DTP—III-2 (23)

TAMIL NADU

GOVERNMENT GAZETTE

PUBLISHED BY AUTHORITY

No.  23]

CHENNAI, WEDNESDAY, JUNE 10,  2026

Vaikasi 27, Parabhava, Thiruvalluvar Aandu–2057

[61]

©

[Regd. No. TN/CCN/467/2012-14.

GOVERNMENT OF TAMIL NADU

[R. Dis. No. 197/2009.

2026

[Price: Rs. 14.40 Paise

Part III—Section 2

Statutory Notifications and Orders issued by

Heads of Departments.

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

CONTENTS

Pages.

CHENNAI PORT AUTHORITY

Revision of Scale of Rates of Chennai Port Authority

..

..

..

..

..

..

62 - 95

62

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

CHENNAI PORT AUTHORITY

Revision of Scale of Rates of Chennai Port Authority

(No.SOR/General Revision/2026/F, Dt. 01.06.2026)

No. SRO C-18/2026.

In exercise of powers conferred under sub-section (1) of Section 27 of The Major Port Authorities Act, 2021

(1 of 2021), the Board of Chennai Port Authority vide B.R. No.31 dt. 27.05.2026 has approved the revised Scale

of Rates along with Performance Standards. As required under clause 4.7 of the Tariff Policy 2021, the Board of

Chennai Port Authority hereby notifies its revised Scale of Rates along with Performance Standards for information

of all concerned. As per the clause 2.9 of the Tariff Policy 2021, the Scale of Rates along with Performance

Standards shall come into force after expiry of 30 days from the date of notification and shall be in force for a

period of 3 years, subject to annual indexation as mentioned in clause 2.8 of the Tariff Policy 2021.

Chennai  -  600 001,

MALLA SRINIVASA RAO,

5th June 2026.

Financial Adviser and Chief Accounts Officer,

Chennai Port Authority.

CHENNAI PORT AUTHORITY

Scale of Rates

Table of Contents

CHAPTER – I DEFINITIONS AND GENERAL TERMS & CONDITIONS

1.1 Definitions – General

1

1.2 General Terms & Conditions

4

CHAPTER – II VESSEL RELATED CHARGES

2.1 Port Dues

2.1.1

Schedule of Port Dues

8

2.1.2

Concession / Exemption in Port Dues

8

2.2 Pilotage Fees

2.2.1

Schedule of Pilotage Fees

9

2.2.2

Schedule of Shifting Charges

9

2.2.3

Pilotage Fee for Cold Move Operations

10

2.2.4

Charges for hire of Tugs/Launches/other Floating Crafts

11

2.2.5

Schedule of Miscellaneous Charges

11

2.3 Berth Hire Charges

2.3.1

Schedule of Berth Hire charges

12

2.3.2

Additional Berth Hire Charges

12

2.3.3

Berth Hire charges for Sailing Vessel / Bodies /Floating Crafts / any other vessel

14

2.3.4

Anchorage Fee

14

2.3.5

Charges for Cruise Vessels

14

CHAPTER–III CARGO RELATED CHARGES

3.1 Wharfage

3.1.1

Wharfage on Cargo

16

3.1.2

Cargo Free of Wharfage

20

NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

63

3.2 Charges for permitting Private Cranes inside the Port

21

3.3 Demurrage Charges

3.3.1

Free period for storage of cargo in transit areas

21

3.3.2

Schedule of Demurrage Charges after free period

23

3.3.3

Charges to be recovered from Customs on goods confiscated by Customs

24

3.4 Other Cargo Related Charges

24

3.5 Mandatory User Charges (MUC) levied by NLDSL

24

3.6 Charges for Operation of Drive Through Container Scanning System

24

3.7 Charges for the use of Chennai Port Parking Plaza (CPPP)

3.7.1

Charges on Containers for intended use of CPPP

25

3.7.2

Charges for overstayal of Trailers/Tankers/Trucks at Chennai Port Parking Plaza

25

CHAPTER – IV CONTAINER HANDLING CHARGES

4.1 Wharfage on Containers including Shipper Own Container and MAFI

26

4.2 Demurrage/Storage Charges on Containers including Shipper Own Containers and MAFI

27

CHAPTER – V STEVEDORING AND CLEARING & FORWARDING CHARGES

5.1 Composite rate for deployment of Labour for Stevedoring Operations

28

5.2 Royalty for Stevedoring and Shore handling Operations

28

CHAPTER – VI MISCELLANEOUS CHARGES

6.1 Supply of water to vessels by Port

30

6.2 Passenger fees (other than Cruise vessels)

30

6.3 Charges for Hire of Port Equipment

30

6.4 Charges for Issuance of License

31

6.5 Charges for erecting Hoardings, Sign Boards, Neon Boards in the Port Premises

31

6.6 Charges for Harbour Entry Permit (HEP)

31

6.7 Charges for use of Weigh Bridge installed by authorized Private Operators

32

6.8 Improper/unsafe Pilot ladder, improper Boarding/disembarking arrangements,

inability to provide Combination Ladder

32

6.9 Other Miscellaneous Charges

32

CHAPTER – VII PORT RAILWAY CHARGES

7.1 Rates notified by ChPA

7.1.1

Haulage Charges

33

7.1.2

Charges for use of Electronic In-motion Rail Weigh Bridge

33

7.2 Rates notified by Railway Board

7.2.1

Terminal Handling Charges

33

7.2.2

Storage Charges

34

7.2.3

Demurrage on wagons

34

7.2.4

Stabling Charges on Privately Owned Wagon

34

CHAPTER– VIII PERFORMANCE STANDARD

35

64

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

CHAPTER – I

Definitions and General Terms & Conditions

1.1 Definitions – General

In this Scale of Rates (SoR), unless the context otherwise requires, the following definitions shall apply:

(i)

“Anchorage” shall mean the area outside the breakwater within the Port limit.

(ii)

“Back to Town cargo/ container” shall mean a cargo/ container entering the Port for export for a

vessel voyage but unable to be exported for some reason and removed from the Port on customs

order.

(iii)

“Ballast” shall mean solid or liquid material placed in the holds of a ship or more often in the ballast

tanks, positioned in the compartments right at the bottom and in rare cases on the sides for stabilization

and make ship seaworthy in all respects. This may consist of liquid material commonly water.

(iv)

“Barge” shall mean a flat bottomed vessel whether self-propelled or not and registered as Barge by

the Competent Authority.

(v)

“Coastal vessel” shall mean any vessel exclusively employed in trading between any port or place in

India to any other port or place in India having a valid coastal license issued by the Director General

of Shipping / Competent Authority.

(vi)

“Container” means any freight container complying with all relevant prevailing ISO standards designed

to facilitate the carriage and transport of cargo by one or more modes and capable of being handled

as a unit with devices permitting ready handling and with unique identification numbers and markings.

(vii)

“Crew” shall mean personnel employed for operation or serving on a vessel other than passengers as

a part of performing the functions of manning;

(viii)

“Cruise Vessel” shall mean any vessel other than pleasure yachts carrying passengers for an ocean

trip taken for purpose of tourism or pleasure calling at ports.

(ix)

“Cold Move” shall mean movement of vessel without power of the engine of the vessel.

(x)

“Day” shall mean the period of 24 hours starting from 6.00 a.m. of a day and ending at 6.00 a.m.

on the following day.

(xi)

“Demurrage” shall mean charges payable for storage of cargo/ container within the Port premises beyond

the free period specified in the Scale of Rates and shall not include the cargo / container stored at

the areas licensed to Port users for storage purposes.

(xii)

“Foreign-going vessel” shall mean any vessel other than coastal vessel and Inland Vessel.

(xiii)

“Free period” shall mean the period during which cargo or container shall be allowed storage free of

Demurrage Charges or Storage Charges, as the case may be, and this period shall be exclusive of

Customs notified holidays and Closed holidays declared by the Port. Sundays shall not be excluded for

the purpose of calculation of free period unless it falls on Customs notified holidays and / or closed

holidays declared by the Port.

(xiv)

“Full Container Load” (FCL) shall mean a container containing cargo belonging to one importer /

exporter.

(xv)

“Goods” includes livestock and every kind of movable property.

(xvi)

“GRT” means Gross Registered Tonnage / Gross Tonnage of vessel as per the Ship’s Registry or

the International Tonnage Certificate issued by the competent authorities or a declaration from defense

Authorities in respect of war ships/ Naval ships.

(xvii)

“Hazardous Container” shall mean a container containing hazardous goods as classified in the International

Maritime Dangerous Goods (IMDG) Code by International Maritime Organisation (IMO) including empty

container with residual content of hazardous material.

(xviii)

“Hazardous Cargo” shall mean any cargo as is defined in the International Maritime Dangerous Goods

(IMDG) Code by International Maritime Organisation (IMO).

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

65

(xix)

“Hazardous Chemicals” shall mean and include the chemicals referred under Schedule-I, Schedule-II

and Schedule-III of Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989 framed under

Environment (Protection) Act, 1986 and Rules, as applicable from time to time and shall also include

cargo /chemicals declared as dangerous in the International Maritime Dangerous Goods (IMDG) Code.

(xx)

“Inland Vessel” shall mean any mechanically propelled inland vessel or non-mechanically propelled

inland vessel which is registered and plying in inland waters, but does not include-

(a). a fishing vessel registered under the Merchant Shipping Act, 1958 (44 of 1958) or the Marine

Products Export Development Authority Act, 1972 (13 of 1972); and

(b). any vessel that are specified as not to be inland vessels by notification by the Central Government.

(xxi)

“Less than a Container Load” (LCL) shall mean a container containing cargo belonging to more than

one importer / exporter.

(xxii)

“M.T.” shall mean Metric Tonne.

(xxiii)

“Major Port or Major Port Authority” shall mean the Major Port as defined in Section (2) sub-section

(1) sub-clause (M) of the Indian Ports Act, 2025.

(xxiv) “Master”, in relation to any vessel or any aircraft making use of any Major Port, means any person

having for the time being the charge or control of such vessel or such aircraft, as the case may be,

except a pilot, harbour master and dock master of the Major Port.

(xxv)

“Month” shall mean the calendar month.

(xxvi) “Over dimensional container” shall mean a container beyond the normal size of standard containers and

needing special devices like slings, shackles, lifting beam etc. They also included damaged containers

and other types which require special devices.

(xxvii) “Ousting Priority” – When a working vessel at berth is removed (ousted) from the berth and shifted

to stream / another berth / mooring / anchorage for accommodating another cargo / container / cruise

vessel, such movement shall be treated as “ousting priority” berthing.

(xxviii) “Pleasure Yacht” shall means a ship howsoever propelled which is exclusively used for pleasure cruises

and does not carry any passengers on a commercial basis.

(xxix) “Port” shall mean Chennai Port Authority (ChPA), unless the context otherwise specifies.

