[103]
TAMIL NADU
GOVERNMENT GAZETTE
PUBLISHED BY AUTHORITY
DTP—VI-2 (38)
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
CONTENTS
No. 38]
CHENNAI, WEDNESDAY, SEPTEMBER 24, 2025
Purattasi 8, Visuvaavasu, Thiruvalluvar Aandu–2056
Part VI—Section 2
Notifications of interest to a section of the public
issued by Heads of Departments, etc.
© [Regd. No. TN/CCN/467/2012-14.
GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009.
2025 [Price: Rs. 4.00 Paise.
Pages.
TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI-600 032.
Amendments to the Tamil Nadu Electricity Regulatory Commission (Renewable Energy
Purchase Obligation) Regulations, 2025.
..
..
..
..
..
..
104-111
TAMIL NADU GOVERNMENT GAZETTE
104
[Part VI—Sec. 2
TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI-600 032.
Amendments to the Tamil Nadu Electricity Regulatory Commission
(Renewable Energy Purchase Obligation) Regulations, 2025.
(Notification No.TNERC/RPO/1-2/2025, dated 26-08-2025)
(Lr.No. TNERC/Legal/1371/D.No.1164/2025)
No. VI(2)/22/2025.
In exercise of the powers conferred by Section 181 read with Sections 61(h), 66 and 86(1)(e) of the Electricity
Act, 2003 (Central Act 36 of 2003) and all other powers enabling it in this behalf, the Tamil Nadu Electricity
Regulatory Commission hereby makes the following amendments to the Tamil Nadu Electricity Regulatory Commission
(Renewable Energy Purchase Obligation) Regulations, 2023 (herein referred to as the Principal Regulations) and the
draft of the same having been previously published as required by sub-section (3) of Section 181 of the said Act.
Amendments
1. (a) These Regulations may be called Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase
Obligation) (Amendment) Regulations, 2025;
(b) It shall come into force from April 01, 2024 as per the Notifications dated 20-10-2023 and 16-04-2025 of the
Ministry of Power, Government of India.
2. Amendment to the Regulation 4 of the Principal Regulations:
In the Principal Regulations, in Regulation 4, the sub-Regulation (3) shall be substituted as follows:
“The Renewable Consumption Obligation (RCO) and conditions notified by the Ministry of Power, Government of India
from time to time shall ordinarily be applicable to the obligated entities / designated consumers as defined in the Energy
Conservation Act, 2001 as amended from time to time. Notwithstanding the above, the Commission may either on its
own motion or on the recommendation of the State Agency or on receipt of an application from the Distribution Licensee,
revise the RPO/RCO percentage and the conditions as notified by the Ministry of Power, Government of India as deemed
appropriate considering the State specific issues, in which case the RPO/RCO prescribed by the Commission shall prevail
over the RCO prescribed by the Ministry of Power, Government of India.
3. Amendment to the Regulation 9 of the Principal Regulations:
In the Principal Regulations, in Regulation 9, the sub-Regulation (2) shall be substituted as follows:
“(2) Where any obligated entity as mandated in the Regulation 3 of the Principal Regulations or designated consumer
fail to comply with the obligation to purchase/consume the required percentage of power from renewable energy sources
or to purchase the renewable energy certificates, it shall be liable for penalty as may be decided by the Commission under
section 142 of the Electricity Act, 2003 or Section 26 of the Energy Conservation Act, 2001 as the case may be:
Provided that in case of bonafide difficulty in complying with the renewable purchase obligation owing to non-availability
of certificates, it is open for the obligated entity to represent to the Commission requesting permission to carry forward of
compliance requirement to the next year for consideration by the Commission on merit.”
4. Amendment to the Annexure-I of the Principal Regulations:
In the Principal Regulations, the Annexure -I shall be substituted as follows:
“Annexure-I (Minimum percentage for Renewable Purchase Obligation)
(1) Every obligated entity as mandated in the Regulation 3 shall purchase energy from renewable energy sources
under the Renewable Purchase Obligation (RPO) and the designated consumers shall consume energy from renewable
energy sources under the Renewable Consumption Obligation (RCO) as mandated under the Energy Conservation Act,
2001 as under:-
Sep. 24, 2025]
TAMIL NADU GOVERNMENT GAZETTE
105
Sl.
