OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
47
Suggestions are welcome on e-mail: [email protected]
EXTRAORDINARY
No. 2
GOVERNMENT OF GOA
Department of Power
Office of the Chief Electrical Engineer
___
Notification
120/03/JERC-MYT/CEE/Tech
The Electricity Department, Government of
Goa, filed its petition for Annual Performance
Review of FY 2016-17 & FY 2017-18, Retail
supply of Tariff for FY 2018-19 and True-up for
FY 2013-14, according to the Regulations and
as per the procedures outlined in section 61,
62 & 64 of the Electricity Act, 2003, before
the Hon’ble Joint Electricity Regulatory
Commission for the States of Goa and Union
Territories.
In exercise of the powers conferred under
various sections of the Electricity Act, 2003
and all powers enabling therein, on behalf of
the Joint Electricity Regulatory Commission
for the State of Goa and Union Territories, has
issued the tariff order dated 28th March, 2018
which is attached herewith for Determina-
tion of Tariff for FY 2018-19 with effective
from 1st April, 2018 and shall remain valid till
issuance of further orders of the Commission,
for the Electricity Department, Government of
Goa.
In consequence to the above Tariff Order,
the State Government is intending to provide
subsidy to the following categories in order to
give relief against the Tariff hike:
(1) LT Domestic Consumers who is
having monthly consumption only upto
200 Units.
(2) LT Agriculture Pump Sets/Irrigation.
Orders in regard to providing above
subsidy is in process and once the same is
issued the subsidy granted will be credited
to the respective consumers starting from the
consumption from 1st April, 2018 in the
subsequent billing months.
The above is hereby brought to the notice
of the public.
By order and in the name of the Governor
of Goa.
N. N. Reddy, Chief Electrical Engineer &
ex officio Additional Secretary (Power).
Panaji, 17th April, 2018.
SERIES I No. 2
Panaji, 18th April, 2018 (Chaitra 28, 1940)
Reg. No. G-2/RNP/GOA/32/2018-20
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
48
JOINT ELECTRICITY REGULATORY COMMISSION
For the State of Goa and Union Territories,
2nd Floor, HSIIDC Office Complex, Vanijya Nikunj,
Udyog Vihar, Phase-V, Gurugram-122016 (Haryana)
Phone: 0124-2875302 Fax: 0124-2342853
Website: www.jercuts.gov.in
Email: [email protected]
__
TARIFF ORDER
True-up of the FY 2013-14 and Approval of Aggregate Revenue Requirement (ARR) and
Determination of Retail Tariff for the FY 2018-19
Petition No. 249/2017
For
Electricity Department, Government of Goa (EDG)
28th March, 2018
_____
Table of Contents
1. Chapter 1: Introduction
55
1.1. About Joint Electricity Regulatory Commission (JERC)
55
1.2. About Electricity Department, Government of Goa (EDG)
55
1.3. JERC Tariff Regulations, 2009
55
1.4. Multi-Year Distribution Tariff Regulations, 2014
56
1.5. Filing and Admission of the Present Petition
56
1.6. Interaction with the Petitioner
56
1.7. Notice for Public Hearing
57
1.8. Public Hearing
58
2. Chapter 2: Summary of Suggestions/Objections received, Response from the Petitioner and
the Commission’s Views
58
2.1. Regulatory Process
58
2.2. Suggestions/Objections, Response of the Petitioner and Commission’s Comments
58
3. Chapter 3: True-up of FY 2013-14
64
3.1. Background
64
3.2. Energy Sales
64
3.3. Inter-State Transmission loss
65
3.4. Intra-State Transmission & Distribution (T&D) loss
66
3.5. Power Purchase Quantum & Cost
67
3.6. Renewable Purchase Obligation (RPO)
70
3.7. Energy Balance
70
3.8. Operation & Maintenance (O&M) Expenses
71
3.9. Capitalisation
74
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
49
3.10. Depreciation
75
3.11. Interest and Finance Charges
77
3.12. Return on Capital Base
78
3.13. Interest on Security Deposits
79
3.14. Interest on Working Capital
80
3.15. Provision for Bad & Doubtful Debts
81
3.16. Non-Tariff Income (NTI)
81
3.17. Revenue from Sale of Surplus Power
82
3.18. Aggregate Revenue Requirement (ARR)
82
3.19. Revenue at Existing Retail Tariff
83
3.20. Standalone Revenue Gap/Surplus
85
4. Chapter 4: True-up of the FY 2014-15, FY 2015-16 and FY 2016-17
85
4.1. Applicable provisions of JERC for the State of Goa and Union Territories (Terms and Conditions
for Determination of Tariff) Regulations, 2009
85
4.2. Approach for the True-up of the FY 2014-15 and FY 2015-16 and FY 2016-17
86
5. Chapter 5: Annual Performance Review of FY 2017-18
87
5.1. Background
87
5.2. Approach for the Review for the FY 2017-18
87
6. Chapter 6: Determination of Aggregate Revenue Requirement for the FY 2018-19
88
6.1. Background
88
6.2. Approach for determination of ARR for the FY 2018-19
89
6.3. Projection of Number of Consumers, Connected Load and Energy Sales
89
6.4. Energy Savings under Domestic Efficiency Lamp Programme (DELP)
90
6.5. Inter-State Transmission Loss
90
6.6. Intra-State Transmission and Distribution (T&D) Loss
91
6.7. Power Purchase Quantum & Cost
91
6.8. Renewable Purchase Obligation (RPO)
95
6.9. Energy Balance
96
6.10. Operation & Maintenance (O&M) Expenses
97
6.11. Capitalisation
97
6.12. Depreciation
97
6.13. Interest and Finance Charges
98
6.14. Return on Equity (RoE)
98
6.15. Interest on Security Deposits
99
6.16. Demand Side Management (DSM) Expenses
99
6.17. Interest on Working Capital
100
6.18. Non-Tariff Income (NTI)
101
6.19. Aggregate Revenue Requirement (ARR)
101
6.20. Revenue at Existing Retail Tariff
101
6.21. Standalone Revenue Gap/Surplus
104
7. Chapter 7: Tariff Principles and Design
105
7.1. Overall Approach
105
7.2. Applicable Regulations
105
7.3. Revenue Gap/Surplus at Existing Tariff
107
7.4. Treatment of the Revenue Gap/Surplus and Tariff Design
107
8. Chapter 8. Open Access Charges for the FY 2018-19
115
8.1. Wheeling Charges
115
8.2. Additional Surcharge
117
8.3. Cross-Subsidy Surcharge
119
9. Chapter 9: Tariff Schedule
121
9.1. Tariff Schedule
121
9.2. Applicability
123
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
50
9.3. General Terms and Conditions
131
9.4. Schedule of Miscellaneous Charges
135
10. Chapter 10. Fuel and Power Purchase Adjustment Mechanism
138
10.1. Legal Provisions
138
10.2. Existing formula
139
10.3. Need to review the existing mechanism
142
10.4. New formula
144
11. Chapter 11: Directives
148
11.1. Directives continued in this Order
148
11.2. New Directives issued in this Order
154
11.3. Directives dropped in this Order
154
Annexures
155
Annexure 1: Public Notices published by the Commission
155
Annexure 2: Public Notices published by the Petitioner
160
Annexure 3: List of Stakeholders
163
List of Tables
Table 1: Timelines w.r.t the Petition filed by EDG
54
Table 2: Timelines of the interaction with the Petitioner
57
Table 3: Details of Public Notices published by the Commission
57
Table 4: Details of Public Notices published by the Petitioner
57
Table 5: Energy Sales (MU) trued-up by the Commission
65
Table 6: Inter-State transmission loss (%)
66
Table 7: Intra-State distribution loss (%)
66
Table 8: Power Purchase cost submitted by the Petitioner (In Rs. Cr)
67
Table 9: Power Purchase Quantum (MU) and cost (Rs Cr) approved by the Commission
69
Table 10: Energy Balance (MU) submitted by Petitioner
70
Table 11: Energy Balance (MU) approved by Commission at State Periphery
71
Table 12: Employee Expenses submitted by the Petitioner (In Rs. Cr)
72
Table 13: Employee Expenses approved by Commission (In Rs. Cr)
72
Table 14: A&G Expenses submitted by Petitioner (In Rs. Cr)
73
Table 15: A&G Expenses approved by Commission (In Rs. Cr)
73
Table 16: R&M Expenses approved by Commission (In Rs. Cr)
74
Table 17: O&M Expenses approved by Commission (In Rs. Cr)
74
Table 18: Capitalisation approved by Commission (In Rs. Cr)
75
Table 19: Depreciation submitted by Petitioner (In Rs. Cr)
75
Table 20: Depreciation Rate (%)
76
Table 21: Depreciation approved by Commission (In Rs. Cr)
76
Table 22: Interest and Finance charges approved by Commission (In Rs. Cr)
78
Table 23: Interest on Consumer Security Deposits submitted by Petitioner (In Rs. Cr)
79
Table 24: Interest on Consumer Security Deposits approved by Commission (In Rs. Cr)
79
Table 25: Interest on Working Capital approved by Commission (In Rs. Cr)
80
Table 26: Non-Tariff Income as submitted by Petitioner (In Rs. Cr)
81
Table 27: Non-Tariff Income approved by Commission (In Rs. Cr)
81
Table 28: Non-Tariff Income approved by Commission (In Rs. Cr)
82
Table 29: Aggregate Revenue Requirement approved by Commission for FY 2013-14 (In Rs. Cr)
82
Table 30: Revenue at existing tariff submitted by the Petitioner for FY 2013-14 (In Rs. Cr)
83
Table 31: Revenue at existing tariff approved by Commission for FY 2013-14 (In Rs. Cr)
84
Table 32: Standalone Revenue Gap/Surplus approved by Commission for FY 2013-14 (In Rs. Cr)
85
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
51
Table 33: No. of Consumer, Connected Load and Energy Sales approved by Commission
90
Table 34: Energy Savings under DELP (MU)
90
Table 35: Inter-State Transmission Loss (%)
91
Table 36: Intra-State T&D loss (%)
91
Table 37: Power Purchase Quantum (MU) and cost (Rs. Cr) approved by Commission
93
Table 38: Summary of Renewable Purchase Obligation (RPO) (MU)
95
Table 39: Cost towards compliance of Renewable Purchase Obligation (RPO) (In Rs. Cr)
96
Table 40: Energy Balance (MU) approved by Commission
96
Table 41: O&M Expenses approved by Commission (In Rs. Cr)
97
Table 42: Capitalisation approved by the Commission (In Rs. Cr)
97
Table 43: Depreciation approved by Commission (In Rs. Cr)
98
Table 44: Interest and Finance Charges approved by Commission (In Rs. Cr)
98
Table 45: RoE approved by Commission (In Rs. Cr)
99
Table 46: Interest on Security Deposits approved by Commission (In Rs. Cr)
99
Table 47: DSM Expenses as approved by Commission (In Rs. Cr)
100
Table 48: Interest on Working Capital approved by Commission (In Rs. Cr)
100
Table 49: Non-tariff Income approved by Commission (In Rs. Cr)
101
Table 50: Aggregate Revenue Requirement approved by Commission for FY 2018-19 (In Rs. Cr)
101
Table 51: Revenue submitted by Petitioner (In Rs. Cr)
102
Table 52: Revenue from existing retail tariff for FY 2018-19 (In Rs. Cr)
103
Table 53: Standalone Revenue Gap/Surplus approved by Commission (In Rs. Cr)
105
Table 54: Standalone Revenue Gap/Surplus submitted by Petitioner (In Rs. Cr)
107
Table 55: Standalone Revenue Gap/Surplus determined by Commission (In Rs. Cr)
107
Table 56: Retail Tariff proposed by Petitioner
108
Table 57: Existing and approved tariff
111
Table 58: Revenue from approved retail tariff (In Rs. Cr)
113
Table 59: Tariff increase approved by Commission
114
Table 60: Revised Revenue Gap/ Surplus approved by Commission (In Rs. Cr)
114
Table 61: Cost of Supply and tariff increase with and without Govt. Budgetary support
115
Table 62: Wheeling Charge calculation as submitted by Petitioner
116
Table 63: Allocation matrix approved by Commission
116
Table 64: Parameters assumed for voltage wise allocation of wheeling costs
117
Table 65: Wheeling Charges approved by Commission
117
Table 66: Additional Surcharge approved by Commission
118
Table 67: Cross-Subsidy Surcharge as proposed by the Petitioner
119
Table 68: Voltage wise losses assumed by Commission
119
Table 69: Energy Input at each voltage level (MU)
120
Table 70: Parameters used for allocation of fixed costs
120
Table 71: Voltage Wise Cost of Supply (VCoS)
120
Table 72: Cross-Subsidy Surcharge approved by Commission (Rs/kWh)
121
Table 73: Tariff Schedule
121
Table 74: Applicability of Tariff Schedule
123
Table 75: Applicability of ToD Tariff
134
Table 76: Schedule of Miscellaneous Charges
135
Table 77: Key Takeaways
143
Table 78: Rapproved determined by Commission for FY 2018-19
148
Table 79: List of Stakeholders
163
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
52
List of abbreviations
Abbreviation
Full Form
A&G
Administration & General
ACoS
Average Cost of Supply
Act
The Electricity Act, 2003
APR
Annual Performance Review
ARR
Aggregate Revenue Requirement
ATE
Appellate Tribunal of Electricity
BPL
Below Poverty Line
CAGR
Compound Annualized Growth Rate
Capex
Capital Expenditure
CEA
Central Electricity Authority
CERC
Central Electricity Regulatory Commission
CGRF
Consumer Grievance Redressal Forum
CGS
Central Generating Stations
Ckt. Km
Circuit Kilometer
COD
Commercial Operation Date
Commission/JERC
Joint Electricity Regulatory Commission for the State of Goa and Union
Territories
Cr
Crore
DELP
Domestic Efficient Lightening Program
Discom
Distribution Company
DSM
Deviation Settlement Mechanism
EA 2003
The Electricity Act, 2003
EDG
Electricity Department, Govt. of Goa
EDF
Electricity Development Fund
EHT
Extra High Tension
ERP
Enterprise Resource Planning
FAR
Fixed Asset Register
FPPCA
Fuel and Power Purchase Cost Adjustment
FY
Financial Year
GFA
Gross Fixed Assets
HP
Horse Power
HT
High Tension
IEX
Indian Energy Exchange Limited
IPDS
Integrated Power Development Scheme
IPP
Independent Power Producer
ISTS
Inter-State Transmission System
JERC
Joint Electricity Regulatory Commission for the State of Goa and Union
Territories
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
53
KVA
Kilo Volt Ampere
KWh
Kilo Watt Hour
LT
Low Tension
MOD
Merit Order Dispatch
MU
Million Units
MW
Mega Watt
MYT
Multi-Year Tariff
NFA
Net Fixed Assets
NTPC
National Thermal Power Corporation
NVVNL
NTPC Vidyut Vyapar Nigam Limited
O&M
Operation and Maintenance
PGCIL
Power Grid Corporation of India Ltd.
PLF
Plant Load Factor
PLR
Prime Lending Rate
POSOCO
Power System Operation Corporation Limited
PPA
Power Purchase Agreement
R&M
Repair and Maintenance
R-APDRP
Restructured Accelerated Power Development and Reforms Programme
REC
Renewable Energy Certificate
RLDC
Regional Load Despatch Centre
RoE
Return on Equity
RPO
Renewable Purchase Obligation
RTC
Round the Clock
SBI PLR
SBI Prime Lending Rate
SERC
State Electricity Regulatory Commission
SLDC
State Load Dispatch Centre
SOP
Standard of Performance
SRPC
Southern Regional Power Committee
T&D
Transmission & Distribution
TVS
Technical Validation Session
UI
Unscheduled Interchange
UT
Union Territory
WART
Weighted Average Retail Tariff
WRPC
Western Region Power Committee
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
54
Before the
Joint Electricity Regulatory Commission
For the State of Goa and Union Territories, Gurugram
QUORUM
Shri. M. K. Goel (Chairperson)
Smt. Neerja Mathur (Member)
Petition No. 249/2017
In the matter of
Approval for the True-up of the FY 2013-14, Annual Performance Review (APR) of the FY 2017-
-18 and Aggregate Revenue Requirement (ARR) and Tariff proposal for the FY 2018-19.
And in the matter of
Electricity Department, Government of Goa (EDG)……………………………………….. Petitioner
ORDER
Dated: 28th March 2018
a) This Order is passed in respect to the Petition filed by the Electricity Department,
Government of Goa (EDG) (herein after referred to as “The Petitioner” or “EDG” or “The
Licensee”) for approval of True-up of the FY 2013-14, Annual Performance Review of the
FY 2017-18, Aggregate Revenue Requirement (ARR) and Tariff proposal for the FY 2018-19
before the Joint Electricity Regulatory Commission (herein after referred to as “The
Commission” or “JERC”).
b) On receipt of the Petition, the Commission scrutinised its contents and requisitioned
further information/clarifications on the data gaps observed in the Petition to take a
prudent view of the Petition. The Commission also held a Technical Validation Session to
determine its sufficiency and the veracity of the information submitted. Further,
suggestions/comments/objections were invited from the public/stakeholders. A Public
Hearing was held and the stakeholders/public were heard. The schedule of activities
performed in the course of this quasi-judicial process are given below:
Table 1: Timelines w.r.t the Petition filed by EDG
Particular
Details
Date of Admission
11th December, 2017
Public Hearing
31st January, 2017
Technical Validation Session
18th January, 2018
c) The tariff, as detailed in the Chapter “Tariff Schedule,” Open Access Charges and other
provisions as approved in this Order shall come into force from 1st April, 2018 and shall
remain valid till further Orders of the Commission.
d) The licensee shall publish the revised Tariff Schedule and the salient features of tariff
within one week of receipt of the Order in three daily newspapers in the respective local
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
55
languages of the region, besides English, having wide circulation in their respective areas
of supply.
e) Ordered as above, read with the attached document giving detailed reasons, grounds and
conditions.
-Sd-
-Sd-
Neerja Mathur
M.K. Goel
(Member)
(Chairperson)
JOINT ELECTRICITY REGULATORY COMMISSION
(For the State of Goa and Union Territories)
Place: Gurugram
Date: 28th March, 2018.
(Certified Copy)
Keerti Tewari
1. Chapter 1: Introduction
1.1. About Joint Electricity Regulatory Commission (JERC)
In exercise of powers conferred by the Electricity Act 2003, the Central Government
constituted the Joint Electricity Regulatory Commission for all the Union Territories except
Delhi to be known as “Joint Electricity Regulatory Commission for the Union Territories” vide
Notification No. 23/52/2003-R&R dated 2 May, 2005. Later with the joining of the State of Goa,
the Commission came to be known as “Joint Electricity Regulatory Commission for the State of
Goa and Union Territories” (hereinafter referred to as “JERC” or “the Commission”) vide
Notification No. 23/52/2003-R&R (Vol. II) dated 30 May, 2008.
JERC is an autonomous body responsible for regulation of the Power Sector in the State of
Goa and Union Territories of Andaman & Nicobar Islands, Lakshadweep Island, Chandigarh,
Daman & Diu, Dadra & Nagar Haveli and Puducherry, consisting of generation, transmission,
distribution, trading and use of electricity etc. Its primary objective includes taking measures
conducive to the development of the electricity industry, promoting competition therein,
protecting the interests of consumers and ensuring supply of electricity to all areas.
1.2.
About Electricity Department, Government of Goa (EDG)
The Electricity Department was formed in January 1963 under the Government of Goa. It is
the only licensee operating in the State of Goa for Transmission and Distribution of Electricity.
The power requirement of the State is met through its share from Central Sector Generating
Stations (CGS), Co-Generation Plants & IPP’s operating within the territory and from Open
Market.
1.3.
JERC Tariff Regulations, 2009
The Commission notified the Joint Electricity Regulatory Commission for the State of Goa
and Union Territories (Terms and Conditions for Determination of Tariff) Regulations, 2009 on
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
56
9th February, 2009 applicable to the whole of the State of Goa and the Union Territories
of Andaman and Nicobar Islands, Chandigarh, Dadra and Nagar Haveli, Daman and
Diu, Lakshadweep and Puducherry. The Regulations were applicable till the FY 2015-16
till the MYT Distribution Tariff Regulations, 2014 were notified by the Commission on
30th June 2014.
1.4.
Multi-Year Distribution Tariff Regulations, 2014
The Commission notified the Joint Electricity Regulatory Commission for the State of Goa
and Union Territories (except Delhi) (Multi-Year Distribution Tariff) Regulations, 2014 on 30th
June, 2014 applicable for a three year Control period starting from FY 2015-16 till FY 2017-18.
The Commission subsequently notified the Joint Electricity Regulatory Commission for the
State of Goa and Union Territories (except Delhi) (Multi-Year Distribution Tariff) (First
Amendment) Regulations, 2015 on 10th August, 2015 shifting the MYT Control Period to
FY 2016-17 to FY 2018-19. These Regulations are applicable to all the distribution licensees in
the State of Goa and Union Territories of Andaman & Nicobar Islands, Lakshadweep Island,
Chandigarh, Daman & Diu, Dadra & Nagar Haveli and Puducherry.
1.5.
Filing and Admission of the Present Petition
The Electricity Department, Government of Goa (EDG) filed the Petition for True-up of the FY
2013-14, APR of the FY 2016-17 and FY 2017-18 and ARR and Tariff Proposal for the FY 2018-19
vide letter dated 7th December, 2017. On preliminary scrutiny of the Petition, certain data gaps
were observed on which the reply of the Petitioner was sought. The Petition was also
scrutinized in terms of the JERC (Conduct of Business) Regulations, 2009. The Petition was
admitted on 11th December, 2017 and numbered as Petition No. 249/2017. A letter indicating
gaps in the information as well as the documentation was sent to the Petitioner.
1.6.
Interaction with the Petitioner
The Order has referred at numerous places to various actions taken by the “Commission.” It
may be mentioned for the sake of clarity that the term “Commission,” except for the Hearing
and Orders, denotes the Secretariat of the Commission responsible for carrying out technical
due diligence and validation of data of the Petitions filed by the utilities, obtaining and
analysing information/clarifications received from the utilities, and submitting relevant issues
for consideration of the Commission.
A preliminary scrutiny/analysis of the Petition was conducted and certain deficiencies were
observed. Accordingly, deficiency notes were issued to the Petitioner. Further, additional
information/clarifications/justifications were solicited from the Petitioner as and when required.
The Commission and the Petitioner also discussed various concerns of the Petitioner and key
data gaps, which included Energy Sales, revenue from retail tariff, capitalisation, tariff proposal
etc. The Petitioner submitted its response on the issue through various letters.
The Commission conducted the Technical Validation Session (TVS) with the Petitioner at the
Commission’s office in Gurugram, during which the discrepancies in the Petition were
discussed and additional information required by the Commission were sought. Subsequently,
the Petitioner submitted replies to the issues raised in these sessions and provided
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
57
documentary evidence to substantiate its claims regarding various submissions. The following
table provides the list of interactions with the Petitioner along with the date:
Table 2: Timelines of the interaction with the Petitioner
S. No
Subject
Date
1
Issue of First Discrepancy Note
20th December 2017
2
Reply received from Petitioner
22nd December 2017 and 15th January 2018
3
Technical Validation Session
17th January 2018
4
Issue of 2nd Discrepancy Note
18th January 2018
5
Reply received from Petitioner
7th February 2018
6
Issue of 3rd Discrepancy Note
20th February 2018
7
Reply received from Petitioner
1st March 2018
8
Public Hearing
31st January 2018
1.7.
Notice for Public Hearing
Public Notices were published by the Commission in the leading newspapers as tabled
below, giving due intimation to the stakeholders, consumers and the public at large about the
Public Hearing to be conducted by the Commission.
Table 3: Details of Public Notices published by the Commission
S. No.
Date
Name of Newspaper
Language
Place of Circulation
1.
4th January 2018
The Times of India
English
Goa
The Navhind Times
English
Goa
Gomantak
Konkani (Marathi)
Goa
2.
29th January 2018
The Times of India
English
Goa
The Navhind Times
English
Goa
Gomantak
Konkani (Marathi)
Goa
Copies of the Public Notices published by the Commission for intimation of the Public
Hearing are attached as Annexure 1 to this Order. These notices were also uploaded on the
Commission’s website.
The Public Notice was published by the Petitioner in the following newspapers for inviting
objections/suggestions from the stakeholders on the Tariff Petition:
Table 4: Details of Public Notices published by the Petitioner
S. No.
Date
Name of Newspaper
Language
Place of Circulation
1.
3rd January 2018
The Navhind Times
English
Goa
2.
Gomantak
Konkani
(Marathi)
Goa
3.
National Herald
English
Goa
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
58
Copies of the Public Notices published by the Petitioner for intimation of the Public Hearing
are attached as Annexure 2 to this Order.
1.8.
Public Hearing
The Public Hearing was held on 31st January 2017 from 10:00 A.M. onwards at “Ravindra
Bhawan” at Goa to discuss the issues related to the Petition filed by the Petitioner. The issues
and concerns raised by the stakeholders in writing and as voiced by them during the hearing
have been examined by the Commission. The issues discussed during the public hearing
and/or written comment made by the stakeholders, the responses of the Petitioner thereon and
the views of the Commission, have been summarized in Chapter 2 of this Order.
2. Chapter 2: Summary of Suggestions/Objections received, Response from the
Petitioner and the Commission’s Views
2.1.
Regulatory Process
On admitting the Petition, the Commission directed the Petitioner to make copies of the
Petition available to the public, upload the Petition on the website and also publish the same in
the newspapers in an abridged form in the given format duly inviting comments/objections
from the public as per the provisions of the MYT Regulations, 2014.
The Public Hearing was held on 31st January 2018 from 10:00 A.M. onwards at Goa. During
the Public Hearing, some of the stakeholders who had submitted their comments in writing
also presented their views in person before the Commission. Other participants from the
general public, who had not submitted written objections earlier, were also given an equal
opportunity to present their views/suggestions in respect of the Petition.
The list of the stakeholders is attached as Annexure 3 to this Order.
2.2.
Suggestions/Objections, Response of the Petitioner and Commission’s Comments
The Commission is appreciative of the efforts of various stakeholders in providing their
suggestions/comments/observations to make the process responsive and efficient. The
relevant observations of the stakeholders have been suitably considered by the Commission
while finalizing this Tariff Order. The submissions of the stakeholders, response of the
Petitioner and views of the Commission are summarized below:
2.2.1.
Procurement of power from cheaper solar energy sources
Stakeholder’s Comment:
The Petitioner should procure power from cheaper solar energy sources that will reduce the
power purchase cost. Further, the status of fulfillment of RPO has not been submitted.
Petitioner’s Response:
It is submitted that ED-Goa has almost complied with the backlog of the Renewable Power
Obligations (RPO) up to FY 2016-17, ED-Goa further submits that from FY 2017-18 onwards
ED-Goa has been procuring renewable Power as per requirement to meet the Renewable
Power Obligations on year on year basis. Government of Goa has issued Solar Power Policy
2017 to further enable cheaper and local power in the State of Goa. The consumers are also
requested to avail the facility of net metering and earn on generating solar power and
supplying to ED-Goa.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
59
Commission’s View:
The Commission has taken note of the Petitioner’s submission. The Commission has dealt
appropriately with the compliance towards RPO for FY 2018-19 while approving the Power
Purchase Cost of FY 2018-19 in the Chapter 6 of this Order. The Petitioner has not yet
submitted the Petition for True-up of FY 2016-17, therefore, the Commission is unable to verify
the Petitioner’s submission of clearing all the pending backlog in FY 2016-17.
The Commission directs the Petitioner to give wide publicity to the Solar Policy, 2017 and
facilitate the stakeholders in Rooftop Solar Power Generation within the State of Goa. In view of
cheaper renewable power available now, the Petitioner needs to continue to purchase physical
solar or non-solar power to fulfill its RPO compliance.
2.2.2.
Power Supply in the State is not reliable
Stakeholder’s Comment:
The quality and reliability of supply in the State is very poor in the State. Further, Power
distribution infrastructure is not capable of handling the growing power demand of the State.
Petitioner’s Response:
EDG has been taking several measures to improve the infrastructure of the State. ED-Goa
has planned for the IT initiatives and distribution infrastructure improvement plan which
broadly includes 400KV S/S at Xeldem/Dharbandora for interlinking Western Grid with
Southern Grid, as any breakdown causes for black out or load shedding, additional 220/33KV
S/S at Tuem, Saligao, Verna and inter connecting 220KV lines from Amona to Cuncolim, New
33/11KV Sub-station (Badem, Mandrem, Karaswada, Calangute, Sal, Altinho-Panaji, Navelim,
Colva, Balli and Dhabal) to reduce loading on existing transformers, reduce 11KV feeder length
and to cater additional growth, Underground cabling works, ABC works etc. Further, EDG has
implemented LED lighting scheme. The scheme also includes Centralized Control and
Monitoring System (CCMS) for remote switching on/off of lights which will be effective from
1st April 2018.
Commission’s View:
The Commission has received various complaints against the Petitioner with regards to the
quality and reliability of supply in the State. The Petitioner during the past few years has been
undertaking lower capitalisation and R&M expenses than approved which clearly implies that
enough efforts are not being undertaken to supply quality/reliable power to the consumers. The
Commission directs the Petitioner to increase its efforts towards augmenting and maintaining
the requisite infrastructure to meet the growing demand and avoid any kind of supply
constraints to consumers.
2.2.3.
Creation of new category for Electric Vehicles
Stakeholder’s Comment:
A new category for Electric Vehicle should be created that will cater to the increasing
demand of power due to commercialization of Electric Vehicles.
Petitioner’s Response:
It is submitted that determination of tariff is a matter under purview of the Commission and
is determined based on the principles of Electricity Act, 2003 and National Tariff Policy 2006.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
60
However ED-Goa submits that till the time there is development on a large scale on Electric
Vehicles and Charging Stations, LT/HT Commercial Tariff be made applicable. For e.g. In
Maharashtra presently LT/HT Commercial tariff is applicable if consumer uses the electricity
for charging his own vehicles at his premises.
Commission’s View:
The Commission has noted the submission of the Petitioner. The Commission believes that
the demand for charging infrastructure for electric vehicles will increase in the near future due
to increased commercialization. However, the Commission doesn’t find it practical to consider
the consumers under this category under LT/HT Commercial, as suggested by the Petitioner.
The Commission would require the Petitioner to submit data on the number of consumers,
connected load and the anticipated demand to enable the Commission to determine the tariff
accurately as it will impact the Petitioner’s revenue. The Petitioner in this regard is directed to
submit a proposal for creation of any such category backed with the requisite data along with
the next tariff petition.
2.2.4.
Submission of Fixed Asset Register (FAR)
Stakeholder’s Comment:
The valuation of assets as per FAR submitted for FY 2013-14 has increased by almost two and a
half times as compared to approved. The FAR has been prepared without any basis.
Petitioner’s Response:
In regard to the re-valuation of assets, it is submitted that the Commission in its Tariff order
dated 27th June 2012 for FY 2011-12 had considered “Nil” opening value of Gross Fixed Asset
(GFA) as Audited Accounts and Fixed Asset Register were not available from FY 2006-07
onwards. Accordingly ED-Goa was directed in the said order to undertake preparation of FAR
& FS on commercial/regulatory principles.
