DTP—VI-3(b) (15)
[13]
TAMIL NADU TRANSMISSION CORPORATION LIMITED
Pages.
General Construction Circle-II, Chennai--Erection of Transmission Lines.
..
..
.. ..
14
General Construction Circle, Salem--Erection of proposed EHT Line to meet out the Additional
Demand for the year 2021-22 and Subsequent years to be Published as per section 164 and 168 of
Electricity Act (2003). .. .. .. .. .. ..
15-18
TAMIL NADU GOVERNMENT GAZETTE
14
[Part VI—Sec.3(b)
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
TAMIL NADU TRANSMISSION CORPORATION LIMITED
GENERAL CONSTRUCTION CIRCLE-II CHENNAI
Erection of Transmission Lines
[Lr. No. SE/GCC-II/CNI/EE/C/TP-I/F. T&D Notification/D.No.158/2022]
No. VI-3(b)/6/2022.
TAN TRANSCO has sanctioned for erection of the following Transmission Lines to Transmit and Distribute Power
so as to meetout additional demands. The work will be taken up in the Thiruvallur District, Tamil Nadu.
Sl.
No.
Name of the Transmission Line
Transmission Line passing
Route (Village)
Route Length
in M
Circuit
Length in M
Administrative Approval
(1)
(2)
(3)
(4)
(5)
(6)
1
Erection of 110 KV SC line on DC
towers with panther conductors for
T. off in Thiruvallur-Mosur 110 KV
SC line to M/s. PCA Automobiles
India Pvt., Ltd., Thiruvallur
Adigathur
95
95
Memo. No. CE/D/CSR/S/
EET/AEES/F.M/s. PCA
Automobiles/D. 753/21,
Dt. 20.12.2021.
Any person interested may make representation on the above schemes within 1 (One) month from the date
of issue of the publication to the undersigned as per the Electricity Act, 2003.
Chennai-16,
Er. G. MEGANATHAN,
7th April 2022.
Superintending Engineer,
General Construction Circle-II.
தமிழ்நாடு மின் த�ொடரமைப்புக் கழகம்
பொது‚ கட்டுமாான வட்டம்-II, சென்னை
அறிவிக்கை
[Lr. No. SE/GCC-II/CNI/EE/C/TP-I/F. T&D Notification/D.No.158/2022]
திருவள்ளூர் மாாவட்டத்தில் வளர்ந்து வரும் கூடுதல் மின் தேவையை பூர்த்தி செய்யும் பொருட்டு கீழக்கணட 110 கி.வ�ோல்ட்
உயரழுத்த மின் க�ோபுரம் நிறுவி மின் பாதை அமைக்கும் பணிகள் தமிழ்நாடு மின் த�ொடரமைப்புக் கழகத்தினாால் அனுமதியளிக்கப்பட்டு
மின்பாதை
அமைக்கும் பணிகள் விரைவில் த�ொடங்கப்படவிருக்கிறது.
வ.
எண்.
மின் த�ொடர் வேலையின் விவரம்
மின்பாதை
அமையவிருக்கும்
ஊர்கள்
மின் பாதையின்
நீளம்
சுற்று நீளம்
நிர்வாாக ஒப்புதல்
(1)
(2)
(3)
(4)
(5)
(6)
1
PCA ஆட்டோ ம�ொபைல்ஸ் இந்திய
லிமிடெட்
திருவள்ளூர்
த�ொழிற்
சால
ைக்காான 110 கில�ோ வ�ோல்ட் மின்
இணைப்பிற்காான
திருவள்ளூர்
-
ம�ோசூர் 110 கில�ோ வ�ோல்ட் மின்
பாதையில் இணைக்கும் 110 கில�ோ
வ�ோல்ட் ஒற்றை
சுற்று மின்பாதை
நிறுவுதல்.
அதிகளத்தூர்
95 மீ.
95 மீ.