No.
Year
Wind Renewable
Energy
Hydro Renewable
Energy
Distributed
Renewable Energy
Other Renewable
Energy
Total Renewable
Energy
(1)
(2)
(3)
(4)
(5)
(6)
(7)
1
2024-25
0.67%
0.38%
1.50%
27.35%
29.91%
2
2025-26
1.45%
1.22%
2.10%
28.24%
33.01%
3
2026-27
1.97%
1.34%
2.70%
29.94%
35.95%
4
2027-28
2.45%
1.42%
3.30%
31.64%
38.81%
5
2028-29
2.95%
1.42%
3.90%
33.10%
41.36%
6
2029-30
3.48%
1.33%
4.50%
34.02%
43.33%
Note 1: The wind renewable energy component shall be met by energy produced from Wind Power Projects (WPPs)
commissioned after the 31st March, 2024.
Note 2: The hydro renewable energy component shall be met only by energy produced from Hydro Power Projects
[including Pump Storage Projects (PSPs) and Small Hydro Projects (SHPs)], commissioned after the 31st March, 2024:
Provided that the hydro renewable energy component may also be met out of the free power being provided to the
State/DISCOM from the Hydro Power Projects commissioned after the 31st March, 2024:
Provided further that the Hydro Renewable Energy component may also be met from Hydro Power Projects located
outside India as approved by the Central Government on a case to case basis.
Note 3: The distributed renewable energy component shall be met only from the energy generated from renewable
energy projects that are less than 10 MW in size and shall include solar installations under all configurations such as net
metering, gross metering, etc. and other RE sources as notified by the Commission from time to time.
Provided that the compliance against distributed renewable energy shall ordinarily be considered in terms of energy
(Kilowatt hour units):
Provided further that in case the designated consumer (as per the Energy Conservation Act, 2001) is unable to
provide generation data against distributed renewable energy installations, the reported capacity shall be transformed into
distributed renewable energy generation in terms of energy by a multiplier of 4 units per kilowatt per day (kWh/kW/day).
Provided further that in case of distributed renewable energy installations installed by various prosumers in the
Distribution Licensee area and if the such Distribution Licensee is unable to assess the quantum of generation due to
non-availability of generation data, the generated units shall be arrived in terms of energy by a multiplier of 4 units per day
for RPO counting of the Distribution Licensee.
Note 4: The other renewable energy component may be met by energy produced from any renewable energy power
project other than specified in Note 1, 2 and 3 and shall comprise energy from all WPPs and Hydro Power Projects
[including Pump Storage Projects (PSPs) and Small Hydro Projects (SHPs)], including free power, commissioned before
the 1st April, 2024.
a)
Any shortfall in achievement of stipulated wind renewable energy consumption in a particular year may be met
with hydro renewable energy which is in excess of that energy component for that year and vice versa.
b)
The balance excess energy consumption under wind renewable energy or hydro renewable energy component
in that year, may be considered as part of other renewable energy component.
c)
Any excess energy consumption under Other renewable energy component in a particular year, may be utilised to
meet the shortfall in achievement of stipulated Wind renewable energy or Hydro renewable energy consumption.
d)
The designated consumers as per the Energy Conservation Act, 2001 who are open access consumers or
consumers with Captive Power Plants shall fulfill their obligation as per the specified total renewable energy
target irrespective of the non-fossil fuel source. The Bureau of Energy Efficiency / State Designated Agency
designated by the State Government shall enforce the applicable provisions of Energy Conservation Act, 2001
including minimum share of consumption of non-fossil sources (renewable energy) by the designated consumers.
e)
The specified renewable energy consumption targets shall be met either directly or through Certificate in
accordance with the Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy
Certificates for Renewable Energy Generation) Regulations, 2022 and amendments issued from time to time:
TAMIL NADU GOVERNMENT GAZETTE
106
[Part VI—Sec. 2
Provided that any shortfall in specified renewable energy consumption targets shall be treated as non-compliance
and consequence of default shall be as per the Regulation 9 of this Regulation.
f)
The State Agency (TN SLDC) / Tamil Nadu Green Energy Corporation (TNGEC) shall maintain data related to
compliance of renewable energy utilisation by the obligated entities and submit report to Commission quarterly
as per the format communicated by the Commission from time to time.”