The Commission in its Order dated 23rd May 2017 has approved Gross Fixed Assets (GFA) for
FY 2011-12 and FY 2012-13 post its review & prudence check, as per Audited Accounts and
also taking into consideration Fixed Asset Register.
It is submitted that it is misconception of objectioner that assets are revalued and audited
without any basis. It is submitted that FAR is prepared by Independent agency and the values
of FAR are part of audited annual accounts which is certified by CAG from time to time for
respective financial years. It is humbly submitted that asset value is same as per original cost/
/book value and it is just that Commission is considering the GFA value in truing-up process
after prudence check and on receipt of audited annual accounts only.
Commission’s View:
The Commission has noted the submission of the Petitioner. The valuation of the assets had
been revised by the Commission in the last Tariff Order while undertaking the True-up of FY
2011-12 and FY 2012-13. This was done based on the audited FAR submitted by the Petitioner
for the years prior to FY 2013-14 and after proper prudence check by the Commission. The
Commission while undertaking the True-up of FY 2013-14 in this Order has considered the
same opening GFA as the closing GFA as approved in the True-up of FY 2012-13. The addition
in GFA has been approved based on the FAR submitted by the Petitioner for FY 2013-14 duly
audited by an Independent Agency.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
61
2.2.5.
Wastage of electricity in Govt. offices
Stakeholder’s Comment:
Lights are on in government offices even during the daytime leading to wastage of power.
Petitioner’s Response:
The Petitioner clarified during the hearing that officers and staff of various government
offices are being briefed regularly for conservation of electricity.
Commission’s View:
The Commission notes the submission of the Petitioner and advises it to regularly issue
appropriate circulars to various departments/offices to make them aware about the benefits of
conservation of electricity. Suitable stickers for electricity conservation at appropriate places
may be pasted to remind the users to switch of the lights, when not required.
2.2.6.
Implementation of Demand Side Management (DSM)
Stakeholder’s Comment:
The Petitioner should implement DSM which will help in reducing the cost of power and
conserve electricity.
Petitioner’s Response:
EDG has taken various measures under Demand Side Management (DSM) program which
include Energy Efficiency measures also. DSM Programs are aimed to reduce consumption at
consumer end and lower the peak demand. DSM also includes use of energy efficient
appliances by consumers. EDG has taken various measures under LED lighting scheme,
replacement of around 1.95 Lakhs conventional street light fixtures has already been done. The
scheme also includes Centralised Control and Monitoring System (CCMS) for remote switching
on/off of lights. Besides this, EDG has also has been undertaking various DSM schemes such
as:
● Jyotirmay Goa Scheme–around 8.20 lakhs LED bulbs (3 LED of 9 W to each household of
Goa) were distributed under the scheme.
● UJALA (DELP)–Distribution of LED bulbs on subsidized cost to household consumers
which can save energy by up to 80%.
● Street Lighting National Programme (SLNP)–Replacement of 1.66 lakh Nos. existing
conventional street lights throughout the entire State of Goa by high quality energy
efficient smart LED fixtures/lights with around 4200 Nos. of Centralised Control and
Monitoring System (CCMS).
● Demonstration of energy efficient technologies through demonstration projects and LED
village campaign.
The Petitioner shall continue undertaking a lot of these kind of initiatives for increased
energy saving energy and reduce the cost of power purchase.
Commission’s View:
The Commission has noted the submission of the Petitioner. The Petitioner should widely
promote the initiatives among the public to create awareness. The stakeholder is requested to
get in contact with the nearest EDG office to avail the benefits of these schemes. The
Commission has allowed Rs 3.03 Cr towards DSM expenses in the ARR of FY 2018-19.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
62
2.2.7.
Submission of Energy Audit Report
Stakeholder’s Comment:
EDG should provide an action plan with timelines for preparation of Energy Audit Report. In
case of non-compliance, the Commission should initiate action.
Petitioner’s Response:
DT metering is pending for 250 Distribution Transformer (DTs) (out of total 6154 DTs).
Further, the department is also facing teething issues with respect to modems, sims,
communications etc. where meters are installed and the same are being addressed. EDG aims
to complete DT metering within next 4-6 months. EDG also submits that non-working energy
meters are being replaced. Work Order for 1.50 Lakh meters has already been issued and work
is expected to commence shortly. Order for another 1.50 Lakh meters will be placed by end of
FY 2017-18. Once the above activities are completed, energy audit can be taken as per
directives of the Commission.
Commission’s View:
The Commission directs the Petitioner to complete the process of DT and Feeder metering
and take up the Energy Audit of the State on priority.
2.2.8.
Unbundling and Corporatisation
Stakeholder’s Comment:
Unbundling and Corporatisation has still not happened.
Petitioner’s Response:
It is submitted that ED-Goa has pursued this matter with Government of Goa and ED-Goa is
yet to receive any specific directives on the same.
Commission’s View:
The Commission has directed the Petitioner to submit the proposal to the State Govt. by
30th June 2018. Till such time a decision is taken by the State Govt. ring fencing of the
transmission functions should be initiated. Further, it is directed that the Petitioner should
increase its efforts towards making the State Load Dispatch Center (SLDC) fully operational.
2.2.9.
Issue of Solar Policy
Stakeholder’s Comment:
The Petitioner has still not finalised the Solar Policy of the State.
Petitioner’s Response:
It is submitted that Solar Energy Policy 2017 has been issued by Goa Energy Development
Agency (GEDA) with due approval of Government of Goa.
Commission’s View:
The Commission has noted the Petitioner’s response. The Petitioner is directed to widely
publicise the Solar Policy and upload the same on its website for the benefit of the general
public. The Petitioner is also directed to submit a copy of the Policy to the Commission.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
63
2.2.10. Residential apartments are being rented out as Commercial/Paying Guests
accommodation and are still paying Domestic tariff.
Stakeholder’s Comment:
Several tourists are staying in Rent-Back-Apartments in the coastal villages of Goa but pay
residential rates instead of commercial, as the Department officials are making no attempt to
take any action in the matter, thereby resulting in a revenue loss of crores of rupees.
Petitioner’s Response:
It is submitted that there is already a provision in the Tariff Order dated 23rd May 2017 under
LT & HT Commercial category for “Houses with Rent back facilities”. The consumers having
houses with rent back facilities are supposed to take LT/HT Commercial connection (which has
higher tariff than domestic category).
Commission’s View:
The Commission has taken note of the Petitioner’s submission. The Commission directs the
Petitioner to ensure that every consumer is given connection based on the categories they
come under to avoid any kind of malpractices. The stakeholder is requested to report specific
cases, if any, to nearby EDG office so that necessary action can be taken in this regard.
2.2.11. Proposed tariff hike is not justified
Stakeholder’s Comment:
The proposed tariff hike to recover the revenue gap is not justified. No tariff hike should be
done similar to the previous year.
Petitioner’s Response:
It is submitted that out of total revenue gap computed for FY 2018-19, the tariff hike of less
than 5% is sought and rest is funded from the budgetary support. Last year there was no tariff
hike and the entire burden was borne by the Government of Goa. Considering other inflations
across sectors over 2 years which is in the range of 5-8% p.a., the tariff hike of less than 5% is
justified. However determination of tariff is in the purview of the Commission.
Commission’s View:
The Commission has noted the Petitioner’ submission. The Commission has determined the
Revenue gap for the FY 2018-19 based on the revised estimate of Power Purchase Cost of FY
2018-19. The Commission believes that the tariff should progressively reflect the cost of supply.
The Commission while determining the tariff for FY 2018-19 has considered the prudent cost of
the Petitioner and has accordingly determined the tariff for each consumer category.
2.2.12. Implementation of LED Street Lights
Stakeholder’s Comment:
Street Lights across many areas in the villages are yet to be deployed with LED Lights
Petitioner’s Response:
EDG has already completed the replacement of around 1.95 Lakhs conventional street light
fixtures. The scheme also includes Centralised Control and Monitoring System (CCMS) for
remote switching on/off of lights. Installation of the same is in progress. Street light is to be
maintained and monitored by M/s EESL for the period of 10 years. Work is targeted for
completion by March 2018. This will have energy saving of ~27 MU every year.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
64
Commission’s View:
The Commission has taken note of the Petitioner’s submission. The Commission directs the
Petitioner to expedite the process of replacing the conventional street lights with LED lights
and submit a compliance status report of the same to the Commission at the earliest.
3. Chapter 3: True-up of FY 2013-14
3.1.
Background
The Commission issued the Order on Aggregate Revenue Requirement (ARR) and Retail
Tariff for the FY 2013-14 on 31st March 2013. Subsequently, the Commission issued the Tariff
Order for FY 2014-15, determining the Aggregate Revenue Requirement (ARR) and tariff for FY
2014-15 and Annual Performance Review of FY 2013-14 on 15th April 2014 (hereinafter referred
to as the “APR Order”).
The True-up of the FY 2013-14 is to be carried out as per Regulation 8 (2) of the JERC Tariff
Regulations, 2009:
(2) (i) After audited accounts of a year are made available, the Commission shall undertake
similar exercise as above with reference to the final actual figures as per the audited accounts.
This exercise with reference to audited accounts shall be called ‘Truing Up’.
(ii) The Truing Up for any year will ordinarily not be considered after more than one year of
‘Review’.
(3) The revenue gap of the ensuing year shall be adjusted as a result of review and truing up
exercises.
(4) While approving such expenses/revenues to be adjusted in the future years as arising out
of the Review and/or Truing up exercises, the Commission may allow the carrying costs as
determined by the Commission of such expenses/revenues. Carrying costs shall be limited to the
interest rate approved for working capital borrowings.
(5) For any revision in approvals, the licensee would be required to satisfy the Commission that
the revision is necessary due to conditions beyond its control.
(6) In case additional supply is required to be made to any particular category, the licensee
may, any time during the year make an application to the Commission for its approval. The
application will demonstrate the need for such change of consumer mix and additional supply of
power and also indicate the manner in which the licensee proposes to meet the cost for such
change of consumer mix and additional supply of power.
(7) The Commission may consider granting approval to such proposals provided the cost of
additional supply is ordinarily met by the beneficiary category.”
In this Chapter, the Commission has analysed all the elements of actual revenue and
expenses for the FY 2013-14 and has carried out the True up of expenses and revenue with
reference to the actual figures (final) as per the audited accounts, after a prudence check and
has permitted necessary adjustments in cases where variations are for reasonable and
justifiable reasons.
3.2.
Energy Sales
Petitioner’s Submission
The Petitioner has submitted the total quantum of energy sales for FY 2013-14 as 3070.56 MU
as against an approved energy sales quantum of 2961.80 MU in the APR Order.
Commission’s Analysis
The Commission, after going through the submissions of the Petitioner including the audited
accounts, has considered the energy sales as 3,070.56 MU as submitted by the Petitioner for
the purpose of True-up of the FY 2013-14 as shown in the table on the next page:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
65
Table 5: Energy Sales (MU) trued-up by the Commission
S. No
Category
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
A. LOW TENSION SUPPLY
1
LTD/Domestic
800.00
844.23
844.23
2
LTD/L.I.G.
2.00
8.26
8.26
3
LTD Domestic Mixed
6.00
5.00
5.00
4
LTC/Commercial
292.00
280.97
280.97
5
LTP/Motive Power
89.00
74.41
74.41
6
LTP Mixed (Hotel Industries)
5.00
4.73
4.73
7
LTP Ice Manufacturing
8.00
8.00
8.00
8
LTAG/Agriculture
16.00
17.76
17.76
9
LTPL (Public lighting)
24.00
37.23
37.23
10
LTPWW/Public Water works
6.00
2.08
2.08
11
LT Temporary
10.00
17.89
17.89
Sub-Total
1258.00
1300.57
1300.57
B. HIGH TENSION SUPPLY
12
HT (Mixed)
112.00
117.88
117.88
13
HTI (Industrial) Ferro Metallurgical/
Steel Melting/Power Intensive.
532.00
517.37
517.37
14
HTI Industrial
628.00
619.33
619.33
15
HTAG (Agriculture)
6.00
6.09
6.09
16
EHTI (Industrial)
184.00
142.55
142.55
17
HT P.W.W. & Sewage system
138.00
138.12
138.12
18
HT. M.E.'s Defence Estt.
24.00
26.66
26.66
19
HTI (Steel Rolling)
59.00
69.02
69.02
20
HTI/IT High Tech
20.00
66.23
66.23
21
HTI/Ice Manufacturing
0.00
0.85
0.85
22
Sale from EDG to GSPL (Div. VII)
0.00
8.70
8.70
23
HTI Hotel Industry
0.00
57.11
57.11
24
HT Temporary
0.00
0.06
0.06
Sub-Total
1703.00
1769.99
1769.99
Total
2961.80
3070.56
3070.56
The Commission approves the energy sales as 3070.56 MU in the True-up of FY 2013-14.
3.3.
Inter-State Transmission loss
Petitioner’s submission
Petitioner has submitted the Inter-State transmission loss of 4.68% against a loss of 4.47%
approved in the APR Order.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
66
Commission’s analysis
The Commission has verified the Inter-State losses from the supporting documentary
evidence submitted by the Petitioner and as per information available on WRPC/SRPC
websites. The Commission accordingly trues-up the Inter-State Losses as shown in the table
below.
Table 6: Inter-State transmission loss (%)
S. No
Particulars
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
1
Inter-State Transmission Loss
4.47%
4.68%
4.68%
The Commission trues-up Inter-State Transmission Loss as 4.68% in the True-up of the
FY 2013-14.
3.4.
Intra-State Transmission & Distribution (T&D) loss
Petitioner’s submission
The Petitioner has submitted that it has achieved an Intra-State T&D loss of 11.16% in the FY
2013-14 against an approved loss of 12.00%.
Commission’s analysis
The Petitioner in its submission has failed to submit the Energy Audit Report of the State for
FY 2013-14. In the absence of the Energy Audit Report, the Commission, for verification of the
Intra-State T&D loss levels has relied on the information of energy drawal at state periphery,
available on the Western and Southern Region Power Committee websites and the energy
sales as approved above. Therefore, in accordance with the information available on the
websites, the Commission approves Intra-State T&D loss of 11.16% for the FY 2013-14 against
an approved loss of 12.00% in the APR Order.
The Petitioner in the Technical Validation Session (TVS) held at the Commission’s office
submitted that due to change in billing agencies, EDG has witnessed a transitional change in
energy accounting and billing in the past few years prior to FY 2017-18 which has resulted in
distortion in energy sales. The impact of the same can be observed in FY 2013-14 as well.
Therefore, in the absence of reliable sales figures for FY 2013-14, the Commission has decided
not to consider any incentive for the overachievement of T&D Loss target in the FY 2013-14.
The table below provides the Intra-State T&D loss approved in the APR of FY 2013-14,
Petitioner’s submission and as approved by the Commission now.
Table 7: Intra-State distribution loss (%)
S. No
Particulars
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
1
T&D Losses (%)
12.00%
11.16%
11.16%
The Commission, while Trueing up for FY 2013-14, has considered the actual Intra-State
T&D loss of 11.16% for the FY 2013-14.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
67
3.5.
Power Purchase Quantum & Cost
Petitioner’s submission
The Petitioner submitted that it meets its total energy requirement from its allocation from the
Central Generating Stations (CGS) and Co-generating Companies like Goa Energy Pvt. Ltd and
Goa Sponge & Power Ltd. Energy requirement is also met through NVVNL and through IPP
(Reliance Infra). The Power Purchase Cost has been submitted as incurred by the Petitioner in
FY 2013-14. The Power Purchase cost also includes ED, Cess, Incentive etc. and supplementary
charges considered on actual basis.
The transmission charges comprise of transmission charges of Western Region and Southern
Region.
With regards to Renewable Purchase Obligation (RPO), the Petitioner submitted that the
matter has been pursued in case No. 61/2012. The Petitioner submitted that the Non-Solar RPO
is being met through purchase of Co-generation power and the same has been acknowledged
by the Commission vide its Order dated 27th December 2013 in case No. 61/2012.
The power purchase quantum and cost for FY 2013-14, as submitted by the Petitioner has been
shown in the following table:
Table 8: Power Purchase cost submitted by the Petitioner (in Rs Cr)
S. No.
Source
Power
Purchase
(MU)
Fixed Charges
(Rs Cr)
Variable
Charges
(Rs Cr)
Other
Charges
(Rs Cr)
Total
Charges (Rs
Cr)
1
2
3
4
5
6
7
A
Central Sector
Power Stations
I
NTPC
3181.02
241.72
428.33
40.05
710.10
KSTPS
1645.01
91.43
154.89
21.04
267.37
KSTPS - III
41.09
6.39
3.88
0.76
11.02
VSTPS - I
231.57
18.03
31.75
5.92
55.69
VSTPS - II
103.89
6.82
13.45
2.45
22.72
VSTPS -III
92.82
9.80
12.03
1.85
23.68
VSTPS-IV
49.77
7.30
6.48
0.40
14.17
KGPP
30.71
7.96
8.30
(2.14)
14.12
GGPP
30.33
10.39
8.52
(2.02)
16.89
SIPAT- I
142.91
22.99
22.01
5.23
50.22
RSTPS
725.58
43.37
152.30
4.40
200.07
SIPAT- II
80.19
10.46
12.70
1.48
24.64
Mouda
7.16
6.79
2.02
(1.13)
7.68
Supplementary
charges inclusive of
rebate
-
1.82
1.82
II
RGPPL
13.94
8.71
(0.13)
8.58
III
NPCIL
200.21
51.98
(1.18)
50.80
KAPS
117.98
28.34
(0.65)
27.69
TAPS
82.23
23.64
(0.53)
23.11
IV
NET OVER-
DRAWAL
32.34
24.19
0.00
24.19
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
68
1
2
3
4
5
6
7
B
Within State
Generations
I
CO-GENERATION
74.03
-
17.54
0.00
17.54
Goa Energy Private
Limited
67.65
16.08
0.00
16.08
Goa Sponge &
Power Limited
6.37
1.46
0.00
1.46
C
IPP
Reliance Infra
115.39
146.46
0.00
146.46
D
OTHER CHARGES
-
-
-
120.79
120.79
PGCIL
Transmission
Charges, Wheeling
& Other Charges
120.79
120.79
Total
3616.94
241.72
677.20
160.71
1078.46
Commission’s analysis
The Petitioner procures power mainly from NTPC Stations, NPCIL stations, Co-Generating
Plants and IPP’s. No power has been purchased through IEX/Bilateral Purchase etc. The
Petitioner submitted the overall Power Purchase cost as Rs 1078.46 Cr inclusive of transmission
charges but exclusive of revenue from UI Underdrawal/sale due to surplus power.
The Commission has verified the power purchase details as submitted by the Petitioner in its
Petition with the publicly available information from the Regional Energy Accounts (REA)
maintained by Western Region Power Committee (WRPC) for the Central Generating Stations
(CGS). Further, apart from Western Region, the Petitioner also gets supply from the Southern
Region from the NTPC’s Ramagundam Thermal Power Station. The Commission has validated
the power purchase details pertaining to this station from the publicly available information
from the Regional Energy Accounts (REA) maintained by Southern Region Power Committee
(SRPC). The Commission has verified the power purchase quantum and cost as per the monthly
and station-wise bills submitted by the Petitioner. The cost has further been reconciled with
the audited annual accounts of FY 2013-14.
The Petitioner has accounted for the revenue from UI Underdrawal separately and Income
from Trading/Power Exchange as part of the Non-Tariff Income (NTI) and adjusted them both in
the Overall ARR. Further, it has been noticed that the Petitioner although has considered the
quantum of UI Underdrawal in the Total Power Purchase Quantum but has omitted the revenue
pertaining to this UI Underdrawal in the Total Power Purchase Cost. The Commission, for the
purpose of finalization of the Power Purchase Cost in the True up of FY 2013-14 has considered
both the Income from UI Underdrawal and Trading/Power Exchange along with the Power
Purchase cost approved now.
Other expenses such as the Transmission Charges and the Other Charges submitted have
been considered as per actuals incurred by the Petitioner.
The Petitioner submitted that no cost has been incurred towards the compliance of
Renewable Purchase Obligation (RPO) in FY 2013-14. The compliance status of RPO has been
discussed in detail in the subsequent section. The table below provides the summary of the
power purchase quantum and the cost approved by the Commission for FY 2013-14.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
69
Table 9: Power Purchase Quantum (MU) and cost (Rs Cr) approved by the Commission
S. No.
Source
Power
Purchase
(MU)
Fixed Charges
(Rs Cr)
Variable
Charges (Rs
Cr)
Other Charges
(Rs Cr)
Total
Charges
(Rs Cr)
A
Central Sector
Power Stations
I
NTPC
3181.02
241.72
428.33
40.05
710.10
KSTPS
1645.01
91.43
154.89
21.04
267.37
KSTPS - III
41.09
6.39
3.88
0.76
11.02
VSTPS - I
231.57
18.03
31.75
5.92
55.69
VSTPS - II
103.89
6.82
13.45
2.45
22.72
VSTPS -III
92.82
9.80
12.03
1.85
23.68
VSTPS-IV
49.77
7.30
6.48
0.40
14.17
KGPP
30.71
7.96
8.30
(2.14)
14.12
GGPP
30.33
10.39
8.52
(2.02)
16.89
SIPAT- I
142.91
22.99
22.01
5.23
50.22
RSTPS
725.58
43.37
152.30
4.40
200.07
SIPAT- II
80.19
10.46
12.70
1.48
24.64
Mouda
7.16
6.79
2.02
(1.13)
7.68
Supplementary
charges inclusive of
rebate
-
1.82
1.82
II
RGPPL
13.94
8.71
(0.13)
8.58
III
NPCIL
200.21
51.98
(1.18)
50.80
KAPS
117.98
28.34
(0.65)
27.69
TAPS
82.23
23.64
(0.53)
23.11
IV
Unscheduled
Interchange/Sale
of Surplus Power/
Trading
32.34
-
12.58
-
12.58
UI Over-drawal
107.02
-
24.19
-
24.19
Less: UI
Underdrawal/
Income from sale of
Surplus
Power/Trading
74.68
-
11.61
-
11.61
B
Within State
Generations
189.42
-
164.00
-
164.00
I
Co-Generation
74.03
-
17.54
0.00
17.54
Goa Energy Private
Limited
67.65
16.08
0.00
16.08
Goa Sponge &
Power Limited
6.37
1.46
0.00
1.46
II
IPP
115.39
-
146.46
0.00
146.46
Reliance Infra
115.39
-
146.46
0.00
146.46
C
Other Charges
-
-
-
120.79
120.79
PGCIL
Transmission
Charges, Wheeling
& Other Charges
120.79
120.79
Total
3616.94
241.72
665.59
159.53
1066.85
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
70
The Commission approves power purchase quantum of 3616.94 MU and cost of Rs 1066.85
Cr in the True-up of the FY 2013-14.
3.6.
Renewable Purchase Obligation (RPO)
As per Clause 1, sub-clause (1) of the JERC for the State of Goa and UTs (Procurement of
Renewable Energy) Regulations, 2010
“Each distribution licensee shall purchase electricity (in kWh) from renewable energy sources,
at a defined minimum percentage of the total consumption of all the consumers in its area during
a year.”
The Commission, in its Business Plan Order dated 22nd December, 2015 issued in the Petition
No. 186/2015, had reiterated that all the pending RPOs upto the FY 2015-16 must be fulfilled by
the Petitioner by 31st March, 2016 and no backlog would be allowed to be carried forward to the
MYT Control Period from FY 2016-17 to FY 2018-19.
The Petitioner for FY 2013-14 has not incurred any costs towards compliance of RPOs as
mentioned in the previous section. The Petitioner has further submitted that it has completely
fulfilled its RPO (both solar and non-solar) target till FY 2015-16 partly by way of purchase of
physical power and partly by RECs.
The Petitioner had made the similar submission before the Commission in the True-up of FY
2011-12 and FY 2012-13 in the previous Tariff Order. The Commission at that time had not
accounted for any cost or disincentive towards non-compliance of RPO till FY 2012-13. The
Commission believed that since the actual cost towards compliance has been incurred only in
FY 2015-16, therefore, the same shall be accounted for in the True-up for FY 2015-16.
In view of the above and keeping similar approach as adopted by the Commission towards
RPO Compliance in True-up of FY 2011-12 and FY 2013-14, the Commission has not considered
any cost towards RPO compliance in the FY 2013-14. The same shall be considered at the time
of True-up of the FY 2015-16.
3.7.
Energy Balance
Petitioner’s submission
The Petitioner has submitted the energy balance as shown in the following table.
Table 10: Energy Balance (MU) submitted by Petitioner
S.
No.
Particulars
Petitioner’s
Submission
1
2
3
1
Energy Input at Goa Periphery
3267.02
2
Total Power Scheduled/Purchased at Goa Periphery
Total Schedule Billed Drawal - CGS
3395.17
Add: Over-drawal
107.02
Add: Power purchase from NVVN/Banking
-
Add: Power purchase from Traders/Open Market
-
Less: Underdrawal
74.68
Add: Renewable Power
-
Less: Power diverted to Exchange
-
Total
3427.52
3
PGCIL Losses - MUs
160.50
PGCIL Losses - %
4.68%
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
71
1
2
3
4
Total Power Purchased within Goa State
Add: Co-generation
74.03
Add: Independent Power Producers (IPP)
115.39
Total
189.42
5
Total Power Purchase availability after PGCIL Losses
3456.44
Less: Retail Sales to Consumers
3070.56
Distribution Losses - MUs
385.88
6
Distribution Losses - %
11.16%
Commission’s analysis
The information submitted by the Petitioner on power purchase quantum, UI over/under
drawl, IEX/Bilateral purchase etc. has been examined and accordingly the energy balance for
FY 2013-14 has been derived. The Commission has determined the energy balance at the
Periphery of the State of Goa. The following table provides the energy balance approved in the
APR of FY 2013-14, the Petitioner’s submission and now trued-up by the Commission.
Table 11: Energy Balance (MU) approved by Commission at State Periphery
S. No.
Particulars
Approved in
APR Order
Petitioner's
Submission
Trued-up by
Commission
A
Energy Requirement
1
Energy sales within the State/UT
2961.80
3070.56
3070.56
2
Distribution losses
%
12.00%
11.16%
11.16%
MU
385.72
385.72
385.72
3
Energy required at State Periphery
3365.68
3456.28
3456.28
B
Energy Transactions at Periphery
1
Energy Availability from CGS stations
3313.76
3423.93
3423.93
(a)
Total availability from sources outside State
3225.74
3234.51
3234.51
(b)
Total availability from sources within State
88.02
189.42
189.42
2
UI Over drawal
77.75
107.02
107.02
3
UI/Under drawal
33.58
74.68
74.68
4
Banking Arrangement
7.75
-
-
5
Total Availability at State Periphery
(1+2-3+4)
3365.68
3456.28
3456.28
3.8.
Operation & Maintenance (O&M) Expenses
The Operation & Maintenance Expenses comprise of the Employee Expenses, Administrative
and General Expenses (A&G) and the Repair & Maintenance Expenses (R&M). The O&M
Expenses have been approved in accordance with the Tariff Regulations, 2009 and the audited
accounts submitted by the Petitioner for FY 2013-14.
3.8.1.
Employee Expenses
Petitioner’s submission
The Petitioner has incurred actual employee expenses of Rs 170.07 Cr against the approved
expenses of Rs 144.21 Cr in the APR of FY 2013-14.
The following table provides the employee expenses as submitted by the Petitioner:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
72
Table 12: Employee Expenses submitted by the Petitioner (In Rs Cr)
S. No.
Particulars
Petitioner’s Submission
1
Salary
170.07
2
Wages
3
Stipend
4
Transport Allowance
5
Overtime allowance
6
Total
170.07
7
Less: Add/Deduct share of others
-
8
Total
170.07
9
Less: Amount capitalized
-
10
Net amount
170.07
11
Add: Pension/DA and other Provision
-
12
Total Employee Expenses
170.07
The Petitioner further submitted that the Employee Expenses for FY 2013-14 are on the
higher side, on account of increase in Dearness Allowance, HRA and travel allowance, out of
which the Dearness Allowance is an uncontrollable factor. The Dearness Allowance accounts
to approx. 35% to 40% of the total employee expenses.
Commission’s analysis
The Commission observes that the employee expenses approved in the past were based on
the estimates prepared on cash basis and not accrual basis. The Petitioner had submitted and
prepared the audited accounts prepared on commercial principles for the first time in the
previous Tariff Order while undertaking the True-up of FY 2011-12 and FY 2012-13.
Since, the Base Employee Expenses considered while projecting the Employee Expenses for
FY 2013-14 in the APR of FY 2013-14 were determined differently, the Commission finds it
appropriate to consider the actual employee costs as available in the audited accounts for the
purpose of the True-up of the FY 2013-14.
Further, the Petitioner has considered an expense towards CGRF of Rs 0.33 Cr separately in
the ARR. The Commission, for the purpose of True-up, has considered this expense along with
the Employee Expenses due to its inherent nature.
The table below provides the employee expenses approved in the APR Order, submitted by
the Petitioner and now approved by the Commission.
Table 13: Employee Expenses approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
1
Employee Expenses
144.21
170.07
170.07
2
Expense towards CGRF
-
-
0.33
3
Total Employee Expenses
144.21
170.07
170.40
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
73
The Commission approves Employee Expenses of Rs 170.40 Cr in the True-up of FY 2013-14.
3.8.2.
Administrative and General (A&G) Expenses
Petitioner’s submission
The Petitioner has incurred A&G expenses of Rs 18.54 Cr against the approved expenses of Rs
9.08 Cr in the APR Order.
The following table provides the A&G expenses as submitted by the Petitioner:
Table 14: A&G Expenses submitted by Petitioner (In Rs Cr)
S. No.
Particulars
Petitioner’s
Submission
1
Travelling Expenses
0.39
2
Office Expenses
13.51
3
Regulatory Expenses (License + Petition Fees)
0.00
4
Petrol, Oil, Lubricant (P.O.L.)
0.00
5
Rent, Rates & Taxes
0.29
6
Advertisement & Publicity
0.26
7
Professional & Special Services
0.97
8
Other A&G Charges
1.46
9
Overtime Allowance
0.00
10
Minor Works
1.66
11
Legal, Professional & Special Service Charges
0.00
12
Total A&G Expenses
18.54
Commission’s analysis
Similar to the approach followed while approving the Employee Expenses, the Commission
approves the A&G Expenses as per the audited accounts for the purpose of True-up of the FY
2013-14. The table below provides the A&G Expenses approved in the APR of FY 2013-14, the
Petitioner’s submission and the expenses now approved by the Commission.
Table 15: A&G Expenses approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
1
Administration & General
Expenses (A&G)
9.08
18.54
18.54
The Commission approves the Administrative & General (A&G) expenses of Rs 18.54 Cr in
the True-up of FY 2013-14.
3.8.3.
