DTP—III-2 (13)

TAMIL NADU

GOVERNMENT GAZETTE

PUBLISHED BY AUTHORITY

No.13]

CHENNAI, WEDNESDAY, MARCH 29,  2023

Panguni 15, Subakiruthu, Thiruvalluvar Aandu–2054

Part III—Section 2

Statutory Notifications and Orders issued by

Heads of Departments.

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

CONTENTS

[33]

Pages.

V.O.CHIDAMBARANAR PORT AUTHORITY, THOOTHUKUDI

General Scale of Rates and Terms & Conditions .. .. .. ..

34-68

©

[Regd. No. TN/CCN/467/2012-14.

GOVERNMENT OF TAMIL NADU

[R. Dis. No. 197/2009.

2023

[Price: Rs. 14.40 Paise

34

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

V.O.CHIDAMBARANAR PORT AUTHORITY, THOOTHUKUDI

General Scale of Rates and Terms & Conditions

CHAPTER –I

[No. :FIN-COSTORSOR(SORT)/1/2020-Part(1)]

No. SRO C-5/2023.

1.1. Definitions – General

In this Scale of Rates, unless the context otherwise requires, the following definitions shall apply:

(i)

“Coastal vessel” shall mean any vessel exclusively employed in trading between any port or place in

India to any other port or place in India having a valid coastal licence issued by the competent authority.

(ii).

“Cold move” shall mean the movement of the vessel without the power of the engine of the vessel.

(iii).

“Day” shall mean the period starting from 6 a.m. of a day and ending at 6 a.m. on the following day.

(iv).

“Foreign-going vessel” shall mean any vessel other than coastal vessel.

(v).

“Week” shall mean a continuous period of 7 days.

(vi).

“Hirer” shall mean all users of the port using any of the appliances of the port.

(vii). “Month” shall mean the period from 1st to end of the calendar month.

(viii). “Port” means both Zone A and Zone B of the Port of Tuticorin. Zone ‘A’ of the Port shall comprise

of all the area other than area in Zone ‘B’. Zone ‘B’ shall comprise the area falling within the limits notified in

G.S.R. No.306 (E) in Part II - Section 3 (i) of Gazette of India (Extraordinary), dated 31st March 1979.

(ix).

“Sailing vessels” shall mean vessels propelled solely by wind power and includes vessels fitted with

mechanical means of propulsion.

(x).

“Sea going Steam vessels” shall mean sea-going vessels other than sailing vessels.

(xi).

“Shift” shall mean shift of 8 hours as applicable to port employees.

(xii). “Shut out cargo / container” shall mean any cargo / container brought into the Port for shipment but

not shipped by the designated vessel. Damaged cargo and cargo rejected by Surveyors of Shippers and moved

out of the Port without being exported, shall not be treated as “Shut out Cargo”.

(xiii). “Trip” shall mean, movements from one point to another in one direction only. In Zone ‘B’, service from

shore to anchorage shall be treated as one trip, and from anchorage to shore shall be treated as another trip.

Ship to ship service shall also be treated as one trip. In other words, service to and fro i.e. from one point to

another and back shall be counted as two trips.

(xiv). “Wharfage” shall mean the basic dues recoverable on all cargo / container imported or exported or

transshipped within the Port limits or passing through the port, irrespective of whether porterage was provided by

the Port or not.

(xv). “Demurrage” - Charges for storage of cargo in Transit area beyond the Free Period.

1.2.

General Terms & Conditions

(i).

The status of the vessel, as borne out by its certification by the Customs or the Director General of

Shipping, shall be the deciding factor for classifying into ‘coastal’ or ‘foreign-going’ category for the purpose of

levying vessel related charges; and, the nature of cargo or its origin will not be of any relevance for this purpose.

(ii).

System of classification of vessel for levy of Vessel Related Charges (VRC).

(a). A foreign going vessel of Indian flag having a General Trading Licence can convert to coastal run

on the basis of a Customs Conversion Order. Such vessel that converts into coastal run based on the Customs

Conversion Order at her first port of call in Indian Port, no further custom conversion is required, so long as it

moves on the Indian Coast.

(b). A Foreign going vessel of foreign flag can convert to coastal run on the basis of a license for

Specified Period or voyage issued by the Director General of Shipping and a custom conversion order.

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

35

(iii).

Criteria for levy of Vessel Related Charges (VRC) at Concessional Coastal rate and foreign rate

(a). In cases of such conversion, coastal rates shall be chargeable by the load port from the time of

the vessel converted into coastal run.

(b). In cases of such conversion coastal rates shall be chargeable till the vessel is converted into foreign

run; immediately thereafter, foreign going rates shall be chargeable by the discharge ports.

(c). For dedicated Indian coastal vessels having a Coastal licence from the Director General of Shipping,

no other document will be required to be entitled to coastal rates.

(iv).

Criteria for levy of Cargo Related Charges (CRC) at Concessional Coastal rate

(a). Foreign going Indian Vessel having General Trading License issued for ‘worldwide and coastal’

operation should be accorded applicable coastal rates with respect to Handling Charges (HC) i.e. ship to shore

transfer and transfer from/ to quay to/ from storage yard including wharfage in the following scenario:

(i). Converted to coastal run and carrying coastal cargo from any Indian Port and destined for any

other Indian Port.

(ii). Not converted* to coastal run but carrying coastal cargo from any Indian Port and destined for

any other Indian Port.

* The Central Board of Excise and Customs Circular no.15/2002-Cus. dated 25 February 2002 allows carriage

of coastal cargo from one Indian port to another port in India, in Indian flag foreign going vessels without any

custom conversion.

(b). In case of a Foreign flag vessel converted to coastal run on the basis of a License for Specified

Period or voyage issued by the Director General of Shipping, and a Custom Conversion Order, the coastal

cargo/ container loaded from any Indian Port and destined for any other Indian Port should be levied at the rate

applicable for coastal cargo/ container.

(v).

(a). Vessel related charges shall be levied on shipowners / steamer agents. Wherever rates have been

denominated in US dollar terms the charges shall be recovered in Indian Rupees after conversion of US currency

to its equivalent Indian Rupees at the reference rate notified by the Reserve Bank of India from time to time.

The date of entry of the vessel into the port limit shall be reckoned with as the day for such conversion.

(b). Container related charges denominated in US dollar terms shall be collected in equivalent Indian

Rupees based on the reference rate notified by Reserve Bank of India from time to time prevalent on the date

of entry of the vessel in case of import containers; and on the date of arrival of the containers into the port in

case of export containers.

(vi).

A regular review of exchange rate shall be made once in thirty days from date of arrival of the vessels

in cases of vessels staying in the port for more than thirty days. In such cases, the basis of billing shall change

prospectively with reference to the appropriate exchange rate prevailing at the time of review.

(vii). (a). For the purpose of calculating the dues, the unit by weight shall be 1 tonne or 1,000 kilograms,

the unit by volume measurement shall be 1 cubic metre and the unit by capacity measurement for liquids in bulk

shall be 1,000 litres.

(b). In calculating the gross weight or measurement by volume or capacity of any individual item, fractions

below 0.5 shall be taken as 0.5 unit and fractions of 0.5 and above shall be treated as one unit, except where

otherwise specified.

(viii). Interest on delayed payments / refunds:

(a). The user shall pay penal interest on delayed payments under this Scale of Rates. Likewise, the

VOCPA shall pay penal interest on delayed refunds.

(b). The rate of interest will be 15.00% p.a.

(c). The delay in refunds by the Port will be counted only 20 days from the date of completion of

services or on production of all the documents required from the users, whichever is later.

(d). The delay in payments by the users will be counted only 10 days after the date of raising the

bills by the VOCPA. This provision shall, however, not apply to the cases where payment is to be made before

availing the services / use of Port’s properties.

(ix).

Aggregate of all payable bills (including demurrage) payable on cargo handling charges on one consignment

shall be subject to a minimum of Rs.500/-

36

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(x).

All charges worked out shall be rounded off to the next higher rupee on the grand total of each bill

before applicable taxes.

(xi).

No refund shall be made unless the amount refundable is Rs.50/- or more. Similarly, short collection

upto Rs.50/- will not be demanded by the Port.

(xii). Every requisition for availing the services of craft/equipment/tools & plant shall be accompanied by the

hire charges in advance.

(xiii). The hire of floating craft, equipment and tool and plant to the public is not guaranteed normally by the

port. The craft/equipment/tool and plant shall be hired out only if available. The VOCPA shall not be responsible

to the hirer or any person for any loss or damage or injury to life or property arising directly or in-directly from

the use of craft/equipment/tool and plant of any sort or any damage which may occur as a result of non-supply

or delay in supply or by the use of the craft/equipment/tool and plant of the port or due to failure of the craft/

equipment/tool and plants at any stage during the period of hire. The hirer shall keep the crafts/equipments in

good order and condition and shall be liable for any damage caused to the crafts/equipment/tools and plants

during the subsistence of hire and shall make good all damages, whether by accident, by fire or otherwise. The

hirer shall indemnify the port and against all loss or damage or injury to life arising directly or indirectly from

the use of the craft/equipment/tool and plants during the period of hire to any property belonging to the Board

including the crafts/equipment/tools and plants under hire or to any other person or property or break down or

any demurrage incurred on cargo. The liability of the hirer shall not be affected by the fact that such loss or

damage or injury to life may have arisen due to any act or default of any employee of the port. The hirer shall

also indemnify the port for all liabilities under the Workmen’s Compensation Act.

(xiv). The cost of repairing the damage sustained by the craft/equipment/tools and plants or appliances or

parts thereof that might be broken, missing or specially damaged or lost during the period of hire shall be that

actually incurred for the purpose by the VOCPA including the usual indirect charges, centage charges. The cost

of replacements, if necessary of a part or in full of the craft/equipment/tools and plants will be either the book

value or the current market value whichever is higher.

(xv). In case of damages to crafts, equipment, tools and plants, the hirer shall deposit anticipated amount

for all such charges for damages as assessed by the VOCPA immediately on receipt of the demand, pending

determination of the actual charges and in case of total loss the hirer shall deposit the book value or market

value of the crafts or appliances or properties of the VOCPA whichever is higher. If the damage cost is not paid

within the time stipulated, the same will be adjusted from any dues payable to the Agencies concerned.

(xvi). (a). The vessel related charges for all coastal vessels should not exceed 60% of the corresponding

charges for other vessels.

(b). The cargo / container related charges for all coastal cargo / containers, other than coal used for

thermal power plants and POL including crude oil, iron ore and iron ore pellets, as declared in Coastal Bill of

Goods should not exceed 60% of the normal cargo / container related charges.

(c). In case of cargo related charges, the concessional rates should be levied on all the relevant handling

charges for ship-shore transfer and transfer from / to quay to/ from storage yard including wharfage.

(d). In case of container related charges, the concession will be applicable on all the relevant charges

for ship-shore transfer, and transfer from / to quay to / from storage yard as well as wharfage on cargo and

containers.

(e). Cargo/ container from a foreign port which reaches an Indian Port ‘A’ for subsequent transhipment

to Indian Port ‘B’ will be levied the concession charges relevant for its coastal voyage. In other words, cargo/

containers from/to Indian Ports carried by vessels permitted to undertake coastal voyage will qualify for the

concession

(f). The charges for coastal cargo/ containers/ vessels shall be denominated and collected in Indian

Rupee.

(xvii). (a). The rates prescribed in the Scale of Rates are ceiling levels; likewise, rebates and discounts are

floor levels. The Port Authority may, if it so desires, charge lower rates and/or allow higher rebates and discounts.

(b). The port may also, if they so desire rationalise the prescribed conditionalities governing the application

of rates prescribed in the Scale of Rates if such rationalisation gives relief to the users in rate per unit and the

unit rates prescribed in the Scale of Rates do not exceed the ceiling level.

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

37

(c). The ports should, however, notify the public such lower rates and/or rationalisation of the conditionalities

governing the application of such rates and continue to notify the public any further changes in such lower rates

and/or in the conditionalities governing the application of such rates provided the new rates fixed shall not exceed

the rates.

(xviii). The users shall not be required to pay charges for delays beyond a reasonable level attributable to the

VOCPA.

(xix). Guidelines on priority berthing of coastal vessels at Major Ports issued by the Ministry of Shipping vide

letter No.PT-11033/51/2014-PT dated 4 September 2014:

(a). “Coastal vessels” is defined as any vessel exclusively employed in trading between any port or

place in India to any other port or place in India having a valid coastal license issued by the Director General

of Shipping / competent authority.

