[ 165 ]

TAMIL NADU

GOVERNMENT GAZETTE

PUBLISHED BY AUTHORITY

©

[Regd. No. TN/CCN/467/2012-14.

GOVERNMENT OF TAMIL NADU

[R. Dis. No. 197/2009.

2021

[Price : Rs. 8.00 Paise.

DTP—VI-2 (42)

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

CONTENTS

No. 42]

CHENNAI, WEDNESDAY, OCTOBER 20, 2021

Aippasi 3, Pilava, Thiruvalluvar Aandu–2052

Part VI—Section 2

Notifications of interest to a section of the public

issued by Heads of Departments, etc.

Pages.

Pages.

TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI-600 032

The Tamil Nadu Electricity Regulatory Commission (Grid Interactive Solar PV Energy

Generating Systems) Regulations, 2021 ..

..

..

..

..

166-183

166-183

GOVERNMENT EXAMINATIONS / EDUCATIONAL OFFICERS

GOVERNMENT EXAMINATIONS / EDUCATIONAL OFFICERS

Loss of Certifi cates .. .. .. .. .. .. ..

..

Loss of Certifi cates .. .. .. .. .. .. ..

..

184

184

TAMIL NADU GOVERNMENT GAZETTE

166

[Part VI—Sec. 2

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI-600 032

The Tamil Nadu Electricity Regulatory Commission (Grid Interactive Solar PV Energy Generating Systems)

Regulations, 2021.

(Notifi cation No. TNERC/GISS Regn.23-1/ Dated 07.10.2021)

(Lr. No. TNERC/DD(L)/F.Notifi cation/D.No. 708/2021)

No. VI(2)/108/2021.

WHEREAS under Section 61 of the Electricity Act, 2003 (Central Act 36 of 2003) the State Electricity Regulatory

Commission shall specify the terms and conditions for the determination of tariff ;

AND WHEREAS the regulations providing for the terms and conditions for determination of tariff shall be subject

to previous publication and accordingly undergone previous publication;

AND WHEREAS the Government of India has notifi ed the Electricity (Rights of Consumers) Rules, 2020 and further

notifi ed the Electricity (Rights of Consumers) Amendment Rules, 2021 in exercise of powers conferred by Section 176

of the Electricity Act 2003 requiring the State Commissions to lay down regulations;

NOW, THEREFORE, in exercise of the powers conferred under Section 61(h) read with Section 86(1)(e) and

Section 181 of the said Electricity Act, 2003, and all other powers enabling it in that behalf, the Tamil Nadu Electricity

Regulatory Commission hereby makes the following regulations.

REGULATIONS

1.

Short title, and commencement

1.1

These Regulations may be called the Tamil Nadu Electricity Regulatory Commission (Grid Interactive Solar

PV Energy Generating Systems) (GISS) Regulations, 2021.

1.2

These Regulations shall extend to the whole of the State of Tamil Nadu.

1.3

These Regulations shall be applicable for loads of less than 1MW

1.4

These Regulation are applicable to eligible consumers, prosumers and generators.

1.5

These Regulations shall come into force from the date of the publication in the Tamil Nadu Government Gazette.

2.

Defi nitions

2.1. In these Regulations, unless the context otherwise requires,

(a) “Act” means the Electricity Act, 2003 (36 of 2003) as amended from time to time ;

(b) “Agreement” means a connection agreement entered into between the Distribution Licensee and the

consumer / prosumer / generator;

(c) “Area of supply” means the geographic area within which the licensee, for the time being, is authorized

by its License to supply electricity;

(d) “Billing Cycle” or “Billing Period” means the period for which the electricity bill is raised by the

concerned Distribution Licensee;

(e) “Check Meter” means a meter, used for accounting and billing of electricity in case of failure of Net

Meter or Solar Generation Meter;

(f)

“Commission” means the Tamil Nadu Electricity Regulatory Commission constituted under the Act;

(g) “Contracted Load or “Sanctioned Load” means the load specifi ed in the agreement between the

consumer and the Licensee engaged in the business of supplying electricity to him;

(h) “Contracted demand ” means the demand specifi ed in the agreement between the consumer and the

Licensee engaged in the business of supplying electricity to him;

Oct. 20, 2021]

TAMIL NADU GOVERNMENT GAZETTE

167

(i)

“Contracted capacity” means the solar plant capacity (capacity of GISS) sanctioned by the licensee

and included in the contracted agreement signed between the licensee and the eligible consumer /

prosumer / generator;

(j)

“Days” means clear working days;

(k) “Distribution licensee” or “licensee” means a person granted a license under Section 14 of the Act

authorizing him to operate and maintain a distribution system for supplying electricity to the consumers

in his area of supply;

(l)

“Electricity Supply Code” means the Tamil Nadu Electricity Supply Code, 2004 and subsequent

amendments thereof;

(m) “Eligible Consumer” means a consumer of electricity in the area of supply of the Distribution Licensee

who uses or intends to use a Grid Interactive Solar PV System having a capacity less than 1 MW,

subject to conditions in capacity / category / voltage level specifi ed in the regulations;

(n) “Generic Tariff ” means the Generic Tariff approved or adopted by the Commission for generation from

diff erent Renewable Energy sources in accordance with the Tamil Nadu Electricity Regulatory Commission

(Power Procurement from New and Renewable Sources of Energy Regulations, 2008) as amended from

time to time;

(o) “Generator” means any person or company or body corporate or association or body of individuals,

whether incorporated or not, or artifi cial juridical person, which owns or operates or maintains a generating

station;

(p) “Generate” means to produce electricity from a generating station for the purpose of giving supply to

any premises or enabling a supply to be so given;

(q) “Generating Station” or “Station” means any station for generating electricity, including any building

and plant with step-up transformer, switchgear, switch yard, cables or other appurtenant equipment, if

any, used for that purpose and the site thereof;

(r)

“Financial Year” or “Year” means the period beginning from fi rst (1st) of April in an English calendar

year and ending on thirty fi rst (31st) of March of the next year;

(s) GISS means “Grid Interactive Solar Photovoltaic Energy Genarating Plant / System” installed on the

rooftops or land of consumer / prosumer / generator premises that uses sunlight for direct conversion

into electricity through photo voltaic technology;

(t)

“Gross-metering” means a mechanism whereby the total solar energy generated from Grid Interactive

Solar Photovoltaic system of a prosumer and the total energy consumed by the prosumer are accounted

separately through appropriate metering arrangements and for the billing purpose, the total energy

consumed by the prosumer is accounted at the applicable retail tariff and total solar power generated

is accounted for at feed-in tariff determined by the Commission;

(u) “Inter-connection Point” means the interface of the GISS with the outgoing terminals of the meter /

Distribution Licensee’s cut-outs/switchgear fi xed in the premises of the Eligible Consumer:

Provided that, in the case of an Eligible Consumer connected at the High Tension (‘HT’) level, the

‘Inter-connection Point’ shall mean the interface of the GISS with the outgoing terminals of the Distribution

Licensee’s metering cubicle placed before such Consumer’s apparatus;

(v) “kWp” means kilo Watt peak; “MWp” means Mega Watt peak;

(w) “Net meter” or “bidirectional meter” means an energy meter which is capable of recording both

import and export of electricity;

(x) “Net-metering” means a mechanism whereby solar energy exported to the Grid from Grid Interactive

Solar Photovoltaic system of a Prosumer is deducted from energy imported from the Grid in units