Repair & Maintenance Expenses (R&M)
Petitioner’s submission
The Petitioner has incurred R&M expenses of Rs 21.45 Cr against the approved expenses of Rs
19.61 Cr in the APR Order. The Petitioner submitted that it has been undertaking various R&M
activities as a step towards improvement of systems, reduction in breakdowns, and reduction
in response time and increasing preventive maintenance. R&M expenses are necessary for
maintenance of infrastructure and for ensuring proper Standards of Performance of the
Petitioner.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
74
Commission’s analysis
Similar to the approach followed while approving the Employee expenses and A&G expenses
above, the Commission approves the R&M Expenses as per actual audited accounts of FY 2013-
14:
Table 16: R&M Expenses approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
1
Repair & Maintenance
Expenses (R&M)
19.61
21.45
21.45
The Commission approves the Repair & Maintenance (R&M) expenses of Rs 21.45 Cr in the
True-up of FY 2013-14.
3.8.4.
Total Operation and Maintenance Expenses (O&M)
The following table provides the O&M Expenses approved in the APR of FY 2013-14,
Petitioner’s submission and O&M now trued-up by the Commission.
Table 17: O&M Expenses approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
1
Employee Expenses
144.21
170.07
170.40
2
Administrative & General
Expenses (A&G)
9.08
18.54
18.54
3
Repair & Maintenance
Expenses
19.61
21.45
21.45
Total Operation &
Maintenance Expenses
172.90
210.06
210.39
The Commission approves the Operation & Maintenance (O&M) expenses of Rs 210.39 Cr in
the True-up of FY 2013-14.
3.9.
Capitalisation
Petitioner’s submission
The Petitioner submitted the actual capitalisation for the FY 2013-14 as Rs 66.35 Cr against an
approved capitalization of Rs 191.44 Cr
Commission’s analysis:
The Commission with regards to capitalisation submitted by the Petitioner, sought details of
the assets created out of Loan/Equity/Govt. Grant/Consumer Contribution etc. In reply, the
Petitioner submitted that majority of capital assets are created out of the equity contribution
from Govt. of Goa and the actual borrowing of loan is only to the extent of the R-APDRP
scheme. The capitalization is inclusive of assets created out of the Electricity Development
Fund which is treated as Government Grant. The Petitioner further submitted that no assets
have been created out of Consumer Contribution.
It is observed that the capital expenditure and capitalisation achieved by the Petitioner is much
lower than approved by the Commission in the APR Order. Lower capital expenditure signifies
that enough efforts have not been undertaken in enhancing the reliability of supply to
consumers. It also signifies that sufficient measures aren’t being taken to provide electricity
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
75
supply to un-electrified areas and equipping the distribution infrastructure with the growing
demand. Accordingly, the Commission directs the Petitioner to increase its efforts towards
undertaking capital expenditure activities necessary for improving the service quality and
targeting 24x7 supply to all consumers.
The Commission has examined the Fixed Asset Register (FAR) as submitted by the Petitioner
in detail and accordingly approves the capitalisation as shown in the following table.
Table 18: Capitalisation approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
1
RAPDRP Scheme
-
10.06
10.06
2
Electricity Development
Fund (EDF)
-
20.00
20.00
3
Other Plan Schemes
-
36.29
36.29
Total Capitalisation
191.44
66.35
66.35
The Commission approves Capitalisation of Rs 66.35 Cr in the True-up of FY 2013-14.
3.10. Depreciation
Petitioner’s submission
The Petitioner has submitted the actual depreciation of assets as per the audited annual
accounts of FY 2013-14. The depreciation is arrived in annual accounts for FY 2013-14 based on
the rates specified by the Commission in the Tariff Regulations, 2009.
The depreciation as claimed by the Petitioner has been tabulated in the table below:
Table 19: Depreciation submitted by Petitioner (In Rs Cr)
S. No
Particulars
Petitioner's Submission
1
Opening Gross Fixed Assets
816.84
2
Addition During the FY
66.35
3
Adjustment/Retirement during the FY
0.00
4
Closing Gross Fixed Assets
883.20
Depreciation
39.57
Commission’s analysis
In respect of depreciation, the Commission has followed Regulation 26 of the Tariff Regulations,
2009, as under:
“26. Depreciation
(1) For the purpose of tariff, depreciation shall be computed in the following manner:
(i) The value base for the purpose of depreciation shall be the historical cost of the assets, that is
actual expenses limited to approved capital cost where such capital cost has been approved by
the Commission:
Provided that land is not a depreciable asset and its cost shall be excluded from the capital cost
while computing depreciation.
(ii) The historical cost of the asset shall include additional capitalization.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
76
(iii) The historical cost shall include foreign currency funding converted into equivalent rupees at
the exchange rate prevalent on the date when foreign currency was actually availed but not
later than the date of commercial operation.
(iv) Depreciation for generation and transmission assets shall be calculated annually as per
straight-line method over the useful life of the asset at the rate of depreciation specified by the
Central Electricity Regulatory Commission from time to time.
As per the norms specified in the Tariff Regulations, 2009 the Commission has verified the
asset wise capitalisation of the Petitioner and has accordingly derived the weighted average
rate of depreciation based on the asset wise depreciation rate prescribed in the CERC Tariff
Regulations, 2009, given in the following table:
Table 20: Depreciation Rate (%)
Description
Rate
Plant & Machinery
5.28%
SCADA Centre
5.28%
Testing & Measuring Equipment
5.28%
Lines & Cables
5.28%
Buildings
3.34%
Vehicles
9.50%
Furniture & Fixtures
6.33%
Office Equipment
6.33%
Computers & Others
15.00%
Land
0.00%
Based on the above depreciation rates and the actual asset addition during the year the
weighted average depreciation rate is computed as 5.27% against a rate of 5.28% approved in
the APR Order. The Commission has not considered depreciation on assets created from the
Electricity Duty Fund as the same has been treated as a Grant from the Government of Goa.
The Commission has calculated the depreciation on average Gross Fixed Assets (GFA) with
the opening GFA considered equivalent to the closing GFA as approved in the True-Up of FY
2012-13, in the Order dated 23rd May, 2017. It is pertinent to mention here that the Commission
had revised the GFA value in accordance with the Fixed Asset Register (FAR) of FY 2011-12
and FY 2012-13 while undertaking the True-up of the respective years. Accordingly, the
Commission approves the GFA and Depreciation as per the revised opening balance of FY
2013-14. The following table provides the calculation of depreciation during the FY 2013-14:
Table 21: Depreciation approved by Commission (In Rs Cr)
S.
No.
Particulars
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
1
Opening Gross Fixed Assets
207.30
816.84
816.84
2
Addition During the FY
191.44
66.35
66.35
3
Less: Addition on account of EDF/
Grant
0.00
0.00
20.00
4
Closing Gross Fixed Assets
398.74
883.20
863.19
5
Average Gross Fixed Assets
303.02
-
840.02
6
Weighted average Rate of
Depreciation (%)
5.28%
-
5.27%
Depreciation
16.00
39.57
44.29
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
77
The Commission approves depreciation of Rs 44.29 Cr in the True-up of FY 2013-14.
3.11. Interest and Finance Charges
Petitioner’s submission
The Petitioner submitted that majority of capital assets are created out of the equity
contribution from the Government of Goa. Interest on Loan has been estimated based on the
normative loan calculation whereby 70% of the opening GFA and the capitalization during the
year have been considered as normative debt. The Interest expense arrived is based on
normative loan considered to the extent of capitalization during the year after deducting the
Electricity Duty available as Grant.
Opening balance of normative loan for FY 2013-14 considered as per the approved normative
loan in truing up of FY 2012-13. Further, the rate of interest has been considered as State Bank
of India Prime Lending Rate (SBI PLR) of 14.45% (rate as on 1st April, 2013).
In addition to the above, the Petitioner has also claimed certain financial charges related to
bank charges, LC charges, etc.
Commission’s analysis:
Regulation 25 of the Tariff Regulations, 2009 states:
“ 1) For existing loan capital interest and finance charges on loan capital shall be computed on
the outstanding loans, duly taking into account the rate of interest and schedule of repayment as
per the terms and conditions of relevant agreements.
2) Interest and finance charges on loan capital for new investments shall be computed on the
loans, duly taking into account the rate of interest and the schedule of repayment as per the
terms and conditions of relevant agreements. The rate of interest shall, however, be restricted to
the prevailing Prime Lending Rate of the State Bank of India.’’ (Read SBI Advance Rate)
Further as per Regulation 23 of the said Tariff Regulations, 2009:
“23. Debt-Equity Ratio
1) For the purpose of determination of tariff, debt-equity ratio in case of existing, ongoing as well
as new projects commencing after the date of notification of these Regulations shall be 70:30.
Where equity employed is more than 30%, the amount of equity for the purpose of tariff shall be
limited to 30% and the balance amount shall be considered as loan. Where actual equity
employed is less than 30%, the actual debt and equity shall be considered for determination of
tariff:
2) Provided that the Commission may, in appropriate cases, consider equity higher than 30% for
the purpose of determination of tariff, where the generating company or the licensee is able to
establish to the satisfaction of the Commission that deployment of equity more than 30% is in the
interest of the general public.
3) The debt and equity amounts arrived at in accordance with sub-regulation (1) above shall be
used for all purposes including for determining interest on loan, return on equity, Advance
against Depreciation and Foreign Exchange Rate Variation:
4) Provided that in the case of an Integrated Utility, till the time it remains Integrated Utility, it
shall be entitled to return on its capital base as per Schedule VI to the repealed Electricity
(Supply) Act, 1948.”
Accordingly, the Commission for the purpose of funding of the capitalisation has considered the
normative debt-equity ratio of 70:30. The addition in loan has been considered with respect to
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
78
the total capitalization during the year excluding the assets created out of the Electricity Duty
Fund.
The Commission for the purpose of calculation of Interest on Loan has considered an interest
rate equivalent to the SBI PLR @ 14.45%, as on 1st April, 2013. The interest has been calculated
on the average loan during the year with the opening loan considered equivalent to the closing
loan approved in the True-Up of FY 2012-13. Repayment of the loan has been considered at 10%
of the opening loan amount. Additionally, the Commission also allows expenditure towards
financing charges as per actuals as reflected in the annual accounts.
The following table provides the Interest and Finance charges as approved by the Commission:
Table 22: Interest and Finance charges approved by Commission (In Rs Cr)
S.
No.
Particulars
Approved in
APR Order
Petitioner's
Submission
Trued-up by
Commission
1
Opening Normative Loan
136.29
148.07
148.07
2
Add: Normative Loan during the year
134.01
28.22
32.45
3
Less: Normative Repayment
equivalent to 10% of opening
normative loan
13.63
14.81
14.81
4
Closing Normative Loan
256.67
161.48
165.71
5
Average Normative Loan
196.48
154.78
156.89
6
Rate of Interest (%)
7.99%
14.45%
14.45%
7
Interest on Loan
15.70
22.37
22.67
8
Financing Charges
1.00
1.48
1.48
Interest and Finance Charges
16.70
23.84
24.15
The Commission approves Interest and Finance Charges of Rs 24.15 Cr in the True-up of the
FY 2013-14
3.12. Return on Capital Base
Petitioner’s submission
The Petitioner has calculated the return on capital base at 3%. The return is calculated on the
Net Fixed Assets (NFA) considering Gross Block inclusive of Capital Works in Progress (CWiP)
and thereby deducting the accumulated depreciation.
Commission’s analysis:
Regulation 24 (1) of the JERC Tariff Regulations, 2009 with regards to Return in Equity specifies
the following:
“Subject to the proviso to Regulation 23(2), Return on Equity shall be computed on the paid up
equity capital determined in accordance with Regulation 23 and shall be guided by the Central
Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004 as
amended by the CERC from time to time. The same principles will apply for distribution business
also as far as possible.”
The Commission, similar to the methodology adopted in the True-ups of FY 2011-12 and FY
2012-13 in the Tariff Order of last year, has determined the Return on Capital Base based on the
Gross Fixed Assets as approved above and the Opening Cumulative Depreciation as on
1st April, 2013, as reflected in the audited annual accounts. The table below shows the
computation of the Return on Capital Base as approved in the APR Order, the Petitioner’s
submission and the Return now approved by the Commission.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
79
Return on Capital Base approved by Commission (In Rs Cr)
S.
No.
Particulars
Approved in APR
Order
Petitioner's
Submission
Now Approved by
Commission
1
Gross Fixed Assets at the
beginning of FY
207.30
1304.08
816.84
2
Less: Opening accumulated
depreciation as per annual audited
accounts
12.13
217.42
217.42
3
Net Fixed Assets
195.17
1086.66
599.42
Return at 3% of NFA
5.86
32.60
17.98
The Commission approves a Return on Capital Base as Rs 17.98 Cr in the True-up of FY
2013-14.
3.13. Interest on Security Deposits
Petitioner’s submission
The Interest on Security Deposit calculated by the Petitioner on normative basis has been
shown in the table below:
Table 23: Interest on Consumer Security Deposits submitted by Petitioner (In Rs Cr)
S. No.
Particulars
Petitioner's Submission
1
Opening Security Deposit
17.17
2
Add: Deposits During the year
8.26
3
Less: Deposits refunded
4.33
4
Closing Security Deposit
21.09
5
Average Security Deposit
19.13
6
Rate of Interest (%)
8.50%
7
Interest on Security Deposit
1.63
8
Interest paid to consumers
0.00
The Petitioner has determined the Interest on Security Deposits on normative basis as per Tariff
Regulations, 2009 but has not considered the same in the ARR as no interest has been paid to
consumers in the FY 2013-14.
Commission’s analysis:
As the Petitioner has not paid any Interest on Security Deposit to consumers, the Commission
does not approve any Interest on Security Deposit in FY 2013-14. The following table provides
the interest on security deposit as approved in the APR of FY 2013-14, the Petitioner’s
submission and the interest now approved by the Commission:
Table 24: Interest on Consumer Security Deposits approved by Commission (In Rs Cr)
S.
No.
Particulars
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
1
Interest on Security Deposit
5.42
0.00
0.00
The Commission approves Interest on Security Deposit as nil in the True-up of FY 2013-14.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
80
3.14. Interest on Working Capital
Petitioner’s submission
The Petitioner has determined the Interest on Working Capital on normative basis considering
sum of the following:
a. Power purchase cost.
b. Employees cost.
c. Administration & general expenses.
d. Repair & Maintenance expenses.
e. Sum of two months requirement for meeting Fuel cost.
The Interest Rate has been considered as SBI PLR as on 1stApril, 2013.
Commission’s analysis:
As per Regulation 29 of the Tariff Regulations, 2009:
“(3) Subject to prudence check, the working capital for integrated utility shall be the sum of one
month requirement for meeting:
a. Power purchase cost.
b. Employees cost.
c. Administration & general expenses.
d. Repair & Maintenance expenses.
e. Sum of two month requirement for meeting Fuel cost.
5) The rate of interest on working capital shall be equal to the short term Prime Lending Rate of
State Bank of India on the 1st April of the relevant financial year. The interest on working capital
shall be payable on normative basis notwithstanding that the generating company/licensee has
not taken working capital loan from any outside agency or has exceeded the working capital
loan amount worked out on the normative figures.”
The Commission has considered the calculation of the different components of the Working
Capital on the basis of the stipulated norms. The Commission has deducted average consumer
security deposit from the Working Capital requirement as reflected in the audited annual
accounts of FY 2013-14. The Commission has considered the SBI PLR as applicable on 1st April,
2013. Accordingly, the Interest on Working Capital has been calculated, as shown in the table
below:
Table 25: Interest on Working Capital approved by Commission (In Rs Cr)
S.
No.
Particulars
Approved in
APR Order
Petitioner's
Submission
Now Approved
by Commission
1
Power Purchase Cost for one month
77.09
89.87
88.90
2
Employee Cost for 1 month
12.02
14.17
14.20
3
A&G Cost for 1 month
0.76
1.55
1.55
4
R&M Cost for 1 month
1.63
1.79
1.79
5
Total Working Capital for 1 month
91.50
107.38
106.44
6
Average Security Deposit
64.95
17.17
19.13
7
Total Working Capital considered for 1 month
26.55
90.21
87.31
8
SBI PLR
14.45%
14.45%
14.45%
Interest on Working Capital
3.84
13.04
12.62
The Commission approves the Interest on Working Capital as 12.62 Cr in the True-up of FY
2013-14.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
81
3.15. Provision for Bad & Doubtful Debts
Petitioner’s submission
The Petitioner submitted that it has created a provision of Rs 2.96 Cr towards Bad and Doubtful
Debts in the annual accounts of FY 2013-14.
Commission’s analysis:
As specified in Regulation 28 of the Tariff Regulations, 2009 (to be read with the format):
“The Commission may, after the generating company/licensee gets the receivables audited,
allow a provision for bad debts up to 1% of receivables in the revenue requirement of the
generating company/licensee.”
It is observed that as per the audited accounts, the licensee has not written off any amount in
the FY 2013-14. Therefore, the Commission does not approve any amount under the provision
for bad and doubtful debts.
The Commission approves nil provision of Bad & Doubtful Debts in the True-up of
FY 2013-14.
3.16. Non-Tariff Income (NTI)
Petitioner’s submission
The Petitioner submitted NTI of Rs 17.02 Cr in the True-Up of FY 2013-14 against Rs 22.55 Cr
approved by the Commission in the ARR for FY 2013-14. The Non–Tariff Income as submitted
by the Petitioner has been shown in the table below:
Table 26: Non-Tariff Income as submitted by Petitioner (In Rs Cr)
S. No.
Particulars
Petitioner's Submission
1
Meter Rent
3.81
2
Revenue from Power Exchange
0.75
3
Misc./Other Receipts
11.94
4
Income from trading of Power
0.52
Total
17.02
Commission’s analysis:
The Commission has authenticated the submission of the Petitioner from the audited accounts
and found the same to be correct. Further, the Commission as discussed while truing up the
Power Purchase Cost had considered the revenue from Trading of Power and Power Exchange
as part of the Power Purchase Cost. Accordingly, the Commission approves the same
remaining NTI as submitted by the Petitioner. The NTI approved in the APR Order, Petitioner’s
submission and now approved by the Commission is shown in the table below:
Table 27: Non-Tariff Income approved by Commission (In Rs Cr)
S. No
Particulars
Approved in
APR Order
Petitioner's
Submission
Trued-up by
Commission
1
Meter Rent
-
3.81
3.81
2
Revenue from Power Exchange
-
0.75
-
3
Misc./Other Receipts
-
11.94
11.94
4
Income from trading of Power
-
0.52
-
Total
23.22
17.02
15.76
The Commission approves Non-Tariff Income of Rs 15.76 Cr in the True-up of FY 2013-14.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
82
3.17. Revenue from Sale of Surplus Power
Petitioner’s submission
The Petitioner has earned a revenue of Rs 10.34 Cr from sale of surplus power/UI Underdrawal.
Commission’s analysis:
The Commission as discussed while approving the Power Purchase Cost has considered the
revenue from sale of surplus power/UI Underdrawal along with the Total Power Purchase Cost
due to its inherent nature.
The revenue from sale of surplus power/UI Underdrawal as approved in the APR Order,
Petitioner’s submission and now trued-up by the Commission is shown in the following table:
Table 28: Non-Tariff Income approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in
APR Order
Petitioner's
Submission
Trued-up by
Commission
1
Revenue from sale of surplus
power/UI Underdrawal
8.38
10.34
10.34
The Commission approves Rs 10.34 as revenue from sale of surplus power/ UI Overdrawal
and has considered the same along with the Total Power Purchase cost approved in the
True-up of FY 2013-14.
3.18. Aggregate Revenue Requirement (ARR)
Petitioner’s submission
Based on the expenses as detailed above, the net aggregate revenue requirement of Rs 1373.50
Cr is submitted for approval in the True-up of FY 2013-14.
Commission’s analysis
The Commission on the basis of the detailed analysis of the cost parameters of the ARR has
considered and approved the revenue requirement in the True-up of FY 2013-14 as given in the
following table:
Table 29: Aggregate Revenue Requirement approved by Commission for FY 2013-14 (In Rs Cr)
S.
No
Particulars
Approved in
APR Order
Petitioner's
Submission
Now Approved
by Commission
1
Power Purchase Cost
933.41
1078.46
1066.85
2
Provision for RPO Compliance
29.42
3
Operation & Maintenance Expenses
172.90
210.06
210.39
4
Depreciation
16.00
39.57
44.29
5
Interest and Finance charges
16.70
23.84
24.15
6
Interest on Working Capital
3.84
13.04
12.62
7
Interest on Security Deposit
5.42
0.00
0.00
8
Return on Equity
5.86
32.60
17.98
9
Provision for Bad Debt
0.00
2.96
0.00
10
Other Expenses
0.56
0.33
0.00
12
Total Revenue Requirement
1184.11
1400.86
1376.27
13
Less: Non-Tariff Income
22.55
17.02
15.76
14
Revenue from sale of surplus power/UI
Overdrawal
8.38
10.34
-*
Net Revenue Requirement
1153.17
1373.50
1360.51
*Adjusted in Power Purchase Cost
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
83
The Commission approves net Aggregate Revenue Requirement of Rs 1360.51 Cr in the
True-up of FY 2013-14.
3.19. Revenue at existing Retail Tariff
Petitioner’s submission
The Petitioner has submitted the net actual revenue for the FY 2013-14 as Rs 1060.29 Cr against
revenue of 990.86 Cr approved by the Commission in the APR Order. The table below provides
the revenue at existing tariff as submitted by the Petitioner:
Table 30: Revenue at existing tariff submitted by the Petitioner for FY 2013-14 (In Rs Cr)
S.
No
Category
Sales (MU)
Total Revenue
(Rs Cr)
ABR (Rs/kwh)
A. LOW TENSION SUPPLY
1
LTD/Domestic
844.23
172.74
2.05
2
LTD/L.I.G.
8.26
1.15
1.39
3
LTD Domestic Mixed
5.00
1.67
3.34
4
LTC/Commercial
280.97
119.86
4.27
5
LTP/Motive Power
74.41
26.85
3.61
6
LTP Mixed (Hotel Industries)
4.73
2.62
5.54
7
LTP Ice Manufacturing
8.00
2.60
3.25
8
LTAG/Agriculture
17.76
3.20
1.80
9
LTPL ( Public lighting )
37.23
13.39
3.60
10
LTPWW/Public Water works
2.08
0.99
4.78
11
LT Temporary
17.89
13.33
7.45
Sub-Total
1300.57
358.39
2.76
B. HIGH TENSION SUPPLY
12
HT ( Mixed )
117.88
52.15
4.42
13
HTI (Industrial) Ferro Metallurgical/
/Steel Melting/Power Intensive
517.37
193.00
3.73
14
HTI Industrial
619.33
239.96
3.87
15
HTAG ( Agriculture)
6.09
1.35
2.22
16
EHTI ( Industrial )
142.55
56.82
3.99
17
HT P.W.W. & Sewage system
138.12
69.50
5.03
18
HT. M.E.'s Defence Estt.
26.66
9.70
3.64
19
HTI ( Steel Rolling )
69.02
28.04
4.06
20
HTI/IT High Tech
66.23
24.43
3.69
21
HTI/Ice Manufacturing
0.85
0.33
3.87
22
Sale from EDG to GSPL (Div. VII)
8.70
3.61
4.15
23
HTI Hotel Industry
57.11
22.93
4.01
24
HT Temporary
0.06
0.08
11.56
Sub-Total
1769.99
701.90
3.97
Total
3070.56
1060.29
3.45
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
84
Commission’s analysis
The Commission has verified revenue from the sale of power within the State in the FY 2013-14
from the audited accounts.
The category-wise revenue as approved in the APR Order, the Petitioner’s submission and the
revenue now Trued-up by the Commission is shown in the following table:
Table 31: Revenue at existing tariff approved by Commission for FY 2013-14 (In Rs Cr)
S.
No.
Category
Approved in
APR Order
Petitioner's
Submission
Now Approved
by Commission
A. LOW TENSION SUPPLY
1
LTD/Domestic
152.00
172.74
172.74
2
LTD/L.I.G.
0.73
1.15
1.15
3
LTD Domestic Mixed
2.00
1.67
1.67
4
LTC/Commercial
100.00
119.86
119.86
5
LTP/Motive Power
33.00
26.85
26.85
6
LTP Mixed (Hotel Industries)
1.99
2.62
2.62
7
LTP Ice Manufacturing
2.50
2.60
2.60
8
LTAG/Agriculture
2.71
3.20
3.20
9
LTPL ( Public lighting )
6.61
13.39
13.39
10
LTPWW/Public Water works
1.47
0.99
0.99
11
LT Temporary
9.11
13.33
13.33
Sub-Total
312.12
358.39
358.39
B. HIGH TENSION SUPPLY
12
HT ( Mixed )
47.14
52.15
52.15
13
HTI (Industrial) Ferro Metallurgical/
Steel Melting/Power Intensive.
188.00
193.00
193.00
14
HTI Industrial
262.36
239.96
239.96
15
HTAG ( Agriculture)
0.89
1.35
1.35
16
EHTI ( Industrial )
70.48
56.82
56.82
17
HT P.W.W. & Sewage system
48.47
69.50
69.50
18
HT. M.E.'s Defence Estt.
8.86
9.70
9.70
19
HTI ( Steel Rolling )
29.00
28.04
28.04
20
HTI/IT High Tech
23.25
24.43
24.43
21
HTI/Ice Manufacturing
0.21
0.33
0.33
22
Sale from EDG to GSPL (Div. VII)
-
3.61
3.61
23
HTI Hotel Industry
-
22.93
22.93
24
HT Temporary
0.08
0.08
0.08
Sub-Total
678.74
701.90
701.90
Total
990.86
1060.29
1060.29
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
85
The Commission approves the revenue from the sale of power as Rs 1060.29 Cr in the
True-up of the FY 2013-14.
3.20. Standalone Revenue Gap/Surplus
Petitioner’s submission
Based on the ARR submitted and the revenue from retail tariff, the standalone revenue gap of
Rs 313.21 Cr is arrived at in the True-up of FY 2013-14.
Commission’s analysis
The Commission, based on the approved ARR and the retail tariff has arrived at the Revenue
Gap/Surplus as follows:
Table 32: Standalone Revenue Gap/Surplus approved by Commission for FY 2013-14
(In Rs Cr)
S. No
Particulars
Approved in APR
Order
Petitioner's
Submission
Trued-up by
Commission
1
Net Revenue Requirement
1153.17
1373.50
1360.51
2
Total Revenue
1014.05*
1060.29
1060.29
Net Gap/(Surplus)
139.12
313.21
300.22
*Inclusive of FPPCA of Rs. 23.19 Cr.
The Commission, in the True-up of FY 2013-14 approves a standalone gap of Rs 300.22 Cr.
The Petitioner has submitted that the entire gap for the FY 2013-14 is committed to be
funded by the Government of Goa by way of budgetary support. The Petitioner in this
regard had submitted the letter dated 1st March, 2013 from the Government of Goa wherein
the Govt. had assured that it would provide the requisite budgetary support to meet the
deficit at the existing tariff for the FY 2013-14. In view of the budgetary support for the FY
2013-14 from the Government of Goa, the Commission approves Nil net revenue gap in the
True-up for the FY 2013-14.
4. Chapter 4: True-up of the FY 2014-15, FY 2015-16 and FY 2016-17
4.1. Applicable provisions of JERC for the State of Goa and Union Territories (Terms and
Conditions for Determination of Tariff) Regulations, 2009
The True-ups of FY 2014-15 and FY 2015-16 are to be carried out as per Regulation 8 (2) of the
Tariff Regulations, 2009:
(2) (i) After audited accounts of a year are made available, the Commission shall undertake
similar exercise as above with reference to the final actual figures as per the audited accounts.
This exercise with reference to audited accounts shall be called ‘Truing Up’.
(ii) The Truing Up for any year will ordinarily not be considered after more than one year of
‘Review’.
(3) The revenue gap of the ensuing year shall be adjusted as a result of review and truing up
exercises.
(4) While approving such expenses/revenues to be adjusted in the future years as arising out of
the Review and/or Truing up exercises, the Commission may allow the carrying costs as
determined by the Commission of such expenses/revenues. Carrying costs shall be limited to the
interest rate approved for working capital borrowings.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
86
(5) For any revision in approvals, the licensee would be required to satisfy the Commission that
the revision is necessary due to conditions beyond its control.
(6) In case additional supply is required to be made to any particular category, the licensee may,
any time during the year make an application to the Commission for its approval. The
application will demonstrate the need for such change of consumer mix and additional supply of
power and also indicate the manner in which the licensee proposes to meet the cost for such
change of consumer mix and additional supply of power.
(7) The Commission may consider granting approval to such proposals provided the cost of
additional supply is ordinarily met by the beneficiary category.”
The True-up of FY 2016-17 the 1st year of the MYT Control Period, is to be carried out as per
Regulation 8 (2) of the MYT Regulations, 2014:
“8. Annual Review of Performance and True-up
(2) After audited accounts of a year are made available, the Commission shall undertake similar
exercise as above with reference to the final actual figures or the provisional actual accounts as
available as per the audited accounts. This exercise with reference to audited accounts shall be
called 'Truing Up'.
The Truing Up for any year will ordinarily not be considered after more than one year of 'Review'.
(3) The revenue gap/surplus, if any, of the ensuing year shall be adjusted as a result of review
and truing up exercises.
(4) While approving such expenses/revenue to be adjusted in the future years as arising out of
the Review and/or Truing up exercises, the Commission may allow the carrying costs as
determined by the Commission of such expenses/revenue. Carrying costs shall be limited to the
interest rate approved for working capital borrowings.
(5) For any revision in approvals, the licensee would be required to satisfy the Commission that
the revision is due to conditions beyond its control.
(6) In case additional supply is required to be made to any particular category, the licensee may,
any time during the year make an application to the Commission for its approval. The
application will demonstrate the need for such additional supply of power and also indicate the
manner in which the licensee proposes to meet the cost for such additional supply of power.
4.2.
Approach for the True-up of the FY 2014-15 and FY 2015-16 and FY 2016-17
Petitioner’s submission:
The Petitioner submitted that the finalization of audited accounts for the FY 2014-15 and FY
2015-16 is in process and the Commission shall be approached for truing-up at a later date
when the audited accounts are available. Further, the provisional figures are available for FY
2016-17 and the finalization of accounts is under process. Based on the provisional accounts,
the Petitioner has requested to approve the provisional actual figures of the FY 2016-17 for
determination of ARR & Revenue gap and treatment thereof.
Commission’s analysis:
The Commission notes that the Petitioner has not submitted the audited accounts prepared on
commercial principles for the FY 2014-15, FY 2015-16 and FY 2016-17. The Commission in its
previous Orders had stressed upon the requirement of the audited accounts to bring in more
accuracy in the estimates made by the Commission. The Tariff Regulations, 2009 and MYT
Regulations, 2014 also require the licensee to file the True up along with the audited accounts
in the filing.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
87
The Commission now directs the Petitioner to prepare and submit the audited accounts from
the FY 2014-15 onwards based on commercial principles along with the True-up Petitions by
30th November 2018.
The True-up would therefore be taken up only after submission of the audited accounts.
Accordingly, the Commission has decided not to consider True-up for the FY 2014-15, FY
2015-16 and FY 2016-17 in the current Order.
5. Chapter 5: Annual Performance Review of FY 2017-18
5.1.