(b). Major ports shall accord priority berthing, at least on one berth, to dry bulk/ general cargo coastal

vessels to enable shippers to transport goods from one port in India to another port in India irrespective of origin

and final destination of the cargo. This would be in addition to dedicated berth, for handling of Coastal Thermal

Coal already existing in Major Ports, if any.

(c). All Major Ports shall accord priority berthing through specific window to coastal container vessels

keeping in view the concession agreements and existing allotment of window berthing at the private terminals

and availability of container berths operated by the ports.

(d). In respect of POL/ Liquid cargo tankers, existing practices regarding such priorities as prevalent in

various ports may continue.

(e). Coastal vessels which are be accorded priority berthing shall not be liable to pay priority berthing

charges

(f). There will be no restrictions on berthing of coastal vessel, in addition to the coastal vessel berthed

on priority as above, if the same is eligible under normal berthing policy of the port

(g). A coastal vessel shall be liable to pay port charges on coastal rates notwithstanding whether it was

berthed on priority or otherwise.

(h). Ports should explore the possibilities of earmarking exclusive berth, storage areas and gates for

coastal cargo outside the custom bonded area of the Ports to further facilitate movement of coastal cargoes.

(i). Major Ports shall clearly work out the time limit within which a coastal vessel would be berthed in

a particular port. This time limit may differ depending on the cargo and berth. Each Major Port should carry out

a detailed exercise and issue a trade notice clearly indicating the upper time limit within which a coastal vessel

would be given a berth in the port. As regards priority berthing through a specific window to coastal container

vessels, Major Ports should have a detailed discussion with the PPP operator and publish the specific window

for coastal container vessels. The above mentioned exercise and publication should be completed within 30 days

from the date of issue of these guidelines.

(j). The MIS in the Port should capture data for coastal and foreign vessels cargoes separately. The

data so captured shall be monitored and reported internally in the port as well as to IPA and Ministry in separate

formal for coastal and foreign vessels.”

(xx). In order to decongest the ports and encourage exporters / importers to utilize the port services beyond

regular hours, lower charges may be levied for cargo and vessels related services as well as special discount

may be offered in port charges for the services rendered after regular hours.

[This condition is incorporated in pursuance to the MOS letter No.PD/14033/101/2015- PD.V dated 3 February

2016 based on which a common adoption Order No.TAMP/14/2016-Misc dated 16 February 2016 is approved

by the Authority].

(xxi) (i)

Coastal good transported between an Indian port on east coast and another Indian port on west

coast or vice versa, by a vessel through the territorial waters of Sri Lanka, whether or not calling any port in Sri

Lanka in between and without change of vessel in terms Notification No.38/2018-Customs (N.T.) dated 11 May

2018 of Central Board of Indirect Taxes and Customs shall be eligible for concession in vessel related charges

and cargo related charges.

(ii)

Coastal good transported between an Indian port on east coast and a river port in India or vice

versa, by a vessel through a route passing through the Bangladeshi waters and without change of vessel in

terms Notification No.38/2018-Customs (N.T.) dated 11 May 2018 of Central Board of Indirect Taxes and Customs

shall be eligible for concession in vessel related charges and cargo related charges.

38

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

The provisions prescribed above shall be subject to adherence to the provisions prescribed in the

Order No.TAMP/53/2015-VOCPA dated 26 November 2015 and amendment Order No.TAMP/53/2015-VOCPA

dated 10 June 2016.

(xxii). (a). The SOR is subject to automatic annual indexation at 100% of the WPI to be annually announced by

the Authority. The next annual indexation will be from May 2023 subject to the VOCPA achieving the performance

standard notified along with the SOR. If Performance Standards prescribed in the SOR are not achieved, there

will be no indexation in the SOR for that particular year.

(b). The port should declare the Performance Standards achieved by it annually for the period 1 January

to 31 December vis-à-vis the Performance Standards notified by the Authority at the level committed by the

port within one month of end of the calendar year to the concerned users as well as to the Authority. If the

Performance Standards as notified by the Authority are achieved by the port, then the port will automatically index

the SOR at 100% of WPI announced by the Authority and apply the indexed SOR w.e.f. 1 May of the relevant

year. The indexed SOR by the VOCPA to be intimated by the port to the concerned users and to the Authority.

(xxiii). The relevant charges shall be collected from whoever the service receiver to avail all Port services

unless until specific exemption / concession specified under the respective schedule of Tariff.

(xxiv). (a). Vessels calling the Port, which are declared as cargo in the Import General Manifest or Export

General Manifest for the purposes of Customs Act, 1962, shall not be treated as cargo and no wharfage shall be

levied on such vessels, and only vessel related charges would be collected if the vessels come into the port on

their own steam and sail out of the port limits on their own steam. However, when loading or unloading of cargo

/ container takes place to / from such vessel within the Port limits, cargo / container related charges including

wharfage shall be applicable as per SoR on such cargo / container declared in the manifest (IGM / EGM).

(b). When a vessel carries another vessel as cargo for discharging in the port, either on the quay, jetty

or foreshore (wharf), or loads another vessel as cargo on board itself from such wharf of the Port, in such cases,

such loaded or unloaded vessels are “cargo”, on which cargo related charges including “wharfage” are leviable.

CHAPTER-II

VESSEL RELATED CHARGES

2.1.

SCHEDULE OF PORT DUES

Sl.

No

Particulars

Rate per GRT

Frequency of payment in respect of

the same vessel

Coastal

vessel

Foreign -

going vessel

Coastal vessel

Foreign - going

vessel

(in Rs.)

(in US$)

1

Ships/steamers

9.70

0.3727

Port dues

payable once

in 30 days.

The due is payable

on each entry into

the port

2

Sailing Vessel

4.87

0.1863

Notes:—

(1).

Port Dues shall be collected based on the GRT of the vessel. Deck Cargo shall be exempted from

assessment of Port Dues.

(2).

For oil tankers with segregated ballast, the reduced gross tonnage that is indicated in "Remarks" column

of its International Tonnage Certificate will be taken to be its gross tonnage for the purpose of levying Port Dues.

(3).

No Port Dues shall be levied in respect of the following;

(i). Vessels belonging to other Indian Ports; or

(ii). any pleasure yachts; or

(iii). Any vessel which having left this port is compelled to re-enter it by stress of weather or in consequence

of having sustained any damage.

(4). A vessel entering the port but not discharging or taking in any cargo or passengers therein (with the

exception of such unshipment/reshipment as may be necessary for purposes of repair) shall be charged with only

50% of the Port Dues with which she would otherwise be chargeable.

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

39

(5).

A vessel entering the port in ballast and not carrying passengers shall be charged with only 75% of

the Port Dues with which she would otherwise be chargeable.

(6).

A LASH vessel making a ‘second call’ to pick up empty and / or laden fleeting LASH barges shall be

treated as vessel entering a Port, but not discharging or taking any cargo or passenger therein, and shall not

be charged any Port Dues.

(7).

Port Dues shall be collected for all non-commercial vessels, fishing vessels and craft.

(8).

A coastal vessel, which after paying 50% of the Port Dues as per provisions prescribed at 4 above,

re-enters the port within the period of exemption with cargo or passengers or in ballast shall be charged the

difference viz., 50% of the Port Dues previously conceded.

(9).

A coastal vessel, which, after paying 75% of Port Dues as per provisions prescribed at 5 above, re-enters

the port within the period of exemption with cargo or passengers or in ballast shall be charged the difference,

viz., 25% of the Port Dues previously conceded.

2.2.1. SCHEDULE OF PILOTAGE FEES

The rate specified below is for Zone A

Sl.

No.

Size of vessel

Rate per GRT

Coastal vessel (in Rs )

Foreign-going vessel (in US $)

1

0 to 20,000 GRT

13.76

0.5272

2

20,001 - 30,000 GRT.

15.80

0.6057

3

30,001 - 60,000 GRT

Rs.4,63,651.35+ Rs.12.64 for

vessels above 30,000 and upto

60,000 GRT

$17,772.17+ $0.4845 for vessels

above 30,000 and upto 60,000 GRT

4

60,001 and above GRT

Rs.8,42,878.67+ Rs.11.05 for

vessels above 60,000 GRT

$32,308.08+ $.0.4240 for vessels

above 60,000 GRT

The Pilotage fee prescribed above is subject to a minimum charge of Rs.26,598.22 in case of coastal vessel

and US$1,019.6160 per ship in case of foreign-going vessel

Notes:—

(1).

Pilotage fee shall include services of the Port's pilot (s) for pilotage of vessels; and, provision of required

number of tug/tugs, launches of adequate capacity for inward and outward movement and shifting of vessel for

port convenience and one shifting on users account will be free.

(2).

Pilotage Fees shall be collected based on the GRT of the vessel. Deck Cargo shall be exempted from

assessment of Pilotage Fees.

2.2.2. MISCELLANEOUS PILOTAGE FEES

Sl.

No.

Particulars

Rates

Coastal vessel

(in Rs)

Foreign-going

vessel (in US $)

1

Fishing Trawlers (Minimum charges per trawler)

4,596.91

176.2905

2

Mooring a vessel outside the harbour when it

does not enter or leave it.

25%

of

the

rate

prescribed

in

schedule

2.2.1 subject to

a

minimum

of

Rs.10,505.14

25% of the rate

prescribed

in

schedule

2.2.1

subject

to

a

minimum of US$

402.8630

3

Shifting and re-mooring or for turning a vessel

around in her berth for special services viz.,

bunkering, supply of fresh water, repair, etc.,

20%

of

the

rate

prescribed

in

schedule

2.2.1 subject to

a

minimum

of

Rs.7,823.97

20% of the rate

prescribed

in

schedule

2.2.1

subject

to

a

minimum of US$

300.0404

40

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

Sl.

No.

Particulars

Rates

Coastal vessel

(in Rs)

Foreign-going

vessel (in US $)

4

Pilots whose services have been requisitioned but

not utilised after the pilot has boarded a vessel.

25% of normal

Pilotage charges

subject

to

a

minimum

of

Rs.6,646.51

25%

of

normal

Pilotage

charges

subject

to

a

minimum of US

$254.9007

5

Detention Charges beyond 30 minutes after the

pilot boards the vessel and is kept waiting on

board the vessel.

(i). For first hour or part of an hour

2,792.06

107.0746

(ii). For every subsequent hour or part thereof

952.75

36.5375

6

Compensation fees for on carriage of Pilot.

328.74

12.6065

Notes:

(1) The charges prescribed at serial number (4) in the schedule shall be levied not only in cases of

cancellation of requisitions for inward and outward pilotage of vessels; but, also for the cancellation of requisitions

for shifting of berth of vessel and remooring or for turning a vessel around in her berth or for remooring a vessel

in the same berth due to position of heavy lifts or for any other reasons.

(2).

The charges prescribed at serial number (4) shall, however, not be levied in the following cases:

(i). Cancellations received at least one hour before the Pilot’s appointed boarding time of the vessel.

(ii). Cancellation caused for reasons attributable to the port.

(3).

In the event of a vessel carrying a pilot outside the port limits for unavoidable reasons the master

shall be bound to leave the pilot at the next nearest port and the master, owner or his representative shall be

responsible for the repatriation and all connected formalities thereof and shall also be liable to pay all expenses

incurred in the matter of boarding, lodging, other reasonable expenses and the repatriation of the pilot thus over

carried. In addition, compensation at the rates prescribed at serial number (6) in the schedule shall be payable

by the master of the vessel till the pilot reports back to duty at the port.

2.2.3. Shifting Charges

Shifting charges shall be 50% on pilotage charges

Sl.

No.

Size of vessel

Rate per GRT

Coastal vessel

(in Rs )

Foreign-going vessel

(in US $)

1

0 to 20,000 GRT

6.88

0.2636

2

20,001 - 30,000 GRT

7.90

0.3029

3

30,001 - 60,000 GRT

Rs.2,31,825.68 + Rs.6.32 for

vessels above 30,000 and

upto 60,000 GRT

$ 8,886.09 + $ 0.2423 for

vessels above 30,000 and

upto 60,000 GRT

4

60,001 and above GRT

Rs.4,21,439.34 + Rs.5.53 for

vessels above 60,000 GRT

$16,154.04 + $ 0.2120 for

vessels above 60,000 GRT

The shifting charges prescribed above is subject to a minimum charge of Rs.13,299.11 in case of coastal

vessel and US$ 509.8080 per ship in case of foreign-going vessel

Notes:—

(i) One shifting is free during cargo operation i.e. after commencement and before completion of cargo operation.

