559
Panaji, 06th August, 2020 (Sravana 15, 1942)
SERIES I No. 19
Reg. No. G-2/RNP/GOA/32/2018-2020
RNI No. GOAENG/2002/6410
PUBLISHED BY AUTHORITY
Suggestions are welcomed on e-mail: dir–[email protected]
NOTE
There are two Extraordinary issues to the Official Gazette, Series I No. 18 dated 30-07-2020, namely:—
(1) Extraordinary dated 04-08-2020 from pages 543 to 546, Notification No. 38/1/2017-Fin(R&C)(164)/559 regarding
GST from Department of Finance (R&C) and Notification No. 120/03/JERC-FPPCA/CEE/Tech regarding Levy of FPPCA
for 1st Quarter of FY 2020-21 from Department of Power.
(2) Extraordinary dated 04-08-2020 from pages 547 to 558 from Goa Legislature Secretariat regarding the Goa
Appropriation Bills and from Department of Law (Legal Affairs) regarding the Goa Appropriation Act, 2020.
INDEX
Department
Order/Notification
Subject
Pages
1.a. Non Conventional Sources
Not. 1-2/Admin/NCSE/2020-21/20
Scheme for implementation of RVE
559
of Energy
Programme in the State of Goa
Dir. & ex off. Jt. Secy.
b. -do-
Not.- 1-2/Admin/NCSE/2020-21/21 Scheme for promotion of Grid connected
561
Solar Rooftop System with Net Metering
System
c. -do-
Not.- 1-2/Admin/NCSE/2020-21/22 Amended Goa State Solar Policy-2017
563
2.
Rural Development
Not.- DRDA-N/MON./8-181/2020-
Authentication or proof for Goa Aadhaar
574
DRDA
-21/604
(TDFOSBS) Act, 2017.
Project Dir. & ex off. Jt. Secy.
GOVERNMENT OF GOA
Department of Non Conventional Sources
of Energy
___
Notification
1-2/Admin/NCSE/2020-21/20
“SCHEME FOR IMPLEMENTATION OF
THE RURAL VILLAGE ELECTRIFICATION
(RVE) PROGRAMME IN THE
STATE OF GOA
1. Short title and commencement.— (i) This
scheme may be called as Implementation of
“Rural Village Electrification in the State of
Goa”.
(ii) It shall come into force with immediate
effect.
(iii) The scheme shall be implemented
through Goa Energy Development Agency
(GEDA).
2. Introduction to the scheme.— Keeping
in view the role of electricity in human and
socio economic development, this scheme is
formulated to ensure last mile connectivity
and electricity connections to all remaining
un-electrified households in the State of Goa.
This scheme is therefore formulated in
order to fulfill the target of Government of
100% electrification in the state.
3. Objectives of the scheme.— The objective
of the Programme is to achieve household
electrification through renewable energy
sources of those un-electrified remote census
villages/hamlets/wadas
where
grid
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
560
connectivity is either not feasible or not cost
effective.
4. Scope of the scheme.— The main scope
of this scheme is providing Solar Photo Voltaic
(SPV) based standalone systems for un-
electrified households located in remote and
inaccessible villages/habitations, where grid
extension is not feasible or not cost effective.
5. Eligibility for availing benefits under the
scheme.— The current eligibility of villages/
hamlets/wadas will be as follows:
(i) Census un-electrified villages/hamlets/
wadas having population of less than 50
subject to following certifications:
(a) A certificate from the Village
Panchayat that the house/households is
in existence.
(b) A certificate from the Electricity
Department, Goa, that the villages/
hamlets/wadas is un-electrified and is not
being taken up for electrification under
State/Central programmes.
6. Quantum of financial subsidy under the
Scheme.— 100% financial assistance will be
provided to household of maximum limit of
Rs. 90,000/- per household for 500Wp solar
system (including transport, installation and
the cost of Annual Maintenance Contract
(AMC), for 5 years).
Electricity charges as determined by
Government on monthly basis be charged
from each households (depend on number of
units consumed) to create corpus fund
(village wise/hamlet wise) which can be used
for maintenance of the systems after expiry
of AMC period.
7. Pattern of Assistance of the Scheme.—
(i) “The GEDA shall be entitled to
Government grants based on the estimate
approved by the Government in the Budget
Estimate during that financial year” for the
scheme and will be sanctioned as per the
terms and conditions laid by the Government.
(ii) The entire amount of the grants should
be utilized within a period of one financial
year and only for the purpose of which it is
sanctioned. Any portion of the grant, which
is not ultimately required, will be refunded
to the Government. After ‘utilizing/refunding’
the above sanctioned amount, an utilization
certificate should be furnished to the
sanctioning authority as required under Form
GFR – 19A.
(iii) The account of the grantee in respect
of this grant should be audited by the
Government approved Auditor/Chartered
Accountant concerned immediately after the
end of the financial year on completion of six
months for which the grant is sanctioned.
The account of the grants shall be maintained
separately and properly from its normal
activities and submitted as and when
required. They shall be open to a test check
by the Controller and Auditor General of India
at his discretion.
8. Relaxation of the provisions of the
scheme.— The Government shall be
empowered to relax any or all of the clauses
or conditions of this scheme in genuine
case(s) for sanction of the grant.
9. Interpretation of the provisions of this
scheme.— If any question arises regarding
interpretation of any clause, word, expression
of the scheme, the decision about the
interpretation shall lie with the Government,
which shall be final and binding on all
concerned.
10. Redressal of grievances and dispute.—
Grievances or disputes if any, arising out of
implementation of this scheme, shall be
referred to the Secretary, NCSE to
Government of Goa who shall hear and
decide such matters and the decision of the
Secretary (NCSE) to the Government in this
regard shall be final and binding on all
concerned.
Provided no grievance or dispute regarding
the decision of the Government under clause
6 (iv) above shall lie with any authority or
tribunal or court, in respect of the decision.
11. This scheme has been issued with the
concurrence of the Finance (Exp.) Department
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
561
vide their U.O. No. 1400070385 dated
2-05-2020.
By order and in the name of Governor of
Goa.
