TAMIL NADU

GOVERNMENT GAZETTE

PUBLISHED BY AUTHORITY

No. 3A]

CHENNAI, WEDNESDAY, JANUARY 18, 2023

Thai 4, Subakiruthu, Thiruvalluvar Aandu–2054

Part VI–Section 1

(Supplement)

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

DTP—VI-1-Sup. (3A)

©

[Regd. No. TN/CCN/467/2012-14.

GOVERNMENT OF TAMIL NADU

[R. Dis. No. 197/2009.

2023

[Price : Rs. 32.00 Paise.

[ 1 ]

CAUVERY-VAIGAI-GUNDAR LINK CANAL SCHEME

PUDUKKOTTAI DISTRICT

Errata notice to the notifi cation Published under section 11(1) of Right to Fair Compensation, and

Transparency in Land Acquisition, Rehabilation and Resettlement Act, 2013 and

under section 13(1) of Rules, 2017.

(Rc.No. 67 /2021/CVG/A2 dated 21.12.2022)

No. VI(1)/48/2023.

The following errata is hereby issued to the Preliminary notifi cation published for Land Acquisition for the public

purpose namely formation of Cauvery-Vaigai-Gundar link canal in Kunnathur Village of Viralimalai Taluk, Pudukkottai District

Under section 11(1) of Right to Fair Compensation, and Transparency in Land Acquisition, Rehabilation and Resettlement

Act -2013 and Under section 13(1) of rules, 2017 to the 189 survey numbers to an extent of 24.33.84 hectares patta lands as

per Pudukkottai District Collector Proceedings No. 67/CVG/LA/2021 dated: 01.10.2021, published Notifi cation No.4 (Tamil), page

No. 90-108 and Notifi cation No. 3 in (English) page No.73-98 of Pudukkottai District Gazette dated :14.10.2021 and in page

No. 12-13 of Dhinakaran Tamil daily news paper dated 17.10.2021 and in Page No: 10-11 of Times of India English daily

news paper dated 17.10.2021. Errata to the following 56 survey numbers is hereby issued as detailed below.

Tඐඍ Sඋඐඍඌඝඔඍ

Pudukkottai District, Viralimalai Taluk, Kunnathur Village.

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

1

1

76/2

0.44.50

0.37.00

DRY

-

Neem

Tree-20

824-Anthonisamy,

S/o. Savarimuthu-1,

Velanganni

S/o. Savarimuthu-2,

Anthoniyammal

W/o. Savarimuthu-3

Anthonisamy

S/o. Savarimuthu-4

1

76/2

0.44.50

0.37.00

DRY

Pipeline

Neem Tree-5

824-Anthonisamy,

S/o. Savarimuthu-1,

Velanganni

S/o. Savarimuthu-2,

Anthoniyammal

W/o. Savarimuthu-3,

Anthonisamy

S/o. Savarimuthu-4

Red Sandal

Wood

Tree -20

Red Sandal

Wood Tree -20

Nuna Tree-1

2

2

76/3

0.36.50

0.36.50

DRY

-

Neem

Tree-17

824-Anthonisamy,

S/o. Savarimuthu-1,

Velanganni

S/o. Savarimuthu-2,

Anthoniyammal

W/o. Savarimuthu-3

Anthonisamy

S/o. Savarimuthu-4

2

76/3

0.36.50

0.36.50

DRY

-

Red Sandal

Wood Tree-4

824-Anthonisamy,

S/o. Savarimuthu-1,

Velanganni

S/o. Savarimuthu-2,

Anthoniyammal

W/o. Savarimuthu-3

Anthonisamy

S/o. Savarimuthu-4

Red Sandal

Wood Tree-

200

Neem Tree-8

Teak Wood

Tree-3

Palm

Tree-1

3

3

76/4

0.22.50

0.22.50

DRY

-

Red Sandal

Wood

Tree-60

2645- Anandhan -1

Madhan-2

s/o Selvaraj

3

76/4

0.22.50

0.22.50

DRY

Pipeline

Red Sandal

wood

Tree-115

2645- Anandhan -1

Madhan-2 S/o. Selvaraj

Neem Tree-8

4

5

76/6

0.21.00

0.00.50

DRY

-

-

824-Anthonisamy,

S/o. Savarimuthu-1,

Velanganni

S/o. Savarimuthu-2,

Anthoniyammal

W/o. Savarimuthu-3

Anthonisamy

S/o. Savarimuthu-4

5

76/6

0.21.00

0.00.50

DRY

-

Red Sandal

Wood Tree-6

824-Anthonisamy,

S/o. Savarimuthu-1,

Velanganni

S/o. Savarimuthu-2,

Anthoniyammal

W/o. Savarimuthu-3

Anthonisamy

S/o. Savarimuthu-4

Neem Tree-3

2

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

5

6

76/7

0.67.00

0 55 50

DRY

-

Neem

Tree-10

2645- Anandhan -1

Madhan-2

S/o. Selvaraj

6

76/7

0.67.00

0.55.50

DRY

Borewell-1

Red Sandal

wood

Tree -133

2645- Anandhan -1

Madhan-2

S/o. Selvaraj

Blackblum

Tree-1

Vatham

Tree-2

Neem Tree-1

Red Sandal

Wood

Tree-30

Nuna Tree-2

6

8

76/12

0.20.00

0.20.00

DRY

-

-

2645- Anandhan -1

Madhan-2

S/o. Selvaraj

8

76/12

0.20.00

0.20.00

DRY

Red Sandal

Wood Tree -42

2645-

Anandhan -1 Madhan-2

S/o. Selvaraj

Neem Tree-9

Nuna Tree-2

Teakwood

Tree-3

Custard Apple

Tree-45

Black blum

Tree-1

7

9

76/13

0.46.00

0.25.00

DRY

Aspestas

Building-1

Coconut

Tree-9

1834-

S.Santhanaraj-1

S. Deniyalraj -2

V. Rajinimala-3 T.

Rajeswari-4

9

76/13

0.46.00

0.25.00

DRY

Terrace

Building 2

Red Sandal

Wood Tree -7

1834-S.Santhanaraj-1

S. Deniyarraj -2 V.

Rajinimala-3

T. Rajeswari-4

Rounded

Well-1

Neem-11

Teakwood

Tree-4

Ground

Level

Water

Tank-1

Teak wood

Tree-6

Rounded

Well-1

Neem Tree-3

Compound

Wall-1

Vatham-3

Coconut

Tree -9

Lime Tree -10

3

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

8

12

77/7

1.39.50

0.54.00

DRY

-

Teakwood

Tree-22

1745- Pakiyaraj

S/o. Santhappan

12

77/7

1.39.50

0.54.00

DRY

-

Neem Tree-34

3480- C.H. Aameena

W/o. Abdul Rahman-1

N.V. Asraf Kunchunu

S/o. Abdul Rahman -2

N.V. Ahamad Unni

S/o. Abdul Rahman -3

N.V. Vummu Kulthum

D/o. Abdul Rahman -4

N.V. Amjath Ibrahim

S/o. Abdul Rahman -5

N.V. Ahasan Moosa

S/o. Abdul Rahman-6

N.V. Fathimanthu

Suhara

D/o. Abdul Rahman-7

Neem Tree-3

Teak Wood

Tree-26

Coconut Tree-1

Palm Tree-12

Manjanathi

Tree-3

Kovapul Tree-1

Banyan Tree -1

Pipal Tree-1

9

13

77/8

0.94.50

0.34.50

DRY

-

Palm Tree-5

2129-Pakiyaraj

S/o. Santhappan

13

77/8

0.94.50

0.34.50

DRY

-

Neem

Tree -39

3479-

C.H. Aameena

W/o. Abdul Rahman-1

N.V. Asraf Kunchunu

S/o. Abdul Rahman -2

N.V. Ahamad unni

S/o. Abdul Rahman-3

N.V. Vummu Kulthum

D/o. Abdul Rahman-4

N.V. Amjath Ibrahim

S/o. Abdul Rahman-5

N.V. Ahasan Moosa

S/o. Abdul Rahman-6

N.V. Fathimanthu

Suhara

D/o. Abdul Rahman-7

Neem

Tree-12

Palm Tree-5

Manjanathi

Tree-2

Velamaram -1

Custard apple

Tree-1

Konnai Tree-1

10

15

82/6

0.35.00

0.34.50

Wet

-

-

542- Chinnaponnu

W/o .

Maruthanayagam-1

Periyanayagam

S/o. Savarimuthu

Vudaiyar-2

Mariyammal -3

15

82/6A

0.17.50

017.50

Wet

Pipeline

-

3597-Mariyammal

W/o. Arockiasamy

82/6B

0.17.50

0.17.00

Wet

Pipeline

-

3605-Immanuvelraj

S/o. Periyanayagam

4

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

11

19

84/2B

0.23.54

0.23.50

Ryot

Manai

Terrace

House-1

Neem Tree-5 407-Sebasthiyan

S/o.

Yagappavudaiyar

19

84/2B

0.23.54

0.23.50

Ryot

Manai

Terrace

House-1

Banana

tree -15

407-Savariyammal

W/o. Sebasthiyar-1

Guava tree-3

Black Blum

Tree-1

Lime tree -2

(Narthai) Wild

lemon tree-2

Custard apple

Tree-3

Drumstick

tree -5

Gooseberry

Tree -1

Compound

wall-1

Pomegranate

tree -5

Aspestas

Tent-1

Poova-

rasam

tree -1

Kodukapuli

Tree -5

Yagappan

S/o. Sebasthiyar-2

Kulanthairaj

S/o. Sebasthiyar-3

Francies Xavier

S/o. Sebasthiyar-4

Aspestas

Tent-1

Mango tree-1

Papaya tree-1

Bathroom

Tub-1

Vatham

(small)

Tree-1

Bathroom

Tub-1

Karuveppillai

tree -10

Jasmine

Plant -12

Tamarind

tree -5

Neem tree -17

Borewell-2

Borewell-2

Vathanarayana

tree-3

Poovarasam

tree -8

Uthiyan

Tree-11

Konnai Tree-1

Subapul pathai

Pungan Tree-2

Velikaruvel

Tree

5

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

12

21

85/1A

0.16.00

0.16.00

DRY

-

-

1456- Savarimuthu

S/o. Innasi-1

Sevathi Vudaiyar

S/o. Yagappa

vudaiyar-2

21

85/1A

0.16.00

0.16.00

DRY

-

Vatha narayana

Tree-7

3559- Arockiyasamy

S/o. Savarimuthu-1

Immanuvel Raj

S/o. Periyanayagam-2

Domaiyammal

D/o. Periyanayagam-3

Savariyammal

W/o. Sebasthiyar-4

Yagappan

S/o. Sebasthiyar-5

Kulanthairaj

S/o. Sebasthiyar -6

Francies Xavier

S/o. Sebasthiyar-7

Velvel Tree-1

13

24

85/1D1

0.01.00

0.01.00

DRY

-

-

458-Savarimuthu

S/o Innasi

24

85/1D1

0.01.00

0.01.00

DRY

Kallarai

-

458-Savarimuthu

S/o. Innasi

14

28

85/1G

0.11.00

0.11.00

DRY

-

-

2731-Immanuvelraja

S/o. Periyanayagam

28

85/1G

0.11.00

0.11.00

DRY

Pipeline

-

2731-Immanuvelraj

S/o. Periyanayagam

15

29

86/2

0.41.50

0.01.50

DRY

-

-

2628- Savariammal

W/o Sebasthiyar-1,

Yagappan

S/o. Sebasthiyar-2,

Kulanthai Rasu

S/o. Sebasthiyar-3,

Fransis Xavier,

S/o. Sebasthiar-4

29

86/2

0.41.50

0.01.50

DRY

-

Palm tree-5

2628- Savariammal

W/o Sebasthiyar-1,

Yagappan

S/o. Sebasthiyar-2,

Kulanthai Rasu

S/o. Sebasthiyar-3,

Fransis Xavier,

S/o. Sebasthiar-4

16

30

86/5

0.33.00

0.33.00

Ryot

Manavari

-

Palm Tree-5

2992-Kulanthaisamy

S/o. Arockiya vudaiyar

30

86/5

0.33.00

0.33.00

Ryot

mana vari

Rounded

well-1

Teakwood

Tree-1

2992-Kulanthaisamy

S/o. Arockiya vudaiyar

Neem Tree-2

Coconut

Tree-16

Motor

Room-1

Drumstick

Tree-1

Pipeline

Palm Tree-3

Coconut

Tree-14

6

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

17

31

86/6

0.16.00

0.16.00

DRY

-

-

1804-Kulanthai

S/o. Arockiya

Udaiyar-1

Susai Udaiyar

G/o. Arockiya

Samy-2

31

86/6A

0.14.68

0.14.68

DRY

-

Ilanthai tree-3

3647-Arockiya samy

S/o. Savarimuthu

Konrai tree -1

Neem tree-2

Mavalinga

tree -1

Manja nathi

tree-2

86/6B

0.00.50

0.00.50

DRY

-

-

3648-Kulanthai samy

S/o. Arockiya Udaiyar

86/6C

0.00.82

0.00.82

DRY

-

-

3709-Kulanthai therasu

W/o. Arockiya samy

18

32

86/7

0.03.00

0.03.00

DRY

Borewell-1

-

1162-Mookayi

W/o. Arockiya

vudaiyar

32

86/7

0.03.00

0.03.00

DRY

-

-

3542-Arockiya Samy

S/o. Sebasthiyar

19

34

86/9

0.05.50

0.04.00

DRY

-

-

459-Savarimuthu

S/o. Arockiya

Udaiyar

34

86/9

0.05.50

0.04.00

DRY

-

Ilanthai tree -1

459-Savarimuthu

S/o. Arockiya Udaiyar

Tamarind

tree-2

20

35

86/12

0.41.00

0.17.00

DRY

-

-

1998-Arulanthu W/o

Susai Udaiyar-1

Arockiyasamy

S/o.

Susaivudaiyar-2

35

86/12A

0.20.86

0.00.54

DRY

-

Mango Tree-1

3624- Arulanthu

S/o. Susai Udaiyar

86/12B

0.17.50

0.13.82

DRY

-

-

3401-Arockiyasamy

S/o Savarimuthu

Udaiyar

86/12

C1

0.00.50

0.0050

DRY

-

-

3696-Kulanthai Samy

S/o. Arockiya Udayar

86/12

C2

0.02.14

0.02.14

DRY

-

-

3625-Kulanthai therasu

W/o. Arockiya samy

21

36

86/13

0.17.50

0.08.50

DRY

Aspestas

Bathroom

-1

Neem tree

(small)-1

185-Arockiyasamy

S/o. Savarimuthu

36

86/13A

0.15.50

0.06.50

DRY

Ground

level Water

Tank-1

Cocunut tree -4

185-Arockiyasamy

S/o. Savarimuthu

Black blum

tree-1

North side

parch of

house -1

Coconut

Tree(small)-1

86/13B

0.01.00

0.01.00

DRY

-

-

3649-Kulanthai samy

S/o. Arockiya Udaiyar

86/13C

0.01.00

0.01.00

DRY

-

-

3709-Kulanthai therasu

W/o. Arockiya samy

22

37

86/24B

0.06.00

0.01.00

DRY

-

Neem tree-1

679-Soosai

S/o. Savarimuthu

37

86/24B

0.06.00

0.01.00

DRY

-

Neem tree-1

679-Soosai

S/o. Savarimuthu

palm tree-1

Palm tree-3

7

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

23

38

86/24C

0.10.00

0.08.50

DRY

-

Konnai

tree-1

702-Sevathiyar S/o

Savarimuthu

38

86/24C

0.10.00

0.08.50

DRY

-

Konnai-2

702- Sevathiyar

S/o. Savarimuthu

Mango tree

(small)-1

Mango tree-1

palm tree-4

Palm tree-7

24

39

86/25

1.10.00

0.91.00

DRY

Rounded

well-1

-

2992-

Kulanthaisamy

S/o. Arockiya

vudaiyar

39

86/25A

1.05.86

0.88.35

DRY

Borewell-1

Manjanathi

Tree-4

2992- Kulanthaisamy

S/o. Arockiya vudaiyar

Thaila tree-4

Uzilla tree-1

Pipeline

Velvel tree-1

Neem tree-2

Coconut tree-2

Drumstick

tree-1

Borewell-1

86/25B

0.04.14

0.02.65

DRY

-

-

3709-

Kulanthai therasu W/o.

Arokiyasamy

25

40

88/1A

0.05.50

0.04.00

Wet

-

-

185- Arockiasamy

S/o. Savarimuthu

40

88/1A

0.05.50

0.04.00

Wet

-

Vaakai tree-1

185-Arockiasamy

S/o. Savarimuthu

26

52

88/7

0.21.50

0.20.50

Wet

-

-

1997- Arockiasamy

S/o Susai vudaiyar

52

88/7

0.21.50

0.20.50

Wet

Pipeline

-

3560-

Kulanthai therasu W/o.

Arokiyasamy

***

27

53

88/8

0.10.00

0.10.00

Wet

-

-

1450-Arockiasamy

S/o. Susai

vudaiyar-1 Durai

S/o. Arockia

vudaiyar-2

53

88/8

0.10.00

0.10.00

Wet

Pipeline

-

3560-

Kulanthai therasu W/o.

Arokiyasamy

***

28

62

90/5B

0.01.00

0.00.25

DRY

-

Neem tree-1

1796-Arockiasamy

S/o. Susai vudaiyar

62

90/5B

0.01.00

0.00.25

DRY

Pipeline

-

3560- Kulanthai therasu

W/o. Arockiasamy

29

63

90/6

0.01.00

0.00.83

DRY

-

Neem tree-1

1997- Arockiasamy

S/o. Susai vudaiyar

63

90/6

0.01.00

0.00.83

DRY

Pipeline

Neem Tree-2

3560- Kulanthai therasu

W/o. Arockiasamy

Aavi tree-1

30

71

128

0.43.00

0.43.00

Ryot Mana

vari

-

-

370- Kumarasamy

S/o. Palaniyandi

71

128/1

0.42.63

0.42.63

Ryot

Mana vari

Damaged

Rounded

well-1

Konnai tree -1

370- kumarasamy

S/o. Palaniyandi

Manja nathi

Tree -1

128/2

0.00.37

0.00.37

Ryot

Mana vari

-

-

3711- Penner francies

smith

S/o. Seyindan smith

8

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

31

95

132/10

0.16.00

0.01.80

Ryot Mana

vari

Rounded

well-1

Neem tree-1

2534- Palaniyandi

S/o. Karuppannan

95

132/10

0.16.00

0.01.80

Ryot

Manavari

Rounded

well-1

Coconut tree -1 2534- Palaniyandi

S/o. Karuppannan

Coconut

tree-1

Konnai

tree-3

Konnai tree -3

32

107

132/29

0.01.50

0.01.50

Ryot Mana

vari

Square

well-1

Neem tree-2

1585- Palaniyandi

S/o. Vellaiyan

Poorani

S/o. Adaikkan-2

Sannasi

S/o. Muthusamy -3

107

132/29

0.01.50

0.01.50

Ryot

Manavari

Squared

well-1

Konnai tree-1

1585- Palaniyandi

S/o. Vellaiyan-1 Poorani

S/o. Adaikkan-2

Sannasi

S/o. Muthusamy -3

Konnai

tree-1

33

121

279/14

0.28.50

0.19.50

DRY

-

-

2731-Immanuvelraj

S/o.

Periyanayagam

121

279/14

0.28.50

0.19.50

DRY

Pipeline

-

2731-Immanuvelraj

S/o. Periyanayagam

34

122

279/23

0.25.50

0.22.00

Wet

-

-

2731-Immanuvelraj

S/o.

Periyanayagam

122

279/23

0.25.50

0.22.00

Wet

Pipeline

-

2731-Immanuvelraj

S/o. Periyanayagam

35

123

280/1

0.54.50

0.51.00

Wet

Electric

Connected

with

Square

well-1

Coconut

Tree-4

2731-Immanuvelraj

S/o.

Periyanayagam

123

280/1

0.54.50

0.51.00

Wet

Electric

Connected

with

Square

well-1

Coconut Tree-4

2731-Immanuvelraj

S/o. Periyanayagam

Pipeline

ground

level

water tank

(small) 1

36

124

307/1

0.68.00

0.67.00

Wet

Electric

Connected

with

Square

well-1

Coconut

Tree-9

2730- Arockiasamy

S/o Savari (A)

Savarimuthu

124

307/1

0.68.00

0.67.00

Wet

Electric

Connected

with

Square

well-1

Coconut Tree-9

2730- Arockiasamy

S/o. Savari (A)

Savarimuthu

Motor

Room-1

Motor

Room-1

Palm Tree-3

Pipeline

9

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

37

129

307/9A

0.08.50

0.08.50

Wet

-

-

2483- Rengasamy

S/o. Muthaiah

129

307/9A

0.08.50

0.08.50

Wet

-

Palm Tree-3

3544-

Kamala

W/o. Rengasamy-1

Thenmozhi

D/o. Rengasamy-2

Devaki

D/o. Rengasamy-3

Mugeswari

D/o. Rengasamy-4

Karuppaiah

S/o. Rengasamy-5

Raja

S/o. Rengasamy-6

***

38

131

308/2A

0.40.00

0.13.50

Wet

-

-

495- Savarimuthu

S/o. Savarimuthu

Udaiyar

131

308/2A

0.40.00

0.13.50

Wet

Pipeline

Neem Tree-3

3418- Joseph

S/o. Savarimuthu-1

Jesurathinam

S/o. Savarimuthu-2

39

132

308/2B

0.06.00

0.06.00

Wet

-

-

1493-Arockiya

samy

S/o. Arockiya

samy Udaiyar-1

Savarimuthu

S/o. Savarimuthu

Udaiyar-2

132

308/2B

0.06.00

0.06.00

Wet

Pipeline

Neem tree -10

3451-Kulanthai samy

S/o. Arockiyasamy-1

Joseph

S/o. Savarimuthu-2

Jesu rethinam

S/o. Savarimuthu-3

Square

well-1

Drumstick

tree -1

Damaged

Motor

Room-1

Manjanathi

tree-1

40

137

308/9D

0.06.00

0.04.00

Wet

Electric

Connected

with

Rounded

well-1

Neem

(small)

Tree-9

354- Samikkannu

S/o. Nadesan

137

308/9D

0.06.00

0.04.00

Wet

Electric

Connected

with

Rounded

well-1

Neem tree -6

354-Samikkannu

S/o. Nadesan

Drumstick

tree-1

Kovapul tree-1

41

139

308/11A

0.01.00

0.01.00

Wet

-

-

1494- Rasu

S/o. Mangulathan-1

Narayanan

S/o. Mangulathan-2

139

308/11A

0.01.00

0.01.00

Wet

Rounded

well-1

-

1494- Narayanan

S/o. Mankulathan-1,

Kamala

W/o. Rengasamy-2

Thenmozhi

D/o. Rengasamy-3

Mugeswari

D/o. Rengasamy-4

Devaki

D/o. Rengasamy -5

Karuppaiah

S/o. Rengasamy -6

Raja

S/o.. Rengasamy-7

10

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

42

149

309/1

0.08.50

0.08.50

Wet

-

-

3046- Kalaivani

W/o. Palanisamy

149

309/1

0.08.50

0.08.50

Wet

Pipeline

-

3046- Kalaivani

W/o. Palanisamy

43

150

309/2

0.07.50

0.07.50

Wet

Electric

Connected

with

Rounded

well -1

Coconut

Tree-5

857- Palanisamy

S/o. Paradesi

150

309/2

0.07.50

0.07.50

Wet

Electric

Connected

with

Rounded

well-1

Coconut Tree-5 857- Palanisamy

S/o. Paradesi

***

Palm tree-1

Pipeline

Palm tree-1

44

151

309/3

0.07.50

0.07.50

Wet

-

Neem tree

(small)-3

3046- Kalaivani

W/o. Palanisamy

151

309/3

0.07.50

0.07.50

Wet

Pipeline

-

3046- Kalaivani

W/o. Palanisamy

45

158

309/9

0.08.50

0.08.50

Wet

-

-

3046- Kalaivani

W/o. Palanisamy

158

309/9

0.08.50

0.08.50

Wet

Pipeline

-

3046- Kalaivani

W/o. Palanisamy

46

159

309/10

0.08.50

0.08.50

Wet

-

-

857- Palanisamy

S/o. Paradesi

159

309/10

0.08.50

0.08.50

Wet

Pipeline

-

857- Palanisamy

S/o. Paradesi

***

47

160

309/11

0.06.50

0.06.50

Wet

-

-

110- Karuthamuthu

S/o. Aandi

160

309/11

0.06.50

0 06 50

Wet

Pipeline

-

3461- Karupayi

W/o. Karuthamuthu-1

Nallusamy

S/o. Karuthamuthu-2

Rathi

D/o. Karuthamuthu-3

Venkatesh

(Guardian Mother

Palaniyammal)

S/o. Balasubramani-4

Deepak (Gardian

Mother Palaniyammal)

S/o. Balasubramani-5

48

161

309/12

0.07.50

0.06.50

Wet

-

-

826- Thiruppan

S/o. Sinnapayal

161

309/12

0.07.50

0 06 50

Wet

Pipeline

-

3693- Palanisamy

S/o. Paradesi

49

164

309/16A

0.13.00

0.13.00

Wet

-

Neem tree 3

2032- Savarimuthu

S/o. Savarimuthu1

Muthayan

S/o.Ramasamy2

164

309/16A1

0.01.50

0.01.50

Wet

-

-

2032- Savarimuthu

S/o. Savarimuthu

309/16A2

0.11.50

0.11.50

Wet

-

-

3546- Muthayan

S/o.Ramasamy

50

165

309/16B

0.45.50

0.31.00

Wet

-

-

2130- Susai

S/o. Savarimuthu

Vudaiyar

165

309/16B1

0.06.50

0.00.87

Wet

Pipeline

-

2130- Susai

S/o. Savarimuthu

Vudaiyar

309/16B2

0.39.00

0.30.13

Wet

Pipeline

-

3673- Juli anbu mari

W/o. Savarimuthu

11

Already Published

To be Edited

Sl.

No.

11(1)

S.No.

Survey

No.

Total

Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

11(1)

S.No.

Survey

No.

Total Area

(Hec.)

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Structure

Tree

Patta No.

Pattadhar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

51

179

311/7

0.12.50

0.11 50

Wet

-

-

2900- Pitchai (a)

Muthusamy

S/o. Adaikalam

179

311/7

0.12.50

0.11.50

Wet

Pipeline

-

2900- Pitchai (a)

Muthusamy

S/o. Adaikalam

52

182

332/2

0.20.50

0.17.50

Wet

Rounded

well-1

Coconut

Tree-3

632- Maruthamuthu

S/o. Kalingimuthu

182

332/2

0.20.50

0 17 50

Wet

Pipeline

Coconut Tree-3 632- Maruthamuthu

S/o. Kalingimuthu

Rounded

well-1

53

183

332/3

0.21.00

0.21.00

Wet

-

-

521-Pappa

W/o Kalingimuthu-1

Maruthamuthu

S/o. Kalingimuthu-2

Nagaraj

S/o.

Kalingamuthu-3

Govindan

S/o.

Kalingamuthu-4

183

332/3A

0.10.50

0.10.50

Wet

Pipeline

-

521-Pappa

W/o. Kalingamuthu-1

Maruthamuthu

S/o. Kalingamuthu-2

Nagaraj

S/o. Kalingamuthu-3

GovindaRaj

S/o. Kalingamuthu-4

332/3B

0.10.50

0.10.50

Wet

Pipeline

-

3516- Rajendran

S/o. Periyasamy

54

184

333/1

2.03.50

1.75.00

Dry

-

-

2606- Moorthi

S/o. Natesan

184

333/1

2.03.50

1.75.00

Dry

Squared

well-1

-

3618- Gokila

W/o. Moorthi-1 Karthick

S/o. Moorthi-2 Karthika

D/o. Moorthi-3 Priyanka

D/o Moorthi-4 Aarthi

D/o. Moorthi-5

55

186

338/1

0.46.50

0.46.50

Dry

-

Neem

Tree(small)-10

2606- Moorthi

S/o. Natesan

186

338/1

0.46.50

0.46.50

Dry

-

Mango

Tree-150

3618- Gokila

W/o. Moorthi-1 Karthick

S/o. Moorthi-2 Karthika

D/o. Moorthi-3 Priyanka

D/o Moorthi-4 Aarthi

D/o. Moorthi-5

***

Neem

Tree-10

Mango

Tree-150

56

189

339/1

2.37.00

0.48.50

Dry

-

Red Sandal

Wood

Tree-30

2645-1.Ananthan

S/o. Selvaraj, 2.

