2995
Panaji, 21st February, 2019 (Phalguna 2, 1940)
SERIES I No. 47
Reg. No. G-2/RNP/GOA/32/2018-20
RNI No. GOAENG/2002/6410
PUBLISHED BY AUTHORITY
Suggestions are welcomed on e-mail: dir–[email protected]
GOVERNMENT OF GOA
Department of Agriculture
Directorate of Agriculture
Notification
3/1/Agri.Mech/AD(AE)/2018-19/D.Agri/275
Read Notification: No. 3/1/AD (AE)/2017-18/D.Agri/119 dated 07-09-2017, Series I No. 23.
NOTE
There is one Extraordinary and one Supplement issue to Official Gazette, Series I No. 46 dated 14-2-2019, namely:
(1) Extraordinary dated 14-2-2019 from pages 2649 to 2652, Notification No. 38/1/2012-Fin(R&C)/2252 regarding Goa
Goods and Services Tax (Removal of Difficulties) Order, 2019 and Not. No. 5-5-2018-Fin (DMU) Market Borrowing Programme
from Department of Finance (Debt Management Division).
(2) Supplement dated 14-2-2019 from pages 2653 to 2994 regarding Translation of the Portuguese Code of Civil Procedure, 1939.
INDEX
Department
Notification/Order
Subject
Pages
1. Agriculture
Not.- 3/1/Agri.-Mech/AD(AE)/
Amendment to the Modified Scheme for Custom 2995
Dir. & ex officio Jt. Secretary
/2018-19/D.Agri/275
Hiring Service in Agriculture.
2. a. Civil Supplies & Consumer Ord.- DCS/EST/Dept-Strength/ Final sanctioned staff strength.
2996
Affairs
/18-19/437
Dir. & ex officio Jt. Secretary
b. —do—
Ord.- DCS/EST/Creation-New
Creation of posts.
2998
Post/18-19/438
3. Forest
Not.- 19-3-2018/FOR/75
Establishment of Compensatory Afforestation
3000
Under Secretary
Fund Goa.
4. Mines
Not.- DMG/MMDR/DMF/01/
Modification of Notification dated 8-1-2019.
3000
Director
/2016/8040
5. a. Panchayats
Not.- 19/105/DP/PAN/HON/
Goa Panchayat (Payment of salaries and allo-
3002
Dir. & ex officio Jt. Secretary 2017/1361
wances to the Sarpanch, Deputy Sarpanch,
elected and co-opted members of Village
Panchayat) (Third Amendment) Rules, 2019.
b. —do—
Not.- 22/4/DP/2017/1362
The Zilla Panchayat (Payment of salaries and allo-
3003
wances to the Adhyaksha, Upadhyaksha,
elected and co-opted members of the Zilla Pan-
chayat) (Fourth Amendment) Rules, 2019.
c. —do—
Not.- 22/4/DP/2010/1360
The Goa (Grant of financial assistance to Pan-
3004
chayats for payment of salaries and allowances
to Sarpanch, Deputy Sarpanch and co-opted
Members of the Village Panchayat) Scheme, 2002.
6. Personnel
Not.- 1/8/89-PER
RR.– Directorate of Health Services.
3005
Special Secretary
7. Power
Not.- 150/01/CEE/Tech
Electricity Supply Code, 2018.
3007
Office of the Chief Ele. Eng.
Chief Electrical Engineer &
ex officio Additional Secretary.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
2996
Short title and commencement.— The scheme shall be called “Modified Scheme for Custom
Hiring Service in Agriculture”.
AMENDMENT
The pattern of assistance at clause 3(iv), Sr. No. (a) to (d), the standard hire charges of
machineries in the above read Notification is revised and amended as shown below:–
Pattern of Assistance:-
Existing
Amended
Sr.
Type of
Existing
Sr.
Type of machinery
Hire charge/
No.
machinery
hire charge/
No.
hr (Rs.)
hr (Rs.)
3(iv) (a)
Tractor (30hp
500/-
3(iv) (a)
Tractor (30hp & above)
700/-
& above)
with implements
excluding Rotovator
3(iv) (b)
Tractor (30 hp & above)
800/-
with Rotovator
3(iv) (b)
Tractor below
200/-
3(iv) (c)
Mini Tractor
500/-
30hp
3(iv) (c)
Power tiller
200/-
3(iv) (d)
Power tiller
400/-
3(iv) (d)
Paddy combine
2000/-
3(iv) (e)
Paddy combine
2400/-
harvester
harvester
Other contents of the Notification remains the same.
This issues with the approval of the Government and concurrence of the Finance (Expenditure)
Department, Government of Goa vide U.O No. 1400038300 dated 22-01-2019.
By order and in the name of the Governor of Goa.
Madhav B. Kelkar, Director & ex officio Joint Secretary (Agriculture).
Tonca-Caranzalem, 12th February, 2019.
———ttt———
Department of Civil Supplies & Consumer Affairs
Order
DCS/EST/Dept-Strength/18-19/437
The supersession of all the previous orders for creation/revival/redesignation/upgradation
of the various posts, Government is pleased to indicate the final sanctioned staff strength of the
Department as under for the next five years:–
Sanction of the Government is hereby accorded for creation of the following posts as per the
details shown below:–
Sr. No.
Designation of the Post
Pay Scale
Sanctioned Strength
1
2
3
4
Non Ministerial (Non Lapsable) Posts
1.
Director
Level-11
1
2.
Dy. Director
Level-10
1
3.
Assistant Director
Level-7
15
4.
Assistant Accounts Officer
Level-7
1
5.
Registrar
Level-6
1
6.
Accountant
Level-6
2
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
2997
1
2
3
4
7.
Assistant Registrar
Level-5
2
8.
Technical Assistant
Level-6
1
9.
Inspector
Level-5
26
10.
Sub-Inspector
Level-4
43
Ministerial (Lapsable posts)
11.
Office Superintendent
Level-7
1
12.
Head Clerk
Level-6
4
13.
Senior Stenographer
Level-5
4
14.
Junior Stenographer
Level-4
6
15.
U.D.C.
Level-4
15
16.
L.D.C.
Level-4
65
17.
Driver
Level-2
8
18.
Bailiff
Level-1
3
19.
MTS
Level-1
26
20.
Court Master
Level-1
3
21.
Labourer
Level-1
6
22.
Watchman
Level-1
6
23.
Sweeper
Level-1
4
Total
244
As per the recommendation and approval of the High Level Empowered Committe (H.L.E.C),
the following posts shall stand abolished, upon superannuation/retirement of the incumbent
or upon the post falling vacant (for whatever reasons).
Sr.
Designation of the post
Name of the Official
Remarks
No.
[Ministerial (Lapsable)
holding the post
posts]
1.
Labourer
1. Anant Parwar
Posts shall stand abolished,
2. Krishna Phaldessai
upon superannuation/retire-
3. Datta P. Naik
ment of the incumbents
4. Joaquim Fernandes
5. Navnath Zoro
6. Ganesh Velip
2.
Watchman
1. Damiao Fernandes
Posts shall stand abolished
2. Vithoba Gawas
upon superannuation/retire-
3. Diogo D’Silva
ment of the incumbents
4. Pradeep Kamat
5. Subhash Parab
6. Pradeep Naik
3.
Sweeper
1. Shankar Naik
Posts shall stand abolished
2. Prakash Parwar
upon superannuation/retire-
3. Gopi Tariyal
ment of the incumbents
4. Reshma Kanconkar
Note:- The existing strength of Drivers shall be continued, until further assessment of the vehicle fleet and
requirement of the department, and any vacancies arising during the interim period shall not be filled up on regular
basis.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
2998
This issues with the approval of the High Level Empowered Committee (H.L.E.C) constituted
with the approval of the Council of Ministers in the XXth meeting held on 8-11-2017 vide Order
No. 1-1-2017-Addl. Secy (PER) dated 22-11-2017 issued by Department of Personnel.
Approval of the High Level Empowered Committee (H.L.E.C.) is conveyed vide letter No.
9/29/IDCO/2018-ARD/17 dated 10-01-2019 issued by the Department of Administrative Reforms,
Secretariat.
By order and in the name of the Governor of Goa.
Sandhya Kamat, Director & ex officio Joint Secretary (CS&CA).
Panaji, 12th February, 2019.
__
Order
DCS/EST/Creation-New Post/18-19/438
Sanction of the Government is hereby accorded for creation of the following posts as per the
details shown below:-
Sr. No.
Designation of the Post
Pay Scale
No. of posts created
1
2
3
4
Non Ministerial (Non Lapsable) Posts
1.
Dy. Director
Level-10
1
2.
Technical Assistant
Level-6
1
3.
Sub-Inspector
Level-4
8 (as Godown
Incharge)
Ministerial (Lapsable posts)
1.
Head Clerk
Level-6
1
2.
Senior Stenographer
Level-5
1
3.
Junior Stenographer
Level-4
1
4.
L.D.C
Level-2
4
5.
Bailiff
Level-1
1
6.
Court Master
Level-1
2
Total
20
2. The expenditure on the creation of above posts would be met from the Budget Head
mentioned against the posts:–
1.
Dy. Director
3456 —Civil Supplies;
2.
Technical Assistant
00 —;
3.
Head Clerk
001—Direction & Administration;
4.
Senior Stenographer
01—Civil Supplies Department (NP);
5.
Junior Stenographer
01— Salaries.
6.
LDC
7.
Sub-Inspector
3456 — Civil Supplies;
00 —;
001 — Direction & Administration;
02— Civil Supplies Inspectorate;
01— Salaries.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
2999
8.
Bailiff
3456 — Civil Supplies;
9.
Court Master
00 —;
001 — Direction & Administration;
04 — Consumer Disputes Redressal Commission (NP);
01 — Salaries.
3. As per the recommendation and approval of the High Level Empowered Committee
(H.L.E.C.), the following posts shall stand abolished, upon superannuation/retirement of the
incumbent or upon the post falling vacant (for whatever reasons).
Sr. No.
Designation of the
Name of the official holding
Remarks
post [Ministerial
the post
(Lapsable) Posts]
1.
Labourer
1. Anant Parwar
Posts shall stand abolished,
2. Krishna Phaldessai
upon superannuation/retirement
3. Datta P. Naik
of the incumbents
4. Joaquim Fernandes
5. Navnath Zoro
6. Ganesh Velip
2.
Watchman
1. Damiao Fernandes
Posts shall stand abolished,
2. Vithoba Gawas
upon superannuation/retirement
3. Diogo D’Silva
of the incumbents
4. Pradeep Kamat
5. Subhash Parab
6. Pradeep Naik
3.
Sweeper
1. Shankar Naik
Posts shall stand abolished upon,
2. Prakash Parwar
superannuation/retirement of the
3. Gopi Tariyal
incumbents
4. Reshma Kanconkar
Note :- The existing strength of Drivers shall be continued, until further assessment of the vehicle fleet and
requirement of the department, and any vacancies arising during the interim period shall not be filled up on
regular basis.
4. This issues with the approval of the High Level Empowered Committee (H.L.E.C)
constituted with the approval of the Council of Ministers in the XXth meeting held on 8-11-2017
vide Order No. 1/1/2017-Addl. Secy(PER) dated 22-11-2017 issued by Department of Personnel.
5. Approval of the High Level Empowered Committee (H.L.E.C) is conveyed vide letter
No. 9/29/IDCO/2018-ARD/17 dated 10-01-2019 issued by the Department of Administrative
Reforms, Secretariat.
By order and in the name of the Governor of Goa.
Sandhya Kamat, Director & ex officio Joint Secretary (CS&CA).
Panaji, 12th February, 2019.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3000
Department of Forest
__
Notification
19-3-2018/FOR/75
In exercise of the powers conferred by sub-section (1) of section 4 of the Compensatory
Afforestation Fund Act, 2016 (Central Act 38 of 2016), the Government of Goa hereby establishes,
with effect for the date of publication of this Notification in the Official Gazette, the State
Compensatory Afforestation Fund Goa for the purposes of the said Act under a distinct Minor
Head 129—State Compensatory Afforestation Fund—Goa (SCAF) below the Major Head 8121—
General and other Reserve Funds.
By order and in the name of the Governor of Goa.
Shaila G. Bhosle, Under Secretary (Forest).
Porvorim, 18th February, 2019.
———ttt———
Department of Mines
Directorate of Mines & Geology
__
Notification
DMG/MMDR/DMF/01/2015/8040
Read:- Government Notification No. DMG/MMDR/DMF/01/2015/7633 dated 08-01-2019
published in Official Gazette No. 41, Series I dated 10th January, 2019.
In partial modification of Notification read at preamble, the section 4 of Chapter II, in the
Governing Council at Sr. No. 2 and 14 shall be read as follows:–
4. Composition of District Mineral Foundation/Trust.— (a) Every District Mineral Foundation
(Trust) as established under sub-section (1) of section 9B of the Act and as guided by provisions
of sub-section (2) (3) and (4) of section 9B shall consist of a Governing Council and Managing
Committee.
(b) The Office of the District Mineral Foundation shall be situated at the Directorate of Mines
and Geology, Government of Goa, Ground Floor, Menezes Braganza Building, Panaji, Goa or at
the District Head Quarters or as may be determined by the Governing Council.
(c) All District Mineral Foundation Trusts may also set up an office at the district level for the
purposes of coordination, planning monitoring accounting and public disclosure of information.
The Governing Council shall ratify the appointment of staff members of District Mineral
Foundation office with prior approval from the State Government.
(d) The Governing Council shall consist of the following members:–
Sr. No.
Name and Designation
Designation in the Governing Council
1
2
3
1.
Collector/District Magistrate
Chairperson/Trustee
2.
Representatives from amongst the Member of Legislative
Member/Trustee
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3001
1
2
3
Assembly from the District preferably among the directly
affected areas shall be recommended by Mines Minister
not exceeding three.
3.
Deputy Director of Mines
Member Secretary/Trustee
4.
The Executive/Assistant Engineer, Public Works
Ex Officio Member/Trustee
Department
5.
The Deputy Director, Directorate of Health
Ex Officio Member/Trustee
6.
The Deputy Director, Directorate of Education or any
Ex Officio Member/Trustee
Officer not below the rank of Assistant Director/Deputy
Director nominated by the Department.
7.
The Assistant Director, Directorate of Social Welfare or
Ex Officio Member/Trustee
any Officer not below the rank of Assistant Director/
/Deputy Director nominated by the Department.
8.
The Deputy Director, Directorate of Women & Child
Ex Officio Member/Trustee
Development or any Officer not below the rank of
Assistant Director/Deputy Director nominated by the
Department.
9.
The Deputy Director, Directorate of Agriculture
Ex Officio Member/Trustee
10.
The Executive/Assistant Engineer, Water Resources
Ex Officio Member/Trustee
11.
The Executive/Assistant Engineer, Department of Electricity
Ex Officio Member/Trustee
12.
The Representative of Finance Department (Budget), not
Ex Officio Member/Trustee
below the rank of Under Secretary.
13.
The Director/Deputy Director, Directorate of Panchayats
Member/Trustee
14.
Representatives of the Mineral Foundation of Goa (or any
Member/Trustee
other Non-Government Organizations/Civil Society/Public
which have worked at the ground level in mines affected
areas for providing relief including undertaking activities
under Corporate Social Responsibility) to be nominated
by the State Government not exceeding three.
15.
Two Representatives shall be recommended by Mines
Member/Trustee
Minister and to be finally nominated by the State
Government amongst the mineral concession holder/
/industry representative/Goa Mineral Ore Exporters
Association
16.
Any other Officials/person nominated by the State
Member/Trustee
Government
By order and in the name of the Governor of Goa.
Ameya Abhyankar, IAS, Director (Mines & Geology).
Panaji, 13th February, 2019.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3002
Department of Panchayati Raj and
Community Development
Directorate of Panchayats
—
Notification
19/105/DP/PAN/HON/2017/1361
Read: (1) Notification No. 19/105/DP/PAN/
HON/2002 dated 1st January,
2003, published in the Official
Gazette, Extraordinary, Series I
No. 40 dated 3rd January, 2003.
(2) Notification No. 19/105/DP/PAN/
/2003 dated 11th February,
2004, published in the Official
Gazette, Extraordinary No. 3,
Series I No. 46, dated 17th
February, 2004.
(3) Notification No. 19/105/DP/PAN/
HON/2011 dated 09th October,
2012 published in the Official
Gazette, Extraordinary, Series I
No. 27, dated 09th October, 2012.
Whereas the draft of the Goa Panchayat
(Payment of salaries and allowances to the
Sarpanch, Deputy Sarpanch, elected and
co-opted members of Village Panchayat) Rules,
2017, was pre-published as required by
sub-section (1) of section 240 of the Goa
Panchayat Raj Act, 1994 (Act 14 of 1994) in
the Official Gazette, Series I No. 44 dated
31-01-2019 under notification No.19/105/DP/
PAN/HON/2017 dated 29-01-2019 of the
Department of Panchayat Raj and Community
Development, inviting objections and
suggestions from all persons likely to be
affected thereby before the expiry of 15 days
from the date of publication of the Notification
in the Official Gazette.
And whereas the said Gazette was made
available to the public on 31-01-2019.
And whereas no objections/suggestions
have been received from the public on the said
draft by the Government.
Now, therefore, in exercise of the powers
conferred by sub-section (2) of section 48
read with sub-section (2) of section 162 and
sub-section (1) of section 240 of the Goa
Panchayat Raj Act, 1994 (Goa Act 14 of 1994),
the Government of Goa hereby makes the
following rules so as to further amend the Goa
Panchayat (Payment of salaries and allowances
to the Sarpanch, Deputy Sarpanch, elected and
co-opted members of Village Panchayat) Rules,
2002, namely:—
1. Short title and commencement.— (1)
These rules may be called the Goa Panchayat
(Payment of salaries and allowances to the
Sarpanch, Deputy Sarpanch, elected and
co-opted members of Village Panchayat) (Third
Amendment) Rules, 2019.
(2) They shall come into force from the date
of their publication in the Official Gazette.
2. Amendment of rule 3.— In rule 3 of the
Goa Panchayat (Payment of salaries and
allowances to the Sarpanch, Deputy Sarpanch,
elected and co-opted members of Village
Panchayat) Rules, 2002 (hereinafter referred
to as the “principal Rules”),
(i) in sub-rule (1), for the words “rupees two
thousand”, the words “rupees three
thousand” shall be substituted;
(ii) in sub-rule (2), for the words “rupees two
thousand”, the words “rupees three
thousand” shall be substituted;
(iii) in sub-rule (3), for the words “rupees
two thousand”, the words “rupees three
thousand” shall be substituted.
3. Amendment of rule 4.— In rule 4 of the
principal Rules,—
(i) in sub-rule (1), for the words “rupees two
thousand”, the words “rupees three
thousand” shall be substituted;
(ii) in sub-rule (2), for the words “rupees one
thousand and five hundred”, the words
“rupees two thousand two hundred and fifty”
shall be substituted;
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3003
(iii) in sub-rule (3), for the words “rupees
one thousand”, the words “rupees one
thousand and five hundred” shall be
substituted.
By order and in the name of the Governor
of Goa.
Rajan Satardekar, Director and ex officio
Joint Secretary (Panchayats).
Panaji, 21st February, 2019.
________
Notification
22/4/DP/2017/1362
Read: (1) Notification No. 35/DP/PAN/ZP/
99 dated 24th March, 2000,
published in the Official Gazette,
Extraordinary, Series I No. 53,
dated 30th March, 2000.
(2) Notification No. 35/DP/PAN/ZP/
99 dated 1st January, 2003
published in the Official Gazette,
Extraordinary, Series I No. 40,
dated 3rd January, 2003.
(3) Notification No. 35/DP/PAN/ZP/
2004 dated 1st March, 2004
published in the Official Gazette,
Extraordinary, Series I No. 48
dated 2nd March, 2004.
(4) Notification No. 22/4/DP/2011
dated
9th
October,
2012,
published in the Official Gazette,
Extraordinary, Series I No. 27,
dated 9th October, 2012.
Whereas the draft of the Goa Zilla Panchayat
(Payment of salaries and allowances to
the Adhyaksha, Upadhyaksha, elected and
co-opted members of the Zilla Panchayat)
Rules, 2000, was pre-published as required by
sub-section (1) of section 240 of the Goa
Panchayat Raj Act, 1994 (Act 14 of 1994) in
the Official Gazette, Series I No. 44 dated
31-01-2019 under Notification No. 22/4/DP/
2017 dated 29-01-2019 of the Department of
Panchayat Raj and Community Development,
inviting objections and suggestions from all
persons likely to be affected thereby before the
expiry of 15 days from the date of publication
of the said Notification in the Official Gazette.
And Whereas the said Gazette was made
available to the public on 31-01-2019.
And Whereas no objections/suggestions
have been received from the public on the said
draft by the Government.
Now, therefore in exercise of the powers
conferred by section 134 read with sub-section
(2) of section 168 and sub-section (1) of section
240 of the Goa Panchayat Raj Act, 1994
(Goa Act 14 of 1994), the Government of Goa
hereby makes the following rules so as to
further amend the Goa Zilla Panchayat
(Payment of salaries and allowances to
the Adhyaksha, Upadhyaksha, elected and
co-opted members of the Zilla Panchayat)
Rules, 2000, namely:—
1. Short title and commencement.— (1)
These rules may be called the Zilla Panchayat
(Payment of salaries and allowances to
the Adhyaksha, Upadhyaksha, elected and
co-opted members of the Zilla Panchayat)
(Fourth Amendment) Rules, 2019.
(2) They shall come into force on the
date of their publication in the Official
Gazette.
2. Amendment of rule 3.— In rule 3 of the
Goa Zilla Panchayat (Payment of salaries and
allowances to the Adhyaksha, Upadhyaksha,
elected and co-opted members of the Zilla
Panchayat) Rules, 2000 (hereinafter referred
to as the “principal Rules”),—
(i) in sub-rule (1), for the words “rupees six
thousand”, the words “rupees nine thousand”
shall be substituted;
(ii) in sub-rule (2), for the words “rupees six
thousand”, the words “rupees nine thousand”
shall be substituted;
(iii) in sub-rule (3), for the words “rupees
six thousand”, the words “rupees nine
thousand” shall be substituted;
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3004
TABLE
Sr.
Amount of
Amount of
Total Amount
No.
Designation
monthly salary
allowance
(in Rupees)
(in Rupees)
(in Rupees)
1.
Sarpanch
Rs. 3000/-
Rs. 3000/-
Rs. 6000/-
2.
Deputy Sarpanch
Rs. 3000/-
Rs. 2250/-
Rs. 5250/-
3.
Elected Panchayat Member
Rs. 3000/-
Rs. 1500/-
Rs. 4500/-
4.
Co-opted Member
Rs. 3000/-
Rs. 1500/-
Rs. 4500/-
This Notification shall come into force from the date of its publication in the Official Gazette.
By order and in the name of the Governor of Goa.
Rajan Satardekar, Director and ex officio Joint Secretary (Panchayats).
Panaji, 21st February, 2019.
3. Amendment of rule 3A.— In rule 3A of
the principal Rules,—
(i) in sub-rule (1), for the words “rupees six
thousand”, the words “rupees nine thousand”
shall be substituted;
(ii) in sub-rule (2), for the words “rupees
five thousand”, the words “rupees seven
thousand and five hundred” shall be
substituted;
(iii) in sub-rule (3), for the words “rupees
four thousand”, the words “rupees six
thousand” shall be substituted.
By order and in the name of the Governor
of Goa.
Rajan Satardekar, Director and ex officio
Joint Secretary (Panchayats).
Panaji, 21st February, 2019.
________
Notification
22/4/DP/2010/1360
Read: (1) Notification No. 22/4/DP/2002
dated 02-07-2002 published in
the Official Gazette, Series I No.15
dated 11-07-2002.
(2) Notification No. 22/4/DP/2010
dated 14-09-2012 published in
the Official Gazette, (Extraordi-
nary No. 3), Series I No. 24 dated
14-09-2012.
The Government of Goa is hereby pleased
to amend the Goa (Grant of financial assistance
to Panchayats for payment of salaries and
allowances to the Sarpanch, Deputy Sarpanch,
elected and co-opted members of the Village
Panchayats) Scheme, 2002 (hereinafter
referred to as the “said Scheme”) published
in the Official Gazette, Series I No. 15 dated
11th July, 2002 vide Notification No. 22/4/DP/
/2002 dated 02-07-2002 of the Department of
Panchayat Raj and Community Development,
as follows, namely:—
1. Amendment of clause 4.— In the said
scheme, for clause 4, the following clause shall
be substituted, namely:—
“4. Amount of financial assistance.— The
financial assistance will be released to
the Village Panchayats every year to cover
the costs of payment of salaries and
allowances to the Sarpanch, Deputy
Sarpanch, elected and co-opted members
of the Village Panchayats as per the
following pattern of assistance indicated in
Table below:—
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3005
Department of Personnel
—
Notification
1/8/89-PER
In exercise of the powers conferred by the
proviso to Article 309 of the Constitution of
India and in supersession of the existing
Recruitment
Rules,
for
the
post
of
Multipurpose
Health
Worker
(Male)/
/Multipurpose Health Worker (Female/
/Midwife)
notified
vide
Government
Notification No. 1/3/90-PER dated 20-8-1993,
published in the Official Gazette, Series I
No. 24 dated 9-9-1993, the Governor of Goa
hereby makes the following rules to regulate
the recruitment to the Group ‘C’, Non-
-Ministerial, Non-Gazetted post, in the
Directorate of Health Services, Government
of Goa, namely:—
1. Short title, application and commence-
ment.— (1) These rules may be called
the Government of Goa, Directorate of Health
Services, Group ‘C’, Non-Ministerial, Non-
-Gazetted post, Recruitment Rules, 2019.
(2) They shall apply to the post specified
in column (1) of the Schedule to these
rules (hereinafter called as the “said
Schedule”).
(3) They shall come into force from the
date of their publication in the Official
Gazette.
2. Number, classification and the level in
the pay matrix.— The number of posts,
classification of the said post and the level in
the pay matrix attached thereto shall be as
specified in columns (2) to (4) of the said
Schedule:
Provided that the Government may vary
the number of posts specified in column (2)
of the said Schedule from time to time subject
to exigencies of work.
3. Method of recruitment, age limit and
other qualifications.— The method of
recruitment to the said post, age limit,
qualifications and other matters connected
therewith shall be as specified in columns
(5) to (13) of the said Schedule.
4. Disqualification.— No person who has
entered into or contracted a marriage with a
person having a spouse living or who, having
a spouse living, has entered into or contracted
a marriage with any person, shall be eligible
for appointment to the service:
Provided that the Government may, if
satisfied that such marriage is permissible
under the personal law applicable to such
person and the other party to the marriage
and that there are other grounds for so doing,
exempt any person from the operation of this
rule.
5. Power to relax.— Where, the Government
is of the opinion that it is necessary or
expedient so to do, it may, by order, for
reasons to be recorded in writing, relax any
of the provisions of these rules with respect
to any class or category of persons.
6. Saving.— Nothing in these rules shall
affect reservation, relaxation of age limit and
other concessions required to be provided
for scheduled castes and other special
categories of persons in accordance with the
orders issued by the Government from time
to time in that regard.
By order and in the name of the Governor
of Goa.
Anjali Sehrawat, IAS, Special Secretary
(Personnel).
Porvorim, 11th February, 2019.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3006
SCHEDULE
Name/
/desig-
nation of
the post
Age limit
for direct
recruits
Period of
probation, if
any
Method of
recruitment,
whether by direct
recruitment or
by promotion
or by deputation/
/transfer/contract
and percentage
of the vacancies
to be filled by
various methods
In case of recruit-
ment by promotion/
/deputation/
/transfer, grades
from which
promotion/
/deputation/
/transfer is
to be made
Educational
and other qualifications
required for
direct recruits
Classifi-
cation
Whether age & educational
qualifications prescribed for the
direct recruits will apply in the
case of promotees
Number
of
posts
Level in
the Pay
Matrix
If a
D.S.C./
/D.P.C.
exists,
what is its
compo-
sition
Circum-
stances in
which the
Goa Public
Service
Commission
is to be
consulted in
making
recruitment
471
(2019)
(Subject
to
variation
depen-
dent on
workload).
N. A.
Group
‘C’
Non-Mini-
sterial
Non-
Gazetted.
L-2.
Not exceed-
ing 45 years
(Relaxable for
Government
servants upto
five years in
accordance
with the
instructions
or orders
issued by the
Government
from time to
time).
N. A.
Two years.
Direct
Recruitment.
Multipur-
pose
Health
Worker
(Male)/
Multipur-
pose
Health
Worker
(Female)/
Auxiliary
Nurse
Midwife.
(Note:
For the
Multi
Purpose
Health
Workers,
in case of
non-
availabil-
ity of male
candi-
dates, the
posts will
be filled
from
female
candi-
dates).
N. A.
Essential:
(1) Higher Secondary
School Certificate or All
India Council for Techni-
cal Education approved
Diploma awarded by a
recognized State Board
of Technical Education
or equivalent quali-
fication from a reco-
gnized Institution.
(2) One and half year
training (Course) as
Multipurpose Health
Workers or two years
training (Course) as
Auxiliary Nurse Mid-
wife from Government
Institute or any Institu-
tion recognized by the
Indian Nursing Council.
(3) Registration with
State Nursing Council.
(4)
Knowledge
of
Konkani.
Desirable:
Knowledge of Marathi.
Whether
selection
post or
non-
-selection
post
Group
‘C’,
D.S.C/
/D.P.C.
N. A.
1
2 3
4 5
6
7
8 9 10 11 12 13
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3007
Department of Power
Office of the Chief Electrical Engineer
—
Notification
150/01/CEE/Tech
Electricity Supply Code, 2018
In exercise of the powers conferred under
various sections of the Electricity Act, 2003,
the Hon’ble J.E.R.C. for the State of Goa and
Union Territories vide notification No.
JERC:23/2018 dated 26th November, 2018 has
notified the Electricity Supply Code, 2018 in
the Gazette of India.
The Notification is brought to the notice of
the general public by order and in the name
of Government of Goa.
Reshma Mathew, Chief Electrical Engineer
& ex officio Additional Secretary (Power).
Panaji, January, 2019.