Aleixo F. da. Costa, Director & ex officio
Joint Secretary (NCSE).
Panaji, 30th July, 2020.
________
Notification
1-2/Admin/NCSE/2020-21/21
“SCHEME FOR PROMOTION OF GRID
CONNECTED SOLAR ROOFTOP SYSTEM
WITH NET METERING SYSTEM”
1. Short title and commencement.— (i) This
scheme may be called as Grant of subsidy to
Grid Connected Solar Rooftop Installation with
Net Metering System.
(ii) It shall come into force with immediate
effect.
(iii) The scheme shall be implemented
through Goa Energy Development Agency
(GEDA).
2. Introduction to the scheme.— (i) The
Govt. of India has put up the target of
increasing renewable energy generation
capacity of 175 GW by 2022. Out of which 40
GW is to be achieved through Solar Rooftop
only. The Ministry of New and Renewable
Energy (MNRE), Govt. of India has set a target
of 150 MW of Solar Rooftop (out of 40 GW) to
the State of Goa.
(ii) Government of Goa has launched the
scheme for promoting Solar Photovoltaic
Rooftop Grid Connected systems with Net to
complete the target by 2022 and fulfill the
goal of the Government of India.
(iii) Grid connected Rooftop Solar Power
with Net metering system in the State will be
as per the Goa State Solar Policy 2017 and its
amendments from time to time.
(iv) This scheme is therefore formulated
in order to promote Grid Connected Solar
Rooftop systems with Net metering System
in the State.
3. Objectives of the scheme.—This scheme
is formulated with the objectives:—
(a) To promote Grid Connected Solar
Rooftop Installations with Net Metering
System to all the Prosumer’s eligible for
subsidy as provided in the Goa State Solar
Policy, 2017 and its amendments from time to
time.
(b)
To provide Financial Assistance for
promotion of Solar Rooftop Installations with
Net Metering System to all the Prosumer’s in
the State and fulfill the target of 150MW of
the State of Goa set by Government of India
by 2022.
4. Scope of the scheme.— (i) The main
scope of this scheme is to promote &
popularize Grid Connected Solar Rooftop
System with Net Metering System, to all the
Prosumers by providing Financial Assistance
as provided in the Goa State Solar Policy-2017
and its amendments from time to time to
achieve the objectives set out in the scheme.
(ii)
Financial Assistance under this
scheme shall be provided for the Installation
of Grid Connected Solar Rooftop System with
Net Metering.
(iii) 50% of Financial Assistance shall be
provided in the form of subsidy with a
maximum limit of Rs. 54,000/- per kW (i.e.
Benchmark cost set by MNRE) towards the
installation of Grid Connected Solar Rooftop
systems with Net metering to residential
purpose ranging from 1kW to 90kW. The
benchmark cost shall vary time to time as
per MNRE guidelines.
(iv) 50% of Financial Assistance shall be
provided in the form of subsidy with a
maximum limit of Rs. 54,000/- per kW (i.e.
Benchmark cost set by MNRE) towards the
installation of Grid Connected Solar Rooftop
Systems with Net Metering to Educational
Institutions (non profit making) ranging from
1kW to 90kW. The benchmark cost shall vary
time to time as per MNRE guidelines.
(v)
20% of Financial Assistance shall be
provided in the form of subsidy with a
maximum limit of Rs. 54,000/- per kW (i.e.
Benchmark cost set by MNRE) towards the
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
562
installation of Grid Connected Solar Rooftop
Systems with Net Metering to residential
purpose ranging from 1kW to 90kW. The
benchmark cost shall vary time to time as
per MNRE guidelines.
(vi) Installations upto LT level i.e. 1kW up
to 90 kW only will be considered for subsidy.
5. Eligibility for availing benefits under the
scheme.— (i) All the buildings/houses which
are registered with Panchayat or Municipality
having permanent Electricity connections are
eligible for subsidy under the scheme.
(ii) Benefit under this scheme shall be
disbursed on first come first serve bases.
(iii) All those Prosumers who have carried
out installation after 21st December, 2017 will
get benefit of the subsidy and incentives
included in the policy.
(iv) The installations eligible for subsidy
on bench mark cost of MNRE or as per the
derived cost by GEDA whichever is lower.
6. Quantum of financial subsidy under the
Scheme.— (i) The total amount of Financial
Assistance shall be restricted to Rs.
2,00,00,000/- only on first come first serve
bases.
(ii) The Financial Assistance @ 50% of the
installation on bench mark cost of MNRE or
as per the derived cost by GEDA whichever
is lower shall be disburse as subsidy for the
installation of Grid Connected Solar Rooftop
systems for Residential and Educational
Institutions purpose.
(iii) The Financial Assistance @ 20% of the
installation on bench mark cost of MNRE or
as per the derived cost by GEDA whichever
is lower shall be disburse as subsidy for the
installation of Grid Connected Solar Rooftop
Systems for Industrial and Commercial
purpose.
(iv) Residential,
Institutional
and
Commercial beneficiaries shall be entitled for
subsidy from capacity of 1kW to 90kW i.e.
restricted to LT consumers only.
(v)
Government reserves the right to stop
future grants and also modify the financial
quantum, so also the conditions of the
scheme, depending upon the budgetary
provisions made.
(vi) Government also reserves the right to
sanction the grant to the GEDA as well as to
hold the scheme in abeyance or suspend or
cancel the scheme, at any point of time and
no claim or appeal or challenge shall lie with
any authority or tribunal or court, in respect
of this decision of the Government.
7. Pattern of Assistance of the Scheme.—
(i) “The GEDA shall be entitled to
Government grants based on the estimate
approved by the Government in the Budget
Estimate during that financial year” for the
scheme and will be sanctioned as per the
terms and conditions laid by the Government.
(ii)
The
GEDA
shall
promote
the
installation of Grid Connected Solar Rooftop
Installations with Net Metering system to all
the Prosumer’s by following the needful
formalities.
(iii) Financial Assistance in the form of
Subsidy shall be released upon completion of
six months of solar power being injected into
the grid.
