èöè‹ åŠ¹î™ õöƒA»œ÷¶.

õ.

â‡

àòó¿ˆî I¡ð£¬îèœ Mðó‹

I¡õ£Kò G¬ô

(FB) ݬí

â‡

ªñ£ˆî

ñFŠd´

Þô†ê‹

(Ï)

º‚Aò Ü‹êƒèœ

ðò¡èœ

(1)

(2)

(3)

(4)

(5)

(6)

1

CŠè£† «ðw II 110/22 A.«õ£

¶¬í I¡ G¬ôòˆFL¼‰¶ ܫꣂ

¬ôô«ô‡† LI†, ÎQ†& II æÅ˜

‚è£ 110 A.«õ£. I¡M¬ê î÷‹

õ¬ó Þó†¬ì„ ²ŸÁ I¡ «è£¹ó‹

GÁM ÜF™ «ð‰î˜ è‹H ªè£‡´

埬ø„²ŸÁ I¡ð£¬î ܬñˆî™

â‡, 220

 12-06-

2019

266.59

1.5 A.e Éó‹

CŠè£† ªðw II

ܫꣂ ¬ôôô£¡

LI†, æÅ˜ ‚

ñŸÁ‹ ܼA½œ÷

Aó£ñƒèœ õNò£è

I¡ð£¬î ܬñˆî™

àò˜ó¿ˆî

I¡ê£ó‹ DCW

Ü®Šð¬ìJ™

M/s. ܫꣂ

¬ôô«ô‡†

îQò£˜

GÁõùˆFŸ°

õöƒ°î™

2(i)

¹Fòî£è ܬñòM¼‚°‹ ªñŒò˜

110/22 A.«õ£ ¶¬í I¡

G¬ôòˆFŸ° «êô‹ KR «î£ŠÌ˜ 110

A.«õ£. dì˜ 1-L¼‰¶ àœ ªõO

ð£¬îò£è Þó†¬ì„ ²ŸÁ I¡ «è£¹ó‹

GÁM ÜF™ «ð‰î˜ è‹H ªè£‡´

Þó†¬ì„ ²ŸÁ I¡ð£¬î ܬñˆî™

â‡, 92 

30-07-2019

331.150

5.00 A.e Éó‹

«êô‹ K.R. «î£ŠÌ˜

¬ñòÛ˜ ñŸÁ‹

ܼA½œ÷ Aó£ñƒèœ

õNò£è I¡ð£¬î

ܬñˆî™

I¡ ªî£ì˜

ܬñŠH¡

«ñ‹ð£†®Ÿè£è

(ii)