—————
JOINT ELECTRICITY REGULATORY
COMMISSION FOR THE STATE OF GOA
AND UNION TERRITORIES (ELECTRICITY
SUPPLY CODE) REGULATIONS, 2018
In exercise of the powers conferred under
Section 181 read with Section 50, of the
Electricity Act, 2003 (Act No. 36 of 2003)
(hereinafter referred to as ‘the Act’), and all
other powers enabling it in this behalf
including sub-ordinate legislation, rules,
statutory orders, resolutions, clarifications
issued by the Government in terms of the Act
relating to supply of electricity, the Joint
Electricity Regulatory Commission for the
State of Goa and Union Territories (UTs) hereby
makes this “Electricity Supply Code”
Regulations, 2018, hereinafter called the
Supply Code, 2018.
1.
Short
title,
scope,
extent
and
commencement.— 1.1 This Supply Code, 2018
shall be called “Joint Electricity Regulatory
Commission for the State of Goa and UTs
(Electricity Supply Code) Regulations, 2018”
(hereinafter referred to as ‘the Supply Code,
2018’).
1.2 This Supply Code, 2018 details the
obligations of the Licensee and consumers
vis-à-vis each other and specifies the set of
practices that shall be adopted by the Licensee
to provide efficient, cost-effective and
consumer friendly service to the consumers.
It specifically details the following:
(1) The procedure for connection,
disconnection, reconnection, assessment of
load, changes in existing connections (load
modifications, change of name, change of
tariff category, etc.);
(2) Practices relating to consumer
metering, billing and payment.
(3) Method of assessment of electricity
charges payable in case of theft of electricity
pending adjudication by the appropriate
court or in case of unauthorized use of
electricity;
(4) Disconnection of supply in case of theft
or unauthorized use of electricity and
removal of meter, electric line, electrical
plant and all other apparatus; and
(5) Measures to prevent diversion of
electricity, theft or unauthorized use or
tampering, distress or damage to electrical
plant, electric line or meter.
1.3 All the forms and formats annexed to the
Supply Code, 2018 are integral part of this
Supply Code, 2018. The Licensee, if it feels
imperative, may approach the Commission to
seek suitable amendments in the forms/
/formats and such amended forms/formats
would be posted on the website of the
respective Licensees for use by consumers.
1.4 This Supply Code, 2018 shall be
applicable to:–
(1) All Distribution Licensees including
Deemed Licensees and all Consumers in the
State of Goa and Union Territories (except
Delhi).
(2) All other persons who are exempted
under Section 13 of the Act from obtaining
the Licence; and
(3)
Unauthorized supply, unauthorized
use, diversion and other means of unauthorized
use/abstraction of electricity.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3008
1.5 The provisions of the Supply Code, 2018
shall be read in conjunction with the
Regulations made under the Joint Electricity
Regulatory Commission for the State of Goa
and UT’s (Standard of Performance for
Distribution Licensees) Regulations, 2015 and
other relevant Regulations and codes notified
by the Commission for the State of Goa and
UT’s and as amended from time to time:
Provided that in case the timelines and other
conditions specified in this Supply Code, 2018
are in variation with Joint Electricity
Regulatory Commission for the State of Goa
and UT’s (Standard of Performance for
Distribution Licensees) Regulations, 2015 (SOP
Regulations), the timelines and other
conditions as specified in this Supply Code,
2018 shall prevail and such timelines and other
conditions shall be deemed to have been
replaced in the existing SOP Regulations.
1.6 This Supply Code, 2018 shall come into
force from the date of its publication in the
Official Gazette.
1.7 The Supply Code, 2018 consists of 10
Chapters, as follows:–
(1) Chapter 1: Short Title, Scope, Extent
and Commencement.
(2) Chapter 2: Definitions.
(3) Chapter 3: Supply Code Review Panel.
(4) Chapter 4: System of Supply and
classification of Consumers.
(5) Chapter 5: Procedure for release of
new connections and modifications as per
existing connection.
(6) Chapter 6: Metering.
(7) Chapter 7: Billing.
(8) Chapter 8: Restrictions-Theft and
Unauthorized use of electricity.
(9) Chapter 9: Disconnection and
Reconnection.
(10) Chapter 10: General Provisions.
CHAPTER-2
2. Definitions and Interpretations.— 2.1
Words, terms and expressions defined in the
Electricity Act, 2003, as amended from time to
time and used in this Supply Code, 2018 shall
have and carry the same meaning as defined
and assigned in the said Act.
All other expressions used herein but not
specifically defined in the Act or Regulations
but defined under any law passed by a
competent legislature and applicable to the
electricity industry in the State of Goa and UTs
shall have the meaning assigned to them in
such law. Subject to the above, expressions
used herein but not specifically defined in the
Act or any law passed by a competent
legislature shall have the meaning as is
generally assigned in the electricity industry.
2.2 In the interpretation of this Supply Code,
2018, unless the context otherwise requires:–
(1) Words in the singular or plural term,
as the case may be, shall also be deemed to
include the plural or the singular term,
respectively;
(2) References to any statutes, Regu-
lations or guidelines shall be construed
as including all statutory provisions
consolidating, amending or replacing such
statutes, Regulations or guidelines, as the
case may be, referred to;
(3) Terms “include” or “including” shall
be deemed to be followed by “without
limitation” or “but not limited to” regardless
of whether such terms are followed by such
phrases or words of like import.
2.3 In this Supply Code, 2018, unless it is
repugnant to the context:–
(1) “Act” means the Electricity Act, 2003
and subsequent amendments thereof;
(2) “Agreement” means an agreement
entered into by the Distribution Licensee
and the consumer for the services including
supply of electricity by the Licensee to the
consumer;
(3) “Appellate Authority” means the
authority prescribed under sub-section (1)
of Section 127 of the Act;
(4) “Applicant” means an owner or
occupier of any land/premises who files an
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3009
application form with a Licensee for supply
of electricity, increase or reduction in
sanctioned load/contract demand, change
in title, disconnection or restoration of supply
or termination of agreement or any other
services as specified in this Supply Code,
2018 as the case may be, in accordance with
the provisions of the Act and the Code, Rules
and Regulations made thereunder or other
services;
(5) “Application” means an application
form complete in all respects in the
appropriate format, as specified in this
Supply Code, 2018 along with documents
showing payment of necessary charges and
other compliances;
(6) “Application form” means an
application form complete in all respects in
the appropriate format, as required under
this Supply Code, 2018;
(7) “Apparatus” means electrical
apparatus and includes all machines,
fittings, accessories and appliances
connected to the electrical distribution
system;
(8) “Area of supply” means the area within
which a Distribution Licensee is authorized
by his licence to supply electricity;
(9) “Assessing Officer” means an officer
designated as Assessing Officer by the
concerned State/UTs Government under
provisions of Section 126 of the Act;
(10) “Authorized Officer” means an officer
designated as Authorized Officer by the
Appropriate Authority, under provisions of
Section 135 of the Act;
(11) “Authorized representative” of any
person/entity means all officers, staff,
representatives or persons discharging
functions under the general or specific
authority of the concerned person/entity;
(12) “Billing cycle or billing period”
means the period as approved by the
Commission for which regular electricity
bills are to be prepared by the Licensee for
different categories of consumers;
(13) “Breakdown” means an occurrence
relating to equipment of the distribution
system of the Licensee including electric
line up to the consumer meter that prevents
its normal functioning;
(14) “Calendar year” means the period
from the first day of January of a year to the
thirty first day of December, of the same
year;
(15) “Check meter” means a meter
connected to the same core of the Current
Transformer (CT) and Voltage Transformer
(VT) to which main meter is connected and
shall be used for accounting and billing of
electricity in case of failure of main meter;
(16) “Commission” means the Joint
Electricity Regulatory Commission for the
State of Goa and Union Territories (except
Delhi);
(17) “Conductor” means any wire, cable,
bar, tube, rail or plate used for conducting
electrical energy and so arranged as to be
electrically connected to a system;
(18) “Connected load” expressed in kilo
Watt (kW), kilo Volt Ampere (kVA) or Horse
Power (HP), means aggregate of the
manufacturer’s rated capacities of all energy
consuming devices or apparatus connected
with the Distribution Licensee’s service line
on the consumer’s premises, which can
be simultaneously used and shall be
determined as per the procedure laid down
in this Supply Code, 2018. This shall be
expressed in kW or kVA. If the rating is in
kVA, the same shall be converted to kW by
multiplying the kVA with a Power Factor of
0.9. If the same or any other apparatus is
rated in H.P., the H.P. shall be converted to
kW by multiplying it by 0.746;
(19) “Connection point” or “Interconne-
ction” means a point at which the
consumer’s installation and/or apparatus
are connected to Distribution Licensee’s
distribution system;
(20) “Consumer” means any person who
is supplied with electricity for his/her own
use by a Licensee or the Government or by
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3010
any other person engaged in the business
of supplying electricity to the public under
the Act or any other law for the time being
in force and includes any person whose
premises are for the time being connected
for the purpose of receiving electricity with
the works of a Licensee, the Government or
such other person, as the case may be
including
temporarily
disconnected
premises. A consumer is specified as a:–
(a) ‘Low Tension Consumer (LT
Consumer)’ if the consumer obtains
supply from the Licensee at low or
medium voltage;
(b) ‘High Tension Consumer (HT
Consumer)’ if the consumer obtains
supply from the Licensee at High Voltage;
(c) ‘Extra High-Tension Consumer (EHT
Consumer)’ if the consumer obtains
supply from the Licensee at Extra High
Voltage;
(21)
“Consumer
installation”
or
“Consumer’s installation” means any
composite portable or stationary electrical
unit including electric wires, fittings, motors
and apparatus erected and wired by or on
behalf of the consumer at the consumer’s
premises starting from the point of supply
and includes apparatus that is available on
his premises for being connected or
envisaged to be connected to the installation
but is for the time being not connected;
(22) “Consumer’s premises” means land,
building or structure or part or combination
thereof in respect of which a separate meter
or metering arrangements have been made
by the Licensee for supply of electricity.
(23) “Consumption Charges” means the
consumption of electrical energy in kWh or
kVAh multiplied by applicable energy
charges and demand charges/fixed
charges, fuel surcharge adjustment (FSA),
peak load exemption charges, whichever
applicable. These exclude all types of duties
and taxes, service charge and rentals;
(24) “Contracted load” or “Contract
demand” means the maximum demand in
kW, kVA or HP, agreed to be supplied by the
Licensee and indicated in the agreement
executed between the Licensee and the
consumer;
(25) “Cut-out” means any appliance or
device for automatically interrupting the
conduction of electricity through any
conductor when the current rises above a
pre-determined quantum and shall also
include fusible devices;
(26) “Date of commencement of supply”
is the date when the Licensee energizes the
installation of the consumer by connecting
it to the Distribution main;
(27) “Demand charge” for a billing period
refers to a charge levied on the consumer
based on the contracted/sanctioned load or
maximum demand (reference to sub clause
2.3(50) of this Supply Code, 2018) whichever
is higher, and shall be calculated as per the
procedure laid down in the Tariff;
Order approved by the Commission;
(28) “Developer” means a person or
company or organization or authority that
undertakes development of an area for
residential, commercial or industrial use and
includes development agencies, colonizers,
co-operative group housing societies,
associations, etc.;
(29) “Disconnection” means the physical
separation of user or consumer from the
Licensee’s system;
(30) “Distribution mains” means the
portion of any main with which a service
line is, or is intended to be, immediately
connected;
(31) “Distribution system” means the
system of wires and associated facilities
between the delivery points on the
transmission lines or the generating station
connection and the point of connection to
the installation of the consumers;
Explanation: Any system consisting
mainly of overhead lines, underground
cables, service lines, electrical plant, control
switchgear and meters having design
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3011
voltage of 33 kV and below and shall also
include any other system of higher voltage
as the Commission may specifically
recognize. The Distribution System shall not
include any part of the Transmission System
except the terminal equipment (metering
system, CT and PT) connected at consumer
end and used for the supply of electricity to
extra high voltage (66 kV and above)
consumers;
(32) “Earthed” means connected with
the general mass of earth in such manner
as to ensure at all times an immediate
discharge of energy without danger;
(33) “Electric line” means any line which
is used for carrying electricity for any
purpose and includes;
(a) any support for any such line, that
is to say, any structure, tower, pole or
other thing in, on, by or from which any
such line is, or may be, supported, carried
or suspended; and
(b) any apparatus connected to any
such line for the purpose of carrying
electricity;
(34) “Emergency Rostering” means load
shedding carried out by disconnecting at
short notice or no notice for safety of
personnel and equipment;
(35) “Energy Charge” refers to a charge
levied on the consumer based on the
quantity of electricity (units in kWh or
kVAh as per tariff) consumed by the
consumer;
(36) “Extra High Voltage (EHV)” or “Extra
High Tension (EHT)” means a voltage
exceeding 33000 Volts;
(37) “Electrical Inspector” means a
person appointed as such by the
appropriate Government under sub-section
(1) of Section 162 of the Act and also includes
the Chief Electrical Inspector;
(38) “Financial Year” means the period
beginning from first of April in an English
calendar year and ending with the thirty first
of the March of the next calendar year;
(39) “Feeder” means an LT, HT or EHT line,
emanating from a sub-station, to which a
distribution sub-station or LT, HT or EHT
consumers are connected;
(40) “Fixed Charges” shall be as per the
provisions of the prevailing Tariff Order
issued for the Licensee by the Commission;
(41) “High Voltage (HV)” or “High Tension
(HT)” means a voltage level above 440 Volts
and up to and including 33000 Volts;
(42) “Independent feeder” means a
feeder constructed at the cost of a consumer
or a group of consumers and supplying
electricity to only that consumer or group
of consumers;
(43) “Island area” means Andaman and
Nicobar and Lakshadweep Islands;
(44) “Licence” means a licence granted
under Section 14 of the Act;
(45) “Licensed Electrical Contractor
(LEC)” means a contractor licensed under
Regulation 29 of the Central Electricity
Authority (Measures relating to Safety and
Electric Supply) Regulations, 2010 and as
amended from time to time;
(46)
“Licensee”
or
“Distribution
Licensee” means a person who has been
granted a licence under Section 14 of the
Act, to operate and maintain a distribution
system for supplying electricity to the
consumers in his area of supply and
includes Deemed Licensee;
(47) “Load factor” is the ratio of the total
number of units consumed during a given
period to the total number of units which
have been consumed had the load been
maintained throughout the same period and
shall usually be expressed as the following
percentage:
Load factor in percentage = Actual units
consumed in a given period (kWh/
/kVAh)*100/(Contracted load in kW/kVAx
No. of hours in the period);
(48) “Low Tension (LT)” means the
voltage of 230 volts between the phase and
neutral or 440 volts between any two phases
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3012
under normal conditions subject to the
percentage variation permissible from time
to time;
(49) “Mainland area” means all areas
other than Island areas falling under the
jurisdiction of JERC;
(50) “Maximum Demand” means the
highest load measured in average kVA or
kW at the point of supply of a consumer
during any consecutive period of 30 (thirty)
minutes or as provided by the Commission,
during the billing period;
(51) “Meter” means an equipment used
for measuring, indicating and recording
electrical quantities like energy in kWh or
kVAh, maximum demand in kW or kVA,
reactive energy in kVAR hours, etc.,
including
accessories
like
Current
Transformer (CT), Voltage Transformer (VT)/
/Potential Transformer (PT)/Capacitor
Voltage Transformer (CVT), etc., where used
in conjunction with such meter.
It shall also include any seal or sealing
arrangement and other measures provided
by the Licensee for sealing, reliability and
for preventing theft/unauthorized use of
electricity;
(52) “Occupier” means the owner or
person in occupation of the premises where
energy is used or proposed to be used;
(53) “Overhead line” means any electric
supply-line, which is placed above ground
and in the open air but excluding live rails
of traction system;
(54) “Outstanding Dues” means all
electricity dues pending on said premises
(i.e., amount billed but not paid by the
consumer) at the time of disconnection plus
late payment surcharge subject to Section
56 (2) of the Act;
(55) “Phased contract demand” means
contract demand agreed to be availed in a
phased manner;
(56) “Point of supply” means the point at
the incoming terminals of switchgear
installed by the consumer;
(57) “Power factor” means, the average
monthly power factor and shall be the ratio
expressed as a percentage of the total
kilowatt hours to the total kilovolt ampere
hours supplied during the month; the ratio
being rounded off to two decimal figures;
(58) “Premises” means land, building or
infrastructure or part or combination
thereof in respect of which a separate meter
or metering arrangements have been made
by the Licensee for supply of electricity;
(59) “Prosumer” means a Consumer who
is also injecting the power in the grid;
(60) “Rural areas” means all areas other
than urban areas;
(61) “Sanctioned Load” means the load
in kW, kVA or HP, which the Licensee has
agreed to supply from time to time subject
to the governing terms and conditions in the
absence of an Agreement between the
Distribution Licensee and the consumer;
(62) “Service Line” means any electric
supply line through which electricity is, or
is intended to be, supplied:
(a) to a single consumer either from a
distributing main or immediately from the
Distribution Licensee’s premises; or
(b) from a distributing main to a group
of consumers on the same premises or on
contiguous premises supplied from the
same point of the distributing main;
(63) “Standby Meter” means a meter
connected to CT and VT, other than those
used for main meter and check meter and
shall be used for accounting and billing of
electricity in case of failure of main meter
for all new connections at voltage level of
33 kV and above to be issued after
notification of these Regulations;
(64) “Supplier” means any entity
authorized to supply electricity to consumer
under the provisions of the Act;
(65) “Tariff Order” in respect of a Licensee
means the most recent order in force issued
by the Commission for that Licensee
indicating the rates to be charged by the
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3013
Licensee from various categories of
consumers for supply of electrical energy
and services;
(66) “Temporary Supply” shall mean the
supply available to any person requiring
power supply for a purpose temporary in
nature for a period up to one year, which
may be extended further after completion
of formalities;
(67) “Tariff Schedule” means the latest
schedule of charges for supply of electricity
and services issued by the Licensee as per
the provisions of the Tariff order for that
Licensee;
(68) “Theft” shall mean theft of electricity
as defined in Section 135 of the Act;
(69) “Transmission Licensee” means a
person who has been granted a licence
under Section 14 of the Act authorizing him
to establish or operate transmission lines;
(70) “Transmission System” means the
system consisting of EHV electric lines being
operated at EHV (excluding generator
interconnection facilities) owned and/or
operated by the Transmission Licensee for
the purposes of transmission of electricity
from one power station to a sub-station or
to another power station or between sub-
-stations or to or from any external
interconnection equipment up to the
interconnection with the distribution system
and includes the plant and apparatus and
meters owned or used by the Transmission
Licensee
in
connection
with
the
transmission of electricity, but shall not
include any part of any Licensee’s
distribution system;
(71) “Urban Areas” means the areas
covered by all Municipal Corporations
and other Municipalities including the
areas falling under the various Urban
Development Authorities, Cantonment
Authorities and industrial estates or
townships including the areas covered
under class I cities;
(72) “User” means any person having
electrical interface with, or using the
distribution system of the Distribution
Licensee to whom this Supply Code, 2018 is
applicable.
Explanation: Any Distribution Licensee,
Transmission Licensee and generating
Units connected to the distribution system
and the person availing open access in
transmission or distribution system are also
included in this term.
CHAPTER-3
3. Electricity supply code review panel.— 3.1
The Commission shall constitute an Electricity
Supply Code Review Panel to review this
Supply Code, 2018 on periodic basis. The
Review Panel shall consist of such number of
members from the State of Goa and Union
Territories (except Delhi), as the Commission
may consider necessary.
The Review Panel shall consist of the
following:–
(1) Secretary of the Commission;
(2) One member from each of the
Distribution Licensees of the State of Goa
and Union Territories;
(3) One member to represent State
Transmission Utility (STU);
(4) Three representatives of Industrial
consumers to be nominated by the
Commission. They shall be from duly
registered organization or Association of
Industries/Chambers of Commerce. Of
these, two representatives shall be from HT/
/EHT consumers and one from LT industrial
consumers;
(5) Two representatives, to be nominated
by the Commission. They shall be from
registered consumer organizations/bodies
to represent domestic and commercial
categories of consumers;
(6) Two representatives from the
Consumer Grievance Redressal Forum
(CGRF) on a rotational basis as nominated
by the Commission from time to time; one of
the CGRF representatives shall represent the
Island area and the other shall represent
mainland area;
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3014
(7) Ombudsman of the Joint Electricity
Regulatory Commission (JERC) shall be a
permanent member of the Review Panel;
(8) One member, to be nominated by the
Commission, shall be from registered bodies
representing interest of agricultural
consumers;
(9) The Commission may further add any
other member(s) or experts to the Review
Panel from any sector/profession as it may
deem necessary.
3.2 The Secretary of the Joint Electricity
Regulatory Commission (JERC) shall be the
Chairperson of the Review Panel.
3.3 The Member-Secretary of the Review
Panel shall be an Officer of the Commission to
be appointed by the Chairperson of the Panel.
3.4 All members of the Review Panel shall
be appointed for a period of three years unless
they cease to hold their office. The new
member in replacement shall be from the same
category and for the unexpired period of the
term.
3.5 The existing members of the Review
Panel shall continue to be members of the
Review Panel till the expiry of their term or till
the new members are appointed, whichever
is later.
3.6 The Review Panel shall meet at least
once in every twelve (12) months. The
Member-Secretary of Review panel shall
convene meetings with the approval of the
Chairperson in consultation with the
Commission. The Chairperson shall send
meeting notice along with agenda to all the
members ten days in advance.
3.7 The Chairperson, Member-Secretary
and all members shall be part-time members
of the Review Panel. They shall draw their
salaries, allowances and perquisites from their
respective parent organizations.
3.8 It will be incumbent upon the members
of the CGRF attending the meetings of the
Review panel to consult with CGRF’s of
other utilities and raise their issues in the
meetings.
3.9 The Member-Secretary of the Review
Panel shall send the proceedings of the
meetings to all the members and to the
Commission within 15 days from the date of
the meetings.
3.10 Any Licensee, generating company,
consumer, industry or any interested parties
or business organization may send their
suggestions in writing for revision of this
Supply Code, 2018 to the Member-Secretary
of the Review Panel. All these representations
or suggestions shall be recorded and
discussed in the meetings. The Member-
-Secretary shall maintain the entire
correspondence relating to the Review
Panel.
3.11 The Commission may amend the
Supply Code, 2018 suo-moto or on the
recommendations of the Review Panel
committee. However, before any amendment
is issued, procedure as specified in the Joint
Electricity Regulatory Commission (Conduct
of Business) Regulations, 2009 as amended
from time to time, shall be followed.
3.12 A notice of the gist of amendments made
in the Supply Code, 2018 shall be published
by the Licensees in at least two newspapers
having wide circulation in the areas/regions
of supply stating that copies of the amended
Electricity Supply Code are available for
purchase in the offices as mentioned at 3.13
below.
3.13 Copies of this Supply Code, 2018, as
duly amended from time to time, shall be kept
at areas offices, regional offices, circle offices,
division and subdivision offices of the
Licensees and such other offices as may be
specified by the Commission. The Licensees
shall also post the copy of this Supply Code,
2018 on their respective websites.
CHAPTER-4
4. System of supply and classification of
consumers.
System of supply.— 4.1 The Licensee shall
supply power within the frequency band
specified in the Central Electricity Regulatory
Commission (Indian Electricity Grid Code)
Regulations, 2010 including amendments
thereof, if any, and JERC (State Grid Code)
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3015
Regulations, 2010 including amendments
thereof, if any. At the point of commencement
of supply, except with the written consent of
the consumer or with the previous sanction of
the Commission, a supplier shall not permit the
voltage to vary from the declared voltage more
than the limit specified by Central Electricity
Authority from time to time.
Classification of supply.— 4.2 The
classification of supply depends upon the
network in the State and Union Territories and
has been customized based on the prevailing
voltage levels in the State and Union
Territories.
4.3 The supply shall generally be given at
the following voltages on the basis of
contracted load for the States and Union
Territories as per the tables given below:
Table 1: Standard Voltage of Supply:–
Category
System of Supply
Low Tension
All installations (other than
Single phase at
irrigation pumping and
220 V/230 V
agricultural services) with
a contracted load up to and
including 5 kW.
Irrigation pumping and
3 Phase, 4 wire
agricultural services and
at 440 V
all installations with a
contracted load exceeding
5 kW and up to and including
100 kVA of contracted load
High Tension
Contracted load exceeding
6.6 kV/11kV/
100 kVA and up to and
/22kV/33kV
including 5000 kVA
Extra High Tension
Contracted load exceeding
66 kV and above
5000 kVA
Notwithstanding above, the consumer may
opt for supply at higher voltage even though
the contracted load is less than the specified
limit, if the consumer so desires:
Provided that such supply shall be provided
only in case it is found technically feasible:
Provided further that the cost of such supply
at higher voltage shall be borne by the
consumer seeking such supply.
The Licensee may, depending upon the
technical constraints of the distribution system,
offer supply at a higher voltage than that
specified above, however, the differential cost
for supplying at higher voltage shall be borne
by the Licensee.
Supply to existing consumers at voltage
lower than the limit specified above, shall
continue and in case their load requirement
increases, the above specified limit will be
applicable and the consumer has to opt for
supply at higher voltage.
Further, the Licensee wise specific details
regarding voltage of supply at various Contract
Loads shall be as per the Conditions of Supply
and the provisions of Supply Code, 2018 in this
regard shall be read in conjunction with
Conditions of Supply.
4.4 The Voltage Rebate for availing the
supply at higher voltage level than the voltage
level prescribed in this Supply Code, 2018 shall
be as specified by the Commission in the Tariff
Orders.
4.5 Load for energy intensive consumers
such as arc/induction furnaces, rolling mills,
re-rolling mills and mini steel plants shall be
released only through an independent feeder
wherever feasible and all necessary charges
shall be paid by the consumer. Supply may be
given through independent feeder in other
cases at the request of the consumer if the
consumer is willing to bear all applicable
charges.
4.6 The Licensee may, depending upon the
technical conditions of the distribution system,
give supply at a voltage and phase other than
the classification of supply in Regulation 4.3
of this Supply Code, 2018, subject to the
Commission’s approval. Adequacy of Power
Factor & Installation of Shunt Capacitors.
4.7 Consumers having a contracted demand
of 20 kW and above shall have to install a PF
correction device such as Shunt Capacitor.
The consumer shall ensure such devices if not
already installed shall be installed as per the
following timeline from the date of notification
of this Supply Code, 2018:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3016
(a) Contract demand of 50 kW and above
except domestic consumers: PF correction
device to be installed within a period of six
months (06) months.
(b) Contract demand of 20 kW to 50 kW
and domestic consumers with contract
demand above 25 kW: PF correction device
to be installed within a period of twelve (12)
months.
4.8 All LT consumers as specified in
Regulation 4.7 above obtaining 3 phase supply
have to maintain Power Factor (lagging) of not
less than 0.85 in respect of their installation.
All HT/EHT consumers should maintain a
Power Factor (lagging) of 0.95 and above. The
meters installed by the Licensee shall have
Power Factor measuring feature and actual
Power Factor shall also be indicated in the bills
of the consumers.
4.9 If Power Factor is not maintained at 0.85
(lagging) by LT consumers except domestic
consumers up to 25 kW and 0.95 (lagging) by
HT/EHT consumers, a penalty shall be
imposed as specified by the Commission in the
Tariff Order. If Power Factor reduces below 0.80
(lagging) in case of LT consumers except
domestic consumers up to 25 kW and 0.90
(lagging) in case of HT/EHT consumers, then
60 days’ notice will be served by the Licensee
for rectification of the Power Factor. Even after
60 days’ notice period, if the Power Factor
is not improved, the Licensee can serve
disconnection notice mentioning that if the
Power Factor is not improved within 30 days,
the Licensee may disconnect the supply.
4.10 The Power Factor Penalty and Incentive
shall be specified by the Commission in the
Tariff Orders.
4.11 The Power Factor Penalty/Incentive as
well as notice for improvement of Power Factor
and disconnection of supply on account of not
maintaining the minimum prescribed Power
Factor shall only be applicable based on actual
Power Factor measured by the Licensee and
indicated in the bill of the consumer.
4.12 The Distribution Licensee shall not
commence power supply to any applicant
requiring power load exceeding the limits as
specified in Regulation 4.7 unless the
consumer installation is provided with a
suitable and adequate Power Factor corrective
equipment.
4.13 The consumer shall procure his own
shunt capacitor of any make from the list of
manufacturers empanelled by the Distribution
Licensee (according to IS Standards) of
adequate rating at his cost. The consumer shall
install it after providing manufacturer’s test
certificate to the Distribution Licensee. The
consumer may also alternatively request the
Distribution Licensee to install the shunt
capacitor for his installation subject to
necessary payment and the Distribution
Licensee shall install shunt capacitor of
adequate rating if available with it. The
Distribution Licensee shall provide, upon
request from consumers, guidance for suitable
rating of the shunt capacitors and name of the
suppliers empanelled by the Distribution
Licensee.
4.14 The shunt capacitor installed by the
Distribution Licensee at the cost of the
Applicant/Consumer shall be the property of
the Applicant/Consumer by whom it shall be
maintained. In case the capacitor installed is
damaged or found missing, it shall be replaced
by the consumer at his cost or the Distribution
Licensee may replace it at the cost of the
consumer if the capacitors of the adequate
ratings are available with the Licensee.
Parallel Operation with Distribution
Licensee’s System.— 4.15 The consumer shall
submit necessary technical and operational
details as may be needed to co-ordinate with
the Distribution Licensee before installing any
generating unit in any premises, in case it is
to be connected with the Distribution System.
Further, the consumer shall take approval
of concerned agencies including Chief
Electrical Inspector or Electrical Inspector in
accordance with the Central Electricity
Authority (Measures Relating to Safety and
Electric Supply) Regulations, 2010 including
amendments thereof and the relevant
Government’s Notification, if any, in force from
time to time before energization of such
generating unit.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3017
4.16 Operation of generating unit in
consumer’s installation in parallel with the
Licensee’s system is permissible only with the
written consent of the Licensee. However, the
consumer may install generator, inverter, solar
generating plant only after the consumer has
installed automatic 4 pole changer and a
manual double link switch changer so that the
current of generator/inverter may not be
injected in the Licensee’s distribution system
under any circumstances. The capacity of the
generator/inverter shall not be taken into
account for calculation of connected load.