(iv) The entire amount of the grants should
be utilized within a period of one financial
year and only for the purpose of which it is
sanctioned. Any portion of the grant, which
is not ultimately required, will be refunded
to the Government. After ‘utilizing/refunding’
the above sanctioned amount, an utilization
certificate should be furnished to the
sanctioning authority as required under Form
GFR–19A.
(v)
The account of the Grantee in respect
of this grant should be audited by the
Government approved Auditor/Chartered
Accountant concerned immediately after the
end of the financial year on completion of six
months for which the grant is sanctioned.
The account of the grants shall be maintained
separately and properly from its normal
activities and submitted as and when
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
563
required. They shall be open to a test check
by the Controller and Auditor General of India
at his discretion.
(vi) The audited statement of accounts
showing the expenditure incurred by the
grantee from the grants should be furnished
to the Government as soon as possible after
the close of the financial year on completion
of six months for which the grant is
sanctioned together with a certificate from
the Auditor to the effect that the grant was
utilized for the purpose for which was
sanctioned.
(vii) The performance–cum-achievement
report specifying in detail the achievements
made by the grantee with the Government
grants/amount sanctioned should be
furnished to concerned Department as soon
as possible.
(viii) The audited statement of accounts
showing the expenditure incurred by the
Grantee from the grants should be furnished
to the Government as soon as possible after
the close of the financial year or on
completion of six months for which the grant
is sanctioned together with a certificate from
the Auditor to the effect that the grants was
utilized for the purpose for which it was
sanctioned.
(ix) A
performance-cum-achievement
report specifying in detail the achievements
made by the Grantee with the Government
grants/amount sanctioned should be
furnished to the Department of Non-
Conventional Sources of Energy annually.
(x) The grantee institution must exercise
reasonable economy, observe all financial
proprietary and the financial rules as issued
by the Government from time to time while
incurring the expenditure.
(xi) In case of miss-utilization of grants, the
amount so miss-utilized shall be recovered
from the grantee institution.
(xii) The amount remaining unspent out of
this grant shall be refunded back to the
Government Treasury by challan within 03
(three) months from the close of financial year.
8. Relaxation of the provisions of the
scheme.— The Government shall be
empowered to relax any or all of the clauses
or conditions of this scheme in genuine case
(s) for sanction of the grant.
9. Interpretation of the provisions of this
scheme.— If any question arises regarding
interpretation of any clause, word, expression
of the scheme, the decision about the
interpretation shall lie with the Government,
which shall be final and binding on all
concerned.
10.
Redressal of grievances and dispute.—
Grievances or disputes if any, arising out of
implementation of this scheme, shall be
referred to the Secretary, NCES to
Government who shall hear and decide such
matters and the decision of the Secretary to
the Government in this regard shall be final
and binding on all concerned.
Provided no grievance or dispute regarding
the decision of the Government under clause
6 (v) above shall lie with any authority or
tribunal or court, in respect of the decision.
11. This scheme has been issued with the
concurrence of the Finance (Exp.) Department
vide their U.O. No. 3785 dated 19-06-2020.
By order and in the name of Governor of
Goa.
Aleixo F. da. Costa, Director & ex officio
Joint Secretary (NCSE).
Panaji, 30th July, 2020.
________
Notification
1-2/Admin/NCSE/2020-21/22
AMENDED GOA STATE SOLAR
POLICY-2017
1. Preamble.— Solar energy is the most
secure of all energy sources. It is abundantly
available. It can be easily converted into
electrical energy. Production of electrical
power and its easy availability at regulated
rates is an established benchmark of
development. No major economic activity can
be sustained without adequate and reliable
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
564
sources of power. The challenges of Climate Change and Global Warming resulting from
burning of fossil fuels are continuously threatening the world community. Solar Power
generation offer an environmentally safe and sustainable alternative.
Goa is richly endowed with moderate climate and bright sunshine for almost 8-9 months
in a year for generating solar power. The State of Goa entirely depends on thermal energy
generated from other States. Goa being eco-sensitive, no Thermal Energy generation is possible
in the State. Hence in order to attain self-reliance in power generation and to promote clean
source of power, Solar Policy is being adopted. This would also result in reduction of carbon
emissions.
The challenge before the State Government is not only to meet the ever growing demand
for power but also to progressively increase the share of Renewable Sources in the energy
- mix so as to achieve overall energy security and also to meet the RPO as per the target fixed
by appropriate authorities from time to time. This can be achieved by promoting the systematic
tapping of the solar energy potential to the maximum. Technological improvements have now
made generation of solar energy economically viable and would lead to reduction in
expenditure of the State for purchase of Conventional Power from the Grid.
An appropriate policy framework is therefore essential to promote the Solar Energy
generation initiatives. Therefore, the State Government is pleased to introduce the “Goa State
Solar Policy -2017”, as under:
2. Title of the Policy.— This policy shall be known as the “Goa State Solar Policy-2017”
3. Operative Period.—
3.1 The policy shall come into effect from the date of its notification and shall remain valid
up to FY 2021-22, until superseded or modified by another policy.
3.2 The Government may undertake review of this Policy at regular time intervals and
modify/amend the provisions of the Policy as and when required with a view of any
technological advancement and/or to remove difficulties.
3.3 The eligible entities participating under this policy shall continue to be eligible for the
incentives declared under this policy for the envisaged period.
4. Abbrevations and Definitions.—
5.1
GEDA
Goa Energy Development Agency
5.2
EDG
Electricity Dept., Govt. of Goa
5.3
MNRE
Ministry of New and Renewable Energy
5.4
CEA
Central Electricity Authority
5.5
CERC
Central Electricity Regulatory Commission
5.6
JERC
Joint Electricity Regulatory Commission
5.7
SRTPV
Solar Rooftop Systems
5.8
RPO
Renewable Purchase Obligation
5.9
SPG
Solar Power Generators
5.10
RESCO
Renewable Energy Service Company
5.11
PPA
Power Purchase Agreement
5.12
REC
Renewable Energy Certificate
5.13
APPC
Average Power Purchase Cost
5.14
SLDC
State Load Dispatch Centre
5.15
ACT
means Electricity Act, 2003, including amendments thereto
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
565
5.16
PROSUMER
“Prosumer” is a Consumer having an already connected load with the
EDG and is also a Producer of Solar Power
5.17
SMALL
Small Prosumer is a consumer already having an LT connection i.e.