(xxx)

“Port Limits” in relation to a Major Port, means the limits of such Major Port as may be determined

by the Central Government by way of notification from time to time as defined at clause No.2 (1) (y)

of Major Port Authorities Act, 2021.

(xxxi) “Priority berthing” if a vessel having a priority for a given berth arrives, she will be berthed ahead of

other vessel waiting for that berth once the berth falls vacant.

(xxxii) “Reefer Container” shall mean a refrigerated container used for carriage of perishable goods or goods

needing a desired temperature to be maintained with provision for electrical supply to maintain the

desired temperature.

(xxxiii) “Roll On/ Roll Off (RO/ RO) Vessel” shall mean a method of ocean cargo service using a vessel with

ramps which allows wheeled vehicles to be loaded and discharged without cranes and also refers to

any specialised vessels designed to carry Ro/ Ro cargo.

(xxxiv) “Sailing vessel” shall means any primitive or traditionally built wooden vessel not primarily propelled

provided with sufficient sail area for navigation under sails alone, whether or not fitted with mechanical

means of propulsion but does not include a pleasure craft.

(xxxv) “Segregated ballast” shall mean the ballast water introduced into a tank which is completely separated

from the cargo oil and oil fuel system and which is permanently allocated to the carriage of ballast.

(xxxvi) “Shift” shall mean the duration of 8 hours constituting 3 shifts in a day as given below:

06 am to 02 pm;

02 pm to 10 pm;

10 pm to 06 am;

66

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(xxxvii) “Shifting” shall mean the movement of a vessel from one berth to another berth or from one berth to

anchorage / mooring or vice versa or within the berth by shifting of the mooring ropes or turnaround

at the same berth within the port limits.

(xxxviii) “Shut out Cargo / Container” shall mean any cargo / container brought into the port for shipment

for a particular vessel but not shipped by the designated vessel and is lying in the port premises for

being re-shipped on another vessel on customs order.

(xxxix) “TEU” shall mean Twenty Feet Equivalent Unit of container and "FEU" shall mean Forty Feet Equivalent

Unit.

(xl)

“Transhipment Cargo / Container” shall mean any container / cargo landed at the Port and subsequently

shipped through another vessel to other destined Port.

(xli)

“Vessel” includes anything made for the conveyance by water of human being or of goods or for any

other purpose.

(xlii) “Vessel Completion Date” (VCD) means the day on which the cargo / bunker operation of the vessel

is fully completed, whichever is later.

(xliii) “Warping” shall mean movement of vessel (other than shifting) by means of her mooring ropes without

shifting of the ropes to facilitate operations.

(xliv) “Wharf” includes any wall or stage and any part of the land or foreshore that may be used for loading

or unloading goods, or for the embarkation or disembarkation of passengers and any wall enclosing or

adjoining the same.

(xlv) “Wharfage” shall mean the basic due recoverable on all cargo/container landed or shipped or transhipped

within the port limits and approaches or passing through the port, whether porteraged was provided by

the port or not.

Note:

Except the terms explicitly defined hereinabove, all other terms used in this Scale of Rates will have the

same definition as in the Major Port Authorities Act, 2021, the Merchant Shipping Act, 1958 and the Indian Ports

Act, 2025 as amended from time to time.

1.2 General Terms & Conditions

(i)

Status of vessel: The status of the vessel as borne out by its certification by the Customs or the Directorate

General of Shipping, shall be the deciding factor for its classification as ‘coastal’ or ‘foreign-going’ for the purpose

of levying vessel related charges. The nature of cargo or its origin will not be of any relevance for this purpose.

(ii) A.

System of classification of vessel for levy of Vessel Related Charges (VRC):

(a) A foreign going vessel of Indian flag having a General Trading Licence can convert to coastal run

on the basis of a Customs Conversion Order. Such vessel that converts into coastal run based on the Customs

Conversion Order at her first port of call in Indian Port will not require any, further custom conversion, so long

as it moves on the Indian Coast.

(b) A foreign going vessel of foreign flag can convert to coastal run on the basis of a License for

Specified period or voyage issued by the Director General of Shipping and a custom conversion order.

B.

Criteria for levy of Vessel Related Charges (VRC) at Concessional Coastal rate and foreign rate:

(a) In cases of such conversion coastal rates shall be chargeable by the load port from the time the

‘converted vessel’ starts loading coastal goods.

(b) In cases of such conversion coastal rates shall be chargeable till the vessel completes discharging

operations at the last call of Indian Port; immediately thereafter, foreign going rates shall be chargeable by the

discharge ports.

(c) For dedicated Indian coastal vessels having a Coastal License from the Director General of Shipping,

no other document will be required to be entitled to coastal rates.

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

67

C.

Criteria for levy of Cargo Related Charges (CRC) at Concessional Coastal rate:

(a) Foreign going Indian Vessel having General Trading License issued for “worldwide and coastal”

operation should be accorded applicable coastal rates with respect to Handling Charges (HC) i.e. ship

to shore transfer and transfer from/ to quay to/ from storage yard including wharfage in the following

scenario:

(i)

Converted to coastal run and carrying coastal cargo from any Indian Port and destined for any

other Indian Port.

(ii)

Not converted* to coastal run but carrying coastal cargo from any Indian Port and destined for any

other Indian Port.

* The Central Board of Excise and Customs Circular no.15/2002- Cus. dated 25 February 2002 allows

carriage of coastal cargo from one Indian port to another port in India, in Indian flag foreign going

vessels without any custom conversion.

(b) In case of a Foreign flag vessel converted to coastal run on the basis of a License for Specified

period or voyage issued by the Director General of Shipping, and a Custom Conversion Order, the

coastal cargo/ container loaded from any Indian Port and destined for any other Indian Port should be

levied at the rate applicable for coastal cargo/ container.

(iii)

Concessional coastal tariff for ships and cargo that move from one Indian Port to another Indian Port

through the territorial waters of Sri Lanka or Bangladesh in terms of Notification No.38/2018-Customs

(NT) dated 11.05.2018 issued by the Central Board of Indirect Taxes and Customs, Department of

Revenue, Ministry of Finance.

(a) Coastal goods transported between an Indian port on east coast and another Indian port on west

coast or vice versa, by a vessel through the territorial waters of Sri Lanka, whether or not calling any

Port in Sri Lanka in between and without change of vessel in terms Notification No.38/2018-Customs

(N.T.) dated 11.05.2018 of Central Board of Indirect Taxes and Customs shall be eligible for concession

in vessel related charges and cargo related charges.

(b) Coastal goods transported between an Indian port on east coast and a river port in India or vice

versa, by a vessel through a route passing through the Bangladeshi waters and without change of vessel

in terms Notification No.38/2018-Customs (N.T.) dated 11.05.2018 of Central Board of Indirect Taxes and

Customs shall be eligible for concession in vessel related charges and cargo related charges.

(iv)

(a) All US dollar denominated tariff will be recovered in Indian Rupees after conversion of charges in

US dollar terms into its equivalent Indian Rupees at the Reference rate notified by the Reserve Bank

of India and in case of non-availability of RBI Reference rate, at the market buying rate notified by

State Bank of India.

(b) The day of entry of the vessel into port limits shall be reckoned as the day for such conversion.

In respect of US dollar denominated charges on containers, the day of entry of the vessel into the port

limit in the case of import containers and the day of arrival of containers into the port in the case of

export containers shall be reckoned as the day for such conversion.

(c) A regular review of exchange rate shall be made once in 30 days from the date of arrival in the

cases of vessels staying in the port for more than 30 days. The basis of billing shall change prospectively

with reference to the appropriate exchange rate prevailing at the time of review.

(d) The vessels shall pay the port dues on entering into the port limits at the rate applicable on the

date of entering into port limit.

(v)

(a) Vessel related charges shall be levied on Shipowners/ Steamer Agents. Wherever rates have been

denominated in US dollar terms, the charges shall be recovered in Indian rupees after conversion of

US currency to its equivalent Indian rupees as prescribed at clause No. (iv) (a).

(b) Container related charges denominated in US dollar terms shall be collected in equivalent Indian

rupees as prescribed at clause No. (iv) (a).

(vi)

All the charges prescribed in the Scale of Rates are exclusive of taxes except Schedule 6.6 – Charges

for Harbour Entry Permit. Applicable taxes, if any, shall be charged

68

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(vii)

Users shall pay all port charges in advance before availing services / use of port facilities.

(viii)

Users shall not be required to pay charges for delays beyond a reasonable level attributable to the

port.

(ix)

Interest on delayed payments / refunds:

(a) The user shall pay penal interest at the rate of 15% per annum (simple interest) on delayed

payments, subject to minimum of Rs. 100/-. Likewise, Port shall pay penal interest on delayed refunds

at the rate of 15% per annum (simple interest).

(b) The delay in payments by user will be counted beyond 10 days after the date of raising the bills.

This provision will not apply to the case where payment is to be made before availing of the services/

use of port properties as prescribed in the SOR.

(c) The delay in refunds by the Port will be counted beyond 20 days from the date of completion of

services or on production of all the documents required from the user, whichever is later.

(x)

All charges worked out shall be rounded off to the next higher rupee on the grand total of each bill.

(xi)

No person shall be entitled to a refund of an overcharges made by a port unless his claim to the

refund has been preferred in writing by him or on his behalf to the port within six months from the

date of raising bill duly supported by all relevant documents and original invoice. Provided that a Port

may of its own motion remit overcharges made in its bills at any time.

(xii)

(a) When Port Authority notices that any charge leviable has been short-levied or erroneously refunded,

it may issue a notice to the person who is liable to pay such charge or to whom the refund has

erroneously been made, allowing him to represent within 30 days from the date of receipt of the notice.

(b) The Port may, after considering the representation, if any, made by the person to whom notice is

issued as at (a) above, determine the amount due from such person and thereupon such person shall

pay the amount so determined.

(xiii)

No refund/recovery shall be made if the amount involved is less than Rs.100/- for all refunds/supplementary

claims. This, however, shall not apply for the provisional Deposits collected for the services in advance.

(xiv)

(a) The Unit of Measurement for calculation of the port charges are as follows:

i.

One unit by weight means 1 Metric Tonne (M.T.) equivalent to 1,000 kilograms.

ii.

One unit by volume means 1 Cubic Meter (Cu.m.).

iii.

One unit by volume of liquid means 1 Kilolitre (K.L.) equivalent to 1,000 litres.

(b) In calculating the gross weight or measurement by volume or capacity of any individual item, any

fractions shall be treated as one unit.

(xv)

(a) The vessel related charges for all coastal vessels should not exceed 60% of the corresponding

charges for foreign vessels.

(b) The cargo/ container related charges for all coastal cargo/ containers, other than thermal coal and

POL including crude oil, iron ore and iron ore pellets should not exceed 60% of the corresponding

charges for normal cargo/container related charges.