4.17 Where consent has been given for
parallel operation, the consumer shall arrange
to protect his installation from disturbances in
the Licensee’s system. The consumer should
also ensure that his supply does not get
connected to the Licensee’s system. The
Licensee shall not be liable for any damage
caused to the consumer’s plant, machinery
and apparatus on account of such parallel
operation, or any adverse consequence arising
thereof. For parallel operation with the grid,
the consumer shall have to follow the
provisions of the Electricity Grid Code as
specified by Joint Electricity Regulatory
Commission for the State of Goa and UTs and
other relevant Regulations. The actual
operations shall be carried out in coordination
with both the State Transmission Utility and
the Licensee.
4.18 Where no such consent has been given,
the consumer shall arrange the plant,
machinery and apparatus of his generating
units, including an extension of or addition to
the same, to operate in an isolated mode and
the generating unit, in no case, should get
connected to the Licensee’s system. The
Licensee, on intimating the consumer, can
enter the premises and inspect the
arrangement to ensure that at no time the
generator gets connected to his system.
4.19 In case the consumer’s supply gets
extended to the Licensee’s system from a
generator or inverter or from any other source,
without appropriate approval from the
Licensee, causing damage to the Licensee’s
apparatus or to human life, the consumer shall
be made responsible for the same and shall
be liable to fully compensate the Licensee for
all losses caused to the Licensee or to the
Licensee’s other consumers/persons and shall
also be fully liable for civil and criminal
offences.
Classification of Consumers/Prosumers.—
4.20 The Commission may classify and
reclassify consumers/prosumers into various
tariff categories including sub-categories and
slabs from time to time. No additional category
including sub-category or slab other than
those approved by the Commission shall be
created by the Licensee.
Charges for Supply.— 4.21 Charges for
supply of electricity shall be as per the tariff
schedule approved by the Commission from
time to time. The charges may include:
(1) Charges for supply of energy (fixed
charges, energy charges, etc.) as
determined for the Licensee by the
Commission in the latest tariff order for the
Licensee;
(2) Wheeling charges and/or cross-
subsidy
surcharge
and
additional
surcharge, if any, as determined by the
Commission;
(3) Rental, if any, towards meters and
other electric plant and equipment of
the Licensee, as approved by the
Commission;
(4) Miscellaneous charges such as penal
charges for exceeding contract demand, late
payment surcharge, and any other charges
applicable as approved by the Commission
from time to time.
In addition to the Charges as approved by
the Commission, Licensee can charge the
statutory levies such as electricity duty, taxes
or any other taxes/duties payable by the
consumer as per law of the relevant
Government of the State and UTs;
In addition to the Charges as approved by
the Commission, Security Deposit shall be
deposited by the consumer with the
Distribution Licensee as per Regulation 5.130
of this Supply Code, 2018.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3018
4.22 The Licensee shall publish the tariff
schedule on its website immediately after the
Commission has approved it. The Licensee
shall also make available copies of the tariff
schedule to consumers at a reasonable price.
Supply through Independent feeders.— 4.23
Due to extensive urbanization, it has become
difficult to lay distribution/transmission lines,
especially in urban areas, because of right of
way problem. Henceforth, before allowing
supply to an applicant through independent
feeder, technical feasibility including right of
way to lay the line, space for placing/erecting
controlling breaker in the control room/
/switchyard, creation of additional line bay
shall be examined. The same shall be allowed
only in cases where it is technically feasible to
lay an independent feeder.
4.24 The Licensee shall not be held
responsible for the delay in giving supply if the
same is on account of problems relating to
statutory clearances, right of way, acquisition
of land, or the delay in consumer’s obligation
to obtain approval of Chief Electrical Inspector
for High Tension installations, over which the
Licensee has no reasonable control.
4.25 The charges of controlling equipment
including Circuit Breaker, Bay (if to be
erected), CTs & PTs, Isolators, Line and Earth
switch, Meter required at the feeding sub-
station, Electric Line up to the consumer end
and the meter at consumer end shall be borne
by the applicant.
4.26 Such consumer, who on his own,
requests for supply of electricity through an
independent feeder, will be billed as per the
meter reading taken jointly by consumer and
the Licensee, of the meter installed as per the
CEA (Installation and Operation of Meters)
Regulations, 2006. The Licensee will inform the
consumer through phone/SMS to be present
for joint reading of meter. In case the consumer
fails to be present, it will be treated as deemed
to be present for meter reading. However, in
case the Automatic Meter Reading (AMR)
meters are installed for meter-reading, the
billing shall be done as per the meter reading
by the Licensee and joint meter reading will
not be applicable.
4.27 If more than one applicant/consumer(s)
are required to be fed from the existing
independent feeder due to right of way or other
similar problems, the utility shall connect such
consumer(s) to an existing independent feeder
provided they are of the same category, i.e.,
HT Industrial, HT Non-Domestic Supply/Bulk
Supply consumers and subject to the
concurrence of the original consumer who has
paid for the independent feeder. In such cases,
metering arrangement at the consumer end
would be mandatory.
The billing of such consumers shall be done
as per Regulation, 4.26 on the basis of the meter
reading, in proportion of the consumption
recorded by the meters installed as per CEA
(Installation and Operation of Meters)
Regulations, 2006. The metering arrangement
at both ends (sub-station as well as the
consumer end) would be of the same
specifications and accuracy class conforming
to CEA Metering Regulations.
4.28 Independent feeder shall be considered
independent as long as the number of
consumers connected on an independent
feeder are five or less subject to technical
limitations.
Where more than five consumers are
connected on an independent feeder, that
feeder shall be considered as general feeder
and the billing to the consumers shall be done
based on the consumption recorded by the
meters installed for the respective consumer.
4.29 The additional consumer required to be
connected on such general feeder, shall
deposit the service connection charges as
approved by the Commission from time to time.
4.30 As long as the status of the feeder
remains independent, the meters installed at
the sub-station and at the consumer end shall
be read by the Licensee on the same day in
the shortest possible time in the presence
of the consumer’s representative. The
apportionment of the feeder losses among the
consumers on the independent feeder shall be
done in proportion of their consumption as per
the meters installed at their end irrespective
of the distance of the consumer on the feeder.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3019
The consumer shall thus, be billed as per
Regulation 4.26.
In case due to exigencies/unforeseen
reasons, any other consumer(s) of different
category are to be connected to the
independent feeder for some period to
maintain the continuity of supply, the same will
be connected only with the permission of the
appropriate authority of the Licensee. If such
consumers are required to be connected on
an independent feeder for more than 7 days,
the permission of the Director or appropriate
authority concerned shall be required and
during such period the independent feeder
will be deemed to be a general feeder.
The consumer(s) of the independent feeder
shall be informed prior to the connection/
/disconnection of consumer(s) of other
category on the independent feeder and the
reading of the meters installed at the consumer
end and the substation meter shall be taken
simultaneously in a shortest possible time in
the presence of the consumer(s) or their
representative. No apportionment of losses
shall be carried out during this period and the
billing for this period shall be done as per the
consumption recorded by the meters installed
at the consumer(s) end. For connecting second
or subsequent consumer on an independent
feeder, the consent of the original consumer(s)
shall be required:
Provided that, with the proposed addition
of load of the subsequent consumer(s), if the
total load on the independent feeder exceeds
its rated capacity, such consumer(s) shall not
be connected until the capacity of the feeder
is augmented.
4.31 When additional consumer(s) are
connected on an independent feeder, the
original cost of the common portion of the
independent feeder shall be shared by the new
consumer(s) and the credit of the same will
be given to the original consumer in the
manner agreed between new consumer(s)
and original consumer.
4.32 In case an independent feeder has been
laid on common poles/structures or otherwise
and any case of misuse for abstraction of
power or unauthorized use of the independent
feeder for connecting any other load by the
line staff is noted, the same shall be dealt under
Section 142 of the Electricity Act for action
against the defaulting employee/person not
withstanding any actions that may be taken
against such employee/person under Section
138 of the Electricity Act by the appropriate
authority:
Provided that in case the connivance of the
consumer is proved, the issue will be dealt
under Section 135 of the Electricity Act for
dishonestly using electricity for the purpose
other than for which the usage of electricity
was authorized.
4.33 Supply to 33 kV and above rating
substations would be given through
independent radial lines, i.e., no tapping of 33
kV and above rating lines would be allowed.
4.34 The estimated cost involved for
extension of distribution system or laying an
independent feeder shall be calculated as per
the Schedule of Rates approved by the
Commission.
4.35 After deposit of requisite charges by
the applicant, the Licensee shall take
necessary steps for extension of distribution
system for supply of electricity within the
time limits as specified in this Supply Code,
2018.
4.36 All equipment except the meter (if
supplied by the applicant), notwithstanding
that whole or a portion thereof has been paid
by the consumer, upon energization, shall
become the property of the Licensee and the
Licensee shall maintain the same without
claiming any operation and maintenance
expenses, including replacement of defective/
/damaged material/equipment from the
consumer. Warranty/Guarantee of such
equipment shall also stand transferred to the
Licensee. The Distribution Licensee shall have
the right to use it for the supply of electricity
to any other person by tapping or otherwise
except if such supply is detrimental to the
supply to the consumer already connected
therewith and subject to the provision under
Regulation 4.27.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3020
4.37 The Licensee shall maintain a record
of expenditure incurred on extension of
distribution system consumer-wise in case of
consumers requiring supply on 11 kV and
above voltage. After execution of work, the
amount found excess, if any, shall be refunded
to the applicant by adjustment in future bills.
The Licensee shall be entitled to demand the
amount found short, if any, by giving a notice
and the applicant shall pay the same within
30 days from the date of dispatch of the notice.
The applicant shall pay interest @ 12% p.a. from
the date of dispatch of notice, on the amount
found short, if the applicant fails to pay the
same within the notice period and the
applicant shall be liable for disconnection in
case of default:
Provided that the Licensee shall complete
the finalization of accounts and present the
detailed statement of expenditure to the
consumer and refund the excess amount if any
within a period of one month from the date of
release of supply failing which the Licensee
shall pay interest to the applicant @ 12% per
annum from the date of completion of work,
on the excess amount.
Special Provisions in case the applicant opts
for execution of extension of distribution
system on his own and in case of single point
supply.— 4.38 In case the applicant opts to
carry out the work on his own, the applicant
shall get the same carried out through a
Licensed Electrical Contractor.
The work relating to electrification of Urban
Estates/Group Housing Societies/Employer’s
Colonies will be executed by the concerned
department/colonizer/society/employer after
the Licensee approves the electrification plan
and the estimates for such plans and the
applicant shall pay supervision charges to the
Licensee at the rate of 15% of the estimated
labour cost of such works. The Goods and
Services Tax (GST) on the Supervision
Charges, if any, shall be recovered from the
consumer. At the time of energization of the
system, the Licensee shall ensure that the
system has been laid as per the approved
electrification plan. The applicant applying for
connection in such area shall not pay service
connection charges to the Licensee as long as
his load is within the parameters of the
sanctioned plan:
Provided that if at the time of energization
of the system, it is noted that the concerned
department/colonizer/society
has
not
executed the complete electrification work as
per the electrification plan approved by the
Licensee, the colonizer/developer shall be
required to furnish the Bank Guarantee
equivalent to 1.5 times of the estimated cost of
the balance work to be executed as per the
approved plan. The Licensee shall not release
single point connection or individual
connections to the residents of such areas
without taking requisite Bank Guarantee.
CHAPTER-5
5. Procedure for release of new connection
and modification in existing connection
Licensee’s obligation to supply.— 5.1 The
Licensee shall, on an application by the owner
or occupier of any premises located in his area
of supply, give supply of electricity to such
premises within the time specified in this
Supply Code, 2018, provided that
(1) The supply of power is technically
feasible. Where it is found to be not feasible,
the Licensee shall endeavour to improve the
feasibility at the earliest and release
connection as per this Supply Code, 2018.
(2) The applicant has observed the
procedure specified in this Supply Code,
2018; and
(3) The applicant agrees to bear the cost
of supply and services as specified in this
Supply Code, 2018.
5.2 The system of supply and voltage shall
depend on the category of the consumer and
the load as per details given in Regulations 4.1
and 4.3, subject to Regulation 4.6 of this Supply
Code, 2018.
5.3 The Licensee shall examine the technical
feasibility of the connection applied for from
their distribution mains and conduct the
inspection within 5 working days of the
receipt of application.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3021
5.4 In case the connection is not found
technically feasible, the Licensee shall intimate
to the applicant in writing within 10 (ten) days
of receipt of application giving reason for the
same and estimated time that it will take to
provide the connection, which shall not
exceed the timelines specified under Supply
Code, 2018.
Provided that no connection up to 20 kW
from the existing network can be delayed only
on technical grounds for domestic and
commercial consumers and for such
connections, feasibility report will not be
required. However, for load exceeding 20 kW
Licensee shall provide connection after
augmentation (if required) of the existing
network as specified in Supply Code, 2018.
5.5 If the connection is delayed beyond the
timeline specified in this Supply Code, 2018,
the applicant can lodge complaint at the
centralized call centre/complaint centre at the
zonal/district offices of the Licensee or through
telephone or on website of the Licensee or
through post. The contact details of these
centres shall be printed on the electricity bill,
displayed at the bill collection centres and
uploaded on the Licensee’s website. The
Licensee shall create Call centre/complaint
centre within a period of 6 months from the
date of notification of these Regulations, in case
not already created.
5.6 The Licensee shall create necessary
online infrastructure within a period of one:
(1) year in order to make it easy for
consumers to apply online. Once the online
infrastructure is created by the Licensee,
the Licensee shall display the monthly
updated status of application for new
connections on its website.
5.7 Nothing contained under Regulation 5.1
above shall be taken as requiring a Distribution
Licensee to supply electricity to any premises
if it is prevented from doing so by cyclone,
floods, storm and other natural calamities
beyond its control.
Licensee’s obligation to extend the
distribution system and consumer’s share in
the cost.— 5.8 The Licensee shall have
obligation for ensuring that its distribution
system
is
upgraded,
extended
and
strengthened to meet the demand for
electricity in its area of supply. Wherever the
existing transformation capacity at sub-station
end is loaded up to 70% of its capacity, the
Licensee shall prepare a scheme for
augmentation of such transformation capacity
after factoring in (N-1) contingency. The
Licensee shall display the monthly updated
status of transformation capacity for each sub-
stations on its website.
5.9 The Licensee shall meet the cost for
strengthening/upgradation of the distribution
system to meet the demand of the existing
consumers as well as future growth in
demand through its annual revenues or funds
arranged by the Licensee and this cost shall
be allowed to be recovered from the
consumers through tariff by the Commission
subject to prudence check.
5.10 In all cases of new connections, the
consumer shall bear the Service Connection
Charges, that is the cost of service connection
from the Distribution Mains to the point of
supply, as approved by the Commission from
time to time.
5.11 For uniformity and simplification in
calculating the actual cost of extension, the
Licensee shall prepare a ready reckoner and
get the same approved by the Commission to
show the per-unit material cost of LT line, HT
line, substation of different capacities, etc.,
within 6 months from the date of notification
of these Regulations. The Licensee shall
update the ready reckoner every year, under
intimation to the Commission.
5.12 In case the connected/contracted load
of any new connection as submitted in
applicable forms is 100 kVA or more, a separate
transformer of adequate capacity shall be
installed at consumer’s cost. The space/room
required for housing the transformer,
substation, switch gears, meters and panels
shall be provided by the consumer, free of cost,
which is easily accessible to the Licensee:
Provided that for any new connection with
connected/contracted load lower than100 kVA
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3022
also, Licensee may install a separate
transformer if requested by the consumer, at
consumer‘s cost.
5.13 The service connection/extension of
distribution mains, notwithstanding that it
has been paid for by the consumer shall be
the property of the Licensee. The Licensee
shall maintain it at its cost and shall also
have the right to use the same service
connection/extension for supply of energy
to any other person but such extension or
service connection should not adversely
affect the supply to the consumer who paid
for the extension of the distribution supply
network and shall be subject to the
concurrence of original consumer as per
Regulation 4.27.
5.14 When the Licensee completes the work
of extension of distribution mains and is ready
to give supply, the Licensee shall serve a
notice on the consumer to take power supply
within one month in case of LT and three
months in case of HT or EHT. If the consumer
fails to avail supply within the notice period,
the agreement shall come into force from the
day following the end of the notice period, and
thereafter the consumer shall be liable to pay
fixed charges and all other charges as
applicable, as per the agreement.
5.15 The applicant shall have an option to
get the work of drawing of service line from
Licensee’s distribution mains up to his
premises as per the estimates and layout
approved by the Licensee through an
appropriate class of licensed electrical
contractor, and the work of extension of EHT
and HT line, distribution or HT substation and
LT line through an appropriate class of
licensed electrical contractor, as per the
estimates and layout approved by the
Licensee. In such case, the consumer himself
shall procure the materials from the list of
empanelled manufacturers issued by the
Licensee. The Licensee will publish on its
website the list of empanelled manufacturers
within 3 months from the date of notification
of these Regulations. The Licensee may ask
for documentary evidence to verify the quality
of materials used.
5.16 In case the consumer is getting the
work done by itself, Licensee can charge
Supervision Charges on the labour component
of the work at the rate of 15%. The Goods and
Services Tax (GST) on the Supervision
Charges, if any shall be recovered from the
consumer.
5.17 The consumer shall get the work done
within the time frame provided under this
Supply Code, 2018 and if consumer needs
more time, the consumer shall represent to the
Licensee with reasonable ground for extension
of time and the Licensee shall communicate
his approval of the same to the Consumer.
Conditions for Grant of Connection.— 5.18
The Licensee shall prominently display on its
website and wherever feasible, in its offices,
the updated status of applications for new
connections in that area/circle, detailed
procedure for grant of new connection, and
the complete list of documents required to be
furnished along with such applications.
Normally no document, which has not been
so listed, will be required for processing
application forms for new connection. Security
amount and cost of service line to be deposited
by applicant in accordance with Annexure-
XVIII to this Supply Code, 2018 shall also be
prominently displayed.
5.19 Connection to any applicant residing
in unauthorized colonies/areas or disputed
property shall not be granted where a
restraining/prohibition order has been issued
by any Indian court and/or a restraining/
/prohibition order has been issued by any
competent authority.
Purchase of existing property.— 5.20 Where
the applicant has purchased an existing
property whose electricity connection has
been disconnected, it shall be the applicant’s
duty to verify that the previous owner has paid
all dues to the Licensee and obtained a
“no-dues certificate” from him. In case where
“no-dues certificate” has not been obtained
by the previous owner before change in
ownership of property, the new owner may
approach the Licensee for such a certificate.
The Licensee shall acknowledge receipt of
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3023
such request and shall either intimate in
writing the dues outstanding on the premises,
if any, or issue a “no-dues certificate” within
1 month from date of receipt of such
application.
5.21 In case the Licensee does not intimate
the outstanding dues or issue a “no dues
certificate” within this time, new connection
to the premises shall not be denied on grounds
of outstanding dues of the previous consumer.
In such an event, the Licensee shall have to
recover the dues if any, from previous
consumer as per provisions of law.
Sub-divided property.— 5.22 Where a
property has been legitimately sub-divided,
outstanding dues for consumption of energy
on such undivided property, if any, shall be
divided on pro-rata basis based on area of such
sub-divided property. A new connection to any
portion of such sub-divided premises shall be
given only after the share of outstanding dues
attributed to such legitimately sub-divided
premises is duly paid by the applicant. A
Licensee shall not refuse connection to an
applicant only on the ground that dues on the
other portion(s) of such premises have not
been paid, nor shall the Licensee demand
record of last paid bills of other portion(s) from
such applicants.
Reconstruction of existing property.— 5.23
In case of demolition and reconstruction of the
entire premises or building, the existing
consumer installation shall be surrendered,
meter and service line shall be removed and
the agreement shall be terminated. The
security deposit of the consumer shall be duly
returned by the Licensee. A new connection
shall be taken for the reconstructed building
after clearing all dues on the old premises.
Temporary power supply from existing
connection shall not be allowed for
construction purpose in such cases. For
availing temporary supply, the applicant shall
apply afresh as per the provisions of this
Supply Code, 2018.
Procedure for providing New Electricity
Service Connection Application Form.— 5.24
The applicant shall apply for release of new
connection in the following format as given in
the Annexure to this Supply Code, 2018:
Application form for release of new
connection (Low Tension) – Annexure-I.
Application form for release of new
connection (High Tension/Extra High Tension)
- Annexure –II
Format for declaration/undertaking to be
signed at the time of receiving electricity
supply – Annexure –III
5.25 Application forms shall be available at
the local office of the Licensee free of cost. The
Licensee shall also put up all application forms
on its website for free download. Legible
photocopies of a blank form may be made by
the applicant, which shall be accepted by the
Licensee. The Licensee shall clearly display
on its website; the address and telephone
numbers of offices where filled-up application
form can be submitted. The Licensee shall also
display in each office, the address and
telephone numbers of offices in the respective
area of supply where filled-up application form
pertaining to that particular area can be
submitted. Any assistance or information
required in filling up the form shall be provided
to applicants at the local office of the Licensee.
5.26 The Licensee shall also provide new
avenues for applying for new connection or
modification in existing connection through
website, call centres, etc., which minimize the
applicant’s interface with the utility during the
process.
5.27 Application forms for new connection
must be accompanied with a photograph of
the applicant, identity proof of the applicant,
proof of applicant’s ownership or occupancy
over the premises for which new connection
is being sought, proof of applicant’s current
address, and in specific cases, certain other
documents as detailed in Regulation 5.29 - 5.34
of this Supply Code, 2018.
5.28 Non-Refundable Registration-cum-
-processing fees of Rs. 20,000/- for HT and
Rs. 1,00,000/- for EHT shall be levied while
applying for new connection. These charges
shall be adjusted by the Licensee while issuing
the demand note.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3024
5.29 Any of the following documents shall
be considered as acceptable proof of identity:
If the applicant is an individual:
(1) Electoral Identity Card.
(2) Passport.
(3) Driving Licence.
(4) Photo Identity card issued by
Government agency.
(5) PAN Card.
(6) Photo Certificate from village Pradhan
or any village level Government functionary
like Patwari/Lekhpal/village level worker/
/village chowkidar/Primary school teacher/
/in-charge of primary health centre, etc.
(7) Aadhaar Card.
5.30 Any of the following documents shall
be considered as acceptable proof of
ownership or occupancy of premises:
(1) Copy of the registered sale deed or
lease deed or rent agreement and in the case
of agricultural connections, a copy of khasra/
/khatauni/khata nakal;
(2) Registered General Power of Attorney;
(3) Municipal/Panchayat tax receipt or
Demand notice or any other related
document;
(4) Letter of allotment;
(5) Copy of the house registration
certificate issued by the Panchayat/
/ownership certificate issued by Revenue
Authorities;
(6) Any other ownership related
document issued by local Government
Authority.
(7) An applicant who is not an owner but
an occupier of the premises shall, along with
any one of the documents listed at (1) to (6)
above, also furnish a No Objection
Certificate from owner of the premises:
Provided that where an applicant, who is
lawful occupier of the premises, is a tenant or
a leaseholder and is unable to produce the No
Objection Certificate from owner for obtaining
a connection, a separate Indemnity Bond shall
be executed in favour of the Distribution
Licensee in the form prescribed by the
Distribution Licensee.
(8) For bonafide consumers residing in JJ
clusters or in other areas with no specific
municipal address, the Licensee may accept
either ration card or electoral identity card
mandatorily having the same address as a
proof of occupancy of the premises only for
the purpose of releasing electricity
connection and not for any other purpose:
Provided further that the electricity bill
shall be only for electricity supply to the
premises occupied by the consumer and
shall not be treated as having rights or title
over the premises.
5.31 All communications shall be sent at the
address where the connection has been
released. However, till release of connection,
communication may be sent at the address
provided by the applicant for this purpose.
5.32 In case of a partnership firm - The
applicant shall furnish the partnership deed
and an authorization in the name of the
applicant for signing the requisition form and
agreement.
5.33 In case of Public and/or Private Limited
Company - The applicant shall furnish the
Certificate of Incorporation, Memorandum and
Articles of Association and Board Resolution
for authorization in the name of the applicant
for signing the requisition form and
agreement.
5.34 Other documents applicable only for
select consumer categories:
(1) Industrial consumers: Valid Industrial
Licence, if applicable, along with approval
of the use of land for non-agricultural
purposes (Not required for industrial
consumers in notified Industrial Areas).
(2) Agricultural consumers: No Objection
Certificate from competent Government
authority;
(3)
Non-Domestic
Khokhas
and
Temporary Structure: No Objection
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3025
Certificate for khokha or temporary
structure from the Nagar Nigam/Nagar
Palika/Nagar Panchayat/Gram Sabha/Gram
Panchayat/Land Development Authority/
/Land Owning Agency.
(4) Where new industrial connection or
addition to the load of existing connection
needs clearance from pollution or
environmental angle, the applicant shall
submit “no objection certificate” from the
competent authority to the Distribution
Licensee.
Processing Application Forms.— 5.35 For all
application forms pertaining to release of
supply of new connections, the Licensee shall
verify the application form along with enclosed
documents and if found deficient, shall issue
a written note on the spot regarding
shortcomings in the application form. If the
application form is complete, the Licensee shall
acknowledge its receipt on the spot. In case
the application is submitted online, the
Licensee shall issue a written note regarding
shortcomings in the application within 3
working days from the date of submission of
application.
5.36 The Licensee shall maintain a
permanent record of all application forms
received in an Application Register/Database.
Each application form shall be allotted
a permanent application number (for
identification) serially in the order in which it
was received. Separate registers/databases for
different category of consumers may be
maintained. The Licensee shall keep the
registers/databases updated with stage-wise
status of disposal of each application form. The
above information should also be maintained
and uploaded on the Licensee website where
applicant can check the status of application.
5.37 The Licensee shall deal with application
forms in each tariff category on the broad
principle of “first come, first served” basis as
per serial priority in the Application Register/
/Database. The Licensee shall maintain a
waiting list of applicants seeking new
connections, area-wise information about new
connections released, and updated status of
the waiting list shall be displayed on the
Licensee’s website or the Notice Board at the
local office of the Licensee, to be updated
weekly.
5.38 An application form shall be deemed
to be received on the date of receipt of
consumer’s application in the prescribed
format of the application form, complete in all
respects and attached with all relevant
documents.
5.39 An application shall be deemed to be
received on the date of receipt of all applicable
charges including the security deposit in
accordance with Annexure XVIII of this Supply
Code, 2018, after receipt of the application
form.
5.40 The Licensee shall, at the time of receipt
of application form, specify a date for
inspection of applicant’s premises in mutual
consultation with the applicant, under written
acknowledgment. The date of inspection must
be scheduled within 3 working days in urban
areas and 5 working days in rural areas from
the date of receipt of application form. If the
applicant wishes, the inspection can be
scheduled on a non-working day for the
Licensee (i.e., Sunday, gazetted holidays, etc.)
on payment of inspection fee of Rs. 500.
5.41 If inspection is required to be carried
out, the Licensee shall inspect and test the
applicant’s consumer installation as required
of him under Regulation 31 of the Central
Electricity Authority (Measures relating to
Safety and Electric Supply) Regulations, 2010
and as amended from time to time, in the
presence of the applicant or his Licensed
Electrical Contractor or his authorized
representative. The Licensee shall maintain a
record of test results in the format given in
Annexure-IX as required of him under
Regulation 31 of the Central Electricity
Authority (Measures relating to Safety and
Electric Supply) Regulations, 2010 and as
amended from time to time.
5.42 During the inspection, the Licensee
shall:
(1) Fix the point of supply and the place
where the meter and the MCB, etc., shall
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3026
be installed in consultation with the
consumer:
Provided that the service line shall be laid
at an accessible location and the meter shall
be fixed at location in conformity with Central
Electricity Authority (Installation and
Operation of Meters) Regulations, 2006, in
such a manner that it is protected from
elements like rain, etc., and is easily accessible
without getting the premises unlocked or
opened for this purpose;
In no case, the Distribution Licensee shall
fix its apparatus, meter or any of its property
in a place, which requires entry by its
employee into private premises.
(2) Record the correct full address of the
premises, if not provided in the application
form, and note down landmarks near the
property and the pole number from where
service connection is proposed to be given;
and
(3) Verify all other particulars mentioned
in the application form, as required;
If on inspection, the Licensee finds any
defect (e.g. consumer’s installation not
completed, bare ends of conductor/joints not
properly covered with insulating tape,
wiring of such nature that it is dangerous to
life/property, etc.) the Licensee shall
intimate the defects to the applicant on the
spot under proper receipt in the format
given at Annexure–IX.
5.43 The applicant shall get all defects
removed within 30 working days from receipt
of intimation of defects as specified in
Regulation 5.42 of this Supply Code, 2018 and
inform the Licensee in writing under
acknowledgement. In case the applicant fails
to remove such defects or fails to inform the
Licensee about removal of defects, the
application form shall stand lapsed and the
applicant will have to apply afresh. The
Licensee may grant additional time to the
applicant for completion of works, in case the
applicant submits a written request for the
same within 10 working days from receipt of
intimation of defects.
5.44 On receipt of information from the
applicant about removal of defects, the
Licensee shall stipulate a date for re-inspection
of applicant’s premises in mutual consultation
with
the
applicant,
under
written
acknowledgment. The date of reinspection
must be scheduled within 3 working days in
urban areas and 5 working days in rural areas
from the date of receipt of such information.
5.45 If on re-inspection, the defects pointed
out earlier are found to persist, the Licensee
shall again record the same in the format given
in Annexure-IX to this Supply Code, 2018 and
hand over a copy of the same to the applicant
or his authorized representative available on
site. The application form shall then stand
lapsed and the applicant shall be informed
accordingly in writing under acknowled-
gement:
Provided that if the applicant feels aggrieved
by the Licensee’s action or omission, the
applicant may file a representation to the
concerned Consumer Grievance Redressal
Forum (CGRF) for redressal of grievance:
5.46 If on inspection, there are no defects
found, or on re-inspection the defects noticed
earlier are found to have been removed, the
Licensee shall sanction the load determined
in accordance with Annexure-VIII to this
Supply Code, 2018 or the load applied for,
whichever is higher, and issue a demand note
in writing, under acknowledgment, within the
timeline specified below:–
Table 2: Timeline for issue of demand note:
Particulars
No. of working days from
receipt of application
Urban Areas
Rural Areas
Extension of
Within 7
Within10
distribution mains
working
working
not required
days
days
Extension of distribution mains/system required
1. In case of LT
Within 7
Within 10
service
working
working
connections
days
days
2. In case of HT
Within15
Within 20
service
working
working
connections
days
days
3. In case of EHT
Within 30
Within 30
service
working
working
connections
days
days
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3027
Provided that the time taken by applicant
in rectifying the defects/deficiencies found at
the applicant’s premises shall not be included
in the timeline specified above:
Provided further that wherever the
Transmission Licensee’s involvement is
required in the process for time and cost
estimation, the time taken by the Transmission
Licensee shall not be included in the timeline
specified above.
