DTP—III-2 (25)
TAMIL NADU
GOVERNMENT GAZETTE
PUBLISHED BY AUTHORITY
No. 25]
CHENNAI, WEDNESDAY, JUNE 23, 2021
Aani 9, Pilava, Thiruvalluvar Aandu – 2052
[29 ]
Part III—Section 2
Statutory Notifi cations and Orders issued by
Heads of Departments.
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
©
[Regd. No. TN/CCN/467/2012-14.
GOVERNMENT OF TAMIL NADU
[R. Dis. No. 197/2009.
2021
[Price : Rs. 2.40 Paise.
CONTENTS
INDIAN RAILWAYS
Energisation of Newly erected Omalur and Mecheri Road Stations in Salem Division of
Southern Railway
..
..
..
..
..
..
..
..
30
Energisation of Newly Provided Singaperumal Koil Station and Chengalpattu Station in
Chennai Division of Southern Railway
..
..
..
..
..
..
31
Energisation of Newly erected Tambaram (TBM) and Guduvancheri (GI) Stations in Chennai
Division of Southern Railway
..
..
..
..
..
..
..
32
Energisation of Newly erected Velachery and Adambakkam Stations in Chennai Division of
Southern Railway
..
..
..
..
..
..
..
..
33
Pages.
30
TAMIL NADU GOVERNMENT GAZETTE
[Part III—Sec. 2
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
______
INDIAN RAILWAYS
Energisation of Newly erected Overhead equipments on the proposed Down line between Omalur and Mecheri road
stations from loc. 08/1 (ch. 8/22.90) to loc. 20/30 (ch.20/714.50) in connection with the doubling of track between Salem
and Mettur Dam in Salem Division of Southern Railway.
(No. E 320/X/CRS vol.XIII/01)
(Proforma 10-01)
"PUBLIC NOTIFICATION"
No. SRO C-9/2021.
Notice is hereby given to all users of Railway lines and premises situated on the completed section of the under
noted sections of Southern Railway that the 25000 Volts. 50 Hz, ac overhead traction wires will be energised on or
after the date specifi ed against the Section. On and from the same date the overhead traction lines shall be treated
as “LIVE” at all times and no unauthorised person shall approach or work in the proximity of the said overhead lines.
Section
Date
Newly erected Overhead equipment on the proposed Down line between Omalur and Mecheri road
stations from loc. 08/1 (ch. 8/22.90) to loc. 20/30 (ch.20/714.50) in connection with the doubling
of track between Omalur and Mecheri Road and Salem Division of Southern Railway.
20.12.2020
Chennai Egmore-600 008,
A. NOUSHAD,
16th June 2021.
Chief Electrical Engineer/OHE,
Southern Railway Construction.
(No. E 320/X/CRS/vol.XIII/01)
INTRODUCTION OF AC 25 kV TRACTION
(Proforma 10-02)
“WARNING TO ROAD USERS”
No. SRO C-10/2021.
It is notifi ed for information of the public that in connection with introduction of 25 kV ac electric traction over the
section of newly laid Down line between Omalur and Mecheri road stations from loc. 08/1 (ch. 8/22.90) to loc. 20/30
(ch.20/714.50) in connection with the doubling of track between Salem and Mettur Dam in Salem Division of Southern
Railway, height gauges have been erected at all the level crossings with clear maximum 4.78m above road level with a
view to prevent loads of excessive height from coming into contact or dangerous proximity to live traction wire (Contact
wire), which shall be at a height of minimum 5.5m above the rail level at level crossings.
Public are hereby notifi ed to observe the height specifi ed above for the purpose of loading vehicles and to see that
the loads carried in road vehicles do not infringe the height gauges under any circumstances.
The dangers of a load of excessive height are as follows :
(i)
Danger to the height gauge and consequent obstruction to the road as well as the Railway line.
(ii) Danger to the materials or equipment carried or for the Vehicle itself.