(c) For the purpose of this concession, cargo / container from a foreign port which reaches an Indian

Port ‘A’ for subsequent transshipment to Indian Port ‘B’ will also qualify in so far as the charges relevant

for its coastal voyage.

(xvi)

The minimum charges recovered in any one application shall be Rs.500/- except Harbour Entry Permits

and Royalty on stevedoring / shorehandling.

(xvii)

(a) Wharfage on Import cargo shall be paid at the rate prevailing on the date of berthing of the vessels

by the port.

(b) Wharfage on Export cargo shall be paid at the rate prevailing on the last date of admittance by

the port or date of commencement of loading operations on the designated vessel whichever is higher.

(xviii)

(a) The port shall not be responsible to the user or any person for any loss or damage or injury to life

arising directly or indirectly from the operations carried out inside the Port. The user shall indemnify the

Port against all loss or damage to any property belonging to the port or any other persons including

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

69

the equipment and/or injury to life of any persons, arising directly or indirectly from the operations inside

the Port. The liability of the user shall not be affected by the fact that such loss or damage or injury

to life may have arisen due to any act or default of any employee of the port. The user shall also

indemnify the port for all liabilities under the Workmen’s Compensation Act.

(b) In case of damages to port assets or properties partly or wholly, the user shall deposit anticipated

amount for all such charges for damages as assessed by the Port immediately on receipt of the demand,

pending determination of the final claim by the Port. In case of total loss, the user shall deposit the

book value or market value of the port assets or properties, whichever is higher. If the damage cost

is not paid within the time stipulated, the same will be adjusted from any dues payable to the user

concerned.

(xix)

(a) The rates prescribed in the Scale of Rates are ceiling levels subject to annual indexation. The

Port may, if it so desires, charge lower rates than the notified rates and/or allow higher rebates and

discounts or increase the prescribed free period.

(b) The port may, if it so desires, rationalise the prescribed conditionalities governing the application of

rates prescribed in the Scale of Rates if such rationalisation gives relief to the user in rate per unit

and the unit rates prescribed in the Scale of Rates do not exceed the ceiling level.

(xx)

Annual Indexation:

(a) The SOR is valid for 3 years from the effective date of implementation of the SOR, subject to

automatic annual indexation in the tariff at 60% of the Wholesale Price Index (WPI) to be annually

announced by the Indian Port Association (IPA) or any other Competent Authority decided by the

Government.

(b) The Port would, be entitled to indexation in tariff at 100% of variation in WPI communicated by

the IPA or any other Competent Authority decided by the Government instead of 60% variation in WPI,

from the second year of tariff fixation on achievement of performance standards committed by the Major

Port Authority.

(c) The next annual indexation in SOR will be from 1st May 2027 and thereon.

(d) Such adjustment of SOR will be made every year and the adjusted SOR will come into force from

1st May of the relevant year to 30th April of the following year.

(xxi)

(a) As per Clause 6 of the Standard Operating Procedure (SOP) for operation of Indo- Bangladesh

Coastal Shipping Agreement, the vessels entering into India from Bangladesh under the Coastal Shipping

Agreement between India and Bangladesh are not to be treated as foreign going (FG) vessels.

(b) Port and other charges

(i) Port dues to be levied by the Port on the entry of vessels of the Republic of Bangladesh into

India under the Coastal Shipping Agreement between the two countries and engaged in inter country

trade, will be treated as domestic vessel engaged in coastal shipping and not as Foreign Going (FG)

vessels.

(ii) The Port shall also on the vessels of the Republic of Bangladesh levy charges for conservancy,

pilotage and other specific services at par with those charged from the coastal vessels. The charges

will be determined with reference to cargo carrying capacity of the vessels, as applicable to coastal

vessel engaged in coastal shipping.

[The clauses (xxi) (b) (i) & (ii) above are subject to the provisions of the Standard Operating Procedure (SOP)

of Agreement on Coastal Shipping between the Govt. of the Peoples Republic of Bangladesh and the Govt. of

the Republic of India.]

(xxii)

The rates prescribed in this SOR are applicable only to the services provided by the Port. The services

offered by any other authorized service provider are not governed by the rates and conditions prescribed

in this SOR, unless tariff for such authorized service provider is specifically prescribed in this SOR.

(xxiii)

Any directions of the Ministry of Ports, Shipping and Waterways, Government of India by way of Circular /

Guidelines / Notification from time to time shall prevail over the provisions mentioned in this SOR.

- - - End of Chapter – I - - -

70

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

CHAPTER – II

VESSEL RELATED CHARGES

2.1

Port Dues

2.1.1 Schedule of Port Dues

Sl.

No.

Type of vessel

Rate Per GRT for each entry

Coastal vessel

(in Rs)

Foreign vessel

(in US $)

1

Tankers

13.3452

0.5045

2

Container vessels

8.8261

0.3337

3

RoRo vessels

11.0099

0.4163

4

Bulk / Break Bulk vessels

10.1941

0.3855

5

Non-Cargo Vessels calling for repair purposes*

8.8261

0.3337

6

Vessels not covered under Sl.No.1 to 5 above

12.2331

0.4625

Refer Port Website: www.chennaiport.gov.in for Trade Notices/Circulars on concessional rates, as applicable.

Notes:

(1)

“Reduced Gross Registered Tonnage” as per the International Tonnage Certificate will be reckoned with

for levy of Port Dues in case of tankers with segregated ballast tank.

(2)

In case a vessel remains in the Port for more than 30 days, the port dues shall be payable once in

thirty days from the day of entry until the vessel leaves the port.

(3)

Tankers carrying other than POL and Crude Oil will be eligible for a concession of 15% on Port dues.

(4)

Port dues being an entry fee is to be realized as per the status of the vessel at the time of the entry.

(5)

Any vessel entering the Port limit from outside shall be treated as fresh entry.

(6)

Port dues shall levied only once for entry of a vessel, irrespective of any change of her Name/ Agent(s)/

Owner(s), during the stay in the port.

*Shifting Charges / Ousting charges will be levied in case the vessel has to vacate the berth to prioritize

cargo vessels.

2.1.2 Concession / Exemption in Port Dues

Sl.

No.

Description

Concession /

Exemption

1

Vessels entering the port in ballast and not carrying passengers or cargo on board.

25%

2

Vessels entering the port only for receiving provisions/stores or fresh water and / or

spares.

50%

3

Vessels entering the port only for receiving bunkers and / or crew change or to

disembark any sick crew member either at anchorage or at berth.

75%

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

71

Sl.

No.

Description

Concession /

Exemption

4

(i) Pleasure yachts

100%

(ii) Vessels, after sailing out, compelled to re-enter by stress of weather or any dam-

age to the vessel

(iii) Any Defence vessel belonging to India or any foreign country

(iv) Fishing vessels & Small crafts

(v) Vessels belonging to other Major Ports except private ports

2.2

Pilotage Fees

2.2.1 Schedule of Pilotage Fees

Sl.

No.

Vessel

size

(GRT)

Rate per GRT

Coastal (in Rs.)

Foreign (in US $)

Tankers Container

vessels

RoRo

vessels

Bulk /

Break

bulk

vessels

Non-

Cargo

Vessels

calling

for repair

purposes

Vessels

not

covered

under

col.3 to 7

Tankers Container

vessels

RoRo

vessels

Bulk /

Break

bulk

vessels

Non-

Cargo

Vessels

calling

for repair

purposes

Vessels not

covered

under col.9

to 13

1

2

3

4

5

6

7

8

9

10

11

12

13

14

1

Upto

10,000

17.6117

11.6479

14.5296

13.4533

11.6479

16.1439

0.6664

0.4409

0.5499

0.5094

0.4409

0.6110

2

10,001

to15,000 20.2079

13.3650

16.6715

15.4367

13.3650

18.5239

0.7640

0.5054

0.6305

0.5838

0.5054

0.7007

3

15,001

to 30,000 23.2672

15.3883

19.1954

17.7736

15.3883

21.3281

0.8799

0.5819

0.7260

0.6721

0.5819

0.8066

4

30,001

to 60,000 33.0237

21.8411

27.2445

25.2265

21.8411

30.2716

1.2502

0.8269

1.0315

0.9550

0.8269

1.1461

5

60,001

& above

38.2328

25.2862

31.5420

29.2056

25.2862

35.0467

1.4472

0.9571

1.1939

1.1054

0.9571

1.3265

Min. charges

per vessel

32,289

1,222

Refer Port Website: www.chennaiport.gov.in for Trade Notices/Circulars on concessional rates, as applicable.

2.2.2 Schedule of Shifting Charges

Description

Shifting charges

For each shifting

50% of the Pilotage Fee prescribed in Schedule 2.2.1.

Notes to Schedule 2.2.1. and 2.2.2.:

(1)

Pilotage fee is a composite fee and shall include one inward and one outward movement. However, in

case of vessels availing only one movement (either Inward or Outward), 50% of the charges prescribed

in the Schedule 2.2.1 will be levied.

(2)

Shifting charges as per Schedule 2.2.2 above shall be levied for movement of a vessel from one berth

to another berth within the port limits or turning around of a vessel within the same berth at the request

of the user or for other than ‘Port Convenience’.

(3)

Shifting of a vessel to anchorage and re-entry at the request of the user or for other than Port Convenience

or due to bad weather, shall be considered as a pilotage operation and will attract additional pilotage

charges at the rates prescribed in Schedule 2.2.1 above.

72

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(4)

No charges shall be levied for the shifting of the vessel for ‘Port Convenience’ and it shall be defined

as mentioned below:

(i)

If a working cargo vessel at berth or any vessel at mooring is shifted / un-berthed for undertaking

dredging work / hydrographic survey work or for allotting a berth for the dredger or for attending to

repairs to berths, maintenance and such other similar works whereby shifting is necessitated by the

Port.

(ii)

If any vessel is shifted to accommodate any other vessel for the convenience of port operations.

(iii) Whenever a vessel is shifted to accommodate another vessel which cannot be berthed at other

berths due to the Draft and LOA restrictions.

(iv) Whenever a vessel is shifted to accommodate another vessel having priority at the adjacent berth

and unless that vessel shifts, another vessel cannot be berthed at the adjacent-berth due to length

restrictions.

(v) Whenever a vessel is shifted from berth to accommodate another vessel carrying hazardous cargo

which needs adjacent-berth to be kept vacant for safety reasons.

(vi) Whenever a vessel is shifted from berth to accommodate another vessel on ousting priority, the

vessel shifted is exempted from the payment of shifting charges since the same is paid by the vessel

enjoying the ousting priority.

(vii) Shifting Charges / Ousting Charges will be levied on the vessels not meant for cargo purposes if

they have to vacate the berth to prioritize cargo vessels.