PROSUMER
Sanction load/Contract Demand upto 90 kW with EDG.
5.18
LARGE
Large Prosumer is a Consumer having an HT connection i.e. Sanction
PROSUMER
load/Contract Demand above 90 kW with EDG
5.19
PRODUCER
The Producer is an entity intending to set up a Solar Power plant with a
capacity of more than 100kW exclusively for sale of power to the Distribution
Licensee under Gross Metering as per the tariff discovered by Reverse
Bidding.
5.20
PRE-DETER-
The tariff will be predetermined before the tender
MINED
CEILING
TARIFF
5. Operating Modes.— The general configuration adopted for deployment of Grid connected
SRTPV in India is without storage capacity. However, the State of Goa had pursued deployment
of Solar PV systems with storage in the past as off-grid systems. The storage component has
been an enabling feature for the State prone to climatic conditions by allowing Grid connected
SRTPV system with storage, the State strives to set an example. Thus, the State endeavours
to promote Grid connected Solar Rooftop Systems, both with and without storage. A minimal
storage component shall enhance the reliability of power supply in the State. The State
envisages designing and promoting a unique and innovative Grid connected SRTPV program
incorporating the storage component which opens pathways to increased self-consumption
and improved grid services.
The State strives to promote Grid connected SRTPV Systems with both storage and non-
storage systems for residential and other LT consumers and Grid connected SRTPV Systems
with advanced storage options capable of peak power management for industries and other
HT consumers.
6. Target.—
6.1 The State shall strive to achieve the objectives of the policy and aim to comply with the
target of 150 MW by 2022 as proposed by MNRE for the State.
6.2 In the last financial years, there has been minimal Grid connected Solar Rooftop Systems
installation in the State of Goa. The State shall revise the target to achieve its 150 MW
solar rooftop by FY 2022. The revised target distributed during the policy period is
shown in Table.
Table 1: Revised Target During Policy Period
Rooftop Solar
Yearly Target Distribution
Photovoltaic Target
FY 2019-20
FY 2020-21
FY 2021-22
150 MW
25
55
50
6.3 To help develop a robust implementation plan, the SRTPV target is further apportioned
based on the consumer segment. The Industrial consumer category is the largest
consumer in the State of Goa. This target trajectory and target segregation among
various consumer categories shall guide GEDA and EDG to design or develop an
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
566
approach that may help accelerate Grid connected SRTPV Systems deployment in the
State of Goa.
Table 2: Consumer Segment Wise Target (MW)
Consumer Segment
FY 19-20
FY 20-21
FY 21-22
Residential
5
25
15
Educational Institutions
10
15
10
NGO’s
Commercial(Urban)
10
25
35
Industrial
Total
Project Based Provisions
7. Rooftop PV Solar Systems.— Rooftop PV Solar Systems with NET Metering: The State
Government will facilitate installation of Rooftop PV Solar Power Systems in the State.
(i) The State will promote setting up of grid connected Rooftop PV Solar Power Plants
under Net metering arrangement.
(ii) Rooftop Solar Power Plants can be set up on Government Buildings on RESCO Model.
A tri-parted Agreement shall be executed between Consumer, GEDA, EDG and Developer.
Out of the total amount 1% of the amount shall be transferred to GEDA for long term
maintenance of the system. If the developer defaults or abandons the installed system
GEDA shall take over the system and maintain the system.
(iii) Rooftop consumers will be provided subsidies/incentives as per the guidelines of
MNRE/State Government.
(iv) Start-ups will be promoted for installation of Rooftop Solar Systems.
The following provisions shall be applicable to Small and Large Prosumers:-
Capacity
Small Prosumers upto 100% of Sanction load/Contract demand upto 90 KW
Large prosumers upto their Sanction load/Contract Demand such that
anticipated generation in the year is not more than 100% of the electricity
consumption in the previous (12) months.
Metering
Bi-directional meter as specified by EDG.
Tariff
In case of NET Import consumers existing tariff shall apply.
In case of NET export any surplus energy generated and exported after
consumption at the end of the billing cycle shall be purchased by EDG at JERC
approved solar tariff rates for that year or APPC rate whichever is lower.
8. Producer (For the Sale of Power to the EDG).— EDG, in order to meet their RPO may
purchase solar power from Producer at a power purchase rate determined through Reverse
bidding. The solar power plant can be installed on rooftop or ground based.
Capacity
As advertised/published by Government or its agencies for four sizes of
installation under Reverse bidding i.e.
i) 100kW to 1MW,
ii) 1MW to 5MW,
iii) 5MW to 10MW and
iv) 10MW & above.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
567
Tariff
The producer will be selected through Reverse Bidding on the basis of Generic
Tariff notified by JERC for solar PV Projects. At the above discovered price of
Solar tariff for that slab/size, the EDG will enter into a Power Purchase Agreement
(PPA) with all intending producers subject to availability of infrastructure for
evacuation of power.
Metering
Using Trivector meter at receiving end of sub-stations of 11 KV/33 KV as specified
by the EDG.
Transmission charge As applicable to normal open access consumer determined by JERC.
Transmission loss
As applicable to normal open access consumer determined by JERC.
Wheeling charge
As applicable to normal open access consumer determined by JERC.
Wheeling loss
As applicable to normal open access consumer determined by JERC.
Cross subsidy
Exempted.
surcharge &
additional
surcharge
RPO
The energy generated by the SPG and procured by the EDG shall be credited
towards the DISCOMs RPO.
9. Solar Projects with Sale of Power to Third Party under Open Access.— In order to boost
the growth and production of Solar Energy in the State, the Goa State opens up the state to
Open-Access solar energy. Consumers with demand load of 1 MW and above shall be eligible
to take power under open access during the peak hours (6 pm to 11 pm).
Capacity
Contracted upto maximum of 50% of the sanction load/contract demand of the
consumer.
