R.N.I.No. TELMUL/2016/73158.
[Price : `.
`.`.
`.`.35-00.
HSE No. 1051/2017-19.
THE TELANGANA GAZETTE
PART- II EXTRAORDINARY
PUBLISHED BY AUTHORITY
No. 85 ]
HYDERABAD, THURSDAY, MAY 31, 2018.
NOTIFICATIONS BY HEADS OF DEPARTMENTS, Etc.
–––x–––
G-154/1.
[ 1 ]
PUBLIC WORKS NOTIFICATIONS
TELANGANA STATE ELECTRICITY REGULATORY COMMISSION: HYDERABAD
No. TSERC / 3 / 2018
Dated: 30.05.2018.
Regulation No. 3 of 2018
Telangana State Electricity Regulatory Commission (Forecasting, Scheduling,
Deviation Settlement and Related Matters for Solar and Wind Generation
Sources) Regulations, 2018
INTRODUCTION.
Electricity is an essential commodity and it is governed by the Electricity Act,
2003 (Act, 2003) at present. The dynamics of demand and supply are based on
several factors including the weather conditions and the time of usage. As electron that
is produced is required to be consumed as otherwise, it is wasted. In order to avoid the
situation of wastage of generation, proper mechanism should be in place to take
2
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
maximum benefit of the limited resources and within the specific time to meet the
status of essential commodity.
2.
The Act, 2003 prima facie assumes and requires that the interest of consumer is
paramount, but at the same time, the electron that runs through generation,
transmission and distribution-cum-supply is better forecasted, settled timely on
accounting of generation and punish the stakeholders for deviating from the set
procedure. In order to facilitate the above position, several steps including the policy
initiatives have been taken by the Government of India, State Government and other
competent authorities.
3.
While there are several stakeholders under the Act, 2003 starting with the
Commission up to the distribution licensee and the end consumer, the generation that
is made available has to be despatched properly and in an orderly manner by following
a grid code providing for the technical parameters required to be adhered to by all the
stakeholders.
4.
To facilitate the above aspect, it is also paramount that the demand is
forecasted properly, deviations in transmission, distribution and supply for the energy
are properly settled, so as to avoid losses to the producers of the electricity more
particularly generators. Due to the encouragement policies and magnificent targets set
forth by the Governments, renewable energy generation more particularly wind and
solar are being relied upon for generation and supply of power. The distribution
licensees are also seeking to procure more and more power generated from these
sources. As these are primarily natural sources and renewable for time immemorial to
come, the same will be relied upon for meeting the demand for power supply. At the
same time, the generation of power from these sources is also not on firm basis and is
dependent on vagaries of nature. Therefore, there is a necessity of forecasting
generation from these sources as well as proper settlement mechanism and allied
aspects for deviations have to be provided for.
5.
CERC had originally notified the technical rules for running the wire business
commonly known as grid code. Such a code has been notified under section 79 (1) (h)
of the Act, 2003. CERC made amendments to the Grid Code and the Deviation
Settlement Mechanism Regulation to safeguard the Grid due to the large scale
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
3
integration of wind and solar capacity what was added to the grid in the past few years
and more is expected to come online over the next 7 years, in alignment with Central
Government’s target of 100 GW solar and 60 GW wind capacities by 2022. Most of
these stations connect directly to the State Transmission Utility (STU) grid and some
are partially connected to Central Transmission Utility (CTU) grid. The CERC
Regulations take care of the Grid security and stability problems associated with the
Solar and Wind generating stations connecting to the CTU grid. As the same applies to
the State of Telangana until this Commission frames a similar regulation under section
86 (1) (h) of the Act, 2003.
6.
However, with a similar large scale integration of renewable energy based
generating stations particularly wind and solar stations with the state grid in the earlier
years and as well as in the near future, managing the state grid will be a daunting task
for State Load Despatch Centres (SLDCs). It is essential that the grid operator has
visibility into how much renewable energy (RE) is expected to be injected into the grid.
This is especially critical for variable and uncertain sources such as wind and solar.
Forecasting and scheduling of these generators is critical to anticipate balancing
requirements and procure requisite reserves to maintain load-generation balance and
grid reliability. At the same time, due to the intermittent nature of these sources,
special provisions must be made so that the generators are not unduly penalized.
7.
To address the above problems, Forum of Regulators (FOR) the apex body of
regulators under section 166 (2) of the Act, 2003 has made available a model
regulations on forecasting, scheduling, deviation settlement and related matters of
solar and wind generation sources and circulated the same to the Electricity
Regulatory Commissions of all the States and Union Territories.
8.
The State of Telangana is also likely to face the grid security and stability
problems due to the expected large scale addition of solar and wind generation
capacities to the state grid in the near future. In order to mitigate the problems that
may be affecting the consumers, it is felt necessary to frame a Regulation on
forecasting, scheduling, deviation settlement and related matters of solar and wind
generation sources that are connected and are likely to connect to the state grid.
Towards this objective TSERC published a draft Regulation to elicit and consider the
views of all the stakeholders before notifying the final Regulation. The objective of the
4
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
Regulation is to facilitate large scale grid integration of solar and wind generating
stations while maintaining grid stability and security through forecasting, scheduling
and commercial mechanism for deviation and settlement of power supplies of these
generators.
9.
In this regard the following is considered by the Commission.
a) The CERC issued “CERC (Deviation Settlement Mechanism and related
matters) Regulations, 2014” applicable to sellers and buyers involved in the
transactions facilitated through short-term open access or medium-term
open access or long-term access in inter-state transmission of electricity.