(By Order of the Commission)
Chennai-600 032,
S. JOHN SUNDARARAJ,
4th September 2025.
Secretary (In-charge),
Tamil Nadu Electricity Regulatory Commission.
Sep. 24, 2025]
TAMIL NADU GOVERNMENT GAZETTE
107
Explanatory Statement
1. The Commission has notified Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase
Obligation) Regulations, 2023 vide Notification No. TNERC/RPO/01/2023, dated 27-09-2023, which came into effect from
15-11-2023. The RPO Trajectory in the TNERC RPO Regulations, 2023 was fixed based on the MoP RPO Trajectory
notification dated 22-07-2022. The earlier TNERC (Renewable Energy Purchase Obligation) Regulations, 2010 was
repealed.
2. In the meantime, the MoP vide notification dated 20-10-2023 has notified Renewable Consumption Obligation
applicable to the Designated Consumers (including Distribution Licensee) under clauses (n) and (x) of Section 14 of the
Energy Conservation Act, 2001 (52 of 2001). The notification also prescribes that it shall come into force on the 1st day
of April, 2024 and till such time, the RPO trajectory specified in paragraphs 5 to 14 vide MoP Order No. 9/13/2021-RCM,
dated 22-07-2022 read with Corrigendum, dated 19-09-2022 shall remain in force.
3. Further, the MoP vide F.No. 09/01/2025-RCM, dated 16-04-2025 has clarified that after notification of RCO dated
20-10-2023 under Energy Conservation Act, 2001, all the earlier notifications related to RPO issued by MoP including
clarification vide order No. 30/04/2018-R&R dated 01-10-2019 related to captive users have been superseded and are
not applicable w.e.f 01-04-2024. The MoP has clarified that all the designated consumers, including Captive users, are
required to comply with the specified RCO targets under the said notification and any deviation from such targets would
be considered as non-compliance and would be liable for action as per provisions under Energy Conservation Act, 2001,
as amended from time to time.
4. It is also to be noted that the Central Electricity Authority in their Reports on Resource Adequacy Plan for various
States including Tamil Nadu has considered only RCO trajectory notified by MoP in their order dated 20-10-2023 to fulfill
the RPO by the States.
5. In view of the above, this amendment is issued to the TNERC (Renewable Energy Purchase Obligation) Regulations,
2023 after due consideration of the RCO trajectory notified by the MoP vide order dated 20-10-2023 and consultation of
the stakeholders.
(By Order of the Commission)
Chennai-600 032,
S. JOHN SUNDARARAJ,
4th September 2025.
Secretary (In-charge),
Tamil Nadu Electricity Regulatory Commission.
TAMIL NADU GOVERNMENT GAZETTE
108
[Part VI—Sec. 2
Statements showing existing provisions and provisions as amended
Amendment to TNERC (Renewable Energy Purchase Obligation) Regulations, 2023
Sl
No.
Existing Regulation
Regulation as amended
1.
4. Renewable Purchase Obligation.-
(1) xxx
(2) xxx
(3) Notwithstanding the above, the Commission may
either on its own motion or on the recommendation
of the State Agency or on guidelines issued by the
Ministry of Power or on receipt of an application
from the Distribution Licensee, revise the RPO
percentage specified in the Annexure-I of these
Regulations as deemed appropriate.