¹Fòî£è ܬñòM¼‚°‹ ªñŒò˜

110/22 A.«õ£ ¶¬í I¡

G¬ôòˆFŸ° «êô‹ KR «î£ŠÌ˜ 110

A.«õ£. dì˜ 1L¼‰¶ Þó†¬ì æ†ì

110 A.«õ£ 1x630 ê¶ó I.I. U.G

«èHœ ªè£‡´ 1.5 A.e‚° ܬñˆî™

1092.313

1.5 A.e Éó‹

«êô‹ K.R. «î£ŠÌ˜

¬ñòÛ˜ ñŸÁ‹

ܼA½œ÷ Aó£ñƒèœ

õNò£è I¡ð£¬î

ܬñˆî™

3

¹Fòî£è ܬñòM¼‚°‹ ¹¶‚«è£†¬ì

(ªè†®«ñ´ 110/22 A.«õ£ ¶¬í I¡

G¬ôòˆFŸ° õ¬ôòŠð†® â¼ñˆîð†®

ü‹ºï£î¾ó‹ 110 A.«õ£ dìKL¼‰¶

àœ ªõO ð£¬îò£è Þó†¬ì„

²ŸÁ I¡ «è£¹ó‹ GÁM ÜF™

«ð‰î˜ è‹H ªè£‡´ Þó†¬ì„ ²ŸÁ

I¡ð£¬î ܬñˆî™

â‡, 100 

21-08-2019

103.395

1.5 A.e Éó‹

õ¬ôòŠð†®,

â¼ñˆîð†®

ü‹ºï£î¹ó‹,

¹¶‚«è£†¬ì

(ªè†®«ñ´) ñŸÁ‹

ܼA½œ÷ Aó£ñƒèœ

õNò£è I¡ð£¬î

ܬñˆî™

I¡ ªî£ì˜

ܬñŠH¡

«ñ‹ð£†®Ÿè£è

4

ªî£Š¹˜ 110 A.«õ£ ¶¬í I¡

G¬ôòˆFL¼‰¶ ªî£Š¹˜ óJ™«õ

®ó‚û¡ ¶¬í I¡ G¬ôòˆFŸ°

Þó†¬ì„ ²ŸÁ I¡ «è£¹ó‹ GÁM

ÜF™ «ð‰î˜ è‹H ªè£‡´

埬ø„²ŸÁ I¡ð£¬î ܬñˆî™

â‡, 396

 06-11-

2019

528.00

08.00 A.e Éó‹

ªî£ŠÌ˜, ªî£ŠÌ˜

óJ™«õ †ó‚û¡

¶¬í I¡ G¬ôò‹

ñŸÁ‹ ܼA½œ÷

Aó£ñƒèœ õNò£è

I¡ð£¬î ܬñˆî™

àò˜ó¿ˆî

I¡ê£ó‹ DCW

Ü®Šð¬ìJ™

M/s. ªî£Š¹˜

óJ™«õ ®ó‚û¡

GÁõùˆFŸ°

õöƒ°î™

TAMIL NADU GOVERNMENT GAZETTE

22

[Part VI—Sec.3(b)

5(i)

ãŸèù«õ Þ¼‰¶ õ¼‹ «êô‹

Cƒè¹ó‹ 230 A.«õ£ 埬ø„²ŸÁ

«è£¹ó 埬ø„²ŸÁ °‰î£ è‹H

I¡ð£¬îJ™ I¡ «è£¹ó‹ â¡.34

ºî™ 40 õ¬ó 230 A.«õ£ 𙲟Á

I¡ «è£¹ó‹ GÁM ÜF™ pŠó è‹H

ªè£‡´ 埬ø ²ŸÁ I¡ð£¬îò£è

ñ£ŸPòñˆî™ ðE

â‡, 5 

07-01-2019

468.225

2.50 A.e Éó‹

F™¬ôïè˜ ñŸÁ‹

ܼA½œ÷ Aó£ñƒèœ

õNò£è I¡ð£¬î

ܬñˆî™

I¡ªî£ì˜

ܬñŠH¡

«ñ‹ð£†®Ÿè£è

(ii)

«ñŸÃP»œ÷ 𙲟Á I¡ «è£¹óˆF™

è£Lò£è Þ¼‰¶ õ¼‹ I¡«è£¹ó

¬èJ™ (Free Arm) «ð‰î˜ è‹H

ªè£‡´ I¡ «è£¹ó â‡.3 ºî™

11 õ¬ó ¹Fòî£è ܬñòM¼‚°‹

F™¬ô ïè˜ 110/22 A.«õ£. ¶¬í

I¡G¬ôòˆFŸ° Þó†¬ì ²ŸÁ

I¡ð£¬î ܬñˆî™

39.850

2.50 A.e Éó‹

F™¬ôïè˜ ñŸÁ‹

ܼA½œ÷ Aó£ñƒèœ

õNò£è I¡ð£¬î

ܬñˆî™

(iii)

¹Fòî£è ܬñòM¼‚°‹ F™¬ôïè˜

110/22 A.«õ£ ¶¬í I¡G¬ôòˆFŸ°

I¡«è£¹ó ⇠11 L¼‰¶ 110

A.«õ£ 𙲟Á «è£¹ó‹ GÁM ÜF™

«ð‰î˜ è‹H ªè£‡´ Þó†¬ì ²ŸÁ

I¡ð£¬î ܬñˆî™.

310.185

4.50 A.e Éó‹

F™¬ôïè˜ ñŸÁ‹

ܼA½œ÷ Aó£ñƒèœ

õNò£è I¡ð£¬î

ܬñˆî™

6.

¹Fòî£è ܬñòM¼‚°‹ «ðÀ˜ 110/33

A.«õ£

¶¬í

I¡

G¬ôòˆFŸ°

àˆîùŠðœO 230 A«ô£ ¶¬í I¡

Þó†¬ì ²ŸÁ «è£¹ó‹ GÁM ÜF™ «ð‰î˜

è‹H ªè£‡´ 埬ø ²ŸÁ I¡ð£¬î

ܬñˆî™.

