[ 95]
TAMIL NADU
GOVERNMENT GAZETTE
PUBLISHED BY AUTHORITY
No. 38]
CHENNAI, WEDNESDAY, SEPTEMBER 22, 2021
Purattasi 6, Pilava, Thiruvalluvar Aandu–2052
©
[Regd. No. TN/CCN/467/2012-14
GOVERNMENT OF TAMIL NADU
[R. Dis. No. 197/2009.
2021
[Price : Rs. 2.40 Paise.
Part III—Section 1(a)
General Statutory Rules, Notifi cations, Orders, Regulations, etc.,
issued by Secretariat Departments.
NOTIFICATIONS BY GOVERNMENT
CONTENTS
DTP—III-1(a)-(38)—1
Pages.
INDUSTRIES DEPARTMENT
Amendments to the Tamil Nadu Minor Mineral Concession Rules.
..
..
96-100
96-100
96
TAMIL NADU GOVERNMENT GAZETTE
[Part III-Sec.1(a)
NOTIFICATIONS BY GOVERNMENT
INDUSTRIES DEPARTMENT
Amendments to the Tamil Nadu Minor Mineral Concession Rules.
[G.O. Ms. No. 213, Industries (MMC.1), 3rd September 2021,
ÝõE 18, Hôõ, F¼õœÀõ˜ ݇´&2052.]
No.SRO A-16/2021.— In exercise of the powers conferred by sub-sections (1) and (1A) of Section 15 of the
Mines and Minerals (Development and Regulation) Act, 1957 (Central Act 67 of 1957), the Governor of Tamil Nadu hereby
makes the following amendments to the Tamil Nadu Minor Mineral Concession Rules, 1959, namely:-
Aඕඍඖඌඕඍඖගඛ
In the said Rules,
(1) after rule 43, the following rule 44 shall be added, namely:-
"44. Removal of earth for betterment of agricultural lands (1) Notwithstanding anything contained in rule 18 and
sub-rule (2) of rule 19, extraction or removal of earth in ryotwari lands manually for improvement of agricultural lands or lands
that are not suitable for cultivation purpose, for an optimum depth based on the topographical condition to be specified by
the Assistant Director of Geology and Mining or Deputy Director of Geology and Mining, as the case may be, not exceeding
one-and-a-half metres shall not be treated as mining activity:
Provided that such extraction of earth shall be carried out under a permit issued for a period not exceeding three months
by the District Collector concerned:
Provided futher that the soil excavated approximately upto 1 feet depth from the top may be used/replaced for improving
the soil structure or fertility of lands where continuous cultivation is under taken for several decades without using organic
manures and where soil nutrients got depleted which resulted in lesser yield:
Provided further that the soil extracted or removed beneath one feet depth exceeding one-and-a-half metres may also
be used for brick kilns, beeding material for soils that were disturbed by natural calamities including floods, etc., so that
vegetation in those areas can be re-established:
Provided further that if the brick earth removed is transported to a registered brick kiln unit, the permit holder
shall pay due seigniorage fee for the quantum of brick earth removed from the permitted area at the rate fixed in
Appendix - II to these rules:
Provided further that the permit holder may use the earth so removed for own consumption, for betterment of his own
land or for any other purpose:
Provided also that the permit holder shall not remove earth after expiry of the permit period.
(2) For improvement of an agricultural land, the owner of the land may apply for permit for removal of earth.
An application for the purpose shall be made to the District Collector in the Form prescribed in Appendix - XXV along with
a plan for removal of earth.
(3) The plan for removal of earth shall contain the following details, namely:-
(i)
the area showing the nature and extent of the land;
(ii)
period and quantum of earth proposed for extraction;
(iii) a certificate to the effect that the proposal is for making the land fit for cultivation, after extraction of earth obtained
from the Joint Director of Agriculture.
(4) Every such application shall be accompanied with an application fee of one hundred rupees along with a
copy of computerised chitta or copy of the latest sale deed registered in the name of the applicant along with extracts of
Village accounts.
DTP—III-1(a)-(38)—1a
Sep. 22, 2021]
TAMIL NADU GOVERNMENT GAZETTE
97
(5) The District Collector shall dispose of the application for extraction of earth in ryotwari lands after ascertaining of
objections, if any. He shall obtain No Objection Certificate from the jurisdictional Revenue Divisional Officer to ensure the
genuineness of the patta of the land applied for and non-inclusion of any Government land or Government interest, including
land acquisition before grant of permit for extraction of earth. The District collector may issue permit under this rule for a
period not exceeding three months, subject to the following conditions, namely:-
(i) Extraction of earth shall be carried out without affecting the interest of the adjoining land owners.
(ii) Extraction of earth shall not be done within a distance of 10 metres from the Village road and
cart track and distance of 50 metres from the highways, railway lines, river, reservoir, tanks and any other permanent
structures.
The District Collector shall also impose terms and conditions as per provisions of the Act and these rules or guidelines,
in the permit.
(6) The Assistant Director of Geology and Mining or Deputy Director of Geology and Mining, as the case
may be, shall inspect the applied area and decide the optimum depth and the quantum of extraction of earth
based on the topographical condition to be permitted, not exceeding one-and-a- half metres. The District
Collector concerned shall ensure that the material proposed to be removed is not sand or gravel, after appropriate
testing in the laboratories authorised by the Director of Geology and Mining. Every permit issued under this rule
shall be entered in the register maintained for the purpose by the Assistant Director of Geology and Mining or
Deputy Director of Geology and Mining.