(iii) Danger of fi re and risk of life due to contact with or in dangerous proximity to the conductors.
File No. E320/X/CRS Vol.XIII,
A. NOUSHAD,
Chennai Egmore-600 008,
Chief Electrical Engineer/OHE,
16th June 2021.
Southern Railway Construction.
June 23, 2021]
TAMIL NADU GOVERNMENT GAZETTE
31
Energisation of newly provided Overhead equipment on the proposed 3rd line between Singaperumal Koil
station and Chengalpattu station from loc. 52/8B (km/ch. 52/202.65) to loc. 58/28A (km/ch. 58/777.30) as a part
of laying of 3rd line between Tambaram and Chengalpattu in Chennai Division of Southern Railway.
(No. E 320/X/CRS vol.XIII/01)
(Proforma 10-01)
"PUBLIC NOTIFICATION"
No. SRO C-11/2021.
Notice is hereby given to all users of Railway lines and premises situated on the completed section of the under
noted sections of Southern Railway that the 25000 Volts 50 Hz, ac overhead traction wires will be energised on or
after the date specifi ed against the section. On and from the same date the overhead traction lines shall be treated
as “LIVE” at all times and no unauthorised person shall approach or work in the proximity of the said overhead lines.
Section
Date
Newly erected Overhead equipment on the proposed 3rd line between Singaperumal koil station and
Chengalpattu station from loc. 52/8B (km/ch. 52/202.65) to loc. 58/28A (km/ch. 58/777.30) as a part
of laying of 3rd line between Tambaram and Chengalpattu in Chennai Division of Southern Railway.
15.01.2021
Chennai Egmore-600 008,
A. NOUSHAD,
16th June 2021.
Chief Electrical Engineer/OHE,
Southern Railway Construction.
(No. E 320/X/CRS vol.XIII/01)
INTRODUCTION OF ac 25 kV TRACTION
(Proforma 10-02)
“WARNING TO ROAD USERS”
No. SRO C-12/2021.
It is notifi ed for information of the public that in connection with introduction of 25 kV ac electric traction over
the section of newly erected Overhead equipment on the proposed 3rd line between Singaperumal koil station and
Chengalpattu station from loc. 52/8B (km/ch. 52/202.65) to loc. 58/28A (km/ch. 58/777.30) as a part of laying of 3rd
line between Tambaram and Chengalpattu in Chennai Division of Southern Railway, height gauges have been erected
at all the level crossings with clear height of maximum 4.78m above and road level with a view to prevent loads of
excessive height from coming into contact or dangerous proximity to live traction wire (Contact wire), which shall be at
a height of minimum 5.5m above the rail level at level crossings.
Public are hereby notifi ed to observe the height specifi ed above for the purpose of loading vehicles and to
see that the loads carried in road vehicles do not infringe the height gauges under any circumstances.
The dangers of a load of excessive height are as follows :
(i)
Danger to the height gauge and consequent obstruction to the road as well as the Railway line.
(ii) Danger to the materials or equipment carried or for the Vehicle itself.
(iii) Danger of fi re and risk of life due to contact with or in dangerous proximity to the conductors.
File No. E320/X/CRS Vol.XIII,
A. NOUSHAD,
Chennai Egmore-600 008,
Chief Electrical Engineer/OHE,
16th June 2021.
Southern Railway Construction.
DTP—III-2 (25)—1a
32
TAMIL NADU GOVERNMENT GAZETTE
[Part III—Sec. 2
Energisation of Newly erected Overhead equipment on the proposed Third line between Tambaram (TBM) and
Guduvancheri (GI) stations from location TBM/2057 (chainage 29/335.50) to location 39/30B
(chainage 39/914.30) in connection with laying of 3rd line between Tambaram - Chengalpattu section in
Chennai Division of Southern Railway.
(No. E 320/X/CRS vol.XIII/01)
(Proforma 10-01)
"PUBLIC NOTIFICATION"
No. SRO C-13/2021.