(1) xxx
(2) xxx
(3) The Renewable Consumption Obligation and conditions
notified by the Ministry of Power, Government of India
from time to time shall ordinarily be applicable to the
obligated entities / designated consumers as defined in
the Energy Conservation Act, 2001. Notwithstanding the
above, the Commission may either on its own motion
or on the recommendation of the State Agency or on
receipt of an application from the Distribution Licensee,
revise the RPO/RCO percentage and the conditions as
notified by the Ministry of Power, Government of India
as deemed appropriate considering the State specific
issues, in which case the RPO/RCO prescribed by the
Commission shall prevail over the RCO prescribed by
the Ministry of Power, Government of India.
2.
9. Consequence of default.-
(1) xxx
(2) Where any obligated entities fails to comply with
the obligation to purchase the required percentage
of power from renewable energy sources or to
purchase the renewable energy certificates, it shall
also be liable for penalty as may be decided by
the Commission under Section 142 of the Act:
Provided that in case of bonafide difficulty in
complying with the renewable purchase obligation
owing to non-availability of certificates, it is
open for the obligated entity to represent to the
Commission requesting permission to carry forward
of compliance requirement to the next year for
consideration by the Commission on merit.
9. Consequence of default.-
(1) xxx
(2) Where any obligated entity as mandated in the
Regulation 3 of the Principal Regulations or designated
consumer fail to comply with the obligation to purchase/
consume the required percentage of power from
renewable energy sources or to purchase the renewable
energy certificates, it shall be liable for penalty as may
be decided by the Commission under Section 142 of
the Electricity Act, 2003 or Section 26 of the Energy
Conservation Act, 2001 as the case may be:
Provided that in case of bonafide difficulty in complying
with the renewable purchase obligation owing to non-
availability of certificates, it is open for the obligated entity
to represent to the Commission requesting permission
to carry forward of compliance requirement to the next
year for consideration by the Commission on merit.
3.
Annexure-I ( Minimum percentage for Renewable
Purchase Obligation)
(1) Every obligated entity including distribution
licensee, consumers owning captive power plant
and open access consumers including short
term open access consumers in the state of
Tamil Nadu, shall purchase energy from renewable
energy sources under the Renewable Purchase
Obligation (RPO) as under: -
“Annexure-I (Minimum percentage for Renewable
Purchase Obligation)
(1) Every obligated entity as mandated in the Regulation
3 shall purchase energy from renewable energy sources
under the Renewable Purchase Obligation (RPO)
and the designated consumers shall consume energy
from renewable energy sources under the Renewable
Consumption Obligation (RCO) as mandated under the
Energy Conservation Act, 2001as under: -
Sep. 24, 2025]
TAMIL NADU GOVERNMENT GAZETTE
109
Year
Wind
RPO
HPO
Other
RPO
Total
RPO
2023-24
1.60%
0.66%
24.81%
27.08%
2024-25
2.46%
1.08%
26.37%
29.91%
2025-26
3.36%
1.48%
28.17%
33.01%
2026-27
4.29%
1.80%
29.86%
35.95%
2027-28
5.23%
2.15%
31.43%
38.81%
2028-29
6.16%
2.51%
32.69%
41.36%
2029-30
6.94%
2.82%
33.57%
43.33%
(a) Wind RPO shall be met only by energy
produced from Wind Power Projects
(WPPs), commissioned after 31st March
2022. Further, Wind RPO may also be
met from the wind energy consumed
over and above 7% of the total energy
consumption, from WPPs commissioned
till 31.03.2022.
(b) Hydro power Purchase Obligation
(HPO) are to be met from Large Hydro
Power Projects (LHPs) or Small Hydro
Power Projects (SHPs) including Pumped
Storage Projects (PSPs), commissioned
after 8th March 2019.
(c) Other RPO may be met by energy
produced from any RE power project not
mentioned in (a) and (b) above.
(2) From FY 2022-23 onwards, the energy from all
Hydro Power Projects (HPPs) will be considered
as part of RPO. The HPO trajectory, as has been
notified earlier will continue to prevail for Hydro
Power Projects (including PSPs and Small Hydro
Projects (SHPs)) commissioned after 8th March
2019. Energy from all other HPPs including free
power from HPPs commissioned before 8th March,
2019 will be considered as part of RPO under
category of ‘other RPO’.