Memo. No. CE/D/
CSR/S/ EET/
AEES/F.M/s. PCA
Automobiles/D.
753/21,
Dt. 20.12.2021
சென்னை
-600 016,
Er. G. MEGANATHAN,
2022 ஏப்ரல் 7.
மேற்பார்வைப் பொறியாாளர்,
பொதுக் கட்டுமாான வட்டம்-II.
Apr. 13, 2022]
TAMIL NADU GOVERNMENT GAZETTE
15
GENERAL CONSTRUCTION CIRCLE/SALEM
Erection of proposed EHT Line to meet out the Additional Demand for the year 2021-22 and Subsequent years to be
Published as per section 164 and 168 of Electricity Act (2003)
[Lr. No. SE/GCC/SLM/AEE (GL)/DM/F. Press 21-22/D.1748/2021]
No. VI-3(b)/7/2022.
It is hereby notified that the following transmission line is proposed to be constructed for the year 2021-22 and
subsequent year for which sanction has been accorded by the TANTRANSCO for augmenting the power supply.
Sl.
No.
Details of EHT lines
Authority
(Per.) FB
TANTRANSCO
Proceedings No.
Estimate cost in
Lakhs Rs.
Salient
features
Benefits
(1)
(2)
(3)
(4)
(5)
(6)
1
Erection of 110 KV DC line
on DC tower with panther
conductor for making LILO
of the existing 110 KV Hosur -
Zuzuvadi - Bagalur feeder
at the proposed Begepally
110/11 KV SS
No.124,
dt.17.08.2020
186.200
For a route length
of 2.5 Kms passing
through Begepally
and nearby
Villages.
To improve the
transmission network
2
(i)
Stringing of 110 KV SC line
with panther conductor on the
free arm of the existing 110
KV Zuzuvadi - Bagalur DC
tower.
No.125,
dt.17.08.2020.
118.580
For a route length
of 14.00 Kms
passing through
Zuzuvadi, Bagalur
and nearby
Villages.
To improve the
transmission network
(ii)
Erection of Multi circuit tower
( 4 Circuit tower) along with
stringing of 110 KV DC line
with panther conductor in one
arm of the multi circuit tower
from ESI Loc. 16 to Zuzuvadi
110 /11 KV SS (Loc.No.18)
130.050
For a route length
of 0.65 Kms
passing through
Zuzuvadi and
nearby Villages.
To improve the
transmission network
(iii)
Laying of 110 KV , 1 x 630 sq
mm XLPE cable (SC) from
Hosur 230 KV SS to ESI
(Loc. No.16)
2550.700
For a route length
of 7.00 Kms
passing through
Hosur and nearby
Villages.
To improve the
transmission network
3
Erection of 110 KV DC line
on DC towers with panther
conductor by making LILO
of
the
existing
110
KV
Mettur - Anthiyur feeder at
the proposed Thippampatty
110/33 KV SS
No.159
dt.24.11.2020
226.275
For a route
length of 2.5 Kms
passing through
Thippampatty and
nearby Villages.
To extend the
EHT Supply to
PWD authority of
Salem Division for
proposed Pumped
storage irrigation
scheme from
Sarabanga Basin at
Thippampatty, Mettur
under DCW basis
TAMIL NADU GOVERNMENT GAZETTE
16
[Part VI—Sec.3(b)
Sl.
No.
Details of EHT lines
Authority
(Per.) FB
TANTRANSCO
Proceedings No.
Estimate cost in
Lakhs Rs.
Salient
features
Benefits
(1)
(2)
(3)
(4)
(5)
(6)
4
Erection of 110 KV SC line
on DC tower with panther
conductor from the existing
Thalaivasal 110 KV SS to the
proposed Thalaivasal Traction
110 KV SS
Memo. No.
04191/CED/ED/
AEE/GL/F.Pro.
No.081 (Cap-
Est)/PR.279/21
Dt.25.03.2021
354.220
For a route length
of 2.435 Kms
passing through
Thalaivasal and
nearby Villages.