(kWh) to arrive at the net imported or exported energy and the net energy import or export is billed or

credited or carried-over by the distribution licensee on the basis of the applicable retail tariff by using

a single bidirectional energy meter for net-metering at the point of supply;

TAMIL NADU GOVERNMENT GAZETTE

168

[Part VI—Sec. 2

(y) “Net work charges” means and includes all charges besides incidental charges incurred by the Licensee

for creating, developing and maintaining the network for its functions and operations that includes providing

the essential grid support to the Grid interactive Renewable Energy Systems for its dependant parallel

operation without which such Grid interactive system cannot operate independently;

(z) “Net-billing or Net feed-in” means a single bidirectional meter used for net-billing or net feed-in at

the point of supply Grid Interactive Solar PV Energy Generating Systems are valued at two diff erent

tariff s, Where-

(i)

the monetary value of the imported energy is based on the applicable retail tariff ;

(ii)

the monetary value of the exported solar energy is based on feed-in tariff determined by the

Commission;

(iii) The monetary value of the exported energy is deducted from the monetary value of the imported

energy to arrive at the net amount to be billed ( or credited / carried over );

(aa) “Obligated Entity” means an entity required to fulfi ll a Renewable Purchase Obligation (‘RPO’) as

specifi ed by the Commission in Regulations governing such Obligation (‘the RPO Regulations’);

(ab) “Prosumer” means a person who consumes electricity from the grid and can also inject electricity into

the grid for distribution licensee, using same point of supply;

(ac) “Premises” means and includes roof-tops or any areas on the land, building or infrastructure or part

or combination thereof in respect of which a separate meter has been provided by the Distribution

Licensee for the supply of electricity;

(ad) “Renewable Energy Generation Meter” means a unidirectional energy meter installed at the point at

which the electricity generated by solar energy generating system for the purpose of accounting and

settlement:

Provided that a separate Renewable Energy Generation Meter shall be installed for each source of

Renewable Energy in case of hybrid or combination of such sources;

(ae) “Renewable Energy Certifi cate’’ shall be as defi ned in Tamil Nadu Electricity Regulatory Commission

(Renewable Purchase Obligation) Regulations, 2010;

(af) “Settlement Period” means the period beginning from the fi rst day of April of a calendar year and

ending with the thirty-fi rst day of March of the following calendar year:

Provided for a newly commissioned solar power system, the fi rst settlement period shall be from the

date of commissioning to March of next year;

Words and expressions used in these Regulations which are not specifi cally defi ned herein but are

defi ned in the Act shall have the meaning assigned to them in the Act; and if not defi ned in the Act,

shall have the meaning assigned to them in any Act of Parliament or the State Legislature applicable

to the electricity industry;

3.

Scope and Applicability

3.1 These Regulations shall apply to the distribution licensee and consumers of electricity of distribution

licensee availing supply from it in its area of supply and generators setting up GISS based solar power

generating station in the State of Tamil Nadu;

3.2

These Regulations shall be applicable to all Grid Interactive Solar PV Energy Generating Systems for

which applications are preferred after notifi cation of this regulation;

3.3

The Eligible Consumer and generator may install GISS (Grid Interactive Solar PV Energy Generating

System) based solar power generating station under net-metering or net-billing or gross-metering arrangement

which,

(a) shall be within the permissible rated capacity as defi ned under these Regulations;

(b) shall interconnect and operate safely in parallel with the distribution licensee network in accordance

with all relevant codes and regulations;

Oct. 20, 2021]

TAMIL NADU GOVERNMENT GAZETTE

169

4.

Eligible consumers, generators and individual project capacity

4.1 The capacity of the GISS (Grid Interactive Solar PV Energy Generating System) shall be represented

by AC output capacity and shall be reckoned by the recorded demand in the Gross generation meter;

4.2 Net-metering : All domestic consumers are eligible for Net metering mechanism up to the level of

sanctioned load/ contracted demand of their service connection irrespective of voltage level;

(i)

Domestic consumers have an additional option of choosing the net- feed in Mechanism;

(ii)

Domestic consumers who have been provided with the solar net-feed in facility shall have option

to migrate to the solar net-metering mechanism;

4.3 Net billing or Net feed-in : All categories of consumers (except Hut & Agriculture) irrespective of load,

tariff and voltage level are eligible for net-billing or net feed-in mechanism up to the level of sanctioned

load / contracted demand of their service connection (or) 999kW whichever is lower;

4.4 Gross- metering: The existing and new consumers of all categories except Low Tension category up

to 150 kW and generators are eligible for gross metering mechanism irrespective of tariff . The minimum

size of the Solar System that can be set up under Gross Metering mechanism shall be 151 kW up to

a maximum capacity of 999 kW;

(i)

New consumers or generators who desire to set up GISS based solar power generating station in a

premises or an open area and sell entire generated power to Licensee are eligible for gross metering

mechanism up to a maximum capacity of 999 kW. The sanctioned load/ contracted demand do not arise

for such cases. If power from grid is required for purposes like security in night hours etc., the same

shall be eligible with separate accounting and billing under appropriate retail tariff :

Provided that the installation of gross-metered GISS on the eligible consumer premises intending to inject

its total generated power from generating station into the Licensee grid shall use separate service line

for evacuation of power to the nearest High Tension network. Such service line for evacuation of power

up to the nearest HT network of same voltage including any building and plant with step-up transformer,

switchgear, switch yard, cables or other appurtenant equipment, if any, used for that purpose shall be

laid and maintained by the eligible consumer at his own cost:

(ii)

The eligible consumer/generator shall facilitate the Licensee to remotely control the incoming switch and

breaker to the GISS station for instant operation during emergency to ensure safety and grid stability.

The eligible consumer/generator shall also provide Automatic Meter Reading facility;

4.5 The Solar plant capacity in all categories shall be represented by the output capacity on AC side;

4.6 Addition of capacity of DC panel is left to the option of eligible consumer / prosumer / generator to the

extent of the sanctioned GISS plant capacity (AC output capacity) which will be reckoned by the AC

output demand reached and recorded in the Gross Generation meter for the given billing cycle. For less

than 10 kW system the demand reached shall be assessed from the inverter reading;

4.7 The applicant shall be a consumer of the local distribution licensee and own or in legal possession of the

premises including the rooftop or terrace or building or infrastructure or open areas of the land or part

or combination thereof on which the Solar PV System is proposed to be installed. Possession resulting

from rent or lease agreement shall also be included within the meaning of legal possession;

4.8 Existing prosumers of all categories or generator are eligible for additional capacities of the respective

GISS subject to the condition that the net load after addition, shall not exceed the ceiling limit stipulated

in this regulation;

4.9 Consumers with pending arrears / outstanding due with the Distribution Licensee shall not be eligible for

provisions under this regulation;

5.

Metering arrangement

5.1 Net-metering mechanism and Net billing or feed-in mechanism: An eligible consumer under the net

metering or Net billing or feed-in mechanism shall be entitled to use the power generated from the GISS

at his premises and the surplus injected to the distribution system of the Licensee at the interconnection

point;

At service connection point, a single bidirectional energy meter to record the energy import from the

licensee grid and energy export to the licensee grid shall be provided. This shall be a digital four

TAMIL NADU GOVERNMENT GAZETTE

170

[Part VI—Sec. 2

quadrant vector summation energy meter confi gured for bidirectional energy measurement whereby both

imported and exported active energy readings and allied parameters are programmed to be displayed. If

the eligible consumer is within the ambit of Time-of-Day (ToD) Tariff , the bidirectional energy meter to be

provided shall have programmable ToD (time-of-the-day) registers with a minimum of four energy import

ToD registers and four energy export ToD registers;

5.2

Gross-metering mechanism: A renewable energy generation meter to record the gross solar energy

generation shall be provided. This meter is to be installed immediately after the solar grid inverter. If the

eligible consumer or generator is within the ambit of Time-of-Day (ToD) Tariff , the energy meter shall

have programmable ToD (time-of-the-day) registers with a minimum of four energy export ToD registers.