The Regulation determined the charges for deviation, payment of charges
and their accounting and limits of deviation. The objective of the Regulation
is to maintain grid discipline and grid security as envisaged under the grid
code through the commercial mechanism for deviation settlement through
drawl and injection of electricity by the users of the grid.
b) Vide the second amendment to the above Regulation made dated
07.08.2015, a platform was provided to the bulk wind and solar generators
which are regional entities for forecasting, scheduling and deviation
settlement of energy and demand and charges for the deviation and left the
forecasting, scheduling and deviation settlement of intra-state wind and solar
generators to the SERCs.
c) The FOR has made available a model Regulation on forecasting, scheduling
and deviation settlement of wind and solar generating stations at the state
level facilitating the State Commissions for adoption and issue of Regulation
in this matter accordingly.
d) The erstwhile APERC had issued regulation for balancing and settlement of
energy and demand under clause 19.4 of APERC (Terms and Conditions of
Open Access) Regulation, 2005 (No. 2 of 2005) and pending formulation of
comprehensive settlement code for the state pool under ABT mechanism,
had issued the “APERC Interim Balancing and Settlement Code for Open
Access Transactions Regulation, 2006 (No. 2 of 2006)”. These Regulations
provide for the scheduling, balancing and settlement of energy and demand
but charges for the deviation and their payment mechanism were not
devised and provided therein.
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
5
e) Though a comprehensive balancing and settlement mechanism for the
conventional sources of generators was made available by the Commission
at Intra-state level, the additional generation produced from wind and solar
are required to be considered for deviation, balancing and settlement to be
included in the existing code as adopted at present unless separate
regulation is provided for.
10.
In exercise of the powers conferred under sub-section (3) of Section 32, sub-
section (4) of Section 33, clause (h) of sub-section (1) of Section 86 and clauses (g)
and (zo) of subsection (2) of Section 181 of the Electricity Act, 2003, (Central Act 36
of 2003) and all other powers hereunto enabling, the Telangana State Electricity
Regulatory Commission hereby makes the following Regulation, namely:
1.
SHORT TITLE AND COMMENCEMENT
(a) This Regulation may be called the “Telangana State Electricity Regulatory
Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters
for Solar and Wind Generation Sources) Regulation, 2018.”
(b) This Regulation shall apply to all wind and solar generators connected to the
state grid, including those connected via pooling stations, and selling power
within or outside the State.
(c) This Regulation shall come into force with effect from the date of publication in the
Official Gazette for the State of Telangana.
Provided that the commercial arrangements specified in this Regulation
and the related provisions regarding deviation charges and penalty, shall come
into force in line with the time specified in the clause 19 of this Regulation.
(d) This Regulation shall apply throughout the State of Telangana.
(e) This Regulation shall be construed harmoniously with the provisions of the Act,
Rules and other Regulations of this Commission as amended and in force from
time to time. In case of any conflict or inconsistency in this Regulation with the
provisions of the Act, Rules and other Regulations of this Commission, the latter
shall prevail.
(f) The Andhra Pradesh General Clauses Act shall apply to interpretation of this
regulations.
6
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
2. DEFINITION AND INTERPRETATION
2.1 . In this Regulation, unless the context otherwise requires: -
(a) “Absolute Error” means the absolute value of the error in the actual
generation of wind or solar generator with reference to the scheduled
generation and the 'Available Capacity'(AvC), as calculated using the following
formula for each 15 minute time block (as amended thereof from time to time):
Error (%) = 100 X [Actual Generation –Scheduled Generation] / (AvC);
(b) “Act, 2003” means the Electricity Act, 2003 (36 of 2003) as amended
from time to time;
(c) “Actual Drawl” in a time-block means electricity drawn by a buyer or a
beneficiary, as the case may be, measured by the interface meters;
(d) “Actual Injection” in a time-block means the electricity generated or
supplied by the seller, as the case may be, measured by the interface
meters;
(e) “Available Capacity or AvC” for wind or solar generator means the
cumulative capacity rating of the wind turbines or solar inverters that are
capable of generating power in a given time-block;
(f) “Beneficiary ” means a person receiving electricity generated from a solar
or wind generating station including solar / wind captive generating station;
(g) “Buyer” means a person, including beneficiary, purchasing electricity
through a transaction scheduled in accordance with the Regulations applicable
for short-term open access, medium-term open access and long-term open
access;
(h) “CEA” means the authority established under sub-section (1) of section 70
of the Act, 2003 or an authority stated under sub-section (2 of section 70 of the
Act, 2003.
(i) “CERC” means the Central Electricity Regulatory Commission referred to
and established in sub- section (1) of section 76 of the Act, 2003;
(j) “Commission” means Telangana State Electricity Regulatory Commission
referred to and established under sub-section (1) of Section 82 of the Act, 2003
read with section 92 of The Andhra Pradesh Reorganisation Act, 2014;
(k) “COLLECTIVE TRANSANCTIONS” means the transactions undertaken
through the power exchange.
(l) “Deviation” in a time-block for a seller means its total actual generation minus
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
7
its total scheduled generation and for a buyer means its total actual drawl minus
its total scheduled drawl;
(m) “Distribution Licensee” means either Southern Power Distribution
Company of Telangana Limited (TSSPDCL) or Northern Power Distribution
Company of Telangana Limited (TSNPDCL) as the case may be and also
includes any other licensee to whom licence has been granted or deemed to
have been granted under sections 14 and 15 of the Act, 2003;
(n) “Forecasting Tools” for the purposes of this regulation include Data
Telemetry, Communication System and Data Acquisition System for transfer of
information to SLDC and appropriate meters for energy accounting.