Tariff
Mutually agreed upon tariff between the developer and the consumer for the
energy consumed by consumer. Surplus to be sold to EDG at APPC if RPO not
given to Discom or at 85% of rate if RPO given to Discom.
Metering
Using Trivector meter at receiving end of sub-stations of 11 KV/33 KV as specified
by the JERC.
Transmission charge As applicable to normal open access consumer determined by JERC.
Transmission loss
As applicable to normal open access consumer determined by JERC.
Wheeling charge
As applicable to normal open access consumer determined by JERC.
Wheeling loss
As applicable to normal open access consumer determined by JERC.
Cross subsidy
For the projects not registered under REC-50% of cross subsidy surcharge
surcharge and
applicable to normal open access consumers determined by EDG.
additional surcharge For the projects registered under REC as applicable to normal open access
consumers determined by JERC.
REC
i) if not registered under REC mechanism:not applicable.
ii) if registered under REC mechanism: REC shall be claimed by producer.
RPO
i) Case I: if not registered under REC mechanism: if the consumer does not
intend to take credit of the generated solar energy towards its RPO, the
generated solar energy shall be credited towards meeting the DISCOM’s
RPO.
ii) Case II:
(a) consumer who set up SPG for meeting its own RPO credit to the extent
of the solar energy consumed by it. However, DISCOM shall get RPO credit
for surplus solar energy (after 15 minutes cycle adjustment) purchased by it
at APPC of the year in which the SPG is commissioned.
(b) if registered under REC mechanism: not applicable as REC will be claimed.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
568
10. Metering Arrangements
10.1 Net Metering.— In this arrangement,
the energy generated from Grid
connected SRTPV systems installed at
the premises of eligible entity is
consumed by the consumer and
surplus electricity, if any, is delivered
to the Distribution Utility after off-
setting the electricity supplied by the
Distribution
Utility
during
the
applicable billing period. The metering
and billing arrangement should
comply with appropriate Regulations
and Guidelines, technical standards
and safety measures of CEA or JERC.
10.2 Gross Metering.— Gross Metering
Framework is not allowed for Solar
Rooftop System as per the “Joint
Electricity Regulatory Commission for
the State of Goa and UTs (Solar PV Grid
Interactive System based on Net
Metering) Regulations, 2019.
The Metering of grid connected SRTPV
systems shall be as per NET or GROSS
as specified by EDG.
11. Business Models.— Business models
are critical to develop an investment-friendly
climate in the Grid connected SRTPV Systems
sector. Further, to achieve the target of 150
MW as laid out under this policy, it is
pertinent to incorporate the best possible
business models to lay foundation for large
scale deployment of Grid connected SRTPV
Systems in the State. Robust business models
ensure investors/developers adequate return
on their business. There are multiple ways
and means for an investor/developer to
generate maximum possible revenue out of
their investment such as, through a Power
Purchase Agreement (PPA) with the
Distribution Utility/rooftop owner/open
access consumer or through direct sale of
equipment and engineering services.
The Government of Goa envisage following
business models to develop vibrant and
dynamic market.
(A) Model-I: Self-Owned.— Self-Owned
business model, also known as capital
expenditure based (CAPEX) business
model, is the most common business model
for solar rooftop deployment. Under this
business model, a consumer develops solar
rooftop system within their premises to
own, operate and generate electricity to
be used for own consumption within the
premises (under net metering only).
(B) Third Party/RESCO/BOOT Model.—
Under this model any RESCO, builds, owns
and operates solar rooftop plants in the
consumer’s premises to generate and sell
electricity to the consumer. The Consumer
may lease out/rent the Rooftop Space/
Land to a Solar Project Developer on a
mutual commercial arrangement for setting
up Solar Project under Net Metering
framework.
Under JERC Net Metering Regulations,
it is specified that Consumer and investor
signs a Power Sale Agreement and/or Roof
Lease Agreement for a period of 15 – 20
years on mutually agreed basis, which
covers tariff of electricity, tenure of the
agreement, ownership at the end of the
tenure etc. Post PPA term the project is
transferred to the consumer at NIL or
mutually agreeable price.
The Consumer will pay the Solar Project
Developer for all the energy generated by
the Solar Project at a mutually agreed tariff.
The commercial arrangement between the
Project Developer and the Prosumer will
be submitted to the Distribution Licensee
for records and the Distribution Licensee
will not have any role in such commercial
arrangement.
All the provisions of Net Metering
framework shall be applicable for Solar
Project set up by a Solar Project Developer.
(C) Utility Driven Model
EDG /GEDA shall increase their
participation in the solar rooftop sector
through
facilitation
and/or
direct
investment. Through facilitation, EDG/
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
569
GEDA may aggregate demand and facilitate
procurement of the systems (Self-Owned
Model) or services (RESCO Model) to the
Government Buildings, Government/
Government aided/unaided High/Higher
secondary schools, colleges etc.
As a facilitator, EDG/GEDA may charge
a facilitation fee to enable solar rooftop
transaction. Through investing, EDG/GEDA
may aggregate demand and invest equity
in developing these projects (Self-Owned
Model) or providing services (RESCO
Model). EDG/GEDA can also play a key role
in financing these systems by tying up with
the financial institutions either as a lender
or as a collection agency.
12. Solar Power Plants under Renewable
Energy Certificate (REC) Mechanism.— The
State Government shall promote the
development of Solar Power Plants under the
REC mechanism specified by the JERC.
Under the REC mechanism the producer will
set up the solar plant and sell the power to
EDG at APPC as per current year Tariff Order
of JERC. The solar power generator will be
permitted to sell the REC as per the market
mechanism. The State shall not claim any
benefit for REC.
13. Decentralized Grid Connected Solar
Power Projects.— Decentralized Grid
Connected Solar Power Projects provide an
opportunity to meet power requirement close
to the load centres. Such generation will help
the utilities to reduce their T&D losses and
optimize the cost of transmission and
distribution system.
(i) The State will promote setting up of
decentralized solar power projects with a
minimum capacity of 100 KW and
maximum capacity of 1 MW in the
premises and vicinity of 33 kV Grid Sub-
Stations for sale of power to DISCOMs. The
sub-stations for which decentralized solar
power projects are to be established will
be selected by EDG. The tariff for these
projects will be determined on basis of
tariff-based competitive bidding process or
as per the guidelines of State Government/
Government of India.