(7) The permit holder shall also pay contribution to the District Mineral Foundation Trust Fund at the rate fixed under the
Tamil Nadu District Mineral Foundation Rules, 2017.
(8) The excavated brick earth shall be transported to the Brick Manufacturing Unit along with the transport slip,
as prescribed in Appendix-XXVI to these Rules issued by the Assistant Director of Geology and Mining or Deputy Director
of Geology and Mining.
(9) The permit issued under this rule shall be a one time permit and shall not be revalidated for any reason.
(10) The permit under this rule shall not be granted for removal of earth in area falling under “Hill areas” specified
by the Government, from time to time and ‘Protected areas’ falling within 10 Kilometres from the Wildlife Sanctuaries
and National Parks and in Elephant Corridors. The No objection Certificate to this effect shall be obtained from the
District Forest Officer concerned.
(11) If any mineral other than earth such as sand or gravel are found to occur during extraction within the
permitted depth, the permit holder shall stop the extraction works immediately and intimate the same to the
District Collector concerned.
(12) The District Collector concerned, on receipt of report or otherwise on the occurrence of any minerals other than
earth such as sand or gravel shall cancel the permit.
(13) If there is any contravention of the conditions of the permit, penal action will be initiated against the permit holder
under the provisions of the Act and these Rules.
(14) In case of breach of the conditions of permit by the permit holder, without prejudice to any other penalty which
may be imposed in respect of such breach, the District Collector shall cancel the permit after providing an opportunity of
hearing to the permit holder.
(15) Any person aggrieved by an order of the District Collector may, within thirty days from the date of receipt of
the order, prefer an appeal to the Director of Geology and Mining against the order.
(16) The District Level Task Force formed for prevention of illegal mining / transportation of minerals by the Government
shall monitor the areas wherein permits are granted, to ensure compliance of the conditions stipulated under this rule."
98
TAMIL NADU GOVERNMENT GAZETTE
[Part III-Sec.1(a)
(2) After APPENDIX-XXIV, the following Appendices shall be added, namely:-
“APPENDIX-XXV
[see rule 44(2)]
APPLICATION FOR SHORT TERM PERMIT TO EXTRACT EARTH BY THE LAND OWNER
From
To
The District Collector,
----------------------------.
Sir,
I / We submit this application under rule 44 of the Tamil Nadu Minor Mineral Concession Rule, 1959
2. I / We request that a short term permit for removal of earth from my patta lands may be granted.
3. The required particulars are given below :
1
Name of the applicant with full address
:
2
Particulars of challan for remittance of application
Fee
:
3
Has the applicant fi led an affi davit stating that
the applicant has paid all the mining dues to the
Government?
:
4
Location of the area applied for the short term
permit.
:
Taluk
Village
S.F.No.
Extent (in hectares)
5
Does the applicant have full ownership/
rights over the land proposed? (copies of
computerised chitta to be attached)
:
6
Period applied for
:
7
Quantity applied for
(in cbm)
:
8
Plan of extraction to be attached.
:
9
Undertaking that the proposed land is not falling
under “Hill areas” specified by the Government,
from time to time or 10 kilometres from Wildlife
sanctuaries or National Parks or in elephant
corridors.
:
10
Purpose of extraction and mode of disposal.
:
11
Undertaking that the applicant will extract not
more than one-and-a-half metres as per the
plan of extraction submitted.
I / We do hereby declare that the particulars furnished above are correct and am / are ready to furnish any other
details as may be required by the District Collector or the Deputy Director/ Assistant Director of Geology and Mining.
Place:
Yours faithfully,
Date:
(Signature of the applicant)
Sep. 22, 2021]
TAMIL NADU GOVERNMENT GAZETTE
99
APPENDIX-XXVI
[see rule 44 (8)]
TRANSPORT SLIP FOR BRICK EARTH
(1)
SI.No.
:
(2)
Name and address of the permit
holder
:
(3)
Order No. and date of grant of
short term permit issued by the
District Collector concerned.
:
(4)
Period of validity of short term permit
From -------------------
To -----------------------
(5)
Location of the excavation site
:
Taluk
Village
S.F.No.
Extent (in hectares)
6)
Details of No Objection
Certifi cate issued by
Revenue Divisional Offi cer.
:
(7)
Details of No Objection
Certifi cate issued by
District Forest Offi cer.
:
(8)
Quantity of brick earth
permitted for transportation.
:
(9)
Location and address of the
brick kiln to which the brick
earth is transported.
:
(a) Mode of transportation
:
(b) Registration No. of
Lorry / Tractor
:
(10)
Route of transport and
approximate distance to the
destination.
:
(11)
(a) Date and time at which
the vechicle left the place
of excavation.
:
(b) Approximate time
expected for transport
:
(c) Signature of the driver of
the vehicle transporting
brick earth (should be
signed before the vehicle
leaves the excavation
site)
:
Signature of the short term permit holder with
seal or the authorised person issuing the
transport slip in the excavation site.
Signature and date of the Assistant Director
of Geology and Mining / Deputy Director of
Geology and Mining with offi ce seal.
100
TAMIL NADU GOVERNMENT GAZETTE
[Part III-Sec.1(a)
CONDITIONS.
1. This Transport slip is intended for transportation of brick earth to the registered brick kiln units only.
2. This Transport slip is not transferable.
3. This Transport slip cannot be revalidated.
4. A copy of this Transport slip should be kept in the excavation site with the short term permit holder or
with the person authorised by the short term permit holder in this behalf.
5. The driver of the vehicle should be in possession of the Transport slip. The Transport slip should be
shown to any authorised offi cer cheking the vehicle in which the brick earth is transported".