(5)

For shifting / pilotage of any vessel for the convenience of / benefit of another vessel, on request by the

User, the vessel benefited is liable to pay the shifting / pilotage charges for shifting and repositioning

of the vessel shifted.

(6)

Pilotage will not be compulsory in case of vessels upto 200 GRT. Such vessels may, however seek

Pilot services, if they so desire on payment of fees as specified in Schedule 2.2.1 above.

(7)

Pilotage will not be compulsory for the crafts licensed under the Chennai Port Harbour Craft rules.

(8)

Tankers carrying other than POL and Crude Oil will be eligible for a concession of 15% on Pilotage

Fee (Schedule 2.2.1) and Shifting charges (Schedule 2.2.2)

(9)

For vessels on cold move during pilotage/shifting operations, cold move charges will be applicable as

prescribed in Schedule 2.2.3.

2.2.3 Pilotage Fee for Cold Move Operations

Sl.

No.

Description

Pilotage Fee

1

For both Inward and Outward movements

2 times of charges as per Schedule 2.2.1 above

2

For only one movement (either Inward or Outward)

1.5 times of charges as per Schedule 2.2.1 above

3

For Shifting

2 times of charges as per Schedule 2.2.2 above

Notes:

During the course of movement, if a vessel fails to offer its full power for a duration exceeding 5 minutes,

it shall be considered as cold move.

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

73

2.2.4 Charges for hire of Tugs / Launches / Other Floating Crafts

Sl.

No.

Description

Unit

Rate per unit per hour or part thereof

Coastal

(in Rs.)

Foreign

(in US $)

1

Oil Recovery vessel (ORV)

Per vessel

29,108

1,103

2

Tugs

Per tug

39,354

1,491

3

Launches

Per launch

3,980

151

4

Bollard Pull test charges

Per vessel

33,053

721

Notes:

(1).

Minimum hours for hire of Tug / launches at Sr. No. 1,2, & 3 above shall be 2 hrs.

(2).

Time is calculated for ORV / Tugs and Launches from the time they have left the station, then the rate

prescribed above shall be levied.

(3).

No cancellation charges shall be levied if the booking for tugs/ Launches/ floating crafts is cancelled for

the reasons attributable to port.

2.2.5 Schedule of Miscellaneous charges

2.2.5.1 Charges for detention of Master Pilot / Pilots:

If the vessel is not able to move within 30 minutes of Master Pilot / Pilot boarding, then the detention

charges shall apply from the time the Pilot boards the vessel.

Sl.

No.

Description

Unit

Rate per unit

Coastal

(in Rs)

Foreign

(in US $)

1

Pilot Detention charges

Per hour or part

thereof

2,980

113

2.2.5.2 Pilot Cancellation charges:

Sl.

No.

Description

Unit

Rate per unit

Coastal

(in Rs)

Foreign

(in US $)

1

Cancellation received less

than 2 hrs. before Pilot

booked time

Per cancellation

5,958

225

2.3

Berth Hire Charges

2.3.1 Schedule of Berth Hire Charges

Sl.

No.

Type of Vessel

Rate per GRT per hour or part thereof

Coastal vessel

(in Rs)

Foreign vessel

(in US $)

1

Very Large Crude Carrier (VLCC) - Tankers

0.2076

0.0080

2

Tankers

0.1887

0.0072

3

Container vessels

0.1249

0.0048

4

RoRo vessels

0.1557

0.0060

5

Bulk / Break Bulk vessels

0.1442

0.0056

74

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

Sl.

No.

Type of Vessel

Rate per GRT per hour or part thereof

Coastal vessel

(in Rs)

Foreign vessel

(in US $)

6

Non-Cargo Vessels calling for repair pur-

poses

0.1249

0.0048

7

Vessels not covered under Sl. No.1 to 6

above

0.1729

0.0067

Minimum Charges per vessel

Rs. 24,256/-

US$ 909.62

Refer Port Website: www.chennaiport.gov.in for Trade Notices/Circulars on concessional rates, as applicable.

2.3.2 Additional Berth Hire Charges

Description

Rate per GRT per hour or part

thereof

Coastal (in Rs )

Foreign (in US $)

Vessels not calling for Pilot within 4 hours after completion of

discharge or loading operations including lashing / unlashing

operations or pipeline flushing through shorelines or bunkering

operations calculated from the time of completion of discharge /

loading / flushing till the time vessels vacate the Berth

2 times berth hire

charges

(normal

berth hire charges

plus one additional

berth hire charges)

shall be levied.

2 times berth hire

charges

(normal

berth hire charges

plus one additional

berth hire charges)

shall be levied.

Vessels at any berth on Additional Berth Hire charges shall va-

cate the berth when port requires the berth for any other vessel

or for any other purpose failing which such vessel shall attract

additional berth hire from the time of issuance of a notice to this

effect by Chennai Port Authority or its authorized officials.

5 times berth hire

charges

(normal

berth hire charges

plus

4

additional

berth hire charges)

shall be levied.

5 times berth hire

charges

(normal

berth hire charges

plus

4

additional

berth hire charges)

shall be levied.

The charges in Schedule 2.3.2 will not be applicable in case of:

(a) Vessel waiting for tide for safe sailing

(b) Strike by the Port employees

(c) Break down of port equipment

Notes:

(1).

(a) The period for the purpose of levy of Berth Hire shall be reckoned from the time the vessel occupies

(First Line Ashore) the berth till she vacates (Last Line castoff) the berth.

(b) The cargo completion time shall include lashing / unlashing / welding operations, pipeline (Chickson

/ Manifold) disconnection, fumigation, bunkering etc. and shall be reckoned as mentioned in Statement

of Facts (SOF).

(2)

(a) Berth Hire Charge shall not be levied after expiry of 4 hours from the time of the vessel signalling

its readiness to sail. In case the ship is forced to wait for want of favourable tidal conditions or on

account of inclement weather or due to absence of night navigation facilities after calling for pilot, the

Berth Hire Charges shall be continued to be levied beyond 4 hours.

(b) A penalty equivalent to Berth Hire Charges for 24 hours shall be levied for a “False Signal” by a

vessel.

“False Signal” means a vessel signals its readiness and asks for a pilot in anticipation even when she

is not ready for un-berthing due to engine not being ready or cargo operation not completed or such

other reasons attributable to the vessel.

(c) The Master/Agents of the vessel shall signal readiness to sail, only in accordance with favourable

weather conditions and tidal movements.

(d) The pilot requisition submitted by the agents will be treated as the signal for the above clauses. The

time mentioned in the pilot requisition shall be considered for the applicability of false signal charges.

(3)

Priority / Ousting Priority Charges in addition to Normal Berth Hire Charges as stated below or as and

when changed by the Govt. or any other competent authority, will be applicable:

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

75

(a) For providing “Priority Berthing” to any vessel, a fee equivalent to 75% of the Berth Hire Charges

calculated for the total period of actual stay at the berth subject to a minimum of Berth Hire Charges

for 24 hours shall be levied.

(b) For providing “Ousting Priority” to any vessel, a fee equivalent to 100% of the Berth Hire Charges

calculated for the total period of actual stay at the berth subject to a minimum of Berth Hire Charges

for 24 hours shall be levied. In addition, pilotage / shifting charges for ‘shifting out’ and ‘shifting in’ of

the vessel shifted from berth shall be levied on the vessel enjoying ousting priority.

(c) The fee for providing priority / ousting priority as mentioned above shall not be charged for the

following categories:

(i)

Coastal vessels which will be accorded priority berthing.

(ii)

Vessels for which special exemption has been granted by the Ministry of Ports, Shipping & Waterways.

(4)

In respect of Vessels coming under “Berth Reservation Scheme”, the berth reservation charges shall be

paid as per the scheme and direction issued by the Government from time to time.

(5)

No Berth Hire will be charged for the period when the vessels idle at the Port’s berths when operations

cannot take place due to breakdown of the ChPA equipment or power failure or any other reasons

attributable to Port. This provision will, however, not apply in the case of vessels idling at berths operated

by the private operators licensed by the Port due to reasons not attributable to Port.

(6)

If the vessel operations are stopped for more than 24 hours due to dispute between the Master of the

Vessel and the Stevedoring Agents / C&F Agent / Importer / Exporter of the cargo, stowage problem,

ship-crane repair, etc., Berth Hire Charges at twice the rate of normal Berth Hire Charges as per

Schedule 2.3.1 above shall be payable for the period beyond 24 hours and till the operations are

resumed.

(7)

Tankers carrying other than POL and Crude Oil will be eligible for a concession of 15% on Berth Hire

Charges.

2.3.3 Berth Hire Charges for Sailing Vessel / Bodies / Floating Crafts / any other vessel

Sl.

No.

Description

Unit

Rate

(in Rs`)

1

Vessels, other than Merchant vessels and

not registered under Harbour Craft Rules of

Chennai Port, berthed anywhere inside the

Port except Timber Pond & Boat Basin

Per vessel per hour or part

thereof

270

2

Vessels registered under Harbour Craft Rules

of Chennai Port berthed anywhere in the port

Per vessel per day or part

thereof

378

3

Pleasure yachts

Per yacht per calendar month

or part thereof

6,668

Note:

The non-commercial powered crafts belonging to the Central Government or a State Government such as

the launches of the Defence Service, the Customs, the Police and the Port Health Department that are plying

and stationed at the port for their Departmental use, concerning the Port Operations will be exempted from the

above Berth Hire Charges.

2.3.4 Anchorage Fee

Sl.

No.

Description

Unit of Levy

Tankers

Other vessels

Coastal

vessel

(in Rs.)

Foreign

vessel

(in US $)

Coastal

vessel

(in Rs.)

Foreign

vessel

(in US $)

1

First 48 hours

Rate per GRT per hour

or part thereof

Free

Free

Free

Free

2

Beyond 48 hours

0.01641

0.00064

0.03281

0.00126

76

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

Notes:

(1)

The anchorage period shall commence from the time a vessel drops the anchor till the time it anchors

away.

(2)

Anchorage charges are applicable for all vessels anchored within the Port limits, except for defence &

other Govt. vessels and vessels anchored for Port convenience.

(3)

Whenever a vessel is ready for berthing in all aspects and waiting for berth, anchorage charges are

not applicable from the time of readiness of the vessel for berthing.

2.3.5 Charges for Cruise Vessels:

Description

Unit of Levy

Rate (in US $)

Port charges (Fixed

Rate)

for the first 12 hours of

stay at berth

Per GRT

0.0850

for the period

exceeding 12 hours

Per GRT per hour

0.0175

Head Tax (Toll)

Per passenger

6.00

Notes:

(1).

No other charges like berth hire, port dues, pilotage, passenger fee etc. will be levied.

(2).

Volume Discounts to Cruise Ships shall be given as under:

Sl. No.