Notice is hereby given to all users of Railway lines and premises situated on the completed section of the under
noted sections of Southern Railway that the 25000 Volts. 50 Hz, ac overhead traction wires will be energised on or
after the date specifi ed against the sections. On and from the same date the overhead traction lines shall be treated
as “LIVE” at all times and no unauthorised person shall approach or work in the proximity of the said overhead lines.
Section
Date
Newly erected Overhead equipment on the proposed Third line between Tambaram (TBM) and
Guduvancheri (GI) stations from location TBM/2057 (chainage 29/335.50) to location 39/30B (chainage
39/914.30) in connection with laying of 3rd line between Tambaram-Chengalpattu section in CHENNAI
Division of SOUTHERN RAILWAY.
28.02.2021
Chennai Egmore-600 008,
A. NOUSHAD,
16th June 2021.
Chief Electrical Engineer/OHE
Southern Railway Construction.
(No. E 320/X/CRS vol.XIII/01)
INTRODUCTION OF ac 25 kV TRACTION
(Proforma 10-02)
“WARNING TO ROAD USERS”
No. SRO C-14/2021.
It is notifi ed for information of the public that in connection with introduction of 25 kV ac electric traction
over the section of newly laid third line between Tambaram (TBM) and Guduvancheri (GI) stations form location
TBM/2057 (chainage 29/335.50) to location 39/30B (chainage 39/914.30 in connection with laying of 3rd line between
Tambaram-Chengalpattu section in Chennai Division of Southern Railway, the height gauges have been erected at all
the level crossings with clear maximum height 4.78m above road level with a view to prevent Loads of excessive
height from coming into contact or dangerous proximity to live traction wire (contact wire), which shall be at a height
of minimum 5.5m above the rail level at level crossings.
Public are hereby notifi ed to observe the height specifi ed above for the purpose of loading vehicles and to
see that the loads carried in road vehicles do not infringe the height gauges under any circumstances.
The dangers of a load of excessive height are as follows :
(i)
Danger to the height gauge and consequent obstruction to the road as well as the Railway line.
(ii) Danger to the materials or equipment carried or for the Vehicle itself.
(iii) Danger of fi re and risk of life due to contact with or in dangerous proximity to the conductors.
File No. E320/X/CRS Vol.XIII,
A. NOUSHAD,
Chennai Egmore-600 008,
Chief Electrical Engineer/OHE,
16th June 2021.
Southern Railway Construction.
June 23, 2021]
TAMIL NADU GOVERNMENT GAZETTE
33
Energisation of Newly erected Overhead equipments on the proposed MRTS UP line between Velachery and
Adambakkam stations from loc. 19/35A (Km/ch. 19/566.65) to loc. 22/47 (Km/ch.22/721.90) in connection with the
extension of UP line MRTS service from Velachery to Adambakkam in
Chennai Division of Southern Railway.
(No. E 320/X/CRS/vol.XIII)
(Proforma 10-01)
"PUBLIC NOTIFICATION"
No. SRO C-15/2021.
Notice is hereby given to all users of Railway lines and premises situated on the completed section of the under
noted sections of the Southern Railway that the 25000 Volts. 50 Hz, ac overhead traction wires will be energised on or
after the date specifi ed against the section. On and from the same date the overhead traction lines shall be treated
as “LIVE” at all times and no unauthorised person shall approach or work in the proximity of the said overhead lines.
Section
Date
Newly erected Overhead equipment on the proposed MRTS UP line between Velachery and
Adambakkam sations from loc. 19/35A (Km/ch. 19.566.65) to loc. 22/47 (Km/ch.22/721.90) in
connection with the extension of UP line MRTS service from Velachery to Adambakkam in Chennai
Division of Southern Railway.
31.10.2021
Chennai Egmore-600 008.
A. NOUSHAD,
16th June 2021.
Chief Electrical Engineer/OHE,
Southern Railway Construction.
PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI
ON BEHALF OF THE GOVERNMENT OF TAMIL NADU