Madan

S/o. Selvaraj

189

339/1

2.37.00

0.48.50

Dry

-

Red Sandal

Wood Tree-2

2645- 1.Ananthan

S/o. Selvaraj,

2. Madan

S/o. Selvaraj

Mango Tree-7

Mango

Tree-5

Neem Tree-10

Teak Tree-6

(small)

Palm Tree-2

Palm Tree-3

Konnai Tree-2

12.46.88

12.46.88

12

It is hereby notifi ed that there is no amendment to the 32 Survey numbers (9.75.00 Hec.) which are acquired through Private Negotiation before publication

of Preliminary Notifi cation of Kunnathur Village, Viralimalai Taluk for Cauvery-Vaigai-Gundar Link Canal Scheme. Details are given below.

Sl.

No.

Survey

No.

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Tree

Structure

Patta No.

Pattadhar Name

Sl.

No.

Survey

No.

Area under

Acquisition

(Hec)

Type of

Land

(Wet/

Dry/

Natham)

Tree

Structure

Patta No.

Pattadhar Name

1

126/4

0.21.00

Manavari

Neem Tree-8

-

Mohamad Abubakkar

S/o Mohamad Ibrahim

***

17

137/9

0.13.00

Dry

-

-

Chidambaram

S/o. Pazhamalai

***

2

126/1A2B

0.08.50

Dry

-

-

Mohamad Abubakkar

S/o Mohamad Ibrahim

***

18

137/11

0.06.00

Dry

Neem Tree - 2

-

Chidambaram

S/o. Pazhamalai

***

3

133/2

0.66.00

Manavari

Neem Tree-17

Manjakadambai-1

Rounded well -1

Motor room-1

Mohamad Abubakkar

S/o Mohamad Ibrahim

***

19

137/12

0.08.00

Dry

-

-

Chidambaram

S/o. Pazhamalai

***

4

134/1

0.18.00

Manavari

Neem Tree- 3

Terrece Building-1

Borewell-1

Ashpetos building

with compound-1

Mohamad Abubakkar

S/o Mohamad Ibrahim

***

20

137/13

0.05.00

Dry

-

-

Chidambaram

S/o. Pazhamalai

***

5

125/1

0.28.50

Dry

-

-

Mohamad Abubakkar

S/o Mohamad Ibrahim

***

21

137/14

0.06.50

Dry

-

-

Chidambaram

S/o. Pazhamalai

***

6

125/3

0.54.00

Dry

Neem Tree -9

Velvel-7

-

Chidambaram

S/o Pazhamalai

***

22

137/15

0.02.00

Dry

-

-

Chidambaram

S/o. Pazhamalai

***

7

135/1

0.08.50

Manavari

Neem Tree - 1

-

Mohamad Abubakkar

S/o Mohamad Ibrahim

***

23

137/17

0.06.00

Dry

-

-

Chidambaram

S/o. Pazhamalai

***

8

135/3

0.10.00

Dry

-

-

Mohamad Abubakkar

S/o Mohamad Ibrahim

***

24

100/1

1.15.00

Dry

Red sandal

wood Tree-34

Neem Tree-10

-

Chidambaram

S/o. Pazhamalai-1

Annamalai

S/o. Chidambaram-2

***

9

136

0.54.50

Dry

-

-

Chidambaram

S/o Pazhamalai

***

25

99/3

0.63.50

Dry

Neem Tree -20

Gooseberry-34

-

Annamalai

S/o. Chidambaram-1

Visalatchi

W/o. Annamalai-2

***

10

119/5

0.00.50

Dry

-

-

Chidambaram

S/o Pazhamalai

***

26

98/4

0.60.00

Dry

Velvel-1

Neem Tree -16

Goosberry-45

-

Chidambaram

S/o. Pazhamalai-1

Annamalai

S/o. Chidambaram-2

***

13

Sl.

No.

Survey

No.

Area under

Acquisition

(Hec.)

Type of

Land

(Wet/ Dry/

Natham)

Tree

Structure

Patta No.

Pattadhar Name

Sl.

No.

Survey

No.

Area under

Acquisition

(Hec)

Type of

Land

(Wet/

Dry/

Natham)

Tree

Structure

Patta No.

Pattadhar Name

11

137/1

1.47.00

Dry

Neem Tree -24

Fig tree-1

-

Chidambaram

S/o Pazhamalai

***

27

98/6

0.16.50

Dry

Velvel-1

Neem Tree -5

Goosberry-35

-

Chidambaram

S/o. Pazhamalai-1

Annamalai

S/o. Chidambaram-2

***

12

137/4

0.26.50

Dry

Neem Tree-4

-

Chidambaram

S/o Pazhamalai

***

28

97

0.94.50

Dry

Neem Tree -15

Goosberry-

29(small)

Velvel-5

Solar electric

fence,

Drop water

irrigation lines

Annamalai

S/o. Chidambaram-1

Visalatchi

W/o. Annamalai-2

***

13

137/5

0.02.50

Dry

-

-

Chidambaram

S/o Pazhamalai

***

29

76/9

0.09.00

Dry

-

-

Duraiselvam

S/o. Muthukannan

***

14

137/6

0.17.50

Dry

Neem Tree -4

Kodukkapuli-1

-

Chidambaram

S/o Pazhamalai

***

30

76/10

0.22.50

Dry

Palm Tree -6

-

Duraiselvam

S/o. Muthukannan

***

15

137/7

0.05.00

Dry

-

-

Chidambaram

S/o Pazhamalai

***

31

76/11A

0.36.00

Dry

-

-

Duraiselvam

S/o. Muthukannan

***

16

137/8

0.13.00

Dry

-

-

Chidambaram

S/o Pazhamalai

***

32

76/11B

0.30.50

Dry

-

-

Duraiselvam

S/o. Muthukannan

***

Note: *** The Land was acquired through Private Negotiation and now Patta Transfered to Public Works Department / Water Resource

Department.

Pudukkottai,

கவிதா ராā,

21st December 2022.

District Collector.

14

காேவரி-ைவைக குண்டாĄ இைணப்Āக் கால்வாய் திட்டம், Āýக்ேகாட்ைட மாவட்டம்

நிலம் ைகயகப்பûத்ýதலில் நியாயமான சரியீû மற்Ąம் ஒளிĈமைறவின்ைம, மĄவாழ்Ĉ மற்Ąம் மĄகுடியமர்Ĉ உரிைமச் சட்டம் 2013-பிரிĈ-11(1)- மற்Ąம்

விதி 2017 -பிரிĈ 13(1)இன் கீழ் ெவளியிடப்பட்ட āதல்நிைல அறிவிக்ைகக்கான திăத்த அறிவிக்ைக.

(ந.க. 67/2021/கா.ைவ.þ/அ2)

ØÊவĉ Öĉ¿த அàÝÁபானĄ ĆĄ¹ேகா½ைட மாவ½ட ÝராÜமைல வ½டÂ, þÊன¿ĖÄ

þÊன¿ĖÄ ÐராமÂ, காேவÛ-ைவைக-þ¾டாĎ இைணÁù காÅவாà ֽட எÊďÂ

ெபாĄநல பயÊபா½ÔÉகாக 189 Ćல எ¾கßÅ (24.33.84 ெஹ¹ேடÄ) ×லஎĂÁĆ ெசÃவதÉகாக ×ல ைகயகÁபĂ¿ĄதÜÅ ×யாயமான சÛñĂ மÉĎ ஒßċமைறÝÊைம, மĎவாÇċ

மÉĎ மĎþÔயமÄċ உÛைம» ச½ட 2013-ØÛċ-11(1) மÉĎ ÝÖ 2017-ØÛċ 13(1)இÊ çÇ ćதÅ×ைல அàݹைக ĆĄ¹ேகா½ைட மாவ½ட ஆ½ÒயÛÊ ெசயÅćைறகÈ

ந.க.67/2021/கா.ைவ.þ/×.எ, நாÈ 01.10.2021-ÊபÔ 14.10.2021 நாß½ட மாவ½ட அரÒதÞÅ தÙÞÅ அàÝÁĆ எ¾ 4-Å

4-Å ப¹கÂ எ¾ 90-108

90-108Ċ மÉĎ ஆºÐல¿ÖÅ அàÝÁĆ எ¾.3-Å ப¹கÂ

எ¾.73-98ĊÂ, 17.10.2021 நாß½ட ÖனகரÊ தÙÇ நாßதÞÅ 12-13ஆ ப¹க¿ÖĊÂ, 17.10.2021 நாß½ட Times of India ஆºÐல நாßதÞÅ 10-11ஆ ப¹க¿ÖĊ ெவßÚடÁப½டÖÅ

çǹக¾ட 56 Ćலºகč¹þ ćதÅ×ைல அàݹைக¹கான Öĉ¿த அà¹ைக çǹக¾டவாĎ ெவßÚடÁபĂÐறĄ.

அட்டவைண

ĆĄ¹ேகா½ைட மாவ½டÂ, ÝராÜமைல வ½டÂ, þÊன¿ĖÄ ÐராமÂ.

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

1

1

76/2

0.44.50

0.37.00

ரய¿Ą

üைச

-

ேவÂĆ-20

ெசÂ

மரºகÈ-20

824-சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-1

சவÛć¿Ą மகÊ

ேவளாºக¾Õ-2

சவÛć¿Ą மைனÝ

அÀேதாÕயÂமாÈ-3

சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-4

1

76/2

0.44.50

0.37.00

ரய¿Ą

üைச

ைபÁைலÊ

ேவÂĆ-5

ெசÂமரºகÈ-20

ąனா மரÂ-1

824-சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-1

சவÛć¿Ą மகÊ

ேவளாºக¾Õ-2

சவÛć¿Ą மைனÝ

அÀேதாÕயÂமாÈ-3

சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-4

2

2

76/3

0.36.50

0.36.50

ரய¿Ą

üைச

-

ெசÂமரÂ

-200,

ேவÂĆ-17

824-சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-1

சவÛć¿Ą மகÊ

ேவளாºக¾Õ-2

சவÛć¿Ą மைனÝ

அÀேதாÕயÂமாÈ-3

சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-4

2

76/3

0.36.50

0.36.50

ரய¿Ą

üைச

-

ெசÂமரÂ-4,

ேவÂĆ-8,

ேத¹þ-3,

பைன-1

824-சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-1

சவÛć¿Ą மகÊ

ேவளாºக¾Õ-2

சவÛć¿Ą மைனÝ

அÀேதாÕயÂமாÈ-3

சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-4

15

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

3

3

76/4

0.22.50

0.22.50

ரய¿Ą

üைச

-

ெசÂமரÂ-60

2645-ெசÅவராĀ மகÊ

ஆனÀதÊ-1 மதÊ-2

3

76/4

0.22.50

0.22.50

ரய¿Ą

üைச

ைபÁைலÊ

ெசÂமரÂ-115

ேவÂĆ-8

2645-ெசÅவராÎ மகÊ

ஆனÀதÊ-1

மதÊ-2

4

5

76/6

0.21.00

0.00.50

ரய¿Ą

üைச

-

-

824-சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-1

சவÛć¿Ą மகÊ

ேவளாºக¾Õ-2

சவÛć¿Ą மைனÝ

அÀேதாÕயÂமாÈ-3

சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-4

5

76/6

0.21.00

0.00.50

ரய¿Ą

üைச

-

ெசÂமரÂ-6

ேவÂĆ-3

824-சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-1

சவÛć¿Ą மகÊ

ேவளாºக¾Õ-2

சவÛć¿Ą மைனÝ

அÀேதாÕயÂமாÈ-3

சவÛć¿Ą மகÊ

அÀேதாÕசாÙ-4

5

6

76/7

0.67.00

0.55.50

ரய¿Ą

üைச

-

ேவÂĆ -10,

நாவÅ -1,

வாதாÂ -2,

ெசÂமரÂ-30

2645-ெசÅவராĀ மகÊ

ஆனÀதÊ-1

மதÊ-2

6

76/7

0.67.00

0.55.50

ரய¿Ą

üைச

ஆǹþழாÃ

ÐணĎ-1

ெசÂமரÂ-133

ேவÂĆ-1

ąனா-2

2645-ெசÅவராÎ மகÊ

ஆனÀதÊ-1 மதÊ-2

6

8

76/12

0.20.00

0.20.00

ரய¿Ą

üைச

-

-

2645-ெசÅவராÎ மகÊ

ஆனÀதÊ-1, மதÊ-2

8

76/12

0.20.00

0.20.00

ரய¿Ą

üைச

-

ெசÂமரÂ-42

ேவÂĆ-9

ąனா-2

ேத¹þ-3

éதா¹

க¾ă-45

நாவÅ-1

2645-ெசÅவராÎ மகÊ

ஆனÀதÊ-1, மதÊ-2

7

9

76/13

0.46.00

0.25.00

ரய¿Ą

üைச

ஆÌ

ெப½டாÌ

க½ÔடÂ -1,

வ½ட¹

ÐணĎ -1

ெதÊைன-9,

ேத¹þ - 4,

ேவÂĆ -3

1834-சா.சÀதனராÎ-1

சா. ேடáயÅராÎ-2

Ý. ரåáமாலா-3

த. ராேஜÌவÛ-4

9

76/13

0.46.00

0.25.00

ரய¿Ą

üைச

தாÄĀ க½ÔடÂ-2

வ½ட¹

ÐணĎ-1

த¾ìÄ

ெதா½Ô-1

காÂபċ¾½

ĀவÄ-1

ெசÂமரÂ-7

ேவÂĆ-11

ேத¹þ-6

வாதாÂ;-3

ெதÊைன-9

எĊÙ»ைச-10

1834-சா. சÀதானராÎ-1

சா. ேடáயÄராÎ-2

Ý. ரåáமாலா-3

த. ராேஜÌவÛ-4

16

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

8

12

77/7

1.39.50

0.54.00

ரய¿Ą

üைச

-

ேத¹þ-22,

ேவÂĆ-3

1745-சாÀதÁபÊ மகÊ

பா¹ÐயராÎ

12

77/7

1.39.50

0.54.00

ரய¿Ą

üைச

-

ேவÂĆ-34

ேத¹þ-26

ெதÊைன-1

பைன-12

ம¼சந¿Ö-3

ேகாவாÁ

ĆÅ-1

ஆலமரÂ-1

அரச மரÂ-1

3480-அÁĄÅ ரÏமாÊ

மைனÝ C.H ஆÙனா-1

அÁĄÅ ரÏமாÊ மகÊ

N.V. அÍரÁ þ¼Āď-2

அÁĄÅ ரÏமாÊ மகÊ

N.V. அஹமĄ

உ¾Õ-3 அÁĄÅ

ரÏமாÊ மகÈ

N.V. உÂć þÅĄÂ-4

அÁĄÅ ரÏமாÊ மகÊ

N.V. அÂஜ¿

இÁராæÂ-5 அÁĄÅ

ரÏமாÊ மகÊ

N.V. அஹசÊ ęசா-6

அÁĄÅ ரÏமாÊ

மகÈ N.V. பா¿ÖமÀĄ

Āஹரா-7

9

13

77/8

0.94.50

0.34.50

ரய¿Ą

üைச

-

பைன-5,

ேவÂĆ-12

2129-சாÀதÁபÊ மகÊ

பா¹ÐயராÎ

13

77/8

0.94.50

0.34.50

ரய¿Ą

üைச

-

ேவÂĆ-39

பைன-5

ம¼சந¿Ö-2

ேவலாமரÂ-1

éதா¹

க¾ă-1

ெகாÊைன-1

3479-அÁĄÅ ரÏமாÊ

மைனÝ

C.H ஆÙனா-1

அÁĄÅ ரÏமாÊ மகÊ

N.V. அÍரÁ þ¼Āď-2

அÁĄÅ ரÏமாÊ மகÊ

N.V. அஹமĄ உ¾Õ-

3 அÁĄÅ ரÏமாÊ

மகÈ

N.V. உÂć þÅĄÂ-4

அÁĄÅ ரÏமாÊ மகÊ

N.V. அÂஜ¿ இÁராæÂ5

அÁĄÅ ரÏமாÊ மகÊ

N.V. அஹசÊ ęசா-6

அÁĄÅ ரÏமாÊ

மகÈ N.V. பா¿ÖமÀĄ

Āஹரா-7

10

15

82/6

0.35.00

0.34.50

ரய¿Ą

ந¼ைச

-

-

542-மĉதநாயகÂ

மைனÝ

ÒÊனÁெபாÊă-1

சவÛć¿Ą உைடயாÄ

மகÊ ெபÛயநாயகÂ-2

Öĉ¹þĂÂபÂ

மாÛயÂமாÈ-3

15

82/6A

0.17.50

0.17.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

3597-ஆேரா¹Ðய

சாÙ மைனÝ

மÛயÂமாÈ

82/6B

0.17.50

0.17.00

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

3605-ெபÛய

நாயகÂ மகÊ இÂமாď

ேவÅ ராÎ

17

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

11

19

84/2B

0.23.54

0.23.50

ரய¿Ą

மைன

தாÄĀ

ôĂ - 1,

ஆÌெப½டாÌ

ெகா½டைக

þßயÅ

அைற-1,

ஆÇĄழாÃ

ÐணĎ-2

ேவÂĆ -5,

ĘவரĀ-1,

வாதாÂ-1

(ÒàயĄ)

407-யாகÁப உைடயாÄ

மகÊ ெசபÌÖயாÊ

19

84/2B

0.23.54

0.23.50

ரய¿Ą

மைன

தாÄĀôĂ- 1

ĀÉĎ»

ĀவÄ-1

þßயÅ அைற¿

ெதா½Ô-1

ஆÌெபÌடாÌ

ெகா½டைக-1

ஆÇþழாÃ

ÐணĎ-2

வாைழ-15

ெகாÃயா-3

நாவÅ-1

எĊÙ»ைச-2

நாÄ¿ைத-2

éதா¹

க¾ă-3

ćĉºைக-5

ெநÅÜ-1

மாĄைள-5

ெகாĂ¹காÁĆß-5

மாºகÊĎ-1

பÁபாß-1

கà

ேவÁØைல-10

மÅÜைக-12

ĆßயமரÂ-5

ேவÂĆ-17

ĀபாĆÅ ப¿ைத

ĆºகÊ-2

ேவܹ

கĉேவÅ

உÖயÊ-11

ĘவரĀ-8

ெகாÊைன-1

வாதநாராயண

மரÂ-3

407-ெசபÌÖயாÄ

மைனÝ

சவÛயÂமாÈ-1

ெசபÌÖயாÄ

ம¹கÈ

யாகÁபÊ-2

þழÀைதராÎ-3

ØராÊÒÌ

ேசÝயÄ-4

18

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

12

21

85/1A

0.16.00

0.16.00

ரய¿Ą

üைச

-

-

1456-இÊனாÒ மகÊ

சவÛć¿Ą-1 யாகÁப

உைடயாÄ மகÊ ெசவ¿Ö

உைடயாÄ-2

21

85/1A

0.16.00

0.16.00

ரய¿Ą

üைச

-

வாதநாராயண

மரÂ-7

ெவÅேவÅ-1

3559-சவÛć¿Ą மகÊ

ஆேரா¹ÐயசாÙ-1

ெபÛயநாயகÂ மகÊ

இÂமாďேவÅ ராÎ-2

ெபÛயநாயகÂ மகÈ

ேதாைமயÂமாÈ-3

ெசபÌÖயாÄ மைனÝ

சவÛயÂமாÈ-4

ெசபÌÖயாÄ மகÊ

யாகÁபÊ-5

ெசபÌÖயாÄ மகÊ

þழÀைதராÎ-6

ெசபÌÖயாÄ மகÊ

ØராÊÒÌ ேசÝயÄ-7

13

24

85/1D1

0.01.00

0.01.00

ரய¿Ą

üைச

-

-

458-இÊனாÒ மகÊ

சவÛć¿Ą

24

85/1D1

0.01.00

0.01.00

ரய¿Ą

üைச

கÅலைற

-

458-இÊனாÒ

மகÊ சவÛć¿Ą

14

28

85/1G

0.11.00

0.11.00

ரய¿Ą

üைச

-

-

2731-ெபÛயநாயகÂ மகÊ

இÂமாďேவÅராஜா

28

85/1

0.11.00

0.11.00

ரய¿Ą

üைச

ைபÁைலÊ

-

2731-ெபÛயநாயகÂ

மகÊ இÂமாď

ேவÅ ராÎ

15

29

86/2

0.41.50

0.01.50

ரய¿Ą

üைச

-

-

2628-ெசபÌÖயாÄ

மைனÝ சவÛயÂமாÈ-1

ெசபÌÖயாÄ ம¹கÈ

யாகÁபÊ-2

þழÀைத ராĀ-3

ØராÊÒÌ ேசÝயÄ -4

29

86/2

0.41.50

0.01.50

ரய¿Ą

üைச

-

பைன-5

2628-ெசபÌÖயாÄ

மைனÝ சவÛயÂமாÈ-1

ெசபÌÖயாÄ மகÊ

யாகÁபÊ-2

ெசபÌÖயாÄ மகÊ

þழÀைத ராĀ-3

ெசபÌÖயாÄ மகÊ

ØராÊÒÌ ேசÝயÄ-4

16

30

86/5

0.33.00

0.33.00

ரய¿Ą

மானாவாÛ

-

பைன-5,

ெதÊைன-16

2992-ஆேரா¹Ðய

உைடயாÄ மகÊ

þழÀைதசாÙ

30

86/5

0.33.00

0.33.00

ரய¿Ą

மானாவாÛ

வ½ட¹ ÐணĎ-1

ேமா½டாÄ

அைற-1

ைபÁைலÊ

ேத¹þ-1

ேவÂĆ-2

ćĉºைக-1

பைன-3

ெதÊைன-14

2992-ஆேரா¹Ðய

உைடயாÄ மகÊ

þழÀைதசாÙ

19

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

17

31

86/6

0.16.00

0.16.00

ரய¿Ą

üைச

-

-

1804-ஆேரா¹Ðய

உைடயாÄ மகÊ

þழÀைத-1

ĒைசஉைடயாÄ காÁபாளÄ

ஆேரா¹ÐயசாÙ-2

31

86/6A

0.14.68

0.14.68

ரய¿Ą

üைச

-

இலÀைத-3

ெகாÊைற-1

ேவÂĆ-2

மாவܺகÂ-1

ம¼சந¿Ö-2

3647-சவÛć¿Ą மகÊ

ஆேரா¹ÐயசாÙ

86/6B

0.00.50

0.00.50

ரய¿Ą

üைச

-

-

3648-ஆேரா¹Ðய

உைடயாÄ மகÊ

þழÀைதசாÙ

86/6C

0.00.82

0.00.82

ரய¿Ą

üைச

-

-

3709-

ஆேரா¹ÐயசாÙ

மைனÝ þழÀைதெதரĀ

18

32

86/7

0.03.00

0.03.00

ரய¿Ą

üைச

ஆÇĄழாÃ

ÐணĎ-1

-

1162-ஆேரா¹Ðய

உைடயாÄ மைனÝ

ę¹காÚ

32

86/7

0.03.00

0.03.00

ரய¿Ą

üைச

-

-

3542--ெசபÌÖயாÄ

மகÊ ஆேரா¹ÐயசாÙ

19

34

86/9

0.05.50

0.04.00

ரய¿Ą

üைச

-

-

459-ஆேரா¹Ðய

உைடயாÄ மகÊ

சவÛć¿Ą

34

86/9

0.05.50

0.04.00

ரய¿Ą

üைச

-

இலÀைத-1

ĆßயமரÂ-2

459-ஆேரா¹Ðய

உைடயாÄ மகÊ

சவÛć¿Ą

20

35

86/12

0.41.00

0.17.00

ரய¿Ą

üைச

-

-

1998-ĒைசஉைடயாÄ

மைனÝ அĉளாÀĄ-1

ĒைசஉைடயாÄ மகÊ

ஆேரா¹ÐயசாÙ-2

35

86/12A

0.20.86

0.00.54

ரய¿Ą

üைச

-

மாமரÂ-1

3624-ĒைசஉைடயாÄ

மகÊ அĉளாÀĄ

86/12B

0.17.50

0.13.82

ரய¿Ą

üைச

-

-

3401-சவÛć¿Ą

உைடயாÄ மகÊ

ஆேரா¹ÐயசாÙ

86/12 C1

0.00.50

0.00.50

ரய¿Ą

üைச

-

-

3696-ஆேரா¹Ðய

உைடயாÄ மகÊ

þழÀைதசாÙ

86/12 C2

0.02.14

0.02.14

ரய¿Ą

üைச

-

-

3625-ஆேரா¹ÐயசாÙ

மைனÝ þழÀைத ெதரĀ

20

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

21

36

86/13

0.17.50

0.08.50

ரய¿Ą

üைச

ஆÌெப½டாÌ

þßயÅ அைற

-1, ô½ÔÊ

வட¹þ பþÖ

ஆÌெப½டாÌ

தாÇவாரÂ

ேவÂĆ

-1(ÒàயĄ,

ெதÊைன -

1(ÒàயĄ)

185-சவÛć¿Ą மகÊ

ஆேரா¹ÐயசாÙ

36

86/13A

0.15.50

0.06.50

ரய¿Ą

üைச

தைரம½ட

த¾ìÄ

ெதா½Ô-1

ெதÊைன-4

நாவÅ-1

185-சவÛć¿Ą மகÊ

ஆேரா¹ÐயசாÙ

86/13B

0.01.00

0.01.00

ரய¿Ą

üைச

-

-

3649-ஆேரா¹Ðய

உைடயாÄ மகÊ

þழÀைதசாÙ

86/13C

0.01.00

0.01.00

ரய¿Ą

üைச

-

-

3709

ஆேரா¹ÐயசாÙ

மைனÝ þழÀைதெதரĀ

22

37

86/24B

0.06.00

0.01.00

ரய¿Ą

üைச

-

ேவÂĆ -1,

பைன -1

679-சவÛć¿Ą மகÊ

Ēைச

37

86/24B

0.06.00

0.01.00

ரய¿Ą

üைச

ேவÂĆ-1

பைன-3

679-சவÛć¿Ą மகÊ

Ēைச

23

38

86/24C

0.10.00

0.08.50

ரய¿Ą

üைச

-

ெகாÊைன

-1, மாமரÂ

-1 (ÒàயĄ)