To extend the EHT
Supply to Thalaivasal
Traction SS of
M/s. Southern
Railway, Salem
Division under DCW
basis
5
Erection of 110 KV SC line
on DC tower with panther
conductor
from
existing
Karnampet
110/33-11
KV
SS for extending supply at
110 KV level to M/s. VIT,
Vellore under DCW basis
Lr.No.580/SE/
VEDC/DEV/AE1/
DM/F.HTSC1251/
Addl (HT to EHT)/
2021, Dt.16.03.21
& revised vide
Lr.No. 96/SE /
VEDC/VLR/EE/
GNL/DEV/AEE/
AE1/F.HT SC
1251 (Addl)/ 21,
Dt.14.06.2021
707.280
For a route length
of 8.00 Kms
passing through
Vellore, Katpadi
and nearby
Villages.
To extend the EHT
Supply to
M/s. VIT Vellore
under DCW basis
6
Erection of 110 KV SC Line
on DC towers with Panther
conductor from existing Hosur
SIPCOT 110 KV SS to extent
the EHT supply for a new
demand of 7000 KVA at 110
KV level to M/s. INOX AIR
Products (p) Ltd., SIPCOT
Phase – II, Hosur Taluk
Memo.No. CE/D/
VLR/EE/Ele/AEE/
Plg/F.(HT SC
New)/D.069/ 2021,
Dt.27.05.2021
142.254
For a route length
of 4.50 Kms
passing through,
Hosur SIPCOT
and nearby
Villages.
To extend the EHT
Supply to
M/s. INOX AIR
Products (P) Ltd.,
SIPCOT
Phase - II, Hosur
under the DCW basis
7
Erection of 110 KV DC line
on DC tower with panther
conductor by making LILO
of the existing Uddanapalli –
Rayakottai 110 KV Feeder for
Extending EHT supply to the
M/s. TATA Electronics (P) Ltd.,
Thimjepalli village Under
DCW basis
Memo.No. CE/
Coml/ SE/EE1/
AEE1/F.M/s.
TATA Electronic/
D.390/21,
Dt.26.10.2021
738.322
For a route length
of 2.50 Kms
passing through
Uddanapally,
Rayakottai and
nearby villages.
To extend the EHT
Supply to
M/s. TATA
Electronics (P) Ltd.,
(Thimjepalli
Village)
under DCW basis
8
Erection of 110 KV DC line
on DC tower with panther
conductor for making LILO of
the existing 110 KV Unjani –
Elanagar
–
Rasipuram
Feeder
at
the
proposed
Elur 110 KV SS.
No.113
Dt.06.12.2021
380.650
For a route length
of 5.0 Kms passing
through Elur and
nearby Villages.
To improve the
transmission network
The notifications published for General Information of the Public. If any objection regarding the above schemes,
this may be appealed to the under signed within two months from the date of issue of this publication as per
section 164 and 168 of the Electricity Act, 2003.
Salem-14,
Er. A. NOWSHATH,
8th April 2022.
Superintending Engineer,
General Construction Circle.
Apr. 13, 2022]
TAMIL NADU GOVERNMENT GAZETTE
17
தமிழ்நாடு மின் த�ொடரமைப்புக் கழகம்
பொதுக் கட்டுமாான வட்டம்-சேலம்
அறிவிக்கை
[Lr. No. SE/GCC/SLM/AEE(GL)/DM/F. Press 21-22/D.1748/2021]
2021-22 மற்றும் அடுத்த ஆண்டுகளில் நிறுவ இருக்கும் மின்பாதை
கள் பற்றிய இவவறிக்கை
2003-ம் ஆண்டு மின்சாா
ர
சட்ட்டப் பிரிவு 164 மற்றும் 168-ன் கீழ் பொதுமக்க்களின் பார்வைக்காா
க வெளியிடப்படுகிறது.