Background
The Tariff Order for the FY 2017-18 was issued by the Commission on 23rd May, 2017 approving
the Aggregate Revenue Requirement (ARR) and tariff for the FY 2017-18. The Annual
Performance Review for the FY 2017-18 is to be carried out in accordance with the Regulation 8
of the JERC for the State of Goa and Union Territories (except Delhi) (Multi-Year Distribution
Tariff) Regulations, 2014:
“(1) The Commission shall undertake a review along with the next Tariff Order of the expenses
and revenue approved by the Commission in the Tariff Order. While doing so, the Commission
shall consider variations between approvals and revised estimates/actuals of sale of electricity,
income and expenditure for the relevant year and permit necessary adjustments/changes in case
such variations are for adequate and justifiable reasons. Such an exercise shall be called
‘Review’.
……(3) The revenue gap/surplus, if any, of the ensuing year shall be adjusted as a result of
review and truing up exercises.
(4) While approving such expenses/revenue to be adjusted in the future years as arising out of
the Review and/or Truing-up exercises, the Commission may allow the carrying costs as
determined by the Commission of such expenses/revenue. Carrying costs shall be limited to the
interest rate approved for working capital borrowings.
(5) For any revision in approvals, the licensee would be required to satisfy the Commission that
the revision is due to conditions beyond its control.
(6) In case additional supply is required to be made to any particular category, the licensee may,
any time during the year make an application to the Commission for its approval.
The application will demonstrate the need for such additional supply of power and also indicate
the manner in which the licensee proposes to meet the cost for such additional supply of
power.”
5.2.
Approach for the Review for the FY 2017-18
Petitioner’s submission:
The Petitioner has submitted the APR of FY 2017-18 based on the actual performance during
the H1 (April-September 2017) of the year and the revised estimates for H2 (October 2017-
-March 2018) of the year. The projections for H2 of FY 2017-18 are arrived at by expected
escalation over performance of H1.
Commission’s analysis:
The Commission for the purpose of estimating the energy demand of the State sought the
information of historical sales, number of consumers and connected load of the previous 5 years
till FY 2017-18 (till December 2017) from the Petitioner. The Petitioner was also asked to provide
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
88
month on month information for the last 3 years from FY 2014-15 to FY 2016-17. Various
anomalies and gaps are observed in the data provided, which are listed as follows:
● Data on Energy Sales, Number of Consumers and Connected Load for FY 2015-16 was
not submitted.
● Overall Energy Sales were reducing by almost 26% in March 2017 vis-à-vis February
2017.
● Energy sales for Domestic category were submitted as 0.49 MU in March 2017 vis-à-vis
average of ~65 MU in earlier months.
● Energy Sales submitted for FY 2014-15 were observed to be higher than FY 2016-17 by
almost ~400 MU.
From the various discrepancies as shown above, it is evident that the base data for projecting
the energy sales for FY 2017-18 is not reliable.
In the Technical Validation Session (TVS) held at the Commission’s office, the Petitioner was
asked to submit justifications for these discrepancies. The Petitioner submitted that there were
issues related to billing of energy to consumers for a few months in H2 of FY 2015-16 due to
changeover of the billing agencies and the transition period thereof. The primary problem was
non-billing in certain months of FY 2015-16 and adjustment of the same in FY 2016-17 resulting
in lower billing than what should have been in FY 2015-16 and higher billing in FY 2016-17. The
Petitioner further submitted that the meter reading and billing was maintained by different
agencies separately in each division, and each agency had its separate logic for bill calculation
and bill generation. However, now a common agency has taken over all the billing and
collection data for HT and LT consumers and a common process is followed for all the divisions
to avoid ambiguity in the process and data. While the process is streamlined, a lot of errors in
the legacy data have been discovered and the error rectification process is going on.
The Petitioner was asked to provide the segregated quantum of month on month sales,
however, the Petitioner expressed its inability to provide this segregated information at this
stage as the information is present in the form of software dump and the analysis and
segregation of the information will take considerable time.
The Commission is of the view that due to this distortion observed in energy sales, it is not
possible to project the energy sales for FY 2017-18 as no definite trends can be observed. It is
not prudent to approve the revised power purchase requirement and revenue from retail sale
on the basis of the unreliable information presently available. Therefore, the Commission shall
consider the actual performance at the time of the True-up of the FY 2017-18 once the audited
accounts are submitted by the Petitioner.
Accordingly, the Commission has decided not to consider the Annual Performance Review of
the FY 2017-18.
Chapter 6: Determination of Aggregate Revenue Requirement for the FY 2018-19
6.1 Background
The ARR for FY 2018-19 was approved in the MYT Order issued for the 1st Control Period (FY
2016-17 to FY 2018-19). In this Chapter the Commission determines the Aggregate Revenue
Requirement (ARR) for the FY 2018-19 based on the actual information available for the
previous years and the various norms defined in the MYT Order. The determination of
Aggregate Revenue Requirement for the FY 2018-19 is to be carried out as per the following
provisions of Regulation 6 of the JERC for the State of Goa and Union Territories (except Delhi)
(Multi-Year Distribution Tariff) Regulations, 2014:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
89
“6. ARR Forecast
6.1 The applicant shall, based on the Business Plan as approved by the Commission by Order,
submit the forecast of Aggregate Revenue Requirement and expected revenue from tariff, for the
Control Period by a Petition in accordance with the JERC (Terms & Condition for determination
of Tariff) Regulations, 2009 by 30th November of the year prior to the commencement of the
Control Period and accompanied by such fee payable, as specified in the JERC (Conduct of
Business) Regulations, 2009.
6.2 The forecast of Aggregate Revenue Requirement shall be developed using the assumptions
relating to the behaviour of individual variables that comprise the Aggregate Revenue
Requirement during the Control Period.
6.3 The forecast of expected revenue from tariff and charges shall be developed based on the
following:
(a) Estimates of quantum of electricity to be supplied to consumers and wheeled on behalf of
Distribution System Users for each financial year within the Control Period; and
(b) Prevailing tariff as at the date of making the application.”
6.2. Approach for determination of ARR for the FY 2018-19
The Petitioner has submitted the same ARR for the FY 2018-19 as approved in the MYT Order
dated 18th April, 2016 along with an additional provision of Interest on Security Deposit. The
Petitioner has computed revenue from the sale of power on the basis of the Retail Tariff
approved by the Commission in the Tariff Order for FY 2017-18. As the Commission is not
undertaking any review for the FY 2017-18 for the reasons detailed in the previous chapter,
the Commission is retaining the projections and consequently costs for the FY 2018-19 at
the same level as approved in the MYT Order dated 18th April, 2016 excluding the power
purchase cost.
The Commission believes that the projections of Power Purchase Quantum and Cost approved
in the MYT Order were based on historical trends and figures. Since the majority of the power
procured by the Petitioner is from Central Generating Stations, it is prudent to revise the Power
Purchase Cost based on the latest Tariff Orders issued by the Central Electricity Regulatory
Commission (CERC) for the Control Period FY 2014-15 to FY 2018-19. Accordingly, the
Commission has determined the revised Power Purchase Cost based on the same energy sales
and Intra-State T&D loss as approved in the MYT Order for FY 2018-19. Resultantly, the
Commission has also determined the Renewable Purchase Obligation (RPO) and the Interest on
Working Capital which are dependent on the Power Purchase Cost. The Commission has
determined the revenue from sale of power based on the approved energy sales, number of
consumers and connected load in the MYT Order for FY 2018-19 to calculate the revenue gap
for the year.
6.3. Projection of Number of consumers, Connected Load and Energy Sales Petitioner’s
Submission
The Petitioner has considered the same number of consumers, connected load and energy sales
as approved in the MYT Order.
Commission’s Analysis
The Commission for the reasons as discussed above approves the same number of consumers,
connected load and energy sales as approved in the MYT Order.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
90
Table 33: No. of Consumer, Connected Load and Energy Sales approved by Commission
Description
No. of Consumers
Connected Load
(kW/kVA)
Energy Sales
(MU)
LTD/Domestic
496725
1429336
984.51
LT-LIG/Low Income Group
3049
338
1.10
Low Tension-DM/LT-DM
4399
13044
14.84
LTC/Commercial
92869
282941
325.42
LTI/Industrial
6466
115580
137.42
LT Mixed/LT-P Hotel Industries
233
4285
5.31
Low Tension-AG/LT-AGP (Pump
Sets/Irrigation)
10821
34481
23.86
LT Temporary
2581
1098
22.08
HTD Domestic
2
193
0.28
HTC Commercial
117
42567
79.05
HTI Industrial
651
417220
1398.09
High Tension-Ferro/SM/PI/SR
37
114756
582.70
High Tension-AG/HT-AGP (Pump
Sets/Irrigation)
41
8378
6.08
Military Engineering Services/defense
Establishments
12
7080
26.89
Public Lighting
2740
9598
36.95
Hoardings/Signboards
104
35
0.35
Total
620848
2480929
3644.93
The Commission approves Number of consumers as 620847, Connected Load as 2480929
kW/kVA and Energy Sales as 3644.93 MU in the ARR of FY 2018-19
6.4. Energy savings under Domestic Efficiency Lamp Programme (DELP)
Petitioner’s Submission
The Petitioner has considered the same energy savings under DELP as approved by the
Commission in the MYT Order.
Commission’s analysis
The Commission in the ARR of FY 2018-19 considers the same energy savings as approved in
the MYT Order.
Table 34: Energy Savings under DELP (MU)
S.
No.
Particulars
Approved in MYT
Order
Petitioner's
Submission
Now Approved by
Commission
1
Energy savings under DELP
78.60
78.60
78.60
The Commission approves Energy Savings of 78.60 MU in the ARR of FY 2018-19.
6.5. Inter-State Transmission Loss
Petitioner’s Submission
The Petitioner has considered the same Inter-State Transmission Loss as approved in the MYT
Order.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
91
Commission’s analysis
The Commission in the ARR of FY 2018-19 considers the Inter-State Transmission loss levels
same as approved in the MYT Order.
Table 35: Inter-State Transmission Loss (%)
S.
No.
Particulars
Approved in
MYT Order
Petitioner’s
Submission
Now Approved by
Commission
1
For Stations in Western Region (WRPC)
3.66%
3.66%
3.66%
2
For Stations in Southern Region (SRPC)
7.50%
7.50%
7.50%
The Commission approves Inter–State Transmission Loss of 3.66% for power received from
stations of Western Region and 7.50% for power received from stations of Southern Region
in the ARR of FY 2018-19.
6.6. Intra-State Transmission and Distribution (T&D) loss
Petitioner’s Submission
The Petitioner has considered the same Intra-State T&D Loss as approved in the MYT Order.
Commission’s analysis
The Commission approves the Intra-State T&D loss at the same level as approved in the MYT
Order.
The following table provides the Intra-State T&D loss approved in the MYT Order, the
Petitioners submission and T&D Loss now approved by the Commission.
Table 36: Intra-State T&D loss (%)
S. No.
Particulars
Approved in MYT
Order
Petitioner’s
Submission
Now Approved
by Commission
1
Intra-State distribution loss
10.75%
10.75%
10.75%
The Commission approves Intra-State T&D loss of 10.75% in the ARR of FY 2018-19.
6.7. Power Purchase Quantum & Cost
Petitioner’s Submission
The Petitioner has considered the same power purchase cost as approved by the Commission
in the MYT Order for FY 2018-19.
Commission’s Analysis
The Commission has projected the power purchase quantum and cost for FY 2018-19 based on
the actual monthly power purchase data for 9 months of FY 2017-18 and 12 months data for FY
2016-17, FY 2015-16 and FY 2014-15, as submitted by the Petitioner. For projecting availability
of power, firm allocation from various generating stations has been considered. The source
wise methodology followed for projecting the quantum and cost of power procurement has
been detailed below:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
92
6.7.1. Availability of power
Availability of energy from NTPC and NPCIL stations:
● The energy availability from all the NTPC and NPCIL stations have been done based on
average Plant Load Factor (PLF) of the respective stations in the last 4-5 years
depending on the status of operation of the plant during the year.
● The energy availability from Kawas Gas Power Plant (KGPP) and Jhanor-Gandhar Power
Plant (JGPP) has been estimated based on the average PLF of the plant during first 9
months of FY 2017-18.
● No energy has been projected from Kakrapara Atomic Power Station (KAPS) as no
energy has been scheduled from April-December 2017 as the plant is shutdown for
maintenance.
Availability of energy from Co-Generation Plants:
● The energy availability from all the Co-Generation plants namely Vedanta Plant-1,
Vedanta Plant-2 and Goa Sponge Pvt. Ltd. has been considered the same as in
FY 2016-17 based on the provisional data submitted by the Petitioner.
Availability of energy from Renewable Energy Stations:
● The energy availability from Renewable Energy Plants namely NVVNL Hydro, SECI, and
NVVNL Solar have been estimated based on the average PLF achieved by the plants in
the first 9 months of FY 2017-18.
Availability from Ratnagiri Gas Power Plant (RGPPL):
● The State of Maharashtra (which has 95% share allocation from RGPPL) is not
scheduling power because of non-availability of natural gas and hence non-availability
of technical minimum schedule to run the plant. For the period from April-December
2017, no power was purchased. Therefore, the Commission has not considered any
availability of power from this station.
Availability of energy from New Stations
● It is expected that the Kameng Hydro Electric Plant (HEP) of NEEPCO will achieve COD
by the starting of FY 2018-19. Accordingly, the Commission has considered the energy
availability from this station based on parameters notified in the CERC Tariff
Regulations, 2014.
Availability of energy from Open Market/Unscheduled Interchange
● The energy deficit/surplus for the FY 2018-19, as discussed in the section on energy
balance later in the Order, has been assumed to be purchased/sold in the open market.
● No power has been projected under UI Under-drawal/Over-drawal.
6.7.2. Power Purchase Cost
Variable Charges:
● The per unit variable costs have been computed by taking the average of the actual per
unit variable cost during the months of October-December 2017 for all the stations.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
93
● For procurement of power from the Open Market, the Average Round the Clock (RTC)
rate for the Western Region during the calendar year 2017 has been considered.
Fixed Charges:
● The fixed costs for CGS have been considered based on the Tariff Orders issued by the
CERC for the respective Central Generating Stations.
● For Cogeneration and Renewable Energy Stations, the tariff has been considered as per
the PPA’s and Tariff Orders of respective stations.
● The fixed cost has been apportioned on the basis of the Petitioner’s share in each
station and the average annual plant availability factor achieved during the last five
years by the plant.
● For new stations, since no source specifying the tariff is available in the public domain,
the Commission has considered an average rate of Rs 5.00/kwh.
Other Charges:
No other charges have been considered for the FY 2018-19.
6.7.3. Transmission Charges
The Commission has projected the transmission charges payable to PGCIL based on the total
capacity of the transmission network allocated to the Petitioner.
The transmission charges are determined based on the latest quarterly Point of Connection
(PoC) rates approved by the Central Electricity Regulatory Commission (CERC) in accordance
with Regulation 17(2) of the Central Electricity Regulatory Commission (Sharing of Inter-State
Transmission Charges and Losses) Regulations, 2010.
6.7.4. Total Power Purchase Quantum and Cost
The following table provides the Power Purchase Quantum and cost approved by the
Commission for FY 2018-19:
Table 37: Power Purchase Quantum (MU) and cost (Rs Cr) approved by Commission
Details of the stations
Power
Purchase at
Generator
Periphery
(MU)
Power Purchase
at UT periphery
(after adjusting
ISTS Losses)
(MU)
Fixed
Charges
(Rs Cr)
Variable
Charges
(Rs Cr)
Total
(Rs Cr)
Avg. Rate
(@ State
Periphery)
(Rs/kwh)
1
2
3
4
5
6
7
NTPC
KSTPS
1579.30
1521.49
101.50
183.72
285.22
1.87
VSTPS - I
257.32
247.90
21.90
38.25
60.15
2.43
VSTPS - II
95.62
92.12
6.83
13.31
20.15
2.19
VSTPS - III
81.96
78.96
8.84
11.41
20.25
2.56
VSTPS - IV
95.62
92.12
15.47
13.35
28.82
3.13
VSTPS - V
45.08
43.43
7.70
6.33
14.03
3.23
KGPP
46.71
45.00
7.68
15.21
22.89
5.09
GGPP
60.92
58.69
9.74
20.90
30.63
5.22
SIPAT - I
177.86
171.35
23.35
20.69
44.04
2.57
KSTPS - III
46.40
44.70
6.11
5.31
11.42
2.55
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
94
1
2
3
4
5
6
7
RSTPS
724.88
670.51
50.53
172.30
222.84
3.32
SIPAT- II
83.51
80.46
10.38
9.97
20.34
2.53
Mouda II
44.72
43.08
14.46
11.00
25.46
5.91
Mouda
34.85
33.57
18.48
8.78
27.26
8.12
Solapur
81.49
78.50
17.47
23.51
40.98
5.22
Sub Total – NTPC
3456.23
3301.90
320.43
554.05
874.48
2.65
RGPPL
0.00
0.00
0.00
0.00
0.00
0.00
NPCIL
KAPS
0.00
0.00
-
0.00
0.00
0.00
TAPS
87.33
84.14
-
25.59
25.59
3.04
Sub Total NPCIL
87.33
84.14
-
25.59
25.59
3.04
Within State
Generations
Vedanta Plant-1- Co-Gen
96.28
96.28
-
23.11
23.11
2.40
Vedanta Plant-2- Co-Gen
75.21
75.21
-
18.05
18.05
2.40
Goa Sponge and Private
Limited
5.82
5.82
-
1.40
1.40
2.40
Sub Total – Within State
Generation
177.31
177.31
-
42.55
42.55
2.40
RPO
NVVNL Solar
10.98
10.57
-
8.45
8.45
7.99
SECI Solar
49.52
47.71
-
26.24
26.24
5.50
Solar-REC
-
-
-
11.46
11.46
-
Non Solar-REC
-
-
-
28.89
28.89
-
Sub Total – RPO
60.49
58.28
-
75.04
75.04
-
NVVNL Hydro (Non
Solar)
89.24
85.97
-
38.60
38.60
4.49
New Station- Kameng
HEP-NEEPCO
20.25
19.51
-
9.76
9.76
5.00
Total Power from firm
sources
3890.85
3727.11
320.43
745.58
1066.01
2.86
Traders
Open Market
268.78
268.78
-
79.83
79.83
2.97
Sub Total – Open
Market
268.78
268.78
-
79.83
79.83
2.97
Total
4159.64
3995.89
320.43
825.41
1145.84
2.87
Transmission Charges
PGCIL Charges
183.84
Total
4159.64
3995.89
320.43
825.41
1329.68
3.33
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
95
The Commission approves the quantum of power purchase for the FY 2018-19 as 3995.89
MU at the State Periphery with a total cost of Rs 1329.68 Cr.
6.8. Renewable Purchase Obligation (RPO)
Petitioner’s Submission
The Petitioner has considered the same cost towards RPO, as approved by the Commission, in
the MYT Order.
Commission’s analysis:
As per Clause 1, Sub-clause (1) of the JERC for the State of Goa and UTs (Procurement of
Renewable Energy) Regulations, 2010
“Each distribution licensee shall purchase electricity (in kWh) from renewable energy sources, at
a defined minimum percentage of the total consumption of all the consumers in its area during a
year.”
The Commission notified the JERC (Procurement of Renewable Energy), (Third Amendment)
Regulations, 2016 on 22nd August 2016 and approved the revised RPO targets, as per which the
Petitioner has to purchase 9.00% of its total consumption (including 3.60% from Solar) from
renewable sources for the FY 2018-19. Further, the Regulation states that the obligation has to
be calculated on the mix of consumption excluding power from hydropower sources.
Accordingly, the Commission has determined the RPO on revised energy sales as shown in the
table below.
The Petitioner is procuring physical power from solar and hydro plants. However, the physical
power is not enough to fulfill the standalone RPO for FY 2018-19. Therefore, the Commission
has considered the remaining RPO to be fulfilled by the purchase of Renewable Energy
Certificate (REC). The Commission has assumed the rate of purchase for both solar and
non-solar REC as Rs 1.50/ kWh (IEX Average Clearing Price Rate) due to non –availability of
solar REC’s in the market. The total cost towards RPO compliance has been considered in the
total power purchase cost approved earlier.
In accordance with the JERC for the State of Goa and UTs (Procurement of Renewable Energy)
Regulations, 2010 the Commission has determined the following Renewable Purchase
Obligation for the Petitioner for FY 2018-19:
Table 38: Summary of Renewable Purchase Obligation (RPO) (MU)
Description
FY 2018-19
Sales within State (MU)
3644.93
Percentage of hydropower (NVVNL Hydro) in total power purchase quantum at Ex-bus
2.15%
Resultant Energy Sales for calculation of RPO (after adjustment of power from hydro
sources) (MU)
3566.73
RPO obligation (in %)
9.00%
Solar
3.60%
Non-Solar
5.40%
RPO obligation for the year (in MU)
321.01
Solar
128.40
Non-Solar
192.60
RPO compliance (Physical Power available at Consumer Periphery after adjusting
Inter-State Transmission of 3.66% and Intra-State T&D Loss of 10.75%)
52.01
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
96
Solar
52.01
Non-Solar
0.00
RPO compliance (REC certificates to be purchased)
268.99
Solar
76.39
Non-Solar
192.60
The cost towards compliance of RPO computed by the Commission has been shown in the
following table.
Table 39: Cost towards compliance of Renewable Purchase Obligation (RPO) (In Rs Cr)
Description
RPO (MU)
Total Cost (Rs Cr)
Avg. Rate (Rs/kWh)
NVVNL Solar
9.44
8.45
8.95
SECI Solar
42.58
26.24
6.16
Solar-REC
76.39
11.46
1.50
Non Solar- REC
192.60
28.89
1.50
Total RPO
321.01
75.04
2.34
The cost towards RPO has already been considered in the total power purchase cost approved
by the Commission in the previous section.
6.9. Energy Balance
Commission’s analysis
Based on the approved energy sales and the revised estimates of the Power purchase quantum,
the Commission approves the energy balance as shown in the following table:
Table 40: Energy Balance (MU) approved by Commission
Particulars
Approved in
MYT Order
Petitioner’s
Submission
Now Approved by
Commission
A
Energy Requirement
1
Energy sales within the State/UT
3644.93
3644.93
3644.93
2
Open Access Sales
0.00
0.00
0.00
3
Less: Energy Savings
78.60
78.60
78.60
4
Total Sales within the State/UT
3566.33
5
Distribution losses
%
10.75%
10.75%
10.75%
MU
429.56
429.56
429.56
6
Energy required at State Periphery
3995.89
3995.89
3995.89
B
Energy Transactions at Periphery
1
Add: Sales in Unscheduled
Interchange
0.00
0.00
0.00
2
Add: Sales in Power Exchanges
0.00
0.00
0.00
3
Less: Purchase under UI (MU)
0.00
0.00
0.00
4
Less: Open Access Purchase (MU)
0.00
0.00
0.00
5
Total energy scheduled at State
Periphery (MU)
3995.89
3995.89
3995.89
6
Energy Available at State Periphery
from firm sources
3995.89
3995.89
3727.11
7
Deficit/(Surplus) (5-6)
0.00
0.00
268.78
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
97
The Commission approves an energy deficit of 268.78 MU in FY 2018-19. The Commission
directs the Petitioner to purchase this deficit power from open market or other cheaper
sources rather than from costlier power stations. The Commission has considered the cost
towards this shortfall along with the Power Purchase Cost as approved earlier.
6.10. Operation & Maintenance (O&M) Expenses
Petitioner’s Submission
The Petitioner has considered the same O&M Expenses as approved in the MYT Order.
Commission’s analysis
The following table provides the O&M expenses approved in the MYT Order, Petitioner’s
submission and now approved by the Commission.
Table 41: O&M Expenses approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in MYT
Order
Petitioner’s
Submission
Now Approved by
Commission
1
Employee Expenses
270.41
270.41
270.41
2
Administrative & General
Expenses (A&G)
10.81
10.81
10.81
3
Repair & Maintenance
Expenses
45.60
45.60
45.60
Total Operation &
Maintenance Expenses
326.82
326.82
326.82
The Commission approves the Operation & Maintenance (O&M) expenses of Rs 326.82 Cr in
the ARR of FY 2018-19.
6.11. Capitalisation
Petitioner’s Submission
The Petitioner has considered the same Capitalization as approved in the MYT Order.
Commission’s analysis:
The Commission approves the same Capitalization as approved in the MYT Order.
Table 42: Capitalisation approved by the Commission (In Rs Cr)
S. No.
Particulars
Approved in MYT
Order
Petitioner’s
Submission
Now Approved by
Commission
1
Capitalisation
685.27
685.27
685.27
The Commission approves Capitalization of Rs 685.27 Cr in the ARR of FY 2018-19.
6.12. Depreciation
Petitioner’s Submission
The Petitioner has considered the same depreciation as approved in the MYT Order.
Commission’s analysis:
The Commission approves the same depreciation as approved in the MYT Order.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
98
Table 43: Depreciation approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in MYT
Order
Petitioner’s
Submission
Now Approved by
Commission
1
Opening Gross Fixed Assets
1454.96
1454.96
1454.96
2
Addition During the FY
685.27
685.27
685.27
3
Less: Capitalization through grants in
Business Plan Order
125.77
125.77
125.77
4
Closing Gross Fixed Assets
2014.46
2014.46
2014.46
5
Average Gross Fixed Assets
1734.71
1734.71
1734.71
6
Weighted Average Depreciation rate (%)
5.28%
5.28%
5.28%
Depreciation
91.59
91.59
91.59
The Commission approves depreciation of Rs 91.59 Cr in the ARR of FY 2018-19.
6.13. Interest and Finance Charges
Petitioner’s Submission
The Petitioner has considered the same Interest and Finance Charges as approved in the
MYT Order.
Commission’s analysis:
The Commission also approves the same Interest and Finance Charges as approved in the MYT
Order.
Table 44: Interest and Finance Charges approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in
MYT Order
Petitioner’s
Submission
Now Approved
by Commission
1
Opening Normative Loan
773.99
773.99
773.99
2
Add: Normative Loan during the year
391.65
391.65
391.65
3
Less: Normative Repayment equivalent to
Depreciation
91.59
91.59
91.59
4
Closing Normative Loan
1074.05
1074.05
1074.05
5
Average Normative Loan
924.02
924.02
924.02
6
Rate of Interest (%)
11.60%
11.60%
11.60%
Interest and Finance Charges
107.19
107.19
107.19
The Commission approves Interest and Finance Charges as Rs 107.19 Cr in the ARR of FY
2018-19.
6.14. Return on Equity (RoE)
Petitioner’s submission
The Petitioner has considered the same RoE as approved in the MYT Order.
Commission’s analysis:
The Commission, similar to above, approves the same RoE as approved in the MYT Order.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
99
Table 45: RoE approved by Commission (In Rs Cr)
S.
No.
Particulars
Approved in
MYT Order
Petitioner’s
Submission
Now Approved
by Commission
1
Opening Equity
436.49
436.49
436.49
2
Additions on account of new Capitalization
167.85
167.85
167.85
3
Closing Equity
604.34
604.34
604.34
4
Average Equity
520.41
520.41
520.41
5
Rate of Return on Equity (%)
16.00%
16.00%
16.00%
Return on Equity
83.27
83.27
83.27
The Commission approves Return on Equity of Rs 83.27 Cr in the ARR of FY 2018-19.
6.15. Interest on Security Deposits
Petitioner’s submission:
The Petitioner has considered the same Interest of Security Deposit as approved in the MYT
Order. Further, the Petitioner has requested the Commission to allow the provision of unpaid
security deposit of Rs 9.15 Cr to be included in the total revenue gap to be recovered in the
FY 2018-19.
Commission’s analysis:
The Commission has considered the same Interest on Security Deposit as approved in the MYT
Order. The Commission has not considered any provision for unpaid Interest on the Consumer
Security Deposit. The Commission will consider the interest paid on consumer security
deposits for the previous years as and when the same is paid to consumers on actual basis as
per the audited accounts.
Table 46: Interest on Security Deposits approved by Commission (In Rs Cr)
S. No
Particulars
Approved in MYT
Order
Petitioner’s
Submission
Now Approved
by Commission
1
Opening Security Deposit
90.57
90.57
90.57
2
Add: Deposits During the year
1.16
1.16
1.16
3
Less: Deposits refunded
0.00
0.00
0.00
4
Closing Security Deposit
91.73
91.73
91.73
5
Average Security Deposit
91.15
91.15
91.15
6
Rate of Interest (%)
7.75%
7.75%
7.75%
7
Interest on Security Deposit
7.02
7.02
7.02
8
Additional provision of unpaid
security deposit
-
9.15
-
Total Interest on Security Deposit
7.02
16.17
7.02
The Commission approves Interest on Security Deposit as Rs 7.02 Cr in the ARR of FY
2018-19.
6.16. Demand Side Management (DSM) Expenses
Petitioner’s submission
The Petitioner has considered the expenses towards DSM as approved in the MYT Order.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
100
Commission’s analysis:
The Commission approves the same DSM expenses as approved in the MYT Order.
Table 47: DSM Expenses as approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in MYT
Order
Petitioner’s
Submission
Now Approved by
Commission
1
DSM Expenses
3.03
3.03
3.03
The Commission approves DSM Expenses as Rs 3.03 Cr in the ARR of FY 2018-19.
6.17. Interest on Working Capital
Petitioner’s Submission
The Petitioner has considered the same Interest on Working Capital as approved in the MYT
Order.
Commission’s analysis:
Since the Power purchase cost has been revised, the same has an impact on the Interest and
Working Capital. The Interest on Working Capital has been calculated based on the normative
principles outlined in the JERC (Multi-Year Distribution Tariff) Regulations, 2014. Regulation 25
of the MYT Regulations, 2014 states the following:
Working capital for retail supply activity of the licensee shall consist of:
(i) Receivables of two months of billing
(ii) Less power purchase cost of one month
(iii) Less consumer security deposit but excluding Bank Guarantee/Fixed Deposit Receipt
(iv) Inventory for two months based on annual requirement for previous year.
The rate of interest on working capital shall be equal to the base rate for the State Bank of India
on the 1st April of the relevant financial year. The interest on working capital shall be payable on
normative basis notwithstanding that the licensee has not taken working capital loan from any
outside agency or has exceeded the working capital loan worked out on the normative figures.”
The Commission has determined the Interest on Working Capital in accordance with the
Regulation as cited above. The Interest Rate has been considered as the prevailing SBI Base
rate. The table below provides the Interest in Working Capital as approved in the MYT Order
and now approved by the Commission:
Table 48: Interest on Working Capital approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in
MYT Order
Petitioner’s
Submission
Now Approved
by Commission
1
Receivables of two months of billing
342.94
342.94
325.42
2
Less: Power Purchase Cost for one month
119.42
119.42
110.81
3
Inventory Based on Annual Requirement for
Previous FY for 2 months
0.00
0.00
0.00
4
Total Working Capital Requirement
223.52
223.52
214.62
5
Less: Average Security Deposit excluding
BG/FDR
90.57
90.57
91.15
6
Net Working Capital
132.94
132.94
123.47
7
Rate of Interest (%)
9.30%
9.30%
8.65%
Interest on Working Capital
12.36
12.36
10.68
The Commission now approves the Interest on Working Capital as Rs 10.68 Cr in the ARR of
FY 2018-19.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
101
6.18. Non-Tariff Income (NTI)
Petitioner’s submission
The Petitioner has considered the same NTI as approved in the MYT Order.