(o) “Gaming” in relation to this Regulation, shall mean an intentional
mis-declaration of available capacity or schedule by any seller in order to make
an undue commercial gain through deviation charges;
(p) “Grid Code” means the grid code specified by this Commission under clause
(h) of sub-section (1) of Section 86 of the Act, 2003 as amended from time to
time;
(q) “IEGC” means the grid code specified by CERC under clause (h) of sub-
section (1) of Section 79 of the Act, 2003 as amended from time to time;
(r) “Interconnection Point” means the interface point of a generation facility
with the transmission or distribution system; and shall mean, in relation to a wind
or solar energy facility, the line isolator on the outgoing feeder on the High
Voltage (HV) side of the pooling sub-station or as provided in the CEA
(Installation and operation of meters) Regulation, 2006 as amended from time to
time;
(s) “Interface Meters” means interface meters as defined by the CEA under the
CEA (Installation and Operation of Meters) Regulations, 2006 as amended from
time to time;
(t) “Pooling station” means the sub-station where pooling of generation of
individual wind generators or solar generators is done for interfacing with the
next higher voltage level;
Provided that where there is no separate pooling station for a wind or solar
generator and the generating station is connected through a common /
dedicated feeder and terminate sub-station of distribution company / STU /
CTU, the sub-station of distribution company / STU / CTU shall be considered
8
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
as the pooling station for such wind or solar generator, as the case may be;
(u) “Qualified Coordinating Agency or QCA” means agency appointed by
wind / solar Generators registered with SLDC to act as a co-ordinating agency
on behalf of wind or solar generators connected to a pooling station and one
of such generators can also be such agency.
Provided such agency has no statutory role and is not recognized as such
under the Act, 2003, accordingly under this regulation also. Any action or
inaction on the part of the wind or solar generator shall be attributable to such
generator or other stakeholders as the case may be only, thus leaving the QCA
to be simple facilitator or coordination only.
(v) “Regional Load Despatch Centre” means the Centre established under
sub-section (1) of Section 27 of the Act, 2003.
(w) “Scheduled Generation” at any time or for a time-block or any period
means schedule of generation in MW or MWh at ex-bus;
(x) “Scheduled Drawl” at any time or for a time-block or any period of
time block means schedule of despatch in MW or MWh at ex-bus given by the
concerned despatch centre being either state or regional;
(y) “Seller” means a person, including a generating station, either selling
power to distribution licensee or supplying electricity for captive use or through
a transaction scheduled in accordance with the regulations applicable for short-
term open access, medium-term open access and long-term open access;
(z) “State” means the State of Telangana;
(aa) “State Level Entity” means an entity which is in the SLDC control area
and whose metering and energy accounting is done at the state level;
(ab) “State Load Despatch Centre or SLDC” means load despatch centre of
the State, established under sub-section (1) of Section 31 of the Act, 2003
responsible for coordinating scheduling of the state entities in accordance with
the provisions of the State Grid Code and also IEGC;
(ac) “State Pool Account” means a separate account to be maintained by
SLDC for receipts and payments on account of deviations specified under this
Regulation;
(ad) “STU” means the Transmission Corporation of Telangana (TSTRANSCO),
which is recognized and notified by the Government of Telangana to be the
State Transmission Utility under sub-section (1) of Section 39 of the Act, 2003;
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
9
(ae) “Time-block” means a time block of fifteen (15) minutes or any such
shorter duration as may be notified by Central Commission and State
Commission, for which specified electrical parameters and quantities are
recorded by special energy meter, with first time block starting at 00.00hrs or
such other period as the Commission may stipulate;
2.2. Words and expressions used and not defined in the Regulations but defined in
the Act and Reform Act shall have the meanings assigned to them in the Act or
Reform Act, Expressions used herein but not specifically defined in the
Regulations or in the Act but defined under any law passed by a competent
legislature and applicable to the electricity industry in the state shall have the
meaning assigned to them in such law. Subject to the above, expressions used
herein but not defined by a competent legislature shall have the meaning as is
generally assigned in the electricity industry.
2.3 .In the interpretation of these Regulations, unless the context otherwise requires;
a) words in the singular or plural term, as the case may be, shall also be
deemed to include the plural or the singular term, respectively;
b) references herein to the ‘Regulation’ shall be construed as a reference to
these Regulations as amended or modified by the Commission from time to
time in accordance with the applicable laws in force.
c) the headings are inserted for convenience and may not be taken into
account for the purpose of interpretation of these Regulations.
d) reference to the statutes, regulations or guidelines shall be construed as
including all provisions consolidating, amending or replacing such statutes,
regulations or guidelines, as the case may be, referred to.
3. GENERAL
3.1 Objective
a) The objective of this regulation is to facilitate a the large-scale grid integration of
solar and wind generating stations that are established in the State of Telangana
while maintaining grid stability and security as envisaged under the state grid code
through forecasting, scheduling and deviation settlement of power generation by
these generators.
b) In order to maintain system security, stability and reliability, the SLDC shall take
into consideration the forecasts done in respect of wind and solar generation for
G-154/2.
10
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
week-ahead, day-ahead and intra-day operations and scheduling and long term
forecasts for planning supply of electricity.
c) The SLDC shall make use of the flexibility provided by conventional generating
units and the capacity of inter-grid tie-lines to accommodate wind and solar energy
generation to the largest extent possible subject to grid security.
3.2. Applicability
This Regulations shall apply to all wind or solar generators (excluding Rooftop
PV Solar power projects) in Telangana connected to the intra-state
transmission system, including those connected through pooling stations and
supplying power to the DISCOMs, or to third parties through open access or for
captive consumption through open access, and selling power within or outside
the State.
Provided that, the combined installed capacity of the wind or solar
generators connected to a particular sub-station / pooling station or that of
individual generator connected to some other sub-station shall not be less
than 5 MW.
4. FORECASTING AND SCHEDULING
4.1.
The methodology for day-ahead scheduling of wind and solar energy
generating stations which are connected to the state grid and re-scheduling
them on one and a half (1.5) hourly basis and the methodology of handling
deviations of such wind and solar energy generating stations shall be as stated
hereunder and accordingly forecasting tools shall be provided by the generator
concerned or by QCA in writing as obtained from the generator(s).