(ii) State aims to increase participation
of farmers in solar energy sector to augment
their sources of income by production and
sale of solar energy to DISCOMs, in
following manner.
(iii) Farmers, on their own or through a
developer, can set up decentralised power
project on their un-cultivable agriculture
land as per clause 13)(i)
(iv) The State will promote solarization
of existing grid connected agriculture
pumps as per the provisions/guidelines
issued by DISCOMs based on Regulations
of JERC/Guidelines of Central/State
Government.
14. Off-grid Solar Applications.— (i) The
State will promote and incentivize off-grid
solar applications, including hybrid systems,
as per the guidelines issued by MNRE to meet
various electrical and thermal energy
requirements for domestic and commercial
use.
(ii) The State will also promote setting up
of standalone solar systems to provide
electricity to households in remote villages/
hamlets.
(iii) The State will promote installation of
Solar PV Pumps for pressure irrigation
systems.
15. Promotion of Setting up of Renewable
Energy based Electric Vehicle Charging
Stations.— Adoption of Electric Vehicles
(‘EVs’) for road transport contributes to a wide
range of goals. These include — better air
quality, reduced noise pollution, enhanced
energy security and in combination with a
low carbon power generation mix, reduced
greenhouse gas emissions. With vehicular
pollution being a consistent source of air
pollution in the State rapid adoption of zero
emission electric vehicles is of great
importance.
Under the National Electric Mobility
Mission Plan (NEMMP), Government of India
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
570
envisions six millions electric and Hybrid
vehicles on India’s roads by 2020. Towards
this
purpose
faster
adoption
and
manufacturing of Hybrid and Electric vehicles
(FAME) has been launched by Government
of India and its targets a saving of 120
millions barrels of oil and 4 millions tons of
CO2 and lowering of vehicular emissions by
1.3 % by 2020, by promoting use of EVs.
FAME India scheme has four focus areas–
Technology development, Demand creation,
Pilot projects and Charging Infrastructures.
The shift to clean and green transport has
become necessary due to increase in carbon
emission from fossil fuel which leads to global
warming and climate change. The rapid
increase in fossil fuel consumption due to
rising vehicular movement has led to increase
in pollution and an adverse impact on
Balance of Payment situation because of the
rising import bill. Based on the recent techno-
economic developments in EV sector and the
vision of Government of India, a need was
felt by Government of Goa for promotion of
this sector in Goa. Government of Goa
envisions to build Goa as a model State in
EV.
Further reduction of carbon footprint it is
essential that the EVs are charged from
renewable energy sources. In view of the
above, the State will promote the use of
renewable energy for charging of EVs in the
following manner:
(i) The Charging Infrastructure will be
developed as per the guidelines and
standards issued by Ministry of Power and
Central Electricity Authority.
(ii) The State Government shall identify
potential locations and provide land
belonging to Government, Government
agencies and PSUs on long lease-basis for
setting up of EV Fast Charging Stations.
(iii) The State Government shall promote
charging infrastructure of different
capacities (Levels 1, 2 and 3) and promote
variety of business models as a part of the
overall learning process. Private-owned,
Discom-owned
and
Investor-owned
charging stations are encouraged through
this Policy.
(iv) The State Government shall provide
a capital subsidy to the first 200 Fast
Charging Station commissioned in the State
to the tune of 25% of the charging
equipment up to a maximum of Rs. 10 Lakh
per station.
(v) The charging station service
providers may set up renewable energy
generation plants within their premises for
captive use, and may also draw renewable
power
through
open
access
from
generation plants located within the
State.
(vi) The aforesaid benefits would also be
available to the chain of EV charging
stations owned by a single service provider.
(vii) The State will support Research and
Development
activities
regarding
promotion and use of Renewable Energy
by EV charging stations and also for the
impact of EV charging infrastructure on the
grid.
16. Subsidy/Incentives.—
16.1 The feed in tariff for the settlement of
net
surplus
energy
credits
outstanding at the end of the
settlement period will be as per the
JERC approved solar tariff rates for
that year or APPC as per current
year Tariff Order of JERC whichever
is lower.
16.2 If the prosumer opts for battery bank
for storage and supply power during
peak hours i.e. 18.30 to 23.00 hrs then
a benefit of 50 paise in addition to
APPC Cost will be passed to the
Prosumer.
16.3 For all Prosumers, Tariff meter (Bi-
directional) and Solar generation
Meter will be installed by EDG and
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
571
rented to the Prosumers by payment
on monthly fees to EDG. All officials
of the EDG authorized for the purpose
shall be allowed to access and
inspect the same as and when
required.
16.4 The State Government shall provide
subsidy restricting to 50% (including
Central) for the prosumers of
Residential
and
Educational
Institutions (non profit making) upto
LT level i.e. having solar plants upto
90kW size, on the capital cost or the
benchmark cost provided by MNRE
or cost arrived through tendering
process by GEDA whichever is lower.
16.5 The State Government shall provide
subsidy restricting to 20% (including
Central) for the prosumers of
Commercial and Industrial establi-
shments upto LT level i.e. having
solar plants upto 90kW size, on the
capital cost or the benchmark cost
provided by MNRE or cost arrived
through tendering process by GEDA
whichever is lower.
16.6 The State subsidy shall be released
upon completion of 06 months of the
solar power injected into the grid.
16.7 The Prosumers shall be eligible to
avail the Subsidy provided the Solar
rooftop system is installed by GEDA
empanelled vendor only.
16.8 The State subsidy shall be applicable
for the prosumers upto the financial
year 2022 or till the target achieved
by the State of Goa whichever is
earlier.
16.9 The State Government shall provide
a subsidy as per guidelines provided
by MNRE for plants of size upto
100kW for the standalone systems
including the cost of battery (Off-grid
Systems). A Energy meter tested and
sealed by EDG is required to be
installed at the generation side to
measure the solar power generation.