5.47 The demand note shall contain the
following details:
(1) Details of the works (including service
line) to be undertaken for providing
electricity supply;
(2) Charges for the abovementioned
works to be paid by the applicant in
accordance with the schedule of charges
specified by the Licensee as approved by
the Commission:
Provided that if the applicant wishes to carry
out the works himself, the same shall be
permitted under supervision by the Licensee’s
official.
Adhering to the estimate and layout
approved by the Licensee, the applicant can
get the work of drawing of service line from
the Licensee’s distribution mains up to his
premises through a ‘C’ or higher-class
Licensed Electrical Contractor (LEC), and the
work of extension of HT/EHT line, Distribution
or HT substation and LT line only through an
‘A’ class LEC. In such case the consumer shall
procure the materials. The Licensee will issue
a list of empanelled manufacturers for
procuring material to be used by the
consumer. The consumers can purchase
materials of any make from the list of
empanelled manufacturers. The Licensee may
ask for documentary evidence to verify the
quality of materials used:
Provided further that if the applicant is
getting the work done by himself, Licensee
can charge Supervision Charges on the labour
component of the work at the rate of 15%. The
Goods and Services Tax (GST) on the
Supervision Charges, if any, shall be recovered
from the applicant:
Provided also that if the applicant chooses
to get the extension work done on his own,
the applicant shall get the work done within
the timeframe specified in Regulation 5.52 of
this Supply Code, 2018, failing which the
Licensee may, on giving 15 days’ notice, treat
the application form for supply as cancelled.
(3) Amount of security deposit as specified
in Annexure-XVIII to this Supply Code, 2018.
5.48 The applicant shall make the payment
within 15 days of receipt of demand note,
failing which the application form shall stand
lapsed and the applicant shall be informed
accordingly in writing under acknowled-
gement. The Licensee’s obligation to energize
the connection shall arise only after receipt
of full payment. The Licensee may grant
additional time to the applicant for payment of
charges in case the applicant submits a
written request for the same, within the 15-
day payment period.
5.49 The demand note shall be prepared as
per the provisions of this Supply Code, 2018
and on the basis of charges specified by the
Licensee with the prior approval of the
Commission from time to time. The Licensee
shall submit a proposal to the Commission
along with the Tariff Petition for approval of
various charges to be charged by the Licensee
in demand notes. The demand note, once
made for an applicant, shall be valid for two
months.
5.50 Any excess/deficient payment made by
the consumer shall be adjusted in the
subsequent two bills.
5.51 If as per this Supply Code, 2018,
provision of supply requires installation of a
distribution transformer within the applicant’s
premises, the applicant shall make available
to the Licensee a suitable room or portion of
land within his premises for the period of
supply for installation of the distribution
transformer.
5.52 The overall timeline for releasing new
electricity connection, from the date of receipt
of application, shall be as under:
Table 3: Timeline for releasing new
electricity connection (energization):
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3028
Activity
Island areas
Mainland areas
New connection/additional
Urban area: 30 days from receipt
Urban area: 16 days from receipt
load where supply can be
of complete application
of complete application
provided from existing
network
Rural area: 30 days from receipt
Rural area: 24 days from receipt
of complete application
of complete application
Extension work or
Urban area:
Rural area:
Urban area:
Rural area:
enhancement of
(a) LT-60 days
(a) LT-90 days
(a) LT-30 days
(a) LT-45 days
transformer capacity is
(b) HT-120 days
(b) HT-120 days
(b) HT-90 days
(b) HT-90 days
required
(c) EHT-180 days
(c) EHT-180 days
(c) EHT-180 days (c) EHT-180 days
Erection of substation to
On case to case basis as per
On case to case basis as per
extend supply
approval of the Commission
approval of the Commission
Provided that the Licensee may approach
the Commission for extension of time specified
above, in specific cases where extension of
distribution mains requires more time, along
with details. In such cases, the Licensee shall
inform the consumer about the likely time of
completion of works.
5.53 Where extension of supply requires
erection and commissioning of new substation,
the Licensee shall submit to the Commission
within 15 days of site inspection, a proposal
for erection of such substation along with the
time required for erection and commissioning
of the same, and get the Commission’s
approval. The Licensee shall commence
electricity supply to the applicant within the
time period approved by the Commission:
Provided that where such substation is
covered in the investment plan approved by
the Commission, the Licensee shall not be
required to take any further approval from the
Commission and shall complete erection of
such substation within the time period
specified in such investment plan:
Provided further that in cases where the
substation is meant to extend supply to an
individual consumer, the Licensee shall
commence erection of the substation only after
receipt of necessary payment against demand
note from the applicant.
5.54 The Licensee shall not be held
responsible for delay, if any, in extending
supply if the same is on account of problems
relating to right of way, acquisition of land, or
delay in consumer’s obligation over which
Licensee has no reasonable control.
5.55 In case the applicant had opted to get
the extension work done himself, the applicant
shall follow the procedure of self-certification
or testing as per the provisions of the Central
Electricity Authority (Measures relating to
Safety and Electric Supply) Regulations, 2010
as amended from time to time:
Provided that if the electric installation
exceeds 11 kV, it will require to be inspected
by
the
Electrical
Inspector
before
commencement of supply.
Procedure for Supply to Multi-Consumer
Complex.— 5.56 In case of multi-consumer
complexes, such as Group Housing, etc., the
new connection sought shall preferably be
provided at single point with single meter on
LT if load is up to 100 kVA and on HT if load
exceeds 100 kVA. A new connection will not
be granted until the entire electrical
infrastructure is completed. The Licensee shall
ensure energization of new connection only
after physically verifying the entire internal
electrical infrastructure and fulfilment of
Regulation 5.35. However, this shall not restrict
the individual owner or occupier of any
premises for applying for individual connection
and the Licensee shall sanction such
individual connections. The choice of having
single LT/HT connection or individual
connections, once exercised before release of
connection, cannot be revoked due to
operational problem.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3029
In case the connected/contracted load of
any connection is projected to be more than
100 kVA, a separate transformer of adequate
capacity shall be installed at consumer’s cost.
The space/room required for housing the
transformer, substation, switch gears, meters
and panels shall be provided by the consumer,
free of cost, which is easily accessible to the
Licensee.
For any new connection with connected/
contracted load lower that 100 kVA also,
License may install a separate transformer if
requested by the consumers, at consumer‘s
cost.
In case the consumers in Multi-consumer
complex have availed individual connections,
separate connection shall be provided for
consumption of energy for common services
such as lifts, pumps for pumping water, etc.,
and such consumption of such connection shall
be billed at highest slab of respective tariff
category.
For all the connections exceeding 11 kV for
multi-storeyed building of more than fifteen
metre in height, the connection shall be
released after obtaining the certificate from
Electrical Inspector in accordance with the
provisions of Central Electricity Authority
(Measures relating to Safety and Electric
Supply) Regulations, 2010 as amended from
time to time.
5.57 For such Multi Consumer complexes,
the
builder/developer/society/Owners
Association shall be liable to pay service
connection charges, i.e., cost of service
connection from the existing network of the
Distribution/Transmission Licensee to the
point of supply, as approved by the Commission
from time to time.
Note: The developer/builder/society/Owners
Association includes any agency whether
Government, local body or private that constructs
the Multi-consumer Complex.
(1) Location for installation of meter
should be decided in consultation with the
consumer in accordance with the
procedures detailed in Chapter-6 of this
Supply Code, 2018.
(2) Connections for common facilities like
lift, water pumps, etc., shall be given in the
name of the builder/developer/society/
/Owners Association.
(3) In case the original approved plan is
for a multi-consumer complex, but the
builder/developer/society/consumer
desires to avail connection for a portion of
it, the connection shall be provided treating
it as multiconsumer complex.
(4) If a building comes under the category
of multi-consumer complex and if a separate
distribution transformer of sufficient
capacity is necessary for giving supply to
such building which was not provided
earlier, it will be provided at the cost of
the builder/developer/society consumer.
Alternatively, the builder/developer/society/
/consumer shall bear the additional cost to
augment the capacity of the existing 11/0.4
kV substation, if found necessary by the
Licensee.
(5) On receipt of requisition from the
builder/developer/society consumer for
supply of electricity to multi-consumer
complexes, the Licensee shall extend the
supply as per this Supply Code, 2018.
5.58 Procedure for Supply for Agriculture/
/Irrigation Pump sets.
(1) The procedure laid down in Clauses
5.29 to 5.52 as applicable, shall be followed
for giving supply to agriculture/irrigation
pump sets where extension of distribution
mains and/or augmentation of distribution
transformer is not required.
(2) Supply for agriculture/irrigation pump
set, at one point, may also be given to a
registered co-operative society or to a group
of famers recognized by the Licensee.
(3) If, on inspection of the premises, it is
found that extension of distribution mains
or augmentation of distribution transformer
capacity or providing of additional
distribution transformer, etc., are required,
necessary estimate as per the cost-data shall
be prepared and got approved by
competent authority. The Distribution
Licensee shall be responsible to develop,
construct, augment and maintain the entire
infrastructure required for distribution
system, including 33/11 kV, at its own cost.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3030
The work of electrification of pump set(s),
will be taken up and completed within the
period as laid down in this Supply Code,
2018 after the amount as intimated is
deposited by the consumer(s). New
connection shall be given on the broad
principle of first-come first serve basis.
Within 7 working days of completion of work,
the Licensee shall intimate the date of
testing of the installation of the consumer
and inspect the wiring in the premises of
the consumer. In case the Licensee is
satisfied, the connection shall be served
within 3 working days of the inspection.
(4) An agricultural consumer, if so desires,
may shift the location of his connection
within his premises, with the approval of the
Licensee, after payment of charges, if any.
5.59 Procedure for supply to Public Street
Lightings
(1) Requisition for power supply to new
or additional public street lights shall be
submitted to the local office of the Licensee
by
the
Municipal
Corporation
or
Municipality or Municipal Board or Gram
Panchayat or Local Body or the Government
Department or any other organization
responsible for maintaining public street
lights (in context of public street lights
herein after called ‘local body’).
(2) The requisition for public lights shall
be accompanied by resolution of the local
body and the sketch indicating the number
of poles, existing or new, where streetlights
are required.
(3) The fittings, brackets or any special
fittings shall be in accordance with the
relevant BIS specifications or its equivalent,
and shall maintain required clearances as
per prevailing rules and regulations. The
local body shall bear the full cost of
arranging of power supply to public
streetlights including complete fittings and
brackets. In case, any special fittings are to
be provided, the local body shall arrange for it.
(4) The Licensee shall intimate the cost of
extension in writing within 20 days from the
date of application. The work shall be taken
up only after deposit of the amount
and execution of agreement by the local
body.
(5) A suitable double compartment
weather proof metal box to house the energy
meter and streetlight switch/MCB/timers
shall be provided by the Licensee.
(6) It shall be the responsibility of the
municipal body/local body to maintain and
replace streetlight fittings and also switch
on and switch off the streetlight. However,
the
Licensee
may
carry
out
the
maintenance of streetlight fixtures on
payment basis. Such maintenance charges
shall be included in the schedule of
miscellaneous charges
(7) All the new installation for Public
Street Lightings, which shall be installed
after 3 months from the date of notification
of these Regulations shall be mandatorily
energy efficient type lamps.
Procedure for Providing Temporary
Supply.— 5.60 Temporary connection shall
be granted for a period of maximum one (1)
year at a time, which may be further
extended, if required:
Provided that in case of construction of
buildings (both residential and nonresidential),
where it would take longer time for completion
of the same or other such projects, the
temporary supply connection shall be given
for a period of two years, which may be further
extended, if required:
Provided further that when any part of the
building/project has been effectively
completed and possession offered to a
prospective occupant, then the developer/
/occupant of such building/portion shall apply
for a permanent connection to the Licensee
within one month from the date of such
effective completion/offer of possession. The
temporary connection shall be removed within
three months after the date of such effective
completion/offer of possession.
5.61 For LT connections, temporary
connection may be granted through prepaid
meters wherever technically feasible.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3031
5.62 The Licensee may give temporary
supply within a period of 24 hours, subject to
the following conditions:
(1) If it is technically feasible;
(2) On payment of an additional fee as
fixed by the Licensee and approved by the
Commission.
5.63 The applicant shall apply for temporary
supply in the format prescribed in Annexure I
or II (as applicable) to this Supply Code, 2018
along with the documents prescribed in
Regulations 5.29 to 5.34 of this Supply Code,
2018 as well as a No Objection Certificate
(NOC) from the local authority if the supply is
required at a place owned by the local authority
along with an advance amount as approved
by the Commission as a part of Miscellaneous
Charges. This advance shall be adjusted
against the estimated cost of works:
Provided that in case temporary supply is
required in premises/place where 100 or more
persons are likely to assemble, applicant shall
comply with the provisions of Section 54 of the
Act:
Provided further that in case any permit/
/NOC is withdrawn by the competent
authority after energization of connection,
supply shall be disconnected forthwith and
shall be reconnected only after the permit/
/NOC is restored.
5.64 The Licensee shall process the
application form as per the procedure given
in Regulations 5.35 to 5.45 of this Supply Code,
2018.
5.65 During the inspection, the Licensee
shall examine the technical feasibility of the
connection applied for. If the connection is not
found technically feasible, the Licensee shall
inform the applicant in writing within 7
working days for LT and 15 working days
for HT/EHT connections after receipt of
application form, giving reason(s) for the same.
However, no connection up to 20 kW shall be
delayed on technical grounds.
5.66 If on inspection/re-inspection, the
connection is found feasible, the Licensee shall
sanction the load applied for and issue a
demand note in accordance with Regulation
5.47 of this Supply Code, 2018, inclusive of an
estimate of advance charges for electricity,
within the timeline specified in Regulation 5.46
of this Supply Code, 2018.
5.67 The applicant or his authorized
representative shall be present during testing
along with the Licensed Electrical Contractor
or his authorized representative who had
undertaken the installation. If the Licensee is
satisfied, the Licensee shall issue a written
acknowledgment on the spot.
5.68 If the Licensee is not satisfied, the
applicant shall be intimated on the spot in
writing, under acknowledgment, of the faults/
/shortcoming in the consumer installation. The
applicant, after rectification of the defects, shall
intimate to the Licensee in writing after which
the Licensee shall again follow the procedure
as laid down in Regulation 5.55 of this Supply
Code, 2018.
5.69 After re-testing of the consumer
installation and payment of prescribed fee (no
fee shall be charged by the Licensee for the
first test but subsequent tests due to faults/
/shortcomings found in the initial test shall be
charged), if the consumer installation is found
satisfactory by the Licensee, the Licensee shall
issue a written acknowledgment on the spot.
5.70 After deposit of estimated cost and
advance charges for temporary electricity
connection by the applicant, and satisfactory
testing of the consumer installation, the
temporary connection shall be released by the
date of requirement as indicated in the
application form, or as per the timelines given
below, whichever is later.
Table 4: Timeline for release of temporary connection:
Activity
Island areas
Mainland areas
Where supply can be provided from
Urban area: 6 days
Urban area: 3 days
existing network
Rural area: 14 days
Rural area: 7 days
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3032
Where supply can be provided after
Urban and Rural areas
Urban and Rural areas:
extension/augmentation of network
(a) LT-60 days
(a) LT-30 days
(b) HT-90 days
(b) HT-90 days
(c) EHT-180 days
(c) EHT-180 days
5.71 If there are outstanding dues on the
premises, temporary connection shall not be
given till such dues are paid by the consumer.
5.72 After the period of temporary supply is
over and supply has been disconnected, the
Licensee shall prepare the final bill on the
basis of actual consumption. Consumption
security, after adjusting unpaid dues, shall be
refunded by the Licensee. Material security
shall also be refunded after deducting any
damage to material (meter, transformer,
isolator, etc.) and dismantling charges, which
shall not be more than 10% of the material
security. Refund of these securities shall be
made within 15 days from the date of
disconnection, failing which the Licensee shall
be liable to pay interest at a rate equivalent to
the late payment surcharge as per the
prevalent Tariff Order issued by the
Commission.
5.73 For extension of the period of temporary
supply, the consumer shall apply to the
Licensee in writing at least 7 working days
before the date of expiry of temporary supply.
The Licensee may grant extension and send
to the consumer a demand note of advance
electricity charges for the period of extension
within 7 working days of receiving the written
request. For extension of the period of
temporary supply for the same load, no fresh
feasibility report will be required.
5.74 The applicant may get the date of
availing temporary supply extended to a date
not later than 90 days from the date of original
sanction, by applying to the Licensee at least
4 days before the originally sanctioned date of
commencement of supply in Urban Areas, and
at least 8 days in advance in Rural Areas.
5.75 The grant of temporary connection does
not create a right in favour of the applicant for
claiming a permanent connection, which shall
be governed by provisions of the Act and this
Supply Code, 2018.
Procedure for Modification in Existing
Connections Application Form.— 5.76 The
applicant shall apply for modification in
existing connection in the following format as
given in the Annexure to this Supply Code,
2018:
(1) Application format for change in name
of registered customer due to change in
ownership/occupancy - Annexure IV.
(2) Application format for transfer of
ownership to legal heir - Annexure V.
(3) Application format for Conversion of
Services/Change of Consumer Category/
/Shifting of Premises - Annexure VI.
(4)
Application
format
for
load
enhancement/reduction - Annexure VII.
5.77 Application forms in English and Hindi
shall be made available at the local office of
the Licensee free of cost. The Licensee shall
also put up all application forms on its website
for free download. Legible photocopies of a
blank form may be made by the consumer and
shall be accepted by the Licensee. The
Licensee shall clearly display on its website
the address and telephone numbers of offices
where filled-up application form can be
submitted. The Licensee shall also display in
each office the address and telephone
numbers of offices in the respective area of
supply where filled-up application form
pertaining to that particular area can be
submitted. Any assistance or information
required in filling up the form shall be provided
to applicants at the local office of the Licensee.
5.78 The Licensee shall facilitate or provide
such avenues for applying for new connection
or modification in existing connection through
website, call centres, etc., which minimize the
applicant’s interface with the utility during the
process.
5.79 All application forms for change in
existing connection must be accompanied
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3033
with an identity proof of the applicant in
accordance with Regulation 5.29 of this Supply
Code, 2018, if the connection is registered in
the name of the applicant; or a No-Objection
Certificate (NOC) from the person in whose
name the connection is registered, if the
connection is not registered in the name of the
applicant.
Processing Application Forms.— 5.80 The
Licensee shall verify the application form along
with enclosed documents and if found
deficient, shall issue a written note on the spot
regarding shortcomings in the application
form. If the application form is complete, the
Licensee shall acknowledge its receipt on the
spot.
5.81 The Licensee shall maintain a
permanent record of all application forms
received in an Application Register/Database.
Each application form shall be allotted
a permanent application number (for
identification) serially in the order in which it
was received. The Licensee shall keep the
registers/databases updated with stage-wise
status of disposal of each application form. The
Licensee shall deal with application forms on
the broad principle of “first come, first served”
basis as per serial priority in the Application
Register/Database.
5.82 An application form shall be deemed
to be received on the date of receipt of
consumer’s requisition of supply in the
prescribed format of the application form,
complete in all respects and attached with all
relevant documents.
5.83 An application shall be deemed to be
received on the date of receipt of all applicable
charges including the security deposit in
accordance with Annexure XVIII of this Supply
Code, 2018, after receipt of the application
form.
5.84 The Licensee shall process application
forms for change in existing connections as
detailed below.
Transfer of Connection
5.85 The consumer shall not without prior
consent in writing of the Distribution Licensee
assign, transfer or part with the benefit of the
Agreement executed with the Distribution
Licensee nor shall part with or create any
partial or separate interest thereunder in any
manner.
5.86 A connection may be transferred in the
name of another person upon death of the
consumer or in case of transfer of the
ownership or occupancy of the premises, upon
filing an application form in the prescribed
format given in either Annexure IV or V (as
applicable) for change of name by the new
owner or occupier:
Provided that such change of name shall not
entitle the applicant to require shifting of the
connection from the present location.
5.87 The Licensee shall deal with
applications relating to change of consumer’s
name due to change in ownership/occupancy
of property in accordance with the procedure
detailed below.
(1) The applicant shall apply for change
of consumer’s name in the format prescribed
in Annexure IV to this Supply Code, 2018,
along with a copy of the latest bill duly paid.
The request for transfer of connection shall
not be accepted unless all dues recoverable
against the concerned connection are
settled. The application form shall be
accepted on showing proof of ownership/
/occupancy of property. A “No Objection
Certificate” from the registered consumer/
/authorized person/previous occupant of
the premises shall be required for cases
involving transfer of security deposit in the
name of applicant. The Licensee shall
process the application form in accordance
with Regulations 5.80 to 5.83 of this Supply
Code, 2018.
(2) In case the No Objection Certificate
from the registered consumer/authorized
person/previous occupant is not submitted,
an application form for change of name shall
be entertained only if security deposit as
stipulated in this Supply Code, 2018 is paid
afresh. However, the original security
deposit shall be refunded to the claimant as
and when a claim is preferred by the
concerned person.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3034
(3) Change of consumer’s name shall be
in effect within two billing cycles after
acceptance of application form.
5.88 The Licensee shall deal with
applications relating to transfer of
consumer’s name to legal heir in accordance
with the procedure detailed below:
(1) The applicant shall apply for change
of consumer’s name in the format prescribed
in Annexure V to this Supply Code, 2018,
with a copy of the latest bill duly paid. The
application form shall be accepted on
showing the Registered Will/Deed,
Succession/Legal Heir Certificate, Mutation
in Municipal/land records or any other proof
of legal heirship. The Licensee shall process
the application form in accordance with
Regulations 5.79 to 5.83 of this Supply Code,
2018.
(2) Security deposit lying with the
Licensee in the name of original consumer
shall be transferred to its legal heir to whom
the connection is to be transferred and the
shortfall in security deposit calculated as
specified in Annexure XVIII of this Supply
Code, 2018, if any, shall be payable by the
applicant.
(3) The change of consumer’s name shall
be effected within two billing cycles after
acceptance of application.
(4) Any charge for electricity or any sum
other than charge for electricity as due and
payable to Licensee, which remains unpaid
by a deceased consumer or the erstwhile
owner/occupier of any land/premises as the
case may be, shall be a charge on the
premise
transmitted
to
the
legal
representative/successors-in-law
or
transferred to the new owner of the premise
as the case may be, and same shall be
recoverable by the Licensee as due from
such legal representative or successor-in-
law or new owner/occupier of the premises
as the case may be.
Conversion of Services.— 5.89 The applicant
shall apply for conversion of the nature of his
existing connection in the format given in
Annexure VI to this Supply Code, 2018. The
Licensee shall process the application form in
accordance with Regulations 5.80 to 5.83 of
this Supply Code, 2018. For site inspection and
issuance and payment of demand note for the
estimated cost of works, both the Licensee and
applicant shall follow the procedure and
timelines as laid down in Regulations 5.40 to
5.51 of this Supply Code, 2018. After payment
of requisite charges by the applicant, the
Licensee shall give effect to applications for
conversion of existing services from Low
Tension to High Tension or vice-versa, and
from single-phase to threephase or vice-versa,
within the following time limits:
Table 5: Timeline for conversion of services:
Urban Areas
Rural Areas
Conversion
Within two
Within two
from LT singer
billing cycles
Billing cycles
phase to LT 3
from payment
from payment
phase or vice-
of necessary
of necessary
versa
charges by
charges by
consumer
consumer
Conversion
Within two
Within two
from LT singer
billing cycles
Billing cycles
phase to LT to
from payment
from payment
HT or vice-
of necessary
of necessary
versa
charges by
charges by
consumer
consumer
Conversion
Within four
Within four
from HT to EHT
billing cycles
Billing cycles
or vice-versa
from payment
from payment
of necessary
of necessary
charges by
charges by
consumer
consumer
5.90 The Licensee shall, within the specified
period, seek the Commission’s approval for
extension of time limit whenever the above
schedule cannot be met.
Shifting of Meter/Existing Connection.—
5.91 The applicant shall apply for shifting the
service connection in existing premises or for
deviation of existing lines in the format
prescribed in Annexure VI to this Supply Code,
2018. The Licensee shall process the
application form in accordance with
Regulations 5.79 to 5.83 of this Supply Code,
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3035
2018. For site inspection and issuance and
payment of demand note for the estimated cost
of works, both the Licensee and applicant shall
follow the procedure and timelines as laid
down in Regulations 5.40 to 5.51 of this Supply
Code, 2018.
5.92 The following time schedule shall be
observed for giving the estimated amount by
the Licensee and completing the works:
(1) Shifting of meter/service line/LT/HT
lines/Transformer: within 30 days for giving
the estimated amount to the consumer for
shifting and within 30 days of the consumer
depositing the amount;
5.93 Any excess/deficient payment made by
the consumer shall be adjusted in the
subsequent two bills.
Reclassification of Consumer Category.—
5.94 If it is found that a consumer has been
wrongly classified in a particular category, or
the purpose of supply as mentioned in
Agreement has changed to other Tariff
Category, or the consumption of power has
exceeded the limit of that category as per the
Commission’s Order, the Licensee may
consider reclassifying the consumer under
appropriate category. The consumer shall be
informed of the proposed reclassification
through a notice and duly given a 30-day
notice period to file objections, if any. The
Licensee, after due consideration of the
consumer’s reply, if any, may alter the
classification within 10 days from the date of
receipt of reply. In case of any dispute, the
consumer may approach the Consumer
Grievance Redressal Forum.
5.95 If a consumer wishes to change his
consumer category, the consumer shall submit
an application form to the Licensee in the
format given in Annexure VI to this Supply
Code, 2018. The Licensee shall process the
application form in accordance with
Regulations 5.79 to 5.83 of this Supply Code,
2018. For site inspection and issuance and
payment of demand note for the estimated cost
of works, both the Licensee and applicant shall
follow the procedure and timelines as laid
down in Regulations 5.40 to 5.51 of this Supply
Code, 2018. The Licensee shall also note down
the meter reading at the time of inspection. If
on inspection, the consumer’s request for
reclassification is found valid, the Licensee
shall change the category within 10 days of
receipt of the application.
5.96 If the Licensee does not find the request
for reclassification valid, it shall inform the
applicant in writing, giving reason(s) for the
same, within 10 days from date of inspection.
5.97 For the period in which the consumer’s
application for reclassification is pending, the
consumer shall not be liable for any action on
grounds of unauthorized use of electricity.
Load Enhancement.— 5.98 Applicants shall
apply for load enhancement to the Licensee
in the format prescribed in Annexure VII to
this Supply Code, 2018. The Licensee shall
process the application form in accordance
with Regulations 5.79 to 5.83 of this Supply
Code, 2018. For site inspection, issuance and
payment of demand note for the estimated cost
of works, both the Licensee and applicant shall
follow the procedure and timelines as laid
down in Regulations 5.40 to 5.51 of this Supply
Code, 2018. Consumer can retrieve the self-
declaration Forms from the website of the
Licensee or collect the same from the office of
Licensee, if the consumer has to increase/
decrease load at any time.
5.99 If on inspection, there are no defects
found, or on re-inspection, the defects noticed
earlier are found to have been removed, the
Licensee shall sanction the additional load
applied for, and issue a demand note in writing
under acknowledgment, within the timeline
specified below:
Table 6: Timeline for raising Demand Note
for Additional Load
Sr. No.
Item
Time limit (within)
1. Aggregate Loads up
10 days of receipt of
to 100 KVA
Application
2. Aggregate Loads above
15 days of receipt of
100 KVA and up to 4000
Application
KVA
3. Aggregate Loads above
30 days of receipt of
4000 KVA
Application
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3036
Provided that the time taken by applicant
in removing the defects/deficiencies found at
the applicant’s premises shall not be included
in the timeline specified above. The timeline
shall not include the time taken by the
Licensee to augment the infrastructure subject
to ceiling limit as specified in Regulation 5.52
of this Supply Code, 2018.
5.100 The Licensee’s written intimation sent
along with the demand note to the consumer
shall cover the following:
(1) Whether the additional power can be
supplied at existing voltage or at a higher
voltage;
(2) Addition or alterations, if any, required
to be made to the system and the cost to be
borne by the consumer;
(3) Amount of additional security deposit,
cost of additional infrastructure and the
system strengthening charges or capacity
building charges, if any, to be deposited; and
(4) Change in classification of the
consumer and applicability of tariff, if
required.
5.101 The application form for enhancement
of load shall not be accepted if the consumer
is in arrears of payment of the Licensee’s dues.
However, the application form may be
accepted if such payment of arrears has been
stayed by a Court of law, or the Commission
or an authority appointed by the Commission.
5.102 If supply of enhanced load is feasible,
the consumer shall:
(1) Pay additional security deposit, cost
of addition or alteration required to be made
to the system, if any, and system
strengthening charges/capacity building
charges, if any, within 15 working days of
receipt of the demand note, and;
(2) Execute a Supplementary Agreement.
5.103 Supply of enhanced load shall be
provided in adherence to the timeline specified
in Regulation 5.52 of this Supply Code, 2018.
5.104 If the consumer feels aggrieved by the
Licensee’s action or omission, the consumer
may file his representation to the concerned
Consumer Grievance Redressal Forum (CGRF)
for redressal of his grievance.
5.105 If the application is not decided by the
Licensee within the period mentioned in Table
6 above, the applicant may, by a written notice
to the Licensee, draw its attention to the matter
and yet if no decision is communicated to him
within a further period of 15 days, the
permission for enhancement of contract
demand shall be deemed to have been
granted.
5.106 The enhancement of load shall be
effective from the date on which the enhanced
load is released by the Licensee or deemed
permission is granted.