This free shifting is not applicable for other than cargo operations.

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

41

(ii) More than one shifting is chargeable as per the above rates whenever the shifting is requested by the

respective vessels Ship agent

General notes relating to Schedule 2.2.1., 2.2.2. and 2.2.3.

(1).

(i). For piloting a vessel on cold move, 100% of the applicable pilotage fee will be

levied

if

both

inward and outward movements are cold move in addition to the normal pilotage fee. In case only one movement

is cold, then 50% of

the applicable pilotage fee will be levied in addition to the normal pilotage

fee.

(ii). For shifting a vessel on cold move, 100% of the applicable shifting charge shall be leviable in

addition to the normal shifting charge.

(2).

(a) Shifting a vessel from any berth to outer anchorage shall mean completion of pilotage act;

on re-entry by the vessel under the same port entry, pilotage fees afresh shall be payable as prescribed under

the Schedule.

(b) Shifting from deeper draft berth to lower draft berth and vice versa in respect of any vessel shall

also be carried out on the request from the steamer agent of the next vessel in the queue for berthing on

payment of applicable charges.

(3).

No charges shall be levied for shifting of a vessel for port convenience.

(i). "Port convenience" is defined to mean the following:

(a). If a working cargo vessel at berth or any vessel at mooring is shifted/ in berthed for undertaking

dredging work/ hydrographic survey work or for allotting a berth for the dredger or for attending to repairs to berths,

maintenance and such other similar works whereby shifting is necessitated, such shifting shall be considered as

"Shifting for Port Convenience". The shifting made to reposition such shifted vessel shall also be considered as

"Shifting for Port Convenience ".

(b). Whenever a vessel is shifted to accommodate another vessel which can not be berthed at other

berths due to draft and LOA restrictions such shifting shall be considered as "Shifting for Port Convenience".

(c). Whenever a vessel is shifted to accommodate another vessel having priority at the adjacent berth

and unless that vessel shifts, another vessel can not be berthed at the adjacent-berth due to length restrictions,

such shifting shall also be considered as "Shifting for Port Convenience".

(d). Whenever a vessel is shifted from berths to accommodate another vessel carrying hazardous

cargo which needs adjacent-berth to be kept vacant for safety reasons such shifting shall also be considered as

" Shifting for Port Convenience ".

(e). Shifting a vessel from deeper draft berth to lower draft berth in all berths to accommodate the

first waiting vessel requiring deeper draft berth provided no other vessel requiring lower draft berth waits, in the

queue shall also be considered as “SHIFTING FOR PORT CONVENIENCE”.

(f). Shifting of vessel during adverse weather condition to anchorage and bring it back to berth.

(ii). Whenever a vessel is shifted from berth to accommodate another vessel on ousting priority, the

vessel shifted is exempted from the payment of shifting charges since the same is paid by the vessel enjoying

the ousting priority or the shifting is treated as for Port Convenience when the priority vessel is exempted from

payment of such charges.

(4).

Shifting from deeper draft berth to lower draft berth and vice versa in respect of any vessel shall be

carried out only on priority / ousting priority request from the steamer agent of the next vessel in the queue for

berthing. The charges payable shall be equivalent to one pilotage act as prescribed in the schedule. When the

working vessel is to complete loading/ unloading and is ready for sailing out within 24 hours from the time the

request for ousting priority from the vessel is received, the former vessel will not be shifted unless vacant berths

are available for completing the handling of the former vessel.

(5).

Ousting priority shall mean ousting a working vessel in a berth or jetty and berthing another vessel

asking for such ousting permission in view of the following:

(i). Warranted by the hazardous nature of the cargo and dock safety requirements.

(ii). The time schedule in the voyage is to be kept up by vessel carrying food grains for public consumption

and fuel, oil and coal meant for consumption by public utility services, viz., thermal power plants, Government

companies dealing in manufacturing, refining and or distribution of such products.

42

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(iii). As directed by the Government from time to time in this regard.

(6).

In cases of ousting priority, over and above the pilotage fees leviable on the vessel availing the benefit

of such ousting, additional pilotage fees equivalent to the pilotage fees for the vessel so ousted shall be leviable

from the former.

(7).

Full pilotage charges will be levied when ousted vessel is shifted to anchorage. If ousted vessel is shifted

to other berths, shifting charges as applicable for the ousted vessels shall be levied as per Scale of Rates. The

vessel availing the benefit of ousting priority shall be liable to pay the additional pilotage / shifting fee prescribed

in this note.

(8).

(a). When any/ all of the following conditionalities are not satisfied in respect

of a working vessel

at a berth then the vessel will be shifted with the approval of Chairman to outer anchorage or another available

and suitable berth with respect to the draught of the vessel:

(i).

When a vessel is operating with ship derricks either in a crane berth or non-crane berth and she

is idle due to non-working of the crane for a period of four hours in a shift either continuously

or intermittently (less than fifteen minutes excluded).

(ii). When a vessel is keeping idle in a shift for a period of four hours in a shift either continuously

or intermittently (less than fifteen minutes excluded), though gangs are deployed by Cargo Handling

Division of the Port.

(iii). When the productivity of a vessel per shift is continuously less than the average productivity per

shift for the cargo during the previous year during the continuous period of two /three shifts.”

(iv). When the vessel is waiting for cargo (whether gang is requisitioned and deployed or not) continuously

or intermittently for a period of four hours in a shift and in two consecutive shifts.”

(b). The following charges shall be levied for shifting of a vessel to outer anchorage/ any other berth on

account of its non-performance:

(i). In case of shifting between berths within harbour basin, shifting charges shall be collected at 50%

of pilotage fee prescribed in schedule 2.2.1.

(9).

Only in cases of any extra-ordinary circumstances and in cases which are not specifically provided in

the Scale of Rates, Chairman, Port Authority may decide whether the movement of a vessel is for port / Agent’s

convenience.

2.3.

SCHEDULE OF TUG HIRE FEES

Sl.No.

Particulars

Unit

Rates

Coastal

vessel

(in Rs )

Foreign–going

vessel (in US $)

1

Harbour tugs of more than 10 Ton Bollard Pull

engaged for towing barges, lighters, etc., and for

services other than berthing, unberthing, shifting,

mooring and remooring

 

(i). Within inner Harbour.

Per tug per

hour or part

thereof

5,272.41

202.1979

(ii). When engaged within port limits.

-do-

10,544.81

404.3844

(iii). When engaged for salvage work within the

port limits.

-do-

16,476.56

631.8640

(iv). When engaged for salvage work outside the

port limits.

-do-

21,089.15

808.7572

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

43

Sl.No.

Particulars

Unit

Rates

Coastal

vessel

(in Rs )

Foreign–going

vessel (in US $)

2

Hire charges for Tugs, Launches and other Harbour

Craft

 

(i). Pilot Launches

For hour or

part thereof

2,111.60

80.97

(ii). Mooring Launches

-do-

1,319.75

50.61

(iii). Tugs below 10 Tonnes Bollard Pull

-do-

1,583.69

60.74

(iv). Dumb Barge

-do-

404.30

673.90

(v). Mooring Boats

-do-

467.58

779.36

(vi). Tugs of 10 Tonnes Bollard pull

-do-

4,827.48

185.13

3

Additional tug charge for towage of each lighter or

sailing vessel in any one direction

Per tug per

hour or part

thereof

422.44

16.21

4

 

 

Tug hire charges when requisitioned but not utilised

or delayed (applicable for all tugs irrespective of

their capacity).

 

(i). Non-utilisation of the tug by the hirer for any

reason, other than those exceptional circumstances

under which the hirer has no control and is not at

fault and the tug released within one hour from the

time of reporting for assigned work.

Per tug

2,636.16

101.10

(ii). In the case of the tug being delayed by the

hirer beyond one hour from the time the tug

has reported for work due to reasons other than

exceptional circumstances under which the hirer has

no control and is not at fault.

 

(a). For first one hour.

Per tug

5,272.41

202.20

(b). For every additional half an hour or part thereof.

Per tug

2,144.52

82.25

5

 

 

Cancellation charges in respect of floating craft

mentioned in Sl. No. 2 above, whose services have

been requisitioned but not utilised or delayed. If

cancellation was done without giving 3 hours Notice.

 

(i). Launch (Flat Rate).

Per tug

422.44

16.21

(ii). In respect of Tug (Flat Rate).

Per tug

844.86

32.40

Notes:

(1).

Tug service shall be provided as part of the pilotage service (without any charge) on requisition from

Owners, Agents of vessels for purposes of berthing, un-berthing, shifting, mooring, re-mooring and all connected

works. Tug service provided as part of shifting service shall also be without any charge.

(2).

The tug hire charges in respect of items (iii) and (iv) in serial number (1) includes the cost of ration

to the crew, the services of the crew and the victualling of the officers deputed for salvage or other operations;

but, excludes the cost of insurance plus incidental charges at 20 percent of the insurance premium which will

also be recovered in addition to the rates prescribed.

(3).

(i). If cancellation in respect of floating craft specified in serial number 2 is done without giving two

hours’ notice, hire charges for one hour at the rates applicable to the particular craft shall be levied.

44

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(ii). In the case of delay on the part of the port user in utilising the craft specified in serial number

2 from the time of requisition, the actual hire charges as prescribed for the particular craft shall be levied from

the time indicated in the requisition.

(4).

Additional fees of 50 percent of the charges otherwise leviable shall be recovered for work performed

on Sundays and port non-operating days or between the hours of 6.00 p.m. and 6.00 a.m. In the case of Zone

‘B’ no charges shall be levied for the work performed between the hours of 6.00 p.m. and 6.00 a.m. on port

working days.

(5).

The VOCPA may, at its discretion, hire out the floating craft outside the port limits at the rates prescribed

above.

2.4.

BERTH HIRE FEES

2.4.1. SCHEDULE OF BERTH HIRE CHARGES

Sl.

No.

Particulars

Rate per GRT per hour or part thereof

Coastal vessel

(in Rs )

Foreign- going vessels (in US $)

1

0 to 20,000 GRT

0.1974

0.0078

2

20,001 - 30,000 GRT

0.2389

0.0093

3

30,001 - 60,000 GRT

Rs.6,773.22+ Rs.0.1911 for vessels

above 30,000 and upto 60,000 GRT

$262.13+ $.0.0073 for vessels above

30,000 and upto 60,000 GRT

4

60,001 and above GRT

Rs.12,505.88+ Rs.0.1673 for

vessels above 60,000 GRT

$483.4+ $.0.0064 for vessels above

60,000 GRT

The berth hire charges prescribed above is subject to a minimum charges of Rs.4,738.09 in case of coastal

vessel and US $187.45 per ship in case of foreign-going vessel.

2.4.2. SCHEDULE OF BERTH HIRE CHARGES FOR OTHER VESSELS

Sl.

No.

Particulars

Unit

Rate per hour or part thereof

Coastal vessel

(in Rs )

Foreign-going vessels

(in US $)

1

Non-cargo vessels

Per

vessel

per

hour or part

thereof

0.4778 Minimum of

Rs.11,467.43

0.0186 Minimum of

$ 445.71

2

Craft

registered

under

the

Harbour

Craft Rules of V.O. Chidambaranar Port

Authority (In Rs.)

-do-

1.40

2.28

3

Other Crafts (In Rs.)

-do-

2.00

3.18

4

(A)

Additional Berth Hire Charges after expiry of time given by the Deputy Port Conservator, to vacate the

berth. (notice given atleast 12 hours in advance)

(i). For the first 12 hours

Per hour or part

thereof

2,371.11

90.9291

(ii). For the next 12 hours

-do-

4,744.42

181.9465

(iii). Thereafter

-do-

7,115.51

272.8756

4

(B)

(i) Vessels not calling for Pilot within 2 hours after completion

of discharge or loading operations including lashing /

unlashing operations or pipeline flushing through shorelines

calculated from the time of completion of discharge /

loading / flushing till the time vessels vacate the Berth.

2 times of Berth

Hire charges as

prescribed

in

Schedule 2.4.1

2

times

of

Berth

Hire

charges

as

prescribed

in

Schedule 2.4.1

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

45

Sl.

No.

Particulars

Unit

Rate per hour or part thereof

Coastal vessel

(in Rs )

Foreign-going vessels

(in US $)

(ii) Vessels at any berth shall vacate the berth when port

requires the berth for any other vessel or for any other

purpose failing which such vessel shall attract additional

berth hire from the time of issuance of a notice to this

effect by the Port or its authorized officials.