(3) RPO shall be calculated in energy terms as
a percentage of total consumption of electricity.
(4) HPO obligations may be met from the power
procured from eligible Hydro Power Projects
(including PSPs and Small Hydro Projects (SHPs))
commissioned on and after 8th March, 2019 to
31st March, 2030.
Large Hydro Power Projects (LHPs) means hydro
Power Projects with more than 25 MW installed
capacity and Small Hydro Projects (SHPs) means
hydro power projects of installed capacity up to
25 MW.
Sl.
No.
Year
Wind
Renew
able
Energy
Hydro
Renew
able
Energy
Distributed
Renew
able
Energy
Other
Renew
able
Energy
Total
Renew
able
Energy
(1)
(2)
(3)
(4)
(5)
(6)
(7)
1
2024-25
0.67%
0.38%
1.50%
27.35%
29.91%
2
2025-26
1.45%
1.22%
2.10%
28.24%
33.01%
3
2026-27
1.97%
1.34%
2.70%
29.94%
35.95%
4
2027-28
2.45%
1.42%
3.30%
31.64%
38.81%
5
2028-29
2.95%
1.42%
3.90%
33.10%
41.36%
6
2029-30
3.48%
1.33%
4.50%
34.02%
43.33%
Note 1: The wind renewable energy component shall
be met by energy produced from Wind Power Projects
(WPPs) commissioned after the 31st March, 2024.
Note 2: The hydro renewable energy component shall
be met only by energy produced from Hydro Power
Projects [including Pump Storage Projects (PSPs) and
Small Hydro Projects (SHPs)], commissioned after the
31st March, 2024:
Provided that the hydro renewable energy component
may also be met out of the free power being provided
to the State/DISCOM from the Hydro Power Projects
commissioned after the 31st March, 2024:
Provided further that the Hydro Renewable Energy
component may also be met from Hydro Power Projects
located outside India as approved by the Central
Government on a case to case basis.
Note 3: The distributed renewable energy component
shall be met only from the energy generated from
renewable energy projects that are less than 10 MW
in size and shall include solar installations under all
configurations such as net metering, gross metering, etc.
and other RE sources as notified by the Commission
from time to time.
Provided that the compliance against distributed renewable
energy shall ordinarily be considered in terms of energy
(Kilowatt hour units):
Provided further that in case the designated consumer
(as per the Energy Conservation Act, 2001) is unable
to provide generation data against distributed renewable
energy installations, the reported capacity shall be
transformed into distributed renewable energy generation
in terms of energy by a multiplier of 4 units per kilowatt
per day (kWh/kW/day).
TAMIL NADU GOVERNMENT GAZETTE
110
[Part VI—Sec. 2
(5) HPO obligation of the State/Distribution
Licensee may be met out of the free power
being provided to the State from Hydro Power
Projects (including PSPs) and Small Hydro Projects
(SHPs), commissioned after 8th March, 2019 as
per agreement at that point of time excluding the
contribution towards Local Area Development Fund
(LADF), if consumed within the State/ Distribution
Licensee. Free power (not that contributed for
Local Area Development) shall be eligible for
HPO benefit.
(6) In case, the free power mentioned above is
insufficient to meet the HPO obligations, then
the State would have to buy the additional hydro
power to meet its HPO obligations or may have
to buy the corresponding amount of Renewable
Energy Certificate corresponding to Hydro Power.
(7) The above HPO trajectory shall be trued up
on an annual basis depending on the revised
commissioning schedule of Hydro projects.
(8) Hydro power imported from outside India shall
not be considered for meeting HPO.
(9) Any shortfall remaining in achievement of
‘Other RPO’ category in a particular year can
be met with either the excess energy consumed
from WPPs, commissioned after 31st March 2022
beyond ‘Wind RPO’ for that year or with excess
energy consumed from eligible Hydro Power
Projects (including PSPs and Small Hydro Projects
(SHPs)), commissioned after 8th March 2019 beyond
‘HPO’ for that year or partly from both. Further,
any shortfall in achievement of ‘Wind RPO’ in a
particular year can be met with excess energy
consumed from Hydro Power Plants, which is in
excess of ‘HPO’ for that year and vice versa.