Commission’s analysis:
The Commission also approves the same NTI as approved in the MYT Order.
Table 49: Non –tariff Income approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in
MYT Order
Petitioner’s
Submission
Now Approved by
Commission
1
Non-Tariff Income
6.74
6.74
6.74
The Commission approves Non-Tariff Income of Rs 6.74 Cr in the ARR of FY 2018-19.
6.19. Aggregate Revenue Requirement (ARR)
Petitioner’s submission
The Petitioner has considered the same ARR for FY 2018-19 as approved in the MYT Order
along with an additional provision of Interest on Security Deposit.
Commission’s analysis
On the basis of the above, the Commission approves the revenue requirement for the
FY 2018-19 as shown in the table below:
Table 50: Aggregate Revenue Requirement approved by Commission
for FY 2018-19 (In Rs Cr)
S. No.
Particulars
Approved in
MYT Order
Petitioner’s
Submission
Now Approved by
Commission
1
Power Purchase Cost (inclusive of RPO Cost)
1433.09
1433.09
1329.68
2
Operation & Maintenance Expenses
326.82
326.82
326.82
3
Depreciation
91.59
91.59
91.59
4
Interest and Finance charges
107.19
107.19
107.19
5
Interest on Working Capital
12.36
12.36
10.68
6
Interest on Security Deposit
7.02
16.17
7.02
7
Return on Equity
83.27
83.27
83.27
8
Provision for Bad Debt
0.00
0.00
0.00
9
Income Tax
0.00
0.00
0.00
10
Payment towards DSM
3.03
3.03
3.03
11
Total Revenue Requirement
2064.37
2073.52
1959.28
12
Less: Non-Tariff Income
6.74
6.74
6.74
13
Net Revenue Requirement
2057.63
2066.78
1952.54
The Commission approves net ARR of Rs 1952.54 Cr for the FY 2018-19.
6.20. Revenue at existing Retail Tariff
Petitioner’s submission
The Petitioner has submitted the revenue from sale of power at existing tariff as Rs 1593.75 Cr
based on the approved energy sales, connected load and number of consumers in the MYT
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
102
Order. The revenue for FY 2018-19 has been computed based on the retail tariff notified by the
Commission in the Tariff Order for the FY 2017-18 dated 23rd May 2017. The table below
provides the category wise revenue computed by the Petitioner for FY 2018-19.
Table 51: Revenue submitted by Petitioner (In Rs Cr)
S. No.
Category
Sales
(MU)
Fixed
Charges
(Rs Cr)
Energy
Charges
(Rs Cr)
Total
Charges
(Rs Cr)
ABR
(Rs
/kWh)
1
2
3
4
5
6
7
A
Low Tension Supply
1
Tariff LTD/Domestic and Non-
Commercial
984.51
16.49
272.07
288.56
2.93
1(a)
0-100 units
89.28
5.09
11.61
16.69
1.87
1(b)
101-200 units
205.24
3.18
38.99
42.18
2.06
1(c)
201 to 300 units
174.49
3.65
41.88
45.53
2.61
1(d)
301 to 400 units
119.79
1.78
37.14
38.91
3.25
1(e)
Above 400 units
395.72
2.79
142.46
145.25
3.67
2
Tariff LTD/Low Income Group
1.10
0.11
-
0.11
1.00
3
Tariff-LTC/Commercial
340.26
5.84
126.41
132.24
3.89
0-20 KW/Commercial Consumers
268.67
5.72
99.66
105.38
3.92
1-100 Units
114.26
2.94
37.13
40.07
3.51
101-200 units
99.42
2.67
38.77
41.45
4.17
201-400 Units
52.41
0.11
22.53
22.65
4.32
Above 400 units
2.59
0.00
1.22
1.22
4.71
>20-90Kw Commercial Consumers
71.59
0.11
26.75
26.86
3.75
1-100 Units
28.04
0.05
9.11
9.17
3.27
101-200 units
28.04
0.05
10.94
10.99
3.92
201-400 Units
14.78
0.00
6.36
6.36
4.30
Above 400 units
0.73
0.00
0.34
0.34
4.70
4
LTI-Industry
137.42
4.16
47.81
51.97
3.78
0-500 Units
7.21
0.22
2.24
2.45
3.40
Above 500 units
130.21
3.94
45.57
49.52
3.80
5
Tariff-LTP/Mixed (Hotel Industries)
5.31
0.15
2.39
2.54
4.79
6
LT-Agriculture
23.86
0.56
3.13
3.69
1.54
7
Tariff-LTAG/Agriculture (Pump
Sets/Irrigation) (A)
23.03
0.40
2.99
3.40
1.48
8
Tariff-LTAG/Agriculture Allied (B)
0.83
0.16
0.13
0.29
3.48
9
Tariff-LTPL/Public Lighting
36.95
0.46
14.41
14.87
4.02
10
Tariff-LT Hoarding and Signboards
0.35
0.00
0.35
0.35
9.97
B
High Tension Supply
11
Tariff HTD/Domestic
0.28
0.03
0.12
0.16
5.64
12
Tariff HT-Commercial
79.05
12.77
43.48
56.25
7.12
13
Tariff HTI/Industrial
1398.09
125.17
599.70
724.87
5.18
Connected at 11/33 kV
1250.34
103.90
537.64
641.55
5.13
Connected at 110 kV
147.75
21.27
62.06
83.32
5.64
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
103
1
2
3
4
5
6
7
14
H.T.Industrial (Ferro Mettallurgical/
Steel Melting/Power Intensive)
582.70
34.43
250.56
284.99
4.89
15
HT-Agriculture
6.08
0.37
0.98
1.34
2.21
Tariff-HTAG/Agriculture (Pump
Sets/Irrigation) (A)
2.95
0.32
0.41
0.73
2.48
Tariff-HTAG/Agriculture (Allied
Activities) (B)
3.13
0.05
0.56
0.61
1.96
16
H.T. MES/Defence Establishments
26.89
1.49
13.45
14.93
5.55
C
Temporary Supply
-
17
Tariff-LT/Temporary Domestic
17.47
0.06
12.23
12.29
7.03
18
Tariff-LT/Temporary Commercial
4.61
0.03
4.57
4.60
19
Tariff-HTTS/Temporary Supply
-
-
-
D
Single Point Supply
-
20
Residential Complexes
-
-
-
21
Commercial Complexes
-
-
-
22
Industrial Complexes
-
-
-
Total
3644.93
202.11
1391.64
1593.75
4.37
Commission’s analysis
The category wise/sub-category wise and slab wise revenue at retail tariff is determined as per
the applicable tariff rates. The revenue from demand charges and the energy charges have
been projected for each category/sub-category and slab. The revenue from LT-AG-Allied
Activities, HT-AG-Allied activities, HT Temporary and Single Point Supply categories has not
been computed due to non-availability of data on energy sales, connected load and number of
consumers for these categories. The category/sub-category/slab wise revenue as computed by
the Commission for FY 2018-19 has been shown in the following table:
Table 52: Revenue from existing retail tariff for FY 2018-19 (In Rs Cr)
S. No.
Category
Sales
(Mus)
Demand
Charges
(Rs Cr)
Energy
charges
(Rs Cr)
Total
Charges
(Rs Cr)
ABR
(Rs/unit)
1
2
3
4
5
6
7
1
DOMESTIC
1000.73
15.53
228.58
244.11
2.44
(i)
LT-D Domestic
999.35
15.38
228.46
243.84
2.44
0-100 units
276.28
6.08
35.92
42.00
1.52
101-200 units
251.76
3.05
47.83
50.88
2.02
201-300 units
164.13
3.16
39.39
42.55
2.59
301-400 units
105.43
1.43
32.68
34.11
3.24
Above 400 units
201.75
1.67
72.63
74.30
3.68
(ii)
Low Income Group
1.10
0.11
-
0.11
1.00
(iii)
HT-D Domestic
0.28
0.03
0.12
0.16
5.64
2
COMMERCIAL
404.47
28.88
184.73
213.61
5.28
(i)
LT-C Commercial
325.42
16.11
141.25
157.36
4.84
0-100 units
49.14
3.33
15.97
19.30
3.93
101-200 units
31.05
0.81
12.11
12.92
4.16
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
104
1
2
3
4
5
6
7
201-400 units
52.14
1.69
22.42
24.11
4.62
Above 400 units
193.08
10.29
90.75
101.03
5.23
(ii)
HT-C Commercial
79.05
12.77
43.48
56.25
7.12
3
INDUSTRIAL
2123.52
124.01
899.10
1023.11
4.82
(i)
LT-I Industrial
137.42
4.16
47.30
51.46
3.74
0-500 units
19.96
1.95
6.19
8.14
4.08
Above 500 units
117.46
2.21
41.11
43.32
3.69
(ii)
Low Tension-Mixed/LT-P
(Hotel Industries)
5.31
0.15
2.39
2.54
4.79
(iii)
High Tension-I/HT-I
1398.09
93.87
598.85
692.73
4.95
Connected at 11/33 kV
1165.47
85.19
501.15
586.34
5.03
Connected at 110 kV
232.62
8.69
97.70
106.39
4.57
(iv)
High Tension-
Ferro/SM/PI/SR
582.70
25.82
250.56
276.38
4.74
4
AGRICULTURE
29.94
0.85
3.95
4.80
1.60
(i)
Low Tension-AG/LT-AGP
(Pump Sets/Irrigation)
23.86
0.50
3.10
3.60
1.51
(ii)
Low Tension-AG/LT-AGA
(Allied Activities)
-
-
-
-
-
(iii)
High Tension-AG/HT-AGP
(Pump Sets/Irrigation)
6.08
0.35
0.85
1.20
1.98
(iv)
High Tension-AG/HT-AG
(Allied Activities)
-
-
-
-
-
5
MILITARY ENGINEERING
SERVICES/DEFENSE
ESTABLISHMENTS
26.89
1.49
13.45
14.93
5.55
6
PUBLIC LIGHTING
36.95
0.46
14.41
14.87
4.02
7
HOARDINGS/SIGNBOARDS
0.35
0.00
0.35
0.35
9.97
8
TEMPORARY
22.08
0.13
21.06
21.19
9.60
(i)
LT
22.08
0.13
21.06
21.19
9.60
LT Domestic
2.74
0.01
1.92
1.93
7.03
LT Commercial
19.34
0.12
19.14
19.26
9.96
(ii)
HT
-
-
-
-
-
TOTAL
3644.93
171.34
1365.63
1536.97
4.22
The Commission has determined revenue from sale of power at existing tariff as Rs 1536.97
Cr for FY 2018-19.
6.21. Standalone Revenue Gap/Surplus
Petitioner’s submission
Based on the ARR submitted and the revenue from retail tariff, a standalone revenue gap of
Rs. 473.03 Cr has been determined by the Petitioner for FY 2018-19.
Commission analysis
Based on the approved ARR and existing retail tariff, the following Revenue Gap/Surplus is
arrived at for the FY 2018-19:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
105
Table 53: Standalone Revenue Gap/Surplus approved by Commission (In Rs Cr)
S. No.
Particulars
Approved in MYT
Order
Petitioner’s
Submission
Now Approved
by Commission
1
Net Revenue Requirement
2057.63
2066.78
1952.54
2
Revenue from Retail Sales at
Existing Tariff
-
1593.75
1536.97
Net Gap /(Surplus)
-
473.03
415.57
The standalone gap at existing retail tariff is Rs 415.57 Cr for FY 2018-19. The estimated gap
is considered while determining the retail tariff for FY 2018-19, as discussed in the
subsequent Chapter.
7. Chapter 7: Tariff Principles and Design
7.1.
Overall Approach
The Commission while designing retail tariffs for FY 2018-19 has kept in view the principles of
determination of tariff set out in the Electricity Act, 2003 (EA, 2003), Tariff Policy, 2016 and the
MYT Regulations, 2014.
The Commission in this Tariff Order, has tried to meet the objectives of the EA 2003, as set out
in its Preamble, including the protection of the interest of consumers, the supply of electricity to
all areas and the rationalisation of tariffs. The EA, 2003 also directs to maintain a healthy
balance between the interests of the Utilities and the reasonableness of the cost of power
being supplied to consumers. The Commission has also taken into consideration the Licensees
submissions as well as the public responses in these proceedings.
The supply of electricity to all the people is an essential driver for development, and also
influences social and economic change. Since, the majority of the energy sales within the
Licensees jurisdiction is of industrial nature, the Commission has attempted to ensure that,
while industries and commerce are promoted, it is not at the cost of other segments of society.
7.2.
Applicable Regulations
Regulation 36 of the MYT Regulations, 2014 states the following:
“a. The Commission shall gradually move towards reduction of cross subsidy in accordance with
Electricity Act, Tariff Policy and such other guidelines of the government as applicable.
b. The Distribution Licensee shall compute the consumer category-wise cost of supply as per the
methodology elaborated below.
c. Allocation of Cost: The Cost to serve shall be allocated to the consumer categories in the
following manner:
Step 1: Functional Demarcation of Cost – Total cost shall be divided on the basis of functions
performed such as power purchase, distribution etc.
Step 2: Classification of Cost –Each of the functionalized costs shall be further classified, based
on its intrinsic nature into Demand related cost, Energy related cost and Customer related cost.
Demand related costs shall generally be of fixed nature, related to capacity creation and shall
include interest on capital borrowing, depreciation etc. Energy cost shall be related to quantum
of electricity consumption of consumer, such as fuel cost, interest on working capital, etc.
Consumer related cost shall include operating expenses associated with meter reading, billing
and accounting.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
106
Step 3: Allocation of Cost
(i) Allocation of Demand Costs: Demand costs of all three functions shall be allocated among
consumer categories on the basis of average coincident peak demand of the tariff
categories (average of past 12 months). To facilitate determination of average coincident
peak demand for the various tariff categories, load research shall be made an integral part
of the operations of the DISCOMs and systematic load research exercises shall be initiated.
(ii) Allocation of Energy Costs: Energy related costs of Distribution functions shall be
allocated to consumer categories on the basis of ratio of electricity consumption of each
consumer category to the total electricity consumption under the purview of the
Distribution Licensee. Energy related costs of Power purchase shall be allocated to various
tariff categories on the basis of block approach on merit order dispatch and incremental
principle, where each tariff category shall be allocated the incremental (energy related)
power purchase cost on the basis of their respective share in the incremental power
purchase. For the purpose of operationalizing the block approach and incremental
principle, the Commission shall identify and notify a suitable year as the “base year”.
(iii) Allocation of Customer Costs: Customer related costs shall be allocated to consumer
categories on the basis of the ratio of number of consumers in each category to total
number of consumers under the purview of the Distribution Licensee.
d. Summation of allocated Demand cost, Energy cost and Customer cost across functions shall be
total Cost to serve for respective consumer categories. Cost to serve reduced by revenue from a
consumer category shall give total subsidy for that category. Total subsidy for a consumer
category reduced by Government subsidy, if any, shall be cross-subsidy for that consumer
category.
e. The consumers below poverty line who consume power below a specified level, say 30 units
per month, shall receive a special support through cross subsidy.
f. Cross-subsidy surcharge and additional surcharge in Open Access
(i) The amount received or to be received by the licensee on account of cross-subsidy
surcharge and additional surcharge, as approved by the Commission from time to time in
accordance with the Regulations specified by the Commission, shall be shown separately
against the consumer category that is permitted open access as per the phasing plan.
(ii) Cross-subsidy surcharge and additional surcharge shall be shown as revenue from the
tariff from the consumer categories who have been permitted open access and such
amount shall be utilized to meet the cross-subsidy requirements of subsidized categories
and fixed costs of the Distribution Licensee arising out of his obligation to supply. Provided
that the licensee shall provide such details in its annual filings.
g. Tariff Design
(i) The Commission shall be guided by the objective that the tariff progressively reflects the
efficient and prudent cost of supply of electricity.
(ii) After the costs have been allocated based on the method specified in clauses I and (d)
above, tariffs for different consumer categories shall be designed with due regard to
factors provided under section 62(3) of the Act.
(iii) The time of day tariff would be structured across three time slabs to denote normal, peak
and off-peak periods. The time-periods would vary according to different seasons of the
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
107
year i.e. summer, winter and the monsoon season. The peak tariff would be 10%-20%
higher than the normal tariff and the off-peak tariff would be priced 5%-10% lower than
the normal tariff.
(iv) Time of Day tariff may be introduced in a phased manner, wherein in phase 1 it would be
for HT Consumers, in phase 2 – for LT consumers consuming more than 25 KW and in
phase 3 for LT consumers consuming more than 10 KW.”
7.3.
Revenue Gap/Surplus at existing tariff
Petitioner’s Submission
The Petitioner has proposed a standalone revenue gap of Rs 473.03 in FY 2018-19. The
Petitioner has submitted that the cumulative revenue gap from FY 2014-15 to FY 2017-18 is not
being claimed, the same shall be submitted once the audited annual accounts are prepared for
respective years. The standalone revenue gap as submitted by the Petitioner has been
tabulated below:
Table 54: Standalone Revenue Gap/Surplus submitted by Petitioner (In Rs Cr)
Particulars
FY 2018-19
Net Revenue Requirement
2066.78
Revenue from Retail Sales at Existing Tariff inclusive of Regulatory
Surcharge applicable in FY 2017-18
1593.75
Standalone Gap /(Surplus) for the year
473.03
Commission’s analysis
The Commission in the True-up of FY 2013-14 approved the revenue gap/surplus as nil. Further,
the Commission has not approved any revenue gap for FY 2014-15 to FY 2016-17 due to non–
availability of audited annual accounts and for FY 2017-18 due to unreliable data. Therefore, the
Commission approves the standalone revenue gap for FY 2018-19 as follows:
Table 55: Standalone Revenue Gap/ Surplus determined by Commission (In Rs Cr)
Particulars
FY 2018-19
Net Revenue Requirement
1952.54
Revenue from Retail Sales at Existing Tariff
1536.97
Standalone Gap /(Surplus) for the year
415.57
The Commission has computed a standalone revenue gap of Rs 415.57 Cr in the FY 2018-19
at the existing tariff.
7.4.
Treatment of the Revenue Gap/ Surplus and Tariff Design
The revenue gap of Rs 415.57 Cr, signifies that the revenue from the existing tariff is not
commensurate with the costs incurred by the Petitioner. Therefore, in order to fulfill this
revenue deficit and to be financially sustainable, the retail consumer tariffs are required to be
increased. The Commission has accordingly dealt with this gap in the following section.
7.4.1.
Tariff Proposal
Petitioner’s Submission
The Petitioner has proposed to recover the revenue gap of Rs 473.03 Cr, partly from proposed
tariff increase and partly from budgetary support from the Govt. of Goa. The Petitioner has
proposed an average tariff hike of 4.95% that will earn an additional revenue of Rs 78.94 Cr. The
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
108
remaining gap of Rs 394.09 Cr is proposed to be met from the budgetary support from the
Government.
The category wise existing and proposed tariff submitted by the Petitioner is as under:
Table 56: Retail Tariff proposed by Petitioner
S. No.
Category
Existing Tariff
Proposed Tariff
Fixed Charges
Energy
Charges
(Paisa/kWh)
Fixed Charges
Energy
Charges
(Paisa/kWh)
1
2
3
4
5
6
1
Domestic
A
Low Tension-D/LT-D
0-100 units
Single Phase Rs
20/Connection/Month
Three Phase Rs
45/Connection/Month
130
Single Phase Rs
25/Connection/Month
Three Phase Rs
80/Connection/Month
140
101-200 units
190
200
201 to 300 units
240
260
301 to 400 units
310
330
Above 400 units
360
380
B
Low Tension-LIG/LT-LIG
Rs
30/Connection/Month
Rs
40/Connection/Month
C
High Tension-D/HT-D
All Units
Rs 150/kVA/Month
440
Rs 160/kVA/Month
460
2
Commercial
A
Low Tension-C/LT-C
0-100 units
0-20 kW - Rs
50/Conn/Month
Above 20kW-90 kW
Rs 50/Conn/month +
additional Rs 55/kW
for every kW increase
above 20 kW
325
0-20 kW - Rs
60/Conn/Month
Above 20kW-90 kW
Rs 90/Conn/month
330
101-200 units
390
400
201 units- 400 units
430
480
Above 400 units
470
520
B
High Tension-C/HT-C
All Units
Rs 250/kVA/month
550
Rs 250/kVA/month
550
3
Industrial
A
Low Tension-I/LT-I
0-500 units
Rs 30/HP/Month
310
Rs 35/HP/Month
330
Above 500 units
Rs 30/HP/Month
350
Rs 35/HP/Month
380
B
Low Tension-Mixed/LT-
P (Hotel Industries)
All Units
Rs 30/kW/Month
450
Rs 35/kW/Month
460
C
High Tension-I/HT-I
Connected at 11/33 kV
Rs 250/kVA/Month
430
Rs 250/kVA/Month
450
Connected at 110 kV
Rs 250/kVA/Month
420
Rs 250/kVA/Month
450
D
High Tension-
Ferro/SM/PI/SR
All Units
Rs 250/kVA/Month
430
Rs 250/kVA/Month
450
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
109
1
2
3
4
5
6
4
Agricultural
A
Low Tension-AG/LT-
AGP (Pump
Sets/Irrigation)
All Units
Rs 12/HP/Month
130
Rs 15/HP/Month
150
Low Tension-AG/LT-
AGA (Allied Activities)
All Units
Rs. 20/HP/Month
160
Rs. 20/HP/Month
180
C
High Tension-AG/HT-
AGP (Pump
Sets/Irrigation)
All Units
Rs. 35/kVA/Month
140
Rs. 35/kVA/Month
150
D
High Tension-AG/HT-AG
(Allied Activities)
All Units
Rs. 50/kVA/Month
180
Rs. 60/kVA/Month
200
5
Military Engineering
Services/Defense
Establishments
All Units
Rs. 175/kVA/Month
500
Rs. 175/kVA/Month
500
6
Public Lighting
All Units
Rs. 40/kW/Month
390
Rs. 40/kW/Month
390
7
Hoardings/Signboards
All Units
Rs. 60/kVA/Month
990
Rs. 60/kVA/Month
990
8
Temporary Supply
A
LT Temporary Domestic
Rs. 60 per kW per
month or part thereof
subject to a minimum
of Rs. 300/- per
connection per month
or part thereof
700
Rs. 60 per kW per
month or part thereof
subject to a minimum
of Rs. 300/- per
connection per month
or part thereof
720
B
LT Temporary
Commercial
Rs. 100 per kVA per
month or part thereof
subject to a minimum
of Rs. 500/- per
connection per month
or part thereof
990
Rs. 120 per kVA per
month or part thereof
subject to a minimum
of Rs. 500/- per
connection per month
or part thereof
990
C
HT Temporary
Rs 120 per kVA per
month or part thereof
990
Rs. 120 per kVA per
month or part thereof
990
9
Single Point Supply
A
Residential Complexes
Rs. 100 per kVA per
month or part thereof
310
Rs. 100 per kVA per
month or part thereof
330
B
Commercial Complexes
Rs. 200 per kVA per
month or part thereof
430
Rs. 200 per kVA per
month or part thereof
430
C
Industrial Complexes
Rs. 200 per kVA per
month or part thereof
390
Rs. 200 per kVA per
month or part thereof
410
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
110
Commission‘s analysis
As discussed above, the Commission has determined the retail tariff for the FY 2018-19 in
accordance with the principles stated in the Electricity Act, 2003 Tariff Policy, 2016, and the
MYT Regulations, 2014.
Tariff design in general is guided by the following principles:
1. Cost reflective: The tariffs determined should efficiently reflect the cost of supply for each
consumer category.
2. Progressive tariffs: Ensuring progressivity among tariffs by having telescopic tariff slab
within a consumer category which encourages efficient consumption and at the same time
promotes intra-category cross-subsidy by way of charging higher tariff for higher
consumption to subsidise the lower consumption consumers.
3. Revenue neutrality: There should be no impact on the utility’s yearly revenue due to
rationalization of tariffs i.e. the overall status quo should be maintained.
4. Revenue stability: Utilities should ensure adequate fixed cost recovery from fixed/demand
charges.
5. Affordability: Assessing affordability of electricity for Domestic & Commercial consumers
for defining slab ranges and setting tariffs.
6. Avoiding tariff shocks: Tariff shocks should be prevented and consumers should be kept
informed about the future trends in tariffs.
7. Demand management and grid stability: Demand management and grid stability should be
ensured with demand-based tariffs.
8. Simplified tariff structure: Tariff structure should be simplified to make it easily
administrable by the utility and easy to understand for the consumer.
9. Smart tariff design: Tariff rate design should take into consideration trends in electric power
such as small scale renewable generation by consumers, energy efficiency, electric vehicle
charging, etc.
Keeping in view the above principles and the Petitioner’s submission the Commission has
determined and modified the Retail Tariff for FY 2018-19 as per the following:
1. The Commission in accordance with the Petitioner’ submission has limited the average
tariff hike with the remaining gap to be recovered from Govt’s budgetary support as
discussed in subsequent sections. A relatively higher tariff increase has been done for
cross-subsidized categories such as Domestic and Agriculture than cross-subsidizing
categories such as Commercial and Industrial category in order to ensure that tariffs
progressively reflect the cost of supply.
2. The consumers under the Commercial category having connected load between 20-90
kW used to pay a monthly Demand charge based on both per connection basis as well
as on connected load basis. The Commission in this Order has done away with the
monthly fixed charge on per connection basis and approved a fixed charge only on the
basis of connected load.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
111
7.4.2.
Tariff Increase and Schedule:
As described earlier, the current tariff is not covering the entire cost of the Petitioner for FY
2018-19 necessitating an increase in Retail Tariff. The existing retail tariff and tariff now
approved by the Commission for each consumer category has been shown in the table below:
Table 57: Existing and approved tariff
Category
Existing Tariff
Approved Tariff
Fixed Charges
Energy
Charges
(Rs/kWh)
Fixed Charges
Energy
Charges
(Rs/kWh)
1
2
3
4
5
6
1 Domestic
A Low Tension-D/LT-D
0-100 units
Single Phase Rs
20/Con/Month
Three Phase Rs
45/Con/Month
1.30
Single Phase Rs
25/Con/Month
Three Phase Rs
60/Con/Month
1.40
101-200 units
1.90
2.10
201 to 300 units
2.40
2.65
301 to 400 units
3.10
3.45
Above 400 units
3.60
4.00
B Low Tension-LIG/LT-LIG
Rs 30/Con/Month
Rs 40/Con/Month
C High Tension-D/HT-D
All Units
Rs 150/kVA/Month
4.40
Rs 100/kVA/Month
3.45
2 Commercial
A Low Tension-C/LT-C
0-100 units
0-20 kW - Rs
50/Con/Month
Above 20kW-90 kW
Rs 50/Con/Month +
additional Rs 55/kW
for every kW
increase above 20
kW
3.25
For consumers with
Load upto – Rs
50/Con/Month
For consumers with
Load more than 20
kW and upto 90 kW-
Rs 55/kW/Month
3.40
101-200 units
3.90
4.10
201 units- 400 units
4.30
4.60
Above 400 units
4.70
5.00
B High Tension-C/HT-C
All Units
Rs 250/kVA/month
5.50
Rs 250/kVA/month
5.50
3 Industrial
A Low Tension-I/LT-I
0-500 units
Rs 30/HP/Month
3.10
Rs 35/HP/Month
3.30
Above 500 units
Rs 30/HP/Month
3.50
Rs 35/HP/Month
3.80
B Low Tension-Mixed/LT-P
(Hotel Industries)
All Units
Rs 30/kW/Month
4.50
Rs 40/kW/Month
4.70
C High Tension-I/HT-I
Connected at 11/33 kV
Rs 250/kVA/Month
4.30
Rs 250/kVA/Month
4.50
Connected at 110 kV
Rs 250/kVA/Month
4.20
Rs 250/kVA/Month
4.40
D High Tension- Ferro/SM/PI/
SR
All Units
Rs 250/kVA/Month
4.30
Rs 250/kVA/Month
4.50
4 Agricultural
A Low Tension-AG/LT-AGP
(Pump Sets/Irrigation)
All Units
Rs 12/HP/Month
1.30
Rs 15/HP/Month
1.40
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
112
1
2
3
4
5
6
B Low Tension-AG/LT-AGA
(Allied Activities)
All Units
Rs 20/HP/Month
1.60
Rs 20/HP/Month
1.70
C High Tension-AG/HT-AGP
(Pump Sets/Irrigation)
All Units
Rs 35/kVA/Month
1.40
Rs 35/kVA/Month
1.50
D High Tension-AG/HT-AG
(Allied Activities)
All Units
Rs 50/kVA/Month
1.80
Rs 60/kVA/Month
1.90
5
Military Engineering
Services/Defense
Establishments
All Units
Rs 175/kVA/Month
5.00
Rs 175/kVA/Month
5.00
6 Public Lighting
All Units
Rs 40/kW/Month
3.90
Rs 50/kW/Month
4.10
7 Hoardings/Signboards
All Units
Rs 60/kVA/Month
9.90
Rs 60/kVA/Month
9.90
8 Temporary Supply
A LT Temporary Domestic
Rs 60 per kW per
month or part
thereof subject to a
minimum of Rs 300/-
per connection per
month or part
thereof
7.00
Rs 60 per kW per
month or part
thereof subject to a
minimum of Rs 300/-
per connection per
month or part
thereof
7.20
B LT Temporary Commercial
Rs 100 per kVA per
month or part
thereof subject to a
minimum of Rs 500/-
per connection per
month or part
thereof
9.90
Rs 120 per kVA per
month or part
thereof subject to a
minimum of Rs 600/-
per connection per
month or part
thereof
9.90
C HT Temporary
Rs 120 per kVA per
month or part
thereof
9.90
Rs 120 per kVA per
month or part
thereof
9.90
9 Single Point Supply
A Residential Complexes
Rs 100 per kVA per
month or part
thereof
3.10
Rs 100 per kVA per
month or part
thereof
3.45
B Commercial Complexes
Rs 200 per kVA per
month or part
thereof
4.30
Rs 200 per kVA per
month or part
thereof
4.60
C Industrial Complexes
Rs 200 per kVA per
month or part
thereof
3.90
Rs 200 per kVA per
month or part
thereof
4.20
Further, the Petitioner has submitted a proposal for recovery of service charge from consumers
availing power from MSEDCL. The Commission is of the view that schedule of miscellaneous
charges have already been approved by the Commission for various services. The Petitioner is
directed to submit a separate proposal along with citations of relevant regulations/judgements
for determination of charges and information on the consumer number, connected load and
energy sales for these type of consumers.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
113
7.4.3.
Revenue from Approved Retail Tariff for FY 2018-19
Based on the retail tariff approved above, the Revenue from approved tariff is shown in the
table below. The revenue from LT-AG-Allied Activities, HT-AG-Allied Activities, HT Temporary
and Single Point Supply has been not been computed due to non-availability of data on energy
sales, connected load and number of consumers for these categories.
Table 58: Revenue from approved retail tariff (In Rs Cr)
S.
No.