Number of calls per year

Rebate in Cruise tariff

1.

Upto 10 calls

Nil

2.

From 11 to 35 calls

10%

3.

From 36 to 70 calls

15%

4.

Above 70 calls

20%

(Approved by IPA vide F.No. CBM/Cruise/044/CruiseTariff/2025 dt.30.04.2026, extended upto 31st March 2027)

- - - End of Chapter – II - - -

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

77

CHAPTER – III

Cargo Related Charges

3.1

Wharfage

3.1.1 Wharfage on Cargo

Sl.

No.

Particulars of commodities

Unit

Rate (in Rs )

Coastal

Foreign

(A)

Liquid (in bulk)

1.

Liquid through pipeline

(a).

Crude Oil

M.T.

94.27

94.27

(b).

POL Products

(i).

Diesel Oil

M.T.

114.11

114.11

(ii).

Furnace Oil

M.T.

100.89

100.89

(iii).

Kerosene Oil

M.T.

120.73

120.73

(iv).

Aviation Turbine Fuel (ATF)

M.T.

120.73

120.73

(v).

Petrol

M.T.

133.96

133.96

(vi).

Lubricating Oil

M.T.

120.73

120.73

(vii).

Base Oil

M.T.

120.73

120.73

(viii).

Slop / Sludge Oil / Waste Oil

M.T.

86.03

86.03

(ix).

Naphtha

M.T.

127.35

127.35

(x).

Ship Bunkering Oil

M.T.

59.38

59.38

(xi).

Transformer Oil

M.T.

120.73

120.73

(xii).

Motor Spirit Oil (MSO)

M.T.

133.96

133.96

(xiii).

Other POL Products

M.T.

133.96

133.96

(c).

Chemicals & Acids

(i).

Bitumen

M.T.

120.73

120.73

(ii).

Benzene

M.T.

125.69

209.48

(iii).

Phosphoric acid

M.T.

90.95

151.60

(iv).

Other acids of all kinds including Acids, Fatty Acids,

Palm fatty acid etc.

M.T.

90.95

151.60

(v).

Other chemicals of all kinds including Ethylene

Glycol; MEG (Mono-ethylene Glycol); Di-ethylene

Glycol; Ethyl Hexanol; Methyl Alcohol; Palm Stearin;

Mineral Oil; Tallow; Alcohol; Ether, Methalene

Chloride, ISC Propylene Alcohol, Toluene, Carbon

Black, Linear Alkaline, Orthoxylene, Other Petro

Chemicals, Vinyl Chloride, Ethylene-di-chloride etc.

M.T.

125.69

209.48

(d).

Edible Oil & other liquids

(i).

Palm Oil, Vegetable Oil & Fats etc.

M.T.

83.84

139.73

(ii).

Molasses

M.T.

37.71

62.84

(iii).

Crude Palm Oil

M.T.

83.84

139.73

(iv).

Crude Sunflower Seed Oil

M.T.

83.84

139.73

(v).

Palm Kernel Oil

M.T.

83.84

139.73

78

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

Sl.

No.

Particulars of commodities

Unit

Rate (in Rs )

Coastal

Foreign

(vi).

RBT Palm Sterin

M.T.

83.84

139.73

(vii).

Soya Bean Oil

M.T.

83.84

139.73

(viii).

Used cooking oil not for human consumption

M.T.

83.84

139.73

(ix).

All other types of edible oil and seed extractions

M.T.

83.84

139.73

2.

Liquid other than through pipeline

(a).

POL Products

(i).

Ship Bunkering Oil

M.T.

59.38

59.38

(b).

Chemicals & Acids

(i).

Bitumen

M.T.

120.73

120.73

(c).

Edible Oil & other liquids

(i).

Palm Oil, Vegetable Oil & Fats etc.

M.T.

83.84

139.73

(ii).

Molasses

M.T.

37.71

62.84

(iii).

All types of oil extractions like soya, rape seed etc.

M.T.

83.84

139.73

(B)

Dry Cargoes (Bulk)

(1)

Cargo handled through Mechanical means

ChPA is not handling any cargo through mechanical means

(2)

Cargo handled through non-mechanized

(i).

Finished Fertilizer i.e. Urea, Ammonium Sulphate,

Potash, Di-Ammonium Phosphate (DAP), Murate

of Potash (MoP), Boronated calcium nitrate, Mono

ammonium phosphate, Nitrogen fertilizer, Potassium

sulphate powder, Mono potassium phosphate etc.

M.T.

37.21

62.02

(ii).

Fertilizer raw material i.e. Sulphur, Rock Phosphate,

etc.

M.T.

37.21

62.02

(iii).

Cement Clinker

M.T.

40.94

68.23

(iv).

Bulk Construction materials i.e. Blue Metal, Bricks,

cement, Sand, Silica Sand, Slag, Stones (except

Granite Blocks, Dressed marbles and slabs) &

Tiles, Concrete slab, 12MM stone dust-construction

materials etc.

M.T.

40.94

68.23

(v).

Dolomite

M.T.

37.21

62.02

(vi).

Iron Ore Pellets / Lumps

M.T.

74.43

74.43

(vii).

Bauxite

M.T.

37.21

62.02

(viii).

Limestone

M.T.

37.21

62.02

(ix).

Asphalt, Barytes, Feldspar, Chrome Ore, Charge

chrome, Ferro Manganese, Ferro Silicon, Ferro

slag, Silicon Manganese, High carbon Ferrochrome,

Flourspar, Kerb stones and other ores

(a). Import

M.T.

37.21

62.02

(b). Export

M.T.

25.80

43.00

(x).

Manganese Ore / Ferro Manganese Slag

M.T.

37.21

62.02

(xi).

Blast furnace slag, Bentonite, Dolomite chips, River

sand and fly ash, Rocksand, Metal Sand, Granule,

Jelly, Manufactured Sand (M.Sand)

M.T.

37.21

62.02

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

79

Sl.

No.

Particulars of commodities

Unit

Rate (in Rs )

Coastal

Foreign

(xii).

Metal scrap including shredded scrap, Iron scrap

and Heavy metal scrap

M.T.

48.37

80.63

(xiii).

Laterite

M.T.

37.21

62.02

(xiv).

Magnesite

M.T.

37.21

62.02

(xv).

All other Minerals

M.T.

37.21

62.02

(xvi).

Food grains, cereals, pulses, rice and oilseeds of

all kinds

M.T.

37.21

62.02

(xvii).

Wood Bamboo, Plywood, Boards, Wood products,

Wood chips and Wood pulp

M.T.

50.78

84.64

(xviii).

Mill Scale

M.T.

37.21

62.02

(xix).

Clay and Chalk in bulk

M.T.

37.21

62.02

(xx).

Cobble Stones

M.T.

37.21

62.02

(xxi).

Salt of all kinds

M.T.

21.22

35.37

(xxii).

Sugar of all kinds

M.T.

46.69

77.83

(xxiii).

Gypsum

M.T.

37.21

62.02

(xxiv).

Sodium Silicate

M.T.

61.19

101.99

(xxv).

All other dry bulk cargo

M.T.

61.19

101.99

(C)

Break Bulk and General cargo other than Con-

tainers

(i).

Log, Timber, Veneer, Timber Logs

Cu.m

30.31

50.53

(ii).

Granite Blocks, Dressed Marbles and Slabs

Cu.m

241.87

403.11

(iii).

Cement and Cement Clinker bags

M.T.

40.94

68.23

(iv).

Asphalt, Barytes, Feldspar, Chrome Ore, Charge

chrome, Ferro Manganese, Ferro Silicon, Ferro

slag, Silicon Manganese, High carbon Ferrochrome,

Flourspar, Kerb stones and other ores (in bags)

(i). Import

M.T.

37.21

62.02

(ii). Export

M.T.

25.80

43.00

(v).

Food grains, cereals, pulses and oilseeds of all

kinds in bags

M.T.

37.21

62.02

(vi).

Machineries and Equipment, if fitted with wheels

and handled as assembled units, like Excavator,

Motor Grader, Dumper Truck, Wheel Loader, Bull

Dozer, Paver, Power Transformer, Concrete Mixer,

etc. along with its own accessories

Ad valorem

0.2695%

subject to

maximum of

Rs.95,092

per unit

0.4492%

subject to

maximum of

Rs.1,58,487

per unit

(vii).

Machineries & Equipment other than mentioned

in Sr. No. C (vi). above, including Electrical and

Electronic goods, Wires, Cables, Parts, Tools &

Accessories

Ad valorem

0.2695%

0.4492%

(viii).

Metal & Metal Products (Alloy / Non-alloy): Ingots &

Billets, Sheets & Plates, Bars, Rods, Angles, Pipes,

Rails, HR / CR Coils, Seamless carbon steel pipes,

seamless alloy steel pipes, boiler tubes, etc. and not

covered under Sl. No. C (vii). above

M.T.

74.41

124.03

(ix).

Aircraft

Each

1,29,026

2,15,043

(x).

Boats and Launches

Each

19,354

32,257

(xi).

Coir, Coir products and Jute & Jute products

M.T.

101.56

169.28

80

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

Sl.

No.

Particulars of commodities

Unit

Rate (in Rs )

Coastal

Foreign

(xii).

Drilling Materials & Chemicals in bags

M.T.

125.68

209.48

(xiii).

Synthetic resin and wood pulp

M.T.

50.78

84.64

(xiv).

Asbestos

M.T.

40.94

68.23

(xv).

Fertiliser and raw material including Sulphur in

bags

M.T.

37.21

62.02

(xvi).

Metals (Ferrous/ non- ferrous) (including plates, pig

iron, steel pipes, Wire Rod Coils, other steel coils)

M.T.

74.41

124.03

(xvii).

Defense stores and Classified Defense cargo

M.T.

221.59

369.33

(xviii).

Coal Tar Pitch (in bags)

M.T.

101.56

169.28

(xix).

Railway Wagon & Coaches

Each

60,000

1,00,000

(xx).

Locomotives including accessories

Each

90,000

1,50,000

(xxi).

Other unspecified break bulk cargo (in bags)

M.T.

101.56

169.28

(xxii).

Other unspecified break bulk cargo

Ad valorem

0.2695%

0.4492%

(D)

Motor Vehicles for carrying Passengers / Cargo

(i).

Two wheelers

Each

517

861

(ii).

Three wheelers

Each

1,614

2,689

(iii).

Four wheelers

Ad valorem

0.3562%

subject to

maximum of

Rs. 7,639

per unit

0.5937%

subject to

maximum of

Rs.12,731 per unit

(v).

Six wheelers and above

Ad valorem

0.2695%

subject to

maximum of

Rs. 27,573

per unit

0.4492%

subject to

maximum of

Rs. 45,955

per unit

(E)

Others:

(i).