The total solar power generated is accounted for feed-in tariff determined by the Commission from time

to time. The energy consumed from Licensee grid if any by the prosumer or generator shall be metered

and accounted separately under applicable retail tariff ;

5.3

In case of multiple GISS units under one service connection, individual generation meter for each

inverter /set of inverters in each spot/place/building of the premise shall be installed. The readings of the

generation meters shall be assessed individually to be added together (both energy and demand recorded

for each billing cycle) to one value of gross generation to be reckoned as the unit consumed and demand

reached for the respective billing cycle of the service connection concerned for all billing purpose;

5.4

For consumers up to the sanctioned load of 10 kW, the generation of solar energy shall be computed

based on the stipulated CUF or energy recorded in the inverter which ever is lower in lieu of installation

of gross meter for such assessment. If any dispute arises over such method of computation of energy

and assessment of demand, the aggrieved party can install the generation meter at his cost to enable

actual assessment of readings relating to the generation;

5.5

For existing consumers of more than 10 kW the Licensee shall issue notice to consumer to install the

generation meter of required capacity, facility and specifi cation. Till the meter is installed the generation

shall be assessed based on CUF for the purpose of collecting network charges and RPO. For new

applicants of more than 10 kW, the generation meter with demand recording facility shall be installed

at the cost of the applicant as a part of GISS system. For Gross generation metering, a four quadrant

TOD meter with AMR facility shall be installed at the cost of the applicant. The rating and specifi cation

of the generation meter shall be communicated to the applicant by the Licensee along with the

sanction/ approval of the load/connectivity;

5.6

HT (11 kV and above) Consumers may install and connect Renewable Energy Generating System at

their LT Bus Bar System:

Provided that, in such cases, the bi-directional Meter shall be installed on the HT side of the Consumer’s

Transformer;

5.7

Energy meters shall be of class 1.0 accuracy and shall comply with applicable CEA (Central Electricity

Authority) and BIS (Bureau of Indian Standards) standards;

6.

Billing and accounting process

6.1 Net metering :

6.2 The solar energy exported to the Grid from grid connected solar photovoltaic system is deducted from

energy imported from the grid in units to arrive at the net imported or exported energy. The net imported

or exported energy is billed or credited or carried over on the basis of the retail tariff . This process shall

continue until the end of the settlement period. At the end of the settlement period, credit i.e the net

units of surplus generation available if any shall get lapsed;

6.3 In case the Eligible Consumer is within the ambit of Time of Day (ToD) tariff , the electricity consumption

in any time slot, i.e. peak hours, off -peak hours, etc., shall be fi rst compensated with the quantum of

electricity injected in the same time slot; any excess injection over and above the consumption in any

other time slot in a Billing Cycle shall be accounted as if the excess injection had occurred during

off -peak hours;

6.4 Net billing or Net feed-in:

6.5 The monetary value of the imported energy is debited based on the applicable retail tariff ; The monetary

value of the exported energy is credited based on the feed-in tariff determined by the Commission. The

monetary value of the exported energy is deducted from the monetary value of imported energy to arrive

Oct. 20, 2021]

TAMIL NADU GOVERNMENT GAZETTE

171

at the net amount to be billed. If the cumulative credit amount exceeds the debit amount during any

billing cycle, the net credit is carried over to the next billing cycle. At the end of a 12-month settlement

period, the consumer has the option to receive payment of the net credit balance (if any) or have such

credit balance carried-over to the next settlement period;

6.6 Gross-metering:

6.7

Gross metering is permitted for eligible consumer or generator who opt to sell all generated solar energy

to the distribution licensee. An eligible consumer or generator under the gross metering scheme shall

inject the entire power generated from the GISS station to the distribution system of the distribution

licensee to the nearest HT network of same voltage. The exported solar energy is credited at the feed

in tariff determined by the Commission. The amount is credited in the Generator/consumers electricity bill

for every billing cycle or paid to the solar generator/ GISS station owner if the generator/ station owner

is not a consumer;

6.8

Net work charges are leviable for the total energy generated in Net metering and Net billing or Net feed-

in mechanisms. Net work charges are not applicable to Gross metering mechanism;

6.9 General:

(i)

Any other charges determined by the Commission from time to time shall be leviable to the eligible

consumer/prosumer/generator;

6.10 For the purpose of billing the import, export and net energy, the units and other allied parameters

recorded in the respective import and export and net register of the consumer bidirectional meter shall be

reckoned respectively. The maximum demand recorded in the gross generation meter or inverter, as the

case may be, shall not exceed the sanctioned/ contracted plant capacity of GISS in any billing cycle. If

the demand exceeds the sanctioned limit in any billing cycle, the quantum of exported units recorded in

the bi-directional meter during the respective demand integration period (DIP) in case of gross metering

and respective billing cycle in case of net-metering and net billing, proportionate to the portion of demand

that exceeded over the sanctioned limit, shall be treated as inadvertent injection in to the grid and shall

not be eligible for payment by the Licensee;

7.

Technical Requirements

7.1 The Distribution Licensee shall permit Net metering or Net feed-in or Gross metering arrangement, as the

case may be, on a non-discriminatory and Distribution Transformer wise ‘fi rst come, fi rst serve’ basis to

Eligible Consumers who have installed or intend to install Grid Interactive Solar energy Generating System

(GISS) connected to the Network of such Distribution Licensee. The interconnection with the Licensee

grid shall conform to the standards as provided in CEA (Technical Standards for Connectivity to the Grid)

Regulation, 2007 as amended from time to time and CEA (Technical Standard for Connectivity of the

Distributed Generation Resources) Regulation, 2013 as amended from time to time, Grid Codes and the

Tamil Nadu Electricity Distribution Code as amended from time to time as applicable;

7.2

The distribution licensee will enhance and update its metering and billing system in line with the requirement

of this regulation such that relevant parameters pertaining to billing and payment under all metering

mechanisms are properly assessed and clearly furnished in the electricity consumers’ bills. Distribution

licensees will make available online all of the above billing data for each consumer, along with a sample

bill explaining the various billing components;

7.3

The solar plant capacity shall not exceed the sanctioned load/contracted demand;

7.4

The cumulative capacity of solar PV systems under net metering or net billing put together connected to

a distribution transformer, shall not exceed 90% of the distribution transformer capacity;

7.5

The cumulative capacity of all Solar generating systems under Gross Metering mechanism in case of HT

connected to a Power transformer shall not exceed 70% of the Power Transformer capacity;

7.6

Distribution licensees shall update the status of the cumulative solar energy system capacity connected and

solar energy generated by each system at each distribution transformers on their website every month;

7.7

Where ever separate meter measuring the gross solar generation is not available at present in existing

grid connected solar system of more than 10 kW, Licensee shall take prompt action to install them as

mandated;