பைன - 4

702-சவÛć¿Ą மகÊ

ெசவ¿ÖயாÄ

38

86/24C

0.10.00

0.08.50

ரய¿Ą

üைச

-

ெகாÊைன-2

மாமரÂ-1

பைன-7

702-சவÛć¿Ą மகÊ

ெசவ¿ÖயாÄ

24

39

86/25

1.10.00

0.91.00

ரய¿Ą

üைச

வ½ட¹

ÐணĎ-1,

ஆÇþழாÃ

ÐணĎ-1

-

2992-ஆேரா¹Ðய

உைடயாÄ மகÊ

þழÀைதசாÙ

39

86/25A

1.05.86

0.88.35

ரய¿Ą

üைச

ஆÇþழாÃ

ÐணĎ-1

ைபÁைலÊ

ம¼சந¿Ö-4

ைதலமரÂ-4

உÒல மரÂ-1

ெவÅேவÅ-1

ேவÂĆ-2

ćĉºைக-1

ெதÊைன-2

2992-ஆேரா¹Ðய

உைடயாÄ மகÊ

þழÀைதசாÙ

86/25B

0.04.14

0.02.65

ரய¿Ą

üைச

-

-

3709-

ஆேரா¹ÐயசாÙ

மைனÝ þழÀைதெதரĀ

25

40

88/1A

0.05.50

0.04.00

ரய¿Ą

ந¼ைச

-

-

185-சவÛć¿Ą மகÊ

ஆேரா¹ÐயசாÙ

40

88/1A

0.05.50

0.04.00

ரய¿Ą

ந¼ைச

-

வாைக-1

185-சவÛć¿Ą மகÊ

ஆேரா¹ÐயசாÙ

26

52

88/7

0.21.50

0.20.50

ரய¿Ą

ந¼ைச

-

-

1997-ĒைசஉைடயாÄ

மகÊ ஆேரா¹ÐயசாÙ

52

88/7

0.21.50

0.20.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

3560 -

ஆேரா¹ÐயசாÙமைனÝ

þழÀைத ெதரĀ

***

21

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

27

53

88/8

0.10.00

0.10.00

ரய¿Ą

ந¼ைச

-

-

1450-ĒைசஉைடயாÄ

மகÊ ஆேரா¹ÐயசாÙ-1

ஆேரா¹Ðய உைடயாÄ

மகÊ Ąைர-2

53

88/8

0.10.00

0.10.00

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

3560 - ஆேரா¹ÐயசாÙ

மைனÝ þழÀைத ெதரĀ

***

28

62

90/5B

0.01.00

0.00.25

ரய¿Ą

üைச

-

ேவÂĆ - 1

1796-ĒைசஉைடயாÄ

மகÊ ஆேரா¹ÐயசாÙ

62

90/5B

0.01.00

0.00.25

ரய¿Ą

üைச

ைபÁைலÊ

-

3560-ஆேரா¹ÐயசாÙ

மைனÝ þழÀைதெதரĀ

29

63

90/6

0.01.00

0.00.83

ரய¿Ą

üைச

-

ேவÂĆ - 1

1997-ĒைசஉைடயாÄ

மகÊ ஆேரா¹ÐயசாÙ

63

90/6

0.01.00

0.00.83

ரய¿Ą

üைச

ைபÁைலÊ

ேவÂĆ-2

ஆÝ மரÂ-1

3560-ஆேரா¹ÐயசாÙ

மைனÝ þழÀைதெதரĀ

30

71

128

0.43.00

0.43.00

ரய¿Ą

மானாவாÛ

-

-

370-பழáயா¾Ô மகÊ

þமாரசாÙ

71

128/1

0.42.63

0.42.63

ரய¿Ą

மானாவாÛ

பČ தைடÀத

வ½ட¹ ÐணĎ-1

ெகாÊைன-1

ம¼சந¿Ö-1

370-பழáயா¾Ô மகÊ

þமாரசாÙ

128/2

0.00.37

0.00.37

ரய¿Ą

மானாவாÛ

-

-

3711 ெசÚÊடாÊ

ஸÙ¿ மகÊ ெபÊனÄ

ØராÊÒÌ ஸÙ¿

31

95

132/10

0.16.00

0.01.80

ரய¿Ą

மானாவாÛ

வ½ட¹ÐணĎ-1

ேவÂĆ-1,

ெதÊைன-1,

ெகாÊைன-

3

2534-கĉÁப¾ணÊ

மகÊ பழáயா¾Ô

95

132/10

0.16.00

0.01.80

ரய¿Ą

மானாவாÛ

வ½ட¹ ÐணĎ-1

ெதÊைன-1

ெகாÊைன-3

2534-கĉÁப¾ணÊ

மகÊ பழáயா¾Ô

32

107

132/29

0.01.50

0.01.50

ரய¿Ą

மானாவாÛ

சĄர ÐணĎ

- 1

ேவÂĆ - 2,

ெகாÊைன

-1

1585-ெவÈைளயÊ மகÊ

பழáயாÊÔ -1

அைட¹கÊ மகÊ

ĘரÕ-2 ć¿Ą»சாÙ

மகÊ சÊனாÒ-3

107

132/29

0.01.50

0.01.50

ரய¿Ą

மானாவாÛ

சĄர ÐணĎ-1

ெகாÊைன-1

1585-ெவÈைளயÊ

மகÊ

பழáயாÊÔ -1

அைட¹கÊ மகÊ

ĘரÕ-2

ć¿Ą»சாÙ மகÊ

சÊனாÒ-3

22

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

33

121

279/14

0.28.50

0.19.50

ரய¿Ą

üைச

-

-

2731-ெபÛயநாயகÂ மகÊ

இÂமாďேவÅ ராÎ

121

279/14

0.28.50

0.19.50

ரய¿Ą

üைச

ைபÁைலÊ

-

2731-ெபÛயநாயகÂ

மகÊ இÂமாďேவÅ

ராÎ

34

122

279/23

0.25.50

0.22.00

ரய¿Ą

ந¼ைச

-

-

2731-ெபÛயநாயகÂ மகÊ

இÂமாďேவÅராÎ

122

279/23

0.25.50

0.22.00

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

2731-ெபÛயநாயகÂ

மகÊ இÂமாďேவÅ

ராÎ

35

123

280/1

0.54.50

0.51.00

ரய¿Ą

ந¼ைச

ÙÊ

இைணÁĆடÊ

ĐÔய சĄர¹

ÐணĎ -1

ெதÊைன

-4

2731-ெபÛயநாயகÂ மகÊ

இÂமாďேவÅராÎ

123

280/1

0.54.50

0.51.00

ரய¿Ą

ந¼ைச

ÙÊ இைணÁĆ

டÊ ĐÔய சĄர¹

ÐணĎ -1

தைரம½ட

த¾ìÄ ெதா½Ô

(ÒàயĄ)-1

ைபÁைலÊ

ெதÊைன -4

2731-ெபÛயநாயகÂ

மகÊ இÂமாďேவÅராÎ

36

124

307/1

0.68.00

0.67.00

ரய¿Ą

ந¼ைச

ÙÊ

இைணÁĆடÊ

ĐÔய

சĄர¹ÐணĎ

-1, ேமா½டாÄ

அைற-1

பைன -3,

ெதÊைன

-9

2730-சவÛ (எ)

சவÛć¿Ą மகÊ

ஆேரா¹ÐயசாÙ

124

307/1

0.68.00

0.67.00

ரய¿Ą

ந¼ைச

சĄர¹ ÐணĎ-

1, ேமா½டாÄ

அைற-1

ைபÁைலÊ

ெதÊைன-9

2730-சவÛ (எ)

சவÛć¿Ą மகÊ

ஆேரா¹ÐயசாÙ

37

129

307/9A

0.08.50

0.08.50

ரய¿Ą

ந¼ைச

-

-

2483-ć¿ைதயா மகÊ

ெரºகசாÙ

129

307/9A

0.08.50

0.08.50

ரய¿Ą

ந¼ைச

-

பைன-3

3544 - ெரºகசாÙ

மைனÝ கமலா1

ெரºகசாÙ மகÈ

ேதÊெமாÞ-2

ெரºகசாÙ மகÈ ேதவÐ

-3

ெரºகசாÙ மகÈ

ćேகÌவÛ-4

ெரºகசாÙ மகÊ

கĉÁைபயா-5

ெரºகசாÙ மகÊ

ராஜா-6

***

23

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

38

131

308/2A

0.40.00

0.13.50

ரய¿Ą

ந¼ைச

-

-

495-சவÛć¿Ą

உைடயாÄ மகÊ

சவÛć¿Ą

131

308/2A

0.40.00

0.13.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

ேவÂĆ-3

3418-சவÛć¿Ą மகÊ

ேஜாசÁ-1

சவÛć¿Ą மகÊ

ேசĀ ெர¿ÖனÂ-2

39

132

308/2B

0.06.00

0.06.00

ரய¿Ą

ந¼ைச

-

-

1493-ஆேரா¹ÐயசாÙ

உைடயாÄ மகÊ

ஆேரா¹ÐயசாÙ -1

சவÛć¿Ą உைடயாÄ

மகÊ சவÛć¿Ą -2

132

308/2B

0.06.00

0.06.00

ரய¿Ą

ந¼ைச

ைபÁைலÊ

சĄரÐணĎ-1

இÔÀத ×ைலÚÅ

ேமா½டாÄஅைற-1

ேவÂĆ-10

ćĉºைக-1

ம¼சந¿Ö-1

3451-ஆேரா¹ÐயசாÙ

மகÊ

þழÀைதசாÙ -1

சவÛć¿Ą மகÊ

ேஜாசÁ-2

சவÛć¿Ą மகÊ

ேசĀெர¿ÖனÂ 3

40

137

308/9D

0.06.00

0.04.00

ரய¿Ą

ந¼ைச

ÙÊ

இைணÁĆடÊ

ĐÔய

வ½ட¹ÐணĎ

-1

ேவÂĆ - 9

(ÒàயĄ)

354-நேடசÊ மகÊ

சாÙ¹க¾ă

137

308/9D

0.06.00

0.04.00

ரய¿Ą

ந¼ைச

ÙÊ இைணÁĆ

டÊ ĐÔய

வ½ட¹ ÐணĎ-1

ேவÂĆ-6

ćĉºைக-1

ேகாவாÁĆÅ-1

354-நேடசÊ மகÊ

சாÙ¹க¾ă

41

139

308/11A

0.01.00

0.01.00

ரய¿Ą

ந¼ைச

-

-

1494-மாºþள¿தாÊ

மகÊ; ராĀ-1,

மாºþள¿தாÊ மகÊ

நாராயணÊ-2

139

308/11A

0.01.00

0.01.00

ரய¿Ą

ந¼ைச

வ½ட¹

ÐணĎ-1

-

1494-மாºþள¿தாÊ

மகÊ நாராயணÊ-1

ெரºகசாÙ மைனÝ

கமலா-2

ெரºகசாÙ மகÈ

ேதÊெமாÞ-3

ெரºகசாÙ மகÈ

ćேகÌவÛ-4

ெரºகசாÙ மகÈ

ேதவÐ-5

ெரºகசாÙ மகÊ

கĉÁைபயா-6

ெரºகசாÙ மகÊ

ராஜா-7

42

149

309/1

0.08.50

0.08.50

ரய¿Ą

ந¼ைச

-

-

3046- பழá»சாÙ

மைனÝ கைலவாÕ

149

309/1

0.08.50

0.08.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

3046- பழá»சாÙ

மைனÝ கைலவாÕ

24

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

43

150

309/2

0.07.50

0.07.50

ரய¿Ą

ந¼ைச

ÙÊ

இைணÁĆடÊ

ĐÔய

வ½ட¹ÐணĎ

-1

ெதÊைன-5

பைன-1

857- பரேதÒ மகÊ

பழá»சாÙ

150

309/2

0.07.50

0.07.50

ரய¿Ą

ந¼ைச

ÙÊ

இைணÁĆடÊ

ĐÔய

வ½ட¹ÐணĎ-1

ைபÁைலÊ

ெதÊைன-5

பைன-1

857 - பரேதÒ மகÊ

பழá»சாÙ

***

44

151

309/3

0.07.50

0.07.50

ரய¿Ą

ந¼ைச

-

ேவÂĆ -3

(ÒàயĄ)

3046-பழá»சாÙ

மைனÝ கைலவாÕ

151

309/3

0.07.50

0.07.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

3046-பழá»சாÙ

மைனÝ கைலவாÕ

45

158

309/9

0.08.50

0.08.50

ரய¿Ą

ந¼ைச

-

-

3046- பழá»சாÙ

மைனÝ கைலவாÕ

158

309/9

0.08.50

0.08.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

3046-பழá»சாÙ

மைனÝ கைலவாÕ

46

159

309/10

0.08.50

0.08.50

ரய¿Ą

ந¼ைச

-

-

857-பரேதÒ மகÊ

பழá»சாÙ

159

309/10

0.08.50

0.08.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

857 - பரேதÒ மகÊ

பழá»சாÙ

***

47

160

309/11

0.06.50

0.06.50

ரய¿Ą

ந¼ைச

-

-

110- ஆ¾Ô மகÊ

கĉ¿தć¿Ą

160

309/11

0.06.50

0.06.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

3461- கĉ¿தć¿Ą

மைனÝ கĉÁபாÚ-1

கĉ¿தć¿Ą மகÊ

நÅĊ»சாÙ-2

கĉ¿தć¿Ą மகÈ

ரÖ-3

பாலĀÁØரமÕ மகÊ

ெவºகேடÍ காÄÔயÊ

தாயாÄ பழáயÂமாÈ-4

பாலĀÁØரமÕ மகÊ

íப¹ காÄÔயÊ தாயாÄ

பழáயÂமாÈ-5

25

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

48

161

309/12

0.07.50

0.06.50

ரய¿Ą

ந¼ைச

-

-

826- ÒÊனÁபயÅ மகÊ

ÖĉÁபÊ

161

309/12

0.07.50

0.06.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

3693-பரேதÒ மகÊ

பழá»சாÙ

49

164

309/16A

0.13.00

0.13.00

ரய¿Ą

ந¼ைச

-

ேவÂĆ-3

2032

சவÛć¿Ą மகÊ

சவÛć¿Ą-1

ராமசாÙ மகÊ

ć¿ைதயÊ-2

164

309/16A1

0.01.50

0.01.50

ரய¿Ą

ந¼ைச

-

-

2032-சவÛć¿Ą மகÊ

சவÛć¿Ą

309/16A2

0.11.50

0.11.50

ரய¿Ą

ந¼ைச

-

-

3546

ராமசாÙ மகÊ

ć¿ைதயÊ

50

165

309/16B

0.45.50

0.31.00

ரய¿Ą

ந¼ைச

-

-

2130-சவÛć¿Ą

உைடயாÄ மகÊ Ēைச

165

309/16B1

0.06.50

0.00.87

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

2130-சவÛć¿Ą

உைடயாÄ மகÊ Ēைச

309/16B2

0.39.00

0.30.13

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

3673-சவÛć¿Ą

மைனÝ ஜுÜ அÊĆ

ேமÛ

51

179

311/7

0.12.50

0.11.50

ரய¿Ą

ந¼ைச

-

-

2900-அைட¹கலÂ மகÊ

Ø»ைச (எ) ć¿Ą»சாÙ

179

311/7

0.12.50

0.11.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

2900-அைட¹கலÂ

மகÊ Ø»ைச (எ)

ć¿Ą»சாÙ

52

182

332/2

0.20.50

0.17.50

ரய¿Ą

ந¼ைச

வ½ட¹

ÐணĎ-1

ெதÊைன-3

632-கܺÐć¿Ą மகÊ

மĉதć¿Ą

182

332/2

0.20.50

0.17.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

வ½ட¹ ÐணĎ-1

ெதÊைன-3

632-கܺÐć¿Ą

மகÊ மĉதć¿Ą

26

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

53

183

332/3

0.21.00

0.21.00

ரய¿Ą

ந¼ைச

-

-

521-கܺÐć¿Ą

மைனÝ பாÁபா-1

கܺÐć¿Ą மகÊ

மĉதć¿Ą-2

கܺகć¿Ą மகÊ

நாகராÎ-3

கܺகć¿Ą மகÊ

ேகாÝÀதÊ-4

183

332/3A

0.10.50

0.10.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

521-கܺகć¿Ą

மைனÝ பாÁபா-1,

கܺகć¿Ą மகÊ

மĉதć¿Ą-2

கܺகć¿Ą மகÊ

நாகராÎ-3

கܺகć¿Ą மகÊ

ேகாÝÀத ராÎ-4

332/3B

0.10.50

0.10.50

ரய¿Ą

ந¼ைச

ைபÁைலÊ

-

3516-ெபÛயசாÙ மகÊ

ராேஜÀÖரÊ

54

184

333/1

2.03.50

1.75.00

ரய¿Ą

üைச

-

-

2606-நேடசÊ மகÊ

ęÄ¿Ö

184

333/1

2.03.50

1.75.00

ரய¿Ą

üைச

சĄர¹ ÐணĎ-1

-

3618-ęÄ¿Ö மைனÝ

ேகாÐலா-1

ęÄ¿Ö மகÊ

காĿֹ-2

ęÄ¿Ö மகÈ

காÄ¿Öகா-3

ęÄ¿Ö மகÈ

ØÛயºகா-4

ęÄ¿Ö மகÈ ஆÄ¿Ö-5

55

186

338/1

0.46.50

0.46.50

ரய¿Ą

üைச

-

ேவÂĆ - 10

(ÒàயĄ)

ேவÂĆ-10

மாமரÂ-150

2606-நேடசÊ மகÊ

ęÄ¿Ö

186

338/1

0.46.50

0.46.50

ரய¿Ą

üைச

-

மாமரÂ-150

3618-ęÄ¿Ö மைனÝ

ேகாÐலா-1

ęÄ¿Ö மகÊ

காĿֹ-2

ęÄ¿Ö மகÈ

காÄ¿Öகா-3

ęÄ¿Ö மகÈ

ØÛயºகா-4

ęÄ¿Ö மகÈ ஆÄ¿Ö-5

***

27

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ. எ¾.

11(1) வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊெசÃ/ ĆÊ

ெசÃ/ ந¿தÂ)

×ல எĂÁĆ

ெசÃĈ்Â

Ćல¿ÖÅ உÈள

க½Ă

மானºகÈ

ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ

உÈள

மரºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11(1) வ. எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁ

பட உÈள பரÁĆ (ெஹ¹.)

×ல

வைகÁபாĂ

(நÊெசÃ/

ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ

ெசÃĈÂ Ćல¿ÖÅ

உÈள க½Ă

மானºகÈ ÝபரÂ

×ல எĂÁĆ

ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ

ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

56

189

339/1

2.37.00

0.48.50

ரய¿Ą

üைச

-

ெசÂமரÂ

-30

மாமரÂ-5

ேத¹þ - 6

(ÒàயĄ)

பைன-3

2645-ெசÅவராÎ மகÊ

ஆனÀதÊ-1 ெசÅவராÎ

மகÊ மதÊ-2

189

339/1

2.37.00

0.48.50

ரய¿Ą

üைச

-

ெசÂமரÂ-2

மாமரÂ-7

ேவÂĆ-10

பைன-2

ெகாÊைன-2

2645-ெசÅவராÎ மகÊ

ஆனÀதÊ-1 ெசÅவராÎ

மகÊ மதÊ-2

ெமா¿தÂ 12.46.88

ெமா¿தÂ 12.46.88

11(1) āதல்நிைல அறிவிக்ைக ெவளியிûவதற்கு āன்பாக குன்னத்ďர் கிராமத்தில் காேவரி ைவைக குண்டாĄ இைணப்Āக் கால்வாய்திட்டத்திற்காக தனிநபர்

ேபச்சுவார்த்ைத ēலம் 32 Āலங்களில் (9.75.00 ெஹக்ேடர்) நிலெமûப்Ā ெசய்யப்பட்டதில் எவ்வித திăத்தāம் இல்ைல. அதன் விவரம் பின்வăமாĄ :

வ. எ¾.

Ćல எ¾.

×ல எĂÁĆ

ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊ ெசÃ/ ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள க½Ă

மானºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

வ. எ¾.

Ćல எ¾.

×ல எĂÁĆ

ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁ பாĂ

(நÊ ெசÃ/ ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

1

126/4

0.21.00

மானா

வாÛ

ேவÂĆ - 8

-

ćகமĄ

இÁராÐÂ

மகÊ ćகமĄ

அĆப¹கÄ

***

17

137/9

0.13.00

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

2

126/1A2B

0.08.50

ĆÊெசÃ

-

-

ćகமĄ

இÁராÐÂ

மகÊ ćகமĄ

அĆப¹கÄ

***

18

137/11

0.06.00

ĆÊெசÃ

ேவÂĆ - 2

-

பழமைல மகÊ

ÒதÂபரÂ

***

3

133/2

0.66.00

மானா

வாÛ

ேவÂĆ-17,

ம¼ச¹கடÂைப-1

வ½ட¹ÐணĎ - 1,

ேமா½டாÄ அைற - 1

ćகமĄ

இÁராÐÂ

மகÊ ćகமĄ

அĆப¹கÄ

***

19

137/12

0.08.00

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

28

வ. எ¾.

Ćல எ¾.

×ல எĂÁĆ

ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊ ெசÃ/ ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள க½Ă

மானºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

வ. எ¾.

Ćல எ¾.

×ல எĂÁĆ

ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁ பாĂ

(நÊ ெசÃ/ ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

4

134/1

0.18.00

மானா

வாÛ

ேவÂĆ - 3

தாÄĀ க½ÔடÂ

- 1, ஆÇĄழாÃ

ÐணĎ - 1,

ĀÉĎ»ĀவĉடÊĐÔய

ஆÌெப½டாÌ

க½ÔடÂ -1

ćகமĄ

இÁராÐÂ

மகÊ ćகமĄ

அĆப¹கÄ

***

20

137/13

0.05.00

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

5

125/1

0.28.50

ĆÊெசÃ

-

-

ćகமĄ

இÁராÐÂ

மகÊ ćகமĄ

அĆப¹கÄ

***

21

137/14

0.06.50

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

6

125/3

0.54.00

ĆÊெசÃ

ேவÂĆ - 9

ெவÅேவÅ-7

-

பழமைல மகÊ

ÒதÂபரÂ

***

22

137/15

0.02.00

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

7

135/1

0.08.50

மானா

வாÛ

ேவÂĆ - 1

-

ćகமĄ

இÁராæÂ

மகÊ

ćகமĄ

அĆப¹கÄ

***

23

137/17

0.06.00

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

8

135/3

0.10.00

ĆÊெசÃ

-

-

ćகமĄ

இÁராæÂ

மகÊ

ćகமĄ

அĆப¹கÄ

***

24

100/1

1.15.00

ĆÊெசÃ

ெசÂமரÂ - 34

ேவÂĆ-10

-

பழமைல மகÊ

ÒதÂபரÂ-1

ÒதÂபரÂ மகÊ

அ¾ணாமைல -2

***

9

136

0.54.50

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

25

99/3

0.63.50

ĆÊெசÃ

ெநÅÜ-34

ேவÂĆ -20

-

ÒதÂபரÂ மகÊ

அ¾ணாமைல -1

அ¾ணாமைல

மைனÝ

Ýசாலா½Ò-2

***

10

119/5

0.00.50

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

26

98/4

0.60.00

ĆÊெசÃ

ெநÅÜ-45

ேவÂĆ-16

ெவÅேவÅ-1

-

பழமைல மகÊ

ÒதÂபரÂ-1

ÒதÂபரÂ மகÊ

அ¾ணாமைல -2

***

29

வ. எ¾.

Ćல எ¾.

×ல எĂÁĆ

ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ

(நÊ ெசÃ/ ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள க½Ă

மானºகÈ ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

வ. எ¾.

Ćல எ¾.

×ல எĂÁĆ

ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁ பாĂ

(நÊ ெசÃ/ ĆÊெசÃ/

ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

மரºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ

ÝபரÂ

ப½டா எ¾,

ப½டாதாரÄ ெபயÄ

11

137/1

1.47.00

ĆÊெசÃ

ேவÂĆ -24

அ¿Ö-1

-

பழமைல மகÊ

ÒதÂபரÂ

***

27

98/6

0.16.50

ĆÊெசÃ

ெவÅேவÅ-1

ேவÂĆ - 5

ெநÅÜ-35

-

பழமைல மகÊ

ÒதÂபரÂ-1

ÒதÂபரÂ மகÊ

அ¾ணாமைல -2

***

12

137/4

0.26.50

ĆÊெசÃ

ேவÂĆ - 4

-

பழமைல மகÊ

ÒதÂபரÂ

***

28

97

0.94.50

ĆÊெசÃ

ெநÅÜ-

29(ÒàயĄ)

ேவÂĆ-15

ெவÅேவÅ-5

ĒÛய

ÙÊேவÜ,

ெசா½ĂîÄ

பாசன

இைணÁĆ

ÒதÂபரÂ மகÊ

அ¾ணாமைல-1

அ¾ணாமைல

மைனÝ

Ýசாலா½Ò-2

***

13

137/5

0.02.50

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

29

76/9

0.09.00

ĆÊெசÃ

-

-

ć¿Ą¹க¾ணÊ

மகÊ

Ąைர»ெசÅவÂ

***

14

137/6

0.17.50

ĆÊெசÃ

ேவÂĆ - 4

ெகாĂ¹காĆß-1

-

பழமைல மகÊ

ÒதÂபரÂ

***

30

76/10

0.22.50

ĆÊெசÃ

பைன -6

-

ć¿Ą¹க¾ணÊ

மகÊ

Ąைர»ெசÅவÂ

***

15

137/7

0.05.00

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

31

76/11A

0.36.00

ĆÊெசÃ

-

-

ć¿Ą¹க¾ணÊ

மகÊ

Ąைர»ெசÅவÂ

***

16

137/8

0.13.00

ĆÊெசÃ

-

-

பழமைல மகÊ

ÒதÂபரÂ

***

32

76/11B

0.30.50

ĆÊெசÃ

-

-

ć¿Ą¹க¾ணÊ

மகÊ

Ąைர»ெசÅவÂ

***

þàÁĆ:

þàÁĆ: *** தá நபÄ ேப»ĀவாÄ¿ைத ęல ×ல ைகயக ெசÃயÁப½Ă தÉேபாĄ ெபாĄÁபÕ¿Ąைற /îÄவள ஆதார¿Ąைற ெபயÛÅ ப½டா மாÉற ெசÃயÁப½ĂÈளĄ.

ĆĄ¹ேகா½ைட,

2022 ÔசÂபÄ 21.

கÝதா ராć,

கÝதா ராć,

மாவ½ட ஆ½Ò¿தைலவÄ,

30

Errata Notice to the Notifi cation published U/S 11(1) of Right to Fair Compensation, and Transparency in Land Acquisition, Rehabilation and

Resettlement Act-2013 and U/S 13(1) of Rules, 2017.

(Rc.No. 121/2022/CVG/A2)

No.VI(1)/49/2023.

The following errata is hereby issued to the preliminary notifi cation published for Land Acquisition for the public purpose namely formation of

Cauvery-Vaigai-Gundar link canal in Poongudi Village of Kulathur Taluk, Pudukkottai District U/S 11(1) of Right to Fair Compensation, and Transparency In

Land Acquisition, Rehabilation and Resettlement Act-2013 and U/S 13(1) of rules, 2017 to the 221 survey numbers to an extent of 33.28.73 hectares patta

lands as per Pudukkottai, District Collector Proceedings No. R.C.121/2022/CVG/A2, dated 25.02.2022, published in Notifi cation No.6 (Tamil), page No. 26

to 52 and Notifi cation No. 4 (English) page No.22 to 47 of Pudukkottai District Gazette dated :04.03.2022 and in page No. 9-10 of Dhinakaran Tamil daily

newspaper dated 16.03.2022 and in Page No. 9-10 of Times of India English daily newspaper dated 16.03.2022. As per Revised Land Plan Schedule given

by Executive Engineer, Special Project division, Cauvery-Vaigai-Gundar Link Canal Scheme, Pudukkottai (Letter No. 02/RLPS/KO1/CVG/2022, date 14.10.2022)

errata to the following 121 survey numbers is hereby issued as detailed below.

Pudukkottai District, Kulathur Taluk, Poongudi Village.

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

1

1

66/1

1.15.00

1.15.00

Wet

-

Neem Tree-2

899.

Selvaraj

S/o. Ramachandran

1

66/1

1.15.00

0.73.00

Wet

-

Neem Tree-2

899.

Selvaraj

S/o. Ramachandran

2

6

66/6

0.94.00

0.80.00

Wet

-

Teak tree-4

901.

Rajkumar

S/o. Ramachandran

2

66/6

0.94.00

0.24.50

Wet

-

Teak -2

901.

Rajkumar

S/o. Ramachandran

3

9

93/1B

0.54.00

0.31.00

Dry

-

Neem tree-1

1005.

1.Muthukkaruppan

S/o. Nallaiah Devar

2.Marimuthu

S/o. Nallaiah Devar

3

93/1B

0.54.00

0.02.00

Dry

-

Neem Tree-1

1005.

1.Muthukkaruppan

S/o. Nallaiah Devar

2.Marimuthu

S/o. Nallaiah Devar

4

10

93/1C1

0.41.00

0.39.50

Dry

Basement

Building at

Basement level -1

Teak-2 Neem tree-1

Coconut Sapling -1

Nava tree-1 Neem

Sapling -2 Mango

Sapling -5 Vatha

tree-4

863.

Sathyamoorthi

S/o. Chinnaiah

4

93/

1C1

0.41.00

0.26.50

Dry

-

Neem

saplings-1

863.

Sathyamoorthi

S/o. Chinnaiah

31

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

5

11

93/1C2

0.20.50

0.20.50

Dry

-

Coconut Sapling-3

Neem tree-10 Nava

tree-1

641.

1. Murugaiah

S/o. Chidambara

Devar

2. Muthaiah

S/o. Chidambara

Devar

3.Ramaiah

S/o. Chidambara

Devar

4. Chinnaiah

S/o. Chidambara

Devar

5.Kasi

S/o. Chidambara

Devar

5

93/

1C2

0.20.50

0.09.50

Dry

-

-

641.