Load Reduction.— 5.107 The Application for
load reduction shall be accepted only after six
months from original energisation for
connections up to 100 kVA, and 1 (one) year
from original energisation for connections
above 100 kVA.
5.108 The applicant shall apply for load
reduction to the Licensee in the format
prescribed in Annexure VII to this Supply
Code, 2018, along with the following
documents:
(1) Details of alteration/modification/
/removal of electrical installation with work
completion certificate and test report from
a Licensed Electrical Contractor where
alteration of installation is involved;
(2) Any other reason(s) for reduction of
contract demand.
5.109 The Licensee shall process the
application form in accordance with
Regulations 5.79 to 5.83 of this Supply Code,
2018. For site inspection, both the Licensee and
applicant shall follow the procedure and
timelines as laid down in Regulations 5.40 to
5.45 of this Supply Code, 2018.
5.110 The Licensee shall consider the
grounds for load reduction stated in the
application, verify the same during inspection
and decide the application within a period of
10 working days from inspection. If the
consumer feels aggrieved by the Licensee’s
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3037
action or omission, the consumer may file his
representation to the concerned Consumer
Grievance Redressal Forum (CGRF).
5.111 The Licensee shall issue a demand
note to the consumer in writing, under
acknowledgment, in accordance with the
timeline specified in Regulation 5.46, and
thereafter, both the Licensee and applicant
shall follow the procedure and timelines as laid
down in Regulations 5.47 to 5.51 of this Supply
Code, 2018.
5.112 If the application is not decided by the
Licensee within the above-mentioned period
of 10 days from inspection, the applicant may,
by a written notice to the Licensee, draw its
attention to the matter. If no decision is
communicated to the consumer within a
further period of 15 days, permission for
reduction of contract demand shall be deemed
to have been granted.
5.113 Any difference in security deposit
arising out of load reduction shall be adjusted
in the subsequent two bills of the consumer.
5.114 The reduction of load shall be effective
from the first day of the month following the
month in which the sanction is communicated
or deemed permission is granted.
Annual Review of Contract Demand.— 5.115
In case of HT and EHT connections, if the
maximum demand was recorded to be in
excess of contract demand by 5% or more for
at least four times during the last financial year,
the Licensee shall issue a 30-day notice to the
consumer for submitting an application form
for enhancement of load. If there is no response
from the consumer by the end of the notice
period, the Licensee shall start the procedure
for enhancing the consumer’s contract
demand to the average of four recordings of
maximum demand shown by the consumer’s
Maximum Demand Indicators (MDI) meter in
the last financial year. In case of LT
connections, similar review shall be carried
out for connections equipped with an MDI
meter.
5.116 Energy meters with MDI facility are
to be installed by all the Distribution Licensees
for all new HT and EHT connections. In case,
the Maximum Demand Indicator of the meter
at the consumer’s installation is found to be
faulty or not recording at all (unless tampered),
the Demand Charges shall be calculated based
on maximum demand during corresponding
months/billing cycle of previous year, when
the meter was functional and recording
correctly. In case the recorded maximum
demand of corresponding month/billing cycle
of past year is also not available, the maximum
demand needs to be computed by applying
the Load Factor as per Annexure XVIII of the
Supply Code, 2018.
5.117 The Licensee and applicant shall
follow the procedure and timelines with
respect to acceptance of application form, site
inspection and issuance of demand note for
the estimated cost of works in accordance with
Regulations 5.35 to 5.50 of this Supply Code,
2018. Enhanced supply shall be released in
accordance with Regulation 5.52 of this Supply
Code, 2018.
5.118 If the consumer feels aggrieved by the
Licensee’s action or omission, the consumer
may file his representation to the concerned
Consumer Grievance Redressal Forum (CGRF)
for redressal of his grievance.
Execution of Agreement.— 5.119 The
Licensee may require the applicant to execute
an Agreement for obtaining new connection,
for change of name, and for enhancement or
reduction of sanctioned load before
commencement of supply.
5.120 The Agreement form shall be supplied
by the Licensee along with application form
and shall also be available on the Licensee’s
website for download.
The Agreement shall include the following:
(1) Name and address of the consumer/
/applicant;
(2) Address of the premises for which
electricity supply has been requisitioned
and for which the agreement is being
executed;
(3) Sanctioned load/contract demand;
(4) Purpose of usage of electricity;
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3038
(5) Declaration by the applicant/
/consumer:
(a) To abide by provisions of Act and this
Supply Code, 2018;
(b) To pay for the supply of electricity
based on the prevailing tariff rates;
(c) To pay for all other charges payable in
accordance with this Supply Code, 2018 and
the Schedule of Miscellaneous Charges of
the Licensee approved by the Commission
from time to time;
(d) To deposit such security money as the
Licensee may be entitled to recover from
him under the Act and this Supply Code,
2018;
5.121 If there is no separate written
Agreement between the Distribution Licensee
and the consumer, after the supply of
electricity has commenced, the consumer shall
be deemed to be bound by terms and
conditions of the Supply Code, 2018. The
consumer shall not refuse to tender an
Agreement if so required by the Distribution
Licensee within thirty days of commencement
of the supply. Upon failure of the consumer to
sign the Agreement, it shall be open to the
Distribution Licensee after giving due notice
and opportunity of representation to
disconnect the supply to such Premises.
However, the Distribution Licensee shall
restore the supply immediately upon execution
of the Agreement by such consumer.
5.122 If any Consumer terminates his
Agreement within period of 2 years of the
commencement of new or additional supply
(or where no formal Agreement is tendered, if
the supply is not utilized for the period of 2
years, which would have been applicable if
an Agreement has been tendered), the
consumer shall be liable to pay the Fixed/
/Minimum charges for each month short of the
period of 2 years.
5.123 A copy of the Agreement executed
shall be given to the consumer/applicant.
General
Conditions
of
Supply
for
determination of Connected Load.— 5.124 The
method of determination of connected load
shall be as per Annexure VIII to this Supply
Code, 2018.
Point of Supply.— 5.125 Supply shall be
given at a single point in the premises of the
consumer. The point of supply shall be
determined by the Licensee such that meters
and other equipment are always accessible to
the Licensee for inspection without infringing
upon the consumer’s privacy. All HT and EHT
consumers shall provide independent entry to
the meter or metering cubicle. However, in
special cases, the Licensee may agree to give
supply at more than one point in the
consumer’s installation on account of the
separate physical layout and wiring of the
installation and the requirements of the
consumer.
5.126 At the point of commencement of
supply, the consumer shall provide a main
switch/circuit breaker. In addition, HT and
EHT consumers shall also provide suitable
protective devices as per the provisions of
Central Electricity Authority (Measures
relating to Safety and Electric Supply)
Regulations, 2010 as amended from time to
time. The system of protection shall have to
be approved by the Licensee before
commencement of supply. Meters, MCBs/CBs
and associated equipment shall be installed
by the Licensee at the point(s) of supply.
5.127 HT and EHT consumers shall install
step-down transformers with a vector group
with delta winding on the high voltage side
and star winding on the low voltage side, with
the neutral terminal brought out and solidly
earthed as per Central Electricity Authority
(Measures relating to Safety and Electric
Supply) Regulations, 2010 and as amended
from time to time.
5.128 The meter, meter boards, service
mains, MCB/CB, load limiters, etc., must on no
account be handled or removed by anyone
who is not an authorized employee/
/representative of the Licensee. Seals, which
are fixed on the meters/metering equipment,
load limiters and the Licensee’s apparatus,
must on no account be tampered with,
damaged or broken. It is the consumer’s
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3039
responsibility to keep in safe custody, the
Licensee’s equipment and seals on the meters/
/metering equipment within the consumer’s
premises.
5.129 In the event of any damage caused
to the Licensee’s equipment within the
consumer’s premises by reason of any act,
neglect or default of the consumer or his
employees, the cost thereof as claimed by the
Licensee shall be payable by the consumer. If
the consumer fails to do so after demand, it
shall be treated as a contravention of the terms
and conditions of supply agreement and the
electricity.
Security Deposit.— 5.130 A security deposit
shall be deposited by all the consumers to
cover:
(1) The estimated amount of bill
corresponding to the billing cycle period
plus one month; and
(2) Payment due to the Licensee for any
electric line or electrical plant or electric
meter that is to be provided for supplying
electricity to the consumer.
The estimated security deposit amount for
different categories while releasing new
connections shall be calculated as per the
methodology given in Annexure XVIII to this
Supply Code, 2018. In case of enhancement of
load, only additional security to cover the
additional consumption shall need to be
deposited, estimated as per the methodology
given:
Provided that for consumers who have
opted for availing phased contract demand,
revision of security deposit for the existing load
shall be based on actual consumption of the
previous financial year, while security deposit
for additional load released during the year
shall be estimated on the basis of the
methodology given in Annexure XVIII to this
Supply Code, 2018.
5.131 Subsequently, the security deposit
shall be revised annually as per the procedure
defined in Regulation 5.136 of this Supply
Code, 2018. For deficient amount of Security
Deposit, the Licensee shall serve the notice to
consumer for Additional Security Deposit to be
deposited by consumer within 30 Days. In
case, the consumer does not deposit additional
Security Deposit within 30 days of notice by
Licensee, the additional Security Deposit shall
be included in two subsequent bills of the
consumer. Any excess amount of Security
Deposit shall be adjusted within two
subsequent bills of the consumer.
5.132 If the security deposit is reduced due
to adjustment of outstanding dues, the same
shall be adjusted within the subsequent two
bills of the consumer.
5.133 The security deposit shall be returned
to consumer upon termination of Agreement
within 30 days of adjustment of all dues. In case
of delay, interest st of April of that year
equivalent to the State Bank of India Base Rate
on the 1 shall be payable to the consumer.
5.134 The LT consumers can provide the
security deposit in the form of cash (applicable
for deposits up to Rs 10,000), cheque or
demand draft. The HT/EHT and industrial
consumers can provide the security deposit
through cash/demand draft/banker’s cheque,
Bank Guarantee as per the format specified in
Annexure XXI or by providing lien against fixed
deposits. If the Security Deposit is submitted
in the form of Bank Guarantee or by providing
lien against fixed deposits, no interest shall be
payable to the consumer.
Interest on Security Deposit.— 5.135 The
Licensee shall pay interest to the consumer at
the State Bank of India Base st of April for the
year, payable annually on the Rate prevailing
on the 1 consumer’s security deposit with
effect from date of such deposit in case of new
connections energized after the date of this
notification, or in other cases, from the date of
notification of this Supply Code, 2018. The
interest accrued during the year shall be
adjusted in the consumer’s bill for the first
billing cycle of the ensuing financial year. If
the Security Deposit is submitted in the form
of Bank Guarantee or by providing lien against
fixed deposits, no interest shall be payable to
the consumer.
Review of Security Deposit.— 5.136 At the
beginning of the financial year, the Licensee
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3040
shall review the consumption pattern of the
consumer for the adequacy of the security
deposit from April to March of the previous
year. Consumer is required to maintain a sum
equivalent to his average payment for the
period of one billing cycle plus one month,
where ‘average payment’ shall be equal to the
average of actual bills paid in the last financial
year:
Provided that for a consumer whose
electricity connection is less than 1 year old,
the security deposit shall not be revised at the
beginning of the financial year.
5.137 The security deposit available with the
Licensee in respect of each consumer shall be
shown in the bill issued to the consumer.
Refund of security to the consumer by the
Licensee, as and when arises, shall be made
through maximum of two electricity bills.
Cost of Servicing New Connection/
/Enhancement of Load.— 5.138 The consumer
shall pay the cost of service line, etc., and other
applicable charges. These charges shall be
either on the basis of the schedule of standard
charges approved by the Commission.
General Provisions Regarding Service Line
and Apparatus.— 5.139 The consumer shall
provide space of requisite dimensions and at
convenient location as mutually agreed
between the consumer and the Licensee, free
of charge, for erection/installation of that part
of service line that falls within his premises,
transformers, switch gear, meter and all other
apparatus up to the point of commencement
of supply. The whole of service line and other
apparatus shall be deemed to be the property
of the Licensee and shall remain under its
control.
5.140 The Licensee may use the service line
and other apparatus to give supply to other
consumers provided that the supply to the
consumer who has paid for these is not affected
adversely. Further, even if the supply to the
consumer who has paid for the line/apparatus
is disconnected for whatever reason, the
consumer shall permit the Licensee continued
access to the service line and other apparatus
if they are required to give supply to other
consumers, and no payment shall be due to
the consumer for such access/facility, until
alternate arrangements are made. However,
it is expressly provided that the Licensee shall
make all possible efforts to make alternate
arrangements within 6 months. For this
purpose, the Licensee may explore a mutually
acceptable arrangement for continuation of
the installation at the existing place.
Resale of Energy.— 5.141 The consumer
shall not supply any energy supplied to him
by the Licensee to another person or other
premises unless the consumer holds a suitable
sanction or licence for distribution and sale of
energy granted by the Commission or has
been exempted from obtaining the licence or
has been appointed as a franchisee of the
Distribution Licensee.
Access to Consumer’s Premises.— 5.142 The
Distribution Licensee or any person duly
authorized by Distribution Licensee shall have
access to consumer’s premises in accordance
with the provisions of Section 163 of the
Electricity Act, 2003.
Failure of Supply due to Fuse Failure.— 5.143
Should at any time the Licensee’s service fuse
or fuses fail, complaint should be registered at
the Licensee’s local office or call centre or if
there are sub-stations, at the nearest sub-
-station. Only authorized representatives of the
Licensee are permitted to replace these fuses
in the Licensee’s cut-outs. Consumers are not
allowed to replace these fuses and they will
render themselves liable to penalty if the
Licensee’s fuse placed to protect the
Licensee’s apparatus are changed.
CHAPTER 6
6. Metering.— 6.1 No installation shall be
serviced without a meter. All meters and
installation of meters shall conform to
requirements as laid down in the Central
Electricity Authority (Installation & Operation
of Meters) Regulations, 2006 issued under
Section 55 of the Act, and as amended from
time to time. Notwithstanding this, the
Licensee may consider installing upgraded
technology meter becoming available in the
market if it meets the requirements over and
above the requirements of CEA.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3041
6.2 For LT loads, Miniature Circuit Breakers
(MCBs) and for HT/EHT loads, Circuit Breakers
(CBs) of appropriate rating and specifications
shall be installed along with the meter.
6.3 At the time of seeking a new connection
the consumer shall have the option to either:
(1) Purchase the meter, MCB/CB and
associated equipment himself as per
specifications issued by the Licensee from
time-to-time; or
(2) Require that the meter, MCB/CB and
associated equipment be supplied by the
Licensee.
The consumer shall indicate this option in
the application form and Licensee shall supply
him with the meter specifications. Once the
consumer has procured the meter as per the
specifications, the Licensee shall test, install
and seal the meter.
The Licensee shall make available on its
website, specifications of meters and other
equipment.
6.4
The Licensee is authorized to review
the status of meters already installed in the
context of upgraded technology becoming
available and suitability of the site where meter
is placed in the consumer’s premises.
6.5 If supply is provided by the Licensee to
different categories of consumers in the same
premises, separate meter(s) shall be installed
for measurement of energy for each such
category.
6.6 The Distribution Licensee shall make out
a plan for introduction and adoption of new
technologies such as pre-paid meters, smart
meters, time of the day (TOD)/Frequency-
based tariff (FBT) meters, automatic remote
meter reading (AMR), Automatic Metering
Infrastructure
(AMI)
system
through
appropriate communication system.
6.7 All the meters to be installed after
notification of these Regulations including
replacement of meters shall be meters with
MDI facility.
6.8 If supply to an HT/EHT consumer is given
on an independent feeder for his exclusive
use, the metering arrangement shall be
installed at the sub-station of the Licensee.
Further, for all new connections availing
supply through independent feeder, Stand-by
meter will be installed at consumer’s premises
at consumer cost to carry out accounting in
case of failure of main meter.
6.9 Temporary Connections wherever
possible shall be released on pre-paid meters.
Supply and Installation of Meters and MCBs/
/CBs.— 6.10 LT, HT and EHT consumers, if they
opt for procurement of meter and related
apparatus, shall provide a locked and
weatherproof enclosure of a design approved
by the Licensee to house the metering
equipment including CTs and PTs. In other
cases, these shall be included in the estimate
and provided by the Licensee.
6.11 If the meter is supplied by the Licensee,
the Licensee shall be entitled to recover the
cost of meter and associated equipment as part
of the demand notice. Else, the Licensee shall
charge meter rent as approved by the
Commission. In case of connections where the
meter has been procured by the consumer, no
meter rent and meter cost shall be charged
from the consumer.
6.12 The installation of meter shall be
decided in consultation with the consumer.
The consumer shall provide suitable and
adequate space for installation of the meter in
such a manner that it is always accessible to
the Licensee or its representatives. In case of
multi-storied buildings, all the meters shall be
fixed preferably on the ground floor/rising
mains having proper air ventilation and
adequate illumination as per the standards and
codes specified.
6.13 Initial installation or replacement of the
meter shall be done by the Licensee’s
representative in the presence of the
consumer or his authorized representative,
after giving a notice of 3 days.
6.14 The Licensee shall evolve a format of
Meter Particulars Sheet for recording the
particulars of the meter at the time of initial
installation or replacement. The Licensee shall
retain one copy and the second copy, duly
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3042
signed by the authorized representative of the
Licensee, shall be given to the consumer under
proper acknowledgment. The consumer or his
authorized representative shall also sign the
Meter Particulars sheet. Subsequently, details
of any faults in the meter, repairs,
replacements, etc., shall be entered into the
Meter Particulars Sheet by the Licensee or his
authorized representative.
6.15 Whenever a new meter is installed (for
a new connection or as a replacement) it shall
be sealed in the presence of the consumer. The
seal, name plates and distinguishing numbers
or marks affixed on the said equipment or
apparatus shall not in any way be broken,
erased or altered by the consumer. Treatment
of meter seals shall be in accordance with the
Central Electricity Authority (Installation and
Operation of Meters) Regulations, 2006 and all
subsequent amendments.
6.16 The consumer shall be responsible for
safe custody of meter(s), MCB/CB, etc., if the
same are installed within the consumer’s
premises. The consumer shall promptly notify
the Licensee about any fault, accident or
problem noticed with the meter.
6.17 All the unmetered connections
including agricultural and streetlights must be
metered by the Licensee within a period of six
(6) months from the issuance of this Supply
Code, 2018.
6.18 It shall be the responsibility of the
Licensee to maintain the meter and keep it in
working order at all times. The Licensee may
also have a provision for such metering system
where the display unit is at the consumer
premises and the metering unit is outside the
premises such as on a pole, etc. In such cases,
the responsibility of safe custody of the
metering unit shall lie with the Licensee.
6.19 The Licensee shall monitor the
consumption pattern of the consumer and get
the meter checked wherever considered
necessary to ensure that the meter is in proper
working condition.
6.20 A consumer may install a check meter
of appropriate make and conforming to the
technical specifications as laid down in
Central Electricity Authority (Installation and
Operation of Meters) Regulations, 2006. These
check meters may be calibrated by the
Licensee upon payment of prescribed fee as
specified by the Licensee with the approval of
the Commission. However, check meter
readings shall not be used for billing purpose
by the Licensee. Stand-by meter readings shall
be used for billing purposes by the Licensee
only when the main meter is faulty/burnt, etc.
Reading of Meters.— 6.21 The meter shall
be read once in every billing cycle and the
consumer shall extend all facilities to the
Licensee or his authorized representatives to
read the meter.
6.22 The meter shall be read by an
authorized representative of the Licensee. The
Licensee shall issue proper photo identity
cards to all meter readers and meter readers
shall carry the photo identity card during the
course of meter reading.
6.23 The meter reader may use hand held
instruments, Meter Reading Instrument (MRI)
or wireless equipment for recording meter
readings and for generation of bills on the spot.
6.24 It shall be the duty of the meter reader
to check the condition of LEDs (Light Emitting
devices) on electronic meters. In case the E/L
LED indicator provided on electronic meters
is found to be ‘ON’, the meter reader shall
inform the consumer that there is leakage in
the premises and advise the consumer to get
the wiring checked and leakage removed. The
meter reader shall also inform the concerned
officials of the Licensee about the leakage.
6.25 Status of the meter and/or its seal along
with the meter reading details for last six billing
cycles of each consumer shall be made
available on the Licensee’s website as well in
each bill to be raised by the Licensee.
6.26 If the meter is inaccessible on two
consecutive meter reading dates as per cycles,
a notice shall be issued to consumer to keep
the meter accessible for reading on the date
(at least 7 days after the date of notice) and
time specified in the notice.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3043
6.27 If meter is not made accessible even
on the specified date, a notice shall be served
on the consumer, if available, or affixed near
the main entrance of the premises, to inform
the meter reading to Licensee within the
next 7 days. Failing this, supply shall be
disconnected.
6.28 The provisions of Regulations 6.26 and
6.27 of this Supply Code, 2018 shall not apply
in case of a domestic consumer who has given
an advance intimation to the Licensee of the
inaccessibility of his meter for reading due
to the consumer being out of station and
has also deposited an amount in accordance
with Regulation 7.22 of this Supply Code,
2018.
6.29 When a domestic consumer gives prior
information in writing about inaccessibility of
the meter to the Licensee due to continued
absence from residence, the Licensee shall not
send any notice/provisional bill to the
consumer provided that the consumer pays
the fixed charges for such period in advance.
Whenever the meter is made accessible by the
consumer for taking the meter reading, the
entire consumption shall be taken as if the
consumption was for the period excluding the
intimated period of inaccessibility. This facility
shall be available to the consumer if the dues
have been up to date.
6.30 If the consumer desires to have a special
reading taken, the same shall be arranged by
the Licensee and the charge, as approved by
the Commission shall be included in the next
bill of the consumer.
Periodic Testing of Meters.— 6.31 It shall be
the Licensee’s responsibility to satisfy itself
regarding the accuracy of the meter before it
is installed and the Licensee may test them
for this purpose. The Licensee shall conduct
periodical inspection/testing and calibration
of the meters as specified by the Central
Electricity Authority (Installation & Operation
of Meters) Regulations, 2006 and as amended
from time to time.
6.32 The Licensee shall conduct periodical
inspection/testing of the meters as per the
following schedule:
(1) Single phase meters: Once every 5
years.
(2) LT 3-phase meters: Once every 3 years.
(3) HT/EHT meters including MDI: Yearly
Wherever applicable, CT and PT shall also
be tested along with meters.
6.33 Test results shall be maintained as per
the format given in Annexure IX to this Supply
Code, 2018.
Testing of Accuracy of Meters.— 6.34 The
Licensee shall have the right to test any meter
and related apparatus if there is a reasonable
doubt about accuracy of the meter. The
consumer shall provide the Licensee
necessary assistance in conduct of the test.
6.35 A consumer may request the Licensee
to test the meter on his premises if the
consumer doubts its accuracy, by applying to
the Licensee in the format given in Annexure
X to this Supply Code, 2018, along with the
requisite testing fee. On receipt of such
request, the Licensee shall follow the
procedure as detailed in Regulations 6.36 to
6.39 of this Supply Code, 2018.
6.36 The meter may be tested for accuracy
at a third-party facility, if so desired by the
consumer. The list of third-party agencies,
which are accredited by NABL (National
Accreditation Board for Testing and Calibration
Laboratories) shall be available on the website
of the Licensee:
Provided that in case of testing on the
consumer’s request, the consumer shall have
to pay the testing fee as per the cost specified
by the Licensee with the approval of the
Commission:
Provided further that if the meter is found
to be defective/burnt due to technical reasons
attributable to the Licensee, viz., voltage
fluctuation, transients, etc., the Licensee shall
refund the test fee to the consumer by
adjustment in the subsequent bill.
6.37 Before testing a consumer’s meter, the
Licensee shall give 7 days’ advance notice in
urban areas and 10 days’ advance notice in
rural areas intimating the date, time and place
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3044
of testing so that the consumer or his
authorized representative may be present at
the time of testing. The Licensee shall inspect
and check the accuracy of the meter within
30 days of receiving the complaint both in
urban and rural areas. The Licensee, after
testing, if needed, shall replace the meter
within 15 days thereafter.
6.38 The consumer/authorized representative
present during testing will sign the test report
as a token of witness. In case the consumer/
/authorized representative is not present, the
Licensee’s representative and the testing
laboratory official shall sign on the test report.
6.39 The Licensee shall dispatch the test
report to the consumer, to be received under
acknowledgment, within 7 working days of
the date of testing. In case of faulty meter,
rectification for a maximum period of six
months or from the date of last testing,
whichever is later, on the basis of the test
report, shall be adjusted or accounted for in
the subsequent bill.
6.40 If a consumer disputes the results of
testing, the consumer may represent to the
Consumer Grievance Redressal Forum (CGRF).
Cost of Replacement of Defective/Burnt/
/Lost Meters.— 6.41 If, as a result of testing, it
is established that the meter became
defective/burnt due to technical reasons,
viz., voltage fluctuation, transients, etc.,
attributable to the Licensee, the cost of the
meter shall be borne by the Licensee.
6.42 If, as a result of testing, it is established
that the meter was rendered defective/burnt
due to reasons attributable to the consumer
such as defect in consumer installation,
connection of unauthorized load by the
consumer, etc., the cost of the meter shall be
borne by the consumer as specified below:
(1) If the meter was owned by the
consumer, the Licensee shall inform the
consumer to replace the meter and
associated equipment as per provisions of
Regulations 6.1 to 6.4 of this Supply Code,
2018 within 7 days, after which the Licensee
may be empowered to install a new meter
and seek additional security deposit and
start charging meter rent, if applicable;
(2) If the meter was owned by the
Licensee, the Licensee shall install a new
meter at its own cost and recover the cost
of the burnt meter from the consumer in
proportion of the remaining useful life of the
meter (useful life of the meter as per the
depreciation schedule of the Commission-
number of years after date of first instalment
of the aforesaid meter) that was rendered
defective/burnt:
Provided further that if, as a result of testing,
it is established that the meter was rendered
defective/burnt due to tampering or any other
deliberate act by the consumer to interfere
with the meter, the consumer shall be assessed
as per Regulation 8.50 of this Supply Code,
2018 and action as permissible under law shall
be taken against the consumer for pilferage
and tampering.
6.43 The meter may be tested at a third-party
facility, if so desired by the consumer. The list
of third-party agencies, which are accredited
by NABL (National Accreditation Board for
Testing and Calibration Laboratories) shall be
available on the website of the Licensee:
Provided that in case of testing on the
consumer’s request, the consumer shall have
to pay the testing fee as per the cost specified
by the Licensee with the approval of the
Commission.
6.44 In case of loss of meter, the cost of new
meter and other apparatus shall be borne by
the consumer unless the meter was installed
outside consumer premises. The Licensee
shall recover the cost of the meter from the
consumer in proportion of the remaining useful
life of the meter that was lost.
The Licensee shall attend the complaint of
consumers for defective/stuck meter within 15
days of receiving the complaint and after
testing, if needed, shall replace the meter
within 15 days thereafter.
Replacement of Meters (including MDI) Not
Recording.— 6.45 The consumer is expected
to intimate the Licensee as soon as it comes to
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3045
the notice of the consumer that the meter has
stopped or is not recording.
6.46 If during periodic or other inspection
any meter is found to be not recording by the
Licensee, or a consumer makes a complaint
in this regard, the Licensee shall follow the
procedure detailed in Regulations 6.37 to 6.39
of this Supply Code, 2018.
6.47 If the meter is actually found to be not
recording, the Licensee shall replace the non-
working (stuck, running slow, fast or creeping)
meter within 15 working days.
Replacement of Burnt Meters.— 6.48 In case
a meter is found burnt either on consumer’s
complaint or upon inspection by the Licensee,
the Licensee shall restore the supply within 6
hours of receipt of the complaint or inspection
by the Licensee, bypassing the burnt meter
after ensuring that necessary preventive
action at site is taken to avoid future damage.
6.49 If the meter is burnt due to causes
attributable to the Licensee, the Licensee shall
replace the burnt meter within 5 working days
of receiving the complaint.
6.50 If the meter is burnt due to causes
attributable to the consumer such as
tampering, defect in consumer’s installation,
connecting unauthorized additional load, etc.,
the procedure laid down in Regulation 6.42
shall be followed with respect to replacement
of meter. The Licensee shall serve a notice to
the consumer for recovery of cost of the meter
within 7 working days of detection and shall
replace the meter within 15 working days of
receiving payment from the consumer and
after necessary corrective action is taken to
avoid future damage to the meter. In case the
consumer does not replace the meter or pay
within the stipulated time for replacement of
meter, the consumer shall be served notice for
disconnection within 7 days of expiry of the
specified period. Failure to comply with the
same shall lead to disconnection with
immediate effect.
Replacement of Lost Meters.— 6.51
Complaints regarding lost meters shall be
entertained by the Licensee only if they are
accompanied by a copy of the FIR lodged by
the consumer with police. In all such cases,
the Licensee shall also conduct an inquiry.
Supply in such cases shall be restored after
installation of a new meter, payment of
electricity charges for the period in which
meter was not available and any other
prescribed charges that may be approved by
the Commission. Electricity charges for the
period in which the meter was not available
shall be assessed as per Regulation 7.14 of this
Supply Code, 2018.
CHAPTER 7
7. Billing General.— 7.1 Tariff and charges
for supply of electricity shall be determined by
the Commission from time to time. The
Licensee shall intimate the consumer, in the
beginning of the financial year, the following:
(1) Billing cycle, which shall be monthly
for all categories of consumers except
agricultural consumers, i.e., pump set
connections, in which case, depending
upon the local conditions, the Licensee shall
specify the billing cycle separately with the
approval of the Commission.
In case of consumers with LT single phase
supply, if the Licensee experiences difficulty
in monthly billing of such a large number of
consumers, it may carry out the billing on
bi-monthly basis (i.e., once in two months)
with the approval of the Commission. The
Commission may consider the difficulties of the
Licensee and may approve the billing on bi-
monthly basis for a limited time period beyond
which the billing cycle shall be on monthly
basis.
(2) Probable week in which bill shall be
issued by the Licensee in every billing cycle;
(3) Probable due dates for payment of bill;
and
(4) Rebates applicable to consumers, if
any.