5 times of Berth

Hire

charges

as

prescribed

in

Schedule 2.4.1

5 times of Berth Hire

charges as prescribed

in Schedule 2.4.1

The charges in Schedule 2.4.2 will not be applicable in case of:

(a). Vessel waiting for tide for safe sailing

(b). Strike by the Port employees

(c). Break down of port equipment

5

(i). Charges for the Lash vessels during

the process of operations of loading

or unloading of cargo.

Per hour or part

thereof

30.06

1.1532

(ii). For barges waiting at safe fleeting area

-do-

10.00

0.3824

6

Berthing fees on sailing vessels and sea-going steam vessels coming alongside the wharves at Zone

‘B’ of the V.O. Chidambaranar Port.

Sailing vessels other than lighters.

(i). During operation period (November

to April)

Per GRT per

hour or part

thereof

0.0680

0.0020

(ii). During lean period (May to October)

Per GRT per

hour or part

thereof

0.0114

0.0004

Notes for Sl. No.6:

(a). If voyage takes place during the lean period, the rate pertaining to operational period will be levied.

(b). When vessel idles during operational period, the rate pertaining to lean period will be levied.(c).

The lean period rates are applicable for the period of repairing at laybuoy (North Pier) of Zone-B.

(iii). Sea going steam vessels.

Per vessel /

per hour or part

thereof

21.28

0.8135

7

Fishing Vessels (Trawlers / Boats)

(i). at finger jetty.

Per vessel /

per hour or part

thereof

24.77

0.9510

(ii). at VOC wharf and additional berth.

- do -

38.95

1.4912

8

Double banking

In respect of a vessel which is double banked with another

vessel occupying a berth it will be charged half of the Berth

hire charges specified at schedule 2.4.1 and 2.4.2.

Note for Schedule 2.4.1 and 2.4.2: Any vessel which continues to occupy any berth after the expiry of the

time given by the Deputy Conservator/Traffic Manager to vacate the berth shall pay additional berth hire charges

at the following rates: -

(i). For the first two days – At four times the rate of berth hire charges for authorised occupation.

(ii). For third day and for subsequent days - At six times the rate of berth hire charges for authorised occupation.

46

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(iii). The additional berth hire charges shall be in addition to normal berth hire charges payable under

the schedule.

Notes:

(1).

The period of hour shall be calculated from the time the vessel occupies berth.

(2).

Berth hire shall stop 4 hours after the time of the vessel signaling its readiness to sail. The time limit

prescribed for cessation of berth hire shall exclude the ship’s waiting time for want of favourable tidal conditions.

There shall be a penal berth hire equal to berth hire charges of one day berth hire charge for a false signal.

(3).

The berth occupancy for each vessel will be determined based on the output norms as given below

for levy of penal berth hire charges:

(i) Productivity Norms for Cargo Handled at IX Berth through HMC:

Sl. No.

Cargo

Proposed Norms

1.

Cattle Feed

7,634

2.

Clinkers

24,892

3.

Coal

33,081

4.

Copper Concentrate

9,078

5.

Gypsum in Bulk

30,352

6.

Iron Ore

34,232

7.

Lime Stones

31,255

8.

MOP

15,476

9.

Peas (Yellow)

7,108

10.

Petroleum Coke

26,914

11.

Rock Phosphate

16,234

12.

Sulphur

8,829

13.

Urea

6,348

14.

Wheat in Bulk

9,162

(ii) Norms for Cargo Handled at all the Berth including Cargo handled through other than HMC at IX Berth:

Sl. No.

Cargo

Proposed Norms

1.

Garnet Sand (Bulk)

6,000

2.

Cashew Nuts in Bags

1,250

3.

Cattle Feed

6,136

4.

Caustic Soda Lye

4,093

5.

Cement in Bags

1,500

6.

Clinkers

10,125

7.

Coal at Coal Jetty II

15,000

8.

Coal at Other Berth

11,589

9.

Copper Concentrate

7,000

10.

Diesel Oil Jetty/Berth

5,561

11.

Diammoniam Phosphate

6,000

12.

Furnace Oil – IOC

6,800

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

47

Sl. No.

Cargo

Proposed Norms

13.

Furnace Oil – SPIC

3,456

14.

General Cargo

1,500

15.

Granite

2,896

16.

Gypsum in Bulk

10,000

17.

Ilmenite (Import)

7,655

18.

Ilmenite (Export)

13,736

19.

Iron And Steel Materials

2,715

20.

Iron Ore

13,000

21.

Lime Stones

10,000

22.

Lime Stone (Small vessels)

3,000

23.

Liquid Ammonia

7,767

24.

Logs

3,640

25.

LPG

4,320

26.

Machineries

631

27.

MOP

9,000

28.

Marble Lumps

3,000

29.

Naptha – IOC

7,500

30.

Maize (Bulk)

4,000

31.

Naptha – SPIC

4,901

32.

Oil Cake / Copra

2,500

33.

Palm Oil

3,740

34.

Peas (Yellow)

4,000

35.

Petroleum Coke

9,609

36.

Phosphoric Acid (Export)

2,420

37.

Phosphoric Acid (Import)

7,948

38.

Rock Phosphate

9,799

39.

Salt in Bulk

7,418

40.

Salt in Bags

2,500

41.

Stone Aggregate

3,537

42.

Stone Dust

2,216

43.

Stone (Rough)

1,571

44.

Sugar (Raw)

7,000

45.

Sugar in Bags

1,500

46.

Sulphur

8,000

47.

Sulphuric Acid

5,481

48.

Urea

6,000

49.

Vinyl Chlorides (VCM)

3,148

50.

Wheat in Bulk

6,300

48

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(iii) The penalty/ incentive for performance is as given hereunder:

Sl. No.

Situation

Penalty / Incentive

1

If the ship stays upto 5% (higher or lower) of the

stipulated time for that commodity as specified in

productivity norms.

Nil

2

Berth stay is more than 5% beyond the stipulated

time for that commodity as specified in productivity

norms.

Penalty at Rs.500/- per hour or part

thereof for every additional hour.

3

Berth stay is 5% lower than the stipulated time for

that commodity as specified in productivity norms.

Incentive at Rs.50/- per hour or part

thereof for every hour of saving in

berth time beyond 5%

Note:

(i)

The penalty provisions will be levied on Stevedores, with the provision that the amount can be

claimed by the Stevedores from the cargo interests (Importer/ Exporter) or vessel owners through their agents,

depending on the reasons thereof. Same way, incentive will be paid to Stevedores. In the case of liquid cargo,

the penal berth hire charges / incentive will be levied on/paid to the ship agent.

(ii). While calculating the performance of the vessel, factors beyond the control of the cargo handler

like cyclone, heavy rain, labour unrest, etc. will be treated as “dies-non”.

(4).

All Tankers carrying oil, petroleum products, chemicals in bulk, lube base stock in bulk shall be charged

berth hire charges at 125% of the charges applicable to relative classification. For calculating priority or ousting

priority charges as per Note-6, the berth hire charges shall be reckoned as 100% of charges applicable as per

relative classification.

(5).

Ousting Priority/Priority Berth Hire Charges:

(i). For providing the priority berthing to any vessel, a fee equivalent to berth hire charges for 24 hours

or 75% of the berth hire charges calculated for the total period of actual stay at the berths, whichever is higher

shall be levied.

(ii). For providing the ousting priority to any vessel, a fee equivalent to berth hire charges for 24 hours

or 100% of the berth hire charges calculated for the total period of actual stay at the berths whichever is higher,

shall be levied.

(6). Charges on lash vessels/ barges.

(i). If the mother vessel is berthed alongside a wharf, all the charges as applicable to other vessels

shall be recoverable.

(ii). If the mother vessel is anchored at outer anchorage within the port limits, Port dues alone shall

be levied.

(iii). If anchored at inner anchorage, all applicable vessel-related charges excluding berth hire shall be

recovered.

(iv). The charges for towing of barges will be recovered as per the rates prescribed for the craft used.

(7).

No berth hire shall be levied for the period when the vessels idle at its berths due to break down of

port equipment or power failure or any other reasons attributable to the port.

2.5.

ANCHORAGE FEES

The following charges shall be levied as anchorage fee for stay of vessel (ship or steamer, sailing vessel,

tugs, launches or other marine crafts) in the port waters within the notified port limits:

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

49

2.5.1. (a) Schedule of Anchorage charges

Sl.

No.

Particulars

Rate per GRT per hour or part thereof

For stay of vessel in any area

inside the harbour basin but without

occupying any of the berths/jetties

either individually or by means of

double banking

For stay of vessel in any area

outside the harbour basin and within

the notified Port Limits of V.O.

Chidambaranar Port Authority.

Coastal vessel

(in Rs )

Foreign - going

vessels (in US$)

Coastal vessel (in

Rs)

Foreign - going

vessels (in US$)

1

Upto and inclusive of

3,000 GRT

0.0236subject to

a minimum of

Rs.46.49

0.0009 subject

to a minimum of

US$1.7817

0.0094 subject

to a minimum of

Rs.18.74

0.0003 subject to

a minimum of US$

0.719

2

3,001 to 10,000 GRT

0.0155 subject

to a minimum of

Rs.70.91

0.0006 subject

to a minimum of

US$2.712

0.0062 subject

to a minimum

Rs.28.53

0.0002 subject

to a minimum of

US$1.094

3

10,001 to 15,000 GRT

0.0203

0.0007

0.0080

0.0003

4

15,001 to 20,000 GRT

0.0251

0.0010

0.0102

0.0003

5

20,001 to 25,000 GRT

0.0341

0.0013

0.0135

0.0004

6

25,001 to 30,000 GRT

0.0374

0.0014

0.0150

0.0006

7

30,001 GRT and above

0.0407

0.0016

0.0162

0.0006

8

Double Banking

In respect of a vessel which is double banked with another vessel occupying a

berth it will be charged half of the anchorage charges specified in the above

schedule.

2.5.1. (b) Anchorage Charges in case Berth is ready but vessel is not ready:

Sl.No

Particulars

Rate per GRT per hour or part thereof

For stay of vessel in any area outside the harbour basin and

within the notified Port Limits of V.O. Chidambaranar Port Authority.

Coastal vessel (in Rs.)

Foreign – going vessels (in US$)

1

Upto and inclusive of 3,000 GRT

0.0176 subject to a minimum of

Rs.34.82

0.0007 subject to a minimum of

US $1.3358

2

3,001 to 10,000 GRT

0.0119 subject to a minimum of

Rs.53.17

0.0004 subject to a minimum of

US $2.0396

3

10,001 to 15,000 GRT

0.0154

0.0006

4

15,001 to 20,000 GRT

0.0187

0.0007

5

20,001 to 25,000 GRT

0.0256

0.0010

6

25,001 to 30,000 GRT

0.0281

0.0011

7

30,001 GRT and above

0.0306

0.0012

Notes:

The above rates are applicable after 48 hrs as per the following condition:

i) Vessels Ready Berth not ready- Charges as per 2.5.1(a) is applicable

ii) Vessel not ready berth ready -Charges as per 2.5.1(b) is applicable

iii) Vessel not ready Berth not ready- Charges as per 2.5.1(b) is applicable

50

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

2.5.2. Schedule of Anchorage charges for other vessels

Sl.

No.

Particulars

Unit

Rate per hour or part thereof

For stay of vessel in

any area inside the

harbour basin but without

occupying any of the

berths/jetties either

individually or by means of

double banking

For stay of vessel in

any area outside the

harbour basin and within

the notified Port Limits of

V.O. Chidambaranar Port

Authority.

Coastal

vessel

(in Rs )

Foreign - going

vessels (in

US$)

Coastal

vessel (in

Rs )

Foreign -

going vessels

(in US$)

1

Non-Commercial

vessels

like

tugs and barges

Per Vessel per

hour or part

thereof

5.92

9.8495

2.35

3.9035

2

Craft

registered

under

the

Harbour Craft Rules of V.O.

Chidambaranar Port Authority

-do-

0.28

0.4652

0.11

0.1816

3

Other Crafts

Per Vessel per

hour or part

thereof

0.40

0.6241

0.16

0.2723

4

(i). Charges for the Lash vessels

during the process of operations

of loading or unloading of cargo.

-do-

5.87

0.2256

2.35

0.0902

(ii). For barges waiting at safe

fleeting area

-do-

1.96

0.0749

0.78

0.0299

5

Berthing fees on sailing vessels and sea-going steam vessels coming alongside the wharves at Zone

‘B’ of the V.O. Chidambaranar Port.