1. Murugaiah

S/o. Chidambara

Devar

2. Muthaiah

S/o. Chidambara

Devar

3. Ramaiah

S/o. Chidambara

Devar

4. Chinnaiah

S/o. Chidambara

Devar

5.Kasi

S/o. Chidambara

Devar

6

12

93/2

1.76.00

1.51.00

Dry

-

Neem Sapling -5

Vela tree -20 Palm

tree-17 Neem

tree -5

550.

1. Karuppan

S/o. Meyyan

2.Mutthan

S/o. Meyyan

6

93/2

1.76.00

0.63.00

Dry

-

Vela tree -66,

Palm tree-18

Neem

tree -14,

550.

1. Karuppan

S/o. Meyyan

2. Mutthan

S/o. Meyyan

7

13

93/3A

3.16.00

1.58.00

Dry

Hand Pump Bore

Ecualyptus tree-

2000 Neem tree-5

Tamarind tree-1

Teak-30 Neem

Sapling -5

892.

Bashkaran

S/o. Ramachandra

Devar

7

93/3A

3.16.00

0.66.50

Dry

Hand

Pump

Bore

Ecualyptus

tree-1150,

Neem tree-4,

Tamarind

tree-1 Teak-4

Vela Tree -1

892.

Bashkaran

S/o. Ramachandra

Devar

8

14

93/3B

0.20.00

0.11.00

Dry

-

-

866.

1. Abdul Rahuman

S/o. Sulthan

Ahammed

2. Mohammed Kani

S/o. Shiek

Mohammed

8

93/3B

0.20.00

0.06.00

Dry

-

-

866.

1. Abdul Rahuman

S/o. Sulthan

Ahammed

2. Mohammed Kani

S/o. Shiek

Mohammed

32

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

9

15

94

0.63.50

0.49.50

Dry

-

Teak-2 Neem tree-1

860.

1. Abdul Rahuman

S/o. Sulthan

Ahammed

2. Mohammed Kani

S/o. Shiek

Mohammed

9

94

0.63.50

0.15.50

Dry

-

Teak-2 Neem

tree-1

860.

1. Abdul Rahuman

S/o. Sulthan

Ahammed

2. Mohammed Kani

S/o. Shiek

Mohammed

10

16

95/1

0.27.00

0.26.73

Dry

-

Mango tree-15

Guava tree-4

Neem tree -1 Neem

Sapling-1

860.

1. Abdul Rahuman

S/o. Sulthan

Ahammed

2. Mohammed Kani

S/o. Shiek

Mohammed

10

95/1

0.27.00

0.04.50

Dry

-

Vagai Tree-1,

Neem tree -1

860.

1. Abdul Rahuman

S/o. Sulthan

Ahammed

2. Mohammed Kani

S/o. Shiek

Mohammed

11

21

96/1A

0.20.00

0.20.00

Dry

-

Ecualyptus -1325

895.

Renuga Devi

W/o. Bashkaran

11

96/1A

0.20.00

0.19.00

Dry

-

Ecualyptus

Saplimgs-500

895.

Renuga Devi

W/o. Bashkaran

12

22

96/1B

0.20.50

0.20.50

Dry

-

-

866.

1. Abdul Rahuman

S/o. Sulthan

Ahammed

2. Mohammed Kani

S/o. Shiek

Mohammed

12

96/1B

0.20.50

0.03.50

Dry

-

Vela Tree-4

866.

1. Abdul Rahuman

S/o. Sulthan

Ahammed

2. Mohammed Kani

S/o. Shiek

Mohammed

13

30

103/1C

0.18.00

0.18.00

Dry

-

Vela tree-15

718.

Rajeshwari

W/o. Kumaravelu

13

103/1C

0.18.00

0.13.50

Dry

-

Vela tree-2,

Ecualyptus

saplings -15,

Akil Tree-1,

Neem-2

718.

Rajeshwari

W/o. Kumaravelu

14

31

103/

1D

0.13.00

0.13.00

Dry

-

Vela tree-13

718.

Rajeshwari

W/o. Kumaravelu

14

103/

1D

0.13.00

0.12.00

Dry

-

Ecualyptus

saplings -23,

Vela

saplings-2,

Neem Tree-1

718.

Rajeshwari

W/o. Kumaravelu

15

32

103/2A

0.02.50

0.02.50

Dry

-

Vela tree-9

266.

Natesan

S/o. Pinnanthan

15

103/

2A

0.02.50

0.02.50

Dry

-

Neem Tree-1,

Akil Tree-1

266.

Natesan

S/o. Pinnanthan

16

33

103/2B

0.02.00

0.02.00

Dry

-

Vela tree-8

8.

Azhagan

S/o. Rengan

16

103/

2B

0.02.00

0.00.50

Dry

-

Palm tree-1

8.

Azhagan

S/o. Rengan

33

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

17

34

103/3A

0.02.00

0.02.00

Dry

-

Vela tree-6

266.

Natesan

S/o. Pinnanthan

17

103/3A

0.02.00

0.01.50

Dry

-

Neem tree-1

266.

Natesan

S/o. Pinnanthan

18

36

103/4

0.04.00

0.04.00

Dry

-

Vela tree-9

152.

Kumaran

S/o. Vaithi

18

103/4

0.04.00

0.01.00

Dry

-

Vela tree-5

152.

Kumaran

S/o. Vaithi

19

37

103/5

0.04.50

0.04.50

Dry

-

Vela tree-13

338.

Maruthaiah

S/o. Karuppan

19

103/5

0.04.50

0.04.50

Dry

-

-

338.

Maruthaiah

S/o. Karuppan

20

38

103/6

0.03.00

0.03.00

Dry

-

Vela tree-10

894.

Chinnaththal

W/o. Krishnan

20

103/6

0.03.00

0.03.00

Dry

-

-

894.

Chinnaththal

W/o. Krishnan

21

39

103/7

0.03.00

0.03.00

Dry

-

Vela tree-7

153.

1. Jeevanantham

S/o. Kumarn

2. Vaithiyalingam

S/o. Kumarn

21

103/7

0.03.00

0.03.00

Dry

-

-

153.

1. Jeevanantham

S/o Kumaran

2. Vaithiyalingam

S/o. Kumaran

22

40

103/8

0.04.50

0.04.50

Dry

-

Vela tree-8

152.

Kumaran

S/o. Vaithi

22

103/8

0.04.50

0.02.00

Dry

-

-

152.

Kumaran

S/o. Vaithi

23

42

103/10

0.05.50

0.05.50

Dry

-

Vela tree-12

153.

1. Jeevanantham

S/o. Kumaran

2. Vaithiyalingam

S/o. Kumaran

23

103/10

0.05.50

0.01.00

Dry

-

Neem

Tree-1, Neem

saplings -1

153.

1. Jeevanantham

S/o. Kumaran

2. Vaithiyalingam

S/o. Kumaran

24

43

103/11

0.05.00

0.05.00

Dry

-

Vela tree-10

8.

Azhagan

S/o. Rengan

24

103/11

0.05.00

0.05.00

Dry

-

-

8.

Azhagan

S/o. Rengan

25

44

103/12

0.05.50

0.05.50

Dry

-

Vela tree-7

266.

Natesan

S/o. Pinnanthan

25

103/12

0.05.50

0.05.50

Dry

-

Vela tree-10,

Neem Tree-1

266.

Natesan

S/o. Pinnanthan

26

45

103/13

0.06.50

0.06.50

Dry

-

Vela tree-6

894.

Chinnatthal

W/o. Krishnan

26

103/13

0.06.50

0.01.50

Dry

-

-

894.

Chinnatthal

W/o. Krishnan

27

46

103/14

0.13.00

0.13.00

Dry

-

Vela tree-10

152.

Kumaran

S/o. Vaithi

27

103/14

0.13.00

0.09.50

Dry

-

-

152.

Kumaran

S/o. Vaithi

28

47

103/

15A

0.08.00

0.08.00

Dry

-

Vela tree-12

219.

Subbaiah

S/o. Muthan

28

103/15A 0.08.00

0.08.00

Dry

-

Vela

tree-35,

Neem

saplings -2

219.

Subbaiah

S/o. Muthan

34

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

29

48

103/

15B

0.07.50

0.07.50

Dry

-

Vela tree-15

219.

Subbaiah

S/o. Muthan

29

103/15B

0.07.50

0.07.00

Dry

-

Vela tree-11,

Neem Tree-1

219.

Subbaiah

S/o. Muthan

30

49

103/16

0.22.50

0.22.50

Dry

-

Vela tree-09

79.

Kanthan

S/o. Rengan

30

103/16

0.22.50

0.15.50

Dry

-

Vela tree-11,

Neem Tree-1

79.

Kanthan

S/o. Rengan

31

50

103/17

0.07.50

0.07.50

Dry

-

Vela tree-10

384.

1.Sivakumar

S/o. Muralitharan

2.Senthilkumar

S/o. Muralitharan

3.Ramachandran

S/o. Muralitharan

31

103/17

0.07.50

0.03.50

Dry

-

Vela tree-6

384.

1.Sivakumar

S/o. Muralitharan

2.Senthilkumar

S/o. Muralitharan

3.Ramachandran

S/o. Muralirtharan

32

52

103/18

0.25.00

0.20.00

Dry

-

Vela tree-26 Neem

Sapling -1

898.

1.Ulagan

S/o. Chinnakkannu

2. Ragubathi

S/o. Chinnakkannu

32

103/18

0.25.00

0.04.00

Dry

-

Vela tree-7,

Neem

saplings -1

898.

1.Ulagan

S/o. Chinnakkannu

2. Ragubathi

S/o. Chinnakkannu

33

60

104/4

0.88.00

0.63.00

Dry

Terraced house -1

Asbestos

House -1 Bath

room-1 Round

Well -1 Electric

Motor -1 Bore -1

Tamarind Tree-5

Teak tree -1 Teak

Sapling-3 Coconut

Sapling-4 Mango

Sapling-1 Guava

sapling -1 Vela

tree-50 Uthiya tree-1

Neem tree-1

152.

Kumaran

S/o. Vaithi

33

104/4

0.88.00

0.14.50

Dry

-

Vela

saplings-32

152.

Kumaran

S/o. Vaithi

34

61

104/6

0.28.00

0.26.00

Dry

-

Vela tree-15

82.

1.Ramaiah

S/o. Kanthaiah

2.Kalyansundram

S/o. Kanthaiah

3.Kumaravelu

S/o. Kanthaiah

34

104/6

0.28.00

0.01.50

Dry

-

Neem tree-1

82.

1.Ramaiah

S/o. Kanthaiah

2.Kalyansundram

S/o. Kanthaiah

3.Kumaravelu

S/o. Kanthaiah

35

62

104/7

0.28.00

0.28.00

Dry

-

Vela tree-25

Neem Sapling-5

Ecualyptus -50

538.

1.Govindan

S/o. Ponnan

2.Arumugam

S/o. Ponnan

35

104/7

0.28.00

0.13.50

Dry

-

Neem Tree-1

Ecualyptus

-50

538.

1.Govindan

S/o. Ponnan

2.Arumugam

S/o. Ponnan

35

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

36

63

104/8

0.14.00

0.14.00

Dry

-

Vela tree-15

538.

1. Govindan

S/o. Ponnan

2.Arumugam

S/o. Ponnan

36

104/8

0.14.00

0.13.00

Dry

-

Neem

saplings -2,

Vela Tree-5,

538.

1.Govindan

S/o. Ponnan

2.Arumugam

S/o. Ponnan

37

64

104/9

0.30.00

0.30.00

Dry

-

Vela tree-20

82.

1.Ramaiah

S/o. Kanthaiah

2. Kalyansundram

S/o. Kanthaiah

3. Kumaravelu

S/o. Kanthaiah

37

104/9

0.30.00

0.21.00

Dry

-

Tamarind

tree-2

82.

1.Ramaiah

S/o. Kanthaiah

2.Kalyansundaram

S/o. Kanthaiah

3.Kumaravelu

S/o. Kanthaiah

38

66

112/1A

0.05.00

0.05.00

Dry

-

-

536.

Kannappa Devar

S/o. Murugaiah

38

112/1A

0.05.00

0.01.50

Dry

-

-

536.

Kannappa Devar

S/o. Murugaiah

39

67

112/1B

1.92.50

1.52.00

Dry

-

Ecualyptus -50

Vela Sapling -30

Neem Sapling -30

Tamarind Tree-6

Palm tree-2 Vagai

tree-1

536.

Kannappa Devar

S/o. Murugaiah

39

112/1B

1.92.50

0.63.00

Dry

-

Ecualyptus

-27, Vela

Sapling

-2 Neem

Sapling -1

Tamarind

Tree-6

536.

Kannappa Devar

S/o. Murugaiah

40

68

112/3

0.19.50

0.19.50

Dry

-

-

669.

Palaniyandi

S/o. Kumaran

40

112/3

0.19.50

0.13.50

Dry

-

Neem Tree-1

669.

Palaniyandi

S/o. Kumaran

41

69

112/4

0.57.50

0.36.50

Dry

-

Aathi tree-1 Neem

Tree-2

945.

Murugaiah

S/o. Periyasamy

41

112/4

0.57.50

0.03.50

Dry

Pipe line

-

945.

Murugaiah

S/o. Periyasamy

42

70

112/

5A1

0.20.50

0.20.50

Dry

-

Neem Sapling-5

975.

Murugaiah

S/o. Periyasamy

42

112/5A1 0.20.50

0.18.00

Dry

Pipe line

-

975.

Murugaiah

S/o. Periyasamy

43

71

112/

5A2

0.20.00

0.16.50

Dry

-

-

984.

Chinnaiah

S/o. Subban

43

112/5A2 0.20.00

0.00.50

Dry

-

-

984.

Chinnaiah

S/o. Subban

44

72

113

1.05.00

0.28.00

Dry

-

Neem tree-1 Neem

Sapling -1

39.

Rajendran

S/o. Ramanathan

44

113

1.05.00

0.02.00

Dry

-

-

39.

Rajendran

S/o. Ramanathan

45

76

117/7

0.17.50

0.17.50

Dry

-

Palm Sapling-10

858.

Meenambal

W/o. Murugaiah

45

117/7

0.17.50

0.12.50

Dry

Pipe line

Neem Tree-1,

Vagai Tree-1,

Pungai

Tree-1

858.

Meenambal

W/o. Murugaiah

36

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

46

77

117/8

0.26.50

0.25.00

Others

-

Palm tree-4

858.

Meenambal

W/o. Murugaiah

46

117/8

0.26.50

0.02.00

Dry

(Ma)

-

-

858.

Meenambal

W/o Murugaiah

47

78

117/10

0.20.00

0.20.00

Dry

Hut House-1

Bore-1

Neem tree-5 Palm

tree-2

68.

Kandan

S/o. Silamban

47

117/10

0.20.00

0.18.50

Dry

Hut

shed -1

Bore

well-1

-

68.

Kandan

S/o Silamban

48

79

118/1

0.24.50

0.23.00

Dry

-

Palm tree-8

Tamarind tree-4

Neem tree-5 Pala

tree-1

76.

Karuppan

S/o. Rengan

48

118/1

0.24.50

0.02.00

Dry

-

Palm tree-2

Neem tree-1

1179.

Kalaiselvi

W/o Subramaniyan

49

80

118/2

0.16.50

0.16.50

Dry

-

-

512.

Veludevar

S/o. Palaniyandi

49

118/2

0.16.50

0.04.50

Dry

-

-

512.

Veludevar

S/o Palaniyandi

50

81

118/3

0.15.50

0.15.50

Dry

-

-

76.

Karuppan

S/o. Rengan

50

118/3

0.15.50

0.13.00

Dry

-

-

76.

Karuppan

S/o Rengan

51

82

118/4A

0.35.50

0.35.50

Dry

Round Well-1

Electric Motor-1

Coconut Sapling-4

Neem tree-1 Lemon

tree-1

245.

Rengasamy

S/o. Ulagan

51

118/4A

0.35.50

0.14.00

Dry

Coconut

Sapling-4

Lemon tree-1

245.

Rengasamy

S/o Ulagan

52

83

118/4B

0.01.00

0.01.00

Dry

-

-

393. Muthukkumar

S/o. Muthaiah

Devar

52

118/4B

0.01.00

0.00.50

Dry

-

-

393. Muthukkumar

S/o Muthaiah Devar

53

85

118/5

0.11.00

0.11.00

Dry

-

-

76.

Karuppan

S/o. Rengan

53

118/5

0.11.00

0.10.00

Dry

-

Palm tree

Small-3

76.

Karuppan

S/o Rengan

54

86

118/6

0.12.00

0.12.00

Dry

-

-

76.

Karuppan

S/o. Rengan

54

118/6

0.12.00

0.11.00

Dry

-

Palm tree-2,

Palm Small

tree-5

76.

Karuppan

S/o Rengan

55

87

118/7A

0.11.50

0.11.50

Dry

-

-

858.

Meenambal

W/o. Murugaiah

55

118/7A

0.11.50

0.04.00

Dry

-

-

858.

Meenambal

W/o Murugaiah

56

94

119/3

0.33.00

0.26.00

Dry

-

-

465.

Rengan

S/o. Meyyappan

56

119/3

0.33.00

0.01.50

Dry

Pipe line

-

465.

Rengan

S/o Meyyappan

57

95

119/4

0.17.50

0.17.50

Dry

-

-

416.

Karuppaiah

57

119/4

0.17.50

0.05.00

Dry

Pipe line

-

416.

Karuppaiah

58

97

119/6

0.11.50

0.11.50

Dry

-

-

419.

Ramaiah

S/o. Meyyan

58

119/6

0.11.50

0.01.50

Dry

-

-

419.

Ramaiah

S/o Meyyan

37

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

59

98

119/7

0.06.00

0.06.00

Dry

-

-

419.

Ramaiah

S/o Meyyan

59

119/7

0.06.00

0.06.00

Dry

Pipe

line

Neem

saplings-2

419.

Ramaiah

S/o Meyyan

60

99

119/8A

0.68.50

0.68.50

Dry

-

Coconut Sapling -15

Neem tree-5

964.

Murugaiah

S/o Periyasamy

60

119/8A

0.68.50

0.45.00

Dry

Pipe line

Coconut

Sapling -3

Neem tree-3,

Vagai Tree-1

964.

Murugaiah

S/o Periyasamy

61

100

119/8B

0.34.00

0.28.50

Dry

-

Coconut Sapling -20

Neem tree;-5

944.

Murugaiah

S/o Periyasamy

61

119/8B

0.34.00

0.05.50

Dry

Cattle

Shed-1

Palm tree--2

Neem tree-2

944.

Murugaiah

S/o Periyasamy

62

101

119/9A

0.09.00

0.09.00

Dry

-

Neem tree;-7 Palm

tree-1

411.

Meyyan

S/o Chinnaiah

62

119/ 9A

0.09.00

0.05.50

Dry

-

Neem

tree-2, Vagai

Tree-1, Neem

saplings-1

411.Meyyan

S/o Chinnaiah

63

102

119/9B

0.05.00

0.03.00

Dry

-

-

601.

1.Mamundi

S/o Chinnaiah

2.Meyyan

S/o Chinnaiah

3.Chinnammal

S/o Chinnadurai

63

119/ 9 B 0.05.00

0.00.13

Dry

-

-

601.

1.Mamundi

S/o Chinnaiah

2.Meyyan

S/o Chinnaiah

3.Chinnammal

W/o Chinnadurai

64

108

164

3.80.50

1.20.95

Dry

-

-

768.

Rengaraj

S/o Karuppaiah

64

164

3.80.50

0.74.00

Dry

-

Ecualyptus

saplings -50

768.

Rengaraj

S/o Karuppaiah

65

111

166/4A

0.06.50

0.05.00

Dry

-

-

791.

Balasubramaniyan

S/o Shanmugam;

65

166/ 4A

0.06.50

0.01.00

Dry

-

Coconut

tree-2, Teak

Sapling -3

791.

Balasubramaniyan

S/o Shanmugam;

66

112

166/4B

0.13.50

0.07.00

Dry

-

Teak Sapling -1

Uthiyam tree-1

768.

Rengaraj

S/o Karuppaiah

66

166/ 4B

0.13.50

0.01.00

Dry

-

768.

Rengaraj

S/o Karuppaiah

67

113

166/5

0.20.00

0.15.00

Dry

-

Seemai karuvai -20

768.

Rengaraj

S/o Karuppaiah

67

166/5

0.20.00

0.05.50

Dry

-

Ecualyptus

saplings -30

768.

Rengaraj

S/o Karuppaiah

68

114

166/6

0.77.00

0.74.50

Dry

-

Vela tree-5

768.

Rengaraj

S/o Karuppaiah

68

166/6

0.77.00

0.46.00

Dry

-

Ecualyptus

saplings -150

768.

Rengaraj

S/o Karuppaiah

38

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

69

115

166/7

0.88.00

0.78.00

Dry

-

Teak tree-42

Uthiyam tree-12

Vagai tree-4 Neem

tree-2

Ecualyptus -10

773. Vijayalakshmi

W/o Palaniyappan

69

166/7

0.88.00

0.33.00

Dry

-

Teak -29

Uthiyam

tree-10

Ecualyptus

-1, Vagai

Tree-1, Vela

Saplings-7

773. Vijayalakshmi

W/o. Palaniyappan

70

120

176/1

0.16.50

0.14.50

Dry

Round Well-1

Motor room-1

Aspectos -1

Coconut tree-15

Neem tree-10

671.

Karuppayee

W/o Subbaiah

70

176/1

0.16.50

0.05.50

Dry

-

-

671.

Karuppayee

W/o. Subbaiah

71

121

176/2

0.54.00

0.39.50

Dry

-

Neem tree-15

671.

Karuppayee

W/o Subbaiah

71

176/2

0.54.00

0.12.00

Dry

-

Neem tree-4

671.

Karuppayee

W/o Subbaiah

72

122

176/3

0.34.00

0.16.00

Dry

-

Neem Sapling-3

Vammaram-1

727.

Palaniyappan

S/o Subbaiah Devar

72

176/3

0.34.00

0.01.50

Dry

-

Neem Tree-2

727.

Palaniyappan

S/o Subbaiah Devar

73

129

179/5

1.42.50

0.97.00

Dry

-

Teak tree -100

Mango tree-15

Neem tree-17 Neem

Sapling -13 Vagai

tree -2

773.

Vijayalakshmi

W/o Palaniyappan

73

179/5

1.42.50

0.32.00

Dry

-

Teak saplings

-31 Neem

Sapling -3

Vagai tree -2,

Akil Tree-2

773.

Vijayalakshmi

W/o Palaniyappan

74

134

185/3C

0.07.00

0.07.00

Dry

-

Vela tree-10 Palm

tree-1 Country

Karuvela tree -1

411.

Meyyan

S/o Chinnaiah

74

185/3C

0.07.00

0.04.50

Dry

-

-

411.

Meyyan

S/o Chinnaiah

75

135

185/

3D

0.25.50

0.25.50

Dry

-

700.

Mathi

S/o Kalaiyan

75

185/

3D1

0.10.50

0.08.00

Dry

-

Vela Tree-1

700.

Mathi

S/o Kaliyan

76

185/

3D2

0.15.00

0.15.00

Dry

-

-

1152.

Chinnaiah

S/o Kaliyan

76

137

185/3F

0.14.50

0.14.50

Dry

-

Palm tree-5 Vagai

tree-2 Vagai

Sapling-3 Neem

Sapling-1

411.

Meyyan

S/o Chinnaiah

77

185/ 3F

0.14.50

0.04.50

Dry

-

Palm tree-4

411.

Meyyan

S/o Chinnaiah

77

138

185/

3G

0.18.50

0.18.50

Dry

-

700

Mathi

S/o Kaliyan

78

185/3G

0.18.50

0.17.50

Dry

-

Palm tree-1

700.

Mathi

S/o Kaliyan

78

139

185/

3H

0.06.50

0.06.50

Dry

-

Vela tree-1

346

.Mamunda

S/o Chinnaiah

79

185/3H

0.06.50

0.05.00

Dry

-

Vela tree-1

346.

Mamunda

S/o Chinnaiah

39

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

79

140

185/3I

0.05.00

0.05.00

Dry

-

411.

Meyyan

S/o Chinnaiah

80

185/ 3I

0.05.00

0.01.50

Dry

-

-

411.

Meyyan

S/o Chinnaiah

80

141

185/3J

0.01.00

0.01.00

Dry

-

346.

Mamunda

S/o Chinnaiah

81

185/ 3J

0.01.00

0.00.65

Dry

-

-

346.

Mamunda

S/o Chinnaiah

81

143

186/1A

0.14.00

0.14.00

Dry

-

350.

Karuppaiah

S/o Kaliyan

82

186/ 1A

0.14.00

0.04.50

Dry

-

-

1177.

Muthu

W/o Karuppaiah

82

144

186/1B

0.13.50

0.13.50

Dry

-

Ecualyptus -5

890.

Palaiyappan

S/o Mamundi

83

186/ 1B

0.13.50

0.01.50

Dry

-

-

890.

Palaiyappan

S/o Mamundi

83

153

187/1A2

0.29.50

0.29.50

Dry

-

Vela tree-10 Neem

tree -3

700.

Mathi

S/o Kaliyan

84

187/

1A2B

0.19.50

0.09.50

Dry

-

-

700.

Mathi

S/o Kaliyan

84

154

187/1B

0.27.00

0.27.00

Dry

-

Ecualyptus -2

890.

Palaniyappan

S/o Mamundi

85

187/ 1B

0.27.00

0.03.50

Dry

-

Ecualyptus

Saplings -3

890.

Palaniyappan

S/o Mamundi

85

155

187/1C

0.26.00

0.26.00

Dry

-

-

411.

Meyyan

S/o Chinnaiah

86

187/ 1C

0.26.00

0.24.00

Dry

-

-

411.

Meyyan

S/o Chinnaiah

86

156

187/2

0.17.00

0.17.00

Dry

-

Ecualyptus -550

409.

Mookkaiah Devar

S/o Krishna Devar

87

187/2

0.17.00

0.15.00

Dry

-

Ecualyptus

Saplings

-200, Akil

Tree-1

409.

Mookkaiah Devar

S/o Krishna Devar

87

157

187/3

0.60.50

0.60.50

Dry

-

Ecualyptus -1500

409.

Mookkaiah Devar

S/o Krishna Devar

88

187/3

0.60.50

0.31.00

Dry

-

Ecualyptus

Saplings

-400

409.

Mookkaiah Devar

S/o Krishna Devar

88

158

187/4

0.54.00

0.34.00

Dry

-

Ecualyptus -750

409.

Mookkaiah Devar

S/o Krishna Devar

89

187/4

0.54.00

0.08.50

Dry

-

Ecualyptus

-150

409.

Mookkaiah Devar

S/o Krishna Devar

89

164

189/2B

0.14.00

0.14.00

Dry

-

-

855.

Vidhya

W/o Kumar

90

189/ 2B

0.14.00

0.05.50

Dry

-

-

855.

Vidhya

W/o Kumar

90

165

189/3

0.12.50

0.12.50

Dry

-

-

1078.

Anbu

S/o Velu Devar

91

189/3

0.12.50

0.09.00

Dry

Pipeline

-

1078.

Anbu

S/o Velu Devar

91

166

189/4

0.11.50

0.11.50

Dry

-

-

855.

Vidhya

W/o Kumar

92

189/4

0.11.50

0.11.50

Dry

-

855.

Vidhya

W/o Kumar

40

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

92

167

189/5A

0.19.50

0.19.50

Dry

-

-

1112.

Anbu

S/o Velu

93

189/5A

0.19.50

0.14.50

Dry

Pipe line

-

1112.

Anbu

S/o Velu

93

168

189/5B

0.17.50

0.17.50

Dry

-

-

1096.

Chinnu

S/o Velu

94

189/5B

0.17.50

0.01.50

Dry

Pipe line

-

1096.

Chinnu

S/o Velu

94

169

189/6A

0.05.00

0.05.00

Dry

-

Tamarind tree -1

14.

Adaikkala Devar

S/o Chinnaiah

Devar

95

189/6A

0.05.00

0.04.00

Dry

-

-

14.

Adaikkala Devar

S/o Chinnaiah

Devar

95

170

189/6B

0.05.00

0.05.00

Dry

-

Tamarind tree -1

395.