TAMIL NADU GOVERNMENT GAZETTE

172

[Part VI—Sec. 2

8. Inter-Connection with the Grid, Standards and safety.

8.1 In case of net metering or net billing, the interface point shall be the bi-directional meter at consumer’s

premises i.e., prosumer side of the meter. In case of gross metering, the interface point shall be the

gross solar power generation meter installed on the licensee side. In case of net metering or net billing

mechanism, the installation solar systems on eligible consumer premises will utilize the same service line

and installation for injection of excess power into the grid, which is currently being used by the consumer

for drawal of power from the distribution licensee. In case of gross metering mechanism, the installation

of gross-metered solar systems on the eligible consumer or generator premises intending to inject its total

generated power into the grid shall use separate service line for evacuation of power. Such service line

up to the nearest HT network shall be laid and maintained by the eligible consumer at his own cost as

laid down in regulation 4.4. Required diagram to show the scheme of such connection shall be submitted

along with the application;

8.2 The Distribution Licensee shall ensure that the inter-connection of the Renewable Energy Generating

System with its Network conforms to the specifi cations, standards and other provisions specifi ed in the

CEA (Technical Standard for Connectivity of the Distributed Generation Resources) Regulations, 2013, the

CEA (Measures relating to Safety and Electric Supply), Regulations, 2010, and the Tamil Nadu Electricity

Grid Code 2005, as amended from time to time;

8.3

The Eligible Consumer may install a Renewable Energy Generating System with or without storage:

Provided that, if an Eligible Consumer opts for connectivity with storage, the inverter shall have appropriate

arrangement to prevent the power from fl owing into the grid during the absence of grid supply to prevent

electrical accidents and that an automatic as well as manual isolation switch shall also be provided;

(i)

The Licensee shall inspect, demonstrate and satisfy himself that such safety features are provided in

the service and function as stipulated to prevent battery supply feed into grid, when grid supply fails or

switched off ;

8.4

The consumer / prosumer / generator shall be responsible for the safe operation, maintenance and

rectifi cation of any defect in the Renewable Energy Generating System up to the point of bidirectional

meter beyond which point such responsibility, including in respect of the meter, shall be that of the

Licensee;

(i)

For gross generation consumers/ generators such responsibility up to the point of interface with grid

network shall be that of Consumer/ generator as the case may be:

Provided further that the Renewable Energy Generation Meter shall be maintained by the Distribution

Licensee at the cost of prosumer;

8.5

In case any GISS plant is found to be running in parallel with the supply system of the distribution licensee

without approval then supply of such consumer may be disconnected with 3 days notice and the supply

shall be restored only after the plant is isolated from the supply system of the licensee. Such consumer

may apply for GISS plant in the next fi nancial year but his application will be kept at the bottom of the

list of applicants. Such consumer will be permitted to set-up the plant only if after allotting the capacity

to all successful applicants above him, there is still capacity available for allotment;

8.6

The Distribution Licensee shall have the right to disconnect the Renewable Energy Generating System

from its network at any time in the event of any threat of accident or damage from such System to its

distribution system so as to avoid any accident or damage to it:

Provided that the Distribution Licensee, considering the criticality, may call upon the Consumer to rectify

the defect within a reasonable time;

8.7 The solar power generator and equipment shall meet the requirement specifi ed in the CEA’s (Technical

Standards for connectivity of the Distributed Generation Resources) Regulations, 2013 and as amended

from time to time. The responsibility of operation and maintenance of the solar Power generator including

all accessories and apparatus lies with the solar power generators. The design and installation of the

GISS should be equipped with appropriately rated protective devices to sense any abnormality in the

system and carryout automatic isolation of the GISS from the grid. The inverters used should meet the

necessary quality requirements. The protection logics should be tested before commissioning of the plant.

Safety certifi cates for the installation should be obtained from the appropriate authorities;

8.8 The automatic isolation of the GISS should be ensured for no grid supply and low or over voltage

conditions and within the required response time. Adequate rated fuses and fast acting circuit breakers

Oct. 20, 2021]

TAMIL NADU GOVERNMENT GAZETTE

173

on input and output side of the inverters and disconnect/Isolating switches to isolate DC and AC system

for maintenance shall be provided. The consumer should provide for all internal safety and protective

mechanism for earthing, surge, DC ground fault, and transients etc. as per the CEA regulation/standards;

8.9

The inverter should be a sine wave inverter suitable for synchronizing with the distribution licensee’s grid.

The inverter shall have features of fi ltering out harmonics and other distortions before injecting the energy

into the system of the Distribution Licensee;

8.10 Any battery backup shall be restricted to the consumer’s network and the consumer shall be responsible

to take adequate safety measures to prevent battery power/Diesel Generator (DG) power/backup power

extending to distribution licensee’s LT grid on failure of distribution licensee’s grid supply;

8.11 To prevent back feeding and possible accidents when maintenance works are carried out by distribution

licensee’s personnel in his network, suitable isolator / isolating disconnect switches which can be locked by

distribution licensee personnel should be provided. This is in addition to automatic sensing and isolating on

grid supply failure etc and in addition to internal disconnect switches. In the event of distribution licensee

LT supply failure, the GISS has to ensure that there will not be any solar power being fed to the LT

grid of distribution licensee. The consumer / prosumer / generator is solely responsible for any accident

to human being/animals whatsoever (fatal/non-fatal/departmental/non departmental) that may occur due to

back feeding from the GISS when the grid supply is off . The distribution licensee reserves the right to

disconnect the consumer installation at any time in the event of such exigencies to prevent accident or

damage to men and material;

8.12 The consumer / prosumer / generator shall abide by all the codes and regulations issued by the CEA/

Commission to the extent applicable and in force from time to time. The consumer shall comply with

CEA/TNERC/CEIG/ distribution licensee’s requirements to the extent it is applicable with respect to safe,

secure and reliable function of the GISS plant and the grid. The power injected into the grid shall be of

the required quality in respect of wave shape, frequency, absence of DC components etc;

8.13 The GISS shall restrict the harmonic generation, fl icker within the limit specifi ed in the Indian Electricity

Grid Code and relevant regulations issued by the Central Electricity Authority;

8.14 Grid Connected Renewable Energy Generating Systems connected behind the Consumer’s meter, and not

opting for either Net Metering Arrangement or Net Billing Arrangement, shall be allowed only after prior

intimation to the respective Distribution Licensee:

Provided that the consumer / prosumer / generator shall be responsible for ensuring that all necessary

safeguarding measures as specifi ed by Central Electricity Authority (CEA) are taken;

Provided further that the Commission may determine additional Fixed Charges or Demand Charges and

any other Charges for such Grid Connected systems excluding Non-fossil fuel-based Cogeneration Plants,

in the retail Tariff Order, if the Distribution Licensee proposes such additional Fixed Charges or Demand

Charges and any other Charges for such systems, in its retail supply Tariff Petition, supported by adequate

justifi cation;

Provided also that in case the Consumer installs Renewable Energy Generating Systems behind the

Consumer’s meter without prior intimation to the respective Distribution Licensee, then the total additional

liabilities in terms of additional Fixed Charges or Demand Charges and any other Charges for such

systems, shall be levied at twice the determined rate for such period of default;

8.15 The Licensee shall not be responsible for any accident resulting in injury to human beings or animals or

damage to property that may occur due to back-feeding from the Renewable Energy Generating System

when the grid supply is off . The Licensee shall have the right to disconnect the installation at any time

in the event of such exigencies to prevent accident or damage;