(i). Sailing vessels other than

lighters.

Per GRT per

trip.

0.32

0.0125

0.12

0.0050

(ii). Sea going steam vessels.

Per vessel /

per hour or

part thereof

4.14

0.1591

1.65

0.0637

6

Fishing

Vessels

(Trawlers

/

Boats)

Per GRT per

trip.

(i). at finger jetty.

Per vessel /

per hour or

part thereof

4.84

0.1860

1.96

0.0744

(ii). at VOC wharf and additional

berth.

-do-

7.59

0.2916

3.06

0.1166

7

Double banking

In respect of a vessel which is double banked with another vessel occupying

a berth, it will be charged half of the anchorage charge specified in the

above schedule

Note:

(1).

Anchorage fees will be for stay of vessels for more than 48 hours.

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

51

2.6. Schedule of Lighterage Operation fee in respect of vessels at anchorage:

Sl.

No.

Particulars

Rate per hour or part thereof

Coastal vessel

(in Rs )

Foreign - going vessels (in

US$)

1

0 to 20,000 GRT

0.0405

0.0016

2

20,001 - 30,000 GRT.

0.0443

0.0017

3

30,001 - 60,000 GRT

Rs.1,254.13+ Rs.0.3554 for vessels

above 30,000 and upto 60,000 GRT

$48.79+ $.0.0013 for vessels above

30,000 and upto 60,000 GRT

4

60,001 and above

Rs.2,94,916.60+ Rs.0.0311 for vessels

above 60,000 GRT

$89.65+ $.0.0012 for vessels above

60,000 GRT

5

Double Banking

In respect of a vessel which is double banked with another vessel

occupying a berth it will be charged half of the above charges specified

in the above schedule.

2.7. ADDITIONAL CESS FOR HANDLING VESSELS AT OIL JETTY TOWARDS OIL INDUSTRY SAFETY

DIRECTORATE (OISD) COMPLIANCE:-

Sl.

No.

Description

Unit

Coastal Vessel

(in Rs)

Foreign going

Vessel (In US $)

1

Additional cess for handling vessels at

Oil Jetty towards OISD Compliances

Per GRT

per hour

0.77

0.0164

CHAPTER – III

CARGO RELATED CHARGES

3.1.1. SCHEDULE OF WHARFAGE DUES

Sl.

No.

Cargo

Rates (In Rupees)

Unit of

charge

Zone A

Zone B

Foreign

Coastal

Foreign

Coastal

1

Liquid Bulk (POL)

(i)

Diesel Oil

1 KL

85.12

85.12

85.12

85.12

(ii)

Furnace Oil

1 KL

120.26

120.26

120.26

120.26

(iii)

LPG / LNG / CNG / Propane

/ Butane

1 Cum

218.35

131.01

218.35

131.01

(iv)

Naptha

1 KL

129.52

129.52

129.52

129.52

(v)

Others – Not specified

1 KL

129.52

129.52

129.52

129.52

2

Liquid Cargo

(i)

Caustic Soda Lye

1 KL

72.17

43.29

72.17

43.29

(ii)

Liquid Ammonia

1 MT

157.28

94.38

157.28

94.38

(iii)

Edible Oil

CBM

85.12

51.09

22.20

13.32

(iv)

Phosphoric Acid

1 MT

157.28

94.38

157.28

94.38

(v)

Sulphuric Acid

1 MT

92.52

55.51

92.52

55.51

52

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

Sl.

No.

Cargo

Rates (In Rupees)

Unit of

charge

Zone A

Zone B

Foreign

Coastal

Foreign

Coastal

(vi)

Vinyl Chlorides

1 MT

157.28

94.38

157.28

94.38

(vii)

Molasses

1 MT

75.88

45.52

75.88

45.52

(viii)

Sludge Oil

1 MT

87.17

52.30

43.58

26.14

(ix)

Others – Not specified

1 MT

166.53

99.93

166.53

99.93

3

Dry Bulk – Coal

(i)

All Types of Coal

 

 

 

 

(a)

Charcoal in bags/ bulk.

1 MT

108.55

65.11

78.93

47.37

(b)

Coal by whatever name described

in Customs Document and used

for Thermal Power Plants

1 MT

127.05

127.05

127.05

127.05

(c)

Coal by whatever name described

in Customs Document other than

sl.no.3(b) above.

  1 MT

127.05

76.22

98.92

59.34

(d)

Metallurgical  Coke

1 MT

141.12

84.67

141.12

84.67

(e)

Petroleum Coke

1 MT

141.12

141.12

141.12

141.12

(f)

Wharfage for NTPL Captive facility

1 MT

127.05

127.05

-

-

4

Dry Bulk – Others

(i)

Clinkers

1 MT

108.55

65.11

82.65

49.59

(ii)

Cu. Concentrate

1 MT

158.51

95.10

158.40

95.10

(iii)

Garnet Sand

1 MT

91.88

55.13

78.93

47.37

(iv)

Gypsum In Bulk

1 MT

69.70

41.81

64.15

38.48

(v)

Ilmenite

1 MT

91.88

55.13

78.93

47.37

(vi)

Iron Ore

1 MT

91.88

91.88

78.93

78.93

(vii)

Lime In Bulk

1 MT

91.88

55.13

78.93

47.37

(viii)

Lime Stones / Dolomite / Any

other minerals

1 MT

91.88

55.13

78.93

47.37

(ix)

Potassium Sulphate (MOP, SOP)

1 MT

132.60

79.54

91.88

55.13

(x)

Rock Phosphate

1 MT

117.79

70.68

83.37

50.02

(xi)

Salt in bags / bulk

1 MT

66.00

39.60

64.15

38.48

(xii)

Sugar in bags / in bulk

1 MT

134.44

80.67

115.94

69.58

(xiii)

Sulphur

1 MT

117.79

70.67

84.50

50.70

(xiv)

Urea

1 MT

132.61

79.54

91.88

55.13

(xv)

Food Grains of any kind

1 MT

93.75

56.24

56.24

47.37

(xvi)

Construction Material

1 MT

90.05

54.03

78.93

47.37

(xvii)

Oil Cake / Copra

1 MT

108.55

65.12

78.93

47.37

(xviii)

Cattle feed / All types of Meals

1 MT

78.93

47.37

67.82

40.72

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

53

Sl.

No.

Cargo

Rates (In Rupees)

Unit of

charge

Zone A

Zone B

Foreign

Coastal

Foreign

Coastal

(xix)

Fly Ash

1 MT

90.04

54.03

78.93

47.37

(xx)

Phosphogypsum

1 MT

93.75

56.24

56.24

47.37

(xxi)

Others – Not specified

1 MT

158.51

95.10

158.40

95.10

5

Break Bulk

(i)

Cashew Kernal, Fruits and Nuts

1 MT

132.60

79.54

119.65

71.80

(ii)

Cement

1 MT

121.50

72.91

90.05

54.03

(iii)

Construction Materials

1 MT

90.05

54.03

78.93

47.37

(iv)

Granite

1 MT

149.25

89.55

106.70

64.01

(v)

Iron and Steel Materials

1 MT

121.50

72.91

90.05

54.03

(vi)

Logs / Timber

1 Cum

114.10

68.46

90.05

54.03

(vii)

Machineries

1 MT

330.82

198.50

222.15

133.29

(viii)

Wind Mill Blade, Tower,

Accessories etc

1 MT

511.00

306.60

--

--

(ix)

Food Grains of any kind

1 MT

93.75

56.24

56.24

47.37

(x)

Fly Ash

1 MT

90.04

54.03

78.94

47.37

(xi)

Phosphogypsum

1 MT

93.75

56.24

56.24

47.37

(xii)

Vehicles (other than Ro Ro)

1 MT

330.82

198.50

222.15

133.29

(xiii)

Others – Not specified

1 MT

134.44

80.67

78.94

47.37

6

Container

(i)

20 feet (empty & loaded)

Each

1,900.00

1,140.00

-

-

(ii)

20 to 40 feet (empty & loaded)

Each

2,850.00

1,710.00

-

-

(iii)

Above 40 feet (empty & loaded)

Each

3,800.00

2,280.00

-

-

7

Ro Ro Vessel

(i)

Automobiles through Ro Ro

vessels for handling below 1,600

CC

Nos.

724.48

434.70

724.48

434.70

(ii)

Automobiles through Ro Ro

vessels for handling above 1,600

CC

Nos.

1,448.97

869.37

1,448.97

869.37

8

Bonafide Consumable / Non- Consumable Ship Stores

(i)

Liquid Items

1 KL

For liquid items wharfage specified for relevant item

as per ‘Liquid Bulk’ (POL) category of schedule

3.1.1 (1) is proposed.

(ii)

Other Items

1 MT

134.44

80.67

78.94

47.37

Note to Sl.No:7

For vehicle with laden containers with trailer, the tariff will be collected at composite rate covering both vehicle

as prescribed above and container separately collecting the rate of container as per prevailing Scale of Rates

vide Sl.No.6 of this Schedule.

54

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

Notes:

(1).

Wharfage charges on bulk cargo shall be recovered on the manifested tonnage of the vessels. In the

case of export bulk cargo wharfage can be levied as declared in the EGM or with reference to the entire admitted

quantity whichever is higher even if the EGM quantity is declared less than the admitted quantity. In case of

Import Cargo, wharfage can be levied as declared in the IGM or entire delivered quantity whichever is higher.

(2).

Wharfage shall be payable on all cargoes on every admission to the said Port’s transit areas for shipment.

Additional 25% of the wharfage shall be levied on shut out cargo, if permitted to remain in the custom bound

transit area on Demurrage terms.

(3).

Transhipment:

(i). Goods consigned to Ports other than V.O.C Port as per the Bill of Lading, if landed at V.O.C Port

for transshipment, shall be considered as transshipment cargo so long as it remains within the Port

Custom bound area, and shall pay single wharfage payable on landing.

(ii). For transshipment of cargo from ship to ship (swapping) outside the Port basin, wharfage shall not

be collected. But, both the vessels shall pay 25% of the Port dues and charges of other services

rendered as per the rates prescribed in the Scale of Rates except in respect of food grains manifested

for Indian Ports.

(iii). As regards, transshipment of cargo from vessel to vessel inside the Harbour basin without using

the landing place, the vessels shall pay Port dues and other charges as applicable in full, and 50%

of single wharfage charges.

(iv). If transshipment cargo goes out of the port security area and thereafter comes into the port security

area for loading into the vessel, the same shall not be treated as transshipment cargo and the

cargo shall pay the wharfage again for loading into the vessel.

(v). Cargo transshipment fee @ Rs.5.80/- per tonne will be collected for cargo handled at the anchorage.

(vi). A fee on cargo transfer from vessel to barge or vice versa in the harbour basin will be levied at

50% of the wharfage rate prescribed in Schedule 3.1.1 of the Scale of Rates in addition to the

wharfage leviable on such cargo for handling at berth.

(4).

In case of cargo loaded into a vessel and subsequently unloaded due to various reasons, no wharfage

shall be levied if the cargo is reshipped in the same vessel without leaving the port's premises. Wharfage shall,

however, be levied again if the cargo is reshipped in another vessel.

(5).

Wharfage on goods from vessels in distress:

Item

No.

Classification for purpose of wharfage

Dues payable

(i).

Cargo of other ports landed from vessels in distress

Wharfage rate as prescribed in Schedule

3.1. shall be levied.

(ii).

Cargo that has paid exports wharfage at Tuticorin

but has not been carried to destination.

No wharfage shall be levied at the time of

landing or at the time of reshipment or if

removed out of the VOCPA premises.

(iii).

Cargo of other ports reshipped without having left

the VOCPA premises.

No wharfage shall be levied at the time of

shipment.

(6).

On packages containing articles of miscellaneous character, wharfage charges shall be levied at the rate

applicable to individual cargo items.

(7).

In the case of hazardous cargo, (i.e.) cargo identified as such in International Maritime Dangerous Goods

Code (IMDG), classified as “Goods not otherwise specified”, vide category 1 to 5 of the above schedule, 100

percent of the wharfage shall be recovered over and above the normal dues”.

(8).

The following categories of goods shall be exempted from wharfage charges:

(i). Passenger’s and Seaman’s Bonafide baggage and personal effects accompanying them;

(ii). Empty gunnies and twines sent to ships to facilitate landing or loading of cargoes in bulk order

replacing wet or torn bags;

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

55

(iii). Goods consigned to or by the VOCPA;

(iv). Postal mail bags.