Muthu Devar

S/o Chinnaiah

96

189/6B

0.05.00

0.05.00

Dry

-

-

395.

Muthu Devar

S/o Chinnaiah

96

171

189/6C

0.15.50

0.15.50

Dry

-

Tamarind tree -2

Neem Sapling -1

1095.

Chinnu

S/o Velu

97

189/6C

0.15.50

0.14.50

Dry

Pipe line

Neem

Sapling -2,

Tamarind

Tree-3

1095.

Chinnu

S/o Velu

97

172

189/

6D

0.05.00

0.05.00

Dry

-

-

36.

Arumuga Devar

S/o Chinnaiah

Devar

98

189/6D

0.05.00

0.05.00

Dry

Pipe line

-

36.

Arumuga Devar

S/o Chinnaiah

Devar

98

176

189/11

0.04.50

0.04.50

Dry

-

-

1078.

Anbu

S/o Velu Devar

99

189/11

0.04.50

0.02.50

Dry

Pipe line

-

1078.

Anbu

S/o Velu Devar

99

177

189/12

0.03.00

0.03.00

Dry

-

-

125. Konginippatti

Karuppan

100

189/12

0.03.00

0.02.00

Dry

-

-

125. Konginippatti

Karuppan

100

182

190/7

0.20.00

0.20.00

Dry

-

Vela Tree -1

Ecualyptus -4

241.

Sundarraj Devar

S/o Palanivel

101

190/7

0.20.00

0.09.00

Dry

-

-

241.

Sundarraj Devar

S/o Palanivel

101

185

327/40

0.03.00

0.03.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

102

327/40

0.03.00

0.03.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

41

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

102

186

327/41

0.03.50

0.03.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

103

327/41

0.03.50

0.03.50

Dry

-

Neem

Saplings-2

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

103

187

327/42

0.01.50

0.01.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

104

327/42

0.01.50

0.01.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandra

104

188

327/43

0.00.50

0.00.50

Dry

-

-

42

. 1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

105

327/43

0.00.50

0.00.50

Dry

Neem Tree-1

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

105

196

327/51

0.01.00

0.01.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

106

327/51

0.01.00

0.00.11

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

42

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

106

197

327/52

0.04.00

0.04.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

107

327/52

0.04.00

0.00.32

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

107

198

327/53

0.04.00

0.04.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

108

327/53

0.04.00

0.03.30

Dry

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

108

204

327/59

0.02.00

0.02.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

109

327/59

0.02.00

0.00.14

Dry

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

109

205

327/60

0.01.50

0.01.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

110

327/60

0.01.50

0.01.00

Dry

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

43

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

110

206

327/61

0.04.00

0.04.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

111

327/

61

0.04.00

0.04.00

Dry

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

111

207

327/62

0.01.00

0.01.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

112

327/ 62

0.01.00

0.01.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

112

208

327/63

0.01.50

0.01.50

Dry

-

-

42. 1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

113

327/ 63

0.01.50

0.01.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

113

209

327/64

0.02.00

0.02.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

114

327/ 64

0.02.00

0.01.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

44

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

114

210

327/65

0.02.50

0.02.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

115

327/ 65

0.02.50

0.00.16

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

115

215

327/70

0.03.00

0.03.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

116

327/ 70

0.03.00

0.02.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

116

216

327/71

0.02.50

0.02.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

117

327/ 71

0.02.50

0.02.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

117

217

327/72

0.02.50

0.02.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

118

327/ 72

0.02.50

0.02.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

45

Already Published

To be Edited

Sl.No.

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

As per Preliminary

Notifi cation Sl.No.

Survey No.

Total Area (Hec)

Area under

Acquisition (Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and

Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

118

218

327/73

0.03.50

0.03.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

119

327/ 73

0.03.50

0.03.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

119

219

327/74

0.02.00

0.02.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

120

327/ 74

0.02.00

0.02.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

120

220

327/75

0.02.50

0.02.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

121

327/ 75

0.02.50

0.01.50

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

121

221

327/76

0.03.00

0.03.00

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Bashkaran

S/o Ramachandran

4.Kathireshan

S/o Ramachandran

122

327/ 76

0.03.00

0.00.40

Dry

-

-

42.

1.Rajkumar

S/o Ramachandran

2.Selvaraj

S/o Ramachandran

3.Baskaran

S/o Ramachandran

4.Kathiresan

S/o Ramachandran

Total

12.30.71

46

As per Revised LPS given by Executive Engineer, Special Project division, Cauvery-Vaigai-Gundar Link Canal Scheme, Pudukkottai (Letter No.-02/RLPS/

KO1/CVG/2022, Date 14.10.2022) Among the 221 survey numbers already published in Preliminary Notifi cation, the following 100 survey numbers are hereby

removed from Land Acquisition. The details are given below.

Pudukkottai District, Kulathur Taluk, Poongudi Village.

Sl.

No.

As per

Preliminary

Notifi cation

Sl.No.

Survey No.

Area under

Acquisition

(Hec)

Sl.No.

As per

Preliminary

Notifi cation

Sl.No.

Survey No.

Area under

Acquisition

(Hec)

Sl.No.

As per

Preliminary

Notifi cation

Sl.No

Survey No.

Area under

Acquisition

(Hec)

Sl.No.

Area under

Acquisition

(Hec)

Survey No.

Area under

Acquisition

(Hec)

1

2

66/2

0.02.00

26

58

103/26

0.02.00

51

123

176/4A

0.11.00

76

173

189/7

0.17.50

2

3

66/3

0.02.00

27

59

104/3

0.07.50

52

124

176/5A

0.03.50

77

174

189/9

0.05.50

3

4

66/4

0.02.00

28

65

106/14

0.11.00

53

125

179/2D

0.06.50

78

175

189/10

0.02.50

4

5

66/5

0.01.00

29

73

113

0.00.50

54

126

179/3B

0.24.50

79

178

190/2D

0.00.50

5

7

66/7

0.13.00

30

74

117/5

0.05.00

55

127

179/4A

0.02.00

80

179

190/3C

0.15.50

6

8

93/1A

0.05.50

31

75

117/6

0.25.00

56

128

179/4B

0.37.50

81

180

190/5

0.05.50

7

17

95/2A

0.03.50

32

84

118/4C

0.00.50

57

130

185/1

0.04.50

82

181

190/6

0.20.00

8

18

95/2A

0.18.00

33

88

118/7B

0.01.50

58

131

185/2

0.01.00

83

183

191/15

0.08.00

9

19

95/2B

0.11.00

34

89

118/8A

0.15.80

59

132

185/3A

0.09.00

84

184

191/16

0.18.50

10

20

95/2C

0.00.15

35

90

118/8B

0.09.50

60

133

185/3B

0.07.00

85

189

327/44

0.00.50

11

23

96/3

0.02.50

36

91

118/8C

0.00.70

61

136

185/3E

0.12.00

86

190

327/45

0.01.00

12

24

101/1A

0.02.00

37

92

118/9A

0.00.50

62

142

185/3K

0.02.50

87

191

327/46

0.01.00

13

25

101/1B

0.05.50

38

93

119/2

0.00.25

63

145

186/1C

0.03.50

88

192

327/47

0.01.00

14

26

102/1

0.20.50

39

96

119/5

0.07.50

64

146

186/1D

0.06.00

89

193

327/48

0.01.00

15

27

102/2A

0.01.50

40

103

119/9C

0.09.50

65

147

186/1E

0.07.50

90

194

327/49

0.02.50

16

28

103/1A

0.08.00

41

104

119/9D

0.05.00

66

148

186/2A

0.07.00

91

195

327/50

0.02.50

17

29

103/1B

0.09.00

42

105

119/10

0.15.00

67

149

186/2B

0.00.15

92

199

327/54

0.01.50

18

35

103/3B

0.01.00

43

106

119/11

0.05.50

68

150

186/3

0.12.50

93

200

327/55

0.03.50

19

41

103/9

0.04.00

44

107

122/2A

0.10.00

69

151

186/4

0.05.50

94

201

327/56

0.01.50

20

51

103/20

0.08.50

45

109

166/2

0.02.50

70

152

187/1A1

0.15.50

95

202

327/57

0.01.50

21

53

103/19

0.02.00

46

110

166/3

0.19.00

71

159

187/5A

0.14.00

96

203

327/58

0.01.50

22

54

103/21

0.05.50

47

116

167/1

0.24.50

72

160

187/5B

0.13.50

97

211

327/66

0.03.00

23

55

103/22

0.00.50

48

117

167/2

0.13.00

73

161

189/1B

0.01.50

98

212

327/67

0.03.00

24

56

103/24

0.04.00

49

118

167/3

0.05.50

74

162

189/1C

0.09.00

99

213

327/68

0.03.00

25

57

103/25

0.02.00

50

119

167/4

0.15.00

75

163

189/2A

0.13.50

100

214

327/69

0.02.00

Pudukkottai,

கவிதா ராā,

21st December 2022.

District Collector.

47

காேவரி - ைவைக - குண்டாĄ இைணப்Āக் கால்வாய் திட்டம், Āýக்ேகாட்ைட மாவட்டம்.

நிலம் ைகயகப்பûத்ýதலில் நியாயமான சரியீû மற்Ąம் ஒளிĈமைறவின்ைம மĄவாழ்Ĉ மற்Ąம் மĄகுடியமர்Ĉ உரிைமச் சட்டம் 2013-பிரிĈ-11(1) மற்Ąம்

2017-ஆம் ஆண்û விதி 13(1)-ன் கீழ் ெவளியிடப்பட்ட āதல்நிைல அறிவிக்ைகக்கான திăத்த அறிவிக்ைக

(ந.க. 121/2022/கா.ைவ.þ/அ2)

ØÊவĉ Öĉ¿த அàÝÁபானĄ ĆĄ¹ேகா½ைட மாவ½ட þள¿ĖÄ வ½டÂ ĘºþÔ Ðராம காேவÛ-ைவைக-þ¾டாĎ இைணÁĆ காÅவாà ֽட எÊď ெபாĄநல பயÊபா½ÔÉகாக

221 ĆலºகßÅ 33.28.73 ெஹ¹ேடÄ ப½டா ×லºகைள ×லஎĂÁĆ ெசÃவதÉகாக ஏÉகனேவ ×ல ைகயகÁபĂ¿ĄதÜÅ ×யாயமான சÛñĂ மÉĎ ஒßċமைறÝÊைம, மĎவாÇċ மÉĎÂ

மĎþÔயமÄċ உÛைம» ச½ட 2013-ØÛċ-11(1) மÉĎ ÝÖ 2017-ØÛċ 13(1)இÊ çÇ ćதÅ×ைல அàݹைக ĆĄ¹ேகா½ைட மாவ½ட ஆ½ÒயÛÊ ெசயÅćைறகÈ ந.க.121/2022/அ2/

கா.ைவ.þ நாÈ : 25.02.2022-ÊபÔ 04.03.2022 நாß½ட ĆĄ¹ேகா½ைட மாவ½ட அரÒதÞÅ தÙÞÅ அàÝÁĆ எ¾ 6 ப¹க எ¾. 26 ćதÅ 52 வைர, ஆºÐல¿ÖÅ அàÝÁĆ எ¾.4

ப¹கÂ எ¾.22 ćதÅ 47 வைரĈÂ மÉĎÂ 16.03.2022 நாß½ட ÖனகரÊ நாßதÞÅ ப¹கÂ 9 ćதÅ 10 வைரĈÂ 16.03.2022 நாß½ட The Times of India ப¿ÖÛ¹ைகÚÅ ப¹கÂ

எ¾. 9-10Å ெவßÚடÁப½ĂÈளதÉþ தÉேபாĄ ெசயÉெபாàயாளÄ îÄவள¿Ąைற, ÒறÁĆ Ö½ட¹ ேகா½டÂ, காேவÛ-ைவைக-þ¾டாĎ இைணÁù காÅவாà ֽடÂ, ĆĄ¹ேகா½ைட

அவÄகßÊ ந.க. 02 RLPS/ேகா1 /கா.ைவ.þ/2022 நாÈ: 14.10.2022 நாß½ட Öĉ¿Öய ×ல Ö½ட அ½டவைணÚÊபÔ çǹக¾ட 121 Ćலºகč¹þ ćதÅ×ைல அàݹைக¹கான Öĉ¿த

அà¹ைக çǹக¾டவாĎ ெவßÚடÁபĂÐறĄ.

அட்டவைண

ĆĄ¹ேகா½ைட மாவ½டÂ, þள¿ĄÄ வ½டÂ, ĘºþÔ ÐராமÂ.

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

1

1

66/1

1.15.00

1.15.00

நÊெசÃ

-

ேவÁப மரÂ-2

899. ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

1

66/1

1.15.00

0.73.00

நÊெசÃ

-

ேவÁப மரÂ-2

899. ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

2

6

66/6

0.94.00

0.80.00

நÊெசÃ

-

ேத¹þ-4

901. ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2

66/6

0.94.00

0.24.50

நÊெசÃ

-

ேத¹þ-2

901. ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

3

9

93/1B

0.54.00

0.31.00

ĆÊெசÃ

-

ேவÁப மரÂ-1

1005.

1.நÅைலயா ேதவÄ

மகÊ ć¿Ą¹கĉÁபÊ

2.நÅைலயா ேதவÄ

மகÊ மாÛć¿Ą

3

93/1B

0.54.00

0.02.00

ĆÊெசÃ

-

ேவÁப மரÂ-1

1005.

1.நÅைலயா ேதவÄ

மகÊ ć¿Ą¹கĉÁபÊ

2.நÅைலயா ேதவÄ

மகÊ மாÛć¿Ą

4

10

93/1C1

0.41.00

0.39.50

ĆÊெசÃ

ேபÌம½ட

க½ÔடÂ-1

ேத¹þ-2 ேவÁப

மரÂ-1 ெதÊனº

கÊĎ-1 நவா

மரÂ-1 ேவÁபº

கÊĎ-2

மாºகÊĎ-5

வாதா மரÂ-4

863

ÒÊைனயா மகÊ

ச¿ÖயęÄ¿Ö

4

93/1C1

0.41.00

0.26.50

ĆÊெசÃ

-

ேவÁபºகÊĎ-1

863

ÒÊைனயா

மகÊ ச¿ÖயęÄ¿Ö

48

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

5

11

93/C2

0.20.50

0.20.50

ĆÊெசÃ

-

ெதÊனº கÊĎ-

3 ேவÁப மரÂ-10

நவா மரÂ-1

641

1. ÒதÂபர¿ ேதவÄ

மகÊ ćĉைகயா

2.ÒதÂபர¿ ேதவÄ

மகÊ ć¿ைதயா

3.ÒதÂபர¿ ேதவÄ

மகÊ ராைமயா

4.ÒதÂபர¿ ேதவÄ

மகÊ ÒÊைனயா

5.ÒதÂபர¿ ேதவÄ

மகÊ காÒ

5

93/1C2

0.20.50

0.09.50

ĆÊெசÃ

-

-

641

1. ÒதÂபர¿ ேதவÄ

மகÊ ćĉைகயா

2.ÒதÂபர¿ ேதவÄ

மகÊ ć¿ைதயா

3.ÒதÂபர¿ ேதவÄ

மகÊ ராைமயா

4.ÒதÂபர¿ ேதவÄ

மகÊ ÒÊைனயா

5.ÒதÂபர¿ ேதவÄ

மகÊ காÒ

6

12

93/2

1.76.00

1.51.00

ĆÊெசÃ

-

ேவÁபº கÊĎ-5

ேவலா மரÂ-20

பைன மரÂ-17

ேவÁப மரÂ-5

550

1.ெமÃயÊ மகÊ;

கĉÁபÊ 2.ெமÃயÊ

மகÊ ć¿தÊ

6

93/2

1.76.00

0.63.00

ĆÊெசÃ

-

ேவலா மரÂ-66

பைன மரÂ-18

ேவÁப மரÂ -14

550

1.ெமÃயÊ மகÊ

கĉÁபÊ 2. ெமÃயÊ

மகÊ ć¿தÊ

7

13

93/3A

3.16.00

1.58.00

ĆÊெசÃ

அÔÁபÂĆ

ேபாÄ

A+கÜÁடÌ மரÂ

2000 ேவÁப

மரÂ-5

ĆßயமரÂ-1

ேத¹þ-30

ேவÁபºகÊĎ-5

892.

ராம»சÀÖர ேதவÄ

மகÊ பாÌகரÊ

7

93/3A

3.16.00

0.66.50

ĆÊெசÃ

அÔÁபÂĆ

ேபாÄ

ĚகÜÁடÌ மரÂ

1150, ேவÁப

மரÂ-4,

ĆßயமரÂ-1

ேத¹þ-4

ேவலா மரÂ-1

892.

ராம»சÀÖர ேதவÄ

மகÊ பாÌகரÊ

8

14

93/3B

0.20.00

0.11.00

ĆÊெசÃ

-

-

866.

1.ĀÅதாÊ அகமĄ

மகÊ அÁĄÅ ரÏமாÊ

2.ேஷ¹ ćகமĄ மகÊ

ćகமĄ கá

8

93/3B

0.20.00

0.06.00

ĆÊெசÃ

-

-

866.

1.ĀÅதாÊ அகமĄ

மகÊ அÁĄÅ ரÏமாÊ

2.ேஷ¹ ćகமĄ மகÊ

ćகமĄ கá

9

15

94

0.63.50

0.49.50

ĆÊெசÃ

-

ேத¹þ மரÂ-2

ேவÁப மரÂ-1

860.

1.ĀÅதாÊ அகமĄ

மகÊ அÁĄÅ ரÏமாÊ

2.ேஷ¹ ćகமĄ மகÊ

ćகமĄ கá

9

94

0.63.50

0.15.50

ĆÊெசÃ

-

ேத¹þ மரÂ-2

ேவÁப மரÂ-1

860.

1.ĀÅதாÊ அகமĄ

மகÊ அÁĄÅ ரÏமாÊ

2.ேஷ¹ ćகமĄ மகÊ

ćகமĄ கá

49

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

10

16

95/1

0.27.00

0.26.73

ĆÊெசÃ

-

மா மரÂ-15

ெகாÃயா மரÂ-4

ேவÁப மரÂ-1

ேவÁப கÊĎ-1

860.

1.ĀÅதாÊ அகமĄ

மகÊ அÁĄÅ ரÏமாÊ

2.ேஷ¹ ćகமĄ மகÊ

ćகமĄ கá

10

95/1

0.27.00

0.04.50

ĆÊெசÃ

-

வாைக மரÂ-1,

ேவÁப மரÂ-1

860.

1.ĀÅதாÊ அகமĄ

மகÊ அÁĄÅ ரÏமாÊ

2.ேஷ¹ ćகமĄ

மகÊ ćகமĄ கá

11

21

96/1A

0.20.00

0.20.00

ĆÊெசÃ

-

ĚகÜÁடÌ

மரÂ-1325

895.

பாÌகரÊ மைனÝ

ேரăகா ேதÝ

11

96/1A

0.20.00

0.19.00

ĆÊெசÃ

-

ĚகÜÁடÌ

கÊĎ-500

895.

பாÌகரÊ

மைனÝ ேரăகா ேதÝ

12

22

96/1B

0.20.50

0.20.50

ĆÊெசÃ

-

-

866.

1.ĀÅதாÊ அகமĄ

மகÊ அÁĄÅ ரÏமாÊ

2.ேஷ¹ ćகமĄ மகÊ

ćகமĄ கá

12

96/1B

0.20.50

0.03.50

ĆÊெசÃ

-

ேவலா மரÂ-4

866.

1.ĀÅதாÊ அகமĄ

மகÊ அÁĄÅ ரÏமாÊ

2.ேஷ¹ ćகமĄ

மகÊ ćகமĄ கá

13

30

103/1C

0.18.00

0.18.00

ĆÊெசÃ

-

ேவலா மரÂ-15

718.

þமாரேவĊ மைனÝ

ராேஜÌவÛ

13

103/1C

0.18.00

0.13.50

ĆÊெசÃ

-

ேவலா மரÂ-2

ĚகÜÁடÌ

கÊĎ-15, அÐல

மரÂ-1, ேவÂĆ-2

718.

þமாரேவĊ

மைனÝ ராேஜÌவÛ

14

31

103/1D

0.13.00

0.13.00

ĆÊெசÃ

-

ேவலா மரÂ-13

718.

þமாரேவĊ மைனÝ

ராேஜÌவÛ

14

103/1D

0.13.00

0.12.00

ĆÊெசÃ

-

ĚகÜÁடÌ

கÊĎ-23 ேவலா

கÊ;Ď-2, ேவÁப

மரÂ-1

718.

þமாரேவĊ

மைனÝ ராேஜÌவÛ

15

32

103/2A

0.02.50

0.02.50

ĆÊெசÃ

-

ேவலா மரÂ-9

266.

ØÊனÀதÊ மகÊ

நேடசÊ

15

103/2A

0.02.50

0.02.50

ĆÊெசÃ

-

ேவÁப மரÂ-1,

அÐல மரÂ-1

266.

ØÊனÀதÊ

மகÊ நேடசÊ

16

33

103/2B

0.02.00

0.02.00

ĆÊெசÃ

-

ேவலா மரÂ-8

8.

ெரºகÊ மகÊ அழகÊ

16

103/2B

0.02.00

0.00.50

ĆÊெசÃ

-

பைன மரÂ-1

8. ெரºகÊ

மகÊ அழகÊ

17

34

103/3A

0.02.00

0.02.00

ĆÊெசÃ

-

ேவலா மரÂ-6

266.

ØÊனÀதÊ மகÊ

நேடசÊ

17

103/3A

0.02.00

0.01.50

ĆÊெசÃ

-

ேவÁப மரÂ -1

266.

ØÊனÀதÊ

மகÊ நேடசÊ

18

36

103/4

0.04.00

0.04.00

ĆÊெசÃ

-

ேவலா மரÂ-9

152.

ைவ¿Ö மகÊ þமரÊ

18

103/4

0.04.00

0.01.00

ĆÊெசÃ

-

ேவலா மரÂ-5

152.

ைவ¿Ö மகÊ þமரÊ

50

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

19

37

103/5

0.04.50

0.04.50

ĆÊெசÃ

-

ேவலா மரÂ-13

338.

கĉÁபÊ

மகÊ மĉைதயா

19

103/5

0.04.50

0.04.50

ĆÊெசÃ

-

-

338.

கĉÁபÊ

மகÊ மĉைதயா

20

38

103/6

0.03.00

0.03.00

ĆÊெசÃ

-

ேவலா மரÂ-10

894.

ÐĉÍணÊ

மைனÝ ÒÊனா¿தாÈ

20

103/6

0.03.00

0.03.00

ĆÊெசÃ

-

-

894.

ÐĉÍணÊ

மைனÝ ÒÊனா¿தாÈ

21

39

103/7

0.03.00

0.03.00

ĆÊெசÃ

-

ேவலா மரÂ-7

153

1.þமரÊ மகÊ

üவானÀதÂ 2.þமரÊ

மகÊ ைவ¿ÖயܺகÂ

21

103/7

0.03.00

0.03.00

ĆÊெசÃ

-

-

153

1.þமரÊ மகÊ

üவானÀதÂ 2.þமரÊ

மகÊ ைவ¿ÖயܺகÂ

22

40

103/8

0.04.50

0.04.50

ĆÊெசÃ

-

ேவலா மரÂ-8

152.

ைவ¿Ö மகÊ þமரÊ

22

103/8

0.04.50

0.02.00

ĆÊெசÃ

-

-

152.

ைவ¿Ö மகÊ þமரÊ

23

42

103/10

0.05.50

0.05.50

ĆÊெசÃ

-

ேவலா மரÂ-12

153

1.þமரÊ மகÊ

üவானÀதÂ 2.þமரÊ

மகÊ ைவ¿ÖயܺகÂ

23

103/10

0.05.50

0.01.00

ĆÊெசÃ

-

ேவÁபமரÂ -1,

ேவÁபºக¾Ď-1

153

1.þமரÊ மகÊ

üவானÀதÂ 2.þமரÊ

மகÊ ைவ¿ÖயܺகÂ

24

43

103/11

0.05.00

0.05.00

ĆÊெசÃ

-

ேவலா மரÂ-10

8.

ெரºகÊ மகÊ அழகÊ

24

103/11

0.05.00

0.05.00

ĆÊெசÃ

-

-

8.

ெரºகÊ மகÊ அழகÊ

25

44

103/12

0.05.50

0.05.50

ĆÊெசÃ

-

ேவலா மரÂ-7

266.

ØÊனÀதÊ

மகÊ நேடசÊ

25

103/12

0.05.50

0.05.50

ĆÊெசÃ

-

ேவÁபமரÂ-1,

ேவலா மரÂ-10

266.

ØÊனÀதÊ

மகÊ நேடசÊ

26

45

103/13

0.06.50

0.06.50

ĆÊெசÃ

-

ேவலா மரÂ-6

894.

ÐĉÍணÊ

மைனÝ ÒÊனா¿தாÈ

26

103/13

0.06.50

0.01.50

ĆÊெசÃ

-

-

894.

ÐĉÍணÊ

மைனÝ ÒÊனா¿தாÈ

27

46

103/14

0.13.00

0.13.00

ĆÊெசÃ

-

ேவலா மரÂ-10

152.

ைவ¿Ö மகÊ þமரÊ

27

103/14

0.13.00

0.09.50

ĆÊெசÃ

-

-

152.

ைவ¿Ö மகÊ þமரÊ

28

47

103/15A

0.08.00

0.08.00

ĆÊெசÃ

-

ேவலா மரÂ-12

219.

ć¿தÊ மகÊ ĀÁைபயா

28

103/15A

0.08.00

0.08.00

ĆÊெசÃ

-

ேவலா மரÂ-35,

ேவÁபº கÊĎ-2

219.

ć¿தÊ

மகÊ ĀÁைபயா

51

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

29

48

103/15B

0.07.50

0.07.50

ĆÊெசÃ

-

ேவலா மரÂ-15

219.

ć¿தÊ மகÊ ĀÁைபயா

29

103/15B

0.07.50

0.07.00

ĆÊெசÃ

-

ேவÁபமரÂ-1,

ேவலாமரÂ-11

219.

ć¿தÊ

மகÊ ĀÁைபயா

30

49

103/16

0.22.50

0.22.50

ĆÊெசÃ

-

ேவலா மரÂ-09

79.

ெரºகÊ மகÊ கÀதÊ

30

103/16

0.22.50

0.15.50

ĆÊெசÃ

-

ேவலாமரÂ-11,

ேவÁப மரÂ-1

79.

ெரºகÊ மகÊ கÀதÊ

31

50

103/17

0.07.50

0.07.50

ĆÊெசÃ

-

ேவலா மரÂ-10

384

1.ćரöதரÊ

மகÊ Òவ¹þமாÄ

2. ćரöதரÊ

மகÊ ெசÀÖÅ þமாÄ

3. ćரöதரÊ

மகÊ ராம»சÀÖரÊ

31

103/17

0.07.50

0.03.50

ĆÊெசÃ

-

ேவலா மரÂ-6

384

1. ćரöதரÊ

மகÊ Òவ¹þமாÄ

2. ćரöதரÊ

மகÊ ெசÀÖÅ þமாÄ

3. ćரöதரÊ

மகÊ ராம»சÀÖரÊ

32

52

103/18

0.25.00

0.20.00

ĆÊெசÃ

-

ேவலா மரÂ-26

ேவÁபº கÊĎ-1

898. 1.ÒÊன¹க¾ă

மகÊ; உலகÊ

2. ÒÊன¹க¾ă

மகÊ; ரþபÖ

32

103/18

0.25.00

0.04.00

ĆÊெசÃ

-

ேவலா மரÂ-7,

ேவÁபºகÊĎ-1

898. 1. ÒÊன¹க¾ă

மகÊ; உலகÊ

2. ÒÊன¹க¾ă

மகÊ; ரþபÖ

33

60

104/4

0.88.00

0.63.00

ĆÊெசÃ

தாÄĀ ôĂ-1

ஆÌப½டாÌ

ெகா½டைக-

1 பா¿ěÂ-1

வ½ட ÐணĎ-1

ÙÊேமா½டாÄ-1

ேபாÄ-1

Ćßய மரÂ-5

ேத¹þ மரÂ-1

ேத¹þ கÊĎ-3

ெதÊைன கÊĎ-

4 மாºகÊĎ-1

ெகாÃயா கÊĎ-1

ேவலா மரÂ-50

உÖய மரÂ-1

ேவÁப மரÂ-1

152.