9. Metering Infrastructure

9.1 All meters installed at the Renewable Energy Generating System shall comply with the CEA (Installation

and Operation of Meters) Regulations, 2006 and subsequent amendments thereof;

9.2 All meters shall have Advanced Metering Infrastructure (AMI) facility with RS 485 (or higher) communication

port;

9.3 The bi-directional metering arrangement shall include a single-phase or a three-phase bi-directional meter,

as may be required by the eligible consumer, located at the point of inter-connection as ascertained by

the Distribution Licensee;

TAMIL NADU GOVERNMENT GAZETTE

174

[Part VI—Sec. 2

9.4 Existing Meter in the premises of the eligible Consumer shall be replaced by the bi-directional meter at

the cost of the Consumer, in accordance with the provisions of the Electricity Supply Code;

9.5 If the eligible Consumer is within the ambit of Time-of-Day (‘ToD’) Tariff , both the Generation meter and

bi-directional meter installed shall be capable of recording ToD consumption and generation;

9.6 The Distribution Licensee shall be responsible for the testing, installation, and maintenance of the metering

equipment, and its adherence to the applicable standards and specifi cations;

9.7 The Eligible Consumer/ generator shall procure, at his own cost, a Renewable Energy Generation Meter

conforming to the applicable CEA Regulations and install as an integral part of the system at an appropriate

location to measure the energy generated from the Renewable Energy Generating System;

9.8 The Renewable Energy Generation Meter shall be maintained by the Distribution Licensee at the cost of

the eligible consumer/ generator:

Provided the eligible consumer/generator may procure the net meter/ generation meter and present the

same to the Licensee for testing and installation. In case meters are provided by the Licensee, the

consumer shall pay the entire cost of the meters. No meter rent shall be charged from the consumer.

The location of the meter shall be as per CEA Metering regulation. The installed meters shall be jointly

inspected and thereafter sealed by the Licensee in the presence of the consumer;

9.9 All the meters under all mechanisms of this regulation such as Bidirectional meter, Renewable Energy

Generation Meter etc., shall be installed at such locations in the premises of the Eligible Consumer that

would enable easy and safe access to the Distribution Licensee for inspection and meter reading at any

time;

9.10 In case of Renewable Energy Generating System with capacity above 20 kW, a Check Meter of appropriate

class may be installed by the Distribution Licensee for the Renewable Energy Generation Meter:

Provided that installation of Check Meter shall be optional for Renewable Energy Generating System with

capacity up to and including 20 kW;

9.11 The meter reading taken by the distribution licensee shall form the basis of commercial settlement;

10. Net work / wheeling charges:

10.1 Net work / wheeling charges shall be applicable to the prosumers categorised under net metering or

net billing or net feed in mechanism, as determined by the Commission under regulation 70 of TNERC

(Terms and conditions for determination of Tariff ) Regulations, 2005, from time to time;

10.2 The extent of concession if any, to any category of consumers under proper justifi cation shall be determined

by the Commission from time to time;

10.3 The total generated units recorded in the gross generation meter to be installed for assessment of entire

generation of solar power shall be reckoned for calculation of network charges;

10.4 The net work / wheeling charges shall be applicable for all existing and new prosumers as specifi ed

under respective category until the network charges is revised by the Commission in the next Tariff Order

or in any other special order;

11. General Conditions

11.1 The seniority of applications under all categories of this regulation shall be considered on fi rst come, fi rst

serve basis;

11.2 At the end of one-year period, the Distribution Licensee shall furnish the capacity of Solar PV system

installed under Net metering, Net billing and Gross metering mechanism , the impact of such solar systems

on the grid and on the other factors of the distribution licensee . Any amendment, if required, may be

considered after due consideration of comments/ objections/ recommendations of the various stakeholders;

11.3 The Distribution Licensee shall update the Distribution Transformer-wise, Power Transformer wise capacity

available and the cumulative capacity of the Renewable Energy Generating Systems installed under Net

Metering / Net Feed-in / Gross Metering arrangements monthly, and provide the information on its website

every month;

Oct. 20, 2021]

TAMIL NADU GOVERNMENT GAZETTE

175

11.4 The Distribution Licensee shall make available the application form for new plants as well as additional

capacities of existing plants and Agreement formats on its website, along with the applicable procedure

within two months of notifi cation of these Regulations;

11.5 In case the prosumer / generator leaves the system or changes the Supply Licensee, the excess electricity

shall be considered in the following manner:

(a)

The unadjusted units as on date of leaving the system or changing the Supply Licensee shall be

compensated at the Generic Tariff , and adjusted along with the fi nal bill settlement with the existing

Supply Licensee;

(b)

Any injection of electricity without entering into a new Net Metering Agreement with the new Supply

Licensee shall be considered as inadvertent injection and shall not be paid for by the new Supply

Licensee;

11.6 The distribution licensee will enhance and update its metering and billing system in line with the requirement

of above mandates such that relevant parameters pertaining to solar energy gross generation, export,

import, net units, demand etc., are assessed and furnished clearly in the electricity consumers’ bills.

Distribution licensees will make available online all of the above billing data for each consumer, along

with a sample bill explaining the various billing components;

11.7 The distribution licensee shall implement online applications for all categories of Grid interactive solar

generation scheme both for new and additional capacities. The status of all applications received online

or offl ine shall be displayed. The licensee shall maintain section wise data base of applications received,

approval status, installation and commissioning details;

12. Energy accounting during meter defect / failure / burnt

12.1 In case of defective/failure/burnt condition of any meter, the Distribution Licensee shall replace the meter

as specifi ed in the Electricity Supply Code;

12.2 The electricity generated by the Renewable Energy Generating System during the period in which the

meter is defective shall be determined based on the readings of the Check Meter or the reading /

consumption recorded in the inverter;

12.3 In case of defect of both meter and inverter, if the recorded data are retrievable from the internal storage

of the meter, billing shall be done based on the data so retrieved;

12.4 In case of data not being retrievable, the consumption during the period in which the Meter is defective

shall be determined as specifi ed in the Electricity Supply Code. The details of meter, nature of defect,

action taken to retrieve the data and reason for non retrieval of data shall be documented by a competitive

authority and preserved to be produced at any time in future;

13. Renewable Purchase Obligation

(i)

The units of solar energy generated under all categories shall qualify towards meeting the RPO of the

respective GISS developer of obligated entity;

(ii)

The cumulative units of solar energy generated under all categories of GISS of the entire State shall

qualify towards meeting the RPO of the Distribution Licensee(s);

14. Eligibility under Renewable Energy Certifi cate mechanism

The eligibility for issuance of renewable energy certifi cate shall be as per the eligibility criteria specifi ed under

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable

Energy Certifi cate for Renewable Energy Generation) Regulations, 2010, as amended from time to time;

15. Procedure for Application and Registration

15.1 The distribution licensee shall implement a web-based application processing system for processing the

applications of GISS, for both new and additional plant capacities;

15.2 The distribution licensee shall facilitate the process for setting up GISS system at consumers’ premises.

In this regard, the licensee shall prominently display on its website and in all its offi ces, the following:

(i) detailed standardized procedure for installation & commissioning of GISS;

TAMIL NADU GOVERNMENT GAZETTE

176

[Part VI—Sec. 2

(ii)

a single point of contact to facilitate the eligible consumers in installation of GISS system from

submission of application form to commissioning;

(iii) complete list of documents required to be furnished along with such applications;

(iv) applicable charges to be deposited by the applicant;

(v) empanelled list of service providers for the benefi t of consumers who want to install GISS through

service providers;

(vi) empanelled list of meter vendors;

(vii) fi nancial incentives to the prosumers, as applicable under various schemes and programmes of the

Central and State Government;

(viii) standard Connection Agreement(s);

15.3 The Eligible Consumer shall apply to the concerned Distribution Licensee for connectivity of the Grid

Interactive Solar PV Energy Generating System with the Licensee’s Network along with following registration

fee either through online or submit the application in the prescribed form ( Annexed ) at the section offi ce;

Sl.No.