கூடுதல் மின் அமைப்பை
நிறைவு செய்வதற்காாகவும் மின் அழுத்தத்தை
சீராக்காக்கவும் மின் இழப்பை
குறைப்பதற்காாகவும் கீழக்கணட
இடஙகளில் மின்பாதை
களை 2021-22 ஆம் ஆண்டு மற்றும் அடுத்த ஆண்டுகளில் நிறுவுவதற்காாக தமிழ்நாடு மின்சாா
ர வாாரியம் /
தமிழ்நாடு மின்தொடரமைப்புக் கழகம் ஒப்புதல் வழங்கியுள்ளது.
வ.
எண்
உயரழுத்த மின்பாதை
கள் விபரம்
மின்வாாரிய நிலை
(FB) ஆணை
எண்
ம�ொத்த்த
மதிப்பீடு
இலட்சம் ரூ.
முக்கிய அம்சஙகள்
பயன்கன்கள்
(1)
(2)
(3)
(4)
(5)
(6)
1
புதியதாாக அமையவிருக்கும் பேகப்பள்ளி
110/22 கி.வ�ோ துணை மின்
நிலையத்திற்கு ஓசூர் - சூசுவாாடி-
பகலூர் 110 கி.வ�ோ பீடரிலிருந்து
உள்வெ
ளி பாதையாா
க இரட்டை
ச்சுற்று
மின் க�ோபுரம் நிறுவி அதில் பேந்தந்தர்
கம்பி க�ொண்டு இரட்டை
ச்சுற்று
மின்பாதை
அமைத்தல்.
எண் 124 நாநாள்
17.08.2020
186.200
2.50 கி.மீ தூரம்
பேகப்பள்ளி மற்றும்
அருகிலுள்ள
கிராமஙகள் வழியாாக
மின்பாதை
அமைத்தல்.
மின் த�ொடர்
அமைப்பின்
மேம்பாாட்டிற்காாக.
2 (i)
சூசுவாாடி- பகலூர் 110 கி.வ�ோ பீடர் /
- லிருந்து எற்கனவே உள்ள
இரட்டை
ச்சுற்று மின் க�ோபுரத்தில்
காாலியாாக இருந்து வரும் மின்கோபுர
கையில் (Free Arm) பேந்தந்தர் கம்பி
க�ொண்டு ஒற்றை
ச்சுற்று மின்பாதை
அமைத்தல்
எண் 125 நாநாள்
17.08.2020
118.580
14.00 கி.மீ தூரம்
சூசுவாாடி பகலூர்
மற்றும் அருகிலுள்ள
கிராமஙகள் வழியாாக
மின்பாதை
அமைத்தல்.
மின் த�ொடர்
அமைப்பின்
மேம்பாாட்டிற்காாக.
(ii)
ESI மின் க�ோபுரம் எண்: 16-லிருந்து
சூசுவாாடி 110 கி.வ�ோ துணை
மின்நிலையத்திற்கு பல்சுற்று மின்
க�ோபுரம் ( நாநான்கு சுற்று மின் க�ோபுரம்)
அமைத்து பேந்தந்தர் கம்பி க�ொண்டு
இரட்டை
சுற்று மின்பாதை
அமைத்தல்.
130.050
0.65 கி.மீ தூரம்
சூசுவாாடி மற்றும்
அருகிலுள்ள
கிராமஙகள் வழியாாக
மின்பாதை
(iii)
ஓசூர் 110 கி.வ�ோ துணை மின்
நிலையத்திலிருந்து ESI மின் க�ோபுரம்
எண்: 16 வரை UG Cable மூலமாக
மின்பாதை
அமைத்தல்.
2550.700
7.00 கி.மீ தூரம்
ஓசூர் மற்றும்
அருகிலுள்ள
கிராமஙகள் வழியாாக
மின்பாதை
அமைத்தல்.