Category
Sales
(MUs)
Demand
Charges
(Rs Cr)
Energy
Charges
(Rs Cr)
Total
Charges
(Rs Cr)
ABR
(Rs/kWh)
K
Factor
1
2
3
4
5
6
7
8
1
DOMESTIC
1000.73
19.92
252.21
272.13
2.72
0.61
(i)
LT-D Domestic
999.35
19.75
252.12
271.87
2.72
0.61
0-100 units
276.28
7.60
38.68
46.28
1.68
0.37
101-200 units
251.76
3.81
52.87
56.68
2.25
0.50
201-300 units
164.13
4.22
43.50
47.71
2.91
0.65
301-400 units
105.43
1.90
36.37
38.27
3.63
0.81
Above 400 units
201.75
2.22
80.70
82.92
4.11
0.92
(ii)
Low Income Group
1.10
0.15
-
0.15
1.33
-
(iii)
HT-D Domestic
0.28
0.02
0.10
0.12
4.28
0.95
2
COMMERCIAL
404.47
28.39
193.44
221.83
5.48
(i)
LT-C Commercial
325.42
15.62
149.97
165.58
5.09
1.13
0-100 units
49.14
3.33
16.71
20.04
4.08
0.91
101-200 units
31.05
0.81
12.73
13.54
4.36
0.97
201-400 units
52.14
1.98
23.99
25.97
4.98
1.11
Above 400 units
193.08
9.50
96.54
106.04
5.49
1.22
(ii)
HT-C Commercial
79.05
12.77
43.48
56.25
7.12
1.59
3
INDUSTRIAL
2123.52
140.71
942.75
1083.46
5.10
(i)
LT-I Industrial
137.42
4.85
51.22
56.08
4.08
0.91
0-500 units
19.96
2.28
6.59
8.87
4.44
0.99
Above 500 units
117.46
2.58
44.63
47.21
4.02
0.90
(ii)
Low Tension-Mixed/LT-P
(Hotel Industries)
5.31
0.21
2.50
2.70
5.09
1.13
(iii)
High Tension-I/HT-I
1398.09
106.39
626.81
733.21
5.24
1.17
Connected at 11/33 kV
1165.47
96.54
524.46
621.01
5.33
1.19
Connected at 110 kV
232.62
9.85
102.35
112.20
4.82
1.08
(iv)
High Tension-
Ferro/SM/PI/SR
582.70
29.26
262.22
291.48
5.00
1.12
4
AGRICULTURE
29.94
0.97
4.25
5.22
1.75
-
(i)
Low Tension-AG/LT-AGP
(Pump Sets/Irrigation)
23.86
0.62
3.34
3.96
1.66
-
(ii)
Low Tension-AG/LT-AGA
(Allied Activities)
-
-
-
-
-
-
(iii)
High Tension-AG/HT-AGP
(Pump Sets/Irrigation)
6.08
0.35
0.91
1.26
2.08
-
(iv)
High Tension-AG/HT-AG
(Allied Activities)
-
-
-
-
-
-
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
114
1
2
3
4
5
6
7
8
5
Military Engineering
Services/Defense
Establishments
26.89
1.49
13.45
14.93
5.55
1.24
6
PUBLIC LIGHTING
36.95
0.58
15.15
15.73
4.26
0.95
7
HOARDINGS/SIGNBOARDS
0.35
0.00
0.35
0.35
9.97
2.22
8
TEMPORARY
22.08
0.15
21.12
21.27
9.63
2.15
(i)
LT
22.08
0.15
21.12
21.27
9.63
2.15
LT Domestic
2.74
0.01
1.97
1.98
7.23
1.61
LT Commercial
19.34
0.14
19.14
19.28
9.97
2.22
TOTAL
3644.93
192.21
1442.72
1634.92
4.49
The Commission approves revenue from approved Retail Tariff of Rs 1634.92 Cr for the FY
2018-19.
The average increase in the retail tariff now approved by the Commission vis-à-vis the
prevailing tariff is 6.37%. The table below provides the category wise Average Cost of Supply
(ACoS), Existing Average Billing Rate (ABR), Approved ABR and the existing and approved
recovery vis-à-vis the (ACoS).
Table 59: Tariff increase approved by Commission
Category
ACoS
(Rs/kwh)
ABR at Existing
Tariff
(Rs/kwh)
ABR at Approved
Tariff
(Rs/kwh)
Increase
(%)
Domestic
5.36
2.44
2.72
11.48%
Commercial
5.36
5.28
5.48
3.85%
Industrial
5.36
4.82
5.10
5.90%
Agriculture
5.36
1.60
1.75
8.82%
Military Engineering Services
5.36
5.55
5.55
0.00%
Public Lighting
5.36
4.02
4.26
5.74%
Hoardings/Signboards
5.36
9.97
9.97
0.00%
Temporary
5.36
9.60
9.63
0.37%
Total
5.36
4.22
4.49
6.37%
7.4.4.
Revised Revenue Gap/Surplus
The Govt. of Goa through its letter No. 1/14/2017-Fin/(Bud)/dated 14th December, 2017 has
conveyed its consent for providing the required budgetary support to meet the revenue gap for
the year as may be approved by the Commission.
In view of above, the Commission approves the revenue gap as follows:
Table 60: Revised Revenue Gap/Surplus approved by Commission (In Rs Cr)
S. No.
Particulars
FY 2018-19
1
Net Revenue Requirement
1952.54
2
Revenue from Retail Sales at Existing Tariff
1536.97
3
Revenue from Retail Sales at Approved Tariff
1634.92
4
Revenue Gap/(Surplus) at Existing Tariff
415.27
5
Revenue Gap/(Surplus) at Approved Tariff
317.61
6
Gap/(Surplus) for the previous year
0.00
7
Total Gap/(Surplus)
317.61
8
Budgetary support from Govt. of Goa
317.61
9
Final Gap/(Surplus) for FY 2018-19
0.00
The Commission approves Final Revenue gap for the FY 2018-19 as nil.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
115
7.4.5.
Government Budgetary Support
The Commission has approved an overall revenue gap of Rs 415.27 Cr at existing tariff in FY
2018-19. This gap is recovered partly by increase in retail tariff and partly by budgetary support
from Govt. of Goa. In case this gap had to be entirely fulfilled by revenue from consumers then
it would have demanded an overall average increase of 27.04%. The Commission, in FY 2018-19,
has approved an average tariff increase of 6.37%. In case the Govt. had not provided the
budgetary support, then an average increase of 19.43% over and above the approved tariff
increase would have been required which would have led to a tariff shock to consumers.
It is observed that the Govt. of Goa has been providing budgetary assistance to the Petitioner
during the past few years. The Commission in this matter would like to point out the over
reliance of the Petitioner on Govt.’s budgetary support. The Petitioner should prepare itself of
the repercussions in case the Govt. withdraws the support in the future.
The table below provides the average tariff increase and ABR with and without Govt.
budgetary support. The ABR without the Government Budgetary support has been calculated
considering the same per unit Gap of Rs 0.87/kWh (Difference between ACoS and ABR at
Approved Tariff with Govt. Budgetary Support) is loaded equally among all consumer
categories.
Table 61: Cost of Supply and tariff increase with and without Govt. Budgetary support
Category
ACoS
(Rs/kwh)
ABR at Approved
Tariff with Govt.
Budgetary
Support
(Rs/kwh)
Increase with
Budgetary
Support
(%)
ABR
without Govt.
Budgetary
Support
(Rs/kwh)
Additional
Increase
without
Budgetary
Support
(%)
Domestic
5.36
2.72
11.48%
3.59
32.04%
Commercial
5.36
5.48
3.85%
6.36
15.89%
Industrial
5.36
5.10
5.90%
5.97
17.08%
Agriculture
5.36
1.75
8.82%
2.62
49.93%
Military
Engineering
Services
5.36
5.55
0.00%
6.42
15.69%
Public Lighting
5.36
4.26
5.74%
5.13
20.48%
Hoardings/
Signboards
5.36
9.97
0.00%
10.84
8.74%
Temporary
5.36
9.63
0.37%
10.50
9.05%
Total
5.36
4.49
6.37%
5.36
19.43%
8. Chapter 8. Open Access Charges for the FY 2018-19
8.1.
Wheeling Charges
8.1.1.
Allocation Matrix - Allocation of ARR into Wheeling and Retail Supply of Electricity
Petitioner’s submission:
The Petitioner has bifurcated the ARR into Wheeling and Retail Supply Charges based on the
methodology adopted by the Commission in the Tariff Order of FY 2017-18. The Petitioner has
submitted the Wheeling Charges as shown in the table below:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
116
Table 62: Wheeling Charge calculation as submitted by Petitioner
Particulars
Unit
Formula
FY 2018-19
Wheeling Cost
Rs Cr
A
477.21
Wheeling Cost at HT/EHT network
Rs Cr
B=A*54.36%
259.40
Input required for sales at 11 kV and above
MU
C
2172.07
Wheeling Charges for HT/EHT network usage
Rs/kWh
D=B/C*10
1.19
Wheeling Cost for LT network
Rs Cr
E=A*45.64%
217.81
Input required for sales at LT level
MU
F
1757.50
Wheeling Charges for LT network usage
Rs/kWh
G=E/F*10
1.24
Commission’s analysis:
The Commission feels that there has to be a proper bifurcation of all expenses between the
functions of the wheeling business (wire business) and the retail supply business. The
Commission for the purpose of bifurcation of wheeling and retail ARR, is guided by the Staff
Paper on “Operationalisation of Open Access in the State of Goa and UT’s”. The allocation
between wheeling and retail supply business for the FY 2018-19 as per the ARR approved in
this Order is provided in the table below:
Table 63: Allocation matrix approved by Commission
Particulars
Allocation (%)
FY 2018-19
Wheeling
Supply
Wheeling
Supply
Total
Cost of power purchase for full year
0%
100%
0.00
1329.68
1329.68
Employee costs
70%
30%
189.29
81.12
270.41
Administration and General Expenses
50%
50%
6.92
6.92
13.84
Repair and Maintenance Expenses
90%
10%
41.04
4.56
45.60
Depreciation
90%
10%
82.43
9.16
91.59
Interest and Finance charges
90%
10%
96.47
10.72
107.19
Interest on Working Capital
22%
78%
2.35
8.33
10.68
Interest on consumer security deposit
22%
78%
1.54
5.48
7.02
Return on NFA/Equity
90%
10%
74.94
8.33
83.27
Provision of Bad & Doubtful Debt
0%
100%
0.00
0.00
0.00
Income Tax
90%
10%
0.00
0.00
0.00
Total Revenue Requirement
494.99
1464.29
1959.28
Less: Non-Tariff Income
0%
100%
0.00
6.74
6.74
Net Revenue Requirement
494.99
1457.55
1952.54
To determine the wheeling charges, the wheeling costs are allocated on the basis of voltage
levels. The wheeling charges are levied for the distribution network utilized by the Open
Access consumers and primarily comprises of O&M Expenses and other costs as provided in
the table above.
The methodology adopted for allocating the derived wheeling costs at respective voltage levels
has been elaborated as follows:
● O&M Expenses consisting of Employee, A&G and R&M expenses are allocated to each
voltage level on the basis of number of consumers
● All expenses other than the O&M expenses are allocated to each voltage level on the
basis of voltage wise asset allocation. The Petitioner in this regard was directed to submit
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
117
the voltage wise asset allocation but has failed to submit the desired information and in
the absence of such information, the Commission has assumed the voltage wise asset
allocation.
● The resultant cost at HT/EHT voltage level derived after performing the above steps is
then divided between LT and HT/EHT voltage level on the basis of input energy at
respective voltage levels, since the HT/EHT network is used by consumers of both
HT/EHT and LT voltage levels.
The energy input has been determined assuming the cumulative loss level of HT/EHT
voltage as 3.64%, which is the same as approved in the Tariff Order of FY 2017-18. The
Petitioner in this regard has failed to submit the voltage wise losses. The resultant losses
have been loaded to the LT voltage level in order to maintain the overall Intra-State T&D
loss at 10.75% as approved in the ARR of FY 2018-19.
Table 64: Parameters assumed for voltage wise allocation of wheeling costs
Category
Consumers
Asset
Allocation
(%)
Sales
(MU)
Cumulative
Voltage wise
Losses (%)
Low Tension (LT)
Level
619987
60.00%
1551.84
18.83%
High Tension (HT)/
Extra High
Tension(EHT) Level
860
40.00%
2093.09
3.64%
Total
620847
100.00%
3644.93
10.75%
Accordingly, the Commission approves the Wheeling Charges as shown in the table below:
Table 65: Wheeling Charges approved by Commission
Category
O&M
Others
Total
Sales
(MU)
Wheeling
Charges
(Rs/kWh)
Low Tension (LT) Level
237.07
202.90
439.98
1551.84
2.84
High Tension (HT)/
Extra High
Tension(EHT) Level
0.17
54.83
55.01
2093.09
0.26
Total
237.25
257.74
494.99
3644.93
The Commission approves wheeling charge of Rs 2.84/ kWh at LT voltage level and
Rs. 0.26/kWh at HT/EHT voltage level
8.2.
Additional Surcharge
Petitioner’s submission:
The Petitioner has not proposed any additional surcharge in the Petition for approval.
Commission’s analysis:
The Commission has notified the Joint Electricity Regulatory Commission for the State of Goa
and Union Territories (Connectivity and Open Access in Intra-State Transmission and
Distribution) Regulations, 2017. The Regulation 4.5 (1) of the said Regulations states the
following:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
118
“An Open Access Consumer, receiving supply of electricity from a person other than the
Distribution Licensee of his area of supply, shall pay to the Distribution Licensee an additional
surcharge in addition to wheeling charges and cross-subsidy surcharge, to meet the fixed cost of
such Distribution Licensee arising out of his obligation to supply as provided under sub-section
(4) of Section 42 of the Act:
Provided that such additional surcharge shall not be levied in case Open Access is provided to a
person who has established a captive generation plant for carrying the electricity to the
destination of his own use.”
Regulation 4.5 (2) of the said Regulations stipulates:
This additional surcharge shall become applicable only if the obligation of the Licensee in terms
of power purchase commitments has been and continues to be stranded or there is an
unavoidable obligation and incidence to bear fixed costs by the Licensee consequent to such a
contract. However, the fixed costs related to network assets would be recovered through
wheeling charges.
Further, Regulation 5.2 (1) (b) states the following:
The quantum of drawal of electricity by a partial Open Access Consumer from the Distribution
Licensee during any Time Block of a Day should not exceed the “Admissible Drawl of Electricity
by the Open Access Consumer” which is the difference of Contract Demand and maximum
quantum of Open Access for which approval has been granted by the Nodal Agency.
[Illustration: If an Open Access Consumer with a Contract Demand of 10 MW has been given an
approval for a maximum Open Access quantum of 6MW for a period of 3 Months, the Admissible
Drawl of Electricity from the Distribution Licensee during any Time Block shall be 4 MW for any
Day during a period of 3 Months.]”
Therefore, in accordance with the above Regulations, the Commission has determined the
Additional Surcharge as per the following:
Table 66: Additional Surcharge approved by Commission
Particulars
FY 2018-19
Total Power Purchase cost approved
1329.68
Fixed Cost component in Power Purchase Cost (excluding
Transmission Charges)
320.43
Energy Sales (MU)
3644.93
Additional Surcharge (Rs/kWh)
0.88
Earlier, a consumer availing Open Access was required to pay fixed charges on the
contracted load even when the load was drawn partially from the Distribution Licensee.
In addition, the consumer was also required to pay wheeling charges, additional surcharge
and the cross-subsidy surcharge. As per the Open Access Regulations, 2017, a consumer
now is only required to pay fixed charges on Admissible Drawal rather than on the total
contracted load.
The Commission approves an Additional Surcharge of Rs 0.88/kwh for FY 2018-19.
The Commission directs the Petitioner to submit quarterly details of the power stranded on
account of consumers opting for open access alongwith the Additional Surcharge recovered
from these consumers. The Commission will analyse the information and change the applicable
Additional Surcharge, if required.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
119
8.3.
Cross-Subsidy Surcharge
Petitioner’s submission:
As per the National Electricity Policy, a surcharge is to be levied by the respective State
Commission on consumers switching to alternate supplies under the open access. This is to
compensate the host distribution licensee serving such consumers who are permitted Open
Access under Section 42 (2) of the Electricity Act, for loss of cross-subsidy element built into
the tariff of such consumers. An additional surcharge may also be levied under sub-section (4)
of Section 42 of the said Act for meeting the fixed cost of the distribution licensee arising out of
its obligation to supply in cases where consumers are allowed open access.
Cross-subsidy surcharge (CSS) has been determined in accordance with the formula specified
in the Tariff Policy, 2016.
The category-wise CSS applicable arrived on consideration of the components ABR, C, L & D as
proposed by the Petitioner is as follows:
Table 67: Cross-Subsidy Surcharge as proposed by the Petitioner
Particulars
Unit
HT/EHT
T (Tariff payable by the relevant category of consumers, including
reflecting the Renewable Purchase Obligation)
Rs/kWh
5.37
C ( per unit weighted average cost of power purchase by the Licensee,
including meeting the Renewable Purchase Obligations)
Rs/kWh
3.58
D (aggregate of transmission, distribution and wheeling charge applicable
to the relevant voltage level)
Rs/kWh
1.19
L (aggregate of transmission, distribution and commercial losses,
expressed as a percentage applicable to the relevant voltage level)
%
3.64%
Surcharge
Rs/kWh
0.59
Commission’s analysis:
The Commission in this Order has calculated the cross-subsidy surcharge with respect to
voltage wise cost of supply. The following approach has been adopted to determine the voltage
wise cost of supply:
● Voltage Wise losses are assumed for HT/EHT voltage level. The remaining losses are
adjusted in the LT voltage level in order to maintain the Intra-State T&D losses at 10.75%,
as approved in the ARR for FY 2018-19. Voltage wise losses assumed at each level have
been shown in the table below:
Table 68: Voltage wise losses assumed by Commission
Category
Voltage Level Loss
(%)
Cumulative Losses upto
that voltage level
(%)
Low Tension (LT) Level
15.76%
18.83%
High Tension (HT)/Extra High Tension (EHT) Level
3.64%
3.64%
Total
10.75%
10.75%
Using these losses the energy input at each voltage level is determined based on the energy
sales. The table below shows the energy input at each voltage level
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
120
Table 69: Energy Input at each voltage level (MU)
Category
Energy Sales
(MU)
Cumulative Losses
(%)
Energy Input
(MU)
Low Tension (LT) Level
1551.84
18.83%
1911.80
High Tension (HT)/Extra High
Tension(EHT) Level
2093.09
3.64%
2172.16
Total
3644.93
10.75%
4083.96
Now the overall ARR approved for FY 2018-19 is divided into variable and fixed ARR with
variable ARR comprising of variable component of the power purchase cost and fixed ARR
comprising of all the other costs.
The fixed component comprising of fixed cost of power purchase, O&M etc. is further allocated
to each voltage category as per the following principles:
● The fixed cost of power purchase is assigned to each voltage level on the basis of energy
input at respective voltage levels.
● The O&M expenses are allocated to each voltage level on the basis of the number of
consumers. The resultant cost allocated to HT/EHT level is then further allocated between
HT/EHT and LT level on the basis of input energy, as the HT/EHT network is utilized by
both LT and HT/EHT network consumers.
● The remaining fixed costs are allocated on the basis of voltage wise asset allocation
assumed earlier and further allocated to respective voltage levels on the basis of input
energy.
Table 70: Parameters used for allocation of fixed costs
Category
Energy Input
(MU)
Voltage wise Asset
Allocation
(%)
Number of
Consumers
Low Tension (LT) Level
1911.80
60.00%
619987
High Tension (HT)/ Extra High Tension
(EHT) Level
2172.16
40.00%
860
Total
4083.96
100.00%
620847
The Variable component of the Power purchase cost is allocated on the basis of energy input.
The Voltage wise cost of supply (VCoS) is then determined on the basis of energy sales of
respective categories.
Accordingly, the VCoS is determined as shown in the table below:
Table 71: Voltage Wise Cost of Supply (VCoS)
Category
Allocated
Fixed Cost
(Rs Cr)
Allocated
Variable Cost
(Rs Cr)
Total Cost
(Rs Cr)
Energy Sales
(MU)
VCoS
(Rs/kwh)
Low Tension (LT) Level
796.34
386.39
1182.73
1551.84
7.62
High Tension (HT)/
Extra High
Tension(EHT) Level
330.79
439.02
769.81
2093.09
3.68
Total
1127.13
825.41
1952.54
3644.93
This, VCoS is then used to determine the Cross-Subsidy Surcharge at each voltage level.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
121
Table 72: Cross-Subsidy Surcharge approved by Commission (Rs/kWh)
Category
VCoS
(Rs/kWh)
ABR
(Rs/kWh)
Cross-Subsidy
(Rs/kWh)
Low Tension (LT) Level
7.62
3.46
(4.16)
High Tension (HT)/Extra High Tension(EHT) Level
3.68
5.24
1.56
The Commission approves nil Cross-Subsidy Surcharge at LT Voltage level and Rs 1.56/kWh
at HT/EHT Voltage level, in FY 2018-19.
9. Chapter 9: Tariff Schedule
9.1.
Tariff Schedule
Table 73: Tariff Schedule
S. No.
Category
Approved Tariff
Fixed Charges
Energy Charges
(Rs/kWh)
1
2
3
4
1
DOMESTIC
A
Low Tension-D/LT-D
0-100 units
Single Phase Rs
25/Con/Month
Three Phase Rs
60/Con/Month
1.40
101-200 units
2.10
201 to 300 units
2.65
301 to 400 units
3.45
Above 400 units
4.00
B
Low Tension-LIG/LT-LIG
Rs 40/Con/Month
C
High Tension-D/HT-D
All Units
Rs 100/kVA/Month
3.45
2
COMMERCIAL
A
Low Tension-C/LT-C
0-100 units
For consumers with Load
upto – Rs 50/Con/Month
For consumers with Load
more than 20 kW and upto
90 kW- Rs 55/kW/Month
3.40
101-200 units
4.10
201 units- 400 units
4.60
Above 400 units
5.00
B
High Tension-C/HT-C
All Units
Rs 250/kVA/month
5.50
3
INDUSTRIAL
A
Low Tension-I/LT-I
0-500 units
Rs 35/HP/Month
3.30
Above 500 units
Rs 35/HP/Month
3.80
B
Low Tension-Mixed/LT-P (Hotel Industries)
All Units
Rs 40/kW/Month
4.70
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
122
1
2
3
4
C
High Tension-I/HT-I
Connected at 11/33 kV
Rs 250/kVA/Month
4.50
Connected at 110 kV
Rs 250/kVA/Month
4.40
D
High Tension-Ferro/SM/PI/SR
All Units
Rs 250/kVA/Month
4.50
4
AGRICULTURAL
A
Low Tension-AG/LT-AGP (Pump
Sets/Irrigation)
All Units
Rs 15/HP/Month
1.40
B
Low Tension-AG/LT-AGA (Allied Activities)
All Units
Rs 20/HP/Month
1.70
C
High Tension-AG/HT-AGP (Pump
Sets/Irrigation)
All Units
Rs 35/kVA/Month
1.50
D
High Tension-AG/HT-AG (Allied Activities)
All Units
Rs 60/kVA/Month
1.90
5
MILITARY ENGINEERING
SERVICES/DEFENSE ESTABLISHMENTS
All Units
Rs 175/kVA/Month
5.00
6
PUBLIC LIGHTING
All Units
Rs 50/kW/Month
4.10
7
HOARDINGS/SIGNBOARDS
All Units
Rs 60/kVA/Month
9.90
8
TEMPORARY SUPPLY
A
LT Temporary Domestic
Rs. 60 per kW per month
or part thereof subject to a
minimum of Rs 300/- per
connection per month or
part thereof
7.20
B
LT Temporary Commercial
Rs. 120 per kVA per month
or part thereof subject to a
minimum of Rs 600/- per
connection per month or
part thereof
9.90
C
HT Temporary
Rs. 120 per kVA per month
or part thereof
9.90
9
SINGLE POINT SUPPLY
A
Residential Complexes
Rs. 100 per kVA per month
or part thereof
3.45
B
Commercial Complexes
Rs. 200 per kVA per month
or part thereof
4.60
C
Industrial Complexes
Rs. 200 per kVA per month
or part thereof
4.20
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
123
9.2.
Applicability
Low Tension Category - Applicable to Power Supply of Voltages at 230V and 440V Voltages
when the Sanctioned Load is below 100 KVA/90 KW/120 HP and power is supplied at single/
/three phase.
High Tension/Extra High Tension Category-Applicable to Power Supply of Voltages at
11KV/33KV/110KV and above i.e. High/Extra High Voltages when the Contracted Demand is
above 100 KVA/ 90 KW/120 HP and power is supplied at three phase.
Table 74: Applicability of Tariff Schedule
Category
Applicability
Point of Supply/Notes
1. LT Domestic
This schedule shall apply to private
residential houses, government residential
quarters, charitable institutions or
educational institutions aided by State/
/Central Board, colleges aided by Goa
University and religious institutions etc for
consumption of energy using normal
domestic appliances.
The Professionals i.e. individuals engaged in
those activities involving services based on
professional skills, like Lawyers, Doctors {only
those using OPD/consultancy}, Professional
Engineers, Chartered Accountants, etc. may
utilize the domestic connection at their
residence for carrying out their professional
work in the nature of consultancy without
attracting commercial tariff for the electricity
consumed, provided the area used for
professional activity does not exceed the area
permitted to be used for such activity in
residential area as per the prevailing
laws/notifications issued by Town and
Country Planning Department/other
concerned departments of Government of Goa
in this regard.
a. For the premises or flats
which are closed or locked for
a continuous period of more
than three months and having
sanctioned /connected load
more than 10 kW, the monthly
minimum charges would be
Rs1000/-.
2. HT Domestic
This schedule shall apply to individual
residential consumers of Bungalows, Villas,
Cottages, etc. using normal domestic
appliances and whose contract demand falls
within the threshold limit of HT category.
3. Low Income
Group
This schedule shall apply to consumers of
Low Income Group who have a sanctioned
load of up to 0.1 kW (primarily 2 points with 2
x 40 watts) and who consume up to 30 units
per month only.
The applicability of the Low
Income Group category will be
assessed at the end of each
month and in case the
consumption exceeds 30 units
per month, the entire
consumption would be billed
at the rate of LTD-/Domestic
for that particular month.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
124
Category
Applicability
Point of Supply/Notes
4. Commercial – LT
and HT
This tariff is applicable to any activity not
specifically covered in any other consumer
categories, or although covered in another
activity, the use is made for a commercial
category. It would include electricity used in
all non-residential, non-industrial premises
and/or commercial premises for commercial
consumption meant for operating various
appliances. It would include the following
categories but not limited to:
●
Houses with rent back facilities
●
Government hospitals
●
Professionals not covered in domestic
category.
●
Commercial Complexes and Business
premises, including Shopping malls/show
rooms, offices/shops;
●
Combined lighting and power services for
Entertainment including film studios,
cinemas and theatres, including
multiplexes, Race Course, Meeting/Town
Halls, Clubs, all types of Guest houses;
●
Offices including Government Offices,
Commercial Establishments;
●
Marriage Halls (including halls attached
to religious places), Hotels/Restaurants
(without boarding facilities), Ice-cream
parlours, Bakeries, Coffee Shops, private
educational institutions, private
hospitals, private messes, Internet/Cyber
Cafes, Mobile Towers, Microwave
Towers, Satellite Antennas used for
telecommunication activity, Telephone
Booths, Fax/Xerox Shops, X-ray
installations, bars and cold drink houses,
Tailoring Shops, Computer Training
Schools, Typing Institutes, Photo
Laboratories, Photo Studios, Laundries,
Beauty Parlours and Saloons, dry cleaners
etc
●
Automobile and any other type of repair
centers, Retail Gas Filling stations, Petrol
Pumps and Service Stations including
Garages, Tyre Vulcanizing units, Battery
Charging Units, Tyre vulcanizing centres
etc;
●
Banks, Telephone Exchanges, TV Station,
Micro Wave Stations, All India Radio
(AIR) Stations, ATM Centres etc;
●
For common facilities, like Water
Pumping/Street Lighting/Lifts/Fire
Fighting Pumps/Premises (Security)
Lighting, etc. in Commercial Complexes;
●
Sports Clubs, Health Clubs, Gymnasium,
Cold Storages which are solely
attached to Agriculture and its
allied activities shall be
charged tariff of Agriculture
Allied activities. All other cold
storages which are partly or
not attached with Agriculture
and Allied activities shall be
charged commercial tariff.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
125
Category
Applicability
Point of Supply/Notes
Swimming Pools;
●
Research and Development units situated
outside Industrial premises;
●
Airports, Railways, Railway Stations, Bus
stands of KTC etc;
5. LT Industrial
This tariff shall apply to industrial units
engaged in industrial activities,
manufacturing process etc. It would include
the following categories but not limited to:
●
Flour Mills, wet grinding, Dal Mills, Rice
Mills, Poha Mills, Masala Mills, Saw Mills,
Power looms including other allied
activities like Warping, Doubling,
Twisting, etc.
●
Ice Factories, Ice Cream Manufacturing
units/Plants, Dairy Testing Process, Milk
Dairies, Milk Processing/Chilling Plants
(Dairy) etc;
●
Engineering workshops, Engineering
Goods Manufacturing units, Printing
Presses, Transformer repairing
Workshops, Tyre retreading units, Motive
Power Loads etc;
●
Mining, Quarry and Stone Crushing units
etc;
●
Garment Manufacturing units,
●
LPG/CNG Bottling plants etc;
●
Sewage Water Treatment Plants/
Common Effluent Treatment Plants
owned, operated and managed by
Industrial Associations and situated
within industrial area.
●
Pumping of water for public water
supply, Sewage Treatment Plants,
activities related with public water
Supply Schemes and Sewage Pumping
Stations.
●
Use of electricity/power supply for
activities/facilities exclusively meant for
employees of the industry within the
premises of the Industry.
●
IT Industry, IT parks etc.
The above mentioned tariff is
based on the supply being
given through a single
delivery and metering point
and at a single voltage.
6. LT Mixed –
Hotel Industries
This schedule shall apply to Hotels/
restaurants with lodging and boarding
facilities.
Hotel Industry consumers
intending to avail the facility
of this tariff should produce a
certificate from the Tourism
Department stating that the
intending applicant is
registered under Goa
Registration of Tourist Trade
Act, 1982 and in the Hotel
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
126
Category
Applicability
Point of Supply/Notes
business on a regular basis.
On receipt of the certificate,
such tariff shall be made
effective from the date of
original validity of the
certificate. In case of failure to
produce the certificate, the
same shall be considered
under Commercial category.
7. HT Industrial
This schedule shall apply to consumers
taking electricity supply for Industrial
purpose. It shall also include the following
categories:
●
Bulk Supply of power at 11 KV, 33 kV /110
KV and above for industries, factories and
other industrial purposes.