(9). The box rate prescribed for cargo in FCL containers in serial number 6(b) and 6(d) in schedule 3.1.1

above will also apply in the case an LCL (Less than Container Load) container coming in and going out of the

VOCPA as a unit load.

(10). All goods intended for shipment shall be assessed on export application. Similarly, all goods landed

within the limits of port of Tuticorin shall be assessed on import application.

(11). The wharfage shall be calculated on the total tonnage of each item of goods. For this purpose the

gross and if the circumstances require, the net units of each package as specified in the relative invoice or

other shipping document shall be reckoned with, subject to test check by the port authorities. In the absence of

these documents or the specification of the gross units therein, the units actually arrived at by test check shall

be taken as the gross units.

(12). Before classifying any cargo under ‘unspecified category’ in the wharfage schedule, the relevant Customs

classification shall be referred to find out whether the cargo can be classified under any of the specific categories

mentioned in those schedules. For this the relevant Section, Chapter and Heading of the Harmonized System of

Nomenclature (HSN) code of Customs Dept. shall be referred.

(13). Vessels which call at the port, for which IGM and/or EGM are filed for the purposes of Customs Act,

1962 cannot be treated as “cargo” and they are conveyance only, and the port shall not charge wharfage on

such vessels.

(14) Restow – Cargo of other ports landed from vessels and reshipped in the same vessel –wharfage shall

be levied in double the rate under relevant cargo category.

(15) A reduction of Rs.15 per MT and Rs.9 per MT will be applicable on the wharfage charges for the foreign

vessels and coastal vessels of more than 11.5 draft respectively, if the cargo is being handled through HMC at

IX th Berth.

3.1.2. CESS FOR POLLUTION MITIGATING MEASURES / SPILLAGE CHARGES FOR DRY BULK CARGO

Cess for Pollution mitigating measures shall be levied at Rs.11.35/- per M.T in respect of all dry bulk cargoes

excluding cargo handled through closed conveyors within port limits.

Notes:

(a) Dusty cargoes handled through bags shall not attract cess for pollution mitigating measures under schedule

3.1.2

(b) The cess for pollution mitigating measures under schedule 3.1.2 shall be applicable to the dusty cargoes

discharged insideCustom Bound area.

3.2. STEVEDORE AND SHORE HANDLING ROYALTY

Sl. No.

Description

Unit

Rate

Rate

(In Rs.)

1

Stevedore Royalty

Per MT

8.55

2

Shore Handling Royalty

Per MT

6.41

Note:

The above tariff cap will be indexed to inflation and will come into effect from 1st April of the relevant year.

3.3. SCHEDULE OF DEMURRAGE CHARGES

3.3.1. FREE PERIOD

Sl. No.

Particulars

Imports

Exports

1

All Cargoes except Timber Logs.

7 days

30 days

2

Timber Logs

3 days

-

56

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

Notes:

(1).

For the purpose of calculation of free period, Customs holidays and the port’s non-operating days shall

be excluded.

(2).

(i). Free period for imports shall be reckoned with following the date of complete discharge of the

goods from the vessel on to jetties, quays or

wharves.

(ii). When goods are landed from the vessel into lighters, barges or other floating crafts, the three working

days shall be calculated from the date of complete discharge of goods from the lighters, barges or

other floating crafts on the jetties, quays or wharves.

(iii). In the case of salvaged goods, the free days shall be reckoned with from the day following the

date of notification of salvage by the receiver of wrecks in the official Gazette of Tamil Nadu State.

(3).

(i). Free period for all exports except salvaged goods shall commence from the actual date of receipt

of the goods in transit area at Zone A and Zone B.

(ii). In case of salvaged goods (export) free period shall commence from the date on which the goods

are actually salvaged up to the date the vessel commences loading.

(iii). "Demurrage shall be calculated till the date the vessel commences loading"

(4).

Transhipment cargo:

The maximum period as per export cargo will be allowed and thereafter demurrage charges shall be levied

as prescribed for export cargo.

(5).

In the case of cargo shut out by one vessel and subsequently shipped by another vessel or the cargo

not shipped due to cancellation of the voyage of the nominated vessel, the free period applicable shall be as

per the table 3.3.1, from the date of admission excluding Customs holidays, Port’s non-operating days. Thereafter

demurrage charges shall be payable till the goods are shipped.

3.3.2. SCHEDULE OF DEMURRAGE CHARGES

Sl.

No.

Description

Unit

For Zone A

Import (in Rs.)

Export (in Rs.)

1

For the first 15 days.

Per day per

wharfage unit

10.83

8.70

2

Thereafter. (Double Rate)

-do-

21.66

17.41

Note:(i). For Zone ‘B’, 75% of the above rates shall apply.

Notes:

(1).

(i). The transit area shall be the area within the security wall excluding warehouse and open area

licensed for storage of cargo

(ii). Transit area can be treated as area licensed for storage of cargo & vice versa as per trade’s

requirement.

(2).

No export cargo shall be admitted into the port premises without the permission in writing from the

authorised official of the port. Normally, export cargo for a vessel shall be admitted only after the vessel is opened

for exports.

(3).

While calculating the demurrage charges, the unit to be adopted shall be the same as prescribed for

levy of wharfage. Where the wharfage is prescribed on ‘per unit’ or otherwise the demurrage shall be calculated

on the basis of weight of ‘one tonne’.

(4).

A minimum charge as for one tonne/one cubic metre shall be levied.

(5).

Demurrage shall be collected on the basis of the actual weighment as determined by the weighbridge,

and /or the railway receipt as issued by the Railway authority for carrying the cargo.

(6).

Demurrage charges on unclaimed goods shall be charged from the steamer agents upto 2 months from

the date of discharge, if they are not cleared within two months from the date of complete discharge of the

vessel from which they were landed.

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

57

(7).

Once demurrage charges begins to accrue no allowance shall be made for Sundays and port’s non-

operating days.

(8). Delivery of Goods

Goods shall not be delivered to owner or consignee unless all dues leviable thereon, including demurrage

charges are paid.

(9).

Congestion of Goods:

If at any time the VOCPA apprehends a serious congestion in the transit sheds or the transit area which

may affect the rapid transit of goods through the port, it may direct the owners or consignees of any specific

goods to remove such goods from the port premises within a specified period. If the goods are not removed

within that period, the VOCPA may itself remove them and shall restack in any other place at the expense and

at the sole risk of the owners or consignees. Goods so removed shall be charged demurrage fees at the rate

of 100% of the wharfage plus actual handling charges incurred by the port.

(10). Goods detained by Customs:

The period during which the goods are detained by the Commissioner of Customs for the purpose of

analytical test or technical tests, other than ordinary process of appraisement and certified by the Commissioner

of Customs to be not attributable to any fault or negligence on the part of the Exporter, for such periods of

detention, the demurrage charges shall be recovered as under:

First 45 days

:

Free

46 days to 60 days

:

25% of actual demurrage charges

61 days to 90 days

:

50% of actual demurrage charges

Beyond 90 days

:

100% of actual demurrage charges

Actual demurrage charges at full rates shall be worked out as per Scale of Rates at the appropriate slab as

applicable after 45 days and the concessional rate mentioned above shall be applied thereon the full demurrage

charges leviable.

The first 45 days shall be reckoned with as follows:

(i). first 45 days after expiry of free days if cargo is detained by the Customs before expiry of free

days; and,

(ii). first 45 days from the date of detention if cargo is detained by the Customs after accrual of

demurrage charges.

The detention certificate for availing the above concession shall be submitted within a period of six months

from the date of clearance of goods.

Notes:

(i). The above time limits will be inclusive of all holidays.

(ii). The time limits can be relaxed in cases of Acts of God or the extra ordinary circumstances beyond

human control.

(11). Free period of 24 hours is allowed for Cargo stacked at railway siding and there after which charges

will be levied @ 50% of the applicable Demurrage charges.

(12). Demurrage charge on both import and export cargo shall not accrue for the period when the VOCPA

is not in a position to deliver/ship cargo when requested by the user.

3.4.

CHARGES FOR STORAGE OF CARGO ON LICENSE TERMS

Sl.

No.

Particulars

Unit

Rates for Zone A

(in Rs.)

1

COVERED SPACE

 

 

(i). For the first two weeks

Per 10 sq. mtr./week or

part thereof

286.81

58

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

Sl.

No.

Particulars

Unit

Rates for Zone A

(in Rs.)

(ii). For the third and fourth week

-do-

573.61

(iii). For the fifth and sixth week

-do-

860.42

(iv). Thereafter for every subsequent week

-do-

1,003.80

2

MP SHED

Per sq. mtr. / per month

or part thereof

83.18

3

OPEN SPACE

(i). Outside the security wall of the Port.

Per sq. mtr. / per month

or part thereof

12.66

(ii). Within the Security wall of the Port.

-do-

15.85

(iii). Storage of containers outside the security

wall (Storage area to be hired shall not be less

than 2000 square metre)

-do-

8.33

For Zone ‘B’ 75% of the rates prescribed above shall apply.

“Month shall mean a continuous period of 30 days” for the purpose of this schedule.”

Notes:

(1).

No goods shall be stored upon any land or in any shed specified in clause (b) of section 27 of Major

Port Authority Act, 2021, and no such land or shed shall be used except under a license issued for such purpose

by the VOCPA or its authorised official.

(2).

The license issued by the VOCPA shall be in force for the period specified therein.

(3).

Storage fee shall be payable in the manner specified in the licence and failure to pay the rates in

accordance therewith shall attract penal interest as prescribed in point No.(viii) (b) in 1.2. General Terms and

Conditions in Chapter I, on the amount due but not paid. If for any reason, outstanding due with penalty is not

paid within 7 days of its due, the authorised official of the VOCPA shall have the right to terminate the licence

and resume the land or shed allotted there under and in case of such termination or resumption of the land or

shed, the licensee shall on no account be entitled to claim any compensation or to remove or take away the

improvement if any made by him thereof.

(4).

Goods stored on the land or in the shed under the licence shall remain at the licensee’s risk and

V.O. Chidambaranar Port Authority or any of its officers shall not in any manner be liable for any pilferage, theft,

damage or any loss whatsoever thereof.

(5).

The licensee shall not be permitted to sub-let the land or shed covered by the licence or any portion

thereof. For any contravention of this condition, the licence is liable to be cancelled.

(6).

If goods are stored in areas not covered under the licence, double the rate, specified shall be charged

from the licensee for the period from the date of storage till such storage is regularised or the goods are removed.

(7).

Any renewal of the licence issued shall be made only on an application made therefore. An application

for renewal shall be made at least seven days prior to the date of expiry of the licence in case the period of

licence is one year or less than one year, and at least 30 days prior to the date of expiry of the licence in

the case of other licences. Provided that, in the event of no order being passed on an application for renewal

before the date of expiry of the licence, the same shall continue to be valid on the terms and conditions specified

therein till orders are passed on the application for renewal.

(8). Demurrage charges shall be payable on the packing materials such as gunny bags/pallet which are not

cleared as soon as the cargo is exported/Imported and are remaining in the port beyond one day of the date

of complete shipment/discharge of cargo.

(9).

'Goods stacked beyond the prescribed period admissible as per Licence issued and not renewed by the

Port will attract double the rate already applicable for storage fee' from the date following the date of expiry of

Licence.

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

59

(10) For Open space allotted as per 3.4 above for storage of cargo, fee equivalent to one month rent will

be collected as advance and two weeks rent will be collected for covered space as Advance.

3.5.

CHARGES FOR STORAGE OF CARGO IN COVERED AND OPEN SPACE AT MARSHALLING YARD ON

LICENSE TERMS

Sl. No.

Particulars

Unit

Rate in Rs.

A.

Covered Space

 

 

1

First slab of 3 days or part thereof

per 10 sq. mtrs.

185.04

2

Second slab of 3 days or part thereof

per 10 sq. mtrs.

277.56

3

Third slab of 3 days or part thereof

per 10 sq. mtrs.

370.06

4

Fourth slab of 3 days or part thereof

per 10 sq. mtrs.

462.57

5

Fifth slab of 3 days or part thereof

per 10 sq. mtrs.

555.10

6

Thereafter for every subsequent slab of 3 days

or part thereof

per 10 sq. mtrs.

647.62

B.

Open Space Available 9600 Sq. Mtrs.

1

First slab of 3 days or part thereof

per sq. mtr.

1.86

2

Second slab of 3 days or part thereof

per sq. mtr.