No payment shall be made to such
producer under Net/Gross metering
to avoid possibility of Double
benefit.
17. Land for Solar Project.— Producer shall
be responsible for obtaining suitable Rooftop
or Private land for atleast 25 years for their
projects within the State of Goa.
17.1 To generate solar power, conversion
of land is not needed. However for
Rooftop solar units have to be fitted
on legally approved structures only.
17.2 2% of the total area can be used for
construction, operation and office set
up subject to a maximum of 200 Sq.
mtrs./per MW.
17.3 No Town & Country Planning (T&CP)
permission will be required for
setting up of solar farm including
construction for operational space as
mentioned at (17.2) above.
17.4 For the rooftop installation of 100kW
and above, the Producer will have
to obtain the stability certificate for
building structure from reputed
Chartered Engineers. Apart from
structural stability certification, no
other certification is required.
17.5 No Gram Panchayat/Urban Local
body/T&CP Department Construction
licence/NOC/Completion certificate
is required for setting up of Land/
Roof Top Solar Plant.
17.6 For setting up of solar plant on
Communidade land, the lease rent
agreed to between the solar power
producer and the Communidade will
have to be approved by General Body
of the Communidade and the State
Government.
17.7 Separate Policy will be formulated for
the allotment of Government land and
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
572
or buildings for setting up of solar
plants.
18. Grid Connectivity, Safety and Billing
Cycle.— As per JERC the State shall allow
cumulative capacity addition up to 75% of the
capacity of the Distribution Transformer in its
Net Metering Regulations. JERC in its
Regulations also specified that Distribution
Licensee may allow solar capacity connected
to a particular Distribution Transformer and
feeder connected to the same exceeding 75
percent of capacity upon consideration of
detailed load study.
The Billing cycle for all prosumers under
NET Metering will be monthly/bimonthly and
the settlement period as specified in the
regulations i.e. “Settlement Period means
Period beginning from the first day of April
as per English Calendar year and end with
thirty first day of March of the next year.
For all the grid connected and battery
backup stand-alone installations, all the
instrumentation, operating unit specifications
and safety norms will as per the guidelines
of JERC and MNRE but State specific. These
will be specified, reinforced and checked
periodically by EDG.
19. Administrative modalities.— Every
Prosumer in the State will have to enter in
PPA with the EDG for the period of 25 years
and the tariff will be determined as per JERC
tariff order and Regulation and are required
to submit account of the power generated
annually before year end.
The 10% of the savings/amount on the
generated electricity shall be transferred to
the empanelled agency installing rooftop solar
power plant as an AMC for atleast 10 years.
The disputes related to the power sale to
EDG will have to be settled through the
empowered committee constituted by the
State as notified.
The Prosumer/Producer or EDG shall have
the right to terminate the PPA at any time by
serving a written notice of 90 days in advance
to the EDG except cases where subsidy or
incentives are disbursed.
All the Solar/RE power projects will have
to be initiated through GEDA, the nodal
agency which will serve as single window
dealing with projects.
20. Roll of State-holders:—
Roll of State Nodal Agency, GEDA
20.1 Announcement of Scheme: The
Nodal Agency shall bring out a
comprehensive scheme to implement
the targets of Renewable Energy
(RE). The scheme should elaborate
the appropriate process for invitation
of bids/applications, incentives and
central financial assistance, if any,
targets, implementation mechanisms
etc.
20.2 Allotment of the Solar Power
Capacities:
The Nodal Agency shall, from time to
time, undertake the process for
allotment of solar power capacities
to the project developers. The Nodal
Agency in consultation with the
related stakeholders shall announce
the process for allotment of solar
power capacities.
20.3 Facilitation in Development of Solar
Power Plant:
The Nodal Agency shall, facilitate the
project developers in Setting up of
solar projects including sanctions/
clearances
from
Government
agencies/departments. The State
Government will provide requisite
clearances through a “Single Window
Clearance Mechanism”. It will be
operated through GEDA.
20.4 Identification of Government Land
and Facilitation of its allotment for
Solar Power Plant Development:
The Nodal Agency shall identify
government land and shall coordinate
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
573
with the Government departments,
prepare transparent procedure, take
necessary approvals and clearances
for the allotment of Government Land
to the project developers for the
development of power plant subject
to policy formulated by Government
as per para 17.7.
20.5 Support in availing the Subsidy:
The Nodal Agency shall facilitate the
prosumer/producer to avail the
subsidy, if any, available from Central
and/or State Government.
20.6 Capacity Building & Awareness:
The Nodal Agency shall organize
Capacity Building & Training Sessions
for participation by the segment
stakeholders. The Nodal Agency shall
also take necessary steps in creating
awareness among the citizens of the
State.
20.7 Coordination
with
MNRE
for
Technical Specification: The State
shall follow the technical specifi-
cations and standards as specified by
the MNRE, from time to time. The
Nodal Agency shall provide its inputs
to the MNRE for specifying new
standards or amending existing
technical specifications for different
component
of
solar
plant
photovoltaic.
Role of Department of Electricity (EDG),
Goa.—
The EDG shall extend their support and
guidance to the eligible entities desired to
install solar power plant and their
connectivity with their electricity system.
The EDG shall comply with the regulatory
framework specified by JERC and provisions
contained in this policy only if they are not
contradicting the JERC regulations.
Its role includes:—
20.8 To provide banking facility for solar
energy, incentives in the form of
exclusion from open access charges,
wheeling charges, T & D loss for solar
power.
20.9 To conduct feasibility study for
evacuation facility and connectivity
with the local grid.
20.10 The voltage of evacuation of
electricity generated, from the solar
power plant shall be governed by the
directions
of
the
JERC.
The
evacuation infrastructure for the solar
power plant wherever necessary
shall be developed and augmented,
by the EDG as per the JERC
regulations in force.
20.11 EDG will conduct supervision, safety
check and extend technical support
to
Developers
wherever
the
evacuation line is laid from site of
power production to the nearest grid
connectivity point as per the JERC
regulations in force.
