DTP—III-2 (22)
TAMIL NADU
GOVERNMENT GAZETTE
PUBLISHED BY AUTHORITY
No. 22]
CHENNAI, WEDNESDAY, MAY 29, 2024
Vaikasi 16, Kurothi, Thiruvalluvar Aandu–2055
[29]
©
[Regd. No. TN/CCN/467/2012-14.
GOVERNMENT OF TAMIL NADU
[R. Dis. No. 197/2009.
2024
[Price: Rs. 1.60 Paise
Part III—Section 2
Statutory Notifications and Orders issued by
Heads of Departments.
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
Pages
INDIAN RAILWAYS
Energisation Notice .. .. .. ..
30-31
CONTENTS
30
TAMIL NADU GOVERNMENT GAZETTE
[Part III—Sec. 2
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
INDIAN RAILWAYS
ENERGISATION NOTICE
“PUBLIC NOTIFICATION’’
(No. E. 320/X/CRS Vol.XIII/01)
Pro forma 10-01
No. SRO C-8/2024.—
Notice is hereby given to all users of Railway lines and premises situated on the completed section of the
under-noted sections of the Southern Railway that the 25000 Volt. 50 Hz, ac, single phase overhead traction wires
will be energised on or after the date specified against the Sections. On and from the same date the overhead
traction line shall be treated as "LIVE" at all times and no unauthorised person shall approach or work in the
proximity of the said overhead line.
Section
Date
Energisation of Overhead Equipment on the newly laid Road Nos. 5,
6 and 7 and connected cross overs as part of yard modification work
at WALAJAH ROAD Junction from OHE Mast Location No.120/05A
(km/Ch: 120/160.00) to OHE Mast Location No. 118/09 (km/ch:118/198.00) at
Ranipet end at 25kV AC single phase 50Hz supply system on Arakkonam-
Jolarpettai section in Chennai Division of Southern Railway.
6-02-2024
Egmore, Chennai- 600 008,
S.A. KUMAR,
24th May 2024.
Deputy Chief Electrical Egineer/OHE,
for Chief Electrical Engineer/Construction,
Southern Railway.
INTRODUCTION OF ac 25 kV TRACTION
"WARNING to ROAD USERS"
(No. E. 320/X/CRS Vol.XIII/01)
Pro forma 10-02
No. SRO C-9/2024.—
It is notified for information of the public that in connection with introduction of 25 kV ac electric traction on
the newly laid Road Nos. 5, 6 and 7 and connected cross overs, as part of yard modification work at WALAJAH
ROAD Junction from OHE Mast Location No. 120/05A(km/Ch: 120/160.00) to OHE Mast Location No. 118/09
(km/ch:118/198.00) at Ranipet end at 25kV AC single phase 50Hz supply system on Arakkonam- Jolarpettai section
in Chennai Division of Southern Railway, height gauges have been erected at all the level crossings with clear
MAXIMUM HEIGHT OF 4.78m above road Ievel with a view to prevent loads of excessive height from coming
into contact or in dangerous proximity to live traction wire (CONTACT WIRE), WHICH SHALL BE AT A HEIGHT
OF MINIMUM 5.5m ABOVE THE RAIL LEVEL AT LEVEL CROSSINGS.
Public are hereby notified to observe the height specified above for the purpose of loading vehicles and to
see that the loads carried in road vehicles do not infringe the height gauges under any circumstances,.
The dangers of a load of excessive height are as follows:
(i) Danger to the height gauge and consequent obstruction to the road as well as the railway line.
(ii) Danger to the materials or equipment carried or for the vehicle itself.
(iii) Danger of fire and risk of life due to contact with or in dangerous proximity to the conductors.
[No. E.320/X/CRS vol. XIII]
S.A. KUMAR,
Egmore, Chennai- 600 008.
Deputy Chief Electrical Engineer/OHE,
24th May 2024.
for Chief Electrical Engineer/Construction,
Southern Railway.
May 29, 2024]
TAMIL NADU GOVERNMENT GAZETTE
31
“PUBLIC NOTIFICATION’’
Pro forma 10-01
No. SRO C-10/2024.—
Notice is hereby given to all users of Railway lines and premises situated on the completed section of the
under-noted sections of the Southern Railway that the 25000 Volt. 50 Hz, ac, single phase overhead traction wires
will be energised on or after the date specified against the Sections. On and from the same date the overhead
traction line shall be treated as "LIVE" at all times and no unauthorised person shall approach or work in the
proximity of the said overhead line.
Section
Date
Energisation of Overhead Equipment on the newly laid Road
No. 8, Road No.11 and Spur lines with connected cross overs
at Tambaram Yard, as part of Tambaram Coaching Terminal
Stage-II modification work, from OHE Mast Location No.27/15-16
(km/ch:27/365.90) to OHE Mast Location No. 29/28B-29B (km/
ch:29/736.10) at 25kV AC single phase 50Hz supply system in
Chennai Divisions of Southern Railway.
28-02-2024
Egmore, Chennai- 600 008,
S.A. KUMAR,
24th May 2024.
Deputy Chief Electrical Engineer/OHE,
for Chief Electrical Engineer/Construction,
Southern Railway.