2.78

3

Third slab of 3 days or part thereof

per sq. mtr.

3.70

4

Fourth slab of 3 days or part thereof

per sq. mtr.

4.62

5

Fifth slab of 3 days or part thereof

per sq. mtr.

5.55

6

Thereafter for every subsequent slab of 3 days

or part thereof

per sq. mtr.

6.48

Notes:

(i).

The above rates are applicable for both export and import of cargo.

(ii).

Only rail borne cargo is entitled for this facility.

(iii). Ships at berths will avail priority.

(iv).

The above rates are for bagging activities only.

(v).

Allotment will initially be for first 3 days only and renewable for subsequent slabs.

Rail borne bulk cargo without bagging or any other value addition activities will be entitled to 24 hours of

free period from the time of storage admission/landing of the first consignment. Thereafter, rates as per above

slabs will be applicable."

CHAPTER – IV

4.1. CHARGES FOR SPECIAL SERVICES TO REEFER CONTAINERS

Sl.

No.

Particulars

Rate per connection per 4 hours or part thereof

Up to 20’

length (in Rs.)

Above 20’ length

but up to 40’

(in Rs.)

Above 40’

length (in Rs.)

1

Charges for electrical and other installation provided

by the port including the charges for electricity

consumed and monitoring the reefer containers.

196.13

294.18

392.27

60

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

4.2.

SCHEDULE OF STORAGE RENT ON EMPTY AND LOADED CONTAINERS

Sl.

No.

Period of Occupation

Foreign-going vessels

Coastal vessels

Upto 20’

in length

(in US $)

Above 20’

in length

but upto 40’

(in US $)

Above

40’ in

length

(in US $)

Upto 20’

in length

(in Rs.)

Above 20’ in

length but

upto 40’

(in Rs.)

Above 40’

in length

(in Rs.)

1

INSIDE THE SECURITY

WALL

(i)

For Import and Export

Containers

 

 

 

 

 

 

(a). For the first 15 days

Free

Free

Free

Free

Free

Free

(b). From 16th to 22nd day

5.5467

11.0934

16.6512

241.28

482.47

723.74

(c). Thereafter

10.7369

21.4628

32.1887

466.38

932.85

1,399.22

(ii).

For Transhipment

Containers

 

 

 

 

 

 

 

(a). For the first 15 days

(including the date of

landing)

Free

Free

Free

Free

Free

Free

 

(b). From 16th to 30th day

7.4068

14.8135

22.1979

321.69

643.36

964.96

 

(c). Thereafter

11.0934

22.1979

33.3135

482.47

964.96

1,447.53

2

OUTSIDE THE SECURITY

WALL

 

Stacked in the Marshalling

yard and /or in any other

area (From the date of

stacking)

1.3923

2.7844

4.1544

66.83

120.64

180.97

Note:

(1).

Premium to the extent of 25% on storage charges to be levied in case of hazardous containers.

(2).

Free dwell – time (storage) for the import containers shall commence from the day after the day of

landing of the container. On expiry of the free period, storage rent shall be levied upto the time of delivery.

For export containers the free period shall commence from the date the container enters the terminal.

On expiry of the free storage period, storage rent shall be calculated upto the date the container leaves the yard.

(3).

Transhipment \ Re-export laden and empty containers

(i) . The free storage rent period shall commence from the date of completion of discharge after the first

vessel to the date of berthing of the second vessel. If the storage period exceeds the free period, the storage

rent shall be calculated after the expiry of the free period upto the time of lift on.

(ii). In case of containers, the transhipment status shall be extended only to loaded containers. Empty

containers meant for other Ports, if landed at Tuticorin shall not be considered as transhipment. Containers that

are de-stuffed within the security gate shall also not be treated as transhipment containers.

(iii). The concession of transhipment to loaded container shall be withdrawn, if the loaded container goes

out of the transit area.

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

61

4.3.

DEMURRAGE CHARGES FOR CONTAINERISED CARGO

4.3.1. Containerised Import Cargo

Sl.

No.

Particulars

Unit

Rate per day (in

Rs.)

 

(From the date of destuffing)

Per tonne or part

thereof

 

1

First 3 days

- do -

Free

2

For the next 6 days or part thereof.

- do -

3.42

3

For the next 6 days or part thereof.

- do -

5.93

4

Thereafter for every 6 days or part thereof.

- do -

11.75

4.3.2. Containerised Export Cargo

Sl.

No.

Particulars

Unit

Rate per day (in

Rs.)

1

First 15 days

Per tonne or part

thereof

Free

2

For the next 6 days or part thereof.

- do -

2.22

3

For the next 6 days or part thereof.

- do -

4.34

4

Thereafter for every 6 days or part thereof.

- do -

8.70

Notes:

(1).

For the purpose of calculation of free period, Customs holidays and the Board holidays shall be excluded.

(2).

The stuffed cargo removed from the container and cargo meant for stuffing in the container stacked

in transit area other than the space allotted on license basis for that purpose, will be liable for demurrage as

applicable to other cargo specified as below:

(i). Containerised Import cargo:

For purpose of demurrage, the free days for such import cargo de-stuffed with from the container shall count

from the date following the date of stuffed of the import cargo from containers.

(ii). Containerised Export cargo:

For purpose of demurrage, the free days for such export cargo shall be reckoned from the date on which

cargo is admitted in the transit area and demurrage leviable, if any, shall be computed from the day following

the completion of free days till such cargo has been stuffed into containers.

(3).

The storage charges on abandoned FCL containers/shipper owned containers shall be levied upto the

date of receipt of intimation of abandonment in writing or 75 days from the day of landing of the container,

whichever is earlier subject to the following conditions:

(i). The consignee can issue a letter of abandonment at any time.

(ii). If the consignee chooses not to issue such letter of abandonment, the container Agent/MLO can

also issue abandonment letter subject to the condition that,

(a). The Line shall resume custody of container along with cargo and either take back it or remove

it from the port premises; and

(b). The line shall pay all port charges accrued on the cargo and container before resuming custody

of the container.

(iii). The container Agent /MLO shall observe the necessary formalities and bear the cost of transportation

and destuffing. In case of their failure to take such action within the stipulated period, the storage charge on

container shall be continued to be levied till such time all necessary actions are taken by the shipping lines for

destuffing the cargo.

62

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(iv). Where the container is seized/confiscated by the Custom Authorities and the same cannot be

destuffed within the prescribed time limit of 75 days, the storage charges will cease to apply from the day the

Custom order release of the cargo subject to lines observing the necessary formalities and bearing the cost of

transportation and destuffing. Otherwise, seized/confiscated containers should be removed by the line/consignee

from the port premises to the Customs bonded area and in that case the storage charge shall cease to apply

from the day of such removal.

General Notes for schedule 4.1. to 4.3.2

(1). Cargo in containers originally manifested at the Port of shipment landed at wharf for transhipment shall

be charged single wharfage dues payable on landing.

(2). General manifest must be produced immediately to the authorised port Official for verification by a test

check of stuffed cargo in container brought for transhipment.

(3). The applicant shall accept all risks and responsibilities for goods stored at the rental space so allotted,

and shall make his own arrangements for security of the goods stored in such spaces.

(4).

Hire charges for port machineries and appliances whenever utilised by the shipper will be charged

separately according to the rates prescribed in the Scale of Rates.

(5).

Storage charges on container/demurrage charges on cargo shall not accrue for the period when the

VOCPA is not in a position to deliver/ship cargo when requested by the user.

(6).

If operational area is leased on rental to users, storage charges on container/demurrage on cargo stored

therein shall not be levied again.

4.4.

MANDATORY USER CHARGES:

The Mandatory User Charges for the Logistics Data Bank(LDB) service to be rendered by Delhi-

Mumbai Industrial Corridor Development Corporation (DMICDC) in pursuance of MOS communication vide

letter No.PD-140333/34/2017-PD-V dated 6 June 2018 will be governed by separate common adoption Order No.

TAMP/46/2018-MUC dated 24 July 2019 approved by TAMP for common adoption by all Major Port Authority

and BOT terminals.

4.5.

DREDGING LEVY ON CARGO HANDLED AT NORTH CARGO BERTH (NCB) - II:

(1)

Dredging Levy on cargo handled at North Cargo Berth (NCB)- II

Rs.56.71 per tonne

CHAPTER – V

MISCELLANEOUS CHARGES

5.01. SCHEDULE OF WEIGHMENT CHARGES

5.01.01 SCHEDULE OF WEIGHMENT CHARGES for ZONE ‘A’ AND ‘B’

Sl. No.

Particulars

Unit

Rate (in Rs.)

1

TARE weight of the vehicle

Per vehicle

Rs.22.70/-

2

Net weight (Gross – TARE weight)

Per tone (rounded off to the

next higher MT)

Rs.4.31 (subject to a

minimum of Rs.60/-)

5.01.02 SCHEDULE OF WEIGHMENT CHARGES FOR IN-MOTION WEIGH BRIDGE FOR ZONE ‘A’ & ‘B’

Sl. No.

Particulars

Unit

Rate (in Rs.)

1

Empty Wagon

Per Wagon

Rs.50.00

2

Laden Wagon

Per MT

Rs. 4.00

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

63

5.02. CHARGES FOR PORT WHARF CRANE WITH GRAB / HOOK FOR CARGO OPERATIONS

Sl. No.

Particulars

Unit

Foreign/Others

(in Rs.)

***Coastal (in Rs.)

1

20 T Wharf Crane *

Per shift or part

thereof

17,830.48

10,700.00

2

10 T Wharf Crane

-do-

5,000.00

3,000.00

3

6 T Wharf Crane

-do-

3,600.00

2,160.00

* ->50% of the above respective rates is applicable for half shift basis. The above prescribed rates shall be

applicable for all vessels berthed at respective berths.

***The rates prescribed shall be applicable for the Coastal Cargo and containers eligible for concessional tariff

for ship-shore transfer, transfer from/to quay and to/from storage yard.

5.03. CHARGES FOR PORT WHARF CRANE WITH GRAB / HOOK AND OTHER MECHANICAL EQUIPMENTS

FOR NON-CARGO OPERATIONS

Sl. No.

Particulars

Unit

Rates per craft/ equipment /

appliance(in Rs.)

Foreign/Others

(in Rs.)

***Coastal

(in Rs.)

1

Floating Crane.

Per hour or

part thereof.

2,826.50

1,695.90

2

Wharf Crane

(a). Wharf Grab Cranes (20 Tonne)

-do-

6,120.80

3,672.47

(b). Wharf Crane (6 tonnes)

-do-

5,840.66

3,504.40

(c). Wharf Crane (10 tonnes)

-do-

6,335.08

3,801.04

3

Charges for stand by Firefighting

services.

Rates (in Rs.)

(i). For salvage and other purposes.

Per hour or

part thereof.

1,495.88

(ii) For stand by duties

(a). Between 0600 hrs and 1400 hrs.

Per shift or

part thereof.

437.00

(b). Beyond 1400 hrs and 2200 hrs.

Per shift or

part thereof.

655.50

(c). Beyond 2200 hrs to 0600 hrs.

Per shift or

part thereof.

1,309.59

4

Penalty for improper use of appliance.

Every occasion

372.57

*** The rates prescribed shall be applicable for coastal cargo and containers eligible for concessional tariff,

for ship-shore transfer, transfer from / to quay and to / from Storage yard.

Notes:

(1).

In respect of use of the port machineries outside the port limits, a surcharge of 20 percent on the

charges prescribed above shall be levied.

(2). When fire fighting units use foam, the actual cost of foam used in the operation shall be charged extra.

(3).

(i). If the requisition of the equipment is not cancelled before 2 hours of the commencement of the

shift, the charges for the full shift will be recovered.

64

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(ii). On the Board holidays, full charges for the period of requisition will be recovered if written notice

of cancellation is not given during the working hours of the day prior to the date of requisition or when the

equipment is not fully utilised as requisitioned.

(4).

While computing the hire charges, the actual hours of work shall be totalled and rounded off to the

next higher hour after completion of the end of the work. For this purpose the time taken by the machinery to

move from the yard to work spot and back to the yard will be included.

5.04. WAY LEAVE CHARGES:

Sl.

No.

Particulars

Unit.

Rates

(in Rs.)

1

Way leave charges for pipelines, overhead wires and underground

cables.

Per Sq. mtr.

per annum.

2.61

2

Way leave charges for the conveyor system owned by M/s.Tuticorin

Thermal Power Station (TTPS)/ NTPL/ TCTPL, Operators of NCB I

and NCB II in the port area on coal moved through conveyor.