Description

Registration fee

1

LT – up to 20 kW

Rs.500

2

LT – above 20 kW and up to 150 kW

Rs.500 up to 20 kW and Rs.100 therafter for

every 20 kW or part there of.

3

HT- above 150 kW and up to 500 kW

Rs.5000

4

HT- above 500 kW to less than 1 MW

Rs.10000

15.4. In case the application form submitted in hard copy form, the same shall be scanned and uploaded on

the website as soon as it is received;

15.5. Acknowledgement with the registration number for that application shall be generated and intimated to

the applicant within three working days of receipt of application. In case of applications being received

online, the acknowledgement with the registration number shall be generated and communicated to the

applicants through email;

15.6. In case of any defi ciencies in the application form, the same shall be intimated within 3 working days

from the date of receipt of application. The consumer shall rectify the defects and resubmit within 7 days

to retain the registration number. If the application form is not submitted with rectifi cation within 7 days

the application shall stand cancelled and the registration fee shall be forfeited;

15.7. The application shall be deemed to be received on the date of generation of acknowledgement with

registration number;

15.8. The distribution licensee shall evolve technical feasibility within 15 working days from the date of registration

of application;

15.9. The technical feasibility shall be conducted on the following aspects and any other factors which the

licensee considers appropriate :

i

AC Voltage level at which connectivity is sought;

ii

Sanctioned Load / Contract Demand of the Applicant;

iii

Rated Output AC Voltage of the proposed Renewable Energy Generating System;

iv

Available cumulative capacity of relevant Distribution / Power Transformer;

If found technically feasible, the Distribution Licensee shall, within 5 working days of the completion of

the feasibility study, convey its approval for installing the Renewable Energy Generating System. The

approval shall indicate the maximum permissible capacity of the System, and shall be valid for a period

of 6 months from the date of approval, or such extended period as may be agreed to by the Distribution

Licensee;

Oct. 20, 2021]

TAMIL NADU GOVERNMENT GAZETTE

177

If found not technically feasible the reason for the same shall be intimated to the applicant within

20 working days from the date of registration of the application;

15.10 The Applicant shall, within the period of validity of such approval, submit the work completion report,

along with relevant details (such as technical specifi cations, test reports received from manufacturer/

system provider, safety certificate from CEIG as may be applicable etc.), and hand over the

Generation/consumer meter with a request to the Distribution Licensee (if the meter is not already

tested) for the testing and commissioning of the Renewable Energy Generating System;

15.11 The Distribution Licensee shall complete the testing of generation/consumer meter, hand over the

generation meter back to the applicant to be installed in the system by the applicant and the Licensee

shall complete testing and commissioning of the System within 20 working days from receipt of such

request and shall install the bidirectional meter and synchronise the Renewable Energy Generating

System within 10 days thereafter;

15.12 The applicant and Licensee shall enter in to agreement in the prescribed format after the solar system

is installed but before it is synchronized with the network;

15.13 The commissioning test of the GISS shall be carried out in the presence of representatives of

consumer/owner of GISS, and concerned offi cer of the distribution licensee. The commissioning certifi cate

shall be signed by all the above named parties;

15.14 The Commissioning certifi cate must contain the following details:

i.

Details of Solar PV panels including name of the manufacturer, type, size/capacity, number of the

panels, etc.;

ii.

Details regarding inverter, such as Make, rating, type, sl.no etc.,

iii.

Total capacity of the GISS;

iv.

Details of meter installed along with details such as Make, types ,rating, accuracy, serial number,

etc.;

15.15 The formats of contract agreement and installation certifi cate shall be placed in the web portal of the

licensee;

15.16 The application tracking mechanism based on the unique registration number shall be provided by the

distribution licensee through web-based module or any other mode to monitor the status of processing

of the application like receipt of application, site inspection, meter installation, commissioning, etc;

15.17 Consumer shall have the option of purchasing the requisite meter from authorised vendors which has

been tested and sealed by the licensee or the meter shall be tested at licensee’s lab with time limit

stipulated or got tested by the consumer at other authorised lab;

15.18 The timelines as specifi ed in these regulations shall be adhered to by the Licensee;

16. Access and Disconnection

16.1 The prosumer shall provide access to the Licensee to the metering equipment and disconnecting devices

of Renewable Energy Generating System, both automatic and manual;

16.2 In an emergent or outage situation, if the Licensee is unable to access the disconnecting devices of

the Renewable Energy Generating System, both automatic and manual, the Licensee may disconnect

power supply to the premises;

16.3 Upon termination of this Agreement, the prosumer shall disconnect the Renewable Energy Generating

System forthwith from the Network of the Licensee;

17. Connection Agreement

17.1 The Distribution Licensee and Eligible Consumer/generator shall enter into a Connection Agreement

after approval of connectivity of the GISS with the distribution Network but before commencement of

actual generation from the System;

17.2

A model Connection Agreement is provided at Annexure, which the Distribution Licensee may modify

suitably, subject to consistency with these Regulations;

TAMIL NADU GOVERNMENT GAZETTE

178

[Part VI—Sec. 2

17.3 The Connection Agreement shall remain in force for twenty fi ve years:

Provided that the prosumer / generator may terminate the Agreement at any time by giving 90 days’

notice to the Distribution Licensee;

17.4 Any prosumer / generator, who intends to discontinue net metering arrangement with the distribution

licensee shall be allowed, subject to a written notice to the distribution licensee made at least one

month in advance. Any excess energy generation remaining unadjusted as on the date of termination

of the agreement shall not be adjusted by the distribution licensee;

Provided further that the Distribution Licensee may terminate the Agreement by giving 30 days’ notice,

if the prosumer / generator breaches any term of the Agreement and does not remedy such breach

within 30 days, or such other longer period as may be provided, of receiving notice from the Licensee

of such breach, or for any other valid reason to be communicated in writing:

Provided also that the Distribution Licensee may terminate the Agreement by giving 15 days’ notice in

case the prosumer / generator fails to pay his dues in a timely manner or indulges in any malpractices:

Provided also that the Agreement may be terminated at any time by mutual consent:

17.5

Any unbilled energy generation as on the date of termination of the agreement shall be paid within

one month from the date of termination of agreement by the distribution licensee;

17.6

The prosumer / generator shall, upon termination of the Agreement, disconnect forthwith his GISS from

the Distribution Licensee’s Network;

17.7

The Agreement may be extended by in slabs of fi ve years after the expiry of 25 years and Licensee

and prosumer shall get the agreement extended till the GISS installation generates power to its

prolonged life period;

18. Power to issue directions

Subject to provisions of the Act, the Commission may from time to time issue such directions and orders as

considered appropriate for implementation of these Regulations;

19. Power to relax

The Commission may by general or special order, for reasons to be recorded in writing, and after giving an

opportunity of hearing to the parties likely to be aff ected, may relax any of the provisions of these Regulations

on its own motion or on an application made before it by an interested person;

20. Power to amend

The Commission may from time to time add, vary, alter, suspend, modify, amend or repeal any provisions of

these Regulations for reasons to be recorded;

21. Power to remove diffi culties

If any diffi culty arises in giving eff ect to the provisions of these Regulations, the Commission may, by an order,

make such provisions, not inconsistent to the provision of the Act and these Regulations, as may appear to

be necessary for removing such diffi culty;

(By Order of the Tamil Nadu Electricity Regulatory Commission)

Chennai-600 032,

S. CHINNARAJALU,

8th October 2021.