(10) The following percentage of total energy
consumed shall be renewable energy along with/
through storage.
FY
Storage (On energy basis)
2023-24
1.0%
2024-25
1.5%
2025-26
2.0%
2026-27
2.5%
2027-28
3.0%
2028-29
3.5%
2029-30
4.0%
Provided further that in case of distributed renewable
energy installations installed by various prosumers in the
Distribution Licensee area and if the such Distribution
Licensee is unable to assess the quantum of generation
due to non-availability of generation data, the generated
units shall be arrived in terms of energy by a multiplier
of 4 units per day for RPO counting of the Distribution
Licensee.
Note 4: The other renewable energy component may
be met by energy produced from any renewable energy
power project other than specified in Note 1, 2 and 3
and shall comprise energy from all WPPs and Hydro
Power Projects [including Pump Storage Projects (PSPs)
and Small Hydro Projects (SHPs)], including free power,
commissioned before the 1st April, 2024.
(a) Any shortfall in achievement of stipulated wind
renewable energy consumption in a particular year may
be met with hydro renewable energy which is in excess
of that energy component for that year and vice versa.
(b) The balance excess energy consumption under
wind renewable energy or hydro renewable energy
component in that year, may be considered as part
of other renewable energy component.
(c) Any excess energy consumption under Other
renewable energy component in a particular year, may
be utilised to meet the shortfall in achievement of
stipulated Wind renewable energy or Hydro renewable
energy consumption.
(d) The designated consumers as per the Energy
Conservation Act, 2001 who are open access consumers
or consumers with Captive Power Plants shall fulfil their
obligation as per the specified total renewable energy
target irrespective of the non-fossil fuel source. The
Bureau of Energy Efficiency / State Designated Agency
designated by the State Government shall enforce the
applicable provisions of Energy Conservation Act, 2001
including minimum share of consumption of non-fossil
sources (renewable energy) by the designated consumers.
(e) The specified renewable energy consumption targets
shall be met either directly or through Certificate in
accordance with the Central Electricity Regulatory
Commission (Terms and Conditions for Renewable
Energy Certificates for Renewable Energy Generation)
Regulations, 2022 and amendments issued from time
to time:
Provided that any shortfall in specified renewable
energy consumption targets shall be treated as non-
compliance and consequence of default shall be as
per the Regulation 9 of this Regulation.
Sep. 24, 2025]
TAMIL NADU GOVERNMENT GAZETTE
111
(11) The Energy Storage Obligation in para (10)
above shall be calculated in energy terms as a
percentage of total consumption of electricity and
shall be treated as fulfilled only when at least 85%
of the total energy stored in the Energy Storage
System (ESS), on an annual basis, is procured
from renewable energy sources.
(12) The Energy Storage Obligation to the extent
of energy stored from RE sources shall be
considered as a part of fulfillment of the total
RPO as mentioned in para 1 above.
(13) Minimum percentage for Renewable Power
Purchase Obligation for each category mentioned
in para 1 and para 10 of this Schedule shall have
to be met separately subject to the conditions
specified in the Regulations and this Schedule.
(14) The provisions contained in this Annexure
shall, unless revised earlier by the Ministry of
Power, Government of India, be applicable in
respect of the period up to 31st March, 2030.
(f) The State Agency (TN SLDC) / Tamil Nadu Green
Energy Corporation (TNGEC) shall maintain data related
to compliance of renewable energy utilisation by the
obligated entities and submit report to Commission
quarterly as per the format communicated by the
Commission from time to time.”
(By Order of the Commission)
Chennai-600 032,
S. JOHN SUNDARARAJ,
4th September 2025.
Secretary (In-charge),
Tamil Nadu Electricity Regulatory Commission.
PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI