DTP—III-2 (25)

TAMIL NADU

GOVERNMENT GAZETTE

PUBLISHED BY AUTHORITY

No. 25]

CHENNAI, WEDNESDAY, JUNE 22, 2022

Aani 8, Subakiruthu, Thiruvalluvar Aandu–2053

Part III—Section 2

Statutory Notifi cations and Orders issued by

Heads of Departments.

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

©

[Regd. No. TN/CCN/467/2012-14.

GOVERNMENT OF TAMIL NADU

[R. Dis. No. 197/2009.

2022

[Price : Rs. 1.60 Paise

CONTENTS

[91]

Pages.

CO-OPERATIVE HOUSING DEPARTMENT CHENNAI

Tamil Nadu Information Technology (Electronic Service Delivery) Rules, 2016.

92

INDIAN RAILWAYS

Energisation the newly erected Overhead Equipment on the following Sections in

Madurai and Thiruvananthauram Division of Southern Railway.

..

..

92-93

92

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

CO-OPERATIVE HOUSING DEPARTMENT CHENNAI-7

Tamil Nadu Information Technology (Electronic Service Delivery) Rules, 2016.

(Lr.No.7471/2021/B3)

No. SRO C-19/2022.

The Registrar of Co-operative Societies Chennai-07 hereby denotifi es the public services specifi ed in column (2) of

the Table below to be the services that can be delivered through electronic mode under the electronic services delivery

system. And the other relevant particulars as specifi ed in column (3) Thereof.

Tඐඍ Tඉඊඔඍ

Sl.No.

Name of the Public Services that can be delivered through

Electronic mode

Designated Offi cer for the delivery

of the Service

(1)

(2)

(3)

1. Services i The type of loan (Construction Mortgage and Jewel Loan) sanctions.

ii. The quantum of loan and rate of interest for each category

iii Documents to be required for getting loan.

iv Waiver details if any.

AGM (Loans), Tamil Nadu Co-operative

Housing Federation.

2. Online

Payment

of loan

dues

i. The Member can browses his loan account statement through

www.https/tnchf.tn.gov./

ii The member can pay the e-dues through online.

iii The member can take a online receipt.

iv. The member can view his Demand, Collection and Balance

AGM (Admn.) Tamil Nadu

Co-operative Housing Federation.

Chennai-600 007. A.D. BASKARAN,

29th April 2022. Registrar of Co-operative Societies (Housing).

INDIAN RAILWAYS

Energisation the newly erected Overhead Equipment on the following Sections in

Madurai and Thiruvananthapuram Division of Southern Railway

(No. RVNL/MAS/GM/E/CRS/MEJ-NCJ/08)

Pro forma 10-01

"PUBLIC NOTIFICATION"

No. SRO C-20/2022.

Notice is hereby given to all users of Railway lines and premises situated on the completed section of the under-

noted sections of the Southern Railway that the 25000 Volt. 50 Hz, ac, single phase overhead traction wires will be

energised on or after the date specifi ed against the Sections. On and from the same date the overhead traction line

shall be treated as “LIVE” at all times and no unauthorised person shall approach or work in the proximity of the said

overhead line.

June 22, 2022]

TAMIL NADU GOVERNMENT GAZETTE

93

PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI

ON BEHALF OF THE GOVERNMENT OF TAMIL NADU

Section

Date

Energisation of Overhead Equipment on the newly laid track, as part of doubling (i) between Milavittan

(Exclusive) and Tuticorin (Inclusive) Stations from OHE Mast Location No.646/23 (km/ch:646/574.70)

to OHE Mast Location No. 653/48 (km/ch:653/1006.00) and (ii) between Valliyur (Exclusive) and

Tirunelveli Jn (Inclusive) Stations from OHE Mast Location No.322/22 (km/ch: 322/595.50) to OHE

Mast Location No. TEN/1002 (Km/Ch:27/22.30) at 25kV AC single phase 50Hz supply system on

Madurai-Tuticorin and Nagercoil-Tirunelveli Sections in Madurai and Thiruvananthapuram Divisions

of Southern Railway.

30.06.2022

Chennai – 600 008.

S.JAYAKRISHNAN,

16th June 2022.

Deputy Chief Electrical Engineer/OHE,

for Chief Electrical Engineer/Construction

Southern Railway, Chennai Egmore.

(No. RVNL/MAS/GM/E/CRS/MEJ-NCJ/08)

INTRODUCTION OF AC 25 kV TRACTION

Pro forma 10-02

“WARNING TO ROAD USERS”

NO. SRO C-21/2022.

It is notifi ed for information of the public that in connection with introduction of 25 kV ac electric traction on the

newly laid track, as part of doubling (i) between Milavittan (Exclusive) and Tuticorin (Inclusive) Stations from OHE

Mast Location No.646/23 (km/ch:646/574.70) to OHE Mast Location No. 653/48 (km/ch:653/1006.00) and (ii) between

Valliyur (Exclusive) and Tirunelveli Jn (Inclusive) Stations from OHE Mast Location No.322/22 (km/ch: 322/595.50) to

OHE Mast Location No. TEN/1002 (Km/Ch:27/22.30) at 25kV AC single phase 50Hz supply system on Madurai-Tuticorin

and Nagercoil-Tirunelveli Sections in Madurai and Thiruvananthapuram Divisions of Southern Railway, height gauges have

been erected at all the level crossings with clear MAXIMUM HEIGHT OF 4.78m above road level with a view to prevent

loads of excessive height from coming into contact or in dangerous proximity to live traction wire (CONTACT WIRE),

WHICH SHALL BE AT A HEIGHT OF MINIMUM 5.5m ABOVE THE RAIL LEVEL AT LEVEL CROSSINGS.

Public are hereby notifi ed to observe the height specifi ed above for the purpose of loading vehicles and to see that

the loads carried in road vehicles do not infringe the height gauges under any circumstances,.

The dangers of a load of excessive height are as follows :

(i) Danger to the height gauge and consequent obstruction to the road as well as the railway line.

(ii) Danger to the materials or equipment carried or for the vehicle itself.

(iii) Danger of fi re and risk of life due to contact with or in dangerous proximity to the conductors.

S. JAYAKRISHNAN,

Deputy Chief Electrical Engineer/OHE,

(No.E.320/RVNL/CRS)

for Chief Electrical Engineer/Construction

Chennai-600 008.

Southern Railway, Chennai Egmore,

16th June 2022. Chennai – 600 008.