ைவ¿Ö மகÊ þமரÊ

33

104/4

0.88.00

0.14.50

ĆÊெசÃ

-

ேவலா கÊĎ

-32

152.

ைவ¿Ö மகÊ þமரÊ

52

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

34

61

104/6

0.28.00

0.26.00

ĆÊெசÃ

-

ேவலா மரÂ-15

82.

1. கÀைதயா மகÊ

ராைமயா

2. கÀைதயா மகÊ

கÅயாணĀÀதரÂ

3. கÀைதயா மகÊ

þமாரேவĊ

34

104/6

0.28.00

0.01.50

ĆÊெசÃ

-

ேவÁபமரÂ -1

82.

1.கÀைதயா மகÊ

ராைமயா

2. கÀைதயா மகÊ

கÅயாணĀÀதரÂ

3. கÀைதயா மகÊ

þமாரேவĊ

35

62

104/7

0.28.00

0.28.00

ĆÊெசÃ

-

ேவலா மரÂ-25

ேவÁபº கÊĎ-5

ĚகÜÁடÌ-50

538.

1. ெபாÊனÊ மகÊ

ேகாÝÀதÊ

2. ெபாÊனÊ மகÊ

ஆĎćகÂ

35

104/7

0.28.00

0.13.50

ĆÊெசÃ

-

ĚகÜÁடÌ -50

ேவÁப மரÂ-1,

538.

1.ெபாÊனÊ மகÊ

ேகாÝÀதÊ

2. ெபாÊனÊ மகÊ

ஆĎćகÂ

36

63

104/8

0.14.00

0.14.00

ĆÊெசÃ

-

ேவலா மரÂ-15

538.

1. ெபாÊனÊ மகÊ

ேகாÝÀதÊ

2. ெபாÊனÊ மகÊ

ஆĎćகÂ

36

104/8

0.14.00

0.13.00

ĆÊெசÃ

-

ேவÁபºகÊĎ-2,

ேவலாமரÂ-5,

538.

1.ெபாÊனÊ மகÊ

ேகாÝÀதÊ

2. ெபாÊனÊ மகÊ

ஆĎćகÂ

37

64

104/9

0.30.00

0.30.00

ĆÊெசÃ

-

ேவலா மரÂ-20

82.

1. கÀைதயா மகÊ

ராைமயா

2. கÀைதயா மகÊ

கÅயாணĀÀதரÂ

3. கÀைதயா மகÊ

þமாரேவĊ

37

104/9

0.30.00

0.21.00

ĆÊெசÃ

-

Ćßய மரÂ-2

82.

1.கÀைதயா மகÊ

ராைமயா

2. கÀைதயா மகÊ

கÅயாணĀÀதரÂ

3. கÀைதயா மகÊ

þமாரேவĊ

38

66

112/1A

0.05.00

0.05.00

ĆÊெசÃ

-

536.

க¾ணÁப ேதவÄ

தÀைத ćĉைகயா

38

112/1A

0.05.00

0.01.50

ĆÊெசÃ

-

536.

க¾ணÁப ேதவÄ

தÀைத ćĉைகயா

39

67

112/1B

1.92.50

1.52.00

ĆÊெசÃ

-

ĚகÜÁடÌ-50

ேவலாºகÊĎ-30

ேவÁபºகÊĎ-30

Ćßய மரÂ-6

பைன மரÂ-2

வைக மரÂ-1

536.

க¾ணÁப ேதவÄ

தÀைத ćĉைகயா

39

112/1B

1.92.50

0.63.00

ĆÊெசÃ

-

Ćßய மரÂ-6,

Ě¹ÜÁடÌ-27,

ேவலாºகÊĎ-2,

ேவÁபºகÊĎ-1,

536.

க¾ணÁப ேதவÄ

தÀைத ćĉைகயா

40

68

112/3

0.19.50

0.19.50

ĆÊெசÃ

-

669.

þமரÊ

மகÊ பழáயா¾Ô

40

112/3

0.19.50

0.13.50

ĆÊெசÃ

-

ேவÁப மரÂ-1

669.

þமரÊ

மகÊ பழáயா¾Ô

53

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

41

69

112/4

0.57.50

0.36.50

ĆÊெசÃ

-

ஆ¿Ö மரÂ-1

ேவÁப மரÂ-2

945.

ெபÛயசாÙ

மகÊ ćĉைகயா

41

112/4

0.57.50

0.03.50

ĆÊெசÃ

ைபÁ

ைலÊ

-

945.

ெபÛயசாÙ

மகÊ ćĉைகயா

42

70

112/5A1

0.20.50

0.20.50

ĆÊெசÃ

-

ேவÁபº கÊĎ-5

975.

ெபÛயசாÙ

மகÊ ćĉைகயா

42

112/5A1

0.20.50

0.18.00

ĆÊெசÃ

ைபÁ

ைலÊ

-

975.

ெபÛயசாÙ

மகÊ ćĉைகயா

43

71

112/5A2

0.20.00

0.16.50

ĆÊெசÃ

-

984.

ĀÁபÊ

மகÊ ÒÊைனயா

43

112/5A2

0.20.00

0.00.50

ĆÊெசÃ

-

-

984.

ĀÁபÊ

மகÊ ÒÊைனயா

44

72

113

1.05.00

0.28.00

ĆÊெசÃ

-

ேவÁப மரÂ-1

ேவÁபº கÊĎ-1

39.

ராமநாதÊ

மகÊ ராேஜÀÖரÊ

44

113

1.05.00

0.02.00

ĆÊெசÃ

-

-

39.

ராமநாதÊ

மகÊ ராேஜÀÖரÊ

45

76

117/7

0.17.50

0.17.50

ĆÊெசÃ

-

பனºகÊĎ-10

858.

ćĉைகயா

மைனÝ ðனாÂபாÈ

45

117/7

0.17.50

0.12.50

ĆÊெசÃ

ைபÁ

ைலÊ

ேவÁபமரÂ-1,

வாைக-1, Ćºக

மரÂ-1

858.

ćĉைகயா

மைனÝ ðனாÂபாÈ

46

77

117/8

0.26.50

0.25.00

மÉறைவ

-

பைன மரÂ-4

858.

ćĉைகயா

மைனÝ ðனாÂபாÈ

46

117/8

0.26.50

0.02.00

ĆÊெசÃ

(மா)

-

-

858.

ćĉைகயா

மைனÝ ðனாÂபாÈ

47

78

117/10

0.20.00

0.20.00

ĆÊெசÃ

Đைர ôĂ-1

ேபாÄ-1

ேவÁப மரÂ-5

பைன மரÂ-2

68.

ÒலÂபÊ மகÊ கÀதÊ

47

117/10

0.20.00

0.18.50

ĆÊெசÃ

Đைர

ெகா½டைக-

1 ஆÇþழாÃ

ÐணĎ-1

-

68.

ÒலÂபÊ மகÊ கÀதÊ

48

79

118/1

0.24.50

0.23.00

ĆÊெசÃ

-

பைன மரÂ-8

Ćßய மரÂ-4

ேவÁப மரÂ-5

பால மரÂ-1

76.

ெரºகÊ

மகÊ கĉÁபÊ

48

118/1

0.24.50

0.02.00

ĆÊெசÃ

-

பைன மரÂ-2

ேவÁப மரÂ-1

1179. ĀÁØரமÕயÊ

மைனÝ கைல»ெசÅÝ

49

80

118/2

0.16.50

0.16.50

ĆÊெசÃ

-

-

512.

பழáயா¾Ô

மகÊ ேவĊ¿ேதவÄ

49

118/2

0.16.50

0.04.50

ĆÊெசÃ

-

-

512.

பழáயா¾Ô

மகÊ ேவĊ¿ேதவÄ

54

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

50

81

118/3

0.15.50

0.15.50

ĆÊெசÃ

-

-

76.

ெரºகÊ

மகÊ கĉÁபÊ

50

118/3

0.15.50

0.13.00

ĆÊெசÃ

-

-

76.

ெரºகÊ

மகÊ கĉÁபÊ

51

82

118/4A

0.35.50

0.35.50

ĆÊெசÃ

வ½ட ÐணĎ-1

ÙÊேமா½டாÄ-1

ெதÊனº

கÊĎ-4

ேவÁப மரÂ-1

எĊÙ»ைச மரÂ-1

245.

உலகÊ

மகÊ ெரºகசாÙ

51

118/4A

0.35.50

0.14.00

ĆÊெசÃ

-

ெதÊனº

கÊĎ-4

எĊÙ»ைச

மரÂ-1

245.

உலகÊ

மகÊ ெரºகசாÙ

52

83

118/4B

0.01.00

0.01.00

ĆÊெசÃ

-

-

393.

ć¿ைதயா ேதவÄ

மகÊ ć¿Ą¹þமாÄ

52

118/4B

0.01.00

0.00.50

ĆÊெசÃ

-

-

393.

ć¿ைதயா ேதவÄ

மகÊ ć¿Ą¹þமாÄ

53

85

118/5

0.11.00

0.11.00

ĆÊெசÃ

-

-

76.

ெரºகÊ

மகÊ கĉÁபÊ

53

118/5

0.11.00

0.10.00

ĆÊெசÃ

-

பைன மரÂ

ÒàயĄ-3

76.

ெரºகÊ

மகÊ கĉÁபÊ

54

86

118/6

0.12.00

0.12.00

ĆÊெசÃ

-

-

76.

ெரºகÊ

மகÊ கĉÁபÊ

54

118/6

0.12.00

0.11.00

ĆÊெசÃ

-

பைன மரÂ-2,

பைன ÒàயĄ-5

76.

ெரºகÊ

மகÊ கĉÁபÊ

55

87

118/7A

0.11.50

0.11.50

ĆÊெசÃ

-

-

858.

ćĉைகயா

மைனÝ ðனாÂபாÈ

55

118/7A

0.11.50

0.04.00

ĆÊெசÃ

-

-

858.

ćĉைகயா

மைனÝ ðனாÂபாÈ

56

94

119/3

0.33.00

0.26.00

ĆÊெசÃ

-

-

465.

ெமÃயÁபÊ

மகÊ ெரºகÊ

56

119/3

0.33.00

0.01.50

ĆÊெசÃ

ைபÁ

ைலÊ

-

465.

ெமÃயÁபÊ

மகÊ ெரºகÊ

57

95

119/4

0.17.50

0.17.50

ĆÊெசÃ

-

-

416.

கĉÁைபயா

57

119/4

0.17.50

0.05.00

ĆÊெசÃ

ைபÁ

ைலÊ

-

416.

கĉÁைபயா

58

97

119/6

0.11.50

0.11.50

ĆÊெசÃ

-

-

419.

ெமÃயÊ

மகÊ ராைமயா

58

119/6

0.11.50

0.01.50

ĆÊெசÃ

-

-

419.

ெமÃயÊ

மகÊ ராைமயா

59

98

119/7

0.06.00

0.06.00

ĆÊெசÃ

-

-

419.

ெமÃயÊ

மகÊ ராைமயா

59

119/7

0.06.00

0.06.00

ĆÊெசÃ

ைபÁ

ைலÊ

ேவÁபºகÊĎ-2

419.

ெமÃயÊ

மகÊ ராைமயா

55

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

60

99

119/8A

0.68.50

0.68.50

ĆÊெசÃ

-

ெதÊனº

கÊĎ-15

ேவÁப மரÂ-5

964.

ெபÛயசாÙ

மகÊ ćĉைகயா

60

119/8A

0.68.50

0.45.00

ĆÊெசÃ

ைபÁ

ைலÊ

ெதÊனº

கÊĎ-3

ேவÁப மரÂ-3,

வாைக மரÂ-1,

964.

ெபÛயசாÙ

மகÊ ćĉைகயா

61

100

119/8B

0.34.00

0.28.50

ĆÊெசÃ

-

ெதÊனங

கÊĎ-20

ேவÁப மரÂ-5

944.

ெபÛயசாÙ

மகÊ ćĉைகயா

61

119/8B

0.34.00

0.05.50

ĆÊெசÃ

மா½Ă

ெகா½டைக

பைன மரÂ-2

ேவÁப மரÂ-2

944.

ெபÛயசாÙ

மகÊ ćĉைகயா

62

101

119/9A

0.09.00

0.09.00

ĆÊெசÃ

-

ேவÁப மரÂ-7

பைன மரÂ-1

411.

ÒÊைனயா

மகÊ ெமÃயÊ

62

119/9A

0.09.00

0.05.50

ĆÊெசÃ

-

ேவÁப மரÂ-2,

வாைக மரÂ-1,

ேவÁபºகÊĎ-1

411.

ÒÊைனயா

மகÊ ெமÃயÊ

63

102

119/9B

0.05.00

0.03.00

ĆÊெசÃ

-

-

601.

1. ÒÊைனயா

மகÊ மாć¾Ô

2. ÒÊைனயா

மகÊ ெமÃயÊ

3. ÒÊன¿Ąைர

மைனÝ ÒÊனÂமாÈ

63

119/9B

0.05.00

0.00.13

ĆÊெசÃ

-

-

601.

1. ÒÊைனயா

மகÊ மாć¾Ô

2. ÒÊைனயா

மகÊ ெமÃயÊ

3. ÒÊன¿Ąைர

மைனÝ ÒÊனÂமாÈ

64

108

164

3.80.50

1.20.95

ĆÊெசÃ

-

-

768.

கĉÁைபயா

மகÊ ெரºகராÎ

64

164

3.80.50

0.74.00

ĆÊெசÃ

-

ĚகÜÁடÌ

கÊĎ-50

768.

கĉÁைபயா

மகÊ ெரºகராÎ

65

111

166/4A

0.06.50

0.05.00

ĆÊெசÃ

-

-

791.

ச¾ćகÂ

மகÊ

பாலĀÁØரமÕயÊ

65

166/4A

0.06.50

0.01.00

ĆÊெசÃ

-

ெதÊைன

மரÂ-2, ேத¹þ

கÊĎ-3

791.

ச¾ćகÂ

மகÊ பாலĀÁØரமÕயÊ

66

112

166/4B

0.13.50

0.07.00

ĆÊெசÃ

-

ேத¹þ கÊĎ-1

உÖய மரÂ-1

768.

கĉÁைபயா

மகÊ ெரºகராÎ

66

166/4B

0.13.50

0.01.00

ĆÊெசÃ

-

768.

கĉÁைபயா

மகÊ ெரºகராÎ

67

113

166/5

0.20.00

0.15.00

ĆÊெசÃ

-

éைம¹

கĉைவ-20

768.

கĉÁைபயா

மகÊ ெரºகராÎ

67

166/5

0.20.00

0.05.50

ĆÊெசÃ

-

ĚகÜÁடÌ

கÊĎ-30

768.

கĉÁைபயா

மகÊ ெரºகராÎ

68

114

166/6

0.77.00

0.74.50

ĆÊெசÃ

-

ேவலா மரÂ-5

768.

கĉÁைபயா

மகÊ ெரºகராÎ

68

166/6

0.77.00

0.46.00

ĆÊெசÃ

-

ĚகÜÁடÌ

கÊĎ-150

768.

கĉÁைபயா

மகÊ ெரºகராÎ

56

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

69

115

166/7

0.88.00

0.78.00

ĆÊெசÃ

-

ேத¹þ-42

உÖய மரÂ-12

வாைக மரÂ-4

ேவÁப மரÂ-2

ĚகÜÁடÌ-10

773.

பழáயÁபÊ

மைனÝ Ýஜயெல½ĀÙ

69

166/7

0.88.00

0.33.00

ĆÊெசÃ

-

ேத¹þ -29,

உÖய மரÂ-10,

ĚகÜÁடÌ-1,

வாைக-1,

ேவலாºகÊĎ-7

773.

பழáயÁபÊ

மைனÝ Ýஜயெல½ĀÙ

70

120

176/1

0.16.50

0.14.50

ĆÊெசÃ

வ½ட

ÐணĎ-1

ேமா½டாÄ

ěÂ-1

ஆÌØ½டாÌ

ெகா½டைக-1

ெதÊைன

மரÂ-15

ேவÁப மரÂ-10

671.

ĀÁைபயா

மைனÝ கĉÁபாÚ

70

176/1

0.16.50

0.05.50

ĆÊெசÃ

-

-

671.

ĀÁைபயா

மைனÝ கĉÁபாÚ

71

121

176/2

0.54.00

0.39.50

ĆÊெசÃ

-

ேவÁப மரÂ-15

671.

ĀÁைபயா

மைனÝ கĉÁபாÚ

71

176/2

0.54.00

0.12.00

ĆÊெசÃ

-

ேவÁப மரÂ-4

671.

ĀÁைபயா

மைனÝ கĉÁபாÚ

72

122

176/3

0.34.00

0.16.00

ĆÊெசÃ

-

ேவÁப கÊĎ-3

வÂமரÂ-1

727.

ĀÁைபயா¿ ேதவÄ

மகÊ பழáயÁபÊ

72

176/3

0.34.00

0.01.50

ĆÊெசÃ

-

ேவÁபமரÂ -2

727.

ĀÁைபயா¿ ேதவÄ

மகÊ பழáயÁபÊ

73

129

179/5

1.42.50

0.97.00

ĆÊெசÃ

-

ேத¹þ-100

மாமரÂ-15

ேவÁப மரÂ-17

ேவÁபகÊĎ-13

வாைக மரÂ-2

773.

பழáயÁபÊ

மைனÝ Ýஜயெல½ĀÙ

73

179/5

1.42.50

0.32.00

ĆÊெசÃ

-

ேத¹þ கÊĎ-31

ேவÁபகÊĎ-3

வாைக மரÂ-2

அÐல மரÂ-2

773.

பழáயÁபÊ

மைனÝ Ýஜயெல½ĀÙ

74

134

185/3C

0.07.00

0.07.00

ĆÊெசÃ

-

ேவலா மரÂ-10

பைன மரÂ-1

நா½Ă கĉேவலா

மரÂ-1

411.

ÒÊைனயா

மகÊ ெமÃயÊ

74

185/3C

0.07.00

0.04.50

ĆÊெசÃ

-

-

411.

ÒÊைனயா

மகÊ ெமÃயÊ

75

135

185/3D

0.25.50

0.25.50

ĆÊெசÃ

-

-

700.

கÜயÊ மகÊ மÖ

75

185/3D1

0.10.50

0.08.00

ĆÊெசÃ

-

ேவலா மரÂ-1

700.

கÜயÊ மகÊ மÖ

76

185/3D2

0.15.00

0.15.00

ĆÊெசÃ

-

1152.

கÜயÊ

மகÊ ÒÊைனயா

76

137

185/3F

0.14.50

0.14.50

ĆÊெசÃ

-

பைன மரÂ-5

வாைக மரÂ-2

வாைக கÊĎ-3

ேவÁபº கÊĎ-1

411.

ÒÊைனயா

மகÊ ெமÃயÊ

77

185/3F

0.14.50

0.04.50

ĆÊெசÃ

-

பைன மரÂ-4

411.

ÒÊைனயா

மகÊ ெமÃயÊ

57

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

77

138

185/3G

0.18.50

0.18.50

ĆÊெசÃ

-

-

700.

கÜயÊ மகÊ மÖ

78

185/3G

0.18.50

0.17.50

ĆÊெசÃ

-

பைன மரÂ-1

700.

கÜயÊ மகÊ மÖ

78

139

185/3H

0.06.50

0.06.50

ĆÊெசÃ

-

ேவலா மரÂ-1

346.

ÒÊைனயா

மகÊ மாć¾ட

79

185/3H

0.06.50

0.05.00

ĆÊெசÃ

-

ேவலா மரÂ-1

346.

ÒÊைனயா மகÊ

மாć¾ட

79

140

185/3I

0.05.00

0.05.00

ĆÊெசÃ

-

-

411.

ÒÊைனயா

மகÊ ெமÃயÊ

80

185/3I

0.05.00

0.01.50

ĆÊெசÃ

-

-

411.

ÒÊைனயா மகÊ

ெமÃயÊ

80

141

185/3J

0.01.00

0.01.00

ĆÊெசÃ

-

-

346.

ÒÊைனயா

மகÊ மாć¾ட

81

185/3J

0.01.00

0.00.65

ĆÊெசÃ

-

-

346.

ÒÊைனயா மகÊ

மாć¾ட

81

143

186/1A

0.14.00

0.14.00

ĆÊெசÃ

-

-

350.

கÜயÊ

மகÊ கĉÁைபயா

82

186/1A

0.14.00

0.04.50

ĆÊெசÃ

-

-

1177.

கĉÁைபயா மைனÝ

ć¿Ą

82

144

186/1B

0.13.50

0.13.50

ĆÊெசÃ

-

ĚகÜÁடÌ-5

890.

மாć¾Ô

மகÊ பழáயÁபÊ

83

186/1B

0.13.50

0.01.50

ĆÊெசÃ

-

-

890.

மாć¾Ô மகÊ

பழáயÁபÊ

83

153

187/1A2

0.29.50

0.29.50

ĆÊெசÃ

-

ேவலா மரÂ-10

ேவÁப மரÂ-3

700.

கÜயÊ மகÊ மÖ

84

187/1A2B

0.19.50

0.09.50

ĆÊெசÃ

-

-

700.

கÜயÊ மகÊ மÖ

84

154

187/1B

0.27.00

0.27.00

ĆÊெசÃ

-

ĚகÜÁடÌ-2

890.

மாć¾Ô

மகÊ பழáயÁபÊ

85

187/1B

0.27.00

0.03.50

ĆÊெசÃ

-

ĚகÜÁடÌ

கÊĎ-3

890.

மாć¾Ô மகÊ

பழáயÁபÊ

85

155

187/1C

0.26.00

0.26.00

ĆÊெசÃ

-

-

411.

ÒÊைனயா

மகÊ ெமÃயÊ

86

187/1C

0.26.00

0.24.00

ĆÊெசÃ

-

-

411.

ÒÊைனயா மகÊ

ெமÃயÊ

86

156

187/2

0.17.00

0.17.00

ĆÊெசÃ

-

ĚகÜÁடÌ-550

409.

ÐĉÍண¿ ேதவÄ

மகÊ ć¹ைகயா¿

ேதவÄ

87

187/2

0.17.00

0.15.00

ĆÊெசÃ

-

ĚகÜÁடÌ

கÊĎ-200,

அÐல மரÂ-1

409.

ÐĉÍண¿ ேதவÄ

மகÊ ć¹ைகயா¿

ேதவÄ

58

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

87

157

187/3

0.60.50

0.60.50

ĆÊெசÃ

-

ĚகÜÁடÌ-1500

409.

ÐĉÍண¿ ேதவÄ

மகÊ ć¹ைகயா¿

ேதவÄ

88

187/3

0.60.50

0.31.00

ĆÊெசÃ

-

ĚகÜÁடÌ

கÊĎ- 400

409.

ÐĉÍண¿ ேதவÄ

மகÊ ć¹ைகயா¿

ேதவÄ

88

158

187/4

0.54.00

0.34.00

ĆÊெசÃ

-

ĚகÜÁடÌ-750

409.

ÐĉÍண¿ ேதவÄ

மகÊ ć¹ைகயா¿

ேதவÄ

89

187/4

0.54.00

0.08.50

ĆÊெசÃ

-

ĚகÜÁடÌ-150

409.

ÐĉÍண¿ ேதவÄ

மகÊ ć¹ைகயா¿

ேதவÄ

89

164

189/2B

0.14.00

0.14.00

ĆÊெசÃ

-

-

855.

þமாÄ மைனÝ Ý¿யா

90

189/2B

0.14.00

0.05.50

ĆÊெசÃ

-

-

855.

þமாÄ மைனÝ Ý¿யா

90

165

189/3

0.12.50

0.12.50

ĆÊெசÃ

-

-

1078.

ேவĊ¿ ேதவÄ

மகÊ அÊĆ

91

189/3

0.12.50

0.09.00

ĆÊெசÃ

ைபÁ

ைலÊ

-

1078.

ேவĊ¿ ேதவÄ

மகÊ அÊĆ

91

166

189/4

0.11.50

0.11.50

ĆÊெசÃ

-

-

855.

þமாÄ மைனÝ Ý¿யா

92

189/4

0.11.50

0.11.50

ĆÊெசÃ

-

-

855.

þமாÄ மைனÝ Ý¿யா

92

167

189/5A

0.19.50

0.19.50

ĆÊெசÃ

-

-

1112.

ேவĊ மகÊ அÊĆ

93

189/5A

0.19.50

0.14.50

ĆÊெசÃ

ைபÁ

ைலÊ

-

1112.

ேவĊ மகÊ அÊĆ

93

168

189/5B

0.17.50

0.17.50

ĆÊ

ெசÃ

-

-

1096.

ேவĊ மகÊ ÒÊď

94

189/5B

0.17.50

0.01.50

ĆÊெசÃ

ைபÁ

ைலÊ

-

1096.

ேவĊ மகÊ ÒÊď

94

169

189/6A

0.05.00

0.05.00

ĆÊ

ெசÃ

-

Ćßய மரÂ-1

14.

ÒÊைனயா ேதவÄ

மகÊ அைட¹கல

ேதவÄ

95

189/6A

0.05.00

0.04.00

ĆÊெசÃ

-

-

14.

ÒÊைனயா ேதவÄ

மகÊ அைட¹கல

ேதவÄ

95

170

189/6B

0.05.00

0.05.00

ĆÊ

ெசÃ

-

Ćßய மரÂ-1

395.

ÒÊைனயா மகÊ

ć¿Ą ேதவÄ

96

189/6B

0.05.00

0.05.00

ĆÊெசÃ

-

-

395.

ÒÊைனயா மகÊ

ć¿Ą ேதவÄ

96

171

189/6C

0.15.50

0.15.50

ĆÊெசÃ

-

Ćßய மரÂ-2

ேவÁபº கÊĎ-1

1095.

ேவĊ மகÊ ÒÊď

97

189/6C

0.15.50

0.14.50

ĆÊெசÃ

ைபÁ

ைலÊ

ேவÁபºகÊĎ-2,

Ćßய மரÂ-3

1095.

ேவĊ மகÊ ÒÊď

59

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

97

172

189/6D

0.05.00

0.05.00

ĆÊெசÃ

-

-

36.

ÒÊைனயா ேதவÄ

மகÊ ஆĎćக ேதவÄ

98

189/6D

0.05.00

0.05.00

ĆÊெசÃ

ைபÁ

ைலÊ

-

36.

ÒÊைனயா ேதவÄ

மகÊ ஆĎćக ேதவÄ

98

176

189/11

0.04.50

0.04.50

ĆÊெசÃ

-

-

1078.

ேவĊ¿ ேதவÄ மகÊ

அÊĆ

99

189/11

0.04.50

0.02.50

ĆÊெசÃ

ைபÁ

ைலÊ

-

1078.

ேவĊ¿ ேதவÄ மகÊ

அÊĆ

99

177

189/12

0.03.00

0.03.00

ĆÊெசÃ

-

-

125.

ெகாºÐáÁப½Ô

கĉÁபÊ

100

189/12

0.03.00

0.02.00

ĆÊெசÃ

-

-

125.

ெகாºÐáÁப½Ô

கĉÁபÊ

100

182

190/7

0.20.00

0.20.00

ĆÊெசÃ

-

ேவலா மரÂ-1,

Ě¹கÜÁடÌ-4

241.

பழáேவÅ மகÊ

ĀÀதÄராÎ ேதவÄ

101

190/7

0.20.00

0.09.00

ĆÊெசÃ

-

-

241.

பழáேவÅ

மகÊ ĀÀதÄராÎ ேதவÄ

101

185

327/40

0.03.00

0.03.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

102

327/40

0.03.00

0.03.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

102

186

327/41

0.03.50

0.03.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

103

327/41

0.03.50

0.03.50

ĆÊெசÃ

-

ேவÁபºகÊĎ-2

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

60

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

103

187

327/42

0.01.50

0.01.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

104

327/42

0.01.50

0.01.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

104

188

327/43

0.00.50

0.00.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

105

327/43

0.00.50

0.00.50

ĆÊெசÃ

-

ேவÁபமரÂ-1

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

105

196

327/51

0.01.00

0.01.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

106

327/51

0.01.00

0.00.11

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

106

197

327/52

0.04.00

0.04.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

107

327/52

0.04.00

0.00.32

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

61

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

107

198

327/53

0.04.00

0.04.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

108

327/53

0.04.00

0.03.30

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

108

204

327/59

0.02.00

0.02.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

109

327/59

0.02.00

0.00.14

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

109

205

327/60

0.01.50

0.01.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

110

327/60

0.01.50

0.01.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

110

206

327/61

0.04.00

0.04.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

111

327/61

0.04.00

0.04.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

62

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

111

207

327/62

0.01.00

0.01.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

112

327/62

0.01.00

0.01.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

112

208

327/63

0.01.50

0.01.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

113

327/63

0.01.50

0.01.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

113

209

327/64

0.02.00

0.02.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

114

327/64

0.02.00

0.01.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

114

210

327/65

0.02.50

0.02.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

115

327/65

0.02.50

0.00.16

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

63

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

115

215

327/70

0.03.00

0.03.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

116

327/70

0.03.00

0.02.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

116

216

327/71

0.02.50

0.02.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

117

327/71

0.02.50

0.02.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

117

217

327/72

0.02.50

0.02.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

118

327/72

0.02.50

0.02.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

118

218

327/73

0.03.50

0.03.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

119

327/73

0.03.50

0.03.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

64

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿ÖÁ பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட

உÈள பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள

க½ĂமானºகÈ ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ

Ćல¿ÖÅ உÈள மரºகÈ

ÝபரÂ

ப½டா எ¾ மÉĎÂ

×ல உÛைமயாளÄகÈ

ெபயÄ

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

119

219

327/74

0.02.00

0.02.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

120

327/74

0.02.00

0.02.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

120

220

327/75

0.02.50

0.02.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

121

327/75

0.02.50

0.01.50

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

121

221

327/76

0.03.00

0.03.00

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

122

327/76

0.03.00

0.00.40

ĆÊெசÃ

-

-

42.

1.ராம»சÀÖரÊ

மகÊ ராÎþமாÄ

2.ராம»சÀÖரÊ

மகÊ ெசÅவராÎ

3.ராம»சÀÖரÊ

மகÊ பாÌகரÊ

4.ராம»சÀÖரÊ

மகÊ கÖேரசÊ

ெமா¿தÂ

ெமா¿தÂ

12.30.71

65

ெசயÉெபாàயாளÄ îÄவள¿Ąைற, ÒறÁĆ Ö½ட¹ ேகா½டÂ, காேவÛ-ைவைக-þ¾டாĎ இைணÁù காÅவாà ֽடÂ, ĆĄ¹ேகா½ைட அவÄகßÊ ந.க. 02 RLPS/ ேகா1 /

கா.ைவ.þ/2022, நாÈ 14.10.2022 நாß½ட Öĉ¿Öய ×ல Ö½ட அ½டவைணÚÊபÔ ஏÉகனேவ ĘºþÔ Ðராம¿ÖÅ ெவßÚடÁப½ட ćதÅ×ைல அàݹைகÚÅ இடÂெபÉàĉÀத

221 Ćல எ¾கßÅ çǹக¾ட 100 Ćல எ¾கÈ ×ல எĂÁØÜĉÀĄ î¹க ெசÃயÁபĂÐறĄ.

ĆĄ¹ேகா½ைட மாவ½டÂ, þள¿ĄÄ வ½டÂ, ĘºþÔ ÐராமÂ

வ.

எ¾

ćதÅ ×ைல

அàݹைகÚÊ

பÔ வ.எ¾

Ćல எ¾

ைகயக பரÁĆ

(ெஹ¹ேடÛÅ)

வ.

எ¾

ćதÅ ×ைல

அàݹைகÚÊ

பÔ வ.எ¾

Ćல எ¾

ைகயக பரÁĆ

(ெஹ¹ேடÛÅ)

வ. எ¾

ćதÅ ×ைல

அàݹைகÚÊ

பÔ வ.எ¾

Ćல எ¾

ைகயக பரÁĆ

(ெஹ¹ேடÛÅ)

வ. எ¾

ćதÅ ×ைல

அàݹைகÚÊ

பÔ வ.எ¾

Ćல எ¾

ைகயக பரÁĆ

(ெஹ¹ேடÛÅ)

1

2

66/2

0.02.00

26

58

103/26

0.02.00

51

123

176/4A

0.11.00

76

173

189/7

0.17.50

2

3

66/3

0.02.00

27

59

104/3

0.07.50

52

124

176/5A

0.03.50

77

174

189/9

0.05.50

3

4

66/4

0.02.00

28

65

106/14

0.11.00

53

125

179/2D

0.06.50

78

175

189/10

0.02.50

4

5

66/5

0.01.00

29

73

113

0.00.50

54

126

179/3B

0.24.50

79

178

190/2D

0.00.50

5

7

66/7

0.13.00

30

74

117/5

0.05.00

55

127

179/4A

0.02.00

80

179

190/3C

0.15.50

6

8

93/1A

0.05.50

31

75

117/6

0.25.00

56

128

179/4B

0.37.50

81

180

190/5

0.05.50

7

17

95/2A

0.03.50

32

84

118/4C

0.00.50

57

130

185/1

0.04.50

82

181

190/6

0.20.00

8

18

95/2A

0.18.00

33

88

118/7B

0.01.50

58

131

185/2

0.01.00

83

183

191/15

0.08.00

9

19

95/2B

0.11.00

34

89

118/8A

0.15.80

59

132

185/3A

0.09.00

84

184

191/16

0.18.50

10

20

95/2C

0.00.15

35

90

118/8B

0.09.50

60

133

185/3B

0.07.00

85

189

327/44

0.00.50

11

23

96/3

0.02.50

36

91

118/8C

0.00.70

61

136

185/3E

0.12.00

86

190

327/45

0.01.00

12

24

101/1A

0.02.00

37

92

118/9A

0.00.50

62

142

185/3K

0.02.50

87

191

327/46

0.01.00

13

25

101/1B

0.05.50

38

93

119/2

0.00.25

63

145

186/1C

0.03.50

88

192

327/47

0.01.00

14

26

102/1

0.20.50

39

96

119/5

0.07.50

64

146

186/1D

0.06.00

89

193

327/48

0.01.00

15

27

102/2A

0.01.50

40

103

119/9C

0.09.50

65

147

186/1E

0.07.50

90

194

327/49

0.02.50

16

28

103/1A

0.08.00

41

104

119/9D

0.05.00

66

148

186/2A

0.07.00

91

195

327/50

0.02.50

17

29

103/1B

0.09.00

42

105

119/10

0.15.00

67

149

186/2B

0.00.15

92

199

327/54

0.01.50

18

35

103/3B

0.01.00

43

106

119/11

0.05.50

68

150

186/3

0.12.50

93

200

327/55

0.03.50

19

41

103/9

0.04.00

44

107

122/2A

0.10.00

69

151

186/4

0.05.50

94

201

327/56

0.01.50

20

51

103/20

0.08.50

45

109

166/2

0.02.50

70

152

187/1A1

0.15.50

95

202

327/57

0.01.50

21

53

103/19

0.02.00

46

110

166/3

0.19.00

71

159

187/5A

0.14.00

96

203

327/58

0.01.50

22

54

103/21

0.05.50

47

116

167/1

0.24.50

72

160

187/5B

0.13.50

97

211

327/66

0.03.00

23

55

103/22

0.00.50

48

117

167/2

0.13.00

73

161

189/1B

0.01.50

98

212

327/67

0.03.00

24

56

103/24

0.04.00

49

118

167/3

0.05.50

74

162

189/1C

0.09.00

99

213

327/68

0.03.00

25

57

103/25

0.02.00

50

119

167/4

0.15.00

75

163

189/2A

0.13.50

100

214

327/69

0.02.00

ĆĄ¹ேகா½ைட,

2022 ÔசÂபÄ 21.

கவிதா ராā,

மாவ½ட ஆ½Ò¿தைலவÄ,

66

Form-IV

[See Rule 13(1)]

11(1) Preliminary Notifi cation

(Rc.No. 196/2022/CVG/A2)

No. VI(1)/50/2023.

Whereas it appears to the appropriate Government that lands are required in Vellanur Village of Kulathur Taluk in Pudukkottai District for public purpose, namely

Cauvery - Vaigai - Gundar Link Canal Scheme as per "Right to Fair compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act,

2013 sec. 11(1) and rule 2017 sec.13(1)" Already Preliminary Notifi cation published for Vellanur Village, 96 Survey numbers an extent of 12.27.46 hectares as per District

Collector, Pudukkottai Proceeding No. RC.196/A2/CVG/2022, dated: 28.04.2022. As per Revised Land Plan Schedule given by Executive Engineer, Special Project division,

Cauvery-Vaigai-Gundar Link Canal Scheme, Pudukkottai (Letter No.02/RLPS/KO/1CVG/2022, date 14.10.2022) additional one survey number is under Acquisition u/s 11

(1) of Right to Fair compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 and u/s 13(1) rule of 2017. Revenue Divisional

Offi cer, Illupur is appointed as administrator for the purpose of Rehabilitation and Resettlement. No families are displaced due to below one survey number Land Acquisition.

Details are given below.

Sl.

No.

Survey No.

Area

Under

Acquisiti

on

Classifi c

ation of

Land

North

South

East

West

Structures

Trees

Pattadhar’s

Name

Patta

No.

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

(12)

1

341/8C

0.22.53

Dry

341/8

352

341/9B

341/10

341/11

341/12

341/7B

341/8B

-

-

Viswanathan,

S/o. Arumugam

2613

This notifi cation is made under sub-section (1) of section 11 of the Right of Fair Compensation and Transparency in Land acquisition, Rehabilitation and

Resettlement Act, 2013 (Central Act 30 of 2013), to all whom it may concern.

A plan of the land may be inspected by the Offi ce of the Collector, Pudukkottai and Offi ce of Land Acquisition Offi cer/Special District Revenue Offi cer,

Pudukkottai on any working day during the working hours.

The Government is pleased to authorize the requiring department Executive Engineer, Special Project division, Cauvery-Vaigai-Gundar Link Canal Scheme,

Pudukkottai and his staff to enter upon a survey land, take levels of any land, dig or bore into the sub-soil and do all other acts required for the proper

execution of their works as provided and specifi ed in section 12 of the said act.

Under sub-section (4) of section 11 of the said Act, no person shall make any transaction or cause any transaction of land i.e. sale/purchase, etc or create

any encumbrances on such land from the date of publication of this notifi cation in the Gazette without prior approval of the Collector.

Objections to the acquisition, if any may be fi led by the person interested within 60 (Sixty) days from the date of publication of this notifi cation as provided

under section 15 of the said Act before the Special District Revenue Offi cer (L.A) Cauvery-Vaigai Gundar, Canal Link Scheme, Pudukkottai (or) Special Tahsildar

(L.A), Cauvery-Vaigai-Gundar, Canal Link Scheme, Unit-3, Pudukkottai.

Pudukkottai,

கவிதா ராā,

21st December 2022.

District Collector.

67

படிவம் IV

13(1)-ஆம் விதிையக் காண்க

11(1) āதல்நிைல அறிவிக்ைக

(ந.க. 196/2022/கா.ைவ.þ/அ2)

ĆĄ¹ேகா½ைட மாவ½ட þள¿ĖÄ வ½ட¿ைத» சாÄÀத ெவÈளġÄ

ெவÈளġÄ Ðராம¿ÖÅ காேவÛ-ைவைக-þ¾டாĎ இைணÁù காÅவாà ֽட எÊď ெபாĄநல பயÊபா½ÔÉகாக

"×ல ைகயகÁபĂ¿ĄதÜÅ ×யாயமான சÛñĂ மÉĎ ஒßċமைறÝÊைம, மĎவாÇċ மÉĎ மĎþÔயமÄċ உÛைம» ச½ட 2013-ØÛċ-11(1) மÉĎ ÝÖ 2017-ØÛċ 13(1)ÊபÔ

96 ĆலºகßÅ 12.27.46

12.27.46 ெஹ¹ேடÄ பரÁபளċ ெகா¾ட ப½டா ×லºகÈ ைகயகÁபĂ¿த ĆĄ¹ேகா½ைட மாவ½ட ஆ½ÒயÛÊ ெசயÅćைறகÈ ந.க. 196/அ2/கா.ைவ.þ/2022,

நாÈ 28.04.2022-ÊபÔ ćதÅ×ைல அàݹைக ெவßÚடÁப½ĂÈளĄ. தÉேபாĄ ெசயÉெபாàயாளÄ îÄவள¿Ąைற, ÒறÁĆ Ö½ட¹ ேகா½டÂ, காேவÛ-ைவைக-þ¾டாĎ இைணÁù

காÅவாà ֽடÂ, ĆĄ¹ேகா½ைட அவÄகßÊ ந.க. 02 RLPS/ேகா1 /கா.ைவ.þ/2022 நாÈ: 14.10.2022 நாß½ட Öĉ¿Öய ×ல Ö½ட அ½டவைணÚÊபÔ ĐĂதலாக çǹக¾ட

1 Ćல எ¾ "×ல ைகயகÁபĂ¿ĄதÜÅ ×யாயமான சÛñĂ மÉĎ ஒßċமைறÝÊைம, மĎவாÇċ மÉĎ மĎþÔயமÄċ உÛைம» ச½ட 2013-ØÛċ-11(1) மÉĎ ÝÖ 2017-ØÛċ

13(1)"-ÊபÔ ைகயகÁபĂ¿தÁபĂÐறĄ என அàݹகÁபĂÐறĄ. மĎவாÇċ மÉĎ மĎþÔயமÄċ வழºþவதÉகாக இĊÁĘÄ வĉவாà ேகா½டா½ÒயÄ ×ÄவாÐயாக ×யமன ெசÃயÁப½ĂÈளாÄ.

çǹக¾ட 1 Ćல எ¾ ைகயகÁபĂ¿தÁபĂவதÊ காரணமாக எÀத þĂÂபć இடமாÉற ெசÃயÁபடÝÅைல. அதÊ Ýவர ØÊவĉமாĎ.

வ.

எ¾.

Ćல எ¾.

ைகயகÁ

பĂ¿தÁபடċÈள

×ல¿ÖÊ

பரÁபளċ

×ல¿ÖÊ

வைக

வட¹þ

ெதÉþ

Ðழ¹þ

ேமÉþ

க½Ă

மானºகÈ

மரºகÈ

ப½டாதாரÄ ெபயÄ

ப½டா

எ¾.

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

1

341/8C

0.22.53

ĆÊெசÃ

341/8

352

341/9B,

341/10,

341/11,

341/12,

341/7B

341/8B

-

-

ஆĎćகÂ

மகÊ ÝÌவநாதÊ

2613

0.22.53

இÀத அàݹைக 2013 ஆ ஆ¾Ă ×ல ைகயகÁபĂ¿ĄதÜÅ ×யாயமான சÛñĂ ெபĎவதÉþ மÉĎ ஒßċமைறÝÊைம¹þÂ. மĎவாÇċ மÉĎ மĎþÔயமÄÝÉகான உÛைம»

ச½ட¿ÖÊ (ம¿Öய» ச½ட 30/2012) 11(1), ØÛÝÊ çÇ வழºகÁப½Ôĉ¹þ ÝÖćைறகßÊ çÇ ெதாடÄĆைடய அைனவĉ¹காகċ ெவßÚடÁபĂÐறĄ.

ĆĄேகா½ைட மாவ½ட ஆ½Ò¿தைலவÄ மÉĎÂ ×ல எĂÁĆ அĊவலÄ / தá மாவ½ட வĉவாÃ அĊவலÄ ஆÐேயாராÅ யாெதாĉ ேவைல நா½கßĊÂ ேவைல ேநரºகßĊÂ ×ல¿ÖÊ

Ö½ட þà¿Ą ஆÃċ ெசÃயÁபடலாÂ.

ேமÉெசாÊன ச½ட¿ÖÊ 2 ஆ ØÛÝÅ þàÁØடÁப½ĂÈள மÉĎ வழºகÁப½ĂÈளவாĎ, ×ல¿ÖÅ ąைழதÅ, யாெதாĉ ×லºகைள அளெவĂ¿தÅ, அÔம¾ைண ேதா¾ĂதÅ

அÅலĄ ஆÇĄைளÚĂதÅ மÉĎ இĄ ெதாடÄபான அைன¿Ą ெசயÅகைளĈ ćைறயாக» ெசயÅபĂ¿த ேக½Ć¿Ąைறயான ெசயÉெபாàயாளÄ îÄவள¿Ąைற, ÒறÁĆ Ö½ட¹ ேகா½டÂ,

காேவÛ-ைவைக-þ¾டாĎ இைணÁù காÅவாà ֽடÂ, ĆĄ¹ேகா½ைட மÉĎ அவரĄ பÕயாளĉ¹þ அÖகாரமß¹þமாĎ அரÒட ேக½Ă¹ ெகாÈளÁபĂÐறĄ.

இ»ச½ட¿ÖÊ 11(4) ஆ ØÛÝÊ çÇ, யாெதாĉ நபĉ ×ல¿ைத ÝÉபைன ெசÃதÅ/வாºþதÅ ேபாÊற யாெதாĉ பÛமாÉறºகßÅ ஈĂபĂதÅ அÅலĄ பÛமாÉறºகÈ ெசÃதÅ அÅலĄ

மாவ½ட ஆ½ÒÚÛÊ ćÊ அºçகார இÊà இÀத அàݹைக ெவßÚடÁப½ட நாßÜĉÀĄ யாெதாĉ ÝÅலºகºகைளĈ ஏÉபĂ¿த இயலாĄ.

ைகயகÁபĂ¿ĄதÅ ெதாடÄபாக மĎÁĆைர ஏேதď இĉÁØÊ இ»ச½ட¿ÖÊ 15 ஆ ØÛÝÊ çÇ ெதÛݹகÁப½ĂÈளவாĎ இÀத அàݹைக ெவßÚடÁப½ட நாßÜĉÀĄ

60 நா½கč¹þÈ (60 நா½கč¹þÈளாக) பÉĎÈளவÄ அதைன தá மாவ½ட வĉவாà அĊவலÄ (×.எ), காேவÛ-ைவைக-þ¾டாĎ இைணÁù காÅவாÿ Ö½டÂ, ĆĄ¹ேகா½ைட அÅலĄ

தá வ½டா½ÒயÄ (×.எ), காேவÛ-ைவைக-þ¾டாĎ, இைணÁù காÅவாà ֽடÂ, அலþ-3, ĆĄ¹ேகா½ைட அவÄகßட அß¹கலாÂ.

ĆĄ¹ேகா½ைட,

கÝதா ராć,

2022 ÔசÂபÄ 21.

மாவ½ட ஆ½Ò¿தைலவÄ.

68

Errata Notice to the Notifi cation published U/S 11(1) of Right to Fair Compensation, and Transparency in Land Acquisition, Rehabilation and

Resettlement Act -2013 and U/S 13(1) of Rules, 2017.

(Rc.No.196/2022/CVG/A2)

No. VI(1)/51/2023.

The following errata is hereby issued to the Preliminary notifi cation published for Land Acquisition for the public purpose namely formation of CAUVERY

VAIGAI-GUNDAR link canal in Vellanur Village of Kulathur Taluk, Pudukkottai District U/S 11(1) of RIGHT TO FAIR COMPENSATION, AND TRANSPARENCY

IN LAND ACQUISITION, REHABILATION AND RESETTLEMENT ACT -2013 and U/S 13(1) of Rules, 2017 to the 96 survey numbers to an extent of 12.27.46

hectares patta lands as per Pudukkottai District Collector Proceedings No. R.C.196/A2/CVG/2022, Dated 28.04.2022, published in Notifi cation No. 13 (Tamil),

page No. 1 to 10 and Notifi cation No.7(English) page No.1 to 13 of Pudukkottai District Gazette dated 04.05.2022 and In page No. 7 to 8 of Dhinakaran

Tamil daily newspaper dated 14.05.2022 and in Page No. 9 to 10 of Times of India English daily newspaper dated 14.05.2022. As, per Revised Land Plan

Schedule given by Executive Engineer, Special Project division, Cauvery-Vaigai-Gundar Link Canal Scheme, Pudukkottai (Letter No. 01/RLPS/KO1/CVG/2022,

Date 14.10.2022) errata to the following 31 survey numbers is hereby issued as detailed below.

Tඐඍ Sඋඐඍඌඝඔඍ

Pudukkottai District, Kulathur Taluk, Vellanur Village.

Already Published

To be Edited

Sl.No.

As per Preliminary Notifi cation

Sl.No

Survey No.

Total Area (Hec)

Area under Acquisition

(Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No and Pattadar Name

As per Preliminary Notifi cation

Sl.No.

Survey No.

Total Area (Hec)

Area under Acquisition

(Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

1

6

225/ 3B

0.09.50

0.02.50

Dry

-

Palm tree-3,

106

Annamalai

S/o Lakshmanan

6

225/ 3B

0.09.50

0.02.50

Dry

-

Palm tree-3

106

Annamalai

S/o. Lakshmanan

Seemaikaruvai

2 Tonne

Tamarind-1

2

7

225/3C

0.09.00

0.04.36

Dry

-

Seemaikaruvai

1-Tonne

341

Shanmugam

S/o Lakshmanan

7

225/3C

0.09.00

0.04.36

Dry

-

Usilai-2,

341

Shanmugam

S/o. Lakshmanan

Vagai Tree-1

Vagai Tree-1

3

8

225/3D

0.09.00

0.06.32

Dry

-

Punga Tree-3

106

Annamalai

S/o Lakshmanan

8

225/3D

0.09.00

0.06.32

Dry

-

Punga Tree-3,

106

Annamalai

S/o. Lakshmanan

Palm tree-1

4

12

225/3H

0.03.00

0.03.00

Dry

-

Tamarind

Tree-1

341.

Shanmugam

S/o Lakshmanan

12

225/3H

0.03.00

0.03.00

Dry

-

Tamarind Tree-2

341

Shanmugam

S/o. Lakshmanan

69

Already Published

To be Edited

Sl.No.

As per Preliminary Notifi cation

Sl.No

Survey No.

Total Area (Hec)

Area under Acquisition

(Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No and Pattadar Name

As per Preliminary Notifi cation

Sl.No.

Survey No.

Total Area (Hec)

Area under Acquisition

(Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

5

20

270/3

0.35.00

0.23.64

Dry

-

Palm Tree-12

2764

Parvathi

W/o Kumar

20

270/3

0.35.00

0.24.00

Dry

Palm Tree-12

2764

Parvathi

W/o Kumar

Tamarind

Tree-1

Tamarind Tree-1

Neem

Sapling -2

Neem Sapling -2

6

21

270/5

0.49.50

0.16.00

Dry

-

Tamarind

Tree-1

3231

1.Chidambaram

S/o Arumugam,

2.Palanivelu

S/o Arumugam,

3.Duraisamy

S/o Arumugam,

4.Muthu

S/o Arumugam,

5.Panneer Selvam

S/o Govindan

21

270/5

0.49.50

0.16.00

Dry

-

-

3231

1.Chidambaram

S/o Arumugam,

2.Palanivelu

S/o Arumugam,

3.Duraisamy

S/o Arumugam,

4.Muthu

S/o Arumugam,

5.Panneer Selvam

S/o Govindan

Neem Tree-1

7

22

270/6

0.06.00

0.02.89

Dry

-

-

142

Arumugam

S/o Arumugam

22

270/6

0.06.00

0.02.50

Dry

-

-

142

Arumugam

S/o Arumugam

8

23

270/9

0.35.50

0.08.00

Dry

-

Neem Tree--2

430

Silamban

S/o Arumugam

23

270/9

0.35.50

0.06.50

Dry

Neem Tree-2,

430

Silamban

S/o Arumugam

Palm Tree-9

Teak-1,

Teak-1

Palm Tree-9

Palm Sapling-1

Palm Sapling-1

9

24

270/10

0.16.00

0.16.00

Dry

-

Coconut Tree-9

842

Muniyandi

S/o Muthusamy

24

270/10

0.16.00

0.16.00

Dry

Pipeline

Coconut Tree-9

842

Muniyandi

S/o Muthusamy

10

25

270/ 11

0.22.50

0.03.16

Dry

-

-

842

Muniyandi

S/o Muthusamy

25

270/11

0.22.50

0.04.50

Dry

Pipeline

-

842

Muniyandi

S/o Muthusamy

11

26

270/ 12

0.14.50

0.09.00

Dry

-

-

842

Muniyandi

S/o Muthusamy

26

270/12

0.14.50

0.09.50

Dry

Pipeline

-

842

Muniyandi

S/o Muthusamy

70

Already Published

To be Edited

Sl.No.

As per Preliminary Notifi cation

Sl.No

Survey No.

Total Area (Hec)

Area under Acquisition

(Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No and Pattadar Name

As per Preliminary Notifi cation

Sl.No.

Survey No.

Total Area (Hec)

Area under Acquisition

(Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

12

27

270/ 13

0.14.50

0.14.50

Dry

-

Coconut

Tree-13

842

Muniyandi

S/o Muthusamy

27

270/13

0.14.50

0.14.50

Dry

Pipeline

Coconut Tree-9

842

Muniyandi

S/o Muthusamy

13

28

270/18A

0.70.86

0.57.00

Dry

Vagai Tree-1

2890

Rengaraj

S/o Pitchaikkannu

28

270/18A

0.70.86

0.54.36

Dry

Pipeline

Vagai Tree-1,

2890

Rengaraj

S/o Pitchaikkannu

Teak Tree-1

Teak Tree-1,

Neem Tree-1

Neem Tree-1,

Neem Sapling-3,

Coconut Tree-7

Coconut Tree -10

Jackfriut Tree-1

14

39

281/24C1

0.01.50

0.01.28

Dry

-

-

2927

Chandrasekaran

S/o.Raman @

Ramaiah

39

281/24C1

0.01.50

0.01.28

Dry

Rounded

Well-1

-

2927

Chandrasekaran

S/o.Raman @

Ramaiah

15

46

281/ 29

0.10.00

0.08.90

Dry

Vagai Tree-1

6

Azhagan

S/o Avadai

46

281/ 29

0.10.00

0.08.90

Dry

Rounded

Well-1

Vagai Tree-1

6

Azhagan

S/o Avadai

Seemai Karuvai

½ Tonne

16

58

287/3

2.43.00

0.65.00

Dry

Brick

Samper

Neem Tree-1

1306

1.Pitchai

S/o Karuppa

Pandaram,

2.Karuppaiah

S/o Karuppa

Pandaram,

3.Ganapathi

S/o Angappan,

4.Chidambaram

S/o Veerappan,

5.Muthuveeran

Pandaram

S/o Sabaapathi

58

287/3

2.43.00

0.65.00

Dry

Brick

Samper,

Neem Tree-1

1306

1.Pitchai

S/o Karuppa

Pandaram,

2.Karuppaiah

S/o Karuppa

Pandaram,

3.Ganapathi

S/o Angappan,

4.Chidambaram

S/o Veerappan,

5.Muthuveeran

Pandaram

S/o Sabaapathi

Akil Tree-1,

Seemai Karuvai

5 Tonne

Hut shed

-1

Palm Tree-1

Palm Tree-1

71

Already Published

To be Edited

Sl.No.

As per Preliminary Notifi cation

Sl.No

Survey No.

Total Area (Hec)

Area under Acquisition

(Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No and Pattadar Name

As per Preliminary Notifi cation

Sl.No.

Survey No.

Total Area (Hec)

Area under Acquisition

(Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

17

61

339/ 1A

1.70.06

0.51.40

Dry

-

Vagai Tree-1,

1143

1.Arumugam

S/o Govinda

Konar 2.Amirtham

S/o Palaniyandi

61

339/1A

1.70.06

0.66.00

Dry

Tiled

shed-1,

Vagai Tree-1,

1143

1.Arumugam

S/o Govinda Konar

2.Amirtham

S/o Palaniyandi

Veli Karuvai ½

Tonne.