Unaccompanied personal baggage

Each

129.03

215.05

(ii).

Provisions, groceries, food item, Vegetables and

Fruits of all kinds for passengers / cruise vessels

M.T.

55.18

91.98

3.1.2 Cargo Free of Wharfage

Sl.

No.

Description

1

Sweepings collected from wharf / sheds.

2

Pallets used for the export of palletized cargo from the wharves.

3

Cargo/Containers transferred from one hatch to another of the same vessel neither manifested

nor-unloaded from the vessel.

4

Bonafide consumable / non-consumable ship stores. However, a documentation fee of

Rs.1,323/- per shipping bill shall be levied

5

Bonafide passengers’ and seamen’s baggage and personal effects accompanying them.

6

Postal Mail bags.

7

Goods consigned to or by the ChPA and goods consigned in the name of Govt. of India on

ChPA account

8

Cargo brought by vessel, but not manifested for / landed at Chennai Port, shall be exempted

from payment of wharfage.

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

81

Notes to Schedule 3.1.1 and 3.1.2:

(1)

Assessment of cargo shall be done on the basis of the description of the cargo as given in the Bill

of entry / coastal bill of lading in case of import cargo and shipping bill in the case of export cargo,

that best fits the item description covered under the above schedule. The description in the invoice and

packing list will also be considered, if required.

(2)

Wharfage shall be collected at the rates specified in the Schedule on the basis of:

(a) Vessel’s draft survey certificate / Vessel’s manifested quantity in case of dry bulk cargo;

(b) Weighment certificate in case of excess landed cargo;

(c) Shore tank receipt quantity certified by the surveyor if stored in shore tanks or quantity as per

Vessel’s ullage report certified by the surveyor in case of direct delivery from the vessel in case of

liquid bulk;

(d) Bill of Entry / Shipping Bill / Invoice / Packing list quantity in all other cases.

(3)

Ad valorem wharfage on imports shall be calculated on CIF value; on the exports on FOB value; and

on coastal cargo on value specified in the bill of coastal goods. Customs bills of entry/ shipping bill/ bill

of coastal goods shall be the main documents for assessing the value of cargo for wharfage purpose

and where it is not available, the value will be determined based on Bill of Lading/ invoice, etc.

(4)

Before classifying any cargo under unspecified category in the wharfage schedule, the relevant Customs

classification shall be referred to find out whether the cargo can be classified under any of the specific

categories mentioned in the wharfage schedule.

(5)

Cargo landed from vessel in distress and reshipped in the same vessel, one time wharfage shall be

levied as per the above schedule. Likewise, cargo loaded into a vessel and subsequently unloaded

due to various reasons and reshipped in the same vessel, no wharfage shall be payable. However,

wharfage shall be levied again if the cargo is reshipped in another vessel.

(6)

(a) Cargo not meant for Chennai Port landed and transshipped shall be assessed for each handling

@ 75% of the wharfage applicable to that cargo. Steamer Agent shall arrange for movement of Cargo

from one berth to another, if required.

(b) Cargo discharged and re-loaded on the same vessel in the same voyage or transshipped from

vessel to vessel directly, shall be assessed for each handling @ 50% of the wharfage applicable to

that cargo.

(c) Cargo manifested for Chennai and subsequently amended for ‘transshipment’, shall be assessed for

each handling @ 100% of the wharfage applicable to that cargo.

(7)

Cargo destuffed from / stuffed into LCL containers will attract the wharfage as per Schedule 3.1.1.

(8)

“Defence stores” would include ‘Bombs, grenades, torpedoes, mines, defence vehicles, missiles, missile

tanks and similar munitions of war and parts thereof, cartridges and other ammunition and projectiles and

parts thereof, including shot and cartridges wads coming under Arms, Ammunition, parts and accessories

thereof but the reference to “parts thereof ” does not include radio or radar apparatus as per note no.2

of Chapter no. 93 of Customs Tariff of India.

(9)

In case of Agreement / MoU entered by the port with the port users for handling cargo at ChPA, the

wharfage will be applicable as per the Agreement / MoU.

(10)

Cargo brought into the Port for export, if taken out of the Port for any reason, a fee equivalent to

wharfage charges applicable for such cargo, is payable irrespective of the cargo stored on transit or

rental terms and free period as applicable shall be allowed.

(11)

Hazardous Cargo shall attract premium 50% of the normal applicable wharfage charges.

(12)

(a) Vessels calling the Port, which are declared as cargo in the Import General Manifest or Export

General Manifest for the purposes of Customs Act, 1962 shall not be treated as cargo and no wharfage

shall be levied on such vessels and only vessel related charges would be collected if the vessels come

into the port on their own steam and sail out of the port limits on their own steam. In such case, a

Facilitation Fee of Rs.25,000/- shall be levied on such vessel for using the port facility. However, when

loading or unloading of cargo / container takes place to / from such vessels within the port limits,

cargo / container related charges including wharfage shall be applicable as per SoR on such cargo /

container, declared in the manifest (IGM/EGM).

82

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(b) When a vessel carries another vessel as cargo for discharging in the port, either on the quay /

jetty or foreshore (wharf), or loads another vessel as cargo on board itself from such wharf of the port,

in such cases, such loaded / unloaded vessels are ‘cargo’ on which cargo related charges including

‘wharfage’ are leviable.

3.2:

Charges for permitting Private Cranes inside the Port for cargo landing/loading operations from

Ship to Shore and vice versa

Sl. No.

Description

Rate per M.T. or part thereof (in Rs.)

Coastal

Foreign

1

Dry bulk cargoes

9.70

16.17

2

Break bulk – package weighing

Upto 30 T

19.40

32.34

3

Break bulk – package weighing

more than 30 T

32.28

53.79

Note:

Charges prescribed in Schedule No. 3.2 are payable for actual deployment of Private Cranes. The above

cranage charges shall not be applicable for cargoes loaded/landed for Ro-Ro vessels on their own wheel or by

using MAFI/Tug master

3.3

Demurrage Charges

3.3.1 Free period for storage of cargo in transit areas

Sl.

No.

Description

Free period

(in Days)

Day of commencement of free period

1

Import Cargo

(i)

Other than direct delivery

7

Day following the Vessel Completion Date

(ii)

Cargo sold in auction

7

From the date of delivery order of the port

2

Export Cargo

(i)

Cars through Ro-Ro vessels

20

Actual day of admission of the cargo in the

port premises

(ii)

All other cargo

30

- do -

(iii)

Export cargo stored in transit

area, shut out by the ship or

prevented from shipment by Act of

God, such as cyclone, grounding

of vessels, etc. and removed out

of port premises

7

Day following the Vessel Completion Date

or day following the Customs shut out order,

whichever is earlier.

3

Salvaged goods

7

Day of salvage

4

Transshipment cargo

21

Day following the Vessel Completion Date

5

Sludge oil

3

Day following the actual date of completion

of discharge

Notes:

(1)

Whenever discharge of Import cargo is suspended or stopped for more than 48 hours for any reason

not attributable to Port and / or removal of vessel from the berth before complete discharge of the

manifested quantity, free days shall be declared for the cargo already discharged from the date of

suspension / stoppage of such discharge. Free days for the balance cargo on board shall be declared

after discharge.

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

83

(2)

The period from the date of commencement of loading of export cargo to the date of completion of

loading shall also be free for export cargo.

(3)

The total free period prescribed in schedule 3.3.1, Sl. No. 2 (i) & (iii) shall be limited to 20 days and

Sl. No. 2 (ii) & (iii) shall be limited to 30 days.

(4)

For direct delivery of cargo, a free time of 3 shifts excluding the landing shift shall be allowed, after

which demurrage applicable for import cargo shall be levied.

(5)

No free days will be allowed for cargo declared as unfit for human consumption by the Competent

Authority and destroyed by Port.

(6)

When an import cargo is stored in transit terms and then converted into re-export, free period will be

considered from the date of filing of export documents like Shipping Bill.

(7)

If the shut out cargo is taken out from Transit area /Port premises, upon the request of the Exporter/

Agent enclosing necessary Customs permission, the details of the permission shall be entered in the

Export Application and delivery permitted under Special Vehicle Ticket duly forfeiting the wharfage charges

and on collection of applicable demurrage charges from the date of admittance of cargo.

(8)

Export cargo if not loaded to a vessel shall be permitted to be loaded to another vessel by amending/

crossing the EA. Original admittance date shall be reckoned for calculation of free days. No additional

wharfage shall be payable in such cases.

(9)

Cargo moved to the transit area not loaded to the designated vessel shall be allowed to be moved

back to the plot and allowed to export. Plot storage time will be considered as dies-non and original

admittance date in the transit area shall be reckoned for calculation of free days.

3.3.2 Schedule of Demurrage Charges after free period

Sl.

No.

Description

Rate per wharfage unit per day or part thereof

(in Rs.)

Cargo stored in open

space

Cargo stored in covered

Space

1

Import cargo

(i) For the first 7 days

30.65

46.03

(ii) For the next 10 days

61.30

92.04

(iii) For the next 13 days

91.94

138.06

(iv) Thereafter

186.03

279.56

2

Export cargo and

Transshipment cargo

 

 

(i) For the first 7 days

30.65

46.03

(ii) For the next 3 days

61.30

92.04

(iii) Thereafter

186.03

279.56

Notes:

(1)

Demurrage charge on both import and export cargo shall not accrue for the period when the port is

not in a position to deliver/ ship cargo when requested by the user.

(2)

If operational area is licensed on rental terms to the users, demurrage charges on cargo stored thereat

shall not be levied again.

(3)

The demurrage charges on hazardous goods shall be levied at 50% above the normal rates specified

in above schedule.

(4)

In cases where the wharfage is based on per each unit, cubic metre and on ad valorem, demurrage

shall be reckoned with on gross weight (per M.T. or part thereof).

(5)

Demurrage leviable in respect of abandoned, uncleared and unclaimed cargo sold by the Port in public

auction shall be limited to 6 (six) months from the date of its accrual, or the date of receipt of letter

of abandonment by Port, whichever is earlier.

84

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

(6)

Demurrage leviable in respect of cargo declared as unfit for human consumption by the Competent

Authority and destroyed by Port shall be limited to 6 (six) months from the date of its accrual and, or

the date of condemnation by the Competent Authority, whichever is earlier. In case the cargo is certified

for any other usage, the demurrage shall be levied till the date of clearance.

(7)

Where goods are detained by the Commissioner of Customs on account of Import/ Export Control

formalities and certified by the Commissioner of Customs to be not attributable to any fault or negligence

on the part of the Importer/ Exporter, for such period of detention under 5(i) and 5(ii), the demurrage

charges shall be recovered as under:

Particulars

Charges

First 30 days of detention

Free

31 days to 60 days

50% of applicable demurrage charges

Beyond 60 days

100% of applicable demurrage charges

The first 30 days shall be reckoned with as follows:

(i) First 30 days after expiry of free days if cargo is detained by the Customs before expiry of free

days and,

(ii) First 30 days from the date of detention if cargo is detained by the Customs after accrual of

demurrage charges.