4.2. (a) Wind and solar generators, either by themselves or represented by QCAs,
shall provide to the SLDC the technical specifications of the generating units
and all other associated equipment of the wind / solar farm, in such format as
may be specified by the SLDC, within the timelines specified in clause 19 of this
Regulation and thereafter, whenever there is any change in such technical
specifications.
(b) The QCA on behalf of wind and solar generators or generators themselves,
shall also provide the real time data related to power generation parameters as
applicable to the SLDC.
(c) The SLDC shall give appropriate directions under sub-section (1) of Section
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
11
33 of the Act, read with this Regulation about the information required on
technical specifications and protocol for sharing information on or before the
timelines specified in clause 19 of this Regulation.
(d) The generators are also required to share with the SLDC such technical
specifications about the establishment of the generating station, maintenance
and operation of the same, information relating to tie-lines, sub-stations and
dedicated transmission lines in accordance with this Regulation as may have
been required to be furnished to other competent authorities under any law for
the time being in force.
4.3. Forecasting shall be done by every wind and solar generator connected to the
state grid directly or through pooling station, either by itself or by a QCA on its
behalf. The SLDC shall also undertake forecasting of wind and solar power that
is expected to be injected into the grid with the objective of ensuring secure grid
operation by planning for the requisite balancing resources.
Provided that the QCA while doing forecasting on behalf of generator,
shall obtain a written consent of satisfaction of the generator before submitting
such data to the SLDC.
4.4. The forecast done by a wind or solar generator or the QCA as the case may be,
shall be provided separately for each pooling station. The wind or solar
generator or QCA will have the option of accepting the SLDC’s forecast for
preparing its schedule or provide the SLDC with a schedule based on its own
forecast. Each QCA shall coordinate the aggregation of schedules of all its
generators connected to a pooling station and communicate the same to the
SLDC.
4.5. (a) In case generator / QCA avails the services of SLDC forecast, the SLDC shall
recover the charges for such services from the beneficiary generator / QCA as
approved by the Commission. The amount recovered from this service by SLDC
shall be considered as other income and shall be given effect in the ARR of
SLDC. The generator / QCA may submit the schedule based on their own
forecast.
(b) Where the generator(s) through QCA or QCA itself avails the services of
SLDC for forecasting or scheduling, they are estopped from taking the plea, that
the error was reflected in the scheduling due to erroneous forecast by SLDC.
(c) The SLDC is in no way responsible for accurate forecasting which is to be
12
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
undertaken by the generator through QCA or generator duly establishing the
required forecasting tools.
4.6. The QCA on behalf of wind and solar generator(s) or generator(s) themselves
shall submit a day-ahead and week-ahead schedule of each generator and
aggregated schedule for each pooling station, as the case may be. Day-ahead
schedule shall contain wind or solar energy generation schedule at intervals of
fifteen (15) minutes time-block for the next day, starting from 00:00 hours of the
day, and prepared for all ninety-six (96) time-blocks. The week-ahead schedule
shall contain the same information for the next seven days or (96 X 7 time-
blocks):
Provided that the wind and solar generators, as the case may be, having
multiple transactions under a power purchase agreement and intra-state and / or
inter-state open access with a common interface meter shall submit schedules
with respect to such approved capacities allocated and such capacities alone
shall be treated as AvCs for the purpose of these transactions under this
Regulation.
Provided further that settlement of energy by SLDC will be on the basis
of aggregated schedule submitted by the generators / QCA with reference to
each pooling station.
4.7. (a) The schedule of wind and solar generators connected to the state grid,
excluding collective transactions, may be revised by giving an advance notice to
the SLDC. Such revisions shall be effective from the fourth (4th) time block, the
first being the time-block in which notice was given.
(b) In respect of wind generators, there may be one revision for each time slot
of one and a half hours starting from 00:00 hours of a particular day subject to a
maximum of sixteen (16) revisions during the day.
(c) In respect of solar generators, there may be one revision for each time slot of
one and a half hours starting from 5:30 hours up to 19:00 hours of a particular
day subject to a maximum of nine (9) revisions during the day.
4.8. The SLDC shall give appropriate directions under sub-section (1) of Section 33
of the Act, 2003 read with this Regulation about the forecasting tools, alternative
means of communication in case of telemetry or other equipment failure, formats
of forecast submission and other details along with timelines for compliance on
or before the timelines specified in clause 19 of this Regulation
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
13
Provided that the directions issued by SLDC for establishing telemetry or
other communication equipment and forecasting tools shall be adhered by all
generators. In case of failure to comply with such directions, the schedules of
the generator will not be accepted and SLDC shall be at liberty to take such
action as may be desirable or expedient to safeguard the safety and security of
the grid.
4.9. Any commercial impact on account of deviation from the schedule based on the
forecast made available by the generator or its QCA shall be borne by the wind
or solar generator either by itself or through their presenting QCA.
4.10. (a) A wind or solar generating station which is already in commercial operation
as on the date of publication of this Regulation or which may commence its
commercial operation before the date of publication of this Regulation in the
official gazette shall establish the forecasting tools either by itself or through a
QCA within the timelines as specified by SLDC in clause 19 of this Regulation.
(b) A wind or solar generating station commencing commercial operation on or
after one month of the publication of this Regulation shall not be allowed to be
commissioned unless it has established the forecasting tools either by itself or
through a QCA.
Provided that the distribution licensee shall confirm with the SLDC about
compliance of establishing forecasting tools before the generator is allowed to
synchronize with the grid on commercial basis.
5. METERING
5.1. The wind and solar generator shall install the meters in accordance with
the CEA (Installation and Operation of Meters) Regulations, 2006 as amended
from time to time.
5.2. The wind and solar generator shall also install appropriate telemetry /
communication system and Data Acquisition System for transfer of required
information for implementation of provisions of this Regulations so as to retrieve
the same on real time basis by the SLDC.
6. QUALIFYING CRITERIA FOR A QCA
6.1.
The QCA shall be appointed by wind / solar generators who may be one
of the generators or any mutually agreed agency. Such QCA shall possess
sufficient experience in forecasting and scheduling.
14
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
6.2.
The generators at a pooling sub-station may appoint one amongst themselves
or any other entity as a QCA.
6.3. The QCA shall be appointed with the approval of at least 51% of the generators
at a pooling sub-station, in terms of their combined installed capacity.
Provided that QCA may undertake forecasting and scheduling at feeder
level, however deviation accounting shall be undertaken for pooling sub-
station as a whole.
6.4. The generators shall satisfy themselves that the QCA is technically and
financially competent to undertake on their behalf the functions and discharge
the obligations specified in this Regulations.
6.5. The terms of engagement of the QCA shall include provisions on the following
aspects:
(a) The respective roles and responsibilities of the QCA and generators;
(b) The metering, billing and energy accounting arrangements;
(c) The modalities for recovery of deviation charges from the generators and
their settlement, including the principles for de-pooling;
(d) The payment security mechanism and related provisions;
(e) The events of default and their mitigation.
Provided that the QCA is not statutorily recognized authority for
omissions and commissions made by the generators and the generators shall
be directly responsible for compliance of the provisions of the Act, 2003 and
the regulations made thereunder.
7. ROLE OF QCA
7.1. For the purposes mentioned hereunder, the QCA will be facilitator between the
SLDC and all the generators, who are connected to a pooling station.
(a) providing schedules with periodic revisions on behalf of the wind / solar
generators.
(b) co-ordinating with the DISCOM / STU / SLDC, as the case may be in respect
of metering, data collection, communication and issuance of instructions for
despatch of power / curtailment thereof.
(c) undertaking commercial settlement on behalf of the generators pertaining to
generation of power injected into the grid, deviations in generation or drawl by
either of the parties, apart from payment of deviation charges to the State
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
15
Pool Account.
(d) undertaking de-pooling of payments received from the State Pool Account
towards generation or deviations made on behalf of the generators and
settling them with the individual generators.
(e) all other ancillary and incidental matters arising out of or in connection with
generation, supply, despatch and payments as may be required to be
undertaken on behalf of the generators.
Provided that in case of QCA appointed by wind / solar generator for
forecasting and scheduling work, the QCA shall facilitate the payment of the
sum payable on behalf of the generator. The individual generator and QCA
shall execute an agreement specifying that the QCA shall be the facilitator for
compliance of all obligations and liabilities arising out of the scheduling,
forecasting and other activities to be carried out by the wind / solar generator.
7.2. The QCA shall facilitate all the payments liable to be payable on behalf of the
wind / solar generators as appointed by the generator. The generators are
responsible for payment of dues to the DISCOMs or SLDC as the case may
be and have a right to recover any sums due from the DISCOMs or SLDC, in
doing so the QCA will be the facilitator. In case of non-compliance of
payments or receipts of either of the parties, the QCA shall facilitate and
ensure compliance of this Regulation as also the payments.
7.3. For this purpose, the generators, who have appointed the QCA, the QCA itself
and the SLDC will enter into arrangements by way of agreement clearly
specifying the rights and obligations of all the parties in terms of this
Regulation.
7.4. To give effect to the above provisions, the SLDC shall in consultation with the
generators and QCA prepare a draft agreement and place it before the
Commission for evaluation and consent. The Commission will on its part
consider the same duly following the procedures set out under Conduct of
Business Regulation, 2015 as amended from time to time for this purpose.
7.5. The SLDC shall give appropriate directions under sub-section (1) of Section 33
of the Act, read with this Regulation about the guidelines for registration of
QCAs, the data / information to be exchanged between the QCA, SLDC and
the generator, the protocol for sharing the same etc., within the timelines
specified in clause 19 of this Regulation.
16
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
8. ENERGY ACCOUNT, DEVIATION SETTLEMENT AND ELIMINATION OF
GAMING.
8.1. The energy generated shall be accounted for and payment made for the energy
generated by the wind and solar generators, who are connected to the state
grid, accounting as well as payments, shall be in accordance with the
guidelines and procedures specified by the Commission or such other
competent authority under the Act, 2003.
8.2. In the event of actual injection of a generating station or a pooling station, as
the case may be, being less or more than the scheduled generation, the
deviation charges for shortfall or excess generation shall be payable by the
wind or solar generator through QCA or generator(s) themselves, as the case
may be, to the State Pool Account, as per the schedule specified in the table
below:
Table: Deviation Charges in case of under or over-injection for sale / supply
of power within the State
Sl. No.
Absolute Error
in the 15- minute
time block
Deviation Charges payable by Wind and Solar
generator through QCA or generator(s)
themselves to State Pool Account
1
<=15%
None
2
>15% but <=25%
At Re. 0.50 per unit for the shortfall or excess
energy for absolute error beyond 15% and up to
25%
3
>25% but <=35%
At Re. 0.50 per unit for the shortfall or excess energy
beyond 15% and up to 25%.
+Rs.1.0 per unit for balance energy beyond 25% and
up to 35%
4
>35%
At Re. 0.50 per unit for the shortfall or excess energy
beyond 15% and up to 25%
+Rs.1.0 per unit for shortfall or excess energy beyond
25% and up to 35%
+ Rs.1.50 per unit for balance energy beyond 35%
8.3. The deviation charges for under or over injection by wind or solar generator
connected to the state grid and selling power outside the State shall be payable
or receivable as per the CERC (Deviation Settlement Mechanism and Related
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
17
Matters) Regulations, 2014 as amended from time to time.
8.4. The Commission will review the absolute error as specified in this Regulation
after a period of 3 years for the wind and solar generators connected to the
state grid.