â‡, 17 

24-01-2019

1378.6

20.00 A.e Éó‹

àˆîùðœO «ðÀ˜

ñŸÁ‹ ܼA½œ÷

Aó£ñƒèœ õNò£è

ܬñˆî™.

I¡ ªî£ì˜

ܬñŠH¡

«ñ‹ð£†®Ÿè£è

7(i)

å¼ â‡E‚¬è KCR I¡«è£¹ó‹

GÁM æÅ˜ & °¼ðóðœO 110

A.«õ£ I¡ð£¬îJ¬ù àœ. ªõO

ªêŒ¶ M/s. ªî¡ & «ñŸ° Hó£‰Fò

ÞóJ™«õ 110/25 A.«õ£ †ó£‚û¡

¶¬í I¡ G¬ôòˆFŸ° Þó†¬ì

²ŸÁ I¡ ð£¬î ܬñˆî™

â‡, 77 

11-03-2020

18.00

0.10 A.e Éó‹;

M/S ªî¡ «ñŸ°

Hó£‰Fò ÞóJ™«õ

110/25 A.«õ£. æÅ˜

†ó£û¡ ܼA™

ܬñˆî™.

M/s. ªî¡ &

«ñŸ° Hó£‰Fò

ÞóJ™«õ

æÅ˜ î£Öè£

ªðƒèÙ¼

«è£†ì‹)

GÁõùˆFŸ°

DCW

Ü®Šð¬ìJ™

àò˜ I¡ê£ó‹

õöƒAì I¡ð£¬î

ܬñˆî™.

(ii)

«ñŸÃP»œ÷ «õ¬ôJ™ ܬñò ªðÁ‹

DP Structure L¼‰¶ ÞóJ™«õ 110/22

A.«õ£ †ó£‚vý¡ ¶¬í I¡

G¬ôò e†ìKƒ ð£J¡† õ¬ó Íôñ£è

I¡ð£¬î ܬñˆî™

194.647

0.40 A.e Éó‹

M/s. ªî¡ & «ñŸ°

Hó£‰Fò ÞóJ™«õ

110/25 A.«õ£ æÅ˜

†ó£‚vý¡ ¶¬í

I¡ G¬ôò‹ e†ìKƒ

ð£J¡† õNò£è

ܬñˆî™.

8.

¹Fòî£è ܬñòM¼‚°‹ ïˆî‚è¬ó

(AIR LIVAS) 110/22 A.«õ£ ¶¬í

I¡ G¬ôòˆFŸ° «îMò£°P„C

& î¬ôõ£ê™ & M¿Š¹ó‹ 110

A.«õ£ I¡ð£¬îJ¬ù àœ ªõO

ªêŒ¶ Þó†¬ì„²ŸÁ «è£¹ó‹ GÁM

«ð‰î˜ è‹H ªè£‡´ Þó†¬ì ²ŸÁ

I¡ð£¬î ܬñˆî™.

â‡, 99 

15-07-2020

410.306

1.50 A.e Éó‹

«îMò£°P„C,

ïˆî‚è¬ó î¬ôõ£ê™

ñŸÁ‹ ܼA½œ÷

Aó£ñƒèœ õNò£è

ܬñˆî™

¹Fòî£è

GÁõŠð†ìM¼‚°‹

AIRLIVAS

(Advanced

Integrated Institute

of Research on

Livestock and

Animal Science)

Ý󣌄C

¬ñòˆFŸ° DCW

Ü®Šð¬ìJ™

àò˜¿ˆî I¡ê£ó

õöƒ°î½‚è£è.

Mar. 10, 2021]

TAMIL NADU GOVERNMENT GAZETTE

23

«ñŸè£íŠð†ì F†ìƒèœ ðŸP ã«î‹ º¬øf´èœ Þ¼‰î£™ M¼Šð‹ àœ÷õ˜èœ ÞšõP‚¬è ªõOJ†ì ï£OL¼‰¶

Þó‡´ ñ£îˆFŸ°œ W«ö ¬èªò£ŠðI†ì ÜFè£KJì‹ 2003-Ý‹ ݇´ I¡ê£ó ê†ìŠHK¾ 164 ñŸø‹ 168-¡ð® º¬øJì

«õ‡ìŠð´Aø¶.

«êô‹&14.

Eක. A. NOWSHATH,

2021, HŠóõK 17.

«ñŸð£˜¬õ ªð£Pò£÷˜,

ªð£¶è†´ñ£ù õ†ì‹.

UNIVERSITY AUTHORITIES

îI›Š ð™è¬ô‚ èöè‹, î…ê£×˜

îI›Š ð™è¬ô‚èöè‹, î…ê£×˜ ݆C‚°¿MŸ°Š «ðó¬õˆ ªî£°FJL¼‰¶ Þ¼ àÁŠHù˜èœ

«î˜¾ ªêŒî™ ðŸPò ÜPM‚¬è.

꣟øPM‚¬è

(ï.è.â‡. 3899/è1/2020.)

No.VI-3(b)/7/2021.

îI›Š ð™è¬ô‚èöè„ ê†ì‹ HK¾ 21 (H) õ°Š¹ II(1)Þ¡ð®, îI›Š ð™è¬ô‚èöè ݆C‚°¿MŸ°Š «ðó¬õˆ ªî£°FJL¼‰¶

ܽõ™õN Ü™ô£î àÁŠHùó£è‚ W›è£μ‹ Þ¼õ˜ «î˜îL™ ªõŸP ªðŸÁœ÷ù˜ âù„ ꣟øŠð´Aø¶.

1.

º¬ùõ˜ è. 𲋪ð£¡,

ÝŒ¾ ÜPë˜, Þ‰Fò ªñ£NèO¡ ï´õ‡ GÁõù‹ ð£óîõ£E,

ï´õ‡ Üóê ñQîõ÷ «ñ‹ð£†´ˆ¶¬ø, ¬ñż

2.

º¬ùõ˜ «è. ñ«ù£èó¡, â‹.ã., â‹.H™. H.â†., H.â„.®,.

54, 5õ¶ ªî¼, â™.ä.C. è£ôQ «ñŸ° MKõ£‚è‹,

ñ¼ˆ¶õ‚è™ÖK ꣬ô, î…ê£×˜.

îI›Š ð™è¬ô‚ èöè ݆C‚°¿MŸ°, 29&12&2020 ºî™ Í¡ø£‡´èœ Ü™ô¶ Üõ˜èÀ¬ìò ð£¬îò «ðó¬õ àÁŠHù˜ ðîM‚è£ô‹

ÞõŸÁœ â¶ º‰Fò«î£ ܶõ¬ó àÁŠHùó£è Gòñù‹ ªêŒòŠð†´œ÷ù˜ âùˆ ªîKM‚èŠð´Aø¶.

îI›Š ð™è¬ô‚ èöè‹,

î…ê£×˜,

°. C¡ùŠð¡

2021 񣘄 2.

ðFõ£÷˜ (ªð£Áй).

UNIVERSITY OF MADRAS

Election of [1] six members to the syndicate by the senate from among its members and [2] four members to the

Academic council by the senate from among its members who are not engaged in teaching.

[No. V.1/SEN/ELEC/02-2021/084.]

No.VI-3(b)/8/2021.

It is hereby notifi ed that the election to [i] THE SYNDICATE and [ii] THE ACADEMIC COUNCIL will be held

under Section 18-1[a] - Other Members, sub-section [1] and section 23-1[a] - Other Members, sub-section [1] of the

Madras Unviersity Act, 1923 respectively.

[i]

TO THE SYNDICATE (Section 18-1[a] - Other Members, Sub-Section [1] SIX MEMBERS to be elected by

the Senate from among its members.

The newly elected member will hold offi ce as member of the Syndicate for a period of three years from the last

date of receipt of nomination / date of withdrawal i.e., from 31-03-2021 to 30-03-2024 or till the date of cessation of

his/her membership in the Senate-Academic Council whichever is earlier.

TAMIL NADU GOVERNMENT GAZETTE

24

[Part VI—Sec.3(b)

PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI

ON BEHALF OF THE GOVERNMENT OF TAMIL NADU

[ii]

TO THE ACADEMIC COUNCIL (Section 23-1[a] - Other Members, Sub-Section [1] FOUR MEMBERS to be elected

by the Senate from among its members who are not engaged in teaching.

The newly elected members will hold offi ce as member of the Academic Council for a period of three years from the

date of receipt of nomination / the date of withdrawal / the date of election/the date of declaration of results whichever

is applicable for the election.

The above election will be conducted on the date of the Annual Meeting of the Senate Scheduled to be held on

SATURDAY, the 27th MARCH 2021.

University Buildings,

Chepauk, Chennai-600 005,

Dක. N. MATHIVANAN,

2nd March 2021.