The detention certificate for availing the above concession shall be submitted within a period of six

months from the date of detention of goods.

(8)

Demurrage shall not be collected if the cargo is moved from vessel hook point to licensed plots within

the Customs bound area of Chennai Port Premises before Customs issues OOC and Agents issue

Delivery Order, subject to the licensee of the plot indemnify the ChPA against any claim for Customs

Duty, pilferage, damages etc.

3.3.3 Charges to be recovered from Customs on goods confiscated by Customs

Pre-confiscation

charges

Cargo related charges accrued on the goods from the date of expiry of free days upto

the date of confiscation, limited to a maximum of 4 months. The amount due shall also

be limited to the extent of amount available from the Customs from the proceeds of sale

of confiscated goods.

Post

confiscation

storage charges

Rs.77/- per wharfage unit per day or part thereof, if unit of levy of wharfage is on weight /

volume basis.

Rs.431/- each per day or part thereof, if unit of levy of wharfage is on each / ad valorem

basis.

Removal charges

Rs.539/- per M.T. or part thereof

3.4

Other Cargo Related Charges

Sl.

No.

Description

Rate per M.T. or part

thereof

(in Rs.)

1.

Environmental Charges on all dry bulk cargo

8.61

2.

Cargo Removal charges for each removal

270

3.5

Mandatory User Charges (MUC) levied by NLDSL

An amount of Rs.145/- per container will be levied on all containers (except transshipment and coastal)

towards Mandatory User Charges (MUC) for the Logistics Data Bank (LDB) service rendered by NICDCL.

NLDSL will also collect Rs.25/- per container (except transshipment and coastal) totaling the aggregate

charges of Rs.170/- per container and pass on to IPA for Maritime Sector Development Fund.

(Approved by MoPSW vide letter No. PD-14033/34/2017-PD-V dt.05.11.2024 and valid for three years

i.e., from 28.10.2024 to 27.10.2027)

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

85

3.6

Charges for Operation of Drive Through Container Scanning System

Sl.

No.

Description

Unit

Rate (in Rs.)

1.

Scanning Charges for

Containers

Per TEU

20.00

Notes:

(1)

The above charges will be collected on all Foreign – laden containers.

(2)

The above charges will be collected by CCTPL / CITPL from the Liners on behalf of ChPA.

3.7

Charges for the use of Chennai Port Parking Plaza (CPPP)

3.7.1 Charges on Containers for intended use of CPPP

Sl.

No.

Description

Unit

Rate (in Rs.)

1.

Charges for the intended use of

Chennai Port Parking Plaza

(CPPP)

Per TEU

30

Notes:

(1)

The above charges will be levied on all containers including Coastal Containers except Transshipment

/ Restow / rail bound containers.

(2)

The above charges will be collected by CCTPL / CITPL from the Liners on behalf of ChPA.

3.7.2 Charges for overstayal of Trailers / Tankers / Trucks at Chennai Port Parking Plaza (CPPP)

Sl.

No.

Description

Unit

Rate (in Rs.)

1.

Parking Charges for overstayal of Trailers /

Tankers / Trucks beyond 24 hours without

valid documents at Chennai Port Parking

Plaza (CPPP)

Per Trailers / Tankers / Trucks

per day

150

Notes:

The above charges will be collected by Chennai Port Parking Plaza operator on behalf of ChPA.

- - - End of Chapter – III - - -

86

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

CHAPTER – IV

Container Handling Charges

(For containers handled in port operated berths)

4.1

Wharfage on Containers including Shipper Own Container and MAFI

Sl.

No.

Description of Cargo

Unit

Rate (in Rs)

Coastal

Foreign

(A)

Containers other than Shipper own

Containers

1

Empty

(a). Upto 20 Feet

Each

81

134

(b). Above 20 Feet and upto 40 Feet

Each

121

202

(c). Above 40 Feet

Each

161

268

2

Laden

 

 

(a). Upto 20 Feet

Each

795

1324

(b). Above 20 Feet and upto 40 Feet

Each

1192

1986

(c). Above 40 Feet

Each

1588

2646

(B)

Shipper own Containers and MAFI

1

For MAFI / Container (Box) only

(a). Upto 20 Feet

Each

81

134

(b). Above 20 Feet and upto 40 Feet

Each

121

202

(c). Above 40 Feet

Each

161

268

2

Cargo loaded on MAFI/Cargo stuffed/destuffed in

the SOC

In addition to the charges in [(B)1.] above,

commodity-wise wharfage as per Sch.3.1.1. shall

also be charged

Notes:

(1)

(a) Container / MAFI not meant for Chennai Port landed and transshipped shall be assessed for each

handling @ 75% of the wharfage applicable to that Container / MAFI. Steamer Agent shall arrange for

movement of Container / MAFI from one berth to another, if required.

(b) Container / MAFI discharged and re-loaded on the same vessel in the same voyage or transshipped

from vessel to vessel directly, shall be assessed for each handling @ 50% of the wharfage applicable

to that Container / MAFI.

(c) Container / MAFI manifested for Chennai and subsequently amended for ‘transshipment’, shall be

assessed for each handling @ 100% of the wharfage applicable to that Container / MAFI.

(2)

No wharfage shall be applicable for Empty containers permitted for domestic movement as certified by

the customs department brought into the Port to stuff cargoes for delivery out of the port or for export.

Such containers should leave the Port within 6 shifts including the shift of entry into the port. After 6

shifts, charges for storage would be levied on per day basis at the rate applicable for storage charges

for 4 days and beyond as mentioned under 4.2.

(3)

For IMDG container, Wharfage is 1.5 times of the above table.

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

87

4.2

Demurrage / Storage Charges on Containers including Shipper Own Container and MAFI

Sl.

No.

Description

Rate per day or part thereof

Coastal container

(in Rs.)

Foreign container

(in USD)

20’

40’

Above

40’

20’

40’

Above

40’

1

Imp. & Exp. – Laden & Empty

First 3 days

Free

Free

Free

Free

Free

Free

4 – 15 days

155.47

310.94

466.41

5.93

11.86

17.79

16 – 30 days

310.94

621.88

932.82

11.86

23.72

35.58

Beyond 30 days

621.88

1243.76

1865.64

23.72

47.44

71.16

2

Transshipment & ICD - Laden

& Empty

 

 

 

 

 

 

First 15 days

Free

Free

Free

Free

Free

Free

16 – 30 days

155.47

310.94

466.41

5.93

11.86

17.79

31 – 45 days

310.94

621.88

932.82

11.86

23.72

35.58

Thereafter

621.88

1243.76

1865.64

23.72

47.44

71.16

Notes:

(1)

(a) The free period for import containers will commence from the date following the day of landing of

the container from the vessel upto the day of loading / delivery / removal of the container.

(b) The free period for export containers will commence from the day the container enters into the

Port.

(2)

For purposes of calculation of free period, Customs notified holidays and closed holidays declared by

the Port shall be excluded.

(3)

Over high and over dimensional containers shall attract 1.5 times the normal demurrage charges.

(4)

The storage charges on abandoned FCL containers/Shipper owned containers shall be levied upto the

date of receipt of intimation of abandonment in writing or 75 days from the day of landing of container,

whichever is earlier subject to the following conditions:

(a) The consignee can issue a letter of abandonment at any time.

(b) If the consignee chooses not to issue such letter of abandonment, the Container Agent (CA)/ Main

Line Operator (MLO) can also issue abandonment letter subject to the condition that:

i.

the CA / MLO shall resume custody of container along with cargo and either take back it or

remove it from the port premises; and

ii.

the CA / MLO shall pay all port charges accrued on the cargo and container before resuming

custody of the container.

(c) The container Agent / MLO shall observe the necessary formalities and bear the cost of transportation

and destuffing. In case of their failure to take such action within the stipulated period, the storage

charge on container shall be continued to be levied till such time all necessary actions are taken by

the shipping lines for destuffing the cargo.

(d) Where the container is seized/confiscated by the Custom Authorities and the same cannot be

destuffed within the prescribed time limit of 75 days, the storage charges will cease to apply from the

date the Customs Order release of the cargo subject to lines observing the necessary formalities and

bearing the cost of transportation and de-stuffing. Otherwise, seized/confiscated containers should be

removed by the Lines/consignee from the port premises to the Customs bonded area and in that case

the storage charges shall cease to apply from the date of such removal.

- - - End of Chapter – IV - - -

88

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

CHAPTER – V

Stevedoring and Clearing & Forwarding Charges

5.1

Composite rate for deployment of Labour for stevedoring operations

Sl.

No.

Category of

worker / staff

Agricultural produce such as cereals

and pulses of all kinds including

sugar of all kinds in bags / jumbo

bags or pallets

All other cargo

Rate per shift or

part thereof

(in Rs.)

Rate per half shift

(in Rs.)

Rate per shift or

part thereof

(in Rs.)

Rate per half shift

(in Rs.)

1

On Board

Supervisor

5,517

2,758

11,505

5,754

2

Tally Clerk

5,076

2,539

10,585

5,293

3

Tindal

4,040

2,020

8,424

4,213

4

Maistry

4,164

2,082

8,683

4,342

5

Winch Driver

3,964

1,983

8,264

4,133

6

Signal Man

3,968

1,986

8,273

4,137

7

Mazdoor

3,465

1,734

7,225

3,614

Notes:

(1)

The above charges shall be paid by the Stevedores prior to the engagement of labour.

(2)

The stevedore will be permitted to indent gang for half shift instead of full shift for incoming and finishing

vessels, by making payment of charges mentioned for half-shift in the above schedule.

(3)

Whenever the services of half shift gang is converted into full shift gang, the Stevedores shall pay one

full gang charges over and above the half shift gang charges as a deterrent measure.

(4)

In case of shortage of manpower in one category, the available manpower in other categories will be

deployed, subject to suitability.

(5)

Rates in respect of additional manpower required by stevedores shall be payable as per the schedule

above.

(6)

The piece-rate incentive shall be paid by the Stevedores at actuals separately, as per the datum issued

by the Traffic Department.

5.2 Royalty payable as per CHPA (Licensing of Stevedoring and Shore Handling) Regulations, 2021

(in Rs.)

Sl.

No.