Secretary,

Tamil Nadu Electricity Regulatory Commission.

Oct. 20, 2021]

TAMIL NADU GOVERNMENT GAZETTE

179

EXPLANATORY STATEMENT

The following Regulations is framed by the Commission in exercise of the powers conferred by section 181 read

with Sections 61, 66, 86(1) (e) of the Electricity Act, 2003 (Central Act 36 of 2003) and all other powers enabling it

in this behalf;

2. The M.P No.14 fi led by the TANGEDCO, requires the Commission to fi x the generic tariff for solar power for

which framing of Regulation is necessary to entail various enabling provisions for implementation tariff so fi xed;

3. The Commission had earlier notifi ed (Notifi cation No.TNERC/TR/5/3, Dated 26-05-21 ) the enabling provision to

recover the network cost from the consumers under Regulation 70 of TNERC (Terms and Conditions for determination

of Tariff ) Regulations, 2005;

4. The Electricity ( Rights of Consumers ) Amendment Rules 2021 mandates State Commissions enactment of

Regulation for Grid Interactive Solar PV generation System ( GISS ) for implementation of Net-metering, Net feed-in

and Gross metering mechanism in exercise of powers conferred under section 181 of the Act;

5. The above set of legal requirements constitute the need to lay down the regulation for Grid Interactive Solar PV

Energy Generating System (GISS) to further evolve and determine the generic tariff for various categories of consumers /

prosumers / generators under diff erent metering mechanisms for implementation.

The proposed regulation seeks to fulfi ll the above objects.

(By Order of the Tamil Nadu Electricity Regulatory Commission)

Chennai-600 032,

S. CHINNARAJALU,

8th October 2021.

Secretary,

Tamil Nadu Electricity Regulatory Commission.

Form – 1

Application Form for Installation of Grid- Connected Solar PV Energy Generating System

To:

The Section Offi cer/Designated Offi cer

Distribution Licensee

[name of offi ce]

I.

I / We herewith apply and request for Grid – Connected Solar PV Energy generating system to be connected to

the service connection of following details:

1. Name(s) of applicant(s) in full

2. Address of the premises at which the solar energy generation

system is to be installed

3. Address for communication

4. Service connection number

5. Service connection tariff

6. Sanctioned Load / Contracted Demand

7. Mobile number(s)

8. Email ID

Photo of

applicant(s)

TAMIL NADU GOVERNMENT GAZETTE

180

[Part VI—Sec. 2

9.

Proposed AC capacity of the solar system to be installed

10.

Roof Top or Ground Mounted

11. Net Metering / Net Feed-in / Gross Metering

12.

Solar grid inverter make, type and capacity

13.

Solar grid inverter has automatic isolation protection (Y/N)?

14.

Has a Solar Generation Meter been installed (Y/N)?

15. Make, capacity, Sl.No of the Generation meter

16.

Expected date of commissioning of solar PV system.

II.

I / We agree to pay the required charges as demanded in accordance with the Rules, Codes and Regulations.

III. I / We agree to install the plant in accordance with the protection and Safety Standards as mandated in the Regulations

relating to Safety.

IV. I / We agree to enter into the agreement as per the Regulation.

V.

I agree to bear the entire cost of erection of separate service line, to inject the total generated power into the grid in case

of gross metering arrangement.

Date:

Name(s) :

Signature(s) :

Grid – Connected Solar Energy Application Acknowledgement

Received an application for Grid – Connected Solar Energy Generating System

Name(s):

Date:

Date:

Service Connection number:

Application Registration No.:

Solar Plant Capacity:

Net Metering / Net Feed-in / Gross Metering :

Name of Offi cer:

Signature:

Designation/Licensee

List of documents attached with application form (to be uploaded)

1.

Copy of ownership / lease deed in case of ground mounted solar energy generating system.

2.

Proof of payment of registration fee.

3.

Diagram showing the layout of premises, metering location and service line confi guration etc., in case of gross metering.

(By Order of the Tamil Nadu Electricity Regulatory Commission)

Chennai-600 032,

S. CHINNARAJALU,

October 2021.

Secretary,

Tamil Nadu Electricity Regulatory Commission.

Oct. 20, 2021]

TAMIL NADU GOVERNMENT GAZETTE

181

FORM – 2

Grid Interactive Solar PV Energy Generating System (GISS)- Agreement

This Agreement is made and entered into at (location) ………………….. on this (date)……..day of (month)……… of……

(year) between the Eligible consumer/ prosumer / generator, residing at (address) as fi rst party...............

……………………………………………………………………………………………………………………………………………………

………………………………….

AND

………………………………………….Distribution Licensee ( herein after called as Licensee ) and having its registered offi ce

at (address)………………... ………………………………………………………………………………………………..as second party

of the agreement

And whereas, the Licensee agrees to permit to connect the eligible consumer’s/ prosumer’s /Generator’s GISS (Grid

Interactive PV Solar Energy Generating System) of Contracted Capacity of …..………… watts at the premises of …………….…

……………….............................................and as per conditions of this agreement and regulations / orders issued by the Tamil

Nadu Electricity Regulatory Commission, from time to time for Net Metering / Net Feed-in / Gross Metering Mechanism.

Both the parties hereby agree to as follows:

1. Eligibility

Eligibility for Net Metering / Net Feed-in / Gross Metering shall be as specifi ed in the relevant Regulations / Codes / Orders of

the Tamil Nadu Electricity Regulatory Commission as amended. Eligible consumer /prosumer /generator is required to be aware,

in advance, of the standards and conditions with which his system has to operate safely with coupled integration with the grid /

distribution system of the Licensee.

2. Technical and Interconnection Requirements

2.1. The eligible consumer/prosumer/generator agrees that his GISS plant /station shall conform to the standards and

requirements specifi ed in the following Regulations and codes as amended from time to time.

(i)

CEA’s (Technical Standards for connectivity of the Distributed Generating Resources) Regulations, 2013.

(ii) Central Electricity Authority (Installation and Operation of Meters) Regulation, 2006.

(iii) Central Electricity Authority (Measures of Safety and Electric Supply) Regulation, 2010.

(iv) Tamil Nadu Electricity Regulatory Commission’s (Grid Interactive Solar PV Energy Generating Systems)

Regulation, 2021

(v) Tamil Nadu Electricity Distribution Code.

(vi) Tamil Nadu Electricity Supply Code.

2.2 Eligible consumer/prosumer/generator agrees that he has installed or will install, prior to connection of GISS to

Licensee’s distribution system, an isolation device (both automatic and inbuilt within inverter and external manual relays) and

agrees for the Licensee to have access to and operation of this, if required and for repair & maintenance of the distribution system.

TAMIL NADU GOVERNMENT GAZETTE

182

[Part VI—Sec. 2

2.3 Eligible consumer/ prosumer/ generator agrees that in case of a power outage on Licensee’s system, GISS will shut

down, automatically and his plant will not generate power.