Per Sq. mtr.

per annum.

2.61

For underground cables, 50% of the applicable charges shall be levied.

Notes:

(1).

Areas chargeable under Way Leave Licence shall be arrived based on the following formulae:

(i). For a single pipe line:

Length of the pipe line multiplied by the Diameter (D) of pipe lines plus working space of 30 c.m

(i.e) A=L+(D+30 cms.)

(ii). For more than one pipe:

Length of the pipeline multiplied by the actual distance (D) between the extreme sides of the outer

most pipes plus working space of 30 c.ms. (i.e.) A = L (D + 30 c.ms.)

(iii). For pipe line over pedestal:

Length of the pipeline multiplied by the width (D) of the foundation of the pedastal plus working space

of 30 c.ms. (i.e.) A = L (D + 30 c.ms.)

(iv). For overhead wires:

Length of the overhead line multiplied by the distance (D) between the extreme ends of the longest

street on the pole plus working space of 60 c.ms. (i.e.) A = L (D + 60 c.ms.)

(v). For underground cables: Length of the cable multiplied by 15.c.ms. for each cable laid plus working

space of 90 c.ms. (i.e.) for a single cable A = L (15 c.ms. + 90 c.ms.); for double cable A = L

(2 x 15 c.ms. + 90 c.ms.) and so on.

5.05. RENTAL CHARGES FOR ROOMS FOR USE IN CONNECTION WITH SHIPPING OPERATION AND

STEAMER AGENTS WITHIN CUSTOM BOUND AREA

Sl.

No.

Particulars

Unit

Rates (in Rs.)

1

Rooms

Per Sqm per month or part thereof

100.00

Notes:

(1).

The charges prescribed above are inclusive of water charges.

(2).

Electricity charges shall be levied on actual consumption based on the meter reading.

(3).

The room will normally be allotted by the VOCP on request in writing in the order of priorities of the

dates of receipt of such requests by the parties concerned.

(4).

The allotment of room is subject to cancellation by the authorized official of the VOCP at any time

without prior notice and without assigning any reason thereafter.

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

65

5.06. RENT FOR OCCUPATION OF COMPARTMENTS IN THE COAL MAZDOOR LINES IN THE PORT

PREMISES.

Sl. No.

Particulars

Unit

Rates

(in Rs.)

1

Rent for occupation of compartments by the coal landing

contractors for housing the coal labourers in the coal

mazdoor lines in the foreshore premises.

Per month

or part

thereof

for each

173.94

Note:

The charges prescribed above are inclusive of water charges and electricity charges.

5.07. CHARGES FOR HIRE OF DRY DOCK TO THE OWNERS OF SAILING VESSELS AND TO OTHER

GOVERNMENT DEPARTMENTS FOR DRY DOCKING THEIR VESSELS

Sl.

No.

Particulars

Unit

Rates

(in Rs.)

1

Dry dock services

 

 

(i). For docking the vessels.

 

 

(a). Sailing vessels

Each

8,134.03

(b). Floating Crafts.

- do -

10,217.49

2

For undocking the vessels

- do -

1,965.04

3

Daily hire charges for the Dry Dock

 

(i). For the first ten days.

Per day or part

thereof

655.03

(ii). From 11th day to 20th day.

- do -

971.41

(iii). From 21st day and subsequent days.

- do -

1,310.03

4

Electricity Charges

- do -

22.20

Notes:

Advance Hire Charges

(i).

For I spell of 10 days.

9,463.77

(ii).

For II spell of 10 days

4,257.29

(iii).

For III spell of 10 days.

5,914.35

(1). Daily hire charges shall be levied excluding the day of docking and undocking of the vessels.

(2).

The charges prescribed above include the ship weight and pumping charges; but, do not include charges

for the supply of fresh water, cranes and other facilities.

(3).

(i). The dry dock in normal cases shall be given only for a period of ten days and owners authorised

agents of vessels in dry dock shall endeavour to complete all repair within 10 days period.

(ii). In no case shall the dry dock be kept occupied for more than 30 days.

(iii). When a vessel of an outside party is in the dry dock and the dry dock facility is urgently required

for carrying out any emergency repair to the floating craft of the Port, the owner / authorised agents of vessel

in the dry dock, shall vacate the same within seven days from the receipt of a notice to that effect.

(4).

On allotment of dry dock the hire charges towards docking, undocking and daily hire charges etc., as

stipulated above shall be paid in advance before the vessel can be placed in the dock. If the vessel is to remain

in the dock beyond the initial period of ten days, then further hire charges for the second and third spells of 10

days respectively, shall be paid in advance, as the case may be.

66

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(5). In the event of the vessel not being ready to be docked, or not using the dock on the day notified for

the admission of the vessel into the dock, cancellation charges equivalent to the advance paid in respect of any

vessel as per provision prescribed in note (4) will be charged.

(6).

(i). Prior to the time regulated for the admission of any vessel into the dock, the necessary arrangements

must be carried out by the hirer on board the vessel in consultation with the authorised official of the VOCPA.

(ii).

If on inspection, it is found that necessary arrangements have not been duly carried out, the vessel may

be refused admission into the dock. In such case all expenses incurred by the Port in respect of the docking

of such vessel, shall be borne by the owners/authorised agents of the vessel and shall be adjusted against the

advance paid.

(7). The bill for the use of dry dock will be furnished to the hirer, after undocking of the vessels, who shall

pay the balance charges, if any, due to this Port.

(8).

The VOCPA or its employees shall not be liable for delay caused to or any damages suffered by a

vessel whilst docking or undocking during its stay in the dry dock.

(9).

Vessels of the following dimensions can only be dry docked.

Feet

Metre

Length

120

36.58

Breadth

29

8.84

Draft

6

1.83

(10). Vessels having a draft of 5 feet 6 inches and above can be docked and undocked only at full tides.

In case after completion of repairs, a vessel is held up in the dry dock for want of sufficient tide, such delays

shall be to the account of the owner and he shall pay hire charges at the rates applicable till the vessel is

undocked.

(11). The hirer shall also make good the cost of any damage, repairs or loss to the dock, its appurtenances,

plant, gear tackle, etc, caused by the vessel arising directly or indirectly in the course of the hire.

(12). The hirer of dry dock shall make his own arrangement for watchman duty for the vessels, etc., round

the clock.

(13). (i). The owners of the vessel shall make their own arrangements to carry out repairs to their vessels

at their cost.

(ii).

The facilities of the port’s workshop shall be given on payment of prescribed charges only when spare

capacity is available in the port workshop for taking up repairs.

(14). Whenever a vessel is docked or undocked outside normal working hours of port’s workshop, the over-

time charges if any payable to the departmental staff shall be borne by the hirers of the dry dock in addition to

the usual charges.

(15). Fire protective measures are to be arranged by the hirers at their cost.

(16). The hirer should agree to indemnify the port against all claims for compensation by or on behalf of any

workmen (Coolies or Labourers as the case may be) employed by him in connection with the work under execution

in the premises of dry dock, for injury or death by an accident under the Indian Workmen’s Compensation Act

of 1923 and that the decision of the Commissioner of Workmen’s Compensation with respect to the amount of

such indemnity will be accepted as final.

5.08. CHARGES FOR TAKING PHOTOGRAPHS OR SHOOTING OF FILMS IN THE HARBOUR PREMISES

Sl.

No

Particulars

Unit

Rates (in Rs.)

DAY (6.00 am

to 6.00 pm)

NIGHT (6.00 pm

to 6.00 am)

1

Shooting of film by film making company or private

parties (Inside Green Gate)

Per calendar day

or part thereof

46,366.73

69,550.08

2

Shooting of film by film making company or private

parties (Outside Green Gate)

Per calendar day

or part thereof

37,672.97

56,508.75

Mar. 29, 2023]

TAMIL NADU GOVERNMENT GAZETTE

67

Sl.

No

Particulars

Unit

Rates (in Rs.)

DAY (6.00 am

to 6.00 pm)

NIGHT (6.00 pm

to 6.00 am)

3

For still photographs of export/import cargoes.

- do -

1,162.53

4

Taking videography related to operational activities.

- do -

4,636.11

5

Taking photography related to operational activities.

- do -

581.27

6

Taking photographs of the parties or of the crew

on board, the ships and in case not covered in

case (1) to (4) above.

Each time each

party

147.07

Notes:

(1). (i). The charges prescribed above shall be paid in advance and no refund of such payment shall be

allowed for any failure/ cancellation of the programme

(ii). If the cancellation of programme is at the instance of the Port the charges paid shall be refunded,

subject to claim in time.

(2). The hire charges for any craft and/or appliance of the Port, if any, that are supplied and used by the

film making company or by those taking photographs shall be levied as per the rates prescribed in the Scale of

Rates in addition to charges payable under this schedule.

5.09. HARBOUR ENTRY FEE

Sl.

No.

Particulars

Rate (in Rs.)

Per day

Per month

Half yearly

Yearly

Inside Custom Bound area

1

Light vehicle

28.98

439.00

2,104.00

2,814.00

2

Heavy vehicle

43.47

652.03

3,122.50

4,173.01

3

Equipment

289.79

4,346.88

20,821.57

39,136.42

Outside Custom Bound area

1

Heavy vehicle

28.98

439.00

2,104.00

2,814.00

2

Equipment

231.84

3,477.50

16,663.03

31,312.03

HEP fee for person/Port Users for Zone A & B

#

Particulars

Per day

For 15 days

For 30 days

Yearly

1

Persons/Port Users

28.37

212.78

425.55

1,078.00

2

Visitors

Rs.6.67 per head (Non-student)

Rs.4.76 per head (Student)

Notes:

(1).

The following vehicles will be exempted from the payment of licence fee:

(i). Vehicles belonging to

(a). V.O. Chidambaranar Port Authority and other Major port Authority and

(b). Tuticorin Thermal Power Project.

The above vehicles should obtain general or specific permission from the concerned head of the department

of the port Authority or the Traffic Manager of the port Authority.

(ii). Regular route buses and school buses.

(iii). All vehicles carrying household goods to and from residence of the Harbour colony and other

residences located inside the check gates

68

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI

ON BEHALF OF THE GOVERNMENT OF TAMIL NADU

(a). Licences issued for a day shall be called temporary licence.

(b). The payment of licence fee will not automatically entitle the owner of a vehicle / equipment

for entering the zones.

(c). No refund is permissible for the charges once paid and of the unexpired period of licence.

(d). Whenever damage to the port’s property is caused by any vehicle / equipment plying within

the port premises, the owner of the vehicle/ equipment shall accept liability thereof and pay

the damages resulting there from and the port reserves the right to suspend the operation of

the licence issued or the issue of the licence to the owner or agent of the vehicle / equipment

until such damage is made good.

(e). The port reserves the right to refuse a licence or cancel a licence issued without assigning

any reasons.

(2).

10% of actual cost is fixed as a penalty for late submission of application for renewal of Licence.

(3).

The Unit “Day” for Licence Fee the daily pass means 24 Hours from the time of obtaining Port entry

permit.

5.10. PASSENGER TOLL AND CHARGES FOR VARIOUS TYPES OF VEHICLES ACCOMPANYING PASSENGERS

Sl. No.

Particulars

Unit

Rate (in Rs)

1

Passenger Toll - Domestic

Each

102.12

2

Passenger Toll - Foreign

Each

113.47

5.11. ISSUE OF DUPLICATE COPY OF BILLS AND RECEIPTS, ETC.

Sl. No.

Particulars

Unit

Rate (in Rs)

1

Issue of duplicate copy of bills and receipts etc.

Each

144.90

5.12. CHARGES FOR RECOVERY OF OVERHEAD EXPENSES FOR SUPPLY OF ELECTRICITY BY PORT

Sl. No.

Particulars

Rate (in Rs)

1

Charges for recovery of overhead expenses for supply

of electricity by port

2.04 per unit of electricity consumed

PERFORMANCE STANDARD

Sl. No.

Performance Parameters

Proposed performance

standards

1

Cargo Related Services

(a)

Output per ship berth day (In MT)

15,514

2

Vessel Related Services

(i) (a)

Average Turnaround Time of Vessels (in hours)

50.16

(b)

Average Turnaround Time of Vessels (in days)

2.09 days

(ii)

Average Pre-Berthing Time of Vessels (in hours)

14.00

Thoothukudi,

ASHOKA KUMAR SAHU,

16th March 2023.

Financial Adviser & Chief Accounts Officer

V.O.Chidambaranar Port Authority.