Teak Tree-45,

Teak Tree-45,

Palm Tree-1,

Pipeline

Neem Tree-2

Palm Tree-1

Neem Tree-2

18

73

341/ 8A

0.07.54

0.01.70

Dry

-

-

143

Arumugam

S/o Govindan

Konar

73

341/8A

0.07.54

0.07.54

Dry

Bathroom-1

Palm Tree-1,

143

Arumugam

S/o Govindan Konar

Neem Tree-1,

Oosilai Tree-1,

Tamarind Tree-1,

Lemon Sapling-1

19

74

348/1

0.28.00

0.06.75

Dry

-

-

938

Ramakkonar

S/o Govinda

Konar

74

348/1

0.28.00

0.05.50

Dry

-

-

938

Ramakkonar

S/o Govinda Konar

20

75

348/2

0.51.00

0.15.00

Dry

-

-

2977

Palanisamy

S/o Govindan

75

348/2

0.51.00

0.12.00

Dry

Pipeline

-

2977

Palanisamy

S/o Govindan

21

77

352/2

0.01.50

0.01.00

Wet

-

-

1136

1.Sambantham

S/o Saminathan,

2.Ramasamy

77

352/2

0.01.50

0.00.75

Wet

-

-

1136

1.Sambantham

S/o Saminathan,

2.Ramasamy

22

78

354/1A

3.94.00

1.30.50

Wet

-

Palm Tree-1

1136

1.Sambantham

S/o Saminathan,

2.Ramasamy

78

354/1A

3.94.00

1.20.00

Wet

Square

Well-1

Palm Tree-1

1136

1.Sambantham

S/o Saminathan,

2.Ramasamy

Seemai

Karuvai -

1 Tonne

23

79

354/3

0.15.00

0.03.50

Dry

-

-

2183

Palraj

S/o Govinda

Konar

79

354/3

0.15.00

0.06.00

Dry

-

2183

Palraj

S/o Govinda Konar

72

Already Published

To be Edited

Sl.No.

As per Preliminary Notifi cation

Sl.No

Survey No.

Total Area (Hec)

Area under Acquisition

(Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No and Pattadar Name

As per Preliminary Notifi cation

Sl.No.

Survey No.

Total Area (Hec)

Area under Acquisition

(Hec)

Type of Land

(Wet/ Dry/ Natham)

Structure

Tree

Patta No. and Pattadar Name

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

24

81

422/8B2

0.07.50

0.03.00

Dry

-

-

1337

1.Chinnathambi

S/o Maruthan,

2.Muthu

S/o Maruthan

81

422/8B2

0.07.50

0.03.00

Dry

-

PalmTree-9

1337

1.Chinnathambi

S/o Maruthan,

2.Muthu

S/o Maruthan

25

82

522/1

2.02.00

0.68.00

Dry

-

-

1653

Kurinchivalli

W/o Anbarasan

82

522/1

2.02.00

0.05.00

Dry

-

-

1653

Kurinchivalli

W/o Anbarasan

26

83

522/2

1.13.50

1.13.50

Dry

-

-

2867

Arunachalam

S/o

Muthukkaruppan

83

522/2

1.13.50

0.58.50

Dry

-

-

2867

Arunachalam

S/o

Muthukkaruppan

27

87

529/2

0.61.50

0.14.36

Dry

-

-

2384

Subbammal

W/o Samikkannu

87

529/2

0.61.50

0.14.36

Dry

-

Vela Sablings-3,

2384

Subbammal

W/o Samikkannu

Neem Sablings-3

28

91

531/3

0.53.00

0.03.00

Dry

-

-

2536

Pitchai

S/o

Thiruvenkatam

91

531/3

0.53.00

0.03.00

Dry

-

Ecualyptus Tree-15

2536

Pitchai

S/o Thiruvenkatam

29

92

531/4

0.20.00

0.11.00

Dry

-

Ecualyptus

Tree-25,

2173

Meenal

W/o Baskar

92

531/4

0.20.00

0.11.00

Dry

-

Eucalyptus Tree-

25,

2173

Meenal

W/o Baskar

Gooseberry

Sapling-10,

Konnai

Sapling-4

Neem Spaling-1

Teak Spaling-1

Neem Spaling-1

30

93

531/5

2.20.00

0.85.50

Dry

-

Ecualyptus

Tree-140

1718

Raju

S/o Malayalam

93

531/5

2.20.00

0.85.50

Dry

-

Ecualyptus Tree-

800

1718

Raju

S/o Malayalam

31

94

532/4

1.49.50

0.10.50

Dry

-

Gooseberry

Sapling-25,

2387

Sakthivel

S/o Paruppa

Gounder

94

532/4

1.49.50

0.10.50

Dry

-

Neem Sapling-1

2387

Sakthivel

S/o Paruppa

Gounder

Neem Sapling-1

Vagai Sapling -1

Vagai Tree-1,

Neem Tree-2

6.47.87

73

As per Revised LPS given by Executive Engineer, Special Project division, Cauvery-Vaigai-Gundar Link Canal Scheme, Pudukkottai (Letter No.01/RLPS/KO1/

CVG/2022, Date 14.10.2022) Among the 96 survey numbers already published in Preliminary Notifi cation, the following 15 survey numbers are hereby removed

from Land Acquisition. The details are given below.

Pudukkottai District, Kulathur Taluk, Vellanur Village

Sl.No

As per Preliminary

Notifi cation Sl.No

Survey No

Area under

Acquisition

(Hec)

Sl.No

As per

Preliminary

Notifi cation

Sl.No.

Survey No.

Area under Acquisition

(Hec)

1

59

336/1F

0.01.50

9

68

341/1G1

0.09.85

2

60

336/1I

0.00.50

10

69

341/2A

0.03.65

3

62

341/1A

0.03.00

11

70

341/3A

0.01.18

4

63

341/1B

0.04.00

12

71

341/4A

0.01.21

5

64

341/1C

0.06.50

13

72

341/7B

0.01.14

6

65

341/1D

0.02.50

14

76

352/1

0.00.12

7

66

341/1E

0.07.50

15

95

533/6

0.10.56

8

67

341/1F

0.00.50

Pudukkottai,

கவிதா ராā,

21st December 2022.

District Collector.

74

நிலம் ைகயகப்பûத்ýதலில் நியாயமான சரியீû மற்Ąம் ஒளிĈமைறவின்ைம, மĄவாழ்Ĉ மற்Ąம் மĄகுடியமர்Ĉ உரிைமச் சட்டம்

2013-பிரிĈ-11(1)- மற்Ąம் விதி 2017 -பிரிĈ 13(1)இன் கீழ் ெவளியிடப்பட்ட āதல்நிைல அறிவிக்ைகக்கான திăத்த அறிவிக்ைக

(ந.க.196/2022/கா.ைவ.þ/அ2 நாÈ:21.12.2022)

ØÊவĉ Öĉ¿த அàÝÁபானĄ ĆĄ¹ேகா½ைட மாவ½ட þள¿ĖÄ வ½ட ெவÈளġÄ Ðராம காேவÛ-ைவைக-þ¾டாĎ இைணÁĆ காÅவாà ֽட எÊď ெபாĄ நல

பயÊபா½ÔÉகாக 96 ĆலºகßÅ 12.27.46 ெஹ¹ேடÄப½டா ×லºகைள ×லஎĂÁĆ ெசÃவதÉகாக ஏÉகனேவ ×ல ைகயகÁபĂ¿ĄதÜÅ ×யாயமான சÛñĂ மÉĎ ஒßċமைறÝÊைம,

மĎவாÇċ மÉĎ மĎþÔயமÄċ உÛைம» ச½ட 2013-ØÛċ-11(1)மÉĎ ÝÖ 2017 -ØÛċ 13(1)இÊ çÇ ćதÅ×ைல அàݹைக ĆĄ¹ேகா½ைட மாவ½ட ஆ½ÒயÛÊ ெசயÅćைறகÈ

ந.க.196/அ2/கா.ைவ.þ/2022 நாÈ 28.04.2022-ÊபÔ 04.05.2022 நாß½ட ĆĄ¹ேகா½ைட மாவ½ட அரÒதÞÅ அàÝÁĆ எ¾ 13-Å (தÙÇ) ப¹க எ¾ 1-10Ċ மÉĎ அàÝÁĆ எ¾.7-Å

(ஆºÐலÂ) ப¹க எ¾ 1-13 Ċ மÉĎ 14.05.2022 நாß½ட ÖனகரÊ தÙÇ நாßதÞÅ 7,8ஆ ப¹க¿ÖĊÂ, 14.05.2022 நாß½ட Times of India ஆºÐல நாßதÞÅ 9,10-ஆ ப¹க¿ÖÅ

ெவßÚடÁப½ĂÈளதÉþ தÉேபாĄ ெசயÉெபாàயாளÄ îÄவள¿Ąைற, ÒறÁĆ Ö½ட¹ ேகா½டÂ, காேவÛ-ைவைக-þ¾டாĎ இைணÁù காÅவாà ֽடÂ, ĆĄ¹ேகா½ைட அவÄகßÊ

ந.க. 02 RLPS/ ேகா1 /கா.ைவ.þ/2022 நாÈ 14.10.2022 நாß½ட Öĉ¿Öய ×ல Ö½ட அ½டவைணÚÊபÔ çǹக¾ட 31 Ćலºகč¹þ ćதÅ×ைல அàݹைக¹கான Öĉ¿த அà¹ைக

çÇக¾டவாĎ ெவßÚடÁபĂÐறĄ.

அட்டவைண

ĆĄ¹ேகா½ைட மாவ½டÂ, þள¿ĖÄ வ½டÂ, ெவÈளġÄ ÐராமÂ.

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿Ö பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ

(ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள க½ĂமானºகÈ

ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள மரºகÈ ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ / ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள க½ĂமானºகÈ

ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள மரºகÈ ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

1

6

225/3B

0.09.50

0.02.50

ĆÊெசÃ

-

பைன

மரÂ-3,

éைம¹

கĉைவ-2

டÊ

106

ெல½ĀமணÊ

மகÊ

அ¾ணாமைல

6

225/3B

0.09.50 0.02.50 ĆÊெசÃ

-

பைன மரÂ-3,

ĆßயமரÂ-1

106

ெல½ĀமணÊ

மகÊ

அ¾ணாமைல

2

7

225/3C

0.09.00

0.04.36

ĆÊெசÃ

-

éைம¹

கĉைவ

1 டÊ, வாைக

மரÂ-1

341.

ெல½ĀமணÊ

மகÊ ச¾ćகÂ

7

225/3C

0.09.00 0.04.36 ĆÊெசÃ

-

உÒைல-2,

வாைக மரÂ-1

341.

ெல½ĀமணÊ

மகÊ ச¾ćகÂ

3

8

225/3D

0.09.00

0.06.32

ĆÊெசÃ

-

Ćºக மரÂ-3

106.

ெல½ĀமணÊ

மகÊ

அ¾ணாமைல

8

225/3D

0.09.00 0.06.32

ĆÊெசÃ

-

Ćºக மரÂ-3,

பைன மரÂ-1

106.

ெல½ĀமணÊ

மகÊ

அ¾ணாமைல

4

12

225/ 3H

0.03.00

0.03.00

ĆÊெசÃ

-

Ćßய மரÂ-1

341.

ெல½ĀமணÊ

மகÊ ச¾ćகÂ

12

225/3H

0.03.00 0.03.00 ĆÊெசÃ

-

Ćßய மரÂ-2

341.

ெல½ĀமணÊ

மகÊ ச¾ćகÂ

5

20

270/3

0.35.00

0.23.64

ĆÊெசÃ

-

ப ைன மரÂ-12,

Ćßய மரÂ-1,

ேவÁபºகÊĎ-2

2764

þமாÄ

மைனÝ பாÄவÖ

20

270/3

0.35.00 0.24.00 ĆÊெசÃ

பைன மரÂ-12,

Ćßய

மரÂ-1, ேவÁபº

கÊĎ-2

2764

þமாÄ

மைனÝ பாÄவÖ

75

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿Ö பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ

(ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள க½ĂமானºகÈ

ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள மரºகÈ ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ / ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள க½ĂமானºகÈ

ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள மரºகÈ ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

6

21

270/5

0.49.50

0.16.00

ĆÊெசÃ

-

Ćßய மரÂ-1,

ேவÁப மரÂ-1

3231

1.ஆĎமகÂ

மகÊ ÒதÂபரÂ,

2.ஆĎćகÂ

மகÊ பழáேவĊ

3.ஆĎćகÂ

மகÊ

Ąைர»சாÙ,

4.ஆĎćகÂ

மகÊ ć¿Ą,

5.ேகாÝÀதÊ

மகÊ பÊøÄ

ெசÅவÂ

21

270/5

0.49.50

0.16.00

ĆÊெசÃ

-

-

3231

1.ஆĎćகÂ

மகÊ ÒதÂபரÂ,

2.ஆĎćகÂ

மகÊ பழáேவĊ

3.ஆĎćகÂ

மகÊ Ąைர»சாÙ,

4.ஆĎćகÂ மகÊ

ć¿Ą,

5.ேகாÝÀதÊ

மகÊ பÊøÄ

ெசÅவÂ

7

22

270/6

0.06.00

0.02.89

ĆÊெசÃ

-

-

142

ஆĎćகÂ மகÊ

ஆĎćகÂ

22

270/6

0.06.00 0.02.50 ĆÊெசÃ

-

-

142

ஆĎćகÂ மகÊ

ஆĎćகÂ

8

23

270/9

0.35.50

0.08.00

ĆÊெசÃ

-

ேவÁப மரÂ-2,

ேத¹þ-1,

பைன மரÂ-9

பனº கÊĎ-1

430

ஆĎćகÂ மகÊ

ÒலÂபÊ

23

270/9

0.35.50

0.06.50 ĆÊெசÃ

ேவÁப மரÂ-2,

ேத¹þ-1,

பைன மரÂ-9

பனº கÊĎ-1

430

ஆĎćகÂ மகÊ

ÒலÂபÊ

9

24

270/10

0.16.00

0.16.00

ĆÊெசÃ

-

ெதÊைன

மரÂ-9

842

ć¿Ą»சாÙ

மகÊ

ćáயா¾Ô

24

270/10

0.16.00

0.16.00

ĆÊெசÃ

ைபÁ ைலÊ

ெதÊைன

மரÂ-9

842

ć¿Ą»சாÙ மகÊ

ćáயா¾Ô

10

25

270/ 11

0.22.50

0.03.16

ĆÊெசÃ

-

-

842

ć¿Ą»சாÙ

மகÊ

ćáயா¾Ô

25

270/11

0.22.50 0.04.50 ĆÊெசÃ

ைபÁ ைலÊ

-

842

ć¿Ą»சாÙ

மகÊ ćáயா¾Ô

11

26

270/ 12

0.14.50

0.09.00

ĆÊெசÃ

-

-

842

ć¿Ą»சாÙ

மகÊ

ćáயா¾Ô

26

270/12

0.14.50

0.09.50 ĆÊெசÃ

ைபÁ ைலÊ

-

842

ć¿Ą»சாÙ

மகÊ ćáயா¾Ô

12

27

270/ 13

0.14.50

0.14.50

ĆÊெசÃ

-

ெதÊைன

மரÂ-13

842

ć¿Ą»சாÙ

மகÊ

ćáயா¾Ô

27

270/13

0.14.50

0.14.50

ĆÊெசÃ

ைபÁ ைலÊ

ெதÊைன

மரÂ-9

842

ć¿Ą»சாÙ மகÊ

ćáயா¾Ô

76

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿Ö பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ

(ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள க½ĂமானºகÈ

ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள மரºகÈ ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ / ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள க½ĂமானºகÈ

ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள மரºகÈ ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

13

28

270/

18A

0.70.86

0.57.00

ĆÊெசÃ

வாைக மரÂ-1,

ேத¹þ மரÂ-1,

ேவÁப மரÂ-1

ெதÊைன

மரÂ-7

2890

Ø»ைச¹க¾ă

மகÊ ெரºகராÎ

28

270/18A

0.70.86 0.54.36 ĆÊெசÃ

ைபÁ ைலÊ

வாைக மரÂ-1,

ேத¹þ மரÂ-1,

ேவÁப மரÂ-1,

ேவÁபºகÊĎ-3,

ெதÊைன

மரÂ-10,

பலா மரÂ-1

2890

Ø»ைச¹க¾ă

மகÊ ெரºகராÎ

14

39

281/

24C1

0.01.50

0.01.28

ĆÊெசÃ

-

-

2927

ராமÊ (எ)

ராைமயா மகÊ

சÀÖரேசகரÊ

39

281/24C1

0.01.50

0.01.28

ĆÊெசÃ

வ½ட¹

ÐணĎ-1

-

2927

ராமÊ (எ)

ராைமயா மகÊ

சÀÖரேசகரÊ

15

46

281/ 29

0.10.00

0.08.90

ĆÊெசÃ

வாைக மரÂ-1,

éைம கĉைவ

½ டÊ

6

ஆவைட

மகÊ அழகÊ

46

281/ 29

0.10.00

0.08.90 ĆÊெசÃ

வ½ட¹

ÐணĎ-1

வாைக மரÂ-1,

6

ஆவைட

மகÊ அழகÊ

16

58

287/3

2.43.00

0.65.00

ĆÊெசÃ

ெசºகÅ

காலவாÃ

ேவÁப மரÂ-1,

éைம¹கĉைவ

5டÊ, பைன

மரÂ-1

1306

1.கĉÁப

ப¾டாரÂ மகÊ

Ø»ைச

2.கĉÁப

ப¾டாரÂ

மகÊ கĉÁைபயா

3.அºகÁபÊ

மகÊ கணபÖ

4.ôரÁபÊ

மகÊ ÒதÂபரÂ

5.சபாபÖ மகÊ

ć¿ĄôரÊ

ப¾டாரÂ

58

287/3

2.43.00 0.65.00 ĆÊெசÃ

ெசºகÅ

காலவாÃ,

Đைர

ெகா½டைக-1

ேவÁப மரÂ-1,

பைன மரÂ-1,

அÚைல மரÂ-1

1306

1.கĉÁப ப¾டாரÂ

மகÊ Ø»ைச

2.கĉÁப ப¾டாரÂ

மகÊ கĉÁைபயா

3.அºகÁபÊ மகÊ

கணபÖ

4.ôரÁபÊ மகÊ

ÒதÂபரÂ

5.சபாபÖ மகÊ

ć¿ĄôரÊ

ப¾டாரÂ

17

61

339/ 1A

1.70.06

0.51.40

ĆÊெசÃ

-

வாைக மரÂ-1,

ேவÜ கĉைவ

½ டÊ ேத¹þ

மரÂ-45,

பைன மரÂ-1,

ேவÁப மரÂ-2

1143

1.ேகாÝÀத¹

ேகானாÄ

மகÊ ஆĎćகÂ

2.பழáயா¾Ô

மகÊ அÙÄதÂ

61

339/1A

1.70.06

0.66.00 ĆÊெசÃ

ஓ½Ă

ெகா½டைக-

1

ைபÁ ைலÊ

வாைக மரÂ-1

ேத¹þ மரÂ-45,

பைன மரÂ-1,

ேவÁப மரÂ-2

1143

1. ேகாÝÀத¹

ேகானாÄ

மகÊ ஆĎćகÂ

2. பழáயா¾Ô

மகÊ அÙÄதÂ

77

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿Ö பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ

(ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள க½ĂமானºகÈ

ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள மரºகÈ ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ / ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள க½ĂமானºகÈ

ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள மரºகÈ ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

18

73

341/ 8A

0.07.54

0.01.70

ĆÊெசÃ

-

-

143

ேகாÝÀதÊ

ேகானாÄ

மகÊ ஆĎćகÂ

73

341/8A

0.07.54 0.07.54 ĆÊெசÃ

பா¿ěÂ-1

பைன மரÂ-1,

உÒைல மரÂ-1,

ேவÁபமரÂ-1,

ĆßயமரÂ-1,

எĊÙ»ைச

கÊĎ-1

143

ேகாÝÀதÊ

ேகானாÄ

மகÊ ஆĎćகÂ

19

74

348/1

0.28.00

0.06.75

ĆÊெசÃ

-

-

938

ேகாÝÀத

ேகானாÄ மகÊ

ராம¹ேகானாÄ

74

348/1

0.28.00

0.05.50 ĆÊெசÃ

-

-

938

ேகாÝÀத

ேகானாÄ மகÊ

ராம¹ேகானாÄ

20

75

348/2

0.51.00

0.15.00

ĆÊெசÃ

-

-

2977

ேகாÝÀதÊ

மகÊ

பழá»சாÙ

75

348/2

0.51.00

0.12.00

ĆÊெசÃ

ைபÁ ைலÊ

-

2977

ேகாÝÀதÊ மகÊ

பழá»சாÙ

21

77

352/2

0.01.50

0.01.00

நÊ

ெசÃ

-

-

1136

1.சாÙநாதÊ

மகÊ சÂபÀதÂ,

2.ராமசாÙ

77

352/2

0.01.50

0.00.75

நÊ

ெசÃ

-

-

1136

1.சாÙநாதÊ மகÊ

சÂபÀதÂ,

2.ராமசாÙ

22

78

354/ 1A

3.94.00

1.30.50

நÊெசÃ

-

பைன மரÂ-1,

éைம கĉைவ

1 டÊ

1136

1.சாÙநாதÊ

மகÊ சÂபÀதÂ

2.ராமசாÙ

78

354/1A

3.94.00

1.20.00

நÊெசÃ

சĄர

ÐணĎ-1

பைன மரÂ-1,

1136

1.சாÙநாதÊ மகÊ

சÂபÀதÂ

2.ராமசாÙ

23

79

354/3

0.15.00

0.03.50

ĆÊெசÃ

-

-

2183

ேகாÝÀத

ேகானாÄ மகÊ

பாÅராÎ

79

354/3

0.15.00

0.06.00 ĆÊெசÃ

-

2183

ேகாÝÀத ேகானாÄ

மகÊ பாÅராÎ

24

81

422/

8B2

0.07.50

0.03.00

ĆÊெசÃ

-

-

1337

1.மĉதÊ

மகÊ

ÒÊன¿தÂØ

2.மĉதÊ

மகÊ ć¿Ą

81

422/8B2

0.07.50 0.03.00 ĆÊெசÃ

-

பைன மரÂ-9

1337

1.மĉதÊ

மகÊ

ÒÊன¿தÂØ

2.மĉதÊ

மகÊ ć¿Ą

25

82

522/1

2.02.00

0.68.00

ĆÊெசÃ

-

-

1653

அÊபரசÊ

மைனÝ

þà¼ÒவÈß

82

522/1

2.02.00 0.05.00 ĆÊெசÃ

-

-

1653

அÊபரசÊ

மைனÝ

þà¼ÒவÈß

78

ஏÉகனேவ ØரĀÛ¹கÁப½டĄ

Öĉ¿Ö பÔ¹கÁபட ேவ¾ÔயĄ

வ.எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ

(ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ/ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள க½ĂமானºகÈ

ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள மரºகÈ ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

ćதÅ×ைல

அàݹைகÚÊபÔ வ.எ¾

Ćல எ¾.

ெமா¿தÁ பரÁĆ (ெஹ¹)

×ல எĂÁĆ ெசÃயÁபட உÈள

பரÁĆ (ெஹ¹.)

×ல வைகÁபாĂ (நÊெசÃ/

ĆÊெசÃ / ந¿தÂ)

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள க½ĂமானºகÈ

ÝபரÂ

×ல எĂÁĆ ெசÃĈÂ Ćல¿ÖÅ

உÈள மரºகÈ ÝபரÂ

ப½டா எ¾ மÉĎÂ ×ல

உÛைமயாளÄகÈ ெபயÄ

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

26

83

522/2

1.13.50

1.13.50

ĆÊெசÃ

-

-

2867

ć¿Ą¹கĉÁபÊ

மகÊ

அĉணா»சலÂ

83

522/2

1.13.50

0.58.50

ĆÊெசÃ

-

-

2867

ć¿Ą¹கĉÁபÊ

மகÊ

அĉணா»சலÂ

27

87

529/2

0.61.50

0.14.36

ĆÊெசÃ

-

-

2384

சாÙ¹க¾ă

மைனÝ

ĀÁபÂமாÈ

87

529/2

0.61.50

0.14.36

ĆÊெசÃ

-

ேவலாºகÊĎ-3,

ேவÁபºகÊĎ-3

2384

சாÙ¹க¾ă

மைனÝ

ĀÁபÂமாÈ

28

91

531/3

0.53.00

0.03.00

ĆÊெசÃ

-

-

2536

ÖĉேவºகடÂ

மகÊ Ø»ைச

91

531/3

0.53.00 0.03.00 ĆÊெசÃ

-

ĚகÜÁடÌ

மரÂ-15

2536

ÖĉேவºகடÂ

மகÊ Ø»ைச

29

92

531/4

0.20.00

0.11.00

ĆÊெசÃ

-

ĚகÜÁடÌ

மரÂ-25,

ெநÅÜ

கÊĎ-10,

ெகாÊைன

கÊĎ-4,

ேத¹க கÊĎ-

1, ேவÁப

கÊĎ-1

2173

பாÌகÄ மைனÝ

ðனாÈ

92

531/4

0.20.00

0.11.00

ĆÊெசÃ

-

ĚகÜÁடÌ

மரÂ-25, ேவÁப

கÊĎ-1

2173

பாÌகÄ மைனÝ

ðனாÈ

30

93

531/5

2.20.00

0.85.50

ĆÊெசÃ

-

ĚகÜÁடÌ

மரÂ-140

1718

மைலயாளÂ

மகÊ ராü

93

531/5

2.20.00

0.85.50

ĆÊெசÃ

-

ĚகÜÁடÌ

மரÂ-800

1718

மைலயாளÂ மகÊ

ராü

31

94

532/4

1.49.50

0.10.50

ĆÊெசÃ

-

ெநÅÜ

கÊĎ-25,

ேவÁப மரÂ-2,

ேவÁப கÊĎ-

1, வாைக

மரÂ-1

2387

பĉÁப¹கċ¾டÄ

மகÊ ச¹ÖேவÅ

94

532/4

1.49.50

0.10.50

ĆÊெசÃ

-

ேவÁப கÊĎ-1,

வாைக கÊĎ-1

2387

பĉÁப¹கċ¾டÄ

மகÊ ச¹ÖேவÅ

ெமா¿தÂ

6.47.87

79

ெசயÉெபாàயாளÄ îÄவள¿Ąைற, ÒறÁĆ Ö½ட¹ ேகா½டÂ, காேவÛ-ைவைக-þ¾டாĎ இைணÁù காÅவாà ֽடÂ, ĆĄ¹ேகா½ைட அவÄகßÊ ந.க. 02 RLPS/ ேகா1 /

கா.ைவ.þ/2022 நாÈ: 14.10.2022 நாß½ட Öĉ¿Öய ×ல Ö½ட அ½டவைணÚÊபÔ ஏÉகனேவ ெவÈளġÄ Ðராம¿ÖÅ ெவßÚடÁப½ட ćதÅ×ைல அàݹைகÚÅ இடÂெபÉàĉÀத

96 Ćல எ¾கßÅ çǹக¾ட 15 Ćல எ¾கÈ ×ல எĂÁØÜĉÀĄ î¹க ெசÃயÁபĂÐறĄ.

ĆĄ¹ேகா½ைட மாவ½டÂ, þள¿ĖÄ வ½டÂ, ெவÈளġÄ ÐராமÂ.

வ.

எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ

வ.எ¾.

Ćல எ¾

ைகயகÁபĂ¿தÁபடċÈள

×ல¿ÖÊ பரÁபளċ

ெஹ¹ேடÛÅ

வ.

எ¾.

ćதÅ×ைல

அàݹைகÚÊபÔ

வ.எ¾.

Ćல எ¾

ைகயகÁ பĂ¿தÁபடċÈள

×ல¿ÖÊ பரÁபளċ

ெஹ¹ேடÛÅ

1

59

336/1F

0.01.50

9

68

341/1Ć1

0.09.85

2

60

336/1I

0.00.50

10

69

341/2A

0.03.65

3

62

341/1A

0.03.00

11

70

341/3A

0.01.18

4

63

341/1B

0.04.00

12

71

341/4A

0.01.21

5

64

341/1C

0.06.50

13

72

341/7B

0.01.14

6

65

341/1D

0.02.50

14

76

352/1

0.00.12

7

66

341/1E

0.07.50

15

95

533/6

0.10.56

8

67

341/1F

0.00.50

ĆĄ¹ேகா½ைட,

கÝதா ராć

கÝதா ராć,

2022 ÔசÂபÄ 21.

மாவ½ட ஆ½Ò¿தைலவÄ.

PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI

ON BEHALF OF THE GOVERNMENT OF TAMIL NADU

80