2.4. All the equipment connected to distribution system must be compliant with relevant international (IEEE/IEC) or Indian

standards (BIS) and installations of electrical equipment protective devices, earthing standard etc., must comply with Central

Electricity Authority (Measures of Safety and Electricity Supply) Regulations, 2010 as amended from time to time.

2.5. Eligible consumer/Prosumer/generator agrees that Licensee will specify the interface / interconnection point and

metering point.

2.6. Eligible consumer/ prosumer / generator and licensee agrees to comply with the relevant CEA regulations in respect of

operation and maintenance of the plant, drawing and diagrams, site responsibility schedule, harmonics, synchronization, voltage

frequency, fl icker etc.

2.7. Due to Licensee’s obligation to maintain a safe and reliable distribution system, eligible consumer/prosumer/generator

agrees that if it is determined by the Licensee that eligible consumer’s/ prosumer’s/ generator’s GISS either causes damage to

and / or produces adverse eff ects aff ecting other consumers or Licensee’s assets, eligible consumer/prosumer/generator will

have to disconnect his GISS immediately from the distribution system upon direction from the Licensee and correct the problem

at his own expense prior to a reconnection.

2.8 Both parties of this agreement are mandated by the Tamil Nadu Electricity Regulatory Commission’s (Grid Interactive

Solar PV Energy Generating Systems) Regulation, 2021 and all relevant regulations, codes and orders of the Tamil Nadu Electricity

Regulatory Commission.

3. Clearances and Approvals

3.1. The eligible consumer/ prosumer/generator agrees to obtain all the necessary approvals and clearances (environmental

and grid connected related) before connecting the GISS to the distribution system.

4. Access and Disconnection

4.1. The eligible consumer/ prosumer/generator shall provide access to Licensee to metering equipment and disconnecting

devices of GISS, both automatic and manual, at all times.

4.2. In emergency or outage situation, where there is no access to a disconnecting means, both automatic and manual,

such as a switch or breaker, Licensee may disconnect service to the premises.

4.3. Upon termination of this agreement the eligible consumer/prosumer/generator shall disconnect the solar system

forthwith from the network of the licensee.

5. Liabilities

5.1. Eligible consumer/prosumer/generator and Licensee will indemnify each other for damages or adverse eff ects from

either party’s negligence or intentional misconduct in the connection and operation of GISS or Licensee’s distribution system.

5.2. Licensee and eligible consumer/prosumer/ generator will not be liable to each other for any loss of profi ts or revenues,

business interruption losses, loss of contract or loss of goodwill, or for indirect, consequential, incidental or special damages,

including, but not limited to, punitive or exemplary damages, whether any of the said liability, loss or damages arise in contract,

or otherwise.

Oct. 20, 2021]

TAMIL NADU GOVERNMENT GAZETTE

183

5.3. Licensee shall not be liable for delivery or realization by eligible consumer/prosumer/generator for any fi scal or other

incentive provided by the Central / State government beyond the scope specifi ed by the Commission in its relevant Order.

6. Commercial Settlement

6.1. The feed-in tariff contracted to be paid by the Licensee to the eligible consumer/ prosumer / generator under this

agreement by …………………………….Metering mechanism is Rs………………. (Rupees………………………..) as per the

orders of the TNERC, Number………………………. ………………. Dated……………

6.2 Metering System, Billing and all other charges and the commercial settlement under this agreement shall be as per the

regulations / codes / orders of TNERC amended from time to time.

6.3. The Licensee shall not be liable to compensate the eligible consumer/ prosumer/ generator if his solar system is unable

to inject power into Licensee’s network on account of failure of power supply in the grid.

7. Connection and Maintenance Costs

7.1. The eligible consumer/ prosumer/generator shall bear all costs related to setting up of photovoltaic system including

metering and interconnection and infrastructure for power evacuation costs.

7.2. The eligible consumer/prosumer/generator agrees to pay the actual cost of modifi cations and upgrades to the service

line/ power evacuation line required to connect GISS in case it is required.

7.3. In case of gross metering arrangement, the eligible consumer/ generator shall bear entire cost of erection and

maintenance of separate service line to be laid to evacuate its total generated power into the grid.

8. Period of Agreement and Termination

8.1. This agreement shall be for a period of twenty fi ve years, but may be terminated prematurely by mutual consent.

8.2. The eligible consumer / prosumer/ generator can terminate agreement at any time with Licensee by providing 90 days

prior notice.

8.3. Licensee has the right to terminate agreement on 30 days prior written notice, if eligible consumer/prosumer/generator

breaches terms of this agreement and does not remedy the breach within 30 days from the date of receiving written notice from

the Licensee.

8.4. Licensee has the right to terminate agreement after giving 15 days’ notice in case the eligible consumer /prosumer/

generator fails to pay his dues in a timely manner or indulges in any malpractices.

8.5. Eligible consumer/prosumer/generator agrees that upon termination of this agreement, he must disconnect the GISS

from Licensee’s distribution system in a timely manner and to Licensee’s satisfaction.

In the witness, whereof of Mr. ………………….. for and on behalf of … ……….. (Eligible consumer/prosumer/generator)

and Mr. ………………… for and on behalf of…………………. (Licensee) sign this agreement in two originals.

Eligible consumer/prosumer/generator

Distribution Licensee

Name

Name

(By Order of the Tamil Nadu Electricity Regulatory Commission)

Chennai-600 032,

S. CHINNARAJALU,

8th October 2021.

Secretary,

Tamil Nadu Electricity Regulatory Commission.

TAMIL NADU GOVERNMENT GAZETTE

184

[Part VI—Sec. 2

GOVERNMENT EXAMINATIONS / EDUCATIONAL OFFICERS

LOSS OF CERTIFICATES

It is hereby notifi ed that the Original Higher Secondary Certifi cates / Matriculation Certifi cates / Diploma Certifi cates /

School Certifi cates of the following pupils are reported to have been lost beyond recovery. Necessary steps are being

taken to issue the duplicate of the said Certifi cates. If the Originals were to be found by anybody, they should be treated

as invalid and sent to the Secretary, Board of Higher Secondary Examination / Directorate of Government Examinations,

Chennai-6 / Director of Technical Education, Chennai-25 / Inspector / Inspectress of Matriculation and Anglo-Indian Schools

as the case may be for cancellation:–

C.â¡.C.

â‡.

ñ£íõ˜/ñ£íM ªðò˜,

ðœOJ¡ ªðò˜ ñŸÁ‹

è™M ñ£õ†ì‹.

ðF¾ /

꣡Pî› â‡.

ñ£î‹

ñŸÁ‹

õ¼ì‹.

«î˜M¡ Mõó‹.

è®î â‡μ‹,

«îF»‹.

(1)

(2)

(3)

(4)

(5)

(6)

No. VI(2)/109/2021.

R. Gandhiya

SBG SM Teachers

Training Institute

Melakodumalur.

0612989

TTI 911549

December

2006

ÝCKò˜ è™M ð†ìò‹

ï.è. ⇠223131/C1/2021,

30-09-2021

è. ªê™õ‚°ñ£˜,

ªêòô£÷˜,

Þ¬í Þò‚°ï˜ (ðEò£÷˜),

ñ£GôŠðœOˆ «î˜¾èœ õ£Kò‹,

îI›ï£´ ñŸÁ‹ Üó²ˆ «î˜¾èœ Þò‚èè‹,

ªê¡¬ù-600 006.

PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI

ON BEHALF OF THE GOVERNMENT OF TAMIL NADU