●
Bulk supply of power at 11 KV and above
for educational institutions owned or
aided by Government, non-industrial
establishments,
●
Industrial units engaged in Ice
Manufacturing Units;
●
Hotels with lodging and boarding
facilities etc
●
Use of electricity/power supply by an
establishment such as IT Industries, IT
Parks, IT Units
●
Pumping of water, public water supply,
public water treatment plant, activities
related with Supply Schemes and
Sewage Treatment Plants, Sewage
Pumping Stations etc
8. HT Ferro
Metallurgical
/Steel
Rolling/Steel
Melting/Power
Intensive
This schedule shall apply to supply of power
having a Contract Demand from 100 KVA up
to 1000 KVA at 11 KV and above 1000 KVA at
33 KV for Steel rolling industry and Metal
Alloy, Steel Melting, Ferro Alloy, and Ferro
metallurgical industries where melting is
involved using electric power.
9. LT and HT
Agriculture
Pump sets
This schedule shall apply to establishments
for Irrigation pumping, De-watering and Lift
Irrigation for cultivation of food crops such as
cereals, pulses, vegetables and fruits etc and
Cane crusher and/or fodder cutter for self-use
for Agricultural purposes.
This tariff shall be applicable
from the date of production of
a certificate from the
Directorate of Animal
Husbandry or Agriculture
Department of Government of
Goa to the effect that the
consumer carried on the said
activity on regular basis. In
10. LT and HT
Agriculture
Allied Activities
This schedule shall apply to establishments
for other allied activities related to
Agriculture and shall include but not limited
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
127
Category
Applicability
Point of Supply/Notes
to:
●
Poultry farms, Livestock farms,
Combination of livestock farms with
dairy, Piggery etc
●
Horticulture, Green Houses, Plantations,
all types of nurseries etc.
●
Fish farms including ornamental fish
farms, prawn farms, other aqua farms etc
●
Tissue culture, Mushroom activities,
Aquaculture, Floriculture, Fisheries,
Sericulture, Floricultural nurseries,
hatcheries etc
●
Any other agricultural activity not falling
under HT-Agriculture (A) shall be
covered under this category
case of failure to produce the
certificate, the same shall be
considered under Commercial
category.
Cold Storages which are solely
attached to Agriculture and its
allied activities shall be
charged tariff of Agriculture
allied activities. All other cold
storages which are partly or
not attached with Agriculture
and Allied activities shall be
charged Commercial Tariff.
11. MES/Defense
Establishments
This schedule shall apply to supply of power
for defense installation establishments,
having mixed load with predominantly
lighting or non-industrial load of more than
50% of connected load.
12. LT Public
Lighting
This schedule shall apply to public lighting
systems. It would include the following
categories but not limited to:
●
Market Places, Roads, Pathways and
Parking Lighting belonging to local
authorities such as Municipality/
Panchayats/Government;
●
Lighting in Public Gardens;
●
Traffic Signals and Traffic Islands;
●
State Transport Bus Shelters;
●
Public Sanitary Conveniences; and
●
Public Water Fountains and such other
Public Places open for general public free
of charge.
●
Street lighting in the colony of a factory
which is situated separately from the
main factory.
●
This shall also be applicable to public
lighting of Government/Semi
Government Establishments but shall
not be applicable in case of private
establishments
13. LT Hoardings/
Sign Boards
This schedule shall apply to lighting
advertisements, hoardings and displays at
departmental stores, malls, multiplexes,
theatres, clubs, hotels, bus shelters, Railway
Stations etc. and shall be separately metered
and charged at the tariff applicable for
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
128
Category
Applicability
Point of Supply/Notes
“Hoardings/Sign Board” category. However
use of electricity for displays for the purpose
of indicating/displaying the name and other
details of the shop, on commercial premises
itself, shall be covered under the prevailing
tariff for such shops or commercial premises.
14. LT Temporary
Supply
a) LT Temporary Domestic: This schedule
shall apply to usage of electricity for all
religious purposes or public functions for
non-commercial purposes. It shall also
apply for construction of own house by
an individual with single tenement
b) LT Temporary Commercial: This
schedule shall apply to usage of
electricity for any of the activities not
covered under LT Temporary Domestic.
It would include but not be limited to:
● All other Constructions including
renovation, of all type of structures/
infrastructure, including buildings,
bridges, flyovers, dams, power stations,
roads, aerodromes, tunnels for laying of
pipe lines for all purposes
i. The temporary connection
shall be released through a
proper meter
ii. These temporary tariffs are
applicable for temporary
supply for a period not
exceeding three months
which may be extended
beyond that period only
with the prior permission of
the Chief Electrical
Engineer, up to a maximum
period of six months for
general purpose and two
years for construction
activities.
iii. Security deposit shall be
collected in advance for an
assessed 3 months billing.
15. HT Temporary
Supply
This schedule shall apply to usage of
electricity for all temporary purposes.
16. HT SPS Single
Point Supply
This schedule shall apply to a group of
consumers who desire to take a HT
connection at single point for consumption of
energy within a Residential Complex – Group
Housing Societies, Residential Housing
Colonies, Cooperative Group Housing
Societies, Township Areas; Commercial
Complexes, including Malls; Industrial
Complexes, including IT Parks, Bio-Parks or
other entities classified as industries by the
Government of Goa.
In case of a dispute on
whether the complex can be
classified as an industrial
complex, a certificate from
Industries Department,
Government of Goa will be
required.
The following shall be the
different combinations for SPS
in a defined area:
i. All LT consumer mix area
ii. All HT consumer mix area
iii. HT+LT consumer mix area
a. The General Conditions,
Miscellaneous and
General Charges would
also be applicable for all
SPS categories.
b. Based on technical and
administrative feasibility,
the ED-Goa may consider
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
129
Category
Applicability
Point of Supply/Notes
providing SPS power
supply at HV/EHV level to
a complex at a mutually
agreed injection point.
c. The SPS arrangement
would be applicable for
the application received
from a Residential
complex/Association of
Persons (AOP)/Developer
of the complex or any
other such similar person.
d. The SPS arrangement
would be considered by
ED-Goa only if the
minimum sanctioned
cumulative contracted
demand of the complex
(group of consumers) is
1.15 MVA/1 MW.
e. The complete cost of
erection and O&M for the
sub-transmission and
distribution infrastructure
within such complex
would need to be borne by
the said SPS applicant.
f.
The SPS applicant would
be required to develop and
maintain an efficient,
co-ordinated and quality
sub-transmission and
distribution system in its
area of electricity supply.
Further, the applicant
would be responsible to
comply with Standards of
Performance and Supply
Code Regulation as laid
down under JERC
Regulations and
guidelines of Goa
Electricity Department, if
any. The network within
the complex will need to
be certified by the Chief
Electrical Inspector.
g. For Residential
Complexes, SPS
application shall be
entertained for groups of
LT consumers only. The
loads of common
amenities for such group
may include pumps for
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
130
Category
Applicability
Point of Supply/Notes
pumping water supply,
lifts and lighting of
common area. However,
the consumption of energy
for common services shall
be separately metered
with meters installed by
the consumer and tested
and sealed by licensee.
The consumption of such
energy over and above
10% of the total
consumption of energy
shall be billed at LT
Commercial Tariff. The
user shall inform the
details of every non-
domestic activity within
the residential complex,
such as commercial
complex, industrial
activity, and recreation
club, along with the
connected load to the
licensee at the time of
seeking the connection or
at the time of
enhancement in contract
demand, and shall seek a
separate connection for
the same in case the
common load is more than
10%.
h. Individual Domestic HT
consumers in a residential
complex that opt for SPS
shall need to apply
separately under HT
Domestic category.
i.
The SPS applicant shall
not charge tariff to the
downstream consumers
higher than stipulated.
j.
The applicant shall be
obliged to pay the total
tariff (total billed amount)
due to ED-Goa, as
measured at HT end of
SPS. However, to cover
energy transformation
losses and other O&M
expenses, such applicant
would be eligible to get
rebates from ED-Goa on
full bill payment, within
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
131
Category
Applicability
Point of Supply/Notes
the due time:
i. 5% on the overall billed
amount in all cases of
LT and HT consumers
ii. Any other loss would
be to the account of
the applicant.
k. For CC and IC applicant,
any LT/HT Consumer in
the area should have
minimum 80% pre-
dominant load of their
appropriate category i.e.
mix load is allowed only
upto 20%. For e.g. If a HT/
/LT Industry Consumer
has Factory, Residential
Colony for its workers and
also some Commercial
facilities for his staff and
the total of Residential and
Commercial load is say
around 30%, then separate
Individual SPD connection
may be taken for each
such group as per activity.
l.
The implementation of SPS
arrangement should be in
accordance with the
Electricity Act, 2003 and
APTEL judgement dated
11th July 2011 in appeal
No. 155 and 156 of 2010 in
this regard.
9.3.
General Terms and Conditions
1) These tariffs are proposed to be made applicable from 1st April 2018 and shall remain valid
till further Orders of the Commission.
Tariffs are subject to revision and/or surcharge that may be levied by ED-Goa from time to
time as per the directives of the Commission.
2) The tariffs are exclusive of electricity duty and taxes levied by the Government or other
competent authority from time to time which are payable by the consumers in addition to
the charges levied as per the tariffs.
3) Unless otherwise agreed to, these tariffs for power supply are applicable for supply at one
point only.
4) Unless specifically stated to the contrary the figures of energy charges relate to rupee per
unit (kWh) charge for energy consumed and fixed charge relates to a month.
5) If the energy supplied for a specific purpose under a particular tariff is used for a different
purpose not contemplated in the contract for supply and/or for which a higher tariff is
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
132
applicable, it shall be deemed as unauthorized use of electricity and shall be assessed
under the provisions of section 126 of the Electricity Act, 2003 and Supply Code Regulation
2010 notified by the JERC.
6) If connected load of a domestic category is found to be at variance with the
sanctioned/contracted load as a result of replacement of appliances such as lamps, fans,
fuses, switches, low voltage domestic appliances, fittings, it shall not fall under Section 126
and Section 135 of the EA 2003.
7) Fixed charges, wherever applicable, will be charged on pro-rata basis from the date of
release of connection. These shall be double in case bi-monthly billing is carried out and
shall be proportionately calculated as per the number of days of billing, Similarly slabs of
energy consumption shall also be considered accordingly in case of bi-monthly or periodic
billing.
8) The consumption for factory lighting/pump house lighting shall be billed as per respective
main tariff category. A separate energy meter for recording energy consumed towards
factory lighting for new installation need not be provided. For the existing installations, till
the factory lighting meter's mains are shifted to main meter, the total energy consumption
shall be arrived at by adding the energy consumption of the main energy meter and the
factory lighting meter.
9) Supply of power in all cases shall be subject to the execution of Agreement between the
Electricity Department, Goa and consumers and as per the JERC (Electricity Supply Code)
Regulation 2010. The other conditions, definitions etc. shall be applicable as per the
Electricity Act 2003 and various JERC Regulations, such as Standards of Performance,
Supply Code, Conditions of Supply, Distribution Code etc., issued from time to time.
10) Billing of Demand in excess of Contracted Demand
The billing shall be on the maximum demand recorded during the month or 85% of
contracted demand whichever is higher. If in any month, the recorded maximum demand of
the consumer exceeds its contracted demand, that portion of the demand in excess of the
contracted demand shall be billed at double the normal rate. Similarly, energy consumption
corresponding to excess demand shall also be billed at double the normal energy rate.
The definition of the maximum demand would be in accordance with the provisions of the
JERC (Electricity Supply Code) Regulations, 2010. If such over-drawal is more than 20% of
the contracted demand then the connection shall be disconnected immediately.
Explanation:
Assuming the contract demand as 100 kVA, maximum demand at 120 kVA and total energy
consumption as 12000 units, then the consumption corresponding to the contract demand
will be 10,000 units (12000 X 100/120) and consumption corresponding to the excess
demand will be 2000 units. This excess demand of 20 kVA and excess consumption of 2000
units will be billed at twice the respective normal rate. e.g. in case of HTI/Industrial
category, excess demand and consumption will be billed at the rate of Rs 500 per kVA per
month and Rs 9.00/kWh respectively. Connections drawing more than 120 kVA shall be
disconnected immediately.
11) The adjustment because of Fuel and Power Purchase Cost variation shall be calculated in
accordance with the FPPCA formula separately notified by the Commission under the
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
133
Regulation. Such charges shall be recovered/refunded in accordance with the terms and
conditions specified in the FPPCA formula.
12) The values of the ‘K’ factor applicable for the different consumer categories for use in the
FPPCA formula shall be as specified in Section 7.4.3 of this Tariff Order.
13) Power Factor Charges for HT and EHT
a) ‘Power Factor’ means, the average monthly power factor and shall be the ratio
expressed as a percentage of the total kilowatt hours to the total kilovolt ampere
hours supplied during the month; the ratio being rounded off to two decimal figures.
b) The consumer shall maintain the monthly average power factor of the supply not
less than 90% (lagging). If the monthly average power factor of (a) consumer falls
below 90% (0.9 lagging), such consumer shall pay a surcharge in addition to his
normal tariff @ 1% on billed demand and energy charges for each fall of 1% in power
factor upto 70%(lagging).
c) In case the monthly average power factor of the consumer is more than 95% (95%
lagging), a power factor incentive @ 1% on demand and energy charges shall be
given for each increase of 1% in power factor above 95% (lagging).
d) If the average power factor falls below 70% (lagging) consecutively for 3 months, the
licensee reserves the right to disconnect the consumer's service connection without
prejudice for the levy of the surcharge.
14) For staff quarters, rest/guest houses, street lighting in the colony of a factory which is
situated separately from the main factory and for distribution lines, service lines, etc.
permitted to be owned and maintained by the HT consumer owning the factory, there shall
be a separate connection and such energy consumed shall be charged under Single Point
Supply.
15) Advance Payment Rebate: If payment is made in advance well before commencement of
the consumption period for which the bill is prepared, a rebate @ 1% per month shall be
given on the amount (excluding security deposit, taxes and duties) which remains with the
licensee at the end of the month. Such rebate, after adjusting any amount payable to the
licensee, shall be credited to the account of the consumer.
If payment is made in advance along with prior declaration of premises to be closed for a
certain period of time, a rebate of 1% per month shall be given on the amount (excluding
security deposit, taxes and duties) which remains with the licensee at the end of the month.
Such rebate, after adjusting any amount payable to the licensee, shall be credited to the
account of the consumer.
16) Prompt Payment Rebate: If payment is made at least 7 days in advance of the due date of
payment a rebate for prompt payment @ 0.25 % of the bill amount (excluding taxes and
duties) shall be given. Those consumers having arrears shall not be entitled for such rebate
and the amount paid will first be used to set off past liabilities.
17) Delayed Payment Charges (DPC): In case the electricity bills are not paid within the due
date mentioned on the bill, delayed payment charges of two percent (2%) (computed on a
daily basis on the outstanding bill from the due date till the date of payment) shall be levied
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
134
on the bill amount. However, if a consumer makes part payment of a bill (in exceptional
circumstances, with prior approval of the Chief Electrical Engineer), within the due date,
then the delayed payment charges shall be applicable only on the amount which was not
paid within the due date.
Such surcharge shall be rounded off to the nearest multiple of one rupee. Amount less than
50 paise shall be ignored and amount of 50 paise or more shall be rounded off to the next
rupee.
If the consumer fails to pay the energy bill presented to him by the due date the department
shall have the right to disconnect the supply after giving 15 days' notice as per provision of
the Electricity Act 2003 and Supply Code Regulations 2010 of JERC as amended from time
to time.
In case of non-realization of payment through Cheque, a penalty of 5% of the cheque
amount in addition to the Delayed Payment Charges (DPC) will be levied on the
consumers.
18) Time of Day Tariff (ToD ):
i. Under the Time of Day (ToD) Tariff, electricity consumption and maximum demand
in respect of HT/EHT consumers for different periods of the day, i.e. normal period,
peak load period and off peak load period, shall be recorded by installing a ToD
meter.
ii. The maximum demand and consumption recorded in different periods shall be billed at
the following rates on the tariff applicable to the consumer.
Table 75: Applicability of ToD Tariff
Time of use
Demand Charges
Energy Charges
Normal period (7:00 a.m. to 6:00 p.m)
Normal Rate
Normal rate of energy charges
Evening peak load period (6:00 p.m to
11.00 p.m)
Normal Rate
120% of normal rate of energy
charges
Off-peak load period (11:00 p.m to
7:00 a.m)
Normal Rate
90% of normal rate of energy
charges
iii.
Applicability and Terms and Conditions of TOD tariff:
a)
TOD tariff is mandatory for HT/EHT consumers and shall be optional for LT
industrial and commercial consumers
b)
The facility of aforesaid TOD tariff shall not be available to HT/EHT consumers
having captive power plants and/or availing supply from sources other than
ED-Goa through wheeling of power.
c)
The HT/EHT industrial consumers who have installed standby generating plants
shall also be eligible for the aforesaid TOD tariff.
d)
In the event of applicability of TOD tariff to a consumer, all other terms and
conditions of the applicable tariff shall continue to apply.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
135
9.4.
Schedule of Miscellaneous Charges
Table 76: Schedule of Miscellaneous Charges
Description
Approved Charges
Monthly Meter Rental Charges (as per provisions of Regulation 7.3 (1) of JERC [Electricity Supply
Code] Regulations 2010)
Single Phase LT meter
Rs 10/month
Three Phase LT meter
Rs 20/month
Three Phase LT meter with CTs
Rs 50/month
LT Meter with MD Indicator
Rs 30/month
Tri-vector Meter
Rs 1000/month
Temporary Supply
Shall be twice as applicable in
above meter types
Changing or moving a Meter board
Actual Cost + 15%
Note:
a. For all domestic and other LT loads less than 50 kW loads in Urban and Rural areas-Static single
phase/three phase meters
b. For LT (contracted load ≥ 50 KW)/HT/EHT consumer–Static, 3 Phase Tri-vector meters with MDI
(MD Display)
Reconnection Charges (as per provisions of Regulation 9.3 (c) of JERC [Electricity Supply Code]
Regulations 2010)
LT Services – At Cut outs
●
Single Phase
Rs. 25/-
●
Three Phase
Rs. 50/-
LT Services – At Overhead Mains
●
Single Phase
Rs. 30/-
●
Three Phase
Rs. 50/-
LT Services – At Underground Mains
●
Single Phase
Rs. 75/-
●
Three Phase
Rs. 125/-
HT Services
Rs. 200/-
Note: If the same consumer seeks reconnection within 12 months from the date of reconnection or
disconnection, 50% will be added to above charges
Re-Rating of Installations
Lighting Installation
Rs. 25/-
Motive Power Installation
Rs. 50/-
Testing Fee for Various Metering Equipments (as per provisions of Regulation 7.4 of JERC
(Electricity Supply Code) Regulations 2010
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
136
Description
Approved Charges
Single phase LT
Rs. 25/energy meter
Poly Phase LT without CT
Rs. 50/energy meter
L.T. meter with CTs/Demand or Special Type Meters
Rs. 150/energy meter
H.T and E.H.T. metering equipment
Rs. 10000/- at site
Transformer Oil
Rs. 200/- per sample
3 – Ø Phase Tri-vector Meter Industrial LT Consumer
Rs. 1000/- for laboratory testing
3 – Ø Phase Tri-vector Meter 11 KV and 33kV HT Consumer
Rs. 5000/- at site
Three Phase Tri-Vector Meter 110 KV EHT Consumers
Rs. 1000/- at site
Combined CTPT Unit for 11kV and 33kV Consumer
Rs. 2500/-
110KV CT/PT Unit
Rs. 10000/-
Single Phase CT
Rs. 150/unit
Three Phase TT Block
Rs. 500/unit
Distribution Transformer Testing (HT con.)
Rs. 6000
Power Transformer Testing ( EHT consumer)
Rs. 20000
Service Connection Charges (as per provisions of Regulation 3.3 (3) of JERC (Electricity Supply
Code) Regulations 2010
Single Phase 1 ф
Rs. 250
Three Phase 3 ф
Rs. 500 to Rs 1200
HT (First 500 KVA)
Rs. 10000
HT (Beyond 500 KVA)
Rs. 20000
Extra Length for 1 ф (beyond 30 meters)
Rs. 50/meter
Extra Length for 1 ф for agricultural consumers (beyond 300
meters)
Rs. 25/meter
Extra Length for 3 ф (beyond 30 meters)
Rs. 100/meter
Extra Length for 3 ф for agricultural consumers (beyond 300
meters)
Rs. 50/meter
Testing Consumer’s installation (as per provisions of Regulation 4.10 (6) of JERC (Electricity
Supply Code) Regulations 2010
For first test of the new installation on or off an extension to an
existing installation if the installation is found to be defective.
NIL
For Subsequent test of the new installation or of an existing
installation if the installation is found to be defective
•
Single phase LT
Rs 100/-
•
Three phase
Rs 200/-
•
MS/BS loads upto 70kW
Rs 4000 + ST
•
LS/BS/RT (loads Above 70kW)
Rs 8000 + ST
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
137
Description
Approved Charges
Changing the Meter or its position in the same premises at the request of the consumer when no
additional material is required (as per provisions of Regulation 6.3 c) of JERC (Electricity Supply
Code) Regulations 2010
Single phase
Rs. 100/-
3-phase without C.Ts
Rs. 200/-
L.T. meter with C.T.s
Rs. 500/-
H.T and E.H.T. metering equipment
Rs. 8000 + ST
Re-sealing charges irrespective of the number of seals involved against each item below and
where seals found to have been broken by the consumer
Meter cupboard/Meter Cubical/Box
Rs. 50/-
Where cut-out is independently sealed
Rs. 50/-
Meter cover or Meter Terminal cover
Rs. 50/-
Meter cover of Meter Terminal cover (3 phase).
Rs. 50/-
Maximum demand Indicator or C.T.s chamber
Rs. 50/-
Service Charges
General Supply
•
Single Phase
Rs. 10/-
•
Three phase below 70kW
Rs. 20/-
•
Three phase above 70kW
Rs. 50/-
Industrial/bulk/agriculture/Street Lightning Supply
• Upto70kW
Rs. 25/-
• Above 70kW
Rs. 50/-
Replacement of broken glass
Replacement of broken glass of meter cupboard (When there is
default on Consumer Side)
Rs. 50/-
Replacement of broken Glass of single phase meter if the consumer
has broken or tamper and with meter.
Rs. 50/-
Replacement of broken Glass of three phase meter if the consumer
has broken or tamper and with meter
Rs. 50/-
Supply of duplicate copies of electricity bills
Domestic Consumers
Rs. 5 per bill or Rs. 10 per
statement
Non Domestic consumers
-
LT Industrial upto 20kW and AP Consumer
-
H.T Industrial and Bulk supply consumer
Rs. 5 per bill or Rs. 10 per
statement
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
138
10. Chapter 10. Fuel and Power Purchase Adjustment Mechanism
The State of Goa and Union Territories of Andaman & Nicobar Islands, Lakshadweep Island,
Chandigarh, Daman & Diu, Dadra & Nagar Haveli and Puducherry receive power from the
Central Generating Stations, State Generating Stations, Independent Power Producer’s (IPP’s)
through the long-term power purchase agreements and short-term purchases – through
exchange, bilateral purchases etc. The distribution licensees procure power from various
available sources and supply power to the consumers at retail tariffs determined by the
Commission. Power purchase cost accounts for more than 80% of the Annual Revenue
Requirements (ARR) of the distribution licensees and includes the cost paid for procurement of
power, transmission charges, Deviation Settlement Mechanism (DSM) charges, State Load
Despatch Center (SLDC)/Regional Load Despatch Center (RLDC) charges and is netted off with
revenue earned from the sale of surplus power.
The cost of the long-term power being procured by the distribution licensees is fixed by the
Central Electricity Regulatory Commission (CERC) for plants supplying power to more than one
State/UT (for example NTPC, NHPC etc.) and by the JERC for plants located within the region
(for IPP’s, licensees own generation and other State generating sources). Charges for the Over-
drawal/Under-drawal from the Grid and the Inter-State Transmission charges, RLDC charges
are fixed by the CERC, while Intra-State Transmission charges and SLDC charges are fixed by
the JERC. Short term purchase/sale of power is done through traders, bilateral contracts,
banking and power exchanges at market-determined prices.
While determining retail tariff for any year, the Commission first determines the ARR based on
the projection of various cost elements including power purchase cost. Power purchase cost of
the distribution licensee is derived from the power purchase quantum and per unit power
purchase cost. Quantum of power purchase depends upon the energy sales to the retail
consumer and distribution losses, out of which energy sales is not under the control of the
distribution licensee. There is also variation in actual per unit power purchase cost vis-a-vis
projected per unit power purchase cost due to change in fuel cost, change in power purchase
mix i.e. thermal/hydel/renewable mix, long term/short term power mix etc. This makes power
purchase cost uncontrollable in nature.
The Commission undertakes the truing up exercise for the variation in the cost and revenue
once the audited accounts of the distribution licensee are available. For example, True-up of FY
2016-17 will be undertaken by the Commission once the audited accounts of FY 2016-17 are
available. If the audited accounts for FY 2016-17 are prepared timely, the impact of true-up of
various cost and revenue items is allowed in the tariff of FY 2018-19, along with the carrying
cost for 2 years as the power purchase cost is the major cost element of the ARR of the
distribution licensee, adjustment due to change in power purchase cost at regular intervals is
important in order to avoid the burden of carrying cost on the additional power purchase cost
incurred during the year.
10.1. Legal Provisions
The relevant provisions of the Electricity Act, Regulations, Policy document and the ATE
judgments, which enable the Commission to devise, adopt and implement a power purchase/
fuel price adjustment mechanism are as follows:-
(a) Indian Electricity Act, 2003- Section 62 (4)
“No tariff or part of any tariff may ordinarily be amended more frequently than once in any
financial year, except in respect of any changes expressly permitted under the terms of any
fuel surcharge formula as may be specified.”
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
139
(b) Tariff Policy, 2016, clause 5.11 – sub-clause (h-4)
“Uncontrollable costs should be recovered speedily to ensure that future consumers are not
burdened with past costs. Uncontrollable costs would include (but not limited to) fuel
costs, costs on account of inflation, taxes and cess, variations in power purchase unit costs
including on account of adverse natural events.”
(c) Tariff Policy, 2016, clause 8.2– sub-clause 8.2.1-(1)
“8.2 Framework for revenue requirements and costs
Actual level of retail sales should be grossed up by normative level of T&D losses as
indicated in MYT trajectory for allowing power purchase cost subject to justifiable power
purchase mix variation (for example, more energy may be purchased from thermal
generation in the event of poor rainfall) and fuel surcharge adjustment as per regulations
of the SERC.”
(d) Hon’ble ATE judgement in OP1 of 2011 dated 11 November, 2011
The Hon’ble ATE directed the SERCs to develop a power purchase cost adjustment
mechanism within six months of the date of the Order. The relevant excerpt of the Order
is shown as follows:
“(vi)Fuel and Power Purchase cost is a major expense of the distribution Company which is
uncontrollable. Every State Commission must have in place a mechanism for Fuel and
Power Purchase cost in terms of Section 62 (4) of the Act. The Fuel and Power Purchase
cost adjustment should preferably be on monthly basis on the lines of the Central
Commission’s Regulations for the generating companies but in no case exceeding a
quarter. Any State Commission which does not already have such formula/mechanism in
place must within 6 months of the date of this Order must put in place such
formula/mechanism.”
10.2. Existing formula
The Commission first introduced the provision for adjustment of fuel surcharge in the Joint
Electricity Regulatory Commission for the State of Goa and UT’s (Terms and conditions for
determination of tariff) Regulations, 2009 notified on 08 February 2010. The relevant Clause 7 of
the Regulations is provided below:
“7. Fuel Surcharge Formula
(1) The fuel cost revisions for the generating companies/units owned by the licensee that are due
to reasons beyond the control of the generating companies/the licensee be in accordance with
the fuel surcharge formula as may be decided by the Commission from time to time.
(2) The generating company or the licensee may determine such charge in accordance with the
specified formula and recover the same from such categories of consumers or the licensees, as the
case may be after following procedure and the terms and conditions attached thereto.”
The Commission subsequently notified the Joint Electricity Regulatory Commission for the
State of Goa and UT’s (Terms and conditions for determination of tariff) (First Amendment)
Regulations, 2009 on 27 June, 2012 prescribing the methodology for determination and the
recovery mechanism of Fuel & Power Purchase Cost Adjustment (FPPCA) formula.
Subsequently on 18 January, 2013, the Commission issued a Corrigendum correcting the
calculations of the FPPCA for certain consumer categories.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
140
On 30 June, 2014 the Commission notified the Joint Electricity Regulatory Commission for the
State of Goa and Union Territories (except Delhi) (Multi-Year Distribution Tariff) Regulations,
2014 wherein the Commission proposed to adopt the same methodology as prescribed in the
Joint Electricity Regulatory Commission for the State of Goa and UT’s (Terms and conditions for
determination of tariff) (First Amendment) Regulations, 2009 in the MYT Period. Clause 19 of
the Regulations is shown as follows
“19. Treatment of Incremental Power procurement cost
The Distribution Licensee shall recover the incremental cost on account of fuel & power purchase
adjustment in accordance with FPPCA formula provided in JERC Terms & Condition for
determination of Tariff (first amendment) Regulations, 2009.”
On 19 October, 2016 JERC notified the Joint Electricity Regulatory Commission for the State of
Goa and UT’s (Multi-Year Distribution Tariff) (Second Amendment) Regulations, 2016 according
to which the Fuel and Power Purchase cost adjustment charge shall be levied by distribution
licensees on consumer electricity bills on account of the incremental power purchase cost
incurred by the licensees and the Transmission charge recovery was also added to the formula.
The relevant amendment to the Regulation has been shown as follows:
“1. Recovery Periodicity (Cycle)
The licensee shall compute fuel and power procurement cost variations on quarterly basis
and adjustment shall be made in consumers bills starting after a month following the end
of the quarter on units billed in the month under consideration. For example, Fuel &
Power Purchase Cost Adjustment (FPPCA) for the quarter April-May-June shall be made
in the month of July and shall be reflected in the consumer bills raised in the months of
August-September and October on the units billed for the respective months. The formula
shall be applicable prospectively for the purpose of consideration of Fuel and Power
Purchase Cost Adjustment. FPPCA shall be done for all consumer categories except
Below Poverty Line (BPL) and Agriculture consumers
2. Formula
The formula for determination of per unit Fuel & Power Purchase Cost Adjustment
(“FPPCA”) is as under:
Per Unit FPPCA (Paisa/unit) = Per Unit Actual cost of Power Purchase - Per Unit
Approved Cost of Power Purchase in Tariff Order
Where
Where:
● : Actual cost of power purchased during the quarter (excluding purchase
from unapproved bilateral and other unapproved sources) includes transmission
charges of PGCIL but excludes SLDC charges, RLDC charges and reactive energy
charges (Rs crores).
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
141
● : Actual Revenue recognized from Sale of power to persons other than
consumers of the licensee during the quarter (Rs crores).
● : Approved per unit cost of power purchase for use in the FPPCA
formula as given in the Tariff Order of the Licensee (Paisa per unit).
● : Actual Energy units (kWh) procured during the quarter in consideration
excluding unapproved sources (million units).
● : Actual Energy Units (kWh) procured during the quarter in consideration (million
units) from power exchanges, power generation within the periphery of the licensee
& used by licensee and units overdrawn from the grid.