3
புதியதாாக அமையவிருக்கும்
திப்பம்பட்டி 110/33 கி.வ�ோ துணை மின்
நிலையத்திற்கு மேட்டூர் - அந்தியூர் பீடர்
110 கி.வ�ோ மின்பாதை
யினை உள்வெ
ளி
செய்து இரட்டை
ச்சுற்று க�ோபுரம் நிறுவி
பேந்தந்தர் கம்பி க�ொண்டு இரட்டை
சுற்று
மின்பாதை
DCW அடிப்படை
யில்
அமைத்தல்.
எண் 159 நாநாள்
24.11.2020
226.275
2.50 கி.மீ தூரம்
திப்பம்பட்டி, மேட்டூர்,
அந்தியூர் மற்றும்
அருகிலுள்ள
கிராமஙகள் வழியாாக
மின்பாதை
அமைத்தல்.
உயர் அழுத்த
மின்சாா
ரம் DCW
அடிப்படை
யில்
PWD, சேலம்
க�ோட்ட்டம் துறைக்கு
சரபங்காா நீரேற்று
திட்டத்திற்காாக
வழங்குதல்.
4
தலைவாசல் 110 கி.வ�ோ துணை மின்
நிலையத்திலிருந்து தலைவாசல் ரயில்வே
ட்ரே
க்ஷன் துணை மின் நிலையத்திற்கு
இரட்டை
ச்சுற்று மின் க�ோபுரம் நிறுவி
அதில் பேந்தந்தர் கம்பி க�ொண்டு ஒற்றை
சுற்று மின்பாதை
DCW அடிப்படை
யில்
அமைத்தல்.
Memo. No.
04191/CED/ED/
AEE/GL/F.Pro.
No.081 (Cap-
Est)/ PR.279/21
Dt.25.03.21
354.220
2.435 கி.மீ தூரம்
தலைவாசல் ரயில்வே
ட்ரே
க்ஷன் துணை
மின் நிலையம் மற்றும்
அருகிலுள்ள
கிராமஙகள் வழியாாக
மின்பாதை
அமைத்தல்.
உயர் அழுத்த
மின்சாா
ரம் DCW
அடிப்படை
யில்
தலைவாசல்
ரயில்வே
ட்ரே
க்ஷன்
நிறுவனத்திற்கு
வழங்குதல்.
TAMIL NADU GOVERNMENT GAZETTE
18
[Part VI—Sec.3(b)
வ.
எண்
உயரழுத்த மின்பாதை
கள் விபரம்
மின்வாாரிய நிலை
(FB) ஆணை
எண்
ம�ொத்த்த
மதிப்பீடு
இலட்சம் ரூ.
முக்கிய அம்சஙகள்
பயன்கன்கள்
(1)
(2)
(3)
(4)
(5)
(6)
5
கார்ணாம்பட்டு 110/33-11 கி.வ�ோ
துணை மின் நிலையத்திலிருந்து
M/s. VIT, வேலூர் துணை மின்
நிலையத்திற்கு இரட்டை
ச்சுற்று மின்
க�ோபுரம் நிறுவி அதில் பேந்தந்தர் கம்பி
க�ொண்டு ஒற்றை
சுற்று மின்பாதை
DCW அடிப்படை
யில் அமைத்தல்.
Lr.No.580/SE/
VEDC/DEV/
AE1/DM/F.
HTSC1251/
Addl (HT to
EHT)/ 2021,
Dt.16.03.21 &
revised vide
Lr.No. 96/SE /
VEDC/VLR/EE/
GNL/DEV/AEE/
AE1/F.HT SC
1251 (Addl)/ 21,
Dt.14.06.2021
707.280
8.00 கி.மீ தூரம்
வேலூர் மற்றும்
அருகிலுள்ள
கிராமஙகள்
மின்பாதை
வழியாாக
அமைத்தல்.
உயர்ர்ரழுத்த
மின்சாா
ரம் DCW
அடிப்படை
யில்
M/s. VIT, வேலூர்
நிறுவனத்திற்கு
வழங்குதல்.