8.5. Appropriate incentive mechanism will be considered after due examination of the
implementation of this Regulation after one year.
For this purpose, the SLDC shall place before the Commission a report duly
certifying the status of compliance of the provisions of this Regulation on and
from the date of its notification in the official gazette for the State of Telangana
and up to the end of one year falling in the next calendar year.
The Commission will take a view on the report only after placing the same on
its website and inviting the view of the relevant stakeholders (generators, QCA
and DISCOMs).
8.6. The distribution licensee(s) have power to examine the metering arrangements
including, installations in the premises of wind or solar generator whenever
required. It may also require the generators to take steps to remedy any short
comings noticed by it in compliance of any rules or regulations that are in force
under the intimation to the SLDC and the Commission.
8.7. Deviations for generation and supply of power or otherwise in respect of Inter-
State and Intra-State transactions at pooling station shall be accounted for
separately.
8.8. The SLDC shall provide separate energy and deviation accounts for inter-state
and intra-state transactions to QCA or the wind or solar generators.
8.9. The QCA shall separately facilitate settlement of deviation charges earned or
liable to be paid by the wind or solar generators for inter-state and intra-state
transactions separately.
8.10. The SLDC shall maintain all necessary and required records, registers and
accounts in respect of forecasting, scheduling and deviation settlement in
accordance with this Regulation.
The records of SLDC have to be maintained to a maximum possible extent
in digital form with proper backing up facility for retrieval of the same at any
given point of time. The SLDC may endeavour to explore the possibility of
maintaining the records on real time basis, if necessary.
8.11. The SLDC shall give appropriate directions under sub-section (1) of Section 33
G-154/3.
18
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
of the Act, 2003 read with this Regulation on the manner of making the State
Pool Account settlement and dealing with the default in respect of the same; the
manner of de-pooling of energy deviations and deviation charges and State Pool
Account within the timelines specified in clause 19 of this Regulation.
8.12. TSTRANSCO being the STU operating the SLDC under the first proviso to
sub-section (2) of Section 31 of the Act, 2003 shall provide the required
manpower, funds and infrastructure to the SLDC for due implementation of
this Regulation.
8.13. The Commission, on a petition made by SLDC, or any affected party, may
initiate proceedings against any generator, or seller or SLDC on the charges of
gaming and if required, may order an inquiry in such manner as decided by the
Commission. When the charge of gaming is established in the inquiry, the
Commission may, without prejudice to any other action under the Act, 2003 or
Regulations made thereunder, disallow the claims or payments of any charges
for deviation received by such generator or the seller for the period where the
Commission has concluded that gaming has taken place.
9. DEVIATION SETTLEMENT FOR INTER-STATE TRANSACTIONS.
9.1. The sale or self-consumption of power outside the State of Telangana by solar
and wind energy generators connected to the intra-state transmission
system or distribution system shall be settled by the procurers on the basis of
their scheduled generation.
9.2. Inter-state transactions at a pooling sub-station shall be permitted only if the
concerned generator is connected through a separate feeder.
9.3. The generator shall submit, through the QCA, a separate schedule for its energy
generation, in accordance with this Regulation to the SLDC as well as the
concerned Regional Load Despatch Centre (RLDC).
9.4. The SLDC shall prepare the deviation settlement account for such generator on
the basis of measurement of the deviation in the energy injected and its impact
at the state periphery.
9.5. The generator shall pay the deviation charges for under / over injection
applicable within the State of Telangana in case of deviations in the State
DSM Pool, the consequences of such deviation at the inter-state level being
governed by the CERC Regulations governing the deviation settlement
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
19
mechanism and related matters.
10. IMPLEMENTATION PROCEDURE WITH RESPECT TO REGULATIONS.
10.1. The plan for data telemetry, formats of forecast submission, and other
modalities and requirements shall be stipulated in the detailed procedure to
be submitted by the SLDC within the timelines specified in clause 19 of this
Regulation, which the Commission shall approve thereafter duly following the
Conduct of Business Regulation, 2015.
10.2. The detailed procedure shall make provision for the following aspects:
(a) The procedure and requirements, including the payment of fees and
penalties, for the registration and de-registration of generators through QCAs or
generator(s) themselves and other stakeholders relevant to this Regulation by the
SLDC.
(b) The information, data and the formats required by the SLDC from the
generators through QCAs or generator(s) themselves and similarly to be provided
by the SLDC to them.
(c) The mode and protocol of communication for exchange of information and
data between the generators through QCAs or generator(s) themselves and the
SLDC.
(d) The guidelines for energy and deviation accounting of wind and solar energy
transactions under the state energy accounting framework, with illustrative
examples, in accordance with the principles specified in this Regulations.
(e) The mechanism for monitoring compliance of the forecasting and scheduling
code by the generators through QCAs or generator(s) themselves alongwith the
other concerned stakeholders.
(f) The default conditions in the state pool settlement by the generators through
QCAs along with the other concerned stakeholders and their treatment.
10.3. The complete accounting process will be operationalized in the manner
explained in paras 10.1 and 10.2:
11. METERING SPECIFICATIONS.
Interface metering for intra-state entities shall be undertaken on an urgent basis.
Every entity must be metered with a Special Energy Meter (SEM) i.e. ABT
compliant meter, capable of recording the energy in 15-minutes time block (with
provision of 5-minutes integration). The generator through QCA or generator(s)
20
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
themselves shall forward weekly meter readings to the SLDC latest by
Wednesday in respect of a previous week in addition to data acquisition provided
to SCADA for energy accounting purpose under this Regulation.
Explanation:- Week for the purpose of this clause in this Regulation shall be
starting from Monday of the previously and ending with the Sunday that has
gone by.
12.
ENERGY ACCOUNTING THROUGH METERING.