Cargo Type

Stevedoring

Operations

Shore Handling

Operations

1

Dry bulk & Break Bulk

3.42 per ton

3.42 per ton

2

Automobiles (upto four wheelers)

4.57 per vehicle

4.57 per vehicle

3

Automobiles (above four wheelers

& MAFI)

13.70 per vehicle

13.70 per vehicle

4

Container (Laden)

91.40 per TEU

91.40 per TEU

5

Container (Empty)

11.42 per TEU

11.42 per TEU

Notes:

(1)

Every agent shall be liable to pay royalty in advance, prior to calling of the vessel, on the basis of

import general manifest quantity, in case of import and on the basis of the quantity declared by the

vessel’s agent or exporter or export general manifest, in case of export and the actual royalty payable

shall be calculated after completion of the vessel’s operation based on the total quantum of cargo

handled by the agent.

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

89

(2)

The above Royalty rate is subject to annual indexation to an extent of 60% of the variation in the

Wholesale Price Index (WPI) as communicated by the Competent Authority and the indexed royalty will

be effective from 1st April of every year.

- - - End of Chapter – V - - -

90

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

CHAPTER – VI

Miscellaneous Charges

6.1

Supply of water to vessels by Port:

Sl.

No.

Description

Unit of Levy

Coastal vessel

(in Rs.)

Foreign vessel

(in US$)

1

Water Supply at Berths

[BD-1 & BD-3]

Per 1,000 litres

or part thereof

500

9.37

6.2

Passenger fees (other than Cruise vessel)

Sl.

No.

Description

Rate per person (in Rs.)

Coastal vessel

Foreign

vessel

1

Embarkation / Disembarkation

charges (Defence personnel on duty

are exempted)

87

173

Notes:

(1)

During the stay of the vessel, the above charges are payable only for the first embarkation / disembarkation,

irrespective of no. of times a passenger embark / disembark.

(2)

For the cruise vessel, Head Tax (Embarkation / Disembarkation charges) will be levied as per Schedule

2.3.5

6.3

Charges for Hire of Port Equipment

Sl. No.

Description

Unit of levy

Rate (in Rs.)

1

Tanker Trailer of 10 KL capacity

Per shift or part thereof

33,333

2

Gangway

Per shift or part thereof

2,151

3

Oil Skimmer

Per shift or part thereof

5,592

4

Oil Barrier (per meter length)

Per shift or part thereof

378

5

Fire Tender and gear

Per hour or part thereof

6,452

6

Fire Trailer Pump

Per hour or part thereof

1,076

Note:

In case the deployment of any equipment to combat fire hazard caused due to any leakage of Liquid / Gas

Pipelines or Oil spillage from any vessel, the charges for the same shall be levied on the owner of the pipelines /

agent of the vessel irrespective of whether any requisition for the same is given or not. Further, in such case

the cost of Foam (along with supervision cost of 20%) used to contain the Fire hazard shall also be recoverable.

6.4

Charges for issuance of License

Sl.

No.

Description

Duration

Rate (in Rs.)

Fresh

Renewal

Security Deposit

1

Stevedoring & Shore handling

3 Years

1,08,000

1,08,000

5,00,000

2

Steamer Agents

3 Years

5,000

5,000

-

3

Harbour Craft License

3 Years

5,000

5,000

-

4

License for supply of Fresh Water Issue

3 Years

5,000

5,000

-

5

Port reception facility – Collection of Water

Waste/Oil Waste, Garbage & Sewage

1 Year

5,000

5,000

2,00,000

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

91

6.5

Charges for erecting Hoardings, Sign boards, Neon boards, etc. in the Port Premises

Sl. No.

Description

Rate per sq. m. per year or part

thereof (In Rs.)

1

Single sided

4,947

2

Double sided

8,279

3

Neon boards

3,334

Note:

The terms & conditions will be as per the letter of permission issued by the Port.

6.6

Charges for Harbour Entry Permit (HEP)

Sl.

No.

Description

Period of validity of HEP

(Rate in Rs. including GST)

Daily

Monthly

Yearly

1

Individual

13

191

508

2

Vehicle

32

382

2539

3

Cargo Handling Equipment

(Poclain, Dozers, Excavators,

Forklift, Dumpers, JCB Earthmover,

Crane, Mobile Crane, Pay loader)

51

571

3807

Notes:

(1)

The rate for RFID card is Rs.108/- per card including GST.

(2)

A penalty equal to respective daily charges will be levied for overstay inside the Port without a valid

HEP calculated for the period of overstay from the date of expiry of HEP.

(3)

An amount of Rs.1,270/- (including GST) is to be recovered for release of blacklisted vehicle.

(4)

Central /State Government employees on official duty, students on educational visit, visitors approved

by the Port administration are exempted from payment of HEP fee.

6.7

Charges for use of Weigh Bridge installed by authorized Private Operators

Sl. No.

Description

Unit of levy

Rate (in Rs.)

1

Weighment charges on Net weight of

the cargo

Per MT

6.70

6.8

Improper/ unsafe Pilot ladder, improper Boarding/ disembarking arrangements, inability to provide

Combination Ladder

Sl.

No.

Description

Unit of levy

Coastal

(in Rs.)

Foreign

(in US $)

1

Improper / Unsafe Pilot Ladder

Per vessel

24,000

450

Note:

Warnings will be issued for the first two instances in a financial year and from the 3rd instance onwards,

the above charges will be levied on the Steamer Agent

92

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

6.9

Other Miscellaneous Charges

Sl.

No.

Description

Unit

Rate (in Rs.)

1

Charges for flushing the pipelines with seawater

Per day or part

thereof

15,060

2

Supply of fresh water to vessels (other than BD-1 &

BD-3) through licensed agencies

Per Trip

500

3

Charges for taking photographs, shooting films,

videography in the port premises

(i). Making Feature films / Documentary films

Per day or part

thereof

2,68,820

(ii) Photography / Videography

5,390

(iii). Photography / Videography using Drone

80,660

4

Charges for issue of certificates/ documents from Port

records

Per sheet

77

5

Port Reception Facility (PRF)

(i) Handling Charges for Waste Water

Per metric tonne

80

(ii) Documentation and processing fees

Each collection

500

- - - End of Chapter – VI - - -

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

93

CHAPTER – VII

Port Railway Charges

7.1

Rates notified by ChPA

7.1.1 Haulage Charges

Sl.

No.

Description

Non-Containerised

Cargo

Container

Upto 20 Feet

Above 20 Feet &

upto 40 Feet

Above 40 Feet

1

Loaded wagon

Rs. 39/- per M.T.

Rs.150/- per

container

Rs.300/- per

container

Rs.450/- per

container

2

Empty wagon used as

dummy

Rs.150/- per wagon

Rs.75/- per wagon

3

Additional operations -

Loaded or empty wagon

---

Rs.300/- per wagon

7.1.2 Charges for use of Electronic In-motion Rail Weigh Bridge

Sl. No.

Description

Unit of levy

Rate (in Rs.)

1

Loaded Wagon

Per wagon

162

2

Empty Wagon

Per wagon

82

Notes:

(1)

The above charges include issuance of weighment Certificate.

(2)

Weighment charge against empty wagon shall be levied only if the same is undertaken as per requirement.

7.2

Rates notified by Railway Board

The following Port railway charges are payable at the rates notified / approved by the Railway Board

from time to time. The present rates are as follows:

7.2.1 Terminal Handling Charges

Sl.

No.

Description

Non- Containerised

Cargo

Containerised Cargo

1

Terminal Handling

charges

Rs.31.19 per Tonne or

part thereof

Rs.31.19 per Tonne or part

thereof

7.2.2 Storage Charges

Goods consigned by rail to ChPA are free of storage charges if cleared within 24 hours after the

completion of unloading operations. Thereafter, storage charges are payable as follows:

Sl.

No.

Classification

Charges payable after expiry

of Free time

Unit

1

For goods of every description except

goods in bulk such as ore, molasses,

coal, charcoal, firewood, sand, shingle,

stone etc.

For the first day - Rs.10/-.

For the next day – Rs.15/-

For subsequent days – Rs.20/-

Per tonne or part thereof per day

or part of a day in excess of free

time

2

For goods in bulk such as ore,

molasses, coal, charcoal, firewood,

sand, shingle, stone, etc.

For the first 3 days – Rs.8/-

For the subsequent days –

Rs.10/-

Per tonne or part thereof per day

or part of a day in excess of free

time

3

Rail borne goods missent to the

harbour

-Nil -

94

TAMIL NADU GOVERNMENT GAZETTE

[Part III—Sec. 2

Sl.

No.

Classification

Charges payable after expiry

of Free time

Unit

4

Rail-borne goods consigned to the

Board

-Nil -

7.2.3 Demurrage on wagons

Demurrage charges are payable beyond the free period notified by the Railway Board as follows:

Sl.

No.

Duration of excess detention beyond free time

Unit

Rate

1

Upto 6 hours

Per wagon per hour or part thereof

Rs.150/-

2

Beyond 6 hours upto 12 hours

Rs.165/-

3

Beyond 12 hours upto 24 hours

Rs.188/-

4

Beyond 24 hours upto 48 hours

Rs.225/-

5

Beyond 48 hours upto 72 hours

Rs.300/-

6

Beyond 72 hours

Rs.450/-

7

Beyond 96 hours

Rs.900/-

7.2.4 Stabling charges on privately owned wagons including wagons owned by Container Train Operators:

Sl.

No.

Description

Unit

Rate

1

Stabling charge

per wagon per day or

part of a day

Rs.705/-

Notes:

(1)

The above charge shall be levied from the time of release to the time of removal for inward rakes &

from the time of advice to the time of removal for outward rakes.

(2)

The rate of stabling charge will be uniform for all types of wagons (BG 6 wheeled / 8 wheeled / 12

wheeled, etc.). When privately owned stock is detained in the Port railway siding except CITPL 1 & 2

& N & C Yard, Stabling charge will be levied. Stabling charges are not applicable when the wagons

are stabled on railway/port account.

(Approved by Ministry of Railways vide letter No. TC-I/2021/201/efile/1(3344010) dt.22.04.2026 and valid

for one year i.e., from 01.05.2026 to 30.04.2027)

- - - End of Chapter – VII - - -

June 10, 2026]

TAMIL NADU GOVERNMENT GAZETTE

95

CHAPTER – VIII

PERFORMANCE STANDARD

Sl. No.

Performance Parameters

Unit

Performance

Standard

(1)

Cargo Related Services

(i)

Average Ship Berth day Output

M.T.

16500

(2)

Vessel Related Services

(i)

Average Turnaround Time

Day

2.10

(ii)

Average Pre-berthing Detention (on Port A/c)

Hours

0.50

- - - End of Chapter – VIII - - -

Chennai  -  600 001,

MALLA SRINIVASA RAO,

5th June 2026.

Financial Adviser and Chief Accounts Officer,

Chennai Port Authority.

PRINTED  AND  PUBLISHED  BY  THE DIRECTOR  OF  STATIONERY  AND  PRINTING, CHENNAI

ON  BEHALF  OF  THE  GOVERNMENT  OF  TAMIL  NADU