● : Approved inter-state transmission losses for the year in consideration
as provided in the Tariff Order (%).
● : Approved T&D losses for the year in consideration as provided in the
Tariff Order (%).
● : Actual Sale of power to persons other than the utility consumers (million units)
during the quarter.
● : Actual energy units billed for BPL and Agriculture category consumers (million
units).
3. Other Terms and conditions
a)
For the purpose of Fuel and Power Purchase Cost Adjustment, all the bills admitted
and credits, if any, received by the distribution licensee during the period in
consideration, irrespective of the period to which they pertain shall be considered.
However, the bills or credits of earlier period received by the distribution licensee
earlier than the period under consideration will not be considered for the purpose of
FPPCA.
b)
The variation in fuel and power purchase cost adjustment with respect to the
approved per unit power purchase cost, as per the formula specified above shall be
recoverable/payable based on units billed for each category of consumers except
BPL & Agriculture.
c)
Per unit rate of FPPCA to be billed to consumers is worked out in Paisa after
rounding off to the next lower integer in case of fraction less than 0.5 and to the
next higher integer in case of fraction equal to or greater than 0.5.
d)
The per unit FPPCA so worked out is charged differentially as per the approved
retail tariff of the consumers. The determination of differential per unit FPPCA is
mentioned below:
● Step 1: Determination of Value of K
The value of K for different consumer category or sub category for the year in
consideration is considered as per the respective Tariff Order.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
142
● Step 2: Determination of proportionate FPPCA (Paisa/unit) consumer category/sub-
category wise
FPPCA to be billed for the consumers category or sub-category (Paisa/unit) =
4. Duties of the licensees and Designated officer
a)
Every distribution licensee shall appoint a designated officer not below the rank of
Executive Engineer with Name, Designation, Telephone No. & Fax and Place of
Posting, who shall compute, certify and post the PPCA calculations, PPCA
chargeable & related data summary on the licensees website and clarify to
consumers query, if any.
b)
The Designated Officer shall send certified copy of FPPCA calculations immediately
to Joint Electricity Regulatory Commission.”
10.3. Need to review the existing mechanism
JERC has been amongst the first few Electricity Regulatory Commission’s in India to introduce
the concept of adjustment of variation in the power purchase cost in the end consumer tariffs
through Fuel and Power Purchase Cost Adjustment (FPPCA) mechanism in 2012.
The Indian Power Sector is very dynamic and has changed a lot since 2012. Further, there have
been changes in the methodology for determination and recovery of generation and
transmission tariff, transmission pricing mechanism, fuel mix with emergence of renewable
energy etc. Other State Electricity Regulatory Commissions (SERCs) have also introduced the
concept of the FPPCA wherein the Fuel and Power Purchase cost variations are passed through
to the consumer either monthly, bi-monthly or quarterly. In between, the Commission has also
received representation from various consumer groups and the distribution licensees seeking
clarity and simplicity in the FPPCA mechanism adopted by the Commission. In light of the
above and the experiences gained during these years, the Commission has decided to examine
the FPPCA mechanism followed in other States vis-à-vis the FPPCA mechanism adopted by the
Commission and identify the best practices.
A detailed examination of the methodology followed across other States for calculation of
variations in the Fuel and Power Purchase Cost Adjustment revealed the following
observations:
•
Every State has a different formula for determination of the FPPCA charges. However
the fundamental objective of all of them remains the same i.e. to pass on the incremental
cost of power procurement to the consumers.
•
FPPCA charges are composed of different elements in different States with power
purchase cost from approved and long term sources being the only element common
across all States.
•
FPPCA charges are mostly determined on the Discom Periphery across all the States.
•
Power purchase cost considered as base for calculation of FPPCA charges is determined
in the Tariff Order.
•
For States, procuring power from own generation plants, the Station Heat Rate and
other components such as Auxiliary consumption, losses etc. are considered as base as
approved in the Tariff Order for calculating the variations in the power purchase costs.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
143
The key takeaways with respect to certain parameters of the formula are provided in the table
below:
Table 77: Key Takeaways
S. No.
Parameter
Takeaways
1.
Time Period
• Time period for levy of the FPPCA is quarterly in most of the
States except in Chhattisgarh and Bihar where recovery is on
bi-monthly and monthly basis respectively.
2.
Approval Process
• Some of the SERC’s allow the Discoms to recover FPPCA
charges upto a certain limit via automatic route (without
approval
of
the
Commission)
thereby
reducing
the
administrative burden. However, in most of the States like
Maharashtra, Kerala, Madhya Pradesh etc. prior approval from
the Commission is required.
3.
Elements included while
determining FPPCA
charges
• In all the States, power purchase cost from long term
approved sources is considered while calculating the FPPCA
charges;
• Central Transmission charges are considered in the States of
Gujarat, Maharashtra, Delhi and Uttar Pradesh;
• Adjustments (Under-recovery/Over-recovery) due to previous
FPPCA period is considered in the States like Bihar,
Karnataka, Kerala and Maharashtra;
• Power Purchase cost from short term sale/purchase, bilateral
exchange, IEX etc. is considered in the States of Gujarat,
Maharashtra and Uttar Pradesh;
• In States like Karnataka and Madhya Pradesh, only variable
cost of power purchase is considered while calculating the
FPPCA charges;
• In Uttar Pradesh (UP) any kind of arrears/refunds etc. in the
period are also considered.
4.
Elements excluded while
determining FPPCA
charges
• Short term power procurement cost is excluded while
calculating FPPCA in most of the States except Gujarat,
Maharashtra and Uttar Pradesh.
• In UP, power purchase cost from unapproved plants is
excluded.
• DSM charges are excluded in most of the States.
• In Bihar, the Regulations categorically define exclusion of any
kind of penalties due to delayed payment, while calculating
FPPCA charges.
• In Chhattisgarh power purchase cost from renewable sources
is excluded.
• In the NCT of Delhi, past arrear/credits are not considered
unlike UP where they are considered.
5.
Categories excluded
• Almost all categories are covered under the ambit of the
FPPCA charges except in the State of Kerala where the
domestic consumers upto a certain consumption limit are not
levied FPPCA charges.
• In Gujarat State, the FPPCA charges for the Agriculture
category are subsidized by the State Government.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
144
S. No.
Parameter
Takeaways
6.
T&D losses considered for
determination
• In most of the States, the T&D losses approved in the Tariff
Order are considered for calculation of gross units; however,
in Gujarat and Bihar, the approved or actual losses whichever
are lower are considered
• In Maharashtra, the actual T&D losses are considered.
7.
Notification via
Regulations/Tariff Order
• In most of the States like Delhi, Maharashtra, Madhya Pradesh
etc., the FPPCA methodology is defined in the Tariff
regulations except in Karnataka and Kerala where individual
regulations are notified.
8.
Ceiling within a month
(%) for recovery
• In States like Maharashtra, Gujarat, Bihar and Karnataka, the
upper ceiling of the FPPCA charges is provided which is
applicable to all categories.
9.
Ceiling within a month
for a category
• Ceiling of the FPPCA charges in a quarter for categories such
as Domestic and Agriculture in Chhattisgarh State.
10.
Recovery Mechanism
• FPPCA charges are recovered from the consumers and are
part of their electricity bills
• In some States like Gujarat and Madhya Pradesh, a uniform
FPPCA charge is recovered depending on the billed units
while in States like Maharashtra and UP, the category wise
FPPCA charges based on the category ABR is determined
The existing FPPCA mechanism notified by the Commission is in the form of an amendment in
the existing Regulation - Joint Electricity Regulatory Commission for the State of Goa and UT’s
(Multi-Year Distribution Tariff) (Second Amendment) Regulations, 2016. These Regulations are
sub-legislations and making any changes in the Regulation involves legal process which is
cumbersome and time consuming. The Commission, therefore, proposes to repeal the Joint
Electricity Regulatory Commission for the State of Goa and Union Territories (except Delhi)
(Multi-Year Distribution Tariff) (Second Amendment) Regulations, 2016 and going forward
provide formula for the FPPCA mechanism in the Tariff Order issued by the Commission.
In the section below, the Commission has discussed the proposed FPPCA formula for inclusion
in the Tariff Order for the FY 2018-19.
10.4. New formula
Based on the review of the existing formula and examination of the formulas and the best
practices adopted by the various SERC’s, the Commission proposes the following mechanism
for calculation and passing on of variations in the Fuel and Power Purchase Cost Adjustment
(FPPCA) in the end consumer tariff, which shall come into force w.e.f. 1st April 2018 (i.e. Power
Purchased by the Licensee from 1st April 2018 onwards). For power purchased by the Licensee
for the period from 1st January 2018 till 31st March 2018, the FPPCA will be calculated based on
the earlier formula.
1. Periodicity for recovery (Cycle)
The licensee shall compute the fuel and power procurement cost variations on a quarterly
basis. The adjustment shall be made in the consumers bills starting after a month following
the end of the quarter on the units billed in the months following the quarter.
For example, FPPCA for the quarter April-June shall be done in the month of July and shall
be reflected in the consumer bills raised in the months of August, September and October
on the units billed for the months of July, August and September respectively.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
145
2. Chargeability
FPPCA charges shall be levied on all consumer categories excluding Below Poverty Line
(BPL) and Agriculture category consumers on per unit basis on monthly/bi-monthly
consumption depending on the billing cycle.
3. Formula
The FPPCA formula shall contain the following three components:
1. Power Purchase Cost adjustments which shall contain the following elements:
•
Variation in the Power Purchased from long term/firm sources viz. CGS, IPP’s,
State, Own generation etc. This may consist of fixed cost, variable costs, arrears,
other charges but excluding any kind of penalties.
•
Variation in Short term power purchase cost through IEX, Bilateral etc. (shall be
allowed upto a certain ceiling rate as may be fixed in the Tariff Order by the
Commission).
•
Variation on account of Deviation Settlement Mechanism – Shall be allowed, but
the incentive/penalty shall be excluded.
2. Transmission cost adjustments which shall contain the following elements:
•
Variation on account of Central Transmission Charges including arrears/revisions.
•
Variation on account of State Transmission charges including arrears/revisions.
3. Other Charges which shall contain all the other elements not forming part of the above
two components for example:
•
Any adjustments/reversals due to over recovery of charges
•
Any adjustments due to under recovery of charges in case the Commission decides
to limit the FPPCA charges in previous quarters to avoid tariff shock or other
reasons
•
Any other adjustments on account of factors not envisaged at the time of tariff
fixation
4. Less any revenue from Additional Surcharge collected from Open Access consumer
towards the stranded power purchase cost.
Based on the components as defined above, the new FPPCA formula can be represented as
follows:
Where:
● Actual Power purchase cost inclusive of fixed cost, variable costs,
arrears, and other charges excluding any kind of penalties incurred in the quarter. This
shall include:
o Cost of procurement from sources outside the State,
o Cost of procurement from sources within the State,
o Cost of DSM excluding any penal charges,
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
146
o Cost of procurement from the Bilateral/exchange etc.
o Less: Revenue from sale of surplus power/DSM
● Actual Transmission cost inclusive of any kind of arrears, other charges
etc. and excluding any kind of penalties incurred in the quarter. This shall include:
o Inter-State transmission cost (PGCIL charges),
o Intra-State transmission cost
● Adjustments from the previous FPPCA quarter on account of over/
under recovery and any other incidental costs not accounted for at the time of retail tariff
fixation
● Revenue from Additional Surcharge collected from Open Access
consumer towards the stranded power purchase cost
● Quantum of power purchased in the quarter from sources outside
State/ Union Territory
● Approved Inter-State transmission losses for the year in consideration as
provided in the relevant Tariff Order
● Quantum of power purchased in the quarter from sources within
State/Union Territory, Bilateral/Exchange and Over-drawal under the DSM
● Actual quantum of sale of surplus power/under-drawal under the DSM
in the quarter
● Approved T&D losses for the year in consideration as provided in the
relevant Tariff Order
● Actual energy sales for agriculture and BPL category consumers in the
quarter
● : Total power purchase cost approved in the Tariff Order for a quarter
inclusive of fixed costs, variable costs etc. and containing the following elements:
o Cost of procurement from sources outside the State,
o Cost of procurement from sources within the State,
o Cost of procurement from the Bilateral/exchange etc.
o Less: Revenue from sale of surplus power
● : Total transmission charges approved in the Tariff Order for a quarter
consisting of the following elements:
o Inter-State transmission charges (PGCIL charges),
o Intra-State transmission charges
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
147
● Quantum of power to be procured from sources outside State/Union
Territory in a quarter as approved in the Tariff Order.
● Approved Inter- State transmission losses for the year in consideration as
provided in the relevant Tariff Order.
● Quantum of power to be procured from sources within the State,
bilateral/exchange in a quarter as approved in the Tariff Order.
● Approved T&D losses for the year in consideration as provided in the
Tariff Order.
● Quantum of sale of surplus power approved in the Tariff Order for a
quarter.
● Sales for agriculture and BPL category consumers for a quarter as
approved in the relevant Tariff Order.
4. Other Terms and conditions
1. For the purpose of the Fuel and Power Purchase Cost Adjustment, the Commission
suggests that all the bills admitted and credits, if any, received by the distribution
licensee during the period in consideration, irrespective of the period to which they
pertain, may be considered.
2. The FPPCA charges determined as per the formula above may be recovered from the
consumers of all categories based on their billed units excluding the BPL and the
agriculture category consumers.
3. The FPPCA charges for a quarter shall be limited to 10% of the ABR for a consumer
category. The distribution licensee shall be allowed to collect the FPPCA without
obtaining approval from the Commission. However, the distribution licensee shall be
required to submit the FPPCA calculation to the Commission atleast one week before
levying the same on the consumers.
4. The per unit FPPCA so worked out is charged differentially as per the approved retail
tariff of the consumers. The determination of differential per unit FPPCA is mentioned
below:
● Step 1: Determination of Value of K
The value of K for different consumer category or sub-category for the year in
consideration is considered as approved in this Tariff Order.
● Step 2: Determination of proportionate FPPCA (Rs/unit) consumer category/sub-
category wise
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
148
5. The Petitioner shall compute the fuel and power procurement cost variations, and
adjustments shall be made in the consumer bills based on the FPPCA formula as
approved by the Commission in this Order.
For the purpose of calculation, the approved per unit cost of power purchase
(Rapproved) shall be taken as Rs 3.76/kWh for the FY 2018-19.
Table 78: Rapproved determined by Commission for FY 2018-19
Particulars
Amount
Total Power Purchase Cost (Rs Cr ), Papp
1,145.84
Transmission Charges (Rs Cr), Tapp
183.84
Power Purchase Quantum from CGS Stations at
Generator Periphery (NTPC, NPCIL, NEEPCO) (MU),
PPOapp
3,713.55
Approved Weighted Average Inter-State Transmission
Loss (%), TLapp
4.41%
Power Purchase Quantum from sources within State/
Open Market (Co-Gen and Open Market) (MU), PPIapp
446.09
Quantum of Sale of Surplus Power (MU), PSOapp
-
Approved Intra-State T&D Loss (%), DLapp
10.75%
Energy Sales for LIG and Agriculture consumer category
(MU), Zapp (MU)
31.04
Rapp (Rs/kWh)
3.76
11. Chapter 11: Directives
Over the years, the Commission has issued various directives to the Petitioner for necessary
action at its end. It has been observed that the Petitioner is not fully complying with many
of the directives issued by the Commission. In order to strengthen the effective monitoring
and ensure timely implementation of all the directives in true spirit, the Commission
hereby directs that the Petitioner shall now submit:
● The detailed action plan for compliance of all the directives within 1 month of the
issuance of this Order.
● The quarterly progress report as per the detailed action plan for all the directives
issued in the subsequent sections within 10 days of the end of each quarter of the
calendar year.
11.1. Directives continued in this Order
While examining the compliance note and supporting documents submitted by the Petitioner in
the present Petition, it is observed that some of the directives issued in the previous Tariff
Orders have not been fully complied with by the Petitioner.
The Commission is of the view that substantial time has already been given to the utility for
compliance with these directions. Thus, the Commission hereby directs the utility to comply
with the directions mentioned below in the given timeframe, failing which the Commission
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
149
shall be constrained to initiate necessary action under Section 142 of the Electricity Act, 2003
read with other provisions of the Act, and Regulations made there under.
11.1.1. Annual Statement of Accounts
Originally Issued in Tariff Order dated 27th June, 2012
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission appreciates the effort undertaken by the Petitioner for the preparation of
audited accounts on commercial principles. However, the Commission is of the view that while
the Commission has undertaken the True-up for the FY 2011-12 and FY 2012-13 in this Order,
in normal course and as per the provisions of Tariff Regulations, 2009, the True-up upto FY
2015-16 should have been done in this Order.
The Commission has taken a serious note of this and directs the Petitioner to undertake
necessary actions on priority so as to ensure that all the True-ups of FY 2013-14 to FY 2016-17
(along with audited accounts) are submitted with the Tariff Petition of FY 2018-19.
The Commission shall be constrained to take appropriate action against the Petitioner in case
of further non-compliance.
Petitioner’s Response in the Present Tariff Petition
The status of Audited reports for the previous years is as follows:
● Financial statements for FY 2013-14 are completed and audit has been undertaken.
Awaiting for CAG Certificate.
● Financial statements for FY 2014-15 are completed and submitted to CAG for conducting
Audit.
● Preparation of Financial Statements for FY 2015-16 and 2016-17, are under process.
Commission’s Response
The Commission has undertaken the True-up for the FY 2013-14 in this Order, even though in
normal course and as per the provisions of Tariff Regulations, 2009 and MYT Regulations,
2014, the True-up upto FY 2016-17 should have been done in this Order.
The Commission has taken a serious note of this and directs the Petitioner to undertake
necessary action on priority so as to ensure that all the True-ups of FY 2014-15 to FY 2017-18
(along with audited accounts) are filed along with the next Tariff Petition submitted to the
Commission.
The Commission shall be constrained to take appropriate action against the Petitioner in case
of further non-compliance.
11.1.2. Preparation of Fixed Asset Register
Originally Issued in Tariff Order dated 27th June, 2012
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission has noted with serious concern that the Petitioner is yet to submit the Fixed
Asset and Depreciation Register. In previous year’s submission also, the Petitioner had
communicated the following:
“GIS mapping of the assets will be completed as the part of RAPDRP Part A by 31st March,
2016”.
Further, the Petitioner has not given any reason for delay in completion of GIS Mapping. The
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
150
Commission would like the Petitioner to take note of the fact that such submissions without
any justifications are not appreciated by the Commission.
The Commission now direct the Petitioner to submit action plan along with timelines for
preparation of Fixed Assets and Depreciation Register for previous years within 1 month of
issuance of this Order. The Commission will be constrained to take appropriate action in case
of further non-compliance by the Petitioner.
Petitioner’s Response in the Present Tariff Petition
The status of FAR for the previous years is as follows:
● FAR for FY 2013-14 and 2014-15 have been completed.
● FAR for FY 2015-16 and FY 2016-17, are under process.
Commission’s Response
The Commission has noted with serious concern that the Petitioner is yet to submit the Fixed
Asset Register. The Petitioner is directed to submit the FAR upto FY 2017-18 along with the
next tariff petition.
11.1.3. Energy Audit Reports
Originally Issued in Tariff Order dated 27th June, 2012
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission has noted with serious concern that the Petitioner is yet to submit the Energy
Audit Reports for previous years.
The Commission now direct the Petitioner to submit action plan along with timelines for
preparation of Energy Audit Report within 1 month of issuance of this Order. The Commission
will be constrained to take appropriate action in case of further non-compliance by the
Petitioner.
Petitioner’s Response in the Present Tariff Petition
DT metering is not yet completed and still in progress. Only on completion of the same, the
Energy Audit Report will be initiated.
Commission’s Response
The Commission has noted with serious concern that the Petitioner is yet to submit the Energy
Audit Reports for previous years.
The Commission directs the Petitioner to expedite the process of DT and Feeder metering and
complete the Energy Audit of the State on priority.
11.1.4. Employee Cost/Manpower study
Originally Issued in Tariff Order dated 27th June, 2012
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission has noted with serious concern that the Petitioner is yet to submit a
systematic manpower study report with a specific focus on manpower rationalization.
The Commission now direct the Petitioner to submit action plan along with timelines for
preparation of a systematic manpower study report with a specific focus on manpower
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
151
rationalization within 2 months of issuance of this Order. The Commission will be constrained
to take appropriate action in case of further non-compliance by the Petitioner.
Petitioner’s Response in the Present Tariff Petition
The report has been furnished by the consultant. However EDG is required to scrutinise
further and subsequently will be submitted to State Government for decision. Post decision
from State Government, the report will be submitted to the Hon’ble Commission.
Commission’s Response
The Commission has noted with serious concern that the Petitioner is yet to submit a
systematic manpower study report with a specific focus on manpower rationalization.
The Commission directs the Petitioner to finalise the report prepared by the appointed
consultant and submit the same for the decision of the State Govt.
11.1.5. Interest on Consumer Security Deposit
Originally Issued in Tariff Order dated 31st March, 2013
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission directs the Petitioner to pay the interest on consumer security deposit in the
bills of as per the provisions of JERC Supply Code Regulations, 2009.
The Commission observes that while the Petitioner has undertaken some efforts towards
compliance of this directive, still substantial payment is yet to be done by the Petitioner. The
Commission is of the view that substantial time has already been given to the Petitioner. The
Commission now directs the Petitioner to compute the quantum of backlog and ensure
payment of balance security deposit pertaining to previous years before 31st August, 2017. No
further extension will be entertained by the Commission in this matter and in case of further
non-compliance, the Commission will be constrained to take appropriate action under Section
142 of the Electricity Act, 2003.
Petitioner’s Response in the Present Tariff Petition
● As on date an amount of Rs 14.79 Cr was allotted for payment of interest on consumer
security deposit, out of which an amount of Rs 8.58 Cr has been credited to consumer
account and the balance amount will be credited before the end of the financial year.
● Further, for FY 2018-19 an amount of Rs 6.47 Cr has been proposed for allotment.
Commission’s Response
The Commission observes that while the Petitioner has undertaken some efforts towards
compliance of this directive, a substantial payment is yet to be credited to the consumers. The
Commission is of the view that substantial time has already been given to the Petitioner. The
Commission now directs the Petitioner to compute the quantum of backlog and ensure
payment of balance interest on security deposit pertaining to previous years before 31st
August, 2018.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
152
11.1.6. Sub Divisions as Strategic Business Units
Originally Issued in Tariff Order dated 06th April, 2015
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission directs the Petitioner to submit the sub-division wise status report of
readiness of all the sub-divisions towards introduction of the system of Cost-Revenue Centre
Oriented Sub-Divisions within 2 months of issuance of this Order.
Petitioner’s Response in the Present Tariff Petition
As a pilot project, one of the sub-division under Division VI, Mapusa has been taken for that
purpose.
Commission’s Response
The Commission has noted the submission of the Petitioner. The Commission directs the
Petitioner to submit the report of this pilot project along with the sub-division wise status
report of readiness of all the sub-divisions towards introduction of the system of Cost-Revenue
Centre Oriented Sub-Divisions within 1 month of issuance of this Order.
11.1.7. Installation of Pre Paid Meters
Originally Issued in Tariff Order dated 06th April, 2015
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission would like to highlight the Petitioner has long history of issues related to
billing and collection. The pre-paid meters, though being costly as compared to conventional
meters, will be cost effective in longer run. Further, GoI is already focusing on installation of
smart meters.
Thus, the Commission now directs the Petitioner to finalize and submit a proposal for
installation of smart meters for following consumers:
1. All HT and EHT Consumers.
2. LT Industries and Hotel Industries.
3. All Government Connections.
4. All connections whose premises remain locked for 3 or more months in a year.
The Petitioner is directed to submit this proposal within 4 months of issuance of this Order
failing which the Commission will be constrained to take appropriate action against the
Petitioner.
Petitioner’s Response in the Present Tariff Petition
As a pilot project under smart city mission, Government has considered installation of Smart
Meters for Panaji and surrounding areas at a cost of Rs 70 Crores.
Thereafter as directed, the Smart meters will be taken up for
(1) All HT and EHT Consumers.
(2) LT Industries and Hotel Industries.
(3) All Government connections.
(4) All Connections whose premise remain locked for 3 or more months in a year.
Commission’s Response
The Commission directs the Petitioner to expedite the process of installation of prepaid meters
and submit a compliance report along with the filing of the next tariff petition.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
153
11.1.8. Unbundling of Electricity Department
Originally Issued in Tariff Order dated 06th April, 2015
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission has noted the submission of the Petitioner. The Commission directs the
Petitioner to actively pursue the unbundling of the Department with the Government of Goa
and submit quarterly progress reports in this regard.
Petitioner’s Response in the Present Tariff Petition
It is requested to the Hon’ble Commission that there is no specific directive for unbundling of
EDG from the State Government and therefore the said directive may be dropped.
Commission’s Response
The Commission directs the Petitioner to submit the proposal to the State Govt. by June 30th
2018. Till such time a decision is taken by the State Govt. ring fencing of the transmission
functions should be initiated. Further, it is directed that the Petitioner should increase its
efforts towards making the State Load Dispatch Center (SLDC) fully operational.
11.1.9. Renewable Energy Obligation
Originally Issued in Tariff Order dated 06th April, 2015
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission directs the Petitioner to submit the status of finalization of Solar Policy within
1 month of issuance of this Order.
Petitioner’s Response in the Present Tariff Petition
Solar Policy has been approved by Government of Goa and the same is being put in Public
domain.
Commission’s Response
The Commission has noted the submission of the Petitioner. The Solar policy may be utilized
for increasing the solar installations in the State. Efforts should be made to purchase physical
power instead of REC’s.
11.1.10. Billing and Collection Efficiency
Originally Issued in Tariff Order dated 06th April, 2015
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission notes with serious concern the state of affairs of operation of the department.
The Commission directs the Petitioner to take all necessary actions on priority so as to resolve
all the issues pertaining to billing and collection and report the status along with next Tariff
Filing.
Petitioner’s Response in the Present Tariff Petition
Presently billing and collection efficiency is above 80%.
Commission’s Response
The Commission notes with serious concern that the billing and collection efficiency in the
State is very low. The Commission in the MYT Order had approved the collection efficiency of
100% for FY 2018-19 and AT&C loss level of 10.75%. The Commission directs the Petitioner to
take all necessary actions on priority so as to resolve all the issues pertaining to billing and
collection and report the status along with next Tariff Filing.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
154
11.2. New Directives issued in this Order
11.2.1. Creation of SLDC
Currently, the functions of scheduling of power is being performed by the EDG itself. The
Commission directs the Petitioner to fully operationalize a separate SLDC which is ring fenced
from the EDG. The Petitioner is directed to deploy suitable employees dedicated for the SLDC
functions.
11.2.2. kVAh based tariff
The Petitioner in the proceedings of this Tariff Order failed to submit the requisite data such as
Power factor, kVAh readings etc. to implement kVAh based energy charges for HT/EHT
consumers. The Petitioner is hereby directed to submit the status of technological readiness of
these high voltage consumers and the requisite information of incentive/disincentive on
account of power factor rebate/penalty, power factor for different categories and kVAh based
readings of FY 2017-18 along with the filing of the next tariff petition.
11.3. Directives dropped in this Order
While examining the compliance note and supporting documents submitted by the Petitioner in
the present Petition, it has been observed that some of the directives issued in previous Tariff
Orders are no longer required.
The Commission is of the view that since these directions have been complied with
satisfactorily, these directions are no longer required in the present context and are required to
be dropped or replaced with new directions. No further compliance/status is required to be
submitted by the Petitioner for the following directives:
11.3.1. Management Information System (MIS) and Database Management System (DBMS)
Originally Issued in Tariff Order dated 06th April, 2015
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission now directs the Petitioner to submit action plan along with timelines for
implementation of MIS and DBMS within 2 months of issuance of this Order.
Petitioner’s Response in the Present Tariff Petition
Management Information System (MIS) and Database Management System DBMS has been
implemented under APDRP Part A Project.
Commission’s Response
The Commission observes that the objectives of implementation of MIS and DBMS have been
achieved, therefore the Commission decides to drop this directive.
11.3.2. Street Lights switching ‘on’ and ‘off’
Originally Issued in Tariff Order dated 06th April, 2015
Commission’s Latest Directive in Tariff Order dated 23rd May, 2017
The Commission has noted the submission of the Petitioner and directs it to submit quarterly
progress reports to the Commission.
Petitioner’s Response in the Present Tariff Petition
The Centralised Control and Monitoring system is in process of installation and is expected to
be completed by end of FY 2017-18.
Commission’s Response
The Commission observes that the Petitioner is submitting quarterly progress reports and is in
process of installation of CCMS. The Commission, therefore, in accordance with the Petitioner’s
submission decides to drop this directive.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
155
ANNEXURES
Annexure 1: Public Notices published by the Commission
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
156
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
157
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
158
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
159
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
160
Annexure 2: Public Notices published by the Petitioner
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
161
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
162
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 2
(EXTRAORDINARY No. 2)
18TH APRIL, 2018
163
Annexure 3: List of Stakeholders
The following is the list of the stakeholders who have submitted objections/suggestions:
Table 79: List of Stakeholders
S. No.
List of Stakeholder
1.
Sh. Owen Braganza
2.
Ms. Nancy Fernandes
3.
Sh. Martin Rodrigues
4.
Sh. Porfiro Fernandes
5.
Ms. Mamta Srivastava
6.
Sh. Prashant K. Anvekar
7.
Dr. Kurade
8.
Sh. Agnelo D’Silva
9.
Ramona Almeida
10. Lorna Fernandes
11. Jose M. Miranda
12. Sh. Mayur Chaudhari
13. Olga Netto
14. Nicladina F. D’Mello
15. George Gravier
16. Vivian Alheida
17. Roland Martins
18. Gerand D’Mello
19. John Diniz
20. Porfiro Fernandes
21. Cipriana Fernandes
22. Ashish Gaundalhan
23. Silvestre Niassso
24. B.L. Biyani
25. Dishant Parab
26. Atish Tulaskan
27. Pratik Parab
28. Xavier Fernandes
29. Hector Colaco
S. No.
List of Stakeholder
30. Vasu R. Patel
31. Rajesh Shet
32. Abhay Keny
33. S.V. Purohit
34. P.K. Umadathan
35. Anthony Fernandes
36. Lira Matu
37. Aditya Bidre
38. Lorna Fernandes
39. Neet De Soya
40. Camil Pinto
41. Josephine Pinto
42. Prakash Lotlikar
43. Raghee Billava
44. Maria Magdalena Almeida
45. Ashley Vales
46. Nilesh Panehwadkor
47. Rolance Coutinho
48. Ratika Naik
49. Uttam Gaonkar
50. Rupesh
51. Confederation of Indian Industries, Goa
52. Alloys and Steels
53. Zuary Foods and Tropical Mushroom
54. Verna Industries Association
55. Gram Sabha
56. Aldona Civic and Consumer Forum
57. Charao Civic and Consumer Forum
58. Raia Civic and Consumer Forum
www.goaprintingpress.gov.in
Published and Printed by the Director, Printing & Stationery,
Government Printing Press,
Mahatma Gandhi Road, Panaji-Goa 403 001.
Price–Rs. 117.00