Every intra-state grid connected entity shall be metered with a Special Energy
Meter (SEM), i.e. ABT compliant meter, capable of recording the energy in 15
minutes time block (with provision of 5 minutes integration) and the energy
accounting for each such entity shall be done taking into consideration of such
meter data.
13.
MEANS OF COMMUNICATION BETWEEN QCA OR GENERATOR(S)
THEMSELVES AND SLDC.
13.1. The generator through QCA or generator(s) themselves and SLDC should
communicate using a software developed and facilitated by the QCA or
generator(s) themselves for clauses from (a) to (h).
(a) Communicating day ahead, intra-day and / or 3 day ahead schedule along
with revisions to SLDC.
(b) Informing real time generation at pooling station and / or at individual
generator level, as required.
(c) Providing information of grid constraints and curtailments from SLDC side
to the generator directly or through QCA.
(d) The generator through QCA or generator(s) themselves should provide
software login to the state, wherein live data for all schedules and information
on the deviations shall also be made available. This method will help in online
communication without time lag and facilitate prompt payment of deviation
charges by the concerned stakeholders including generator through QCA or
generator(s) themselves to SLDC.
(e) The software should facilitate information from generator through QCA or
generator(s) themselves to SLDC on generation outage with reason for such
outage.
(f) It should intimate the generator through QCA or generator(s) themselves
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
21
and other stakeholders on the deviation charges at the pooling station by the
SLDC.
(g) It should provide basic information of the site and turbines / inverters
(Static Sheet).
(h) SLDC should be able to view the state level schedule along with actual
generation being handled by the generators through QCA or generator(s)
themselves.
14.
ACCESS TO METERS
14.1.
The generators shall enter into an agreement after nominating a QCA and
such agreement shall provide specifically the following conditions.
(a) Access to the QCAs to install modem on existing ABT meters for getting
data on 15 minutes basis (with provision of 5 minutes integration).
(b) Permit access to the API link for getting the data from the meter to the
QCAs central server to facilitate better forecasting.
(c) Alternatively allow the QCA to install parallel meter on the existing CT /
PT set to facilitate acquisition of real time data so that best schedule can
be submitted to SLDC.
15.
DEVIATION ACCOUNTING.
15.1. Computation of deviation charge: The deviation charges have to be calculated
and notified to the concerned stakeholders in accordance with the provisions
made in clauses (a) to (e) below:
(a) Deviation charge (D) payable or / receivable for the state as a whole at the
state periphery shall be first computed by the SLDC.
(b) SLDC shall calculate Absolute Error occurred in the scheduled energy
and actual energy and deviation reflected at state periphery for each pooling
station and for each generator who is not a part of the pooling station feeding
directly to the sub-station.
(c) The deviation charges (R) as specified in this Regulation shall be calculated
by the SLDC for the pooling stations and for each generator who is not a part of
the pooling station feeding directly to the sub-station.
(d) SLDC shall calculate the deviation for each pooling station and for each
generator who is not a part of the pooling station feeding directly to the sub-
station, assuming (i) the share out of state level deviation charge as ‘D’ and (ii)
22
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
receipt of deviation charge from each pooling station and for each generator who
is not a part of the pooling station feeding directly to the sub-station based on
the charges for deviation, as (R). Actual commercial impact for the state as a
result of deviation of wind and solar generation would be D minus R.
(e) This amount D minus R shall be further allocated to each pooling station and
for each generator who is not a part of the pooling station feeding directly to the
sub-station in proportion to their deviation.
16.
SETTLEMENT OF DEVIATION CHARGES
SLDC shall prepare the State Pool Account and Deviation Energy Account and
shall undertake settlement of deviation charges payable by each pooling
station and each generator who is not a part of the pooling station feeding
directly to the sub-station as per the provisions of this Regulation.
17.
PAYAMENT MECHANISM FOR SETTLEMNT OF DEVIATIONS BY WIND /
SOLAR GENERATORS AND PAYMENT SECURITY:
17.1.
The payment settlement of deviations charges beyond permissible limits shall
be prime responsibility of all the wind and solar generators connected to
respective pooling station or connected with the sub-station as the case may
be. The generators shall make payment of deviation charges through QCA
nominated by them as per the rates specified in clause 8.2 of this Regulation.
17.2.
The wind or solar generator shall provide payment security to SLDC by way
of bank guarantee obtained from a public sector bank and / or revolving letter
of credit given by a scheduled commercial bank covering deviation settlement
mechanism payment for 6 months.
17.3.
In case the wind or solar generator defaults in payment to SLDC through
QCA then QCA shall inform about the default by the generator to the SLDC
and SLDC shall not despatch such generation.
17.4.
The payment of all charges on account of deviations beyond the permissible
limit at a pooling station by wind and solar generators shall have priority over
other payments and shall be paid within 10 (ten) days from the issuance of
the invoice along with statement of account. Such payment shall attract an
interest of 0.04% per day for each day of delay in the event the payment is
made beyond 12 days.
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
23
18.
ENERGY ACCOUNTING FOR (DEVIATION CHARGES AND DE-POOLING
OF
DEVIATION
CHARGES
OF
WIND
/
SOLAR
GENERATORS
CONNECTED TO POOLING STATIONS.
18.1.
All accounts related to deviation either ways shall be prepared by the
generator through QCA or generator(s) themselves on a weekly basis, based
on inputs from the SLDC. The same is to be made available to the SLDC by
the generator through QCA or generator(s) themselves using the software put
in place for the said purpose.
18.2.
SLDC shall make available the processed data on a weekly basis not later
than afternoon of Thursday for the seven-day period which ended on the mid-
night of previous Sunday, to the concerned generators through QCA or
generator(s) themselves in a specified format, for preparation of energy
accounts related to accounting of energy from the pooling station / sub-station
on a weekly basis.