21. Time frame for implementation of
project.—
For solar projects beyond 100kW capacity
proposed under Reverse Bidding, the time
schedule of completion will be from the date
of approval by the EDG is as follows:
Plant Capacity
Time Schedule
100kW - 1MW
240 Days
1MW – & above
1 Year
unless specifically provided for in the bid
document.
22. Empowered Committee.— To oversee,
monitor and resolve various issues arising out
of this policy and disputes settlements, an
Empowered committee will be constituted
under the Chairmanship of the Secretary, Non
Conventional Energy Sources (NCES) of the
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
574
state. The committee shall have following
members.
Secretary, NCES
: Chairman
Jt. Secretary (Finance) or
: Member
Rep. not below Under
Secretary
Chief Electrical Engineer,
: Member
EDG
Director, Science &
: Member
Technology or his Rep. not
below Dy. Director
Director (Accounts)
: Member
Member Secretary, GEDA
: Member
Secretary
The Chairman of the Committee is
empowered to co-opt subject matter experts
if required. The committee shall be
authorized to deliberate and decide on aspects
related to implementation of this policy on its
own motion or on the written representation
by the stakeholders. It can take help/
assistance of Technical experts as Consultants
on payment basis for the same. The
Government reserves the right to change any
of the provisions of this policy giving 30 days
public notice. However, the said changes will
not have any retrospective effect and will not
have any effect on the agreements already
entered in by Solar Prosumer/Producers with
EDG or any other State Government
Department/Organisation.
In case of any dispute with regard to this
policy wherein the policy is silent, then
provision of Solar Regulation of JERC-2019
as amended from time to time shall apply.
23. Power to remove difficulties.— In case
of any difficulty arising in implementing this
policy the Government [Min. (Power) with
approval of Chief Minister] may clarify subject
to condition that no such clarification will
impact already signed contracts.
24. Communication facilities.— All grid
connected Solar Power Projects shall have
Static Trivector Meters designated as Solar
Meter with features to record energy for 45
days at injection point into the grid. The Solar
Meter should comply with JERC Regulation-
2019. All projects with capacity of above
25KWp the meter shall have communication
port for exchanging real time information with
the distribution licensee. For plant size of 1
MWP and above the Producer shall establish
communication will be with SLDC also, in
addition to the distribution Licensee.
25. Power to amend and interpret the
policy.— Government of Goa will have power
to amend/review/relax/interpret any of the
provisions under this policy as and when
required.
This policy has been issued with the
concurrence of the Finance (Exp.) Department
vide their U.O. No. 3785 dated 19-06-2020.
By order and in the name of Governor of
Goa.
Aleixo F. da. Costa, Director & ex officio,
Joint Secretary (NCSE).
Panaji, 30th July, 2020.
———ttt———
Department of Rural Development
District Rural Development Agency
__
Notification
DRDA-N/MON./8-181/2020-21/604
In exercise of the powers conferred by section 4 of the Goa Aadhaar (Targeted Delivery
of Financial and Other Subsides, Benefits and Services) Act, 2017 (Goa Act 11 of 2017),
(hereafter referred to as the “said Act”), the Government of Goa hereby notifies the Schemes
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
575
enlisted in the following Schedules for which the authentication or proof is required as per
section 3 of the said Act.
SCHEDULE “A”
Sr. No.
Name of the Schemes
1.
Pradhan Mantri Awas Yojana - Gramin (PMAY-G)
2.
Goa State Rural Livelihood Mission (GSRLM) (DAY-NRLM)
3.
Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA)
4.
National Social Assistance Programme (NSAP)
a) Indira Gandhi National Old Age Pension Scheme (IGNOAPS)
b) Indira Gandhi National Disability Pension Scheme (IGNDPS)
c) Indira Gandhi National Widow Pension Scheme (IGNWPS)
d) National Family Benefit Scheme (NFBS)
5.
Goa Gramin Urja Yojana (GGUY)
SCHEDULE “B”
Sr. No.
Name of Subsidies
NIL
SCHEDULE “C”
Sr. No.
Name of the Benefits
1.
Pradhan Mantri Awas Yojana - Gramin (PMAY-G): Financial Assistance of Rs. 1.20 lakhs (in 3
installments) for construction of house.
2.
Goa State Rural Livelihood Mission (GSRLM) (DAY-NRLM): Financial Assistance of
Rs. 15,000/- as Revolving Fund to Self Help Groups and Rs. 24,300 /- as Start-up Fund to Village
Organization.
3.
Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA): 100 days of
guaranteed wage employment in a financial year to every household (Job Card Holder) @
Rs.280/-per day.
4.
National Social Assistance Programme (NSAP):
a) Indira Gandhi National Old Age Pension Scheme (IGNOAPS): Financial Assistance of
Rs. 200/- per month for Senior Citizen in the age category between 60 to 79 years and thereafter
Rs. 500/- per month.
b) Indira Gandhi National Disability Pension Scheme (IGNDPS): Financial Assistance of
Rs. 300/- per month for Disabled person in the age category between 18 to 79 years and
thereafter Rs. 500/- per month.
c) Indira Gandhi National Widow Pension Scheme (IGNWPS): Financial Assistance of
Rs. 300/- per month for Widow in the age category between 40 to 79 years and thereafter
Rs. 500 /- per month.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 19
6TH AUGUST, 2020
576
d) National Family Benefit Scheme (NFBS): Assistance of Rs. 20,000/- is provided to the family
on the death of its primary bread winner.
5.
Goa Gramin Urja Yojana (GGUY): LPG installation comprising of one gas stove with two burners
and two cylinders for a total cost of Rs. 6,087/- who do not possess gas connection.
SCHEDULE “D”
Sr. No.
Name of Services
NIL
This Notification shall come into force with immediate effect.
By order and in the name of Governor of Goa.
Sanjit Rodrigues, Project Director & ex officio Joint Secretary (RD).
Panaji, 27th July, 2020.
www.goaprintingpress.gov.in
Printed and Published by the Director, Printing & Stationery,
Government Printing Press,
Mahatma Gandhi Road, Panaji-Goa 403 001.
PRICE – Rs. 18.00
PRINTED AT THE GOVERNMENT PRINTING PRESS, PANAJI-GOA—141/120—8/2020.