6
ஓசூர் சிப்காாட் 110 கி.வ�ோ மின்
நிலையத்திலிருந்து M/s. INOX AIR
Products (P) Ltd.,க்கு 110 கிவ�ோ உயர்
அழுத்த மின்சாா
ரம் DCW அடிப்படை
யில்
வழங்கிட இரட்டை
சுற்று மின்கோபுரம்
நிறுவி அதில் பேந்தந்தர் கம்பி க�ொண்டு
ஒற்றை
சுற்று மின்பாதை
அமைத்தல்.
Memo.No.
CE/D/VLR/
EE/Ele/AEE/
Plg/ F.(HT SC
New)/D.069/
2021,
Dt.27.05.2021
142.254
4.50 கி.மீ தூரம்
ஒசூர் சிப்காாட் மற்றும்
அருகிலுள்ள
கிராமஙகள் வழியாாக
அமைத்தல்.
உயர் அழுத்த
மின்சாா
ரம் DCW
அடிப்படை
யில்
M/s. INOX AIR
Products (P) Ltd
நிறுவனத்திற்கு
வழங்குதல்.
7
புதியதாாக அமையவிருக்கும்
M/s. TATA Electronics (P) Ltd.,
திமிஞ்சப்பள்ளி 110 கி.வ�ோ துணை
மின் நிலையத்திற்கு உட்டனப்பள்ளி -
ராயக்கோட்டை 110 கி.வ�ோ
மின்பாதை
யினை உள் வெளி செய்து
இரட்டை
ச்சுற்று க�ோபுரம் நிறுவி பேந்தந்தர்
கம்பி க�ொண்டு இரட்டை
சுற்று
மின்பாதை
DCW அடிப்படை
யில்
அமைத்தல்.
Memo.No. CE/
Coml/ SE/EE1/
AEE1/F.
M/s. TATA
Electronic/
D.390/21,
Dt.26.10.2021
738.322
2.50 கி.மீ தூரம்
உட்டனப்பள்ளி,
ராயக்கோட்டை
மற்றும் அருகிலுள்ள
கிராமஙகள் வழியாாக
அமைத்தல்.
உயர் அழுத்த
மின்சாா
ரம் DCW
அடிப்படை
யில்
M/s. TATA
Electronics (P)
Ltd., திமிஞ்சப்பள்ளி
நிறுவனத்திற்கு
வழங்குதல்.
8
புதியதாாக அமையவிருக்கும் எலூர்
110 கி.வ�ோ துணை மின் நிலையத்திற்கு
உஞ்சனை - இளநகர் - இராாசிபுரம்
110 கி.வ�ோ மின்பாதை
யினை உள்வெ
ளி
செய்து இரட்டை
ச்சுற்று க�ோபுரம் நிறுவி
பேந்தந்தர் கம்பி க�ொண்டு இரட்டை
சுற்று
மின்பாதை
அமைத்தல்.
எண் 113, நாநாள்
06.12.2021
380.650
5.00 கி.மீ தூரம்
எலூர் மற்றும்
அருகிலுள்ள
கிராமஙகள் வழியாாக
அமைத்தல்.
மின் த�ொடர்
அமைப்பின்
மேம்பாாட்டிற்காாக.
மேற்காணப்பட்டட்ட திட்டஙகள் பற்றி ஏதேனும் முறையீடுகள் இருந்தாால் விருப்பம் உள்ளவர்கள் இவவறிக்கை
வெளியிட்ட நாநாளிலிருந்து
இரண்டு மாாதத்திற்குள் கீழே கைய�ொப்பமிட்ட அதிகாாரியிடம் 2003-ஆம் ஆண்டு மின்சாா
ர சட்ட்டப்பிரிவு 164 மற்றும் 168-ன் படி முறையிட
வேண்டப்படுகிறது.
சேலம்-14,
Er. A. NOWSHATH,