18.3. The data furnished by SLDC shall be open to all entities for checking /
verification for a period of 15 days. In case any mistake is detected, SLDC
shall forthwith make a complete check and rectify the mistakes.
19.
DE-POOLING OF DEVIATION CHARGE.
19.1.
The QCA serving the generators shall de-pool the energy deviation as well as
deviation charges to each generator connected at a respective pooling station
in proportion to energy injected in each time block by each generator.
20.
GRID STABILITY.
20.1. All the wind and solar generators have to maintain reactive power, voltage and
frequency in line with the central / state gird code regulations for maintenance
of stability, safety and security of the grid.
24
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
21.
SUMMARY OF TIMELINES
Reference
Activity / Milestone
Action by
Period / Duration
from date of
notification of
Regulations
4.2 (a) and
4.2 (c)
Technical Specification and Information
Sharing protocol by generators through
QCA or generator(s) themselves to
SLDC
SLDC
Three Months
4.8
Forecasting tool, alternate means of
communication, formats for submission
to the SLDC.
Forecasting
tools
to
be
established by
the
generators
through QCAs
or
generator(s)
themselves
QCA
4.10
Forecasting tools to be established by
the
generators
through
QCAs
or
generator(s) themselves.
Three Months
7.4
Guidelines for registration of QCA, data
exchange between QCA and SLDC
SLDC
Two Months
8.11
Manner of making State Pool Account
and settlement thereof
SLDC
Three Months
10.1 & 10.2 Detailed procedures covering plan for
data
telemetry
by
SLDC
to
the
Commission
SLDC
Three Months
Trial Run – During this period all
parties shall comply with the above and
the remainder period shall be termed
as a Trial Run period (maximum of 3
months).
All concerned
stakeholders
Six Months
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
25
Reference
Activity / Milestone
Action by
Period / Duration
from date of
notification of
Regulations
1(c)
Commencement
of
Commercial
arrangement
specified
in
this
Regulation
All concerned
stakeholders
Six Months
22.
DISPUTE RESOLUTION.
22.1. Any dispute arising out of or in connection with issues of despatch of energy,
levy of charges or payment of deviation charges, the SLDC and the generator
through QCA or generator(s) themselves shall make efforts to resolve the
matters by mutual discussion.
22.2. Failing such an action, the aggrieved stakeholders are free to agitate the issue
by means of filing a proper petition under the provisions of the Act, 2003, duly
complying with Conduct of Business Regulation, 2015 and Levy of Fee and
Charges for the Services rendered by the Commission Regulation, 2016.
Provided that the QCA cannot independently initiate any proceedings
before the Commission and can only be party to the proceedings along with
generator(s) as it is not a statutory authority under the Act, 2003 to raise any
issue before the Commission.
23.
MISCELLANEOUS
23.1. The interpretation of the provisions of the regulation shall be made by the
Commission either upon itself noticing any difficulty in giving effect to the same
or on a request of any of the stakeholders to cause interpretation of any
provision. The decision of the Commission is final in the matter.
23.2 Nothing in this Regulation shall be deemed to limit or otherwise affect the
inherent power of the Commission to make such orders as may be necessary
to meet the ends of justice or to prevent abuse of process of the Commission.
23.3. Nothing in this Regulation shall bar the Commission from adopting a
procedure, which is at variance with any of the provisions of this Regulation, if
the Commission, in view of the special circumstances of a matter or class of
matters and for reasons to be recorded in writing, deems it necessary or
expedient for so doing in order to deal with such a matter or class of matters.
G-154/4.
26
TELANGANA GAZETTE EXTRAORDINARY
[Part-II
23.4. Nothing in this Regulation shall, expressly or impliedly, bar the Commission to
deal with any matter or exercise any power under the Act, 2003 or Reform Act,
1998 for which no provisions have been framed, and the Commission may deal
with such matters, powers and functions in a manner it deems fit in appropriate
case.
24.
POWER TO REMOVE DIFFICULTIES.
Where any difficulty arises in giving effect to any of the provisions of this
Regulation, the Commission may, by general or special order, do anything not
being inconsistent with the provisions of the Act, 2003 or Reform Act, 1998,
which appears to it to be necessary or expedient for the purpose of removing
the difficulties.
25.
POWER TO RELAX
The Commission may by general or special order, for reasons to be recorded
in writing, and after giving an opportunity of hearing to the parties likely to be
affected by grant of relaxation, may relax any of the provisions of this
Regulation on its own motion or on an application made before it by an
interested person in accordance with Conduct of Business Regulation, 2015.
26.
POWER TO ISSUE DIRECTIONS
Subject to the provisions of the Act, 2003 and this Regulation, the Commission
may, from time to time, issue orders and directions in regard to the
implementation of the Regulation and procedure to be followed and various
matters which the Commission has been empowered by this Regulation to
specify or direct, as may be considered necessary in furtherance of the
objective and purpose of this Regulation.
27. GENERAL POWER TO AMEND.
The Commission may, at any time and on such terms as to costs or otherwise,
as it may think fit, rectify any defect or error in any proceeding before it, and
all acts shall be done for the purpose of determining the real question or issue
arising in the proceedings.
May 31, 2018 ]
TELANGANA GAZETTE EXTRAORDINARY
27
28. REGULATIONS TO BE IN ADDITION TO AND NOT IN DEROGATION OF
OTHER LAWS.
This Regulation is in addition to and not in derogation of any provision laid
under the Act, rules or regulations framed thereunder or under any other
laws.
(BY ORDER OF THE COMMISSION)
Printed and Published by the Commissioner of Printing, Govt. of Telangana, at Govt. Central Press, Chanchalguda, Hyderabad.
–––x–––
Hyderabad,
30-052018.
UMAKANTA PANDA,
Commission Secretary (A/C),
Telangana State Electricity Regulatory Commission.