7.2 Provided that the due date for bill
payment through cheques shall be 3 working
days in advance of the normal due date for
cash payment. The Licensee shall also
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3046
intimate the consumer of bill dispatch through
SMS and/or email, if the consumer has
furnished requisite details. The billing details
of last six bills (including the latest bill) for all
consumers shall also be made available on the
Licensee’s website along with payment
receipt details.
7.3 The Licensee may explore an option of
introducing Spot Billing to domestic and
commercial consumers in its area of supply.
7.4 The Licensee shall issue the first bill
within two billing cycles of energizing a new
connection. In case the consumer does not
receive the first bill within two billing cycles
from the date of energization of the connection,
the consumer shall complain, in writing, to the
Licensee’s office and the Licensee shall issue
the bill within the next 14 days.
7.5 The bill will be delivered to the
consumer immediately in case of spot billing
under acknowledgment by the consumer. In
all other cases, the Licensee shall ensure that
the bill is delivered to the consumer by hand/
/post/courier at least 15 days prior to the due
date of payment.
7.6 If a consumer does not receive the bill
within 7 days of the probable bill issue date,
the consumer may obtain a duplicate bill from
the concerned billing office of the Licensee or
download it from the website of the Licensee.
However, the responsibility of delivering the
bill to the consumer lies with the Licensee only.
The Licensee shall issue a duplicate bill
immediately if the consumer contacts the
Licensee’s office in person/telephonically, or
on the date of acknowledgement if received
by post.
7.7 The following information shall be
included in the bill:
(1) Address and telephone number of the
billing office/distribution centre;
(2) Service Connection Number;
(3) Bill Number and Period of Bill;
(4) Consumer Number, Name and
Address;
(5) Pole Number from which connection
is served/Name of sub-division or centre;
(6) Date of issue of Bill;
(7) Tariff category of consumer (i.e.,
domestic, commercial, etc.);
(8) Tariff, rate of electricity duty and cess
applicable;
(9) Status of meter (OK/defective/not
available);
(10) Billing Status (Regular/Assessed/
/Provisional Bill with reason);
(11) Supply details:
a) Type of supply (i.e., single phase, three-
phase LT or HT);
b) Contracted load/Connected load.
(12) Meter number and identification
details of meter (in case the meter was
replaced during the billing period, the bill
must indicate the meter numbers of new as
well as old meter, date of replacement, final
reading of old meter and initial reading of
new meter at the time of replacement of
meter);
(13) Initial meter reading with date;
(14) Final meter reading with date;
(15) Multiplying Factor of the meter, if any;
(16) Units consumed;
(17) Maximum Demand;
(18) Power Factor, if applicable;
(19) Due date of payment (separately
specified for payment by cash, cheque,
Credit/Debit Card, etc., if necessary) and
date of payment with prompt rebate;
(20) Security Deposit deposited by
consumer;
(21) Billing details: Item-wise details for
the current month as well as past arrears
shall be furnished in the bill. A representative
list is given below:
(a) Energy Charges;
(b) Fixed Charges;
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3047
(c) Meter rent, if any;
(d) Capacitor surcharges;
(e) Other Charges, if any;
(f) Electricity Duty;
(g) Fuel price purchase adjustment
charges;
(h) Power factor adjustment charges, if
any;
(i) Reactive Energy Charges, if any;
(j) Surcharge for delay, if any;
(k) Interest on instalments due;
(l) Total current month demand;
(m) Arrears (with details);
(n) Details of Subsidy, if any, under Section
65 of the Act;
(o) Others (with details);
(p) Total amount due;
(q) Adjustment;
(r) Net amount to be paid;
(s) Modes of payment accepted;
(t) In case of cheques and bank drafts,
the receiving authority in whose favour the
amount should be drawn;
(u) Amount of Security Deposit held and
required;
(v) Consumption details of last six
readings.
7.8 The following information shall be
provided on the reverse of the bill, if not
provided on the front or stamped on the bill or
be sent in an annexure accompanying the bill
at least twice a year:
(1) Address(es) of collection centre(s) and
working hours for collection of bill
payments, including the date and time of
presence of the mobile van, if any, at different
venues for collection of bill payments;
(2) Designation and address of the
authority with whom grievance/complaints
pertaining to bills can be lodged;
(3) Complete address(es) with telephone
number(s) of the complaint centres, if any;
(4) Addresses and telephone numbers of
CGRFs as well as that of the Ombudsman
constituted under Section 42 sub-clause 6
of the Act;
(5) Tariff Schedule applicable to the
consumer; and
(6) Information relating to safety, energy
conservation, prevention of theft, etc.
7.9 The bill may contain additional
information, if any, as desired by the Licensee.
7.10 The Licensee shall ensure adequate
publicity of the addresses/locations and
working hours of the collection centres
including those of banks wherein consumers
can make payments.
Procedure for Billing under Special
Circumstances/Billing when Meter Not
Accessible.
7.11 In all cases not covered by the Spot
Billing system, if the Licensee is not able to
read the meter, a provisional bill may be issued
on the basis of the consumption for the
corresponding period of the previous year
wherein the meter was functional. However,
the Licensee shall ensure that such provisional
billing does not extend to more than two billing
cycles at a stretch, and there are not more than
two provisional bills generated for a consumer
during one financial year. If the premises of
the consumer is inaccessible for more than
two billing cycle, a notice is to be affixed in
the premises of the consumer for temporary
disconnection. If within 30 days from the
affixation of such notice, if the consumer fails
to make arrangement for meter reading, the
supply shall be temporarily disconnected after
giving one-month notice. The provisional bills
shall be adjusted on the basis of the
subsequent actual meter reading.
In case of new connection for which one-
year data is not available, the consumption for
the purpose of provisional billing shall be
computed by considering the load factor as
specified for that category in Annexure XVIII
of these Regulations.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3048
Billing in case of defective/stuck/stopped/
/burnt meter.— 7.12 In case of defective/stuck/
/stopped/burnt meter, the consumer shall be
billed on the basis of higher of monthly
consumption of corresponding month of the
previous year and average monthly
consumption of immediately preceding three
months. These charges shall be leviable for a
maximum period of three months only during
which time the Licensee is expected to have
replaced the defective meter.
7.13 In case, the Maximum Demand
Indicator of the meter at the consumer’s
installation is found to be faulty or not
recording at all (unless tampered), the
Demand Charges shall be calculated based on
maximum demand during corresponding
months/billing cycle of previous year, when
the meter was functional and recording
correctly. In case, the recorded maximum
demand of corresponding month/billing cycle
of past year is also not available, the maximum
demand shall be calculated based on the load
factor as per the mechanism specified in
Annexure XIX of the Supply Code, 2018.
Billing in case of Lost Meters.— 7.14 In case
of meters reported as lost, electricity charges
for the period for which the meter was not
available shall be assessed as below:
(1) As per Regulation 8.50 of this Supply
Code, 2018, if it is established in the
Licensee’s enquiry that the loss of meter
was due to a deliberate act of the consumer
and/or with his connivance;
(2) As per Regulations 7.12 and 7.13 of this
Supply Code, 2018, in other cases.
Special Reading and Billing of Meters in
cases of Change of Occupancy or Vacancy of
Premises for Domestic Consumers.— 7.15 It
shall be the responsibility of the consumer to
get a special reading done by the Licensee at
the time of change of occupancy or on the
premises falling vacant and obtain a No-Dues
Certificate from the Licensee.
7.16 The consumer shall request in writing
to the Licensee for special reading to be taken
at least 15 days in advance of the said vacancy
of premises or change of the occupancy, as the
case may be. However, the Licensee may
accept a notice of shorter period.
7.17 The Licensee shall arrange to take a
special reading of the meter within 5 days of
receiving the consumer’s written request and
issue a final bill including all arrears till the
date of billing, at least 5 days before change of
occupancy/vacancy of premises. The final bill
thus raised shall mention that no other dues
are pending on the premises and the bill is final.
The final bill shall also include charges for the
period between the date of special reading and
date of vacancy of premises on a pro-rata basis.
7.18 Once the final bill is raised, the Licensee
shall not have any right to recover any
charge(s) other than those in the final bill, for
any period prior to the date of such bill. The
Licensee shall disconnect supply to the
premises on its vacancy. It shall be the
responsibility of the consumer to make the final
payment on vacating the premises and the
Licensee shall accordingly issue a No-Dues
Certificate on receiving such payment.
However, in case of change of occupancy, the
connection shall not be disconnected and after
completing the commercial formalities for
change of name, the same shall be affected.
Payment on Self-Assessment by the
Consumer.— 7.19 In case of non-receipt of bill,
the consumer may deposit self-assessed bill
in the format prescribed in Annexure XII to
this Supply Code, 2018 for the period for which
bill has not been received, provided that it is
not less than the average consumption during
the billing cycle over the last six months. The
excess/deficient payment so made by the
consumer shall be adjusted in the next bill.
7.20 In case of dispute regarding levy of
surcharges, the Licensee shall settle the
dispute within one billing cycle from the date
of protest by the consumer after giving him
an opportunity of being heard.
Advance Payment of Bills.— 7.21 In case a
consumer’s premises remains vacant for some
duration and the consumer intends to make
advance lump sum payments from which the
billed amount may be deducted periodically,
the consumer can apply to the Licensee in the
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3049
format prescribed at Annexure XIII to this
Supply Code, 2018.
7.22 In such cases, the consumer shall
deposit an amount that covers the fixed
charges for the duration of the proposed
absence. Such provisional payment shall be
adjusted when subsequent bill is issued on the
basis of actual meter reading.
7.23 Bills of the consumers opting for this
arrangement shall be showing the amount
deposited by the consumer, amount adjusted
against the electricity dues after each billing
cycle and the balance left. On the amount
remaining outstanding from such advance
deposits, interest shall be paid at the State
Bank of India’s prevailing interest rate
for Savings Bank account. This interest
computation will be done quarterly.
Billing in case of Disputed Bills.— 7.24 On
receipt of the complaint in case of disputed
bills in person, the Licensee shall issue a
written/electronic acknowledgment on the
spot or within three days of receipt, if received
by post and give a complaint number for
reference.
7.25 If no additional information is required
from the consumer, the Licensee shall resolve
the consumer’s complaint and intimate the
result to the consumer within 7 days of receipt
of the complaint. In case, any additional
information is required, the same shall be
obtained, the issue resolved and result
intimated to the consumer within 7 days of
receipt of the additional information. However,
if the consumer does not provide information
on time, the Licensee shall not be held liable
for the consequent delay. Till the complaint on
the bill is resolved, the consumer shall pay the
amount based on average consumption of
corresponding period of the previous year
when the meter was functional. Amount so
recovered shall be subject to final adjustment
on resolution of the complaint.
7.26 If the complaint is found to be correct
by the Licensee, a revised bill shall be issued
within 5 working days of intimation of the same
to the consumer. The consumer shall make the
payment within 15 days after receipt of the
revised bill. The consumer shall not be
charged any late payment surcharge, if the
payment is made by the revised due date.
7.27 If the complaint was found to be
incorrect, the consumer shall be notified and
directed to make the payment as per the
original bill immediately and the consumer
shall be liable to pay late payment surcharge
if the payment is made after the due date of
the original bill.
7.28 Consumers, who intend to get the
special meter reading conducted, shall pay the
requisite fee for the same as approved by the
Commission from time to time.
Billing in case of Excess Load.— 7.29 The
billing for excess load shall be made as
approved by the Commission.
Payment of Bills.— 7.30 Consumer may pay
the bill by cash (up to Rs. 5,000), Cheque,
Demand Draft or Debit/Credit Card, banker’s
cheque, Electronic Clearing System, net
banking, drop boxes, etc. Cheques and
Demand Drafts shall be payable at any branch
of a scheduled commercial bank that is a
member of the clearing house for the area
where the concerned Sub Divisional Office is
located. The date of depositing of the cheque
by the consumer, shall be deemed to be the
date on which the payment is received in the
Licensee’s account.
7.31 The payment may be made
(1) In person at the designated collection
offices of the Licensee during specified
times; or
(2) By post or courier; or
(3) By deposit in the drop-boxes
maintained by the Licensee at designated
locations; or
(4) By bank transfer through the internet;
or
(5) By any other scheme accepted by the
Licensee for acceptance of bill payment.
7.32 The Licensee shall establish sufficient
number of collections centres at suitable
locations with necessary facilities where
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3050
consumer can deposit the bill amount with
ease and without undue congestion. Wherever
necessary, separate collection counter should
be provided for senior citizens, physically
challenged person and women, preferably at
the ground floor.
7.33
The
Licensee
may
issue
a
disconnection notice in writing, as per Section
56 of the Act, to any consumer who defaults
on his payment of dues, after giving him a
notice period of 15 clear days to pay the dues.
In case a cheque is dishonoured, the
Licensee shall inform the consumer and
require him to pay the bill within 7 days in
cash. The consumer shall be liable to pay the
late payment surcharge, as applicable, as well
as a charge on account of the dishonour of the
cheque/non-realization of the draft. If there are
two instances of dishonour of cheques/
/draft of a consumer in a financial year, the
consumer shall be required to make all
payments through net banking till the end of
the following financial year. In addition, the
Licensee may have the option to initiate action
against the consumer as per the legal
provisions of the Negotiable Instruments Act.
7.34 In addition to the mode of payments
specified in Regulation 7.30 of this Supply Code,
2018, the Licensee may notify schemes for
acceptance of bill payment through Electronic
Clearing System or at designated counters of
a bank or through credit/debit cards or
through any other means in a specified area
and/or for a specified category of consumers,
after due notice is given to consumers.
However, any change in the mode of payment
shall be consumer friendly.
7.35 Where the due date indicated for
payment on the bill falls on a Sunday or a
public holiday, the payment shall become due
on the next working day.
Receipt of bill payment.— 7.36 Receipt shall
be given to the consumer for payment of bills
made in person. In all cases, payments shall
be acknowledged in the next bill.
Utilization of the Amount Received.— 7.37
All payments made by the consumer will be
adjusted in the following order of priority:
(1) Late payment surcharge;
(2) Arrears of electricity charges and
corresponding arrears of electricity duty/
tax;
(3) Current electricity charges and
corresponding current electricity duty/tax;
(4) Miscellaneous charges.
Late Payment Surcharge.— 7.38 Surcharge
for delayed payment shall be levied as per the
prevailing Tariff Order.
Instalment Facility
7.39 The Licensee may frame a scheme for
providing facility of payment of bills in
instalments for consumers who are for the time
being under financial distress to continue the
supply of electricity. Late payment surcharge
shall however, be levied on the amount paid
after the due date.
Recovery of Arrears.— 7.40 No sum due from
any consumer, on account of default in
payment shall be recoverable after the period
of two years from the date when such sum
became first due unless such sum has been
shown continuously as recoverable as arrear
of charges for electricity supplied.
Further, dues of any consumer (if any)
pending for a period more than 6 months can
be transferred to another installation of the
same consumer after thorough verification by
the Licensee, i.e., proof that the both
consumers are same.
CHAPTER 8
8. Theft and unauthorized use of electricity
theft of electricity.— 8.1 Whenever a case of
theft of energy is detected, the Authorized
Officer shall carry out assessment, in
accordance with the procedure as laid down
in the clauses below:
Procedure for booking a case of theft of
electricity.
8.2 The Licensee or supplier shall publish
the list of the Authorized Officers prominently
in all the Offices and its website and the Photo
Identity Card issued to such officers shall
indicate so for inspection of any place or
premise, as per Section 135(2) of the Act.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3051
8.3 An Authorized Officer, suo-moto or on
receipt of reliable information regarding theft
of electricity, shall promptly conduct
inspection of such premises after prior
intimation to Executive Engineer (SE) of that
area:
Provided that in cases where EE is not
appointed; prior intimation shall be provided
to the concerned Assistant Engineer:
Provided further that no inspection, search
and seizure of any residential premises shall
be carried out between sunset and sunrise,
except in the presence of an adult male
member occupying such premises.
8.4 The inspection team of the Licensee or
supplier, headed by such Authorized Officer
shall carry along with them their Photo
Identity Cards. Photo Identity Card should
be shown to the consumer/consumer
representative before entering the premises.
Photo Identity Card of the Authorized Officer
shall clearly indicate that he has been
nominated as Authorized Officer as per
provisions of Section 135 of the Act.
8.5 While conducting inspection, the
Authorized Officer and his team shall follow
the provisions of sub-sections 2, 3 and 4 of
Section 135 of the Act.
8.6 As far as possible, the events of
inspection shall be photographed/video-
graphed. In cases, where significant law and
order problem is anticipated, the Authorized
Officer inspecting the premises shall
immediately seek assistance from his senior
officer(s) and also call for police help. In such
cases all events shall be recorded through
video camera.
8.7 If such entry or inspection reveals
nothing to indicate the commission of or
engagement in any act of theft of electricity
by the person/consumer, the Authorized
Officer, the employees accompanying him and
the Licensee shall not be liable for any alleged
loss or inconvenience caused to the person/
/consumer on account of such entry,
inspection and search.
8.8 The Authorized Officer shall prepare a
report giving details such as connected load,
condition of meter seals, working of meter and
mention any irregularity noticed (such as
tampered meter, artificial means adopted for
theft of energy).
8.9 The report shall clearly indicate whether
sufficient evidence substantiating the theft
of energy was found or not. The details of
such evidence should be recorded in the
report.
8.10 No case for theft shall be booked only
on account of seals on the meter missing or
tampered or breakage of glass window, unless
corroborated by consumption pattern of
consumer and such other evidence as may be
available.
8.11 In case sufficient evidence is found to
establish direct theft of electricity, Licensee or
Supplier as per Section 135 sub-clause (1A) of
the Act shall disconnect the supply and seize
all material evidence including wires/cables,
meter, service line, etc., from the premises and
shall lodge a complaint in writing relating to
the commission of such offence in police station
having jurisdiction within 24 hours from the
time of such disconnection.
8.12 In case of suspected theft, the
Authorized Officer shall remove the old meter
under a seizure memo and seal it in the
presence of the consumer or his authorized
representative and the Authorized Officer and
the consumer have to sign on the seal borne
on the meter.
8.13 The Licensee or supplier shall continue
the supply to the consumer with a new meter.
The old meter shall be tested in the presence
of the consumer or his authorized represen-
tative and the Authorized Officer at the
Licensee’s testing lab, which shall give a test
report, in writing, which along with
photographs/videos shall constitute evidence
thereof. The Authorized Officer shall record
reasons to suspect theft in the premises in his
report:
Provided that if consumer requests, the
testing of the meter will be carried out at a
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3052
NABL (National Accreditation Board for Testing
and Calibration Laboratories) accredited third-
party testing facility at the cost of consumers.
8.14 The report shall be signed by the
Authorized Officer and each member of the
inspection team and the same must be handed
over to the consumer or his/her representative
at site immediately under proper receipt. In
case of refusal by the consumer or his
Authorized representative to either accept or
give a receipt, a copy of the inspection report
must be pasted at a conspicuous place in/
/outside the premises and photographed.
Simultaneously, the report shall be sent to the
consumer through Registered Post/Speed Post
on the day or the next day of the inspection:
Provided that in case of suspected theft, if
the consumption pattern for last one year is
reasonably uniform and is not less than 75%
of the assessed consumption, no further
proceedings shall be taken and the decision
shall be communicated to the consumer under
proper receipt within three days.
8.15 After detailed examination of the
evidence and the consumption pattern of the
consumer, if the Licensee or supplier is
convinced that a prima-facie case is made out
for the abstraction, consumption or use of
electricity dishonestly against the consumer,
the Licensee or supplier shall, within 7 days
of inspection, serve a provisional assessment
order assessed as per Regulation 8.25 of this
Supply Code, 2018 along with show cause
notice to the consumer, giving reasons, as to
why a case of theft should not be booked
against such consumer giving full details for
arriving at such decision and points on which
reply has to be submitted. The notice should
clearly state the time, date and place at which
the reply has to be submitted and the
designation of the person to whom it should
be addressed.
8.16 In case a show-cause notice is not
served even after 30 days from date of
inspection by the Licensee or supplier, the case
of suspected theft shall be considered as
dropped and no further action can be initiated
against the consumer.
8.17 Theft shall not be limited to physical
interference with the meter found during
physical inspection. It shall also include theft
committed by resorting to external methods
such as remote control, high voltage injection,
etc., which interfere with the accurate
recording of energy consumed. Theft of
electricity may be established by analysis of
metering data down loaded by the Licensee.
In case the consumer requests for the testing
of meter or analysis of metering data
downloaded by a third-party facility
accredited by the NABL, the cost of such
testing/analysis by third party shall be borne
by the consumer. In case theft of energy is
determined by way of meter down load, the
provisional assessment order assessed as per
Regulation 8.25 of this Supply Code, 2018 along
with show-cause notice will be sent to the
consumer/user. The notice should clearly state
the time, date and place at which the reply
has to be submitted and the designation of the
person to whom it should be addressed.
8.18 The person, on whom an order has
been served under Regulations 8.15 and 8.17
of this Supply Code, 2018, shall be entitled to
file objections, if any, against the provisional
assessment before the Assessing Officer, who
shall, after affording a reasonable opportunity
of hearing to such person, pass a final order of
assessment.
Submission of consumer’s reply.— 8.19 The
consumer shall submit his/her reply within 15
days of receipt of show cause notice to the
concerned officer mentioned in Regulations
8.15 and 8.17 of this Supply Code, 2018.
8.20 In such cases where the consumer files
objections against the provisional assessment
order, the process of hearing shall be as per
Regulations 8.21 and 8.22 of this Supply Code,
2018.
Hearing in case of suspected theft.— 8.21
Within 5 working days from the date of
submission of consumer’s reply, the Licensee
or Supplier shall arrange a hearing with the
consumer. The consumer may be given
another opportunity in case the consumer fails
to appear for the hearing. In case, the
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3053
consumer fails to appear for the second time,
the Licensee may proceed against the
consumer.
8.22 During the hearing, the Assessing
Officer shall give due consideration to the facts
submitted by the consumer and pass, within
5 working days, an order as to whether the
case of theft is established or not. The order
shall contain the brief of inspection report,
submissions made by consumer in his written
reply and oral submissions during hearing and
reasons for acceptance or rejections of the
same.
8.23 In all cases where theft of electricity
has been detected, the Licensee or Supplier
shall file the case with Special Courts
established under Section 153 of the Act.
8.24 In case of the decision based on the
consumer’s reply/hearing wherein the case of
theft is not established, no further proceedings
shall be required.
Assessment.— 8.25 The Assessing Officer of
the Licensee or the Supplier as defined under
Section 126 of the Act, notwithstanding the
criminal action taken under Section 135 of the
Act for theft of electricity, shall assess the
energy consumption as per the assessment
formula given in Annexure XIX to this Supply
Code, 2018, for the entire period during which
such theft of electricity has taken place and if,
however, the period during which such theft
of electricity has taken place cannot be
ascertained, such period shall be limited to 12
months immediately preceding the date of
inspection and prepare an assessment order
on applicable tariff. After assessing the energy
consumption as per the assessment formula
given in Annexure–XIX to these Regulations,
the Licensee shall prepare a final assessment
bill equal to two times of the tariff applicable
and serve upon the consumer notices
containing the following information:
(1) The details relating to the inspection
carried out by the Authorized Officer
including the dates and timings, list of
material seized and any other relevant fact;
(2) Details of the energy consumption
assessed on account of theft of electricity,
the period for which assessment has been
made and the amount to be deposited by
the consumer/person (amount calculated
formula given in Annexure–XIX to these
Regulations).
8.26 In case of a regular metered
connection, where a case of theft of electricity
is detected, units recorded in the meter for
which bills have been raised by the Licensee
to the person during the period, for which the
assessment is made, shall be duly credited to
the consumer.
8.27 The consumer shall be required to make
the payment within 7 days of its receipt.
8.28 The Licensee or Supplier, as the case
may be, on deposit or payment of the assessed
amount or electricity charges in accordance
with the provisions of these Regulations, shall,
without prejudice to the obligation to lodge the
complaint as referred to in the second proviso
to the clause (1A) of Section 135 of the
Act, restore the supply line of electricity
within forty-eight hours of such deposit or
payment.
8.29 If the person does not make payment
within the stipulated time, the Licensee or
supplier shall proceed to recover its dues
against the assessment order.
8.30 In case of default by the person in
payment of assessed amount, the person, in
addition to the assessed amount, shall be liable
to pay, on expiry of thirty days from the date
of order of assessment, an amount of interest
at the rate of 16% per annum compounded
every 6 months pending adjudication by
Appropriate Court.
Default in payment of assessed amount or
instalments thereof.— 8.31 In case of default
in payment of the assessed amount, the
Licensee will, after giving 15 days’ notice, in
writing, file a case against the consumer in the
designated Special Court as per the provisions
of Section 135 of the Act.
Voluntary Declaration of Tampered Meters.—
8.32 In case a consumer comes forward and
voluntarily declares tampering of meter and/
or seals:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3054
(1) The tampered meter shall be replaced
with a new meter by the Licensee at the
consumer’s cost or by the consumer, as the
case may be, immediately and the Licensee
shall raise the assessment bill at two times
the normal tariff for the period of last six
months reckoned from date of declaration;
(2) The energy bill, for the period the
meter is not replaced, shall be sent as per
the procedure for defective meters;
(3) The Licensee shall not move the
Special Court in case a consumer voluntarily
declares the tampered meter and pays the
requisite charges in time;
(4) In case of default in payment, the
procedure for booking the theft case may
be followed.
Unauthorized Use of Electricity (UUE)
Cases to be treated as Unauthorized Use of
Electricity.— 8.33 The following acts on the
part of consumer are to be considered as
unauthorized use of electricity for the purpose
of assessment under the provisions of Section
126 of the Act;
(1) By any artificial means; or
(2) By a means not authorized by the
concerned person or authority or Licensee; or
(3) Through a tampered meter; or
(4) For the purpose other than for which
the usage of electricity was authorized; or
(5) For the premises or areas other than
those for which the supply of electricity was
authorized.
8.34 Cases not to be treated as unauthorized
use of electricity:
(1) If connected load of any consumer
(including domestic consumer) is found to
be at variance from the sanctioned/
/contracted load as a result of increase of
load or due to any replacement of lamps,
fans, fuses, switches, low voltage domestic
appliances, fittings, etc., it shall neither fall
under unauthorized use of electricity
(Section 126 of Act 2003) nor under theft of
electricity (Section 135 of Act 2003);
(2) Supply to activities incidental to main
activity, for example supply to chemist shop
in nursing homes and hospitals, tea shops,
canteens, employee co-operative stores,
dispensaries, puncture shops in petrol
pumps, etc., provided that the connected
load for such activities remains within 5% of
the sanctioned load or 5 kW, whichever is
less;
(3) In case of domestic/non-domestic
connection(s), extension of supply from the
connection to other portion of the building/
/plot including for servant quarters, own
parking garages or for social requirements
relating to personal religious functions,
sports, etc., in residential areas so long as
the supply is not extended to any portion
for which the connection has been
disconnected due to non-payment of dues
and there is no change in the category of
use;
(4) Professionals such as Doctors,
Engineers, Lawyers, CAs, Journalists and
Consultants practicing from their residence
irrespective of location provided that such
use shall not exceed 25% of the area of the
premises or as specified in the rules/
/regulations of their respective State or
Union Territory;
(5) For cottage and commercial activities
operating in residences such as repair of
shoes by cobbler, dhobi, ironing of clothes,
stitching/knitting, paan-shop and bakery
products, small shops, tea shops, etc., with
total load (maximum demand) of 5 kW,
domestic tariff shall be applicable, subject
to the installation of MDI Meters. In cases
where total load is more than 5 kW, separate
metering shall be done for commercial and
domestic use, and consumption shall be
charged according to the applicable tariff;
(6) In industrial or commercial premises
where the supply is used by one or more
persons where partition in business takes
place or division in the family occurs or
where user of the connection changes due
to succession.
Procedure for booking a case for
Unauthorized Use of Electricity.— 8.35 The
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3055
Licensee or Supplier shall publish the list of
Assessing Officers, prominently in all the
Offices and its website and issue Photo Identity
Card to such officers.
8.36 An Assessing Officer, suo-moto or on
receipt of reliable information regarding
unauthorized use of electricity, shall promptly
conduct inspection of such premises and
shall be present at the time of conducting
inspection of such premises.
8.37 The inspection team of the Licensee,
headed by such Assessing Officer shall carry
along with them their Visiting Cards and Photo
Identity Cards. Photo Identity Card should be
shown and Visiting Card handed over to the
consumer before entering the premises.
8.38 The Assessing Officer shall prepare a
report giving details such as connected load,
condition of seals, working of meter and
mention any irregularity noticed (such as,
artificial means adopted for unauthorized use
of electricity).
8.39 The report shall clearly indicate
whether sufficient evidence substantiating
unauthorized use of electricity was found or
not. The details of such evidence should be
recorded in the report and the material utilized
for the purpose shall be kept as evidence.
8.40 The report shall be signed by the
Assessing Officer, each member of the
inspection team and by the consumer, if the
consumer fails to sign the report then the same
has to be recorded in the inspection report and
the report must be handed over to the
consumer or his/her representative at site
immediately under proper receipt. In case
of refusal by the consumer or his/her
representative to either accept or give a
receipt, a copy of inspection report shall be
pasted at a conspicuous place in/outside the
premises and photographed. Simultaneously,
the report shall be sent to the consumer under
Registered Post/Speed post on the day or the
next day of the inspection.
8.41 Within three working days of the date
of inspection, the Assessing Officer shall
analyse the case after carefully considering all
the evidence including the consumption
pattern, wherever available and prepare the
report of inspection. If it is concluded that no
unauthorized use of electricity has taken place,
no further action will be taken.
Notice to consumer.— 8.42 If the Assessing
Officer suspects that the unauthorized use of
electricity has taken place, he shall serve a
provisional assessment order assessed as per
Regulations 8.49 and 8.50 of Supply Code, 2018
along with show cause notice to the consumer,
giving reasons as to why a case of
unauthorized use of electricity should not be
booked against such consumer.
The show-cause notice should clearly state
the time, date and place at which the reply
has to be submitted and the designation of the
person to whom it should be addressed.
8.43 The person, on whom an order has
been served under Regulation 8.42 of this
Supply Code, 2018, shall be entitled to file
objections, if any, against the provisional
assessment before the Assessing Officer, who
shall, after affording a reasonable opportunity
of hearing to such person, pass a final order of
assessment.
8.44 If the provisional assessment amount
is deposited within 7 days of serving such
provisional assessment order on the consumer,
reply to the notice shall not be necessary.
Submission of Consumer’s Reply.— 8.45 The
consumer shall submit his reply within 15 days
of receipt of show cause notice to the
concerned officer mentioned in Regulation
8.42 of this Supply Code, 2018.
8.46 In such cases where the consumer files
objections against the provisional assessment
order, the process of hearing shall be as per
Regulations 8.47 and 8.48 of this Supply Code,
2018.
Hearing in case of suspected unauthorized
use of electricity.— 8.47 Within 5 days from the
date of submission of consumer’s reply, the
Licensee shall arrange a hearing with the
consumer.
8.48 During the hearing, the Assessing
Officer shall give due consideration to the facts
submitted by the consumer and pass, within
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3056
5 working days, an order as to whether the
case of unauthorized use of electricity is
established or not. The order shall contain the
brief of inspection report, submissions made
by consumer in his written reply and oral
submissions during hearing and reasons for
acceptance or rejections of the same.
Assessment.— 8.49 Where it is established
that there is a case of unauthorized use of
electricity based on consumer’s reply
submission/hearing, the Assessing Officer
shall assess the energy consumption taking
into consideration the following:
(1) Period of assessment: If the Assessing
Officer reaches to the conclusion that
unauthorized use of electricity has taken
place, the assessment shall be made for
the entire period during which such
unauthorized use of electricity has taken
place and if, however, the period during
which such unauthorized use of electricity
has taken place cannot be ascertained, such
period shall be limited to a period of 12
months immediately preceding the date of
inspection;
(2) Assessment charge: The assessment
shall be limited to twice the financial loss
caused to the Licensee for the period during
which the unauthorized use has taken
place, i.e., two times the difference of the
electricity charges required to be paid by
the consumer as per the relevant category
of tariff and electricity charges actually paid
during the period, subject to a maximum
period of 12 months;
(3) If a consumer is found indulging in
more than one act of unauthorized use of
electricity, the charges payable by the
consumer in respect of each such
unauthorized use shall be separately
assessed and billed accordingly.
8.50 The Assessing Officer of the Licensee
or the Supplier as defined under Section 126
of the Act, notwithstanding the criminal action
taken under Section 135 of the Act for theft of
electricity,
shall
assess
the
energy
consumption as per the assessment formula
given in Annexure XIX to this Supply Code,
2018.
8.51 The final assessment order shall be
served on the consumer under proper receipt.
The consumer shall be required to make the
payment within 7 days of its proper receipt. A
copy of the order shall also be handed over to
the consumer under proper receipt.
8.52 The order of final assessment shall be
served upon the person in occupation or
possession or in charge of the place or premises
in such manner as prescribed by the State
Government under Section 126(2) of the Act.
8.53 Any person served with the order of
final assessment, may, accept such
assessment and deposit the assessed amount
with the Licensee within 7 days of service of
assessment order upon him.
8.54 In case of non-payment of bill amount
within 7 days of serving the final assessment
order, the connection will be disconnected by
serving a 15 days’ notice, which will not be
reconnected until the assessed amount is
deposited. In case of non-payment, the amount
will be shown as arrear in the regular bill.
8.55 When a consumer defaults in making
payment of assessed amount, the consumer
in addition to the assessed amount, shall be
liable to pay, on the expiry of 30 days from the
date of order of assessment, an amount of
interest at the rate of 16% per annum
compounded every 6 months.
Appeal to Appellate Authority.— 8.56 Any
person aggrieved by the final order served by
the Assessing Officer may, within 30 days of
the said order, prefer an appeal in such form,
verified in such manner and be accompanied
by such fee as specified by the State
Commission, to an Appellate Authority.
8.57 No appeal against an order of
assessment under Regulation 8.56 above shall
be entertained unless an amount equal to half
of the assessed amount is deposited with the
Licensee and documentary evidence of such
deposit has been enclosed along with the
appeal.
8.58 The Appellate Authority will dispose of
the appeal after hearing the parties and pass
appropriate order after hearing the parties and
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3057
send copy of the order to the Assessing Officer
and the appellant. The order of the Appellate
Authority shall be final.
8.59 The consumer will be served with a
revised bill as per final order of the Appellate
Authority to be paid in 7 days.
8.60 If a consumer defaults in making the
payment within 7 days of serving the final
order of the Appellate Authority, the
connection will be disconnected after serving
a 15 days’ notice, which will not be
reconnected until the bill amount is cleared.
In case of non-payment, the amount will be
indicated as arrears in regular bill and action
will be taken for recovery.
8.61 An interest of 16% per annum will be
charged on the amount as per final order of
the Appellate Authority after thirty days from
the date of final order, compounded every 6
months as per Section 127(6) of the Act.
8.62 In case the Appellate Authority holds
that no case of unauthorized use of electricity
is established, no further proceedings will be
initiated by the Licensee and the amount
deposited by the appellant shall be refunded
along with interest at the rate of 16 percent
per annum compounded every six months for
the period from the date of deposit till the
amount recovered is adjusted through
adjustment in the electricity bills of the
immediately succeeding months. The
appellant may also opt for cash refund of the
amount deposited by the appellant along with
prevalent saving bank rate interest of State
Bank of India, till payment of such amount is
made by the Licensee.
8.63 In case the amount payable as
determined by the appellate authority is less
than the amount already deposited by the
person, the excess amount will be refunded
by adjustment in the bills of the immediately
succeeding months along with prevalent
saving bank rate interest of State Bank of India
from the date of such excess deposit till the
date of actual adjustment.
8.64 In case person does not prefer to appeal
under Section 127 of the Act and also defaults
in the making payment of assessed amount,
the connection will be disconnected by
serving a 15 days’ notice, which will not be
reconnected until the assessed amount is
deposited. In case of non-payment, the amount
will be shown as arrear in the regular bill.
8.65 When a person defaults in making
payment of assessed amount, he, in addition
to the assessed amount shall be liable to pay,
on the expiry of 30 days from the date of order
of assessment, an amount of interest at the rate
of 16% per annum compounded every 6
months.
CHAPTER 9
9. Disconnection and Reconnection.— 9.1
The supply may be disconnected temporarily
or on a permanent basis as per the procedure
described below. The Licensee shall remove
service line, meter, etc., after permanent
disconnection. However, the Licensee may not
remove service line, meter, etc., in case of
temporary disconnection.
9.2
The
charges
for
connection,
reconnection and disconnection shall be in
accordance with the Schedule of Charges
approved by the Commission.
Temporary Disconnection.— 9.3 The supply
may be disconnected temporarily in following
cases:
(1) On non-payment of the Licensee’s
dues: The Licensee may issue a
disconnection notice in writing, as per
Section 56 of the Act, to any consumer who
defaults on his payment of dues, after giving
him a notice period of minimum 15 working
days to pay the dues. Thereafter, the
Licensee may disconnect the consumer’s
installation on expiry of the said notice
period by removing the service line/meter
as the Licensee may deem fit;
(2) If the conduct/continuance of any
business/industry/activity being carried out
in any premises becomes unlawful due to
lack of necessary permission or withdrawal
of permission from the competent authority;
(3) If the wiring, apparatus, equipment
or installation at the consumer’s premises
is found to be defective or there is leakage
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3058
of electricity or if the consumer is found to
have altered the position of the meter and
related apparatus or if the consumer uses
any apparatus or appliance or uses the
energy in such manner as to endanger the
service lines, equipment, electric supply
mains and other works of the Licensee, or
is found to be using it in any manner which
unduly or improperly interferes with the
efficient supply of energy to any other
consumer;
(4) If at any time, the consumer is found
to be using energy for a purpose other than
for which it was intended/provided or
tampers with the meter and/or other
apparatus of the Licensee on his premises
or extends/allows supply of energy to any
other premises from his connection;
(5) If the consumer remains unavailable
for meter reading for two or more billing
cycle after factoring in advance payment for
the period of absence, if any as per the
provisions of this Supply Code, 2018.
9.4 The supply shall be disconnected after
giving a notice period of minimum 15 days. The
supply shall be disconnected only if the cause
of the disconnection is not removed within the
notice period.
9.5 The Licensee shall, after the connection
is temporarily disconnected as per Regula-
tions 9.3(2), 9.3(3) and 9.3(4), issue a notice to
the consumer to remove the cause of
disconnection within 45 days for domestic
consumer and 15 days for consumer of other
categories, respectively, failing which the
supply shall be disconnected permanently.
9.6 The Licensee may take steps to prevent
unauthorized reconnection of consumers
disconnected in the manner as described
above. Wherever the Licensee discovers that
connection has been re-connected in an
unauthorized manner, Licensee may initiate
action as per provisions of Section 138 of the
Act. Further, in case the Licensee discovers
that supply to such premises has been
restored through another live connection, the
same shall also be disconnected.
Permanent Disconnection.— 9.7 The supply
shall be disconnected permanently in following
cases:
(1) On the termination of the Agreement;
(2) If the cause for which the supply was
temporarily disconnected is not removed
within the notice period:
Provided that if the service of the consumer
remains continuously disconnected for 180
days, not being a temporary disconnection
upon request of the consumer, the Agreement
shall be deemed to be terminated on the expiry
of 15 days or after expiry of the initial period of
agreement, whichever is later without
prejudice to the rights of the Licensee or of
the consumer under the Act for recovery of
any amount due under the Agreement.
Disconnection on Consumer’s Request.— 9.8
In case a consumer desires his meter to be
permanently disconnected, the consumer shall
apply for the same in the format prescribed in
Annexure XV to this Supply Code, 2018. The
Licensee shall give a written acknowledgment
of receipt of such request, on the spot.
9.9 The Licensee shall carry out a special
reading and prepare a final bill including all
arrears up to the date of such billing within 5
days from receipt of the request. Upon
payment, the Licensee shall issue a receipt
with ‘Final Bill’ stamped on it. This receipt shall
be treated as a No Dues Certificate:
Provided that whenever an agreement is
terminated on notice given by the consumer,
the Licensee shall give a written intimation
within 2 working days after termination in the
format given in Annexure XVI to this Supply
Code, 2018, failing which such intimation shall
be deemed to have been given to the
consumer.
9.10 In case of consumers who were
sanctioned contract demand in a phased
manner and supply was released for initial or
intermediary phased demands, the consumer
may seek deferment or cancellation of such of
the phased demands, which are scheduled
beyond minimum period of Agreement, by
giving 3 months’ notice in advance or in lieu
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3059
thereof pay 3 months’ charges towards such
deferment or cancellation of such phased
demands.
9.11 HT/EHT consumers opting for
disconnection shall also bear the estimated
expenditure on removal of the apparatus and
service line. The Licensee shall issue a
demand note to the consumer in writing,
under acknowledgment, within 10 working
days of receipt of request.
Reconnection— 9.12 In case the consumer
request for reconnection within a period of 6
months after disconnection, the Licensee shall
reconnect the consumer’s installation within
5 days of payment of past dues and
reconnection charges.
9.13 In case the consumer requests for
reconnection after 6 months of disconnection,
the connection shall be reconnected only after
all the formalities as required in the case of a
new connection are complied with by the
consumer including payment of pending dues,
services line charges, security deposit, etc.,
as applicable for that category of consumer.
CHAPTER 10
10. General Provisions General.— 10.1 The
Licensee shall monitor the progress of new
connections, billing, metering, disconnection,
reconnection and theft on monthly basis and
send MIS reports to the Commission every
quarter, mentioning the performance
standards achieved, violation of Supply Code,
2018 in each category, penalty leviable,
penalty adjusted, etc.
10.2 The Licensee shall keep uploading the
area-wise list and current status of new
connection, billing, metering, disconnection,
reconnection and number of theft cases on the
website giving overall figure of such cases
booked, decided and pending. The Licensee
shall also upload on its website all the reports
sent to the Commission in accordance with
this Supply Code, 2018.
Provision for load shedding.— 10.3
Notwithstanding anything contained in any
agreement or undertaking executed by a
consumer with Licensee or in the tariff
applicable to him, the consumer shall restrict
the use of electricity in terms of his maximum
demand and/or stagger energy consumption
in the manner and for the period as maybe
specified in any order that may be made by
the State Load Dispatch Centre or the State
Government or the Licensee to maintain
orderly grid operation. The Licensee shall
inform bulk/HT consumers in advance about
such restrictions as early as possible by any
convenient communication mode for arranging
alternate means.
Complaints Management System
10.4 Any aggrieved person, electricity
consumer, consumer association or legal heirs
or authorized representatives (in case of death
of a consumer) may lodge a complaint at the
centralized call centre/complaint centre/
/website or through telephone or post to the
Licensee. In case the grievances of the
consumer are not addressed by the Licensee,
the consumer may approach the Consumer
Grievances Redressal Forums (CGRF)
established by the Licensee as per JERC
(Establishment of Forum for Redressal of
Grievances of Consumers) Regulations, 2009.
Seasonal Industry-Change in Contract
Demand.— 10.5 In order to reduce burden on
seasonal industries, the Seasonal Industry
consumers can change their contract demand
twice a year with at least 1 month of notice
period.
Service of Notice.— 10.6 Any order/notice
on the consumer by the Licensee, including
the notice under Section 56 of the Act shall be
deemed to be duly served if it is sent by
registered/speed post at the correct postal
address of the addressee or delivered by hand
to the person residing at the address notified
to the Licensee by the consumer:
Provided that in the case of an individual,
service of notice to the consumer’s spouse or
his authorized representative, and in the case
of a firm, company or corporation, service of
notice on the Managing Director, Director or
Principal Officer or an authorized person of
such a concern, shall be taken as proper and
complete service for the purpose of this Supply
Code, 2018.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3060
10.7 If a consumer refuses or avoids
receiving the notice, the service may be
effected by:
(1) Affixing the notice at a conspicuous
place on the consumer’s premises in the
presence of two witness and photographing
the notice; or
(2) Publication of the notice in daily
newspaper(s) commonly read in the
concerned locality to be kept on record by
the Licensee.
Either of the above shall be deemed as
proper and complete service of notice.
Power Quality Audit.— 10.8 All HT/EHT
consumers shall submit power quality audit
report to the respective Licensee at least
once in a year for improvement in quality of
power.
Supply Safety Guidelines.— 10.9 The
Licensee and the consumer shall, in every
respect, comply with the provisions of the
Central Electricity Authority (Measures
Relating to Safety and Electric Supply)
Regulations, 2010, as amended from time to
time.
Demand Side Management.— 10.10 It shall
be the duty of every consumer to stop wastage
and inefficient use of electricity and to extend
necessary co-operation to the Licensee in
implementation of the programs for Demand
Side Management that may be launched by
the Licensee.
Term and Conditions of Supply.— 10.11
Every Licensee, shall, modify and update the
terms and conditions of supply and all
circulars, orders and any other document or
communication relating to the supply of
electricity to consumers to make them
consistent with these Regulations under
intimation to the Commission.
Exemption.— 10.12 The timelines and
procedures specified in these Regulations shall
remain suspended during Force Majeure
conditions such as war, mutiny, civil
commotion, riot, flood, cyclone, lightning,
earthquake, lockout, fire, etc., affecting the
Licensee’s installations and activities.
Repeal and Savings.— 10.13 Save as
otherwise provided in this Supply Code, 2018,
JERC (Electricity Supply Code) Regulations,
2010 together with amendments made from
time to time, are hereby repealed.
10.14 Notwithstanding such repeal,
anything done or action taken or purported to
have been taken, or proceedings initiated
under such repealed Regulations, shall be
deemed to have been taken under this Supply
Code, 2018 to the extent that same were not
inconsistent with the Act.
Inconsistency.— 10.15 In case of any
inconsistency in the provisions of Supply Code,
2018 and Joint Electricity Regulatory
Commission for the State of Goa & UT (Standard
of Performance for Distribution Licensee)
Regulations, 2015 as amended from time to
time, the provisions of Supply Code, 2018 shall
prevail.
Power to Remove Difficulties.— 10.16 If any
difficulty arises in giving effect to any of the
provisions of this Supply Code, 2018, the
Commission may, by general or special order,
do or undertake or direct the Licensees to do
or undertake things, which in the opinion of
the Commission are necessary or expedient
for the purpose of removing the difficulties.
Powers to Amend.— 10.17 The Commission
may, at any time and on such times as it may
think fit, amend, alter or modify any provisions
of the Supply Code, 2018 or remove any error
or defect in this Supply Code, 2018.
ANNEXURE -1
Application form - New Connection (Low Tension Service):
1.
Name of the Applicant/Organization:
2.
Name of father/husband/Director/Partner/Trustee:
3.
Address:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3061
(a) For communication
House/Plot/Premise No.
Street
Area/Colony
District
Telephone No.:
(b) Where the new connection is applied for
House/Plot/Premise No.
existing connection is required to be shifted
Street
Area/Colony
District
(Indicate landmarks to identify the location)
4 . Plot size: sq. feet
Covered area: sq. feet
5.
Category of Supply: (list of categories attached)
6.
Purpose of Supply:
7.
Total Load applied for (in kW):
8.
Type of Supply (Permanent/Temporary):
8(a) If Temporary supply, specify period of
From (date):
requirement:
To (date):
9.
Please indicate whether you want to carry
out the works of laying service line and/or
dedicated distribution facility for the
electricity supply requisitioned (Yes/No)
10. Please indicate whether you want to install
your own CEA approved meter (Yes/No)
11. List of documents attached:
(a) Photograph affixed on application form (Yes/No)
(b) Identity Proof submitted along with this application
form:
If Applicant is a person (Tick any one)
(i) Electoral identity card;
(ii) Passport;
(iii) Driving license;
(iv) Photo identity card issued by
Government agency;
(v) PAN card;
(vi) Certificate from village Pradhan/
/Patwari/Lekhpal/village level worker/
village chowkidar/Primary school teacher/
/in-charge of primary health center etc.
(vii) Aadhar Card
If Applicant is an organization (Tick any one)
Signature of competent authority (e.g.
Branch Manager, Principal, Executive
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3062
Engineer etc.) along with relevant
resolution/authority letter of the institution
concerned
(c) Proof of ownership or occupancy of premises
(i) Copy of sale deed or lease deed or in the
for which electricity connection is required
case of agricultural connections a copy of
(Tick any one)
khasra/khatauni/khata nakal
(ii) Registered General Power of Attorney;
(iii) Municipal tax receipt or Demand
notice or other related document;
(iv) Letter of allotment;
(v) Copy of the house registration certificate
issued by the Panchayat/ownership
certificate issued by Revenue Authorities
(vi) Any other ownership related document
issued by local Government Authority
(vii) An applicant who is not an owner but
an occupier of the premises shall along with
any one of the documents listed at (i) to (vi)
above also furnish a No Objection Certificate
from owner of the premises:
Provided that where an applicant, who is
lawful occupier of the premises, is a tenant
or a leaseholder and is unable to produce
the No Objection Certificate from owner for
obtaining a connection, a separate
Indemnity Bond shall be executed in favour
of the distribution Licensee in the form
prescribed by the distribution Licensee.
(viii) For bonafide consumers residing in JJ
clusters or in other areas with no specific
municipal address, the Licensee may
accept either ration card or electoral
identity card mandatorily having the same
address as a proof of occupancy of the
premises only for the purpose of releasing
electricity connection:
Provided that if the Applicant is an
individual, the Applicant has to be Indian
Citizen for availing new electrical service
connection.
(d) Proof of current address (Tick any one)
(i) Electoral identity card;
(ii) Passport;
(iii) Driving license;
(iv) Ration card;
(v) Photo identity card issued by any
Government agency;
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3063
(vi) Statement of running Bank Account;
(vii) Water/Telephone/Electricity/Gas
connection Bill;
(viii) Income Tax assessment order/Aadhar Card.
(e) Any other document as applicable (Please
Specify)
12.
Any electricity dues outstanding in Licensee’s area of operation in consumer’s name: Yes/ No.
13.
Any electricity dues outstanding for the premises for which connection applied for: Yes/No.
14.
Any electricity dues outstanding with the Licensee against any firm with which the consumer is
associated as an Owner, Partner, Director or Managing Director: Yes/No.
(For questions 12, 13 & 14 if the answer is ‘Yes’ in any case please provide details on a separate sheet).
I/We hereby declare that
(a) The information provided in this application is true to my knowledge.
(b) I/We have read the Joint Electricity Regulatory Commission (JERC) Supply Code Regulations 2018 and
agree to abide by the conditions mentioned therein.
(c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.
(d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.
(e) I/We further agree that the connection given to me/us is only for availing electricity during my occupancy
and shall not be used in any way to show ownership of premises.
Date:
Signature of the consumer/Authorized Signatory.
Place:
Name:
Contact No:
E mail-Id:
Note: Apart from documents for identity proof, proof of ownership/occupancy of premises and proof of
current address, the following documents shall be attached with the application form:
(1) In case of a partnership firm - The applicant shall furnish the partnership deed and an authorization in the name
of the applicant for signing the requisition form and agreement;
(2) In case of Public and/or Private limited Company- The applicant shall furnish a Memorandum and Articles of
Association and Certificate of Incorporation along with Board Resolution for authorization in the name of the applicant
for signing the requisition form and agreement;
(3) Other documents applicable only for select consumer categories:
(a) Industrial consumers: Valid Industrial License, if applicable
(b) Agricultural consumers: No Objection Certificate from competent government authority for tube wells, if required
(c) Non-Domestic Khokhas and Temporary Structure: No Objection Certificate for khokha or temporary structure
from the nagar nigam/nagar palika/nagar panchayat/gram sabha/gram panchayat/land development authority/
/land owning agency.
ACKNOWLEDGEMENT
Application of ……………………. (name of applicant) ………………… for ………………………….. (purpose)
is hereby received on (date).
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3064
In this regard, the applicant is given a reference No. ……………… to be used for all future correspondence.
Signature/Seal of Licensee’s Representative
Name and Designation:
—————
ANNEXURE – II
Application form — New Connection (High Tension/Extra High-Tension Service)
1.
Name of the Applicant/Organization:
2.
Name of father/husband/Director/Partner/Trustee:
3.
Address for communication:
4.
Address where the new connection is applied for
existing connection is required to be shifted:
(Indicate landmarks to identify the location)
5.
Voltage at which supply is required (kV)
(Please tick the category applicable)
6.6
11
22 33
66
110
132
220 kV
kV
kV
kV kV
kV
kV
kV
6.
Type of Supply (Permanent/Temporary):
6(a) If Temporary supply, specify period of
From (date):
requirement:
To (date):
7.
Total Contract Demand applied for (in kW/kVA):
8.
Basis for projection of Contract Demand:
9.
Phasing of Contract Demand required (Yes/No):
If Yes, then provide the following details in the given format:
CD required (kVA) along with remarks, if any
Tentative Date from which required
(a)
(b)
(c)
10.
Purpose of Installation:
11.
Category of Tariff opted for:
12.
Category of Tariff provided (To be filled by Licensee):
13.
Production capacity:
14.
Category of Industry: (Tick the applicable one)
SSI
MSI
LSI
Type of unit:
(viz. Ownership/Partnership/Private Ltd./Public
Ltd./Society/Govt. Dept./Govt. undertaking)
15.
Name of Institution developing Premises:
16.
Possession Letter or No-Objection Certificate
(Number: Date:
16(b)
17.
Whether supply is needed through an
independent feeder:
18.
Whether the above unit ever operated at some
(a) Sanctioned Load:
other place or applied for connection? (If Yes,
(b) Service Connection No.:
please provide details)
(c) Arrears of payment (if any):
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3065
19.
If electricity connection for the premises was
(a) Name of unit:
requested in past? (If Yes, please provide details)
(b) Service Connection No.: Arrears of
payment (if any):
20.
Status of land acquisition:
21.
Expected date by which finance will be available:
22.
Whether the requisite consent/NOC (if applicable as per the list of Pollution Control Board) has been
obtained as per statutory requirements (If yes, attach a copy):
23.
Any electricity dues outstanding in Licensee’s area in consumer’s name: Yes/No.
24.
Any electricity dues outstanding for the premises for which connection applied for: Yes/No.
25.
Any electricity dues outstanding with the Licensee against any firm with which the consumer is
associated as an Owner, Partner, Director or Managing Director: Yes/No.
(For questions 22, 23 & 24 if the answer is ‘Yes’ in any case please provide details on a separate sheet)
I/We hereby declare that
(a) The information provided in this application is true to my knowledge.
(b) I/We have read the Electricity Supply Code, 2018 and agree to abide by the conditions mentioned
therein.
(c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other
charges.
(d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation
thereafter.
Date: …………..
Signature of the consumer/authorized signatory
Place: …………..
Name:
Contact No.:
Email-Id:
Note: The following documents shall be attached with the application form:–
1.
Proof of ownership of the premises.
2.
A map indicating the proposed location of the plant/office and the point where supply is required.
The map should normally be of the scale of 1 cm representing 1200 cm.
3.
Licence/NOC from statutory authority, if required or a declaration by the applicant that his connection
does not fall under the requirement of NOC under any statute.
4.
In case of a proprietary firm, an affidavit to be submitted stating that the applicant is the sole proprietor
of the firm.
5.
In case of partnership firm, partnership deed.
6.
In case of Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.
7.
Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change
at a later date, the same shall be intimated by the consumer to the Licensee immediately.
8.
Letter of intent for production/enhancement in production may be furnished.
9.
List of equipment’s proposed to be installed along with the expected load.
10.
Board Resolution for authorized signatory.
11.
Registration from Industries Department.
12.
Extract of project report relevant to power and process requirements (in case of industries).
13.
Copy of the relevant section of the current tariff order that provides details of the tariff category opted
by the consumer and duly signed by him. This will be appended with the agreement after completion
of formalities.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3066
ACKNOWLEDGEMENT
Application of .................................................................. (name of applicant) For ………………………………
(Purpose) is hereby received on .................................... (date).
In this regard, the applicant is given a reference No. ................... to be used for all future correspondence.
Signature/Seal of Licensee’s representative
Name and Designation:
—————
ANNEXURE-III
Declaration/Undertaking
I, .................................................................. Son/Daughter of ……………………….. Resident of ........................
(hereinafter referred to as “Applicant”, which term shall mean and include executors, administrators,
successors and assigns), do hereby swear and declare as under:–
Or
The ............................………………………a company incorporated under the provisions of the Companies
Act, 1956/2013 having its registered office at ……………………………………………………………... (hereinafter
referred to as “Applicant”, which expression shall, unless repugnant to the context or meaning thereof,
include its successors and assigns), do hereby swear and declare as under:
That the Applicant is a lawful occupant of the premises at………………………………………… in support
of which the Applicant has enclosed a proof of occupancy.
That the Applicant has requested the Licensee to provide a service connection at the abovementioned
premises in the Applicants name for the purpose mentioned in the application form.
That in furnishing the Declaration, the Applicant has clearly understood that should the above statements
prove to be false or incorrect at any later stage, the Licensee shall have every right disconnect supply to the
Applicant without any notice and above right to adjust dues against Consumer Security Deposit.
That the Applicant hereby agrees and undertakes:
(1) To indemnify the Licensee against all proceedings, claims, demands, costs, damages, expenses that
the Licensee may incur by reason of a fresh service connection given to the Applicant.
(2) That all Electrical Works done within the premises are as per Central Electricity Authority (Measures
relating to Safety and Electricity Supply) Regulations, 2010 to the best of our knowledge and have been
carried out by a licensed electrical contractor (in case the Applicant is an owner and wiring in the premises
is new).
Or
That all Electrical Work done within the premises are as per Central Electricity Authority (Measures
relating to Safety and Electricity Supply) Regulations, 2010 to the best of our knowledge (where application
is for reconnection or Applicant is occupier of the premises).
(3) The Licensee is indemnified against any loss accrued to the applicant on this account. Further,
Applicant agrees that if there is any harm/loss to the property of the Licensee due to the fault in Electrical
work within the premises of Applicant, all the liabilities shall be borne by the Applicant.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3067
(4) To pay the electricity consumption bills and all other charges at the rates set out in the Licensee’s
Tariff Schedule and miscellaneous charges for supply as may be in force from time to time, regularly as and
when the same becomes due for payment.
(5) To deposit the additional consumption deposit as revised by the Licensee from time to time based on
the consumption of the Applicant in preceding year.
(6) To abide by the provisions of the Electricity Act, 2003, Electricity Supply Code, 2018 tariff orders and
any other rules or regulations notified by the Commission, as applicable from time to time.
(7) That Licensee shall be at liberty to adjust the electricity consumption charges along with any other
charges against the Consumer Security Deposit paid by the Applicant, in the event of termination of the
agreement prior to expiry of the contracted period or in case of any contractual default.
(8) To be responsible for safe custody of Meters, CTs, Cables etc. provided by the Licensee and in case,
there is any damage to equipment due to the reasons attributable to Applicant the same shall be chargeable
to the Applicant. Further, all repercussions on account of breakage of seals of meters etc. or Direct/Dishonest
Abstraction of energy shall be to the account of Applicant, as per the existing laws.
(9) To allow clear and un-encumbered access to the meters for the purpose of meter reading and its
checking etc.
(10) That the Applicant would let the Licensee disconnect the Service connection under reference, in
the event of any default, non-compliance of statutory provisions and in the event of a legally binding
directive by Statutory Authority(ies) to effect such an order. This shall be without prejudice to any other
rights of the Licensee including that of getting its payment as on the date of disconnection.
(11) That the Licensee shall not be held responsible for any interruption or diminution of supply of
Electricity.
(12) All the above declaration given by the Applicant shall be construed to an Agreement between the
Licensee and the Applicant.
Signature of the Applicant
Name of the applicant
Contact No. of Applicant
SIGNED AND DELIVERED
In presence of witness
Name of Witness
—————
ANNEXURE-IV
Application form— Change in Name of Registered Consumer
1. Service Connection No.:
2. Name of Registered Consumer (at present):
3. Consumer category:
4. Contracted load:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3068
5. Address:
Telephone No.:
6. Name of the person in whose name connection
to be changed (in CAPITAL LETTERS)
Note: The following documents are attached with the application form: (Tick whichever applicable):
1. Copy of latest bill duly paid.
2. Proof of ownership/legal occupancy of premises.
3. No. Objection Certificate from the existing consumer if available/possible.
4. Registered deed/Succession certificate/ ……………(if any other document, please specify).
Date: Signature of the Consumer:
Place: Name:
Contact No.: Email-Id:
—————
ACKNOWLEDGEMENT
Application form of Service Connection No. ……………………. at present in the name of …………… (name
of applicant) has been received on …………………. (date) for changing the name of Consumer to
................................................................... ..
In this regard, the consumer is given a reference No. ………….to be used for all future correspondence.
Signature/Seal of Licensee’s representative
Name and Designation:
—————
ANNEXURE-V
Application form— Transfer of Ownership to Legal Heir
1. Service Connection No.:
2. Name of Registered Consumer (at present):
3.Consumer category:
4. Contracted load:
5. Address:
Telephone No.:
6. Name of the person in whose name connection
to be changed (in CAPITAL LETTERS)
Note: The following documents are attached with the application form: (Tick whichever applicable)
1. Copy of latest bill duly paid.
2. Proof of ownership/legal occupancy of premises.
3. Registered will/Succession or Legal Heir certificate/Mutation deed/(if any other document, please
specify).
4. NOC from other legal heir(s) in case connection is to be changed in the name of one of the legal heirs in
absence of 3 above.
Date:
Signature of the Consumer
Place:
Name:
Contact No.:
Email-Id:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3069
ACKNOWLEDGEMENT
Application form of Service Connection No. ……………. at present in the name of …………. (name of
applicant) has been received on………………..(date) for changing the name of Consumer to ………………….
In this regard, the consumer is given a reference No. .......... to be used for all future correspondence.
Signature/Seal of Licensee’s representative
Name and Designation
—————
ANNEXURE-VI
Application form— Conversion of Services/Change of Consumer Category/Shifting of Connection to
new Premises
(Tick the applicable purpose)
1.
Service Connection No.:
2.
Name of Consumer:
3.
Consumer category:
4.
Contracted load:
5.
Address:
6.
Telephone No.:
7.
Request for change in service:
(i) If request is for conversion of service:
Conversion from LT single phase to LT 3-
(Tick whichever applicable)
phase Conversion from LT 3-phase to LT
single phase.
Conversion from LT to HT.
Conversion from HT to LT.
Conversion from HT to EHT Conversion from
EHT to HT Other (Please specify)
(ii) If request is for change in consumer
(See list of all tariff categories attached
category, mention the tariff category to
with this form)
which Consumer wants to shift:
(iii) If request is for change of connection to new
(a) New address to which existing service
premises:
connection is to be shifted:
(b) Details of equipment to be shifted (Meter/
/service line, LT/HT line, transformer, etc.):
8.
Reason for change in service
Note: The following documents are attached with the application form: (Tick whichever applicable).
1. Installation inspection report.
2. Proof of ownership/legal occupancy of premises, if request is for shifting of premises.
3. Any other document (please specify).
Date:
Signature of the Consumer
Place:
Name:
Contact No.:
Email-Id:
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3070
ACKNOWLEDGEMENT
Application form of Service Connection No. ……………………at present in the name of …………… (Name
of applicant) has been received on ........................... (date) for .............. (Purpose).
In this regard, the consumer is given a reference No. ………….. to be used for all future correspondence.
Signature/Seal of Licensee’s representative
Name and Designation:
—————
ANNEXURE-VII
Application form— Load Enhancement/Load Reduction
(Tick the applicable purpose)
1.
Name of the Applicant/Organization:
2.
Service Connection Number:
3.
Address of premises to which electricity is being
supplied:
4.
Telephone No.:
5.
In case of Load Enhancement:
Existing sanctioned load (in kW/kVA):
Enhanced load requested (in kW/kVA):
6.
In case of Load Reduction:
Existing sanctioned load (in kW/kVA):
Reduced load requested (in kW/kVA):
7.
Reason(s) for Load Enhancement/Reduction:
8.
Details of load added/disconnected from supply, if applicable. (Please attach list of equipment category-
wise):
a. Lighting
b. Motive Power
c. Agricultural
d. Other (please specify)
Date:
Signature of the consumer
Place:
Name:
Contact No:
Email-Id:
Note: The following documents are attached with the application form (if applicable):
1. A work completion certificate & test report from Licensed Electrical Contractor, if the consumer’s
installation has been altered.
2. Resolution for authorized signatory.
ACKNOWLEDGEMENT
Application of ……………………. for load enhancement/load reduction …………….. against Service
Connection No. ………….. is hereby received on …………. (date).
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3071
In this regard, the applicant is given a reference No. .................................................... to be used in all future
correspondence.
Signature/Seal of Licensee’s representative
Name and Designation:
————
ANNEXURE-VIII
Procedure for Determination of Connected Load
Name of applicant: …………………………………………………………………
Service Connection No. (For existing connections): …………………………..
Address of applicant: ……………………………………………………………...
Contact No. of applicant: …………………………………………………………..
Email-Id of the applicant: …………………………………………………………..
Electrical equipment proposed to be put to use: ………………………………...
(Please fill-up the following table to enable determination of the connected load. Normally the actual load
of each item will be considered to determine the connected load at the premises. In case of non availability
of the rated capacity of any item, the load shown below shall be considered).
Item
Load per item (Watts)
No.
Total load (Watts)
1
2
3
4 = 2x3
CFL
15
Bulb
60
Tube light
50
Fan
60
Tape-recorder/Music system
100
Television
90
Mixer
375
Electric iron
750
Fridge
150
Cooler
250
Heater (for cooking and water heating)
1000
Washing machine
750
Geyser
2000
Microwave oven
2000
Air Conditioner (1 ton)
1500
Air Conditioner (1.5 Ton)
2250
Computer
100
Printer
150
Pump-set
375
Total
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3072
Test Result Report of Applicant’s Installation
[Regulation 31 of Central Electricity Authority (Measures relating to Safety and Electricity Supply)
Regulations, 2010].
(To be filled by Licensee’s representative)
Reference No. .………………………………
Date…………………………………
1.
Name and address of the Consumer:
2.
Contact No of applicant:
3.
Email-Id of the applicant:
4.
Details of the installation:
5.
Short circuit fault level of the installation:
6.
Date of Commissioning of installation (In case of additional supply or reconnection):
7.
Results of the tests conducted.
Sr. No.
Equipment
Test Conducted
Test Results
Remarks
1.
Linked with
(i) Mechanical Operation
Smooth/Troublesome
Switch Fuse(s)
(ii) Rating of Fuse
……….Amp Full/Partial
(iii) Contact of Blades
1a
Isolator
(i) Mechanical operation
(i) OK/Not OK
(ii) Remote operation
(ii) OK/Not OK
(iii) Local operation
(iii) OK/Not OK
(iv) Measurement of Contact (iv) …….. micro Ohm
resistance
(v) Interlocking with earth
(v) OK/Not OK
switch
(vi) Interlocking with CB
(vi) OK/Not OK
(vii) IR Values
(vii) …….. M Ohm
Open Condition
Ph-Ph Ph-E
Closed Condition
2.
Circuit Breaker
(1) Rating of the Circuit Breaker
Sr. No.
(i) Type
(ii) Voltage
______
(iii) Normal current
(iv) Rupturing capacity
…… kV
(2) IR Values
…….. Amps
Open Condition
........... kA
Closed Condition
Ph-Ph Ph-E ……
Contact Resistance
…..
Mechanical Operation
…….. micro Ohm
Instant smooth
Remote Operation
Local Operation
Time Gap ( Sec)
Interlocking with Isolator
OK/Not
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3073
Interlocking with Earth
OK/Not OK
switch
Alarm and Trip for
OK/Not OK
OTI/WTI/Buchholz/PRV
OK OK/Not OK
Earth Fault Relay
Over Current Relay
OK/Not OK OK/Not OK
Under Voltage Relay SF6
OK/Not OK
Pressure
Alarm and trip Operation
OK/Not OK
Test
Transformer Sr. No.
(a) Insulation resistance
values
1. HT to LT
…… M Ohm
2. HT to earth
….. M Ohm
3. LT to Earth
….. M Ohm
(b) Break down Voltage Test
1) Oil Sample- I (Top)
2) Oil Sample-II Bottom)
......kV
c) Vector Group Test
….. kV
d) Polarity Test
OK/Not OK
e) Magnetizing Balance
OK/Not OK
f) Tan Delta Test (as per
OK/Not OK
capacity)
g) Oil level in conservator
OK/Not OK OK/Not OK
tank
h) Oil level in breather cup OK/Not OK
i) OTI/WTI settings
A/T_oC A/T_oC
j) OTI/WTI Alarm and Trip
operation
OK/Not OK
k) Operation of Buchholz
OK/Not OK
relay
l) Operation of PRV
OK/Not OK
m) Oil leakage
OK/Not OK
n) Interlock of door switch
OK/Not OK
for dry transformer
OK/Not OK
o) Clearance for side
…….. Cms
clearance:
Between two Transformers: ........ Meters
(p) Body Earth resistance
N1….Ohm
Neutral Earth resistance
N2 …Ohm
4.
DG Sets Sl. No.
a) Interlocking with other
OK/Not OK
for Alternator
Supply Sources
Engine
b) Body Earth resistance
N1……Ohm
c) Neutral Earth resistance N2……..Ohm
5.
Cable Size: Sq
A) Insulation Resistance
mm
Values
….M Ohm
1. Ph-Ph
….M Ohm
2. PH -Earth
….M Ohm
3. Ph-Earth + Other Ph
OK/Not OK
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3074
B) Bending Radius
6 .
Earthing
A) Metal and Size of Earth
Cu/Al/GI……. Sq mm
Strips
B) Type of Earthing
1) Plate Earthing
Yes/No
2) Pipe Earthing
Yes/No
3) Counter Poise Earthing
Yes/No
C)Value of Earth resistance
of earth electrodes for
…..N1 Ohm …N2 Ohm
1) Reactor Neutral:
R) …..Ohm (Y)… Ohm
2) LA’s
(B)…. Ohm
3) Structure:
.......Ohm ........Ohm
4) Frames/bodies of
.......Ohm
equipment
5) Motors
OK/ Not OK
7.
Potential
i) Ratio Test
OK/ Not OK
Transformer
ii) Polarity Test
…….kV
iii) BDV of Oil
iv) IR Test
(R) P-E…. M Ohm
(Y) P-E ….M Ohm
(B) P-E …...M Ohm
8.
Current
i) Ratio Test
OK/Not OK
Transformer
ii) Polarity Test
OK/Not OK
iii) BDV of Oil
iv) IR Test
…… kV
R) P-E….. M Ohm
(Y) P-E ….M Ohm
(B) P-E …...M Ohm
9.
Transmission
i) Physical condition of
Ok/Not OK
Line
conductor/tower
ii) Check of tower accessories
Ok/Not
iii) Tower footing resistance
…….Ohm
iv) Conductor continuity
Ok/Not OK
test
v) Check of ground clearance
Ok/Not OK
vi) Check of electrical
Ok/Not OK
clearance along the route
General Observations
Sr. No.
Item
Observation
1.
Check of required phase to phase, phase to ground
and sectional clearance.
2.
Check for equipment layout and overall installation
details.
3.
Test of resistance of earth mat or earth electrodes as
applicable.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3075
4.
Check of consumer’s pre-commissioning test reports
of individual equipment.
5.
Check of manufacturer’s routine/type test reports of
individual equipment.
6.
Whether Inspector’s approval if applicable is obtained.
7.
Whether owner’s self-certification about compliance
with the Regulations is obtained?
8.
General observations and views (specific deviation
from the requirements of the Regulations shall be
clearly brought out).
Name, Signature and Seal of Authority.
—————
ANNEXURE-X
Meter Related Complaints/Request for Testing of Meter
(Tick the applicable purpose)
Complaint reference No.: ............................................. (to be given by Licensee)
1. Service Connection No.:………………………………………………….
2. Name of the consumer: …………..……………………………………….
3. Address and Contact No. of the consumer: ……………………………
4. Email-Id of the consumer……………………………………………………
5. Brief description of the complaint - Burnt out/completely stopped/fast meter/Seal broken/Testing of
Meter ………………….
6. Initial cost of meter was borne by (tick one): Consumer/Licensee ……..........................................………….
7. Complainant desires to provide/has provided a new meter for replacement (Yes/No): …..............………
8. Any other information…………………………
Date:
(Signature of Consumer)
(For Office Use)
1. Site verification report
Signature (concerned official)
2. Comments of concerned official
Signature (concerned official)
ACKNOWLEDGEMENT
Complaint reference No.:
(to be given by Licensee)
Complaint received by:
(name and designation)
Date of receiving complaint:
Signature/Seal of Licensee Representative
Name and Designation
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3076
ANNEXURE-XI
Meter Testing Result Report
1. Consumer Particulars
Service Connection No. ……………..
Name of Consumer ……..................................…………..
Consumer Category…………………….
Contracted Load ………..............................…………….
Address of Consumer…………………………………….
Contact No. of Consumer………………………..
Email-Id of Consumer………………………………
2. Meter Particulars
Meter No. …………………
Size…………………………………….
Type………………………….
C. T. Ratio……………………………..
E/L-LED Status Rev LED Status
3. Revolution/Pulse Test
Meter Constant ……………………….
Load …………………
Reading before test …………........…..
Reading after test ……………….
No. of Revolution/Pulse taken ……..........................
Actual Time Taken for the test ……..
Energy Recorded by meter ……...............……..
Energy Recorded by a standardized Meter Error ……………………………..
RESULT
Consumer Meter recorded …………… % LESS/MORE Consumption…………………….
Needs replacement OR ……...................….. Results are within ………....................…….
Certificate
This is to certify that testing has been carried out as per the procedure. An external load of ……………….
kW was used for testing for 1 kWh and total time taken was ….....................…. minutes. The testing was
carried out by using optical scanner for counting the pulses/revolutions.
Signature of Consumer
Signature of Company Official:
Name:
Name and Designation
Note: Approximate time taken for test for different external loads is as under:
Load in kW
Approximate time in minutes
1 kW
60
2 kW
30
4 kW
15
5 kW
12
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3077
ANNEXURE-XII
Application for Self-Assessed Bill
1.
Name of the Consumer
2.
Service Connection Number
3.
Address
4.
Average consumption of last 6 months
5.
Amount paid by Consumer based on
Current Reading
reading (Self assessed)
Previous Reading
(Must not be less than average
Net Consumption
consumption last 6 months)
Amount
6.
Mode of Payment
Cheque
DD/Money Order
Cash
Signature of Consumer: Contact No. of Consumer:
Name of Consumer: Email-Id of Consumer:
—————
ANNEXURE-XIII
Format for Application of Advance Payment
Service Connection No. ………………… Name of consumer: ……..............................……………….
Consumer category: ………........................……………..
Contracted Load: ………….............…………………
Address of consumer: ………………………… Contact No.: ………………………………..
Email-Id : ……………………………………..
Dear Sir,
I wish to make advance payment for the period from……… to…………against the above referred
connection.
You are requested to kindly send me a provisional advance bill for my electricity consumption of above
period, so that I can make payment.
Thank you.
Signature of Consumer
Name of Consumer:
—————
ANNEXURE-XIV
Format for Inspection Report in case of UUE/Theft
Date of Inspection: ……………
Sr. No.:………………….
Inspecting Agency: ……………
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3078
Service Connection No.
Name of Consumer
Consumer category
Address:
Load Details
(a) Sanctioned/Contracted Load
(b) Maximum demand in kW or kVA or
sanctioned contract demand, whichever
is higher
(c) Total Connected Load with details of each
equipment in case of Theft
Type of Irregularity: (Tick whichever applicable)
Unauthorized Use of Electricity
Theft
Other (Specify in detail)
INSPECTION RESULT:
Meter No. (Painted):
CT Box Seal No.:
Found:
Meter No. (Dial):
Meter Box Seal No.:
Found:
Reading (kWh):
Meter Terminal Seal No.:
Found:
Reading (kVAh):
Half Seal No.:
Found:
Reading (kVARh):
Working Meter:
MDI:
Cable Status:
Power Factor:
CT Ratio:
Size:
Type:
Shunt Capacitor (Tick one)
Shunt Capacitor ____ No. of _____ rating
and _____make found installed in
working order to maintain the power factor;
OR
No shunt capacitor found installed. Power
factor measured ____ lagging
Generator: …......................…… kVA found installed with/without permission Details of Seals.
Other observations by Inspection Team :……………………………………………
Note to Consumer: You are requested to please appear before…........…… on the time and date mentioned
in the Show-Cause Notice issued by inspection team member/police officer.
Signature of Consumer
Name of Consumer: …………………..
Contact No. of Consumer:
Email-Id of Consumer:
Signature of Assessing/Authorized Officer(s):
Signature
Name
Designation
Employee No.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3079
ANNEXURE-XV
Request for Permanent Disconnection & Termination of Agreement
Service Connection No. …….......................................…..
Name of the consumer: …........................................……..
Consumer category: ……….....................................……..
Contracted load: …………...............................…………..
Address: …………………………………………………………………………………………………
…………………………………………………………………………………………………
It is requested that the above connection may be permanently disconnected and the relevant Agreement
with the Licensee be terminated forthwith.
Note: The following documents are attached with the application form:
1. Copy of last bill.
2. Copy of payment receipt of last bill.
Thank you
Date: ………………………..
Signature of the Consumer Place:………………………
Name:
Contact No.
Address:
Email-Id:
—————
ACKNOWLEDGEMENT
Application of .................... (name of applicant) complete in all respects for disconnection and termination
of Agreement has hereby been received at this office on ............................................... (date).
In this regard, the applicant is given a reference No…………to be used for all future correspondence.
Signature/Seal of Licensee’s representative
Name and Designation:
ANNEXURE-XVI
Format for Intimation to Consumer after Termination of Agreement
Licensee’s Office
Date…………...
Office Address…………………………….
Service Connection No. …………………..
……………………………………………… (Name of consumer)
……………………………………………… (Address of consumer)
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3080
……………………………………………….. (Contact No.of consumer)
………………………………………………… (Email-Id of Consumer)
This is to inform you that an agreement dated…………. against Service Connection No………..between
yourself and…………..(name of Licensee) ................... regarding supply of……………… kW/MW (contracted
load) in the .................... consumer category has been terminated w.e.f ......................... (date) on account of
(reason) Your supply has been disconnected permanently.
After final adjustment of all charges and energy bills an amount of:
1. Rs. …….................…..is payable to you for which Cheque No. ................................................ is enclosed.
2. Rs. .................... is due from you. You are requested to pay the amount within a week of receipt of this
letter, failing which, action as prescribed under the law shall be initiated for recovery of the amount.
Thank you.
Sincerely,
Signature/Seal of Licensee’s representative
Name and Designation:
——————
ANNEXURE-XVII
Format for Intimation to Consumer after Temporary Disconnection of Supply
Licensee’s Office Address…………………...................……
Date…………………
Service Connection No.: ………………..
Name of consumer: ……………………..
Consumer category: ………………………..
Contracted Load: ………………………………
Address of consumer: …………………………. Contact No. of consumer: ……………………… Email-Id of
consumer……………………….
This is to inform you that your supply has been temporarily disconnected with effect from ................................
(date) due to the following reason(s):
You are requested to remove the cause of disconnection and intimate this office at the earliest. You are
also requested to pay a sum of Rs. …………..towards disconnection & re-connection charges and…………….
(mention if any other dues are to be deposited, with a detailed breakup).
If the cause of disconnection is not removed to the satisfaction of this office and above amount is not
paid, within 45 days of this notice your supply shall be disconnected permanently without any further
notice.
Thank you.
Sincerely,
,Signature/Seal of Licensee’s Representative
Name and Designation
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3081
ANNEXURE - XVIII
Delimitation of Security Deposit amount
Security deposit amount for a consumer = Load x Load Factor of the category in which the consumer falls
x [30 days (except agricultural consumers) + 30 days] x 24 hours x Current tariff
Sr. No.
Particulars
Load factor2
1.
Domestic
30%
2.
Commercial
50%
3.
LT Industrial
50%
4.
HT/EHT Industrial:
• Single shift industries
50%
• Double shift industries
75%
• Continuous industries
100%
5.
Agriculture/Water Supply
33%
6.
Street lights
40%
7.
Signals & blinkers
75%
8.
Railway Traction
50%
Note: For agricultural consumers the time period shall be 60 days.
—————
ANNEXURE-XIX
Assessment of Energy in cases of Theft
1. The assessment formula for calculation of the consumption due to theft of electricity shall be as under:
Units assessed = L x D x H x F
Where,
L = Load (Connected load found in the consumer’s premises during the course of inspection) in kW;
D = Period of assessment in days, during which unauthorized use/theft is suspected and shall be taken for
different categories of use as specified below:
(a)
Continuous Industry
30 days
(b)
Non-continuous Industry
25 days
(c)
Domestic use
30 days
(d)
Agriculture
30 days
(e)
Non-Residential (continuous) viz. hospital, hotels restaurants, guest houses, nursing homes, petrol
pumps and Tele-communication towers
30 days
(f)
Non Residential(general) i.e., other than (e)
25 days
(g)
Water works & Street lights
30 days
(h)
Other Categories (including temporary supply)
30 days
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3082
H = Average number of hours per day of power supply made available in the distribution mains feeding
the consumer which shall be taken for different categories as specified below:
(a)
Single shift Industry (day/night only)
08 hrs
(b)
Non continuous process industry (day & night)
20 hrs
(c)
Continuous process industry
24 hrs
(d)
(i) Non-Residential(general)including restaurants
12 hrs
(ii) Hotels, hospitals, nursing homes, guest houses,
Petrol pumps and Tele-communications towers
20 hrs
(e)
Domestic
08 hrs
(f)
Agriculture
04 hrs
(g)
Water works
08 hrs
(h)
Street lights
08 hrs
(i)
Other categories (including temporary supply)
12 hrs
F = Load factor, which shall be taken for different categories of use as given below:–
Sr. No.
Particulars
Load factor
1.
HT (including load above 75 kW for non-domestic
and above107 HP or 100 kVA for
100%
2.
LT Industrial (107 HP or 100 kVA)
75%
3.
Non- domestic (up to 75kW)
50%
4.
Domestic (up to 75 kW)
40%
5.
Agriculture
50%
6.
Water supply
50%
7.
Street light
50%
8.
Direct theft - All categories
100%
2. Assessment of energy in case of temporary connection
In the case of temporary connection, the assessment of units consumed for theft of electricity shall be
done as under:
Units assessed = L x D x H
Where,
L = Load (found connected at the time of inspection) in kW;
D = Period of assessment in days; and
H = 6 hours for agriculture connections and 12 hours for others.
—————
ANNEXURE-XX
General Conditions of Supply
Wiring on Consumer’s Premises
1. The work of wiring at the premises of the consumer shall be carried out by a Licensed Electrical
Contractor and conform to the standards specified in Central Electricity Authority (Measures relating to
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3083
Safety and Electricity Supply) Regulations, 2010. The material used for wiring shall comply with or be
superior to the standards laid down by the Bureau of Indian Standards. All high-rise buildings, having a
height of more than 15 meters from ground level, shall also comply with Rule 50-A of the Central Electricity
Authority (Measures relating to Safety and Electricity Supply) Regulations, 2010. Wiring shall be tested as
per provisions of regulation 31 of the Central Electricity Authority (Measures relating to Safety and Electricity
Supply) Regulations, 2010.
Installation of AC Motors
2. No AC motor shall be connected to the low or medium voltage system of the Licensee unless the motor
and the installation thereof has a suitable device to limit the starting current in accordance with the
requirement indicated below.
(1) Power supply shall not be given to any applicant at low or medium voltage for utilizing induction
motors of 3 HP capacity or above or welding transformers of 1 kVA capacity or above, unless shunt capacitors
of appropriate rating are installed by the consumer across the terminal of such motors and welding
transformers to achieve an average monthly power factor that is specified in this Supply Code, 2018.
(2) Motors of low or medium voltage shall be provided with control gear to satisfactorily prevent the
maximum current demand from the consumer’s installation exceeding the limits given in the following
schedule under all possible conditions:
Nature of Supply
Sizeof Installation
Max. Current Demand
Single phase/
(a) Up to and including 1 BHP.
Six times full load current
Three phase
(b) Above 1 BHP and up to and including
Three times full load current
10BHP
(c) Above 10 BHP and up to and including
Two times the full load current
15 BHP
(d) Above 15 BHP
One and a half times the ful
load current
Failure to comply with these requirements shall render the consumer liable to be disconnected. The
Licensee may, depending on the location and condition of working, relax the starting current limit.
(3) A triple pole linked switch protected by a no-volt release shall control the motor circuit and triple pole
fuses (or overload release). It is important that the release shall be maintained in good working order. Wiring
for motors shall be run with all three-phase wire bunches in a metallic conduit, which shall be effectively
earthed throughout and shall be connected to the frame of the motor from which two separate earth wires
shall run. The minimum permissible size of the earth wire permitted shall be No. 14 SWG. Central Electricity
Authority (Measures relating to Safety and Electricity Supply) Regulations, 2010, as amended from time to
time, shall be complied with in every respect.
(4) Total harmonic voltage distortion shall not exceed the limits mentioned below:
EHT = 4%
HT = 10%
LT = 15%
(5) In addition, synchronous motors shall also be provided with an apparatus to control wattles
current.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3084
Installation of Irrigation/Agriculture Pump Set
All new pumping set connection/reconnections shall have the following:
(1) Friction less foot valve.
(2) HDPE piping suction and delivery.
(3) ISI marked energy efficient monobloc pump set.
(4) Capacitor of adequate rating for the pump set.
Parallel Operation with the Supply System of Licensee
3. The consumer shall arrange the plant, machinery and apparatus of his generating units, including an
extension of or addition to the same, to operate in an isolated mode, with the consent of the Distribution
Licensee, for capacity above 50 kW. Where consent has been given for parallel operation, the consumer shall
arrange his installation to protect it from disturbances in the Licensees system. The Licensee shall not be
liable for any damage caused to the consumer’s plant, machinery and apparatus on account of such parallel
operation, or any adverse consequence arising thereof. For parallel operation with the grid, the consumer
shall have to follow the provisions of the JERC State Grid Code Regulations, 2010 as amended from time to
time and other relevant regulations and shall pay synchronizing charges as approved by the Commission.
The actual operations shall be carried out in coordination with the STU and the Licensee.
4. If it is brought to the notice of the SLDC/Licensee that a particular consumer is using electricity during
emergency rostering by unauthorized or irregular means, the feeder feeding such a consumer shall be
opened to dis energize it from the source grid sub-station, on instructions from the SLDC, for which the
consumer shall be solely responsible.
—————
ANNEXURE-XXI
FORM OF PERFORMANCE GUARANTEE/BANK GUARANTEE BOND
In consideration of the ............... Name of Licensee (Herein called “name of distribution Licensee…….”
which expression shall unless repugnant to the subject or contract include his successor and assigns)
having agreed to exempt M/s________________ situated at Plot No. ............. Survey No._______ having its
registered office at ________(herein after called “ the Consumer(s)”) from the payment of Security Deposit
under Joint Electricity Supply Code Regulations 2018 (hereinafter called Supply Code, 2018 for supply
of___.kVA High Tension power on production of Bank Guarantee for Rs.____(Rupees______only).
1. We___________ (hereinafter referred to as “the Bank”)at the request of M/s__________do hereby
undertake to pay the Name of Licensee .................. an amount not exceeding Rs.______(Rupees .............only)
against any loss or damage caused to or suffered or would be caused to or suffered by the ................... Name of
Licensee by any reason of any breach by the said consumer(s) of any of the terms and conditions contained
in the said Joint Electricity Regulatory Commission (Supply Code) Regulations,2018 and other agreement/
/rules for supply of electrical energy prevailed in Name of place from time to time.
2. We_________do hereby undertake to pay amounts due and payable under this guarantee without any
demur, merely on a demand from the Name of Licensee stating that the amount claimed is due by way of loss
or damage caused to or would be caused to or suffered by the ................... Name of Licensee by reasons of the
breach by the said consumer(s) of any of the terms and conditions of the said Joint Electricity Regulatory
Commission (Supply Code) Regulations,2018 or any other rules/agreements for supply of electrical energy.
Any such demand made on the bank shall be conclusive as regards the amount due and payable by the bank
under this guarantee. However, our liability under this guarantee shall be restricted to an amount not
exceeding Rs. ……….......................…… (Rupees .............................. only).
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 47
21ST FEBRUARY, 2019
3085
3. We, the said bank further undertakes to pay the Name of Licensee any money so demanded
notwithstanding any dispute or disputes raised by the consumer(s)in any suit or proceeding pending
before any court or Tribunal relating thereto, our liability under this present being absolute and unequivocal.
4. We ....................... (Name of the Bank) further agree that the Guarantee herein contain shall remain in
full force and effect during the entire period of power supply or any other period covered under the said
Joint Electricity Regulatory Commission (Supply Code) Regulations,2018 or any other rules/agreements
applicable to the supply of Electrical Energy but not beyond Date(D) and it shall continue to be enforceable
till all the dues of the Name of the Licensee have been fully paid unless a claim or demand under this
Guarantee is made on us in writing on before D+6 months shall be discharged from all liability under this
guarantee thereafter.
5. We _____________________further agree with the (Name of Licensee) that the Name of Licensee shall
have the fullest liberty wits and conditions of the said Joint Electricity Regulatory Commission (Supply
Code) Regulations, 2018 or any other rules/agreement for the supply of electrical energy and we shall not be
relieved from our liability by reason of any such variation.
6. This guarantee will not be discharged due to the change in the constitution of the Bank or the
consumer(s).
7. We, …………………………. (indicate the name of the bank) lastly undertake not to revoke this guarantee
during its currency except with the previous consent of the Name of the Licensee in writing.
8. This guarantee shall not be valid up to ………………… unless extended on demand by the Name of
Licensee. Notwithstanding anything mentioned above, our liability against this guarantee is restricted to
Rs. ………(Rupees………………….) and unless a claim in writing is lodged with us within six months of the
date of expiry or the extended date of expiry of this guarantee all our liabilities under guarantee shall stand
discharged.
Dated the ………… day of ………….. for ……………….. (Name of Bank).
www.goaprintingpress.gov.in
Printed and Published by the Director, Printing & Stationery,
Government Printing Press,
Mahatma Gandhi Road, Panaji-Goa 403 001.
PRICE – Rs. 91.00
PRINTED AT THE GOVERNMENT PRINTING PRESS, PANAJI-GOA—361/160—2/2019.